Best Practices
Applies to:
SAP R/3, SAP ECC 6.0 and SAP BW 3.5/SAP BI 7.0. For more information, visit the EDW homepage.
Summary
This article gives an overview of the SAP Transport Procedure (STMS) and the Best Practices which would
help in smooth flow of Transports.
Author:
Vinay Soin
Author Bio
Vinay is currently working with Cognizant as BW Consultant. He has around 6 years of experience in BW. He
is involved in various Implementation projects across various clients.
Table of Contents
Purpose............................................................................................................................................................... 3
Overview ............................................................................................................................................................. 3
Landscape .......................................................................................................................................................... 3
Packages ............................................................................................................................................................ 3
Change Request ................................................................................................................................................. 4
Creating a task .................................................................................................................................................... 4
Prerequisite ..................................................................................................................................................... 4
Steps. .............................................................................................................................................................. 4
ECC Request Transport Path ............................................................................................................................. 5
BW Transport Path ............................................................................................................................................. 6
Process and Dependencies ............................................................................................................................ 6
First Steps .................................................................................................................................................................... 6
Dependencies .............................................................................................................................................................. 6
Sequence ..................................................................................................................................................................... 7
Purpose
The purpose of this document is to describe the transport policy, procedures and best practices. This
document will provide a detailed approach on the transport strategy.
Overview
This document covers the transport procedure for ECC and BW.
SAP provides the necessary mechanisms and tools for supporting this strategy such as the SAP Transport
Management System (STMS). This is a SAP designed tool to ensure that data and objects are migrated
correctly and are accurately tracked from system to system and client to client
Landscape
For each SAP component we will have a system landscape, Development, Assembly/Product Test, UAT and
Production. Developments will be made in the Development environments. Initial assembly and product
testing will commence in QA1. Later testing phases take place in QA2. Cutover testing, (pre) Production
testing and eventually go-live will take place in Production.
Configuration customizing and ABAP development objects will be transported through the systems from
Development, QA1, QA2 and onto Production.
Development
String
QA1
QA2
QA
Production
All customization and developments occur in the Development systems. The majority will be transported to
QA1, QA2 and Production systems.
The transports are managed by SAPs Transport Management System (TMS).
Packages
Packages contain a group of development objects that are logically related that is, objects that must be
developed, maintained, and transported together. It allows the easy creation of a transport with all the
elements included in it.
a. BW Objects are created as local objects (non-transportable) and by default are saved in the
development class $TMP. As we will be migrating newly created BW Objects, it is imperative
that ALL BW Objects be transportable, hence they cannot be saved under the default
development class. Rather, all transportable objects are to be saved under Z development
classes that (e.g., ZDEV). Or other classes as maintained by the projects.
Example:
$TMP is used for local objects, and is non transportable.
Z packages are used to capture all development objects and enable transport to the next
system environment (DEV to QA1 and then to QA2 and PROD)
Change Request
Standard SAP tools will be used to manage the change and transport process between environments.
The standard SAP Change and Transport System (CTS) mechanism called SAP Transport Change
Request (SAP CR) is used to manage recording, documenting and transporting changes throughout the
SAP system landscape. All changes in the implementation process are recorded to change requests. The
change requests once released are exported into the SAP transports.
Changes should be unit tested in Development system before being released from the Dev environment.
Steps
1.
2.
3.
4.
5.
6.
7.
Change Request is created in the respective clients (ECC DEV and BW DEV).
Login to clients ECC DEV and BW DEV.
Transaction SE10.
Select create request and decide if it is a customizing or workbench request.
Enter a short description for the request and use the naming conventions in section 9.
Add users to the tasks.
Save the request
Creating a task
Prerequisite
Configuration / development request has to be created in clients ECC DEV and BW DEV
Change Request has been created and user has been assigned.
Steps
When users start build, they can assign their work to transportable requests. It is important that users assign
their work to the correct Change Request as it is possible to have many for a single user. So when a user
begins development/customization and is asked to assign work to a transportable request, the user should
select one of their own requests.
