Professional Documents
Culture Documents
CLIENT
DATE
PROJECT
REPORT NO.
VENDOR
Shift
Coating Specs.
Weld Type
Pipe Dia.
W.T
Surface Prep
Time
Pipe No.
Profile Clean
S. Dust
Conc cont
Ambiant Param
Ta
T,sur RH %
Thickness
Peeling
DEW
H Weld Body
POINT
7.00
8.00
9.00
10.00
11.00
12.00
1.00
2.00
3.00
4.00
5.00
6.00
QC Follow up (Coating)
PTJ-COT-F19 Rev 0
QC Engineer (Coating)
PTJ-COT-F19 Rev 0