Professional Documents
Culture Documents
Completion - Design - Manual - Very Good
Completion - Design - Manual - Very Good
ENI S.p.A.
Agip Division
ORGANISING
DEPARTMENT
TYPE OF
ACTIVITY'
ISSUING
DEPT.
DOC.
TYPE
REFER TO
SECTION N.
PAGE.
OF
STAP
295
7100
TITLE
COMPLETION DESIGN MANUAL
DISTRIBUTION LIST
Eni - Agip Division Italian Districts
Eni - Agip Division Affiliated Companies
Eni - Agip Division Headquarter Drilling & Completion Units
STAP Archive
Eni - Agip Division Headquarter Subsurface Geology Units
Eni - Agip Division Headquarter Reservoir Units
Eni - Agip Division Headquarter Coordination Units for Italian Activities
Eni - Agip Division Headquarter Coordination Units for Foreign Activities
NOTE: The present document is available in Eni Agip Intranet (http://wwwarpo.in.agip.it) and a
CD-Rom version can also be distributed (requests will be addressed to STAP Dept. in
Eni - Agip Division Headquarter)
Date of issue:
28/06/99
f
e
d
c
b
Issued by
REVISIONS
M. Bassanini
28/06/99
C. Lanzetta
28/06/99
A. Galletta
28/06/99
PREP'D
CHK'D
APPR'D
The present document is CONFIDENTIAL and it is property of AGIP It shall not be shown to third parties nor shall it be used for
reasons different from those owing to which it was given
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
2 OF 295
REVISION
STAP-P-1-M-7100
INDEX
1.
2.
3.
INTRODUCTION
1.1.
1.2.
OBJECTIVES
12
1.3.
FUNCTIONS OF A COMPLETION
13
1.4.
13
RESERVOIR CONSIDERATIONS
14
2.1.
INTRODUCTION
14
2.2.
14
14
14
15
16
17
18
24
27
2.3.
HYDROCARBON DATA
2.3.1.
Oil Property Correlation
28
28
2.4.
RESERVOIR/PRODUCTION FORECAST
2.4.1.
Inflow Perfomance
2.4.2.
Reservoir Simulation For IPR Curves
2.4.3.
IPR Selection
2.4.4.
Outflow Performance
2.4.5.
Flow Rate Prediction
29
31
42
44
46
55
WELL TESTING
60
3.1.
INTRODUCTION
3.1.1.
Types of Tests
60
60
3.2.
DST OBJECTIVE
63
3.3.
DST STRING
64
3.4.
RESERVOIR CHARACTERISTICS
3.4.1.
Pressure Build-Up Analysis
3.4.2.
Basics Of DST Operations
3.4.3.
Common Test Tools Description
3.4.4.
Tools Utilised With Permanent Packer Systems
3.4.5.
Sub-Sea Test Tools Used On Semi-Submersibles
3.4.6.
Deep Water Tools
3.4.7.
Downhole Pressure Recording
69
69
77
77
80
80
81
82
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
3.5.
4.
5.
3 OF 295
0
83
83
84
84
DRILLING CONSIDERATIONS
87
4.1.
CASING DESIGN
4.1.1.
Casing Profile
4.1.2.
Casing Specifications
4.1.3.
Casing Connections
87
87
88
89
4.2.
89
4.3.
90
90
91
92
5.1.
94
94
96
96
5.2.
RESERVOIR-WELLBORE INTERFACE
5.2.1.
Open Hole Completions
5.2.2.
Uncemented Liner Completions
5.2.3.
Perforated Completions
5.2.4.
Multi-Zone Completions
97
97
98
100
101
5.3.
CASING-TUBING INTERFACE
5.3.1.
Packer Applications
5.3.2.
Packer-Tubing Interfaces
5.3.3.
Annulus Circulation
104
106
107
108
5.4.
TUBING-WELLHEAD INTERFACE
5.4.1.
Tubing Hanger Systems
5.4.2.
Xmas Trees
5.4.3.
Metal-To-Metal Seals
109
109
115
115
5.5.
FUTURE CONSIDERATIONS
5.5.1.
Stimulation
5.5.2.
Formation Management
5.5.3.
Well Servicing Techniques
117
118
118
119
5.6.
121
123
123
123
124
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
6.
7.
4 OF 295
CORROSION
126
6.1.
DEVELOPMENT WELLS
126
6.2.
126
6.3.
FORMS OF CORROSION
6.3.1.
Sulphide Stress Cracking (SSC)
6.3.2.
Corrosion Caused By CO2 And Cl
6.3.3.
Corrosion Caused By H2S, CO2 And Cl-
128
128
135
137
6.4.
138
6.5.
CORROSION INHIBITORS
139
6.6.
139
139
140
140
140
142
6.7.
142
142
142
6.8.
MATERIAL SELECTION
6.8.1.
OCTG Specifications
6.8.2.
DHE Specifications
6.8.3.
Wellhead Specifications
144
145
146
147
6.9.
ORDERING SPECIFICATIONS
152
TUBING DESIGN
153
7.1.
POLICIES
153
7.2.
THEORY
7.2.1.
Mechanical Properties of Steel
7.2.2.
Temperature
7.2.3.
Tubing Movement/Stress Relationship
153
154
158
158
7.3.
WELL DATA.
7.3.1.
Casing Profile/Geometry
7.3.2.
Tubing Data
7.3.3.
Bottom-hole Pressure
7.3.4.
Temperatures (Static and Flowing)
7.3.5.
Reservoir Fluids
7.3.6.
Completion Fluid
160
160
160
160
160
161
161
7.4.
161
162
163
167
168
7.5.
169
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
170
172
174
7.7.
174
174
175
175
177
177
181
7.8.
TUBING SELECTION
7.8.1.
Critical Factors
7.8.2.
Tubing Size And Weight
7.8.3.
Anchoring Systems
181
182
182
184
7.9.
TUBING CONNECTIONS
7.9.1.
Policy
7.9.2.
Class of Service
7.9.3.
Selection Criteria
7.9.4.
NACE And Proximity Definitions
7.9.5.
CRA Connections
7.9.6.
Connection Data
185
185
185
186
189
190
190
8.
5 OF 295
SUB-SURFACE EQUIPMENT
190
191
193
195
195
196
205
206
8.1.
PACKERS
8.1.1.
Selection Procedure
8.1.2.
Selection Criteria
8.1.3.
Well Classification
8.1.4.
Packer Selection For Single String Completion
8.1.5.
Single Selective Completion Packers
206
207
207
209
209
217
8.2.
223
223
223
223
224
224
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
9.
6 OF 295
8.3.
225
225
225
226
228
230
230
231
233
236
8.4.
237
238
239
PERFORATING
240
9.1.
240
9.2.
GUN TYPES
9.2.1.
Wireline Conveyed Casing Guns
9.2.2.
Through-Tubing Hollow Carrier Guns
9.2.3.
Through-Tubing Strip Guns
9.2.4.
Tubing Conveyed Perforating
241
241
243
243
243
9.3.
GUN PERFORMANCE
9.3.1.
API And Performance Data
9.3.2.
Underbalanced Perforating
9.3.3.
Firing Heads
9.3.4.
Perforating Procedures
244
244
246
247
247
250
251
253
254
254
256
259
259
260
262
262
265
265
265
268
268
270
272
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
7 OF 295
REVISION
STAP-P-1-M-7100
274
11.1. POLICY
274
274
11.3. APPLICATION
274
275
275
275
276
A.1.
277
A.2.
278
A.3.
279
A.3.
280
A.4.
281
A.5.
282
A.6.
283
A.7.
284
A.8.
285
A.9.
286
287
APPENDIX C - ABBREVIATIONS
289
APPENDIX D - BIBLIOGRAPHY
292
294
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-M-1-P-7100
1.
INTRODUCTION
1.1.
8 OF 295
The purpose of this manual is to guide experienced engineers of all technical disciplines,
within the Eni-Agip Division and Affiliated Companies, in the completion design process and
its importance on well productivity, well servicing capabilities and completion life. These in
consequence, have a large impact on costs and field profit.
The Corporate Standards in this manual define the requirements, methodologies and rules
that enable to operate uniformly and in compliance with the Corporate Company Principles.
This, however, still enables each individual Affiliated Company the capability to operate
according to local laws or particular environmental situations.
The final aim is to improve performance and efficiency in terms of safety, quality and costs,
while providing all personnel involved in Drilling & Completion activities with common
guidelines in all areas worldwide where Eni-Agip operates.
The approach to completion design must be interdiscipline, involving Reservoir Engineering,
Petroleum Engineering, Production Engineering and Drilling Engineering. This is vital in
order to obtain the optimum completion design utilising the process described in this
manual.
The manual will provide the engineers within the various disciplines with a system to guide
them through the process with the objectives of helping them make the key decisions and
obtaining the optimum design to maximise productivity and, hence profit.
Many of the decisions made by the various disciplines are interrelated and impact on the
decisions made by other disciplines. For instance, the decision on the well architecture may
subsequently be changed due to the availability of well servicing or workover techniques.
This does not mean that the process is sequential and many decisions can be made from
studies and analysis run in parallel.
The design process consists of three phases:
Conceptual
Detailed design
Procurement.
The process of well preparation and installation of completions is fully described in the
Completions Procedures manual.
The activities in each phase are illustrated in figure 1.a, figure 1.b and figure 1.c.
The conceptual design process guides the engineers through analysis and key questions to
be considered. During this phase, the user will resolve many of the dilemmas, raised by the
interrelated decisions, at an early time. The final conceptual design will be used as the basis
for the detailed design process.
The conceptual design process begins at the field appraisal stage when a Statement Of
Requirements (SOR) of the completion is produced. It is essential that this is an accurate
statement including all the foreseen requirements, as it has a fundamental effect on the
field final design and development.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
9 OF 295
REVISION
STAP-P-1-M-7100
As more information is gleamed from further development wells and as conditions change,
the statement of requirements need to reviewed and altered to modify the conceptual
design for future wells. This provides a system of ongoing completion optimisation to suit
changing conditions, increased knowledge of the field and incorporate new technologies.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
10 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
11 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
1.2.
12 OF 295
OBJECTIVES
The fundamental objectives for a completion are:
These may be summarised as to safely provide maximum long term profitability. This,
however, in reality is not simple and many critical decisions are needed to balance long
term and short term cash flow and sometimes compromises are made.
An expensive completion may derive more long term profit than a low cost completion but
the initial capital costs will be higher (Refer to figure 1.d).
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
13 OF 295
REVISION
STAP-P-1-M-7100
On the other hand if the data available is not accurate, the estimate of some well
performance and characteristics throughout the life of the well may be wrong and early
workover or well intervention operations will impact on well profitability.
An inherent problem is that the Reservoir Engineering Departments objectives do not
coincide with the Completion Engineering Departments in that Reservoir Engineerings
objectives are for the whole field performance whereas the Completion Groups is to
optimise for profit on a long term well by well basis which includes well servicing/workover.
Reservoir and geoscience groups often have to set plans and objectives for the field on well
performance based on limited information, in the early stages, but are not concerned about
production problems, well maintenance or detailed operations.
1.3.
FUNCTIONS OF A COMPLETION
The main function of a completion is to produce hydrocarbons to surface or deliver injection
fluids to formations. This is its primary function, however a completion must also satisfy a
great many other functions required for safety, optimising production, servicing, pressure
monitoring and reservoir maintenance.
These main functional requirements must be built into the conceptual design and include:
1.4.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
14 OF 295
REVISION
STAP-P-1-M-7100
2.
RESERVOIR CONSIDERATIONS
2.1.
INTRODUCTION
Oil and gas wells are expensive faucets that enable production of petroleum reservoirs or
allow injection of fluids into an oil or gas reservoir. As pointed out in section 1.1, a
completion conceptual design must take into account all the well objectives to produce the
optimum design to maximise profitability.
The purpose of this section is to consider the characteristics of reservoir fluids and the flow
of these in the area around the wellbore to allow these parameters to be tied into the well
completion design and well intervention/workover operational requirements.
2.2.
2.2.1.
Porosity
Porosity or pore space in reservoir rocks provides the container for the accumulation of oil
and gas and gives the rock characteristic ability to absorb and hold fluids. Most commercial
reservoirs have sandstone, limestone or dolomite rocks, however some reservoirs even
occur fractured shale.
2.2.2.
Permeability
Permeability is a measure of the ability of which fluid can move through the interconnected
pore spaces of the rock. Many rocks such as clays, shales, chalk, anhydrite and some
highly cemented sandstones are impervious to movement of water, oil or gas even although
they may be quite porous. Darcy, a French engineer, working with water filters, developed
the first relationship which described the flow through porous rock which is still used today.
Darcys Law states that the rate of flow through a given rock varies directly with permeability
(measure of the continuity of inter-connected pore spaces) and the pressure applied, and
varies inversely with the viscosity of the fluid flowing.
In a rock having a permeability of 1 Darcy, 1cc of a 1cp viscosity fluid will flow each second
2
through a portion of rock 1cm in length and having a cross-section of 1cm , if the pressure
across the rock is 1 atmosphere.
K=
qL
Ap
Eq. 2.A
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
15 OF 295
REVISION
STAP-P-1-M-7100
In oilfield units the linear form of Darcys Law for flow of incompressible fluid through a rock
filled with only one fluid is:
q=1.127 10 3
kA(p 1 p 2 )
BL
Eq. 2.B
where:
q
k
A
L
p1
p2
B
2.2.3.
=
=
=
=
=
=
=
=
Relative Permeability
As normally two or three fluids exist in the same pore spaces in a reservoir, relative
permeability relationships must be considered. Relative permeability represents the ease at
which one fluid flows through connecting pore spaces in the presence of other fluids, in
comparison to the ease that it would flow if there was no other fluid.
To understand this, assume a rock filled with only with oil at high pressure where gas has
not been able to come out of solution:
All available space is taken up by the oil and only oil is flowing.
If reservoir pressure is allowed to decline, some lighter components of the oil will
evolve as gas in the pore spaces. Flow of oil is reduced but gas saturation is too
small for it to flow through the pores.
If pressures to continue to decline, gas saturation continues to increase and at
some point (equilibrium gas saturation) gas begins to flow and the oil rate is
further reduced.
With further increases in gas saturation, the gas rate continues to increase and
less oil flows through the pores until finally only gas flows.
Significant oil may still occupy the pores but cannot be recovered by primary
production means as the permeability to oil has dropped to zero.
This same principle governs the flow of oil in the presence of water. The saturation of each
fluid present affects the ease of fluid movement or relative permeability.
The gas-oil or water-oil relative permeability relationships of a particular reservoir rock
depend on the configurations of the rock pore spaces and the wetting characteristics of the
fluids and rock surfaces. In an oil-water system, the relative permeability to oil is significantly
greater when the rock is water wet.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
16 OF 295
REVISION
STAP-P-1-M-7100
Where two or more fluids are present, the permeability in eq. 2.b represents the
permeability of the rock to the desired fluid. This can be achieved by multiplying absolute
permeability of the rock by the relative permeability of the rock to the desired fluid.
q=1.127 10 3
k abs k ro A(p1 p 2 )
B o L
Eq. 2.C
where:
qo
kabs
kro
=
=
=
For a well producing both water and oil, the water cut or fraction of water in the total flow
stream at standard conditions of temperature and pressure can be calculated by:
fw =
1
k o w Bw
1 + +
k w o Bo
Eq. 2.D
where:
ko
kw
o
w
Bo
Bw
2.2.4.
=
=
=
=
=
=
Wettabilty
Most reservoirs were formed or laid down in water with oil moving in later from adjacent
zones to replace a portion of the water. For this reason, most reservoir rocks are considered
to be water wet. This means that the grains of the rock matrix are coated with a film of
water permitting hydrocarbons to fill the centre of the pore spaces. The productivity of oil in
this condition is maximised.
Although it is extremely difficult to determine wettability of cores due to the cutting and
preparing specimens for laboratory testing which alters the wettability characteristics, it is
not important as this characteristic is included in the permeability measurements.
However, it is important when completing or servicing the well in that any foreign substance
which may come into contact with the rock may alter its wettability characteristic and reduce
the relative permeability to hydrocarbon fluids and cause emulsion which may block flow.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
2.2.5.
17 OF 295
Fluid Distribution
The distribution of fluids vertically in the reservoir is very important as the relative amounts
of oil, gas and water present at a particular level determines the fluids that produced by a
well completed at that level and also influence the relative rates of fluid production.
In rock the capillary forces, which are related to water wettability, work to change the normal
sharp interfaces between the fluids separated by density.
From the point in a zone of the free water level upward to some point where water
saturation becomes constant is called the transition zone. Relative permeability permits
both water and oil to flow within the transition zone. Water saturation above the transition
zone is termed irreducible water saturation or more commonly the connate water
saturation. Above the transition zone, only oil will flow in an oil-water system.
Connate water is related to permeability and pore channels in lower rocks are generally
smaller. For a given height, the capillary pressure in two different pore sizes will be the
same, therefore the water film between the water and the oil will have the same curvature,
hence more oil will be contained in larger pore spaces.
The nature and thickness of the transition zones between the water and oil, oil and gas, and
water and gas are influenced by several factors: uniformity, permeability, wettability, surface
tension and the relative density differences between the fluids. These can be summarised
in three statements:
The lower the permeability of a given sand, the higher will be the connate water
saturation.
In lower permeability sands, the transition zones will be thicker than in higher
permeability sands.
Due to the greater density difference between gas and oil as compared to oil
and water, the transition zone between the oil and gas is not as thick as the
transition zone between oil and water.
A well completed in the transition zone will be expected to produce both oil and water,
depending on the saturations of each fluid present at the completion level. figure 2.a
summarises oil, water and gas saturation in a typical homogeneous rock example.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
18 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
19 OF 295
REVISION
STAP-P-1-M-7100
In a radial flow situation, where fluids move towards the well from all directions, most of the
pressure drop in the reservoir occurs fairly close to the wellbore. As shown in figure 2.b, in a
uniform sand, the pressure drop across the last 15ft of the formation surrounding the
wellbore is about one half of the total pressure drop from the well to a point 500ft away in
the reservoir. Obviously flow velocities increase tremendously as fluid approaches the
wellbore. This area around the wellbore is the critical area and as much as possible should
be done to prevent damage or flow restrictions in this critical area.
0.00708kh(p o p w )
r
B1n( o )
rw
Eq. 2.E
Corrections are required to account for the flow of compressible fluids and for turbulent flow
velocities.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
20 OF 295
REVISION
STAP-P-1-M-7100
k 1h1 +k 2 h 2 +k 3 h 3
h1 +h 2 +h 3
Eq. 2.F
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
21 OF 295
REVISION
STAP-P-1-M-7100
Eq. 2.G
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
22 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
23 OF 295
REVISION
STAP-P-1-M-7100
The existence of damage can be calculated by well test results analysing the pressure
build-up periods. The skin effect (abnormal pressure drop) or the normal radial flow
pressure drop can be calculated by:
p s =
141.2qB
s
kh
Eq. 2.H
Other terms which are used to quantify formation damage are Damage Ratio and Flow
Efficiency. Damage ratio calculation is:
DR=
Eq. 2.I
qt
qa
where:
=
=
qt
qa
also:
DR=
=
Jideal
Jactual
Eq. 2.J
pp wf
pp wf p s
Flow efficiency:
FE=
=
Jideal
Jactual
Eq. 2.K
pp wf p s
pp wf
In multi-zone completion intervals, where transient pressure testing techniques may give
questionable results concerning formation damage, production logging techniques may
provide helpful data. Flow profiling may highlight zones, in an otherwise productive interval,
which are not contributing to the total flow. Non-contributing zones are likely to have been
damaged.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
2.2.7.
24 OF 295
Dissolved gas
Gas cap
Water drive.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
25 OF 295
REVISION
STAP-P-1-M-7100
Many case histories are available to show problems resulting from reservoir development
without having sufficient information about the stratigraphy of the reservoir.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
26 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
2.2.8.
27 OF 295
Reservoir Homogeneity
The general procedures, as described in the previous section is to complete water drive
reservoirs high and for dissolved gas drive reservoir low on the structure to obtain an
adequate number of wells without excess. However this is only practical if the reservoir is
uniform.
Most sandstone reservoirs were originally laid down as stratified layers of varying porosity
and permeability. Similar assumptions can be made for carbonate and even reef type
reservoirs which results in reservoirs of a highly stratified nature. Fluids from such reservoirs
will flow through the various layers at different restrictions to flow and often there are
impervious beds between the layers so that fluid cannot flow between the bed to bed. This
is demonstrated in figure 2.i and figure 2.j.
In thin beds or highly stratified beds, fingering of the free gas down from a gas cap, or
water from a water basin, is a distinct possibility, especially if the interval is short and
production rates are high.
If the reservoir is stratified, either by shale breaks or by variations in permeability, it will
probably be necessary to stagger the completion intervals in various members of the
reservoir to be sure that each is drained properly. Vertical staggering of the completion can
be effected during development to obtain proportionate depletion of the various strata.
Additional distribution of intervals in the various members can then be made during later
well interventions on the basis of data obtained, experience and operating conditions.
To maximise recovery, intervals should be produced independently wherever practical
(usually determined by economics). Single string/single zone completions are preferred to
facilitate thorough flushing for higher recovery and flexibility of re-completion to control
reservoir performance. Completions with more than one zone are termed multi-zone
completions and are required for long completion intervals for obtaining sufficient volumes
of production.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
28 OF 295
REVISION
STAP-P-1-M-7100
HYDROCARBON DATA
The practical approach to the study of reservoir fluid behaviour is to anticipate pressure and
temperature changes in the reservoir and at surface during production, and to measure, by
laboratory tests, the changes occurring in the reservoir samples. The results of these tests
then provide the basic fluid data for estimates of fluid recovery by various methods of
reservoir operations and also to estimate reservoir parameters through transient pressure
testing.
Two general methods are used to obtain samples of reservoir oil for laboratory examination
purposes, by means of subsurface samplers and by obtaining surface samples of separator
liquid and gas. The surface samples are then recombined in the laboratory in proportions
equal the gas-oil ratio measured at the separator during well testing.
Information concerning the characteristics and behaviour of gas needed for gas reservoirs,
depends upon the type of gas and the nature of the problem. If retrograde condensation is
involved, it may require numerous tests and measurements. If the gas is wet with no
retrograde condensation, or if dry gas, the information is less complex.
2.3.1.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
2.4.
29 OF 295
RESERVOIR/PRODUCTION FORECAST
To obtain the optimum performance from a well, it is first necessary to determine its full
potential and which way this can be fully exploited within any technical or economic
constraints. The determination of the wells performance entails analysing the following:
In-flow performance
Near wellbore performance and design
Multiphase flow of tubing performance
Artificial lift.
The process of this analysis is shown in figure 2.k which requires continuous repetition
during field life to account for changing conditions.
The inflow performance relationship (IPR) provides the flow potential of the reservoir into
the wellbore against the resistance to flow of the formation and near wellbore region. The
theoretical IPR is an idealistic assumption of flow performance without pressure drop due to
skin effect in the near wellbore region and governed only by the size, shape and
permeability of the producing zone and the properties of the produced fluids. The basic
theory of this is described in this section along with some simplified IPR relationships from
observed field data.
Flow behaviour in the near wellbore region may cause a dramatic effect on the IPR curve
which results in greatly reduced flow capability. This is characterised by a damaged IPR
curve and the amount of damage or skin effect, is mainly caused by the drilling and
completion practices. Good drilling and completion practices can or may minimise this
damage allowing use of the idealised IPR curve to be used for completion design.
Some completion designs to deal with reservoir conditions, such as gravel packs for
unconsolidated sands, will also cause reduced IPR curves which must be anticipated during
the design phase. Two phase flow, velocity effects in gas wells, high rate or high GOR oil
wells, in undamaged near wellbore regions also reduce the IPR curve. Alternatively,
stimulation procedures which can provide a negative skin are desirable as this increases
production.
Once the IPR is completed, the outflow performance can be determined which takes into
consideration the relationship between the surface flowrate and pressure drop in the tubing.
The prediction of this relationship is complicated by the nature of multi-phase fluid flow.
Hence, analysis of the outflow performance requires predictions of phase behaviour,
effective fluid density, friction losses and flowing temperatures.
The results of the outflow performance analysis are usually produced graphically depicting
how bottom hole flowing pressure (BHFP), or pump intake pressure, varies with flowrate
against a fixed back-pressure which is normally the wellhead or separator pressure. These
curves are termed tubing performance curves (TPC) and the point of intersection is the
natural flowing point as demonstrated earlier in figure 2.k.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
30 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
2.4.1.
31 OF 295
Inflow Perfomance
This section addresses the fundamental principles of inflow performance for oil and gas
wells. The use of IPRs generated from reservoir simulation models is also described as is
the technique for the applications of the various techniques for predicting inflow
performance. Essentially the less data which is available, the more appropriate it is to use
theoretical radial flow equation. As more data becomes available, an empirical expression
can be validated and applied, however for larger projects, reservoir simulation is usually
employed.
Oil Well - Straight Line IPR
The simplest IPR equation assumes that inflow into a well is proportional to the pressure
differential between the reservoir and the wellbore which is termed the drawdown.
p=p R p wf
Eq. 2.L
where:
p
pR
pwf
=
=
=
With a straight line IPR, the flow rate is directionally proportional to the drawdown. The
linear relationship can be substantiated from theoretical arguments for a single
incompressible fluid (i.e. above the bubble point). However, it has been verified that the
straight line approach also provides the accuracy needed for well performance calculations
in situations which exceed the theoretical basis, e.g. low drawdowns and damaged wells.
In situations which allow the use of a straight line IPR, the constant of proportionality is
termed the productivity index (PI). PI defined as J by the API, is:
J=
q
p R p wf
Eq. 2.M
where:
q
Total liquid flow rate at surface under stock tank conditions (14.7psia,
o
60 F)
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
32 OF 295
REVISION
STAP-P-1-M-7100
J can be calculated directly from bottom-hole gauges in well test results or estimated
pressures from simulation studies. Oil PI, J, can also be derived theoretically from Darcys
radial flow equation:
Jo =
Eq. 2.N
k oh
r
141.2 o B o 1n e
rw
0.75+S
where:
h
ko
o
Bo
ro
rw
S
=
=
=
=
=
=
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
33 OF 295
REVISION
STAP-P-1-M-7100
This assumes pseudo-steady state flow from a well in the centre of a circular reservoir and
it is worth noting that ko is the effective permeability to oil for an oil PI. As water saturation
increases, Ko obviously decreases and as does Jo.
Deviation from the theoretical ideal PI (i.e. S = 0) should be expected as a result of
additional pressure losses in the near wellbore area due to damage, fractures, increased
gas saturation in oil wells, producing below the bubble point, changes in radial flow
geometry and non-Darcy pressure losses due to high flow velocities in gas wells, high rate
or high GOR oil wells.
Damaged wells with positive skins have straight line IPRs with PIs less than the ideal PI.
Straight line IPRs with PIs greater than the ideal are typical of wells with negative skin such
as when they have been stimulated, have natural fractures or are highly deviated.
The PI is very useful for describing the potential of various wells as it combines all rock and
fluid properties as well as geometrical issues in a single constant making it unnecessary to
consider these properties individually.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
34 OF 295
REVISION
STAP-P-1-M-7100
p
0.8 wf
pR
Eq. 2.O
where:
pR
pwf
q
qmax
=
=
=
=
Qmax is a theoretical value sometimes referred to as Absolute Open Flow (AOF) of the oil
well.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
35 OF 295
REVISION
STAP-P-1-M-7100
Vogels equation has been validated through observed field data particularly on pumped
wells with high drawdowns where pwf approaches zero.
The model used to develop Vogels reference curve did not include skin effects which would
tend to straighten the IPR curve. Procedures to correct for skin are available.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
36 OF 295
REVISION
STAP-P-1-M-7100
Where inflow relationship passes through the bubble point, a straight line IPR is drawn
above the bubble point and the curved IPR signifies the two phase flow below this point. For
this, Vogels equation is combined with the PI to develop a general IPR equation. This has
been published by Brown. When the BHFP is above the bubble point use the normal
straight line equation:
q o =J(p R p wf )
Eq. 2.P
and when it drops below the bubble point use the modified Vogel equation:
p
Jp
qo =J(p R p wf )+ b 10.2 wf
1 .8
pb
p
0.8 wf
pb
Eq. 2.Q
where:
pb
If water production is involved, it is dependant upon whether it is produced from the same
interval or others. As oil is normally produced from a different zone to the water, the
following equations are applied:
q w =J(p R p wf )
p
q o =q o max 10.2 wf
pR
Eq. 2.R
p
0.8 wf
pR
Eq. 2.S
If oil and water both flow from the same zone then the Vogel equation is used for the gross
flow rate:
p
q o +q w =(q o +q o max )10.2 wf
pR
p
0.8 wf
pR
Eq. 2.T
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
37 OF 295
REVISION
STAP-P-1-M-7100
q o =C p R p wf
2
2 n
where:
C
n
=
=
Eq. 2.U
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
38 OF 295
REVISION
STAP-P-1-M-7100
Golan and Whitson showed how this relationship could be expressed in a similar form to
Vogels reference curve as:
p
= 1 wf
q max p R
Eq. 2.V
This equation is compared with Vogels reference curve in figure 2.q, for two values of the
exponent, n. It is seen that when n = 1, the Vogel and Fetkovich IPRs are similar. It is
recommended that n be assumed to be 1 where no multi-rate data is available.
n is considered as the means to account for non-Darcy flow but there is no theoretical
technique for finding it as it is a function of the rate used during testing. If multi-rate data is
2
2
available then a log-log plot of q versus (pR - pwf ) will give a straight line with a slope of 1/n.
Eq. 2.W
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
39 OF 295
REVISION
STAP-P-1-M-7100
The Darcy flow coefficient, a, can be determined theoretically for a well producing at
pseudo-steady state flow in the middle of a circular reservoir:
a=
141.2 o B o re
ln
kh
rw
0.75+S
Eq. 2.X
J * future
J * present
k ro
o B o future
=
k ro
o B o present
Eq. 2.Y
and:
q future =J * future
p
p R future 10.2 wf
p R future
0.8 p wf
p Rfuture
Eq. 2.Z
where:
J*
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
40 OF 295
REVISION
STAP-P-1-M-7100
Eq. 2.AA
It may be shown theoretically that exponent m could vary between 1 and 3. An exponent of
2.5 gives the best fit to the gas drive IPR curves by Vogel while values of 1.66 have been
found in actual field studies by Eickmeir.
Gas Wells - Simplified Deliverability Relationship
Rawlins and Schellardt developed a simplified gas well back-pressure equation which
relates gas flow rate to the BHFP and is the well Known AOF equation;
p g =C p R p wf
2
2 n
Eq. 2.BB
This equation was developed empirically using several hundred multi-rate gas well test data
and not by theory but satisfactorily describes the behaviour of the gas well tests considered.
The exponent, n , in the equation must be estimated from one of a number of well test
methods (e.g. isochronal test) due to there being no accepted theoretical basis available. A
2
2
log-log plot of (pR - pwf ) versus q is conducted from which the slope gives the value of 1/n.
This exponent can vary between 1.0 for laminar flow to 0.5 for fully turbulent flow. Obviously
at low to moderate rates there is little turbulence and n is close to 1, however in high rates
this is highly improbable and makes the IPR projections almost impossible and erring on the
optimistic side. It is, therefore, critical that well tests are conducted up to or above the
rate of intended production.
The constant C is also found from the log-log plot and varies as a function of flow time until
it reaches a constant pseudo-steady state. In some instances C can be calculated from
reservoir parameters, using kh and S from build-up data but is only applicable if flow is
laminar (n = 1). To obtain a value of n, it is normal to test the well at three rates at a fixed
period of time followed by a single rate until stabilisation is reached to obtain C. The
problem with this isochronal test is the time required to reach stabilised flow in tight gas
sands which could be months.
