Holding Cost %
Holding Cost $
Days/year
Avg Daily Demand
StdDev Daily Demand
Annual Demand
Service Level
Z Value
Casting Cost
Machining Cost
Prodn Rate/day
Setup/Ordering Cost
Avg Setup time
StdDev Setup time
ERS/EOQ
Run Time
Inventory Max
Safety Stock
11,162.93 $
6,433.01 $
6,854.51
$14,035.50
$7,304.19
$12,553.16
$297,106.28
$285,679.12
$347,783.28
$ 322,304.72 $ 299,416.32 $ 367,190.94
Ans 1)The New process of using the new equipment would result in the lowest total annua
Ans2) The three critical failings of the analysis which prevent from making a clear recomm
i. The Cost of new equipement, training of people to operate the new
ii. The depreciation of new equipment as being considered in case of t
iii. The machining cost, setup cost, setup time and production rate of t
Vendor Discount
27%
$6.28
250
198.7333
34.844
49683.325
99.70%
2.7477813854
$16.35
$6.91
$
300.00
4.284
1.615
5000
5000
903.9026088974
2,981.00
$21,379.49
$343,435.98
367,796.47
result in the lowest total annual cost for machining and inventorying 795GTX water pump housings
nt from making a clear recommendation as to which of the four options is best for the firm are:
g of people to operate the new equipment and ongoing maintanance have not been accounted in th
as being considered in case of the current equipment has not been considered in the analysis
p time and production rate of the new equipment has not been validated or tested.