Professional Documents
Culture Documents
3 REFORMING
4 DRILLING
5 INSPECTION
2 WELDING
3 REFORMING
4 DRILLING
5 INSPECTION
3 WELDING
4 REFORMING
5 DRILLING
6 RIVET
7 INSPECTION
Page 1 of 3978
4. 1 ASSY BRACKET
SIDE SILL ( END )
00901AR/AL 2 REFORMING
Page 2 of 3978
5. 1 MELINTANG ( END U/F )
CROSS BEAM
2 TENGAH
1 ASSY IN JIG
4 REFORMING
5 INSPECTION
1 WELDING IN JIG
3 BRACKET
4 REFORMING
6 INSPECTION
4 SPOT WELDING
Page 3 of 3978
6 INSPECTION
Page 4 of 3978
9. END WALL 1 DUDUKAN RUBBER BELLOW ASSY
2 ASSY IN JIG
3 WELDING IN JIG
6 WELDING, GRINDING
7 DRILLING, REFORMING
8 INSPECTION
PURLINE
6 INSPECTION
Page 5 of 3978
2 MAIN ASSY
1. CARBODY STRUCTURE
2. CARBODY WELDING
3. CARBODY REFORMING
4. PARTITION
5. CEILLING
6. INSPECTION
7. GRIT BLASTING
8. PRIMER PAINTING
3 CARBODY REPAIR
PCC - 1
HADI SUNARYO
Page 6 of 3978
###
###
###
###
###
###
Page 7 of 3978
Page 8 of 3978
###
###
###
Page 9 of 3978
Page 10 of 3978
###
###
###
###
###
Page 11 of 3978
###
###
###
###
APPROVED BY:
PCC - 2 M. DALPROD
NARGIYANTO SUTRISNO
Page 12 of 3978
1 MINOR ASSY, SUB ASSY
3 REFORMING X
###
4 DRILLING X
###
5 INSPECTION X
###
2 WELDING X
###
3 REFORMING X
###
4 DRILLING X
###
5 INSPECTION X
###
3 WELDING X
###
4 REFORMING X
###
5 DRILLING X
###
6 RIVET X
###
7 INSPECTION X
###
4. 1 ASSY BRACKET X
SIDE SILL ( END ) ###
00901AR/AL 2 REFORMING X
###
Page 13 of 3978
5. 1 MELINTANG ( END U/F ) X
CROSS BEAM ###
2 TENGAH X
###
1 ASSY IN JIG X
###
4 REFORMING X
###
5 INSPECTION X
###
1 WELDING IN JIG X
###
3 BRACKET X
###
4 REFORMING X
###
6 INSPECTION X
###
4 SPOT WELDING X
###
6 INSPECTION X
###
Page 14 of 3978
9. END WALL 1 DUDUKAN RUBBER BELLOW ASSY X
###
3 WELDING IN JIG X
###
6 WELDING, GRINDING X
###
7 DRILLING, REFORMING X
###
8 INSPECTION X
###
PURLINE X
###
6 INSPECTION X
###
Page 15 of 3978
2 MAIN ASSY ###
1. CARBODY STRUCTURE X
###
2. CARBODY WELDING X
###
3. CARBODY REFORMING X
###
4. PARTITION /
###
5. CEILLING /
###
6. INSPECTION
###
7. GRIT BLASTING
###
8. PRIMER PAINTING
###
3 CARBODY REPAIR
###
APPROVED BY:
Page 16 of 3978
1 MINOR ASSY, SUB ASSY
Page 17 of 3978
4.
SIDE SILL ( END )
1 REFORMING X X X X X X X X
SIDE SILL ( CENTER ) 02601R/L X X X X X X X X
5. CENTER SILL X X X X X X X X
6.
CROSS BEAM
1 MELINTANG ( END U/F ) X X X X X X X X
2 TENGAH X X X X X X X X
1 ASSY IN JIG X X X X
7. END U / F 2 WELDING IN JIG X X X X
3 WELD. OUT JIG + GRINDING X X X X
4 REFORMING X X X X
5 INSPECTION X X X X
1 WELDING IN JIG X X
8. UNDERFRAME 2 WELD. OUT JIG + GRINDING X X
3 BRACKET X X
4 REFORMING X X
5 INSPECTION X
6 GRIT BLASTING /
7 PAINTING (PRIMER)
Page 18 of 3978
9 INSPECTION
Page 19 of 3978
9. SIDE WALL 1 FRAME ASSY IN JIG X X X
2 WELD. OUT JIG + GRINDING X /
3 SHEATING PLATE TACK WELD. X
4 SPOT WELDING /
5 WELD. BRACKET + GRIND.
6 INSPECTION
3 WELDING IN JIG
6 WELDING, GRINDING
7 DRILLING, REFORMING
8 INSPECTION
Page 20 of 3978
5 INSPECTION
Page 21 of 3978
2 MAIN ASSY
1. CARBODY STRUCTURE
2. CARBODY WELDING
3. CARBODY REFORMING
4. PARTITION
5. CEILLING
6. INSPECTION
7. GRIT BLASTING
8. PRIMER PAINTING
3 CARBODY REPAIR
APPROVED BY:
PCC 1 PCC 2
Page 22 of 3978
X X X X X X X
X X X X X X X
X X X X X X X
/ /
X X X X X X X
X X X X X X
X X X X X X
/ X X X
X X X
X X X
X X X
Page 23 of 3978
X X X X X X X
X X X X X X X
X X X X X X X
X X X X X X X
X X X X X X X
/ /
Page 24 of 3978
Page 25 of 3978
###
###
###
Page 26 of 3978
Page 27 of 3978
###
###
###
###
SUTRISNO
NARGIYANTO
Page 28 of 3978
1 MINOR ASSY, SUB ASSY
3 REFORMING
4 MACHINING
5 INSPECTION
2 WELDING
3 REFORMING
4 DRILLING
5 INSPECTION
2 WELDING
3 REFORMING
4 INSPECTION
4. ASSY BRACKET
SIDE SILL ( END )
00901AR/AL 1 REFORMING
Page 29 of 3978
5. 1 MELINTANG ( END U/F )
CROSS BEAM
2 TENGAH
1 ASSY IN JIG
4 REFORMING
5 INSPECTION
1 WELDING IN JIG
3 BRACKET
4 REFORMING
6 INSPECTION
4 SPOT WELDING
Page 30 of 3978
6 INSPECTION
Page 31 of 3978
9. END WALL 1 DUDUKAN RUBBER BELLOW ASSY
2 ASSY IN JIG
3 WELDING IN JIG
6 WELDING, GRINDING
7 DRILLING, REFORMING
8 INSPECTION
PURLINE
6 INSPECTION
Page 32 of 3978
2 MAIN ASSY
1. CARBODY STRUCTURE
2. CARBODY WELDING
3. CARBODY REFORMING
4. PARTITION
5. CEILLING
6. INSPECTION
7. GRIT BLASTING
8. PRIMER PAINTING
3 CARBODY REPAIR
Page 33 of 3978
###
###
###
###
Page 34 of 3978
###
###
###
Page 35 of 3978
Page 36 of 3978
###
###
###
###
###
Page 37 of 3978
###
###
###
###
Page 38 of 3978
KETERANGAN :
CHECK POSISI KEMAJUAN PRODUKSI ( FAB ) X SELESAI
PROYEK : 1 CAR TMC ACEH OKA: 15 39 01 / DLM PROSES
Posisi tanggal : 15 Agustus 2015
3 REFORMING X 0
4 MACHINING X 0
5 INSPECTION X 0
ASSY 2 WELDING X 0
3 REFORMING X 0
4 INSPECTION X 0
2 YOKE STOPPERDRILLING X 0
4 REFORMING X 0
5 DRILLING X 0
6 INSPECTION X 0
4.
