The
TheSupplier
SupplierAssessment
Assessmentisisto
tobe
beaa process
processassessment
assessmentand
andshould
shouldaccurately
accuratelyreflect
reflectthe
theSupplier's
Supplier's
actual
manufacturing
and
quality
processes,
as
evidenced
on
the
manufacturing
floor.
The
actual manufacturing and quality processes, as evidenced on the manufacturing floor. TheAssessment
Assessment
should
shouldvalidate
validatethat
thatthe
theday-to-day
day-to-dayoperations
operationscomply
complywith
withthe
therequirements
requirementsdetailed
detailedin
inthe
theAssessment.
Assessment.
ItItisisinsufficient
insufficientfor
foraaSupplier
Supplierto
tohave
havedocumented
documentedprocedures
proceduresonly.
only.
Recognizing
Recognizingthat
thatsome
somesuppliers
suppliershave
havethe
thecapacity
capacityto
toprovide
providemultiple
multiplecommodities,
commodities,ititisisencouraged
encouragedthat
that
the
theappropriate
appropriatetechnical
technicalassessment
assessmentbe
becompleted
completedin
inparallel
parallelwith
withthe
thequality
qualityassessment
assessmentportion.
portion.There
There
isisalso
alsoaa"Quick
"QuickAssessment"
Assessment"worksheet
worksheetthat
thatcan
canbe
becompleted
completedas
aspart
partof
ofaageneral
generaloverview
overviewor
orvisit
visitof
ofaa
supplier's
supplier'sfacility.
facility.Recognizing
Recognizingthat
thatthis
thisisisaavery
verygeneral
generaloverview
overviewonly,
only,aadetailed
detailedquality
qualityand
andtechnical
technical
assessment
assessmentshould
shouldalways
alwaysbe
becompleted
completedprior
priorto
toaward
awardof
ofnew
newbusiness,
business,substantial
substantialincrease
increaseof
ofexisting
existing
business
or
in
response
to
poor
supplier
performance
and/or
elevated
risk.
business or in response to poor supplier performance and/or elevated risk.
For
Foreach
eachaudit
auditsection,
section,the
therequired
requiredevidence/documentation
evidence/documentationisisdescribed
describedon
onthe
theAssessment
AssessmentForm.
Form.The
The
Assessor
should
also
use
the
"Observations
&
Notes"
field
to
help
clarify
and
explain
their
findings.
Assessor should also use the "Observations & Notes" field to help clarify and explain their findings.AA
"High",
"High","Medium"
"Medium"or
or"Low"
"Low"Risk
Riskstatus
statuswill
willautomatically
automaticallybe
begenerated
generatedby
bythe
thescore
scoreassigned
assignedto
toeach
each
element.
element.The
TheSummary
SummaryScore
Scorefor
foreach
eachparticular
particularelement
elementof
ofthe
theOperational/Quality
Operational/Qualityportion,
portion,will
will
automatically
automaticallybe
bereflected
reflectedon
onthe
theAudit
AuditCover
CoverPage
Pageand
andthe
thetotal
totalnumber
numberof
ofhigh
highrisk
riskelements
elementswill
willbe
be
shown.
shown.The
Therisk
risksummaries
summariesfor
foreach
eachQuick
Quickand
andTechnical
Technicalassessment
assessmentcompleted,
completed,should
shouldbe
bemanually
manually
entered
enteredon
onthe
thecover
coverpage,
page,as
aswell.
well.
All
Allareas
areasassessed
assessedas
as High
High Risk
Riskmust
musthave
haveaadefined
definedCorrective
CorrectiveAction
ActionPlan
Plandetailed,
detailed,as
aswell
wellas
asdates
dates
defined
for
completion,
prior
to
award
of
any
new
business.
Aside
from
the
"High"
risk
elements,
defined for completion, prior to award of any new business. Aside from the "High" risk elements,
corrective
correctiveaction
actionshall
shallbe
beat
atthe
thediscretion
discretionof
ofthe
theAssessor.
Assessor.The
Thegoal
goalof
ofCorrective
CorrectiveAction
Actionisisto
toeliminate
eliminateall
all
"High"
risk
elements
in
addition
to
attaining
a
minimum
score
of
80%
for
each
audit
section.
The
"High" risk elements in addition to attaining a minimum score of 80% for each audit section. The
"Corrective
"CorrectiveAction
ActionPlan"
Plan"contained
containedwithin
withinthe
theAssessment
Assessmentfile,
file,shall
shallbe
beused
usedto
totrack
trackall
allcorrective
correctiveaction
action
activity.
activity.
