PART 1926SAFETY AND HEALTH 1926.60 Methylenedianiline.

1926.61 Retention of DOT markings, plac-


REGULATIONS FOR CONSTRUCTION ards and labels.
1926.62 Lead.
Sec. 1926.64 Process safety management of high-
ly hazardous chemicals.
Subpart AGeneral 1926.65 Hazardous waste operations and
1926.1 Purpose and scope. emergency response.
1926.2 Variances from safety and health 1926.66 Criteria for design and construction
standards. of spray booths.
1926.3 Inspectionsright of entry.
1926.4 Rules of practice for administrative Subpart EPersonal Protective and Life
adjudications for enforcement of safety Saving Equipment
and health standards.
1926.5 OMB control numbers under the Pa- 1926.95 Criteria for personal protective
perwork Reduction Act. equipment.
1926.6 Incorporation by reference. 1926.96 Occupational foot protection.
1926.971926.98 [Reserved]
Subpart BGeneral Interpretations 1926.100 Head protection.
1926.101 Hearing protection.
1926.10 Scope of subpart. 1926.102 Eye and face protection.
1926.11 Coverage under section 103 of the act 1926.103 Respiratory protection.
distinguished. 1926.104 Safety belts, lifelines, and lanyards.
1926.12 Reorganization Plan No. 14 of 1950. 1926.105 Safety nets.
1926.13 Interpretation of statutory terms. 1926.106 Working over or near water.
1926.14 Federal contract for mixed types
1926.107 Definitions applicable to this sub-
of performance.
part.
1926.15 Relationship to the Service Contract
Act; Walsh-Healey Public Contracts Act.
1926.16 Rules of construction. Subpart FFire Protection and Prevention
1926.150 Fire protection.
Subpart CGeneral Safety and Health 1926.151 Fire prevention.
Provisions 1926.152 Flammable liquids.
1926.20 General safety and health provi- 1926.153 Liquefied petroleum gas (LP-Gas).
sions. 1926.154 Temporary heating devices.
1926.21 Safety training and education. 1926.155 Definitions applicable to this sub-
1926.22 Recording and reporting of injuries. part.
[Reserved]
1926.23 First aid and medical attention. Subpart GSigns, Signals, and Barricades
1926.24 Fire protection and prevention.
1926.25 Housekeeping. 1926.200 Accident prevention signs and tags.
1926.26 Illumination. 1926.201 Signaling.
1926.27 Sanitation. 1926.202 Barricades.
1926.28 Personal protective equipment. 1926.203 Definitions applicable to this sub-
1926.29 Acceptable certifications. part.
1926.30 Shipbuilding and ship repairing.
1926.32 Definitions. Subpart HMaterials Handling, Storage,
1926.33 Access to employee exposure and Use, and Disposal
medical records.
1926.34 Means of egress. 1926.250 General requirements for storage.
1926.35 Employee emergency action plans. 1926.251 Rigging equipment for material
handling.
Subpart DOccupational Health and 1926.252 Disposal of waste materials.
Environmental Controls
Subpart IToolsHand and Power
1926.50 Medical services and first aid.
1926.51 Sanitation. 1926.300 General requirements.
1926.52 Occupational noise exposure. 1926.301 Hand tools.
1926.53 Ionizing radiation. 1926.302 Power-operated hand tools.
1926.54 Nonionizing radiation. 1926.303 Abrasive wheels and tools.
1926.55 Gases, vapors, fumes, dusts, and 1926.304 Woodworking tools.
mists. 1926.305 Jackslever and ratchet, screw,
1926.56 Illumination. and hydraulic.
1926.57 Ventilation. 1926.306 Air receivers.
1926.58 [Reserved] 1926.307 Mechanical power-transmission ap-
1926.59 Hazard communication. paratus.

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00017 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926 29 CFR Ch. XVII (7112 Edition)

Subpart JWelding and Cutting APPENDIX C TO SUBPART LLIST OF NA-


TIONAL CONSENSUS STANDARDS
1926.350 Gas welding and cutting. APPENDIX D TO SUBPART LLIST OF TRAINING
1926.351 Arc welding and cutting. TOPICS FOR SCAFFOLD ERECTORS AND DIS-
1926.352 Fire prevention. MANTLERS [RESERVED]
1926.353 Ventilation and protection in weld- APPENDIX E TO SUBPART LDRAWINGS AND
ing, cutting, and heating. ILLUSTRATIONS
1926.354 Welding, cutting, and heating in
way of preservative coatings. Subpart MFall Protection
Subpart KElectrical 1926.500 Scope, application, and definitions
applicable to this subpart.
GENERAL 1926.501 Duty to have fall protection.
1926.502 Fall protection systems criteria
1926.400 Introduction.
and practices.
1926.401 [Reserved]
1926.503 Training requirements.
INSTALLATION SAFETY REQUIREMENTS APPENDIX A TO SUBPART MDETERMINING
ROOF WIDTHS
1926.402 Applicability.
APPENDIX B TO SUBPART MGUARDRAIL SYS-
1926.403 General requirements.
TEMS
1926.404 Wiring design and protection.
APPENDIX C TO SUBPART MPERSONAL FALL
1926.405 Wiring methods, components, and
ARREST SYSTEMS
equipment for general use.
APPENDIX D TO SUBPART MPOSITIONING DE-
1926.406 Specific purpose equipment and in-
VICE SYSTEMS
stallations.
APPENDIX E TO SUBPART MSAMPLE FALL
1926.407 Hazardous (classified) locations.
PROTECTION PLANS
1926.408 Special systems.
1926.4091926.415 [Reserved]
Subpart NHelicopters, Hoists, Elevators,
SAFETY-RELATED WORK PRACTICES and Conveyors
1926.416 General requirements. 1926.550 [Reserved]
1926.417 Lockout and tagging of circuits. 1926.551 Helicopters.
1926.4181926.430 [Reserved] 1926.552 Material hoists, personnel hoists,
and elevators.
SAFETY-RELATED MAINTENANCE AND 1926.553 Base-mounted drum hoists.
ENVIRONMENTAL CONSIDERATIONS 1926.554 Overhead hoists.
1926.431 Maintenance of equipment. 1926.555 Conveyors.
1926.432 Environmental deterioration of
equipment. Subpart OMotor Vehicles, Mechanized
1926.4331926.440 [Reserved] Equipment, and Marine Operations
SAFETY REQUIREMENTS FOR SPECIAL 1926.600 Equipment.
EQUIPMENT 1926.601 Motor vehicles.
1926.602 Material handling equipment.
1926.441 Batteries and battery charging. 1926.603 Pile driving equipment.
1926.4421926.448 [Reserved] 1926.604 Site clearing.
1926.605 Marine operations and equipment.
DEFINITIONS
1926.606 Definitions applicable to this sub-
1926.449 Definitions applicable to this sub- part.
part.
Subpart PExcavations
Subpart LScaffolds
1926.650 Scope, application, and definitions
1926.450 Scope, application and definitions applicable to this subpart.
applicable to this subpart. 1926.651 Specific excavation requirements.
1926.451 General requirements. 1926.652 Requirements for protective sys-
1926.452 Additional requirements applicable tems.
to specific types of scaffolds. APPENDIX A TO SUBPART PSOIL CLASSIFICA-
1926.453 Aerial lifts. TION
1926.454 Training requirements. APPENDIX B TO SUBPART PSLOPING AND
APPENDIX A TO SUBPART LSCAFFOLD SPECI- BENCHING
FICATIONS APPENDIX C TO SUBPART PTIMBER SHORING
APPENDIX B TO SUBPART LCRITERIA FOR DE- FOR TRENCHES
TERMINING THE FEASIBILITY OF PROVIDING APPENDIX D TO SUBPART PALUMINUM HY-
SAFE ACCESS AND FALL PROTECTION FOR DRAULIC SHORING FOR TRENCHES
SCAFFOLD ERECTORS AND DISMANTLERS APPENDIX E TO SUBPART PALTERNATIVES TO
[RESERVED] TIMBER SHORING

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00018 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926
APPENDIX F TO SUBPART PSELECTION OF CONNECTION AND A STAGGERED CONNEC-
PROTECTIVE SYSTEMS TION: NON-MANDATORY GUIDELINES FOR
COMPLYING WITH COMPLYING WITH
Subpart QConcrete and Masonry 1926.756(C)(1)
Construction
Subpart SUnderground Construction,
1926.700 Scope, application, and definitions Caissons, Cofferdams and Compressed Air
applicable to this subpart.
1926.701 General requirements. 1926.800 Underground construction.
1926.702 Requirements for equipment and 1926.801 Caissons.
tools. 1926.802 Cofferdams.
1926.703 Requirements for cast-in-place con- 1926.803 Compressed air.
crete. 1926.804 Definitions applicable to this sub-
1926.704 Requirements for precast concrete. part.
1926.705 Requirements for lift-slab construc- APPENDIX A TO SUBPART SDECOMPRESSION
tion operations. TABLES
1926.706 Requirements for masonry con-
struction. Subpart TDemolition
APPENDIX A TO SUBPART QREFERENCES TO
SUBPART Q OF PART 1926 1926.850 Preparatory operations.
1926.851 Stairs, passageways, and ladders.
Subpart RSteel Erection 1926.852 Chutes.
1926.853 Removal of materials through floor
1926.750 Scope. openings.
1926.751 Definitions. 1926.854 Removal of walls, masonry sec-
1926.752 Site layout, site-specific erection tions, and chimneys.
plan and construction sequence. 1926.855 Manual removal of floors.
1926.753 Hoisting and rigging. 1926.856 Removal of walls, floors, and mate-
1926.754 Structural steel assembly. rial with equipment.
1926.755 Column anchorage. 1926.857 Storage.
1926.756 Beams and columns. 1926.858 Removal of steel construction.
1926.757 Open web steel joists. 1926.859 Mechanical demolition.
1926.758 Systems-engineered metal build- 1926.860 Selective demolition by explosives.
ings.
1926.759 Falling object protection. Subpart UBlasting and the Use of
1926.760 Fall protection. Explosives
1926.761 Training.
APPENDIX A TO SUBPART RGUIDELINES FOR 1926.900 General provisions.
ESTABLISHING THE COMPONENTS OF A SITE- 1926.901 Blaster qualifications.
SPECIFIC ERECTION PLAN: NON-MANDATORY 1926.902 Surface transportation of explo-
GUIDELINES FOR COMPLYING WITH sives.
1926.752(E) 1926.903 Underground transportation of ex-
APPENDIX B TO SUBPART R [RESERVED] plosives.
APPENDIX C TO SUBPART RILLUSTRATIONS 1926.904 Storage of explosives and blasting
OF BRIDGING TERMINUS POINTS: NON-MAN- agents.
DATORY GUIDELINES FOR COMPLYING WITH 1926.905 Loading of explosives or blasting
1926.757(A)(10) AND 1926.757(C)(5) agents.
APPENDIX D TO SUBPART RILLUSTRATION OF 1926.906 Initiation of explosive charges
THE USE OF CONTROL LINES TO DEMARCATE electric blasting.
CONTROLLED DECKING ZONES (CDZS): NON- 1926.907 Use of safety fuse.
MANDATORY GUIDELINES FOR COMPLYING 1926.908 Use of detonating cord.
WITH 1926.760(C)(3) 1926.909 Firing the blast.
APPENDIX E TO SUBPART RTRAINING: NON- 1926.910 Inspection after blasting.
MANDATORY GUIDELINES FOR COMPLYING 1926.911 Misfires.
WITH 1926.761 1926.912 Underwater blasting.
APPENDIX F TO SUBPART RPERIMETER COL- 1926.913 Blasting in excavation work under
UMNS: NON-MANDATORY GUIDELINES FOR compressed air.
COMPLYING WITH 1926.756(E) TO PROTECT 1926.914 Definitions applicable to this sub-
THE UNPROTECTED SIDE OR EDGE OF A part.
WALKING/WORKING SURFACE
APPENDIX G TO SUBPART RFALL PROTECTION Subpart VPower Transmission and
SYSTEMS CRITERIA AND PRACTICES FROM Distribution
1926.502: NON-MANDATORY GUIDELINES
FOR COMPLYING WITH COMPLYING WITH 1926.950 General requirements.
1926.760(D) 1926.951 Tools and protective equipment.
APPENDIX H TO SUBPART RDOUBLE CONNEC- 1926.952 Mechanical equipment.
TIONS: ILLUSTRATION OF A CLIPPED END 1926.953 Material handling.

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00019 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926 29 CFR Ch. XVII (7112 Edition)
1926.954 Grounding for protection of em- RECORDKEEPING
ployees.
1926.1091 Recordkeeping requirements.
1926.955 Overhead lines.
1926.956 Underground lines. APPENDIX A TO SUBPART YEXAMPLES OF
1926.957 Construction in energized sub- CONDITIONS WHICH MAY RESTRICT OR
stations. LIMIT EXPOSURE TO HYPERBARIC CONDI-
1926.958 External load helicopters. TIONS
1926.959 Linemans body belts, safety straps, APPENDIX B TO SUBPART YGUIDELINES FOR
and lanyards. SCIENTIFIC DIVING
1926.960 Definitions applicable to this sub-
part. Subpart ZToxic and Hazardous
Substances
Subpart WRollover Protective Structures; 1926.1100 [Reserved]
Overhead Protection 1926.1101 Asbestos.
1926.1102 Coal tar pitch volatiles; interpre-
1926.1000 Rollover protective structures
tation of term.
(ROPS) for material handling equipment.
1926.1103 13 carcinogens (4-Nitrobiphenyl,
1926.1001 Minimum performance criteria for
etc.).
rollover protective structures for des-
1926.1104 alpha-Naphthylamine.
ignated scrapers, loaders, dozers, graders,
1926.1105 [Reserved]
and crawler tractors. 1926.1106 Methyl chloromethyl ether.
1926.1002 Protective frames (roll-over pro- 1926.1107 3,3-Dichlorobenzidiene (and its
tective structures, known as ROPS) for salts).
wheel-type agricultural and industrial 1926.1108 bis-Chloromethyl ether.
tractors used in construction. 1926.1109 beta-Naphthylamine.
1926.1003 Overhead protection for operators 1926.1110 Benzidine.
of agricultural and industrial tractors 1926.1111 4-Aminodiphenyl.
used in construction. 1926.1112 Ethyleneimine.
APPENDIX A TO SUBPART WFIGURES W14 1926.1113 beta-Propiolactone.
THROUGH W28 1926.1114 2-Acetylaminofluorene.
1926.1115 4-Dimethylaminoazobenzene.
Subpart XStairways and Ladders 1926.1116 N-Nitrosodimethylamine.
1926.1117 Vinyl chloride.
1926.1050 Scope, application, and definitions 1926.1118 Inorganic arsenic.
applicable to this subpart. 1926.1126 Chromium (VI).
1926.1051 General requirements. 1926.1127 Cadmium.
1926.1052 Stairways. 1926.1128 Benzene.
1926.1053 Ladders. 1926.1129 Coke oven emissions.
1926.10541926.1059 [Reserved] 1926.1144 1,2-dibromo-3-chloropropane.
1926.1060 Training requirements. 1926.1145 Acrylonitrile.
APPENDIX A TO SUBPART XLADDERS 1926.1147 Ethylene oxide.
1926.1148 Formaldehyde.
Subpart YDiving 1926.1152 Methylene chloride.

GENERAL Subparts AABB [Reserved]


1926.1071 Scope and application. Subpart CCCranes and Derricks in
1926.1072 Definitions.
Construction
PERSONNEL REQUIREMENTS
1926.1400 Scope.
1926.1076 Qualifications of dive team. 1926.1401 Definitions.
1926.1402 Ground conditions.
GENERAL OPERATIONS PROCEDURES 1926.1403 Assembly/Disassemblyselection
1926.1080 Safe practices manual. of manufacturer or employer procedures.
1926.1081 Pre-dive procedures. 1926.1404 Assembly/Disassemblygeneral re-
1926.1082 Procedures during dive. quirements (applies to all assembly and
1926.1083 Post-dive procedures. disassembly operations).
1926.1405 Disassemblyadditional require-
SPECIFIC OPERATIONS PROCEDURES ments for dismantling of booms and jibs
(applies to both the use of manufacturer
1926.1084 SCUBA diving. procedures and employer procedures).
1926.1085 Surface-supplied air diving. 1926.1406 Assembly/Disassemblyemployer
1926.1086 Mixed-gas diving. proceduresgeneral requirements.
1926.1087 Liveboating. 1926.1407 Power line safety (up to 350 kV)
assembly and disassembly.
EQUIPMENT PROCEDURES AND REQUIREMENTS
1926.1408 Power line safety (up to 350 kV)
1926.1090 Equipment. equipment operations.

10

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00020 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.2
1926.1409 Power line safety (over 350 kV). SOURCE: 44 FR 8577, Feb. 9, 1979; 44 FR
1926.1410 Power line safety (all voltages) 20940, Apr. 6, 1979, unless otherwise noted.
equipment operations closer than the
EDITORIAL NOTE: At 44 FR 8577, Feb. 9, 1979,
Table A zone.
and corrected at 44 FR 20940, Apr. 6, 1979,
1926.1411 Power line safetywhile traveling.
OSHA reprinted without change the entire
1926.1412 Inspections.
text of 29 CFR part 1926 together with cer-
1926.1413 Wire ropeinspection. tain General Industry Occupational Safety
1926.1414 Wire ropeselection and installa- and Health Standards contained in 29 CFR
tion criteria. part 1910, which have been identified as also
1926.1415 Safety devices. applicable to construction work. This repub-
1926.1416 Operational aids. lication developed a single set of OSHA regu-
1926.1417 Operation. lations for both labor and management
1926.1418 Authority to stop operation. forces within the construction industry.
1926.1419 Signalsgeneral requirements.
1926.1420 Signalsradio, telephone or other
electronic transmission of signals. Subpart AGeneral
1926.1421 Signalsvoice signalsadditional
requirements. AUTHORITY: Sec. 3704, Contract Work Hours
1926.1422 Signalshand signal chart. and Safety Standards Act (40 U.S.C. 3701 et
1926.1423 Fall protection. al.); secs. 4, 6, and 8, Occupational Safety and
1926.1424 Work area control. Health Act of 1970 (29 U.S.C. 653, 655, 657);
1926.1425 Keeping clear of the load. Secretary of Labors Order No. 1271 (36 FR
1926.1426 Free fall and controlled load low- 8754), 876 (41 FR 25059), 983 (48 FR 35736), 6
ering. 96 (62 FR 111), 52007 (72 FR 31160), and 42010
1926.1427 Operator qualification and certifi- (75 FR 55355), as applicable; and 29 CFR part
cation. 1911.
1926.1428 Signal person qualifications.
EFFECTIVE DATE NOTE: At 77 FR 37600, June
1926.1429 Qualifications of maintenance &
22, 2012, the authority citation for subpart A
repair employees.
was revised, effective Sep. 20, 2012. For the
1926.1430 Training.
convenience of the user, the revised text is
1926.1431 Hoisting personnel.
set forth as follows:
1926.1432 Multiple-crane/derrick liftssup-
AUTHORITY: 40 U.S.C. 333; 29 U.S.C. 653, 655,
plemental requirements.
657; Secretary of Labors Order No. 1271 (36
1926.1433 Design, construction and testing.
FR 8754), 876 (41 FR 25059), 983 (48 FR 35736),
1926.1434 Equipment modifications.
696 (62 FR 111), 52007 (72 FR 31160), 42010 (75
1926.1435 Tower cranes. FR 55355), or 12012 (77 FR 3912), as applica-
1926.1436 Derricks. ble; and 29 CFR part 1911.
1926.1437 Floating cranes/derricks and land
cranes/derricks on barges. 1926.1 Purpose and scope.
1926.1438 Overhead & gantry cranes.
1926.1439 Dedicated pile drivers. (a) This part sets forth the safety and
1926.1440 Sideboom cranes. health standards promulgated by the
1926.1441 Equipment with a rated hoisting/ Secretary of Labor under section 107 of
lifting capacity of 2,000 pounds or less. the Contract Work Hours and Safety
1926.1442 Severability. Standards Act. The standards are pub-
APPENDIX A TO SUBPART CC OF PART 1926 lished in subpart C of this part and fol-
STANDARD HAND SIGNALS lowing subparts.
APPENDIX B TO SUBPART CC OF PART 1926 (b) Subpart B of this part contains
ASSEMBLY/DISASSEMBLYSAMPLE PROCE-
statements of general policy and inter-
DURES FOR MINIMIZING THE RISK OF UNIN-
TENDED DANGEROUS BOOM MOVEMENT
pretations of section 107 of the Con-
APPENDIX C TO SUBPART CC OF PART 1926 tract Work Hours and Safety Stand-
OPERATOR CERTIFICATIONWRITTEN EX- ards Act having general applicability.
AMINATIONTECHNICAL KNOWLEDGE CRI-
TERIA 1926.2 Variances from safety and
health standards.
Subpart DDCranes and Derricks Used in (a) Variances from standards which
Demolition and Underground Construction are, or may be, published in this part
1926.1500 Scope. may be granted under the same cir-
1926.1501 Cranes and derricks. cumstances whereunder variances may
APPENDIX A TO PART 1926DESIGNATIONS FOR be granted under section 6(b)(A) or 6(d)
GENERAL INDUSTRY STANDARDS INCOR- of the Williams-Steiger Occupational
PORATED INTO BODY OF CONSTRUCTION Safety and Health Act of 1970 (29 U.S.C.
STANDARDS 65). The procedures for the granting of

11

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00021 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.3 29 CFR Ch. XVII (7112 Edition)

variances and for related relief under and the following subparts shall be the
this part are those published in part same as those published in part 6 of
1905 of this title. this title with respect to safety and
(b) Any requests for variances under health violations of the Service Con-
this section shall also be considered re- tract Act of 1965 (69 Stat. 1035), except
quests for variances under the Wil- as provided in paragraph (b) of this sec-
liams-Steiger Occupational Safety and tion.
Health Act of 1970, and any requests for (b) In the case of debarment, the find-
variances under Williams-Steiger Occu- ings required by section 107(d) of the
pational Safety and Health Act with Act shall be made by the hearing exam-
respect to construction safety or iner or the Assistant Secretary of
health standards shall be considered to Labor for Occupational Safety and
be also variances under the Construc- Health, as the case may be. Whenever,
tion Safety Act. Any variance from a as provided in section 107(d)(2), a con-
construction safety or health standard tractor requests termination of debar-
which is contained in this part and ment before the end of the 3-year pe-
which is incorporated by reference in riod prescribed in that section, the re-
part 1910 of this title shall be deemed a quest shall be filed in writing with the
variance from the standard under both Assistant Secretary of Labor for Occu-
the Construction Safety Act and the pational Safety and Health who shall
Williams-Steiger Occupational Safety publish a notice in the FEDERAL REG-
and Health Act of 1970. ISTER that the request has been re-
ceived and afford interested persons an
1926.3 Inspectionsright of entry. opportunity to be heard upon the re-
(a) It shall be a condition of each quest, and thereafter the provisions of
contract which is subject to section 107 part 6 of this title shall apply with re-
of the Contract Work Hours and Safety spect to prehearing conferences, hear-
Standards Act that the Secretary of ings and related matters, and decisions
Labor or any authorized representative and orders.
shall have a right of entry to any site
1926.5 OMB control numbers under
of contract performance for the fol- the Paperwork Reduction Act.
lowing purposes:
(1) To inspect or investigate the mat- The following sections or paragraphs
ter of compliance with the safety and each contain a collection of informa-
health standards contained in subpart tion requirement which has been ap-
C of this part and following subparts; proved by the Office of Management
and and Budget under the control number
(2) To carry out the duties of the Sec- listed.
retary under section 107(b) of the Act. OMB con-
29 CFR citation
(b) For the purpose of carrying out trol No.
his investigative duties under the Act, 1926.33 ................................................................ 12180065
the Secretary of Labor may, by agree- 1926.50 ................................................................ 12180093
ment, use with or without reimburse- 1926.52 ................................................................ 12180048
1926.53 ................................................................ 12180103
ment the services, personnel, and fa- 1926.59 ................................................................ 12180072
cilities of any State or Federal agency. 1926.60 ................................................................ 12180183
Any agreements with States under this 1926.62 ................................................................ 12180189
section shall be similar to those pro- 1926.64 ................................................................ 12180200
1926.65 ................................................................ 12180202
vided for under the Walsh-Healey Pub- 1926.103 .............................................................. 12180099
lic Contracts Act under 41 CFR part 50 1926.200 .............................................................. 12180132
205. 1926.250 .............................................................. 12180093
1926.251 .............................................................. 12180233
1926.403 .............................................................. 12180130
1926.4 Rules of practice for adminis- 1926.404 .............................................................. 12180130
trative adjudications for enforce- 1926.405 .............................................................. 12180130
ment of safety and health stand- 1926.407 .............................................................. 12180130
ards. 1926.408 .............................................................. 12180130
1926.453(a)(2) ..................................................... 12180216
(a) The rules of practice for adminis- 1926.502 .............................................................. 12180197
trative adjudications for the enforce- 1926.503 .............................................................. 12180197
1926.550(a)(1) ..................................................... 12180115
ment of the safety and health stand- 1926.550(a)(2) ..................................................... 12180115
ards contained in subpart C of this part 1926.550(a)(4) ..................................................... 12180115

12

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00022 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.6

29 CFR citation OMB con- 1926.6 Incorporation by reference.


trol No.
(a) The standards of agencies of the
1926.550(a)(6) ..................................................... 12180113 U.S. Government, and organizations
1926.550(a)(11) ................................................... 12180054
1926.550(a)(16) ................................................... 12180115 which are not agencies of the U.S. Gov-
1926.550(b)(2) ..................................................... 12180232 ernment which are incorporated by ref-
1926.550(g) ......................................................... 12180151 erence in this part, have the same force
1926.552 .............................................................. 12180231 and effect as other standards in this
1926.652 .............................................................. 12180137
1926.703 .............................................................. 12180095 part. Only the mandatory provisions
1926.800 .............................................................. 12180067 (i.e., provisions containing the word
1926.803 .............................................................. 12180067 shall or other mandatory language)
1926.900 .............................................................. 12180217 of standards incorporated by reference
1926.903 .............................................................. 12180227
1926.1080 ............................................................ 12180069 are adopted as standards under the Oc-
1926.1081 ............................................................ 12180069 cupational Safety and Health Act. The
1926.1083 ............................................................ 12180069 locations where these standards may
1926.1090 ............................................................ 12180069 be examined are as follows:
1926.1091 ............................................................ 12180069
1926.1101 ............................................................ 12180134 (1) Offices of the Occupational Safety
1926.1103 ............................................................ 12180085 and Health Administration, U.S. De-
1926.1104 ............................................................ 12180084 partment of Labor, Frances Perkins
1926.1106 ............................................................ 12180086 Building, Washington, DC 20210.
1926.1107 ............................................................ 12180083
1926.1108 ............................................................ 12180087 (2) The Regional and Field Offices of
1926.1109 ............................................................ 12180089 the Occupational Safety and Health
1926.1110 ............................................................ 12180082 Administration, which are listed in the
1926.1111 ............................................................ 12180090
1926.1112 ............................................................ 12180080
U.S. Government Manual.
1926.1113 ............................................................ 12180079 (b) The materials listed in para-
1926.1114 ............................................................ 12180088 graphs (g) through (ff) of this section
1926.1115 ............................................................ 12180044 are incorporated by reference in the
1926.1116 ............................................................ 12180081
1926.1117 ............................................................ 12180010
corresponding sections noted as they
1926.1118 ............................................................ 12180104 exist on the date of the approval, and a
1926.1126 ............................................................ 12180252 notice of any change in these materials
1926.1127 ............................................................ 12180186 will be published in the FEDERAL REG-
1926.1128 ............................................................ 12180129
1926.1129 ............................................................ 12180128 ISTER. These incorporations by ref-
1926.1144 ............................................................ 12180101 erence were approved by the Director
1926.1145 ............................................................ 12180126 of the Federal Register in accordance
1926.1147 ............................................................ 12180108
1926.1148 ............................................................ 12180145
with 5 U.S.C. 552(a) and 1 CFR part 51.
1926.1402 ............................................................ 12180261 (c) Copies of standards listed in this
1926.1403 ............................................................ 12180261 section and issued by private standards
1926.1404 ............................................................ 12180261 organizations are available for pur-
1926.1406 ............................................................ 12180261
1926.1407 ............................................................ 12180261
chase from the issuing organizations at
1926.1408 ............................................................ 12180261 the addresses or through the other con-
1926.1409 ............................................................ 12180261 tact information listed below for these
1926.1410 ............................................................ 12180261 private standards organizations. In ad-
1926.1411 ............................................................ 12180261
1926.1412 ............................................................ 12180261 dition, these standards are available
1926.1413 ............................................................ 12180261 for inspection at the National Archives
1926.1414 ............................................................ 12180261 and Records Administration (NARA).
1926.1417 ............................................................ 12180261
1926.1423 ............................................................ 12180261
For information on the availability of
1926.1424 ............................................................ 12180261 these standards at NARA, telephone:
1926.1427 ............................................................ 12180261 2027416030, or go to http://
1926.1428 ............................................................ 12180261 www.archives.gov/federallregister/
1926.1431 ............................................................ 12180261
1926.1433 ............................................................ 12180261 codeloflfederallregulations/
1926.1434 ............................................................ 12180261 ibrllocations.html. Also, the standards
1926.1435 ............................................................ 12180261 are available for inspection at any Re-
1926.1436 ............................................................ 12180261
1926.1437 ............................................................ 12180261
gional Office of the Occupational Safe-
1926.1441 ............................................................ 12180261 ty and Health Administration (OSHA),
or at the OSHA Docket Office, U.S. De-
[61 FR 5509, Feb. 13, 1996, as amended at 63 partment of Labor, 200 Constitution
FR 3814, Jan. 27, 1998; 63 FR 13340, Mar. 19, Avenue, NW., Room N2625, Wash-
1998; 63 FR 17094, Apr. 8, 1998; 64 FR 18810, ington, DC 20210; telephone: 2026932350
Apr. 16, 1999; 71 FR 38086, July 5, 2006; 75 FR (TTY number: 8778895627).
68430, Nov. 8, 2010] (d) [Reserved.]

13

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00023 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.6 29 CFR Ch. XVII (7112 Edition)

(e) [Reserved.] Manual) Supplement, IBR approved for


(f) [Reserved.] 1926.552(d).
(g) The following material is avail- (12) ANSI A17.2b1967, Practice for
able for purchase from the American the Inspection of Elevators (Inspectors
Conference of Governmental Industrial Manual) Supplement, IBR approved for
Hygienists (ACGIH), 1330 Kemper 1926.552(d).
Meadow Drive, Cincinnati, OH 45240; (13) ANSI A92.21969, Vehicle Mount-
telephone: 5137426163; fax: 513742 ed Elevating and Rotating Work Plat-
3355; e-mail: mail@acgih.org; Web site: forms, IBR approved for 1926.453(a)
http://www.acgih.org: and 1926.453(b).
(1) Threshold Limit Values of Air- (14) ANSI B7.11970, Safety Code for
borne Contaminants for 1970, 1970, IBR the Use, Care, and Protection of Abra-
approved for 1926.55(a) and appendix A sive Wheels, IBR approved for
of 1926.55. 1926.57(g), 1926.303(b), 1926.303(c), and
(h) The following material is avail- 1926.303(d).
able for purchase from the American (15) ANSI B20.11957, Safety Code for
National Standards Institute (ANSI), Conveyors, Cableways, and Related
25 West 43rd Street, Fourth Floor, New Equipment, IBR approved for
York, NY 10036; telephone: 2126424900; 1926.555(a).
fax: 2123021286; e-mail: info@ansi.org; (16) ANSI B56.11969, Safety Stand-
Web site: http://www.ansi.org/. ards for Powered Industrial Trucks,
(1) ANSI A10.31970, Safety Require- IBR approved for 1926.602(c).
ments for Explosive-Actuated Fas- (17) ANSI J6.11950 (R1971), Rubber
tening Tools, IBR approved for Insulating Line Hose, IBR approved for
1926.302(e). 1926.951(a).
(2) ANSI A10.41963, Safety Require- (18) ANSI J6.21950 (R1971), Rubber
ments for Workmens Hoists, IBR ap- Insulating Hoods, IBR approved for
proved for 1926.552(c). 1926.951(a).
(19) ANSI J6.41971, Rubber Insu-
(3) ANSI A10.51969, Safety Require-
lating Blankets, IBR approved for
ments for Material Hoists, IBR ap-
1926.951(a).
proved for 1926.552(b).
(20) ANSI J6.51971, Rubber Insu-
(4) ANSI A11.11965 (R1970), Practice
lating Sleeves, IBR approved for
for Industrial Lighting, IBR approved
1926.951(a).
for 1926.56(b).
(21) ANSI J6.61971, Rubber Insu-
(5) ANSI A17.11965, Elevators, lating Gloves, IBR approved for
Dumbwaiters, Escalators, and Moving 1926.951(a).
Walks, IBR approved for 1926.552(d). (22) ANSI J6.71935 (R1971), Rubber
(6) ANSI A17.1a1967, Elevators, Matting for Use Around Electric Appa-
Dumbwaiters, Escalators, and Moving ratus, IBR approved for 1926.951(a).
Walks Supplement, IBR approved for (23) ANSI O1.11961, Safety Code for
1926.552(d). Woodworking Machinery, IBR approved
(7) ANSI A17.1b1968, Elevators, for 1926.304(f).
Dumbwaiters, Escalators, and Moving (24) ANSI Z35.11968, Specifications
Walks Supplement, IBR approved for for Accident Prevention Signs, IBR ap-
1926.552(d). proved for 1926.200(i).
(8) ANSI A17.1c1969, Elevators, (25) ANSI Z35.21968, Specifications
Dumbwaiters, Escalators, and Moving for Accident Prevention Tags, IBR ap-
Walks Supplement, IBR approved for proved for 1926.200(i).
1926.552(d). (26) ANSI Z49.11967, Safety in Weld-
(9) ANSI A17.1d1970, Elevators, ing and Cutting, IBR approved for
Dumbwaiters, Escalators, and Moving 1926.350(j).
Walks Supplement, IBR approved for (27) ANSI Z87.11968, Practice for Oc-
1926.552(d). cupational and Educational Eye and
(10) ANSI A17.21960, Practice for the Face Protection, IBR approved for
Inspection of Elevators (Inspectors 1926.102(a).
Manual), IBR approved for 1926.552(d). (28) ANSI Z89.11969, Safety Require-
(11) ANSI A17.2a1965, Practice for ments for Industrial Head Protection,
the Inspection of Elevators (Inspectors IBR approved for 1926.100(b).

14

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00024 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.6

(29) ANSI Z89.21971, Industrial Pro- (ASME B30.52004), IBR approved for
tective Helmets for Electrical Workers, 1926.1414(b); 1926.1414(e); 1926.1433(b).
Class B, IBR approved for 1926.100(c) (3) ASME B30.72001, Base-Mounted
and 1926.951(a). Drum Hoists, issued Jan. 21, 2002
(i) [Reserved.] (ASME B30.72001), IBR approved for
(j) The following material is avail- 1926.1436(e).
able for purchase from the American (4) ASME B30.142004, Side Boom
Society for Testing and Materials Tractors, issued Sept. 20, 2004 (ASME
(ASTM), ASTM International, 100 Barr B30.142004), IBR approved for
Harbor Drive, PO Box C700, West 1926.1440(c).
Conshohocken, PA, 194282959; tele- (5) ASME Boiler and Pressure Vessel
phone: 6108329585; fax: 6108329555; e- Code, Section VIII, 1968, IBR approved
mail: service@astm.org; Web site: http:// for 1926.152(i), 1926.306(a), and
www.astm.org/: 1926.603(a).
(1) ASTM A3701968, Methods and (6) ASME Power Boilers, Section I,
Definitions for Mechanical Testing and 1968, IBR approved for 1926.603(a).
Steel Products, IBR approved for (m) The following material is avail-
1926.1001(f). able for purchase from the American
(2) ASTM B1171964, 50 Hour Test, Welding Society (AWS), 550 N.W.
IBR approved for 1926.959(a). LeJeune Road, Miami, Florida 33126;
(3) ASTM D561969, Standard Method telephone: 18004439353; Web site:
of Test for Flash Point by the Tag http://www.aws.org/:
Closed Tester, IBR approved for
(1) AWS D1.1/D1.1M:2002, Structural
1926.155(i).
Welding CodeSteel, 18th ed., ANSI ap-
(4) ASTM D931969, Standard Method
proved Aug. 31, 2001 (AWS D1.1/
of Test for Flash Point by the Pensky
D1.1M:2002), IBR approved for
Martens Closed Tester, IBR approved
1926.1436(c).
for 1926.155(i).
(5) ASTM D3231958 (R1968), Standard (2) ANSI/AWS D14.394, Specification
Method of Test for Vapor Pressure of for Welding Earthmoving and Con-
Petroleum Products (Reid Method), struction Equipment, ANSI approved
IBR approved for 1926.155(m). Jun. 11, 1993 (ANSI/AWS D14.394),
(k) The following material is avail- IBR approved for 1926.1436(c).
able for purchase from the American (n) The following material is avail-
Society of Agricultural and Biological able for purchase from the British
Engineers (ASABE), 2950 Niles Road, Standards Institution (BSI), 389
St. Joseph, MI 49085; telephone: 269429 Chiswick High Road, London, W4 4AL,
0300; fax: 2694293852; e-mail: United Kingdom; telephone: +44 20 8996
hq@asabe.org; Web site: http:// 9001; fax: +44 20 8996 7001; e-mail:
www.asabe.org/: cservices@bsigroup.com; Web site: http://
(1) ASAE R313.11971, Soil Cone Pene- www.bsigroup.com/:
trometer, reaffirmed 1975, IBR ap- (1) BS EN 13000:2004, CranesMobile
proved for 1926.1002(e). Cranes, published Jan. 4, 2006 (BS EN
(l) The following material is avail- 13000:2004), IBR approved for
able for purchase from the American 1926.1433(c).
Society of Mechanical Engineers (2) BS EN 14439:2006, CranesSafety
(ASME), Three Park Avenue, New Tower Cranes, published Jan. 31, 2007
York, NY 10016; telephone: 1800843 (BS EN 14439:2006), IBR approved for
2763; fax: 9738821717; e-mail: 1926.1433(c).
infocentral@asme.org; Web site: http:// (o) The following material is avail-
www.asme.org/: able for purchase from the Bureau of
(1) ASME B30.22005, Overhead and Reclamation, United States Depart-
Gantry Cranes (Top Running Bridge, ment of the Interior, 1849 C Street,
Single or Multiple Girder, Top Running NW., Washington DC 20240; telephone:
Trolley Hoist), issued Dec. 30, 2005 2022084501; Web site: http://
(ASME B30.22005), IBR approved for www.usbr.gov/:
1926.1438(b). (1) Safety and Health Regulations for
(2) ASME B30.52004, Mobile and Lo- Construction, Part II, Sept. 1971, IBR
comotive Cranes, issued Sept. 27, 2004 approved for 1926.1000(f).

