Standard Material
Standard Material
(A)
SR.
NO.
1
2
3
ITEMS IN PLINTH
Excavation in black
cotton soil
Compacted murum filling
Rubble soiling 23 cm (9) thick
(B)
SR.
NO.
CONCRETE ITEMS
P.C.C. (1 : 4 : 8)
P.C.C. (1 : 3 : 6)
R.C.C. (1 : 2 : 4)
R.C.C. (1 : 1 : 3)
(C)
SR. CONCRETE BLOCKS
NO.
1
2
UNIT PER
UNIT
PER
100 cft
1 cum
100 cft
1 cum
100 cft
1 cum
100 cft
1 cum
UNIT
PER
100 cft
1 cum
100 cft
1 cum
100 sft
1 sqm
CEMENT
9 bags
3.18 bags
12 bags
4.24 bags
17 bags
6.00 bags
22 bags
7.77 bags
CEMENT
LOOSE
SOIL
150 cft
1.5 cum
LOOSE
MURUM
RUBBLE
150 cft
1.50 cum
90 cft
0.26 cum
SAND
60 cft
0.60 cum
60 cft
0.60 cum
60 cft
0.60 cum
60 cft
0.60 cum
SAND
35 Nos.
35 Nos.
11 bags
1 bags
3.75 cft
0.11 cum
50 Nos.
50 Nos.
1 bags
1 bags
3.75 cft
0.11 cum
METAL
25
mm
(1)
65 cft
0.65 cum
65 cft
0.65 cum
METAL
20
mm
(
)
20 cft
0.20 cum
20 cft
0.20 cum
65 cft
0.65 cum
65 cft
0.65 cum
SHINGLE METAL
12
mm
()
2.50 cft
7.00 cft
0.07 cum 0.20 cum
2.50 cft
0.07 cum
7.00 cft
0.20 cum
METAL
12
mm
()
20 cft
0.20 cum
20 cft
0.20 cum
STONE
GRIT
STONE
DUST
5.50 cft
0.16 cum
2.50 cft
0.07 cum
5.50 cft
0.16 cum
2.50 cft
0.07 cum
(D)
SR.
NO.
MASONRY ITEMS
(excluding R.C.C.
band
UNIT
PER
U.C.R. masonry
in C.M. 1:6
23 cm (9) B.B.M.
in C.M. 1:6
15 cm (6) B.B.M.
in C.M. 1:6
10 cm (4) B.B.M.
in C.M. 1:4
100 cft
1 cum
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
4.50 bags
1.60 bags
2.50 bags
0.27 bags
1.50 bags
0.16 bags
1.00 bags
0.11 bags
1.00 bags
0.11 bags
40 cft
125 cft
0.40 cum 1.25 cum
20 cft
0.06 cum
15 cft
0.05 cum
8 cft
0.25 cum
11 cft
0.03 cum
100 sft
1 sqm
1.00 bags
0.11 bags
8 cft
0.25 cum
15 cm (6) concrete
block masonry
in C.M. 1:6
10 cm (4) concrete
block masonry
in C.M. 1:4
CEMENT
SAND
RUBBLE
BRICKS
23X
10X
7 cm
BRICKS
23X
15X
9 cm
BRICKS
23X
10X
7 cm
1000 Nos.
110 Nos.
400 Nos.
45 Nos.
475 Nos.
50 Nos.
145 Nos.
16 Nos.
145 Nos.
16 Nos.
(E)
SR.
NO.
PLASTERING ITEMS
c) In C.M. 1 : 6
Sanla faced plaster
Single coat 15 to 20 mm thick
a) In C.M. 1 : 4
b) In C.M. 1 : 5
c) In C.M. 1 : 6
Sanla faced plaster
Double coat 15 to 20 mm thick
a) In C.M. 1 : 4
BRICKS
23X
10X
7 cm
UNIT PER
CEMENT
SAND
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
1.50 bags
0.16 bag
1.20 bags
0.13 bag
1.00 bags
0.11 bag
2.4 bags
0.26 bag
1.90 bags
0.21 bag
1.60 bags
0.17 bag
2.25 bags
0.24 bag
11.0 cft
0.03 cum
11.0 cft
0.03 cum
11.0 cft
0.03 cum
18 cft
0.06 cum
18 cft
0.06 cum
18 cft
0.06 cum
17.0 cft
0.05 cum
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
1.8 bags
0.19 bag
1.5 bags
0.16 bag
3.75 bags
0.41 bag
17.0 cft
0.05 cum
17.0 cft
0.05 cum
28.0 cft
0.09 cum
SANLA
(30 Kg bag)
0.60 bag
0.07 bag
0.60 bag
0.07 bag
0.60 bag
0.07 bag
0.60 bag
0.07 bag
0.60 bag
0.07 bag
0.60 bag
0.07 bag
100 sft
1 sqm
100 sft
1 sqm
b) In C.M. 1 : 5
c) In C.M. 1 : 6
3.0 bags
0.32 bag
2.5 bags
0.27 bag
28.0 cft
0.09 cum
28.0 cft
0.09 cum
(F)
SR.
NO.
