AL-KHAFJI JOINT OPERATIONS

REQUEST FOR INSPECTION (RFI)

Client/Location :

AL-KHAFJI

Contractor :

DAEWOO-E & C

Project Name

HOUT (KRL) ONSHORE FACILITIES


PROJECTS

Contract No.

HQ979PC11

Discipline

MECHANICAL (WELDING)

Request No.:

SF-DEC-0037

Civil

Mechanical

Electrical

Coating

Inst.

Others

Submitted By (D-E&C)

Aswagoshe G

Date:

Time:

Received By (PMT/PMC)

George Taras

Date:

Time:

Confirmed By (KJO QA/QC)

Anil Kumar

Date:

Time:

Work Permit Required


Yes
No
Project Quality Plan:
Request for Post-weld Visual Inspection and Approval :
DEC-FDWIR-005R(1jts)

Hold Point

Witness Point
Enclosures:

1. Check List

Total Joints 1

2. Related drawings
3. Others

Location
SAIC-W-2013
GAS FACILITY AREA / PIPERACK 02
Spec. Ref.
Dwg. No.:
:
Planned Date/Time of Inspection 21-SEPT-2014 9:00 am
Actual Date/Time Inspected
The contractor requests inspection of the following site works and certifies that
all items of work have been properly executed in accordance with the contract
specifications and approved drawings.
All items have been coordinated with the future works of all other disciplines.

Enclosures Attached
Check List (Specify)

S.No.
1

QR-Number : SF-DEC-0037

SAIC-W-2013

ATTACHED ON FDWIR

ENGINEERING CERTIFICATE
ACTION CODE FOR ITEM CHECKED
A ACCEPTED AS INSPECTED
B SEE REMARKS, RE-INSPECTION REQUIRED
C REJECTED, SEE REMARKS

Contractor QC

Verified By
KJO Inspector

Status

Remarks:

SURVEYOR : N/A
Acceptance does not relieve the contractor from his responsibility and liability concerning compliance with contract requirement
Contractor QC

KJO Project Representative

KJO QA/QC Unit / Inspector

Name: Aswagoshe G

Name:George Taras

Name:Anil Kumar

Signature:

Signature:

Signature:

Date:

Date:

Date:
ESD-QA/QC FORM NO. 003