Subsequent
Subsequent follow-up
follow-up activity,
activity, and
and subsequent
subsequent Assessments
Assessments to
to validate
validate implementation
implementation of
of
Corrective
Corrective Action,
Action, shall
shall be
be the
the responsibility
responsibility of
of the
the originating
originating Magna
Magna Group
Group and
and Supplier
Supplier
Quality/Development
Quality/Development Engineer,
Engineer, and
and must
must be
be initiated
initiated with
with the
the award
award of
of business,
business, at
at the
the latest.
latest.
If
If the
the Assessing
Assessing Group
Group does
does not
not source
source business
business with
with the
the Supplier,
Supplier, development
development activity
activity shall
shall
become
become the
the responsibility
responsibility of
of the
the sourcing
sourcing Group/Division,
Group/Division, as
as defined
defined by
by their
their Business
Business Rules.
Rules.
ItItisisat
atthe
thediscretion
discretionof
ofthe
theparticular
particularMagna
MagnaGroups
Groupsto
tobase
basesourcing
sourcingdecisions
decisionson
onthe
thefinal
finalscore
scoreattained.
attained.
Each
Groups'
Business
Rules
shall
define
the
selection
criteria
to
be
used.
The
aim
of
an
Assessment
isisnot
Each
Groups'
Business
Rules
shall
define
the
selection
criteria
to
be
used.
The
aim
of
an
Assessment
not
336574061.xlsx
simply
the
generation
of
a
score.
The
ultimate
aim
is
to
identify
and
address
areas
of
systemic
failure
simply the generation of a score. The ultimate aim is to identify and address areas of systemic failure
driving
drivingundue
unduerisk
riskto
toour
ourGroups
Groupsand
andDivisions,
Divisions,and
andtherefore
thereforeproper
properresolution
resolutionand
andclosure
closureof
of"High"
"High"risk
risk
items,
items,isiscritical.
critical.
tthe
theSupplier's
Supplier's
The
. TheAssessment
Assessment
in
inthe
theAssessment.
Assessment.
tisisencouraged
encouragedthat
that
ment
mentportion.
portion.There
There
erview or
verview
orvisit
visitof
ofaa
lity and
ality
andtechnical
technical
ncrease
ncreaseof
ofexisting
existing
ssment
ssmentForm.
Form.The
The
heir
findings.
heir findings.AA
signed to
ssigned
toeach
each
ortion, will
portion,
will
lements will
elements
willbe
be
ld be
uld
bemanually
manually
as
aswell
wellas
asdates
dates
elements,
elements,
on
onisisto
toeliminate
eliminateall
all
ection.
The
ection. The
lllcorrective
correctiveaction
action
lementation
lementation of
of
p and
and Supplier
Supplier
ness,
ness, at
at the
the latest.
latest.
ment
ment activity
activity shall
shall
rr Business
Business Rules.
Rules.
efinal
finalscore
scoreattained.
attained.
an
Assessment
isisnot
an Assessment
not
336574061.xlsx
systemic
failure
systemic failure
osure
osureof
of"High"
"High"risk
risk
SUPPLIER ASSESSMENT
SUPPLIER NAME:
DATE OF AUDIT:
ADDRESS / CITY /
STATE
FAX NUMBER:
E-Mail Address
NEW BUSINESS
QUICK ASSESSMENT
ANNUAL ASSESSMENT
FOLLOW-UP ASSESSMENT
TECHNICAL ASSESSMENT
CUSTOMERS (AUTOMOTOVE):
Union Facility
YES
NO
CERTIFICATION EXPIRY
DATE
TS 16949
Certification
CERTIFICATION
EXPIRY DATE
VDA/Other
Certification
CERTIFICATION
EXPIRY DATE
ISO 14001
Certification
YES
YES
YES
Yes
NO
NO
NO
NO
YES
NO
CQI Compliant?
N/A
Yes
CERTIFICATION
EXPIRY DATE
No
CQI #:
Next Assessment:
CQI #:
Next Assessment:
MAGNA PLANTS
SUPPLIED:
(Optional Comments)
Major Strengths of Organization:
79
1)
2)
3)
19
12
9
0
10
0
10
7
0
8
0
4
0
TYPE COMPLETED:
Completed by:
(enter total number of elements at each risk level)
336574061.xlsx
Purchasing
Cover Sheet
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
High Risk
ITEM
336574061.xlsx
4 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
No formal process
Unaware of requirements
336574061.xlsx
5 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
High Risk
ITEM
336574061.xlsx
6 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
10
12
7 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
14
15
16
Does the control plan identify all gauges and test equipment
required for inspection? Including test frequency?
