You are on page 1of 2
AND SCOPE OF WORKS ON PM CHECK"A custome KO Corr pare or report: _|i-T3-ls ENGINE MODEL: BSL‘ = GB 6 ‘GENERATING ET MODEL: HOUR METER READING: |) BEFORE PM TEST RUN (2 MINUTES) Oi Pressre Exh) vote soe Hour ATE oi temperance Dg Fesweney avery Bree Ampere toed harsng voltage ower Factor “BY MEGHANICAL CHECK AND INSPECTION — | check fel tok evel separator. “4 Drain water rom fel tan 5 checks cane indeator () ELECTRICAL CHECK AND INSPECTION: 1 Check elecvolyte level 2 checkspeciie gravy of electrolyte. 3 Checkol prestreswiteh senso. 4 Check thermo swteh/Check coolant temp sensor. 5 Check genset controler. 6 Visual check up of genser's main aerator. 7 check magnti switch. 28 Check magnetic pickup resistance, ) AFTER PM TEST RUN: 1 Testrun genset at ated seed without load for Sto 10minuts. I 2 Observe and monitor genset performance. | 3 Record genset parameters and outputs Ayo Pressure A Volage 35 Oil Temperature Frequency ‘kw Hour ee came eae Curgnevege |Z hawereand _ er 05.4: yale GR ) GENSET CLEANING AND HOUSEKEEPING: 1 Store fel and engine olin a prescribed strege container 2 Make sure thatthe cps of ful and engne ol containers tre etiyCosed and store them nthe designated ste 13 Clear the aes from combustible such soe, engine ci Sector asres onesie oéangeron meters : torte enn. . win ou, GH f fie a apthecnge ad the suroundng ae ect att and frelon materi, CART filet Fcht AUP. AA ig fy nEconDING: "subi city report to lentrepresentatve 2 submit eportt St fice with lent/ropresenativ’signature/accaptance [DOTTIE Dba eMC CAPT 1 fe PERFORMED BY/DATE PERFORMED: ACKNOWLEDGED BY va C-min J Giieu J. fata __BY (PRINTED NAME & SIGNATURE)

You might also like