Minutes of Meeting

HAMBURG CONSULT, BOMBARDIER & INKA


KRLPT INKA, Madiun
05 June 2012

TS 8
Revision : B

No

Audited Item

Remark

Action by PT. INKA / Result

Status

Department

PIC

Close
Open Item List

This OIL covers only open items specific for TS8.


PT INKA will prepare a TRAIN OIL that is valid for
all 10 train sets and forms an amendment of this
OIL

0
0.1 Interior
Roof TC2
0.2
1
2
3
4
5
6
7
8
9
10
11
12

Interior TC1 driver's cab


Interior TC1 driver's cab
Interior TC1 driver's cab
Interior TC1 driver's cab
Interior TC1 driver's cab
Interior TC1 driver's cab
Interior TC1 driver's cab
Interior TC1 driver's cab
Interior TC1 driver's cab
Interior TC1 driver's cab
Interior TC1 driver's cab
Interior TC1 driver's cab
Interior Passenger Compartment

this train is reported finished for month now


good example for gangway: cables correctly fixed
and minimum sealing used at brackets
same TC2
same TC2
same TC2
same TC2
same TC2

fix mic
install headlamp
close cover
fix MFD
finish painting

(12/09/2012)
(13/07/2012)
(13/07/2012)
(13/07/2012)
(12/09/2012)

FINISHING
FINISHING
FINISHING
FINISHING
FINISHING

1
2
3
4
5

same TC2

repair painting

(12/09/2012)

FINISHING

same TC2

repair corrosion and


finish painting
repair painting

(12/09/2012)

FINISHING

(12/09/2012)

FINISHING

repair painting

(12/09/2012)

FINISHING

repair according WI

(12/09/2012)

FINISHING

10

repair painting

(13/07/2012)

FINISHING

11

repair painting

(12/09/2012)

FINISHING

12

finish exchange of
windows with incorrect
lamination

(12/09/2012)

FINISHING

13

painting ceiling of drivers cab


unfinished
both driver's seat cannot turn

finish painting

(13/07/2012)

FINISHING

14

repair

(13/07/2012)

FINISHING

right driver's seat cannot keep


height
lamp cover not fixed (noise)
air con outlets not closed

repair

(12/09/2012)

FINISHING

repair
close AC outlets and
make sure all cables are
connected

(12/09/2012)
(12/09/2012)

FINISHING
FINISHING

17
18

repair

(12/09/2012)

FINISHING

19

microphone not fixed


cabin head lamp not installed
cover not closed
multi function display not fixed
right bottom cupboard unfinished
paint
right cupboard door below driver's
desk has damaged painting
cupboard behind drivers seat has
unfinished paint and corrosion
upper fixing point of right driver's
door has damaged painting
left cupboard door has damaged
painting
lock of left cupboard door corroded
painting damaged on top of left
drivers door
left bottom cupboard has damaged
painting
windows have incorrect lamination

same TC2

same TC2

13
14
15
16

Interior TC1 driver's cab


Interior TC1 driver's cab
Interior TC1 driver's cab

17 Interior Passenger Compartment


Interior Passenger Compartment
18
19

Interior Passenger Compartment

prepared by: Dieter Kroeger


22.11.2012

painting of many panel doors is


damaged

check all including sharp edges

335445960.xls

01-1, 01-2
02-1, 02-2

Page 1 of 5

Interior Passenger Compartment


20
21 Interior Passenger Compartment
Interior Passenger Compartment
22
23
24
25
26
27
28
29
30
31

42
43

check complete train


check complete train

(12/09/2012)

FINISHING

add cover
paint

(13/07/2012)
(12/09/2012)

FINISHING
FINISHING

21
22

several door have damaged painting

repair painting

(12/09/2012)

FINISHING

23

Interior Passenger Compartment

several openable windows cannot


close
spiders are invading passenger
compartment
box for not used emergency door
vale cannot be closed
several fitting for seats are damaged check complete train

repair

(13/07/2012)

FINISHING

24

remove spider

(13/07/2012)

FINISHING

25

drill holes and close box

(13/07/2012)

FINISHING

26

repair

(12/09/2012)

FINISHING

27

several fittings for handrail have


sharp edges
painting of door cover door 4
damaged

check complete train

repair

(12/09/2012)

