You are on page 1of 1

FORM NO.

E-021

TOYO ENGINEERING INDIA LTD.


FIELD INSPECTION REPORT
FIR NO :

JOB NO : 6261

DATE :

DESCRIPTION

CLIENT

PMC

SUBCONTRACTOR

Inspector
Signature
Date

INSPECTION
TYPE
Test Date :

CHECKLIST FOR LT. PANELS.


(PCC, PMCC, MCC, PDB and MLDB)
Weather :

Temp :

TAG NO.
Sr

Points To Ensure

Confirmation

Check for any physical breakage / damage

Yes / No

Cubicals bolted in position.

Yes / No

Position of busbars and spacing checked and found within acceptable limit.

Yes / No

All the insulators are in good condition.

Yes / No

Inter-changing of all size of Motor, Power and ACB Feeders checked.

Yes / No

Operation of shutter mechanism checked and satisfied.

Yes / No

Panel wiring checked and found as per scheme.

Yes / No

Motor Feeders.

Motor feeder interlock with Control Room Panels

Incomer interlocks scheme.

All meters tested and CT / PT. Ratio checked as per the ITP. And CTs have been
put in service.

Yes / No

All protection relays tested and tripping through relays checked..

Yes / No

BUSBAR IR checked.

Yes / No

10

Auxiliary power supply made available.

Yes / No

DC Supply for protection & interlocks.

Auxiliary supply for Space Heaters.

Control Power supply.

11

Check all the Main & Control fuses of recommended ratings

Yes / No

12

Check Feeder

Yes / No