You are on page 1of 137

Training material for

VMS-NSN project

Training material for VMS-NSN project / Jul. 2011

R 0.1

Delta Confidential

Contents

System introduction

Quick Installation parameter setting

Controller introduction

NRMS software introduction

Troubleshooting & Maintenance

Q&A

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

Contents

System introduction

Quick Installation parameter setting

Controller introduction

NRMS software introduction

Troubleshooting & Maintenance

Q&A

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

Telecom power system concept

Rectifier # 2
Rectifier # 3

Rectifier # N

Battery

LVDS

LOAD (Switch ,ADSLE.T.C.)

U.P.S

AC Distribution Unit

Generator

Rectifier # 1

Output DC Distribution Unit

AC Input

Control Supervisory
Unit (CSU)

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

INDOOR POWER SYSTEM - ESAA150-FTA11


z Power System

z
z
z
z
z

Three phase / 4 line (3W-N-PE/220V)


Power System with 3 rectifier slots
Distribution:
Load Breaker: (High PL) 20A x 2 + 10A x 2;
(Low PL) 100A x 1 + 40A x 3 (DIN Rail)
Battery Breaker: 125A x 2 (DIN Rail)
Protection:
01 x AC Surge included
01 x DC surge included
Alarm relay: 8 positions, 7 positions definable
Rectifier module: 3 * DPR 2700
DC Output Voltage: 54Vdc (40~59 Vdc)
Controller: CSU501+
Local access: NRMS through mini USB interface
(Optional) Web/SNMP for remote monitoring and control

ESAA150-FTA11

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

INDOOR POWER SYSTEM - ESAA150-FTA11


High priority load
20A x 2 + 10A x 2
Low priority load
100A x 1 + 40A x 3

Battery breaker
125A x 2

Controller
CSU501

Mini
USB port

AC I/P breaker
3P/40A

Temperature
sensor TA & TB

Alarm dry contact


Terminal block
Web/SNMP
(Optional)

Training material for VMS-NSN project / Jul. 2011

AC surge
arrestor

DC surge
arrestor
Delta Confidential

KEYS COMPONENT ESAA150-FTA11

Controller CSU 501+

Power distribution unit

Web board (optional)


Rectifier DPR2700W

Battery string

Training material for VMS-NSN project / Jul. 2011

19 Rectifier shelf

Delta Confidential

System Drawing

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

OUTDOOR POWER SYSTEM ESOA150-FAC01


z Outdoor Power System

z
z
z
z

Single Layer / Aluminum / Double Door / IP 54 / Fan Cooling


12U equipment space reserved
Cable: 1/2" Jumper Cable x 06 + cable Glands x 06.
Fan speed control for reducing audible noise
Power System
Three phase / 4 line (3W-N-PE/220V)
Power System with 3 rectifier slots
Distribution:
Load Breaker: (High PL) 20A x 2 + 10A x 2;
(Low PL) 100A x 1 + 40A x 3 (DIN Rail)
Battery Breaker: 125A x 2 (DIN Rail)
Protection:
01 x AC Surge
01 x DC Surge
Alarm relay: 8 positions, 7 positions definable
Rectifier module: 3 * DPR 2700/ 2900 HE
Local access: NRMS through mini USB interface
(Optional) Web/SNMP for remote monitoring and control
Outline Dim.: (H*W*D): <2000mm x 750mm x 720mm (Body)

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

OUTDOOR POWER SYSTEM ESOA150-FAC01

12U space for NSN


Customer equipment

Fan cooling

DC Power system
ESAA150-FTA Series
Power System with 3
rectifier slots
(Rear side access)
Battery tray 1

Battery tray 2
Cable Gland x 6 +
1/2" Jumper Cable x 06

Front View

Front Side

Dimension (H*W*D): < 2000mm x 750mm x 720mm


Training material for VMS-NSN project / Jul. 2011

Delta Confidential

10

OUTDOOR POWER SYSTEM ESOA150-FAC01

12U space for NSN


Customer equipment

DC Power system
ESAA150-FTA Series
Power System with 3
rectifier slots
(Front side access)

DPR 2900 /
2700W Rectifier

Battery tray 1

Battery tray 2

Rear View
Training material for VMS-NSN project / Jul. 2011

Rear Side
Delta Confidential

11

KEY COMPONENTS ESOA150-FAC01

Power shelf: SB-23N/HJ E


Fan tray (EX-F01B)

Rectifier DPR2700W

Controller CSU 501+

Battery string
Web board (optional)

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

12

Power shelf - ESOA150-FAC01


High priority load
20A x 2 + 10A x 2
Low priority load
100A x 1 + 40A x 3

Battery breaker
125A x 2

Controller
CSU501

Mini
USB port

AC I/P breaker
3P/40A

Temperature
sensor TA & TB

Alarm dry contact


Terminal block
Web/SNMP
(Optional)

Training material for VMS-NSN project / Jul. 2011

AC surge
arrestor

DC surge
arrestor
Delta Confidential

13

OUTDOOR POWER SYSTEM ESOA150-FAC01


Alarm CCU Board

Alarm dry
contact

CCU
Board

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

14

OUTDOOR POWER SYSTEM ESOA150-FAC01


CCU Relay Positions and Definition

NO
COM
NC
NO
COM
NC

Cooling alarm

Environments alarm

Environment control Board


Training material for VMS-NSN project / Jul. 2011

Delta Confidential

15

OUTDOOR POWER SYSTEM ESOA150-FAC01


PDU Relay Positions and Definition
Alarm
Relay

PIN
1

NO

COM

NC

NO

COM

NC

NO

COM

NC

10

NO

11

COM

12

NC

13

NO

14

COM

15

NC

16

NO

17

COM

18

NC

19

NO

20

COM

21

NC

22

NO

23

COM

24

NC

Alarm Setting

Alarm Description

AC off

AC off

Rectifier failure

Any Rectifier Failure

CSU Failure

CSU Hardware Failure


(Hardware setting can not defined by yourself)