Are Work Instructions for all employees affecting product quality, No work or operator instructions posted, or significant lack
of instructions
including for repair and re-work operations available and
posted?
No start up procedures defines
No evidence of start up controls - such as first-piece,
Are controls in place to verify process start up and job change- containment etc.
over?
No tracking system in place
17
18
19
336574061.xlsx
8 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
336574061.xlsx
9 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
High Risk
ITEM
Is this Supplier ISO or TS registered ? Are they current with their Supplier has no certifications at present
surveillance audit schedule?
336574061.xlsx
10 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
Lack of instructions
Lack of operator training documentation
Missing, or no SPC where required
10
Does the supplier have a record retention process that ensures No formal document retention system
all necessary test, inspection and safety critical records are
retained for period as defined by the Customer?
11
336574061.xlsx
11 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
12
Has this Supplier identified all of the special processes that will
be required? Will any of these special processes require
outsourcing? Are additional controls in place to manage
outsources services?
336574061.xlsx
12 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
High Risk
ITEM
336574061.xlsx
13 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
Does this Supplier have processes / systems in place to confirm No evidence of min/max values set
and manage inventory levels?
No regular cycle or inventory counts
Does the supplier utilize off-site warehouses? If so, is inventory Off-site warehouses used
tracked? Are cycle counts conducted?
No visible controls in place
7
10
336574061.xlsx
14 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
High Risk
ITEM
Does this supplier have a process / system to recertify a tool
after repair but before production is scheduled?
0
No formal process or procedure in place
Does the supplier have a tooling database to track and manage No database or formal tracking system for tools
tooling?
2
Does the supplier conduct a Tooling inventory and compare the No regular inventory
results against the Tooling database?
4
336574061.xlsx
15 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
336574061.xlsx
16 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
High Risk
ITEM
Does this Supplier have a process / system to track and manage No system in place to track quote response
RFQ's to ensure that quotes are submitted by the requested due No system to ensure cross-functional review
date?
Is this Suppliers facility unionized? If yes, what union represents Supplier is unionized
the bargaining unit? When does the current contract expire?
Contract expiry is in <3months
No contingency planning in place at this time
336574061.xlsx
17 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
Does this Supplier have a process / procedure for the selection, No formal procedure for selection of suppliers
qualification, approval, and management of their supply base? No, or minimal tracking of supplier performance
8
Does this Supplier have a process / system in place to disqualify No formal system in place
their suppliers based on performance?
Supplier performance not monitored or,
No reaction to poor supplier performance
10
336574061.xlsx
18 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
High Risk
ITEM
Does this Supplier have a process / system to track and manage No formal process to track scheduled or unscheduled
scheduled and unscheduled downtime for this facility?
downtime
3
336574061.xlsx
19 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
Does this Supplier have a process / system in place to train new No formal training program
employees?
336574061.xlsx
20 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
Engineering
No.
High Risk
ITEM
Does this Supplier have the latest Customer drawings and
specifications for all parts in the program? Does the system
ensure drawing/specifications are at the latest level?
0
No formal tracking system in place
Informal system in place but high potential for obsolete
drawings/specifications in the system
If required by Customer and/or Government regulations is there No system to track validation requirements
proof of annual recertification testing and compliance to DOT
regulations, FMVSS standards, PPAP submission, etc.
2
Is the electronic design program (software) used by the supplier Supplier unable to communicate engineering data,
(with design / Tool design responsibilities) appropriate and
internally
compatible with Magna systems?