While this method is widely used throughout the industry, it is not recommended for
estimating IPRs as it lacks the theoretical basis and other rigorous equations are available.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
41 OF 295
REVISION
STAP-P-1-M-7100
Eq. 2.CC
The Darcy and non-Darcy coefficients, A and B, are determined in a similar manner as the
2
2
generalised IPR equation for an oil well, however the straight line plot is (pR - pwf )/q versus
q. It will be seen that the gas IPR is curved even when the non-Darcy term is 0.
eq. 2.cc is not precisely correct since inherent in its derivation is an assumption that the
product of and z is constant. For most gas compositions this is valid only at pressures less
than approx 2,000psi or if drawdown pressure changes are small which is the case in high
permeability wells above 3,000psi when z is proportional to pressure, an equation similar
to eq. 2.w can be used. Between 2,000psi and 3,000psi, there is curvature in the plot of z
against p making neither approach applicable. In this range the correct inflow equation is
written in terms of pseudo-pressures:
m(p)=2
Eq. 2.DD
p
dp
pb z
g
where:
g
z
=
=
Gas viscosity, cp
Gas deviation factor
and where the integration limits are substituted with the pressure range being considered,
normally pg and pwf for inflow calculations, hence:
m(p R )m(p wf )= Aq g +Bqg
Eq. 2.EE
where:
A
1422
T re
ln
k g h r w
1422
TD
k gh
0.75+S
Here the results of the multi-rate test would be plotted as m(pg) - m(pwf)/q versus q to find a
value of B from the slope and to check the value of A from the intercept.
The non-Darcy coefficient B can also be calculated theoretically but, as for oil wells,
requires knowledge of the correct turbulence factor, . The non-Darcy skin is also frequently
accounted for by using:
m(p R )m(p wf )=1422
q g T re
ln
k gh rw
0.75+S+Dqg
Eq. 2.FF
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
42 OF 295
REVISION
STAP-P-1-M-7100
where:
D
qg
T
S
D
kg
is
=
=
=
=
=
As modern test analysis use computer software, the pseudo-pressure values are readily
available, therefore there is a growing trend to use gas pseudo pressures for predicting gas
well IPRs at all pressure conditions although the pressure squared method has a use in the
field for convenience.
2.4.2.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
43 OF 295
REVISION
STAP-P-1-M-7100
The results from such field models will provide the reservoir pressure, production rates and
wellbore saturations at various time steps, however judgement is required when using these
results, in particular check:
Confirm if non-Darcy and multi-phase flow effects have been taken into
consideration.
Input on skin is realistic for the period covered.
Ensure that proposed completion effects on near wellbore performance, e.g.
gravel packing, partial completion, deviation, stimulation, etc. have been
considered.
If the reservoir pressure refers to grid block or to the drainage area.
Whether rates have been modified for downtime due to maintenance, workover
or sales contracts, etc.
As the use of full field reservoir simulation requires many assumptions and simplifications
are made to manage the problem, therefore the predicted flow rates should not be
considered as precise and the relevant reservoir engineer should be consulted to establish
the accuracy. They may also be able to advise on possible sudden changes in water cut or
gas production due to conning or cusping.
Often more reliable predictions in shape of the well IPR can be achieved by engineers using
single well models to study the probability of water or gas conning or to model transient well
test results. It is also used to determine the sensitivity of production to drawdown and
optimise perforating strategy.
When and as new well data from log and RFT/DST results becomes available, it should be
used to update the generalised IPR to reflect the actual pay interval, reservoir quality, skins,
saturations, pressure and mechanical data. From this, revisions can be made to the
completion designs, programmes and production forecast.
After using measured IPR curves, the model needs to be updated to include actual log and
test results. Once this achieved, then the model can be used to evaluate the effect of
depletion, water breakthrough and saturation changes on production and used for artificial
lift studies. Care must be exercised, however, in extrapolating the shape of the IPR and
determining the effects by well operations and production may have on skin.
It is extremely important that production engineers understand that the uncertainties
involved and do not give greater reliability on model studies than reasonably can be
expected.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
2.4.3.
44 OF 295
IPR Selection
In developing representative IPRs for a field, the appropriate IPR model needs to be
selected based upon the anticipated production conditions. These are summarised again in
the following table:
Type Of Well
Producing Conditions
Undersaturated oil
Pwf > pb
Saturated oil
Pwf < pb
Vogel or Fetkovich
Pwf < pb
S > +3
PR > pb
Pwf < pb
WC > 0
Use
as
above
for
the
appropriate oil and linear PI or
radial flow equation for water
WC > 90%
q > 25stb/d/ft
q > 25stb/d/ft
Blount - Jones
Water zone
Pwf < pb
Gas wells
Pseudo-pressure equation
2
(m(pR) - m(pwf) = Aq + Bq )
Omit B if only single rate data
available
Table 2.A - IPR Selection Based on Reservoir Type
The appropriate technique will also depend on the reservoir data that is available which is
function of the development stage. The selection of an IPR model based on this is given in
table 2.b.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
45 OF 295
REVISION
STAP-P-1-M-7100
Reservoir Model
IPRs
Empirical IPRs
Technical Evaluations
Prospect evaluation
Guestimate potential.
Validate
interpretation
Primary method.
Identify variations
geographically with
time.
Validate results.
Highlight damage
risks.
Conceptual design,
small field/single well
Primary method.
Validate results.
Highlight damage
risks.
Development plan
Primary method.
Validate results.
Highlight damage
risks.
Validate results.
Evaluate completion
results.
Primary method.
Validate results.
Highlight damage
risks.
Primary method.
Evaluate completion
methods.
Validate results.
Highlight damage
risks.
Development Planning
Primary method.
Workover planning
Revised development
plan
Primary method.
Validate reservoir
model results.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
2.4.4.
46 OF 295
Outflow Performance
Tubing Performance
Predicting fluid flow behaviour in tubing involves combining the basic fundamentals of mass
momentum and energy conservation with complex mass transfer phenomena for multicomponent hydrocarbon mixtures. Application of these concepts, results in utilising the
following interrelated topics:
Phase behaviour.
Flowing Temperature prediction.
Pressure drop prediction.
The relationship between pressure and temperature drop in wells and PVT behaviour is
complex. Pressure drop is determined using empirical and semi-empirical correlations and
carried out on computer software programmes. Refer to the following sections.
The methods for predicting pressure and temperature drops are addressed in the following
sections.
PVT Relationships
There are two PVT methods used in the prediction of mass transfer between oil and gas,
the black oil model and the compositional model.
The black oil model assumes a constant composition for the liquid phase and accounts for
mass transfer using the parameters gas-oil ratio and formation volume factor. The variable
composition model requires performing vapour-liquid equilibrium (VLE) or flash calculations
to determine the amount and composition of both the gas and liquid phases. Each model
uses differing methods to determine the densities and viscosities for each phase and
interfacial surface tension.
In general the black oil model is easier to use than the compositional model.
Oil Well - PVT Relationships
With most modern software programmes there are four methods of obtaining PVT
properties for oil wells which are listed in order of preference. In the vast majority of cases
there are sufficient data to use the tuned black oil model correlation method.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
47 OF 295
REVISION
STAP-P-1-M-7100
The approach adopted when choosing the appropriate method for each application should
be:
a)
Use the black oil model flash vaporisation lab data if they are available. Do not
use differential separation data since it is not representative of the vaporisation
that occurs in the tubing.
b)
Use the tuned empirical correlations for black oil model variables if the
appropriate although limited experimental data are available.
c)
d)
Do not use untuned black oil model empirical correlations unless the data
available cannot justify a more rigorous method.
The linear profile is the most widely used due to the complexity of heat transfer calculations
in conjunction with the lack of sufficient measured data. Although the linear approach is
unrealistic, the error has been found to be less than 15% in overall temperature drop in
typical wells. However, in gas wells it has amore significant effect.
Some wells have produced fluids with special properties that are very sensitive to
temperatures and more complex heat transfer calculations are required. These are:
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
48 OF 295
REVISION
STAP-P-1-M-7100
Eq. 2.GG
pgsin
dp
=
gc
dL HYD
Eq. 2.HH
where:
is the pressure gradient caused by the hydrostatic head of potential energy of the multiphase liquid.
f pv 2
dp
=
dL FR 2g c D
Eq. 2.II
g c dL
dL ACC
Eq. 2.JJ
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
49 OF 295
REVISION
STAP-P-1-M-7100
Annular flow
Churn flow
Slug flow
Bubble flow
Liquid flow.
Considering the above, it is obvious that the pressure at each point in the well and,
therefore, the total pressure drop is very dependent on flow pattern. Typical pressure
gradients in wells for different flow patterns are:
=
=
=
=
0.36psi/ft
0.25psi/ft
0.20psi/ft
0.1 - 0.2psi/ft
Hence, it is seen that prediction of pressure drop in multi-phase systems is complex and
has led to the development of different correlations to be used. Although many of these
have been successful to some degree, no single method has been universally been
accepted.
The early developed correlations assumed the flow as homogeneous mixtures ignoring
liquid hold up effects. Attempts were made to compensate for these errors in the equations
by single empirical derived friction factor. Subsequent correlations were developed to
predict liquid hold up but most of these first required an empirical correlation or map to
predict the flow pattern. The accuracy of existing correlations for predicting flow pattern,
liquid hold up pressure gradient is limited by the ranges of data used in their development
and no single method can be applied universally. More recent models developed based on
flow mechanisms and conservation principles, referred to as mechanical models, offer more
potential for accurate predictions but these are not readily accepted as standard design
methods as yet.
Some software programmes use all the correlations available and the more recent
promising mechanical models can be added.
Flow Patterns
Transition between the various flow patterns, as listed in the previous section, can be
identified using flow pattern maps. The most common maps are empirically derived with coordinates based on dimensionless groups of variables that include volumetric flow rates,
diameter and PVT properties.
Although bubble, slug and churn floe predominate in oil wells, it is possible for oil and gas
wells to include all flow patterns in addition to single phase liquid and gas.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
50 OF 295
REVISION
STAP-P-1-M-7100
Classification Of Methods
Published methods of multi-phase flow pressure gradients in wells can be placed into one
of three general categories based on the assumptions from which the method was
developed:
Homogeneous flow correlations where slippage and flow pattern are not
considered.
Slip flow correlations where slippage is considered but not flow pattern.
Flow pattern dependent correlations where liquid hold up and flow pattern are
considered.
Mechanised models where slippage, flow pattern and basic flow mechanisms
are considered.
As illustrated in figure 2.r and figure 2.s, these correlations predict different pressure drops
for the same application, however any one of these may be successful in a given field.
Validation and actual field data are the only means of choosing a pressure loss method but
this is not available at the time of designing the completions. Ansari recently performed an
evaluation of the most widely used correlations and his own proposed mechanistic model.,
performed using the TUFFP well databank consisting of 1775 flowing well surveys covering
a broad range of production variables and pressure loss methods were also evaluated for
each flow pattern. table 2.c presents the overall results below:
Average Error
Absolute
Average Error
Standard
Deviation
Relative Performance
Factor, RPC
Ansari
9.3
101.3
163.9
1.000
Hagbr
-28.5
102.8
178.4
1.132
Dunros
33.4
110.9
177.7
1.178
Aziz
-20.8
116.6
190.4
1.198
Begbril
41.3
134.9
207.9
1.404
Orkis
12.2
151.3
273.3
1.597
Mukbr
78.7
159.8
217.2
1.666
Method
Table 2.C - Evaluation of Pressure Loss Methods Using TUFFP Well Databank
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
51 OF 295
REVISION
STAP-P-1-M-7100
Selecting the best prediction method from table 2.c is not appropriate as the best statistical
results do not guarantee the best performance for a specific application. The choice must
be made on experience. The applicability of the various methods is compared in table 2.d.
Figure 2.R - Comparison Lift Curves for High Gas-Oil Ratio Well
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
52 OF 295
REVISION
STAP-P-1-M-7100
Figure 2.S - Comparison of Lift Curves for Low Gas-Oil Ratio Well
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
Method
53 OF 295
Category
Accuracy
Data
Fluids
Application/Comments
Mechanistic
Model
Good
N/A
N/A
Flow Pattern
Dependent
Variable
depending
on version
Laboratory
and field
Oil, water,
gas
Brill
Flow Pattern
Poor
Laboratory
Air, water
Flow Pattern
Dependent
Fair
Laboratory
Air, water
Homogeneous
Good in
some flow
patterns
Field
(annular
flow)
Oil, Gas
Ros
Flow Pattern
Dependent
Good
Laboratory
,
experiment
al plus
field data
Oil, gas,
water
and
Slip Flow
Good in
some flow
patterns
Field
experiment
Oil, water,
air
Hagedorn
and
Brown with Griffith
Bubble
and
restriction on hold
up
Flow Pattern
Dependent
Good
Field
experiment
Oil, water,
air
Kleyweg
et
al
Occidental
mod
(1983)
Slip Flow
Field
Oil, water,
Gas
Orkiszewski (1967)
Flow Pattern
Dependent
Some
Hagedorn
and Brown
data, field
Oil, water,
gas
Ansari
1963)
(TUFFP
Aziz et al (!972)
Beggs
(1973)
and
Cornish (1976)
Duns
(1963)
and
Hagedorn
Brown (1965)
Fair
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
54 OF 295
REVISION
STAP-P-1-M-7100
As with oil wells, validation with field data is the only reliable method for determining the
most appropriate correlation and, similarly, this is never usually available at the time that the
completions are designed. If this is the case, the Gray correlation is generally recommended
although the Ansari model mat prove to be even more accurate since it includes a good
model for predicting pressure gradient in annular flow which is the most predominant in gas
wells.
Care is needed in the selection of tubing in that, even in low liquid rates, wells can quickly
load up over a few weeks if it is not correctly sized. Although any of the correlations can be
used, the Gray correlation is recommended based on the work with Reinicke et al but
results should be used with caution.
In gas wells, liquid loading can also be predicted using simplified methods presented with
Turner et al which are independent of pressure drop calculations. These methods have
been reviewed by Lea and Tighe. For wells producing high gas-water or gas-condensate
ratios, it is recommended that tubing size be assessed using these methods in addition to
lift curve methods and that the most conservative approach be adopted.
Effect Of Deviation Angle
Nowadays most wells of interest to operators are directional or deviated wells. The accuracy
of pressure drop calculations in these circumstances using correlations developed for
vertical is obviously extremely questionable.
Flow pattern and liquid hold up is very dependent on deviation angle. For wells with
o
deviations up to 45 from vertical, vertical correlations perform accurately enough for wells
o
greater than 45 , accounting for deviation by simply using the sine in the hydrostatic
component of the pressure gradient equation may not be adequate in these cases, either
the Beggs and Brill correlation or a mechanistic model would be necessary.
In any study, differing correlations should not be used for different deviations, as the
difference between the predicted pressure drops is generally greater than the effect of the
deviation itself.
Effect Of Restrictions
Most oil and gas wells contain some types of flow control devices in the completion which
choke flow. The geometry of these restrictions varies from a simple reduced diameter axial
flow path to a tortuous complex path. When a multiphase mixture flows through a
restriction, the phase velocities dramatically increase. If these reach sonic velocity, critical
flow occurs.
For critical flow, simple empirical correlations such as the Gilbert equation are sufficiently
accurate. For sub-critical flow, behaviour is very dependent on geometry and a simple
Bernoulli type equation with a discharge coefficient is recommended.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
55 OF 295
REVISION
STAP-P-1-M-7100
Effect Of Erosion
Erosion in completions occurs when there are high velocities and if there are solids particles
in the flow stream. The most common points for erosion is where there are restrictions
which cause increased velocities. The API have published a method in API RP 14E, to
determine the threshold velocities for erosion to occur in piping systems but the validity of
this for all conditions is questionable.
2.4.5.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
56 OF 295
REVISION
STAP-P-1-M-7100
Figure 2.U- Combined IPR and TPC Curves Under Unstable Conditions
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
57 OF 295
REVISION
STAP-P-1-M-7100
If the natural flow point is in the unstable region, a smaller size tubing or artificial lift system
should be considered. Using smaller tubing may result in higher frictional pressure drops
and if this reduces flow rates to below uneconomic levels, a tapered tubing string may be a
consideration.
Where the IPR and TCP curves intersect close to, or to the left of the minimum, the flow will
become increasingly unstable and wells with large size tubing will die quickly, whereas small
tubing may sustain unsteady flow until the IPR and TPC curves become almost tangential.
Where the curves intersect at two rates (Refer to figure 2.v), the intersection point to the left
is always unstable and the well will either die or progressively produce more fluid until it
reaches the stable flow point. To obtain flow at these conditions, it is necessary to kick the
well off quickly.
Figure 2.V - IPR and TPC Curves with Two Apparent Intersection Points
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
58 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
59 OF 295
REVISION
STAP-P-1-M-7100
As shown in the example (figure 2.x below), it is apparent that gas lift will maximise the
deliverability of good wells (PI = 2.5std/d/psi) provided 2 7/8ins tubing is installed, while
submersible pumping gives the maximum rate from the poorer zones (PI = 0.4 to
1.0stb/d/psi) provided there is no drawdown limitation.
Artificial lift is often widely used to improve flow stability and increase the production of
existing producing wells, however the operating and capital costs of equipment must be
justified against the incremental increase in production rate.
Figure 2.X - Artificial Lift Options for Deep Wells with 5 1/2ins Casing
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
3.
WELL TESTING
3.1.
INTRODUCTION
60 OF 295
The main objective when drilling an exploration well is to test and evaluate the target
formation. The normal method of investigating the reservoir is to conduct a well test. There
are two types of well test methods available:
Production Test
Many options of string design are available depending on the requirements of
the test and the nature of the well.
Many designs of well testing strings are possible depending on the requirements of the test
and the nature of the well and the type of flow test to be conducted but basically it consists
of installing a packer tailpipe, packer and downhole test tools and a tubing or drill pipe string
then introducing a low density fluid into the string in order to enable the well to flow through
surface testing equipment which controls the flow rate, separates the fluids and measures
the flow rates and pressures.
3.1.1.
Types of Tests
Drawdown
A drawdown test entails flowing the well and analysing the pressure response as the
reservoir pressure is reduced below its original pressure. This is termed drawdown. It is not
usual to conduct solely a drawdown test on an exploration well as it is impossible to
maintain a constant production rate throughout the test period as the well must first cleanup. During a test where reservoir fluids do not flow to surface, analysis is still possible. This
was the original definition of a drill stem test or DST. However, it is not normal nowadays to
plan a test on this basis.
Multi-Rate Drawdown
A multi-rate drawdown test may be run when flow rates are unstable or there are
mechanical difficulties with the surface equipment. This is usually more applicable to gas
wells but can be analysed using the Odeh-Jones plot for liquids or the Thomas-Essi plot for
gas.
It is normal to conduct a build-up test after a drawdown test.
The drawdown data should also be analysed using type curves, in conjunction with the build
up test.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
61 OF 295
REVISION
STAP-P-1-M-7100
Build-Up
A build-up test requires the reservoir to be flowed to cause a drawdown then the well is
closed in to allow the pressure to increase back to, or near to, the original pressure which is
termed the pressure build-up or PBU. This is the normal type of test conducted on an oil
well and can be analysed using the classic Horner Plot or superposition.
From these the permeability-height product, kh, and the near wellbore skin can be
analysed.
On low production rate gas wells, where there is a flow rate dependant skin, a simple form
of test to evaluate the rate dependant skin coefficient, D, is to conduct a second flow and
PBU at a different rate to the first flow and PBU. This is the simplest form of deliverability
test described below.
Deliverability
A deliverability test is conducted to determine the wells Inflow Performance Relation, IPR,
and in the case of gas wells the Absolute Open Flow Potential, AOFP, and the rate
dependant skin coefficient, D.
The AOFP is the theoretical fluid rate at which the well would produce if the reservoir sand
face was reduced to atmospheric pressure.
This calculated rate is only of importance in certain countries where government bodies set
the maximum rate at which the well may be produced as a proportion of this flow rate.
There are three types of deliverability test:
Flow-on-Flow
Conducting a flow-on-flow test entails flowing the well until the flowing pressure stabilises
and then repeating this at several different rates. Usually the rate is increased at each step
ensuring that stabilised flow is achievable. The durations of each flow period are equal. This
type of test is applicable to high rate gas well testing and is followed by a single pressure
build up period.
Isochronal
An isochronal test consist of a similar series of flow rates as the flow-on-flow test, each rate
of equal duration and separated by a pressure build-up long enough to reach the stabilised
reservoir pressure. The final flow period is extended to achieve a stabilised flowing pressure
for defining the IPR.
Modified Isochronal
The modified isochronal test is used on tight reservoirs where it takes a long time for the
shut-in pressure to stabilise. The flow and shut-in periods are of the same length, except
the final flow period which is extended similar to the isochronal test. The flow rate again is
increased at each step.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
62 OF 295
REVISION
STAP-P-1-M-7100
Reservoir Limit
A reservoir limit test is an extended drawdown test which is conducted on closed reservoir
systems to determine their volume. It is only applicable where there is no regional aquifer
support. The well is produced at a constant rate until an observed pressure drop, linear with
time, is achieved. Surface readout pressure gauges should be used in this test.
It is common practice to follow the extended drawdown with a pressure build-up. The
difference between the initial reservoir pressure, and the pressure to which it returns, is the
depletion. The reservoir volume may be estimated directly from the depletion, also the
volume of produced fluid and the effective isothermal compressibility of the system. The
volume produced must be sufficient, based on the maximum reservoir size, to provide a
measurable pressure difference on the pressure gauges, these must therefore be of the
high accuracy electronic type gauges with negligible drift.
Interference
An interference test is conducted to investigate the average reservoir properties and
connectivity between two or more wells. It may also be conducted on a single well to
determine the vertical permeability between separate reservoir zones.
A well-to-well interference test is not carried out offshore at the exploration or appraisal
stage as it is more applicable to developed fields. Pulse testing, where the flowrate at one
of the wells is varied in a series of steps, is sometimes used to overcome the background
reservoir pressure behaviour when it is a problem.
Injectivity
In these tests a fluid, usually seawater offshore is injected to establish the formations
injection potential and also its fracture pressure, which can be determined by conducting a
step rate test. Very high surface injection pressures may be required in order to fracture the
formation.
The water can be filtered and treated with scale inhibitor, biocide and oxygen scavenger, if
required. Once a well is fractured, which may also be caused by the thermal shock of the
cold injection water reaching the sandface, a short term injection test will generally not
provide a good measure of the long term injectivity performance.
After the injectivity test, the pressure fall-off is measured. The analysis of this test is similar
to a pressure build-up, but is complicated by the cold water bank.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
3.2.
63 OF 295
DST OBJECTIVE
A DST is conducted to determine the productivity characteristics of one specific zone.
Currently, analysis can provide good data to help evaluate the productivity of the zone,
completion practices, extent of formation damage and if there is a requirement for
stimulation.
In many cases, actual well production rates can be accurately predicted from DST data as it
shows what the well will produce against a gradually increasing back-pressure. From this a
Productivity Index (PI) or Inflow Performance Relationship (IPR) can be established (Refer
to Section 2.4) and, if the flowing pressure gradient in the tubing can be estimated, then
actual producing rates can also be determined.
Testing is an expensive and high risk operation and, therefore, should only be conducted
for essential data. The starting premise should be that testing is not required unless it is
clearly justified.
The second premise is that, if testing is warranted, it should be done in the simplest
possible manner, avoiding any operations which entail higher risk, such as running wireline
or coil tubing through the testing string.
By adopting this position, the Petroleum Engineer should not appear to be negative but
work towards obtaining essential data, which the company needs rather than that which is
nice to have, in the most cost-effective manner.
The test objectives must be agreed by those who will use the results and those who will
conduct the test before the test programme is prepared. The Petroleum Engineer should
discuss with the geologists and reservoir engineers about the information required and
make them aware of the costs and risks involved with each method. They should select the
easiest means of obtaining data, such as coring, if possible. Such inter-disciplinary
discussions should be formalised by holding a meeting (or meetings) at which these
objectives are agreed and fixed.
The objectives of an exploration well test are to:
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
3.3.
64 OF 295
DST STRING
The well testing objectives, test location and relevant planning will dictate which is the most
suitable test string configuration to be used. Some generic test strings used for testing from
various installations are shown overleaf. For more detailed information on well test strings
and tooling, refer to the Company Well Test Manual.
In general, well tests are performed inside a 7ins production liner, using full opening test
tools with a 2.25ins ID. In larger production casing sizes the same tools will be used with a
larger packer. In smaller casing sizes, smaller test tools will be required, but similarly, the
tools should be full opening to allow production logging across perforated intervals. For a
5
barefoot test, conventional test tools will usually be used with a packer set inside the 9 /8ins
casing.
If conditions allow, the bottom of the test string should be 100ft above the top perforation to
allow production logging of the interval.
In the following description, tools which are required both in production tests and
conventional tests are included. The list of tools is not exhaustive, and other tools may be
included. However, the test string should be kept as simple as possible to reduce the risk of
mechanical failure. The tools should be dressed with elastomers suitable for the operating
environment, considering packer fluids, prognosed production fluids, temperature and the
stimulation programme, if applicable.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
65 OF 295
REVISION
STAP-P-1-M-7100
Figure 3.A- Typical Jack Up Test String With TCP Guns On Permanent Packer
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
66 OF 295
REVISION
STAP-P-1-M-7100
Figure 3.B - Typical Test String With TCP Guns Stabbed Through Production Packer
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
67 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
68 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
3.4.
69 OF 295
RESERVOIR CHARACTERISTICS
Reservoir characteristics that may be estimated from DST analysis include:
In summary, the DST if properly applied is an essential tool for the Completions Engineer.
3.4.1.
162.6qB
t t
log10
kh
t
where:
pws
t
t
pi
q
B
k
h
=
=
=
=
=
+
=
=
=
Eq. 3.A
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
70 OF 295
REVISION
STAP-P-1-M-7100
Conditions which must be assumed during the build-up period for eq. 3.a to be strictly
correct are:
Radial flow
Homogenous formation
Steady state conditions
Infinite reservoir
Single phase flow.
Most of these conditions are met on a typical DST although steady state flow is the
condition which may cause most concern particularly at early shut-in time.
Horner Build-Up Plot
t p + t
should yield a
Assuming these conditions are met, then a plot of pws versus log10
straight line and the slope (m) of the straight line should be:
m=
162.6qB
kh
Eq. 3.B
=0 and at log10 p
pressure value at log10
t =1.0
If the points are plotted on semi-log paper, m is the change in pressure over one log cycle.
The ideal plot is where all the points align up in a straight line but is seldom found in
actuality, since after-flow or wellbore storage effects cause deviation from the straight line
in the early region. As a rule of thumb, four points are the fewest to determine a straight
line.
An important issue is the time required to approach steady state or straight line conditions,
depends on reservoir and fluid characteristics, and flow conditions. Experience has
formulated some certain rules of thumb to help determine the shut-in time. One of these is
that generally the shut-in pressure must reach at least 65% of the static pressure.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
71 OF 295
REVISION
STAP-P-1-M-7100
Prior to type curve matching methods, no analysis of the plot was possible unless the
straight line was achieved, however, sometimes reasonable estimates of formation
parameters could be made.
162.6qB
mh
Eq. 3.C
162.6qB
m
Eq. 3.D
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
72 OF 295
REVISION
STAP-P-1-M-7100
0
kh
is determined:
B
kh 162.6q
=
m
B
Eq. 3.E
Static reservoir pressure, pi, is obtained by extrapolating the Horner straight line to an
infinite shut-in time:
At infinite shut-in time,
t p + t
t + t
= 0.
= 1.0.0 , or as shown in figure 3.e, log10
t
t
st
nd
In figure 3.e, both the 1 build-up and 2 build-up plots extrapolate to the same static
pressure lending confidence to the analysis. If the second build-up pressure was lower than
st
the 1 , them depletion may have occurred.
Wellbore damage, is presented by the empirical equation for the dimensionless value, s,
skin factor:
k t p
p p
+2.85
s=1.151 i ff log
crw
m
Eq. 3.F
However, this factor cannot be readily applied to specific formations to obtain to show the
potential of the zone would be if there was no damage. This was carried on a stage further
introducing the concept of damage ratio, DR, which compares the flow rate observed, q, to
the theoretical flow rate without damage:
DR=
qt
qa
An another equation, for calculation of DR based on the skin factor relation of Hurst and
van Everdingen, is:
DR=
p i p ff
k t p
2.85
m log
2
cr w
where:
pi
pff
c
rw
k
tp
=
=
=
=
=
=
=
=
Eq. 3.G
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
73 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
74 OF 295
REVISION
STAP-P-1-M-7100
The distance to the anomaly, ra, whether it be a barrier, change of permeability, or a fluid
contact, can be calculated:
3,793r 2 a c
t + t a
=2.303ln p
E
t
kt p
a
Eq. 3.H
where:
ra
Tp
ta
-E
=
=
=
=
Distance to anomaly, ft
Flow time, hrs
Shut-in time at the point of slope change, hrs
Exponential integral value.
Radius Of Investigation
The following equation from Van Poollen may be used to estimate the radius of
investigation of any particular DST in an infinite radial flow system:
ri =
Eq. 3.I
kt i
5.7610 c
4
where:
ri
tp
=
=
Radius of investigation
Flow time, mins
Needless to point out, the longer the flowing time, the deeper the radius of investigation.
Depletion
As explained previously, if the extrapolated pressure from a second build-up is lower than
the initial pressure of the first build-up, then depletion may be the cause. Obviously, a
reservoir would need to be extremely small for this to occur, however there is plenty of field
examples to prove that it occurs.
Another reason that a recorded initial shut-in pressure may be higher than true shut-in
pressure. This effect is termed supercharged which may be caused by leak off of filtrate
over-pressuring the formation. This effect needs to be diagnosed to confirm supercharging.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
75 OF 295
REVISION
STAP-P-1-M-7100
t
If the SG of the gas is known, the values of Z and can be found from standard testing
literature.
1637 q g Tf Z
mg h
where:
Z
Qg
Tf
mg
=
=
=
=
Eq. 3.J
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
76 OF 295
REVISION
STAP-P-1-M-7100
Wellbore Damage:
2
2
p p
i
ff
EDR =
1
m g log t + 2.65
p
Eq. 3.K
( )
qg p 2 i
(p
Eq. 3.L
2 n
i p i
where:
n is an exponent varying between 0.5 and 1.0
If n=1.0Max AOF=
qg p 2 i
Eq. 3.M
p 2 i p 2 ff
If n=0.5Max AOF=
qg p i
Eq. 3.N
p 2 i p 2 ff
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
3.4.2.
77 OF 295
After a suitable time (usually 1 /2 times the flow period), the tester valve is then reopened to
conduct the planned flow and shut-in periods in accordance to the programme requirements
to obtain other additional data and verification. figure 3.h shows a typical schematic of a
simple single flow operational sequence.
A description of the tools used in DST test strings are outlined in the next section.
Figure 3.H - DST Typical Sequence of Events
3.4.3.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
78 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
79 OF 295
REVISION
STAP-P-1-M-7100
Hydraulic Jar
The jar is run to aid in freeing the packer if it becomes stuck. The jar allows an overpull to
be taken on the string which is then suddenly released, delivering an impact to the stuck
tools.
Downhole Tester Valve
The downhole tester valve provides a seal from pressure from above and below. The valve
is operated by pressuring up on the annulus. The downhole test valve allows downhole shut
in of the well so that after-flow effects are minimised, providing better pressure data. It also
has a secondary function as a safety valve.
Single Operation Reversing Sub
Produced fluids may be reversed out of the test string and the well killed using this tool. It is
actuated by applying a pre-set annulus pressure which shears a disc or pins allowing a
mandrel to move and expose the circulating ports. Once the tool has been operated it
cannot be reset, and therefore must only be used at the end of the test.
This reversing sub can also be used in combination with a test valve module if a further
safety valve is required. One example of this is a system where the reversing sub is
combined with two ball valves to make a single shot sampler/safety valve.
Multiple Operation Circulating Valve
This tool enables the circulation of fluids closer to the tester valve whenever necessary as it
can be opened or closed on demand and is generally used to install an underbalance fluid
for brining in the well.
This tool is available in either annulus or tubing pressure operated versions. The tubing
operated versions require several pressure cycles before the valve is shifted into the
circulating position. This enables the tubing to be pressure tested several times while
running in hole. Eni-Agips preference is the annulus operated version.
Drill Collar
3
Drill collars are required to provide a weight to set the packer. Normally two stands of 4 /4
ins drill collars (46.8 lbs/ft) should be sufficient weight on the packer, but should be
regarded as the minimum.
Slip Joint
These allow the tubing string to expand and contract in the longitudinal axis due to changes
in temperature and pressure. They are non-rotating to allow torque for setting packers or
operating the safety joint.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
80 OF 295
REVISION
STAP-P-1-M-7100
Crossovers
Crossovers warrant special attention, they are of the utmost importance as they connect
every piece of equipment in the test string which have differing threads. If crossovers have
to be manufactured, they need to be tested and fully certified. In addition, they must be
checked with each mating item of equipment before use.
3.4.4.
3.4.5.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
81 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
82 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
3.5.
83 OF 295
Periodic
Productivity or Deliverability
Transient Pressure.
