11-9 Bechtold Construction is in the process of installing power lines to a large housing development.
Steve Bechtold wants to minimize the total length of wire used, which will minimize his costs. The housing
development is shown as a network in Figure 11.21. Each house has been numbered, and the distances
between houses are given in hundreds of feet. What do you recommend?
Jawab :
Summary of steps
STEP
CONNECTED MODES
UNCONNECTED MODES
CLOSEST
UNCONNECTED
MODE
ARC
SELECTED
ARC
LENGTH
TOTAL
DISTANCE
1-3
2,3,4,5,6,7,8,9,10,11,12,13,14
1,3
2,4,5,6,7,8,9,10,11,12,13,14
1,3,4
2,5,6,7,8,9,10,11,12,13,14
1,2,3,4
1-4
2 or 5
1-2
5,6,7,8,9,10,11,12,13,14
4-5
11
1,2,3,4,5
6,7,8,9,10,11,12,13,14
3-6
14
1,2,3,4,5,6
7,8,9,10,11,12,13,14
6-7
17
1,2,3,4,5,6,7
8,9,10,11,12,13,14
7-9
23
1,2,3,4,5,6,7,9
8,10,11,12,13,14
8-9
26
1,2,3,4,5,6,7,8,9
10,11,12,13,14
10
9 - 10
30
10
1,2,3,4,5,6,7,8,9,10
11,12,13,14
11
10 - 11
33
11
1,2,3,4,5,6,7,8,9,10,11
12,13,14
13
11 - 13
36
12
1,2,3,4,5,6,7,8,9,10,11,13
12,14
12
9 - 12
41
13
1,2,3,4,5,6,7,8,9,10,11,12,13
14
14
12 - 14
45
Jadi, agar panjang kabel yang didapatkan minimal maka jarak antara rumah adalah 4500 ft.
11-10 The city of New Berlin is considering making several of its streets one-way. What is the maximum
number of cars per hour that can travel from east to west? The network is shown in Figure 11.22.
Jawab :
Iterasi I : 1 2 5 7 8
Maksimum flow : 2
0
4
0
2
0
4
8
Iterasi II : 1 3 5 7 8
Maksimum flow : 0 tidak perlu dilakukan iterasi
Iterasi III : 1 3 6 8
Maksimum flow : 2
0
4
2
Iterasi IV : 1 4 6 8
Maksimum Flow : 1
1
3
8
1
2
2
4
Iterasi V : 1 4 8
Maksimum flow : 0 Tidak perlu dilakukan iterasi
Jaringan baru :
0
4
0
1
3
2 2
2
0
7
0
1 6
3
0
3 1
0
1
2
2
4
Maksimum flow :
Path
1 2 - 5 7 8 200
1368
200
1468
100
Total
500
Jadi, maksimum arus mobil per jam dari arah timur ke barat = 500 mobil per jam.
11-16 Transworld Moving, like other moving companies, closely follows the impact of road construction
to make sure that its routes remain the most efficient. Unfortunately, there has been unexpected road
construction due to a lack of planning for road repair around the town of New Haven, represented by
node 9 in the network. (See Problem 11-11.) All roads leading to node 9, except the road from node 9 to
node 11, can no longer be traveled. Does this have any impact on the route that should be used to ship
the office furniture and equipment of Cohen Properties to their new headquarters?
Jawab :
Berdasarkan hasil perhitungan diatas, jarak minimum dari node 1 13 adalah 430, dengan rute melewati
node 1 3 5 7 10 13. Dengan adanya ketentuan bahwa node 6 dan node 8 tidak boleh melewati
node 9 maka tidak berpengaruh terhadap rute terpendek yang dapat dilewati.
11-20 A road construction project would increase the road capacity around the outside roads from
International Drive to Disney World by 200 cars per hour (see Problem 11-19). The two paths affected
would be 126911 and 1581011. What impact would this have on the total flow of cars? Would
the total flow of cars increase by 400 cars per hour?
Dengan adanya penambahan arus menjadi 200 mobil per jam untuk rute 126911 dan 1581011,
menyebabkan pada rute berikut arus meningkat menjadi
6
0
9
10
0
12
11
1
Menjadi
0
7
6
5
9
5
5
11
15
11
12
10
Menjadi
11
8
7
11
10
11
10
1
Menjadi :
10
10
2
2
8
11
17
10
3
16
Menjadi
11
12
1
15
10
5
4
14
Total arus mobil =500 + 800 + 200 + 200 = 1700 mobil per jam.
Dengan adanya penambahan arus menjadi 200 mobil per jam berdampak akan meningkatkan total arus
mobil menjadi 1700 mobil per jam. Artinya penambahan total arus mobil yang ada melebihi 400 mobil
per jam.
11-29 Grey Construction would like to determine the least expensive way of connecting houses it is
building with cable TV. It has identified 11 possible branches or routes that could be used to connect the
houses. The cost in hundreds of dollars and the branches are summarized in the following table.
(a) What is the least expensive way to run cable to the houses?
7
2
5
3
6
5
6
1
6
7
4
5
2
4
5
STEP
CONNECTED MODES
UNCONNECTED MODES
CLOSEST
UNCONNECTED
MODE
ARC
SELECTED
ARC
LENGTH
TOTAL
DISTANCE
2,3,4,5,6,7,8,9
1-2
1,2
3,4,5,6,7,8,9
1-3
11
1,2,3
4,5,6,7,8,9
1-4
17
1,2,3,4
5,6,7,8,9
1-5
22
1,2,3,4,5
6,7,8,9
3-7
27
1,2,3,4,5,7
6,8,9
6-7
28
1,2,3,4,5,6,7
8,9
5-8
32
1,2,3,4,5,6,7,8
8-9
34
Agar setiap rumah dapat dilewati dan diinstalasi kabel TV maka dengan menggunakan teknik minimalspanning tree didapatkan total biaya yang dibutuhkan adalah $34.
(b) After reviewing cable and installation costs, Grey Construction would like to alter the costs for installing
cable TV between its houses. The first branches need to be changed. The changes are summarized in the
following table. What is the impact on total costs?
7
2
5
3
1
5
6
1
1
7
4
1
2
4
5
STEP
CONNECTED MODES
UNCONNECTED MODES
CLOSEST
UNCONNECTED
MODE
ARC
SELECTED
ARC
LENGTH
TOTAL
DISTANCE
2,3,4,5,6,7,8,9
1-2
1,2
3,4,5,6,7,8,9
1-3
1,2,3
4,5,6,7,8,9
1-4
1,2,3,4
5,6,7,8,9
1-5
1,2,3,4,5
6,7,8,9
3-7
13
1,2,3,4,5,7
6,8,9
6-7
14
1,2,3,4,5,6,7
8,9
5-8
18
1,2,3,4,5,6,7,8
8-9
20
Dengan adanya pengurangan biaya, maka total biaya yang dibutuhkan agar setiap rumah dapat dilewati
dan diinstalasi kabel TV berkurang menjadi $20. Namun dapat dilihat bahwa jalur yang dilewati sama
dengan kasus no.a.