336574061.xlsx
21 of 104
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is n
2. If a particular element is currently "N/A" but there is the potential of fut
No formal system in place, or informal system allowing
high chance of error
336574061.xlsx
22 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Score
Moderate to High Risk
336574061.xlsx
23 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Aware of customer requirements
Some level of support in place to support
No formal process
Some evidence of layered audits
No formal process
Some evidence of design or contract reviews
336574061.xlsx
24 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Score
Moderate to High Risk
336574061.xlsx
25 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Evidence of some containment in place, but only on a
limited basis
Supplier only implements containment when directed by
the Customer
Process flow and manufacturing basically match, but some Process flow and manufacturing process match but
out of sequence steps noted
inspection points out of sequence
Risk numbers assigned on FMEA's, but no evident linkage Risk numbers assigned on FMEA's
to customer requirements
Risk numbers linked to customer requirements
336574061.xlsx
26 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Evidence of improvements to mistake proofing, but no
visible link to RPN's
Control plans identify required gauging, test equipment and Control plans identify required gauging, test equipment and
frequencies
frequencies
Only minor exceptions noted
No visible exceptions noted
Process in place to communicate design requirements and Process in place to communicate design requirements and
engineering specifications to suppliers
engineering specifications to suppliers
Minor exceptions noted
No exceptions noted
336574061.xlsx
27 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
336574061.xlsx
28 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Score
Moderate to High Risk
Documented procedure
Issues addressed in timely manner
Lack cross-functional approach
Documented procedure
Timely response to internal & external issues
Cross functional approach used
336574061.xlsx
29 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Formal, but manual system in place
Very few, or no fixtures/gages past due
Fixtures and gages referenced on control plans
336574061.xlsx
30 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Sub-tier suppliers have at least partial evaluation prior to
sourcing
No regular performance reviews
Total High R
336574061.xlsx
31 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Score
Moderate to High Risk
System in place to receive customer orders, but no verified System in place to receive and verify customer orders
back up system
Regular monitoring of delivery performance
No regular tracking of delivery performance
Back up system for receiving orders but system is not
tested regularly
336574061.xlsx
32 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Raw materials/components inventories tracked and
ordered according to min/max values
No linkage to customer orders or releases
Supplier almost always issues ASN but at times in excess Supplier issues ASN for all shipments
of 30 minutes prior to shipment
ASN issued at maximum of 30 minutes prior to shipment
336574061.xlsx
33 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Score
Moderate to High Risk
336574061.xlsx
34 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Preventive maintenance in place
Maintenance driven by tooling/equipment downtime
Maintenance includes production tooling, equipment and
fixtures
336574061.xlsx
35 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Score
Moderate to High Risk
1
Supplier has full technical capability to support Magna
business
Magna represents >35% but <50% of supplier's overall
business
2
Supplier has full technical capability to support Magna
business
Some secondary processing out-sourced
Magna represents >35% but <50% of supplier's overall
business
Supplier is a direct competitor to Magna, but with different Supplier is competitor with Magna, but with different
OE Customer base
technology and/or products
Cross functional team reviews quotes for feasibility
No formal tracking system in place
Supplier is unionized
Contract expiry is in 3-6 months
No contingency planning in place at this time
Supplier is unionized
Contract expiry is in 3-6 months
Contingency planning in place at this time
36 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Procedure defines selection of supplier
Supplier performance is measured/monitored
No evident signs of supplier development
336574061.xlsx
37 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Score
Moderate to High Risk
336574061.xlsx
38 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Plant layout available
Current production flow differs from existing plant layout
336574061.xlsx
39 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Score
Moderate to High Risk
336574061.xlsx
40 of 104
ot applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" section
t there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section.
Formal system in place
Verification that drawings/specifications at latest level
Change control managed by single individual or
department
336574061.xlsx
41 of 104
Negligible to No Risk
Score
Risk
Notes
336574061.xlsx
42 of 104
High
High
336574061.xlsx
43 of 104
Negligible to No Risk
Score
Risk
Notes
336574061.xlsx
44 of 104
High
336574061.xlsx
45 of 104
High
46 of 104
19
336574061.xlsx
47 of 104
Negligible to No Risk
Score
Risk
Notes
336574061.xlsx
48 of 104
49 of 104
12
336574061.xlsx
50 of 104
Negligible to No Risk
Score
Risk
Notes
336574061.xlsx
51 of 104
High
High
10
336574061.xlsx
52 of 104
Negligible to No Risk
Score
Risk
Notes
High
336574061.xlsx
53 of 104
High
336574061.xlsx
54 of 104
Negligible to No Risk
Score
Risk
Notes
High
Facility is owned
Proof available to verify adequate insurance
Customer owned capital insured (Bailee Bond)
High
55 of 104
High
10
336574061.xlsx
56 of 104
Negligible to No Risk
Score
Risk
Notes
336574061.xlsx
57 of 104
High
High
336574061.xlsx
58 of 104
Negligible to No Risk
Score
Risk
Notes
High
High
336574061.xlsx
59 of 104
High
336574061.xlsx
60 of 104
QUICK ASSESSMENT
No.