Periodic Tests
Production tests are carried out routinely to physically measure oil, gas and water produced
by individual wells under normal producing conditions.
From the well and reservoir viewpoint, they provide periodic physical well conditions where
unexpected changes such as extraneous water or gas production may highlight well or
reservoir problems. Abnormal production declines may also indicate artificial lift problems,
sand build-up, scale build-up in perforations, etc.
On oil wells, results are reported as oil production rate, gas-oil ratio and water oil ratio as a
percentage of water in the total liquid stream. Accuracy in measurement, with careful
recording of the conditions is essential. Choke size, tubing pressures, casing pressure,
details of artificial lift system operation and all other effects on the well producing capability
should be recorded. Potential production problems should be recognised in order that they
can be properly handled such as emulsions, security of power fluid or gas lift gas supply,
etc.
It is important that the well is produced at its normal conditions as flow rate will vary the
relative quantities of oil, gas and water.
On gas wells, routine are less common as each well normally has individual measuring
capability. Gas production is reported as well as condensate and water. Similar to oil wells,
the wells must be produced at the normal rates.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
3.5.2.
84 OF 295
Productivity Index
Inflow Performance
Flow-After-Flow
Isochronal.
Flow-After-Flow
Isochronal.
Transient Tests
Radial Flow Characteristics
Flow from reservoirs are characterised as transient, pseudo-steady state or steady state
flow, depending on whether the pressure response initiated by opening the well had
reached the drainage area boundary and on the type of boundary.
Transient flow occurs when the well is initially opened or has a significant rate change, and
is a result of the pressure disturbance moving out towards the outer boundary of the
drainage area. During this the production conditions at the wellbore change rapidly and the
BHPF, pwf, decreases exponentially with time.
Most DSTs and many production tests are conducted under transient flow conditions and
consequently the observed productivity will often appear greater than that seen in long term
production. This means that corrections need to made to compensate for transient flow
behaviour as well as for skin effects.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
85 OF 295
REVISION
STAP-P-1-M-7100
When the flow reaches the outer boundary, flow becomes steady state or pseudo- steady
state. If the boundary is a constant pressure boundary, then PR will not alter with time and is
termed steady state. However if it is a no-flow boundary, then PR will decline purely as a
result of depletion and the flow is then termed pseudo-steady state.
When the BHFP appears to be constant or declining slowly proportionally with time, the well
is stabilised and pseudo-steady state flow equations can be used to predict the long term
deliverability of a well.
Transient pressure tests are classified as:
Pressure Build-up
Pressure Drawdown
Multiple Rate
Injectivity or Fall-off
Multiple Well Interference.
Each type presents certain advantages and limitations and factors which are important for
reasonable results.
Transient pressure testing and calculation procedures for oil wells are particularly well
covered in SPE Monograph No. 5 - Advances in Well Test Analysis.
Pressure Build-Up Tests
Pressure build-up tests are described earlier in Section 3.4.1 - DST tests.
Pressure Drawdown Testing
Pressure drawdown tests have advantages over pressure build-up tests, production
continues as the test is being carried out, and an estimate can be made of the reservoir
volume in communication with the wellbore. Therefore, the Reservoir Limit Test can be
used to estimate if there is sufficient hydrocarbons in place to justify additional wells in a
new reservoir.
Multiple Rate Testing
Pressure build-up or drawdown tests require a constant flow rate which is sometimes
difficult to achieve over a long period of time. Multiple rate analysis can be applied to
several flow situations, e.g. uncontrolled variable rates, a series of constant rates or
constant bottom-hole pressure with continually changing flow rate.
Multiple rate tests have the advantage of providing transient test data without the need for
well shut-in. They minimise wellbore storage effects and phase segregation effects so
provide good results where build-up or drawdown tests would not.
Accurate flow rate and pressure measurement is essential and more critical than on buildup or drawdown tests. The rate changes must be significant enough to effect the transient
pressure behaviour. The analysis procedure is direct and simple but computations are more
troublesome and are often conducted by computer software.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
86 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
4.
87 OF 295
DRILLING CONSIDERATIONS
These are primarily the responsibility of drilling engineering, however the production
department provide the design parameters to the drilling engineers.
4.1.
CASING DESIGN
Refer to the Drilling Design and Casing Design Manuals for all casing design policies and
criteria. These manuals provide the policies and design procedures for both exploration and
development wells.
4.1.1.
Casing Profile
The surface and intermediate casings are designed to provide well control and borehole
stability during the drilling operation. The production casing is the string, or combination of
strings, through which the well will be completed and controlled throughout its life. The
production casing and its cement isolates the producing intervals to facilitate reservoir
control, anchor the completion equipment and act as a safety barrier to the uncontrolled
emission of hydrocarbons.
The production casing is usually:
In highly productive wells, e.g. offshore, the production casing size may be swedged to
accommodate larger tubing and completion equipment (i.e. TRSSVs with control line) near
surface or a hot string of isolated pipe. This larger tubing reduces friction losses.
The size of the production casing is primarily dictated to accommodate the optimum size of
completion tubing and equipment, and/or artificial lift systems. However, as is obvious in
deep high pressure wells, there is a limit to the size of production casing which can be
provided. In low rate and deep land wells, production casing sizes are typically 7ins or
1
3
5
5 /2ins. In high rate and offshore wells, 10 /4ins, 9 /8ins and 7ins are the common sizes
(Refer to the Casing Design Manual).
The decision whether to run a liner or not primarily lies with the drilling engineer however
the impact of the completion needs to thoroughly considered. If there were a choice, the
completions engineer would always prefer the largest casing possible to provide the
flexibility in well interventions, workovers and re-completions with artificial lift, etc. However
today, the popularity of the mono-bore completion, where a large size tubing mates to a
similar size liner utilising a PBR or similar type system, it is a completion design parameter.
This is a design which provides the greatest flexibility to live well intervention operations as
the completion is full bore allowing regular tools to be run and used in the sump area
eliminating the use of through-tubing devices. This gives live well interventions much more
scope to conduct stimulation, plugging back, straddle packing-off gassed out zones, etc.
which may have required a workover in previous times.
figure 4.a shows these various casing profile options.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
88 OF 295
REVISION
STAP-P-1-M-7100
Casing Specifications
Design criteria and casing specifications are fully described in the Casing Design Manual.
Specifically with regard to metallurgy, it is Eni-Agips policy to use standard service
production casing where there is a casing tubing annulus as the tubing is designed for the
well environment and isolates the production casing. However, production casing or liner
below the production packer or liner hanger PBR system, will have similar specification to
the tubing in order to combat corrosion from produced fluids. The crossover between the
two different materials must be selected in order that there is no localised erosion.
Casing exposed to H2S will have a specification in accordance to NACE MR01-75. Casing
above the packer is exposed to the completion or packer fluid which must be chemically
dosed to prevent any corrosion although, in general, only a biocide and possibly corrosion
inhibitor needs to be added.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
4.1.3.
89 OF 295
Casing Connections
Where an annulus is to be used as a production conduit for gas production, injection or gas
lift supply, a premium thread connection should be used to reduce the risk of leakage
especially if the pressure is above circa 1,250psi. This is due to the poor performance of the
API Buttress Thread.
Some operators specify premium connections if the wellhead pressure is to be above
5,000psi.
The main problem in casing design of producing wells over exploration wells is the
increased temperature. Usually production casing is held in tension but this may not be
adequate enough in high temperature and thermal wells to prevent buckling. An overpull is
often required especially if the casing is not cemented into the previous shoe.
4.2.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
4.3.
90 OF 295
4.3.1.
Channelling of the cement and bypassing of mud due to pipe eccentricity and
poor fluid rheology.
Failure to cement washouts.
Poor formation bonding due to lack of mud cake removal.
Poor cement procedure leading to gas entry or cross flow.
o
Cement strength loss due to high temperatures (<230 F) when using normal
Portland cement.
Cement dehydration opposite high temperature zones.
Dissolution of evaporites by the cement.
In general, the list of recommendations given below will help improve the success of zonal
isolation:
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
4.3.2.
91 OF 295
Design the programme so as the cement has a minimum contact time of 4 mins
at all points where zonal isolation is needed.
The cement column should extend 1,200ft above the top of the pay zone.
Pipe reciprocation should be used or otherwise rotation.
Centralise the casing in the pay zone.
Ensure quality control of the cement formulation is strict.
Use batch mixing whenever possible.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
5.
92 OF 295
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
93 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
94 OF 295
REVISION
STAP-P-1-M-7100
5.1.
5.1.1.
Reservoir Considerations
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
95 OF 295
REVISION
STAP-P-1-M-7100
Figure 5.B - Guideline for Length of Cemented Interval Required for Zonal Isolation
Interval Length
The interval length should be determined by reservoir requirements as perforating lengths
can be adjusted to suit. Casing guns standard perforating lengths are 5, 10 and 15ft and
through tubing guns 20, 30 and 40ft, however one (or more sections) can be partially
loaded.
Wireline guns are run and fired sequentially therefore only the first perforations can be
carried out with a static underbalance. To create an underbalance for other runs, the well
needs to flowed which carries a risk of the guns being blown up the hole. The use of tubing
conveyed means that great lengths can be installed and fired simultaneously, and
underbalanced if desired, although deploying and retrieving these long lengths may impact
on safety and needs use of a safe deployment method. This is particularly useful on
perforated horizontal wells.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
5.1.2.
96 OF 295
Mechanical Considerations
The main mechanical influence on completion design is the casing profile and deviation
discussed previously in sections 4.1 and 4.2.
It is essential that sufficient clearance is available to allow the completion to fit comfortably
inside the casing profile. With completions large tubing sizes, this may mean running of a
tapered casing string to accommodate the TRSV and control line. To this end it is important
to carry out the procedures to prepare the well by cleaning it and displacing to clean
completion fluids and checking the internal drift.
Entry into liner laps in high angles are also problematic, especially when running the
completion from a moving floater so consideration needs to be given to the procedure or by
using an automatic mule shoe.
The type of production packer selected is dependent upon its application and installation
method due to hole angle, whether it is single trip, etc.
5.1.3.
Safety Considerations
Safety of the personnel and well site installation are paramount in completion design and
the completion procedures.
Whenever possible and economical, perforated completions should be used over open hole
for well control as the casing, once it is tested, is a mechanical barrier which is safer for
BOP removal. Modern compact or high performance wellheads are preferred over the
traditional spool systems as the completion may be installed with out BOP removal (Refer to
the Drilling Design Manual).
Downhole packers in the completion string which anchor the tubing are barriers used to
protect the annulus from well pressures and corrosion from well fluids although
operationally they also isolate gas lift gas or pump power fluids from formation pressures in
gas lift and pump completions. Refer to section 8.1 for the Eni-Agip Company policy on the
use of packers.
Downhole safety valves are installed as per the En-Agip company policy given in section
8.2.1.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
5.2.
97 OF 295
RESERVOIR-WELLBORE INTERFACE
There are three reservoir-wellbore interface options which can be further classified into
seven major alternatives in completion architecture (Refer to figure 5.a):
5.2.1.
Perforated completions.
Standard perforated
Fracture Stimulation
Cased hole gravel packs
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
98 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
99 OF 295
REVISION
STAP-P-1-M-7100
Whether to use the more expensive and finer wire wrapped screen or slotted
pipe.
Slot width requirement which is dependent on the sand size and stability, fluid
viscosity and control objectives. A slot width that would retain the coarsest 10%
of the sand is common practice in heavy oil wells with coarser slots for light oil
wells, and finer slots or pre-packed screens for filtering and for uniform sized
sands.
Clearance required for washover (1 - 1.5ins on OD) and whether centralisers
should be expandable, or millable, solid type.
The location of the packer and packer tailpipe.
Is gravel packing more suitable alternative ?
For open hole gravel packs, the following additional issues need to be considered:
Loss circulation control during under-reaming and tripping, and how the LCM
can be subsequently removed before gravel packing.
The stability of the hole during under-reaming and the limitations this may
impose on hole angle and screen length.
Gravel pack design with regard to grain size, length of blank pipe, volumes,
reserve volume, etc.
Type of gravel packer and will it double as the production packer ?
Slotted Liner
This type of completion entails a liner with flow slots machined throughout its length
installed below the production casing. The slot widths can range between 0.254 - 1.016mm.
A slotted liner is used where there is a risk of wellbore instability to maintain a bore through
the formation which otherwise might collapse and plug off all production. It also helps in
liquid lift due to the smaller flow area.
Wire Wrapped Screen
A plain wire wrapped screen is used either as a simple filter to strain out small amounts of
intermittently produced sand from a relatively stable formation or as a sand retention screen
where high permeability, coarse sands would readily flow onto the screen forming a rubble
zone.
External Gravel pack
An open hole gravel pack is used where the sands are too fine or abrasive for a plain
screen. The open hole is under-reamed to remove drilling damage and to create a larger
annulus for the filter sized gravel to pack against the formation wall. When properly
installed, it is the most effective sand control measure for weak sandstones and
unconsolidated rocks, however carries more risk than a cased hole gravel pack.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
5.2.3.
100 OF 295
Perforated Completions
This type of completions are the most common world-wide due to the selectivity, flexibility,
lower costs, increased safety and convenience that they provide. There are three
subdivisions, standard, fracture stimulation and cased hole gravel pack (Refer to figure 5.d).
The key issues in cased hole completion design are:
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
101 OF 295
REVISION
STAP-P-1-M-7100
Multi-Zone Completions
There are four main methods of completing multi-zone wells (Refer to figure 5.e):
Commingled production
allowing all zones to produce together.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
102 OF 295
REVISION
STAP-P-1-M-7100
Commingled Production
Commingled production is only allowable is limited instances where there are no reservoir
management problems and regulatory rules allow.
Sequential Zonal Production
Due to its simplicity and ease of installation, completion designers prefer to use single
string/single zone completion methods for mutli-zone situations. This preference is subject,
however, to economics, reservoir management and regulatory requirements. In this method,
the zones are depleted from the bottom upwards and temporarily suspended or abandoned
sequentially and then the next higher zone completed.
If zones are close together, the initial completion can be installed to allow plugging and
perforating of each zone by well intervention methods, however there is a trade off in that
flow efficiency of the deeper zones and depth access for artificial lift and well killing will be
compromised. An option is to conduct a workover pulling the tubing and re-completing by
moving the packer depth upwards.
Single String Multi-Zone Production
These provide easy methods of bring on other fresh zones when the first zone experiences
production problems. They may also be used for reservoir management, by allowing
commingling or individual section production at different stages in the wells life in order to
maximise the full potential of the reservoir. Downhole chokes or regulators can be installed
to control flow from each zone when commingling to prevent cross-flow, reduce excessive
gas, etc.
Dual String Multi-Zone Production
Dual string multi-zone completions are often used offshore or on stacked reservoirs where
the production rate is per zone is limited by inflow performance and the previous methods
described above would be uneconomic. They can often double an individual wells
productivity for a reasonably low cost increment.
Either parallel strings or concentric strings can be used. Concentric strings may yield higher
flow capability but obviously no downhole safety valve can be installed in the outer tubing.
Some operators use the casing tubing annulus as another flow conduit but this is subject to
individual operator philosophy and regulatory rules dictating.
If artificial lift is required parallel strings would normally be needed.
Triple strings and indeed quadruple string have been used in the past, but generally they
are not economic as they are too restrictive of well capacity.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
103 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
5.3.
104 OF 295
CASING-TUBING INTERFACE
There are three main casing-tubing interface options which have six sub-divisions (Refer to
figure 5.f):
Packerless completions
Anchored
Unanchored
Tubingless.
Packer Completions
Shallow set
Deep set.
PBR Completions
Liner hanger.
Packers and PBRs are required to provide a seal between the tubing and production casing
or liner for the following reasons:
To isolate the casing-tubing annulus from well fluids and pressure acting as a
barrier on the annulus side.
To prevent heading in the annulus improving flow conditions.
Prevent annulus corrosion from well fluids.
To allow the annulus to be used for supplying artificial lift fluids or injection of
inhibitors.
To allow the annulus to be used for production (if permitted).
To isolate liner laps or casing leaks.
To anchor the tubing if no tubing movement is desired.
To facilitate well operations through having wireline nipples in a tailpipe, e.g. well
plugging, BHP gauge positioning, etc.
To protect formations from damage from well intervention or workover fluids by
plugging in the tailpipe.
Some onshore low pressure wells are completed without a packer or liner PBR as the risk of
damage to the wellhead, hence the risk of injury to personnel and pollution of the
environment, is low. This has both advantages and disadvantages. There is one barrier less
on the annulus side and the casing may be exposed to corrosive well fluids and the well
pressure even if it is low and some operators do not allow this practice. On the other hand,
on pump completions it is useful for venting off gas. It is essential for plunger lift
completions which uses annulus gas as its energy source for unloading liquids.
Tubingless completions, i.e. wells which use a small diameter casing or a tubing as the
production casing, offers serious well control problems as there is no downhole safety at all.
These are used on low rate, low pressure wells but are not allowed by most operating
companies.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
105 OF 295
REVISION
STAP-P-1-M-7100
Anchored tubing completions are used on rod pumpers to keep the tubing in tension so that
the reciprocation of the rods does not cause buckling on the upstroke and stretch on the
downstroke unless the well is shallow and annulus clearance is small.
Packer completions are the most popular due to their flexibility in the options in which they
are available and their ability to be installed in an exact position at any desired depth
compared to the liner PBR. The liner PBR completion offers a larger through bore than a
packer option and, therefore are used in high rate wells and mono-bore completions where
full bore access is gained to he formation.
The liner PBR interface should not be confused with the packer PBR system which
although is exactly the same in basic design, is used for packer-tubing sealing and catering
for tubing movement.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
5.3.1.
106 OF 295
Packer Applications
Packer application with regard to completion design is addressed in this section as there
are some basic features which affect the completion architecture.
Although there are many varieties of packers available, there are three basic types used in
completion designs:
Permanent
Retrievable
Permanent Retrievable.
Eni-Agip do not have any particular policy to the type of packer system to be used in a
particular situation due to the wide range of packers available and changing technology but
do operate a packer qualification system to ensure that any packer used meets with specific
criteria. The packer qualification system is specified in STAP-M-1-M-5010.
Retrievable Packer Systems
The definition of a retrievable packer is that it is installed and retrieved on the completion
tubing. They have advantages in that they can be installed in high angle wells although their
operating differential pressure rating, temperature rating and bore size are less than
equivalent permanent packers. It is important that designers fully consider the effects of
pressure and tubing stresses on these packer systems and associated packer-tubing
connections. Their packing element systems are also more sensitive to well fluids as they
are more complex due to their ability to be retrieved but after redressing they can be reused.
Retrievable packers tend to be used for the following applications:
Tubing tension
Tubing compression
Hydraulic pressure
Tubing rotation.
Tension or compression set packers are very sensitive to tubing movement and are rarely
used nowadays owing to the benefits and variety of other retrievable packers available.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
107 OF 295
REVISION
STAP-P-1-M-7100
Severe or hostile operating conditions with differential pressures > 5,000psi and
o
temperatures in excess of 300 F and high stresses.
Long life completions.
Where workovers are expected to be above the packer, hence not requiring its
removal which is costly.
Where workovers are expected to be above the packer and the packer tailpipe
can be used for plugging the well and isolating foreign fluids from the formation.
Providing large bore for high rate wells.
Packer-Tubing Interfaces
Tubing can be interfaced with packers through three basic options:
Fixed
By threaded connection to the packer mandrel as with retrievable packers.
Snap latch requiring an overpull to release
By an anchor latch system to a permanent packer.
Free moving
Seal unit in a packer bore.
Seal unit in a PBR attached to the packer.
Travel joint.
ELTSR.
Limited movement
Seal unit set down in a packer bore allowing upward movement only.
Closed PBR or ELTSR.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
108 OF 295
REVISION
STAP-P-1-M-7100
Free movement or partial movement options are used when tubing movement must be
catered for otherwise it may be over-stressed due to tubing forces found through the stress
analysis (Refer to section 7). However, sometimes they suffer from premature seal failure
due to being dynamic seals and if the material type has not been correctly selected for the
environment and pressure differentials. To help prevent seal failure, seal units can be shear
pinned in a mid open or closed position to prevent seal movement until the stresses in the
tubing reach a predetermined level.
The selected packer-tubing interface has a significant effect on the completion architecture
especially with regard to installation procedure, well kill method, stimulation treatment and
type of hanger system.
The most popular packer systems are those which have one trip installation saving extra
trips by workstring or wireline to install the packer before running the completion tubing.
5.3.3.
Annulus Circulation
Communication between the tubing and annulus on packer type completions is consider to
be beneficial to efficient well killing, maintaining a fluid barrier in the annulus, circulating kill
fluid before workovers or circulating in underbalance fluids well kick off. This is the same
reasons for installing kill strings in packerless completions.
Circulating devices, typically sliding sleeves or sliding side doors (SSDs) installed above the
top packers, are used for this purpose but they have traditionally been a weak link in design
when seals material was not suited to the well conditions. This would require a workover to
replace the sleeve so other devices such as SPMs are used as the seals can be recovered
and replaced by wireline methods. Some operators recommend that no circulation device
be used which limits the flexibility of the completion and requires a tubing punch to be used
for circulation before workovers.
If a circulating device is undesired but the option is to kill the well by circulation rather than
bullheading, a single shot shear kill valve can be installed which is operated by annulus
pressure.
Annulus circulation is used for:
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
5.4.
109 OF 295
TUBING-WELLHEAD INTERFACE
The wellhead carries the casing and completion loads which is transferred to the ground
through the surface casing. It also isolates the top of the tubing-casing annulus, mates and
seals with the Xmas tree and provides annulus access to all the annuli. It consists of an
assembly made up of casing head spools, tubing hanger/spool and Xmas tree. The casing
head and tubing hanger spools are now commonly replaced by compact or unitised
wellheads (Refer to the Drilling Design Manual) to reduce height and improve safety as
there are less BOP removals for spool installations.
Wellhead specifications are laid out in API Specification 6A and are rated by:
Temperature Classification
Operating Range, oF
-75 to 180
-60 to 180
-40 to 180
-20 to 180
0 to 150
0 to 180
0 to 250
PSL O
-20 to 250
5.4.1.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
110 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
111 OF 295
REVISION
STAP-P-1-M-7100
1.2
1.2
1.2
1.2
1.2
DCSFSL 3
SCSO 1
DCSO 1
DCSO 2
DCSO3
21 1/4
21 1/4
21 1/4
21 1/4
21 1/4
21 1/4
2.1
2.4
20 & 18 5/8
3000
5000
5000
5000
5000
5000
5000
5000
5000
24 1/2
20 & 18 5/8
20 & 18 5/8
20 & 18 5/8
20 & 18 5/8
20 & 18 5/8
20 & 18 5/8
2.6
2.5
2.4
2.4
2.4
2.4
2.4
2.4
2.1
20 & 18 5/8
2.1
5000
Ref. nr
Btm (CSG)
(in)
Max.
W.P.
(psi)
26 3/4
21 1/4
21 1/4
21 1/4
21 1/4
21 1/4
21 1/4
21 1/4
21 1/4
13 5/8
13 5/8
13 5/8
Btm
Flange
(in)
3000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
Max.
W.P.
(psi)
21 1/4
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
Top
flange
(in)
5000
10000
5000
5000
5000
5000
5000
5000
5000
5000
5000
5000
Max.
W.P.
(psi)
2.5
2.3
2.2
2.2
2.1
2.1
2.1
2.2
2.1
Ref.
nr
21 1/4
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
5000
10000
5000
5000
5000
5000
5000
5000
5000
Max.
W.P.
(psi)
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
Top
flange
(in)
10000
10000
10000
10000
5000
5000
5000
10000
5000
Max.
W.P.
(psi)
2.3
5.2
5.5
5.4
5.4
5.3
5.2
5.1
5.1
5.1
5.1
Ref.
nr
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
13 5/8
Btm
Flange
(in)
7 1/16
7 1/16
7 1/16
11
Top
flange
(in)
10000
10000
5000
5000
5000
10000
5000
5000
5000
5000
Max.
W.P.
(psi)
10000
13 5/8
10000
10000
10000
5000
5000
5000
10000
5000
5000
5000
5000
Max.
W.P.
(psi)
TUBING SPOOL
6.8
6.7
6.9
6.4
6.5
6.8
6.6
6.3
6.2
6.1
Ref.
nr
5000
10000
7 1/16
7 1/16
10000
5000
7 1/16
5000
2 x 2 3/8
2 x 2 3/8
2 x 2 3/8
3 1/2
2 x 3 1/2
2 x 2 3/8
2 x 2 3/8
5000
10000
3 1/2
2 7/8
Diam
tbg
(in)
5000
5000
5000
Max.
W.P.
(psi)
11
Diam
(in)
TUBING HANGER
ENI S.p.A.
Agip Division
IDENTIFICATION CODE
STAP-P-1-M-7100
26 3/4
1.2
DCSFSL 2
21 1/4
1.1
1.2
DCSFSL 1
13 5/8
21 1/4
1.3
MSCL 3
13 5/8
13 5/8
Top
flange
(in)
CASING HEAD
1.2
1.3
MSCL 2
(*)
1.3
Ref.nr
MSCL 1
AGIP
CODE
Typical outlines for on-shore, off-shore single and dual completion class -A and class -B
(STAP -M-1-SS-5701E)
ARPO
PAGE
112 OF 295
REVISION
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
113 OF 295
REVISION
STAP-P-1-M-7100
20"
13 3/8"
9 5/8"
7"
WP (psi)
Section 1
Section 2
Section 3
Section 4
Section 5
3K (A)
470
620
472
-
3K (B)
470
620
472
-
5K (C)
470
625
472
-
5K (D)
470
690
670
581
-
10K (E)
470
690
660
700
-
10K (F)
510
850
700
700
--
15K (G)
510
850
700
750
15K (H)
510
850
700
750
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
114 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
5.4.2.
115 OF 295
Xmas Trees
The type of Xmas tree and construction are important as they have an effect on safety and
cost. The important pointers for the design engineer are:
Conventional composite flanged connection trees with a single master valve are
the norm for land and low to moderate offshore wells.
In very high pressure wells (i.e. 15,000psi) Eni-Agip normally installs an
additional gate valve between the tubing spool and the Xmas tree to provide
double barrier protection.
A second master valve is normally required to enable repair to any of the other
tree valves with two barriers in situ (the lower master valve and the tubing
hanger plug). Today it is normal to have to justify only a single master valve as
the upper master is usually an ESD hydraulically operated valve which is at risk
of undue wear and tear.
Trees for sour service or high pressure will normally have two outlets, production
and kill wing sides. The kill wing is often permanently connected up to the kill
line to a permanent pump or to allow quick and easy connection of a portable
pump.
A swab valve is an essential element to enable safe rig up of vertical well
interventions by wireline, coiled tubing or snubbing services or for the BPV rod
lubricator.
The production wing, which is often a remote hydraulic operated valve, choke
and flowline arrangement must be configured to meet with how the well is
closed-in and opened up. Pressure losses of the offtake system must be
considered in the well deliverability analysis (Refer to Section 2.4.3).
Chemical injection points are usually available at the tree or through the hanger
system for downhole.
If the tree upper master valve and production wings are fully automated, the
control system should be designed to close the wing valve first a few seconds
before the upper master to avoid erosion or damage over a period of time to the
upper master gate and seats as they are more difficult to repair.
Metal-To-Metal Seals
The purpose of metal-to-metal seals is to provide enhanced sealing where it is required in
particular applications.
Policy
Metal-to-metal seals shall be used in the applications outlined in the following sections.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
116 OF 295
REVISION
STAP-P-1-M-7100
Application
The following criteria is applicable to the various conditions listed in the following tables:
a)
b)
c)
d)
These designations A, B, C and D will be used in the tables in the tables below.
Oil And Gas Producers
These tables apply equally to onshore and offshore wells.
Sweet Service Wells (with top hole temperature less than 100C)
9 = YES
Sealing WP, psi
5,000
10,000
>10,000
8 = NO
9
9
9
8
9
9
8
8
8
9
9
9
9
9
9
9
9
9
8
8
9
9
9
9
9
9
8
9
8
8
9
9
9
9
8
9
8
8
9
9
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
117 OF 295
REVISION
STAP-P-1-M-7100
Water Injectors
Sealing WP, psi
5,000
10,000
9
9
8
9
8
8
9
9
9
9
8(1)
9
8
8
9
9
FUTURE CONSIDERATIONS
Built into the conceptual stage, a design life for the completion will have been established.
During this process future well servicing and maintenance will also have been planned. This
will have included identification of the potential reasons for well interventions or workover
servicing. This will have an impact of the completion architecture and establish a
philosophy.
The well location and type of development has a large impact on the techniques available
and cost of well servicing and maintenance optimising the completion design around the
potential problems and remedial techniques is a balancing act between effectiveness and
cost.
As an example of this is horizontal completions selected to maximise initial well productivity,
where the stand-off from the water or gas zones increases the risk of producing early
unwanted fluids. In this case to the stand-off can be increased but there is a penalty in
lower initial production rates.
Another example is on offshore subsea fields, due to the high cost of subsea well re-entrys,
well servicing should be minimised as they require a floating vessel from which to deploy
the re-entry system. This means well life should be planned for the life of the field or as long
as feasible (typically 7-10 years) although some unplanned problems may occur.
Alternately, on an easily accessible land wells where servicing and workover methods are
relatively much less costly, servicing can be conducted almost on demand. This may lend to
the selection of a wireline retrievable type safety valve rather than a tubing retrievable type
as in the event of failure, the valve can be replaced cheaply without requiring a workover.
Well servicing or workover techniques also have an impact on the well area with regard to
height and lateral space, and may be problematic on platforms where space, height and
weight are at a premium.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
5.5.1.
118 OF 295
Stimulation
If future stimulation operations are required such as fracturing, the effects of the pressures
causing additional stresses on the tubing and packer need to be input and catered for in the
tubing design process (Refer to Section 7). If the costs of upgrading the well tubulars to
resist these stresses are prohibitive, e.g. the surface pressure would demand a higher
pressure rated Xmas tree than required for production only, then straddles are sometimes
utilised to keep pressure off the SCSSV and Xmas tree. It could also increase the tubing
movement and alter the choice of tubing movement device and spacing out.
If acid stimulations are planned, the effects on the completion materials needs to be
considered or alternatively to use coiled tubing for spotting of the acid before pumping to
the formation.
5.5.2.
Formation Management
As the fluid interfaces move through time and unwanted fluids are produced, or as
producing zones become depleted and require isolating before brining on other zones,
cement squeezes and reperforating techniques are required. Also, producing zones are
sometimes damaged by scale build up or movement of fines, etc. and need reperforating.
If the well has been planned for these operations then the completion may have been
designed to accomplish these operations without pulling of the tubing in a workover
operation.
A single string sequential completion may be employed where existing perforations can be
isolated simply by installation of a bridge plug on wireline but often the perforations require
to be squeezed off with cement (Refer to Section 5.2.4). This can be conducted by coiled
tubing or snubbing services without killing the well. The next production zone can then be
perforated using through tubing perforating techniques (Refer to Section 9).
If a multi-zone single string selective completion design has been installed then producing
zones can be closed off or opened up by wireline techniques and hence, are more flexible
but have higher initial capital cost.
Excessive water or gas production due to fingering which requires continuing production
from lower zones can be isolated by cement squeezing or if using a monobore type
completion by installing a straddle across the interval on wireline or coiled tubing methods.
If multi-zone multi-string completions are installed then the individual zones can simply be
closed off by shutting in the well at surface or, if there are more than one zone to a string,
by opening and closing isolation sleeves.
Where this problem has not been planned into the completion design a complete workover
to re-complete may be required.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
5.5.3.
119 OF 295
Workovers rigs
Drilling rigs
Hydraulic workover units.
Braided Line
Braided line is used for:
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
120 OF 295
REVISION
STAP-P-1-M-7100
Electric Line
Electric line is used for:
Coiled Tubing
Coiled tubing (C/T) is used for:
Stimulation (acidising)
Cementing
Cleaning out tubing and sump
Gas lifting
Logging (stiff wireline)
Installing flow controls (wireline type tools)
Milling
Drilling (underbalance side tracking, multi-laterals)
Fishing (generally when wireline has been unsuccessful).
Snubbing
Snubbing is used for:
Stimulation (acidising)
Cementing
Cleaning out tubing and sump
Gas lifting
Installing flow controls (wireline type tools)
Milling
Drilling (underbalance side tracking, multi-laterals).
Snubbing has found a revival with platform horizontal wells where it is used to work in long
horizontal sections where C/T may not be capable.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
5.6.
