QUOTATION FOR THE LANDSCAPING IN VILLA AT MUDO


S.No

Description

Unit

1)

Excavation of top soil from the existing level


to required level to receive sweet soil forplanting and
hardscape elements, Disposal of surplus unsuitable excavated
material off site

M3

2)

Filling of sweet soil for the planting of trees, shrubs, ground


cover

M3

Planting Trees, shrubs and the like planted in prepared


ground including all compost and fertilizers (Including Soil
Moisture)
3

Supply and Plant Tree Millingtonia Hortensis


(4 Mtr C/T)

Nos.

Supply and plant Palm Tree Pheonix Dactylfera


(3 Mtr C/T)

Nos.

Supply and plant Shrub Canna Indica

Nos.

Supply and Plant shrub Ixora coccinea

Nos.

Supply and plant Shrub Jatropha

Nos.

Supply and plant Shrub Bamboosa Multiplex

Nos.

Supply and plant Shrub Tecoma Stans

Nos

10

Supply and Plant Bougainvillia Alexandra

Nos.

11

Supply and plant Seasonal Flowering Plant

12

Supply and fix turf grass(Paspalum Veginatum)

M2

13

Supply and install


Block Work planter box including all finishing work and
water proofing

LSM

14

Supply and lay ceramic tiles as per the preliminary design


including joint filling , bedded on mortar setting bed

M2

15

Supply and lay Interlocking pavers tiles as


per the preliminary design

M2

17 Supply and install heel kerb


16 Supply and install Automatic irrigation System
(Including water tank, Irrigation Pump, Main line,
Subline, Lateral, Risers, Solinoid valvesand automatic
Controllers

LSM

13)

Date

12/7/2016

N VILLA AT MUDON
Amount
(AED)

Qty

Rate
(AED)

153

42

6,426.00

114

48

5,472.00

385

3,080.00

1580

1,580.00

68

12

816.00

68

22

1,496.00

68

22

1,496.00

38

45

1,710.00

60

22

1,320.00

40

38

1,520.00

126

25

3,150.00

124

18

2,232.00

37500

37,500.00

108

110

11,880.00

42

98

4,116.00

140

65

9,100.00

32000

32,000.00

TOTAL

124,894.00