CONTRACT NO. :
CON/006/VI/201
3-1106 2013
SAMPLE NO
:-
DATE
THE CONTRACTOR :
PACKAGE
COST CENTER NO :
DATE
SOWJ
THE ENGINEER :
ASTM E82
JIS A 1412
JIS A 6301
CONTRACTORS SUBMISSION
Approval for the above-mentioned material is requested to carry out
the specified works.
ENGINEERS COMMENTS:
The material is accepted/rejected (*)
Name :
Position:
Contractors Representative
( SOWJ JV )
(JMCMC)
Date :
Date:
ENGINEERS COMMENTS:
The material is accepted/rejected (*)
With the following reason (s):
Name :
Position: Project Manager
(JMCMC)
Date :
Name :
Position :
(MRTJ)
Date: