You are on page 1of 2

Chiemsee Knee Replacement Clinic

Total Time per procedure = Knee surgery+Cleaning + Prep = 60+20+10


= 90 Mins
Total Time per surgeon = 4*60 = 240 mins
So Case per surgeon = 240/90 =2.67
But as surgeon cany exceed his time slot, max cases per surgeon = 2
So No fo cases per day = 3 Surgeon*2 case /surgeon = 6

OEE = (value-add time per patient x patients/day x days/cycle) / (total


amount of available time/cycle)
So OEE = (60min/Patient x 6 Patinet/day x 6day/week) / (12 hrs per day x
60 min per hr x 7 day/week)
= (60*6*6)/(12*60*7)
= 0.43
Parsa Real Estate
% occupied = 2-0.2*Rent
Invested capital = $1M
Area = 10000 SFT
COnt per SFT = 6-2 = $4
Total monthly Profit = 4*80%*10000 10,000 = $22,000
So Yearly profit = 12*22,000

PR1: ROIC = 12*22,000/1,000,000 = 0.26


PR2 :
% occupied = 2-0.2*Rent = 2-0.2*8 = 0.4 or 40%
COnt per SFT = 8-2 = $6
Total monthly Profit = 6*40%*10000 10,000 = $14,000
So Yearly profit = 12*14,000
ROIC = 12*14,000/1,000,000 = 0.17
12 Tasks to 4 Workers

Worker
Worker
Worker
Worker

1:
2:
3:
4:

Tasks
Tasks
Tasks
Tasks

1, 2, 3 = 30+25+15 = 70
4, 5, 6 = 20+15+20 = 55
7, 8, 9 = 50+15+20 = 85
10, 11, 12 = 25+15+20 = 60

12T4W1. What is the capacity of the current line? 42.35 units


Worker
1
2
3
4

Task
1,2,3
4,5,6
7,8,9
10,11,12

AT
70
55
85
60

Cap
51.43
65.45
42.35
60.00

12T4W2. What is the direct labor content?

Direct Labor content = Sum of activities with Labor = (70+55+85+60) =


270 sec/unit
12T4W3. Assume a demand rate of 20 units per minute. What
would be the takt time of the process?
3
Demand = 20 unit/min = (20/60) unit/sec
Takt Time = 1/demand = 60/20 = 3 sec
12T4W4. Assume a demand rate of 20 units per minute. What
would be the target manpower?
Demand = 20 unit/min = (20/60) unit/sec
Takt Time = 1/demand = 60/20 = 3 sec
Target manpower = labor content/takt time = (70+55+85+60)/3 = 90