15

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00025 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.6 29 CFR Ch. XVII (7112 Edition)

(p) The following material is avail- 116601:2008(E)), IBR approved for


able for purchase from the California 1926.1423(c).
Department of Industrial Relations, 455 (2) ISO 116602:1994(E), CranesAc-
Golden Gate Avenue, San Francisco CA cess, guards and restraintsPart 2: Mo-
94102; telephone: (415) 7035070; e-mail: bile cranes, 1994 (ISO 116602:1994(E)),
info@dir.ca.gov; Web site: http:// IBR approved for 1926.1423(c).
www.dir.ca.gov/: (3) ISO 116603:2008(E), CranesAc-
(1) Construction Safety Orders, IBR cess, guards and restraintsPart 3:
approved for 1926.1000(f). Tower cranes, 2d ed., Feb. 15, 2008 (ISO
(q) [Reserved.] 116603:2008(E)), IBR approved for
(r) [Reserved.] 1926.1423(c).
(s) [Reserved.] (y) The following material is avail-
(t) [Reserved.] able for purchase from the National
(u) The following material is avail- Fire Protection Association (NFPA), 1
able for purchase from the Federal Batterymarch Park, Quincy, MA 02169;
Highway Administration, United telephone: 6177703000; fax: 617770
States Department of Transportation, 0700; Web site: http://www.nfpa.org/:
1200 New Jersey Ave., SE., Washington, (1) NFPA 10A1970, Maintenance and
DC 20590; telephone: 2023664000; Web Use of Portable Fire Extinguishers,
site: http://www.fhwa.dot.gov/: IBR approved for 1926.150(c).
(1) Manual on Uniform Traffic Con- (2) NFPA 131969, Standard for the In-
trol Devices, Millennium Edition, Dec. stallation of Sprinkler Systems, IBR
2000, IBR approved for 1926.200(g), approved for 1926.152(d).
1926.201(a), and 1926.202. (3) NFPA 301969, The Flammable and
(v) The following material is avail- Combustible Liquids Code, IBR ap-
able for purchase from the General proved for 1926.152(c).
Services Administration (GSA), 1800 F
(4) NFPA 801970, Standard for Fire
Street, NW., Washington, DC 20405;
Doors and Windows, Class E or F Open-
telephone: (202) 5010800; Web site:
ings, IBR approved for 1926.152(b).
http://www.gsa.gov/:
(5) NFPA 2511969, Standard Methods
(1) QQP416, Federal Specification
of Fire Test of Building Construction
Plating Cadmium (Electrodeposited),
and Material, IBR approved for
IBR approved for 1926.104(e).
1926.152(b) and 1926.155(f).
(w) The following material is avail-
able for purchase from the Institute of (6) NFPA 3851966, Standard for Tank
Makers of Explosives (IME), 1120 19th Vehicles for Flammable and Combus-
Street, NW., Suite 310, Washington, DC tible Liquids, IBR approved for
20036; telephone: 2024299280; fax: 202 1926.152(g).
4299280; e-mail: info@ime.org; Web site: (z) [Reserved.]
http://www.ime.org/: (aa) The following material is avail-
(1) IME Pub. No. 2, American Table of able for purchase from the Power Crane
Distances for Storage of Explosives, and Shovel Association (PCSA), 6737 W.
Jun. 5, 1964, IBR approved for Washington Street, Suite 2400, Mil-
1926.914(a). waukee, WI 53214; telephone: 1800369
(2) IME Pub. No. 20, Radio Frequency 2310; fax: 4142721170; Web site: http://
EnergyA Potential Hazard in the Use www.aem.org/CBC/ProdSpec/PCSA/:
of Electric Blasting Caps, Mar. 1968, (1) PCSA Std. No. 1, Mobile Crane
IBR approved for 1926.900(k). and Excavator Standards, 1968, IBR ap-
(x) The following material is avail- proved for 1926.602(b).
able for purchase from the Inter- (2) PCSA Std. No. 2, Mobile Hydraulic
national Organization for Standardiza- Crane Standards, 1968 (PCSA Std. No.
tion (ISO), 1, ch. de la Voie-Creuse, 2 (1968)), IBR approved for
Case postale 56, CH1211 Geneva 20, 1926.602(b), 1926.1433(a), and
Switzerland; telephone: +41 22 749 01 11; 1926.1501(a).
fax: +41 22 733 34 30; Web site: http:// (3) PCSA Std. No. 3, Mobile Hydraulic
www.iso.org/: Excavator Standards, 1969, IBR ap-
(1) ISO 116601:2008(E), CranesAc- proved for 1926.602(b).
cess, guards and restraintsPart 1: (bb) [Reserved.]
General, 2d ed., Feb. 15, 2008 (ISO (cc) [Reserved.]

16

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00026 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.6

(dd) The following material is avail- erators of Construction and Industrial


able for purchase from the Society of Machinery, IBR approved for
Automotive Engineers (SAE), 400 Com- 1926.1001(f).
monwealth Drive, Warrendale, PA (16) SAE J743a1964, Tractor Mounted
15096; telephone: 18776067323; fax: 724 Side Boom, 1964 (SAE J743a1964),
7760790; Web site: http://www.sae.org/: IBR approved for 1926.1501(a).
(1) SAE 1970 Handbook, IBR approved (17) SAE J9591966, Lifting Crane
for 1926.602(b). Wire-Rope Strength Factors, 1966
(2) SAE 1971 Handbook, IBR approved (SAE J9591966), IBR approved for
for 1926.1001(h). 1926.1501(a).
(3) SAE J1661971, Trucks and Wag- (18) SAE J987 (rev. Jun. 2003), Lattice
ons, IBR approved for 1926.602(a). Boom CranesMethod of Test, revised
(4) SAE J1681970, Protective Enclo- Jun. 2003 (SAE J987 (Jun. 2003)), IBR
suresTest Procedures and Perform- approved for 1926.1433(c).
ance Requirements, IBR approved for (19) SAE J1063 (rev. Nov. 1993), Canti-
1926.1002(a). levered Boom Crane StructuresMeth-
(5) SAE J185 (reaf. May 2003), Access od of Test, revised Nov. 1993 (SAE
Systems for Off-Road Machines, re- J1063 (Nov. 1993)), IBR approved for
affirmed May 2003 (SAE J185 (May 1926.1433(c).
1993)), IBR approved for 1926.1423(c). (ee) The following material is avail-
(6) SAE J2361971, Self-Propelled able for purchase from the United
Graders, IBR approved for 1926.602(a). States Army Corps of Engineers, 441 G
(7) SAE J2371971, Front End Loaders Street, NW., Washington, DC 20314;
and Dozers, IBR approved for telephone: 2027610011; e-mail: hq-
126.602(a). publicaffairs@usace.army.mil; Web site:
(8) SAE J319b1971, Self-Propelled http://www.usace.army.mil/:
Scrapers, IBR approved for 1926.602(a). (1) EM38511, General Safety Re-
(9) SAE J320a1971, Minimum Per- quirements, Mar. 1967, IBR approved
formance Criteria for Roll-Over Protec- for 1926.1000(f).
tive Structure for Rubber-Tired, Self- (ff) The following material is avail-
Propelled Scrapers, IBR approved for able for purchase from standards re-
1926.1001(h). sellers such as the Document Center
(10) SAE J321a1970, Fenders for Inc., 111 Industrial Road, Suite 9, Bel-
Pneumatic-Tired Earthmoving Haulage mont, CA 94002; telephone: 6505917600;
Equipment, IBR approved for fax: 6505917617; e-mail: info@document-
1926.602(a). center.com; Web site: http://
(11) SAE J333a1970, Operator Protec- www.document-center.com/:
tion for Agricultural and Light Indus- (1) ANSI B15.11953 (R1958), Safety
trial Tractors, IBR approved for Code for Mechanical Power-Trans-
1926.602(a). mission Apparatus, revised 1958, IBR
(11) SAE J3861969, Seat Belts for approved for 1926.300(b)(2) and
Construction Equipment, IBR approved 1926.1501(a).
for 1926.602(a). (2) ANSI B30.2.01967, Safety Code for
(12) SAE J3941971, Minimum Per- Overhead and Gantry Cranes, approved
formance Criteria for Roll-Over Protec- May 4, 1967, IBR approved for
tive Structure for Rubber-Tired Front 1926.1501(d).
End Loaders and Robber-Tired Dozers, (3) ANSI B30.51968, Crawler, Loco-
IBR approved for 1926.1001(h). motive, and Truck Cranes, approved
(13) SAE J3951971, Minimum Per- Dec. 16, 1968, IBR approved for
formance Criteria for Roll-Over Protec- 1926.1433(a), 1926.1501(a), and
tive Structure for Crawler Tractors 1926.1501(b).
and Crawler-Type Loaders, IBR ap- (4) ANSI B30.61969, Safety Code for
proved for 1926.1001(h). Derricks, approved Dec. 18, 1967, IBR
(14) SAE J3961971, Minimum Per- approved for 1926.1501(e).
formance Criteria for Roll-Over Protec- [75 FR 48130, Aug. 9, 2010]
tive Structure for Motor Graders, IBR EFFECTIVE DATE NOTE: At 77 FR 37600, June
approved for 1926.1001(h). 22, 2012, 1926.6 was amended by revising
(15) SAE J3971969, Critical Zone paragraphs (h)(28) and (h)(29) and adding new
Characteristics and Dimensions for Op- paragraph (h)(30), effective Sep. 20, 2012. For

17

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00027 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.10 29 CFR Ch. XVII (7112 Edition)
the convenience of the user, the added and subcontractor contracting for any part
revised text is set forth as follows: of the contract work shall require any
1926.6 Incorporation by reference. laborer or mechanic employed in the
performance of the contract to work in
surroundings or under working condi-
* * * * *
tions which are unsanitary, hazardous,
(h) * * * or dangerous to his health or safety, as
(28) American National Standards Institute determined under construction safety
(ANSI) Z89.12009, American National Stand-
ard for Industrial Head Protection, approved
and health standards promulgated by
January 26, 2009; IBR approved for the Secretary by regulation.
1926.100(b)(1)(i). Copies of ANSI Z89.12009
are available for purchase only from the 1926.11 Coverage under section 103
International Safety Equipment Association, of the act distinguished.
1901 North Moore Street, Arlington, VA (a) Coverage under section 103. It is im-
222091762; telephone: 7035251695; fax: 703
5282148; Web site: www.safetyequipment.org.
portant to note that the coverage of
(29) American National Standards Institute section 107 differs from that for the
(ANSI) Z89.12003, American National Stand- overtime requirements of the Contract
ard for Industrial Head Protection; IBR ap- Work Hours and Safety Standards Act.
proved for 1926.100(b)(1)(ii). Copies of ANSI The application of the overtime re-
Z89.12003 are available for purchase only quirements is governed by section 103,
from the International Safety Equipment which subject to specific exemptions,
Association, 1901 North Moore Street, Ar-
includes: (1) Federal contracts requir-
lington, VA 222091762; telephone: 703525
1695; fax: 7035282148; Web site: ing or involving the employment of la-
www.safetyequipment.org. borers or mechanics (thus including,
(30) American National Standards Institute but not limited to, contracts for con-
(ANSI) Z89.11997, American National Stand- struction), and (2) contracts assisted in
ard for Personnel ProtectionProtective whole or in part by Federal loans,
Headwear for Industrial WorkersRequire- grants, or guarantees under any stat-
ments; IBR approved for 1926.100(b)(1)(iii).
ute providing wage standards for such
Copies of ANSI Z89.11997 are available for
purchase only from the International Safety work. The statutes providing wage
Equipment Association, 1901 North Moore standards for such work include stat-
Street, Arlington, VA 222091762; telephone: utes for construction which require the
7035251695; fax: 7035282148; Web site: payment of minimum wages in accord-
www.safetyequipment.org. ance with prevailing wage findings by
the Secretary of Labor in accordance
* * * * * with the Davis-Bacon Act. A provision
to section 103 excludes from the over-
Subpart BGeneral time requirements work where the
Interpretations Federal assistance is only in the form
of a loan guarantee or insurance.
(b) Coverage under section 107. To be
AUTHORITY: Sec. 107, Contract Work Hours
and Safety Standards Act (Construction covered by section 107 of the Contract
Safety Act) (40 U.S.C. 333). Work Hours and Safety Standards Act,
a contract must be one which (1) is en-
1926.10 Scope of subpart. tered into under a statute that is sub-
(a) This subpart contains the general ject to Reorganization Plan No. 14 of
rules of the Secretary of Labor inter- 1950 (64 Stat. 1267); and (2) is for con-
preting and applying the construction struction, alteration, and/or repair, in-
safety and health provisions of section cluding painting and decorating.
107 of the Contract Work Hours and
Safety Standards Act (83 Stat. 96). Sec- 1926.12 Reorganization Plan No. 14
of 1950.
tion 107 requires as a condition of each
contract which is entered into under (a) General provisions. Reorganization
legislation subject to Reorganization Plan No. 14 of 1950 relates to the pre-
Plan Number 14 of 1950 (64 Stat. 1267), scribing by the Secretary of Labor of
and which is for construction, alter- appropriate standards, regulations,
ation, and/or repair, including painting and procedures with respect to the en-
and decorating, that no contractor or forcement of labor standards under

18

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00028 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.12

Federal and federally assisted con- units as well as supplementary loans


tracts which are subject to various for improvement of repair or resale of
statutes subject to the Plan. The rules memberships.
of the Secretary of Labor imple- (iv) Urban Renewal HousingSection
menting the Plan are published in part 1715k provides mortgage insurance on
5 of this title. Briefly, the statutes sub- single family or multifamily housing
ject to the Plan include the Davis- in approved urban renewal areas.
Bacon Act, including its extension to (v) Low or Moderate Income Hous-
Federal-aid highway legislation subject ingSection 1715L(d) (3) and (4) insures
to 23 U.S.C. 113, and other statutes sub- mortgages on low-cost single family or
ject to the Plan by its original terms, multifamily housing.
statutes by which the Plan is expressly (vi) Housing for ElderlySection
applied, such as the Contract Work 1715v provides mortgage insurance on
Hours Standards Act by virtue of sec- rental housing for elderly or handi-
tion 104(d) thereof. capped persons.
(b) The Plan. (1) The statutes subject (vii) Nursing HomesSection 1715w
to Reorganization Plan No. 14 of 1950 authorizes mortgage insurance on
are cited and briefly described in the nursing home facilities and major
remaining paragraphs of this section. equipment.
These descriptions are general in na- (viii) Experimental HousingSection
ture and not intended to convey the 1715x provides mortgage insurance on
full scope of the work to be performed single family or multifamily housing
under each statute. The individual with experimental design of materials.
statutes should be resorted to for a (ix) War Housing InsuranceSection
more detailed scope of the work. 1743 not active.
(2) Federal-Aid Highway Acts. The pro- (x) Yield InsuranceSection 1747 in-
visions codified in 23 U.S.C. 113 apply sures investment returns on multi-
to the initial construction, reconstruc- family housing.
tion, or improvement work performed (xi) Armed Services HousingSec-
by contractors or subcontractors on tion 1748b to assist in relieving acute
highway projects on the Federal-aid shortage and urgent need for family
systems, the primary and secondary, as housing at or in areas adjacent to mili-
well as their extensions in urban areas, tary installations.
and the Interstate System, authorized (xii) Defense Housing for Impacted
under the highway laws providing for AreasSection 1748h2 provides mort-
the expenditure of Federal funds upon gage insurance on single family or
the Federal-aid system. As cited in 41 multifamily housing for sale or rent
Op. A.G. 488, 496, the Attorney General primarily to military or civilian per-
ruled that the Federal-Aid Highway sonnel of the Armed Services, National
Acts are subject to Reorganization Aeronautics and Space Administration,
Plan No. 14 of 1950. or Atomic Energy Commission.
(3) National Housing Act (12 U.S.C. (xiii) Defense Rental HousingSec-
1713, 1715a, 1715e, 1715k, 1715l(d)(3) and tion 1750g provides for mortgage insur-
(4), 1715v, 1715w, 1715x, 1743, 1747, 1748, ance in critical defense housing areas.
1748h2, 1750g, 1715l(h)(1), 1715z(j)(1), (xiv) RehabilitationSection 1715L
1715z1, 1715y(d), Subchapter 1x-A and (h)(1) provides mortgage insurance for
1x-B, 1715z7). This act covers construc- nonprofit organizations to finance the
tion which is financed with assistance purchase and rehabilitation of deterio-
by the Federal Government through rating or substandard housing for sub-
programs of loan and mortgage insur- sequent resale to low-income home
ance for the following purposes: purchasers. There must be located on
(i) Rental HousingSection 1713 pro- the property five or more single family
vides mortgage and insurance on rental dwellings of detached, semidetached, or
housing of eight or more units and on row construction.
mobile-home courts. (xv) Homeowner AssistanceSection
(ii) Section 1715aRepealed. 1715Z(j)(1) authorizes mortgage insur-
(iii) Cooperative HousingSection ance to nonprofit organizations or pub-
1715e authorizes mortgage insurance on lic bodies or agencies executed to fi-
cooperative housing of five or more nance sale of individual dwellings to

19

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00029 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.12 29 CFR Ch. XVII (7112 Edition)

lower income individuals or families. (6) Housing Act of 1949 (42 U.S.C. 1459).
Also includes the rehabilitation of such Construction contracts awarded by
housing if it is deteriorating or sub- local authorities financed with the as-
standard for subsequent resale to lower sistance of loans and grants from the
income home purchasers. Federal Government. The construction
(xvi) Rental Housing Assistance programs are for slum clearance and
Section 1715Z1 authorizes mortgage urban renewal which includes rehabili-
insurance and interest reduction pay- tation grants, neighborhood develop-
ments on behalf of owners of rental ment programs, neighborhood renewal
housing projects designed for occu- plans, community renewal, demolition
pancy by lower income families. Pay- projects, and assistance for blighted
ments are also authorized for certain areas. See the Housing Act of 1964,
State or locally aided projects. paragraph (b)(21) of this section, con-
(xvii) Condominium HousingSec- cerning financial assistance for low-
tion 1715y(d) provides mortgage insur- rent housing for domestic farm labor.
ance on property purchased for the de- (7) School Survey and Construction Act
velopment of building sites. This in- of 1950 (20 U.S.C. 636). This act provides
cludes waterlines and water supply in- for a Federal grant-in-aid program to
stallations, sewer lines and sewage dis- assist in the construction of schools in
posal installations, steam, gas, and federally affected areas.
electrical lines and installations, (8) Defense Housing & Community Fa-
roads, streets, curbs, gutters, side- cilities & Services Act of 1951 (42 U.S.C.
walks, storm drainage facilities, and 1592i). Inactive Program.
other installations or work. (9) United States Housing Act of 1937
(42 U.S.C. 1416). This statute covers the
(xviii) Group Medical Practice Facili-
construction of low-rent public housing
tiesSubchapter LX-B authorizes
and slum clearance projects awarded
mortgage insurance for the financing
by local authorities. These projects are
of construction and equipment, of fa-
financed with the assistance of loans
cilities for group practice of medicine,
and grants from the Federal Govern-
optometry, or dentistry.
ment. The slum clearance is the demo-
(xix) Nonprofit Hospitals1715z7 au- lition and removal of buildings from
thorizes mortgage insurance to cover any slum area to be used for a low-rent
new and rehabilitated hospitals, in- housing project.
cluding initial equipment. (10) Federal Civil Defense Act of 1950 (50
(4) Hospital Survey and Construction U.S.C. App. 2281). This act provides for
Act, as amended by the Hospital and Federal assistance to the several
Medical Facilities Amendments of 1964 (42 States and their political subdivisions
U.S.C. 291e). The provisions of this Act in the field of civil defense which in-
cover construction contracts made by cludes procurement, construction, leas-
State or local authorities or private in- ing, or renovating of materials and fa-
stitutions under Federal grant-in-aid cilities.
programs for the construction of hos- (11) Delaware River Basin Compact
pitals and other medical facilities. (sec. 15.1, 75 Stat. 714). This joint resolu-
(5) Federal Airport Act (49 U.S.C. tion creates, by intergovernmental
1114(b)). The act provides grant-in-aid compact between the United States,
funds for airport construction limited Delaware, New Jersey, New York, and
to general site preparation runways, Pennsylvania, a regional agency for
taxiways, aprons, lighting appurtenant planning, conservation, utilization, de-
thereto, and fire, rescue, and mainte- velopment, management and control of
nance buildings. The act excludes con- the water and related sources of the
struction intended for use as a public Delaware River.
parking facility for passenger auto- (12) Cooperative Research Act (20 U.S.C.
mobiles and the cost of construction of 332a(c)). This act provides Federal
any part of an airport building except grants to a university, college, or other
such of those buildings or parts of appropriate public or nonprofit private
buildings to house facilities or activi- agency or institution for part or all of
ties directly related to the safety of the cost of constructing a facility for
persons at the airport. research or for research and related

20

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00030 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.12

purposes. Research and related pur- ious States for the construction of pub-
poses means research, research train- lic libraries.
ing, surveys, or demonstrations in the (19) Urban Mass Transportation Act of
field of education, or the dissemination 1954 (49 U.S.C. 1609). This act provides
of information derived therefrom, or for grants and loans to assist States
all of such activities, including (but and local public bodies and agencies
without limitation) experimental thereof in financing the acquisition,
schools, except that such term does not construction, reconstruction, and im-
include research, research training, provement of facilities and equipment
surveys, or demonstrations in the field for use, by operation or lease or other-
of sectarian instruction or the dissemi- wise, in mass transportation service in
nation of information derived there- urban areas and in coordinating such
from. Construction includes new build- service with highway and other trans-
ings, and the acquisition, expansion, portation in such areas.
remodeling, replacement, and alter- (20) Economic Opportunity Act of 1964
ation of existing buildings and the
(42 U.S.C. 2947). This act covers con-
equipping of new buildings and existing
struction which is financed with assist-
buildings.
ance of the Federal Government for the
(13) Health Professions Educational As- following purposes:
sistance Act of 1963 (42 U.S.C. 292d (c)(4),
(i) Authorizes Federal assistance for
293a(c)(5)). The provisions of this act
construction of projects, buildings and
provide for grants to assist public and
works which will provide young men
nonprofit medical, dental, and similar
schools for the construction, expan- and women in rural and urban residen-
sion, or renovation of teaching facili- tial centers with education, vocational
ties. training, and useful work experience
(Title I).
(14) Mental Retardation Facilities Con-
struction Act (42 U.S.C. 295(a)(2)(D), (ii) Authorizes financial assistance
2662(5), 2675(a)(5)). This act authorizes for construction work planned and car-
Federal financial assistance in the con- ried out at the community level for
struction of centers for research on antipoverty programs (Title II):
mental retardation and related aspects (a) Authorizes loans to low income
of human development, of university- rural families by assisting them to ac-
affiliated facilities for the mentally re- quire or improve real estate or reduce
tarded and of facilities for the men- encumbrances or erect improvements
tally retarded. thereon, and to participate in coopera-
(15) Community Mental Health Centers tive associations and/or to finance non-
Act (42 U.S.C. 2685(a)(5)). This act au- agricultural enterprises which will en-
thorizes Federal grants for the con- able such families to supplement their
struction of public and other nonprofit income (Title III);
community mental health centers. (b) Authorizes loans to local coopera-
(16) Higher Education Facilities Act of tive associations furnishing essential
1963 (20 U.S.C. 753). This act authorizes processing, purchasing, or marketing
the grant or loan of Federal funds to services, supplies, or facilities predomi-
assist public and other nonprofit insti- nantly to low-income rural families
tutions of higher education in financ- (Title III);
ing the construction, rehabilitation, or (c) Authorizes financial assistance to
improvement of academic and related States, political subdivisions of States,
facilities in undergraduate and grad- public and nonprofit agencies, institu-
uate schools. tions, organizations, farm associations,
(17) Vocational Educational Act of 1963 or individuals in establishing housing,
(20 U.S.C. 35f). This act provides for sanitation, education, and child day-
Federal grants to the various States care programs for migrants and other
for construction of area vocational seasonally employed agricultural em-
education school facilities. ployees and their families (Title III).
(18) Library Services and Construction (iii) Authorizes loans or guarantees
Act (20 U.S.C. 355e(a)(4)). This act pro- loans to small businesses for construc-
vides for Federal assistance to the var- tion work (Title IV).

21

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00031 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.12 29 CFR Ch. XVII (7112 Edition)

(iv) Authorizes the payment of the and treatment centers, and other fa-
cost of experimental, pilot, or dem- cilities for health; seal and fill voids in
onstration projects to foster State pro- abandoned mines and to rehabilitate
grams providing construction work ex- strip mine areas; construction of
perience or training for unemployed fa- school facilities for vocational edu-
thers and needy people (Title V). cation; and to assist in construction of
(21) Housing Act of 1964 (42 U.S.C. sewage treatment works.
1486(f); 42 U.S.C. 1452b(e)). Provides fi- (27) National Technical Institute for the
nancial assistance for low-rent housing Deaf Act (20 U.S.C. 684(b)(5)). Provides
for domestic farm labor. The Act fur- for financial assistance for institutions
ther provides for loans, through public of higher education for the establish-
or private agencies, where feasible, to ment, construction, including equip-
owners or tenants of property in urban ment and operation, of a National In-
renewal areas to finance rehabilitation stitution for the Deaf.
required to conform the property to ap- (28) Housing Act of 1959 (12 U.S.C.
plicable code requirements or carry out 1701(q)(c)(3)). This act authorizes loans
the objectives of the urban renewal to nonprofit corporations to be used for
plan for the area. the construction of housing and related
(22) The Commercial Fisheries Research facilities for elderly families. Also, the
and Development Act of 1964 (16 U.S.C. provisions of the act provide for reha-
779e(b)). This Act authorizes financial bilitation, alteration, conversion or
assistance to State agencies for con- improvement of existing structures
struction projects designed for the re- which are otherwise inadequate for
search and development of the com- proposed dwellings used by such fami-
mercial fisheries resources of the Na- lies.
tion.
(29) College Housing Act of 1950, as
(23) The Nurse Training Act of 1964 (42
amended (12 U.S.C. 1749a(f)). This act
U.S.C. 296a(b)(5)). This act provides for
provides for Federal loans to assist
grants to assist in the construction of
educational institutions in providing
new facilities for collegiate, associate
housing and other educational facili-
degree, and diploma schools of nursing,
or replacement or rehabilitation of ex- ties for students and faculties.
isting facilities of such schools. (30) Housing and Urban Development
(24) Elementary and Secondary Edu- Act of 1965 (42 U.S.C. 1500c3, 3107). This
cation Act of 1965 (20 U.S.C. 241i, 848). act provides for Federal assistance for
The purpose of the act is to provide fi- the following purposes:
nancial assistance to local educational (i) Grants to States and local public
agencies serving areas with concentra- bodies to assist in any construction
tions of children from low-income fam- work to be carried out under the open-
ilies for construction in connection space land and urban beautification
with the expansion or improvement of provisions contained therein. It pro-
their educational programs. vides for parks and recreation areas,
(25) Federal Water Pollution Control conservation of land and other natural
Act, as amended by the Water Quality Act resources, and historical and scenic
of 1965 (3 U.S.C. 466e(g)). Provides for fi- purposes.
nancial assistance to States or munici- (ii) Grants to local public bodies and
palities for construction of facilities in agencies to finance specific projects for
connection with the prevention and basic public water facilities (including
control of water pollution. This in- works for the storage, treatment, puri-
cludes projects that will control the fication, and distribution of water),
discharge into any waters of untreated and for basic public sewer facilities
or inadequately treated sewage. (other than treatment works as de-
(26) Appalachian Regional Development fined in the Federal Water Pollution
Act of 1965 (40 U.S.C. App. 402). Author- Control Act).
izes Federal assistance in the construc- (iii) Grants to any local public body
tion of an Appalachian development or agency to assist in financing neigh-
highway system; construction of multi- borhood facilities. These facilities
county demonstration health facilities, must be necessary for carrying out a
hospitals, regional health, diagnostic program of health, recreational, social,

22

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00032 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.12

or similar community service and lo- ical schools, research, institutions,


cated so as to be available for the use hospitals, and other public and non-
of the areas low or moderate income profit agencies and institutions, or as-
residents. sociations thereof to assist in construc-
(31) National Foundation on the Arts tion and equipment of facilities in con-
and the Humanities Act of 1965 (20 U.S.C. nection with research, training, dem-
954(k)). The act establishes the Na- onstration of patient care, diagnostic
tional Foundation on the Arts and the and treatment related to heart disease,
Humanities which may provide cancer, stroke, and other major dis-
matching grants to groups (nonprofit eases.
organizations and State and other pub- (35) Mental Retardation Facilities and
lic organizations) and to individuals Community Mental Health Centers Con-
engaged in creative and performing struction Act Amendments of 1965 (20
arts for the entire range of artistic ac- U.S.C. 618(g)). These provisions provide
tivity, including construction of nec- for grants to institutions of higher edu-
essary facilities. cation for construction of facilities for
(32) Public Works and Economic Devel- research or for research and related
opment Act of 1965 (42 U.S.C. 3222). This purposes relating to education for men-
act provides for Federal assistance for tally retarded, hard of hearing, deaf,
the following purposes: speech impaired, visually handicapped,
(i) Grants for the acquisition or de- seriously emotionally disturbed, crip-
velopment of land or improvements for pled, or other health impaired children
public works or development facility who by reason thereof require special
usage in redevelopment areas. It au- education.
thorizes loans to assist in financing the (36) Vocational Rehabilitation Act
purchase or development of land for Amendments of 1965 (29 U.S.C. 41a(b)(4)).
public works which will assist in the This act authorizes grants to assist in
creation of long-term employment op- meeting the costs of construction of
portunities in the area. public or other nonprofit workshops
(ii) Loans for the purchase or devel- and rehabilitation facilities.
opment of land and facilities (including (37) Clean Air and Solid Waste Disposal
machinery and equipment) for indus- Acts (42 U.S.C. 3256). This act provides
trial or commercial usage within rede- for financial assistance to public (Fed-
velopment areas; guarantee of loans for eral, State, interstate, or local) au-
working capital made to private bor- thorities, agencies, and institutions,
rowers by private lending institutions private agencies and institutions, and
in connection with direct loan projects; individuals in the construction of fa-
and to contract to pay to, or on behalf cilities for solid-waste disposal. The
of, business entities locating in rede- term construction includes the instal-
velopment areas, a portion of the inter- lation of initial equipment.
est costs which they incur in financing (38) Medical Library Assistance Act of
their expansions from private sources. 1965 (42 U.S.C. 280b3(b)(3)). This act
(iii) Loans and grants to create eco- provides for grants to public or private
nomic development centers within des- non-profit agencies or institutions for
ignated county economic development the cost of construction of medical li-
districts. brary facilities.
(33) High-Speed Ground Transportation (39) Veterans Nursing Home Care Act
Study (40 U.S.C. 1636(b)). This act pro- (38 U.S.C. 5035(a)(8)). The construction
vides for financial assistance for con- industry health and safety standards
struction activities in connection with do not apply to this act since it is not
research and development of different subject to Reorganization Plan No. 14
forms of high-speed ground transpor- of 1950.
tation and demonstration projects re- (40) National Capital Transportation
lating to intercity rail passenger serv- Act of 1965 (40 U.S.C. 682(b)(4)). This act
ice. provides for Federal assistance to the
(34) Heart Disease, Cancer and Stroke National Capital Transportation Agen-
Amendments of 1965 (42 U.S.C. 299(b)(4)). cy for construction of a rail rapid tran-
This act provides for grants to public sit system and related facilities for the
or nonprofit private universities, med- Nations Capital.

23

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00033 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.12 29 CFR Ch. XVII (7112 Edition)

(41) Alaska Centennial1967 (80 Stat. education programs to meet the special
82). The program under this legislation needs of children with limited English-
has expired. speaking ability in the United States.
(42) Model Secondary School for the (47) Vocational Rehabilitation Amend-
Deaf Act (80 Stat. 1028). This act pro- ments of 1967 (29 U.S.C. 42a(c)(3)). This
vides for funds to establish and oper- act authorizes Federal assistance to
ate, including construction and initial any public or nonprofit private agency
equipment of new buildings, expansion, or organization for the construction of
remodeling, and alteration of existing a center for vocational rehabilitation
buildings and equipment thereof, a of handicapped individuals who are
model secondary school for the deaf to both deaf and blind which shall be
serve the residents of the District of known as the National Center for Deaf-
Columbia and nearby States. Blind Youths and Adults. Construction
(43) Allied Health Professions Personnel includes new buildings and expansion,
Training Act of 1966 (42 U.S.C. remodeling, alteration and renovation
295h(b)(2)(E)). This act provides for of existing buildings, and initial equip-
grants to assist in the construction of ment of such new, newly acquired, ex-
new facilities for training centers for panded, remodeled, altered, or ren-
allied health professions, or replace- ovated buildings.
ment or rehabilitation of existing fa- (48) National Visitor Center Facilities
cilities for such centers. Act of 1968 (40 U.S.C. 808). This act au-
(44) Demonstration Cities and Metro- thorizes agreements and leases with
politan Development Act of 1966 (42 the owner of property in the District of
U.S.C. 3310; 12 U.S.C. 1715c; 42 U.S.C. Columbia known as Union Station for
1416). This act provides for Federal as- the use of all or a part of such property
sistance for the following purposes: for a national visitor center to be
(i) Grants to assist in the construc- known as the National Visitor Center.
tion, rehabilitation, alteration, or re- The agreements and leases shall pro-
pair of residential property only if such vide for such alterations of the Union
residential property is designed for res- Station Building as necessary to pro-
idential use for eight or more families vide adequate facilities for visitors.
to enable city demonstration agencies They also provide for the construction
to carry out comprehensive city dem- of a parking facility, including nec-
onstration programs (42 U.S.C. 3310). essary approaches and ramps.
(ii) Amends the National Housing Act (49) Juvenile Delinquency Prevention
(12 U.S.C. 1715c) and the Housing Act of and Control Act of 1968 (42 U.S.C. 3843).
1937 (42 U.S.C. 1416). See these acts for This act provides for Federal grants to
coverage. State, county, municipal, or other pub-
(45) Air Quality Act of 1967 (42 U.S.C. lic agency or combination thereof for
1857j3). This act provides for Federal the construction of facilities to be used
assistance to public or nonprofit agen- in connection with rehabilitation serv-
cies, institutions, and organizations ices for the diagnosis, treatment, and
and to individuals, and contracts with rehabilitation of delinquent youths and
public or private agencies, institutions, youths in danger of becoming delin-
or persons for construction of research quent.
and development facilities and dem- (50) Housing and Urban Development
onstration plants relating to the appli- Act of 1968 (including New Communities
cation of preventing or controlling dis- Act of 1968) (42 U.S.C. 3909). This act
charges into the air of various types of provides for Federal assistance for the
pollutants. following purposes:
(46) Elementary and Secondary Edu- (i) Guarantees, and commitments to
cation Amendments of 1967 (Title VIIBi- guarantee, the bonds, debentures,
lingual Education Act) (20 U.S.C. 880b6). notes, and other obligations issued by
This act provides for Federal assist- new community developers to help fi-
ance to local educational agencies or nance new community development
to an institution of higher education projects.
applying jointly with a local edu- (ii) Amends section 212(a) of the Na-
cational agency for minor remodeling tional Housing Act, adding section 236
projects in connection with bilingual for Rental Housing for Lower Income

24

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00034 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.13

Families and section 242 Mortgage the preschool, elementary school, and
Insurance for Nonprofit Hospitals secondary school levels.
thereto. (56) Housing and Urban Development
(51) Public Health Service Act Amend- Act of 1970 (Pub. L. 91609, section
ment (Alcoholic and Narcotic Addict Re- 707(b)). This Act provides for grants to
habilitation Amendments of 1968) (42 States and local public agencies to help
U.S.C. 2681, et seq.). This act provides finance the development of open-space
for grants to a public and nonprofit pri- or other land in urban areas for open-
vate agency or organization for con- space uses. This Act becomes effective
struction projects consisting of any fa- on July 1, 1971.
cilities (including post-hospitalization (57) Developmental Disabilities Services
treatment facilities for the prevention and Facilities Construction Amendments
and treatment of alcoholism or treat- of 1970 (Pub. L. 91517, section 135(a)(5)).
ment of narcotic addicts.) This Act authorizes grants to States
(52) Vocational Education Amendments for construction of facilities for the
of 1968 (20 U.S.C. 1246). This act pro- provision of services to persons with
vides for grants to States for the con- developmental disabilities who are un-
struction of area vocational education able to pay for such services.
school facilities. The act further pro- (58) Rail Passenger Service Act of 1970
vides grants to public educational (Pub. L. 91518, section 405(d)). This stat-
agencies, organizations, or institutions ute provides that the National Rail-
for construction of residential schools road Passenger Corporation may con-
to provide vocational education for the struct physical facilities necessary to
purpose of demonstrating the feasi- intercity rail passenger operations
bility and desirability of such schools. within the basic national rail pas-
The act still further provides grants to senger system designated by the Sec-
State boards, to colleges and univer- retary of Transportation.
(c) VA and FHA housing. In the course
sities, to public educational agencies,
of the legislative development of sec-
organizations or institutions to reduce
tion 107, it was recognized that section
the cost of borrowing funds for the con-
107 would not apply to housing con-
struction of residential schools and
struction for which insurance was
dormitories.
issued by the Federal Housing Author-
(53) Postal Reorganization Act (39 ity and Veterans Administration for
U.S.C. 410(d)(2)). This Act provides for individual home ownership. Concerning
construction, modification, alteration, construction under the National Hous-
repair, and other improvements of ing Act, Reorganization Plan No. 14 of
postal facilities located in leased build- 1950 applies to construction which is
ings. subject to the minimum wage require-
(54) Airport and Airway Development ments of section 212(a) thereof (12
Act of 1970 (Pub. L. 91258, section U.S.C. 1715c).
52(b)(7)). This Act provides for Federal
financial assistance to States and lo- 1926.13 Interpretation of statutory
calities for the construction, improve- terms.
ment, or repair of public airports. (a) The terms construction, alteration,
(55) (i) Public Law 91230. This Act and repair used in section 107 of the Act
provides for federal financial assist- are also used in section 1 of the Davis-
ance to institutions of higher learning Bacon Act (40 U.S.C. 276a), providing
for the construction of a National Cen- minimum wage protection on Federal
ter on Educational Media and Mate- construction contracts, and section 1 of
rials for the Handicapped. The program the Miller Act (40 U.S.C. 270a), pro-
under this statute expires on July 1, viding performance and payment bond
1971. Public Law 91230, section 662(1). protection on Federal construction
(ii) Education of the Handicapped Act contracts. Similarly, the terms con-
(20 U.S.C. 12326, 1404(a)). This Act pro- tractor and subcontractor are used in
vides for financial assistance to States those statutes, as well as in Copeland
for construction, expansion, remod- (Anti-Kickback) Act (40 U.S.C. 276c)
eling, or alteration of facilities for the and the Contract Work Hours and Safe-
education of handicapped children at ty Standards Act itself, which apply

25

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00035 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.14 29 CFR Ch. XVII (7112 Edition)

concurrently with the Miller Act and considered manufacturing; therefore a


the Davis-Bacon Act on Federal con- supplier of such materials would not be
struction contracts and also apply to considered a subcontractor. An ex-
most federally assisted construction ample of material supplied for the
contracts. The use of the same or iden- specific project on a customized basis
tical terms in these statutes which as that phrase is used in this section
apply concurrently with section 107 of would be ventilating ducts, fabricated
the Act have considerable precedential in a shop away from the construction
value in ascertaining the coverage of job site and specifically cut for the
section 107. project according to design specifica-
(b) It should be noted that section 1 tions. On the other hand, if a con-
of the Davis-Bacon Act limits min- tractor buys standard size nails from a
imum wage protection to laborers and foundry, the foundry would not be a
mechanics employed directly upon covered subcontractor. Ordinarily a
the site of the work. There is no contract for the supplying of construc-
comparable limitation in section 107 of tion equipment to a contractor would
the Act. Section 107 expressly requires not, in and of itself, be considered a
as a self-executing condition of each subcontractor for purposes of this
covered contract that no contractor or part.
subcontractor shall require any la-
borer or mechanic employed in the per- 1926.14 Federal contract for mixed
formance of the contract to work in types of performance.
surroundings or under working condi- (a) It is the intent of the Congress to
tions which are unsanitary, hazardous, provide safety and health protection of
or dangerous to his health or safety as Federal, federally financed, or feder-
these health and safety standards are ally assisted construction. See, for ex-
applied in the rules of the Secretary of ample, H. Report No. 91241, 91st Cong.,
Labor. first session, p. 1 (1969). Thus, it is clear
(c) The term subcontractor under sec- that when a Federal contract calls for
tion 107 is considered to mean a person mixed types of performance, such as
who agrees to perform any part of the both manufacturing and construction,
labor or material requirements of a section 107 would apply to the con-
contract for construction, alteration or struction. By its express terms, section
repair. Cf. MacEvoy Co. v. United 107 applies to a contract which is for
States, 322 U.S. 102, 1089 (1944). A per- construction, alteration, and/or re-
son who undertakes to perform a por- pair. Such a contract is not required
tion of a contract involving the fur- to be exclusively for such services. The
nishing of supplies or materials will be application of the section is not lim-
considered a subcontractor under ited to contracts which permit an over-
this part and section 107 if the work in all characterization as construction
question involves the performance of contracts. The text of section 107 is
construction work and is to be per- not so limited.
formed: (1) Directly on or near the con- (b) When the mixed types of perform-
struction site, or (2) by the employer ances include both construction and
for the specific project on a customized manufacturing, see also 1926.15(b) con-
basis. Thus, a supplier of materials cerning the relationship between the
which will become an integral part of Walsh-Healey Public Contracts Act and
the construction is a subcontractor section 107.
if the supplier fabricates or assembles
the goods or materials in question spe- 1926.15 Relationship to the Service
cifically for the construction project Contract Act; Walsh-Healey Public
and the work involved may be said to Contracts Act.
be construction activity. If the goods (a) A contract for construction is
or materials in question are ordinarily one for nonpersonal service. See, e.g.,
sold to other customers from regular 41 CFR 11.208. Section 2(e) of the Serv-
inventory, the supplier is not a sub- ice Contract Act of 1965 requires as a
contractor. Generally, the furnishing condition of every Federal contract
of prestressed concrete beams and (and bid specification therefor) exceed-
prestressed structural steel would be ing $2,500, the principal purpose of

26

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00036 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.16

which is to furnish services to the 1926.16 Rules of construction.


