You are on page 1of 2

Form 106

EPCC OF MBC PILOT PLANT PROJECT AT TERENGGANU GAS TERMINAL (TGAST)

PUNCHLIST FORM
SUB SYSYSTEM 130 TEST PACK NO. PG/VH-TP130-P001
P&ID No : DWG-002-1

LINE WALK CONDUCTED BY Owner Contractor Vendor DATE

COMPLETION (SIGN & DATE)


NO. ISO NO./ LOCATION DESCRIPTION INITIATOR TYPE CAT
CONTRACTOR INITIATOR

Category "A" To be repaired or corrected before Hydrotesting can take place

Internal
Form 106

EPCC OF MBC PILOT PLANT PROJECT AT TERENGGANU GAS TERMINAL (TGAST)

PUNCHLIST FORM
SUB SYSYSTEM 130 TEST PACK NO. PG/VH-TP130-P001
P&ID No : DWG-002-1

LINE WALK CONDUCTED BY Owner Contractor Vendor DATE

COMPLETION (SIGN & DATE)


NO. ISO NO./ LOCATION DESCRIPTION INITIATOR TYPE CAT
CONTRACTOR INITIATOR
Category "B" To be repaired, completed and corrected before Mechanical Completion (MC)/ System Mechanical Completion (SMC)/ Ready For Start-Up (RFSU), as applicable

Internal

You might also like