You are on page 1of 7

sample estimate- Greg Parks

Data Release : Year 2016 Quarter 2


LineNumber
Quantity

Line
Source

200

24113900400

100

24116172040

1000

28533500200

1000

28533500250

100

334413150023

100

334413131700

Total

Unit Cost Estimate


Description
Crew

Daily Output Labor Hours

Selective demolition, retaining walls, concrete


retaining wall, 6' high, includes reinforcing

B13K

200

0.08

Buillding footings and foundations demolition,


remove concrete walls, block, 6" thick, excludes
disposal costs and dump fees

B13L

6000

Demolition in mold contaminated area, ceiling,


including suspension system, lath & plaster

A9

2100

0.03

Demolition in mold contaminated area, ceiling,


gypsum board

A9

2500

0.03

1 Clab

80

0.1

B6

3.43

Utility area drain, catch basin cover, remove


Utility area drain, catch basins or manholes frames
and covers, cast iron, 26" D shape, 600 lb.,
excluding footing & excavation

Unit

Total
Material

Labor

Ext. Mat.

Equipment

L.F.

3.62 $

7.40 $

11.02 $

S.F.

0.12 $

0.31 $

0.43 $

S.F.

0.09 $

1.02

1.11 $

90.00

S.F.

0.08 $

0.86

0.94 $

80.00

Ea.

2.16

2.16 $

Ea.

490.36 $

47.79 $

619.80 $

81.65 $

Err:501

49,036.00

Err:501

Ext. Labor

Ext. Equip.

Ext. Total

Mat. O&P

724.00 $

1,480.00 $

2,204.00 $

12.00 $

31.00 $

43.00 $

1,020.00 $

1,110.00 $

0.10

860.00 $

940.00 $

0.08

216.00 $

216.00 $

8,165.00 $

4,779.00 $

61,980.00 $

Err:501

Err:501

Err:501

538.91

Labor O&P

Equip. O&P

Total O&P

Ext. Mat. O&P

5.72 $

8.18 $

13.90 $

0.19 $

0.35 $

0.54 $

1.64 $

1.74 $

100.00

1.38 $

1.46 $

80.00

3.54 $

3.54 $

131.90 $

52.84 $

723.65 $

Err:501

53,891.00

Err:501

Ext. Labor
O&P

Ext. Equip.

Ext. Total O&P

O&P

1,144.00 $

1,636.00 $

2,780.00 RR

19.00 $

35.00 $

54.00 RR

1,640.00 $

1,740.00 RR

1,380.00 $

1,460.00 RR

354.00 $

354.00 RR

13,190.00 $

5,284.00 $

72,365.00 RR

Err:501

Err:501

Err:501

Labor Type

Data Release

CCI Location

Year 2016 Quarter 2

ARKANSAS / FORT SMITH (729)

Year 2016 Quarter 2

ARKANSAS / FORT SMITH (729)

Year 2016 Quarter 2

ARKANSAS / FORT SMITH (729)

Year 2016 Quarter 2

ARKANSAS / FORT SMITH (729)

Year 2016 Quarter 2

ARKANSAS / FORT SMITH (729)

Year 2016 Quarter 2

ARKANSAS / FORT SMITH (729)

Notes

You might also like