Professional Documents
Culture Documents
Generation Report - 05 07 2015 PDF
Generation Report - 05 07 2015 PDF
2447
6406
CEB Hydro
3947
17230
CEB Coal
IPP Thermal
SPP Wind
Note: Generation from other SPPs (Mini Hydro, Solar and Biomass) is not included
Cumulative Dispatch
01st July 02nd July
Category
Dispatch (MWh)
Category
Dispatch (GWh)
CEB Hydro
41,056
24.84%
CEB Hydro
2,403
37.72%
17,394
10.52%
371
5.82%
CEB Coal
76,630
46.37%
CEB Coal
2,744
43.07%
IPP Thermal
19,098
11.56%
IPP Thermal
422
6.63%
SPP Wind
11,085
6.71%
Renewable
430
6.76%
Total
165,263
Total
6,371
Note: Generation from Mini Hydro, Solar and Biomass power plants in May, June and July is not
included in annual cumulative renewable generation figure.
6000
5000
4000
Rated Capacity
Available
Dispatched
3000
2000
1000
250
200
Installed
Capacity
150
Available
Capacity
Night Peak Load
100
50
CEB Hydro
745
246.4
SPP Wind
210
180
150
120
38.5%
72.2%
71.2%
90
48.4%
60
30
30%
0
Castlereigh
Maussakelle
Kotmale
Victoria
Randenigala Samanalawewa
Note: Hydro Reservoir Storage Capacity as at 05th July 2015 628.3Wh (49.92%)
GWh
1200
1000
800
2012
2013
600
2014
2015
400
200
MW
2200
2000
1800
1600
1400
1200
Nigh Peak
1000
Day Peak
800
Minimum
Demand
600
400
200
Note: Contribution from Mini Hydro, Solar and Biomass is not included
2-Jul
25-Jun
18-Jun
11-Jun
4-Jun
28-May
21-May
14-May
7-May
30-Apr
23-Apr
16-Apr
9-Apr
2-Apr
26-Mar
19-Mar
12-Mar
5-Mar
26-Feb
19-Feb
12-Feb
5-Feb
29-Jan
22-Jan
15-Jan
8-Jan
1-Jan
MW
1800
1500
CEB Hydro
1200
IPP Thermal
CEB Thermal Oil
CEB Coal
900
600
300
Time of Day
Note: Contribution from Wind, Mini Hydro, Solar and Biomass is not included
8
7000
GWh
6000
5000
SPP Wind
IPP
4000
CEB Coal
CEB Oil
3000
CEB Hydro
2000
1000
2014
2015
Year
GWh
12000
11000
10000
9000
8000
7000
2014
6000
2015
5000
4000
3000
2000
1000
0
Note: Generation from SPP Mini Hydro, Solar and Biomass is not included
10
Capacity (MW)
Primary Fuel
CEB Hydro
Victoria
Ukuwela
Kotmale
Randenigala
Rantambe
Bowatenna
Nilambe
Upper Kotmale
Old Laxapana
New Laxapana
Polpitiya
Wimalasurendra
Canyon
Samanalawewa
Kukuleganga
Inginiyagala
Udawalawe
210
40
201
122
49
40
3.2
150
50
115
75
50
60
120
75
10
6
CEB Thermal
Sapugaskanda 1
Sapugaskanda 2
Kelanitissa Small Gas Turbines
GT 7 - Kelanitissa
Kelanitissa CCY
Lakvijaya (Puttalam Coal)
Lakvijaya (Puttalam Coal) Stage II
Lakvijaya (Puttalam Coal) Stage III
New Chunnakam
72
72
85
115
165
285
285
285
24
51
163
270
27
11
Heavy Fuel
Heavy Fuel
Auto Diesel
Auto Diesel
Naptha & Diesel
Coal
Coal
Coal
Heavy Fuel
Heavy Fuel
Auto Diesel
Low Sulphur Furnace oil
Auto Diesel