SIDE SILL
1 ASSY BRACKET X 0
2 REFORMING X 0
5. CROSS BEAM X 0
1 WELDING IN JIG X 0
3 BRACKET X 0
4 REFORMING X 0
7 INSPECTION X 0
INSPECTION X 0
BLASTING X 0
Page 39 of 3978
PRIMER X 0
REPAIR WELDING X
INSPECTION / 0
2 WELDING IN JIG X 0
4 INSPECTION X 0
5 GRIT BLASTING X 0
6 PRIMER X 0
7 REPAIR WELDING X 0
INSPECTION 0
2 MAIN ASSY 0
1. CARBODY STRUCTURE 0
2. CARBODY WELDING 0
3. CARBODY REFORMING 0
4. PARTITION 0
5. CEILLING 0
6. INSPECTION 0
3 CARBODY REPAIR 0
APPROVED BY:
Page 40 of 3978
KETERANGAN :
CHECK POSISI KEMAJUAN PRODUKSI ( FAB ) X SELESAI
PROYEK : 1 CAR SHUNTING LOCO OKA: 15 42 01 / DLM PROSES
Posisi tanggal : 15 Agustus 2015
3 REFORMING X 0
4 MACHINING X 0
5 INSPECTION X 0
ASSY 2 WELDING X 0
3 REFORMING X 0
4 INSPECTION X 0
2 YOKE STOPPERDRILLING X 0
4 REFORMING X 0
5 DRILLING X 0
6 INSPECTION X 0
4.
SIDE SILL
1 ASSY BRACKET X 0
2 REFORMING X 0
5. CROSS BEAM X 0
1 WELDING IN JIG X 0
3 BRACKET X 0
4 REFORMING X 0
7 INSPECTION X 0
INSPECTION X 0
BLASTING X 0
Page 41 of 3978
PRIMER X 0
REPAIR WELDING X
INSPECTION / 0
2 WELDING IN JIG X 0
4 INSPECTION X 0
5 GRIT BLASTING X 0
6 PRIMER X 0
7 REPAIR WELDING X 0
INSPECTION 0
2 MAIN ASSY 0
1. CARBODY STRUCTURE 0
2. CARBODY WELDING 0
3. CARBODY REFORMING 0
4. PARTITION 0
5. CEILLING 0
6. INSPECTION 0
3 CARBODY REPAIR 0
APPROVED BY:
Page 42 of 3978
DESKRIPSI
TAKT
NO LAMBUNG
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
7 FITTING OF PIPING DIESEL GENERATOR S:
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
DESKRIPSI
O LAMBUNG 1 2 3 4 5 6 7 8
ME
DERFRAME
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP 2
FRAME BAGAGE
BRAKE SWITCH,
DUMMY COUPLING
PROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
PROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
PROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
PROCESS FITTING
ER
CONTROL PANEL AC
SPEAKER FITTING
PROCESS FITTING
PASESENGER SEAT
PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
PROCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 1
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 32%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
32% 33% 33% 33% 34% 34% 34% 0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
SEPTIC TANK
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
1 FINAL INSPECTION
5 CURVA TEST
TESTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODU
PROYEK : 6 TRA
( 48 K3+ 12 K3 Difabe
Bulan Ma
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
RODUKSI ( FINISHING )
6 TRAINSET K3 PMN
Difabel + 6 MP3 )K3 no 2
an Maret 2017
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 28% 29% 29% 29% 29% 32% 32% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
31
0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
SEPTIC TANK
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
1 FINAL INSPECTION
5 CURVA TEST
TESTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODU
PROYEK : 6 TRAI
( 48 K3+ 12 K3 Difabe
Bulan Mar
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
RODUKSI ( FINISHING )
6 TRAINSET K3 PMN
Difabel + 6 MP3 )K3 no 3
an Maret 2017
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 32% 32% 33% 33% 34% 34% 34% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
31
Uji coba
Uji coba
Uji coba
Uji coba
Uji coba
Uji coba
Uji coba
Uji coba
Uji coba
0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PR
DESKRIPSI
1 2 3 4 5 6
UNDERFRAME)
G +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
NGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
S FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
S FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
S FITTING
ENTRANCE DOOR
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
S FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CONTROL PANEL AC
SPEAKER FITTING
S FITTING
PASESENGER SEAT
S FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
S FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
PLATE
ATE
S FITTING
0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 4
Bulan Maret 2017
Tanggal
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
22 23 24 25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
SEPTIC TANK
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODUKSI ( FINISHIN
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no
Bulan Maret 2017
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
ISHING )
MN
)K3 no 5
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 21% 23% 25% 25% 25% 27% 27% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
31
0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48
ESKRIPSI
1 2 3 4 5 6 7 8
ERFRAME
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
UK TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
ROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
ROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
ROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
ROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
ROCESS FITTING
ND MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
ROCESS FITTING
PASESENGER SEAT
ROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
ROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
ARK PLATE
ROCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 6
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 19%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
tidak sesuai qc
20% 21% 21% 21% 25% 24% 0% 0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48
SKRIPSI
1 2 3 4 5 6 7 8
AME
UNDERFRAME)
NG +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
NGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
SS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
SS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
SS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
SS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
SS FITTING
MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
SS FITTING
PASESENGER SEAT
SS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
SS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
K PLATE
LATE
SS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 7
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0% 0% 0%
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48
ESKRIPSI
1 2 3 4 5 6 7 8
FRAME
ND UNDERFRAME)
TING +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
OCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
OCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
OCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
OCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
OCESS FITTING
D MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
OCESS FITTING
PASESENGER SEAT
OCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
OCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
ARK PLATE
K PLATE
OCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 8
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PR
(4
DESKRIPSI
1 2 3 4 5 6 7
DERFRAME
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
BRAKE SWITCH,
DUMMY COUPLING
PROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
PROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
PROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
PROCESS FITTING
AND MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
PROCESS FITTING
PASESENGER SEAT
PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
PROCESS FITTING
0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 9
Bulan Maret 2017
Tanggal
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
23 24 25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
(4
DESKRIPSI
1 2 3 4 5 6 7
ERFRAME
END UNDERFRAME)
UNTING +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
UK TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
ROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
ROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
ROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
ROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
ROCESS FITTING
ND MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
ROCESS FITTING
PASESENGER SEAT
ROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
ROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
ARK PLATE
ROCESS FITTING
0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 10
Bulan Maret 2017
Tanggal
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
23 24 25 26 27 28 29 30 31
perbaikan sambungan
0% 0% 0% 0% 0% 0% 0% 0% 0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PR
(4
ESKRIPSI
1 2 3 4 5 6 7
NDERFRAME)
+WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
GKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CONTROL PANEL AC
SPEAKER FITTING
FITTING
PASESENGER SEAT
FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
PLATE
FITTING
0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 11
Bulan Maret 2017
Tanggal
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
KETERAN
23 24 25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
FINISH
PROCESS
KETERANGAN
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROG
P
( 48 K3
RIPSI
1 2 3 4 5 6 7 8
ERFRAME)
WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
ATAS)
BRAKE SWITCH,
DUMMY COUPLING
TING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
TING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
TING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
TING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CONTROL PANEL AC
SPEAKER FITTING
TING
PASESENGER SEAT
TING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
TING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 12
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRE
PR
( 48 K3+
PSI
1 2 3 4 5 6 7 8 9
ERFRAME)
ELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
ATAS)
BRAKE SWITCH,
DUMMY COUPLING
TING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
TING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
TING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
TING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CONTROL PANEL AC
SPEAKER FITTING
TING
PASESENGER SEAT
TING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
TING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
0% 0% 0% 0% 0% 0% 0% 0% 0%
OGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 13
Bulan Maret 2017
Tanggal
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
25 26 27 28 29 30 31
0% 0% 0% 0%
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
RIPSI
1 2 3 4 5 6 7 8
DERFRAME)
WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
I ATAS)
BRAKE SWITCH,
DUMMY COUPLING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
BOX STOP BLOCK
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CONTROL PANEL AC
SPEAKER FITTING
PASESENGER SEAT
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0% 0% 0%
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
ESKRIPSI
1 2 3 4 5 6 7 8
RFRAME
END UNDERFRAME)
NTING +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
K TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
OCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
OCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
OCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
OCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
OCESS FITTING
ND MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
OCESS FITTING
PASESENGER SEAT
OCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
OCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
RK PLATE
OCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 15
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODUKSI ( FINISHIN
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no
Bulan Maret 2017
