SYSTEM PADA PEKERJAAN PLUMBING

Roof Tank

Pompa

Preassure Tank

Roof Area

Kran

Kran
Typical Area
Kran

Pompa
Air PDAM

GWT

Pompa

Note :
=
=
=

Pipa Transfer
Pipa Supply
Pipa Buangan

Saluran Kota
STP/ Sumpit

Basement Area

SYSTEM PADA PEKERJAAN MEKANIKAL ELEK


Stop Kontak
Lampu

MCB 6th

DB 6th

MCB 5th

DB 5th

MCB 4th

DB 4th

MCB 3rd

DB 3rd

MCB2nd

DB2nd

MCB GF

DB GF

Saklar

Stop Kontak
Lampu
Saklar

Stop Kontak
Lampu
Saklar

Stop Kontak
Lampu
Saklar

Stop Kontak
Lampu
Saklar

Stop Kontak
Lampu
Saklar

Listrik PLN

Travo

Mekanikal Elektrikal Room (ME Room)


Note :
= Kabel Feeder
= Kabel Tray
= Kabel MCB to Saklar / Stop Kontak
= Kabel Saklar to Lighting

Panel
Utama

AAN MEKANIKAL ELEKTRIKAL

6th Floor

5th Floor

4th Floor

3rd Floor

2nd Floor

Ground Floor

Panel
Genset

Genset

Basement Area

SYSTEM PADA PEKERJAAN AIR CONDITIONER (AC


Udara dari Luar

Outdoor
Unit

Luar Ruangan

Panel/MCB

Kabel Power

Butom Power

Dalam Ruangan

Note :

Pipa Refrigerant

= Kabel Power
= Pipa Refrigerant + Kabel Kontrol (Di Seal Tape Jadi Satu)
= Pipa Drain (Menghasilkan air dan dibuang ke saluran terdekat/ toilet)

PEKERJAAN AIR CONDITIONER (AC)

Luar Ruangan

Indoor Unit

Pipa Drain

Air

Udara Dingin/ Panas

Toilet / Luar Ruangan