121 OF 295
The example well #1 in figure 5.j shows that the 4 /2 tubing size should be selected to
ensure the offtake exceeds the target of 8,000 to 9,000stb/d and perhaps even larger
tubing could be investigated. However, at low rates, the reduced fluid velocities experienced
in larger tubing increase the hydrostatic head because of slippage. This shifts the TPC
minimum to a higher rate and, therefore widening the flat uncertain portion around the
minimum. If the IPR curve intersects the TPCs in the region near the minimum, the optimum
tubing size will be a compromise maximising flow rate and having steady producing
1
conditions. For example, using the IPR for well 2, the maximum flow rate is obtained with /2
7
tubing but only a slight reduction in flow rate is seen if the 2 /8 tubing is selected which
gives steadier and regular flow.
It is generally recommended to select a tubing size such that the flowing pressure, Pwf, is
greater than 1.05 of pressure minimum, pmin to ensure stability.
As previously mentioned, the changing conditions over the life of the well must be
considered when selecting tubing size. These changes are normally declining reservoir
pressure and increasing water cut which will reduce flow rates. This trend is downwards
towards cessation of flow and ,obviously the tubing selected for the start of production will
not be the optimum size after some period of time. The choice at that time will be to reduce
wellhead pressure, replace the tubing with a smaller size or to implement artificial lift which
will have associated costs.
The optimum size of tubing is clearly the size which will be most cost effective over a
number of years, typically 5-8 years. Where high costs workovers are involved such as on
subsea wells, the selection may be for an even longer period of time, incurring early loss of
potential production.
The following sub-sections describes the various factors and there effect on TPC.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
122 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
5.6.1.
123 OF 295
Reservoir Pressure
As reservoir pressure declines over time, it collapses towards the origin, as illustrated in
figure 5.k, leading to decreasing natural flow rates. Unstable flow conditions and eventually
cessation will occur unless some other change in the system is made.
In reservoirs where significant reductions in reservoir pressure are anticipated, the effect on
productivity must be considered during the completion design stage to find the most cost
effective method of maximising productivity, e.g. where workover costs are high to complete
with smaller size tubing to ensure stability through the economic life of the well.
5.6.2.
5.6.3.
Gas-Liquid Ratio
Increasing gas-liquid ratios cause a decrease in hydrostatic head and increase in frictional
pressure drop which in the early stages may actually result in increased flow rates.
However, above a critical point there will be a net increase in the overall pressure drop,
hence flow rates. In these circumstances the frictional effects near surface become very
dominant and can be alleviated by the use of a tapered tubing string.
figure 5.l shows the effect of increasing GLR.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
124 OF 295
REVISION
STAP-P-1-M-7100
Artificial Lift
The intention of installing artificial lift is to reduce the hydrostatic head and, therefore,
bottom-hole pressure. This effectively shifts the TPC downwards bringing the intersection
point further towards stable flowing conditions. An example of rates which can be obtained
by different artificial lift methods is illustrated in figure 5.m.
Refer to section 10 for the applications and comparisons of the various methods of artificial
lift.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
125 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
6.
126 OF 295
CORROSION
A production well design should attempt to contain produced corrosive fluids within tubing.
They should not be produced through the casing/tubing annulus.
However, it is accepted that tubing leaks and pressured annuli are a fact of life and as such,
production casing strings are considered to be subject to corrosive environments when
designing casing for a well where hydrogen sulphide (H2S) or carbon dioxide (CO2) laden
reservoir fluids can be expected.
During the drilling phase, if there is any likelihood of a sour corrosive influx occurring,
consideration should be given to setting a sour service casing string before drilling into the
reservoir.
The BOP stack and wellhead components must also be suitable for sour service.
6.1.
DEVELOPMENT WELLS
Casing corrosion considerations for development wells can be confined to the production
casing only.
Internal corrosion
The well should be designed to contain any corrosive fluids (produced or injected)
within the tubing string by using premium connections.
Any part of the production casing that is likely to be exposed to the corrosive
environment, during routine completion/workover operations or in the event of a tubing
or wellhead leak, should be designed to withstand such an environment.
External corrosion
Where the likelihood of external corrosion due to electrochemical activity is high and the
consequences of such corrosion are serious, the production casing should be cathodically
protected (either cathodically or by selecting a casing grade suitable for the expected
corrosion environment).
6.2.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
127 OF 295
REVISION
STAP-P-1-M-7100
The existence, if any, of the following conditions alone, or in any combination may be a
contributing factor to the initiation and perpetuation of corrosion:
Oxygen (O2)
Oxygen dissolved in water drastically increases its corrosivity potential. It can cause
severe corrosion at very low concentrations of less than 1.0ppm.
The solubility of oxygen in water is a function of pressure, temperature and chloride
content. Oxygen is less soluble in salt water than in fresh water.
Oxygen usually causes pitting in steels.
Temperature
Like most chemical reactions, corrosion rates generally increase with increasing
temperature.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
128 OF 295
Pressure
Pressure affects the rates of chemical reactions and corrosion reactions are no
exception.
In oilfield systems, the primary importance of pressure is its effect on dissolved gases.
More gas goes into solution as the pressure is increased this may in turn increase the
corrosivity of the solution.
6.3.
FORMS OF CORROSION
The following forms of corrosion are addressed in this manual:
Corrosion caused by H2S (SSC)
-
Corrosion caused by combinations of H2S, CO2 and ClCorrosion in injection wells and the effects of pH and souring are not included.
The procedure adopted to evaluate the corrosivity of the produced fluid and the
methodology used to calculate the partial pressures of H2S and CO2 will be illustrated in the
following sub-sections.
6.3.1.
In vertical oil wells, generally corrosion occurs only when the water cut becomes
higher than 15% which is the threshold or commonly defined as the critical
level and it is necessary to analyse the water cut profile throughout the
producing life of the well.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
b)
129 OF 295
0
o
In highly deviated wells (i.e. deviations >80 ), the risk of corrosion by H2S is
higher since the water, even if in very small quantities, deposits on the surface
of the tubulars and so the problem can be likened to the gas well case where
the critical threshold for the water cut drops to 1% (WC <1%).
The following formulae are used to calculate the value of pH2S (partial pressure of H2S) in
both the cases of gas (or condensate gas) wells or oil wells.
Firstly, the potential for SSC occurring is evaluated by studying the water cut values
combined with the type of well and deviation profile. If the conditions specified above are
verified then the pH2S can be calculated.
Gas Or Condensate Gas Well
H2S partial pressure is calculated by:
pH2S = SBHP x Y(H2S)/100
Eq. 6.A
where:
SBHP =
Y(H2S) =
=
pH2S
Basic method.
Material balance method.
If the quantity of H2S in gas at the bubble point pressure [mole fraction = Y(H2S)], is not
known or the values obtained are not reliable, the pH2S is calculated using both methods
and the higher of the two results is taken as the a reliable value. Otherwise the basic
method is used.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
130 OF 295
REVISION
STAP-P-1-M-7100
Basic Method
This method is used, without comparison with the other method, when the H2S value in the
separated gas at bubble point conditions is known and is reliable or if Y(H2S), molar fraction
in the separated gas at bubble point pressure (Pb) is higher than 2%.
The pH2S is calculated by:
pH2S = Pb x Y(H2S)/100
Eq. 6.B
where:
Pb
=
Y(H2S) =
pH2S
Eq. 6.C
where:
Psep
H2Ssep
1000
GOR
1000 +
(d 29 )
GOR
23.6
23.6
PM giac
Eq. 6.D
where:
PM
Ci
Mi
d
=
=
=
i =l
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
131 OF 295
REVISION
STAP-P-1-M-7100
Eq. 6.E
where:
H1
PM
The quantity of H2S in the gas in equilibrium is calculated (per litre of oil):
6
Eq. 6.F
where:
GOR
23.6
=
=
Eq. 6.G
where:
K
H2
the reservoir
Henry constant for the reservoir temperature and reservoir oil (see
procedure for calculating Henry constant)
In general, H2S corrosion can occur at either the wellhead or bottom-hole without distinction.
There is SSC potential if pH2S >0.0035 atm and STHP >18.63 atm.
Procedure For Calculating Henry Constant
The value of the Henry constant is a function of the temperature measured at the separator.
The mapping method can be applied for temperatures at the separator of between 20C
and 200C. Given the diagram in figure 6.a which represents the functions H(t) for the three
types of oils:
Heptane PM
=100
N-propyl benzene PM
= 120
Methylnaphthalene PM
=142
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
132 OF 295
REVISION
STAP-P-1-M-7100
If 100 < PM < 120, the mean value is calculated using the H(t) curve of propyl
benzene and the H(t) curve of methylnaphthalene.
If 120 < PM < 142 the mean value is calculated using the H(t) curve of heptane
and the H(t) curve of propyl benzene.
Given FTHT, wellhead flowing temperature, the H1 value is interpolated linearly
on the chosen curve(s). For this purpose the temperature values immediately
before and after the temperature studied are taken into consideration.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
133 OF 295
REVISION
STAP-P-1-M-7100
Henry
atm/Y[H2S]
130
120
110
100
90
methylnaphthalene PM = 142
80
N-propylbenzene PM = 120
heptane PM = 100
70
60
50
40
30
20
20
30
40
50
60
70
80
90
100 110 120 130 140 150 160 170 180 190 200
T C
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
134 OF 295
REVISION
STAP-P-1-M-7100
2)
Calculation is of the partial pressure at the wellhead, i.e. when FTHP <Pb:
The data result from the production conditions and only the basic method is used.
Basic Method
pH2S = STHP x Y(H2S)/100
where:
STHP =
Y(H2S) =
pH2S
The SSC phenomenon is triggered off at the wellhead if pH2S >0.0035 atm and STHP
>18.63 atm.
Calculation Of Partial Pressure In Case B:
Calculation of partial pressure in the reservoir:
In the reservoir the gas is already separated, FBHP <Pb, calculation of pH2S can be
approximated on the basis of the following:
The PVTs are reliable, Y(H2S) >0.2%, the partial pressure is calculated as:
pH2S = Y(H2S) x FBHP 1
where:
Y(H2S) =
The PVTs are not reliable, the material balance method can be used as in the
case of undersaturated oil; these are the worst conditions. The error made can
be high when Pb > FBHP.
If the percentage (ppm) of H2S in the gas under static conditions is not known, the corresponding
value in reservoir conditions is assumed as being partial pressure at the wellhead.
2 If the percentage (ppm) of H S in the separated gas under static conditions is not known, the
2
corresponding value in reservoir conditions is assumed as being partial pressure at the wellhead.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
6.3.2.
135 OF 295
Corrosion Caused By CO2 And ClIn the presence of water, CO2 gives rise to a corrosion form which is different to those
caused by the presence of H2S. It also occurs only if the partial pressure of CO2 exceeds a
particular threshold. As in the case of SSC, the possibility that corrosions exist in water cut
values combined with the type of well and deviation profile is evaluated. If the conditions
described in section 6.3.1 exist, then the pCO2 is then calculated.
Gas Or Condensate Gas Wells
The partial pressure is calculated:
pCO2 = SBHP x Y(CO2)/100
where:
SBHP =
Y(CO2) =
pCO2 =
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
136 OF 295
REVISION
STAP-P-1-M-7100
Oversaturated Oil
The oil is considered oversaturated when the gas separates in the fluid because the
pressure of the system is lower than bubble point pressure. Two situations may arise:
Case A
FTHP <Pb
FBHP >Pb
Case B
FTHP <Pb
FBHP <Pb
Calculation Of Partial Pressure In Case A:
Calculation of pCO2 in reservoir conditions:
FBHP >Pb pCO2 is calculated in the same way as undersaturated oil wells earlier in this
section.
pCO2 = Pb x Y(CO2)/100
where:
Pb
=
Y(CO2) =
pCO2 =
If the percentage (ppm) of CO2 in the gas under static conditions is not known, the corresponding
value in reservoir conditions is assumed as being partial pressure at the wellhead
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
137 OF 295
REVISION
STAP-P-1-M-7100
It is possible to encounter H2S and CO2 besides Cl . In this case the problem is much more
complex and the choice of suitable material is more delicate. The phenomenon is
diagnosed by calculating the partial pressures of H2S and CO2 and comparing them with the
respective thresholds.
If the percentage (ppm) of CO2 in the gas under flowing/static conditions is not known, the
corresponding value in reservoir conditions is assumed as being partial pressure at the wellhead.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
6.4.
138 OF 295
Cathodic protection
Chemical inhibition
Chemical control
Oxygen scavengers
Chemical sulphide scavengers
pH adjustment
Deposit control
Coatings
Non metallic materials or metallurgical
Control
Stress reduction
Elimination of sharp bends
Elimination of shock loads and vibration
Improved handling procedures
Corrosion allowances in design
Improved welding procedures
Organisation of repair operations.
Means
Surface treatment
Plastic coating
Plating
pH
Temperature
Pressure
Chloride concentration
CO2 concentration
2
H S concentration
2
H O concentration
Flow rate
Inhibitors
the
alloying
elements
micro
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
6.5.
139 OF 295
CORROSION INHIBITORS
An inhibitor is a substance which retards or slows down a chemical reaction. Thus, a
corrosion inhibitor is a substance which, when added to an environment, decreases the rate
of attack by the environmental on a metal.
Corrosion inhibitors are commonly added in small amounts to acids, cooling waters, steam
or other environments, either continuously or intermittently to prevent serious corrosion.
There are many techniques used to apply corrosion inhibitors in oil and gas wells:
6.6.
6.6.1.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
6.6.2.
140 OF 295
6.6.3.
6.6.4.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
141 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
6.6.5.
142 OF 295
6.7.
6.7.1.
CO2 Corrosion
In producing wells, the presence of CO2 may lead to corrosion on those parts coming in
contact with CO2 which normally means the production tubing and part of the production
casing below the packer.
Corrosion may be limited by:
6.7.2.
H2S Corrosion
In wells, where there is H2S, consideration should be given to limit casing and
wellhead yield strength according to API 5CT and NACE standard MR-01-75.
Casing and tubing material will be selected according to the amount of H2S and other
corrosive media present.
Refer to figure 6.c and figure 6.d for partial pressure limits.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
143 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
6.8.
144 OF 295
MATERIAL SELECTION
The choice of material is based on the application of engineering diagrams supplied by
manufacturers of tubing and, hence the use of the modified SMI has been adopted, refer to
figure 6.e and figure 6.f. The choice of materials proposed is conservatively as recent
develop materials such as 13%Cr and Super Duplex class have not been considered
because experiments on these materials are not completed.
In the partial pressures of H2S and CO2 are below the critical thresholds established in the
previous section, all materials in class C-steel/L-A-steel can be used, otherwise the
following combinations of conditions may exist:
The tables regarding the choice of materials are shown below. These give the rules used by
Eni-Agip sectioned on the basis of the conditions as listed above and the use in the well.
Materials are sub-divided into three categories, OCTG, DHE materials and wellhead
materials.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
6.8.1.
145 OF 295
OCTG Specifications
Refer to table 6.b below.
OCTG Materials For Corrosion By H2S Only In Oil Wells
Conditions
o
FBHT >80 C
o
o
60 C< FBHT >80 C
o
FBHT >80 C
Material
Alternately
FBHT >80 C
o
FBHT <80 C
Material
Alternately
FBHT <150 C
o
o
150 C< FBHT <200 C
o
o
200 C< FBHT <250 C
Cl* <50,000
Material
Alternately
13% Cr
22% Cr
25% Cr-SA
25% Cr
Material
Alternately
Cl* <50,000
13% Cr-80KSI
Max
22% Cr
25% Cr
Cl* >50,000
FBHT <150 C
FBHT <200 C
o
Cl* <50,000
Cl* <50,000
22% Cr CW
25% Cr CW
22% Cr
25% Cr
25% Cr
Cl* >50,000
25% Cr CW
Cl* <20,000
25% Cr
Cl* <50,000
25% Cr CW
Cl* <50,000
28% Cr
Cl* <50,000
22% Cr SA
Cl* <50,000
25% Cr SA
Cl* >50,000
28% Cr
28% Cr
Incoloy 825
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
6.8.2.
146 OF 295
DHE Specifications
Refer to table 6.c below.
Materials For DHE Corrosion By H2S Only In Oil Wells
Conditions
Material
o
FBHT >80 C
o
FBHT >80 C
o
FBHT <65 C
o
FBHT <65 C
Alternately
AISI-41XX-110KSI-MAX
AISI-41XX-80KSI-MAX
AISI-41XX-HRC-22-MAX
AISI-41XX-HRC-22-MAX
Material
o
FBHT >80 C
Alternately
AISI-41XX-80KSI-MAX
AISI-41XX-HRC-22-MAX
AISI-41XX-HRC-22-MAX
FBHT <80 C
FBHT <100 C
o
o
100 C< FBHT <150 C
o
o
150 C< FBHT <250 C
Material
Alternately
28% Cr
Inconel 718
Incoloy 825
Cl* <50,000
Cl* <50,000
Material
o
FBHT <100 C
Cl* <50,000
9% Cr-1Moly
Cl* <50,000
13%-Cr-80KSIMAX
Cl* <50,000
Cl* <50,000
Cl* >50,000
22% Cr
25% Cr
25% Cr
Inconel 718
Incoloy 825
22% Cr CW
25% Cr CW
Cl* >50,000
25% Cr CW
Cl* <50,000
25% Cr
Cl* >50,000
28% Cr
Cl* <50,000
22% Cr SA
25% Cr SA
Cl* <50,000
Cl* >50,000
25% Cr SA
28% Cr
28% Cr
FBHT <250 C
FBHT <250 C
Alter
Or
22% Cr
25% Cr
Inconel 718
Incoloy 825
Inconel 718
Incoloy 825
Inconel 718
Incoloy 825
Inconel 718
Incoloy 825
Inconel 718
Incoloy 825
Inconel 718
Incoloy 825
22% Cr,
Inconel 718
Incoloy 825
Inconel 718
Incoloy 825
Inconel 718
Incoloy 825
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
6.8.3.
147 OF 295
Wellhead Specifications
Refer to below.
Wellhead Materials For Corrosion Caused By H2S
Conditions
Tubing
Hanger
Tbg Head
Adapter
Tubing
Spool
Cross
Top
Adapter
Casing
Spool
Stud
Nut
pH2S-MAX >
0.035
AISI-4140
HRC-22MAX
AISI-4135
HRC-22MAX
AISI-4135
HRC-22MAX
AISI-4135
HRC-22MAX
AISI-4135
HRC-22MAX
AISI-4135
HRC-22MAX
ASTMA193-B7M
ASTMA194-2M
pH2S-MAX <
0.035
AISI-4140
AISI-4135
AISI-4135
AISI-4135
AISI-4135
AISI-4135
ASTMA193-B7M
ASTMA194-2H
Automatic-Master-Valve
Manual Master-Valve
Conditions
Body Bonnet
Flanges
Steam
Body Bonnet
Flanges
Steam
pH2S-MAX>
0.035
AISI-4135HRC-22-MAX
AISI-4140HRC-22-MAX
AISI-4140HRC-22-MAX
AISI-4135HRC-22-MAX
AISI-4140HRC-22-MAX
AISI-4140
HRC-22-MAX
pH2S-MAX <
0.035
AISI-4135
AISI-4140
AISI-4140
AISI-4135
AISI-4140
AISI-4140
Tubing
Hanger
Tbg Head
Adapter
Tubing
Spool
Cross
Top
Adapter
Casing
Spool
Stud
Nut
13%-Cr80ksi-Max
F6NM
13%-Cr80ksi-Max
F6NM
AISI-4135
13%-Cr80ksi-Max
13%-Cr80ksi-Max
F6NM
Carbon-Steel
AISI-41XX
ASTMA193-B7
ASTMA194-2H
Monel-K500
Inconel-718
AISI-4135-IC
AISI-4135
AISI-4135-IC
AISI-4135
ASTMA193-B7
ASTMA194-2H
F6NM
Inconel-625
Inconel -625
Monel-K500
Automatic-Master-Valve
Manual Master-Valve
Conditions
Body Bonnet
Flanges
Steam
Body Bonnet
Flanges
Steam
13%-Cr-80ksiMax
13%-Cr-80ksiMax
Monel-K500
13%-Cr80ksi-Max
13%-Cr80ksi-Max
Monel-K500
F6NM
17-4-PH
F6NM
pCO2-Max <100e
AISI-4135-IC
Inconel -718
AISI-4135-IC
150<FTHT< 200e
Inconel-625
Cl < 50000
Inconel -718
Inconel-625
17-4-PH
Inconel-718
Inconel-718
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
Tubing
Hanger
Tbg Head
Adapter
Tubing
Spool
Cross
Top
Adapter
F6NM
13%-Cr
80ksi-Max
AISI-4135
HRC-22Max
13%-Cr80ksi-Max
13%-Cr
80ksi-Max
F6NM
F6NM
AISI-4135HRC-22Max
F6NM
F6NM
AISI-4135HRC-22MAX
F6NM
pH2S-Max <
F6NM
0.005
148 OF 295
Casing
Spool
Stud
Nut
AISI-4135
ASTMHRC-22-Max A193-B7M
ASTMA194-2M
AISI-4135
ASTMHRC-22-Max A193-B7M
ASTMA194-2M
F6NM
MonelK500
F6NM
ASTMA194-2M
Cl < 50000
F6NM
MonelK500
F6NM
F6NM
AISI-4135HRC-22MAX
ASTMA193-B7M
AISI-4135
HRC-22MAX
MonelK500
MonelK500
Inconel718
Inconel718
Cl < 50000
pCO2-Max < 100
pH2S-Max <0.8
Inconel718
Inconel625
FTHT< 150
-
Cl < 50000
Cl > Water
50000
pCO2-Max <100
pH2S-Max e >
0.8
AISI-4135IC
Inconel718
AISI-4135IC
Inconel625
AISI-4135
HRC-22MAX
AISI-4135
HRC-22Max
AISI-4135- AISI-4135IC
IC
Inconel625
Inconel625
MonelK500
MonelK500
Inconel625
Inconel718
Inconel718
ASTMA194-2M
ASTMA194-2M
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
Automatic-Master-Valve
Conditions
Body Bonnet
Flanges
0.005
149 OF 295
Manual Master-Valve
Steam
Body Bonnet
Flanges
Steam
13%-Cr-80 KSIMax
17-4-PH F6NM
13%-Cr-80KSIMax
13%-Cr80KSI- Max
17-4-PH
13%-Cr80KSI- Max -
Monel-K500
F6NM
F6NM
F6NM
F6NM
13%-Cr-80 KSIMax
Stellite-6
Monel-K500
F6NM
Stellite--6
Cl < 50000
pCO2- Max < 100
AISI-4135-I.C.
F6NM
Inconel-625
Inconel-718
Monel-K500
AISI-4135-I.C.
F6NM
Inconel-625
Inconel-718
AISI-4135-I.C.
Inconel-718
Monel-K500
FTHT< 150
-
Cl <50000
pCO2- Max < 100 AISI-4135- I.C.
pH2S- Max < 0.8
Inconel-625
Inconel-718
Inconel-718
Inconel-625
Cl Water 50000
pCO2- Max < 100
pH2S- Max e >
0.8
Inconel-718
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
100
pCO2
(atm)
10
FBHT<= 250 C
and
Cl- <= 20000 ppm
25% Cr-CW
FBHT<=250 C
and
Cl- <= 50000 ppm
25% Cr-CW
200<FBHT<=250 C
25% Cr-SA
or
25% Cr
10-1
(*)
200<FBHT<=250 C
and
Cl- > 50000 ppm
28 % Cr
or
INCOLOY- 825
(*)
C- STEEL
J 55
N 80
P 110
10-3
FBHT >80 C
J55 K55 N80-1 C95
P110-1 (only oil)
or
L80 mod C90 T1
10-4
10-3
10-2
10-4
FBHT<= 150 C
Cl- <= 50000 ppm
13 % Cr 80 Ksi max
or 22 % Cr 25 % Cr
FBHT < = 65 C
L 80
or
L 80 mod;C 90 T1
T 95 T1
10-2
150 OF 295
10-1
10
100
pH2S (atm)
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
100
pCO2
(atm)
10
10-1
(*)
200 < FBHT<=250 C
Cl- > 50000 ppm
28 % Cr
or
INCONEL 718
INCOLOY 825
(*)
C-STEEL
or
AISI 41XX
AISI 41XX
22 HRC max
FBHT > 80 C
C-STEEL 110 Ksi max
AISI 41XX
10-3
10-4
10-4
10-3
10-2
FBHT<= 250 C
Cl- > 50000 ppm
28 % Cr
INCOLOY- 825
INCONEL 718
FBHT < = 65 C
AISI 41XX
22 HRC max
10-2
151 OF 295
10-1
10
100
pH2S (atm)
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
6.9.
152 OF 295
ORDERING SPECIFICATIONS
When ordering tubulars for sour service, the following specifications should be included, in
addition to those given in the above table.
1)
2)
3)
4)
5)
6)
7)
Downgraded grade N80, P105 or P110 tubulars are not acceptable for orders for J55
or K55 casing.
The couplings must have the same heat treatment as the pipe body.
The pipe must be tested to the alternative test pressure (see API Bulletins 5A and
5AC).
Cold die stamping is prohibited, all markings must be paint stencilled or hot die
stamped.
Three copies of the report providing the ladle analysis of each heat used in the
manufacture of the goods shipped, together with all the check analyses performed,
must be submitted.
Three copies of a report showing the physical properties of the goods supplied and
the results of hardness tests (Refer to step 3 above) must be submitted.
Shell modified API thread compound must be used.
Note:
The steel used in the manufacture of the casing should have been quenched
and tempered. (This treatment is superior to tubulars heated/treated by other
methods, e.g. normalising and tempering).
All sour service casing should be inspected using non-destructive testing or
impact tests only, as per API Specification 5CT.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
7.
TUBING DESIGN
7.1.
POLICIES
153 OF 295
All completion tubing strings will have tubing movement calculations conducted to ascertain
the maximum load applied to the string and/or completion tubing movement to be catered
for in the completion design.
All tubing strings should be designed for stress, preferably using an appropriate up to date
computer programme. Currently Eni-Agip Division and Affiliates recommended programme
is the Enertech WS-Tube programme to the latest version.
A safety factor (SF) of 1.25 applies to the ratio of the calculated stress in a string to
the minimum yield strength of the selected tubing in carbon steels.
A safety factor (SF) of 1.35 applies to the ratio of the calculated stress in a string to
the minimum yield strength of the selected tubing of CRA materials.
If the stress SF is less than these limits, the calculation should be run again substituting,
either a heavier weight or, a higher grade of pipe. Under some special conditions, the SFs
may be reduced, refer to the criteria in section 7.10.2.
Tubing size shall be determined by the reservoir engineers using IPR curves and Nodal
analysis (Refer to section 5.6).
7.2.
THEORY
During completion tubing design process, it is necessary to calculate the variations in length
for the stresses applied under load conditions. When these have been determined it will
confirm the suitability of the selected tubing.
Tubing movement occurs due to only two reasons:
Temperature changes
Change in pressure induced forces.
Movement can only occur if the tubing is free to move. If the tubing is not free to move and
is anchored to a packer then stress will be subjected to the tubing string and packer. This
relationship is fully explained in section 7.10 Stress Calculations.
Tubing movement upwards (contraction) is assumed to be negative and downwards
(lengthening) is positive.
To fully understand these effects, it is first necessary to understand the properties of steels
used in the manufacture of tubing.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
7.2.1.
154 OF 295
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
155 OF 295
REVISION
STAP-P-1-M-7100
Beyond the elastic limit, permanent or plastic strain occurs. If the stress is released in the
region between the elastic limit and the yield strength; see figure 7.a, the material will
contract along a line generally nearly straight and parallel to the original elastic line, leaving
a permanent set.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
156 OF 295
REVISION
STAP-P-1-M-7100
In steels, a curious phenomenon occurs after the elastic limit, known as yielding. This gives
rise to a dip in the general curve followed by a period of deformation at approximately
constant load. The maximum stress reached in this region is called the upper yield point
and the lower part of the yielding region the lower yield point.
In the harder and stronger steels, and under certain conditions of temperature, the yielding
phenomenon is less prominent and is correspondingly harder to measure.
In materials that do not exhibit a marked yield point, it is customary to measure a yield
strength. This is arbitrarily defined as the stress at which the material has a specified
permanent set (the value of 0.2% is widely accepted in the industry).
For steels used in the manufacturing of tubular goods, API specifies the yield strength as
the tensile strength required to produce a total elongation of 0.5% to 0.6% of the gauge
length.
Similar arbitrary rules are followed with regard to the elastic limit in commercial practice.
Instead of determining the stress up to which there is no permanent set, as required by
definition, it is customary to designate the end of the straight portion of the curve (by
definition the proportional limit) as the elastic limit. Careful practice qualifies this by
designating it the proportional elastic limit.
As extension continues beyond yielding, the material becomes stronger causing a rise of
the curve, but at the same time the cross-sectional area of the specimen becomes less as it
is drawn out.
This loss of area weakens the specimen so that the curve reaches a maximum and then
falls off until final fracture occurs. The stress at the maximum point is called the tensile
strength or the ultimate strength of the material and is its most often quoted property.
The mechanical and chemical properties of casing, tubing and drill pipe are laid down in API
specification of further specs. 5CT which is a combination of former specs. 5A, 5AC, 5AX
and 5AQ - Casing and Tubing requirements. Depending on the type or grade, minimum
requirements are laid down for the mechanical properties, and in the case of the yield point
even maximum requirements (except for H-40). The denominations of the different grades
are based on the minimum yield strength, e.g.:
H-40 - min. yield strength 40,000 psi.
J-55 - min. yield strength 55,000 psi.
L-80 - min. yield strength 80,000 psi.
Others are shown in figure 7.c.
The lines indicating equivalent hardness of 22 and 23 Rc indicates the tolerances for use of
the materials in H2S conditions according to NACE which is fully described in section 7.9.4.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
157 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
7.2.2.
158 OF 295
Temperature
Temperature changes cause expansion and contraction in metals which is a significant
factor in tubing strings. All metals have a particular expansion rate which is termed the Coefficient of thermal expansion.
For a given volume, an object will expand or contract through temperature change by the
Co-efficient of thermal expansion for the type of material.
-6
The co-efficient of liner expansion for tubular steels is usually 6.9 x 10 in/in/F.
7.2.3.
b)
The tubing is positioned where it is fully free to move upwards but its downward
movement is restricted and stress applied to the packer.
c)
The tubing is connected to the packer by being threaded to, or latched to, the
packer
Free Movement
The tubing is free to move fully upwards or downwards using the packer bore with a seal
assembly, a PBR, a TSR or travel joint (Refer to figure 7.d below).
Calculations must be conducted to establish the full tubing movement in order that the
length of tubing movement device can be determined. These devices are usually available
in 10ft stroke lengths or multiples of 10ft, i.e. 10ft, 20ft and 30ft.
The movement determined by calculation should be used to select a device which
accommodates this movement with a margin of error, e.g. with a calculated movement of +
6ft and - 3ft = total 9ft, a 20ft device should be selected as a 10ft device would not provide
enough contingency for error, unless the movement was subsequently restricted as
described in the next section.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
b)
159 OF 295
In this case the tubing is fully free to move upwards but is restricted in its downward
movement (Refer to figure 7.e).
This restricted downward movement results in further stress applied to the bottom of the
tubing and, correspondingly to the packer. This additional stress will be calculated during
the tubing movement calculations and must not exceed the stress limit for the tubing,
otherwise permanent deformation will occur.
c)
Anchored Tubing
In this case the tubing is anchored to the packer by being threaded to it (as in the case
when using retrievable packers) or by using an anchoring device such as an Anchor Latch,
Ratchet Latch, etc. (Refer to figure 7.f).
When the tubing is anchored to the packer and movement is eliminated, it will result in
increased tensional and compressive forces, hence increased stress in the tubing. This may
be acceptable when temperature and pressure changes are not excessive. Similarly, the
calculations will determine that the tubing stress limit is not exceeded.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
7.3.
160 OF 295
WELL DATA.
The well data and parameters required (or already determined) to produce an accurate
tubing movement/stress analysis and, hence, selection of a tubing are:
7.3.1.
Casing Profile/Geometry
The planned casing design and contingency plans are required as they affect the tubing
movement calculations (Refer to 4.1.1). Each casing or liner weight and corresponding
length of section must be known to enable calculation. Deviation tables are also required.
7.3.2.
Tubing Data
The optimum tubing size, determined by nodal analysis conducted by the reservoir
engineers, is required and is the basis of all the calculations. The tubing grade is selected in
accordance to the criteria listed in section 6 to combat the effects of any corrosion from the
well conditions.