FINISHING

repair

(12/09/2012)

FINISHING

29

several wire of emergency door


release are too long
lamp covers have different level

could influence function

cut wire

(12/09/2012)

FINISHING

30

adjust to same level

(13/09/2012)

FINISHING

31

MFD not installed


headlamp not installed
cover not closed
right and left bottom cupboard have
damaged holes for screws
knob of note pad not fixed

install MFD
install headlamp
close cover
repair holes
(professional)
fix

(13/07/2012)
(12/09/2012)
(13/07/2012)
(12/09/2012)

FINISHING
FINISHING
FINISHING
FINISHING

32
33
34
35

clean complete train


finish painting

FINISHING
FINISHING
FINISHING
FINISHING

36
36

interior of train dirty


painting of cow catcher not finished

(13/07/2012)
(12/09/2012)
(22/11/2012)
(13/09/2012)

marking of screws cow catcher


missing
marking of screws for coupler
missing
overlong screws from drivers seat

add marks

(13/09/2012)

FINISHING

40

add marks

(13/09/2012)

FINISHING

41

cut until 3-5mm

(13/09/2012)

FINISHING

42

repair painting and grind


cut out parts
report from engineering
if this has no static
impact. Are drawings
modified?

(13/09/2012)

FINISHING

43

Underframe TC1 - right - I

unprofessional work after installation


of drainage tube
the existing beam was cut

ENGINEERING

43

Underframe TC1 - right - I

some holes are sealed, others not

45-3 MUST be sealed (corrosion) - drawing ?

report by engineering if
sealing is necessary or
not. Is it in design
drawing or not.
Maintenance manual PT
KAI

(22/11/2012)

ENGINEERING

45-1, 45-2,
45-3

cable connection broken


metal at coupler bent

check complete train

repair
repair

(13/09/2012)
(13/09/2012)

FINISHING
FINISHING

46
47

Interior Passenger Compartment


Interior Passenger Compartment
Interior Passenger Compartment
Interior Passenger Compartment
Interior Passenger Compartment - MC2
Interior Passenger Compartment
Interior Passenger Compartment - MC2

36 Interior TC2 driver's cab


37 Interior TC2 driver's cab
38 Interior
Underframe TC1 - right - I
39

41

cover of LCD screen missing


screws of baggage rack unpainted

repair

Interior Passenger Compartment

32 Interior TC2 driver's cab


33 Interior TC2 driver's cab
34 Interior TC2 driver's cab
Interior TC2 driver's cab
35

40

several gangway doors make noise


and are difficult to open/close

Underframe TC1 - right - I


Underframe TC1 - right - I
Underframe TC1 - right - I
Underframe TC1 - right - I

44

45

46 Underframe MC2 - right - III


47 Underframe MC2 - right - IV
prepared by: Dieter Kroeger
22.11.2012

335445960.xls

39

Page 2 of 5

48 Underframe TC2 - right - II


Underframe TC2 - right - II
49

cable not fixed


is here a grounding contact missing?

fix cable
report from engineering

(13/07/2012)
(13/07/2012)

FINISHING
ENGINEERING

48
49

50 Underframe TC2 - right - III


Underframe TC2 - right - IV
51

missing sealing
is this cable connection OK; one
protection tube is "in" the other is
"out"

seal
report from engineering

(13/07/2012)
(13/07/2012)

FINISHING
ENGINEERING

50
51

nut is corroded, is the material


correct?
bolt not fixed
painting unfinished / damaged
no painting after additional work
tubes are touching holes and
corrosion inside tube
area not painted
Battery not mounted

report from engineering

(13/07/2012)

ENGINEERING

52

fix bolt
complete work
complete work
repair

(13/07/2012)
(13/09/2012)
(13/09/2012)
(13/09/2012)

FINISHING
FINISHING
FINISHING
FINISHING

52
54
55
56

paint
battery was removed
because it is down and
cannot be recharged by
internal battery charger.
Investigation by
Engineering, NCR

(13/07/2012)
(13/09/2012)

FINISHING
ENGINEERING

57

52

Underframe TC2 - left - I

53 Underframe TC2 - left - I


54 Underframe TC2 - left - I
55 Underframe TC2 - left - I
Underframe TC2 - left - III
56
57 Underframe TC2 - left - III
Underframe MC1 - left

WI might be useful

can this cause permanent damage or influence


life time of battery?