LVDS trip

Low voltage disconnect

High temperature

Ambient Temperature High (TA2H)


Battery Temperature High (TB1H)

Major Alarm

Major Alarm

Minor Alarm

Minor Alarm

N/A

Training material for VMS-NSN project / Jul. 2011

Dont use

Delta Confidential

16

OUTDOOR POWER SYSTEM ESOA150-FAC01


Cable entries
6pcs of bottom cable entries reserved

1pce MG32A 1-hole Cable Gland


For AC input (spare)

3pcs MG32A 2-hole Cable Gland


For cable range (OD): 12mm

2pce 3-hole Cable Gland


For cable range (OD): 12mm

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

17

OUTDOOR POWER SYSTEM ESOA150-FAC01


NSN equipment
Grounding bus bar

Main Grounding Bus bar with 6pcs M6


insert nut for NSN equipment

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

18

OUTDOOR POWER SYSTEM ESOA150-FAC01


Power system
Grounding bus bar

Main Grounding Bus bar x 1 with 6pcs M6


insert nut for for Power system grounding.

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

19

OUTDOOR POWER SYSTEM ESOA150-FAC01


Air filter module

Suggestion:
Clean: 1~2 Months using vacuum cleaner
Replacement: 6~12 Months
Training material for VMS-NSN project / Jul. 2011

Delta Confidential

20

OUTDOOR POWER SYSTEM ESOA150-FAC01


AC terminal & AC Grounding bus bar

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

21

OUTDOOR POWER SYSTEM ESOA150-FAC01


AC socket, AC breaker & Fan breaker

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

22

System Drawing

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

23

48 VDC equipment for RNC (8900W)


z Power System

z
z
z
z

Three phase / 4 line (3W-N-PE/220V)


Power System with max.12 rectifier slots
Distribution:
1. Main AC breaker 3P 380Vac type
2. AC Surge Protection
3. Rail 1 Breaker X 16 (DIN rail C120 type ) 125A x1;100A
x1; 80A x1
4. Rail 2 Breaker x23 (DIN rail C60 type) 63x3; 50Ax1; 40Ax1;
32Ax1; 25Ax1;20Ax116Ax1; 10Ax1
5. Rail 3 Breaker X 16 (DIN rail C120 type ) 125A x1;100A
x1; 80A x1
6. Battery Fuse X 4 (400A x2 )
Alarm relay: 8 positions, 7 positions definable
Rectifier module: 10 * DPR 2000
DC Output Voltage: 54Vdc (40~59 Vdc)
Local access: NRMS
Optional Web/SNMP for remote monitoring and control

ES 48/600-UBA02
Training material for VMS-NSN project / Jul. 2011

Delta Confidential

24

48 VDC equipment for Transport node Hub Site


(Tellabs) (1000W)
z Power System

z
z
z
z
z

Three phase / 4 line (3W-N-PE/220V)


Power System with 3 rectifier slots
Distribution:
Load Breaker: (High PL)10A x 2;
(Low PL) 32A x 2;
Battery Breaker: 125A x 2 (DIN Rail)
Protection:
01 x AC Surge included
01 x DC surge included
Alarm relay: 8 positions, 7 positions definable
Rectifier module: 2 * DPR 2000
DC Output Voltage: 54Vdc (40~59 Vdc)
Controller: CSU501+
Local access: NRMS through mini USB interface
Optional Web/SNMP for remote monitoring and control

Training material for VMS-NSN project / Jul. 2011

ESAA150-FTA Series + 0.75M Lion rack

Delta Confidential

25

48 VDC equipment for Transport Node RNC Site


(2000W)
z Power System

z
z
z
z
z

Three phase / 4 line (3W-N-PE/220V)


Power System with 3 rectifier slots
Distribution:
Load Breaker: (High PL)10A x 2;
(Low PL) 32A x 4;
Battery Breaker: 125A x 2 (DIN Rail)
Protection:
01 x AC Surge included
01 x DC surge included
Alarm relay: 8 positions, 7 positions definable
Rectifier module: 3 * DPR 2000
DC Output Voltage: 54Vdc (40~59 Vdc)
Controller: CSU501+
Local access: NRMS through mini USB interface
Optional Web/SNMP for remote monitoring and control

Training material for VMS-NSN project / Jul. 2011

ESAA150-FTA Series + 0.75M Lion rack

Delta Confidential

26

48 VDC equipment for BSC/PCU site (3200W)


z Power System

z
z
z
z

Three phase / 4 line (3W-N-PE/220V)


Power System with 4 rectifier slots
Distribution:
Load Breaker: (High PL)10A x 2 + 20A x 2;
(Low PL) 100A x 2 + 40A x 2;
Battery Breaker: 125A x 3 (DIN Rail)
Protection:
01 x AC Surge included
01 x DC surge included
Alarm relay: 8 positions, 7 positions definable
Rectifier module: 4 * DPR 2000
DC Output Voltage: 54Vdc (40~59 Vdc)
Local access: NRMS software
Optional Web/SNMP for remote monitoring and control

ES 48/200-UQB03
+ 1.5M Lion rack
Training material for VMS-NSN project / Jul. 2011

Delta Confidential

27

48 VDC equipment for TC site (3720W)


z Power System

z
z
z
z

Three phase / 4 line (3W-N-PE/220V)


Power System with 4 rectifier slots
Distribution:
Load Breaker: (High PL)10A x 2;
(Low PL) 100A x 2 + 16A x 4;
Battery Breaker: 125A x 3 (DIN Rail)
Protection:
01 x AC Surge included
01 x DC surge included
Alarm relay: 8 positions, 7 positions definable
Rectifier module: 4 * DPR 2700
DC Output Voltage: 54Vdc (40~59 Vdc)
Local access: NRMS software
Optional Web/SNMP for remote monitoring and control

