Professional Documents
Culture Documents
CENTERCOST
ACCOUNTING
PRODUCT
CONTROLLING
END USER TRAINING DOCUMENTS
KKS1 - Variance Calculation Production Order - Collective
Functionality
This transaction code is used to calculate variance on production order collectively.
The system compares the control costs (actual costs) with the target costs and assigns the
variances to variance categories. The variances are assigned to variance categories in the
following sequence:
Input price variance
Resource-usage variance
Input quantity variance
Remaining input variance
Mixed-price variance
Output price variance
Lot size variance
Remaining variance
Variances are 0 if only partial Goods Receipts has been performed.
Variances are posted if only complete Goods Receipts has been performed.
Scenario
We want to calculate variances on all the production order in all the plant.
Requirements
WIP has been calculated at the previous step.
1.
Menu Path
Transaction Code
KKS1
SAPTOPJOBS
Page 1 of 7
COST
CENTERCOST
ACCOUNTING
PRODUCT
CONTROLLING
END USER TRAINING DOCUMENTS
Variance Calculation: Initial Screen
c
2.
Field Description
Values
Plant
1001
Period
11
Fiscal year
2002
3.
4.
SAPTOPJOBS
checkbox to select
button.
Page 2 of 7
COST
CENTERCOST
ACCOUNTING
PRODUCT
CONTROLLING
END USER TRAINING DOCUMENTS
Variance Calculation: List
5.
SAPTOPJOBS
Page 3 of 7
COST
CENTERCOST
ACCOUNTING
PRODUCT
CONTROLLING
END USER TRAINING DOCUMENTS
Variance Calculation: List
6.
SAPTOPJOBS
button.
Page 4 of 7
COST
CENTERCOST
ACCOUNTING
PRODUCT
CONTROLLING
END USER TRAINING DOCUMENTS
Variance Calculation: List
7.
SAPTOPJOBS
button.
Page 5 of 7
COST
CENTERCOST
ACCOUNTING
PRODUCT
CONTROLLING
END USER TRAINING DOCUMENTS
Variance Calculation: Basic List
8.
SAPTOPJOBS
button.
Page 6 of 7
COST
CENTERCOST
ACCOUNTING
PRODUCT
CONTROLLING
END USER TRAINING DOCUMENTS
9.
10.
If you are satisfied with the results, repeat the same process in Production mode by
deselecting the Test run
checkbox.
SAPTOPJOBS
button.
Page 7 of 7