This document is a study case on the completion strategy for the horizontal well BRG-21 HZ located at the Beringin structure. It was prepared by a group of 7 students from the Petroleum Engineering study program at the University Pembangunan Nasional "Veteran" Yogyakarta for their Technical Drilling Engineering course in 2016.
This document is a study case on the completion strategy for the horizontal well BRG-21 HZ located at the Beringin structure. It was prepared by a group of 7 students from the Petroleum Engineering study program at the University Pembangunan Nasional "Veteran" Yogyakarta for their Technical Drilling Engineering course in 2016.
This document is a study case on the completion strategy for the horizontal well BRG-21 HZ located at the Beringin structure. It was prepared by a group of 7 students from the Petroleum Engineering study program at the University Pembangunan Nasional "Veteran" Yogyakarta for their Technical Drilling Engineering course in 2016.