ES 48/200-UQB04
+ 1.5M Lion rack
Training material for VMS-NSN project / Jul. 2011

Delta Confidential

28

DP 2700 Series Rectifier


Features and Benefits
-48V/56A, Output; Max. Power 2700W
Wide Input Voltage Range (90V~300V)
Power Factor Correction (>0.99)
Hot-pluggable, All Connectors are at the rear
Compact Size
34W/in3 (48V) Power Density
Dimension:42mm/1U(H)*125.5mm/2.8U(W)*268mm(D)
Light weight:>2 Kg
Horizontal(1U)/Vertical(2U) Models Available
High Efficiency: >91% (48V)
Fan cooling and Easy replaceable fan design
Operation temp.:-5oC~+75oC
UL/CUL,TUV/CE Certificated

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

29

AC Input Characteristic(48V)
Wide AC input voltage range with derating below 176 V
Maximum input current 19 A
Input fuse 25A fast (L and N)

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

30

DC Output Characteristic (48V)

Max. Output Power: 2700W(-48V)


Constant Power Design
Output voltage 40 ... 59.5 Vdc
Output fuse 30A x 3 (- pole)

48

56
Training material for VMS-NSN project / Jul. 2011

Delta Confidential

31

Thermal Management (CSU Control)


OTP = Over Temperature Protection
Ambient temperature sense for thermal management:

OTP control is based on internal temperature


OTP protection is based on critical internal temperature

Power limit

Vinrms: 184
Rectifier
restart

2700
2300

Ambient
55 C
Training material for VMS-NSN project / Jul. 2011

65 C

75 C
Delta Confidential

32

Rectifier - Interface

I/O Connector
Input

Pin Number

Signal

Output

Signal

Description

P1

AC_L

AC main, L terminal

P2

AC_N

AC main, N terminal

P3

FG

AC main, frame ground

Training material for VMS-NSN project / Jul. 2011

Pin Number

Signal

Description

P4

VOP

Precharge

P5-P7

VO-

DC Output -

P8-P10

VO+

DC Output +

H1

SGNDO

Signal ground

H2

RS485+

RS 485 + communication

G1

CGND

Communication ground

G2

RS485-

RS 485 communication

F1

INH

Short pin for well connection

F2

IDA

ID analog

E1

IDD

ID digital

E2

IBUS

Load Sharing Bus

Delta Confidential

33

Rectifier - Dimension

W x H x D=4.9 x 1.6 x 11.7 inch =125.5 x 40.5 x 270 mm


Training material for VMS-NSN project / Jul. 2011

Delta Confidential

34

Contents

System introduction

Quick Installation parameter setting

Controller introduction

NRMS software introduction

Troubleshooting & Maintenance

Q&A

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

35

Quick installation system parameter


Quick Installation via NRMS software (Step 1: Date & Time setting)

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

36

Quick installation system parameter


Quick Installation via NRMS software (Step 2: Battery capacity setting)
For this case, battery capacity is 300AH.

Default setting
Training material for VMS-NSN project / Jul. 2011

Delta Confidential

37

Quick installation system parameter


Quick Installation via LCD display (Step 1: Date & Time setting)

Step 1-1

Step 1-2

Step 1-3
Training material for VMS-NSN project / Jul. 2011

Delta Confidential

38

Quick installation system parameter


Quick Installation via LCD display (Step 2: Battery capacity setting). For this case,
Battery capacity is 300AH

Step 2-1

Step 2-4

Training material for VMS-NSN project / Jul. 2011

Step 2-2

Step 2-3
Delta Confidential

39

START - UP PROCEDURE
z START - UP PROCEDURE: Check-list and inspection before turn-on: Verify

all connections prior to starting this section

Ensure the input AC circuit breaker located on the AC service panel is


switched to Off position

Confirm the operating voltage before proceeding

Ensure the frame ground is properly connected to a permanent earth


ground connection

Ensure all the DC circuit breakers in the equipment are switched to the
Off position

Tighten the DC circuit breaker lugs to ensure proper contact is made with
the load cable and the trip sense wire as it may cause heat damage

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

40

START - UP PROCEDURE
z

Turn on the system


Step 1

Check all wiring are correct

Step 2

Check and confirm the input voltage is correct

Step 3

Pull out all the rectifiers from the system

Step 4

Switch on the battery breaker(s)

Step 5

Check the monitor of display on the controller

Step 6

Switch on the AC breaker

Step 7

Check the monitor of display on the controller again

Step 8

Push one rectifier into the rectifier slot

Step 9

Check the system works in normal condition.

Step 10

Push all other rectifier(s) into the rectifier slots

Step 11

Switch on the load breaker(s) sequentially

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

41

START - UP PROCEDURE
z

Simple troubleshooting guide


Status

Possible causes

Action

LCD display on the


controller is OFF

AC utility does not


supply to the system

Check the AC utility


Make sure the AC wire is properly connected at the AC input
terminal
Check the AC breaker position to ON position
Contact technician if problem still exists

All CSU LED are OFF

AC utility does not


supply to the system

Check the AC utility


Make sure the AC wire is properly connected at the AC input
terminal
Check the AC breaker position to ON position
Contact technician if problem still exists

Rectifier LEDs are


OFF

AC utility is not
available
Rectifier is not properly
placed

Check the AC utility


Make sure the AC wire is properly connected at the AC input
terminal
Check the AC breaker position to ON position
Pull out the rectifier and insert it properly
Contact technician if problem still exists

System shows in normal


operation but no output
to the load

DC breaker is tripped
LVDS2 did not reconnect

Check the load breaker position to ON position


Change the breaker if breaker is overloaded in use.
Check the system output voltage

No battery backup when


AC fails

Battery breaker is no
connected or the
battery voltage too low
Battery life reaches
end