The tubing movement/stress calculations will then determine the tubing weight or any
change in grade required to meet with the applied SF for stress.
The well deviation is also important to determine the type of packer/tubing seal device
and/or tubing movement device to ensure that, either, straight pull or torque can be applied
to the tubing downhole at the packer depth overcoming any frictional drag.
Once the tubing size, weight and grade is confirmed then the appropriate rated completion
components can be specified in order that the purchasing department can prepare tender
documents.
7.3.3.
Bottom-hole Pressure
Accurate initial and prognosed future formation pressures both static and dynamic are
fundamental to tubing movement/stress calculations. These pressures can be obtained
from previous well exploration test data or appraisal well test reports.
7.3.4.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
7.3.5.
161 OF 295
Reservoir Fluids
As described earlier, the constituents of the produced reservoir fluids will initially determine
the material required for the tubing. This is subject to any corrosion inhibition methods
which may be implemented.
Particular importance should be paid to Hydrogen Sulphide, Carbon Dioxide and Chloride
levels. In the presence of water and under certain temperature conditions, these corrosive
agents can cause serious problems, therefore it is essential that a detailed corrosion study
is completed to enable the choice of materials and/or inhibition procedures.
If justified economically, the material chosen should combat the effects of corrosion,
however if this choice is not economic and some corrosion inhibition process was suitable
then this would be a fallback position.
Future parameters must also be considered as water may rise and the GOR will change,
therefore the materials should be chosen to last the planned life of the completion.
7.3.6.
Completion Fluid
The completion fluid, usually a brine, is chosen for its compatibility with the formation and its
fluids so as not to cause any formation damage. It should be selected to provide an
overbalance at the top of the reservoir. It also must be selected for its stability over long
time periods and not suffer from dehydration or deterioration.
As the completion fluid (sometimes referred to as the packer fluid) will be left in the annulus,
it should be suitably dosed with corrosion inhibitors and oxygen scavenger to prevent
corrosion to the exposed tubulars and elastomers.
The information required to make a considered selection may be obtained from the ADIS
(Advanced Drilling Information System) database (which holds all the data regarding the
drilling of the well), well tests carried out earlier and other sources which may be useful in
the decision making process.
7.4.
Piston effect.
b)
Buckling effect.
c)
Ballooning effect.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
7.4.1.
162 OF 295
Piston Effect
Tubing, when run in a well must first withstand the load of its own weight which may be a
significant factor especially in deep wells. This tensile load is greatest in the joint
immediately below the tubing hanger. The tubing is run into a completion fluid with
equivalent fluid density inside and outside the tubing which results in a reduction of the load
due to buoyancy.
If there is an alteration from this initial condition causing a change in pressure forces across
the packer seal unit then a piston effect is caused. This will alter the tensile load on the top
and bottom of the tubing.
The change in length due to these alterations is calculated from Hooks Law:
Where E is the modulus of elasticity (sometimes referred to as a Youngs Modulus formula).
The force (F) change is caused by the change in piston force from the initial conditions
created by a change in pressure in the annulus or tubing at the packer. 7.7 and figure 7.h
illustrate this piston force for two cases, tubing larger than the packer bore, and tubing
smaller than the packer bore. The formula in each case is the same:
L1 =
L
F
EAs
Eq. 7.A
L1 =
L
EAs
where:
L
E
As
Ap
Ai
Ao
Pi
Po
=
=
=
=
=
=
=
=
Eq. 7.B
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
Ao
Ao
Ai
Ai
Ap
Po
Pi
163 OF 295
Po
Ap
Pi
Buckling Effect
Helical buckling is initiated by compressive force acting on the bottom of the tubing and is
the formation of helical spirals in the tubing string. The helix shown in figure 7.i has a
variable pitch as the compressive force is progressively lowered by the weight of the pipe
hanging below. The buckling effect is greater when pressure differential is applied across
the pipe. Unless the tubing string is short or the compressive force is exceedingly high,
some of the tubing will be buckled and the rest straight. The exact point between the
buckled and straight sections is the neutral point (Refer to figure 7.i).
The neutral point can be calculated from the following:
n=
F
w
where:
W
Wi
Wo
=
=
=
Ws + Wi - Wo
Ai x Weight of fluid inside the tubing
Ao x Weight of fluid outside the tubing
Eq. 7.C
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
164 OF 295
REVISION
STAP-P-1-M-7100
F2 r2
L2 =
8EI w
where:
I=
(D 4 d 4 )
64
Eq. 7.D
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
165 OF 295
REVISION
STAP-P-1-M-7100
L2
F
Figure 7.J - Helical Buckling
If the tubing is very short (as happens for example on selective type completions between
two packers) all the string may be affected by buckling and there is no neutral point. In this
case, the length reduction due to the buckling effect is dependant upon the entire length of
the string and can be calculated by the following formula:
n>L
L2 =
F 2 r 2 Lw
Lw
2
8 EIw F
F
Eq. 7.E
As seen, the formulae for both piston effect and helicoidal buckling above has so far used
F, i.e. the change in the piston force acting on the bottom of the tubing. However, in order to
complete the understanding of the effects which lead to variations in length due to buckling,
we must also consider the effect caused by pressure differential across a pipe.
If the internal pressure in a pipe is greater than the external pressure, the tube remains
straight only if it has an axially symmetric cross-section with no deformation to change its
shape. This configuration is unstable and any distortion can lead immediately to a stable
equilibrium condition which is helicoidal buckling.
Helicoidal buckling is caused by the effect of the pressure which acts on the lateral surface
of the pipe wall as the convex surface of the bend in a greater force is larger than the
concave surface (Refer to figure 7.k). The internal pressure will therefore exert a greater
force on the convex side of the helix, than that exerted on the concave section of the same
bend. The resulting force will, therefore, create the helicoidal buckling configuration.
The same occurs when the stable external pressure is greater than the internal pressure
also resulting in helical buckling.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
166 OF 295
REVISION
STAP-P-1-M-7100
Moreover, the effect of the external pressure on the tubing lateral surfaces is equivalent to a
tensile force applied at the tubing bottom of:
F f = Ai Pi
I
Ff
II
Eq. 7.F
= Ao Po
Eq. 7.G
Po
Po
Pi
Internal pressure
Pi
External pressure
II
Therefore the tubing will be buckled by the piston force and by the sum of Ff and Ff . The
fictitious force Ff is obtained from the sum of the three elements:
Ff = Ff + Ff
I
II
+ Fa
Eq. 7.H
by substitution:
F f = A p (Pi Po )
Eq. 7.I
If Ff is greater than zero it will cause helical buckling and hence, if it is less than zero there
is no deformation.
It is however important to relate that the only force actually applied at the bottom of the
tubing is the piston force, while the fictitious force is used only to calculate the buckling
effect.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
167 OF 295
REVISION
STAP-P-1-M-7100
It should be remembered that, to calculate the variations in length, the variations of the
forces compared to initial conditions must be calculated. Therefore, to sum up:
in the L1 (Hookes law), the variation of the piston force Fa must be used;
in the L2 (buckling), the variation of the fictitious force Ff must be used when
this is positive, otherwise, being a tensile force, it cannot buckle the string and
L2 = 0.
The theory above was developed considering Pi = Po in the initial conditions, it thus follows
that the Ff is equal to zero and that the variation of fictitious force Ff is therefore equal to
the final fictitious force.
7.4.3.
Ballooning Effect
The third element which changes the length of a string, due to the changes to internal and
external pressure, is caused by ballooning. This effect occurs when P = Pi - Po is positive
and tends to swell the tubing which, contracts axially or shortens (Refer to figure 7.m). On
the other hand, when P = Pi - Po is negative, the tubing is squeezed and, expands axially
or elongates. This is termed reverse ballooning (Refer to figure 7.l).
The normally used simplified formula to calculate the ballooning or reverse ballooning effect
is:
L3 =
2 Pim R 2 Pom
L
E
R2 1
Eq. 7.J
In this the average internal and external pressure variations are defined by the formulae:
+ Pi ( final ) Pi (initial )
Pi ( final ) Pi (initial )
bottomhole
tophole
Pim =
2
Eq. 7.K
+ Po ( final ) Po (initial )
Po ( final ) Po (initial )
bottomhole
tophole
Pom =
2
Eq. 7.L
Again this is developed from Hookes law using Youngs Modulus of elasticity (already used
in the piston and buckling effect) and Poisson ratio.
Poissons ratio v as earlier expressed is:
V=
t / t
L / L
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
168 OF 295
Temperature Effect
The final effect considered when calculating tubing length variations, is the temperature
effect which usually induces the largest movement.
During a well operation, e.g. stimulation, the temperature of the tubing may be much less
than that in, either, the initial or flow rate conditions. During well stimulations, significant
quantities of fluids are pumped through the tubing at ambient surface temperature which
may change the temperature of the tubing by several degrees.
The formula used to calculate the change of length due to temperature effect is:
L4 = TM L
Eq. 7.M
where the average temperature variation in the string can be calculated as follows:
TM =
(T
final
.
Eq. 7.N
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
169 OF 295
REVISION
STAP-P-1-M-7100
In the formula represents the materials coefficient of thermal expansion. For steel this
value is:
= 6.9 x 10-6 in/in/F.
figure 7.n shows typical geothermal temperature gradients during both stimulation and
production conditions. It can be seen that the temperature variations to which the tubing is
subjected may cause considerable changes to its length.
100
200
300
T (F)
PRODUCTION
2500
5000
GEOTHERMAL
INJECTION
7500
D (feet)
Figure 7.N - Typical Geothermal Gradients
7.5.
Ltot = L1 + L2 + L3 + L4
Eq. 7.O
With free moving packer/tubing seals systems, the calculations are made for the selection
of an appropriate length of seal assembly, PBR or ELTSR with anchored packer/tubing
systems, this same calculation can be made to select the length of tubing movement
devices such as telescopic or expansion joints. However, if no movement is converted to
stress in the tubing, the resultant is stress on the packer (Refer to section 7.6).
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
7.6.
170 OF 295
ANCHORED TUBING
In some completions the tubing is firmly fixed to the packer, preventing any movement of
the string when well conditions vary (figure 7.o). In this situation the tubing-packer forces
generated by the presence of the anchoring must be determined so as to be able to confirm
if the tubing-packer anchoring system and the packer have sufficient strength to safely
withstand all the forces exerted.
Moreover, once this force is known, the load on the tubing can be calculated to check if the
completion components have sufficient strength.
L =
FL
EAs
FP = L4
EAs
L
Eq. 7.P
However, in general the problem of identifying the tubing/packer reaction is not linear due to
the helical buckling effect and so, it is possible to use a graphical approach.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
171 OF 295
REVISION
STAP-P-1-M-7100
The first step is to plot the characteristic strength/length variation of the system. This curve,
shown in figure 7.p is determined by the size of tubing, on the material, radial distance
between the tubing OD and casing ID and on the fluids in the well. This can be plotted using
the following formulae:
L =
FL
EAs
( for F < 0 )
L =
FL F 2 r 2
EAs 8 EIw
( for F > 0 )
Eq. 7.Q
The second step is to identify, on the curve, the tubing representative point in the well when
it is subjected to the fictitious force, even when this is negative. On the curve given in figure
7.q this condition is identified by intersection point (Ff, Lf). Indeed, if a force of Ff, was
applied at the end of the tubing, the cause of the buckling would be eliminated and the
neutral point would return to the bottom in the tubing.
The origin of the axis moves to the point found in this way (Ff ,Lf) and the diagram
obtained has a total length variation of LP = -ltot, so to position the tubing in the packer
after contracting the string must be elongated accordingly. As shown in figure 7.q the Fp
force, transferred between the tubing and packer, is then identified.
L4
Fp
L4
Fp
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
172 OF 295
REVISION
STAP-P-1-M-7100
Lp
Fp
Fp
Lp
Lf
Ff
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
173 OF 295
REVISION
STAP-P-1-M-7100
Fso L Fso2 r 2
Lso =
E As 8 E I w
Eq. 7.R
where:
Fso
With this type of anchoring it is, therefore, possible to limit the movements of the tubing with
respect to the packer and consequently the length of the packer seal-assembly. If an
anchored type constraint is considered then the tubing-packer force with respect to the
anchored tubing can be reduced, e.g. in an injection operation.
In practice, applying slack-off is the same as moving the packer upwards by Lso,
compressing the string and thus causing part of the length variation which would occur in
any case at a later stage due to the effects described above.
The same considerations can be made if Ltot < 0 during the operation while, on the other
hand, any elongation of the string would be prevented, causing a force on the packer which
would be equal to that of the slack-off amount.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
7.6.2.
174 OF 295
Packer Setting
A particular problem arises in tubing tied to packer completions when using hydraulic set
packers, as pressure is applied to the tubing to set the packer, it changes the length of the
tubing during the setting process. This in turn places stress in the tubing after the packer is
set and the pressure is bled off.
This stress needs to be taken into account to determine the total stress applied to the
tubing.
Hydraulic packers are set by plugging the tubing below the packer either by dropping a
setting ball onto a shear out ball seat, or by installing a plug with wireline.
The formulae for determine this tubing length change are:
Fa L
EAs
2 Pim
L3 =
L
E R2 1
L1 =
(Hookes law)
(ballooning)
where:
Fa = Ai Pi and Pim=Pi
7.7.
7.7.1.
Pressure Testing
The very first load condition experienced during and after the installation of the completion
string is pressure testing. This involves applying predetermined test pressures to both the
tubing and annulus. These pressures may be applied more than once during the installation
operation.
During the time taken to install the tubing, the completion will have warmed up to ambient
well conditions, therefore the only load applied is the pressure induced forces of piston
effect buckling and ballooning. However, the designed test pressures should be equal to or
greater than any other subsequent pressures applied to the completion so the magnitude is
high.
This may be of particular concern when using large bore tubing movement devices as the
forces generated by the test pressure are greater than packer tubing seal arrangements.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
7.7.2.
175 OF 295
Acid Stimulation
Acid jobs are carried out to remove formation damage caused during drilling by the invasion
of fluids and cuttings or to stimulate the formation by improving permeability. This operation
is carried out by pumping a predetermined quantity of acid down the tubing to the formation
at set pressures and flow rates.
From the point of view of the stresses exerted on the tubing string, the maximum pressure
able to be applied at the well head must be considered in order to determine the rate of acid
which can be applied, together with the temperature variations caused by the injection of
colder fluid. It may be necessary in some cases, to reduce the loads on the tubing by preheating the acid in order to limit the thermal expansion and pressurising the annulus to
reduce the tubing ballooning effect. Friction reducers may also be used to increase flow at
the same wellhead pressure, and decreasing the bottom hole pressure thus reducing the
load.
It is important to monitor the pressure and temperature trends during the operation as the
acid rate will probably increase due to the effect of the acid on the formation. This may lead
to greater cooling down of the tubing with reduced pressures.
figure 7.s shows the pressure and temperature trends required to be known so as to ensure
stress control of the string, according to the classical Lubinsky theory. Other data are often
needed for more complex calculations, using computer programmes, which, in Eni-Agip
Division and Affiliates case are in-house software which allows reproduction of the correct
temperature trend.
7.7.3.
Fracturing
Fracturing involves the propagation of fractures in the formation for the improvement of
productivity of hydrocarbons. These fractures reach from the well bore deep into reservoir
and allows better drainage.
To carry out fracturing, the formation must be pressurised until one (or more) fractures are
created. This entails obtaining in advance the injection parameters from various injectivity
tests with increasing flow rates. The calculated flow rate is applied during the operation and
the pressure trend (which usually decreases when the fracture is created due to the
reduction of load losses in the formation) is monitored.
With regard to the stresses on the string similar to acid stimulations, it is important to assess
the drop in temperature caused by the injection of colder fluid which, is carried out at high
flow rates even though of short duration.
The pressures which can be attained, especially during the early injection stage, are higher
than that during acid jobs. At times during these early stages, in order to exceed the
fracturing gradient, the maximum allowable pressure for some well head equipment may be
reached. This equipment must therefore be protected using special isolating tools or
protection sleeves. To check the string design is suitable, the pressure and temperature
trends can be plotted as shown by the previous example of the acid stimulation (figure 7.s),
selecting the end of the operation as the final conditions but with a well head pressure
equal to the maximum estimated.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
176 OF 295
REVISION
STAP-P-1-M-7100
If during the initial stages of the operation, a significant break-down is forecast (by a marked
reduction of pressure when the fracture is opened up in the formation). The latter condition
may be too conservative, therefore two conditions should be checked; the first with high
pressures without temperature variations, and the second with marked temperature
variations and lower pressures.
100
200
300
T (F)
2500
FINAL TBG
5000
7500
D (feet)
5000
10000
0
FINAL CSG
15000
P (psi)
FINAL TBG
2500
5000
INITIAL TBG
INITIAL CSG
7500
D (feet)
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
7.7.4.
177 OF 295
Flowing
In this case it is not an operation carried out on the well but the normal flowing load
conditions to which the string is being subjected. It is therefore very important to establish,
or at least approximate, the pressure and temperature profiles during the life of the well.
Different production situations will occur which cause changing load conditions; e.g.
temperature differences between the beginning and end of the productive life or the need to
increase or decrease the flow rate for reasons external to the well.
Compared to the initial condition, the string undergoes temperature increases which cause
elongation in the string. The resulting compressive forces may lead to the buckling
phenomena and even cause the tubing to exceed its elastic limit.
As shown in the diagrams of figure 7.t and figure 7.u, which give the pressure and
temperature bottom hole trends as a function of the depth at production start up and when
the reservoir is depleted, external pressure may be greater than internal pressure, making it
necessary to ensure a collapse control of some sections.
7.7.5.
Shut-In
Once a well is in production, it is necessary to interrupt production for maintenance or in
order to take some data measurements. This shut-in operation involves closing the well
during which the well head pressure increases because the reservoir pressure rises to static
condition, pressuring up the fluids in the tubing.
This load condition is considered critical as, at the moment of shut-in, the temperature of
the string does not vary greatly due to the thermal inertia of the well. The situation is now
similar to that during production but with well head pressures which are greater and hence
increase the stresses on the string.
figure 7.u shows typical pressure and temperature trends after a shut-in.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
178 OF 295
100
200
300
T (F)
2500
FINAL TBG
5000
INITIAL CSG E TBG - FINAL CSG
7500
D (feet)
5000
10000
15000
P (psi)
FINAL TBG
2500
INITIAL TBG
5000
INITIAL CSG - FINAL CSG
7500
D (feet)
Figure 7.T - Pressure and Temperature Trends in Normal Production Conditions
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
179 OF 295
REVISION
STAP-P-1-M-7100
Figure 7.U - Pressure and Temperature Trends in Depleted Reservoir Production Conditions
100
200
300
T (F)
2500
FINAL TBG
5000
INITIAL CSG E TBG - FINAL CSG
7500
D (feet)
5000
10000
0
FINAL TBG
2500
INITIAL TBG
5000
INITIAL CSG - FINAL CSG
7500
D (feet)
15000
P (psi)
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
180 OF 295
100
200
300
T (F)
2500
FINAL TBG
5000
INITIAL CSG AND TBG - CSG FINAL
7500
D (feet)
5000
10000
15000
P (psi)
FINAL TBG
2500
INITIAL TBG
5000
INITIAL CSG - FINAL CSG
7500
D (feet)
Figure 7.V - Pressure and Temperature Trends After Shut-In
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
7.7.6.
181 OF 295
7.8.
TUBING SELECTION
The tubing string selection procedure and subsequent stress analysis is fundamental to the
completion design process as it is during these two stages, that the optimum solution is
found through a sequence of approximations. By using an iterative method, i.e. by choosing
and verifying the various possibilities, the correct safety factor for all the calculated load
conditions expected during the life of the well, can be obtained.
The Eni-Agip Division and Affiliates approach to choosing the tubing string is similar to that
followed when designing any other mechanical part. A draft design is considered based on
the expected well conditions and then this design is checked to obtain the safety factor(s).
Alterations are then made to the draft completion until the ideal safety factor, which may
differ depending on the local environmental conditions and on some parameters discussed
below, is reached.
Since the economic factor plays a primary role of importance when selecting a completion,
it is necessary to assess all the various possible solutions. A typical example is that of wells
with the presence of corrosive agents where either strings and down hole equipment can be
made in Corrosion Resistant Alloy (CRA) or carbon steel with inhibitors injected downhole
can be used. In both cases the problem of completing the well is solved but it is necessary
to verify both cost and whether it is better to use on CRA, avoiding future workovers or if it
is more economical to use carbon steel with an inhibition system and scheduled workovers.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
7.8.1.
182 OF 295
Critical Factors
The main factors driving the choice of the string are described below. Taking into
consideration the well conditions, it is then possible to identify the optimum mechanical
solutions.
Materials
The choice of material for the tubing string depends mainly on the well environment, in
terms of all the mechanical stresses and corrosivity of the fluids.
In general, the ideal material is determined by the results of corrosion studies carried out
prior to the tubing design stage, especially when the severity of the conditions suggest the
use of expensive CRA materials (Refer to section 6).
With regard to corrosion studies, it is always necessary to determine, the exact quantities of
H2S, CO2, chlorides and water from production tests and to enter these data into an expert
system, or for a quicker choice, using the engineering diagrams supplied by manufacturers.
However, this method does not provide a solution to using carbon steel in conjunction with
an inhibition system. In this case, it is best to base the choice on an appropriate corrosion
study which takes into account many other parameters, e.g. thickness of the corrosion
product, economics, frequency of workovers, etc.
Once the choice of materials has been identified, it will be necessary to take into
consideration their mechanical properties to ensure that a suitable factor can be verified in
the subsequent stress analysis stage. Indeed, to complete a well with the presence of
corrosive agents (H2S and/or CO2) the use carbon steel with controlled hardness and/or
martensitic steel, is often sufficient though these only reach a maximum grade of T95 (95
ksi yield) therefore do not always meet with stress requirements in high pressures and great
depth.
When CRA steels are used (which must be cold worked in order to obtain the required
mechanical characteristics), the possibility of anisotropies must be checked into as they
generally imply a lower compressive yield load than tensile yield load and corresponding
reductions for their use at high temperatures. The presence of residual tension may induce
stress corrosion and over-stressing problems which must also be taken into consideration.
7.8.2.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
183 OF 295
REVISION
STAP-P-1-M-7100
The first indications of tubing size obtained is from tubing inflow performance analysis.
These studies can generally be completed quickly using Eni-Agip Division and Affiliates
software which directly provides the diameters of tubing for the expected flow rates and
projected rates, which take into account the type of fluid, surface pressures, bottom hole
pressures and other parameters. Calculation of the tubing inflow performance is very
complicated and time consuming in most cases and is not covered in this manual.
Once the projected size of the tubing is established for the required flow rate then in gas, or
gas condensate wells, it is necessary to calculate the velocities in the string during
production. This rate must be lower than the rate at which erosion occurs. These threshold
velocities can be found in API RP 14E.
The most important value to be decided on the selected tubing is its mechanical strength.
As explained in the following section, the loads resulting from the various load conditions
(acid jobs, production, etc.) applied to the selected string, the safety factor under these
loads against the yield strength are calculated. Once this calculation has been made, it may
be necessary to increase the weight or grade because the string is too weak. In some
particular situations non-traditional solutions must be chosen as some parameters, such as
cost, limit the choices. In the case of a very expensive super austenitic steel string for
example, it may be more appropriate to choose more structurally efficient solutions which
use a tapered string with different diameters thus reducing the amount of material needed
and therefore the cost.
Wells in which hydrocarbons containing corrosive agents are produced are sometimes
completed using carbon steel and it is accepted that a certain amount of the material will be
lost through corrosion during the life of the well. The strings of these wells, which generally
will be equipped with a corrosion inhibitor injection system, should therefore have added
thickness so as to have sufficient material to last until the scheduled workover. The two
cases; i.e. the new string (maximum thickness, maximum weight) and the workover stage
(minimum thickness, minimum weight) must both be taken into consideration when
calculating the strings stress resistance. It is prudent in such cases to reduce through
tubing interventions which knock off the corrosion exposing fresh material and, hence,
faster wall thickness reduction.
When choosing the thickness of the tubing forming the string, it is useful to consider the
thickness tolerance adopted by the manufacturer of the selected tubing. API standards for
carbon steels define a 12.5% eccentricity tolerance which means one point on the tubings
circumference probably has less thickness. This value for CRA tubings is often only 10%.
which provides a better safety factor under similar conditions. Another reduction of
thickness which must be taken into account on used tubing, may be due to repairs, by
grinding, carried out to remove tong marks.
The above factors can often lead to a variety of solutions, so it is necessary to evaluate
each one in order to obtain the most suitable solution in terms of cost, mechanical strength
and practical feasibility.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
7.8.3.
184 OF 295
Anchoring Systems
As illustrated earlier, the operations carried out during the life of a well cause movement of
the tubing string which can depend on the type of tubing/packer seal system used between
the bottom of the tubing and the packer, will generate different loads in the string will be
generated.
From figure 7.w, which shows the three most common types of packer/tubing systems, it is
clear from this that the least severe system is where the tubing seal assembly is free to
move in the packer bore. This system does, however, have some disadvantages which are
often unacceptable such as dynamic seals.
In very deep wells, with high pressures and temperatures the movements of the lower end
of the tubing may reach several feet in magnitude and hence very long seal units would
need to be used in the packer which brings related assembly and protection problems
during running in. Another important problem of free tubing, is the continuous movement of
the seal elastomers which may become damaged due to wear or from the debris deposited
in the annulus above the packer.
The best solution, due to the use of static seals, is systems to screw the tubing to the
packer using a threaded connection on retrievable packer systems or to a tubing anchor
(which allows the packer to be released when necessary) on permanent packer systems.
This type of anchoring provides the solution to seal life, but leads to greater stressing of the
tubing string. In preference, the free moving system is the first choice and if the loads it
creates do not allow for a suitable safety factor during well operations are other systems
considered.
Free Movement
Limited Downward
Movement
Attached
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
7.9.
185 OF 295
TUBING CONNECTIONS
The Eni-Agip Division and Affiliates policy for tubing connections is that the use of premium
connections is mandatory. In conjunction Eni-Agip Division and Affiliates also
recommended that a premium connection be used for production casings and production
liners, especially when the annulus is to be used for gas lift or an underbalance fluid is used
as a completion fluid.
7.9.1.
Policy
The connections to be used shall be qualified according to the requirements as set in the
Eni-Agip Division and Affiliates procedure Connection Procedure Evaluation.
7.9.2.
Class of Service
According to the specification STAP M-1-M 5006 Connection Procedure Evaluation, there
are two service classes, I and II, termed Application Levels (AL). Application Level I applies
to the most severe service conditions.
To date three tubing connections have been qualified for the most severe conditions ALI.
They are :
Coupled Connections
AMS 28 ( manufacturer Dalmine)
Vam ACE ( manufacturer Vallourec and Sumitomo)
Integral Connections
Eni-Agip Division and Affiliates A-DMS (Dual Metal Seal)
Other connections like Hydril CS, PJD Dalmine and Antares MS have not yet been
subjected to the complete qualification programme as per STAP M-1-M- 5006 or API 5C5.
They have however been used successfully for years with good results. They may be used
for all service condition where an Application Level II connection is required.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
7.9.3.
186 OF 295
Selection Criteria
The following are the selection criteria for connections used in different types of wells and
operating conditions.
Work string or well testing string:
Integral AL1 connection shall be used
Horizontal wells with Build up 20/100 feet:
Integral AL1 connection should be used
Wells with TVD 4500m:
Integral AL1 connection shall be used
Producing Oil And Gas Wells (TVD < 4500m)
Criteria
Requirement
NACE
no
no
yes
yes
Close Proximity
yes
no
yes
no
AL II
AL II
AL I
AL II
AL I
AL II (*)
AL I
AL I
AL I
AL I
AL I
AL I
Requirement
AL I
AL II
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
187 OF 295
REVISION
STAP-P-1-M-7100
Requirement
AL II
AL II
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
188 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
7.9.4.
189 OF 295
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
190 OF 295
REVISION
STAP-P-1-M-7100
Maximum volume determined to be available for escape in cubic feet per day.
H2S =
The volume used as the escape rate in determining the radius of exposure shall be that
specified below, as is applicable:
For the new wells in developed areas, the escape rate shall be determined by using the
current adjusted open-flow rate of offset wells, or the field average current adjusted openflow rate, whichever is the larger.
The escape rate used in determining the radius of exposure shall be corrected to standard
o
conditions of 14.65psia and 60 F.
When a well is in an area where insufficient data exists to calculate a radius of exposure,
but where hydrogen sulphide may be expected, a 100ppm radius of exposure equal to
3,000ft shall be assumed.
7.9.5.
CRA Connections
For steels with a high chrome content (>13%), there is a tendency to gall during make up.
This requires special surface treatment in the connections pin and box. The anti-galling
treatments (e.g. Bakertron or copper plating) is always applied to the couplings to ensure
the utmost coating, hence protection.
7.9.6.
Connection Data
Data on tubing connections are available from API specifications and tables in industry
handbooks.
7.10.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
191 OF 295
REVISION
STAP-P-1-M-7100
Piston Forces
Fictitious Forces
Free tubing
Fa
Ff
Fa* = Fa + F p
F f* = F f + F p
Piston Forces
Fictitious Forces
Free tubing
Fa tp = Fa w s L
F f tp = F f wL
Fa*tp = Fa* w s L
F f*tp = F f* wL
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
192 OF 295
REVISION
STAP-P-1-M-7100
a =
Fa
As
The fictitious force is used to calculate the axial stress caused by the tubing bending when
helically buckled, it is given by the expression:
b =
Dr
Ff
4I
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
193 OF 295
REVISION
STAP-P-1-M-7100
Now all the factors needed to determine the equivalent stress a, b, Po and Pi are
available, i.e. the stress which, by applying suitable criterion (for the materials used in the oil
industry the most appropriate is Von Mises), allows comparison of the stresses due to the
different effects in a particular section of the string against the material yield stress rating.
In this case the equivalent force will be the greater of the two, calculated using the
expression below, which gives the equivalent stresses in the outside and inside wall of the
considered tubing section.
2
P P P R Po
o = 3 i 2 o + i 2
+ a b
R 1 R 1
Pi R 2 Po
R 2 (Pi Po )
b
i = 3
+
+
a
2
2
R 1
R
R 1
As stated above, if the section to be calculated is buckled, both calculations must be made
to determine the higher of the two values while, if there is no buckling b = 0 and the greater
stress is that in the inside wall, the equivalent stress is eq = i
The higher of the stress values determined above will make it possible to obtain the SF of
the string for the load conditions and the section considered:
SF =
sn
eq
The SF must be greater than the minimum dictated by policy and listed in section 7.1 which
gives the SF values to be used by Eni-Agip Division and Affiliates.
7.10.2. Safety Factor
A completion strings safety factor is defined as the ratio between the yield stress and the
maximum value of the stress obtained as described above. It, therefore, provides a quick
reference parameter to evaluate the magnitude of the stresses present in the tubing
compared to the maximum acceptable.
To calculate the SF the yield limit values of the material are taken into consideration so that
there is no permanent corkscrewing of the string which could jeopardise, even if only
slightly, its functionality.
The Eni-Agip Division and Affiliates policy is to apply different types of material due to their
different mechanical behaviours and resistance to corrosion.
Carbon and CRA Steels up to 13%Cr
The acceptable SF for these types of materials is:
1.25
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
194 OF 295
REVISION
STAP-P-1-M-7100
In each individual case the string design and stress analysis engineer may evaluate
whether the acceptable SF can be lowered to 1.15 for some particular operations and for
specific well conditions. (e.g. low pressure oil wells, economic decision not to use the next
grade of tubing etc.).
Cold Worked (CW) CRA Steels
The acceptable SF for these types of materials which include duplex, super-austenitic and
Incoloy is:
1.35
Similarly, the engineer may evaluate whether, for some particular operations and for
specific well conditions, the acceptable SF can be lowered to 1.20.
The different SFs between the carbon and CRA steels can be attributed to the different
behaviour of these materials for stress values above the yield point. As stated previously,
the SF is calculated using the yield point but also the collapse rating of the string. This is a
dangerous situation which occurs at the breaking point.
figure 7.z shows the stress/strain diagrams for the above two types of materials. As can be
seen, apart from the yielding the cold worked materials reach breaking point soon after the
yield point while the carbon steels maintain a greater plastic deformation margin before the
breaking point.
Furthermore, the cold worked materials retain residual stress so, from both the viewpoint of
stress corrosion and mechanical strength, the SF should be slightly higher. It is, therefore,
clear that a higher SF for Cold Worked materials is required in order to maintain the same
safety factor relevant to the breaking points for the two types of materials.