United States through the use of (a) The prime contractor and any
service employees, that certain safe- subcontractors may make their own
ty and health standards be met. See 29 arrangements with respect to obliga-
CFR part 1925, which contains the De- tions which might be more appro-
partment rules concerning these stand- priately treated on a jobsite basis rath-
ards. Section 7 of the Service Contract er than individually. Thus, for exam-
Act provides that the Act shall not ple, the prime contractor and his sub-
apply to any contract of the United contractors may wish to make an ex-
States or District of Columbia for con- press agreement that the prime con-
struction, alteration, and/or repair, in- tractor or one of the subcontractors
cluding painting and decorating of pub- will provide all required first-aid or
lic buildings or public works. It is toilet facilities, thus relieving the sub-
clear from the legislative history of contractors from the actual, but not
section 107 that no gaps in coverage be- any legal, responsibility (or, as the
tween the two statutes are intended. case may be, relieving the other sub-
(b) The Walsh-Healey Public Con- contractors from this responsibility).
In no case shall the prime contractor
tracts Act requires that contracts en-
be relieved of overall responsibility for
tered into by any Federal agency for
compliance with the requirements of
the manufacture or furnishing of mate-
this part for all work to be performed
rials, supplies, articles, and equipment under the contract.
in any amount exceeding $10,000 must (b) By contracting for full perform-
contain, among other provisions, a re- ance of a contract subject to section
quirement that no part of such con- 107 of the Act, the prime contractor as-
tract will be performed nor will any of sumes all obligations prescribed as em-
the materials, supplies, articles or ployer obligations under the standards
equipment to be manufactured or fur- contained in this part, whether or not
nished under said contract be manufac- he subcontracts any part of the work.
tured or fabricated in any plants, fac- (c) To the extent that a subcon-
tories, buildings, or surroundings or tractor of any tier agrees to perform
under working conditions which are any part of the contract, he also as-
unsanitary or hazardous or dangerous sumes responsibility for complying
to the health and safety of employees with the standards in this part with re-
engaged in the performance of said spect to that part. Thus, the prime
contract. The rules of the Secretary contractor assumes the entire responsi-
concerning these standards are pub- bility under the contract and the sub-
lished in 41 CFR part 50204, and ex- contractor assumes responsibility with
press the Secretary of Labors interpre- respect to his portion of the work.
tation and application of section 1(e) of With respect to subcontracted work,
the Walsh-Healey Public Contracts Act the prime contractor and any subcon-
to certain particular working condi- tractor or subcontractors shall be
tions. None of the described working deemed to have joint responsibility.
(d) Where joint responsibility exists,
conditions are intended to deal with
both the prime contractor and his sub-
construction activities, although such
contractor or subcontractors, regard-
activities may conceivably be a part of
less of tier, shall be considered subject
a contract which is subject to the to the enforcement provisions of the
Walsh-Healey Public Contracts Act. Act.
Nevertheless, such activities remain
subject to the general statutory duty
prescribed by section 1(e). Section
Subpart CGeneral Safety and
103(b) of the Contract Work Hours and
Health Provisions
Safety Standards Act provides, among
other things, that the Act shall not AUTHORITY: Sec. 3704, Contract Work Hours
and Safety Standards Act (40 U.S.C. 333);
apply to any work required to be done secs. 4, 6, and 8, Occupational Safety and
in accordance with the provisions of Health Act of 1970 (29 U.S.C. 653, 655, 657);
the Walsh-Healey Public Contracts Secretary of Labors Order No. 1271 (36 FR
Act. 8754), 876 (41 FR 25059), 983 (48 FR 35736), 6

27

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00037 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.20 29 CFR Ch. XVII (7112 Edition)
96 (62 FR 111), or 52007 (72 FR 31160) as appli- process, it shall prevail over any dif-
cable; and 29 CFR part 1911. ferent general standard which might
otherwise be applicable to the same
1926.20 General safety and health condition, practice, means, method, op-
provisions.
eration, or process.
(a) Contractor requirements. (1) Sec- (2) On the other hand, any standard
tion 107 of the Act requires that it shall apply according to its terms to
shall be a condition of each contract any employment and place of employ-
which is entered into under legislation ment in any industry, even though par-
subject to Reorganization Plan Number ticular standards are also prescribed
14 of 1950 (64 Stat. 1267), as defined in for the industry to the extent that
1926.12, and is for construction, alter- none of such particular standards ap-
ation, and/or repair, including painting plies.
and decorating, that no contractor or
(e) In the event a standard protects
subcontractor for any part of the con-
on its face a class of persons larger
tract work shall require any laborer or
than employees, the standard shall be
mechanic employed in the performance
applicable under this part only to em-
of the contract to work in sur-
ployees and their employment and
roundings or under working conditions
places of employment.
which are unsanitary, hazardous, or
dangerous to his health or safety. (f) Compliance duties owed to each em-
ployee(1) Personal protective equipment.
(b) Accident prevention responsibilities.
Standards in this part requiring the
(1) It shall be the responsibility of the
employer to provide personal protec-
employer to initiate and maintain such
tive equipment (PPE), including res-
programs as may be necessary to com-
pirators and other types of PPE, be-
ply with this part.
cause of hazards to employees impose a
(2) Such programs shall provide for
separate compliance duty with respect
frequent and regular inspections of the
to each employee covered by the re-
job sites, materials, and equipment to
quirement. The employer must provide
be made by competent persons des-
PPE to each employee required to use
ignated by the employers.
the PPE, and each failure to provide
(3) The use of any machinery, tool,
PPE to an employee may be considered
material, or equipment which is not in
a separate violation.
compliance with any applicable re-
quirement of this part is prohibited. (2) Training. Standards in this part
Such machine, tool, material, or equip- requiring training on hazards and re-
ment shall either be identified as un- lated matters, such as standards re-
safe by tagging or locking the controls quiring that employees receive train-
to render them inoperable or shall be ing or that the employer train employ-
physically removed from its place of ees, provide training to employees, or
operation. institute or implement a training pro-
gram, impose a separate compliance
(4) The employer shall permit only
duty with respect to each employee
those employees qualified by training
covered by the requirement. The em-
or experience to operate equipment and
ployer must train each affected em-
machinery.
ployee in the manner required by the
(c) The standards contained in this
standard, and each failure to train an
part shall apply with respect to em-
employee may be considered a separate
ployments performed in a workplace in
violation.
a State, the District of Columbia, the
Commonwealth of Puerto Rico, the [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
Virgin Islands, American Samoa, 1979, as amended at 58 FR 35078, June 30, 1993;
Guam, Trust Territory of the Pacific 73 FR 75588, Dec. 12, 2008]
Islands, Wake Island, Outer Conti-
nental Shelf lands defined in the Outer 1926.21 Safety training and edu-
Continental Shelf Lands Act, Johnston cation.
Island, and the Canal Zone. (a) General requirements. The Sec-
(d) (1) If a particular standard is spe- retary shall, pursuant to section 107(f)
cifically applicable to a condition, of the Act, establish and supervise pro-
practice, means, method, operation, or grams for the education and training of

28

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00038 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.26

employers and employees in the rec- more than 4 feet in depth such as pits,
ognition, avoidance and prevention of tubs, vaults, and vessels.
unsafe conditions in employments cov-
ered by the act. 1926.22 Recording and reporting of
(b) Employer responsibility. (1) The em- injuries. [Reserved]
ployer should avail himself of the safe-
1926.23 First aid and medical atten-
ty and health training programs the tion.
Secretary provides.
(2) The employer shall instruct each First aid services and provisions for
employee in the recognition and avoid- medical care shall be made available
ance of unsafe conditions and the regu- by the employer for every employee
lations applicable to his work environ- covered by these regulations. Regula-
ment to control or eliminate any haz- tions prescribing specific requirements
ards or other exposure to illness or in- for first aid, medical attention, and
jury. emergency facilities are contained in
(3) Employees required to handle or subpart D of this part.
use poisons, caustics, and other harm-
1926.24 Fire protection and preven-
ful substances shall be instructed re- tion.
garding the safe handling and use, and
be made aware of the potential haz- The employer shall be responsible for
ards, personal hygiene, and personal the development and maintenance of
protective measures required. an effective fire protection and preven-
(4) In job site areas where harmful tion program at the job site through-
plants or animals are present, employ- out all phases of the construction, re-
ees who may be exposed shall be in- pair, alteration, or demolition work.
structed regarding the potential haz- The employer shall ensure the avail-
ards, and how to avoid injury, and the ability of the fire protection and sup-
first aid procedures to be used in the pression equipment required by subpart
event of injury. F of this part.
(5) Employees required to handle or
1926.25 Housekeeping.
use flammable liquids, gases, or toxic
materials shall be instructed in the (a) During the course of construction,
safe handling and use of these mate- alteration, or repairs, form and scrap
rials and made aware of the specific re- lumber with protruding nails, and all
quirements contained in subparts D, F, other debris, shall be kept cleared from
and other applicable subparts of this work areas, passageways, and stairs, in
part. and around buildings or other struc-
(6)(i) All employees required to enter tures.
into confined or enclosed spaces shall (b) Combustible scrap and debris
be instructed as to the nature of the shall be removed at regular intervals
hazards involved, the necessary pre- during the course of construction. Safe
cautions to be taken, and in the use of means shall be provided to facilitate
protective and emergency equipment such removal.
required. The employer shall comply (c) Containers shall be provided for
with any specific regulations that the collection and separation of waste,
apply to work in dangerous or poten- trash, oily and used rags, and other
tially dangerous areas. refuse. Containers used for garbage and
(ii) For purposes of paragraph (b)(6)(i) other oily, flammable, or hazardous
of this section, confined or enclosed wastes, such as caustics, acids, harmful
space means any space having a limited dusts, etc. shall be equipped with cov-
means of egress, which is subject to the ers. Garbage and other waste shall be
accumulation of toxic or flammable disposed of at frequent and regular in-
contaminants or has an oxygen defi- tervals.
cient atmosphere. Confined or enclosed
spaces include, but are not limited to, 1926.26 Illumination.
storage tanks, process vessels, bins, Construction areas, aisles, stairs,
boilers, ventilation or exhaust ducts, ramps, runways, corridors, offices,
sewers, underground utility vaults, shops, and storage areas where work is
tunnels, pipelines, and open top spaces in progress shall be lighted with either

29

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00039 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.27 29 CFR Ch. XVII (7112 Edition)

natural or artificial illumination. The title, Shipyard Employment, shall


minimum illumination requirements apply.
for work areas are contained in subpart [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
D of this part. 1979, as amended at 61 FR 9249, Mar. 7, 1996]
1926.27 Sanitation. 1926.32 Definitions.
Health and sanitation requirements The following definitions shall apply
for drinking water are contained in in the application of the regulations in
subpart D of this part. this part:
(a) Act means section 107 of the Con-
1926.28 Personal protective equip-
ment. tract Work Hours and Safety Stand-
ards Act, commonly known as the Con-
(a) The employer is responsible for struction Safety Act (86 Stat. 96; 40
requiring the wearing of appropriate U.S.C. 333).
personal protective equipment in all (b) ANSI means American National
operations where there is an exposure Standards Institute.
to hazardous conditions or where this (c) Approved means sanctioned, en-
part indicates the need for using such dorsed, accredited, certified, or accept-
equipment to reduce the hazards to the ed as satisfactory by a duly constituted
employees. and nationally recognized authority or
(b) Regulations governing the use, se- agency.
lection, and maintenance of personal (d) Authorized person means a person
protective and lifesaving equipment approved or assigned by the employer
are described under subpart E of this to perform a specific type of duty or
part. duties or to be at a specific location or
locations at the jobsite.
1926.29 Acceptable certifications. (e) Administration means the Occupa-
(a) Pressure vessels. Current and valid tional Safety and Health Administra-
certification by an insurance company tion.
or regulatory authority shall be (f) Competent person means one who is
deemed as acceptable evidence of safe capable of identifying existing and pre-
installation, inspection, and testing of dictable hazards in the surroundings or
pressure vessels provided by the em- working conditions which are unsani-
ployer. tary, hazardous, or dangerous to em-
(b) Boilers. Boilers provided by the ployees, and who has authorization to
employer shall be deemed to be in com- take prompt corrective measures to
pliance with the requirements of this eliminate them.
part when evidence of current and valid (g) Construction work. For purposes of
certification by an insurance company this section, Construction work means
or regulatory authority attesting to work for construction, alteration, and/
the safe installation, inspection, and or repair, including painting and deco-
testing is presented. rating.
(c) Other requirements. Regulations (h) Defect means any characteristic
prescribing specific requirements for or condition which tends to weaken or
other types of pressure vessels and reduce the strength of the tool, object,
similar equipment are contained in or structure of which it is a part.
subparts F and O of this part. (i) Designated person means author-
ized person as defined in paragraph (d)
1926.30 Shipbuilding and ship repair- of this section.
ing. (j) Employee means every laborer or
(a) General. Shipbuilding, ship repair- mechanic under the Act regardless of
ing, alterations, and maintenance per- the contractual relationship which
formed on ships under Government may be alleged to exist between the la-
contract, except naval ship construc- borer and mechanic and the contractor
tion, is work subject to the Act. or subcontractor who engaged him.
(b) Applicable safety and health stand- Laborer and mechanic are not de-
ards. For the purpose of work carried fined in the Act, but the identical
out under this section, the safety and terms are used in the Davis-Bacon Act
health regulations in part 1915 of this (40 U.S.C. 276a), which provides for

30

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00040 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.35

minimum wage protection on Federal 1926.34 Means of egress.


and federally assisted construction
(a) General. In every building or
contracts. The use of the same term in
structure exits shall be so arranged and
a statute which often applies concur-
maintained as to provide free and un-
rently with section 107 of the Act has
obstructed egress from all parts of the
considerable precedential value in
building or structure at all times when
ascertaining the meaning of laborer
it is occupied. No lock or fastening to
and mechanic as used in the Act. La-
prevent free escape from the inside of
borer generally means one who per-
any building shall be installed except
forms manual labor or who labors at an
in mental, penal, or corrective institu-
occupation requiring physical strength;
tions where supervisory personnel is
mechanic generally means a worker
continually on duty and effective pro-
skilled with tools. See 18 Comp. Gen.
visions are made to remove occupants
341.
in case of fire or other emergency.
(k) Employer means contractor or
(b) Exit marking. Exits shall be
subcontractor within the meaning of
marked by a readily visible sign. Ac-
the Act and of this part.
cess to exits shall be marked by readily
(l) Hazardous substance means a sub-
visible signs in all cases where the exit
stance which, by reason of being explo-
or way to reach it is not immediately
sive, flammable, poisonous, corrosive,
visible to the occupants.
oxidizing, irritating, or otherwise
(c) Maintenance and workmanship.
harmful, is likely to cause death or in-
Means of egress shall be continually
jury.
maintained free of all obstructions or
(m) Qualified means one who, by pos-
impediments to full instant use in the
session of a recognized degree, certifi-
case of fire or other emergency.
cate, or professional standing, or who
by extensive knowledge, training, and [58 FR 35083, June 30, 1993]
experience, has successfully dem-
onstrated his ability to solve or resolve 1926.35 Employee emergency action
problems relating to the subject mat- plans.
ter, the work, or the project. (a) Scope and application. This section
(n) Safety factor means the ratio of applies to all emergency action plans
the ultimate breaking strength of a required by a particular OSHA stand-
member or piece of material or equip- ard. The emergency action plan shall
ment to the actual working stress or be in writing (except as provided in the
safe load when in use. last sentence of paragraph (e)(3) of this
(o) Secretary means the Secretary of section) and shall cover those des-
Labor. ignated actions employers and employ-
(p) SAE means Society of Automotive ees must take to ensure employee safe-
Engineers. ty from fire and other emergencies.
(q) Shall means mandatory. (b) Elements. The following elements,
(r) Should means recommended. at a minimum, shall be included in the
(s) Suitable means that which fits, plan:
and has the qualities or qualifications (1) Emergency escape procedures and
to meet a given purpose, occasion, con- emergency escape route assignments;
dition, function, or circumstance. (2) Procedures to be followed by em-
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
ployees who remain to operate critical
1979, as amended at 58 FR 35078, June 30, 1993] plant operations before they evacuate;
(3) Procedures to account for all em-
1926.33 Access to employee exposure ployees after emergency evacuation
and medical records. has been completed;
NOTE: The requirements applicable to con- (4) Rescue and medical duties for
struction work under this section are iden- those employees who are to perform
tical to those set forth at 1910.1020 of this them;
chapter. (5) The preferred means of reporting
[61 FR 31431, June 20, 1996] fires and other emergencies; and

31

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00041 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.50 29 CFR Ch. XVII (7112 Edition)

(6) Names or regular job titles of per- Sections 1926.58, 1926.59, 1926.60, and 1926.65
sons or departments who can be con- also issued under 5 U.S.C. 553 and 29 CFR
tacted for further information or expla- part 1911.
Section 1926.61 also issued under 49 U.S.C.
nation of duties under the plan. 18011819 and 6 U.S.C. 553.
(c) Alarm system. (1) The employer Section 1926.62 also issued under section
shall establish an employee alarm sys- 1031 of the Housing and Community Develop-
tem which complies with 1926.159. ment Act of 1992 (42 U.S.C. 4853).
(2) If the employee alarm system is Section 1926.65 also issued under section
126 of the Superfund Amendments and Reau-
used for alerting fire brigade members, thorization Act of 1986, as amended (re-
or for other purposes, a distinctive sig- printed at 29 U.S.C.A. 655 Note), and 5 U.S.C.
nal for each purpose shall be used. 553.
(d) Evacuation. The employer shall
establish in the emergency action plan 1926.50 Medical services and first
the types of evacuation to be used in aid.
emergency circumstances. (a) The employer shall insure the
(e) Training. (1) Before implementing availability of medical personnel for
the emergency action plan, the em- advice and consultation on matters of
ployer shall designate and train a suffi- occupational health.
cient number of persons to assist in the (b) Provisions shall be made prior to
safe and orderly emergency evacuation commencement of the project for
of employees. prompt medical attention in case of se-
(2) The employer shall review the rious injury.
plan with each employee covered by (c) In the absence of an infirmary,
the plan at the following times: clinic, hospital, or physician, that is
(i) Initially when the plan is devel- reasonably accessible in terms of time
oped, and distance to the worksite, which is
available for the treatment of injured
(ii) Whenever the employees respon-
employees, a person who has a valid
sibilities or designated actions under
certificate in first-aid training from
the plan change, and
the U.S. Bureau of Mines, the Amer-
(iii) Whenever the plan is changed. ican Red Cross, or equivalent training
(3) The employer shall review with that can be verified by documentary
each employee upon initial assignment evidence, shall be available at the
those parts of the plan which the em- worksite to render first aid.
ployee must know to protect the em- (d)(1) First aid supplies shall be eas-
ployee in the event of an emergency. ily accessible when required.
The written plan shall be kept at the (2) The contents of the first aid kit
workplace and made available for em- shall be placed in a weatherproof con-
ployee review. For those employers tainer with individual sealed packages
with 10 or fewer employees the plan for each type of item, and shall be
may be communicated orally to em- checked by the employer before being
ployees and the employer need not sent out on each job and at least week-
maintain a written plan. ly on each job to ensure that the ex-
[58 FR 35083, June 30, 1993] pended items are replaced.
(e) Proper equipment for prompt
transportation of the injured person to
Subpart DOccupational Health a physician or hospital, or a commu-
and Environmental Controls nication system for contacting nec-
essary ambulance service, shall be pro-
AUTHORITY: Section 107 of the Contract vided.
Work Hours and Safety Standards Act (40 (f) In areas where 911 is not available,
U.S.C. 3704); Sections 4, 6, and 8 of the Occu- the telephone numbers of the physi-
pational Safety and Health Act of 1970 (29 cians, hospitals, or ambulances shall be
U.S.C. 653, 655, and 657); and Secretary of La- conspicuously posted.
bors Order No. 1271 (36 FR 8754), 876 (41 FR
(g) Where the eyes or body of any
25059), 983 (48 FR 35736), 190 (55 FR 9033), 6
96 (62 FR 111), 32000 (65 FR 50017), 52002 (67 person may be exposed to injurious cor-
FR 65008), 52007 (72 FR 31159), 42010 (75 FR rosive materials, suitable facilities for
55355), or 12012 (77 FR 3912) as applicable; quick drenching or flushing of the eyes
and 29 CFR part 1911. and body shall be provided within the

32

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00042 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.51

work area for immediate emergency (4) The common drinking cup is pro-
use. hibited.
(5) Where single service cups (to be
APPENDIX A TO 1926.50FIRST AID KITS
(NON-MANDATORY) used but once) are supplied, both a san-
itary container for the unused cups and
First aid supplies are required to be easily a receptacle for disposing of the used
accessible under paragraph 1926.50(d)(1). An
example of the minimal contents of a generic
cups shall be provided.
first aid kit is described in American Na- (6) Potable water means water that
tional Standard (ANSI) Z308.11978 Min- meets the standards for drinking pur-
imum Requirements for Industrial Unit-Type poses of the State or local authority
First-aid Kits. The contents of the kit list- having jurisdiction, or water that
ed in the ANSI standard should be adequate meets the quality standards prescribed
for small work sites. When larger operations by the U.S. Environmental Protection
or multiple operations are being conducted
at the same location, employers should de- Agencys National Primary Drinking
termine the need for additional first aid kits Water Regulations (40 CFR part 141).
at the worksite, additional types of first aid (b) Nonpotable water. (1) Outlets for
equipment and supplies and additional quan- nonpotable water, such as water for in-
tities and types of supplies and equipment in dustrial or firefighting purposes only,
the first aid kits. shall be identified by signs meeting the
In a similar fashion, employers who have
requirements of subpart G of this part,
unique or changing first-aid needs in their
workplace may need to enhance their first- to indicate clearly that the water is
aid kits. The employer can use the OSHA 300 unsafe and is not to be used for drink-
log, OSHA 301 log, or other reports to iden- ing, washing, or cooking purposes.
tify these unique problems. Consultation (2) There shall be no cross-connec-
from the local fire/rescue department, appro- tion, open or potential, between a sys-
priate medical professional, or local emer- tem furnishing potable water and a
gency room may be helpful to employers in
system furnishing nonpotable water.
these circumstances. By assessing the spe-
cific needs of their workplace, employers can (c) Toilets at construction jobsites. (1)
ensure that reasonably anticipated supplies Toilets shall be provided for employees
are available. Employers should assess the according to the following table:
specific needs of their worksite periodically
and augment the first aid kit appropriately. TABLE D1
If it is reasonably anticipated employees
will be exposed to blood or other potentially Number of em- Minimum number of facilities
ployees
infectious materials while using first-aid
supplies, employers should provide personal 20 or less .......... 1.
protective equipment (PPE). Appropriate 20 or more ......... 1 toilet seat and 1 urinal per 40 workers.
PPE includes gloves, gowns, face shields, 200 or more ....... 1 toilet seat and 1 urinal per 50 workers.
masks and eye protection (see Occupational
Exposure to Blood borne Pathogens, 29 CFR (2) Under temporary field conditions,
1910.1030(d)(3)) (56 FR 64175).
provisions shall be made to assure not
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6, less than one toilet facility is avail-
1979, as amended at 49 FR 18295, Apr. 30, 1984; able.
58 FR 35084, June 30, 1993; 61 FR 5510, Feb. 13,
(3) Job sites, not provided with a san-
1996; 63 FR 33469, June 18, 1998; 76 FR 80740,
Dec. 27, 2011] itary sewer, shall be provided with one
of the following toilet facilities unless
1926.51 Sanitation. prohibited by local codes:
(a) Potable water. (1) An adequate sup- (i) Privies (where their use will not
ply of potable water shall be provided contaminate ground or surface water);
in all places of employment. (ii) Chemical toilets;
(2) Portable containers used to dis- (iii) Recirculating toilets;
pense drinking water shall be capable (iv) Combustion toilets.
of being tightly closed, and equipped (4) The requirements of this para-
with a tap. Water shall not be dipped graph (c) for sanitation facilities shall
from containers. not apply to mobile crews having
(3) Any container used to distribute transportation readily available to
drinking water shall be clearly marked nearby toilet facilities.
as to the nature of its contents and not (d) Food handling. (1) All employees
used for any other purpose. food service facilities and operations

33

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00043 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.52 29 CFR Ch. XVII (7112 Edition)

shall meet the applicable laws, ordi- (iii) Body soap or other appropriate
nances, and regulations of the jurisdic- cleansing agents convenient to the
tions in which they are located. showers shall be provided as specified
(2) All employee food service facili- in paragraph (f)(3)(iii) of this section.
ties and operations shall be carried out (iv) Showers shall be provided with
in accordance with sound hygienic hot and cold water feeding a common
principles. In all places of employment discharge line.
where all or part of the food service is (v) Employees who use showers shall
provided, the food dispensed shall be be provided with individual clean tow-
wholesome, free from spoilage, and els.
shall be processed, prepared, handled, (g) Eating and drinking areas. No em-
and stored in such a manner as to be ployee shall be allowed to consume
protected against contamination. food or beverages in a toilet room nor
(e) Temporary sleeping quarters. When in any area exposed to a toxic mate-
temporary sleeping quarters are pro- rial.
vided, they shall be heated, ventilated, (h) Vermin control. Every enclosed
and lighted. workplace shall be so constructed,
(f) Washing facilities. (1) The employer equipped, and maintained, so far as
shall provide adequate washing facili- reasonably practicable, as to prevent
ties for employees engaged in the ap- the entrance or harborage of rodents,
plication of paints, coating, herbicides, insects, and other vermin. A con-
or insecticides, or in other operations tinuing and effective extermination
where contaminants may be harmful to program shall be instituted where their
the employees. Such facilities shall be presence is detected.
in near proximity to the worksite and (i) Change rooms. Whenever employ-
shall be so equipped as to enable em- ees are required by a particular stand-
ployees to remove such substances. ard to wear protective clothing because
(2) General. Washing facilities shall of the possibility of contamination
be maintained in a sanitary condition. with toxic materials, change rooms
(3) Lavatories. (i) Lavatories shall be equipped with storage facilities for
made available in all places of employ- street clothes and separate storage fa-
ment. The requirements of this sub- cilities for the protective clothing
division do not apply to mobile crews shall be provided.
or to normally unattended work loca- [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
tions if employees working at these lo- 1979, as amended at 58 FR 35084, June 30, 1993;
cations have transportation readily 76 FR 33611, June 8, 2011]
available to nearby washing facilities
which meet the other requirements of 1926.52 Occupational noise exposure.
this paragraph. (a) Protection against the effects of
(ii) Each lavatory shall be provided noise exposure shall be provided when
with hot and cold running water, or the sound levels exceed those shown in
tepid running water. Table D2 of this section when meas-
(iii) Hand soap or similar cleansing ured on the A-scale of a standard sound
agents shall be provided. level meter at slow response.
(iv) Individual hand towels or sec- (b) When employees are subjected to
tions thereof, of cloth or paper, air sound levels exceeding those listed in
blowers or clean individual sections of Table D2 of this section, feasible ad-
continuous cloth toweling, convenient ministrative or engineering controls
to the lavatories, shall be provided. shall be utilized. If such controls fail to
(4) Showers. (i) Whenever showers are reduce sound levels within the levels of
required by a particular standard, the the table, personal protective equip-
showers shall be provided in accord- ment as required in subpart E, shall be
ance with paragraphs (f)(4) (ii) through provided and used to reduce sound lev-
(v) of this section. els within the levels of the table.
(ii) One shower shall be provided for (c) If the variations in noise level in-
each 10 employees of each sex, or nu- volve maxima at intervals of 1 second
merical fraction thereof, who are re- or less, it is to be considered contin-
quired to shower during the same shift. uous.

34

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00044 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.54

(d)(1) In all cases where the sound 1926.53 Ionizing radiation.


levels exceed the values shown herein, (a) In construction and related ac-
a continuing, effective hearing con- tivities involving the use of sources of
servation program shall be adminis- ionizing radiation, the pertinent provi-
tered. sions of the Nuclear Regulatory Com-
missions Standards for Protection
TABLE D2PERMISSIBLE NOISE EXPOSURES
Against Radiation (10 CFR part 20), re-
Sound level lating to protection against occupa-
Duration per day, hours dBA slow tional radiation exposure, shall apply.
response
(b) Any activity which involves the
8 ......................................................................... 90 use of radioactive materials or X-rays,
6 ......................................................................... 92 whether or not under license from the
4 ......................................................................... 95 Nuclear Regulatory Commission, shall
3 ......................................................................... 97 be performed by competent persons
2 ......................................................................... 100
112 ..................................................................... 102
specially trained in the proper and safe
1 ......................................................................... 105 operation of such equipment. In the
12 ....................................................................... 110 case of materials used under Commis-
14 or less ........................................................... 115 sion license, only persons actually li-
censed, or competent persons under di-
(2)(i) When the daily noise exposure rection and supervision of the licensee,
is composed of two or more periods of shall perform such work.
noise exposure of different levels, their (c)(r) [Reserved]
combined effect should be considered, NOTE: The requirements applicable to con-
rather than the individual effect of struction work under paragraphs (c) through
each. Exposure to different levels for (r) of this section are identical to those set
various periods of time shall be com- forth at paragraphs (a) through (p) of
puted according to the formula set 1910.1096 of this chapter.
forth in paragraph (d)(2)(ii) of this sec- [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
tion. 1979, as amended at 61 FR 5510, Feb. 13, 1996;
(ii) Fe = (T1/L1)+(T2/L2)+ + (Tn/Ln) 61 FR 31431, June 20, 1996]

Where: 1926.54 Nonionizing radiation.


Fe = The equivalent noise exposure factor. (a) Only qualified and trained em-
T = The period of noise exposure at any es- ployees shall be assigned to install, ad-
sentially constant level. just, and operate laser equipment.
L = The duration of the permissible noise ex- (b) Proof of qualification of the laser
posure at the constant level (from Table D
2).
equipment operator shall be available
and in possession of the operator at all
If the value of Fe exceeds unity (1) the times.
exposure exceeds permissible levels. (c) Employees, when working in areas
(iii) A sample computation showing in which a potential exposure to direct
an application of the formula in para- or reflected laser light greater than
graph (d)(2)(ii) of this section is as fol- 0.005 watts (5 milliwatts) exists, shall
lows. An employee is exposed at these be provided with antilaser eye protec-
levels for these periods: tion devices as specified in subpart E of
this part.
110 db A 14 hour. (d) Areas in which lasers are used
100 db A 12 hour. shall be posted with standard laser
90 db A 112 hours. warning placards.
Fe = (14/12)+(12/2)+(112/8) (e) Beam shutters or caps shall be
Fe = 0.500+0.25+0.188 utilized, or the laser turned off, when
Fe = 0.938 laser transmission is not actually re-
quired. When the laser is left unat-
Since the value of Fe does not exceed tended for a substantial period of time,
unity, the exposure is within permis- such as during lunch hour, overnight,
sible limits. or at change of shifts, the laser shall be
(e) Exposure to impulsive or impact turned off.
noise should not exceed 140 dB peak (f) Only mechanical or electronic
sound pressure level. means shall be used as a detector for

35

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00045 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.55 29 CFR Ch. XVII (7112 Edition)

guiding the internal alignment of the American Conference of Governmental


laser. Industrial Hygienists, shall be avoided.
(g) The laser beam shall not be di- See appendix A to this section.
rected at employees. (b) To achieve compliance with para-
(h) When it is raining or snowing, or graph (a) of this section, administra-
when there is dust or fog in the air, the tive or engineering controls must first
operation of laser systems shall be pro- be implemented whenever feasible.
hibited where practicable; in any When such controls are not feasible to
event, employees shall be kept out of achieve full compliance, protective
range of the area of source and target equipment or other protective meas-
during such weather conditions. ures shall be used to keep the exposure
(i) Laser equipment shall bear a label of employees to air contaminants with-
to indicate maximum output. in the limits prescribed in this section.
(j) Employees shall not be exposed to Any equipment and technical measures
light intensities above: used for this purpose must first be ap-
(1) Direct staring: 1 micro-watt per
proved for each particular use by a
square centimeter;
competent industrial hygienist or
(2) Incidental observing: 1 milliwatt
other technically qualified person.
per square centimeter;
(3) Diffused reflected light: 212 watts Whenever respirators are used, their
per square centimeter. use shall comply with 1926.103.
(k) Laser unit in operation should be (c) Paragraphs (a) and (b) of this sec-
set up above the heads of the employ- tion do not apply to the exposure of
ees, when possible. employees to airborne asbestos,
(l) Employees shall not be exposed to tremolite, anthophyllite, or actinolite
microwave power densities in excess of dust. Whenever any employee is ex-
10 milliwatts per square centimeter. posed to airborne asbestos, tremolite,
anthophyllite, or actinolite dust, the
1926.55 Gases, vapors, fumes, dusts, requirements of 1910.1101 or 1926.58 of
and mists. this title shall apply.
(a) Exposure of employees to inhala- (d) Paragraphs (a) and (b) of this sec-
tion, ingestion, skin absorption, or tion do not apply to the exposure of
contact with any material or substance employees to formaldehyde. Whenever
at a concentration above those speci- any employee is exposed to formalde-
fied in the Threshold Limit Values of hyde, the requirements of 1910.1048 of
Airborne Contaminants for 1970 of the this title shall apply.

APPENDIX A TO 1926.551970 AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL


HYGIENISTS THRESHOLD LIMIT VALUES OF AIRBORNE CONTAMINANTS

THRESHOLD LIMIT VALUES OF AIRBORNE CONTAMINANTS FOR CONSTRUCTION

Skin Designa-
Substance CAS No. d ppm a mg/m 3,b tion

Abate; see Temephos.


Acetaldehyde ......................................... 75070 200 360
Acetic acid ............................................. 64197 10 25
Acetic anhydride .................................... 108247 5 20
Acetone ................................................. 67641 1000 2400
Acetonitrile ............................................. 75058 40 70
2-Acetylaminofluorine; see 1926.1114 53963
Acetylene ............................................... 74862 E
Acetylene dichloride; see 1,2-
Dichloroethylene.
Acetylene tetrabromide ......................... 79276 1 14
Acrolein ................................................. 107028 0.1 0.25
Acrylamide ............................................. 79061 0.3 X
Acrylonitrile; see 1926.1145 ............... 107131
Aldrin ..................................................... 309002 0.25 X
Allyl alcohol ........................................... 107186 2 5 X

36

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00046 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.55

THRESHOLD LIMIT VALUES OF AIRBORNE CONTAMINANTS FOR CONSTRUCTIONContinued

Skin Designa-
Substance CAS No. d ppm a mg/m 3,b tion

Allyl chloride .......................................... 107051 1 3


Allyl glycidyl ether (AGE) ...................... 106923 (C)10 (C)45
Allyl propyl disulfide .............................. 2179591 2 12
alpha-Alumina ....................................... 1344281
Total dust .......................................
Respirable fraction .........................
Alundum; see alpha-Alumina.
4-Aminodiphenyl; see 1926.1111 ....... 92671
2-Aminoethanol; see Ethanolamine.
2-Aminopyridine .................................... 504290 0.5 2
Ammonia ............................................... 7664417 50 35
Ammonium sulfamate ........................... 7773060
Total dust ....................................... 15
Respirable fraction ......................... 5
n-Amyl acetate ...................................... 628637 100 525
sec-Amyl acetate ................................... 626380 125 650
Aniline and homologs ............................ 62533 5 19 X
Anisidine (o-, p-isomers) ....................... 29191524 0.5 X
Antimony and compounds (as Sb) ....... 7440360 0.5
ANTU (alpha Naphthylthiourea) ............ 86884 0.3
Argon ..................................................... 7440371 E
Arsenic, inorganic compounds (as As);
see 1926.1118 ................................ 7440382
Arsenic, organic compounds (as As) .... 7440382 0.5
Arsine .................................................... 7784421 0.05 0.2
Asbestos; see 1926.58.
Azinphos-methyl .................................... 86500 0.2 X
Barium, soluble compounds (as Ba) ..... 7440393 0.5
Benzene g; see 1926.1128 ................. 71432
Benzidine; see 1926.1110 .................. 92875
p-Benzoquinone; see Quinone.
Benzo(a)pyrene; see Coal tar pitch
volatiles.
Benzoyl peroxide ................................... 94360 5
Benzyl chloride ...................................... 100447 1 5
Beryllium and beryllium compounds (as
Be) ..................................................... 7440417 0.002
Biphenyl; see Diphenyl.
Bisphenol A; see Diglycidyl ether.
Boron oxide ........................................... 1303862
Total dust ....................................... 15
Boron tribromide .................................... 10294334 1 10
Boron trifluoride ..................................... 7637072 (C)1 (C)3
Bromine ................................................. 7726956 0.1 0.7
Bromine pentafluoride ........................... 7789302 0.1 0.7
Bromoform ............................................. 75252 0.5 5 X
Butadiene (1,3-Butadiene); see 29 CFR
1910.1051; 29 CFR 1910.19(l) .......... 106990 STEL
1 ppm/5 ppm

Butanethiol; see Butyl mercaptan.


2-Butanone (Methyl ethyl ketone) ......... 78933 200 590
2-Butoxyethanol .................................... 111762 50 240 X
n-Butyl-acetate ...................................... 123864 150 710
sec-Butyl acetate ................................... 105464 200 950
tert-Butyl acetate ................................... 540885 200 950
n-Butyl alcohol ....................................... 71363 100 300
sec-Butyl alcohol ................................... 78922 150 450
tert-Butyl alcohol ................................... 75650 100 300
Butylamine ............................................. 109739 (C)5 (C)15 X
tert-Butyl chromate (as CrO3); see
1926.1126 n ........................................ 1189851
n-Butyl glycidyl ether (BGE) .................. 2426086 50 270
37

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00047 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.55 29 CFR Ch. XVII (7112 Edition)

THRESHOLD LIMIT VALUES OF AIRBORNE CONTAMINANTS FOR CONSTRUCTIONContinued

Skin Designa-
Substance CAS No. d ppm a mg/m 3,b tion

Butyl mercaptan .................................... 109795 0.5 1.5


p-tert-Butyltoluene ................................. 98511 10 60
Cadmium (as Cd); see 1926.1127 ........ 7440439
Calcium carbonate ................................ 1317653
Total dust .......................................
Respirable fraction .........................
Calcium oxide ........................................ 1305788 5
Calcium sulfate ...................................... 7778189
Total dust ....................................... 15
Respirable fraction ......................... 5
Camphor, synthetic ............................... 76222 2
Carbaryl (Sevin) .................................... 63252 5
Carbon black ......................................... 1333864 3.5
Carbon dioxide ...................................... 124389 5000 9000
Carbon disulfide .................................... 75150 20 60 X
Carbon monoxide .................................. 630080 50 55
Carbon tetrachloride .............................. 56235 10 65 X
Cellulose ................................................ 9004346
Total dust .......................................
Respirable fraction .........................
Chlordane .............................................. 57749 0.5 X
Chlorinated camphene .......................... 8001352 0.5 X
Chlorinated diphenyl oxide .................... 55720995 0.5
Chlorine ................................................. 7782505 1 3
Chlorine dioxide .................................... 10049044 0.1 0.3
Chlorine trifluoride ................................. 7790912 (C)0.1 (C)0.4
Chloroacetaldehyde .............................. 107200 (C)1 (C)3
a-Chloroacetophenone (Phenacyl chlo-
ride) .................................................... 532274 0.05 0.3
Chlorobenzene ...................................... 108907 75 350
o-Chlorobenzylidene malononitrile ........ 2698411 0.05 0.4
Chlorobromomethane ............................ 74975 200 1050
2-Chloro-1,3-butadiene; see beta-Chlo-
roprene.
Chlorodiphenyl (42% Chlorine) (PCB) .. 53469219 1 X
Chlorodiphenyl (54% Chlorine) (PCB) .. 11097691 0.5 X
1-Chloro,2,3-epoxypropane; see
Epichlorohydrin.
2-Chloroethanol; see Ethylene
chlorohydrin.
Chloroethylene; see Vinyl chloride.
Chloroform (Trichloromethane) ............. 67663 (C)50 (C)240
bis(Chloromethyl) ether; see
1926.1108 ....................................... 542881
Chloromethyl methyl ether; see
1926.1106 ....................................... 107302
1-Chloro-1-nitropropane ........................ 600259 20 100
Chloropicrin ........................................... 76062 0.1 0.7
beta-Chloroprene .................................. 126998 25 90 X
Chromium (II) compounds.
(as Cr) ............................................ 7440473 0.5
Chromium (III) compounds.
(as Cr) ............................................ 7440473 0.5
Chromium (VI) compounds; See
1926.1126 o.
Chromium metal and insol. salts (as
Cr) ...................................................... 7440473 1
Chrysene; see Coal tar pitch volatiles.
Coal tar pitch volatiles (benzene solu-
ble fraction), anthracene, BaP, phen-
anthrene, acridine, chrysene, pyrene 65996932 0.2
Cobalt metal, dust, and fume (as Co) .. 7440484 0.1

38

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00048 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.55

THRESHOLD LIMIT VALUES OF AIRBORNE CONTAMINANTS FOR CONSTRUCTIONContinued

Skin Designa-
Substance CAS No. d ppm a mg/m 3,b tion

Coke oven emissions; see 1926.1129.


Copper ................................................... 7440508
Fume (as Cu) ................................. 0.1
Dusts and mists (as Cu) ................ 1
Corundum; see Emery.
Cotton dust (raw) .................................. 1
Crag herbicide (Sesone) ....................... 136787
Total dust .......................................
Respirable fraction .........................
Cresol, all isomers ................................ 1319773 5 22 X
Crotonaldehyde ..................................... 123739; 2 6
4170303
Cumene ................................................. 98828 50 245 X
Cyanides (as CN) .................................. Varies with 5 X
Compound
Cyanogen .............................................. 460195 10
Cyclohexane .......................................... 110827 300 1050
Cyclohexanol ......................................... 108930 50 200
Cyclohexanone ...................................... 108941 50 200
Cyclohexene .......................................... 110838 300 1015
Cyclonite ................................................ 121824 1.5 X
Cyclopentadiene .................................... 542927 75 200
DDT, see
Dichlorodiphenyltrichloroethane.
DDVP, see Dichlorvos.
2,4-D (Dichlorophenoxyacetic acid) ...... 94757 10
Decaborane ........................................... 17702419 0.05 0.3 X
Demeton (Systox) ................................. 8065483 0.1 X
Diacetone alcohol (4-Hydroxy-4-methyl-
2-pentanone) ..................................... 123422 50 240
1,2-Diaminoethane; see Ethylene-
diamine.
Diazomethane ....................................... 334883 0.2 0.4
Diborane ................................................ 19287457 0.1 0.1
1,2-Dibromo-3-chloropropane (DBCP);
see 1926.1144 ................................ 96128
1,2-Dibromoethane; see Ethylene
dibromide.
Dibutyl phosphate ................................. 107664 1 5
Dibutyl phthalate ................................... 84742 5
Dichloroacetylene .................................. 7572294 (C)0.1 (C)0.4
o-Dichlorobenzene ................................ 95501 (C)50 (C)300
p-Dichlorobenzene ................................ 106467 75 450
3,3-Dichlorobenzidine; see
1926.1107 ....................................... 91941
Dichlorodifluoromethane ....................... 75718 1000 4950
1,3-Dichloro-5,5-dimethyl hydantoin ..... 118525 0.2
Dichlorodiphenyltrichloroethane (DDT) 50293 1 X
1,1-Dichloroethane ................................ 75343 100 400
1,2-Dichloroethane; see Ethylene di-
chloride.
1,2-Dichloroethylene ............................. 540590 200 790
Dichloroethyl ether ................................ 111444 (C)15 (C)90 X
Dichloromethane; see Methylene chlo-
ride.
Dichloromonofluoromethane ................. 75434 1000 4200
1,1-Dichloro-1-nitroethane ..................... 594729 (C)10 (C)60
1,2-Dichloropropane; see Propylene di-
chloride.
Dichlorotetrafluoroethane ...................... 76142 1000 7000
Dichlorvos (DDVP) ................................ 62737 1 X
Dieldrin .................................................. 60571 0.25 X

39

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00049 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.55 29 CFR Ch. XVII (7112 Edition)

THRESHOLD LIMIT VALUES OF AIRBORNE CONTAMINANTS FOR CONSTRUCTIONContinued

Skin Designa-
Substance CAS No. d ppm a mg/m 3,b tion

Diethylamine .......................................... 109897 25 75


2-Diethylaminoethanol ........................... 100378 10 50 X
Diethylene triamine ............................... 111400 (C)10 (C)42 X
Diethyl ether; see Ethyl ether.
Difluorodibromomethane ....................... 75616 100 860
Diglycidyl ether (DGE) .......................... 2238075 (C)0.5 (C)2.8
Dihydroxybenzene; see Hydroquinone.
Diisobutyl ketone ................................... 108838 50 290
Diisopropylamine ................................... 108189 5 20 X
4-Dimethylaminoazobenzene; see
1926.1115 ....................................... 60117
Dimethoxymethane; see Methylal.
Dimethyl acetamide ............................... 127195 10 35 X
Dimethylamine ....................................... 124403 10 18
Dimethylaminobenzene; see Xylidine.
Dimethylaniline (N,N-Dimethylaniline) ... 121697 5 25 X
Dimethylbenzene; see Xylene.
Dimethyl-1,2-dibromo- 2,2-dichloroethyl
phosphate .......................................... 300765 3
Dimethylformamide ............................... 68122 10 30 X
2,6-Dimethyl-4-heptanone; see
Diisobutyl ketone.
1,1-Dimethylhydrazine ........................... 57147 0.5 1 X
Dimethylphthalate .................................. 131113 5
Dimethyl sulfate ..................................... 77783 1 5 X
Dinitrobenzene (all isomers) ................. 1 X
(ortho) ............................................. 528290
(meta) ............................................. 99650
(para) .............................................. 100254
Dinitro-o-cresol ...................................... 534521 0.2 X
Dinitrotoluene ........................................ 25321146 1.5 X
Dioxane (Diethylene dioxide) ................ 123911 100 360 X
Diphenyl (Biphenyl) ............................... 92524 0.2 1
Diphenylamine ....................................... 122394 10
Diphenylmethane diisocyanate; see
Methylene bisphenyl isocyanate.
Dipropylene glycol methyl ether ............ 34590948 100 600 X
Di-sec octyl phthalate (Di-(2-ethylhexyl)
phthalate) ........................................... 117817 5
Emery .................................................... 12415348
Total dust .......................................
Respirable fraction .........................
Endosulfan ............................................ 115297 0.1 X
Endrin .................................................... 72208 0.1 X
Epichlorohydrin ...................................... 106898 5 19 X
EPN ....................................................... 2104645 0.5 X
1,2-Epoxypropane; see Propylene
oxide.
2,3-Epoxy-1-propanol; see Glycidol.
Ethane ................................................... 74840 E
Ethanethiol; see Ethyl mercaptan.
Ethanolamine ........................................ 141435 3 6
2-Ethoxyethanol (Cellosolve) ................ 110805 200 740 X
2-Ethoxyethyl acetate (Cellosolve ace-
tate) .................................................... 111159 100 540 X
Ethyl acetate ......................................... 141786 400 1400
Ethyl acrylate ......................................... 140885 25 100 X
Ethyl alcohol (Ethanol) .......................... 64175 1000 1900
Ethylamine ............................................. 75047 10 18
Ethyl amyl ketone (5-Methyl-3-
heptanone) ......................................... 541855 25 130
Ethyl benzene ....................................... 100414 100 435

40

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00050 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.55

THRESHOLD LIMIT VALUES OF AIRBORNE CONTAMINANTS FOR CONSTRUCTIONContinued

Skin Designa-
Substance CAS No. d ppm a mg/m 3,b tion

Ethyl bromide ........................................ 74964 200 890


Ethyl butyl ketone (3-Heptanone) ......... 106354 50 230
Ethyl chloride ......................................... 75003 1000 2600
Ethyl ether ............................................. 60297 400 1200
Ethyl formate ......................................... 109944 100 300
Ethyl mercaptan .................................... 75081 0.5 1
Ethyl silicate .......................................... 78104 100 850
Ethylene ................................................ 74851 E
Ethylene chlorohydrin ............................ 107073 5 16 X
Ethylenediamine .................................... 107153 10 25
Ethylene dibromide ............................... 106934 (C)25 (C)190 X
Ethylene dichloride (1,2-
Dichloroethane) ................................. 107062 50 200
Ethylene glycol dinitrate ........................ 628966 (C)0.2 (C)1 X
Ethylene glycol methyl acetate; see
Methyl cellosolve acetate.
Ethyleneimine; see 1926.1112 ........... 151564
Ethylene oxide; see 1926.1147 .......... 75218
Ethylidene chloride; see 1,1-
Dichloroethane.
N-Ethylmorpholine ................................. 100743 20 94 X
Ferbam .................................................. 14484641
Total dust ....................................... 15
Ferrovanadium dust .............................. 12604589 1
Fibrous Glass.
Total dust .......................................
Respirable fraction .........................
Fluorides (as F) ..................................... Varies with 2.5
compound
Fluorine ................................................. 7782414 0.1 0.2
Fluorotrichloromethane
(Trichlorofluoromethane) ................... 75694 1000 5600
Formaldehyde; see 1926.1148 ........... 50000
Formic acid ............................................ 64186 5 9
Furfural .................................................. 98011 5 20 X
Furfuryl alcohol ...................................... 98000 50 200
Gasoline ................................................ 8006619 A3
Glycerin (mist) ....................................... 56815
Total dust .......................................
Respirable fraction .........................
Glycidol .................................................. 556525 50 150
Glycol monoethyl ether; see 2-
Ethoxyethanol.
Graphite, natural, respirable dust ......... 7782425 ( 2) ( 2) (2)
Graphite, synthetic.
Total dust .......................................
Respirable fraction .........................
Guthion; see Azinphos methyl.
Gypsum ................................................. 13397245
Total dust .......................................
Respirable fraction .........................
Hafnium ................................................. 7440586 0.5
Helium ................................................... 7440597 E
Heptachlor ............................................. 76448 0.5 X
Heptane (n-Heptane) ............................ 142825 500 2000
Hexachloroethane ................................. 67721 1 10 X
Hexachloronaphthalene ........................ 1335871 0.2 X
n-Hexane ............................................... 110543 500 1800
2-Hexanone (Methyl n-butyl ketone) ..... 591786 100 410
Hexone (Methyl isobutyl ketone) .......... 108101 100 410
sec-Hexyl acetate .................................. 108849 50 300
Hydrazine .............................................. 302012 1 1.3 X

41

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00051 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.55 29 CFR Ch. XVII (7112 Edition)

THRESHOLD LIMIT VALUES OF AIRBORNE CONTAMINANTS FOR CONSTRUCTIONContinued

Skin Designa-
Substance CAS No. d ppm a mg/m 3,b tion

Hydrogen ............................................... 1333740 E


Hydrogen bromide ................................. 10035106 3 10
Hydrogen chloride ................................. 7647010 (C)5 (C)7
Hydrogen cyanide ................................. 74908 10 11 X
Hydrogen fluoride (as F) ....................... 7664393 3 2
Hydrogen peroxide ................................ 7722841 1 1.4
Hydrogen selenide (as Se) ................... 7783075 0.05 .02
Hydrogen sulfide ................................... 7783064 10 15
Hydroquinone ........................................ 123319 2
Indene ................................................... 95136 10 45
Indium and compounds (as In) ............. 7440746 0.1
Iodine ..................................................... 7553562 (C)0.1 (C)1
Iron oxide fume ..................................... 1309371 10
Iron salts (soluble) (as Fe) .................... Varies with 1
compound
Isoamyl acetate ..................................... 123922 100 525
Isoamyl alcohol (primary and sec-
ondary) ............................................... 123513 100 360
Isobutyl acetate ..................................... 110190 150 700
Isobutyl alcohol ..................................... 78831 100 300
Isophorone ............................................ 78591 25 140
Isopropyl acetate ................................... 108214 250 950
Isopropyl alcohol ................................... 67630 400 980
Isopropylamine ...................................... 75310 5 12
Isopropyl ether ...................................... 108203 500 2100
Isopropyl glycidyl ether (IGE) ................ 4016142 50 240
Kaolin .................................................... 1332587
Total dust .......................................
Respirable fraction .........................
Ketene ................................................... 463514 0.5 0.9
Lead, inorganic (as Pb); see 1926.62 .. 7439921
Limestone .............................................. 1317653
Total dust .......................................
Respirable fraction .........................
Lindane .................................................. 58899 0.5 X
Lithium hydride ...................................... 7580678 0.025
L.P.G. (Liquefied petroleum gas) .......... 68476857 1000 1800
Magnesite .............................................. 546930
Total dust .......................................
Respirable fraction .........................
Magnesium oxide fume ......................... 1309484
Total particulate ............................. 15
Malathion ............................................... 121755
Total dust ....................................... 15 X
Maleic anhydride ................................... 108316 0.25
Manganese compounds (as Mn) .......... 7439965 (C)5
Manganese fume (as Mn) ..................... 7439965 (C)5
Marble ................................................... 1317653
Total dust .......................................
Respirable fraction .........................
Mercury (aryl and inorganic)(as Hg) ..... 7439976 0.1 X
Mercury (organo) alkyl compounds (as
Hg) ..................................................... 7439976 0.01 X
Mercury (vapor) (as Hg) ........................ 7439976 0.1 X
Mesityl oxide ......................................... 141797 25 100
Methane ................................................ 74828 E
Methanethiol; see Methyl mercaptan.
Methoxychlor ......................................... 72435
Total dust ....................................... 15
2-Methoxyethanol (Methyl cellosolve) ... 109864 25 80 X
2-Methoxyethyl acetate (Methyl
cellosolve acetate) ............................. 110496 25 120 X

42

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00052 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.55

THRESHOLD LIMIT VALUES OF AIRBORNE CONTAMINANTS FOR CONSTRUCTIONContinued

Skin Designa-
Substance CAS No. d ppm a mg/m 3,b tion

Methyl acetate ....................................... 79209 200 610


Methyl acetylene (Propyne) .................. 74997 1000 1650
Methyl acetylene-propadiene mixture
(MAPP) .............................................. 1000 1800
Methyl acrylate ...................................... 96333 10 35 X
Methylal (Dimethoxy-methane) ............. 109875 1000 3100
Methyl alcohol ....................................... 67561 200 260
Methylamine .......................................... 74895 10 12
Methyl amyl alcohol; see Methyl iso-
butyl carbinol.
Methyl n-amyl ketone ............................ 110430 100 465
Methyl bromide ...................................... 74839 (C)20 (C)80 X
Methyl butyl ketone; see 2-Hexanone.
Methyl cellosolve; see 2-
Methoxyethanol.
Methyl cellosolve acetate; see 2-
Methoxyethyl acetate.
Methylene chloride; see 1910.1052.
Methyl chloroform (1,1,1-Trichloro-
ethane) ............................................... 71556 350 1900
Methylcyclohexane ................................ 108872 500 2000
Methylcyclohexanol ............................... 25639423 100 470
o-Methylcyclohexanone ......................... 583608 100 460 X
Methylene chloride ................................ 75092 500 1740
Methylenedianiline (MDA) ..................... 101779
Methyl ethyl ketone (MEK); see 2-Buta-
none.
Methyl formate ...................................... 107313 100 250
Methyl hydrazine (Monomethyl hydra-
zine) ................................................... 60344 (C)0.2 (C)0.35 X
Methyl iodide ......................................... 74884 5 28 X
Methyl isoamyl ketone .......................... 110123 100 475
Methyl isobutyl carbinol ......................... 108112 25 100 X
Methyl isobutyl ketone; see Hexone.
Methyl isocyanate ................................. 624839 0.02 0.05 X
Methyl mercaptan .................................. 74931 0.5 1
Methyl methacrylate .............................. 80626 100 410
Methyl propyl ketone; see 2-Pentanone.
Methyl silicate ........................................ 681845 (C)5 (C)30
alpha-Methyl styrene ............................. 98839 (C)100 (C)480
Methylene bisphenyl isocyanate (MDI) 101688 (C)0.02 (C)0.2
Mica; see Silicates.
Molybdenum (as Mo) ............................ 7439987
Soluble compounds ....................... 5
Insoluble compounds.
Total dust .................................... 15
Monomethyl aniline ............................... 100618 2 9 X
Monomethyl hydrazine; see Methyl hy-
drazine.
Morpholine ............................................. 110918 20 70 X
Naphtha (Coal tar) ................................ 8030306 100 400
Naphthalene .......................................... 91203 10 50
alpha-Naphthylamine; see 1926.1104 134327
beta-Naphthylamine; see 1926.1109 91598
Neon ...................................................... 7440019 E
Nickel carbonyl (as Ni) .......................... 13463393 0.001 0.007
Nickel, metal and insoluble compounds
(as Ni) ................................................ 7440020 1
Nickel, soluble compounds (as Ni) ....... 7440020 1
Nicotine ................................................. 54115 0.5 X
Nitric acid .............................................. 7697372 2 5
Nitric oxide ............................................ 10102439 25 30

43

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00053 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.55 29 CFR Ch. XVII (7112 Edition)

THRESHOLD LIMIT VALUES OF AIRBORNE CONTAMINANTS FOR CONSTRUCTIONContinued

Skin Designa-
Substance CAS No. d ppm a mg/m 3,b tion

p-Nitroaniline ......................................... 100016 1 6 X


Nitrobenzene ......................................... 98953 1 5 X
p-Nitrochlorobenzene ............................ 100005 1 X
4-Nitrodiphenyl; see 1926.1103 ......... 92933
Nitroethane ............................................ 79243 100 310
Nitrogen ................................................. 7727379 E
Nitrogen dioxide .................................... 10102440 (C)5 (C)9
Nitrogen trifluoride ................................. 7783542 10 29
Nitroglycerin .......................................... 55630 (C)0.2 (C)2 X
Nitromethane ......................................... 75525 100 250
1-Nitropropane ...................................... 108032 25 90
2-Nitropropane ...................................... 79469 25 90
N-Nitrosodimethylamine; see
1926.1116 ....................................... 62799
Nitrotoluene (all isomers) ...................... 5 30 X
o-isomer ......................................... 88722;
m-isomer ........................................ 99081;
p-isomer ......................................... 99990
Nitrotrichloromethane; see Chloropicrin.
Nitrous oxide ......................................... 10024972 E
Octachloronaphthalene ......................... 2234131 0.1 X
Octane ................................................... 111659 400 1900
Oil mist, mineral .................................... 8012951 5
Osmium tetroxide (as Os) ..................... 20816120 0.002
Oxalic acid ............................................. 144627 1
Oxygen difluoride .................................. 7783417 0.05 0.1
Ozone .................................................... 10028156 0.1 0.2
Paraquat, respirable dust ...................... 4685147; 0.5 X
1910425;
2074502
Parathion ............................................... 56382 0.1 X
Particulates not otherwise regulated.
Total dust organic and inorganic ... 15
PCB; see Chlorodiphenyl (42% and
54% chlorine).
Pentaborane .......................................... 19624227 0.005 0.01
Pentachloronaphthalene ....................... 1321648 0.5 X
Pentachlorophenol ................................ 87865 0.5 X
Pentaerythritol ....................................... 115775
Total dust .......................................
Respirable fraction .........................
Pentane ................................................. 109660 500 1500
2-Pentanone (Methyl propyl ketone) ..... 107879 200 700
Perchloroethylene
(Tetrachloroethylene) ......................... 127184 100 670
Perchloromethyl mercaptan .................. 594423 0.1 0.8
Perchloryl fluoride ................................. 7616946 3 13.5
Petroleum distillates (Naphtha)(Rubber
Solvent) .............................................. A3
Phenol ................................................... 108952 5 19 X
p-Phenylene diamine ............................ 106503 0.1 X
Phenyl ether, vapor ............................... 101848 1 7
Phenyl ether-biphenyl mixture, vapor ... 1 7
Phenylethylene; see Styrene.
Phenyl glycidyl ether (PGE) .................. 122601 10 60
Phenylhydrazine .................................... 100630 5 22 X
Phosdrin (Mevinphos) ........................... 7786347 0.1 X
Phosgene (Carbonyl chloride) .............. 75445 0.1 0.4
Phosphine ............................................. 7803512 0.3 0.4
Phosphoric acid ..................................... 7664382 1
Phosphorus (yellow) .............................. 7723140 0.1
Phosphorus pentachloride .................... 10026138 1

44

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00054 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.55

THRESHOLD LIMIT VALUES OF AIRBORNE CONTAMINANTS FOR CONSTRUCTIONContinued

Skin Designa-
Substance CAS No. d ppm a mg/m 3,b tion

Phosphorus pentasulfide ....................... 1314803 1


Phosphorus trichloride .......................... 7719122 0.5 3
Phthalic anhydride ................................. 85449 2 12
Picric acid .............................................. 88891 0.1 X
Pindone (2-Pivalyl-1,3-indandione) ....... 83261 0.1
Plaster of Paris ...................................... 26499650
Total dust .......................................
Respirable fraction .........................
Platinum (as Pt) .................................... 7440064
Metal ..............................................
Soluble salts ................................... 0.002
Polytetrafluoroethylene decomposition
products ............................................. A2
Portland cement .................................... 65997151
Total dust ....................................... 15
Respirable fraction ......................... 5
Propane ................................................. 74986 E
Propargyl alcohol .................................. 107197 1 X
beta-Propriolactone; see 1926.1113 .. 57578
n-Propyl acetate .................................... 109604 200 840
n-Propyl alcohol .................................... 71238 200 500
n-Propyl nitrate ...................................... 627134 25 110
Propylene dichloride .............................. 78875 75 350
Propylene imine .................................... 75558 2 5 X
Propylene oxide .................................... 75569 100 240
Propyne; see Methyl acetylene.
Pyrethrum .............................................. 8003347 5
Pyridine ................................................. 110861 5 15
Quinone ................................................. 106514 0.1 0.4
RDX; see Cyclonite.
Rhodium (as Rh), metal fume and in-
soluble compounds ............................ 7440166 0.1
Rhodium (as Rh), soluble compounds 7440166 0.001
Ronnel ................................................... 299843 10
Rotenone ............................................... 83794 5
Rouge.
Total dust .......................................
Respirable fraction .........................
Selenium compounds (as Se) ............... 7782492 0.2
Selenium hexafluoride (as Se) .............. 7783791 0.05 0.4
Silica, amorphous, precipitated and gel 112926008 ( 2) ( 2) (2)
Silica, amorphous, diatomaceous earth,
containing less than 1% crystalline
silica ................................................... 61790532 ( 2) (2) ( 2)
Silica, crystalline cristobalite, respirable
dust .................................................... 14464461 ( 2) ( 2) (2)
Silica, crystalline quartz, respirable dust 14808607 ( 2) ( 2) (2)
Silica, crystalline tripoli (as quartz), res-
pirable dust ........................................ 1317959 ( 2) (2) ( 2)
Silica, crystalline tridymite, respirable
dust .................................................... 15468323 ( 2) (2) (2)
Silica, fused, respirable dust ................. 60676860 ( 2) (2) (2)
Silicates (less than 1% crystalline sili-
ca).
Mica (respirable dust) .................... 12001262 ( 2) (2) ( 2)
Soapstone, total dust ..................... ( 2) ( 2) (2)
Soapstone, respirable dust ............ ( 2) ( 2) (2)
Talc (containing asbestos); use as-
bestos limit; see 1926.58.
Talc (containing no asbestos), res-
pirable dust ................................. 14807966 ( 2) (2) ( 2)

45

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00055 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.55 29 CFR Ch. XVII (7112 Edition)

THRESHOLD LIMIT VALUES OF AIRBORNE CONTAMINANTS FOR CONSTRUCTIONContinued

Skin Designa-
Substance CAS No. d ppm a mg/m 3,b tion

Tremolite, asbestiform; see


1926.58.
Silicon carbide ....................................... 409212
Total dust .......................................
Respirable fraction .........................
Silver, metal and soluble compounds
(as Ag) ............................................... 7440224 0.01
Soapstone; see Silicates.
Sodium fluoroacetate ............................ 62748 0.05 X
Sodium hydroxide ................................. 1310732 2
Starch .................................................... 9005258
Total dust .......................................
Respirable fraction .........................
Stibine ................................................... 7803523 0.1 0.5
Stoddard solvent ................................... 8052413 200 1150
Strychnine ............................................. 57249 0.15
Styrene .................................................. 100425 (C)100 (C)420
Sucrose ................................................. 57501
Total dust .......................................
Respirable fraction .........................
Sulfur dioxide ........................................ 7446095 5 13
Sulfur hexafluoride ................................ 2551624 1000 6000
Sulfuric acid ........................................... 7664939 1
Sulfur monochloride .............................. 10025679 1 6
Sulfur pentafluoride ............................... 5714227 0.025 0.25
Sulfuryl fluoride ..................................... 2699798 5 20
Systox, see Demeton.
2,4,5-T (2,4,5-trichlorophenoxyacetic
acid) ................................................... 93765 10
Talc; see Silicates.
Tantalum, metal and oxide dust ........... 7440257 5
TEDP (Sulfotep) .................................... 3689245 0.2 X
Teflon decomposition products ............. A2
Tellurium and compounds (as Te) ........ 13494809 0.1
Tellurium hexafluoride (as Te) .............. 7783804 0.02 0.2
Temephos ............................................. 3383968
Total dust .......................................
Respirable fraction .........................
TEPP (Tetraethyl pyrophosphate) ........ 107493 0.05 X
Terphenyls ............................................. 26140603 (C)1 (C)9
1,1,1,2-Tetrachloro-2,2-difluoroethane .. 76119 500 4170
1,1,2,2-Tetrachloro-1,2-difluoroethane .. 76120 500 4170
1,1,2,2-Tetrachloroethane ..................... 79345 5 35 X
Tetrachloroethylene; see
Perchloroethylene.
Tetrachloromethane; see Carbon tetra-
chloride.
Tetrachloronaphthalene ........................ 1335882 2 X
Tetraethyl lead (as Pb) ......................... 78002 0.1 X
Tetrahydrofuran ..................................... 109999 200 590
Tetramethyl lead, (as Pb) ..................... 75741 0.15 X
Tetramethyl succinonitrile ..................... 3333526 0.5 3 X
Tetranitromethane ................................. 509148 1 8
Tetryl (2,4,6-
Trinitrophenylmethylnitramine) .......... 479458 1.5 X
Thallium, soluble compounds (as Tl) .... 7440280 0.1 X
Thiram ................................................... 137268 5
Tin, inorganic compounds (except ox-
ides) (as Sn) ...................................... 7440315 2
Tin, organic compounds (as Sn) ........... 7440315 0.1
Tin oxide (as Sn) ................................... 21651194
Total dust .......................................

46

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00056 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.55

THRESHOLD LIMIT VALUES OF AIRBORNE CONTAMINANTS FOR CONSTRUCTIONContinued

Skin Designa-
Substance CAS No. d ppm a mg/m 3,b tion

Respirable fraction .........................


Titanium dioxide .................................... 13463677
Total dust .......................................
Toluene ................................................. 108883 200 750
Toluene-2,4-diisocyanate (TDI) ............. 584849 (C)0.02 (C)0.14
o-Toluidine ............................................. 95534 5 22 X
Toxaphene; see Chlorinated camphene.
Tremolite; see Silicates.
Tributyl phosphate ................................. 126738 5
1,1,1-Trichloroethane; see Methyl chlo-
roform.
1,1,2-Trichloroethane ............................ 79005 10 45 X
Trichloroethylene ................................... 79016 100 535
Trichloromethane; see Chloroform.
Trichloronaphthalene ............................. 1321659 5 X
1,2,3-Trichloropropane .......................... 96184 50 300
1,1,2-Trichloro-1,2,2-trifluoroethane ...... 76131 1000 7600
Triethylamine ......................................... 121448 25 100
Trifluorobromomethane ......................... 75638 1000 6100
Trimethyl benzene ................................. 25551137 25 120
2,4,6-Trinitrophenol; see Picric acid.
2,4,6-Trinitrophenylmethylnitramine;
see Tetryl.
2,4,6-Trinitrotoluene (TNT) .................... 118967 1.5 X
Triorthocresyl phosphate ....................... 78308 0.1
Triphenyl phosphate .............................. 115866 3
Tungsten (as W) ................................... 7440337
Insoluble compounds ..................... 5
Soluble compounds ....................... 1
Turpentine ............................................. 8006642 100 560
Uranium (as U) ...................................... 7440611
Soluble compounds ....................... 0.2
Insoluble compounds ..................... 0.2
Vanadium .............................................. 1314621
Respirable dust (as V2 O5) ............ (C)0.5
Fume (as V2 O5) ............................ (C)0.1
Vegetable oil mist.
Total dust .......................................
Respirable fraction .........................
Vinyl benzene; see Styrene.
Vinyl chloride; see 1926.1117 ............ 75014
Vinyl cyanide; see Acrylonitrile.
Vinyl toluene .......................................... 25013154 100 480
Warfarin ................................................. 81812 0.1
Xylenes (o-, m-, p-isomers) .................. 1330207 100 435
Xylidine .................................................. 1300738 5 25 X
Yttrium ................................................... 7440655 1
Zinc chloride fume ................................. 7646857 1
Zinc oxide fume ..................................... 1314132 5
Zinc oxide .............................................. 1314132
Total dust ....................................... 15
Respirable fraction ......................... 5
Zirconium compounds (as Zr) ............... 7440677 5

MINERAL DUSTS
SILICA:
Crystalline
Quartz. Threshold Limit calculated from the formula .......... 250 (k)

%SiO2+5

47

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00057 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.56 29 CFR Ch. XVII (7112 Edition)

MINERAL DUSTSContinued
Cristobalite.
Amorphous, including natural diatomaceous earth ...... 20
SILICATES (less than 1% crystalline silica)
Mica .............................................................................. 20
Portland cement ............................................................ 50
Soapstone ..................................................................... 20
Talc (non-asbestiform) .................................................. 20
Talc (fibrous), use asbestos limit .................................. --
Graphite (natural) ................................................................. 15

Inert or Nuisance Particulates: (m) 50 (or 15 mg/m3 whichever is the smaller) of total
dust <1% SiO2
[Inert or Nuisance Dusts includes all mineral, inorganic,
and organic dusts as indicated by examples in TLVs
appendix D]
Conversion factors.
mppcf 35.3 = million particles per cubic meter = particles
per c.c.
Footnotes
1 [Reserved]
2 See Mineral Dusts Table.
3 Use Asbestos Limit 1926.58.
4 See 1926.58.
* The PELs are 8-hour TWAs unless otherwise noted; a (C) designation denotes a ceiling limit.
** As determined from breathing-zone air samples.
a Parts of vapor or gas per million parts of contaminated air by volume at 25 C and 760 torr.
b Milligrams of substance per cubic meter of air. When entry is in this column only, the value is exact; when listed with a
ppm entry, it is approximate.
c [Reserved]
d The CAS number is for information only. Enforcement is based on the substance name. For an entry covering more than
one metal compound, measured as the metal, the CAS number for the metal is givennot CAS numbers for the individual
compounds.
e f [Reserved]
g For sectors excluded from 1926.1128 the limit is 10 ppm TWA.
h i [Reserved]
j Millions of particles per cubic foot of air, based on impinger samples counted by light-field techniques.
k The percentage of crystalline silica in the formula is the amount determined from airborne samples, except in those in-
stances in which other methods have been shown to be applicable.
l [Reserved]
m Covers all organic and inorganic particulates not otherwise regulated. Same as Particulates Not Otherwise Regulated.
n If the exposure limit in 1926.1126 is stayed or is otherwise not in effect, the exposure limit is a ceiling of 0.1 mg/m3.
o If the exposure limit in 1926.1126 is stayed or is otherwise not in effect, the exposure limit is 0.1 mg/m3 (as CrO ) as an
3
8-hour TWA.
The 1970 TLV uses letter designations instead of a numerical value as follows:
A 1 [Reserved]
A 2 Polytetrafluoroethylene decomposition products. Because these products decompose in part by hydrolysis in alkaline solu-
tion, they can be quantitatively determined in air as fluoride to provide an index of exposure. No TLV is recommended pending
determination of the toxicity of the products, but air concentrations should be minimal.
A 3 Gasoline and/or Petroleum Distillates. The composition of these materials varies greatly and thus a single TLV for all
types of these materials is no longer applicable. The content of benzene, other aromatics and additives should be determined
to arrive at the appropriate TLV.
E Simple asphyxiants. The limiting factor is the available oxygen which shall be at least 19.5% and be within the require-
ments addressing explosion in part 1926.

[39 FR 22801, June 24, 1974, as amended at 51 FR 37007, Oct. 17, 1986; 52 FR 46312, Dec. 4, 1987;
58 FR 35089, June 30, 1993; 61 FR 9249, 9250, Mar. 7, 1996; 61 FR 56856, Nov. 4, 1996; 62 FR 1619,
Jan. 10, 1997; 71 FR 10381, Feb. 28, 2006; 71 FR 36009, June 23, 2006]

1926.56 Illumination. TABLE D3MINIMUM ILLUMINATION INTENSITIES


IN FOOT-CANDLES
(a) General. Construction areas,
ramps, runways, corridors, offices, Foot-candles Area or operation
shops, and storage areas shall be light-
5 ........................ General construction area lighting.
ed to not less than the minimum illu- 3 ........................ General construction areas, concrete
mination intensities listed in Table D placement, excavation and waste areas,
3 while any work is in progress: accessways, active storage areas, load-
ing platforms, refueling, and field main-
tenance areas.
5 ........................ Indoors: warehouses, corridors, hallways,
and exitways.