1. Once they have completed the discrete piece of work, the user should unit test to ensure accuracy.
2. The task would be documented. This will be invaluable whenever there are problems with transports
between clients. This can be achieved in transaction SE10. Double click the task and then click the
Documentation Tab.
3. Release the task. In SE10, click on the task and press F9 or click on the truck icon.
The following figure below shows the transport path for both ECC.
ECC - Customizing/Developments
R/3
Development
PSV
100
Gold Develop
Development
&
Customise
120
Unit
Test
130
140
Sandbo
x
Routes
Assembly
Test
100
Assembly
Testing
100
UAT
UAT
Production
Production
BW Transport Path
The following figure below shows the transport path for BI.
BW Clients/Instances - Customizing/Developments
Routes
R/3
Development
PSV
100
100
Gold Develop
Development
&
Customise
Assembly
Assembly Testing
140
100
Test
UAT
100
UAT
Production
100
Production
Sequence
The sequence in which a transport is to take place is extremely important. The mechanism for a transport
can not deviate; else the transport will fail, and cause the subsequent transports for that particular InfoCube
to fail as well. The order of battle for the transport release queue is defined below.
a. All ECC components, User Exits, Programs, etc
b. BW components (Import Execution Order)
Info Area
Info Object Catalog
Info Objects
c.
<Functional Team>:
For Example:
FI Finance,
HR HR,
PS Projects,
PP Procurement,
BI Reporting,
SE SEM,
BA Basis
AB ABAP (if not assign to any of the above teams);
<Type>:
CU customizing/configuration
WO ABAP/Workbench
<Identifier>:
Subsequent numbers which can be used if change request will need to be re-transported.
1, 2, 3 ..
Example:
1:HR:CU:1: Address Details configuration
1:FI:WO:1: Account Details - ABAP
The identifier indicates if a change request is a fix to a tested and rejected change request. For example if a
CR has been assembly tested in QA1 and requires adjustments then the change request has to be rejected
in the QA1 and the work has to be redone in the DEV system. A new CR is created and all objects from the
rejected CR should be added to the new CR (automatic process; there is a process to specify the change
request number to copy from) and the new task is created to do the required fix. If the fix is the first one, the
identifier will be incremented by 1, therefore the identifier will be 2. If another fix is necessary this identifier
will be incremented again and will be 3. It is very important to include all the objects from rejected
CR/transport since none of these objects will be transported to the target system.
Transporting Procedure
Build Phase Developments
Customizing / Development
At the start of the build phase each functional lead will create a number of change requests for the team to
record their customizing and development against. The change request owner will create the transports by
functional area or SAP component type, as they require, splitting the work into logical units of related
configuration. The team members will each have a task under the relevant transport request to store their
changes. The change request owner will be able to create new tasks as required (e.g. if a new team
member joins or if a team member starts working in a new functional area). The change request owner will
also be able to create additional transport requests through the build phase, if required, but these should be
kept to a minimum during the build phase.
Ongoing Development / Fixes
Ongoing development and fixes follow the same process as the initial build. The change request owner will
need to create a change request and assign users to it for development. The one difference is if a specific
change request that has been released into QA1 and is subsequently found to be incorrect. The change
request owner should in this instance reject this transport using STMS_QA and a new change request would
have to be created based on the original thereby including all the objects in the original change request. If
the original objects are not included in the new Change request, there maybe a situation where objects will
not get transported into Test and then Production.
Steps to create a new Change Request based on the previous :-
1. The original Change Request has been released and transported but is subsequently found to be
incorrect.
3. Enter the description as per the naming strategy. And click the save icon.
5. Right click on this to bring up the menu list and select Include Objects.
Transport Schedule
Transports will be imported into target QA clients based on the designated schedule or as per request.
Emergency Transports
Emergency transports cover typical scenarios such as:The system has stopped working; configuration is fundamentally wrong and is having an adverse effect on all
other clients etc.