UNIT
PER
CEMENT
SAND
LIME
(30 kg/bag)
TILES
WHITE
CEM
ENT
100 cft
1.0 bags
16 cft
2.0 bags
150 Nos.
5 kg
1 cum
1.11 bags
0.05 cum
0.2 bags
16 Nos.
0.55 kg
100 sft
2.0 bags
2 cft
125 Nos.
2 kg
1 sqm
0.65 bags
0.01 cum
14 Nos.
0.65 kg
100 sft
2.0 bags
16 cft
43 Nos.
2 kg
1 sqm
0.22 bags
0.05 cum
5 Nos.
0.221 kg
100 sft
0.75 bags
18 cft
2.0 bags
40 Nos.
1 sqm
0.08 bags
0.06 cum
0.2 bags
4 Nos.
100 sft
1.25 bags
16 cft
2.0 bags
150 Nos.
1 sqm
0.13 bags
0.05 cum
0.2 bags
16 Nos.
100 sft
2.50 bags
16 cft
2.0 bags
required
tukda
1 sqm
0.27 bags
0.05 cum
0.2 bags
required
tukda
100 sft
3.5 bags
16 cft
1 sqm
0.38 bags
0.05 cum
100 sft
3.5 bags
420 Nos.
2 kg
1 sqm
0.38 bags
45 Nos.
0.22 kg
4
5
7
8
I.P.S. flooring
Glazed tile dado
(15 cm x 15 cm)
(G)
SR.
NO.
1
2
3
WATER PROOFING
UNIT
PER
CEMENT
SAND
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
6.0 bags
0.65 bags
4.0 bags
0.43 bags
5.0 bags
0.50 bags
30 cft
0.09 cum
30 cft
0.09 cum
45 cft
0.14 cum
BRICKBAT
30 cft
0.09 cum
30 cft
0.09 cum
30 cft
0.09 cum
LIME
(30 kg/bag)
KAVADI
(in
kg)
1.20 bags
0.13 bag
125 kg
13.5 kg
WHITE
CEM
ENT
25 kg
2.07 kg
MATERIAL REQUIRED
Plywood 12 m thick of
Size 2.44 x 1.22 m
(8-0 x 4-0)
Silver oak battern of
Size 75 mm x 40 mm
(3 x 1 )
3
4
UNIT
2500 sft
0.02
APPROXIMATE
QUANTITY OF
MATERIAL
REQUIRED
50 Nos. Sheets
232 sqm
0.22
50 Nos. Sheets
2500 sft
50 sheets of plywood
x 65
50 sheets of plywood
x 19.82
2500 sft x 0.24
3250 rft
183 rm
300 Nos.
2500 sft
600 rft
beam bottom x 0.5
183 rft
beam bottom x 1.65
2500 sft x 0.16
232 sqm
400 Nos.
2500 sft
2500 x 0.4
1000 rft
232 sqm
232 x 1.31
305 rm
2500 sft
2500 x 0.16
400 Nos.
232 sqm
232 x 1.72
400 Nos.
2500 sft
2500 x 0.020
50 kg
232 sqm
232 x 0.22
50 kg
2500 sft
2500 x 0.006
15 litres
232 sqm
232 x 0.065
15 litres
2500 sft
232 sqm
2500 x 0.08
200 Nos.
232 x 0.86
200 Nos.
232 sqm
2500 sft
232 sqm
2500 sft
232 sqm
b) For slab
5
6
7
8
9
MULTIPLYING
CONSTANT BY
THUMB RULE
990 rm
600 rft
300 Nos.
400 Nos.
ITEMS
Footing
CONSUMPTION OF STEEL
on built-up area
0.55 kg/sqm
0.05kg/sft
02
Columns up to plinth
2.15 kg/sqm
0.20kg/sft
03
Tie beam
1.15 kg/sqm
0.10kg/sft
04
4.80 kg/sqm
0.45kg/sft
05
Slab
7.0 kg/sqm
0.65kg/sft
06
Beam
7.5 kg/sqm
0.70kg/sft
07
Chajja/loft/lintel
0.55 kg/sqm
0.05kg/sft
08
0.55 kg/sqm
0.05kg/sft
TOTAL
24.25 kg/sqm
2.25kg/sft
ITEM
APPROX. QTY.
PER
SQ. FT.
1.00 cft
SR.
NO.
ITEM
APPROX. QTY.
PER
01
Excavation
SQ. M.
0.31 cum
02
0.046 cum
0.15 cft
a) MM tile
0.75 sqm
0.75 sft
03
0.290 cum
0.95 cft
b) skirting
0.82 rm
0.25 rft
04
Internal Masonry
0.7 sqm
0.7 sft
c) W.C. / Bath
0.05 sqm
0.05 sft
05
External Masonry
0.9 sqm
0.9 sft
d) Dado
0.20 sqm
0.20 sft
06
Internal Plaster/Paint
3.2 sqm
3.2 sft
10
Waterproofing
0.30 sqm
0.30 sft
07
External Plaster/Paint
2.5 sqm
2.5 sft
11
Door Frames
0.17 sqm
0.17 sft
08
Oil Paint
0.62 sqm
0.62 sft
12
Windows
0.14 sqm
0.14 sft
09
SQ. M.
SQ. FT.
Flooring