Contents
Zones
BBP Tripping Scheme
BFP Tripping Scheme
ABB
REB500 Zones.
BZ1
BZ2
Q2
Q1
Q2
Q1
Q2
Q1
P1
P2
Q9
Q0
P2
P1
P1
Q0
Feeder
Q9
Q9
P2
Coupler
Feeder
ABB
Q1
Q2
Q1
Q2
Q1
P1
P2
Q9
Q0
P2
P1
P1
Q0
Q9
Q9
P2
Feeder
BBP algorithm is executed per zone & phase, in case a fault is detected all the
breakers associated with that zone should trip.
ABB
Q1
Q2
Q1
Q2
Q1
P1
P2
Q9
Q0
P2
P1
P1
Q0
Q9
Q9
P2
Feeder
BFP algorithm detects that a breaker did not operate, all the breakers connected to
the same zone as the faulty breaker should open.
ABB
Q1
Q2
Q1
Q2
Q1
P1
P2
Q9
Q0
P2
P1
P1
Q0
Q9
Q9
P2
Feeder
EFP detect a fault between an open breaker and a CT all the breakers connected
to the same zone as the CT , should trip, meaning in case the CT is bus-side the
breakers on the bus should trip
ABB
Q1
Q2
Q1
Q2
Q1
P1
P2
Q9
Q0
P2
P1
P1
Q0
Q9
Q9
P2
Feeder
EFP detect a fault between an open breaker and a CT all the breakers connected
to the same zone as the CT , should trip, meaning in case the CT is Line-Side the
breaker located on the Remote End is tripped.
ABB
Q1
Q2
Q1
Q2
Q1
P1
P2
Q9
Q0
P2
P1
Q9
ABB Switzerland Ltd. - 8
REB500 Intertripping Scheme / 2008-07-01 /SJ
Q0
Feeder
P1
Q9
P2
Coupler
Feeder
ABB
Q1
Q2
Q1
Q1
Q2
P1
P2
Q9
Q0
P2
P1
P1
Q91
Q0
Q92
Q0
Feeder
P2
P1
Q9
P2
Coupler
Feeder
ABB
Q1
Q2
Q1
Q2
Q1
P1
P2
Q9
Q0
P2
P1
P1
Q91
Q0
Q92
Q0
Feeder
P2
P1
Q9
P2
Coupler
Feeder
ABB