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
TING
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
NISHING )
PMN
)K3 no 16
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
31
0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
5 FITTING OF COMPONEN :
UNDERFRAME
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
DESKRIPSI
1 2 3 4 5 6 7 8
RAME
PUL)
UNDERFRAME
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
BRAKE SWITCH,
DUMMY COUPLING
OF PROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
OF PROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
OF PROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
OF PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
MENT
R EQUIPMENT
OF PROCESS FITTING
UPLER
CONTROL PANEL AC
SPEAKER FITTING
OF PROCESS FITTING
PASESENGER SEAT
OF PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
OF PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 17
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
5 FITTING OF COMPONEN :
UNDERFRAME
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
DESKRIPSI
1 2 3 4 5 6
RFRAME
MPUL)
F UNDERFRAME
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
BRAKE SWITCH,
DUMMY COUPLING
T OF PROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
T OF PROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
T OF PROCESS FITTING
ENTRANCE DOOR
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
T OF PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
PMENT
OR EQUIPMENT
T OF PROCESS FITTING
OUPLER
CONTROL PANEL AC
SPEAKER FITTING
T OF PROCESS FITTING
PASESENGER SEAT
T OF PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
T OF PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 18
Bulan Maret 2017
Tanggal
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
KETER
22 23 24 25 26 27 28 29 30 31
tidak sesuai
tidak sesuai
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
FINISH
PROCESS
KETERANGAN
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
5 FITTING OF COMPONEN :
UNDERFRAME
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
DESKRIPSI
1 2 3 4 5 6 7 8
FRAME
MPUL)
UNDERFRAME
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
BRAKE SWITCH,
DUMMY COUPLING
AME
T OF PROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
T OF PROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
T OF PROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
T OF PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
MENT
OR EQUIPMENT
T OF PROCESS FITTING
OUPLER
CONTROL PANEL AC
SPEAKER FITTING
T OF PROCESS FITTING
PASESENGER SEAT
T OF PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
T OF PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 19
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
SEPTIC TANK
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODUKSI ( FINISHI
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 n
Bulan Maret 2017
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
NECTING
ATOR
NG 1)
UNG 2)
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
NISHING )
3 PMN
3 )K3 no 20
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
31
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
SKRIPSI
1 2 3 4 5 6 7 8
AME
D UNDERFRAME)
NG +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
ANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
ESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
ESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
ESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
ESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CONTROL PANEL AC
SPEAKER FITTING
ESS FITTING
PASESENGER SEAT
ESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
ESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
RK PLATE
PLATE
ESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 21
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGR
( 48 K
KRIPSI
1 2 3 4 5 6 7 8
UNDERFRAME)
G +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
NGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
SS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
SS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
SS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
SS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CONTROL PANEL AC
SPEAKER FITTING
SS FITTING
PASESENGER SEAT
SS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
SS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
PLATE
SS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 22
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
5 FITTING OF COMPONEN :
UNDERFRAME
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGR
( 48 K3+
DESKRIPSI
1 2 3 4 5 6 7 8
AME
NDERFRAME
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
BRAKE SWITCH,
DUMMY COUPLING
F PROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
F PROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
F PROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
F PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
NT
EQUIPMENT
F PROCESS FITTING
PLER
CONTROL PANEL AC
SPEAKER FITTING
F PROCESS FITTING
PASESENGER SEAT
F PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
F PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
F PROCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
ROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 23
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PR
(4
DESKRIPSI
1 2 3 4 5 6 7
RFRAME
END UNDERFRAME)
NTING +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
K TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
OCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
OCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
OCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
OCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
OCESS FITTING
D MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
OCESS FITTING
PASESENGER SEAT
OCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
OCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
RK PLATE
OCESS FITTING
0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 24
Bulan Maret 2017
Tanggal
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
KETERAN
23 24 25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0%
INFORMATION :
FINISH
PROCESS
KETERANGAN
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
ESKRIPSI
1 2 3 4 5 6 7 8
FRAME
ND UNDERFRAME)
TING +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
CESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
CESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
CESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
CESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CESS FITTING
MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
CESS FITTING
PASESENGER SEAT
CESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
CESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
ARK PLATE
K PLATE
CESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 25
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
RIPSI
1 2 3 4 5 6 7 8
ERFRAME)
WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
ATAS)
BRAKE SWITCH,
DUMMY COUPLING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
BOX STOP BLOCK
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CONTROL PANEL AC
SPEAKER FITTING
PASESENGER SEAT
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
RIPSI
1 2 3 4 5 6 7 8
FRAME)
LDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
TAS)
BRAKE SWITCH,
DUMMY COUPLING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
BOX STOP BLOCK
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CONTROL PANEL AC
SPEAKER FITTING
PASESENGER SEAT
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGR
( 48 K
SKRIPSI
1 2 3 4 5 6 7 8
FRAME
ND UNDERFRAME)
TING +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
CESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
CESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
CESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
CESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CESS FITTING
MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
CESS FITTING
PASESENGER SEAT
CESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
CESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
ARK PLATE
K PLATE
CESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 28
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0% 0% 0%
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGR
PR
( 48 K3+
KRIPSI
1 2 3 4 5 6 7 8 9
RFRAME
END UNDERFRAME)
NTING +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
K TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
OCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
OCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
OCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
OCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
OCESS FITTING
D MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
OCESS FITTING
PASESENGER SEAT
OCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
OCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
RK PLATE
OCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0% 0%
ROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 29
Bulan Maret 2017
Tanggal
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGR
( 48 K
DESKRIPSI
1 2 3 4 5 6 7 8
ME
DERFRAME
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
BRAKE SWITCH,
DUMMY COUPLING
PROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
PROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
PROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
PROCESS FITTING
ER
CONTROL PANEL AC
SPEAKER FITTING
PROCESS FITTING
PASESENGER SEAT
PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
PROCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
ROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 30
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
DESKRIPSI
1 2 3 4 5 6 7 8
ERFRAME
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
UK TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
ROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
ROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
ROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
ROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
ROCESS FITTING
ND MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
ROCESS FITTING
PASESENGER SEAT
ROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
ROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
ARK PLATE
ROCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 31
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
DESKRIPSI
1 2 3 4 5 6 7 8
ERFRAME
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
UK TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
ROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
ROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
ROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
ROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
ROCESS FITTING
ND MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
ROCESS FITTING
PASESENGER SEAT
ROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
ROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
ARK PLATE
ROCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 32
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODUKSI ( FINISHING
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no
Bulan Maret 2017
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
ISHING )
MN
)K3 no 33
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
31
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
FITTING FOR ELECTRIC
TAKT 4 5 COMPONENT AT END WALL : ELECTRIC COMPONENT ??????