48

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00058 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.57

TABLE D3MINIMUM ILLUMINATION INTENSITIES sion in harmful quantities into the at-
IN FOOT-CANDLESContinued mosphere where employees work.
(d) Duration of operations. (1) The ex-
Foot-candles Area or operation
haust system shall be in operation con-
5 ........................ Tunnels, shafts, and general underground tinually during all operations which it
work areas: (Exception: minimum of 10 is designed to serve. If the employee re-
foot-candles is required at tunnel and mains in the contaminated zone, the
shaft heading during drilling, mucking,
and scaling. Bureau of Mines approved system shall continue to operate after
cap lights shall be acceptable for use in the cessation of said operations, the
the tunnel heading.) length of time to depend upon the indi-
10 ...................... General construction plant and shops
vidual circumstances and effectiveness
(e.g., batch plants, screening plants,
mechanical and electrical equipment of the general ventilation system.
rooms, carpenter shops, rigging lofts (2) Since dust capable of causing dis-
and active storerooms, barracks or liv- ability is, according to the best med-
ing quarters, locker or dressing rooms,
mess halls, and indoor toilets and work-
ical opinion, of microscopic size, tend-
rooms). ing to remain for hours in suspension
30 ...................... First aid stations, infirmaries, and offices. in still air, it is essential that the ex-
haust system be continued in operation
(b) Other areas. For areas or oper- for a time after the work process or
ations not covered above, refer to the equipment served by the same shall
American National Standard A11.1 have ceased, in order to ensure the re-
1965, R1970, Practice for Industrial moval of the harmful elements to the
Lighting, for recommended values of il- required extent. For the same reason,
lumination. employees wearing respiratory equip-
ment should not remove same imme-
1926.57 Ventilation. diately until the atmosphere seems
(a) General. Whenever hazardous sub- clear.
stances such as dusts, fumes, mists, va- (e) Disposal of exhaust materials. The
pors, or gases exist or are produced in air outlet from every dust separator,
and the dusts, fumes, mists, vapors, or
the course of construction work, their
gases collected by an exhaust or ven-
concentrations shall not exceed the
tilating system shall discharge to the
limits specified in 1926.55(a). When
outside atmosphere. Collecting sys-
ventilation is used as an engineering
tems which return air to work area
control method, the system shall be in-
may be used if concentrations which
stalled and operated according to the
accumulate in the work area air do not
requirements of this section. result in harmful exposure to employ-
(b) Local exhaust ventilation. Local ex- ees. Dust and refuse discharged from an
haust ventilation when used as de- exhaust system shall be disposed of in
scribed in (a) shall be designed to pre- such a manner that it will not result in
vent dispersion into the air of dusts, harmful exposure to employees.
fumes, mists, vapors, and gases in con- (f) Abrasive blasting(1) Definitions
centrations causing harmful exposure. applicable to this paragraph(i) Abra-
Such exhaust systems shall be so de- sive. A solid substance used in an abra-
signed that dusts, fumes, mists, vapors, sive blasting operation.
or gases are not drawn through the (ii) Abrasive-blasting respirator. A res-
work area of employees. pirator constructed so that it covers
(c) Design and operation. Exhaust the wearers head, neck, and shoulders
fans, jets, ducts, hoods, separators, and to protect the wearer from rebounding
all necessary appurtenances, including abrasive.
refuse receptacles, shall be so designed, (iii) Blast cleaning barrel. A complete
constructed, maintained and operated enclosure which rotates on an axis, or
as to ensure the required protection by which has an internal moving tread to
maintaining a volume and velocity of tumble the parts, in order to expose
exhaust air sufficient to gather dusts, various surfaces of the parts to the ac-
fumes, vapors, or gases from said tion of an automatic blast spray.
equipment or process, and to convey (iv) Blast cleaning room. A complete
them to suitable points of safe dis- enclosure in which blasting operations
posal, thereby preventing their disper- are performed and where the operator

49

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00059 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.57 29 CFR Ch. XVII (7112 Edition)

works inside of the room to operate the matic systems. Where flammable or ex-
blasting nozzle and direct the flow of plosive dust mixtures may be present,
the abrasive material. the construction of the equipment, in-
(v) Blasting cabinet. An enclosure cluding the exhaust system and all
where the operator stands outside and electric wiring, shall conform to the
operates the blasting nozzle through an requirements of American National
opening or openings in the enclosure. Standard Installation of Blower and
(vi) Clean air. Air of such purity that Exhaust Systems for Dust, Stock, and
it will not cause harm or discomfort to Vapor Removal or Conveying, Z33.1
an individual if it is inhaled for ex- 1961 (NFPA 911961), and subpart S of
tended periods of time. this part. The blast nozzle shall be
(vii) Dust collector. A device or com- bonded and grounded to prevent the
bination of devices for separating dust build up of static charges. Where flam-
from the air handled by an exhaust mable or explosive dust mixtures may
ventilation system. be present, the abrasive blasting enclo-
(viii) Exhaust ventilation system. A sure, the ducts, and the dust collector
system for removing contaminated air shall be constructed with loose panels
from a space, comprising two or more or explosion venting areas, located on
of the following elements (A) enclosure sides away from any occupied area, to
or hood, (B) duct work, (C) dust col- provide for pressure relief in case of ex-
lecting equipment, (D) exhauster, and plosion, following the principles set
(E) discharge stack. forth in the National Fire Protection
(ix) Particulate-filter respirator. An air Association Explosion Venting Guide.
purifying respirator, commonly re- NFPA 681954.
ferred to as a dust or a fume respirator, (3) Blast-cleaning enclosures. (i) Blast-
which removes most of the dust or cleaning enclosures shall be exhaust
fume from the air passing through the ventilated in such a way that a contin-
device. uous inward flow of air will be main-
(x) Respirable dust. Airborne dust in tained at all openings in the enclosure
sizes capable of passing through the during the blasting operation.
upper respiratory system to reach the (A) All air inlets and access openings
lower lung passages. shall be baffled or so arranged that by
(xi) Rotary blast cleaning table. An en- the combination of inward air flow and
closure where the pieces to be cleaned baffling the escape of abrasive or dust
are positioned on a rotating table and particles into an adjacent work area
are passed automatically through a se- will be minimized and visible spurts of
ries of blast sprays. dust will not be observed.
(xii) Abrasive blasting. The forcible (B) The rate of exhaust shall be suffi-
application of an abrasive to a surface cient to provide prompt clearance of
by pneumatic pressure, hydraulic pres- the dust-laden air within the enclosure
sure, or centrifugal force. after the cessation of blasting.
(2) Dust hazards from abrasive blasting. (C) Before the enclosure is opened,
(i) Abrasives and the surface coatings the blast shall be turned off and the ex-
on the materials blasted are shattered haust system shall be run for a suffi-
and pulverized during blasting oper- cient period of time to remove the
ations and the dust formed will contain dusty air within the enclosure.
particles of respirable size. The com- (D) Safety glass protected by screen-
position and toxicity of the dust from ing shall be used in observation win-
these sources shall be considered in dows, where hard deep-cutting abra-
making an evaluation of the potential sives are used.
health hazards. (E) Slit abrasive-resistant baffles
(ii) The concentration of respirable shall be installed in multiple sets at all
dust or fume in the breathing zone of small access openings where dust
the abrasive-blasting operator or any might escape, and shall be inspected
other worker shall be kept below the regularly and replaced when needed.
levels specified in 1926.55 or other per- (1) Doors shall be flanged and tight
tinent sections of this part. when closed.
(iii) Organic abrasives which are (2) Doors on blast-cleaning rooms
combustible shall be used only in auto- shall be operable from both inside and

50

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00060 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.57

outside, except that where there is a other pertinent sections of this part
small operator access door, the large and the nozzle and blast are not phys-
work access door may be closed or ically separated from the operator in
opened from the outside only. an exhaust-ventilated enclosure.
(4) Exhaust ventilation systems. (i) The (iii) Properly fitted particulate-filter
construction, installation, inspection, respirators, commonly referred to as
and maintenance of exhaust systems dust-filter respirators, may be used for
shall conform to the principles and re- short, intermittent, or occasional dust
quirements set forth in American Na- exposures such as cleanup, dumping of
tional Standard Fundamentals Gov- dust collectors, or unloading shipments
erning the Design and Operation of of sand at a receiving point when it is
Local Exhaust Systems, Z9.21960, and not feasible to control the dust by en-
ANSI Z33.11961. closure, exhaust ventilation, or other
(a) When dust leaks are noted, re- means. The respirators used must be
pairs shall be made as soon as possible. approved by NIOSH under 42 CFR part
(b) The static pressure drop at the ex- 84 for protection against the specific
haust ducts leading from the equip- type of dust encountered.
ment shall be checked when the instal- (iv) A respiratory protection program
lation is completed and periodically as defined and described in 1926.103,
thereafter to assure continued satisfac- shall be established wherever it is nec-
tory operation. Whenever an appre- essary to use respiratory protective
ciable change in the pressure drop indi- equipment.
cates a partial blockage, the system (v) Operators shall be equipped with
shall be cleaned and returned to nor- heavy canvas or leather gloves and
mal operating condition. aprons or equivalent protection to pro-
(ii) In installations where the abra- tect them from the impact of abra-
sive is recirculated, the exhaust ven- sives. Safety shoes shall be worn to
tilation system for the blasting enclo- protect against foot injury where
sure shall not be relied upon for the re- heavy pieces of work are handled.
moval of fines from the spent abrasive (A) Safety shoes shall conform to the
instead of an abrasive separator. An requirements of American National
abrasive separator shall be provided for Standard for Mens Safety-Toe Foot-
the purpose. wear, Z41.11967.
(iii) The air exhausted from blast- (B) Equipment for protection of the
cleaning equipment shall be discharged eyes and face shall be supplied to the
through dust collecting equipment. operator when the respirator design
Dust collectors shall be set up so that does not provide such protection and to
the accumulated dust can be emptied any other personnel working in the vi-
and removed without contaminating cinity of abrasive blasting operations.
other working areas. This equipment shall conform to the
(5) Personal protective equipment. (i) requirements of 1926.102.
Employers must use only respirators (6) Air supply and air compressors. Air
approved by NIOSH under 42 CFR part for abrasive-blasting respirators must
84 for protecting employees from dusts be free of harmful quantities of dusts,
produced during abrasive-blasting op- mists, or noxious gases, and must meet
erations. the requirements for supplied-air qual-
(ii) Abrasive-blasting respirators ity and use specified in 29 CFR
shall be worn by all abrasive-blasting 1910.134(i).
operators: (7) Operational procedures and general
(A) When working inside of blast- safety. Dust shall not be permitted to
cleaning rooms, or accumulate on the floor or on ledges
(B) When using silica sand in manual outside of an abrasive-blasting enclo-
blasting operations where the nozzle sure, and dust spills shall be cleaned up
and blast are not physically separated promptly. Aisles and walkways shall be
from the operator in an exhaust venti- kept clear of steel shot or similar abra-
lated enclosure, or sive which may create a slipping haz-
(C) Where concentrations of toxic ard.
dust dispersed by the abrasive blasting (8) Scope. This paragraph applies to
may exceed the limits set in 1926.55 or all operations where an abrasive is

51

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00061 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.57 29 CFR Ch. XVII (7112 Edition)

forcibly applied to a surface by pneu- this standard, consisting of abrasive


matic or hydraulic pressure, or by cen- particles held together by artificial or
trifugal force. It does not apply to natural bonds and used for peripheral
steam blasting, or steam cleaning, or grinding.
hydraulic cleaning methods where (ix) Header pipe (main pipe). A pipe
work is done without the aid of abra- into which one or more branch pipes
sives. enter and which connects such branch
(g) Grinding, polishing, and buffing op- pipes to the remainder of the exhaust
erations(1) Definitions applicable to system.
this paragraph
(x) Hoods and enclosures. The partial
(i) Abrasive cutting-off wheels. Or-
or complete enclosure around the
ganic-bonded wheels, the thickness of
which is not more than one forty- wheel or disc through which air enters
eighth of their diameter for those up an exhaust system during operation.
to, and including, 20 inches (50.8 cm) in (xi) Horizontal double-spindle disc
diameter, and not more than one-six- grinder. A grinding machine carrying
tieth of their diameter for those larger two power-driven, rotatable, coaxial,
than 20 inches (50.8 cm) in diameter, horizontal spindles upon the inside
used for a multitude of operations var- ends of which are mounted abrasive
iously known as cutting, cutting off, disc wheels used for grinding two sur-
grooving, slotting, coping, and joint- faces simultaneously.
ing, and the like. The wheels may be (xii) Horizontal single-spindle disc
solid consisting of organic-bonded grinder. A grinding machine carrying
abrasive material throughout, steel an abrasive disc wheel upon one or
centered consisting of a steel disc both ends of a power-driven, rotatable
with a rim of organic-bonded material single horizontal spindle.
moulded around the periphery, or of (xiii) Polishing and buffing wheels. All
the inserted tooth type consisting of power-driven rotatable wheels com-
a steel disc with organic-bonded abra- posed all or in part of textile fabrics,
sive teeth or inserts mechanically se-
wood, felt, leather, paper, and may be
cured around the periphery.
coated with abrasives on the periphery
(ii) Belts. All power-driven, flexible,
coated bands used for grinding, of the wheel for purposes of polishing,
polishing, or buffing purposes. buffing, and light grinding.
(iii) Branch pipe. The part of an ex- (xiv) Portable grinder. Any power-driv-
haust system piping that is connected en rotatable grinding, polishing, or
directly to the hood or enclosure. buffing wheel mounted in such manner
(iv) Cradle. A movable fixture, upon that it may be manually manipulated.
which the part to be ground or polished (xv) Scratch brush wheels. All power-
is placed. driven rotatable wheels made from
(v) Disc wheels. All power-driven ro- wire or bristles, and used for scratch
tatable discs faced with abrasive mate- cleaning and brushing purposes.
rials, artificial or natural, and used for (xvi) Swing-frame grinder. Any power-
grinding or polishing on the side of the driven rotatable grinding, polishing, or
assembled disc. buffing wheel mounted in such a man-
(vi) Entry loss. The loss in static pres- ner that the wheel with its supporting
sure caused by air flowing into a duct framework can be manipulated over
or hood. It is usually expressed in stationary objects.
inches of water gauge. (xvii) Velocity pressure (vp). The ki-
(vii) Exhaust system. A system con-
netic pressure in the direction of flow
sisting of branch pipes connected to
necessary to cause a fluid at rest to
hoods or enclosures, one or more head-
er pipes, an exhaust fan, means for sep- flow at a given velocity. It is usually
arating solid contaminants from the expressed in inches of water gauge.
air flowing in the system, and a dis- (xviii) Vertical spindle disc grinder. A
charge stack to outside. grinding machine having a vertical, ro-
(viii) Grinding wheels. All power-driv- tatable power-driven spindle carrying a
en rotatable grinding or abrasive horizontal abrasive disc wheel.
wheels, except disc wheels as defined in

52

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00062 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.57

(2) Application. Wherever dry grind- (iii) Scratch-brush wheels and all
ing, dry polishing or buffing is per- buffing and polishing wheels mounted
formed, and employee exposure, with- on floor stands, pedestals, benches, or
out regard to the use of respirators, ex- special-purpose machines shall have
ceeds the permissible exposure limits not less than the minimum exhaust
prescribed in 1926.55 or other perti- volume shown in Table D57.2.
nent sections of this part, a local ex-
haust ventilation system shall be pro- TABLE D57.2BUFFING AND POLISHING
vided and used to maintain employee WHEELS
exposures within the prescribed limits. Minimum
Wheel
(3) Hood and branch pipe requirements. Wheel diameter, inches (cm) width, exhaust
volume
(i) Hoods connected to exhaust systems inches cm) (feet3/min.)
shall be used, and such hoods shall be
designed, located, and placed so that To 9 (22.86) ................................... 2 (5.08) 300
Over 9 to 16 (22.86 to 40.64) ....... 3 (7.62) 500
the dust or dirt particles shall fall or Over 16 to 19 (40.64 to 48.26) ..... 4 (10.16) 610
be projected into the hoods in the di- Over 19 to 24 (48.26 to 60.96) ..... 5 (12.7) 740
rection of the air flow. No wheels, Over 24 to 30 (60.96 to 76.2) ....... 6 (15.24) 1,040
Over 30 to 36 (76.2 to 91.44) ....... 6 (15.24) 1,200
discs, straps, or belts shall be operated
in such manner and in such direction
(iv) Grinding wheels or discs for hori-
as to cause the dust and dirt particles
zontal single-spindle disc grinders shall
to be thrown into the operators
be hooded to collect the dust or dirt
breathing zone.
generated by the grinding operation
(ii) Grinding wheels on floor stands,
and the hoods shall be connected to
pedestals, benches, and special-purpose
branch pipes having exhaust volumes
grinding machines and abrasive cut-
as shown in Table D57.3.
ting-off wheels shall have not less than
the minimum exhaust volumes shown TABLE D57.3HORIZONTAL SINGLE-SPINDLE
in Table D57.1 with a recommended DISC GRINDER
minimum duct velocity of 4,500 feet per
minute in the branch and 3,500 feet per Exhaust
Disc diameter, inches (cm) volume
minute in the main. The entry losses (ft.3/min.)
from all hoods except the vertical-spin-
Up to 12 (30.48) .................................................. 220
dle disc grinder hood, shall equal 0.65 Over 12 to 19 (30.48 to 48.26) ........................... 390
velocity pressure for a straight takeoff Over 19 to 30 (48.26 to 76.2) ............................. 610
and 0.45 velocity pressure for a tapered Over 30 to 36 (76.2 to 91.44) ............................. 880
takeoff. The entry loss for the vertical-
spindle disc grinder hood is shown in (v) Grinding wheels or discs for hori-
figure D57.1 (following paragraph (g) zontal double-spindle disc grinders
of this section). shall have a hood enclosing the grind-
ing chamber and the hood shall be con-
TABLE D57.1GRINDING AND ABRASIVE nected to one or more branch pipes
CUTTING-OFF WHEELS having exhaust volumes as shown in
Table D57.4.
Wheel Minimum
width, exhaust
Wheel diameter, inches (cm) TABLE D57.4HORIZONTAL DOUBLE-SPINDLE
inches volume
(cm) (feet3/min.) DISC GRINDER
To 9 (22.86) ................................... 112 (3.81) 220
Exhaust
Over 9 to 16 (22.86 to 40.64) ....... 2 (5.08) 390 Disc diameter, inches (cm) volume
Over 16 to 19 (40.64 to 48.26) ..... 3 (7.62) 500 (ft.3/min.)
Over 19 to 24 (48.26 to 60.96) ..... 4 (10.16) 610
Over 24 to 30 (60.96 to 76.2) ....... 5 (12.7) 880 Up to 19 (48.26) .................................................. 610
Over 30 to 36 (76.2 to 91.44) ....... 6 (15.24) 1,200 Over 19 to 25 (48.26 to 63.5) ............................. 880
Over 25 to 30 (63.5 to 76.2) ............................... 1,200
Over 30 to 53 (76.2 to 134.62) ........................... 1,770
For any wheel wider than wheel diame- Over 53 to 72 (134.62 to 182.88) ....................... 6,280
ters shown in Table D57.1, increase the
exhaust volume by the ratio of the new (vi) Grinding wheels or discs for
width to the width shown. vertical single-spindle disc grinders
Example: If wheel width = 412 inches (11.43 shall be encircled with hoods to remove
cm), the dust generated in the operation.
then 4.54 610 = 686 (rounded to 690). The hoods shall be connected to one or

53

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00063 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.57 29 CFR Ch. XVII (7112 Edition)

more branch pipes having exhaust vol- and Operation of Local Exhaust Sys-
umes as shown in Table D57.5. tems, Z9.21960.
(ii) Exhaust systems for grinding,
TABLE D57.5VERTICAL SPINDLE DISC polishing, and buffing operations shall
GRINDER be tested in the manner described in
One-half or more Disc not cov-
American Standard Fundamentals
of disc covered ered Governing the Design and Operation of
Disc diameter, inches Ex- Ex-
Local Exhaust Systems, Z9.21960.
(cm) (iii) All exhaust systems shall be pro-
Num- haust Num- haust
ber 1 foot 3/ ber 1 foot3/ vided with suitable dust collectors.
min. min.
(5) Hood and enclosure design. (i) (A) It
Up to 20 (50.8) .......... 1 500 2 780 is the dual function of grinding and ab-
Over 20 to 30 (50.8 to
76.2) ....................... 2 780 2 1,480
rasive cutting-off wheel hoods to pro-
Over 30 to 53 (76.2 to tect the operator from the hazards of
134.62) ................... 2 1,770 4 3,530 bursting wheels as well as to provide a
Over 53 to 72 (134.62 means for the removal of dust and dirt
to 182.88) ............... 2 3,140 5 6,010
generated. All hoods shall be not less
1 Number of exhaust outlets around periphery of hood, or in structural strength than specified in
equal distribution provided by other means.
the American National Standard Safe-
(vii) Grinding and polishing belts ty Code for the Use, Care, and Protec-
shall be provided with hoods to remove tion of Abrasive Wheels, B7.11970.
dust and dirt generated in the oper- (B) Due to the variety of work and
ations and the hoods shall be connected types of grinding machines employed,
to branch pipes having exhaust vol- it is necessary to develop hoods adapt-
umes as shown in Table D57.6. able to the particular machine in ques-
tion, and such hoods shall be located as
TABLE D57.6GRINDING AND POLISHING close as possible to the operation.
BELTS (ii) Exhaust hoods for floor stands,
Exhaust pedestals, and bench grinders shall be
Belts width, inches (cm) volume designed in accordance with figure D
(ft.3/min.)
57.2. The adjustable tongue shown in
Up to 3 (7.62) ...................................................... 220 the figure shall be kept in working
Over 3 to 5 (7.62 to 12.7) ................................... 300 order and shall be adjusted within one-
Over 5 to 7 (12.7 to 17.78) ................................. 390 fourth inch (0.635 cm) of the wheel pe-
Over 7 to 9 (17.78 to 22.86) ............................... 500
Over 9 to 11 (22.86 to 27.94) ............................. 610 riphery at all times.
Over 11 to 13 (27.94 to 33.02) ........................... 740 (iii) Swing-frame grinders shall be
provided with exhaust booths as indi-
(viii) Cradles and swing-frame grind- cated in figure D57.3.
ers. Where cradles are used for han- (iv) Portable grinding operations,
dling the parts to be ground, polished, whenever the nature of the work per-
or buffed, requiring large partial enclo- mits, shall be conducted within a par-
sures to house the complete operation, tial enclosure. The opening in the en-
a minimum average air velocity of 150 closure shall be no larger than is actu-
feet per minute shall be maintained ally required in the operation and an
over the entire opening of the enclo- average face air velocity of not less
sure. Swing-frame grinders shall also than 200 feet per minute shall be main-
be exhausted in the same manner as tained.
provided for cradles. (See fig. D57.3) (v) Hoods for polishing and buffing
(ix) Where the work is outside the and scratch-brush wheels shall be con-
hood, air volumes must be increased as structed to conform as closely to figure
shown in American Standard Fun- D57.4 as the nature of the work will
damentals Governing the Design and permit.
Operation of Local Exhaust Systems, (vi) Cradle grinding and polishing op-
Z9.21960 (section 4, exhaust hoods). erations shall be performed within a
(4) Exhaust systems. (i) Exhaust sys- partial enclosure similar to figure D
tems for grinding, polishing, and buff- 57.5. The operator shall be positioned
ing operations should be designed in outside the working face of the opening
accordance with American Standard of the enclosure. The face opening of
Fundamentals Governing the Design the enclosure should not be any greater

54

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00064 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.57

in area than that actually required for lar to that illustrated in figure D57.7.
the performance of the operation and The openings for passing the work into
the average air velocity into the work- the grinding chamber should be kept as
ing face of the enclosure shall not be small as possible, but must never be
less than 150 feet per minute. less than twice the area of the branch
(vii) Hoods for horizontal single-spin- outlets.
dle disc grinders shall be constructed (ix) Vertical-spindle disc grinders
to conform as closely as possible to the shall be encircled with a hood so con-
hood shown in figure D57.6. It is essen- structed that the heavy dust is drawn
tial that there be a space between the
off a surface of the disc and the lighter
back of the wheel and the hood, and a
dust exhausted through a continuous
space around the periphery of the
wheel of at least 1 inch (2.54 cm) in slot at the top of the hood as shown in
order to permit the suction to act figure D57.1.
around the wheel periphery. The open- (x) Grinding and polishing belt hoods
ing on the side of the disc shall be no shall be constructed as close to the op-
larger than is required for the grinding eration as possible. The hood should
operation, but must never be less than extend almost to the belt, and 1-inch
twice the area of the branch outlet. (2.54 cm) wide openings should be pro-
(viii) Horizontal double-spindle disc vided on either side. Figure D57.8
grinders shall have a hood encircling shows a typical hood for a belt oper-
the wheels and grinding chamber simi- ation.

55

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00065 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.57 29 CFR Ch. XVII (7112 Edition)

Dia. D inches (cm) Exhaust E Volume Ex-


hausted at Note
4,500 ft/min
Min. Max. No Pipes Dia. ft3/min

.................................... 20 (50.8) 1 414 (10.795) 500 When one-half or more of the disc
can be hooded, use exhaust
ducts as shown at the left.
Over 20 (50.8) ........... 30 (76.2) 2 4 (10.16) 780
Over 30 (76.2) ........... 72 (182.88) 2 6 (15.24) 1,770
Over 53 (134.62) ....... 72 (182.88) 2 8 (20.32) 3,140

.................................... 20 (50.8) 2 4 (10.16) 780 When no hood can be used over


disc, use exhaust ducts as
shown at left.
Over 20 (50.8) ........... 20 (50.8) 2 4 (10.16) 780
Over 30 (76.2) ........... 30 (76.2) 2 512 (13.97) 1,480
Over 53 (134.62) ....... 53 (134.62) 4 6 (15.24) 3,530
72 (182.88) 5 7 (17.78) 6,010
Entry loss=1.0 slot velocity pressure + 0.5 branch velocity pressure.
Minimum slot velocity=2,000 ft/min12-inch (1.27 cm) slot width.

56
EC30OC91.000

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00066 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.57

Wheel dimension, inches (centimeters) Volume of


Exhaust outlet, air at
Diameter inches (centi- 4,500 ft/
Width, Max meters) E min
Min= d Max= D

9 (22.86) 112 (3.81) 3 220


Over 9 (22.86) ............................................................................. 16 (40.64) 2 (5.08) 4 390
Over 16 (40.64) ........................................................................... 19 (48.26) 3 (7.62) 412 500
Over 19 (48.26) ........................................................................... 24 (60.96) 4 (10.16) 5 610
Over 24 (60.96) ........................................................................... 30 (76.2) 5 (12.7) 6 880
Over 30 (76.2) ............................................................................. 36 (91.44) 6 (15.24) 7 1,200
Entry loss = 0.45 velocity pressure for tapered takeoff 0.65 velocity pressure for straight takeoff.

57
EC30OC91.001

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00067 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.57 29 CFR Ch. XVII (7112 Edition)

FIGURE D57.3A METHOD OF APPLYING AN EXHAUST ENCLOSURE TO SWING-FRAME GRINDERS

NOTE: Baffle to reduce front opening as


much as possible

58
EC30OC91.002

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00068 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.57

STANDARD BUFFING AND POLISHING HOOD


Wheel dimension, inches (centimeters) Volume of
Exhaust outlet, air at
Diameter inches E 4,500 ft/
Width, Max min
Min= d Max= D

9 (22.86) 2 (5.08) 312 (3.81) 300


Over 9 (22.86) ............................................................................. 16 (40.64) 3 (5.08) 4 500
Over 16 (40.64) ........................................................................... 19 (48.26) 4 (11.43) 5 610
Over 19 (48.26) ........................................................................... 24 (60.96) 5 (12.7) 512 740
Over 24 (60.96) ........................................................................... 30 (76.2) 6 (15.24) 612 1.040
Over 30 (76.2) ............................................................................. 36 (91.44) 6 (15.24) 7 1.200
Entry loss = 0.15 velocity pressure for tapered takeoff; 0.65 velocity pressure for straight takeoff.

59
EC30OC91.003

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00069 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.57 29 CFR Ch. XVII (7112 Edition)

FIGURE D57.5CRADLE POLISHING OR GRINDING ENCLOSURE

Entry loss = 0.45 velocity pressure for


tapered takeoff

60
EC30OC91.004

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00070 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.57

Dia D, inches (centimeters) Volume ex-


Exhaust E, hausted at
dia. inches 4,500 ft/min
Min. Max. (cm) ft3/min

12 (30.48) 3 (7.6) 220


Over 12 (30.48) ........................................................................................................... 19 (48.26) 4 (10.16) 390
Over 19 (48.26) ........................................................................................................... 30 (76.2) 5 (12.7) 610
Over 30 (76.2) ............................................................................................................. 36 (91.44) 6 (15.24) 880
NOTE: If grinding wheels are used for disc grinding purposes, hoods must conform to structural strength and materials as de-
scribed in 9.1.
Entry loss = 0.45 velocity pressure for tapered takeoff.

61
EC30OC91.005

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00071 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.57 29 CFR Ch. XVII (7112 Edition)

Disc dia. inches (centimeters) Exhaust E Volume


exhaust at
4,500 ft/ Note
Min. Max. No Pipes Dia. min. ft3/
min

19 (48.26) 1 5 610
Over 19 (48.26) ................. 25 (63.5) 1 6 880 When width W permits, exhaust
ducts should be as near heaviest
grinding as possible.
Over 25 (63.5) ................... 30 (76.2) 1 7 1,200
Over 30 (76.2) ................... 53 (134.62) 2 6 1,770
Over 53 (134.62) ............... 72 (182.88) 4 8 6,280
Entry loss = 0.45 velocity pressure for tapered takeoff.

62
EC30OC91.006

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00072 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.57

FIGURE D57.8A TYPICAL HOOD FOR A BELT OPERATION

Entry loss = 0.45 velocity pressure for mable and Combustible Materials,
tapered takeoff NFPA No. 331969).
(iii) Spray room. A spray room is a
Exhaust room in which spray-finishing oper-
Belt width W. inches (centimeters) volume.
ft.1/min ations not conducted in a spray booth
are performed separately from other
Up to 3 (7.62) ...................................................... 220
3 to 5 (7.62 to 12.7) ............................................ 300
areas.
5 to 7 (12.7 to 17.78) .......................................... 390 (iv) Minimum maintained velocity. Min-
7 to 9 (17.78 to 22.86) ........................................ 500 imum maintained velocity is the veloc-
9 to 11 (22.86 to 27.94) ...................................... 610 ity of air movement which must be
11 to 13 (27.94 to 33.02) .................................... 740 maintained in order to meet minimum
Minimum duct velocity = 4,500 ft/min branch, 3,500 ft/min specified requirements for health and
main. safety.
Entry loss = 0.45 velocity pressure for tapered takeoff; 0.65
velocity pressure for straight takeoff. (2) Location and application. Spray
booths or spray rooms are to be used to
(6) Scope. This paragraph (g), pre- enclose or confine all operations.
scribes the use of exhaust hood enclo- Spray-finishing operations shall be lo-
sures and systems in removing dust, cated as provided in sections 201
dirt, fumes, and gases generated through 206 of the Standard for Spray
through the grinding, polishing, or Finishing Using Flammable and Com-
buffing of ferrous and nonferrous met- bustible Materials, NFPA No. 331969.
als. (3) Design and construction of spray
(h) Spray finishing operations(1) Defi- booths. (i) Spray booths shall be de-
nitions applicable to this paragraph(i) signed and constructed in accordance
Spray-finishing operations. Spray-fin- with 1926.66(b) (1) through (4) and (6)
ishing operations are employment of through (10) (see sections 301304 and
methods wherein organic or inorganic 306310 of the Standard for Spray Fin-
materials are utilized in dispersed form ishing Using Flammable and Combus-
for deposit on surfaces to be coated, tible Materials, NFPA No. 331969), for
treated, or cleaned. Such methods of general construction specifications.
deposit may involve either automatic, For a more detailed discussion of fun-
manual, or electrostatic deposition but damentals relating to this subject, see
do not include metal spraying or met- ANSI Z9.21960
allizing, dipping, flow coating, roller (A) Lights, motors, electrical equip-
coating, tumbling, centrifuging, or ment, and other sources of ignition
spray washing and degreasing as con- shall conform to the requirements of
ducted in self-contained washing and 1926.66(b)(10) and (c). (See section 310
degreasing machines or systems. and chapter 4 of the Standard for Spray
(ii) Spray booth. Spray booths are de- Finishing Using Flammable and Com-
fined and described in 1926.66(a). (See bustible Materials NFPA No. 331969.)
sections 103, 104, and 105 of the Stand- (B) In no case shall combustible ma-
ard for Spray Finishing Using Flam- terial be used in the construction of a

63
EC30OC91.007

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00073 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.57 29 CFR Ch. XVII (7112 Edition)

spray booth and supply or exhaust duct concrete, masonry, or other material
connected to it. having similar properties.
(ii) Unobstructed walkways shall not (A) Tanks shall be provided with
be less than 612 feet (1.976 m) high and weirs, skimmer plates, or screens to
shall be maintained clear of obstruc- prevent sludge and floating paint from
tion from any work location in the entering the pump suction box. Means
booth to a booth exit or open booth for automatically maintaining the
front. In booths where the open front is proper water level shall also be pro-
the only exit, such exits shall be not vided. Fresh water inlets shall not be
less than 3 feet (0.912 m) wide. In submerged. They shall terminate at
booths having multiple exits, such least one pipe diameter above the safe-
exits shall not be less than 2 feet (0.608 ty overflow level of the tank.
m) wide, provided that the maximum (B) Tanks shall be so constructed as
distance from the work location to the to discourage accumulation of haz-
exit is 25 feet (7.6 m) or less. Where ardous deposits.
booth exits are provided with doors, (vi) Pump manifolds, risers, and
such doors shall open outward from the headers shall be adequately sized to in-
booth. sure sufficient water flow to provide ef-
(iii) Baffles, distribution plates, and ficient operation of the water chamber.
dry-type overspray collectors shall (4) Design and construction of spray
conform to the requirements of rooms. (i) Spray rooms, including
1926.66(b) (4) and (5). (See sections 304 floors, shall be constructed of masonry,
and 305 of the Standard for Spray Fin- concrete, or other noncombustible ma-
ishing Using Flammable and Combus- terial.
tible Materials, NFPA No. 331969.) (ii) Spray rooms shall have non-
(A) Overspray filters shall be in- combustible fire doors and shutters.
stalled and maintained in accordance (iii) Spray rooms shall be adequately
with the requirements of 1926.66(b)(5), ventilated so that the atmosphere in
(see section 305 of the Standard for the breathing zone of the operator
Spray Finishing Using Flammable and shall be maintained in accordance with
Combustible Materials, NFPA No. 33 the requirements of paragraph (h)(6)(ii)
1969), and shall only be in a location of this section.
easily accessible for inspection, clean- (iv) Spray rooms used for production
ing, or replacement. spray-finishing operations shall con-
(B) Where effective means, inde- form to the requirements for spray
pendent of the overspray filters, are in- booths.
stalled which will result in design air (5) Ventilation. (i) Ventilation shall be
distribution across the booth cross sec- provided in accordance with provisions
tion, it is permissible to operate the of 1926.66(d) (see chapter 5 of the
booth without the filters in place. Standard for Spray Finishing Using
(iv) (A) For wet or water-wash spray Flammable or Combustible Materials,
booths, the water-chamber enclosure, NFPA No. 331969), and in accordance
within which intimate contact of con- with the following:
taminated air and cleaning water or (A) Where a fan plenum is used to
other cleaning medium is maintained, equalize or control the distribution of
if made of steel, shall be 18 gage or exhaust air movement through the
heavier and adequately protected booth, it shall be of sufficient strength
against corrosion. or rigidity to withstand the differential
(B) Chambers may include scrubber air pressure or other superficially im-
spray nozzles, headers, troughs, or posed loads for which the equipment is
other devices. Chambers shall be pro- designed and also to facilitate clean-
vided with adequate means for creating ing. Construction specifications shall
and maintaining scrubbing action for be at least equivalent to those of para-
removal of particulate matter from the graph (h)(5)(iii) of this section.
exhaust air stream. (B) [Reserved]
(v) Collecting tanks shall be of weld- (ii) Inlet or supply ductwork used to
ed steel construction or other suitable transport makeup air to spray booths
non-combustible material. If pits are or surrounding areas shall be con-
used as collecting tanks, they shall be structed of noncombustible materials.

