Professional Documents
Culture Documents
8
(kPa)
20
40
80
160
320
640
1280
320
80
20
0
e
0.864
0.853
0.843
0.83
0.785
0.696
0.602
0.628
0.663
0.704
0.801
a. plot the pressure versus void ratio on both arithmatic and semilogaritmic graph
Arithmatic graph
1
0.95
0.9
undisturbed clay
0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5
200
400
600
800
1000
1200
1400
pressure (kPa)
Logaritmic graph
1
0.95
0.9
0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5
1
10
100
pressure (kPa)
1000
10000
b. determine the equations for the virgin compression curve and for the
rebound curve for unloading starting at 1280 Kpa
Logaritmic graph
1
0.95
0.9
0.864
eo
0.85
0.8
0.75
Cc
0.7
0.65
Cr
0.6
0.55
0.5
1
10
100
1000
10000
pressure (kPa)
_=/(log( _2/_1))
_=/(log( _2/_1))
_=(0.7250.59)/
_=(0.7950.56)/
(log( 1000/10)) =
(log( 2000/300)) =
0.0675
0.285
c. what are the corresponding modified compression and recompression indices for this
assume eo = 0.864 (based on logarithmic graph number 8.8b)
_=_/(1+ _ )
_=_/(1+ _ )
_=0.0675/
(1+0.864) = 0.036
_=0.285/
(1+0.864) = 0.152
d. estimate the stress to which this clay has been preconsolidated (after A. Casagrande
Logaritmic graph
1
0.95
0.9
0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5
1
10
100
pressure (kPa)
1000
10000
0.7
0.65
0.6
0.55
0.5
1
10
100
pressure (kPa)
1000
10000
emilogaritmic graph
urbed clay
1200
1400
10000
nd for the
10000
10000
10000
Solution :
equation of compression indices
_=/(log( _2/_1))
No Test
e
8
9
10
11
13
evaluation :
terdapat perbedaan lebih kecil hasil
pengujian dilaboratorium.
Disebabkan pengaruh pengujian
laboratorium benda uji sedikit
terganggu. Kerusakan benda uji
menghasilkan pengurangan
kemiringan dari garis pemampatan
Cc hasil lapangan. Sehingga Cc
lapangan sedikit lebih besar.
ression indices
Cc
Problem 8.2
verify the values of the preconsolidation stress shown in figure 8.9a
Solution :
determine value preconsolidation stress using Casagrande Method
'p (kPa)
No Test
8
9
10
11
13
Problem 8.3
determine the overconsolidation ratio (OCR) for the five-grained soils of fig. 8.9a
Solution : equation of =
value
OCR
is _/ _
No Test
8
9
10
11
13
'vo (kPa)
'p (kPa)
Problem 8.4
Verify the values 'p and Cc are correct in figure below (8.9b)
OCR
(8.6) Estimate the preconsolidation stress 'p for figure below and (8.7) determine compression ind
a. undisturb Leda Clay