Check the battery breaker position to ON position and check


the battery voltage.
Change the battery

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

42

Alarm dry contact & SNMP card installation

ESAA150 FTA11 Power Shelf

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

43

Alarm dry contact

Alarm dry contact

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

44

Alarm dry contact


z

Type of contact: Dry contact is a contact


that is not initially connected to a voltage
source.
z Alarm relay: 8 positions, 7 positions
definable
z 7 positions can be defined by NRMS
software
z Local access: NRMS through mini USB
interface.
Relay 8 7 6 5

Training material for VMS-NSN project / Jul. 2011

4 3 2 1

Delta Confidential

45

Alarm relay define


Relay & LED

Relay 8 7 6 5

Training material for VMS-NSN project / Jul. 2011

Config

4 3 2 1

Delta Confidential

46

Config

Alarm relay define


Alarm relay & LED indicator can be defined

Relay & LED

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

47

SADMIN level
Pull down list for alarm relay & LED indicator define

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

48

Alarm dry contact

Using tool to push the button


and connect the signal wire
Training material for VMS-NSN project / Jul. 2011

Finish
Delta Confidential

49

Alarm dry contact Default setting


Alarm Relay

PIN
1

NO

COM

NC

NO

COM

NC

NC

COM

NO

10

NO

11

COM

12

NC

13

NO

14

COM

15

NC

16

NO

17

COM

18

NC

19

NO

20

COM

21

NC

22

NO

23

COM

24

NC

Alarm Setting

Alarm Description

AC off

AC off

Rectifier failure

Any Rectifier Failure

CSU Failure

CSU Hardware Failure


(Hardware setting can not defined by
yourself)

LVDS trip

Low voltage disconnect

High temperature

Ambient Temperature 2 Hi (TA2H)


(Power bay, threshold= 45 )
Battery Temperature Hi

Major

Major Alarm

Minor

Minor alarm

N.A

Training material for VMS-NSN project / Jul. 2011

No define

Delta Confidential

50

SNMP Card Installation


Web Server Function and Feature (Optional)
Features:
Applied in TCP/IP Internet/Intranet Environment
Complete Supervising to Power System
User-friendly Graphic Interface
Dynamic information presentation
Password function
Multi Language Support
Microsoft Explorer and Netscape Support

Main Screen

Parameter Setting

Status
Alarm
Training material for VMS-NSN project / Jul. 2011

Configuration
Delta Confidential

51

SNMP Card Installation (optional)


Step 1: Relax 4 screws of controller

4
2

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

52

SNMP Card Installation (optional)


Step 2: Move out cover and prepare SNMP card kits

Controller without SNMP card

Training material for VMS-NSN project / Jul. 2011

SNMP card kits

Delta Confidential

53

SNMP Card Installation (optional)


Step 3: Connect signal cables

Connect signal cables to SNMP terminal

Connect signal cables to CSU


Note: follow this picture to connect 2 cables. Web
function may not work because of wrong wiring.

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

54

SNMP Card Installation (optional)


Step 4: Fix SNMP Card (2 screws)

Fix SNMP Card by 2 screws

Training material for VMS-NSN project / Jul. 2011

SNMP Card connect port

Delta Confidential

55

SNMP Card Installation (optional)


Step 5: Recover CSU cover

2
1

Fix CSU cover by 4 screws

Training material for VMS-NSN project / Jul. 2011

Controller with SNMP card

Delta Confidential

56

Contents

System introduction

Quick Installation parameter setting

Controller introduction

NRMS software introduction

Troubleshooting & Maintenance

Q&A

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

57

Controller CSU 501+


z Reliable and user friendly controller
z User configurable alarms and settings
z Programmable DC output voltage
z Battery temperature compensated float voltage
z LVD contactor control
z Battery charging control
z Automatic battery testing
z LCD 128 x 64 dots display
z Entry of alarm and system parameters from PC via
mini USB port
z Internet Web Server Function: By Web Server
Software/SNMP via RJ45 (Option)
z Green Function / Efficiency management
z Hot plug in design
Training material for VMS-NSN project / Jul. 2011

Delta Confidential

58

Controller CSU 501+


User Interfaces
Internet Web Server
Function port (optional)

Up
Major LED
Minor LED
EQU LED

Down
Enter

ESC

128 x 64 LCD
Dots Display

Training material for VMS-NSN project / Jul. 2011

Mini USB (slave)

Delta Confidential

59

Controller CSU 501+


Function architecture (Main\Data)
Home
DCV
DCI
Sys Status(FL/EQU)
Alarm Existing

Sys Info

Rectifier
I.D. Address
Output Current
Status

Battery
Batt. String I.D.
Batt.Status
Batt. Current

Current Alarm

Sys Setting

Event Log
Alarm Function Time
Recover Time

Current .setting
DC Setting
Alarm Setting
Batt.Setting
Other Setting

AC & Temp
ACV Voltage
Ambient Temp.

Data &
Version
Date/Time
H/W version
S/W version

* DC/DC Data
* Function architecture varies in different systems
Training material for VMS-NSN project / Jul. 2011

Delta Confidential

60

Controller CSU 501+


Function architecture (Main\Data)
Home
DCV
DCI
Sys Status(FL/EQU)
Alarm Existing

Sys Info

Current Alarm

Sys Setting

Password

DC Setting
DCV setting
CL setting

Alarm Setting
ACV,
DCV,LVDS,
OTP,EQU,
Batt.Test.