58

Underframe MC1 - left

corrosion inside battery box

use acid resistant paint


inside battery box

(13/09/2012)

FINISHING

59

Underframe MC1 - left

mechanic damage inside battery


box; battery box very difficult to
close

investigation by
engineering, NCR, repair
according result of
investigation

(13/09/2012)

ENGINEERING, TP,
FINISHING

60

Underframe MC1 - left

battery box needs two people to


close

this is not maintenance


friendly. Define
mitigation measures

(13/09/2012)

ENGINEERING

61

missing screw
drainage tube bent and corrosion
two versions for same type of fixing

repair
repair
report from engineering
about correct version

(13/07/2012)
(13/07/2012)
(13/09/2012)

FINISHING
FINISHING
ENGINEERING

62
63
64

check material and


replace if necessary
paint
check material and
replace if necessary
repair
repair
check material and
repair or replace
clear instruction from
Engineering, WI
repair

(13/07/2012)

ENGINEERING

65

(13/09/2012)
(13/09/2012)

FINISHING
ENGINEERING

66
67

(13/09/2012)
(13/09/2012)
(13/07/2012)

FINISHING
FINISHING
ENGINEERING

68
68
70

(22/11/2012)

TP, FINISHING

71

(13/07/2012)

FINISHING

72

(13/07/2012)
(13/07/2012)

FINISHING
FINISHING

73
74

59

60

61
62 Underframe MC1 - left - III
63 Underframe TC1 - left - I
Underframe TC1 - left - I
64

corroded bolt

check complete train

66 Underframe TC1 - centre - I


Underframe TC1 - centre - I
67

no paint inside
corroded nut

check complete train


check complete train

68 Gangway TC1 - MC1


69 Gangway TC1 - MC1
Underframe MC1 - centre - I
70

corrosion inside
every second screw missing
corroded tube connectors

check complete train


check complete train
check complete train

65

71
72

Underframe TC1 - centre - I

Underframe MC1 - centre - II

another type of tube connector

Underframe MC1 - centre - II

deformation in box / no paint inside

73 Underframe MC1 - centre - bogie 2


Underframe MC1 - centre - bogie 2
74
prepared by: Dieter Kroeger
22.11.2012

must this box be waterproof?

corrosion
corrosion

repair according WI
repair according WI

335445960.xls

TOIL

burnt by welding, no
corrosion

Page 3 of 5

75 Underframe MC2 - centre - I


no paint at cable duct
Underframe MC2 - centre - centre bogie no paint
76
1

paint
paint

(13/07/2012)
(13/09/2012)

FINISHING
FINISHING

75
76

77
78
79
80
81
82
83

(13/07/2012)
(13/07/2012)
(13/07/2012)
(13/09/2012)
(13/07/2012)
(13/07/2012)
(13/07/2012)
(13/09/2012)

FINISHING
FINISHING
FINISHING
FINISHING
FINISHING
FINISHING
FINISHING
ENGINEERING,
FINISHING
ENGINEERING,
FINISHING
ENGINEERING,
FINISHING
FINISHING

77
78
79
80
81
82
83
84

sealing damaged

close box
repair according WI
fix screws
repair
repair
repair
repair according WI
check material and
replace
check material and
replace
check material and
replace
repair according WI

signatures are missing

add signatures

(27/07/2012)

outdated
missing
signatures are missing
signatures are missing
2 inspection records, same date,
different data
signatures are missing
record empty, footpump missing,
update P3K

update
add
add signatures
add signatures
claify

(27/07/2012)
(13/09/2012)
(27/07/2012)
(27/07/2012)
(22/11/2012)

add signatures
complete work

(27/07/2012)
(13/09/2012)

signatures are missing


actual detailed tests missing
signatures are missing
signatures are missing
signatures are missing
signatures are missing
signatures are missing
incomplete
incomplete
no test record

add signatures
add detailed tests
add signatures
add signatures
add signatures
add signatures
add signatures
complete work
complete work
complete work

