PFLNG3-009-EXE-JSC-0000-QAC-PRC-0001
Document to CPY Document for Procurement (JGC topside) Document for Procurement (SHI topside) Document for Module Fab at SHI Document for Onshore
SHOP INSPECTION PLAN FOR EPCC (JGC SCOPE) General requirement General requirement General requirement
PFLNG3-009-EXE-JSC-0000-QAC-PRC-0002 QUALITY CONTROL REQUIREMENTS TO VENDOR (PROCUREMENT PHASE) - TOP SIDE AND ON-SHORE (JGC SCOPE) SOURCE INSPECTION PROCEDURE (SHI PROCURED ITEMS) CONSTRUCTION QUALITY MANAGEMENT PLAN FOR HULL & To be issued Construction quality management plan for Malaysia ons To be issued
PFLNG3-009-EXE-JSC-0000-QAC-PRC-1002 SN2661-0000-QAC-PRC-5009 SN2661-0000-QAC-QMS-5001 PFLNG3-009-EXE-JSC-0000-QAC-PLN-0001
INSPECTION AND TEST PLAN (ITP) FOR ALL DISCIPLINES (TOPSIDE PROCUREMENT-JGC SCOPE)
PFLNG3-009-EXE-JSC-0000-QAC-ITP-0101 NONCONFORMANCE CONTROL AND CORRECTIVE ACTION PROCEDURE
PFLNG3-009-EXE-JSC-0000-QAC-PRC-1003
QUALITY SURVEILLANCE PROGRAM
PFLNG3-009-EXE-JSC-0000-QAC-PLN-1006 Each specific requirement to vendor Each specific requirement for module Fabrication Each specific ITP, procedure is to be issued by Subcontractor
GENERAL REQUIREMENTS FOR MANUFACTURING RECORD BOOK -TOP SIDE AND ON-SHORE Site Inspection Test Plan for Hullside
PFLNG3-009-EXE-JSC-0000-QAC-PRC-1004 SN2661-0000-QAC-ITP-6008
MATERIAL TRACEABILITY AND MATERIAL CERTIFICATION REQUIREMENTS -TOP SIDE AND ON-SHORE Site Inspection Test Plan for Topside (Piping)
PFLNG3-009-EXE-JSC-0000-QAC-PRC-1005 SN2661-0000-QAC-ITP-6009
GENERAL WELDING REQUIREMENTS (TOPSIDE) PROCUREMENT PHASE Site Inspection Test Plan for Topside (Structure)
PFLNG3-009-EXE-JSC-0000-QAC-PRC-1008 SN2661-0000-QAC-ITP-6010
CASTING REQUIREMENTS -TOP SIDE AND ON-SHORE Site Inspection Test Plan for Topside (Mechanical)
PFLNG3-009-EXE-JSC-0000-QAC-PRC-1007 SN2661-0000-QAC-ITP-6011
etc.