Batt. Setting
Batt. Par.
T-Comp
BDT Test
B-EQU

Date Setting
Year/month/
day/time

Password
New PW Cfm
PW Default
(0000)
Training material for VMS-NSN project / Jul. 2011

Efficn.t Mgt.
ON/OFF

Language
English

Generator
ON/OFF

Temp. Unit
ON/OFF

Comm.
Modbus
Baudrate
Alarm Reset
Reset HVSD
Reset Com-fail

* Function architecture varies in different systems


Delta Confidential

61

Controller CSU 501+


Function architecture (Main\Data)

Home
DCV
DCI
Sys Status(FL/EQU)
Alarm Existing

Sys Info

Sys Setting

Current Alarm

All Alarm Function show on Display


Show Real Information and Alarm Time in Event Log

* Function architecture varies in different systems


Training material for VMS-NSN project / Jul. 2011

Delta Confidential

62

Display Menu Tree

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

63

Display Menu Tree

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

64

Display Menu Tree

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

65

Display Menu Tree

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

66

Display Menu Tree

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

67

Display Menu Tree

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

68

Contents

System introduction

Quick Installation parameter setting

Controller introduction

NRMS software introduction

Troubleshooting & Maintenance

Q&A

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

69

NRMS software introduction

Mini U
SB

Local Access

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

70

Mini USB

The files is **.EXE files,


So just double clock it

Training material for VMS-NSN project / Jul. 2011

Local Access

Delta Confidential

71

NRMS H/W Tools


1.

H/W Mini USB Cable

2.

Delta NRMS software

3.

Computer with USB port

Mini USB Cable

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

72

User level login

The port must be


match your
PC/Laptop

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

73

User level login Find the


comm Port in your computer

Click to Device
Manager

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

74

User level login Find the


comm Port in your computer

Click to Ports (COM


& LPT)

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

75

User level login

Push this button


to connect to
system

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

76

User level
NRMS Version

CSU
System data
DC O/P voltage
Ambient Temp.
Load current
Total current
(load + battery)
AC voltage (Phase1)
AC voltage (Phase 2)

Buzzer stop
Manual battery Test
Manual EQU

AC voltage (phase 3)

Software Version
Firmware Version
System status
RMS software status

Training material for VMS-NSN project / Jul. 2011

Login level
System voltage
System time

Delta Confidential

77

User level
Rectifier

Max.
rectifier slot
in system

No. of
rectifier
failure

No. of
rectifier
working

No. of
rectifier
turned Off

No. of rectifier
communication
error

Clear
communication
error

Rectifiers
status

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

78

User level
Battery
Total Batt. current
(+: charge)
(-: discharge)

Batt. 1 Temp.

Batt. capacity

Batt. 2 Temp.
Batt. 1 current

Batt. 3 Temp.

Batt. 2 current
Batt. 3 current

Batt. middle point Vol 1


Batt. middle Point Vol 2
Batt. middle point Vol 3
Batt. middle Point Vol 4

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

79

Parameter

User level

System
AC High
DCV high setting point

AC Low

DCV low setting point


Energy Saving

Pre DCV low setting point

SMR Max. Current

HV shutdown setting point


LVDS1 trip point
LVDS2 trip point

Time Setting

LVDS3 trip point

Manual LVDS1 Trip

Float voltage

Manual LVDS2 Trip

EQU voltage
Ambient temp. high
Ambient temp. low
High temp. shutdown
Low temp. shutdown

Training material for VMS-NSN project / Jul. 2011

Alarm when current over


80% of rectifier capacity

Delta Confidential

80

Delta Power System LVDS Behavior


Battery

Power System
Rectifier
Volt (54V)

Battery

Power System
Battery Volt
(54V)

Energy

Battery Volt
(54V)

Energy

Energy
BLVD

Energy
BLVD

Battery Low
Voltage
Disconnect

Rectifier
Volt (0V)

BLVD
Close

Battery Low
Voltage
Disconnect

Current
Sensor

Current
Sensor

BLVD
Close

LVDS2
Close
PL

NPL

Output (Load)

Normal (AC)
Training material for VMS-NSN project / Jul. 2011

LVDS2
Close
PL

NPL

Output (Load)

Discharge (AC break off)


Delta Confidential

81

Delta Power System LVDS Behavior


Power System

Battery

Energy

Energy

Battery Volt
(46V)

BLVD
Rectifier
Volt (0V)

Battery Low
Voltage
Disconnect

Rectifier
Volt (0V)

Power System

Battery

Energy

Energy
Battery Volt
(42V)

BLVD
Battery Low
Voltage
Disconnect

BLVD
Close

BLVD Trip (42V)

LVDS2 Trip (46V)

X X

X
PL

NPL

Output (Load)

Discharge (LVDS2 Trip)


Training material for VMS-NSN project / Jul. 2011

PL

LVDS2
Open

NPL

Output (Load)

Discharge (BLVD Trip)


Delta Confidential

82

Delta Power System LVDS Behavior


Power System

Battery

Power System

Battery

Energy

Energy

Energy

Energy

Battery Volt
(45V)

Rectifier
Volt (45V)

BLVD
Close

BLVD Auto recover


(42V + 3V=45V)

X
PL

Output (Load)

Battery recharge
(BLVD Recover)
Training material for VMS-NSN project / Jul. 2011

LVDS2 Auto
recover (46V +
3V=49V)

LVDS2
Open

NPL

Battery Volt
(49V)

Rectifier
Volt (49V)

PL
NPL
Output (Load)

Battery recharge
(LVDS2 Recover)
Delta Confidential

83

Parameter

User level

Battery

Batt. Test Function

Battery capacity

Test Time

Batt. Temp. High ALM


Batt. Middle point

Test Criterion
Discharge current for test

SMR max. current limit


Charge Management
Batt. Periodic Test Function

Charge CL 1
Charge CL -2

Test Periodic

Charge CL -3

Which day do the test


What time do the test
Last batt. Test Time
Next batt. Test Time

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

84

Concept of Battery Charge Current Limit

Battery Capacity x Charge rate = Charger Current


In this case, battery capacity is 300Ah, so:
300Ah x 0.2C = 60A (battery charge current)
300Ah x 0.1C = 30A (battery charge current)

Charge Voltage and Charge Current

EqulizeVoltage

Float Voltage
Deeply Discharge
Voltage
Battery current

Stage - 1 Current Limit


Stage - 2 Current Limit
Stage - 3 Current Limit
EQU stop current

0V / 0A

Time

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

85

Parameter

User level

Temp.
Compensation
Temp. Compensation
Function
Compensation Mode

Coefficient (per cell) of


Temp. Compensation
Max. Range of Compensation
Center of temp.

System volt of T0
System volt of T1
System volt of T2
System volt of T3

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

86

Parameter

User level

EQU

Equalize charge

Batt. remaining capacity

EQU Max. Time

System voltage

Additional EQU Time

AC fail time

Criterion for stop EQU

Discharge Current

Periodic EQU Function


Periodic

Criteria for enforce EQU

Which day enforce


What time enforce
Last EQU Time
Next EQU Time

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

87

Parameter

User level

Alarm Mask

Rectifier current limit

TB sensor fail alarm

One rectifier fail

Battery temp. high

More than 1 rectifier fail

Battery fuse fail


Battery discharge

Major alarm
Minor alarm

Battery breaker trip

Load breaker trip

Middle test fail

High priority breaker trip

Battery test fail

Low priority breaker trip


Load fuse fail
Load rail alarm
GMT fuse fail

Training material for VMS-NSN project / Jul. 2011

Rect. Over capacity


DCV high alarm
DCV low alarm
LVDS 2 trip
LVDS trip alarm
TA high alarm
TA low alarm
TA sensor fail alarm
ACV high alarm
ACV low alarm
AC breaker trip
AC phase lost alarm

Delta Confidential

88

Parameter

User level

WEB
IP Address
Subnet Mask
Gateway

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

89

Parameter

User level

CCU

Fan 1 start point

Fan 2 start point

Fan 1 stop point

Fan 2 stop point


Duty for fan 2 full speed

Duty for fan 1 full speed

Fan 2 full speed point

Fan 1 full speed point

Start point for heater

Push this button then fan 2 run from


low speed to full speed
Push this button then fan 2 run full speed

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

90

Alarm

User level

system
Alarm light with alarm

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

91

Alarm

User level

CCU

Alarm light w/o alarm

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

92

Event

User level

Record items
Right now
Event log list

Clear all Event log

Down load Event log

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

93

Setting

Change permission

User level

Modem configure

Change password
Logout (return to user level)

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

94

SADMIN level login

3
4
Password:
8888
Training material for VMS-NSN project / Jul. 2011

Delta Confidential

95

SADMIN level login

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

96

SADMIN level
NRMS Version

CSU
System data
DC O/P voltage
Ambient Temp.
Load current
Total current
(load + battery)
AC voltage (Phase1)
AC voltage (Phase 2)

Buzzer stop
Manual battery Test
Manual EQU

AC voltage (phase 3)

Software Version
Firmware Version
System status
RMS software status

Training material for VMS-NSN project / Jul. 2011

Login level
System voltage
System time

Delta Confidential

97

SADMIN level
Rectifier

Max.
rectifier slot
in system

No. of
rectifier
failure

No. of
rectifier
working

No. of
rectifier
turned Off

No. of rectifier
communication
error

Clear
communication
error

Manual on/off
rectifier

Rectifiers
status

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

98

SADMIN level
Battery
Total Batt. current
(+: charge)
(-: discharge)

Batt. 1 Temp.

Batt. capacity

Batt. 2 Temp.
Batt. 1 current

Batt. 3 Temp.

Batt. 2 current
Batt. 3 current

Batt. middle point Vol 1


Batt. middle Point Vol 2
Batt. middle point Vol 3
Batt. middle Point Vol 4

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

99

Parameter

SADMIN level

System
AC High
DCV high setting point

AC Low

DCV low setting point


Energy Saving

Pre DCV low setting point

SMR Max. Current

HV shutdown setting point


LVDS1 trip point
LVDS2 trip point

Time Setting

LVDS3 trip point

Manual LVDS1 Trip

Float voltage

Manual LVDS2 Trip

EQU voltage
Ambient temp. high
Ambient temp. low
High temp. shutdown
Low temp. shutdown

Training material for VMS-NSN project / Jul. 2011

Alarm when current over


80% of rectifier capacity

Delta Confidential

100

Parameter

SADMIN level

Battery

Batt. Test Function

Battery capacity

Test Time

Batt. Temp. High ALM


Batt. Middle point

Test Criterion
Discharge current for test

(SMR model selection )


SMR max. current limit
Charge Management
Batt. Periodic Test Function

Charge CL 1
Charge CL -2

Test Periodic

Charge CL -3

Which day do the test


What time do the test
Last batt. Test Time
Next batt. Test Time

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

101

Parameter

SADMIN level

Temp.
Compensation
Temp. Compensation
Function
Compensation Mode

Coefficient (per cell) of


Temp. Compensation
Max. Range of Compensation
Center of temp.

System volt of T0
System volt of T1
System volt of T2
System volt of T3

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

102

Parameter

SADMIN level

EQU

Equalize charge

Batt. remaining capacity

EQU Max. Time

System voltage

Additional EQU Time

AC fail time

Criterion for stop EQU

Discharge Current

Periodic EQU Function


Periodic

Criteria for enforce EQU

Which day enforce


What time enforce
Last EQU Time
Next EQU Time

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

103

Parameter

SADMIN level

Alarm Mask
System
Rectifier current limit

TB sensor fail alarm

One rectifier fail

Battery temp. high

More than 1 rectifier fail

Battery fuse fail


Battery discharge

Major alarm
Minor alarm

Battery breaker trip

Load breaker trip

Middle test fail

High priority breaker trip

Battery test fail

Low priority breaker trip

Rect. Over capacity

Load fuse fail


Load rail alarm
GMT fuse fail

Training material for VMS-NSN project / Jul. 2011

DCV high alarm


DCV low alarm
LVDS 2 trip
LVDS trip alarm
TA high alarm
TA low alarm
TA sensor fail alarm
ACV high alarm
ACV low alarm
AC breaker trip
AC phase lost alarm

Delta Confidential

104

Parameter

SADMIN level

Alarm Mask
CCU
Fan 1 fail

Door open

Fan 2 fail

Fan 1 disconnect

Heater fail

Fan 2 disconnect

Smoke alarm
Humidity alarm

Heater disconnect
TA 2 sensor fail

Water level alarm

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

105

Parameter

SADMIN level

WEB
IP Address
Subnet Mask
Gateway

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

106

Parameter

SADMIN level

CCU

Fan 1 start point

Fan 2 start point

Fan 1 stop point

Fan 2 stop point


Duty for fan 2 full speed

Duty for fan 1 full speed

Fan 2 full speed point

Fan 1 full speed point

Start point for heater

Push this button then fan 2 run from


low speed to full speed
Push this button then fan 2 run full speed

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

107

Alarm

SADMIN level

system
Alarm light with alarm

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

108

Alarm

SADMIN level

CCU

Alarm light w/o alarm

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

109

Event

SADMIN level

Record items
Right now
Event log list

Clear all Event log

Down load Event log

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

110

Config

SADMIN level
Alarm level can be defined

Alarm level
System
DCV high

High priority load

DCV low

Low priority load

DCV low 2

Load breaker trip

HV shutdown
LVDS trip

Load fuse fail


Load rail fail

TA high

One rectifier fail

TA low

> 1 rectifier fail

HT shutdown
LT shutdown
TA sensor fail
Rectifier current limit

Training material for VMS-NSN project / Jul. 2011

Rect. over capacity


ACV high
ACV low
AC fail
AC breaker trip
AC phase lost
GMT fuse fail
TB sensor fail
TB high
Battery fuse fail
Battery middle test fail
Battery discharge
Battery test fail
Battery breaker trip

Delta Confidential

111

Config

SADMIN level
Alarm level can be defined

Alarm level
CCU
Fan 1 fail
Fan 2 fail
Heater fail
Smoke alarm
Humidity alarm

Door open alarm


Fan 1 disconnect
Fan 2 disconnect
Heater disconnect
TA 2 sensor fail

Water level alarm


Digital input
Digital input
Digital input

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

112

SADMIN level
Relay & LED

Relay 8 7 6 5

Training material for VMS-NSN project / Jul. 2011

Config

Alarm relay define

4 3 2 1

Delta Confidential

113

Config

SADMIN level
Alarm relay & LED indicator can be defined

Relay & LED

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

114

SADMIN level
Pull down list for alarm relay & LED indicator define

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

115

Config

SADMIN level

Rectifier
model

Rectifier type 1
Rectifier type 2

Rectifier model
defining

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

116

Config

SADMIN level

Auto
calibrate
DCV calibration

Unnecessary to do the
calibration in normally

DCV
calibration

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

117

Setting

Change permission

SADMIN level

Modem configure

Change password
Logout (return to user level)

Installation notes edit

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

118

Contents

System introduction

Quick Installation parameter setting

Controller introduction

NRMS software introduction

Troubleshooting & Maintenance

Q&A

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

119

Troubleshooting

Alarm information (Display &Event)


AC Fail/AC High Voltage / AC Low Voltage Alarm
Description
DC Output Voltage High/Low
DC Circuit Breaker Tripped Alarm
Over-Temperature Alarm
Rectifier Failure Alarm
Controller(CSU501) Failure
Cooling System Failure

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

120

Alarm information
Display (Alarm)
Home
DCV
DCI
Sys Status(FL/EQU)
Alarm Existing

Sys Info

Sys Setting

Current Alarm

All Alarm Function show on Display


Show Real Information and Alarm Time in Event Log

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

121

Alarm information
Display (Event Log)
Home
DCV
DCI
Sys Status(FL/EQU)
Alarm Existing

Sys Info

Rectifier
I.D. Address
Output Current
Status

Battery
Batt. String I.D.
Batt.Status
Batt. Current

Current Alarm

Sys Setting

Event Log
Alarm Function Time
Recover Time

Current .setting
DC Setting
Alarm Setting
Batt.Setting
Other Setting

AC & Temp
ACV Voltage
Ambient Temp.

Data &
Version
Date/Time
H/W version
S/W version

* DC/DC Data

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

122

AC Fail/AC High Voltage / AC Low Voltage


Alarm Description
There are three (3) AC alarm conditions that are monitored by the system: AC Fail, AC
High Voltage and AC Low Voltage. AC fail occurs when AC current is not present. AC
high Voltage (ACH) is a factory set parameter and can be adjusted. High Voltage
Alarm (ACH) to the desired voltage. High Voltage alarms result in the system shutting
down rectifiers until AC is restored (AC is restored, or the AC voltage returns to levels
within the parameter threshold settings.

AC Fail Trouble Shooting: Verify the AC input voltage at the AC service panel by
a multi-meter. To check whether commercial power problem or AC circuit breaker
tripped causes the AC Fail. The AC circuit breaker should be tripped until the AC
utility is repaired and the AC input is within input specifications.

AC High Voltage (ACH) Trouble shooting: Verify the AC input voltage at the AC
service panel by a multi-meter. If the AC input voltage is higher than the threshold
setting, the system will continue to operate. But if the AC voltage is not higher than
the setting value, although the system still continues to operate, the CSU may be
faulty. The CSU should be swapped with a spare. Follow established repair/return
policy to have the faulty CSU repaired by Delta Products.

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

123

DC Output Voltage High/Low (HV/LV)


Verify the output of each rectifier. If the rectifier output is not within tolerance, swap the
rectifier with a spare module, and return the faulty unit to Delta Products for repair. If the
output of each rectifier is within tolerance, check the parameters to ensure the correct
settings.