COLD WORKED
CARBON STEEL
sn
r
sn
r = breaking point
sn = yield point
= elongation
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
195 OF 295
REVISION
STAP-P-1-M-7100
The SF discussed up to this point is valid, if referred to only as in the condition of triaxial
stress which, therefore, takes into consideration all the stress components to determine the
eq, from which it is possible to make a comparison with the yield load.
Any other SFs, referred to, in a state of monoaxial stresses, cannot be compared in any
way to those described in this manual because they take into consideration only one mode
of loading. For example, tension tubing, if applied individually, causes a state of monoaxial
stress. However, it would be incorrect to use the SF for tension alone because during the
life of the well it will be subjected to a combination of stresses.
7.10.3. External Pressure Limit
During the productive life of a well, conditions may occur making it necessary to limit the
external pressure on the string. One example is a well at the end of its productive life with
less pressure in the tubing than in the annulus, due to the depletion in reservoir pressure.
Another example is downhole pumps for artificial lifting and are operated by the power fluid
pumped down the annulus, which require substantial differential operating pressures.
Calculation of external pressure is carried out using the formulae supplied by API Bulletin
5C3 which identifies four types of collapse at external pressure in relation to the D/t ratio
and the Yp yield stress of the material. In fact the causes of collapse can range from
material yield as in the case of pipes with a low D/t ratio, to the sections elastic limit which
occurs in thin-walled pipes.
In order to use the API Bul 5C3 formulae, once D/t and Yp are known, the type of formula is
chosen then the maximum withstandable pressure calculated. If an axial force is applied to
the pipe as well as external pressure, the Yp value for use for calculations is adjusted using
a special formula.
7.10.4. Packer Load Limits
If the Fp force value transmitted by the string to the packer is known, it is possible to
calculate this value under various well conditions. By evaluating the magnitude of this force
and considering other factors such as the possibility of future recovery, the most suitable
type of packer in relation to the completion type, can be determined. By using diagrams
supplied by the manufacturer, it is possible to check whether well conditions come within
the limits set by the packer rating.
A typical diagram for packer force limits is shown in figure 7.aa. If the force exerted by the
tubing on the packer (Fp = set-down, if negative, Fp = tension, is positive) and the differential
pressure above and below the packer (Po>Pi above, Po<Pi below), are known, this diagram
can be used to ascertain the suitability of the condition.
As can be seen, when the pressure in the annulus increases compared to that in the tubing,
greater tensile loads can be applied and vice versa. In order to comply with the
specifications of the supplier, the tensile strength in this case is positive.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
196 OF 295
REVISION
STAP-P-1-M-7100
(tension)
400
300
FORCE
(Thousands)
200
100
Safety zone
(set-down)
-100
-200
-20
-10
10
20
(Thousands)
(above)
PRESSURE DIFF.
(below)
Ai = 4.68in
2
Ao = 6.49in
2
As = 1.81in
R = 1.178
ws = 0.542lb/in
4
I = 1.61in
sn = 80,000psi
ID = 6.094in
r = 1.61in
Packer bore:
Dpb = 3.25in
2
Ap = 8.3in
Length of string:
L = 10,000ft = 120,000in
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
197 OF 295
REVISION
STAP-P-1-M-7100
Initial Conditions
Initially both the tubing and the annulus are filled with 30 API oil, while the temperature is
60F at the well head and 200F at the bottom hole. figure 7.cc shows the pressure and
temperature variations against depth. It should be noted that 30 API corresponds to a
3
specific gravity of 0.0317lb/in and, therefore, to a pressure gradient of 0.38 psi/ft.
Final Conditions
Final conditions are cement displacement with a specific gravity of 15lb/gal, obtained by
pressurising the tubing at 5,000psi and the casing at 1,000psi. This operation causes the
string to cool to 160F at the bottom hole and creates the pressure and temperature trend
3
shown in figure 7.cc (15lb/gal corresponds to a specific gravity of 0.0649lb/in and to a
pressure gradient of 0.7795psi/ft).
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
198 OF 295
REVISION
STAP-P-1-M-7100
P (psi)
T (F)
60
GEOTERMICO
CSG e TBG
10000
10000
3800
D (feet)
200
D (feet)
FINAL CONDITIONS
O
1000
P (psi)
5000
T (F)
60
TBG
SQUEEZE
CSG
10000
4800
10000
12795
160
D (feet)
D (feet)
The variation in the piston force between initial and final conditions is expressed by:
Fa = Pi (Ap Ai ) Po (Ap Ao )
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
199 OF 295
REVISION
STAP-P-1-M-7100
so the variation in length according to Hookes Law (piston force) is given by:
L1 =
Fa L
30751.9 x 120000
=
E As
30000000 x 1.81
= 67.96 in
The fictitious force, which is initially zero because Pi = Po, is given by:
F f = A p (Pi Po )
As this value is positive, then the string is buckled, so it is necessary to determine the
position of the neutral point in order to calculate the L2.
The weight of string, w, fully immersed in fluids, is calculated in the following way:
w fi = Ai
fi
= 4.68 x 0.0649
= 0.3037 lb/in
w fo = Ao
fo
= 6.49 x 0.0317
= 0.2057 lb/in
w = ws + w fi w fo
= 0.542 + 0.3037 0.20567
= 0.640 lb/in
The neutral point from the bottom hole is therefore:
n=
Ff
w
66358.5
=
0.640
= 103685.16 in
As this distance is less than the length of the string, not all the string is buckled.
The variation in length L2, is calculated using the first of the two formulae in section 7.4.2.
L 2 =
F2 r 2
8Elw
(1.6166358.5 )
8300000001.610.64
= 46.16
2
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
200 OF 295
REVISION
STAP-P-1-M-7100
As regards the variation in length due to ballooning, the average variations in pressure
along the string can be calculated using the formulae in section 7.4.3:
Pim =
= 6997.5 psi
Pom =
= 1000 psi
Therefore, the variation in length caused by ballooning is as follows:
L3 =
2
E
Pim R2 x Pom
xL
2
R 1
2 x 0.3
6997.5 (1.178) x 1000
x
x 120000
30000000
(1.178)2 1
2
= 34.73 in.
As regards the variation in length due to temperature, the formula in section 7.4.4, is used
to calculate the average variation in temperature along the string:
TM =
= 20 F
The variation in length is therefore:
L4 = TM L
= 6.9 x 10 6 x ( 20 ) x 120000
= 16.56 in.
The variation in total length of the tubing, if the tubing can freely move in the packer-bore, is
therefore given by
Ltot = L1 + L2 + L3 + L4 1
= 165.4 in.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
b)
201 OF 295
w fi = Ai
fi
= 4.68 x 0.0317
= 0.1483 lbs/in
w = w s + w fi w fo
= 0.542 + 0.1483 0.20575
= 0.48 lbs/in.
Assuming that the slack-off force off loaded on the packer is 20,000lb, the neutral point is
located as:
Fso
w
20000
=
0.485
= 41266.4 in.
n=
Fso L Fso2 r 2
Lso =
E As 8 E I w
(1.61 x 20000)
20000 x 120000
=
The variation in the length of the string during the cement squeeze job, when there is a
tubing permitting limited motion is given by:
Lsotot = Ltot L so
= 165.41 ( 49.73)
= 115.68 in.
As can be seen, this value is lower than that calculated for a free tubing.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
c)
202 OF 295
Anchored tubing
If we assume a condition obtained with a tubing which only permits limited motion, giving
so
Ltot = -115.68 in. This value may still be unacceptable so it is necessary to use anchoring
in both directions. In this case as slack-off after setting the packer is present it is necessary
to determine the force required to position the end of the tubing in the packer (Fp), thus
so
setting the elongation Lp =-Ltot =115.68 in .
Figure 8.6 shows the diagram obtained using the formulae which supplies the
force/elongation characteristic for tension and compression. When the data of the example
are replaced, the formulae below are obtained (the diagram can be quickly plotted by
entering any F values and calculating the corresponding L):
L =
F
452.5
[in]
for F<0
L =
F
F2
452.5 95403727
[in]
for F >0 .
If the diagram is plotted with the value of the fictitious force calculated previously
(66358.5lbs), it is possible to identify the point where the origin of the axes has moved to.
From this point, movement in the direction of elongation by a Lp value is made in order to
locate the point which is distant from the curve by a Fp value. As figure 7.cc shows, Fp = 37000lbs, so the string is subject to stress at its lower end which is equal to 37,000lbs and
the packer is forced upwards by the same amount.
d)
If we consider a tubing anchored to the packer during a cement squeeze operation, with a
slack-off of 20,000lbs, the fictitious and piston forces, calculated according to section 7.6,
are:
Fa* = Fa + F p
= Pi (A p Ai ) P0 (A p Ao ) + F p
= 629 in.
F f* = F f + F p
= 29358 lb
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
203 OF 295
REVISION
STAP-P-1-M-7100
In the section above the packer (figure 7.bb), the forces at the well head are:
Fa*tp = Fa* w s x L
= 629 6.5 x 10000
= 64371 in.
F f* tp = F f* w x L
allungamenti
[in]
allungamenti
[in]
100
50
20
-40
60
80
100
compressione
[lbx1000]
-20
-50
Fp
-100
Lp
-150
Ff
-200
20
40
compressione
[lbx1000]
accorciamenti
[in]
trazione
[lbx1000]
40
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
204 OF 295
REVISION
STAP-P-1-M-7100
Bottom Hole
The piston force generates an axial stress equal to:
Fa*
a =
As
629
=
1.81
= 347 psi
the deformation due to buckling generates an axial stress equal to:
Dr *
Ff
4I
2.875 x 1.61 x 29358
=
4 x 1.61
= 21095 psi
b =
If we replace the a e b, values, along with Pi = 12795 psi e Po = 4800 psi, the values
below are obtained using the formulae in section 7.10:
o = 51688psi
i = 60223psi ,
therefore, if we consider the highest value found as equivalent force, the result is eq = i,
we can obtain the following bottom hole safety factor:
SF =
sn
eq
80000
60223
= 1.33
=
Well Head
*
As Ff tp < 0 the string at the well head is not buckled, b = 0 and the greatest amount of
stress is generated on the inner wall of the tubing:
a =
Fa*tp
As
64371
=
1.81
= 35564 psi
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
205 OF 295
REVISION
STAP-P-1-M-7100
If we replace the a value obtained and as pi = 5,000psi and po = 1,000psi, the value below
is obtained using the formula in section 7.10:
i = 36117 psi
therefore as eq = i, , the well head safety factor is:
SF =
sn
eq
80000
36117
= 2.21
=
The safety factor for the cement squeeze operation results as the lowest of obtained
values, therefore:
SF = 1.33
This value is acceptable because the lower limit for a carbon steel string is 1.25.
7.10.6. Example Computation
As an example we have included two cases of string calculations, carried out using the
Wellcat programme supplied by Enertech. The first example is the same as that dealt with
by Lubinsky. The second is a case history, analysed during completion studies for the
Villafortuna-Trecate field. Particular attention should be paid to data entry and presentation
of results in order to obtain knowledge of how the programme handles these two cases.
For a description of the programmes general functions, please refer to the notes in
Appendix D and the users manual available in the Companys library.
Examples done with the Vertubing programme, have been deliberately omitted as this
programme is no longer used by Eni-Agip Division and Affiliates. Therefore only a brief
description has been given in Appendix D. For further information please refer to the users
manual.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
206 OF 295
REVISION
STAP-P-1-M-7100
8.
SUB-SURFACE EQUIPMENT
8.1.
PACKERS
The types of packer systems and applications have already been described in section 5.3.1.
This section defines the series of criteria for choosing packer characteristics to apply to
single and selective completions.
The packers considered are listed in table 8.a below. The proposed criteria for the choice
only take into consideration general technical aspects and do not cover the individual
characteristics of particular models or tools, while still reflecting the needs which lead to
selection of the most commonly used models.
Once the packer type and model have been defined, the next stage is establish its
performance to meet with all the expected operating conditions (applied force and pressure
differences). For this reason regarding permanent packers, reference is made to the
operating Envelopes; i.e. operating diagrams for the packers supplied by the manufacturer
of the particular packer and to the pressure ratings for retrievable packers.
Type Of Packer
Setting Method
Permanent
Mechanical
Permanent/
Retrievable
Retrievable
Setting Tool
Sealbore Features
Std/Large/Dual
Electric line
Std/Large/Dual
Hydraulic
N/A
Std/Dual
Mechanical
N/A
Std/Large/Dual
Hydraulic
N/A
Std/Dual
Hydraulic
N/A
Hydrostatic
N/A
Weight
N/A
Table 8.A - Packer Types
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
8.1.1.
207 OF 295
Selection Procedure
Packer selection has three stages:
1)
2)
3)
In stage 3, stress analysis is carried out to check the completion string (packer and tubing)
under the stress to which they are exposed, refer to section 7.5 which describes the
iterative process of tubing weight/grade/stress calculations.
8.1.2.
Selection Criteria
Various representations can be used to describe the categories of criteria. This section
illustrates the flow diagrams, identifying the standard procedures for each stage (Refer to
figure 8.a.).
The selection process includes the following categories of data:
General Well Data
This includes data which effects the configuration of the well to be completed, the most
important being:
Completion Data
This includes the following parameters such as:
These data also include type of packer chosen and setting, setting depth, etc.
Operational Data
The following operational data are required:
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
208 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
8.1.3.
209 OF 295
Well Classification
An important parameter for defining the characteristics of a packer is the degree of difficulty
of the well to be completed. To this end four classes of well have been identified which are
used to analyse the various problems involved in the selection of the packer:
1)
2)
3)
Critical Well
4)
Non-critical well
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
210 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
211 OF 295
REVISION
STAP-P-1-M-7100
At points A and B, high frequency of extraction corresponds to a completion life of less than
five years.
The rectangle Choose indicates the choice between the two alternatives, the priority is
indicated by a number (1 corresponds to a higher priority than 2). For example, in the
choice is made on the basis of point (D) then there are no particular constraints (no
workovers, or requests due to the completion fluid characteristics).
The safety factor of using a retrievable packer or not depends on the criticality of the well
and, in particular, on its depth.
Packer Setting Method
Permanent and Permanent/Retrievable Packers
The selection is dependent mainly on the well characteristics:
1)
2)
3)
Figure 8.C - Packer Setting Method for Critical and Non-Critical Wells
For a mechanical type permanent packer, the setting is defined by the conditions
detailed in (A). The same procedure will also be used later for packers of the type
used in a selective type completion.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
212 OF 295
REVISION
STAP-P-1-M-7100
Check (A) is only true if one of the following conditions are relevant:
2)
Check (B):
3)
There is high frequency of tubing pullout (life of the completion < 5 years).
Check (E):
5)
Check (C):
4)
Check (F):
The packer fluid is a high density mud (> 1.6 kg/l) with the probability that it
leaves solid deposits on the packer.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
213 OF 295
REVISION
STAP-P-1-M-7100
The decision of whether to use a hydraulic, or hydrostatic, set is left to the engineer. The
main consideration is the required setting pressure (lower for hydrostatic packers) which
influences the wellhead pressure rating.
The conditions at the moment of packer setting decides whether to use a retrievable
packer. If these are outwith the capacity of the retrievable packer, a permanent/retrievable
packer will be utilised and consequently, the corresponding setting procedure will have to
be adopted (see permanent packers above).
Permanent And Permanent/Retrievable Packers Setting Method
There are principally two aspects to analyse:
If during the application of the stress analyses of the string gives negative results, a
configuration which fulfils the stress analysis requirements must be considered for the
packer-tubing connection5.
The shear ring value is generally set by increasing the maximum force applied to the packer
by 25%. The maximum force is determined using stress analysis (to take into account the
tolerance of the nominal shear value 5 to 10%). The shear value is checked for the stress
conditions at the wellhead section during the packer release stage.
Tubing-packer connections seal assembly elements will be of the moulded seal type when
subjected to alternating pressure cycles, e.g. gas injection wells where the IBHP is greater
than the packer fluid pressure and SBHP is lower than the packer fluid pressure.
Highly Critical Well: Anchored Completion
For a highly critical well, the approach is the same as that for an anchored tubing-packer.
defines the type of anchoring on the basis of the conditions for (A), in particular the choice
is made between a shear release or anchor seal assembly.
The type of anchor to be used can be defined during this first stage for an anchored
completion (without shear release):
If the packer is set mechanically, the anchor will be a ratchet type or,
alternatively, fixed.
5 If the failure of the stress analysis is due to the tension caused by the tubing-packer connection. At present the stress
analysis procedure is developed using the Veritas software package .Veritas is the UNIX version of the VERTBG package.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
214 OF 295
REVISION
STAP-P-1-M-7100
If the stress analysis upon releasing is negative, an anchor will be used and the
check will be carried out again.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
215 OF 295
The packer fluid is a high density mud (> 1.6 kg/l) which may leave solid
deposits on the packer.
Check (B):
The packer is one trip installation, i.e. run on the tubing. This is only possible
with hydraulically packers.
The procedure illustrated in figure 8.f gives a general description of the criteria behind the
choice of dynamic seal to be adopted. Reference will be made to this later and also for
cases which are different to those described in highly critical wells above.
Here, following any failure of the stress analysis, no other rules are apply as, in general,
when using dynamic seals, the stress analysis results are corrected using factors other than
the seal element.
Critical, Non-Critical Well
The easiest solution in these cases is to choose a Standard Seal Locator.
This is the case with the following conditions:
If these conditions do not apply, the procedure illustrated in figure 8.g is followed.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
216 OF 295
REVISION
STAP-P-1-M-7100
Check (A):
the packer fluid is a high density mud (> 1.6 kg/l) which may leave solid deposits
on the packer.
(B):
(C):
(D):
Again in figure 8.g, the outlet conditions included in the rectangle indicate, besides the
choice of tubing-packer connection, the need to use the packing setting procedure
specified.
In the case of a deviated well, anchored completion is not recommended. It is better to use
a completion with a shear element which is more easily releasable, or a dynamic seal
whenever feasible.
No additional adaptation of the seal element is foreseen as a consequence of any stress
analysis.
Retrievable Packer Tubing-Packer Connections
The choice of the tubing-packer connection for retrievable packers (hydraulic and set down
weight) is made on the basis of that in figure 8.h.
Particular conditions raise questions over which type of retrievable packer to use. In these
cases, a permanent/retrievable packer is the priority or a permanent should be used and
consequently the associated setting procedure and seal assembly selected.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
217 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
218 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
219 OF 295
REVISION
STAP-P-1-M-7100
Figure 8.J - Selective Single Well with Depths Between 3,000 and 4,000m
Figure 8.K - Selective Single Well with Depths Between 1,500 and 3,000m
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
220 OF 295
REVISION
STAP-P-1-M-7100
Figure 8.L - Selective Single Well with Depths Less Than 1,500m
In the case of depths less than 1,500m in a well not considered complex, it is strongly
recommend that a retrievable type packer be used.
Application of the criteria illustrated in figure 8.i through figure 8.l is common with the only
exception, in the case of multiple choices, being that the order of priority for the lower zone
can be changed by applying the following rules:
If workovers are planned with removal of the tubing and packer, and a
retrievable packer is one in the list of possible choices, then it should be
selected.
If the completion fluid is a mud with deposition problems, and a permanent or
permanent/retrievable packer are in the list of possible choices, then the
permanent/retrievable should be selected over of the retrievable.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
221 OF 295
REVISION
STAP-P-1-M-7100
Type of packer
Setting distance between the packers.
The setting criteria of a mechanical permanent packer (on a workstring, or wireline) are
those already defined for the single completion described in section 8.1.4.
Permanent Stacked Packers:
Refer to figure 8.i with all permanent packers, if the setting distance between the packers is
> 500m (check with the packer manufacturer), choose hydraulic setting for all the packers or
else mechanical setting.
Lower Permanent Packer With Upper Retrievable:
Refer to figure 8.j, figure 8.k and figure 8.l, in these cases the reference packer is
permanent and the other packers are the retrievable or permanent/retrievable type. With
these type of packers, if the completion fluid is a brine, hydraulic type setting should be
used or else the packers can be set mechanically.
Mechanical setting is preferred for the reference packer and the setting should be by
electric line when the distance between the packers is < 500 m.
If the reference packer is set by a workstring, a depth control procedure is necessary to
verify the depth of the packer setting to ensure positioning of the blast joint across the
upper zone which is open to production.
All packers are Retrievable
Refer to figure 8.k and figure 8.l where all packers are retrievable, hydraulic setting should
be used for this type of packer. It is essential to check with manufacturers that the distance
between the packers is sufficient for the packers to be set.
Tubing-Packer Connection Selection
The criteria continues by classifying the packers by type and setting with the zones treated
separately. In some cases, three zones are assumed (upper, intermediate, lower). In cases
where there is no specific mention of an Intermediate zone, it is treated with the same
criteria used for the upper zone.
Generally, the results of the stress analysis specifically identifies the packers with releasing
problems. Due to this, the zones are be treated separately; i.e. modifications are be made
only to those packers which have the problems. It is recommended in any case to re-check
the completion after having made the modifications.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
222 OF 295
REVISION
STAP-P-1-M-7100
Upper packer
The rules described for the single completion are applied to the upper packer (Refer to
8.1.4).
Lower or Intermediate Packer
There are three possible ways of treating the lower zones:
1)
2)
3)
All the packers are of the permanent or permanent/retrievable types with hydraulic
setting. Initially an anchor with shear release should be selected. In the case of failure
of the stress analysis on this packer, a dynamic seal will be used (anchor with PBR or
telescopic joint).
The lower zone packer is a permanent with mechanical setting. A dynamic seal should
be used; in particular, a standard length locator. In the case of failure of the stress
analysis, a longer locator with seal bore extension should be used. For the
intermediate zone in the three zone case, an anchor or retrievable type packer will be
used, for the intermediate packer.
The lower zone packer is a retrievable. In the case of failure in the stress analysis a
dynamic seal with telescopic joint will be used.
For the intermediate zone in the case of three zones, a telescopic joint should be used
when there is failure in the stress analysis.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
8.2.
223 OF 295
8.2.1.
Policy
All Eni-Agip Division and Affiliates completions shall incorporate a SSSV in the
completion string to provide safety in the event of an uncontrolled well flow.
Surface controlled sub-surface safety valves (SCSSVs) shall be used accordingly to the
criteria listed below in section 8.2.4.
8.2.2.
Applications
The applications for SSSVs are given in section 8.2.5.
The choice of SSSV for a particular development will depend on:
Well location
Fluid properties
Required flow area
Well intervention capabilities.
This will determine whether the selected SSSV is Wireline Retrievable (WRSV) or Tubing
Retrievable (TRSV).
8.2.3.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
8.2.4.
224 OF 295
Well Type
Criteria
Oil Producer
Gas producer
Gas storage
All wells.
Gas injection
All wells.
Water injection
All wells.
All wells on gas lift, tubing and annulus.
Electrical submersible pump, tubing and only
annulus if used for gas venting.
Artificial lift
All wells.
All valves with ball type closure mechanisms are not recommended for
use as they are less reliable than flapper valves.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
225 OF 295
REVISION
STAP-P-1-M-7100
Type of Valve
Applications
Storm Chokes
8.3.1.
Control Lines
Tube used as control line to operate downhole safety valves are installed along with the
production string. In this case, SCSSVs are usually set at shallow depths and, therefore,
the length of line required is generally relatively short.
8.3.2.
Injection Lines
Tube used as injection lines to inject chemical products such as corrosion or scale
inhibitors down hole or as deep as possible in the well, are also installed with the tubing
string. The line length required in this case, will be considerably longer.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
8.3.3.
226 OF 295
Tube Specifications
Size
Small diameter tubes for control or injection line applications are manufactured either as
seamless or seam-welded and sunk. They are usually available in a full range of materials
and sizes.
In the seamless tube manufacturing process, the raw material comes in the form of
extruded hollows, which are then reduced to the desired diameter and wall thickness by a
cold drawing operation. In the case of welded tube process, the raw material comes in
strips which are first rolled into tube form which is fed through a welding head to perform a
fusion weld. The cycles of cold drawing with a floating plug drawing method is preferred and
annealing operations performed to reach the desired dimensions and produce a weld zone
homogeneous with the rest of the tube material.
Welded tubes are considered the norm as opposed to seamless which are considerably
more expensive and limited in length (usually a max. of 1000 ft in length). Welded tubes
can be produced in extra long coils more than 3200 ft by butt welding lengths of tubings
together.
Both types of lines comply with ASTM specification A269 Seamless and Welded Austenitic
Stainless Steel Tubing for General Service and ASTM-B751 specification General
requirement for Ni and Ni alloy Seamless and Welded Tube.
1
The standard size for both applications, control and injection line, is /4 OD and the wall
thickness chosen from among the following sizes according to the pressure requirements:
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
227 OF 295
REVISION
STAP-P-1-M-7100
Injection rates referred to in this application are always low, therefore the flow profile can be
assumed to be laminar. Once the friction losses for laminar flow have been calculated then
the diameter size can be determined accordingly. figure 8.n shows the graphs of pressure
losses per 100m versus flow rate plotted for various internal diameters and various values
of fluid viscosity. Once the working pressure has been defined as explained below, (Refer
to table 8.d), the selection of the tubing size to meet with requirements can be made.
Working pressure is defined as follows:
WP = BHSP + Pfr Phd
Eq. 8.A
where:
WP =
BHSP=
Pfr =
Phd =
The pressures given in the table are computed with ultimate and yield tensile strength
values given in table 8.f and they are rated to temperatures between -20 and 100F. Values
obtained are based on the Lams formula for thick section pipes using internal pressure
only and stress defined at the internal diameter face, combining radial and tangential stress
to determine an equivalent resultant using the Von Mises Theory of Distortion Energy:
OD 2
Ys
1
ID
P=
4
OD
3x
+1
ID
Eq. 8.B
Variables are defined as:
P
Ys
Ys
WP
OD
ID
=
=
=
=
=
=
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
228 OF 295
REVISION
STAP-P-1-M-7100
Type of alloy
OD (inch)
Wall (inch)
WP (psi)
Burst (psi)
Test (psi)
AISI 316 L
0.250
0.035
5.328
18.646
6.659
0.250
0.049
7.118
24.914
8.898
0.250
0.065
8.809
30.831
11.011
0.375
0.035
3.651
12.780
4.564
0.375
0.049
5.004
17.515
6.255
0.250
0.035
5.967
18.646
7.459
0.250
0.049
7.972
24.914
9.965
0.250
0.065
9.866
30.831
12.333
0.375
0.035
4.089
12.780
5.112
0.375
0.049
5.605
17.515
7.006
0.250
0.035
7.459
22.642
9.323
0.250
0.049
9.965
30.252
12.457
0.250
0.065
12.333
37.438
15.416
0.375
0.035
5.112
15.518
6.390
0.375
0.049
7.006
21.268
8.757
0.250
0.035
12.786
31.965
15.983
0.250
0.049
17.084
42.709
21.355
0.250
0.065
21.142
52.854
26.427
0.375
0.035
8.763
21.908
10.954
0.375
0.049
12.010
30.025
15.013
Monel K400
Incoloy 825
Inconel 625
Material Selection
Among the stainless steels and nickel alloys available, the most commonly used for control
or injection line applications are listed in table 8.e together with their relative characteristics.
Compatibility of packer or completion fluid with the selected material must be confirmed by
means of condition specific laboratory testing. table 8.f shows the mechanical properties of
these materials in the annealed condition.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
229 OF 295
REVISION
STAP-P-1-M-7100
Type of Alloy
Main Characteristics
AISI 316 L
Is an austenitic stainless steel with reduced carbon content. Has good resistance
to grain boundary attack and improved resistance to pitting and crevice attack. It
is susceptible to chloride stress cracking when the presence of stress is
combined with a packer fluid containing chlorides.
Monel K400
Incoloy 825
Inconel 625
Table 8.E - Stainless Steels and Nickel Alloys Most Commonly Used
Once the type of material to be used has been defined, based on pressure ratings and
working environment, the corrosion department should be consulted to confirm compatibility
with the packer fluids.
Control or Injection line made of the above material shall comply with the following ASTM
specifications:
AISI 316L
Monel K400
Incoloy 825
Inconel 625
Type of Alloy
AISI 316 L
70,000
25,000
Monel K400
70,000
28,000
Incoloy 825
85,000
35,000
Inconel 625
120,000
60,000
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
8.3.5.
230 OF 295
Fittings
Connections for either SCSSV control lines or chemical injection lines shall be performed as
follows:
In case of pressure rating < 5000 psi, line connections shall be of the Swagelok
type.
In case of pressure rating > 5000 psi, line connections shall be of the
Autoclave type as recommended by API Spec. 6A (Wellhead & Christmas Tree
Equipment) at the paragraph Equipment specification requirement under test
and gauge connections.
It is suggested to avoid, as far as possible, any intermediate connections to reduce potential
leak paths.
8.3.6.
Protectors
Control line protectors are designed to support and avoid (bare or encapsulated) crushing at
where it is most exposed, e.g. where it crosses large offsets like couplings, downhole safety
valves or gas lift mandrels. Protectors shall be designed for small annular clearances
allowing sufficient annulus flow area. They should be of the one piece type without loose
parts and designed so as to be quickly installed and removed.
Across coupling tubing protectors are recommended for use with both SCSSV control and
injection lines applications. For control lines used on SCSSVs installed at shallow depth
(less than 250m), other types of protectors may be used. In general, steel banding or
banding straps, rubber based and mid joint protectors shall be avoided at all costs.
The following technical requirements will identify protector performance:
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
8.3.7.
231 OF 295
Encapsulation
Encapsulation of this line is recommended only for chemical injection lines applications.
Encapsulation increases crush resistance during installation, protects line against abrasion,
pinching and improves clamping profile. Several encapsulation materials are available,
covering a wide range of environmental conditions. table 8.g indicates the compatibility of
the main encapsulation materials with the most commonly used packer/completion fluids. In
some cases, braided wire is placed alongside the injection line and bonded together by the
encapsulation material, to further enhance resistance and strength avoiding any rolling and
twisting tendencies (Refer to table 8.h).
The following laboratory tests are suggested to confirm the lines mechanical characteristics
and compatibility of the encapsulation material with the packer fluid used:
The following table 8.g shows the main properties of the most common types of
encapsulation material available. The choice of material, is mainly based on type of packer
fluid, well deviation and working temperatures to be experienced and shall be confirmed by
laboratory tests for compatibility.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
232 OF 295
REVISION
STAP-P-1-M-7100
Encapsulation Material
Main properties
Nylon
Santroprene
Halar
Rislan II
Foraflon PVDF
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
233 OF 295
REVISION
STAP-P-1-M-7100
Sample Size
2.45
2.65
3.8
7.0
9.0
Fri
c.
los
ses
psi
/10
0m
100
90
80
70
60
50
40
30
20
10
0
10
Q injection - liters/hr
w.t.= 0,035
w.t.= 0,049
w.t.= 0,065
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
234 OF 295
REVISION
STAP-P-1-M-7100
18
16
14
12
10
8
6
4
2
0
w.t.=0,035
w.t.=0,049
0
10
w.t.=0,065
Q injection - liters/hr
Pf =
Q x L x
612.95 Di 4
Eq. 8.C
where:
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
Oil Name/Properties
235 OF 295
Agip Arnica 32
(Petroleum based)
Agip OSO 32
(Paraffinic based)
Agip Betula S 32
(Synthetic based)
Viscosity at 40 C cSt
32
30
29,4
6,4
5,3
5,1
Viscosity index
163
110
98
Pour Point C
-39
-30
-55
Flash point C
202
204
206
0,865
0,875
0,841
-60
Density at 15 kg/l
Floc point C
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
8.3.9.
236 OF 295
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
8.4.
237 OF 295
Data on all of these nipples can be found in the manufacturers current catalogue. Do not
rely on data produced elsewhere or use old catalogues as changes to the nipple systems
may have been made resulting in incompatibility.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
8.4.1.
238 OF 295
The first nipple, generally in the tubing hanger, is always a Baker type F and is chosen with
the maximum diameter available for the size of the completion tubing below the hanger.
For the lower nipples, the minimum top and bottom restriction dimensions are determined
by the following procedure:
1)
The top restriction (RA) is the minimum upper diameter of the nipple, chosen from one
of the following:
2)
ID of the packer
Drift of the tubing
ID of the safety valve
Vertical access of the wellhead
Sealbore diameter (top) or no-go ID (bottom) of the upper nipple.
