Submitted by:
AMBAS, Darla T.
CADIANG, Kathrine Kate F.
Cua, Jomel P.
DELA CRUZ, Maika Danica G.
FIDEL, Roselyn G.
LIBUNAO, Jeanne Louise P.
LUCENO, Edily Joy S.
MONES, Carrizza S.
Submitted to:
Engr. Perferinda P. Caubang
Instructor
INTRODUCTION
Logistics
and
Shipping
industry
is
continuously
innovating
nowadays.
BLOCK DIAGRAM
PROCESS FLOW
GANTT CHART
DESIGN
Expected Result
ACTIVITY
ASSEMBLY TIME
DISCUSSION OF THE PROJECTS OBJECTIVES
DISCUSSION OF THE APPLICATION OF THE PROJECT
MATERIAL RECOVERY PROGRAM
RESEARCH ON THE POSSIBLE DESIGN AND ITS MECHANISM
SKETCHING OF THE DESIGNED PARTS
LAYOUT THE PROCESS FLOWCHART
PLANNING OF THE GANTT CHART
SUMMARY AND DOCUMENTATION OF THE MEETING
On the first day, the members first discuss the projects objective, a conveyor that
separates metal and plastic. Its commonly used in the material recovery program. After
that, the group research for the possible sensors that can be used the possible design
of the conveyor and its proponents. Then the design has been sketched, its a conveyor
that uses a material alignment mechanism to hold and align the metal or plastic that will
be inserted and sorted in the conveyor. A tentative flowchart has been generated and a
Gantt chart to follow for the next weeks to come.
DAY 2 (OCTOBER 27, 2016)
TIME
1:00 2:30
2:30 3:00
3:00 3:30
3:30 5:30
5:30 6:30
6:30 6:45
6:45 6:55
6:55 7:00
ACTIVITY
ASSEMBLY TIME
CHANGING THE PROJECTS OBJECTIVES
DISCUSSION OF THE APPLICATION OF THE PROJECT
LOGISTICS INDUSTRY
RESEARCH ON THE MATERIALS
SKETCHING OF THE DESIGNED PARTS
LAYOUT THE PROCESS FLOWCHART
PLANNING OF THE GANTT CHART
SUMMARY AND DOCUMENTATION OF THE MEETING
On the second day, the group alters the objective of the project. From a material
recovery program to logistic industry, so that the previous project using an ultrasonic
sensor will still be applicable. The researchers just add a color sensor to separate the
different color of the boxes. Each color will represent the destination of the packages.
Designing two separate conveyors to accommodate the two size of the parcel. The
group decides to use the old conveyor as its main conveyor, so that the expense will be
lessened. The conveyor has been inspected to see how will be the parts be layout.
Afterwards, the members strategically planned the activities within the given period of
time.
DAY 3 (NOVEMBER 3, 2016)
TIME
1:00 2:30
2:30 4:00
4:00 5:30
5:30 6:30
6:30 6:45
6:45 6:55
6:55 7:00
ACTIVITY
ASSEMBLY TIME
ALTERING THE DESIGN
RESEARCH ON THE MATERIALS
SKETCHING OF THE DESIGNED PARTS AND POSSIBLE
LAYOUT
LAYOUT THE PROCESS FLOWCHART
UPDATING THE GANTT CHART
SUMMARY AND DOCUMENTATION OF THE MEETING
been updated. The following are more accomplishments done by the group as of
present: More concrete idea of the process flow of the project. Tentative design of the
conveyor. Lengthen the conveyor to accommodate more processes to be done on it.
Gather the materials needed. (i.e., sensors, connecting wires and wood) Tested the
sensors and checked if it is still fit for usage. Planned the size and material to use for
the sample boxes that will go on the conveyor. Updated gantt chart of the groups's plan.
Group discussion for the prototype design, materials required and illustration of project
schedule.
The group extended the length of the existing conveyor's structure. This was done by adjusting
and widening the spaces between each of the rollers.
Disassembling the past project and testing it with the new program/material.