( BORDES)
PROFIL ALL NO 2
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODUKSI ( FINISHING
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 3
Bulan Maret 2017
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SHING )
MN
K3 no 34
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
31
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
FITTING FOR ELECTRIC
TAKT 4 5 COMPONENT AT END WALL : ELECTRIC COMPONENT ??????
( BORDES)
PROFIL ALL NO 2
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODUKSI ( FINISHING
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 35
Bulan Maret 2017
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SHING )
MN
3 no 35
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
31
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODUKSI ( FINISHING
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 3
Bulan Maret 2017
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
SHING )
MN
K3 no 36
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
31
0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
DESKRIPSI
1 2 3 4 5 6 7 8
RAME
UNDERFRAME
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
BRAKE SWITCH,
DUMMY COUPLING
OF PROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
OF PROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
OF PROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
OF PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
OF PROCESS FITTING
UPLER
CONTROL PANEL AC
SPEAKER FITTING
OF PROCESS FITTING
PASESENGER SEAT
OF PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
OF PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 37
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODUKSI ( FINISHIN
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no
Bulan Maret 2017
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
ISHING )
PMN
)K3 no 38
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
31
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
DESKRIPSI
1 2 3 4 5 6 7 8
ERFRAME
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
UK TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
ROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
ROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
ROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
ROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
ROCESS FITTING
ND MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
ROCESS FITTING
PASESENGER SEAT
ROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
ROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
ARK PLATE
ROCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 39
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
ESKRIPSI
1 2 3 4 5 6 7 8
ERFRAME
END UNDERFRAME)
UNTING +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
UK TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
ROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
ROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
ROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
ROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
ROCESS FITTING
ND MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
ROCESS FITTING
PASESENGER SEAT
ROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
ROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
ARK PLATE
ROCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 40
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
KETERA
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
INFORMATION :
FINISH
PROCESS
KETERANGAN
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODUKSI ( FINISHIN
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no
Bulan Maret 2017
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
TING
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
NISHING )
PMN
)K3 no 41
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
31
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
ESKRIPSI
1 2 3 4 5 6 7 8
RFRAME
END UNDERFRAME)
NTING +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
K TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
OCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
OCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
OCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
OCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
OCESS FITTING
D MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
OCESS FITTING
PASESENGER SEAT
OCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
OCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
RK PLATE
OCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 42
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGR
PR
( 48 K3+
KRIPSI
1 2 3 4 5 6 7 8 9
FRAME
ND UNDERFRAME)
TING +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
OCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
OCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
OCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
OCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
OCESS FITTING
D MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
OCESS FITTING
PASESENGER SEAT
OCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
OCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
ARK PLATE
K PLATE
OCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0% 0%
ROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 43
Bulan Maret 2017
Tanggal
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
KETERA
25 26 27 28 29 30 31
0% 0% 0% 0%
NFORMATION :
FINISH
PROCESS
KETERANGAN
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
SEPTIC TANK
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODUKSI ( FINISHIN
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no
Bulan Maret 2017
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
TING
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
NISHING )
PMN
)K3 no 44
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
31
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
0%
DESKRIPSI
TAKT
1
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
SEPTIC TANK
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
0%
PROGRES PRODUKSI ( FINISHING
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 45
Bulan Maret 2017
Tanggal
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
HING )
N
3 no 45
nggal
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
ESKRIPSI
1 2 3 4 5 6 7 8
ERFRAME
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
UK TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
ROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
ROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
ROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
ROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
ROCESS FITTING
ND MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
ROCESS FITTING
PASESENGER SEAT
ROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
ROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
ARK PLATE
ROCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 46
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
KETERAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
INFORMATION :
FINISH
PROCESS
KETERANGAN
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
SEPTIC TANK
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODUKSI ( FINISHIN
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no
Bulan Maret 2017
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
TING
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
ISHING )
PMN
)K3 no 47
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
31
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
DESKRIPSI
1 2 3 4 5 6 7 8
AME
NDERFRAME
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
BRAKE SWITCH,
DUMMY COUPLING
F PROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
F PROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
F PROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
F PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
F PROCESS FITTING
PLER
CONTROL PANEL AC
SPEAKER FITTING
F PROCESS FITTING
PASESENGER SEAT
F PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
F PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
F PROCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 no 48
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K3+
ESKRIPSI
1 2 3 4 5 6 7 8
RFRAME
END UNDERFRAME)
NTING +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
K TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
OCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
OCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
OCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
OCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
OCESS FITTING
D MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
OCESS FITTING
PASESENGER SEAT
OCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
OCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
RK PLATE
OCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
48 K3+ 12 K3 Difabel + 6 MP3 )K3 Difable no 1
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
KETERAN
24 25 26 27 28 29 30 31
uji coba
0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
FINISH
PROCESS
KETERANGAN
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
SEPTIC TANK
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODUKSI ( FINISHIN
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 Difabl
Bulan Maret 2017
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
ISHING )
PMN
Difable no 2
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
31
0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
SEPTIC TANK
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODUKSI ( FINISHIN
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 Difabl
Bulan Maret 2017
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
ISHING )
PMN
Difable no 3
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
31
0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K3+
ESKRIPSI
1 2 3 4 5 6 7 8
ERFRAME
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
UK TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
PROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
PROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
PROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
PROCESS FITTING
AND MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
PROCESS FITTING
PASESENGER SEAT
PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
ARK PLATE
PROCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
48 K3+ 12 K3 Difabel + 6 MP3 )K3 Difable no 4
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
kuarng rapi
DESKRIPSI
TAKT
1
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
SEPTIC TANK
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
0%
PROGRES PRODUKSI ( FINISHING
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 Difable n
Bulan Maret 2017
Tanggal
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
TING
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
HING )
MN
ifable no 5
nggal
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K3+
SKRIPSI
1 2 3 4 5 6 7 8
UNDERFRAME)
G +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
GKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
S FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
S FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
S FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
S FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CONTROL PANEL AC
SPEAKER FITTING
S FITTING
PASESENGER SEAT
S FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
S FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
PLATE
ATE
S FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
8 K3+ 12 K3 Difabel + 6 MP3 )K3 Difable no 6
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K3+
SKRIPSI
1 2 3 4 5 6 7 8
NDERFRAME)
+WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
GKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CONTROL PANEL AC
SPEAKER FITTING
FITTING
PASESENGER SEAT
FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
PLATE
FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
48 K3+ 12 K3 Difabel + 6 MP3 )K3 Difable no 7
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
KETERA
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
INFORMATION :
FINISH
PROCESS
KETERANGAN
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGR
PR
( 48 K3+ 12
RIPSI
1 2 3 4 5 6 7 8 9
NDERFRAME)
+WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
GKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CONTROL PANEL AC
SPEAKER FITTING
FITTING
PASESENGER SEAT
FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
PLATE
FITTING
0% 0% 0% 0% 0% 0% 0% 0% 0%
ROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
K3+ 12 K3 Difabel + 6 MP3 )K3 Difable no 8
Bulan Maret 2017
Tanggal
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
25 26 27 28 29 30 31
0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K3+
SKRIPSI
1 2 3 4 5 6 7 8
D UNDERFRAME)
NG +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
ANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
ESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
ESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
ESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
ESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CONTROL PANEL AC
SPEAKER FITTING
ESS FITTING
PASESENGER SEAT
ESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
ESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
RK PLATE
PLATE
ESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 Difable no 9
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
24 25 26 27 28 29 30 31
0% 0% 0% 0% 0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGR
PR
( 48 K3+ 12
KRIPSI
1 2 3 4 5 6 7 8 9
RAME
ND UNDERFRAME)
ING +WELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
TANGKI ATAS)
BRAKE SWITCH,
DUMMY COUPLING
CESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
CESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
CESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
CESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CESS FITTING
MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
CESS FITTING
PASESENGER SEAT
CESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
CESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
RK PLATE
PLATE
CESS FITTING
0% 0% 0% 0% 0% 0% 0% 0% 0%
ROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
3+ 12 K3 Difabel + 6 MP3 )K3 Difable no 10
Bulan Maret 2017
Tanggal
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
25 26 27 28 29 30 31
0% 0% 0% 0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
SEPTIC TANK
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODUKSI ( FINISHIN
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 Difab
Bulan Maret 2017
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
ECTING
NG 2)
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
NISHING )
PMN
3 Difable no 11
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
31
0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
SEPTIC TANK
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODUKSI ( FINISHIN
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 )K3 Difab
Bulan Maret 2017
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
NECTING
ATOR
NG 2)
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
NISHING )
PMN
3 Difable no 12
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
31
0%
DESKRIPSI
TAKT
1 2 3 4 5 6 7
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
2 WIRING ON ROOF
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
SEPTIC TANK
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 ) MP3 no 1
Bulan Maret 2017
Tanggal
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
30 31
0% 0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
DUMMY COUPLING
CABLE AUDIO+VIDEO
TAIL LIGHT
7 INSPECTION FUNCTION & CONNECT OF PROCESS FITTING
SEPTIC TANK
CEROBONG UDARA AC
DRAFT GEAR
SAFETY CHAIN
10 FITTING HARDBOARD
WASH BASHIN
HOOK MIRROR
PENGHARUM RUANG
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
SPEAKER FITTING
2 FLOOR COVERING
PASESENGER SEAT
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 3
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
ENTRANCE DOOR
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRES PRODUKSI ( FINISHIN
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 ) MP3
Bulan Maret 2017
Tang
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
ECTING
NG 2)
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
NISHING )
PMN
) MP3 no 2
Tanggal
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
31
0%
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PRO
( 48 K
ESKRIPSI
1 2 3 4 5 6 7 8
DERFRAME
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
BRAKE SWITCH,
DUMMY COUPLING
PROCESS FITTING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
PROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
PROCESS FITTING
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
PROCESS FITTING
AND MARK PLATE
