Professional Documents
Culture Documents
METHODOLOGY
ACCESS CONTROL
Document No
W-QAG-SC01
Effectivit
Iss
y Date
ue
02-Jan13
SMOKE DETECTOR
Rev
Pag
Total
No
Page
No
Document No
W-QAG-SC01
Effectivit
Iss
y Date
ue
ACCESS CONTROL
02-Jan13
Rev
Pag
Total
No
Page
No
Create a disclaimer relative to the acceptance of the facility clearly identifying the
items that are not acceptable or does not have proper result documentation
forwarded by the party turning over the site. Disclaimer: All items not listed will
not be accepted without proper documents and test results and shall not be held
liable. This is the minimum requirement and in the event that the building
guidelines is strictly enforced this shall be govern.
Make a standard turnover acceptance document/form for all trades, that will
include the following:
Kick-off and turn-over of documents (Internal)
External Kick-off meeting
Mobilization
Safety Orientation
Inspection of deliveries in accordance to specifications (done each time there
are deliveries from sub-con)
General Implementation of works
Site Survey
ACCESS CONTROL
Document No
W-QAG-SC01
Effectivit
Iss
y Date
ue
02-Jan13
Rev
Pag
Total
No
Page
No
ACCESS CONTROL
Document No
W-QAG-SC01
Effectivit
Iss
y Date
ue
02-Jan13
Rev
Pag
Total
No
Page
No
Functionality Test
Interfacing
ACCESS CONTROL
Document No
W-QAG-SC01
Effectivit
Iss
y Date
ue
02-Jan13
Rev
Pag
Total
No
Page
No