PM
TUTORIAL
THE WBS
43
44
3. Compromise
Raft
Design
Raft
Design
Concept
Detail
Gather materials
Logs
Hides
Grape vines
Prepare materials
Logs
Hides
Grape vines
Assemble
Deck
Movement
Test
Float
Movement
Concept
Detail
Gather Materials
Logs
Hides
Grape vines
Construct
Fabricate
Assemble
Movement
Prepare Materials
Assemble
Test
Criteria
project Duration . . . . . . . . . . . . . . . . . B . . . G . .
Cost . . . . . . . . . . . . . . . . . . . . . . B . . . G . .
Conformance to Specs . . . . . . . . . . . . G . . . B . .
Risk - Design . . . . . . . . . . . . . . . . . . G . . . I . . .
- Production . . . . . . . . . . . . . . . . B . . . G . .
- Conflict . . . . . . . . . . . . . . . . . G . . . B . .
Resource Utilization - Human . . . . . . . . . G . . . B . .
- Materials . . . . . . . . G . . . B . .
Specialization of Skills . . . . . . . . . . . . . . B . . . G . .
Commitment . . . . . . . . . . . . . . . . . . G . . . G . .
Design Effort. . . . . . . . . . . . . . . . . . . G . . . B . .
Coordination/Integration by PM . . . . . . . . . G . . . B . .
.
.
.
.
.
I
I
I
I
I
. I
.
.
.
.
.
.
I
I
I
I
I
I
Change control is essential. The anomaly of projects is that, while they are the
means for instituting change, change
itself creates many of the problems on
projects.
Sam listed the objectives and other considerations that would be important in deciding how to manage the building of a raft.
Then three WBSs were developed down to
level 3. Each of these was evaluated on a
three-point scale: good, bad, and intermediate or indifferent. Based on this analysis,
even though it required more work by Sam,
the fast and efficient approach was chosen
(see Table 3).
REFERENCES
1. A Guide to the Project Management
Body of Knowledge (PMBOK), Exposure
Draft (especially Chapter 5). September
1994. Project Management Institute,
Upper Darby, PA.
2. Lavold, Garry. 1983. Developing
and Using the Work Breakdown Structure. In Project Management Handbook,
David I. Cleland and William R. King.
New York: Van Nostrand Reinhold, pp.
302-323.
3. Kerzner, Harold. 1989. Project Management: A Systems Approach to Planning, Scheduling and Control, 3rd Ed.
New York: Van Nostrand Reinhold, pp.
597-607.
PMNETwork December 1994
This material has been reproduced with the permission of the copyright owner.
Unauthorized reproduction of this material is strictly prohibited. For permission to
reproduce this material, please contact PMI.