This follows the same transport route, but the Transports are pushed immediately as and when the change is
fixed and does not wait for a dedicated schedule for Transport push.
Releasing Exporting Transports
Releasing a change request is a significant step in the overall change management process:
It indicates that the change objects recorded in the change request have been unit tested and are
ready for transport
It freezes the objects recorded in the change request
It places the change request in the import queue of the target system
If a change request is not ready for promotion to the quality assurance system, it should not be released.
Developers should activate object checks for Repository objects in the development system. Object checks
identify and display errors found in customer developments before the change request is released (e.g.
program syntax errors). The errors should be corrected or verified by the developer before the change
request is released.
TMS QA
TMS Quality Assurance increases the quality and the availability of the production systems by validating
requests in the QA system before they are delivered to subsequent systems.
-
Best Practices
Transport Collection Timing Do not start transporting until the development is stable. When new
objects are created (e.g. InfoObjects, DSOs) these are by default created as local objects ($TMP). Leave
all new objects as $TMP until they are absolutely ready for transport.
Transport Request Deletion Do not delete any transport Requests in the DEV system. If you do not
require a transport request to be transported, rename and append DO NOT TRANSPORT in the name.
Then release the transport and ask Basis not to import the request to the QA system. Deleting transports
may affect the control process of managing transports.
Transport Import Sequence Ensure that objects are transported in the correct sequence otherwise
errors may result. [See section Sequence for the sequence of transporting BW objects]. Ensure also
that a transport has been successfully imported before transporting the next set of dependent objects.
(For e.g. suppose that you have 2 requests A and B. For B to be transported successfully it requires that
transport A has been successfully imported first. Communicate with Basis in order to make sure that
import of transports A and B do not commence at the same time; import of transport B should only
commence after transport A has been successfully imported first).
No changes to be made directly in QA or PROD Make sure that QA and PROD clients are not open
to changes, as manual changes in these clients will break the sync between DEVQAPROD
Make sure that the ECC transports that are required by the BW transports are successfully
imported before the BW transports Make sure that ECC DataSources are replicated prior to initiating
the BW transports.
BEx Transports With BEx Objects it is necessary that there is always an open BEx transport request.
As this transport request will be collecting all BEx related changes (e.g. Query Changes) make sure that
this transport is not transported to the QA system. As a best practice always have an open BEx dummy
transport. When the development (e.g. query) is stable and a developer wants to transport the query, the
dummy transport should first be released but not transported. Then the query should be collected via
Transport Connection and transported.
InfoObjects & InfoObject Catalogs - With InfoObjects it is preferred that there is always one open
transport where InfoObject related transports are collected (new InfoObjects are added as tasks to the
existing request). Then whenever a developer needs to send the InfoObjects to QA then that request is
send and a new one is created.
Maintain a Transport Status Log A transport log should be maintained in order to track the status of
transports
Glossary
Change request used to group tasks and help to manage number of transport and dependencies; should
be testable unit not too small but not too big; should be planned and created before starting
customizing/development activities; if required can be created on demand (balance between control and
flexibility)
Tasks Customizers/Developer should use their own request created by Change Request Owners;
Unit test Perform the required tests pertaining to the Individual Transports and check for the integrity.
Dependencies Dependencies between change requests; Developers must keep log of change requests
and dependencies;
Transport After releasing change request becomes transport; SAP Basis team should be informed about
transport/change request number and dependencies (e.g. the sequence in which the transport should be
imported etc.)
Transactions:
SE09 & SE10 : Used to create change requests, transports and tasks
Related Content
http://help.sap.com/saphelp_nw04/helpdata/en/0b/5ee7377a98c17fe10000009b38f842/content.htm
http://en.wikipedia.org/wiki/Transport_(SAP)
http://wiki.sdn.sap.com/wiki/display/BI/Transport+Sequence+in+SAP+BW
For more information, visit the EDW homepage.