ITEM
Employees are wearing safety equipment as prescribed in plant health and safety
standards
Evidence of effective lock-out procedure in place, and observed
Good housekeeping practices, including implementation of 5S
Aisle ways are clear and well lit
Emergency exits are clearly marked and easily accessed
Management
Quality System
Advance Planning
Supplier has a detailed process to manage new programs and advance quality planning
There are sufficient resources in place to manage new program activity
There are regular reviews of status on all new programs
Material Control
Problem Solving
General Observations
OBSERVATIONS/NOTES
Score
CORRECTIVE ACTION
Indicate total number of elements per risk level, in summary on Cover Page
Page61 of 104
336574061.xlsx
ITEM
-Maintenance schedule for die cast and trim machines, cooling systems, shot plunger,
Evidence of proper Preventive Maintenance
and furnaces are in evidence
for equipment
- Check lists exist for regular equipment checks by skilled tradesman
10
11
12
OBSERVATIONS/NOTES
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
- Die maintenance cycle count and preventative maintenance in place and operating
- Molten metal preparation, cleaning, and pouring are evident
Indicate total number of elements per risk level, in summary on Cover Page
Page62 of 104
336574061.xlsx
ITEM
The Supplier has the proper type and volume - Number of machines can support capacity
of equipment to support current and quoted - Type of machines used are appropriate for dispensing of
production capacity.
the subcomponents such as the Resistors / Capacitors
OBSERVATIONS/NOTES
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
Page 63 of 104
336574061.xlsx
ITEM
10
11
12
13
14
OBSERVATIONS/NOTES
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
Indicate total number of elements per risk level, in summary on Cover Page
Page 64 of 104
336574061.xlsx
ITEM
OBSERVATIONS/NOTES
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
Page 65 of 104
336574061.xlsx
10
11
12
13
14
15
16
a. Chemical Concentration
b. Tank Temperature
c. Submersion Time
17
OBSERVATIONS/NOTES
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
Indicate total number of elements per risk level, in summary on Cover Page
Page 66 of 104
336574061.xlsx
Technical
Assessment - Forging Machining
- Presence of critical inspection
No.
ITEM
The Supplier has the proper type
and volume of equipment to
support current and quoted
production capability.
equipment
APQP Documentation
AIAG
-- Review
current 8Ds formeets
completion
Tier
2/3 Supplier
PPAP
- Engineering
Records
of Audits
Change
Records
- Hydraulic
(e.g.
standard
CMM,
pressures
Material
areTester
monitored
etc.)for &
All
Evidence
Error-proofing
material
of
specifications
CFT
to
onresolve
line
are
problems
available
Records
of Instructions
Advance
Quality
PlanningREQUIRED
- Audit
Inspection
Schedule
based
on
are
process
changed
towith
EVIDENCE/
DOCUMENTATION
tonnage,
- Record
Engineering
Records
Availability
Approved
Review
ejector
submitted
of
packaging
Early
to
software
load.
3rd
PPAP
Product
Party
plans
packages
(e.g.
Certified
CATIA,
for Test
-known
Poka
Yoke
of
Customer
Non-conformance
Tier 2/3 Suppliers
reflect
requirements
-reports
- In
IGIS
Containment
Run-at-Rate
Warehouse
Program
accuracy
process
etc.)
Review
and
isare
clean
or
completeness
OEE
Process
&
are
orderly
Documents
controlled
Flow
Lot
Lock
numbers
boxes
& drawings
for
controlled
defects
and
traceable
- (High
Records
of regular
Supplier
latest
Customer
level
PPM,
FailureAudits
Modesand
etc.)
-- Center
CAE,
Packaging
Review
Organization
Records
Facilities
Mold
benches
Pre-Launch
of
ensures
flow,
Program
Chart
available
Stress
protection
Control
showing
Review
Analysis
for
Plans
TIR
ofof
Meetings
product
checks
etc.
Boxes
Record
status.
and
Evidence
ofof
drums
daily
of
verification
are
Tracking
clean
and
Log.
sealed
error
a.
Number
machines
support
-development
PPAP
Evidence
documents
of Lessons-Learned
reflect can
latest
to
level
drive capacity
-proof
Flash
Inspection/Test
resources
under
records
is monitored
toaction
validate
testing
Application
offill
corrective
all
b.
Type /of
equipment
quoted
isacross
capable
- Manufacturing
improvement
Documents
at latest
level of
- applicable
Responses and
to out
of specification
similar
products
meeting part complexity
conditions
OBSERVATIONS/NOTES
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
Tonnage
and
ejector
force
monitored
-- Center
CAE,
Packaging
Review
Organization
Records
Facilities
Mold
benches
Pre-Launch
of
ensures
flow,
Program
Chart
available
Stress
protection
Control
showing
Review
Analysis
for
Plans
TIR
of Meetings
product
checks
etc.
a.
