You are on page 1of 5

STATUS OF INSPECTION REPORT &DOCUMENTATION

JOB NO: FAB. LOCATION : RASLAFFAN W/S


DIMENSIONAL INSPECTION WELD MAP (FIT UP)
ACCEPTED ACCEPTED

CLIENT :
FINAL VISUAL & DIMENSIONAL
ACCEPTED

SI NO

WO# &DESCRPTION

FTC NO

EQUIPMENT

DWG #:

ITEM NO:

MATERIAL INSPECTION

WELD VISUAL

NDT (DP)

SURFACE PREPARATION & PAINTING


ACCEPTED

3431

1,2....13

500-020-0047

020-0047-01&02

ACCEPTED

ACCEPTED

ACC.

COPERION STRUCTURAL FABRICATION

COPERION CHUTE FABRICATION FLUIDISATION PIPING AND VENT PIPING HAIRPIN DUCT GAS COLLECTOR DUCT

Prepared by Sign : Sign :

Approved by:

Name :

Name :

DATE:

REMARKS

17/09/08

CLEARED TO ERECTION SITE

DANEM ENGINEERING WORKS WLL.


S.NO: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 MATERIAL DESCRIPTION UPE 300 UPE 300 PL4mm PL4mm PL4mm PL 3mm UPE 120 UPE 120 UPE 120 UPE 120 EQUAL ANGLE 90X7 HEB 100 HEB 100 4" SCH 40 SPECIFICATION S235 JR S235 JR S235 JR S235 JR S235 JR S235 JR S235 JR S235 JR S235 JR S235 JR S235JR S235 JR S235 JR ASTM A53 Gr A HEAT NO: MTC NOT RECEIVED DELIVERY NOTE REFERENCE DNS /211/000072 DNS /211/000073 11063,11062 11076,11077 11083 11070,11069 DNS-W211/000058 DNS-W211/000057 DNS-W211/000060 DNS-W211/000059 DNS /211/000038 DNS/211/000036 DNS/211/000037 80056907 MEMO REFERENCE UB/QC/004 UB/QC/004 UB/QC/004 UB/QC/004 UB/QC/004 UB/QC/004 UB/QC/004 UB/QC/004 UB/QC/004 UB/QC/004 UB/QC/004 UB/QC/004 UB/QC/004 UB/QC/004 57 23 50 270 271 700 QTY 90

PAGE: 2/2

REMARKS

(AL AMARA TRADING)

NOTE: NO HEAT NO IS MENTIONED IN ANY MATERIAL.

You might also like