CONTROL PANEL AC
SPEAKER FITTING
PROCESS FITTING
PASESENGER SEAT
PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
PROCESS FITTING
0% 0% 0% 0% 0% 0% 0% 0%
PROGRES PRODUKSI ( FINISHING )
PROYEK : 6 TRAINSET K3 PMN
( 48 K3+ 12 K3 Difabel + 6 MP3 ) MP3 no 3
Bulan Maret 2017
Tanggal
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
24 25 26 27 28 29 30 31
0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
pasang braket
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
(
DESKRIPSI
1 2 3 4 5 6
RFRAME)
LDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
TAS)
BRAKE SWITCH,
DUMMY COUPLING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
BOX STOP BLOCK
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
ENTRANCE DOOR
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CONTROL PANEL AC
SPEAKER FITTING
PASESENGER SEAT
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
KETERAN
22 23 24 25 26 27 28 29 30 31
0% 0% 0% 0% 0% 0%
INFORMATION :
FINISH
PROCESS
KETERANGAN
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGRE
PR
( 48 K3+ 12
PSI
1 2 3 4 5 6 7 8 9
FRAME)
DING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
AS)
BRAKE SWITCH,
DUMMY COUPLING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
BOX STOP BLOCK
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CONTROL PANEL AC
SPEAKER FITTING
PASESENGER SEAT
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
25 26 27 28 29 30 31
0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
DESKRIPSI
TAKT
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
4 TOUCH UP WATER SANDING
TAKT 2
5 STRIPING
6 CLEAR COAT
1 WINDOW FITTING :
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
TAKT 10
2 FITTING FOR INSIDE BODY LETTERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
PROGR
PR
( 48 K3+
PSI
1 2 3 4 5 6 7 8 9
RFRAME)
ELDING END WALL)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
ATAS)
BRAKE SWITCH,
DUMMY COUPLING
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
BOX STOP BLOCK
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
CONTROL PANEL AC
SPEAKER FITTING
PASESENGER SEAT
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
COAT HOOK
FIRE EXTINGUISHER
GENSET
RADIATOR
DUCTING OF RADIATOR
LADDER FOR CHECKING WATER RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
25 26 27 28 29 30 31
0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
KETERANGAN
DESKRIPSI
TAKT NO UNDERFRAME
NO LAMBUNG
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
6 CLEAR COAT
1 WINDOW FITTING :
2 WIRING ON ROOF
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
2 FITTING OF CORRUGATED BELLOW :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
7 FITTING OF PIPING DIESEL GENERATOR S :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
Primer
Painting
putty s/d surfacer
Top coat (Clear Coat)
Elektrik Cabling
Eksterior
Interior
Mekanik rangka bawah
Lavatory
Alat perangkai
Bogie Mounting
Testing
Painting Primer
putty s/d surfacer
Top coat (Clear Coat)
Elektrik Cabling
Eksterior
Interior
Mekanik rangka bawah
Lavatory
Alat perangkai
Bogie Mounting
Testing
KRIPSI
ERFRAME
MBUNG K3-1 K3-2 K3-3 K3-4 K3-5 K3-6
ME
DERFRAME
& END UNDERFRAME)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
DUMMY COUPLING
PROCESS FITTING
CABLE POWER
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
PROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
PROCESS FITTING
ENTRANCE DOOR
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
QUIPMENT
PROCESS FITTING
ER
CONTROL PANEL AC
SPEAKER FITTING
PROCESS FITTING
PASESENGER SEAT
PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
TUTUP CENTER PIN
COAT HOOK
FIRE EXTINGUISHER
PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
PROCESS FITTING
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
Progres Total K3
K3 K3S MP3 TS 1 TS 2 TS 3
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
K3-7 K3-8 K3-9 K3-10 K3-11 K3-12 K3-13 K3-14 K3-15 K3-16
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
K3 K3S
TS 4 TS 5 TS 6 TS 1 TS 2 TS 3 TS 4 TS 5 TS 6 TS 1
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
K3-17 K3-18 K3-19 K3-20 K3-21 K3-22 K3-23 K3-24 K3-25
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
MP3
TS 2 TS 3 TS 4 TS 5 TS 6
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
PROGRES PRODUKSI ( FI
PROYEK : 6TRAINSET
( 48 K3+ 12 K3 Difabel +
No Kereta
Kereta
: FINISH
: PROCESS
% KETERANGAN
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
DESKRIPSI
TAKT NO UNDERFRAME
NO LAMBUNG
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
6 CLEAR COAT
1 WINDOW FITTING :
2 WIRING ON ROOF
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
2 FITTING OF CORRUGATED BELLOW :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
7 FITTING OF PIPING DIESEL GENERATOR S :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
Primer
Painting
putty s/d surfacer
Top coat (Clear Coat)
Elektrik Cabling
Eksterior
Interior
Mekanik rangka bawah
Lavatory
Alat perangkai
Bogie Mounting
Testing
Painting Primer
putty s/d surfacer
Top coat (Clear Coat)
Elektrik Cabling
Eksterior
Interior
Mekanik rangka bawah
Lavatory
Alat perangkai
Bogie Mounting
Testing
KRIPSI
ERFRAME
MBUNG K3-1 K3-2 K3-3 K3-4 K3-5 K3-6
ME
DERFRAME
& END UNDERFRAME)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
DUMMY COUPLING
PROCESS FITTING
CABLE POWER
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
PROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
PROCESS FITTING
ENTRANCE DOOR
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
QUIPMENT
PROCESS FITTING
ER
CONTROL PANEL AC
SPEAKER FITTING
PROCESS FITTING
PASESENGER SEAT
PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
TUTUP CENTER PIN
COAT HOOK
FIRE EXTINGUISHER
PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
MARK PLATE
PROCESS FITTING
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
Progres Total K3
K3 K3S MP3 TS 1 TS 2 TS 3
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
K3-7 K3-8 K3-9 K3-10 K3-11 K3-12 K3-13 K3-14 K3-15 K3-16
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
K3 K3S
TS 4 TS 5 TS 6 TS 1 TS 2 TS 3 TS 4 TS 5 TS 6 TS 1
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
K3-17 K3-18 K3-19 K3-20 K3-21 K3-22 K3-23 K3-24 K3-25
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
MP3
TS 2 TS 3 TS 4 TS 5 TS 6
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
PROGRES PRODUKSI ( FI
PROYEK : 6TRAINSET
( 48 K3+ 12 K3 Difabel +
No Kereta
Kereta
: FINISH
: PROCESS
% KETERANGAN
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
DESKRIPSI
TAKT NO UNDERFRAME
NO LAMBUNG
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
6 CLEAR COAT
1 WINDOW FITTING :
2 WIRING ON ROOF
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
2 FITTING OF CORRUGATED BELLOW :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
7 FITTING OF PIPING DIESEL GENERATOR S :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
Primer
Painting
putty s/d surfacer
Top coat (Clear Coat)
Elektrik Cabling
Eksterior
Interior
Mekanik rangka bawah
Lavatory
Alat perangkai
Bogie Mounting
Testing
Painting Primer
putty s/d surfacer
Top coat (Clear Coat)
Elektrik Cabling
Eksterior
Interior
Mekanik rangka bawah
Lavatory
Alat perangkai
Bogie Mounting
Testing
SKRIPSI
NDERFRAME
LAMBUNG K3-1 K3-2 K3-3 K3-4 K3-5
FRAME
UNDERFRAME
KET & END UNDERFRAME)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
DUMMY COUPLING
T OF PROCESS FITTING
CABLE POWER
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
T OF PROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
T OF PROCESS FITTING
ENTRANCE DOOR
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
T OF PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
OR EQUIPMENT
T OF PROCESS FITTING
OUPLER
CONTROL PANEL AC
SPEAKER FITTING
T OF PROCESS FITTING
PASESENGER SEAT
T OF PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
TUTUP CENTER PIN
COAT HOOK
FIRE EXTINGUISHER
T OF PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
T OF PROCESS FITTING
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
Progres Total
K3 K3S MP3 TS 1 TS 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
K3-6 K3-7 K3-8 K3-9 K3-10 K3-11 K3-12 K3-13 K3-14 K3-15
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
K3 K3S
TS 3 TS 4 TS 5 TS 6 TS 1 TS 2 TS 3 TS 4 TS 5 TS 6
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
K3-16 K3-17 K3-18 K3-19 K3-20 K3-21 K3-22 K3-23 K3-24
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
MP3
TS 1 TS 2 TS 3 TS 4 TS 5 TS 6
