SPM40 & SPM50 PROCESS FLOW


Part No. :SPM40 & SPM50
Drw:
N/A

RM Receipt Area

LINEAR
BEARING
OPERATION:

Date: 02/27/2015
PAG

Fabrication Process

Inspection

Final Assy

inspection plate

The finished plates


11952C go to Final
assy to build the
SPM40 or SPM50.

N/A

1 OF 1

QA Area

Shipping Area

Start

11537C - Raw Material


is received.
Cut raw material to
build plate.

Shearing and Coining


plate

Tumbling, Washing &


Drying

Heat Treat

Tumbling, Washing &


Drying

Race
Grinding
Noise Test.
Graduation Process

Ramp Grinding
process.

Stamped bearing
(Model & date code).

The SPM40 & SPM50


bearings pass to
shippig area were
them will be
delivered.
Finish

VISUAL AID
SPM40 & SPM50 PROCESS FLOW
Part No. :SPM40 & SPM50
Drw:
N/A

RM Receipt Area

LINEAR
BEARING
OPERATION:

Date: 06/03/2015

Fabrication Process

Start

Molding Area

Metalic Balls
Area

PAG

1 OF 2

Final Assy

QA Area

N/A
Shipping
Area

The finished materials


go to Final assy to
build the SPM40 or
SPM50.

Raw Material is
received.
Cut raw material to
build plate.

Assembly
bearings SPM40
or SPM50
WITHOUT Wiper.

Shearing and Coining


plate

Develop the
following
inspection:
1- OD Ring Gage.
2- ID Plug Gage
Go/
No Go.
3- Rotation & lack
of
balls.
4- Coast Test.

Tumbling, Washing &


Drying

Heat Treat

100% Noise
inspection

Test SPM40 and


SPM50 with NO
wiper installed.

100% Noise
Test

Tumbling, Washing &


Drying

Weight test
100%

Race
Grinding

Engraving/Marki
ng Bearing

Ramping process.

The SPM40 &


SPM50 bearings
pass to shippig
area for delivery.

Apply grease
inside bearing.

Washing & Drying

Install WIPER
into bearing.

Graduation Process

Apply grease
outside bearing
(see work inst).

Plate inspection

Metalic Balls
Area

Finish

RM Receipt Area
Raw Material is
received. (TEP 205
Resin)

Fabrication Process

Molding Area

Metalic Balls
Area

Final Assy

QA Area

Molding process

Annealing in oven

Check all parts in


OD Ring

Assemble plastic
sleeve and retainer
manually

QA Approval

100% Visual
Inspection
Raw Material is
received. (TEP 631
Resin)

Molding process

Remove plastic
excess

QA Approval

100% Inspection
QA Approval

Raw Material is
received. (TEP 631
Resin)

Lapping process

Shipping
Area