64

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00074 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.57

(A) If negative pressure exists within (E) Inspection or clean-out doors


inlet ductwork, all seams and joints shall be provided for every 9 to 12 feet
shall be sealed if there is a possibility (2.736 to 3.648 m) of running length for
of infiltration of harmful quantities of ducts up to 12 inches (0.304 m) in di-
noxious gases, fumes, or mists from ameter, but the distance between
areas through which ductwork passes. cleanout doors may be greater for larg-
(B) Inlet ductwork shall be sized in er pipes. (See 8.3.21 of American Na-
accordance with volume flow require- tional Standard Z9.11951.) A clean-out
ments and provide design air require- door or doors shall be provided for serv-
ments at the spray booth. icing the fan, and where necessary, a
(C) Inlet ductwork shall be ade- drain shall be provided.
quately supported throughout its (F) Where ductwork passes through a
length to sustain at least its own combustible roof or wall, the roof or
weight plus any negative pressure wall shall be protected at the point of
which is exerted upon it under normal penetration by open space or fire-resis-
operating conditions. tive material between the duct and the
(iii) [Reserved] roof or wall. When ducts pass through
(A) Exhaust ductwork shall be ade- firewalls, they shall be provided with
quately supported throughout its automatic fire dampers on both sides of
length to sustain its weight plus any the wall, except that three-eighth-inch
normal accumulation in interior dur- steel plates may be used in lieu of
ing normal operating conditions and automatic fire dampers for ducts not
any negative pressure exerted upon it. exceeding 18 inches (45.72 cm) in diame-
(B) Exhaust ductwork shall be sized ter.
in accordance with good design prac- (G) Ductwork used for ventilating
tice which shall include consideration any process covered in this standard
of fan capacity, length of duct, number shall not be connected to ducts ven-
of turns and elbows, variation in size, tilating any other process or any chim-
volume, and character of materials ney or flue used for conveying any
being exhausted. See American Na- products of combustion.
tional Standard Z9.21960 for further (6) Velocity and air flow requirements.
details and explanation concerning ele- (i) Except where a spray booth has an
ments of design. adequate air replacement system, the
(C) Longitudinal joints in sheet steel velocity of air into all openings of a
ductwork shall be either lock-seamed, spray booth shall be not less than that
riveted, or welded. For other than steel specified in Table D57.7 for the oper-
construction, equivalent securing of ating conditions specified. An adequate
joints shall be provided. air replacement system is one which
(D) Circumferential joints in duct- introduces replacement air upstream
work shall be substantially fastened or above the object being sprayed and
together and lapped in the direction of is so designed that the velocity of air
airflow. At least every fourth joint in the booth cross section is not less
shall be provided with connecting than that specified in Table D57.7
flanges, bolted together, or of equiva- when measured upstream or above the
lent fastening security. object being sprayed.
TABLE D57.7MINIMUM MAINTAINED VELOCITIES INTO SPRAY BOOTHS
Airflow velocities, f.p.m.
Crossdraft,
Operating conditions for objects completely inside booth f.p.m. Design Range

Electrostatic and automatic airless operation contained in booth Negligible .... 50 large booth ...................... 5075
without operator.
................. 100 small booth .................... 75125
Air-operated guns, manual or automatic ............................................ Up to 50 ...... 100 large booth .................... 75125

................. 150 small booth .................... 125175


Air-operated guns, manual or automatic ............................................ Up to 100 .... 150 large booth .................... 125175

................. 200 small booth .................... 150250


NOTES:

65

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00075 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.57 29 CFR Ch. XVII (7112 Edition)
(1) Attention is invited to the fact that the effectiveness of the spray booth is dependent upon the relationship of the depth of
the booth to its height and width.
(2) Crossdrafts can be eliminated through proper design and such design should be sought. Crossdrafts in excess of
100fpm (feet per minute) should not be permitted.
(3) Excessive air pressures result in loss of both efficiency and material waste in addition to creating a backlash that may
carry overspray and fumes into adjacent work areas.
(4) Booths should be designed with velocities shown in the column headed Design. However, booths operating with veloci-
ties shown in the column headed Range are in compliance with this standard.

(ii) In addition to the requirements TABLE D57.8LOWER EXPLOSIVE LIMIT OF


in paragraph (h)(6)(i) of this section the SOME COMMONLY USED SOLVENTSContinued
total air volume exhausted through a
Lower ex-
spray booth shall be such as to dilute Cubic feet plosive
per gallon
solvent vapor to at least 25 percent of of vapor of limit in per-
Solvent cent by
the lower explosive limit of the solvent liquid at 70 volume of
F (21.11
being sprayed. An example of the meth- air at 70 F
C). (21.11 C)
od of calculating this volume is given
below. Benzene ........................................ 36.8 1 1.4

Butyl Acetate (n) ............................ 24.8 1.7


Example: To determine the lower explosive Butyl Alcohol (n) ............................ 35.2 1.4
limits of the most common solvents used in Butyl Cellosolve ............................. 24.8 1.1
spray finishing, see Table D57.8. Column 1 Cellosolve ...................................... 33.6 1.8
gives the number of cubic feet of vapor per Cellosolve Acetate ......................... 23.2 1.7
Cyclohexanone .............................. 31.2 1 1.1
gallon of solvent and column 2 gives the
1,1 Dichloroethylene ...................... 42.4 5.9
lower explosive limit (LEL) in percentage by 1,2 Dichloroethylene ...................... 42.4 9.7
volume of air. Note that the quantity of sol- Ethyl Acetate ................................. 32.8 2.5
vent will be diminished by the quantity of Ethyl Alcohol .................................. 55.2 4.3
solids and nonflammables contained in the Ethyl Lactate .................................. 28.0 1 1.5

finish. Methyl Acetate ............................... 40.0 3.1


To determine the volume of air in cubic Methyl Alcohol ............................... 80.8 7.3
Methyl Cellosolve .......................... 40.8 2.5
feet necessary to dilute the vapor from 1 gal- Methyl Ethyl Ketone ...................... 36.0 1.8
lon of solvent to 25 percent of the lower ex- Methyl n-Propyl Ketone ................. 30.4 1.5
plosive limit, apply the following formula: Naphtha (VM&P) (76Naphtha) ..... 22.4 0.9
Naphtha (100Flash) Safety Sol-
Dilution volume required per gallon of ventStoddard Solvent ............. 23.2 1.0
solvent=4 (100LEL) (cubic feet of Propyl Acetate (n) ......................... 27.2 2.8
vapor per gallon) LEL Propyl Acetate (iso) ....................... 28.0 1.1
Propyl Alcohol (n) .......................... 44.8 2.1
Using toluene as the solvent. Propyl Alcohol (iso) ....................... 44.0 2.0
(1) LEL of toluene from Table D57.8, col- Toluene .......................................... 30.4 1.4
Turpentine ..................................... 20.8 0.8
umn 2, is 1.4 percent.
Xylene (o) ...................................... 26.4 1.0
(2) Cubic feet of vapor per gallon from
Table D57.8, column 1, is 30.4 cubic feet per 1 At 212 F (100 C).
gallon.
(3) Dilution volume required =
(iii)(A) When an operator is in a
booth downstream of the object being
4 (1001.4) 30.4 1.4=8,564 cubic feet. sprayed, an air-supplied respirator or
(4) To convert to cubic feet per minute of other type of respirator approved by
required ventilation, multiply the dilution NIOSH under 42 CFR part 84 for the
volume required per gallon of solvent by the material being sprayed should be used
number of gallons of solvent evaporated per by the operator.
minute. (B) Where downdraft booths are pro-
vided with doors, such doors shall be
TABLE D57.8LOWER EXPLOSIVE LIMIT OF closed when spray painting.
SOME COMMONLY USED SOLVENTS (7) Make-up air. (i) Clean fresh air,
Lower ex- free of contamination from adjacent
Cubic feet
per gallon plosive industrial exhaust systems, chimneys,
limit in per-
Solvent of vapor of cent by stacks, or vents, shall be supplied to a
liquid at 70
F (21.11 volume of spray booth or room in quantities
air at 70 F
C). equal to the volume of air exhausted
(21.11 C)
through the spray booth.
Column 1 Column 2 (ii) Where a spray booth or room re-
Acetone ......................................... 44.0 2.6 ceives make-up air through self-closing
Amyl Acetate (iso) ......................... 21.6 1 1.0

Amyl Alcohol (n) ............................ 29.6 1.2 doors, dampers, or louvers, they shall
Amyl Alcohol (iso) ......................... 29.6 1.2 be fully open at all times when the

66

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00076 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.57

booth or room is in use for spraying. sources of heat may be employed to


The velocity of air through such doors, meet this requirement.
dampers, or louvers shall not exceed (C) No means of heating make-up air
200 feet per minute. If the fan charac- shall be located in a spray booth.
teristics are such that the required air (D) Where make-up air is heated by
flow through the booth will be pro- coal or oil, the products of combustion
vided, higher velocities through the shall not be allowed to mix with the
doors, dampers, or louvers may be make-up air, and the products of com-
used. bustion shall be conducted outside the
(iii) (A) Where the air supply to a building through a flue terminating at
spray booth or room is filtered, the fan a point remote from all points where
static pressure shall be calculated on make-up air enters the building.
the assumption that the filters are (E) Where make-up air is heated by
dirty to the extent that they require gas, and the products of combustion
cleaning or replacement. are not mixed with the make-up air but
(B) The rating of filters shall be gov- are conducted through an independent
erned by test data supplied by the man- flue to a point outside the building re-
ufacturer of the filter. A pressure gage mote from all points where make-up
shall be installed to show the pressure air enters the building, it is not nec-
drop across the filters. This gage shall essary to comply with paragraph
be marked to show the pressure drop at (h)(7)(iv)(F) of this section.
which the filters require cleaning or re- (F) Where make-up air to any manu-
placement. Filters shall be replaced or ally operated spray booth or room is
cleaned whenever the pressure drop heated by gas and the products of com-
across them becomes excessive or bustion are allowed to mix with the
whenever the air flow through the face supply air, the following precautions
of the booth falls below that specified must be taken:
in Table D57.7. (1) The gas must have a distinctive
(iv) (A) Means for heating make-up and strong enough odor to warn work-
air to any spray booth or room, before men in a spray booth or room of its
or at the time spraying is normally presence if in an unburned state in the
performed, shall be provided in all make-up air.
places where the outdoor temperature (2) The maximum rate of gas supply
may be expected to remain below 55 F. to the make-up air heater burners
(12.77 C.) for appreciable periods of must not exceed that which would
time during the operation of the booth yield in excess of 200 p.p.m. (parts per
except where adequate and safe means million) of carbon monoxide or 2,000
of radiant heating for all operating per- p.p.m. of total combustible gases in the
sonnel affected is provided. The re- mixture if the unburned gas upon the
placement air during the heating sea- occurrence of flame failure were mixed
sons shall be maintained at not less with all of the make-up air supplied.
than 65 F. (18.33 C.) at the point of (3) A fan must be provided to deliver
entry into the spray booth or spray the mixture of heated air and products
room. When otherwise unheated make- of combustion from the plenum cham-
up air would be at a temperature of ber housing the gas burners to the
more than 10 F. below room tempera- spray booth or room.
ture, its temperature shall be regulated (8) Scope. Spray booths or spray
as provided in section 3.6.3 of ANSI rooms are to be used to enclose or con-
Z9.21960. fine all spray finishing operations cov-
(B) As an alternative to an air re- ered by this paragraph (h). This para-
placement system complying with the graph does not apply to the spraying of
preceding section, general heating of the exteriors of buildings, fixed tanks,
the building in which the spray room or similar structures, nor to small
or booth is located may be employed portable spraying apparatus not used
provided that all occupied parts of the repeatedly in the same location.
building are maintained at not less (i) Open surface tanks(1) General. (i)
than 65 F. (18.33 C.) when the exhaust This paragraph applies to all oper-
system is in operation or the general ations involving the immersion of ma-
heating system supplemented by other terials in liquids, or in the vapors of

67

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00077 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.57 29 CFR Ch. XVII (7112 Edition)

such liquids, for the purpose of clean- Combustible Liquids, NFPA No. 34
ing or altering the surface or adding to 1966, National Fire Protection Associa-
or imparting a finish thereto or chang- tion. Where the tank contains a mix-
ing the character of the materials, and ture of liquids, other than organic sol-
their subsequent removal from the liq- vents, whose effects are additive, the
uid or vapor, draining, and drying. hygienic standard of the most toxic
These operations include washing, elec- component (for example, the one hav-
troplating, anodizing, pickling, ing the lowest p.p.m. or mg./m.3) shall
quenching, dying, dipping, tanning, be used, except where such substance
dressing, bleaching, degreasing, alka- constitutes an insignificantly small
line cleaning, stripping, rinsing, digest- fraction of the mixture. For mixtures
ing, and other similar operations. of organic solvents, their combined ef-
(ii) Except where specific construc- fect, rather than that of either individ-
tion specifications are prescribed in ually, shall determine the hazard po-
this section, hoods, ducts, elbows, fans, tential. In the absence of information
blowers, and all other exhaust system to the contrary, the effects shall be
parts, components, and supports there- considered as additive. If the sum of
of shall be so constructed as to meet the ratios of the airborne concentra-
conditions of service and to facilitate tion of each contaminant to the toxic
maintenance and shall conform in con- concentration of that contaminant ex-
struction to the specifications con- ceeds unity, the toxic concentration
tained in American National Standard shall be considered to have been ex-
Fundamentals Governing the Design ceeded. (See Note A to paragraph
and Operation of Local Exhaust Sys- (i)(2)(v) of this section.)
tems, Z9.21960. (v) Hazard potential shall be deter-
(2) Classification of open-surface tank mined from Table D57.9, with the
operations. (i) Open-surface tank oper- value indicating greater hazard being
ations shall be classified into 16 class- used. When the hazardous material
es, numbered A1 to D4, inclusive. may be either a vapor with a
(ii) Determination of class. Class is de- threshhold limit value (TLV) in p.p.m.
termined by two factors, hazard poten- or a mist with a TLV in mg./m.3, the
tial designated by a letter from A to D, TLV indicating the greater hazard shall
inclusive, and rate of gas, vapor, or be used (for example, A takes prece-
mist evolution designated by a number dence over B or C; B over C; C over D).
from 1 to 4, inclusive (for example, B.3). NOTE A:
(iii) Hazard potential is an index, on (c1TLV1)+(c2TLV2)+(c3TLV3)+; . .
a scale of from A to D, inclusive, of the .(cNTLVN)1
severity of the hazard associated with Where:
the substance contained in the tank be- c = Concentration measured at the operation
cause of the toxic, flammable, or explo- in p.p.m.
sive nature of the vapor, gas, or mist
produced therefrom. The toxic hazard TABLE D57.9DETERMINATION OF HAZARD
is determined from the concentration, POTENTIAL
measured in parts by volume of a gas Toxicity group
or vapor, per million parts by volume
of contaminated air (p.p.m.), or in mil- Hazard potential Gas or Mist (mg./ Flash point in
vapor
ligrams of mist per cubic meter of air m3) degrees F. (C.)
(p.p.m.)
(mg./m.3), below which ill effects are
A .......................... 010 00.1 ..........................
unlikely to occur to the exposed work- B .......................... 11100 0.111.0 Under 100
er. The concentrations shall be those in (37.77)
1926.55 or other pertinent sections of C .......................... 101500 1.110 100 200
(37.7793.33)
this part. D .......................... Over 500 Over 10 Over 200
(iv) The relative fire or explosion (93.33)
hazard is measured in degrees Fahr-
enheit in terms of the closed-cup flash (vi) Rate of gas, vapor, or mist evo-
point of the substance in the tank. De- lution is a numerical index, on a scale
tailed information on the prevention of of from 1 to 4, inclusive, both of the
fire hazards in dip tanks may be found relative capacity of the tank to
in Dip Tanks Containing Flammable or produce gas, vapor, or mist and of the

68

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00078 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.57

relative energy with which it is pro- (D) The extent that the tank gases or
jected or carried upwards from the produces mist in an arbitrary scale
tank. Rate is evaluated in terms of high, medium, low, and nil. (See Table
(A) The temperature of the liquid in D57.10, Note 2.) Gassing depends upon
the tank in degrees Fahrenheit; electrochemical or mechanical proc-
(B) The number of degrees Fahr- esses, the effects of which have to be
enheit that this temperature is below individually evaluated for each instal-
the boiling point of the liquid in de- lation (see Table D57.10, Note 3).
grees Fahrenheit; (vii) Rate of evolution shall be deter-
(C) The relative evaporation of the mined from Table D57.10. When evapo-
liquid in still air at room temperature ration and gassing yield different rates,
in an arbitrary scalefast, medium, the lowest numerical value shall be
slow, or nil; and used.
TABLE D57.10DETERMINATION OF RATE OF GAS, VAPOR, OR MIST EVOLUTION 1
Liquid temperature, Degrees below boil-
Rate Relative evaporation 2 Gassing 3
F. (C.) ing point

1 ................................ Over 200 (93.33) 020 Fast ...................................... High.


2 ................................ 150200 (65.55 2150 Medium ................................ Medium.
93.33)
3 ................................ 94149 (34.4465) 51100 Slow ..................................... Low.
4 ................................ Under 94 (34.44) Over 100 Nil ........................................ Nil.
1 In certain classes of equipment, specifically vapor degreasers, an internal condenser or vapor level thermostat is used to pre-
vent the vapor from leaving the tank during normal operation. In such cases, rate of vapor evolution from the tank into the work-
room is not dependent upon the factors listed in the table, but rather upon abnormalities of operating procedure, such as carry-
out of vapors from excessively fast action, dragout of liquid by entrainment in parts, contamination of solvent by water and other
materials, or improper heat balance. When operating procedure is excellent, effective rate of evolution may be taken as 4. When
operating procedure is average, the effective rate of evolution may be taken as 3. When operation is poor, a rate of 2 or 1 is in-
dicated, depending upon observed conditions.
2 Relative evaporation rate is determined according to the methods described by A. K. Doolittle in Industrial and Engineering
Chemistry, vol. 27, p. 1169, (3) where time for 100-percent evaporation is as follows: Fast: 03 hours; Medium: 312 hours;
Slow: 1250 hours; Nil: more than 50 hours.
3 Gassing means the formation by chemical or electrochemical action of minute bubbles of gas under the surface of the liquid
in the tank and is generally limited to aqueous solutions.

(3) Ventilation. Where ventilation is (ii) All tanks exhausted by means of


used to control potential exposures to hoods which
workers as defined in paragraph (A) Project over the entire tank;
(i)(2)(iii) of this section, it shall be ade- (B) Are fixed in position in such a lo-
quate to reduce the concentration of cation that the head of the workman,
the air contaminant to the degree that in all his normal operating positions
a hazard to the worker does not exist. while working at the tank, is in front
Methods of ventilation are discussed in
of all hood openings; and
American National Standard Fun-
damentals Governing the Design and (C) Are completely enclosed on at
Operation of Local Exhaust Systems, least two sides, shall be considered to
Z9.21960. be exhausted through an enclosing
(4) Control requirements. (i) Control hood.
velocities shall conform to Table D (D) The quantity of air in cubic feet
57.11 in all cases where the flow of air per minute necessary to be exhausted
past the breathing or working zone of through an enclosing hood shall be not
the operator and into the hoods is un- less than the product of the control ve-
disturbed by local environmental con- locity times the net area of all open-
ditions, such as open windows, wall ings in the enclosure through which air
fans, unit heaters, or moving machin- can flow into the hood.
ery.

69

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00079 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.57 29 CFR Ch. XVII (7112 Edition)

TABLE D57.11CONTROL VELOCITIES IN FEET PER MINUTE (F.P.M.) FOR UNDISTURBED LOCATIONS
Enclosing hood Canopy hood 2
Lateral ex-
Class One open Two open haust 1 Three Four open
side sides open sides sides

B1 and A2 ........................................................................... 100 150 150 Do not use Do not use


A3 2, B1, B2, and C1 ....................................................... 75 100 100 125 175
A3, C2, and D1 3 ............................................................... 65 90 75 100 150
B4 2, C3, and D2 3 ............................................................. 50 75 50 75 125
A4, C4, D3 3, and D4 4 .................................................... .................. .................. .................. .................. ..................
1 See Table D57.12 for computation of ventilation rate.
2 Do not use canopy hood for Hazard Potential A processes.
3 Where complete control of hot water is desired, design as next highest class.
4 General room ventilation required.

(iii) All tanks exhausted by means of (A) For lateral exhaust hoods over 42
hoods which do not project over the en- inches (1.06 m) wide, or where it is de-
tire tank, and in which the direction of sirable to reduce the amount of air re-
air movement into the hood or hoods is moved from the workroom, air supply
substantially horizontal, shall be con- slots or orifices shall be provided along
sidered to be laterally exhausted. The the side or the center of the tank oppo-
quantity of air in cubic feet per minute site from the exhaust slots. The design
necessary to be laterally exhausted per of such systems shall meet the fol-
square foot of tank area in order to
lowing criteria:
maintain the required control velocity
shall be determined from Table D57.12 (1) The supply air volume plus the en-
for all variations in ratio of tank width trained air shall not exceed 50 percent
(W) to tank length $(L). The total of the exhaust volume.
quantity of air in cubic feet per minute (2) The velocity of the supply air-
required to be exhausted per tank shall stream as it reaches the effective con-
be not less than the product of the area trol area of the exhaust slot shall be
of tank surface times the cubic feet per less than the effective velocity over
minute per square foot of tank area, the exhaust slot area.
determined from Table D57.12.
TABLE D57.12MINIMUM VENTILATION RATE IN CUBIC FEET OF AIR PER MINUTE PER SQUARE
FOOT OF TANK AREA FOR LATERAL EXHAUST
C.f.m. per sq. ft. to maintain required minimum velocities at fol-
Required minimum control velocity, f.p.m. (from Table D lowing ratios (tank width (W)/tank length (L)). 1,2
57.11)
0.00.09 0.10.24 0.250.49 0.50.99 1.02.0

Hood along one side or two parallel sides of tank when one hood is against a wall or baffle. 2
Also for a manifold along tank centerline. 3

50 ............................................................................................ 50 60 75 90 100
75 ............................................................................................ 75 90 110 130 150
100 .......................................................................................... 100 125 150 175 200
150 .......................................................................................... 150 190 225 260 300

Hood along one side or two parallel sides of free standing tank not against wall or baffle.

50 ............................................................................................ 75 90 100 110 125


75 ............................................................................................ 110 130 150 170 190
100 .......................................................................................... 150 175 200 225 250
150 .......................................................................................... 225 260 300 340 375
1 Itis not practicable to ventilate across the long dimension of a tank whose ratio W/L exceeds 2.0.
It is undesirable to do so when W/L exceeds 1.0. For circular tanks with lateral exhaust along up to 1/2 the circumference, use
W/L=1.0; for over one-half the circumference use W/L=0.5.
2 Baffle is a vertical plate the same length as the tank, and with the top of the plate as high as the tank is wide. If the exhaust
hood is on the side of a tank against a building wall or close to it, it is perfectly baffled.
3 Use W/2 as tank width in computing when manifold is along centerline, or when hoods are used on two parallel sides of a
tank.
Tank Width (W) means the effective width over which the hood must pull air to operate (for example, where the hood face is
set back from the edge of the tank, this set back must be added in measuring tank width). The surface area of tanks can fre-
quently be reduced and better control obtained (particularly on conveyorized systems) by using covers extending from the upper
edges of the slots toward the center of the tank.

70

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00080 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.57

(3) The vertical height of the receiv- the liquid in the tank to minimize mist
ing exhaust hood, including any baffle, formation, or any combination thereof,
shall not be less than one-quarter the may all be used as gas, mist, or vapor
width of the tank. control means for open-surface tank
(4) The supply airstream shall not be operations, provided that they effec-
allowed to impinge on obstructions be- tively reduce the concentrations of
tween it and the exhaust slot in such a hazardous materials in the vicinity of
manner as to significantly interfere the worker below the limits set in ac-
with the performance of the exhaust cordance with paragraph (i)(2) of this
hood. section.
(5) Since most failure of push-pull (7) System design. (i) The equipment
systems result from excessive supply for exhausting air shall have sufficient
air volumes and pressures, methods of capacity to produce the flow of air re-
measuring and adjusting the supply air quired in each of the hoods and open-
shall be provided. When satisfactory ings of the system.
control has been achieved, the adjust- (ii) The capacity required in para-
able features of the hood shall be fixed graph (i)(7)(i) of this section shall be
so that they will not be altered. obtained when the airflow producing
(iv) All tanks exhausted by means of equipment is operating against the fol-
hoods which project over the entire lowing pressure losses, the sum of
tank, and which do not conform to the which is the static pressure:
definition of enclosing hoods, shall be (A) Entrance losses into the hood.
considered to be overhead canopy (B) Resistance to airflow in branch
hoods. The quantity of air in cubic feet pipe including bends and trans-
per minute necessary to be exhausted formations.
through a canopy hood shall be not less (C) Entrance loss into the main pipe.
than the product of the control veloc- (D) Resistance to airflow in main
ity times the net area of all openings pipe including bends and trans-
between the bottom edges of the hood formations.
and the top edges of the tank. (E) Resistance of mechanical equip-
(v) The rate of vapor evolution (in- ment; that is, filters, washers, con-
cluding steam or products of combus- densers, absorbers, etc., plus their en-
tion) from the process shall be esti- trance and exit losses.
mated. If the rate of vapor evolution is (F) Resistance in outlet duct and dis-
equal to or greater than 10 percent of charge stack.
the calculated exhaust volume re- (iii) Two or more operations shall not
quired, the exhaust volume shall be in- be connected to the same exhaust sys-
creased in equal amount. tem where either one or the combina-
(5) Spray cleaning and degreasing. tion of the substances removed may
Wherever spraying or other mechanical constitute a fire, explosion, or chem-
means are used to disperse a liquid ical reaction hazard in the duct sys-
above an open-surface tank, control tem. Traps or other devices shall be
must be provided for the airborne provided to insure that condensate in
spray. Such operations shall be en- ducts does not drain back into any
closed as completely as possible. The tank.
inward air velocity into the enclosure (iv) The exhaust system, consisting
shall be sufficient to prevent the dis- of hoods, ducts, air mover, and dis-
charge of spray into the workroom. charge outlet, shall be designed in ac-
Mechanical baffles may be used to help cordance with American National
prevent the discharge of spray. Spray Standard Fundamentals Governing the
painting operations are covered by Design and Operation of Local Exhaust
paragraph (h) of this section. Systems, Z9.21960, or the manual, In-
(6) Control means other than ventila- dustrial Ventilation, published by the
tion. Tank covers, foams, beads, chips, American Conference of Governmental
or other materials floating on the tank Industrial Hygienists 1970. Airflow and
surface so as to confine gases, mists, or pressure loss data provided by the man-
vapors to the area under the cover or ufacturer of any air cleaning device
to the foam, bead, or chip layer; or sur- shall be included in the design calcula-
face tension depressive agents added to tions.

71

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00081 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.57 29 CFR Ch. XVII (7112 Edition)

(8) Operation. (i) The required airflow (ii) All persons required to work in
shall be maintained at all times during such a manner that their feet may be-
which gas, mist, or vapor is emitted come wet shall be provided with rubber
from the tank, and at all times the or other impervious boots or shoes,
tank, the draining, or the drying area rubbers, or wooden-soled shoes suffi-
is in operation or use. When the system cient to keep feet dry.
is first installed, the airflow from each (iii) All persons required to handle
hood shall be measured by means of a work wet with a liquid other than
pitot traverse in the exhaust duct and water shall be provided with gloves im-
corrective action taken if the flow is pervious to such a liquid and of a
less than that required. When the prop- length sufficient to prevent entrance of
er flow is obtained, the hood static liquid into the tops of the gloves. The
pressure shall be measured and re- interior of gloves shall be kept free
corded. At intervals of not more than 3 from corrosive or irritating contami-
months operation, or after a prolonged nants.
shutdown period, the hoods and duct (iv) All persons required to work in
system shall be inspected for evidence such a manner that their clothing may
of corrosion or damage. In any case become wet shall be provided with such
where the airflow is found to be less aprons, coats, jackets, sleeves, or other
than required, it shall be increased to garments made of rubber, or of other
the required value. (Information on air- materials impervious to liquids other
flow and static pressure measurement than water, as are required to keep
and calculations may be found in their clothing dry. Aprons shall extend
American National Standard Funda- well below the top of boots to prevent
mental Governing the Design and Oper- liquid splashing into the boots. Provi-
ation of Local Exhaust Systems, Z9.2 sion of dry, clean, cotton clothing
1960, or in the manual, Industrial Ven- along with rubber shoes or short boots
tilation, published by the American and an apron impervious to liquids
Conference of Governmental Industrial other than water shall be considered a
satisfactory substitute where small
Hygienists.)
parts are cleaned, plated, or acid
(ii) The exhaust system shall dis-
dipped in open tanks and rapid work is
charge to the outer air in such a man-
required.
ner that the possibility of its effluent (v) Whenever there is a danger of
entering any building is at a minimum. splashing, for example, when additions
Recirculation shall only be through a are made manually to the tanks, or
device for contaminant removal which when acids and chemicals are removed
will prevent the creation of a health from the tanks, the employees so en-
hazard in the room or area to which gaged shall be required to wear either
the air is recirculated. tight-fitting chemical goggles or an ef-
(iii) A volume of outside air in the fective face shield. See 1926.102.
range of 90 percent to 110 percent of the (vi) When, during the emergencies
exhaust volume shall be provided to specified in paragraph (i)(11)(v) of this
each room having exhaust hoods. The section, employees must be in areas
outside air supply shall enter the work- where concentrations of air contami-
room in such a manner as not to be nants are greater than the limits set
detrimental to any exhaust hood. The by paragraph (i)(2)(iii) of this section
airflow of the makeup air system shall or oxygen concentrations are less than
be measured on installation. Corrective 19.5 percent, they must use respirators
action shall be taken when the airflow that reduce their exposure to a level
is below that required. The makeup air below these limits or that provide ade-
shall be uncontaminated. quate oxygen. Such respirators must
(9) Personal protection. (i) All employ- also be provided in marked, quickly-ac-
ees working in and around open-surface cessible storage compartments built
tank operations must be instructed as for this purpose when the possibility
to the hazards of their respective jobs, exists of accidental release of haz-
and in the personal protection and first ardous concentrations of air contami-
aid procedures applicable to these haz- nants. Respirators must be approved by
ards. NIOSH under 42 CFR part 84, selected

72

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00082 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.57

by a competent industrial hygienist or type of construction and by frequent


other technically-qualified source, and flushing. They shall be firm, sound, and
used in accordance with 29 CFR of the design and construction to mini-
1926.103. mize the possibility of tripping.
(vii) Near each tank containing a liq- (ii) Before cleaning the interior of
uid which may burn, irritate, or other- any tank, the contents shall be drained
wise be harmful to the skin if splashed off, and the cleanout doors shall be
upon the workers body, there shall be opened where provided. All pockets in
a supply of clean cold water. The water tanks or pits, where it is possible for
pipe (carrying a pressure not exceeding hazardous vapors to collect, shall be
25 pounds (11.325 kg)) shall be provided ventilated and cleared of such vapors.
with a quick opening valve and at least (iii) Tanks which have been drained
48 inches (1.216 m) of hose not smaller to permit employees to enter for the
than three-fourths inch, so that no purposes of cleaning, inspection, or
time may be lost in washing off liquids maintenance may contain atmospheres
from the skin or clothing. Alter- which are hazardous to life or health,
natively, deluge showers and eye through the presence of flammable or
flushes shall be provided in cases where toxic air contaminants, or through the
harmful chemicals may be splashed on absence of sufficient oxygen. Before
parts of the body. employees shall be permitted to enter
(viii) Operators with sores, burns, or any such tank, appropriate tests of the
other skin lesions requiring medical atmosphere shall be made to determine
treatment shall not be allowed to work
if the limits set by paragraph (i)(2)(iii)
at their regular operations until so au-
of this section are exceeded, or if the
thorized by a physician. Any small
oxygen concentration is less than 19.5
skin abrasions, cuts, rash, or open
percent.
sores which are found or reported shall
be treated by a properly designated (iv) If the tests made in accordance
person so that chances of exposures to with paragraph (i)(11)(iii) of this sec-
the chemicals are removed. Workers tion indicate that the atmosphere in
exposed to chromic acids shall have a the tank is unsafe, before any em-
periodic examination made of the nos- ployee is permitted to enter the tank,
trils and other parts of the body, to de- the tank shall be ventilated until the
tect incipient ulceration. hazardous atmosphere is removed, and
(ix) Sufficient washing facilities, in- ventilation shall be continued so as to
cluding soap, individual towels, and prevent the occurrence of a hazardous
hot water, shall be provided for all per- atmosphere as long as an employee is
sons required to use or handle any liq- in the tank.
uids which may burn, irritate, or oth- (v) If, in emergencies, such as rescue
erwise be harmful to the skin, on the work, it is necessary to enter a tank
basis of at least one basin (or its equiv- which may contain a hazardous atmos-
alent) with a hot water faucet for every phere, suitable respirators, such as
10 employees. See 1926.51(f). self-contained breathing apparatus;
(x) Locker space or equivalent cloth- hose mask with blower, if there is a
ing storage facilities shall be provided possibility of oxygen deficiency; or a
to prevent contamination of street gas mask, selected and operated in ac-
clothing. cordance with paragraph (i)(9)(vi) of
(xi) First aid facilities specific to the this section, shall be used. If a con-
hazards of the operations conducted taminant in the tank can cause derma-
shall be readily available. titis, or be absorbed through the skin,
(10) Special precautions for cyanide. the employee entering the tank shall
Dikes or other arrangements shall be also wear protective clothing. At least
provided to prevent the possibility of one trained standby employee, with
intermixing of cyanide and acid in the suitable respirator, shall be present in
event of tank rupture. the nearest uncontaminated area. The
(11) Inspection, maintenance, and in- standby employee must be able to com-
stallation. (i) Floors and platforms municate with the employee in the
around tanks shall be prevented from tank and be able to haul him out of the
becoming slippery both by original tank with a lifeline if necessary.

73

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00083 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.58 29 CFR Ch. XVII (7112 Edition)

(vi) Maintenance work requiring the vapors of such liquids, for the pur-
welding or open flame, where toxic pose of cleaning or altering their sur-
metal fumes such as cadmium, chro- faces, or adding or imparting a finish
mium, or lead may be evolved, shall be thereto, or changing the character of
done only with sufficient local exhaust the materials, and their subsequent re-
ventilation to prevent the creation of a moval from the liquids or vapors,
health hazard, or be done with res- draining, and drying. Such operations
pirators selected and used in accord- include washing, electroplating, anod-
ance with paragraph (i)(9)(vi) of this izing, pickling, quenching, dyeing, dip-
section. Welding, or the use of open ping, tanning, dressing, bleaching,
flames near any solvent cleaning degreasing, alkaline cleaning, strip-
equipment shall be permitted only ping, rinsing, digesting, and other simi-
after such equipment has first been lar operations, but do not include mol-
thoroughly cleared of solvents and va- ten materials handling operations, or
pors. surface coating operations.
(12) Vapor degreasing tanks. (i) In any (ii) Molten materials handling oper-
vapor degreasing tank equipped with a ations means all operations, other than
condenser or vapor level thermostat, welding, burning, and soldering oper-
the condenser or thermostat shall keep ations, involving the use, melting,
the level of vapors below the top edge smelting, or pouring of metals, alloys,
of the tank by a distance at least equal salts, or other similar substances in
to one-half the tank width, or at least the molten state. Such operations also
36 inches (0.912 m), whichever is short- include heat treating baths, descaling
er. baths, die casting stereotyping, gal-
(ii) Where gas is used as a fuel for vanizing, tinning, and similar oper-
heating vapor degreasing tanks, the ations.
combustion chamber shall be of tight (iii) Surface coating operations means
construction, except for such openings all operations involving the applica-
as the exhaust flue, and those that are tion of protective, decorative, adhe-
necessary for supplying air for combus- sive, or strengthening coating or im-
tion. Flues shall be of corrosion-resist- pregnation to one or more surfaces, or
ant construction and shall extend to into the interstices of any object or
the outer air. If mechanical exhaust is material, by means of spraying, spread-
used on this flue, a draft diverter shall ing, flowing, brushing, roll coating,
be used. Special precautions must be pouring, cementing, or similar means;
taken to prevent solvent fumes from and any subsequent draining or drying
entering the combustion air of this or operations, excluding open-tank oper-
any other heater when chlorinated or ations.
fluorinated hydrocarbon solvents (for
example, trichloroethylene, Freon) are [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
used. 1979, as amended at 58 FR 35099, June 30, 1993;
61 FR 9250, Mar. 3, 1996; 63 FR 1295, Jan. 8,
(iii) Heating elements shall be so de-
1998]
signed and maintained that their sur-
face temperature will not cause the 1926.58 [Reserved]
solvent or mixture to decompose, break
down, or be converted into an excessive 1926.59 Hazard communication.
quantity of vapor.
(iv) Tanks or machines of more than NOTE: The requirements applicable to con-
struction work under this section are iden-
4 square feet (0.368 m2) of vapor area, tical to those set forth at 1910.1200 of this
used for solvent cleaning or vapor chapter.
degreasing, shall be equipped with suit-
able cleanout or sludge doors located [61 FR 31431, June 20, 1996]
near the bottom of each tank or still.
These doors shall be so designed and 1926.60 Methylenedianiline.
gasketed that there will be no leakage (a) Scope and application. (1) This sec-
of solvent when they are closed. tion applies to all construction work as
(13) Scope. (i) This paragraph (i) ap- defined in 29 CFR 1910.12(b), in which
plies to all operations involving the there is exposure to MDA, including
immersion of materials in liquids, or in but not limited to the following:

74

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00084 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.60

(i) Construction, alteration, repair, ployer shall maintain records of the


maintenance, or renovation of struc- initial monitoring results or objective
tures, substrates, or portions thereof, data supporting that exemption and
that contain MDA; the basis for the employers reliance on
(ii) Installation or the finishing of the data, as provided in the record-
surfaces with products containing keeping provision of paragraph (o) of
MDA; this section.
(iii) MDA spill/emergency cleanup at (b) Definitions. For the purpose of this
construction sites; and section, the following definitions shall
(iv) Transportation, disposal, stor- apply:
age, or containment of MDA or prod- Action level means a concentration of
ucts containing MDA on the site or lo- airborne MDA of 5 ppb as an eight (8)-
cation at which construction activities hour time-weighted average.
are performed. Assistant Secretary means the Assist-
(2) Except as provided in paragraphs ant Secretary of Labor for Occupa-
(a)(7) and (f)(5) of this section, this sec- tional Safety and Health, U.S. Depart-
tion does not apply to the processing, ment of Labor, or designee.
use, and handling of products con-
Authorized person means any person
taining MDA where initial monitoring
specifically authorized by the employer
indicates that the product is not capa-
whose duties require the person to
ble of releasing MDA in excess of the
enter a regulated area, or any person
action level under the expected condi-
entering such an area as a designated
tions of processing, use, and handling
representative of employees for the
which will cause the greatest possible
purpose of exercising the right to ob-
release; and where no dermal exposure
serve monitoring and measuring proce-
to MDA can occur.
dures under paragraph (p) of this sec-
(3) Except as provided in paragraph
tion, or any other person authorized by
(a)(7) of this section, this section does
the Act or regulations issued under the
not apply to the processing, use, and
Act.
handling of products containing MDA
Container means any barrel, bottle,
where objective data are reasonably re-
can, cylinder, drum, reaction vessel,
lied upon which demonstrate the prod-
storage tank, commercial packaging or
uct is not capable of releasing MDA
the like, but does not include piping
under the expected conditions of proc-
systems.
essing, use, and handling which will
cause the greatest possible release; and Decontamination area means an area
where no dermal exposure to MDA outside of but as near as practical to
can occur. the regulated area, consisting of an
(4) Except as provided in paragraph equipment storage area, wash area, and
(a)(7) of this section, this section does clean change area, which is used for
not apply to the storage, transpor- the decontamination of workers, mate-
tation, distribution or sale of MDA in rials, and equipment contaminated
intact containers sealed in such a man- with MDA.
ner as to contain the MDA dusts, va- Dermal exposure to MDA occurs where
pors, or liquids, except for the provi- employees are engaged in the handling,
sions of 29 CFR 1910.1200 and paragraph application or use of mixtures or mate-
(e) of this section. rials containing MDA, with any of the
(5) Except as provided in paragraph following non-airborne forms of MDA:
(a)(7) of this section, this section does (i) Liquid, powdered, granular, or
not apply to materials in any form flaked mixtures containing MDA in
which contain less than 0.1% MDA by concentrations greater than 0.1% by
weight or volume. weight or volume; and
(6) Except as provided in paragraph (ii) Materials other than finished ar-
(a)(7) of this section, this section does ticles containing MDA in concentra-
not apply to finished articles con- tions greater than 0.1% by weight or
taining MDA. volume.
(7) Where products containing MDA Director means the Director of the
are exempted under paragraphs (a)(2) National Institute for Occupational
through (a)(6) of this section, the em- Safety and Health, U.S. Department of

75

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00085 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.60 29 CFR Ch. XVII (7112 Edition)

Health and Human Services, or des- diaminodiphenylmethane, Chemical


ignee. Abstract Service Registry number 101
Emergency means any occurrence 779, in the form of a vapor, liquid, or
such as, but not limited to, equipment solid. The definition also includes the
failure, rupture of containers, or fail- salts of MDA.
ure of control equipment which results Regulated Areas means areas where
in an unexpected and potentially haz- airborne concentrations of MDA exceed
ardous release of MDA. or can reasonably be expected to ex-
Employee exposure means exposure to ceed, the permissible exposure limits,
MDA which would occur if the em- or where dermal exposure to MDA
ployee were not using respirators or can occur.
protective work clothing and equip- STEL means short term exposure
ment. limit as determined by any 15-minute
Finished article containing MDA is de- sample period.
fined as a manufactured item: (c) Permissible exposure limits. The em-
(i) Which is formed to a specific ployer shall assure that no employee is
shape or design during manufacture; exposed to an airborne concentration
(ii) Which has end use function(s) de- of MDA in excess of ten parts per bil-
pendent in whole or part upon its shape lion (10 ppb) as an 8-hour time-weight-
or design during end use; and ed average and a STEL of one hundred
(iii) Where applicable, is an item
parts per billion (100 ppb).
which is fully cured by virtue of having
(d) Communication among employers.
been subjected to the conditions (tem-
On multi-employer worksites, an em-
perature, time) necessary to complete
the desired chemical reaction. ployer performing work involving the
Historical monitoring data means mon- application of MDA or materials con-
itoring data for construction jobs that taining MDA for which establishment
meet the following conditions: of one or more regulated areas is re-
(i) The data upon which judgments quired shall inform other employers on
are based are scientifically sound and the site of the nature of the employers
were collected using methods that are work with MDA and of the existence of,
sufficiently accurate and precise; and requirements pertaining to, regu-
(ii) The processes and work practices lated areas.
that were in use when the historical (e) Emergency situations(1) Written
monitoring data were obtained are es- plan. (i) A written plan for emergency
sentially the same as those to be used situations shall be developed for each
during the job for which initial moni- construction operation where there is a
toring will not be performed; possibility of an emergency. The plan
(iii) The characteristics of the MDA- shall include procedures where the em-
containing material being handled ployer identifies emergency escape
when the historical monitoring data routes for his employees at each con-
were obtained are the same as those on struction site before the construction
the job for which initial monitoring operation begins. Appropriate portions
will not be performed; of the plan shall be implemented in the
(iv) Environmental conditions pre- event of an emergency.
vailing when the historical monitoring (ii) The plan shall specifically pro-
data were obtained are the same as vide that employees engaged in cor-
those on the job for which initial moni- recting emergency conditions shall be
toring will not be performed; and equipped with the appropriate personal
(v) Other data relevant to the oper- protective equipment and clothing as
ations, materials, processing, or em- required in paragraphs (i) and (j) of this
ployee exposures covered by the excep- section until the emergency is abated.
tion are substantially similar. The (iii) The plan shall specifically in-
data must be scientifically sound, the clude provisions for alerting and evacu-
characteristics of the MDA containing ating affected employees as well as the
material must be similar and the envi- applicable elements prescribed in 29
ronmental conditions comparable. CFR 1910.38 and 29 CFR 1910.39, Emer-
4,4Methylenedianiline or MDA means gency action plans and Fire preven-
the chemical; 4,4- tion plans, respectively.