Maintenance
schedule
for
equipment
development
- Flash
Inspection/Test
resources
under fillrecords
is monitored
to validate testing
b.
Ram /alignment
- Responses to out of specification
c.
Check valves, hydraulics
conditions
d. Coolant and/or cutting fluids are kept at
appropriate concentration levels
latest
Customer
level is appropriate
PPM, Failure Modes
etc.)
a.(High
Equipment
for component
- Record
status. Evidence
of daily of
verification
Tracking Log.
of error
- Evidence
PPAP documents
of Lessons-Learned
reflect latestto
level
drive
complexity
-proof
Application of corrective action across all
- Manufacturing
improvement
Documents at latest level
b.
CMM
onsite
applicable and similar products
c. Is production gaging suitable for inspection in
serial production
d. Adequate engineering support as required
10
Equipment complexity is
appropriate for scope of work
requirements
reflect
- Lock boxes
reports
&
for defects
Page 67 of 104
336574061.xlsx
Technical
Assessment - Forging Machining
- Presence of critical inspection
No.
ITEM
equipment
APQP Documentation
AIAG
-- Review
current 8Ds formeets
completion
Tier
2/3 Supplier
PPAP
- Engineering
Records
of Audits
Change
Records
- Hydraulic
(e.g.
standard
CMM,
pressures
Material
areTester
monitored
etc.)for &
All
Evidence
Error-proofing
material
of
specifications
CFT
to
onresolve
line
are
problems
available
Records
of Instructions
Advance
Quality
PlanningREQUIRED
- Audit
Inspection
Schedule
based
on
are
process
changed
towith
EVIDENCE/
DOCUMENTATION
tonnage,
- Record
Engineering
Records
Availability
Approved
Review
ejector
submitted
of
packaging
Early
to
software
load.
3rd
PPAP
Product
Party
plans
packages
(e.g.
Certified
CATIA,
for Test
-known
Poka
Yoke
of
Customer
Non-conformance
Tier 2/3 Suppliers
reflect
requirements
-reports
- In
IGIS
Containment
Run-at-Rate
Warehouse
Program
accuracy
process
etc.)
Review
and
isare
clean
or
completeness
OEE
Process
&
are
orderly
Documents
controlled
Flow
Lot
Lock
numbers
boxes
& drawings
for
controlled
defects
and
traceable
- (High
Records
of regular
Supplier
latest
Customer
level
PPM,
FailureAudits
Modesand
etc.)
-- Center
CAE,
Packaging
Review
Organization
Records
Facilities
Mold
benches
Pre-Launch
ensures
flow,
Program
Chart
available
Stress
protection
Control
showing
Review
Analysis
for
Plans
TIR
ofof
Meetings
product
checks
etc.
Boxes
Record
status.
and
Evidence
ofof
drums
daily
of
verification
are
Tracking
clean
and
Log.
sealed
error
-development
PPAP
Evidence
documents
ofare
Lessons-Learned
reflect with
latesttool
to
level
drive
a.
Broaches
tagged
life
-proof
Flash
Inspection/Test
resources
/ under
records
is monitored
toaction
validate
testing
Application
offill
corrective
across
all
- Manufacturing Documents at latest level
improvement
documented
- applicable
Responses and
to out
of specification
similar
products
b.
Controls in place to prevent double hits
conditions
12
13
15
16
17
OBSERVATIONS/NOTES
11
14
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
Indicate total number of elements per risk level, in summary on Cover Page
Page 68 of 104
336574061.xlsx
ITEM
Page 69 of 104
336574061.xlsx
ITEM
Page 70 of 104
336574061.xlsx
10
ITEM
Proper methods in place to control required
material mixing and processing
11
12
13
Page 71 of 104
336574061.xlsx
OBSERVATIONS/NOTES
"N" = No Compliance/Evidence
Score
Page 72 of 104
336574061.xlsx
OBSERVATIONS/NOTES
"N" = No Compliance/Evidence
Score
Page 73 of 104
336574061.xlsx
OBSERVATIONS/NOTES
"N" = No Compliance/Evidence
Score
ndicate total number of elements per risk level, in summary on Cover Page
Page 74 of 104
336574061.xlsx
iance/Evidence
plicable
"N" = No Compliance/Evidence
CORRECTIVE ACTION
Page 75 of 104
336574061.xlsx
iance/Evidence
plicable
"N" = No Compliance/Evidence
CORRECTIVE ACTION
Page 76 of 104
336574061.xlsx
iance/Evidence
plicable
"N" = No Compliance/Evidence
CORRECTIVE ACTION
Page 77 of 104
336574061.xlsx
ITEM
Are there adequate controls for receiving Confirm system for receiving inspection and
inspection of incoming material.
identification of incoming material.
