STRESS CALCULATIONS FOR STRADDLE BEAM DESIGN

Units of stress
SATGE A :

PT- Effect
+1.334

+1.334

+1.095

Compression
Tension

+0.193

-0.572

PT- Effect

+1.857

SW of (Trough + CIP Pour)


+4.815

-2.389

+1.334

+1.095

+3.760

-2.207

+0.222

Analysis and design of the composite section (Trough + CIP concrete in effect)
Stage B effect
+3.760

Service Condition
-0.01

+0.222
For Stage-C, the composite section is assumed to be un-cracked for stress calculation

+3.750

Note:

+ve
-ve

Design of Precast Prestressed Concrete Trough for CIP concrete pour

+1.334

SATGE C :

ksi

SW of Trough
+1.248

-2.389

SATGE B :

Design of Precast Prestressed Concrete Trough (Self Weight)

-1.978

-1.756