76

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00086 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.60

(2) Alerting employees. Where there is monitoring for each such employee at
the possibility of employee exposure to least every six (6) months.
MDA due to an emergency, means shall (ii) If the monitoring required by
be developed to promptly alert employ- paragraph (f)(2) of this section reveals
ees who have the potential to be di- employee exposure above the PELs, the
rectly exposed. Affected employees not employer shall repeat such monitoring
engaged in correcting emergency con- for each such employee at least every
ditions shall be evacuated immediately three (3) months.
in the event that an emergency occurs. (iii) Employers who are conducting
Means shall also be developed for alert- MDA operations within a regulated
ing other employees who may be ex- area can forego periodic monitoring if
posed as a result of the emergency. the employees are all wearing supplied-
(f) Exposure monitoring(1) General. air respirators while working in the
(i) Determinations of employee expo- regulated area.
sure shall be made from breathing zone (iv) The employer may alter the mon-
air samples that are representative of itoring schedule from every three
each employees exposure to airborne months to every six months for any
MDA over an eight (8) hour period. De- employee for whom two consecutive
termination of employee exposure to measurements taken at least 7 days
the STEL shall be made from breathing apart indicate that the employee expo-
zone air samples collected over a 15 sure has decreased to below the PELs
minute sampling period. but above the action level.
(ii) Representative employee expo- (4) Termination of monitoring. (i) If the
sure shall be determined on the basis of initial monitoring required by para-
one or more samples representing full graph (f)(2) of this section reveals em-
shift exposure for each shift for each ployee exposure to be below the action
job classification in each work area level, the employer may discontinue
the monitoring for that employee, ex-
where exposure to MDA may occur.
cept as otherwise required by para-
(iii) Where the employer can docu-
graph (f)(5) of this section.
ment that exposure levels are equiva-
(ii) If the periodic monitoring re-
lent for similar operations in different quired by paragraph (f)(3) of this sec-
work shifts, the employer shall only be tion reveals that employee exposures,
required to determine representative as indicated by at least two consecu-
employee exposure for that operation tive measurements taken at least 7
during one shift. days apart, are below the action level
(2) Initial monitoring. Each employer the employer may discontinue the
who has a workplace or work operation monitoring for that employee, except
covered by this standard shall perform as otherwise required by paragraph
initial monitoring to determine accu- (f)(5) of this section.
rately the airborne concentrations of (5) Additional monitoring. The em-
MDA to which employees may be ex- ployer shall institute the exposure
posed unless: monitoring required under paragraphs
(i) The employer can demonstrate, on (f)(2) and (f)(3) of this section when
the basis of objective data, that the there has been a change in production
MDA-containing product or material process, chemicals present, control
being handled cannot cause exposures equipment, personnel, or work prac-
above the standards action level, even tices which may result in new or addi-
under worst-case release conditions; or tional exposures to MDA, or when the
(ii) The employer has historical mon- employer has any reason to suspect a
itoring or other data demonstrating change which may result in new or ad-
that exposures on a particular job will ditional exposures.
be below the action level. (6) Accuracy of monitoring. Monitoring
(3) Periodic monitoring and monitoring shall be accurate, to a confidence level
frequency. (i) If the monitoring required of 95 percent, to within plus or minus
by paragraph (f)(2) of this section re- 25 percent for airborne concentrations
veals employee exposure at or above of MDA.
the action level, but at or below the (7) Employee notification of monitoring
PELs, the employer shall repeat such results. (i) The employer must, as soon

77

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00087 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.60 29 CFR Ch. XVII (7112 Edition)

as possible but no later than 5 working drink, smoke, chew tobacco or gum, or
days after the receipt of the results of apply cosmetics in regulated areas.
any monitoring performed under this (h) Methods of compliance(1) Engi-
section, notify each affected employee neering controls and work practices and
of these results either individually in respirators. (i) The employer shall use
writing or by posting the results in an one or any combination of the fol-
appropriate location that is accessible lowing control methods to achieve
to employees. compliance with the permissible expo-
(ii) The written notification required sure limits prescribed by paragraph (c)
by paragraph (f)(7)(i) of this section of this section:
shall contain the corrective action
(A) Local exhaust ventilation
being taken by the employer or any
other protective measures which have equipped with HEPA filter dust collec-
been implemented to reduce the em- tion systems;
ployee exposure to or below the PELs, (B) General ventilation systems;
wherever the PELs are exceeded. (C) Use of workpractices; or
(8) Visual monitoring. The employer (D) Other engineering controls such
shall make routine inspections of em- as isolation and enclosure that the As-
ployee hands, face and forearms poten- sistant Secretary can show to be fea-
tially exposed to MDA. Other potential sible.
dermal exposures reported by the em- (ii) Wherever the feasible engineering
ployee must be referred to the appro- controls and work practices which
priate medical personnel for observa- can be instituted are not sufficient to
tion. If the employer determines that reduce employee exposure to or below
the employee has been exposed to MDA the PELs, the employer shall use them
the employer shall: to reduce employee exposure to the
(i) Determine the source of exposure; lowest levels achievable by these con-
(ii) Implement protective measures trols and shall supplement them by the
to correct the hazard; and
use of respiratory protective devices
(iii) Maintain records of the correc-
which comply with the requirements of
tive actions in accordance with para-
graph (o) of this section. paragraph (i) of this section.
(g) Regulated areas(1) Establish- (2) Special Provisions. For workers en-
ment(i) Airborne exposures. The em- gaged in spray application methods,
ployer shall establish regulated areas respiratory protection must be used in
where airborne concentrations of MDA addition to feasible engineering con-
exceed or can reasonably be expected trols and work practices to reduce em-
to exceed, the permissible exposure ployee exposure to or below the PELs.
limits. (3) Prohibitions. Compressed air shall
(ii) Dermal exposures. Where employ- not be used to remove MDA, unless the
ees are subject to dermal exposure to compressed air is used in conjunction
MDA the employer shall establish with an enclosed ventilation system
those work areas as regulated areas. designed to capture the dust cloud cre-
(2) Demarcation. Regulated areas shall ated by the compressed air.
be demarcated from the rest of the (4) Employee rotation. The employer
workplace in a manner that minimizes shall not use employee rotation as a
the number of persons potentially ex- means of compliance with the exposure
posed. limits prescribed in paragraph (c) of
(3) Access. Access to regulated areas this section.
shall be limited to authorized persons.
(5) Compliance program. (i) The em-
(4) Personal protective equipment and
clothing. Each person entering a regu- ployer shall establish and implement a
lated area shall be supplied with, and written program to reduce employee
required to use, the appropriate per- exposure to or below the PELs by
sonal protective clothing and equip- means of engineering and work prac-
ment in accordance with paragraphs (i) tice controls, as required by paragraph
and (j) of this section. (h)(1) of this section, and by use of res-
(5) Prohibited activities. The employer piratory protection where permitted
shall ensure that employees do not eat, under this section.

78

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00088 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.60

(ii) Upon request this written pro- (ii) An employee who cannot use a
gram shall be furnished for examina- negative-pressure respirator must be
tion and copying to the Assistant Sec- given the option of using a positive-
retary, the Director, affected employ- pressure respirator, or a supplied-air
ees and designated employee represent- respirator operated in the continuous-
atives. The employer shall review and, flow or pressure-demand mode.
as necessary, update such plans at (j) Protective work clothing and equip-
least once every 12 months to make ment(1) Provision and use. Where em-
certain they reflect the current status ployees are subject to dermal exposure
of the program. to MDA, where liquids containing MDA
(i) Respiratory protection(1) General. can be splashed into the eyes, or where
For employees who use respirators re- airborne concentrations of MDA are in
quired by this section, the employer excess of the PEL, the employer shall
must provide each employee an appro- provide, at no cost to the employee,
priate respirator that complies with and ensure that the employee uses, ap-
the requirements of this paragraph. propriate protective work clothing and
Respirators must be used during: equipment which prevent contact with
(i) Periods necessary to install or im- MDA such as, but not limited to:
plement feasible engineering and work- (i) Aprons, coveralls or other full-
practice controls. body work clothing;
(ii) Work operations, such as mainte- (ii) Gloves, head coverings, and foot
nance and repair activities and spray- coverings; and
application processes, for which engi-
(iii) Face shields, chemical goggles;
neering and work-practice controls are
or
not feasible.
(iv) Other appropriate protective
(iii) Work operations for which fea-
equipment which comply with 29 CFR
sible engineering and work-practice
1910.133.
controls are not yet sufficient to re-
duce employee exposure to or below the (2) Removal and storage. (i) The em-
PELs. ployer shall ensure that, at the end of
(iv) Emergencies. their work shift, employees remove
(2) Respirator program. The employer MDA-contaminated protective work
must implement a respiratory protec- clothing and equipment that is not
tion program in accordance with routinely removed throughout the day
1910.134 (b) through (d) (except in change areas provided in accordance
(d)(1)(iii)), and (f) through (m), which with the provisions in paragraph (k) of
covers each employee required by this this section.
section to use a respirator. (ii) The employer shall ensure that,
(3) Respirator selection. (i) Employers during their work shift, employees re-
must: move all other MDA-contaminated pro-
(A) Select, and provide to employees, tective work clothing or equipment be-
the appropriate respirators specified in fore leaving a regulated area.
paragraph (d)(3)(i)(A) of 29 CFR (iii) The employer shall ensure that
1910.134. no employee takes MDA-contaminated
(B) Provide HEPA filters for powered work clothing or equipment out of the
and non-powered air-purifying res- decontamination areas, except those
pirators. employees authorized to do so for the
(C) For escape, provide employees purpose of laundering, maintenance, or
with one of the following respirator op- disposal.
tions: Any self-contained breathing ap- (iv) MDA-contaminated work cloth-
paratus with a full facepiece or hood ing or equipment shall be placed and
operated in the positive-pressure or stored and transported in sealed, im-
continuous-flow mode; or a full face- permeable bags, or other closed imper-
piece air-purifying respirator. meable containers.
(D) Provide a combination HEPA fil- (v) Containers of MDA-contaminated
ter and organic vapor canister or car- protective work clothing or equipment
tridge with air-purifying respirators which are to be taken out of decon-
when MDA is in liquid form or used as tamination areas or the workplace for
part of a process requiring heat. cleaning, maintenance, or disposal,

79

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00089 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.60 29 CFR Ch. XVII (7112 Edition)

shall bear labels warning of the hazards (iii) Equipment area. The equipment
of MDA. area shall be supplied with imper-
(3) Cleaning and replacement. (i) The meable, labeled bags and containers for
employer shall provide the employee the containment and disposal of con-
with clean protective clothing and taminated protective clothing and
equipment. The employer shall ensure equipment.
that protective work clothing or equip- (2) Shower area. (i) Where feasible,
ment required by this paragraph is shower facilities shall be provided
cleaned, laundered, repaired, or re- which comply with 29 CFR 1910.141(d)(3)
placed at intervals appropriate to wherever the possibility of employee
maintain its effectiveness. exposure to airborne levels of MDA in
(ii) The employer shall prohibit the excess of the permissible exposure
removal of MDA from protective work limit exists.
clothing or equipment by blowing, (ii) Where dermal exposure to MDA
shaking, or any methods which allow occurs, the employer shall ensure that
MDA to re-enter the workplace. materials spilled or deposited on the
(iii) The employer shall ensure that skin are removed as soon as possible by
laundering of MDA-contaminated methods which do not facilitate the
clothing shall be done so as to prevent dermal absorption of MDA.
the release of MDA in the workplace. (3) Lunch Areas. (i) Whenever food or
(iv) Any employer who gives MDA- beverages are consumed at the work-
contaminated clothing to another per- site and employees are exposed to MDA
son for laundering shall inform such the employer shall provide clean lunch
person of the requirement to prevent areas were MDA levels are below the
the release of MDA. action level and where no dermal expo-
(v) The employer shall inform any sure to MDA can occur.
person who launders or cleans protec- (ii) The employer shall ensure that
tive clothing or equipment contami- employees wash their hands and faces
nated with MDA of the potentially with soap and water prior to eating,
harmful effects of exposure. drinking, smoking, or applying cos-
(4) Visual Examination. (i) The em- metics.
ployer shall ensure that employees (iii) The employer shall ensure that
work clothing is examined periodically employees do not enter lunch facilities
for rips or tears that may occur during with contaminated protective work
performance of work. clothing or equipment.
(ii) When rips or tears are detected, (l) Communication of hazards to em-
the protective equipment or clothing ployees(1) Hazard communication. The
shall be repaired and replaced imme- employer shall include
diately. Methylenedianiline (MDA) in the pro-
(k) Hygiene facilities and practices(1) gram established to comply with the
General. (i) The employer shall provide Hazard Communication Standard
decontamination areas for employees (HCS) ( 1910.1200). The employer shall
required to work in regulated areas or ensure that each employee has access
required by paragraph (j)(1) of this sec- to labels on containers of MDA and
tion to wear protective clothing. Excep- safety data sheets, and is trained in ac-
tion: In lieu of the decontamination cordance with the provisions of HCS
area requirement specified in para- and paragraph (l)(3) of this section. The
graph (k)(1)(i) of this section, the em- employer shall ensure that at least the
ployer may permit employees engaged following hazards are addressed: Can-
in small scale, short duration oper- cer; liver effects; and skin sensitiza-
ations, to clean their protective cloth- tion.
ing or dispose of the protective cloth- (2) Signs and labels (i) Signs. (A) The
ing before such employees leave the employer shall post and maintain leg-
area where the work was performed. ible signs demarcating regulated areas
(ii) Change areas. The employer shall and entrances or access-ways to regu-
ensure that change areas are equipped lated areas that bear the following leg-
with separate storage facilities for pro- end:
tective clothing and street clothing, in DANGER
accordance with 29 CFR 1910.141(e). MDA

80

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00090 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.60
MAY CAUSE CANCER pendices A and B of this section, and
CAUSES DAMAGE TO THE LIVER indicate to employees where a copy of
RESPIRATORY PROTECTION AND PRO- the standard is available;
TECTIVE CLOTHING MAY BE REQUIRED
(B) Describe the medical surveillance
IN THIS AREA
AUTHORIZED PERSONNEL ONLY program required under paragraph (n)
of this section, and explain the infor-
(B) Prior to June 1, 2016, employers mation contained in appendix C of this
may use the following legend in lieu of section; and
that specified in paragraph (l)(2)(i)(A) (C) Describe the medical removal
of this section: provision required under paragraph (n)
DANGER of this section.
MDA (4) Access to training materials. (i) The
MAY CAUSE CANCER employer shall make readily available
LIVER TOXIN to all affected employees, without cost,
AUTHORIZED PERSONNEL ONLY all written materials relating to the
RESPIRATORS AND PROTECTIVE CLOTH- employee training program, including
ING MAY BE REQUIRED TO BE WORN IN
a copy of this regulation.
THIS AREA
(ii) The employer shall provide to the
(ii) Labels. (A) The employer shall en- Assistant Secretary and the Director,
sure that labels or other appropriate upon request, all information and
forms of warning are provided for con- training materials relating to the em-
tainers of MDA within the workplace. ployee information and training pro-
The labels shall comply with the re- gram.
quirements of 1910.1200(f) and shall in- (m) Housekeeping. (1) All surfaces
clude at least the following informa- shall be maintained as free as prac-
tion for pure MDA and mixtures con- ticable of visible accumulations of
taining MDA: MDA.
DANGER (2) The employer shall institute a
CONTAINS MDA program for detecting MDA leaks,
MAY CAUSE CANCER spills, and discharges, including reg-
CAUSES DAMAGE TO THE LIVER ular visual inspections of operations
(B) Prior to June 1, 2015, employers involving liquid or solid MDA.
may include the following information (3) All leaks shall be repaired and liq-
workplace labels in lieu of the labeling uid or dust spills cleaned up promptly.
requirements in paragraph (l)(2)(ii)(A) (4) Surfaces contaminated with MDA
of this section: may not be cleaned by the use of com-
(1) For Pure MDA: pressed air.
(5) Shoveling, dry sweeping, and
DANGER other methods of dry clean-up of MDA
CONTAINS MDA may be used where HEPA filtered
MAY CAUSE CANCER vacuuming and/or wet cleaning are not
LIVER TOXIN
feasible or practical.
(2) For mixtures containing MDA: (6) Waste, scrap, debris, bags, con-
DANGER
tainers, equipment, and clothing con-
CONTAINS MDA taminated with MDA shall be collected
CONTAINS MATERIALS WHICH MAY and disposed of in a manner to prevent
CAUSE CANCER the re-entry of MDA into the work-
LIVER TOXIN place.
(3) Information and training. (i) The (n) Medical surveillance(1) General.
employer shall provide employees with (i) The employer shall make available
information and training on MDA, in a medical surveillance program for em-
accordance with 29 CFR 1910.1200(h), at ployees exposed to MDA under the fol-
the time of initial assignment and at lowing circumstances:
least annually thereafter. (A) Employees exposed at or above
(ii) In addition to the information re- the action level for 30 or more days per
quired under 29 CFR 1910.1200, the em- year;
ployer shall: (B) Employees who are subject to
(A) Provide an explanation of the dermal exposure to MDA for 15 or more
contents of this section, including ap- days per year;

81

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00091 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.60 29 CFR Ch. XVII (7112 Edition)

(C) Employees who have been exposed intake, and the appearance of physical
in an emergency situation; signs relating to the liver, and the
(D) Employees whom the employer, skin;
based on results from compliance with (B) The appropriate tests and exami-
paragraph (f)(8) of this section, has rea- nations including liver function tests
son to believe are being dermally ex- and skin examinations; and
posed; and (C) Appropriate additional tests or
(E) Employees who show signs or examinations as deemed necessary by
symptoms of MDA exposure. the physician.
(ii) The employer shall ensure that (ii) If in the physicians opinion the
all medical examinations and proce- results of liver function tests indicate
dures are performed by or under the su- an abnormality, the employee shall be
pervision of a licensed physician at a removed from further MDA exposure in
reasonable time and place, and pro- accordance with paragraph (n)(9) of
vided without cost to the employee. this section. Repeat liver function
(2) Initial examinations. (i) Within 150 tests shall be conducted on advice of
days of the effective date of this stand- the physician.
ard, or before the time of initial assign- (4) Emergency examinations. If the em-
ment, the employer shall provide each ployer determines that the employee
employee covered by paragraph (n)(1)(i) has been exposed to a potentially haz-
of this section with a medical examina- ardous amount of MDA in an emer-
tion including the following elements: gency situation under paragraph (e) of
(A) A detailed history which in- this section, the employer shall provide
cludes: medical examinations in accordance
(1) Past work exposure to MDA or with paragraphs (n)(3) (i) and (ii) of
any other toxic substances; this section. If the results of liver func-
(2) A history of drugs, alcohol, to- tion testing indicate an abnormality,
bacco, and medication routinely taken the employee shall be removed in ac-
(duration and quantity); and cordance with paragraph (n)(9) of this
(3) A history of dermatitis, chemical section. Repeat liver function tests
skin sensitization, or previous hepatic shall be conducted on the advice of the
disease. physician. If the results of the tests are
(B) A physical examination which in- normal, tests must be repeated two to
cludes all routine physical examina- three weeks from the initial testing. If
tion parameters, skin examination, and the results of the second set of tests
examination for signs of liver disease. are normal and on the advice of the
(C) Laboratory tests including: physician, no additional testing is re-
(1) Liver function tests and (2) Uri- quired.
nalysis. (5) Additional examinations. Where the
(D) Additional tests as necessary in employee develops signs and symptoms
the opinion of the physician. associated with exposure to MDA, the
(ii) No initial medical examination is employer shall provide the employee
required if adequate records show that with an additional medical examina-
the employee has been examined in ac- tion including liver function tests. Re-
cordance with the requirements of this peat liver function tests shall be con-
section within the previous six months ducted on the advice of the physician.
prior to the effective date of this stand- If the results of the tests are normal,
ard or prior to the date of initial as- tests must be repeated two to three
signment. weeks from the initial testing. If the
(3) Periodic examinations. (i) The em- results of the second set of tests are
ployer shall provide each employee normal and on the advice of the physi-
covered by this section with a medical cian, no additional testing is required.
examination at least annually fol- (6) Multiple physician review mecha-
lowing the initial examination. These nism. (i) If the employer selects the ini-
periodic examinations shall include at tial physician who conducts any med-
least the following elements: ical examination or consultation pro-
(A) A brief history regarding any new vided to an employee under this sec-
exposure to potential liver toxins, tion, and the employee has signs or
changes in drug, tobacco, and alcohol symptoms of occupational exposure to

82

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00092 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.60

MDA (which could include an abnormal recommendations of the second physi-


liver function test), and the employee cian, unless the employer and the em-
disagrees with the opinion of the exam- ployee reach a mutually acceptable
ining physician, and this opinion could agreement.
affect the employees job status, the (7) Information provided to the exam-
employee may designate an appro- ining physician. (i) The employer shall
priate and mutually acceptable second provide the following information to
physician: the examining physician:
(A) To review any findings, deter- (A) A copy of this regulation and its
minations or recommendations of the appendices;
initial physician; and (B) A description of the affected em-
(B) To conduct such examinations, ployees duties as they relate to the
consultations, and laboratory tests as employees potential exposure to MDA;
the second physician deems necessary (C) The employees current actual or
to facilitate this review. representative MDA exposure level;
(ii) The employer shall promptly no- (D) A description of any personal pro-
tify an employee of the right to seek a tective equipment used or to be used;
second medical opinion after each oc- and
casion that an initial physician con- (E) Information from previous em-
ducts a medical examination or con- ployment related medical examina-
sultation pursuant to this section. The tions of the affected employee.
employer may condition its participa- (ii) The employer shall provide the
tion in, and payment for, the multiple foregoing information to a second phy-
physician review mechanism upon the sician under this section upon request
employee doing the following within either by the second physician, or by
fifteen (15) days after receipt of the the employee.
foregoing notification, or receipt of the (8) Physicians written opinion. (i) For
initial physicians written opinion, each examination under this section,
whichever is later: the employer shall obtain, and provide
(A) The employee informing the em- the employee with a copy of, the exam-
ployer that he or she intends to seek a ining physicians written opinion with-
second medical opinion, and in 15 days of its receipt. The written
(B) The employee initiating steps to opinion shall include the following:
make an appointment with a second (A) The occupationally pertinent re-
physician. sults of the medical examination and
(iii) If the findings, determinations, tests;
or recommendations of the second phy- (B) The physicians opinion con-
sician differ from those of the initial cerning whether the employee has any
physician, then the employer and the detected medical conditions which
employee shall assure that efforts are would place the employee at increased
made for the two physicians to resolve risk of material impairment of health
any disagreement. from exposure to MDA;
(iv) If the two physicians have been (C) The physicians recommended
unable to quickly resolve their dis- limitations upon the employees expo-
agreement, then the employer and the sure to MDA or upon the employees
employee through their respective phy- use of protective clothing or equipment
sicians shall designate a third physi- and respirators; and
cian: (D) A statement that the employee
(A) To review any findings, deter- has been informed by the physician of
minations, or recommendations of the the results of the medical examination
prior physicians; and and any medical conditions resulting
(B) To conduct such examinations, from MDA exposure which require fur-
consultations, laboratory tests, and ther explanation or treatment.
discussions with the prior physicians (ii) The written opinion obtained by
as the third physician deems necessary the employer shall not reveal specific
to resolve the disagreement of the findings or diagnoses unrelated to oc-
prior physicians. cupational exposures.
(v) The employer shall act consistent (9) Medical removal(i) Temporary
with the findings, determinations, and medical removal of an employee(A)

83

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00093 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.60 29 CFR Ch. XVII (7112 Edition)

Temporary removal resulting from occupa- the employee no longer has a detected
tional exposure. The employee shall be medical condition which places the em-
removed from work environments in ployee at increased risk of material
which exposure to MDA is at or above impairment to health from exposure to
the action level or where dermal expo- MDA.
sure to MDA may occur, following an (B) For the purposes of this section,
initial examination (paragraph (n)(2) of the requirement that an employer re-
this section), periodic examinations turn an employee to his or her former
(paragraph (n)(3) of this section), an job status is not intended to expand
emergency situation (paragraph (n)(4) upon or restrict any rights an em-
of this section), or an additional exam- ployee has or would have had, absent
ination (paragraph (n)(5) of this sec- temporary medical removal, to a spe-
tion) in the following circumstances: cific job classification or position
(1) When the employee exhibits signs under the terms of a collective bar-
and/or symptoms indicative of acute gaining agreement.
exposure to MDA; or (iii) Removal of other employee special
(2) When the examining physician de- protective measure or limitations. The
termines that an employees abnormal employer shall remove any limitations
liver function tests are not associated placed on an employee or end any spe-
with MDA exposure but that the abnor- cial protective measures provided to an
malities may be exacerbated as a re- employee pursuant to a final medical
sult of occupational exposure to MDA. determination when a subsequent final
(B) Temporary removal due to a final medical determination indicates that
medical determination. (1) The employer the limitations or special protective
shall remove an employee from work measures are no longer necessary.
having an exposure to MDA at or above (iv) Employer options pending a final
the action level or where the potential medical determination. Where the physi-
for dermal exposure exists on each oc- cian review mechanism used pursuant
casion that a final medical determina- to the medical surveillance provisions
tion results in a medical finding, deter- of this section, has not yet resulted in
mination, or opinion that the employee a final medical determination with re-
has a detected medical condition which spect to an employee, the employer
places the employee at increased risk shall act as follows:
of material impairment to health from (A) Removal. The employer may re-
exposure to MDA. move the employee from exposure to
(2) For the purposes of this section, MDA, provide special protective meas-
the phrase final medical determina- ures to the employee, or place limita-
tion shall mean the outcome of the tions upon the employee, consistent
physician review mechanism used pur- with the medical findings, determina-
suant to the medical surveillance pro- tions, or recommendations of the phy-
visions of this section. sician who has reviewed the employees
(3) Where a final medical determina- health status.
tion results in any recommended spe- (B) Return. The employer may return
cial protective measures for an em- the employee to his or her former job
ployee, or limitations on an employees status, and end any special protective
exposure to MDA, the employer shall measures provided to the employee,
implement and act consistent with the consistent with the medical findings,
recommendation. determinations, or recommendations of
(ii) Return of the employee to former job any of the physicians who have re-
status. (A) The employer shall return viewed the employees health status,
an employee to his or her former job with two exceptions:
status: (1) If the initial removal, special pro-
(1) When the employee no longer tection, or limitation of the employee
shows signs or symptoms of exposure resulted from a final medical deter-
to MDA, or upon the advice of the phy- mination which differed from the find-
sician. ings, determinations, or recommenda-
(2) When a subsequent final medical tions of the initial physician; or
determination results in a medical (2) The employee has been on re-
finding, determination, or opinion that moval status for the preceding six

84

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00094 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.60

months as a result of exposure to MDA, with any employer made possible by


then the employer shall await a final virtue of the employees removal.
medical determination. (F) Employees who do not recover with-
(v) Medical removal protection bene- in the 6 months of removal. The em-
fits(A) Provisions of medical removal ployer shall take the following meas-
protection benefits. The employer shall ures with respect to any employee re-
provide to an employee up to six (6) moved from exposure to MDA:
months of medical removal protection (1) The employer shall make avail-
benefits on each occasion that an em- able to the employee a medical exam-
ployee is removed from exposure to ination pursuant to this section to ob-
MDA or otherwise limited pursuant to tain a final medical determination
this section. with respect to the employee;
(B) Definition of medical removal pro- (2) The employer shall assure that
tection benefits. For the purposes of this the final medical determination ob-
section, the requirement that an em- tained indicates whether or not the
ployer provide medical removal protec- employee may be returned to his or her
tion benefits means that the employer former job status, and, if not, what
shall maintain the earnings, seniority, steps should be taken to protect the
and other employment rights and bene- employees health;
fits of an employee as though the em- (3) Where the final medical deter-
ployee had not been removed from nor- mination has not yet been obtained, or
mal exposure to MDA or otherwise lim- once obtained indicates that the em-
ited. ployee may not yet be returned to his
(C) Follow-up medical surveillance dur- or her former job status, the employer
ing the period of employee removal or lim- shall continue to provide medical re-
itations. During the period of time that moval protection benefits to the em-
an employee is removed from normal ployee until either the employee is re-
exposure to MDA or otherwise limited, turned to former job status, or a final
the employer may condition the provi- medical determination is made that
sion of medical removal protection the employee is incapable of ever safe-
benefits upon the employees participa- ly returning to his or her former job
tion in follow-up medical surveillance status; and
made available pursuant to this sec- (4) Where the employer acts pursuant
tion. to a final medical determination which
(D) Workers compensation claims. If a permits the return of the employee to
removed employee files a claim for his or her former job status despite
workers compensation payments for a what would otherwise be an unaccept-
MDA-related disability, then the em- able liver function test, later questions
ployer shall continue to provide med- concerning removing the employee
ical removal protection benefits pend- again shall be decided by a final med-
ing disposition of the claim. To the ex- ical determination. The employer need
tent that an award is made to the em- not automatically remove such an em-
ployee for earnings lost during the pe- ployee pursuant to the MDA removal
riod of removal, the employers med- criteria provided by this section.
ical removal protection obligation (vi) Voluntary removal or restriction of
shall be reduced by such amount. The an employee. Where an employer, al-
employer shall receive no credit for though not required by this section to
workers compensation payments re- do so, removes an employee from expo-
ceived by the employee for treatment- sure to MDA or otherwise places limi-
related expenses. tations on an employee due to the ef-
(E) Other credits. The employers obli- fects of MDA exposure on the employ-
gation to provide medical removal pro- ees medical condition, the employer
tection benefits to a removed employee shall provide medical removal protec-
shall be reduced to the extent that the tion benefits to the employee equal to
employee receives compensation for that required by paragraph (n)(9)(v) of
earnings lost during the period of re- this section.
moval either from a publicly or em- (o) Recordkeeping(1) Objective data
ployer-funded compensation program, for exempted operations. (i) Where the
or receives income from employment employer has relied on objective data

85

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00095 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.60 29 CFR Ch. XVII (7112 Edition)

that demonstrate that products made were obtained are the same as those on
from or containing MDA are not capa- the job for which initial monitoring
ble of releasing MDA or do not present will not be performed;
a dermal exposure problem under the (D) Environmental conditions pre-
expected conditions of processing, use, vailing when the historical monitoring
or handling to exempt such operations data were obtained are the same as
from the initial monitoring require- those on the job for which initial moni-
ments under paragraph (f)(2) of this toring will not be performed; and
section, the employer shall establish (E) Other data relevant to the oper-
and maintain an accurate record of ob- ations, materials, processing, or em-
jective data reasonably relied upon in ployee exposures covered by the excep-
support of the exemption. tion.
(ii) The record shall include at least (iii) The employer shall maintain
the following information: this record for the duration of the em-
(A) The product qualifying for ex- ployers reliance upon such historical
emption; monitoring data.
(B) The source of the objective data; (3) The employer may utilize the
(C) The testing protocol, results of services of competent organizations
testing, and/or analysis of the material such as industry trade associations and
for the release of MDA; employee associations to maintain the
(D) A description of the operation ex- records required by this section.
empted and how the data support the (4) Exposure measurements. (i) The em-
exemption; and ployer shall keep an accurate record of
(E) Other data relevant to the oper- all measurements taken to monitor
ations, materials, processing, or em- employee exposure to MDA.
ployee exposures covered by the ex- (ii) This record shall include at least
emption. the following information:
(iii) The employer shall maintain (A) The date of measurement;
this record for the duration of the em- (B) The operation involving exposure
ployers reliance upon such objective to MDA;
data. (C) Sampling and analytical methods
(2) Historical monitoring data. (i) used and evidence of their accuracy;
Where the employer has relied on his- (D) Number, duration, and results of
torical monitoring data that dem- samples taken;
onstrate that exposures on a particular (E) Type of protective devices worn,
job will be below the action level to ex- if any; and
empt such operations from the initial (F) Name, social security number,
monitoring requirements under para- and exposure of the employees whose
graph (f)(2) of this section, the em- exposures are represented.
ployer shall establish and maintain an (iii) The employer shall maintain
accurate record of historical moni- this record for at least thirty (30)
toring data reasonably relied upon in years, in accordance with 29 CFR
support of the exception. 1910.33.
(ii) The record shall include informa- (5) Medical surveillance. (i) The em-
tion that reflect the following condi- ployer shall establish and maintain an
tions: accurate record for each employee sub-
(A) The data upon which judgments ject to medical surveillance by para-
are based are scientifically sound and graph (n) of this section, in accordance
were collected using methods that are with 29 CFR 1910.33.
sufficiently accurate and precise; (ii) The record shall include at least
(B) The processes and work practices the following information:
that were in use when the historical (A) The name and social security
monitoring data were obtained are es- number of the employee;
sentially the same as those to be used (B) A copy of the employees medical
during the job for which initial moni- examination results, including the
toring will not be performed; medical history, questionnaire re-
(C) The characteristics of the MDA- sponses, results of any tests, and physi-
containing material being handled cians recommendations.
when the historical monitoring data (C) Physicians written opinions;

86

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00096 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.60

(D) Any employee medical com- MDA conducted pursuant to paragraph


plaints related to exposure to MDA; (f) of this section.
and (2) Observation procedures. When ob-
(E) A copy of the information pro- servation of the measuring or moni-
vided to the physician as required by toring of employee exposure to MDA
paragraph (n) of this section. requires entry into areas where the use
(iii) The employer shall ensure that of protective clothing and equipment
this record is maintained for the dura- or respirators is required, the employer
tion of employment plus thirty (30) shall provide the observer with per-
years, in accordance with 29 CFR sonal protective clothing and equip-
1910.33. ment or respirators required to be worn
(iv) A copy of the employees medical by employees working in the area, as-
removal and return to work status. sure the use of such clothing and equip-
(6) Training records. The employer ment or respirators, and require the
shall maintain all employee training observer to comply with all other ap-
records for one (1) year beyond the last plicable safety and health procedures.
date of employment. (q) Appendices. The information con-
(7) Availability. (i) The employer, tained in appendices A, B, C, and D of
upon written request, shall make all this section is not intended, by itself,
records required to be maintained by to create any additional obligations
this section available to the Assistant not otherwise imposed by this standard
Secretary and the Director for exam- nor detract from any existing obliga-
ination and copying. tion.
(ii) The employer, upon request, shall
make any exposure records required by APPENDIX A TO 1926.60SUBSTANCE DATA
SHEET, FOR 44 METHYLENEDIANILINE
paragraphs (f) and (n) of this section
available for examination and copying NOTE: The requirements applicable to con-
to affected employees, former employ- struction work under this appendix A are
ees, designated representatives, and identical to those set forth in appendix A to
the Assistant Secretary, in accordance 1910.1050 of this chapter.
with 29 CFR 1910.33(a)(e) and (g)(i). APPENDIX B TO 1926.60SUBSTANCE
(iii) The employer, upon request, TECHNICAL GUIDELINES, MDA
shall make employee medical records
NOTE: The requirements applicable to con-
required by paragraphs (n) and (o) of
struction work under this appendix B are
this section available for examination identical to those set forth in appendix B to
and copying to the subject employee, 1910.1050 of this chapter.
anyone having the specific written con-
sent of the subject employee, and the APPENDIX C TO 1926.60MEDICAL
Assistant Secretary, in accordance SURVEILLANCE GUIDELINES FOR MDA
with 29 CFR 1910.33. NOTE: The requirements applicable to con-
(8) Transfer of records. The employer struction work under this appendix C are
shall comply with the requirements identical to those set forth in appendix C to
concerning transfer of records set forth 1910.1050 of this chapter.
in 29 CFR 1910.1020(h).
APPENDIX D TO 1926.60SAMPLING AND ANA-
(ii) Whenever the employer ceases to LYTICAL METHODS FOR MDA MONITORING
do business and there is no successor AND MEASUREMENT PROCEDURES
employer to receive and retain the
records for the prescribed period, the NOTE: The requirements applicable to con-
struction work under this appendix D are
employer shall notify the Director at
identical to those set forth in appendix D to
least 90 days prior to disposal and, 1910.1050 of this chapter.
upon request, transmit them to the Di-
rector. [57 FR 35681, Aug. 10, 1992, as amended at 57
FR 49649, Nov. 3, 1992; 61 FR 5510, Feb. 13,
(p) Observation of monitoring(1) Em-
1996; 61 FR 31431, June 20, 1996; 63 FR 1296,
ployee observation. The employer shall Jan. 8, 1998; 69 FR 70373, Dec. 6, 2004; 70 FR
provide affected employees, or their 1143, Jan. 5, 2005; 71 FR 16674, Apr. 3, 2006; 71
designated representatives, an oppor- FR 50191, Aug. 24, 2006; 73 FR 75588, Dec. 12,
tunity to observe the measuring or 2008; 76 FR 33611, June 8, 2011; 77 FR 17889,
monitoring of employee exposure to Mar. 26, 2012]

87

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00097 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.61 29 CFR Ch. XVII (7112 Edition)

1926.61 Retention of DOT markings, Director means the Director, National


placards and labels. Institute for Occupational Safety and
NOTE: The requirements applicable to con- Health (NIOSH), U.S. Department of
struction work under this section are iden- Health and Human Services, or des-
tical to those set forth at 1910.1201 of this ignee.
chapter. Lead means metallic lead, all inor-
[61 FR 31432, June 20, 1996] ganic lead compounds, and organic lead
soaps. Excluded from this definition
1926.62 Lead. are all other organic lead compounds.
(a) Scope. This section applies to all This section means this standard.
construction work where an employee (c) Permissible exposure limit. (1) The
may be occupationally exposed to lead. employer shall assure that no em-
All construction work excluded from ployee is exposed to lead at concentra-
coverage in the general industry stand- tions greater than fifty micrograms per
ard for lead by 29 CFR 1910.1025(a)(2) is cubic meter of air (50 g/m3) averaged
covered by this standard. Construction over an 8-hour period.
work is defined as work for construc- (2) If an employee is exposed to lead
tion, alteration and/or repair, including for more than 8 hours in any work day
painting and decorating. It includes the employees allowable exposure, as a
but is not limited to the following: time weighted average (TWA) for that
(1) Demolition or salvage of struc- day, shall be reduced according to the
tures where lead or materials con- following formula:
taining lead are present; Allowable employee exposure (in g/m3)
(2) Removal or encapsulation of ma- = 400 divided by hours worked in the
terials containing lead; day.
(3) New construction, alteration, re-
pair, or renovation of structures, sub- (3) When respirators are used to limit
strates, or portions thereof, that con- employee exposure as required under
tain lead, or materials containing lead; paragraph (c) of this section and all the
(4) Installation of products con- requirements of paragraphs (e)(1) and
taining lead; (f) of this section have been met, em-
(5) Lead contamination/emergency ployee exposure may be considered to
cleanup; be at the level provided by the protec-
(6) Transportation, disposal, storage, tion factor of the respirator for those
or containment of lead or materials periods the respirator is worn. Those
containing lead on the site or location periods may be averaged with exposure
at which construction activities are levels during periods when respirators
performed, and are not worn to determine the employ-
(7) Maintenance operations associ- ees daily TWA exposure.
ated with the construction activities (d) Exposure assessment(1) General.
described in this paragraph. (i) Each employer who has a workplace
(b) Definitions. or operation covered by this standard
Action level means employee expo- shall initially determine if any em-
sure, without regard to the use of res- ployee may be exposed to lead at or
pirators, to an airborne concentration above the action level.
of lead of 30 micrograms per cubic (ii) For the purposes of paragraph (d)
meter of air (30 g/m3) calculated as an of this section, employee exposure is
8-hour time-weighted average (TWA). that exposure which would occur if the
Assistant Secretary means the Assist- employee were not using a respirator.
ant Secretary of Labor for Occupa- (iii) With the exception of moni-
tional Safety and Health, U.S. Depart- toring under paragraph (d)(3), where
ment of Labor, or designee. monitoring is required under this sec-
Competent person means one who is tion, the employer shall collect per-
capable of identifying existing and pre- sonal samples representative of a full
dictable lead hazards in the sur- shift including at least one sample for
roundings or working conditions and each job classification in each work
who has authorization to take prompt area either for each shift or for the
corrective measures to eliminate them. shift with the highest exposure level.

