You are on page 1of 4

TIME SHEET

Location

Bintulu, Sarawak

Project

SMDS Production Pipeline Project

Name

MOHD SAFFRIRIZAL BIN ABDUL HALIM

Position

QAQC ENGINEER

Date
1-Dec-16

In
0800

Out
1800

2-Dec-16

0800

1800

3-Dec-16

0800

1800

5-Dec-16

6-Dec-16

0800

1800

7-Dec-16

0800

1800

8-Dec-16

0800

1800

9-Dec-16

0800

1800

10-Dec-16

0800

1800

12-Dec-16

0800

1800

13-Dec-16

0800

1800

14-Dec-16

0800

1800

15-Dec-16

0800

1800

16-Dec-16

0800

1800

17-Dec-16

0800

1800

19-Dec-16

0800

1800

20-Dec-16

0800

1800

21-Dec-16

0800

1800

22-Dec-16

0800

1800

23-Dec-16

0800

1800

24-Dec-16

0800

1800

25-Dec-16

26-Dec-16

27-Dec-16

0800

1800

28-Dec-16

0800

1800

29-Dec-16

0800

1800

30-Dec-16

0800

1800

31-Dec-16

0800

1800

Remarks

4-Dec-16
ANNUAL LEAVE

11-Dec-16

18-Dec-16

Parepared by:

Verified by:

Name: Mohd Saffririzal B. Abdul Halim

Name: Muhammad Asyraq B Ariffin

Date: 4-Jan-2016

Date:

TIME SHEET
Others

Project No

M1611

Month

Dec'16

Remarks

AL LEAVE

Approved by:

Name: Murali Menta


Date:

You might also like