3)
In other cases, the previous conditions are re-applied, decreasing the NGD to adjust
the calculations. The minimum values which can be reached by the NGD are:
4)
The data obtained are then used to match the nipple. To select the nipples to be as
compatible as possible with the available options in the suppliers catalogues, an
approximation of 1/100ins for SB is acceptable.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
1)
In the event of achieving a good match, the nipple is compared with the data from the
catalogue. If there is no nipple with the characteristics required, there are two options:
2)
239 OF 295
The type of nipple (e.g. F) is obtained from the previous selection. If F is chosen, it is
then possible to use an R type nipple if the following conditions exist:
The nipple in question is not required for the installation of a W/L retrievable
backup SCSSV
The subsequent nipple must be type F with the following characteristics:
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
9.
240 OF 295
PERFORATING
The objective of perforating a well is to establish communication between the wellbore and
the formation by making holes through the casing, cement and into formation in such a
manner so as not to inhibit the inflow capacity of the reservoir.
To optimise perforating efficiency, it is not solely down to the perforating technique but
relies extensively on the planning and execution of the well completion which includes
selection of the perforated interval, fluid selection, gun selection, applied pressure
differential or underbalance, well clean-up, and perforating orientation.
One of the important aspects is the underbalance, which has been proven to significantly
help to achieve a post-perforating flow rate to effectively flush out gun debris and remove
the crushed zone which surrounds every perforating tunnel. If this is not effective, increased
perforating skin can reduce production rates.
The advantages of perforated casing wells is already described in section 5.2.3 and offers
selectivity, however the perforated volume in the pay is relatively small compared to open
hole (+/- 25%), therefore perforation damage is an extremely important aspect. To this end
it is necessary to obtain an adequate shot density with a sufficiently deep enough
penetration to pass through the drilling damage and maximise flow through each tunnel.
9.1.
The explosives for use in most shaped charges up to 300 F is RDX (cyclonite) and above
this temperature and depending on time exposed to the temperature, HMX, PS, HNS or
PYX is used. The performance of each is available from the suppliers. The detonating cord,
which couples all the charges to the detonator in the firing head, must match the explosive
selected.
The detonator is triggered by electrical heating when deployed on wireline systems or by a
firing pin in mechanically or hydraulically operated firing head systems employed on tubing
conveyed perforating (TCP) systems.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
241 OF 295
REVISION
STAP-P-1-M-7100
GUN TYPES
There are four main types of perforating guns:
9.2.1.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
242 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
9.2.2.
243 OF 295
9.2.3.
9.2.4.
Another version available, normally used on well tests, is where a differential is applied
between the annulus and the sump via porting through the test packer.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
244 OF 295
REVISION
STAP-P-1-M-7100
Due to the longer exposure time because of the deployment, higher grade charges may
also be required.
9.3.
GUN PERFORMANCE
9.3.1.
Entrance hole size and penetration length into a 5ft diameter concrete target.
Entrance hole, penetration and flow efficiency in a Berea sandstone target at
elevated temperatures and an estimated 800psi effective stress.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
245 OF 295
REVISION
STAP-P-1-M-7100
Guidelines
Gravel Pack Completions
Due to the problem of flow restriction discussed earlier in section 2.4.1, the important
factors are:
This in conjunction with correct gravel pack procedures is essential for to prevent high skin
factors.
High Underbalanced TCP Perforating
High drawdowns over 500psi for production wells require, if possible:
TCP methods
Deep penetrating charges.
High shot density over 8spf.
o
Minimum 90 phasing.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
246 OF 295
REVISION
STAP-P-1-M-7100
Penetration
In general, the deeper the shot the better, but at the least it should exceed the drilling
damage area by 75mm. However, to obtain high shot density, the guns may be limited to
the charge size which can physically be installed which will impact penetration.
Phasing
o
Providing the stand-off is less than 50mm, 180 or less, 120 ,90 , 60 is preferable. If the
smallest charges are being used then the stand-off should not be more than 25mm. If
o
fracturing is to be carried out then 90 and lower will help initiate fractures.
Gun Stand-Off
Gun stand-off should be minimised for improved performance, especially at high pressures.
If low phase angle, high density shots are preferred then TCP and casing guns should be
used. As a general rule stand-off should never be more than 50mm.
Hole Size
The hole size obtained is a function of the casing grade and should be as follows:
Overbalanced Perforating
If a well is to be perforated overbalanced, then strict control over the fluid used to ensure it
is compatible with the reservoir formation, formation fluids and must also be clean to
prevent formation damage.
9.3.2.
Underbalanced Perforating
To optimise the perforating clean up, an underbalance should be used. King et al
developed a recommended minimum level of drawdown based on a number of field studies
where TCP perforating had been employed, (Refer to the Figures below). These guidelines
should be used to select the appropriate drawdown for consolidated completions.
In unconsolidated sands, the intention is to cause perforation enlargement to remove the
crushed zone without collapsing the cavity or sanding in the guns. This requires that less
drawdown is exerted during the well clean up.
The optimum clean up period is subjective and opinions range from 1gall to 5gall per
perforation. The best method of clean up is to flow the well continually for several hours
after perforating at normal offtake rates.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
9.3.3.
247 OF 295
Firing Heads
As described earlier, there are a number of different firing heads for various applications. .
Wireline perforating systems are normally electrically trigger by passing an electrical signal
down the cable to the guns. However, in TCP systems there are a wide variety including
pressure operated, bar drop, wireline activated, etc.
Two very important considerations are safety during installation of TCP systems and
redundancy in the event of a fault occurring in the primary firing system.
Safety
The use of tubing installed hydraulic actuated systems has the problem of how to conduct
pressure integrity tests on the completion with sufficient margin between the gun activation
pressure and the highest test pressure applied. Obviously, it is undesirable to have a gun
actuation pressure higher than the test pressure as a leak may occur while trying to trigger
the guns. Protecting the firing head from test pressure is a dangerous procedure as a plug
may leak will also cause premature detonation.
It is good practice to use a bar drop firing mechanism (deployed on wireline if possible as
dropping the bar from surface may damage sensitive completion items) or wireline installed
firing heads which can be installed after the completion is set and tested. This provides full
safety during gun deployment.
Redundancy
This is an important aspect, for if there is a firing head fault, gun recovery would be very
costly. Using wireline installed firing heads provides some redundancy in that the first head
can be retrieved and a second head deployed. There are other side-by-side systems
available which provide a tubing installed pressure activated firer with a secondary
receptacle for a wireline installed firer.
9.3.4.
Perforating Procedures
Refer to the Completion Procedures Manual.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
248 OF 295
REVISION
STAP-P-1-M-7100
Figure 9.C - Recommended Underbalance for Perforating Gas Zones in Stable Sandstones
Figure 9.D - Recommended Underbalance for Perforating Gas Zones in Stable Sandstones
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
249 OF 295
REVISION
STAP-P-1-M-7100
Figure 9.E - Recommended Underbalance for Perforating Shallow Unconsolidated Gas Sands
Figure 9.F - Recommended Underbalance for Perforating Shallow Unconsolidated Oil Sands
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
10.
250 OF 295
ARTIFICIAL LIFT
The benefits and most commonly used artificial lift were described previously in section
5.6.4. The application of artificial lift simply displaces the TPC curve downwards so that a
lower bottom-hole flowing pressure is achieved. In simple terms, the artificial lift injects
energy into the system.
Energy can also be introduced by reservoir pressure maintenance. Reservoir development
optimisations studies are necessary to determine the relative technical and economic
benefits of the options and the timing of the investments.
In some fields, both pressure maintenance and artificial lift are used which defers the
installation. In other cases, artificial lift from the outset is necessary to achieve the
production and economic targets. Just as tubing size is critical to high PI wells, then
minimisation of the FBHP is critical to low PI, low pressure wells.
To summarise the reasons for the installation of artificial lift are to:
The selection of the most appropriate artificial lift system involves a number of factors but
mainly on specific well performance. Section 10.7 lists all the systems, their applications,
design considerations, limitations and comparisons.
Selection of the method is also based upon operating costs and workover frequency costs.
System life is difficult to predict as it is a function of operating conditions, e.g. ESP life can
vary between days and five years depending on temperature, solids production, GLR and
lack of particular experience with the system. Some systems are able to cope better with
production problems than others which will obviously affect the choice.
Consideration of future artificial lift requirements must be taken during the planning stage,
such as casing size, liner top setting, etc. These early decisions can save much expense
later, such as:
Casing ID
Casing connection in on gas lift
Size and positioning of liners
Provision of a sump for rod pumpers
Pre-positioning of gas lift mandrels for gas lift and ASV system
Pre-installation of conduits for hydraulic pumps
Parallel bore for plunger lift
etc.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
10.1.
251 OF 295
GAS LIFT
The continuous gas lift method adds gas into the producing fluids which reduces the
hydrostatic head and, hence the back-pressure on the formation.
The injection gas is supplied in a closed loop system in which it is taken from the separators
and then compressed, dried if necessary and then delivered to the well (Refer to figure
10.a).
The lift gas is normally pumped into the annulus and into the tubing through gas lift valves
installed in Side Pocket Mandrels (SPMs). Occasionally the gas is pumped into the tubing
and the production taken up the annulus or in the annular space in a concentric completion.
Another less common application is Intermittent Gas Lift, also shown in figure 10.a, which is
used to produce low volumes of liquid (<350stb/d) from wells with low BHFP (<0.1psi/ft).
Due to the low liquid production, it must be produced in slugs by intermittently gas injection
through a motorised valve. A standing valve is sometimes necessary to prevent the gas
from flowing into the formation.
In continuous gas lift, it is desirable to position the lower gas injection point as deep as
possible in the well, however this is limited by:
figure 10.b illustrates the fundamental principle of a gas lift design and operation. As can be
seen the gas is injected down the annulus and into the tubing through the topmost valve
lightening the fluid column in accordance with the total GLR curve shown. As the fluid
gradient changes, the gas moves down to the next valve unloading the casing fluid and as
the reaches the second valve and lightens the fluid gradient from that point, the first
unloading valve closes so that all the gas passes through the second valve. This continues
in sequence for all other valves until reaching the operating valve where the casing
pressure will drop below the initial kick-off pressure. During this process the well BHP will
drop to the point where the well will flow.
Production is determined by:
reservoir pressure
PI
water cut
gas injection rate
Once the well reaches a stabilised rate, the injection is optimised to maximise production.
As described in section 2.4.3, increasing GLR initially decreases the bottom-hole pressure
on the TPC. There is an optimum GLR to produce stabilised flow for a particular tubing size
and a minimum BHFP. As GLR requirements are subject to diminishing returns, most gas lift
systems are based on available gas supply volumes, Qi, or either the near optimum GLR
which provides a BHFP within 20-50psi of the minimum.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
252 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
253 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
254 OF 295
REVISION
STAP-P-1-M-7100
Eq. 10.A
where:
NS
HS
=
=
number of stages
head per stage
The pump characteristics are based on constant rotational speed which is dependent on the
AC supply frequency, 3,500 rpm at 60 Hertz and 2,915 at 50 Hertz. Due to these high
speeds and pump construction it is obvious that sand production is very detrimental and
that emulsions are easily formed. To prevent sand production it is sometimes necessary to
install a gravel pack or pre-packed screen for pump protection.
The ESP delivery capacity will vary according to:
Well IPR
Reservoir pressure
Surface back-pressure
Electrical supply frequency
figure 10.c shows the most common types of ESP installations and the pump components.
Surface equipment usually includes a three phase transformer, motor controller and a
wellhead pack-off for the cable.
If possible, the installation should be designed to facilitate downhole separation of free gas
and vented up the annulus which is necessary when the gas volume exceeds the pump
operating limit (typically +/-10% of the total fluid volume). On offshore installations, gas
production up the annulus may be a significant problem.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
255 OF 295
REVISION
STAP-P-1-M-7100
As can be seen from the schematic, most pump installations are on the end of tubing and
positioned above the perforations or open hole. The motor is situated at the bottom of the
assembly so that the well flow around the motor will dissipate the heat generated. If the
pump has to be positioned below the interval, a shroud is used to draw the produced fluid
down past the motor. Bottom discharge pumps are used in powered dump flood wells.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
256 OF 295
REVISION
STAP-P-1-M-7100
Both of these suffer from some problems such as cable failures with the cable suspension
method and well control issues with the C/T mounted method (i.e. downhole safety systems
if the well can flow naturally). A recent development with the later is in Norway where
downhole safety is satisfied by the installation of shear seal capability below the coiled
tubing hanger.
10.2.1. ESP Performance
It is normal procedure to select the largest pump that will fit into the production casing
(especially if this was catered for in the planning stage). Small casing or liners will obviously
limit the pump size selection. ESP sizes and capacities are shown in table 10.j below.
Rate, stb/d
Power, HP
TDH, ft
4 /2
3.375
3.750
100-1,900
50-125
5,000-12,000
5 /2
4.000
4.500
200-5,000
100-300
5,000-12,000
5.625
5.437
1,000-16,000
200-650
5,000-12,000
8 /8
6.750
7.375
4,000-26,000
400-850
3,000-10,000
8.625
N/A
12,000-33,000
500-1020
2,000-5,000
11.250
N/A
24,000-100,000
500-1030
500-3,500
10 /4
13 /8
2)
Pre-select the production target and corresponding BHFP and determine the TDH and
pump size and depth required to meet this rate. This often carried out by plotting the
pressure traverses above and below the pump (Refer to figure 10.d).
Pre-select the maximum pump horsepower, or number of stages, and determine the
attainable pump rate with:
In this approach the pump performance curve is often plotted below the system
performance curves. An example this to optimise the number of stages for a
maximum pump HP is shown in figure 10.e.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
257 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
258 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
259 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
10.3.
260 OF 295
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
261 OF 295
REVISION
STAP-P-1-M-7100
Head Ratio
Flow Ratio
0.45
0.5
0.25
1.0
0.17
1.5
0.10
2.0
Head Ratio =
Often the maximum power fluid supply pressure and rate is fixed by surface equipment
rating, e.g. p<5,000psi, qPF <4,500stb/d.
When calculating bottom hole pressures, the completion configuration and power fluid rate
to the production to obtain the total discharge rate. The pump intake curve (PIC) can then
be generated using table 10.k above plotted against well IPR (Refer to figure 10.f).
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
262 OF 295
REVISION
STAP-P-1-M-7100
Turbine Pumps
The hydraulic turbine pump developed by Weir Pumps is an alternative to the ESP for
producing very large volumes of fluid, 2,000-100,000stb/d. It has the same principle of
operation as the ESP but the motor is replaced by a hydraulic turbine which rotate the shaft
at 5,000-10,000rpm. This provides higher lift capacities (head and volume) per stage,
therefore the units are much shorter approximately 10% of the ESP.
The operating range is much greater as the pump can be controlled by varying the supply
pressure giving 10-100% rate and 20-50% TDH at reduced rates.
Their reliability is still suspect due to the high rotating speed and metallurgy problems.
10.3.1. Impact On Completion Design
The casing size is obviously important here to accommodate the pump size and perhaps
two tubing strings. Sometimes concentric completions are preferred or the annulus is used
but consideration must be given to potential corrosion due to oxygen in the power fluid. Like
the piston pump solids free power fluid is essential.
Like the ESP, gas venting may be necessary which would require a third conduit (generally
the annulus). Occasionally the DHSV is controlled by pressure from the pump.
10.4.
ROD PUMPS
The most common pumping system on low rate land wells is the rod or beam pumping. It is
usually limited to shallow wells (<8,000ft) producing less than 500stb/d although they can
produce up to 2,000stb/d.
The system consists of three elements, the downhole pump assembly, the sucker rod and
the surface pumping unit.
The annulus is usually left open and used to vent any free gas that is separated downhole.
Tubing is used as the production conduit and contains the rods preventing wear and
corrosion to the annulus. The tubing is usually anchored to the casing and pulled into
tension to reduce tubing movement, buckling and, hence rod wear.
There are two versions of bottom-hole pump, the tubing retrievable barrel and the rod
retrievable barrel. The tubing pump requires the tubing to be pulled to retrieve the barrel
and the rod pump barrel is retrieved when pulling the rods. The tubing pump has the largest
capacity but is more costly to repair than the rod pump which is the most common.
The pump displacement, PD, is defined by the plunger stroke, SP, and the pump speed, N,
the plunger diameter, D and the amount of liquid fillage and/or slippage past the plunger, EP
= 0.7 to 9.5.
2
PD = Ct x Sp x N x D x Ep
Eq. 10.B
where:
EP
Ct
=
=
Pump efficiency
2
Correction factor 0.1166 for oilfield units, (in, spm, in , stb/d)
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
263 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
264 OF 295
REVISION
STAP-P-1-M-7100
As the rod suffers from stretch and dynamic forces, SP will not be the same as the stroke at
surface, S, therefore load-displacement plot forms the basis for pump design and analysis.
The fluid load, Fo, carried by the rods on the upstroke is dependent on the net lift, H, which
is the vertical distance from the operating fluid level (OFL) in the annulus to surface plus the
equivalent head of any surface back-pressure. It also depends on fluid SG or density. API
recommends ignoring the area of the rods when calculating this load:
2
Fo = Ct x SG x D x H
where:
Ct
This load can be estimated from dynamometer surveys, which measure the rod load versus
displacement at the surface and serves the most effective means of diagnosing pump
problems.
As the loads on the polished rod includes fluid load, dynamic forces and rod weight, the rod
weights may be relatively large in deep wells and in these cases a tapered rod string is
preferred where the rod diameter is larger with increasing load. Buoyancy varies throughout
the cycle but it is generally taken on the downstroke when the travelling valve is open.
Acceleration and friction are also factors in dynamic loading with the peak polished rod load
on the upstroke will be significantly higher than the sum of the rod and fluid loads. Similarly,
on the downstroke, the minimum will be less than the buoyant weight of the rods. Pump
stroke efficiency is a function of pump speed and rod loading. The dynamics also cause the
rods to oscillate harmonically like a stiff spring.
Typical pumping speeds are 8 to 15spm which amounts to 4.2 to 7.9 million cycles per year,
therefore the rod design must focus on minimising fatigue failures which is exacerbated by
corrosion in the operating environment.
The surface pump unit is usually a beam type although other concepts have been
developed. The surface prime mover and gearbox have been developed over the years to
cater for the rod pump to reduce failures.
System design is very complex and is an iterative process normally carried out by computer
software. API have produced a programme to generate a set of design curves published in
API RP11L and provided some general results in Bulletins 11L3 and 11L4 which are a
useful starting point for design. However, in 11L4, API used 100% efficiency and pump
rates which are higher than those generally found in the field, therefore, it is advisable to
enter a curve which is 100 to 200% of the intended target for scoping out the required
o
equipment capacity. It is also not reliable for heavy oil wells (<20 API) unless correction
factors are applied for fluid vicosities and lack of rod weight on the downstroke. Rod fall
problems often cut restrict pump rates to 1.5 to 2.5spm which lead the use of long stroke
pumps. Sand problems are often a problem with high viscous crudes which increase wear
of the pump parts.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
265 OF 295
REVISION
STAP-P-1-M-7100
10.6.
PLUNGER LIFT
Plunger lift are used on high GLR wells that produce liquids at relatively low rates
(<500stb/d). The tubing/casing annulus is used to store gas energy provided to the tubing
when the well is opened up. This energy is used to drive the plunger up to surface carrying
a small slug of liquid. After production of the following tail gas when the liquid begins to kill
the well the plunger is dropped again and the cycle repeated.
It is particularly useful for de-watering gas wells. Operating requirements are:
GLR >500scf/stb
PI <1stb/d/psi
Plunger velocity 700 to 1,000ft/min
Efficiency of this system decreases with depth and PI but increases with tubing size. It is
essential that the completion tubing is parallel and drifted to ensure correct operation of the
plunger.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
266 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
267 OF 295
REVISION
STAP-P-1-M-7100
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
10.7.
268 OF 295
Rod Pumping
Screw Pumping
ESP
Hydraulic
Piston
Pumping
Hydraulic Jet
Pumping
Continuous
Gas Lift
Intermittent
Gas Lift
Plunger Lift
Capital Cost
Low to
moderate
increase with
depth and larger
units.
Low increase
with depth and
larger rates.
Relatively low
capital cost if
commercial
electric power
available. Costs
increase as
horsepower
rises.
Competitive with
rod pump. Cost
increases with
higher
horsepower.
Low well
equipment costs
but lines and
compression
costs may be
high. Central
compression
system reduces
cost per well.
Same as
continuous flow
gas lift.
Downhole
Equipment
Reasonably
good rod design
and operating
practices
needed. Data
bank of rod and
pump failures
beneficial. Good
selection,
operating and
repair practices
needed rods
and pump.
Good design
and operating
practices
needed. May
have problems
with selection of
appropriate
stator
elastomer.
Requires proper
cable in addition
to motor,
pumps, seats,
etc. Good
design plus
good operating
practices
essential.
Proper design
plus good
operating
practices
essential.
requires
powerful
conductor. Free
pump and
choose powerful
option.
Requires
computer
design
programme for
sizing. tolerant
to moderate
solids in power
fluid. No moving
parts in pump.
Long service life
and simple
repair
procedures.
Good valve
design and
spacing
essential.
Moderate cost
for well
equipment
(valves and
mandrels).
Choice of
wireline
retrievable or
conventional
valves.
Unload to
bottom with gas
lift valves.
Consider
chamber or high
PI and low BHP
wells.
Operating
practices have
to be tailored
to each well for
optimisation.
Some
problems with
sticking
plungers.
Efficiency
(output
hydraulic HP
divided by
input HP)
Excellent total
system
efficiency. Full
pump fillage
efficiency
typically about
50-60% feasible
if well is not
over-pumped.
Excellent. May
exceed rod
pumps for ideal
cases. Reported
system
efficiency 5070%. More
operating data
needed.
Fair to poor.
Maximum
efficiency only
30%. Heavily
influenced by
power fluid plus
production
gradient.
Typically
operating
efficiencies of
10-20%.
Fair increases
for wells that
require small
injection GLRs.
Low wells for
wells requiring
high GLRs.
Typical
efficiencies at
20% but range
from 5-30%.
Poor, normally
requires a high
injection gas
volume/bbl fluid.
Typical lift
efficiency is 1050% improved
with plungers.
Excellent for
flowing wells.
No input
energy
required
because it
uses the well.
Good even
when small
supplementary
gas is added.
Flexibility
Excellent, can
alter stroke
speed, length,
plunger size and
run time to
control
production rate.
Poor. Pumps
usually run at a
fixed speed.
Requires careful
sizing. VSD
provides more
flexibility but
added costs.
Time cycling
normally
avoided. Must
size pump
properly.
Good to
excellent. Power
fluid rate and
speed of
downhole
pump.
Numerous
pump sizes and
pump/engine
ratios adapt to
production and
depth needs.
Good to
excellent. Can
vary power fluid
rate and
pressure adjusts
the production
rate and lift
capacity.
Selection of
throat and
nozzle sizes
extend range of
volume and
capacity.
Excellent. Gas
injection rate
varied to change
rates. Tubing
needs to be
sized correctly.
Good, must
adjust injection
time and cycles
frequently.
Miscellaneous
problems
Stuffing box
leakage may be
messy and a
potential hazard.
Anti-pollution
stuffing boxes
are available.
May have
limited service
in some areas.
Because this a
newer method,
field knowledge
and experience
are limited.
Requires a
highly reliable
electric power
system. Method
sensitive to rate
changes.
Power fluid
solids control
essential. Need
15ppm of 15m
particle size
max. to avoid
excessive
engine wear.
Must add
surfactant to a
water power
fluid for
lubrication.
Triplex plunger
leakage control
required.
More tolerant of
power fluid
solids, 200ppm
of 25m particle
size acceptable.
Dilutents may
be added if
required. Power
water (fresh,
produced or
seawater)
acceptable.
A highly reliable
compressor with
95+% run time
required. Gas
must be
dehydrated
properly to avoid
gas freezing.
Labour intensive
to keep time
tuned otherwise
poor
performance.
maintaining
steady gas
show often
causes injection
gas
measurement
and operating
problems.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
Consideration
Rod Pumping
269 OF 295
Screw Pumping
ESP
Hydraulic
Piston
Pumping
Hydraulic Jet
Pumping
Continuous
Gas Lift
Intermittent
Gas Lift
Plunger Lift
Operating
Costs
Potentially low
but short run life
on stator or rotor
frequently
reported.
Varies, if HP is
high, energy
costs are high.
High pulling
costs result
from short run
life. Other repair
costs are high.
Often higher
than rod pump
even for free
systems. Short
run life
increases total
operating costs.
Same as
continuous flow
gas lift.
Usually very
low,
Reliability
Excellent. Run
time efficiency
>95% if good
operating
practices are
adopted and
corrosion, wax
asphaltenes,
solids,
deviations, etc.,
are controlled.
Good. Normally
over-pumping
and lack of
experience
decreases run
time.
Varies.
Excellent for
ideal gas lift
cases, poor for
problem areas.
Very sensitive to
operating
temperatures
and electrical
malfunctions.
Good with a
correctly
designed and
operated
system.
Problems or
changing well
conditions
reduce
downhole pump
reliability.
Frequent
downtime
results from
operational
problems.
Good with
proper throat
and nose sizing
for the operating
conditions. Must
avoid operating
in cavitation
range of jet
pump throat,
related to pump
intake pressure.
More problems
if pressures
>4,000psig.
Excellent if
compression
system is
properly
designed and
maintained.
Excellent if there
is an adequate
supply of
ingestion gas
and adequate
low pressure
storage volume
for injection gas.
System must be
designed for the
unstable gas
flow rates.
Good if well
production is
stable.
Salvage Value
Excellent, easily
moved and
good market for
used
equipment.
Fair to poor.
Easily moved
and some
current market
for used
equipment
Fair. Some
trade in value.
Poor open
market values.
Good. Easily
moved. Some
trade in value.
Fair market for
triplex pump.
Fair. Some
market for good
used
compressors
and some trade
in value for
mandrels and
valves.
Same as
continuous flow
gas lift.
Fair. Some
trade in value.
Poor open
market value.
System (total)
Straightforward
and basic.
procedures to
design, install
and operates
following API
specifications
and
recommended
practices. Each
well needs an
individual
system.
Simple to install
and operate.
Limited proven
design,
installation and
operating
specifications
Each well needs
an individual
system.
Fairly simple to
design but
requires good
rate data.
System not
forgiving.
Requires
excellent
operating
practices.
Follow API
recommended
practices in
design, testing
and operation.
Typically each
well is an
individual
producer using
a common
electric system.
Simple manual
or computer
design, typically
used. Free
pump easily
retrieved for
servicing.
Individual well
unit very flexible
but extra cost.
Requires
attention.
Central plant
more complex,
usually results
in test and
treatment
problems.
Computer
programme
typically used
for design.
Basic operating
procedures
needed for
downhole pump
and wellsite
unit. Free pump
easily retrieved
for onsite repair
or replacement.
Downhole jet
often requires
trial and error to
arrive at
best/optimum
jet.
An adequate
volume, high
pressure, dry
non-corrosive
and clean gas
supply source is
needed
throughout the
entire life.
System
approach
needed. Low
back-pressure
beneficial. Good
data needed for
valve design
and spacing.
API
specifications
and
design/operatin
g recommended
practices should
be followed.
Same as
continuous flow
gas lift.
Individual well
or system.
Simple to
design, install
and operate.
Requires
adjusting and
plunger
maintenance.
Usage/ Outlook
Excellent. Used
on about 85% of
US artificial lift
wells. The
normal standard
artificial lift
method.
Limited to
relatively
shallow wells
with low rates.
Used on less
than 0.5% of US
lifted wells.
Used primarily
on gas well dewatering.
An excellent
high rate
artificial lift
system. Best
suited for
<200oF and
>1,000BFPD
rates. Most
often used on
high water cut
wells.
Often used as a
default artificial
lift system.
Flexible
operation, wide
rate range
suitable for
relatively deep,
high volume,
high
temperature
deviated oil
wells. Used on
<2% of US lifted
wells.
Good, flexible,
high rate
artificial lift
system for wells
with high
bottom-hole
pressures. Most
like a flowing
well. Used on
about 10% of
US lifted wells,
mostly offshore.
Often used as a
default artificial
lift method in
lieu of sucker
rod pumps. Also
a default for low
bottom-hole
pressure wells
on continuous
gas lift. Used on
<1% of US lifted
wells.
Essentially a
low liquid rate,
high GLR lift
method. Can
be used for
extending flow
life or
improving
efficiency.
Ample gas
volume and/or
pressure
needed for
successful
operation.
Used on <1%
of US lifted
wells.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
270 OF 295
REVISION
STAP-P-1-M-7100
Rod Pumping
Screw Pumping
ESP
Hydraulic
Piston
Pumping
Hydraulic Jet
Pumping
Continuous
Gas Lift
Intermittent
Gas Lift
Plunger Lift
Casing size
limits (restricts
tubing size)
Problems only
in high rate
wells requiring
large plunger
pumps. Small
casing size (4.5
and 5.5ins) may
limit free gas
separation.
Normally no
problem for
4.5ins casing
and larger but
gas separation
may be limited.
Larger casing
required for
parallel free or
closed systems.
Small casing
(4.5 and 5.5ins)
mat result in
excessive
friction losses
and limits
production rate.
Small casing
size often limits
producing rate
owing to high
(unacceptable)
friction losses.
Larger casing
may be required
if dual strings
run.
Small casing
(4.5 and 5.5ins)
normally is not a
problem for this
relatively low
volume lift.
Small casing
suitable for this
low volume lift.
Annulus must
have adequate
gas storage
volume.
Depth limits
Good, rods of
structure may
limit rate at
depth.
Effectively about
500stb/d at
7,500ft and
150stb/d at
15,000ft.
Poor, limited to
relatively
shallow depths,
possibly 5,000ft.
Usually limited
to motor HP or
temperature.
Practical depth
about 10,000ft.
Excellent,
limited by power
fluid pressure
(5,000psi) or
HP. Low
volume, high lift
head pumps
operating at
depths to
17,000ft
Excellent,
similar limits as
reciprocating
pump. Practical
depth of
20,000ft.
Controlled by
system injection
pressure and
fluid rates.
Typically for
1,000stb/d with
2.5ins nominal
tubing. 1,440psi
lift system and
lift system and
1,000 GLR, has
an injection
depth of about
10,000ft.
Usually limited
by fallback, few
wells >10,000ft.
Typically
<10,000ft.
Intake
Capability
Excellent,
<25psig feasible
provided
adequate
displacement
and gas venting.
Typically about
50 to 100psig.
Good, <100psi
provided
adequate
displacement
and gas venting.
Poor to fair,
>350psig to
5,000ft with low
GLR. Typical
design targets
25%
submergence.
Poor restricted
by the gradient
of the gas lifted
fluid. Typically
moderate rate is
limited to about
100psi/1,000ft
injected depth.
Thus the backpressure on
10,000ft well
may be
>1,000psig.
Noise Level
Fair, moderately
high for urban
areas.
Excellent with
low noise. Often
preferred in
urban areas if
production rate
is high.
Same as piston
pump.
Same as
continuous flow.
Low.
Obtrusiveness
Size and
operation are
drawbacks in
populated and
farming areas.
Special low
profile units are
available.
Fair to good
wellhead
equipment has
low profile.
Requires
surface treating
and high
pressure
pumping
equipment.
Same as piston
pump.
Same as
continuous flow.
Low.
Prime mover
flexibility
Good, both
engines or
motors can be
used easily.
Motors are more
reliable and
flexible.
Good, both
engines or
motors can be
used.
Fair, requires a
good power
source without
spikes or
interruptions.
Higher voltages
can reduce I2R
losses
Excellent. Prime
mover can be
electric motor,
gas or diesel
fired engines or
motors.
Same as piston
pump.
Good, engines,
turbines or
motors can be
used for
compression.
Same as
continuous flow.
None normally
required.
Surveillance
Excellent, can
be easily
analysed based
on well test,
fluid levels, etc.
Analysis
improved by use
of
dynamometers
and computers.
Fair, analysis
can be based
on production
and fluid levels
only. Not
possible to use
dynamometers
and pump-off
cards.
Fair based on
electrical
checks but
special
equipment
needed
otherwise.
Good to fair.
Downhole pump
performance
can be analysed
from surface
power fluid rate
and pressure,
speed and
producing rate.
Bottom-hole
pressure
obtained with
free pumps.
Same as piston
pump.
Good to
excellent. Can
be analysed
easily. Bottomhole pressure
and production
log surveys
easily obtained.
Optimisation
and computer
control being
tried.
Fair but
complicated by
standing valve
and fallback.