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

124

Load/Battery Breaker Trip Alarm


If the circuit breaker continues to fail:
Check trip load side still short or over rating.
Check the DC Branch load (fed by the DC circuit breaker) to ensure the circuit breaker
is the correct rating. If the branch load exceeds the circuit breaker rating, the circuit
breaker must be changed to a higher rating.
Swap with a spare circuit breaker with a higher rating.

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

125

Over-Temperature Alarm
This alarm is generated when the threshold temperature set in parameter alarm
setting TA/Tb1 is exceeded and also controls the Temperature Compensation Voltage
Control. The CSU senses the temperature via sensor TA/Tb1 and generates an
Ambient Over Temperature Alarm setting TA/Tb1.

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

126

Over-Temperature Alarm
z Over Temperature - Ambient Troubleshooting: Verify that the ambient

temperature has exceeded the parameter setting by checking the thermal sensor
reading in the hut or equipment room and comparing the reading to the CSU
Reading.
If the TA parameter setting has been exceeded, increase the air conditioning.
If the TA threshold is exceeded, it is recommended to turn off the AC Main
feeding the Rectifiers until the ambient temperature has decreased below the
threshold temperature.
If the sensor is defective, turn the Temperature Compensation Feature off.
Contact Delta for a replacement sensor

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

127

Over-Temperature Alarm
z Over Temperature - Battery Alarm: This alarm is generated when the TB

temperature is exceeded the threshold temperature set. The CSU senses the
temperature via sensor TB and generates a Battery Over Temperature Alarm-TB.

z Over Temperature-Battery Troubleshooting: Check the battery temperature and

verify it is within the TB parameter threshold. If the TB thresholds are not


exceeded, check the thermostat reading in the hut or equipment room and
comparing the reading to the CSU reading. If the TB sensor is defective, contact
Delta for a replacement sensor. It is recommended that if the system is in the
equalize mode, switch the status to float to reduce the battery temperature.

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

128

Rectifier Failure Alarm

When a rectifier fails, the alarm information is sent to the CSU and the rectifier is shut
down. The rectifier should be swapped out with a spare unit and the faulty unit returned
to Delta for repair.
Warning! Do not open the rectifier module. There are no serviceable parts.
Call Delta Customer Service for a RMA number for repair and return.

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

129

Troubleshooting rectifiers
z

Use the following troubleshooting table if there is a rectifier alarm to find out whether a
rectifier is faulty, or the failure is outside the rectifier module.
LED ok: OFF and an alarm signal active:
Event

Definition

Mains voltage is missing

Check mains fuse and connector

Fan Failure

If a fan failure is detected, an alarm is issued (RFA/FF


LED flashes ON for 0.25 seconds and OFF for 0.25
seconds) and the rectifier shuts down.
Check air flow at front, clean air filter, check fan and
replace rectifier module

Rectifier is faulty

Replace rectifier module

Communication failed R

Rectifier internal communication fail; (RFA/FF LED


flashes ON for 2 seconds and OFF for 1 seconds)
Reset the communication fail alarm from controller,
Check bus cable to controller, replace rectifier module

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

130

Troubleshooting batteries
z

Please follow the battery manufacturers instructions for troubleshooting batteries. If a battery
is changed or replaced, check the voltage and recalibrate the controller. System temperature
readings must also be checked and recalibrated.

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

131

Contacting Delta customer service


z

If an alarm or specific problem cannot be resolved, please contact the nearest Delta office or
Delta representative for further assistance. Please have the system type and serial number
ready before contacting Delta.

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

132

Contacting Delta customer service


Local Service support in Vietnam
Contact window 1: Delta engineer in Vietnam
Name: Phu Nguyen Hanoi
Email address: phu.nguyen@delta.com.tw
Phone #: +84 943 553 022
Contact window 2 for escalated issues:. Sales office in Vietnam
Name: Christie Nguyen Hanoi
Email address: christie.nguyen@delta.com.tw
Phone #: +84 4 62754420/ +84 9737 46699
Service support from HQ in Taiwan
Contact window 1: Delta engineer in Taiwan
Name: Chad Tseng
Email address: Chad.Tseng@delta.com.tw
Phone #: +886-3-4526107 ext.6358
Contact window 2: Delta Quality Manager in Taiwan
Name: Sunny Hong
Email address: sunny.hong@delta.com.tw
Phone #: +886-886-4526107 ext.6415
Training material for VMS-NSN project / Jul. 2011

Delta Confidential

133

Maintenance - Change battery


Battery should be replaced with the same type when the old battery had out of
working. The battery replacing sequences are:
1. Switch of the battery breaker
2. Remove the battery leading wires from battery terminals
3. Remove battery temperature sensor cable
4. Remove the bus between battery cell
5. Remove the old battery and replace the new one
6. Re-connecting the bus and leading wires in reverse order of 1 to 4

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

134

Maintenance - Change DC breaker


z

All wiring to the breakers are use lead with striped ends. Ensure to tight the
screw and keep the wires are all into the breaker terminal, no any wires or threads
are remain outside of the breaker to avoid short-circuit. Refer to the figure below.

Training material for VMS-NSN project / Jul. 2011

Delta Confidential

135

Maintenance - Replace rectifier


z Remove rectifier modules

1. If on-line operation hot-swappable required, make sure the battery connection


is correct to avoid system shutdown during the operation.
2. Move the both locking devices (to unlock direction) to un-lock the rectifier.
3. Pull out the rectifier module slowly from the shelf, using one hand to support the
rectifier and remove the rectifier from the shelf.
z Insert rectifier modules
1. Install the rectifier module, holding the handle with one hand and using the other
to support the rear half of the rectifier module. Push into the shelf carefully.
2. Lock the rectifier by pushes the two locking devices (to the lock direction) to lock
the rectifier
3. Check rectifier LED and make sure they are in normal operation. The rectifier
shall only have GREEN LED on if it works properly.
4. Check controller and make sure there is no alarm message shown.

Training material for VMS-NSN project / Jul. 2011