RFI Ref. No:
ICC
GGS
Date of Submittal : 19.12.2012 9:00 AM
Review Random Inspection
TRM (ICC)-Mec-004
Witness
Zone Sec-BOO1P
Building System
Level
Drawing No.
ITP Item no. Check List No. CONFIRMATION OF SUB-CONTRACTOR'S QA/QC ENGINEER Details of Inspection : External Final inspection Coating for Repair internal after lining CP works (DFT,H.T) for the joints number Station 1: 97+027 Station 2: 103+030 Station 2:103+072 Inspected by Sub-Contractor QA/QC Engineer The Works are : Name :
Accepted Rejected
Signature:
Date :
Time:
Accepted
Rejected
Signature:
Date :
Time:
If Rejected by Contractor, it shall not be forwaded to Owner's Engineer for inspection until corrected. OWNER'S ENGINEER REPRESENTATIVE Comments :
Independent Testing Laboratory Performed Test (Yes/ No) : Result of test Finally the works are: Accepted Rejected
Satisfactory
Un Satisfactory
Name, Signature & Date of ARE/Responsible Eng. MWI/WAJ REPRESENTATIVE (If applicable) Comments :