You are on page 1of 5

The PBL sub again proved invaluable at TD to boost hole cleaning,

helping to remove the debris accumulated while sliding.

PBL is a registered trademark of SBO

PBL SUB RUN LOG

TOOL SERIAL NO: 6-3/4 BP 265


Date 22-12-12

Sr.
No.

Rig

Well
RIH Time

CET

N-15-1H

Out of Hole
Time

1/18/2013
10:00:00 AM

Time
Time
Activated
LCM Pumped
in
activated PBL Sub
(Coarse/
Hole (Circula(No of
Medium/Fine)
(Hrs)
ting)
Times)

1. Open
1. Close

14

LCM Volume/
Rate Pumped

PPB

Comments

Surface tested OK
Vinyl ball Drop #1
(PORT OPEN & CLOSE)

1 SURF TEST

COARSE/
MEDIUM/FINE

80 BBL/300 GPM

80 PPB

LCM PILL #1
Vinyl ball Drop #2
(PORT OPEN)

COARSE/
MEDIUM/FINE

80 BBL/300 GPM

100 PPB

LCM PILL #2

100 BBL/250 GPM

100 PPB

LCM PILL #3
(PORT CLOSE)

80 PPB

LCM PILL #4
Vinyl ball Drop #3
(PORT OPEN & CLOSE)

CET

N-15-1H

19-Jan-13

24

1.5 HRS

CET

N-15-1H

20-Jan-13

24

1.5 HRS

CET

N-15-1H

20-Jan-13

24

1.5 HRS

2. Close

COARSE

1.5 HRS

3. Open
3. Close

COARSE/
MEDIUM/FINE

100 BBL/250 GPM

Cmt Plug #1

60 BBL/250GPM
total sea water
Displace 192 BBls
and circulate

CMT PLUG #1
Vinyl ball Drop #4
12.5 PPG (PORT OPEN & CLOSE)

Cmt Plug #2

80 BBL/250GPM
total sea water
Displace 192 BBls
and circulate

CMT PLUG #2
Vinyl ball Drop #5
12.5 PPG (PORT OPEN & CLOSE)

CET

CET

CET

N-15-1H

N-15-1H

N-15-1H

21-Jan-13

24

21-Jan-13

22-Jan-13

24

1/23/2013
18:00:00 PM

TOTAL
HOURS IN
HOLE

18

152

3 HRS

2. Open

HOLE SIZE: 8.5

4. Open
4. Close

3 HRS

5. Open
5. Close

11 HRS

Open 5
Times
Close 5

PBL SUB OPNED AT LESS 100 PSI PRESSURE INCREASE AND CLOSE AT 2100 AT SURFACE AND 2550 M WITH 2200 PSI.

You might also like