PT PEMBANGKITAN JAWA BALI

PJB INTEGRATED MANAGEMENT SYSTEM


FORM UJI
CONDENSATE PUMP
Site :

Muara Karang

Manufaktur

Unit :

PLTU 4

Inspeksi

:
:

No. Dok.
Tgl. Terbit
Revisi
Halaman

Mitsubishi

Tahun

QP No.

SI

2014

OEM Doc. No.

T-02-1-1308

FU No.

HTCT 422017 Pag

Clearance Impeller- Shaft

Clearance Shaft - Shaft Sleeve

* Standard Clearance 0.125 ~ 0.175 (mm)

Manufacture Design Shaft Sleeve 85 (mm)


Manufacture Design Suction Bell 70 (mm)
RECOMMENDATION

ACCEPTED/REWORK/REPLACE SHAFT SLEEVE POSITION 1,3, 4, 5 AND 8 WITH NEW PART


(by Quality Control)

Measuring Tool:
Description
Name
Signature

Tested/measured by

Coordinator

QualityControl

Witne

Signature
Date

PT PEMBANGKITAN JAWA BALI


PJB INTEGRATED MANAGEMENT SYSTEM
FORM UJI
CONDENSATE PUMP
Site :

Muara Karang

Manufaktur

Unit :

PLTU 4

Inspeksi

:
:

Mitsubishi
SI

Revisi
Halaman

QP No.

2014

OEM Doc. No.

*Remark

Standard Clearance 0.5 ~ 0.652 (mm)


Manufacture Design Casing Ring 288 mm

Measuring Tool:

Tgl. Terbit

Tahun

Upper Side

RECOMMENDATION

No. Dok.

ACCEPTED/REWORK/REPLACE ALL CASING RING WITH NEW PART


(by Quality Control)

T-02-1-1308

Lower Side

FU No.

HTCT 422017 Pag

Description

Tested/measured by

Coordinator

QualityControl

Witne

Name
Signature
Date

PT PEMBANGKITAN JAWA BALI


PJB INTEGRATED MANAGEMENT SYSTEM
FORM UJI

No. Dok.
Tgl. Terbit
Revisi
Halaman

Site :

Muara Karang

Manufaktur

Unit :

PLTU 4

Inspeksi

RECOMMENDATION

:
:

Mitsubishi

Tahun

QP No.

Tipe SI

2014

OEM Doc. No.

ACCEPTED/REWORK/REPLACE
(by Quality Control)

T-02-1-1308

FU No.

HTCT 422017 Pag

RECOMMENDATION

ACCEPTED/REWORK/REPLACE
(by Quality Control)

Measuring Tool:
Description

Tested/measured by

Coordinator

QualityControl

Witne

Name
Signature
Date

PT PEMBANGKITAN JAWA BALI


PJB INTEGRATED MANAGEMENT SYSTEM
FORM UJI

No. Dok.
Tgl. Terbit
Revisi
Halaman

Site :

Muara Karang

Manufaktur

Unit :

PLTU 4

Inspeksi

:
:

Mitsubishi

Tahun

Tipe SI

2013

QP No.

T-02-1-1308
OEM Doc. No.

FU No.

HTCT 422017 Pag

RECOMMENDATION

ACCEPTED/REWORK/REPLACE
(by Quality Control)

Measuring Tool:
Description
Name
Signature
Date

Tested/measured by

Coordinator

QualityControl

Witne

Tgl. Terbit

FMT 17.2-04-3

06 Juli 2013

04

:
FU No.

1-1
T-13-1-010202

HTCT 422017 Page 1

NEW PART

Witness

Tgl. Terbit

FMT 17.2-04-3

06 Juli 2013

04

:
FU No.

1-1
T-13-1-010202

HTCT 422017 Page 1

Witness

:
Tgl. Terbit

FMT 17.2-04-3
06 Juli 2013

04

:
FU No.

1-1
T-13-1-010202

HTCT 422017 Page 1

Witness

:
Tgl. Terbit

FU No.

FMT 17.2-04-3
06 Juli 2013

04

1-1
T-13-1-010202

HTCT 422017 Page 1

Witness