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
PROGRES PRODUK
PROYEK : 6TRA
( 48 K3+ 12 K3 Di
No Ke
No Kereta
: FINISH
: PROCESS
% KETERANGAN
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
DESKRIPSI
TAKT NO UNDERFRAME
NO LAMBUNG
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
6 CLEAR COAT
1 WINDOW FITTING :
2 WIRING ON ROOF
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
2 FITTING OF CORRUGATED BELLOW :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
7 FITTING OF PIPING DIESEL GENERATOR S :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
Primer
Painting
putty s/d surfacer
Top coat (Clear Coat)
Elektrik Cabling
Eksterior
Interior
Mekanik rangka bawah
Lavatory
Alat perangkai
Bogie Mounting
Testing
Painting Primer
putty s/d surfacer
Top coat (Clear Coat)
Elektrik Cabling
Eksterior
Interior
Mekanik rangka bawah
Lavatory
Alat perangkai
Bogie Mounting
Testing
SKRIPSI
NDERFRAME
LAMBUNG K3-1 K3-2 K3-3 K3-4 K3-5
FRAME
UNDERFRAME
KET & END UNDERFRAME)
EMERGENCY LAMP
FRAME BAGAGE
LUGGAGE RACK ( K3S)
PROFIL ALL NO 2
TAIL LIGHT
T OF PROCESS FITTING
SAFETY CHAIN
DRAFT GEAR GUID & SUPPORT
HAND BRAKE
T OF PROCESS FITTING
ENTRANCE DOOR
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
SLIDING DOOR PARTITION
DOOR LINTLE PARTITION
REL WAY GUIDE
T OF PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
OR EQUIPMENT
T OF PROCESS FITTING
OUPLER
CONTROL PANEL AC
SPEAKER FITTING
T OF PROCESS FITTING
PASESENGER SEAT
T OF PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
TUTUP CENTER PIN
COAT HOOK
FIRE EXTINGUISHER
T OF PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
T OF PROCESS FITTING
Progres Total
K3 K3S MP3 TS 1 TS 2
20 4 2 8 8
18 4 0 8 8
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
K3-6 K3-7 K3-8 K3-9 K3-10 K3-11 K3-12 K3-13 K3-14 K3-15
100% 100% 40% 100% 100% 100% 60% 0% 100% 60%
100% 100% 0% 100% 100% 100% 0% 0% 100% 0%
63% 63% 0% 63% 63% 63% 0% 0% 63% 0%
20% 60% 0% 20% 80% 80% 0% 0% 60% 0%
13% 6% 0% 0% 22% 28% 0% 0% 13% 0%
0% 9% 0% 7% 9% 9% 0% 0% 9% 0%
12% 15% 0% 0% 29% 29% 0% 0% 16% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 43% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
K3 K3S
TS 3 TS 4 TS 5 TS 6 TS 1 TS 2 TS 3 TS 4 TS 5 TS 6
4 0 0 0 2 2 0 0 0 0
2 0 0 0 2 2 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
K3-16 K3-17 K3-18 K3-19 K3-20 K3-21 K3-22 K3-23 K3-24
100% 100% 100% 100% 100% 100% 100% 0% 60%
94% 100% 100% 100% 100% 100% 76% 0% 0%
63% 63% 63% 63% 63% 63% 63% 0% 0%
20% 80% 60% 60% 80% 40% 20% 0% 0%
0% 28% 13% 13% 22% 6% 0% 0% 0%
0% 9% 7% 7% 9% 9% 0% 0% 0%
0% 29% 12% 23% 29% 23% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 57% 0% 0% 57% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
MP3
TS 1 TS 2 TS 3 TS 4 TS 5 TS 6
1 1 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
PROGRES PRODUK
PROYEK : 6TRA
( 48 K3+ 12 K3 Di
No Ke
100% 0% 0% 80% 100% 60% 0% 0% 0%
100% 0% 0% 0% 100% 0% 0% 0% 0%
38% 0% 0% 0% 63% 0% 0% 0% 0%
80% 0% 0% 0% 80% 0% 0% 0% 0%
28% 0% 0% 0% 22% 0% 0% 0% 0%
9% 0% 0% 0% 9% 0% 0% 0% 0%
29% 0% 0% 0% 29% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
14% 0% 0% 0% 14% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
S PRODUKSI ( FINISHING )
K : 6TRAINSET K3 PMN
+ 12 K3 Difabel + 6 MP3 )
No Kereta
0% 0% 60% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
K3-43 K3-44 K3-45 K3-46 K3-47 K3-48 K3S-1 K3S-2 K3S-3
0% 0% 0% 0% 0% 0% 100% 100% 100%
0% 0% 0% 0% 0% 0% 100% 100% 100%
0% 0% 0% 0% 0% 0% 63% 63% 63%
0% 0% 0% 0% 0% 0% 80% 80% 20%
0% 0% 0% 0% 0% 0% 28% 28% 9%
0% 0% 0% 0% 0% 0% 11% 9% 9%
0% 0% 0% 0% 0% 0% 29% 29% 23%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 57% 14% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
K3S-4 K3S-5 K3S-6 K3S-7 K3S-8 K3S-9 K3S-10 K3S-11 K3S-12
100% 0% 0% 0% 0% 0% 0% 0% 0%
100% 0% 0% 0% 0% 0% 0% 0% 0%
63% 0% 0% 0% 0% 0% 0% 0% 0%
80% 0% 0% 0% 0% 0% 0% 0% 0%
3% 0% 0% 0% 0% 0% 0% 0% 0%
7% 0% 0% 0% 0% 0% 0% 0% 0%
23% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
% KETERANGAN
56%
56%
55%
41%
39%
39%
36%
35%
35%
39%
33%
38%
36%
36%
36%
36%
36%
36%
36%
36%
36%
36%
36%
36%
35%
33%
0%
0%
0%
27%
18%
26%
35%
35%
35%
35%
0%
0%
0%
28%
0%
27%
28%
0%
0%
18%
26%
24%
18%
2%
0%
27%
18%
36%
0%
26%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
33%
33%
28%
33%
18%
18%
18%
11%
12%
0%
17%
0%
6%
0%
2%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100% 60% 100% 60% 60% 60%
29% 0% 18% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
DESKRIPSI
TAKT NO UNDERFRAME
NO LAMBUNG
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
6 CLEAR COAT
1 WINDOW FITTING :
2 WIRING ON ROOF
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
2 FITTING OF CORRUGATED BELLOW :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
7 FITTING OF PIPING DIESEL GENERATOR S :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
Primer
Painting
putty s/d surfacer
Top coat (Clear Coat)
Elektrik Cabling
Eksterior
Interior
Mekanik rangka bawah
Lavatory
Alat perangkai
Bogie Mounting
Testing
Painting Primer
putty s/d surfacer
Top coat (Clear Coat)
Elektrik Cabling
Eksterior
Interior
Mekanik rangka bawah
Lavatory
Alat perangkai
Bogie Mounting
Testing
SKRIPSI
NDERFRAME
LAMBUNG K3-1 K3-2 K3-3 K3-4 K3-5
FRAME
UNDERFRAME
KET & END UNDERFRAME)
FIX WINDOW
OPENABLE WINDOW
EMERGENCY WINDOW
PROFIL ALL NO 2
PROFIL ALL NO 3
PROFIL ALL NO 4
EMERGENCY LAMP
FRAME BAGAGE
DUMMY COUPLING
T OF PROCESS FITTING
CABLE POWER
CABLE AUDIO+VIDEO
PROFIL ALL NO 2
TAIL LIGHT
T OF PROCESS FITTING
SEPTIC TANK
AC UNIT
CEROBONG UDARA AC
AUTOMATIC COUPLER
DRAFT GEAR
SAFETY CHAIN
HAND BRAKE
T OF PROCESS FITTING
ENTRANCE DOOR
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PARTITION PANEL
T OF PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
INSPECTION COVER
OR EQUIPMENT
T OF PROCESS FITTING
OUPLER
CONTROL PANEL AC
SPEAKER FITTING
T OF PROCESS FITTING
PASESENGER SEAT
T OF PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
TUTUP CENTER PIN
COAT HOOK
FIRE EXTINGUISHER
T OF PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
T OF PROCESS FITTING
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
0% 0% 0% 0% 0%
Progres Total
K3 K3S MP3 TS 1 TS 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
K3-6 K3-7 K3-8 K3-9 K3-10 K3-11 K3-12 K3-13 K3-14 K3-15
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
K3 K3S
TS 3 TS 4 TS 5 TS 6 TS 1 TS 2 TS 3 TS 4 TS 5 TS 6
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
K3-16 K3-17 K3-18 K3-19 K3-20 K3-21 K3-22 K3-23 K3-24
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
MP3
TS 1 TS 2 TS 3 TS 4 TS 5 TS 6
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
PROGRES PRODUK
PROYEK : 6TRA
( 48 K3+ 12 K3 Di
No Ke
No Kereta
: FINISH
: PROCESS
% KETERANGAN
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% #VALUE! 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
DESKRIPSI
TAKT NO UNDERFRAME
NO LAMBUNG
1 GRIT BLASTING
3 PRIMER PAINTING
7 UNITEX (FLOORING)
9 THERMAL INSULATION
10 PUTTY I
TAKT 1
11 SANDING UNITEX
12 PUTTY II
14 SANDING PUTTY
15 SURFACER PAINTING
16 WET SANDING
17 TOUCH UP PUTTY
18 TOUCH UP SURFACER
19 SEALENT GUTTER
2 BASE COAT
3 CLEANER
6 CLEAR COAT
1 WINDOW FITTING :
2 WIRING ON ROOF
6 FITTING OF AC UNIT :
10 FITTING HARDBOARD
TAKT 6
1 FITTING OF APRON :
2 FITTING OF CORRUGATED BELLOW :
TAKT 7
TAKT 8
2 CONNECTING WIRE TO JUMPLER COUPLER
TAKT 8
2 FLOOR COVERING
4 FITTING OF AC UNIT :
6 FITTING OF WIRING :
7 FITTING OF PIPING DIESEL GENERATOR S :
1 BOGIE MOUNTING
6 STATIC TEST
7 RUNNING TEST
8 REPAIRING
9 DELIVERY
Primer
Painting
putty s/d surfacer
Top coat (Clear Coat)
Elektrik Cabling
Eksterior
Interior
Mekanik rangka bawah
Lavatory
Alat perangkai
Bogie Mounting
Testing
Painting Primer
putty s/d surfacer
Top coat (Clear Coat)
Elektrik Cabling
Eksterior
Interior
Mekanik rangka bawah
Lavatory
Alat perangkai
Bogie Mounting
Testing
SKRIPSI
NDERFRAME
LAMBUNG K3-1 K3-2 K3-3 K3-4 K3-5
FRAME
UNDERFRAME
KET & END UNDERFRAME)
EMERGENCY LAMP
FRAME BAGAGE
LUGGAGE RACK ( K3S)
PROFIL ALL NO 2
TAIL LIGHT
T OF PROCESS FITTING
BOX STOP BLOCK
SEPTIC TANK
BOX PUMP SUBERSIBLE
WATER TANK ( LOWER)
AC UNIT
CEROBONG UDARA AC
FLEXIBLE DUCTING OUTLET AC
AUTOMATIC COUPLER
DRAFT GEAR
UNCOUPLING LEVER FITTING
SAFETY CHAIN
DRAFT GEAR GUID & SUPPORT
HAND BRAKE
T OF PROCESS FITTING
ENTRANCE DOOR
WC STOOL
WASH BASHIN
WASTE BIN
HOOK MIRROR
PENGHARUM RUANG
CHUTE LAVATORY
PIPING SEPTIC TANK
PARTITION PANEL
SLIDING DOOR PARTITION
DOOR LINTLE PARTITION
REL WAY GUIDE
T OF PROCESS FITTING
APPRON
GUIDE RAIL
LEAF SPRING
RUBBER CLOSING .