Good but
depends on
good well test
and pressure
charts.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
Consideration
271 OF 295
Rod Pumping
Screw Pumping
ESP
Hydraulic
Piston
Pumping
Hydraulic Jet
Pumping
Continuous
Gas Lift
Intermittent
Gas Lift
Plunger Lift
Testing
Good, Well
testing is simple
with few
problems using
standard
available
equipment and
procedures.
Good, same as
rod pumping.
Good, Well
testing is simple
with few
problems. High
water cut and
high rate wells
may require a
free water
knock-out.
Fair. Well
testing with
standard
individual well
units presents
few problems.
Well testing
with a central
system is more
complex
requiring
accurate power
fluid
measurement.
Same as piston
pump. Three
stage
production tests
can be
conducted by
adjusting
production step
rates. A
pressure
recorder must
be used to
monitor intake
pressures.
Fair. Well
testing
complicated by
injection gas
volume/rate.
Formation GLR
obtained by
subtracting
injected gas
from total
produced gas.
Gas
measurement
errors are
common.
Poor. Well
testing
complicated by
injection gas
volume/rate..
Measurement of
both input and
outflow gas is a
problem.
Intermittent flow
can cause
operating
problems with
separators.
Well testing is
simple with
few problems.
Excellent if well
can be pumpedoff.
Good. Avoid
shutdown in
high
viscosity/sand
producers.
Poor, is
possible but not
normally used.
Usually
controlled only
by displacement
checks. Pumpoff control not
developed.
Not applicable.
Poor. Cycle
must be
periodically
adjusted.
Labour intensive
Not applicable.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
272 OF 295
REVISION
STAP-P-1-M-7100
Rod Pumping
Screw Pumping
ESP
Hydraulic
Piston
Pumping
Hydraulic Jet
Pumping
Continuous
Gas Lift
Intermittent
Gas Lift
Plunger Lift
Corrosion/
scale handling
ability
Good to
excellent.
frequently for
both corrosion
and scale
control.
Good. Batch
treatment
inhibitor used
down annulus
feasible.
Fair. Batch
inhibition
treatment only
to intake unless
shroud is used.
Good to
excellent. Batch
or continuous
inhibition
treatment can
be circulated
with power fluid
for effective
control.
Good to
excellent.
Inhibitor mixed
with power fluid
mixes with
produced fluids
at entry of jet
pump throat.
Batch treat
down annulus is
feasible.
Good. Inhibitor
in the injection
gas and/or
batch inhibiting
down tubing
feasible. Steps
must be taken
to avoid
corrosion in
injection gas
lines.
Same as
continuous flow.
Fair. Normal
production
cycle must be
interrupted to
batch treat the
well.
Crooked/
deviated holes
Fair, increased
load and wear
problems. High
angle deviated
holes (>70o) and
horizontal wells
are being
produced. Some
success in
pumping
15o/100ft using
rod guides.
Poor to fair.
Increased load
and wear
problems.
Currently very
few known
installations.
Good. Few
problems.
Limited
experience in
horizontal wells.
Requires long
radius wellbore
bends to get
through.
Excellent if
tubing can be
run in the well.
Pump will
normally pass
through the
tubing. Free
pump retrieved
without pulling
tubing. Feasible
operation in
horizontal wells.
Excellent, short
pump can pass
through doglegs
up to 24o/100ft
in 2ins nominal
tubing. Same
condition as
hydraulic piston
pump.
Excellent. Few
wireline
problems up to
70o deviation for
wireline
retrievable
valves.
Same as
continuous flow.
Excellent.
Dual
application
Fair. Parallel
2x2ins low rate
dual feasible
inside 7ins
casing. Dual
inside 5ins
casing currently
not in favour.
Gas is a
problem for
lower zone.
Increased
mechanical
problems.
No known
installations.
No known
installations.
Larger casing
would be
needed.
Possible
running and
pulling
problems.
Fair. Three
string nonvented
applications
have been
achieved with
complete
isolation of
production and
power fluid from
each zone.
Limited to low
GLRs and
moderate rates.
Same as piston
pump except it
can possibly
handle higher
GLRs but at
reduced
efficiency.
Same as
continuous flow.
No none
installations.
Gas handling
ability
Poor if it must
pump any free
gas..
Good to fair.
Concentric fixed
pump or parallel
free permits gas
venting with
suitable
downhole gas
separator below
pump intake.
Casing free
pump limited to
low GLRs.
Similar to piston
pump. Free gas
reduces
efficiency but
helps lift. Vent
free gas if
possible. Use a
gas anchor.
Excellent.
Produced gas
reduces need
for injection gas.
Same as
continuous flow
Excellent.
Offshore
application
Poor. Must
design for unit
size, weight and
pulling unit
space. Most
wells are
deviated and
typically
produce sand.
Good. Must
provide
electrical power
and service
pulling unit.
Fair. Feasible
operation in
highly deviated
wells. Requires
deck space for
treatment tanks
and pumps.
Water power
fluid can be
used. Power oil
a fire and safety
problem.
Good. Produced
water or
seawater may
be used as a
power fluid with
wellsite type
system or power
fluid separation
before
production
treating system.
Excellent and is
the most
common
method if
adequate
injection gas
available.
Poor in wells
needing sand
control. Use of
standing valves
risky. Heading
causes
operating
problems.
Excellent for
correct
application.
Paraffin
handling
capacity
Fair to good.
Hot water/oil
treating and/or
use of scrapers
possible but
they increase
operating
problems and
costs.
Fair. Tubing
may require
treatment. Rod
scrapers not
used. Possible
to unseat pump
and circulate hot
fluids.
Fair to good.
Hot water/oil
treatments,
mechanical
cutting, batch
inhibition
possible.
Good to
excellent.
Circulate heat to
downhole pump
to minimise
build-up.
Mechanical
cutting and
inhibition
possible.
Soluble plugs
available. Free
pumps can be
surfaced on a
schedule.
Same as piston
pump.
Good
mechanical
cutting
sometimes
required.
Injection gas
may aggravate
existing
problem.
Same as
continuous flow
gas lift.
Excellent as it
cuts paraffin
and removes
small deposits.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
Consideration
Rod Pumping
Screw Pumping
Slim-hole
completions
(27/8ins
production
casing string)
Feasible if low
rates, low GORs
and shallow
depths but no
known
installations.
Solids/sand
handling ability
Temperature
limitation
273 OF 295
ESP
Hydraulic
Piston
Pumping
Hydraulic Jet
Pumping
Continuous
Gas Lift
Intermittent
Gas Lift
Plunger Lift
No known
installations.
Possible but
may have high
friction losses or
gas problems.
Suitable for low
rates and low
GLRs.
Same as piston
pump.
Same as
continuous flow.
Good. Similar
to casing lift
but must have
adequate
formation gas.
Excellent up to
50% sand with
high viscosity
>200cP crude.
Decreases to
<10% sand for
water
producers.
Poor. Requires
<200ppm
solids. Improved
wear resistant
materials
available at
premium cost.
Poor. Requires
<10ppm solids
power fluid for
good run life.
Also produced
fluids must have
low solids
<200ppm of
15m particles
for reasonable
life. Use fresh
water injection
for salt build-up
formations.
Excellent. Limit
is inflow and
surface
problems.
Typical limit is
0.1% sand for
inflow and
outflow
problems.
Fair but
standing valve
may cause
problems. Same
as continuous
flow.
Excellent and
currently used in
thermal
operations.
550oF.
Limited to about
<250oF for
standard and
<325oF with
special motors
and cables.
Excellent.
Standard
materials up to
300oF+ and to
500oF+ feasible
with special
materials.
Excellent and
possible to
operate to 500oF
with special
materials.
Excellent.
Typically a
maximum of
about 350oF.
Need to know
temperatures to
design bellows
charged valves.
Same as
continuous flow.
Excellent.
High viscosity
fluid handling
capability
Good for
<200cP fluids
and low rates
400stb/d. Rod
fall problems for
high rates.
Higher rates
may required
dilutent to lower
viscosity.
Excellent for
high viscosity
fluids with no
stator/rotor
problems.
Fair, limited to
about 200cP.
Increases HP
and reduces
head. Potential
solution is to
use core flow
with 20% water.
Good to
excellent.
Production with
up to 800cP
possible. Power
oil of oil >24o
API and ,50cP
viscosity or
water power
fluid reduces
friction losses.
Fair. Few
problems for
>16 o API. or
below 20cP
viscosity.
Excellent for
high water cut
lift even with
high viscosity
oil.
Same as
continuous flow
Normally not
applicable.
Fair but
restricted to
shallow depths
using large
plungers . max.
rate about
4,000stb/d from
1,000ft and
1,000stb/d from
5,000ft.
Poor. Restricted
to relatively
small rates.
Possibly
2,000stb/d from
2,000ft and
200stb/d from
5,000ft.
Excellent.
limited by
needed HP and
can be
restricted by
casing size. In
5.5ins casing
can produce
4,000stb/d from
4,000ft with 240
HP. Tandem
motors can be
used but will
increase costs.
Good. Limited
by tubular and
HP. Typically
3,000stb/d from
4,000ft and
1,000stb/d from
10,000ft with
3,500psi
system.
Excellent. Up to
15,000stb/d with
adequate
flowing bottomhole pressure,
tubular size and
HP.
Excellent.
Restricted by
tubing size and
injection gas
rate and depth.
Depending on
reservoir
pressure and PI
with 4ins
nominal tubing,
rates of
5,000stb/d from
10,000ft feasible
with 1,440psi
injection gas
and GLR of
1,000.
Poor. Limited by
cycle volume
and number of
possible
injection cycles.
Typically about
200stb/d from
10,000ft with
<250psi pump
intake pressure.
Poor. Limited
by number of
cycles.
Possibly
200stb/d from
10,000ft.
Excellent. Most
commonly used
method for wells
producing
<100stb/d.
Excellent for
<100stb/d
shallow wells
that do not
pump-off.
Generally poor.
Lower efficiency
and high
operating costs
for <400stb/d.
Fair. Not as
good as rod
pumping.
Typically 100 to
300stb/d from
4,000 to
10,000ft,
>75stb/d from
12,000ft
possible.
Fair, >200stb/d
from 4,000ft.
Fair. Limited by
heading and
slippage. Avoid
unstable flow
range. Typically
lower limit is
200stb/d for
2ins tubing
without heading,
400stb/d for
2.5ins and
700stb/d for
3.5ins tubing.
Good. Limited
by efficiency
and economic
limit. Typically
0.5 to 4stb/cycle
with up to 48
cycles/d
Excellent for
low flow rates
of 1 to 2stb/d
with high
GLRs.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
274 OF 295
REVISION
STAP-P-1-M-7100
11.
11.1.
POLICY
The purpose of this section is to provide the basic criteria when non-kill weight packer
fluids can be used in completion design.
The use of non-kill weight packer fluid has been thoroughly evaluated and is permitted for
the wells which have pressure gradients above 1.30kg/Lt/10m, i.e. high pressure and high
temperature (HP/HT) wells.
This policy does not refer to gradients below 1.30kg/Lt/10m where it is still considered good
practice to use overbalance completion fluids.
11.2.
BARRIER PRINCIPLES
Eni-Agip Division and Affiliates has determined that a packer fluid, regardless of the density,
cannot be considered as a barrier.
The main reasons are:
11.3.
APPLICATION
The use of non-kill weight packer fluid will be considered in the following situations:
When a brine with a gradient lower than the formation gradient has already
been used as completion fluid, i.e. through tubing perforation after packer
setting.
When it is necessary to replace a completion fluid containing solids in
suspension, i.e. high density oil mud.
The re-use of the completion fluid is envisaged when it is opportune or cost
effective.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
11.4.
275 OF 295
RISK ASSESSMENT
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
276 OF 295
REVISION
STAP-P-1-M-7100
ARPO 01
ARPO 02
Daily Report
ARPO 06
ARPO 07
Perforating Report
ARPO 08
ARPO 09
ARPO 11
Wireline Report
ARPO 12
ARPO 13
ARPO 20
Behind each report form are instructions on how to fill in the forms. As the first section is
generic to all the forms it is only shown in ARPO 01 instructions.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
A.1.
277 OF 295
District/Affiliate Company
DATE:
INITIAL ACTIVITY
REPORT ARPO 01
Permit/Concession N
FIELD NAME
Cost center
Well Code
General Data
On shore
WELL NAME
Off shore
Joint venture
Ground Level[m]
AGIP:
Latitude:
Longitude
Reference
First Flange[m]
Rig Name
Type of Operation
Reference Rig
Rig Type
Contractor
Program TD (Measured)
[m]
Program TD (Vertical)
[m]
Cellar Pit
Rig Heading []
Rig Pump
Depth [m]
Manufacturer
Distance [m]
Length [m]
Type
Direction []
Width [m]:
Type of Service
Company
Contract N
Type of Service
Company
Contract N
Mud Logging
D. & C. Fluids
Cementation
Waste treatment
Operating Time
Moving
[gg:hh]
Leg
Air gap
Penetration
Positioning
[hh:min]
[m]
[m]
Anchorage
[hh:min]
Rig-up
[hh:min]
Delay
[hh:min]
Lost-time Accidents
[hh:min]
Name
Horse
Bollard pull
Power
[t]
Rig Anchorage
Anchor
Bow
N
Angle
Mooring Line
Weight
[t]
Piggy Back
Length
Cable
Chain
[m]
[m]
Weight
N
[t]
Mooring Line
Chain
Tension Operative
Cable
Length
Length
[m]
[mm]
[m]
[mm]
Tension
Time
[t]
[t]
[hh:min]
1
2
3
4
5
6
7
8
9
10
11
12
Note:
Total
[Tested]
Supervisor
Superintendent
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
A.2.
278 OF 295
DAILY REPORT
WELL NAME
Drilling
FIELD NAME
District/Affiliate Company
ARPO 02
DATE:
Cost center
Rig Name
RT Elevation
[m]
Well Code
Type of Rig
[m]
Report N
Contractor
[m]
Permit / Concession N
Well
Last casing
BOP
Next Casing
Type
w.p. [psi]
of
M.D. (24:00)
[m]
nom.[in]
Stack
T.V.D. (24:00)
[m]
Top [m]
Diverter
Total Drilled
[m]
Bottom [m]
Annular
Rotating Hrs
[hh:mm]
Annular
R.O.P.
[m / h]
[hh:mm]
Last Survey []
at m
Upper Rams
at m
Middle Rams
Middle Rams
Personnel
Pump N
[hh:mm]
Injured
Middle Rams
Agip
Agip
Liner [in]
Lower Rams
Rig
Rig
Strokes
Press. [psi]
Last Test
Others
Total
Other
Total
Lithology
Shows
From (hr)
To (hr)
Operation at 07:00
Mud type
Density
Viscosity
P.V.
Y.P.
Gel 10"/10'
Water Loss
HP/HT
Press.
Temp.
ClSalt
pH/ES
MBT
Solid
Oil/water Ratio.
Sand
pm/pom
pf
mf
Daily Losses
Progr. Losses
[kg/l]
[s/l]
[cP]
[g/100cm2]
/
[cc/30"]
[cc/30"]
[kg/cm2]
[C]
[g/l]
[g/l]
[kg/m3]
[%]
[%]
Bit
Data
Manuf.
Type
Serial No.
IADC
Diam.
Nozzle/TFA
From [m]
To [m]
Drilled [m]
Rot. Hrs.
R.P.M.
W.O.B.[t]
Flow Rate
Pressure
Ann. vel.
Jet vel.
HHP Bit
HSI
I
[m 3]
[m 3]
B
Run N
Run N
Description
Part. L
Progr.L Partial Progr.
Stock
Total Cost
O
G
D
O
L
R
I
B
O
G
D
O
L
R
Daily
Progr.
Quantity
UM
Supervisor:
Supply vessel
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
A.3.
279 OF 295
WASTE DISPOSAL
WELL NAME
Management Report
FIELD NAME
District/Affiliate Company
ARPO-06 Cost center
DATE:
Report N
Depth (m)
Mud Type
From [m]
Density (kg/l)
To [m]
Cumulative volume [m ]
Usage
Phase /Period [m ]
Water consumption
Fresh water
Recycled
Cumulative [m ]
Total
Fresh water
Recycled
Total
Mixing Mud
Others
Total
3
Fresh water [m ]
Readings / Truck
3
Mud Volume [m ]
Phase
Cumulative
Recycled [m ]
Service
Mixed
Company
Contract N
Mud Company
Lost
Waste Disposal
Dumped
Transportation
Transported IN
Trans orted OUT
Waste
Disposal
Water base
cuttings
Period
[t]
[t]
[t]
[t]
[t]
[t]
[t]
[t]
[t]
[t]
Sewage water
[t]
Transported Brine
[t]
Cumulative
Remarks
Remarks
Supervisor
Superintendent
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
A.3.
280 OF 295
PERFORATING
REPORT
District/Affiliate Company
Onshore
FIELD NAME
ARPO-07
DATE:
Well location
WELL NAME
Cost center
Formation name:
Pool:
Lithology
Offshore
[m]
Total Depth
st
st
Vertical
T.V.D.
Deviated
Max. inclination
Horizontal
at
Size []
Well
M.D.
Well Type
Situation
Reference Logs:
[]
[m]
Steel
Thickness
Grade
[lb/ft]
Measured Depth
Top [m]
Bottom [m]
Recorded on:
Vertical Depth
Top [m]
Bottom [m]
Cement Top
M.D. [m]
T.V.D. [m]
Liner
Casing
Casing
Tubing
Service Company
Packer
Tubing shoe
Perforation System
Wireline
Overbalance
Completion fluid
Density
[kg/l]
TCP
Underbalance
Density
[kg/l]
Thru Tubing
Data
Gun
Gun
Gun
Charge
Type
Specific.
Type
Measured Depth
Top [m]
Bottom [m]
[m3]
Vertical Depth
Top [m]
Bottom [m]
Note:
Supervisor
Superintendent
Pool
Remarks
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
A.4.
281 OF 295
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
MATRIX STIMULATION
HYDRAULIC FRACTURING
WELL NAME
FIELD NAME
District/Affiliate Company
ARPO - 09
DATE:
Well Location
Onshore
Cost center
General Data
Interval to be Treated
Tot. net perf.:
M.D. [m]
Open hole
Offshore
T.V.D. [m]
Perfor. interval
Well Type
Vertical
Open hole
Prod. casing / liner
Slotted liner
From [m]
Pool:
Deviated
Horizontal
To [m]
Lithology:
Treatment Type
Matrix stimulation
Acid
Solvent
Other
Hydraulic Fracturing
Treatment Data
Service Company
Density [Kg/l]
2
Gradient [Kg/cm /10 m.]
HHP avaible
Type
Wellhead type
Completion Data
Bottom hole gauge [Y / N]
Packer type
Packer fluid
Porosity %
Water base
SBHT [C]
2
SBHP [kg/cm ]
Oil base
Formation name:
Reservoir Parameters
Reservoir fluid
Foam
Density
at m
at m
Other
Acid Fracturing
Equipment
Acid
Gelled acid
Acid + Gel
Other
Coiled Tubing [Y / N]
Operation Description
Fluid
Ref.
Fluid Schedule
Fluid Composition
Fluid Type
Density [kg/l]
1
2
3
4
5
6
7
8
9
10
N
Fluid
Ref.
Injected
Circulated
A.5.
282 OF 295
Starting
Pumping
Time
Rate
[bbl/1']
Volume
Progr.
Volume
[m ]
[m ]
Pumping Parameter
Progr.Vol. Proppant
Initial
Entering in
Formation
Final
Injection
Casing
Concentr.
Press.
Press.
Index
Press.
[lb/gal]
[psi]
[psi]
[bbl/day/psi]
[psi]
Notes / Remarks:
Supervisor
Superintendent
Notes
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
A.6.
283 OF 295
WELL NAME
FIELD NAME
District/Affiliate Company
ARPO - 11
DATE:
SINGLE COMPLETION
Cost center
SHORT STRING
SELECTIVE
DUAL COMPLETION
Well Code
LONG STRING
General Data
RKB Elevation @ m.
Flanges
Base Flange
Tbg Spool
Top Flange
Psi
Tubing Size OD
Weight [lb/ft]
@ m.
Flowing Flange
Psi
Tubing Size OD
Weight [lb/ft]
@ m.
Psi
@ m.
@ m.
BPV Type
Tubing Shoe
Packer data
@ m.
Minimum I.D. String
Previous Bottom Hole
@ m.
Request Operation
THP
[Kg/cm 2]
Annulus
Annulus
/
/
P
P
[Kg/cm 2]
[Kg/cm 2]
Annulus
[Kg/cm 2]
POOL
Perforated Zones
Open Hole
From [m]
To [m]
Note
Operation Description
SCSSV
BPV
PLUG
@m
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
A.7.
284 OF 295
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
A.8.
WELL PROBLEM
REPORT
District/Affiliate Company
DATE:
Problem
Code
Well
Situation
ARPO -13
WELL NAME
Cost center
Start date
Bottom [m]
End date
Measured Depth
Top [m]
FIELD NAME
Top [m]
Vertical Depth
Bottom [m]
Top [m]
KOP
Bottom [m]
Open hole
Mud in hole
[m]
Max inclination []
Type
@m
Last casing
Dens.[kg/l]:
Solutions Applied:
Results Obtained:
Solutions Applied:
Results Obtained:
Solutions Applied:
Results Obtained:
Solutions Applied:
Results Obtained:
Supervisor
Supervisor
Supervisor
Superintendent
Lost Time
Remarks at HQ level
285 OF 295
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
A.9.
286 OF 295
WELL SITUATION
FIELD NAME
(COMPLETION TALLY)
WELL NAME
District/Affiliate Company
ARPO 20 / E
DATE:
SINGLE COMPLETION
Joint
n
Progr.
m
DUAL COMPLETION
Note
Joint
n
Cost center
SHORT STRING
Progr.
m
Note
Joint
n
LONG STRING
m
Supervisor
Remarks:
Superintendent
pag.:
of:
Progr.
m
Note
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
287 OF 295
REVISION
STAP-P-1-M-7100
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Pi /pi
Po /po
R
r
t
Tfinal
Tinitial
w
ws
wfi
wfo
fi
fo
Fa
Ff
L
L1
L2
L3
L4
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
Lp
Lf
lso
ltot
Pi
pim
pom
TM
a
b
eq
i
o
sn
Yp
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
288 OF 295
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
APPENDIX C - ABBREVIATIONS
API
BHA
BHP
BHT
BOP
BPD
BPM
BPV
BSW
BUR
C/L
CBL
CCL
CET
CGR
CRA
C/T
DC
DE
DHSV
D&CM
DP
DST
E/L
ECD
ECP
EMW
ESD
ESP
ETA
FBHP
FBHT
FTHP
FTHT
GLR
GOC
GOR
GP
GPM
GPS
GR
HAZOP
HP/HT
IADC
ID
289 OF 295
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
IPR
JAM
KOP
LAT
LCM
LMRP
LOT
LWD
MAASP
MD
MLH
MLS
MMS
MODU
MPI
MSL
MSS
MWD
NACE
NDT
NSG
NTU
OBM
OD
OIM
ORP
OWC
P&A
PBR
PDC
PDM
PGB
PI
PLT
POB
PPB
ppg
ppm
PVT
Q
Q/AQ
RFT
RKB
ROE
ROP
ROU
ROV
290 OF 295
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
RPM
RT
S/N
SAFE
SBHP
SBHT
SCC
SCSSV
SDE
SF
SG
SICP
SIDPP
SPM
SSC
SSD
SSSV
STHP
STHT
TCP
TD
TOC
TOL
TRSV
TVD
UHF
VBR
VDL
VHF
VSP
W/L
WBM
WC
WHP
WHSIP
WOB
WOC
WOW
WP
YP
291 OF 295
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
292 OF 295
REVISION
STAP-P-1-M-7100
APPENDIX D - BIBLIOGRAPHY
Document:
STAP Number
STAP P-1-M-6100
Other References:
Ansari, A A Comprehensive Mechanistic Model For Multiphase Flow In Wells, MS Thesis,
The University Of Tulsa (1988)
API BUL 5C3 Sixth Edition: Formulas and Calculations for Casing Tubing Drill Pipe, and
Line Pipe Properties, October 1, 1994.
API RP 14E Recommended Practices For Design And Installation Of Offshore Production
rd
Platform Piping Systems, 3 edition (Dec 1981)
API RP 14E Fourth Edition: Recommended Practice for Design and Installation of Offshore
Production Platform Piping System, April 15, 1984.
Arthur Lubinsky: Helical Buckling of Tubing Sealed in Packers, 36th Annual Fall Meeting of
SPE, Dallas, October 8-11, 1961.
Aziz, K, Covier, GW and Fogarasi, M : Pressure drop in wells producing oil and gas (July Sept 1972), 38-48
Beggs, H D and Brill, J P : A study of two-phase flow in inclined pipes (May 1973), 607617
Blount, E M, Jones, L G and Glaze, O H : Use of short term multirate flow tests to predict
performance of wells having turbulence (1976)
Brown, K E : The Technology Of Artificial Lift Methods, Vols 1 And 4, Ponwell Publishing
Company, Tulsa, OK, 1977
Bruist, E HY : Better performance of Gulf Coast wells( 1974)
D. J. Hammerlind: Basic Fluid and Pressure Forces on Oilwell Tubulars, 53th annual Fall
Technical Conference and Exhibition, Houston, October 1-4, 1978.
D. J. Hammerlind: Movement, Forces and Stresses Associated With Combination Tubing
Strings Sealed in Packers, Journal of Petroleum Technology, February, 1977.
Duns, H JR and Ros, N C J : Vertical flow of gas and liquid mixtures in wells (1963), 451
Earlougher, R C JR and Kersch K M : Analysis of short-time transient test data by typecurve matching (July 1974) 793
Eickmeier, J R : How To Accurately Predict Future Well Productivities ( May 1968) 99-106
Fetkovich, M J : The Isochronal Testing Oil Wells (1973)
Forcheimer, P ;P Wasserbewegung Durch Boden (1901) 45, 1781-1788 (in german)
Gilbert, W.E: Flowing and Gas-Lift Well Performance API Drill and Prod Pract (1954), 126
Golan, M and Whiston, C H: Well Performance, International Human Resource
Development Corporation, Boston, NY (1986)
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
293 OF 295
REVISION
STAP-P-1-M-7100
Gray, H E : Vertical Flow Correlation-Gas Wells API Man 14BM; API 14B, SSCSSV Sizing
Computer Program, 38-40
H. D. Beggs: Production Optimisation Using NODAL Analysis, OGCI, Tulsa, 1991.
Hagedoorn, A R and Brown, K E: Experimental study of pressure gradients occurring
during continuous two-phase flow in small diameter vertical conduits ( April 1965) 475-484
Hagedorn and Brown (1967)
Horner, D R : Pressure build up in wells (1951)
Hurst, W : Establishment of skin effect and its impediment to fluid flow into a wellbore
(Oct 1953)
King, G E, Anderson, A R and Bingham, M D A field study of underbalance pressure
necessary to obtain clean perforations using tubing-conveyed perforating ( June 1986) 662
Lea, J F JR and Tighe, R E : Gas Well Operations With Liquid Production ( 1983)
Milner, E E and Warren D A JR : Drill stem test analysis utilising McKinley system of after
flow dominated pressure build up (Oct. 1972)
Orkiszewski, J : Predicting Two-Phase Pressure Drops In Vertical Pipes (June 1967), 829838
Ramey, H J JR : Short-Time Well Test Data Interpretation In The Presence Of Skin Effect
And Wellbore Storage, (Jan 1970) 97
Rawlins, E L and Schellhardt, M A : Back-Pressure Data On Natural Gas Wells And Their
Application To Production Practices US Bureau Of Mines, (1936)
Reinicke, K M, Remer, R J and Hueni, G : Comparison Of Measured And Predicted
Pressure Drops In Tubing For High-Water-Cut Gas Wells (Aug 1987) 165-177
Saucier, R J : Gravel pack design consideration (Feb 1974)
Standing, M B : Concerning The Calculation Of Inflow Performance Of Wells Producing
From Solution Gas Drive Reservoirs (Sept 1971) 1141-1142
Texas Railroad Commission Rule 36
Turner, R G, Hubard, M G and Duckler, A E : Analysis And Predictions Of Minimum Flow
Rate For The Continuous Removal Of Liquid From Gas Wells (Nov 1969)
Van Everdingen, F : The Skin Effect And Its Influence On The Productive Capacity Of A
Well (Oct 1953)
Van Poollen, H K : Radius-Of-Drainage And Stabilisation Time Equations (Sept 1964) Vol
62. No 37
Vogel, J V : Inflow Performance Relationships For Solution Gas Drive Wells, (Jan 1968)
83-93
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
294 OF 295
REVISION
STAP-P-1-M-7100
VERTUBING PROGRAMME
The need to fast computing to carry out tubing movement/stress calculations led AGIP to
produce the Vertubing programme in 1989. This application was based on a previous
version designed by a company named Tubmov which was run on Hewlett Packard 41CV
computers.
The Vertubing programme provided a calculation tool which significantly reduced times for
engineers involved in string calculations. The programme also enabled users to find an
optimal solution by means of the iterative process using a number of approximations and
producing results which were more reliable.
The programme is supported by VAX/VMS computer systems and is currently available at
Head Office and in the Districts on the Company computer network. The application carries
out all functions for tubing control in vertical or deviated wells, with a string and a high
number of packers as well (multiple zone completions) and takes into account the fact that
packer setting can be mechanical or hydraulic.
It is also possible to check stress tubings with varying diameters (tapered string) and to
consider materials with anisotropic characteristics. It is not, however, possible to take into
account the reduction in the performance of some CRA type steels, caused by temperature
increases.
The programme does not incorporate a library or collection of data on commonly used
tubing material, which would enable users to design the string starting from an existing
material.
The programmes architecture defines a rigid sequence for data entry, which results in
extremely accurate results. The application does not enable the user to independently
assess dynamic situations such as with production or injection operations. It is necessary to
calculate load losses during the relative operation and obtain the resulting fictitious
hydrostatic gradient which then lets the user obtain the correct pressures for the various
string sections.
Vertubing produces the results as numerical files, without any graphic display.
The programme is generally considered to be reliable because the results of three years
use have consistently matched actual well applications.
ARPO
IDENTIFICATION CODE
PAGE
ENI S.p.A.
Agip Division
REVISION
STAP-P-1-M-7100
E.2.
295 OF 295
WELLCAT PROGRAMME
Eni-Agip Division and Affiliates recently acquired Enertechs (1994) Wellcat programme
which is an application integrating the most specialised software, ranging from drilling, to
completion and other various well operations. The brief description below only describes the
parts of the application concerning tubing.
The need to use an in-house company programme which was more complex compared to
Vertubing, is due to this applications limitations in terms of obtaining the trend of
temperatures the string is subject to during various well operations, and the inability to
analyse dual completions. As Vertubing had to be integrated with software in ENI-Agip
Division and Affiliates expert system (Welcome) it seemed more appropriate to use a
modern design programme such as Wellcat.
The programme incorporates five modules. The WT-Drill module lets the user evaluate the
temperatures and pressures during drilling and the casing installation stages, while the
resulting stresses the casing is subject to are calculated using the WS-Casing module. The
WT-Circ and WT-Prod modules let the user evaluate the temperatures during standard
production and circulation operations and the WS-Tube module lets the user calculate
tubing movement and stress.
Wellcat can be used for single completions, selective completions with a maximum of five
packers, dual completions with a maximum of two packers and dual selective completions.
The programme also assesses the installation of a hanger in the completion as well as
hydraulic or mechanical packer setting. It is possible to evaluate the reduction in material
rating due to temperature and any anistropy of materials. The calculation of load losses and
the hydraulic conditions can be carried out using different correlations which are valid for
two-stage flow (Beggs & Brill, Orkiszewski, Gray, Hagedorn & Brown, Duns & Ross), while
the Govier-Aziz formula is used for single stage fluids.
The most interesting feature of the programme is its capability to evaluate temperatures
during and after well operations. During testing the results were compared to actual field
data and a good match was obtained. It is also possible to calibrate the average
coefficients for thermal exchange and specific heat, once the temperature profile and
lithology of the formations are known.
Wellcat produces results in ASCII format, which can be read, printed or exported as
graphic files. During processing it is also possible to display and print a simple drawing of
the well and the completion.
The Wellcat programme was initially tested with the most typical cases (discussed in
publications) and appropriate comparisons were made with data previously obtained using
the Vertubing programme with reasonable results. The programme is now used in the
company for completion string design and at present available in PC, VAX Mainframe and
UNIX versions.