Is lot traceability maintained for received Must record all casting lots loaded on machine with
components
their Lot number, Date, Time, Supplier name
OBSERVATIONS/NOTES
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
10
11
12
13
14
15
16
Page 78 of 104
336574061.xlsx
ITEM
17
18
19
20
21
22
Are tool presetting, tool changes and tool Review supplier controls for tool presets, tool changes
offsets done by skilled technicians?
and tool offsets
23
24
25
26
27
28
29
30
31
OBSERVATIONS/NOTES
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
Page 79 of 104
336574061.xlsx
ITEM
OBSERVATIONS/NOTES
32
33
34
35
36
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
Indicate total number of elements per risk level, in summary on Cover Page
Page 80 of 104
336574061.xlsx
ITEM
OBSERVATIONS/NOTES
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
10
Page 81 of 104
336574061.xlsx
11
ITEM
OBSERVATIONS/NOTES
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
Sintering
12
13
14
15
16
Condition of Furnace
Indicate total number of elements per risk level, in summary on Cover Page
Page 82 of 104
336574061.xlsx
ITEM
OBSERVATIONS/NOTES
6
Proper set up processes are in place
336574061.xlsx
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
10
ITEM
OBSERVATIONS/NOTES
11
13
Proper methods in place to control resin and
raw material
14
15
Proper methods in place to control required
material mixing and processing
16
336574061.xlsx
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
ITEM
17
Supplier has adequate tool design and
manufacturing capability
18
19
Supplier utilizes technology, as appropriate,
to maximize efficiency
OBSERVATIONS/NOTES
Indicate total number of elements per risk level, in summary on Cover Page
336574061.xlsx
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
ITEM
The Supplier has the proper type and volume - Number of machines and spindle type can support capacity
of equipment to support current and quoted - Vertical or Horizontal turrets in use
production capability.
- Machines are fully automated, as appropriate
The Supplier has Process Controls to ensure - Machine size is appropriate for product
conformance to product design and
- Evidence of SPC Controls in use
requirements
- Bar diameter and size is appropriate for products
OBSERVATIONS/NOTES
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
10
11
Page 86 of 104
336574061.xlsx
ITEM
OBSERVATIONS/NOTES
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
12
13
14
15
Indicate total number of elements per risk level, in summary on Cover Page
Page 87 of 104
336574061.xlsx
No.
OBSERVATIONS/NOTES
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
a. All rework processes are identified on P Flow, CP, FMEA & PPAP'd.
b. Standardized Work for all rework operations..
c. Are all molding parameters clearly defined and available at presses?
d. Is process for removing excess flash automated to insure consistency for excess flash
removal?
a. Controls in place for monitoring rubber prep process i.e..: Mill roll temp.; perform tooling
temp.; cutter speed, weight verification; poppet die size; shape / wedge cut; specific gravity;
d. FIFO in place for coated mat'l.
e. Identification for FIFO and WIP is in place.
- Billet/bar temperature controlled
(hot/warm process)
- Tonnage and ejector force monitored
Page 88 of 104
336574061.xlsx
No.
ITEM
a. Compression Rings, Sleeves, etc. are organized and stored for easy access.
b.Tooling is cleaned and reviewed after each run, including repair, polish, or replacement as
Supplier has adequate controls in
required.
place for storage and maintenance of
c. Evidence of periodic checks for bell mouth condition at i.d. interface.
standard tooling
d. Inventory levels maintained.
e. Tools are properly identified with Customer I.D. if applicable.
10
11
a. Adequate number and skilled tool engineers onsite to support mfg. plant.
b. Design capability, including ability to translate math data (CATIA, UG, Pro-Eng etc.)
c. Adequate CAD licenses for scope or work.
12
13
14
15
Seals
OBSERVATIONS/NOTES
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
Page 89 of 104
336574061.xlsx
No.
ITEM
16
17
18
a. Solution ratio.
b. Temperature.
c. Time.