OR EQUIPMENT
T OF PROCESS FITTING
OUPLER
CONTROL PANEL AC
SPEAKER FITTING
T OF PROCESS FITTING
PASESENGER SEAT
T OF PROCESS FITTING
LEMARI JANITOR
CURTAIN
PENGHARUM RUANGAN
TUTUP CENTER PIN
COAT HOOK
FIRE EXTINGUISHER
T OF PROCESS FITTING
GENSET
RADIATOR
DUCTING OF RADIATOR
PROFILE ALLUMINIUM NO 5
PROFILE ALLUMINIUM NO 3
AC UNIT
CEROBONG UDARA AC
DUCTING AC
CABLE DUCT
CONTROL PANEL AC
CEILING PANEL
PEREDAM SUARA
PARTTITION DOOR
ENTRANCE DOOR
T OF PROCESS FITTING
Progres Total
K3 K3S MP3 TS 1 TS 2
21 4 2 8 8
17 3 0 8 8
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
K3-6 K3-7 K3-8 K3-9 K3-10 K3-11 K3-12 K3-13 K3-14 K3-15
100% 100% 40% 100% 100% 100% 60% 0% 100% 60%
100% 100% 0% 100% 100% 100% 0% 0% 100% 0%
63% 63% 0% 63% 63% 63% 0% 0% 63% 0%
20% 60% 0% 20% 80% 80% 0% 0% 60% 0%
117% 50% 0% 0% 250% 250% 0% 0% 117% 0%
0% 9% 0% 7% 9% 9% 0% 0% 9% 0%
19% 15% 0% 0% 29% 29% 0% 0% 19% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 43% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
K3 K3S
TS 3 TS 4 TS 5 TS 6 TS 1 TS 2 TS 3 TS 4 TS 5 TS 6
5 0 0 0 2 2 0 0 0 0
1 0 0 0 2 1 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
K3-16 K3-17 K3-18 K3-19 K3-20 K3-21 K3-22 K3-23 K3-24
100% 100% 100% 100% 100% 100% 100% 0% 60%
94% 100% 100% 100% 94% 100% 82% 0% 0%
63% 63% 63% 63% 63% 63% 63% 0% 0%
20% 80% 60% 60% 80% 40% 20% 0% 0%
0% 250% 50% 150% 200% 50% 0% 0% 0%
0% 9% 9% 7% 9% 9% 0% 0% 0%
0% 33% 12% 23% 29% 23% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 57% 0% 0% 57% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
MP3
TS 1 TS 2 TS 3 TS 4 TS 5 TS 6
1 1 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
PROGRES PRODUK
PROYEK : 6TRA
( 48 K3+ 12 K3 Di
No Ke
100% 0% 0% 100% 100% 60% 0% 0% 0%
100% 0% 0% 12% 100% 0% 0% 0% 0%
63% 0% 0% 0% 63% 0% 0% 0% 0%
80% 0% 0% 0% 80% 0% 0% 0% 0%
250% 0% 0% 0% 200% 0% 0% 0% 0%
9% 0% 0% 0% 9% 0% 0% 0% 0%
29% 0% 0% 0% 33% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
57% 0% 0% 0% 14% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
S PRODUKSI ( FINISHING )
K : 6TRAINSET K3 PMN
+ 12 K3 Difabel + 6 MP3 )
No Kereta
0% 0% 60% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
K3-43 K3-44 K3-45 K3-46 K3-47 K3-48 K3S-1 K3S-2 K3S-3
0% 0% 0% 0% 0% 0% 100% 100% 100%
0% 0% 0% 0% 0% 0% 100% 94% 100%
0% 0% 0% 0% 0% 0% 63% 63% 63%
0% 0% 0% 0% 0% 0% 80% 80% 60%
0% 0% 0% 0% 0% 0% 250% 250% 83%
0% 0% 0% 0% 0% 0% 11% 9% 9%
0% 0% 0% 0% 0% 0% 29% 29% 23%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 57% 14% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
K3S-4 K3S-5 K3S-6 K3S-7 K3S-8 K3S-9 K3S-10 K3S-11 K3S-12
100% 0% 0% 0% 0% 0% 0% 0% 0%
100% 0% 0% 0% 0% 0% 0% 0% 0%
63% 0% 0% 0% 0% 0% 0% 0% 0%
60% 0% 0% 0% 0% 0% 0% 0% 0%
25% 0% 0% 0% 0% 0% 0% 0% 0%
7% 0% 0% 0% 0% 0% 0% 0% 0%
23% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0% 0% 0% 0%
INFORMATION :
: FINISH
: PROCESS
% KETERANGAN
56%
56%
55%
41%
41%
41%
38%
35%
35%
39%
30%
39%
38%
38%
38%
38%
38%
38%
38%
38%
38%
38%
38%
38%
36%
35%
0%
0%
0%
26%
18%
24%
35%
35%
35%
35%
0%
0%
0%
30%
0%
28%
30%
0%
0%
18%
29%
26%
18%
2%
0%
29%
17%
36%
0%
27%
0%
0%
0%
0%
0%
0%
0%
0%
0%
8%
35%
33%
28%
35%
18%
20%
18%
12%
14%
0%
17%
0%
11%
0%
2%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100% 60% 100% 60% 60% 60%
82% 0% 24% 0% 0% 0%
38% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% #VALUE! 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
0% 0% 0% 0% 0% 0%
PENGECATAN PUTTY SAMPAI TOP COAT (CLEAR
JML CABLING
PRIMER SURFACER COAT)
8K3 8 8 0 0
TS1 2KS3 2 2 0 0
1MP3 1 0 0 0
8K3 8 8 0 0
TS2 2KS3 2 2 0 0
1MP3 1 0 0 0
8K3 4 2 0 0
TS3 2KS3 0 0 0 0
1MP3 0 0 0 0
8K3 0 0 0 0
TS4 2KS3 0 0 0 0
1MP3 0 0 0 0
8K3 0 0 0 0
TS5 2KS3 0 0 0 0
1MP3 0 0 0 0
8K3 0 0 0 0
TS6 2KS3 0 0 0 0
1MP3 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
*Satua
8% 0% 0%
4% 0% 0%
7% 0% 0%
2% 0% 0%
1% 0% 0%
2% 0% 0%
0% 0% 0%
1% 0% 0%
0% 0% 0%
0% 0% 0%
BOGIE
TESTING
MOUNTING
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
*Satuan Car
PENGECATAN PUTTY SAMPAI TOP COAT (CLEAR
JML CABLING
PRIMER SURFACER COAT)
8K3 0 0 0 0
TS1 2KS3 0 0 0 0
1MP3 0 0 0 0
8K3 0 0 0 0
TS2 2KS3 0 0 0 0
1MP3 0 0 0 0
8K3 0 0 0 0
TS3 2KS3 0 0 0 0
1MP3 0 0 0 0
8K3 0 0 0 0
TS4 2KS3 0 0 0 0
1MP3 0 0 0 0
8K3 0 0 0 0
TS5 2KS3 0 0 0 0
1MP3 0 0 0 0
8K3 0 0 0 0
TS6 2KS3 0 0 0 0
1MP3 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
*Satua
0% 0% 0%
0% 0% 0%
0% 0% 0%
0% 0% 0%
0% 0% 0%
0% 0% 0%
0% 0% 0%
0% 0% 0%
0% 0% 0%
0% 0% 0%
BOGIE
TESTING
MOUNTING
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
*Satuan Car