You are on page 1of 2

SURFACE PREPARTION LOG SHEET

CLIENT

DATE

PROJECT

REPORT NO.

VENDOR

Shift

Coating Specs.

Weld Type

Pipe Dia.

W.T

Surface Prep
Time

Pipe No.

Profile Clean

S. Dust
Conc cont

Ambiant Param
Ta

T,sur RH %

Thickness

Peeling
DEW
H Weld Body
POINT

7.00
8.00
9.00
10.00
11.00
12.00
1.00
2.00
3.00
4.00
5.00
6.00

QC Follow up (Coating)

PTJ-COT-F19 Rev 0

QC Engineer (Coating)

PTJ-COT-F19 Rev 0