- Billet temperature is controlled and monitored
- Forgings monitored and controlled for Laps &
flats
- Forgings monitored and controlled for cracks,
including end cracks
- Seals
OBSERVATIONS/NOTES
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
Indicate total number of elements per risk level, in summary on Cover Page
Page 90 of 104
336574061.xlsx
ITEM
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
OBSERVATIONS/NOTES
Are nitrogen systems (self-contained) part of - All nitrogen systems must be part of a predictive
maintenance program (based on hits, not time) to ensure
supplier predictive maintenance plan?
that no non-conforming product can be produced as a result
of low or excessive tonnage.
10
Page 91 of 104
336574061.xlsx
ITEM
11
12
13
14
15
OBSERVATIONS/NOTES
Score
"N" = No Compliance/Evidence
CORRECTIVE ACTION
16
17
18
19
Page 92 of 104
336574061.xlsx
Customer
Status
No.
Issue Description
DO
Actions Taken
Responsibility
Project name
Materials 1
= Behind
2
= O.K.
3
= Completed
4
5
6
Quality 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Manufacturing 1
2
3
4
5
6
= Behind
= O.K.
= Completed
1
2
3
4
5
6
7
8
9
10
11
Engineering -
12
13
Magna PPM
300
250
200
150
100
50
0
40553
40585
40617
40649
40681
40713
40745
40777
WORKSHEET
PDCA Update
06/21/10
Task Timing
Target
Date
Project name
Materials -
Quality -
Closed
Date
Results/Conclusions
Comments
Manufacturing -
Engineering -
- Plantwide Initiatives
agna PPM
745
Magna PPM
40777
40809
40841
40873
40905
40937
Month
Magna PPM
Jan-11
Feb-11
Mar-11
Apr-11
May-11
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Revision Summary
Previous Level
8/29/2005
8/29/2005
New Level
9/26/2005
9/26/2005
Guidelines
Page #
Element #
8/29/2005
9/26/2005
27
8/29/2005
9/26/2005
24
8/29/2005
8/29/2005
8/29/2005
8/29/2005
8/29/2005
8/29/2005
8/29/2005
8/29/2005
8/29/2005
8/29/2005
8/29/2005
8/29/2005
8/29/2005
8/29/2005
8/29/2005
9/26/2005
9/26/2005
9/26/2005
9/26/2005
9/26/2005
9/26/2005
9/26/2005
9/26/2005
9/26/2005
9/26/2005
9/26/2005
9/26/2005
9/26/2005
9/26/2005
9/26/2005
9/26/2005
2/27/2006
4
Cover
Cover
Cover
Cover
4
3
3
4
4
4
2
2
3
30
Description
Language changed/added to paragraphs 2, 5 & 6
Certified 3rd Party Test Facility added
29
25
20
29
29
30
17
16
23
Guidelines
Cover
2/27/2006
3/20/2006
3/20/2006
3/20/2006
3/20/2006
7/25/2008
7/25/2008
9/23/2008
H/Treat
Plating
Cover
3/20/2006
9/23/2008
Finance
9/23/2008
9/26/2008
9/26/2008
10/1/2008
Finance
10/1/2008
2/10/2010
Finance
Organization
Plastic Inj
All
All
2/10/2010
9/27/2010
10/31/2010-V10
9/27/2010
10/31/2010-V10
11/01/2010-V11
336574061.xlsx
10 & 11
All
All
11/01/2010-V11
02/18/2011-V12
02/18/2011-V12
03/14/2011-V13
03/14/2011-V13
04/15/2011-V14
04/15/2011-V14
05/04/2011-V15
Cover
Quality
Facilities/
Tooling
Purchasing
Operations
Engineering
Quick
Assessment
Detailed
Quality Ass't.
Materials
Purchasing
Corrective
Acition
All
Advance Q.
Operations
Organization
Purchasing
Quality
09/30/2011-V16
14
12
Materials
05/04/2011-V15
Cover
Detailed
Quality Ass't.
336574061.xlsx
All
19
7
7
3
6
4
6
7
3
10
3
6
10
16
All
All
Description
nts defined
(if required)
show Current PPM
to Strengths & Weaknesses
e question added
ks or constraints added
or-proofing added
signature" added
ainers" added
bar code labelling" added
er List added
Conditions added
ab removed
336574061.xlsx
nformation added
s Sections redefined
s Sections redefined
s Sections redefined
s Sections redefined
s Sections redefined
revised
revised
quirements added
requirements added
to PDCA Tracker
revised
information added
336574061.xlsx