WaterCAD Report

CIW 702- Drinking Water &


Sanitary Engineering
Name : Ahmad
TUT. T-05

Objectives

ID. 34-8490

1.
2.
3.
4.
5.

Data Entry
Pump Definition
Pipe Lengths and Diameters
Junctions demand and elevation
System
Requirements
1. Direction flow
2. Pipe velocities
3. Pump curve & operating
point
4. Tanks status
5. If P-13 & P-14 are closed

1. Data Entry
By entering the system components of
reservoirs and tanks and pumps with junctions

2.

Pump Definition

3. Pipe Lengths and


Diameters
From view we open Flex table
and open Pipe table

4. Junctions demand and


elevation

5. System

Requirements

1. Direction flow

2. Pipe velocities

3. Pump curve & operating


point

4. Tanks status

5. If P-13 & P-14 are


closed
The system will work with
different velocities