(13/09/2012)
(13/09/2012)
(27/07/2012)
(27/07/2012)
(27/07/2012)
(13/09/2012)
(13/09/2012)
(13/09/2012)
(27/07/2012)
(13/09/2012)

no test record

complete work

(13/09/2012)

train dirty

complete outside
cleaning
check sealing and repair
if necessary
replace material
repair painting

(22/11/2012)

repair

(12/09/2012)

repair

(12/09/2012)

84
85
86

Underframe MC2 - centre - II


Underframe MC2 - centre - II
Underframe MC2 - centre - III
Underframe TC2 - centre - III
Underframe TC2 - centre - bogie 2
Underframe TC2 - centre - bogie 2
Underframe TC2 - centre - axle 16
Roof MC2

box not closed


corrosion (behind box)
box not properly closed
clamp not fixed
no paint
no paint
corrosion
corrosion AC

check complete train

Roof MC2

corrosion pantograph

check complete train

Roof MC2

corrosion pantograph

check complete train

87 Roof MC2
87 Roof MC2
88
89
90
91
92
93

7/6/2012
VRB - Component Number Inspection
VRB - List of drawings
VRB - list of open items
VRB - Bogie mounting inspection
VRB - bogie load test
VRB - Bogie component number

94 VRB - Bogie assembly inspection


VRB - Check sheet of component
95
installation
96
97
98
99
100
101
102
103
104
105

VRB - Water test


VRB - Water test
VRB - Weighting test
VRB - Loading Gauge
VRB - Curve Test
VRB - Bell connection test
VRB - Insulation Test
VRB - Pneumatic static test
VRB - electronic static test brake
VRB - Train routine test propulsion

106 VRB - TCMS routine test


7/16/2012
107 exterior
108 Exterior MC2 - right - first mascara
109 Exterior - Gangway TC2/Mc2
110 Exterior - MC2 - door 4
7/30/2012
111 Funtion TC1, MC1, MC2
112 Function TC1 - Driver's cab
prepared by: Dieter Kroeger
22.11.2012

sealing looks not OK

check all sealings

corroded washer
painting at bottom damaged

check all gangways

some room lamps passenger


compartement are not working
lamps near AC outlet not working
335445960.xls

(13/09/2012)
(13/09/2012)
(13/09/2012)
(22/11/2012)

85

86

(13/09/2012)

108

(13/09/2012)
(13/09/2012)

109
110

Page 4 of 5

113 Function TC1 - Driver's cab


114
115
116
117

Function TC1 - Driver's cab


Function TC1 - Driver's cab
Function TC1 - Driver's cab
Function TC1 - Driver's cab

118 Function (TC1 - Driver's cab)


119 Function TC2 - Driver's cab
120 Function TC2 - Driver's cab
121 Function TC2 - Driver's cab
122 Function TC2 - Driver's cab
123 Function TC2 - Driver's cab
9/12/2012
124 Function TC1 - Driver's cab
125 Function TC1 - Driver's cab
126 Function TC2 - Driver's cab

buttons of lamps near AC outlet are


not linked to the related lamp
horn cannot be switsched off
MCD of horn iws not fixed
head lamp "low" NOK
window wiper not working
LCD screen passenger
compartment "no signal"
position of window wiper NOK
speed of window wiper high and low
the same
"Battery charger error on HMI"

repair

(13/09/2012)

repair
repair
repair
repair

(12/09/2012)
(14/09/2012)
(12/09/2012)
(12/09/2012)
(13/09/2012)

repair
repair

(12/09/2012)
(12/09/2012)
(22/11/2012)

lamp for switch "train washing" NOK

root cause analysis,


NCR
repair

Pantograph 2 cannot lift

NCR, repair

(12/09/2012)

Green signallamp left NOK


Driver roomlamp not working
Main lamp switch NOK

repair
repair
repair

(13/09/2012)
(13/09/2012)
(13/09/2012)

Number of Open Items:


Number of Train Open Items:
TOTAL Number of Open Items:
closed Open Items:
Closed Train Open Items:
TOTAL Number of Closed Open Items:
Percentage of closed open item:
remaining open:

prepared by: Dieter Kroeger


22.11.2012

121

(13/09/2012)

126
69
195
125
55
180
92%
15

335445960.xls

Page 5 of 5