TRANSFORMER TRAINING
www.lipower.org
Outside
Metal Encased, Tank, Fins, Cabinet
Sits on a Three Piece Vault
Fragile Enclosure, Not for Storage
Inside Contains
Oil Tank, Windings, Terminals
Primary and Secondary Compartments
Grounding Loop
Cables and Terminations
Primary Connections
(radial, or loop)
Incoming - H1C, H1A,
H1B
Outgoing - H2B, H2A,
H2C
No Load Tap Changer
A Through E (2.5%
increments, middle
is zero boost)
Bayonet Fuses, Protect
Primary Side of
Transformer
Lightning Arrestor
Elbows (radials, and
open points)
Static Drain Wires
(#14, and #10 Cu.)
Grounding Loop
#2BTN, One HLC
Primary Bushings
Standoff Bushing
Slots (open point)
Secondary
Compartment
Pressure
Relief Valve
Do Not Pull
Oil Fill Level
Oil
Temperature
Gauge
Oil Level
Gauge
Nameplate
Identifies Primary and
Secondary Voltage
Indicates Voltage on
Different Tap Settings
Shows Internal Coil
Configuration
Indicates Transformer
Weight
Indicates Transformer
Impedance
Secondary Cable
Transformer is Delivered,
Owned, and Maintained by LIPA
for Secondary Metered Service
Cables
480v (must be installed in conduit)
USE-2, XHHW-2, or RHW-2
8 Sets Max
208v
USE-2, THW-2, THWN-2, XHHW-2, or RHW-2*
*With neoprene or hypalon jacket only
Miscellaneous
Provide Advance Notification of Projects
Access to an Energized Vault is Forbidden
Industrial Code Rules 753, and 57
These Requirements Conform to the NEC
Contractor to Comply With:
Applicable Codes
Three Phase Transformer Spec. Package
Redbook
Lists Distribution Design Representatives
www.lipower.org