88

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00098 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.62

(iv) Full shift personal samples shall posed to levels of lead below 500 g/m3,
be representative of the monitored em- the employer may provide the exposed
ployees regular, daily exposure to employee with the appropriate res-
lead. pirator prescribed for such use at such
(2) Protection of employees during as- lower exposures, in accordance with
sessment of exposure. (i) With respect to Table 1 of this section. The tasks cov-
the lead related tasks listed in para- ered by this requirement are:
graph (d)(2)(i) of this section, where (A) Using lead containing mortar;
lead is present, until the employer per- lead burning
forms an employee exposure assess- (B) Where lead containing coatings or
ment as required in paragraph (d) of paint are present: rivet busting; power
this section and documents that the tool cleaning without dust collection
employee performing any of the listed systems; cleanup activities where dry
tasks is not exposed above the PEL, expendable abrasives are used; and ab-
the employer shall treat the employee rasive blasting enclosure movement
as if the employee were exposed above and removal.
the PEL, and not in excess of ten (10) (iv) With respect to the tasks listed
times the PEL, and shall implement in paragraph (d)(2)(iv) of this section,
employee protective measures pre- where lead is present, until the em-
scribed in paragraph (d)(2)(v) of this ployer performs an employee exposure
section. The tasks covered by this re-
assessment as required in paragraph (d)
quirement are:
of this section and documents that the
(A) Where lead containing coatings
employee performing any of the listed
or paint are present: Manual demoli-
tasks is not exposed to lead in excess of
tion of structures (e.g, dry wall), man-
2,500 g/m3 (50PEL), the employer
ual scraping, manual sanding, heat gun
shall treat the employee as if the em-
applications, and power tool cleaning
ployee were exposed to lead in excess of
with dust collection systems;
2,500 g/m3 and shall implement em-
(B) Spray painting with lead paint.
ployee protective measures as pre-
(ii) In addition, with regard to tasks
scribed in paragraph (d)(2)(v) of this
not listed in paragraph (d)(2)(i), where
section. Where the employer does es-
the employee has any reason to believe
tablish that the employee is exposed to
that an employee performing the task
levels of lead below 2,500 g/m3, the em-
may be exposed to lead in excess of the
ployer may provide the exposed em-
PEL, until the employer performs an
ployee with the appropriate respirator
employee exposure assessment as re-
prescribed for use at such lower expo-
quired by paragraph (d) of this section
sures, in accordance with Table I of
and documents that the employees
this section. Interim protection as de-
lead exposure is not above the PEL the
scribed in this paragaraph is required
employer shall treat the employee as if
where lead containing coatings or
the employee were exposed above the
paint are present on structures when
PEL and shall implememt employee
performing:
protective measures as prescribed in
(A) Abrasive blasting,
paragraph (d)(2)(v) of this section.
(iii) With respect to the tasks listed (B) Welding,
in paragraph (d)(2)(iii) of this section, (C) Cutting, and
where lead is present, until the em- (D) Torch burning.
ployer performs an employee exposure (v) Until the employer performs an
assessment as required in paragraph (d) employee exposure assessment as re-
of this section, and documents that the quired under paragraph (d) of this sec-
employee performing any of the listed tion and determines actual employee
tasks is not exposed in excess of 500 g/ exposure, the employer shall provide to
m3, the employer shall treat the em- employees performing the tasks de-
ployee as if the employee were exposed scribed in paragraphs (d)(2)(i), (d)(2)(ii),
to lead in excess of 500 g/m3 and shall (d)(2)(iii), and (d)(2)(iv) of this section
implement employee protective meas- with interim protection as follows:
ures as prescribed in paragraph (d)(2)(v) (A) Appropriate respiratory protec-
of this section. Where the employer tion in accordance with paragraph (f)
does establish that the employee is ex- of this section.

89

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00099 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.62 29 CFR Ch. XVII (7112 Edition)

(B) Appropriate personal protective confidence levels of paragraph (d)(10) of


clothing and equipment in accordance this section.
with paragraph (g) of this section. (iv) Where the employer has objec-
(C) Change areas in accordance with tive data, demonstrating that a par-
paragraph (i)(2) of this section. ticular product or material containing
(D) Hand washing facilities in accord- lead or a specific process, operation or
ance with paragraph (i)(5) of this sec- activity involving lead cannot result in
tion. employee exposure to lead at or above
(E) Biological monitoring in accord- the action level during processing, use,
ance with paragraph (j)(1)(i) of this sec- or handling, the employer may rely
tion, to consist of blood sampling and upon such data instead of imple-
analysis for lead and zinc menting initial monitoring.
protoporphyrin levels, and (A) The employer shall establish and
(F) Training as required under para- maintain an accurate record docu-
graph (l)(1)(i) of this section regarding menting the nature and relevancy of
29 CFR 1926.59, Hazard Communication; objective data as specified in paragraph
training as required under paragraph (n)(4) of this section, where used in as-
(1)(2)(iii) of this section, regarding use sessing employee exposure in lieu of
of respirators; and training in accord- exposure monitoring.
ance with 29 CFR 1926.21, Safety train- (B) Objective data, as described in
ing and education. paragraph (d)(3)(iv) of this section, is
(3) Basis of initial determination. (i) not permitted to be used for exposure
Except as provided under paragraphs assessment in connection with para-
(d)(3)(iii) and (d)(3)(iv) of this section graph (d)(2) of this section.
the employer shall monitor employee (4) Positive initial determination and
exposures and shall base initial deter- initial monitoring. (i) Where a deter-
minations on the employee exposure mination conducted under paragraphs
monitoring results and any of the fol- (d) (1), (2) and (3) of this section shows
lowing, relevant considerations: the possibility of any employee expo-
(A) Any information, observations, or sure at or above the action level the
calculations which would indicate em- employer shall conduct monitoring
ployee exposure to lead; which is representative of the exposure
(B) Any previous measurements of for each employee in the workplace
airborne lead; and who is exposed to lead.
(C) Any employee complaints of (ii) Where the employer has pre-
symptoms which may be attributable viously monitored for lead exposure,
to exposure to lead. and the data were obtained within the
(ii) Monitoring for the initial deter- past 12 months during work operations
mination where performed may be lim- conducted under workplace conditions
ited to a representative sample of the closely resembling the processes, type
exposed employees who the employer of material, control methods, work
reasonably believes are exposed to the practices, and environmental condi-
greatest airborne concentrations of tions used and prevailing in the em-
lead in the workplace. ployers current operations, the em-
(iii) Where the employer has pre- ployer may rely on such earlier moni-
viously monitored for lead exposures, toring results to satisfy the require-
and the data were obtained within the ments of paragraph (d)(4)(i) of this sec-
past 12 months during work operations tion if the sampling and analytical
conducted under workplace conditions methods meet the accuracy and con-
closely resembling the processes, type fidence levels of paragraph (d)(10) of
of material, control methods, work this section.
practices, and environmental condi- (5) Negative initial determination.
tions used and prevailing in the em- Where a determination, conducted
ployers current operations, the em- under paragraphs (d) (1), (2), and (3) of
ployer may rely on such earlier moni- this section is made that no employee
toring results to satisfy the require- is exposed to airborne concentrations
ments of paragraphs (d)(3)(i) and (d)(6) of lead at or above the action level the
of this section if the sampling and ana- employer shall make a written record
lytical methods meet the accuracy and of such determination. The record shall

90

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00100 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.62

include at least the information speci- level being exposed above the PEL, the
fied in paragraph (d)(3)(i) of this sec- employer shall conduct additional
tion and shall also include the date of monitoring in accordance with this
determination, location within the paragraph.
worksite, and the name and social se- (8) Employee notification. (i) The em-
curity number of each employee mon- ployer must, as soon as possible but no
itored. later than 5 working days after the re-
(6) Frequency. (i) If the initial deter- ceipt of the results of any monitoring
mination reveals employee exposure to performed under this section, notify
be below the action level further expo- each affected employee of these results
sure determination need not be re- either individually in writing or by
peated except as otherwise provided in posting the results in an appropriate
paragraph (d)(7) of this section. location that is accessible to employ-
(ii) If the initial determination or ees.
subsequent determination reveals em- (ii) Whenever the results indicate
ployee exposure to be at or above the that the representative employee expo-
action level but at or below the PEL sure, without regard to respirators, is
the employer shall perform monitoring at or above the PEL the employer shall
in accordance with this paragraph at include in the written notice a state-
least every 6 months. The employer ment that the employees exposure was
shall continue monitoring at the re- at or above that level and a description
quired frequency until at least two of the corrective action taken or to be
consecutive measurements, taken at taken to reduce exposure to below that
least 7 days apart, are below the action level.
level at which time the employer may
(9) Accuracy of measurement. The em-
discontinue monitoring for that em-
ployer shall use a method of moni-
ployee except as otherwise provided in
toring and analysis which has an accu-
paragraph (d)(7) of this section.
racy (to a confidence level of 95%) of
(iii) If the initial determination re-
not less than plus or minus 25 percent
veals that employee exposure is above
for airborne concentrations of lead
the PEL the employer shall perform
monitoring quarterly. The employer equal to or greater than 30 g/m3.
shall continue monitoring at the re- (e) Methods of compliance(1) Engi-
quired frequency until at least two neering and work practice controls. The
consecutive measurements, taken at employer shall implement engineering
least 7 days apart, are at or below the and work practice controls, including
PEL but at or above the action level at administrative controls, to reduce and
which time the employer shall repeat maintain employee exposure to lead to
monitoring for that employee at the or below the permissible exposure limit
frequency specified in paragraph to the extent that such controls are
(d)(6)(ii) of this section, except as oth- feasible. Wherever all feasible engi-
erwise provided in paragraph (d)(7) of neering and work practices controls
this section. The employer shall con- that can be instituted are not suffi-
tinue monitoring at the required fre- cient to reduce employee exposure to
quency until at least two consecutive or below the permissible exposure limit
measurements, taken at least 7 days prescribed in paragraph (c) of this sec-
apart, are below the action level at tion, the employer shall nonetheless
which time the employer may dis- use them to reduce employee exposure
continue monitoring for that employee to the lowest feasible level and shall
except as otherwise provided in para- supplement them by the use of res-
graph (d)(7) of this section. piratory protection that complies with
(7) Additional exposure assessments. the requirements of paragraph (f) of
Whenever there has been a change of this section.
equipment, process, control, personnel (2) Compliance program. (i) Prior to
or a new task has been initiated that commencement of the job each em-
may result in additional employees ployer shall establish and implement a
being exposed to lead at or above the written compliance program to achieve
action level or may result in employees compliance with paragraph (c) of this
already exposed at or above the action section.

91

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00101 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.62 29 CFR Ch. XVII (7112 Edition)

(ii) Written plans for these compli- (3) Mechanical ventilation. When ven-
ance programs shall include at least tilation is used to control lead expo-
the following: sure, the employer shall evaluate the
(A) A description of each activity in mechanical performance of the system
which lead is emitted; e.g. equipment in controlling exposure as necessary to
used, material involved, controls in maintain its effectiveness.
place, crew size, employee job respon- (4) Administrative controls. If adminis-
sibilities, operating procedures and trative controls are used as a means of
maintenance practices; reducing employees TWA exposure to
(B) A description of the specific lead, the employer shall establish and
means that will be employed to achieve implement a job rotation schedule
compliance and, where engineering which includes:
controls are required engineering plans (i) Name or identification number of
and studies used to determine methods each affected employee;
selected for controlling exposure to (ii) Duration and exposure levels at
lead; each job or work station where each af-
(C) A report of the technology consid- fected employee is located; and
ered in meeting the PEL; (iii) Any other information which
(D) Air monitoring data which docu- may be useful in assessing the reli-
ments the source of lead emissions; ability of administrative controls to
(E) A detailed schedule for implemen- reduce exposure to lead.
tation of the program, including docu- (5) The employer shall ensure that, to
mentation such as copies of purchase the extent relevant, employees follow
orders for equipment, construction good work practices such as described
contracts, etc.; in appendix B of this section.
(F) A work practice program which (f) Respiratory protection(1) General.
includes items required under para- For employees who use respirators re-
graphs (g), (h) and (i) of this section quired by this section, the employer
and incorporates other relevant work must provide each employee an appro-
practices such as those specified in priate respirator that complies with
paragraph (e)(5) of this section; the requirements of this paragraph.
(G) An administrative control sched- Respirators must be used during:
ule required by paragraph (e)(4) of this (i) Periods when an employees expo-
section, if applicable; sure to lead exceeds the PEL.
(H) A description of arrangements (ii) Work operations for which engi-
made among contractors on multi-con- neering and work-practice controls are
tractor sites with respect to informing not sufficient to reduce employee expo-
affected employees of potential expo- sures to or below the PEL.
sure to lead and with respect to respon- (iii) Periods when an employee re-
sibility for compliance with this sec- quests a respirator.
tion as set-forth in 1926.16. (iv) Periods when respirators are re-
(I) Other relevant information. quired to provide interim protection of
(iii) The compliance program shall employees while they perform the op-
provide for frequent and regular inspec- erations specified in paragraph (d)(2) of
tions of job sites, materials, and equip- this section.
ment to be made by a competent per- (2) Respirator program. (i) The em-
son. ployer must implement a respiratory
(iv) Written programs shall be sub- protection program in accordance with
mitted upon request to any affected 1910.134(b) through (d) (except
employee or authorized employee rep- (d)(1)(iii)), and (f) through (m), which
resentatives, to the Assistant Sec- covers each employee required by this
retary and the Director, and shall be section to use a respirator.
available at the worksite for examina- (ii) If an employee has breathing dif-
tion and copying by the Assistant Sec- ficulty during fit testing or respirator
retary and the Director. use, the employer must provide the em-
(v) Written programs must be revised ployee with a medical examination in
and updated at least annually to re- accordance with paragraph (j)(3)(i)(B)
flect the current status of the program. of this section to determine whether or

92

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00102 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.62

not the employee can use a respirator required by paragraph (g)(1) of this sec-
while performing the required duty. tion.
(3) Respirator selection. (i) Employers (iii) The employer shall repair or re-
must: place required protective clothing and
(A) Select, and provide to employees, equipment as needed to maintain their
the appropriate respirators specified in effectiveness.
paragraph (d)(3)(i)(A) of 29 CFR (iv) The employer shall assure that
1910.134. all protective clothing is removed at
(B) Provide employees with a full the completion of a work shift only in
facepiece respirator instead of a half change areas provided for that purpose
mask respirator for protection against as prescribed in paragraph (i)(2) of this
lead aerosols that may cause eye or section.
skin irritation at the use concentra- (v) The employer shall assure that
tions. contaminated protective clothing
(C) Provide HEPA filters for powered which is to be cleaned, laundered, or
and non-powered air-purifying res- disposed of, is placed in a closed con-
pirators. tainer in the change area which pre-
(ii) The employer must provide a vents dispersion of lead outside the
powered air-purifying respirator when container.
an employee chooses to use such a res- (vi) The employer shall inform in
pirator and it will provide adequate writing any person who cleans or laun-
protection to the employee. ders protective clothing or equipment
(g) Protective work clothing and equip- of the potentially harmful effects of ex-
ment(1) Provision and use. Where an posure to lead.
employee is exposed to lead above the (vii)(A) The employer shall ensure
PEL without regard to the use of res- that the containers of contaminated
pirators, where employees are exposed protective clothing and equipment re-
to lead compounds which may cause quired by paragraph (g)(2)(v) of this
skin or eye irritation (e.g. lead arse- section are labeled as follows:
nate, lead azide), and as interim pro-
tection for employees performing tasks DANGER: CLOTHING AND EQUIPMENT
as specified in paragraph (d)(2) of this CONTAMINATED WITH LEAD. MAY
section, the employer shall provide at DAMAGE FERTILITY OR THE UNBORN
no cost to the employee and assure CHILD. CAUSES DAMAGE TO THE CEN-
TRAL NERVOUS SYSTEM. DO NOT EAT,
that the employee uses appropriate
DRINK OR SMOKE WHEN HANDLING. DO
protective work clothing and equip- NOT REMOVE DUST BY BLOWING OR
ment that prevents contamination of SHAKING. DISPOSE OF LEAD CONTAMI-
the employee and the employees gar- NATED WASH WATER IN ACCORDANCE
ments such as, but not limited to: WITH APPLICABLE LOCAL, STATE, OR
(i) Coveralls or similar full-body FEDERAL REGULATIONS.
work clothing;
(B) Prior to June 1, 2015, employers
(ii) Gloves, hats, and shoes or dispos- may include the following information
able shoe coverlets; and on bags or containers of contaminated
(iii) Face shields, vented goggles, or protective clothing and equipment re-
other appropriate protective equip- quired by paragraph (g)(2)(v) in lieu of
ment which complies with 1910.133 of the labeling requirements in paragraph
this chapter. (g)(2)(vii)(A) of this section:
(2) Cleaning and replacement. (i) The
employer shall provide the protective Caution: Clothing contaminated with lead.
clothing required in paragraph (g)(1) of Do not remove dust by blowing or shaking.
this section in a clean and dry condi- Dispose of lead contaminated wash water in
accordance with applicable local, state, or
tion at least weekly, and daily to em-
federal regulations.
ployees whose exposure levels without
regard to a respirator are over 200 g/ (viii) The employer shall prohibit the
m3 of lead as an 8-hour TWA. removal of lead from protective cloth-
(ii) The employer shall provide for ing or equipment by blowing, shaking,
the cleaning, laundering, and disposal or any other means which disperses
of protective clothing and equipment lead into the air.

93

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00103 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.62 29 CFR Ch. XVII (7112 Edition)

(h) Housekeeping(1) All surfaces employees shower at the end of the


shall be maintained as free as prac- work shift and shall provide an ade-
ticable of accumulations of lead. quate supply of cleansing agents and
(2) Clean-up of floors and other sur- towels for use by affected employees.
faces where lead accumulates shall (4) Eating facilities. (i) The employer
wherever possible, be cleaned by shall provide lunchroom facilities or
vacuuming or other methods that min- eating areas for employees whose air-
imize the likelihood of lead becoming borne exposure to lead is above the
airborne. PEL, without regard to the use of res-
(3) Shoveling, dry or wet sweeping, pirators.
and brushing may be used only where (ii) The employer shall assure that
vacuuming or other equally effective lunchroom facilities or eating areas
methods have been tried and found not are as free as practicable from lead
to be effective. contamination and are readily acces-
(4) Where vacuuming methods are se- sible to employees.
lected, the vacuums shall be equipped (iii) The employer shall assure that
with HEPA filters and used and employees whose airborne exposure to
emptied in a manner which minimizes lead is above the PEL, without regard
the reentry of lead into the workplace. to the use of a respirator, wash their
(5) Compressed air shall not be used hands and face prior to eating, drink-
to remove lead from any surface unless ing, smoking or applying cosmetics.
the compressed air is used in conjunc- (iv) The employer shall assure that
tion with a ventilation system de- employees do not enter lunchroom fa-
signed to capture the airborne dust cre- cilities or eating areas with protective
ated by the compressed air. work clothing or equipment unless sur-
(i) Hygiene facilities and practices. (1) face lead dust has been removed by
The employer shall assure that in areas vacuuming, downdraft booth, or other
where employees are exposed to lead cleaning method that limits dispersion
above the PEL without regard to the of lead dust.
use of respirators, food or beverage is (5) Hand washing facilities. (i) The em-
not present or consumed, tobacco prod- ployer shall provide adequate
ucts are not present or used, and cos- handwashing facilities for use by em-
metics are not applied. ployees exposed to lead in accordance
(2) Change areas. (i) The employer with 29 CFR 1926.51(f).
shall provide clean change areas for (ii) Where showers are not provided
employees whose airborne exposure to the employer shall assure that employ-
lead is above the PEL, and as interim ees wash their hands and face at the
protection for employees performing end of the work-shift.
tasks as specified in paragraph (d)(2) of (j) Medical surveillance(1) General. (i)
this section, without regard to the use The employer shall make available ini-
of respirators. tial medical surveillance to employees
(ii) The employer shall assure that occupationally exposed on any day to
change areas are equipped with sepa- lead at or above the action level. Ini-
rate storage facilities for protective tial medical surveillance consists of bi-
work clothing and equipment and for ological monitoring in the form of
street clothes which prevent cross-con- blood sampling and analysis for lead
tamination. and zinc protoporphyrin levels.
(iii) The employer shall assure that (ii) The employer shall institute a
employees do not leave the workplace medical surveillance program in ac-
wearing any protective clothing or cordance with paragraphs (j)(2) and
equipment that is required to be worn (j)(3) of this section for all employees
during the work shift. who are or may be exposed by the em-
(3) Showers. (i) The employer shall ployer at or above the action level for
provide shower facilities, where fea- more than 30 days in any consecutive
sible, for use by employees whose air- 12 months;
borne exposure to lead is above the (iii) The employer shall assure that
PEL. all medical examinations and proce-
(ii) The employer shall assure, where dures are performed by or under the su-
shower facilities are available, that pervision of a licensed physician.

94

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00104 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.62

(iv) The employer shall make avail- (B) The employer shall notify each
able the required medical surveillance employee whose blood lead level is at
including multiple physician review or above 40 g/dl that the standard re-
under paragraph (j)(3)(iii) without cost quires temporary medical removal
to employees and at a reasonable time with Medical Removal Protection ben-
and place. efits when an employees blood lead
(2) Biological monitoring(i) Blood lead level is at or above the numerical cri-
and ZPP level sampling and analysis. terion for medical removal under para-
The employer shall make available bio- graph (k)(1)(i) of this section.
logical monitoring in the form of blood (3) Medical examinations and consulta-
sampling and analysis for lead and zinc tions(i) Frequency. The employer shall
protoporphyrin levels to each employee make available medical examinations
covered under paragraphs (j)(1)(i) and and consultations to each employee
(ii) of this section on the following covered under paragraph (j)(1)(ii) of
schedule: this section on the following schedule:
(A) For each employee covered under (A) At least annually for each em-
paragraph (j)(1)(ii) of this section, at ployee for whom a blood sampling test
least every 2 months for the first 6 conducted at any time during the pre-
months and every 6 months thereafter; ceding 12 months indicated a blood lead
(B) For each employee covered under level at or above 40 g/dl;
paragraphs (j)(1) (i) or (ii) of this sec- (B) As soon as possible, upon notifi-
tion whose last blood sampling and cation by an employee either that the
analysis indicated a blood lead level at employee has developed signs or symp-
or above 40 g/dl, at least every two toms commonly associated with lead
months. This frequency shall continue intoxication, that the employee desires
until two consecutive blood samples medical advice concerning the effects
and analyses indicate a blood lead level of current or past exposure to lead on
below 40 g/dl; and the employees ability to procreate a
(C) For each employee who is re- healthy child, that the employee is
moved from exposure to lead due to an pregnant, or that the employee has
elevated blood lead level at least demonstrated difficulty in breathing
monthly during the removal period. during a respirator fitting test or dur-
(ii) Follow-up blood sampling tests. ing use; and
Whenever the results of a blood lead (C) As medically appropriate for each
level test indicate that an employees employee either removed from expo-
blood lead level is at or above the nu- sure to lead due to a risk of sustaining
merical criterion for medical removal material impairment to health, or oth-
under paragraph (k)(1)(i) of this sec- erwise limited pursuant to a final med-
tion, the employer shall provide a sec- ical determination.
ond (follow-up) blood sampling test (ii) Content. The content of medical
within two weeks after the employer examinations made available pursuant
receives the results of the first blood to paragraph (j)(3)(i)(B)(C) of this sec-
sampling test. tion shall be determined by an exam-
(iii) Accuracy of blood lead level sam- ining physician and, if requested by an
pling and analysis. Blood lead level employee, shall include pregnancy
sampling and analysis provided pursu- testing or laboratory evaluation of
ant to this section shall have an accu- male fertility. Medical examinations
racy (to a confidence level of 95 per- made available pursuant to paragraph
cent) within plus or minus 15 percent (j)(3)(i)(A) of this section shall include
or 6 g/dl, whichever is greater, and the following elements:
shall be conducted by a laboratory ap- (A) A detailed work history and a
proved by OSHA. medical history, with particular atten-
(iv) Employee notification. (A) Within tion to past lead exposure (occupa-
five working days after the receipt of tional and non-occupational), personal
biological monitoring results, the em- habits (smoking, hygiene), and past
ployer shall notify each employee in gastrointestinal, hematologic, renal,
writing of his or her blood lead level; cardiovascular, reproductive and neu-
and rological problems;

95

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00105 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.62 29 CFR Ch. XVII (7112 Edition)

(B) A thorough physical examination, (C) If the findings, determinations or


with particular attention to teeth, recommendations of the second physi-
gums, hematologic, gastrointestinal, cian differ from those of the initial
renal, cardiovascular, and neurological physician, then the employer and the
systems. Pulmonary status should be employee shall assure that efforts are
evaluated if respiratory protection will made for the two physicians to resolve
be used; any disagreement.
(C) A blood pressure measurement; (D) If the two physicians have been
(D) A blood sample and analysis unable to quickly resolve their dis-
which determines: agreement, then the employer and the
(1) Blood lead level; employee through their respective phy-
(2) Hemoglobin and hematocrit deter- sicians shall designate a third physi-
minations, red cell indices, and exam- cian:
ination of peripheral smear mor- (1) To review any findings, deter-
phology; minations or recommendations of the
(3) Zinc protoporphyrin; prior physicians; and
(4) Blood urea nitrogen; and, (2) To conduct such examinations,
consultations, laboratory tests and dis-
(5) Serum creatinine;
cussions with the prior physicians as
(E) A routine urinalysis with micro-
the third physician deems necessary to
scopic examination; and
resolve the disagreement of the prior
(F) Any laboratory or other test rel- physicians.
evant to lead exposure which the exam- (E) The employer shall act consistent
ining physician deems necessary by with the findings, determinations and
sound medical practice. recommendations of the third physi-
(iii) Multiple physician review mecha- cian, unless the employer and the em-
nism. (A) If the employer selects the ployee reach an agreement which is
initial physician who conducts any otherwise consistent with the rec-
medical examination or consultation ommendations of at least one of the
provided to an employee under this sec- three physicians.
tion, the employee may designate a (iv) Information provided to examining
second physician: and consulting physicians. (A) The em-
(1) To review any findings, deter- ployer shall provide an initial physi-
minations or recommendations of the cian conducting a medical examination
initial physician; and or consultation under this section with
(2) To conduct such examinations, the following information:
consultations, and laboratory tests as (1) A copy of this regulation for lead
the second physician deems necessary including all Appendices;
to facilitate this review. (2) A description of the affected em-
(B) The employer shall promptly no- ployees duties as they relate to the
tify an employee of the right to seek a employees exposure;
second medical opinion after each oc- (3) The employees exposure level or
casion that an initial physician con- anticipated exposure level to lead and
ducts a medical examination or con- to any other toxic substance (if appli-
sultation pursuant to this section. The cable);
employer may condition its participa- (4) A description of any personal pro-
tion in, and payment for, the multiple tective equipment used or to be used;
physician review mechanism upon the (5) Prior blood lead determinations;
employee doing the following within and
fifteen (15) days after receipt of the (6) All prior written medical opinions
foregoing notification, or receipt of the concerning the employee in the em-
initial physicians written opinion, ployers possession or control.
whichever is later: (B) The employer shall provide the
(1) The employee informing the em- foregoing information to a second or
ployer that he or she intends to seek a third physician conducting a medical
second medical opinion, and examination or consultation under this
(2) The employee initiating steps to section upon request either by the sec-
make an appointment with a second ond or third physician, or by the em-
physician. ployee.

96

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00106 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.62

(v) Written medical opinions. (A) The the employer shall assure that it be
employer shall obtain and furnish the done under the supervision of a li-
employee with a copy of a written med- censed physician in a clinical setting
ical opinion from each examining or with thorough and appropriate medical
consulting physician which contains monitoring and that the employee is
only the following information: notified in writing prior to its occur-
(1) The physicians opinion as to rence.
whether the employee has any detected (k) Medical removal protection(1)
medical condition which would place Temporary medical removal and return of
the employee at increased risk of ma- an employee(i) Temporary removal due
terial impairment of the employees to elevated blood lead level. The em-
health from exposure to lead; ployer shall remove an employee from
(2) Any recommended special protec- work having an exposure to lead at or
tive measures to be provided to the em- above the action level on each occasion
ployee, or limitations to be placed that a periodic and a follow-up blood
upon the employees exposure to lead; sampling test conducted pursuant to
(3) Any recommended limitation this section indicate that the employ-
upon the employees use of respirators, ees blood lead level is at or above 50
including a determination of whether g/dl; and,
the employee can wear a powered air (ii) Temporary removal due to a final
purifying respirator if a physician de- medical determination. (A) The employer
termines that the employee cannot shall remove an employee from work
wear a negative pressure respirator; having an exposure to lead at or above
and the action level on each occasion that
(4) The results of the blood lead de- a final medical determination results
terminations. in a medical finding, determination, or
(B) The employer shall instruct each opinion that the employee has a de-
examining and consulting physician to: tected medical condition which places
(1) Not reveal either in the written the employee at increased risk of ma-
opinion or orally, or in any other terial impairment to health from expo-
means of communication with the em- sure to lead.
ployer, findings, including laboratory (B) For the purposes of this section,
results, or diagnoses unrelated to an the phrase final medical determination
employees occupational exposure to means the written medical opinion on
lead; and the employees health status by the ex-
(2) Advise the employee of any med- amining physician or, where relevant,
ical condition, occupational or non- the outcome of the multiple physician
occupational, which dictates further review mechanism or alternate medical
medical examination or treatment. determination mechanism used pursu-
(vi) Alternate physician determination ant to the medical surveillance provi-
mechanisms. The employer and an em- sions of this section.
ployee or authorized employee rep- (C) Where a final medical determina-
resentative may agree upon the use of tion results in any recommended spe-
any alternate physician determination cial protective measures for an em-
mechanism in lieu of the multiple phy- ployee, or limitations on an employees
sician review mechanism provided by exposure to lead, the employer shall
paragraph (j)(3)(iii) of this section so implement and act consistent with the
long as the alternate mechanism is as recommendation.
expeditious and protective as the re- (iii) Return of the employee to former
quirements contained in this para- job status. (A) The employer shall re-
graph. turn an employee to his or her former
(4) Chelation. (i) The employer shall job status:
assure that any person whom he re- (1) For an employee removed due to a
tains, employs, supervises or controls blood lead level at or above 50 g/dl
does not engage in prophylactic chela- when two consecutive blood sampling
tion of any employee at any time. tests indicate that the employees
(ii) If therapeutic or diagnostic che- blood lead level is below 40 g/dl;
lation is to be performed by any person (2) For an employee removed due to a
in paragraph (j)(4)(i) of this section, final medical determination, when a

97

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00107 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.62 29 CFR Ch. XVII (7112 Edition)

subsequent final medical determina- mination which differed from the find-
tion results in a medical finding, deter- ings, determinations, or recommenda-
mination, or opinion that the employee tions of the initial physician or;
no longer has a detected medical condi- (2) If the employee has been on re-
tion which places the employee at in- moval status for the preceding eight-
creased risk of material impairment to een months due to an elevated blood
health from exposure to lead. lead level, then the employer shall
(B) For the purposes of this section, await a final medical determination.
the requirement that an employer re- (2) Medical removal protection bene-
turn an employee to his or her former fits(i) Provision of medical removal pro-
job status is not intended to expand tection benefits. The employer shall pro-
upon or restrict any rights an em- vide an employee up to eighteen (18)
ployee has or would have had, absent months of medical removal protection
temporary medical removal, to a spe- benefits on each occasion that an em-
cific job classification or position ployee is removed from exposure to
under the terms of a collective bar- lead or otherwise limited pursuant to
gaining agreement. this section.
(iv) Removal of other employee special (ii) Definition of medical removal pro-
protective measure or limitations. The tection benefits. For the purposes of this
employer shall remove any limitations section, the requirement that an em-
placed on an employee or end any spe- ployer provide medical removal protec-
cial protective measures provided to an tion benefits means that, as long as the
employee pursuant to a final medical job the employee was removed from
determination when a subsequent final continues, the employer shall maintain
medical determination indicates that the total normal earnings, seniority
the limitations or special protective and other employment rights and bene-
measures are no longer necessary. fits of an employee, including the em-
(v) Employer options pending a final ployees right to his or her former job
medical determination. Where the mul- status as though the employee had not
tiple physician review mechanism, or been medically removed from the em-
alternate medical determination mech- ployees job or otherwise medically
anism used pursuant to the medical limited.
surveillance provisions of this section, (iii) Follow-up medical surveillance
has not yet resulted in a final medical during the period of employee removal or
determination with respect to an em- limitation. During the period of time
ployee, the employer shall act as fol- that an employee is medically removed
lows: from his or her job or otherwise medi-
(A) Removal. The employer may re- cally limited, the employer may condi-
move the employee from exposure to tion the provision of medical removal
lead, provide special protective meas- protection benefits upon the employ-
ures to the employee, or place limita- ees participation in follow-up medical
tions upon the employee, consistent surveillance made available pursuant
with the medical findings, determina- to this section.
tions, or recommendations of any of (iv) Workers compensation claims. If a
the physicians who have reviewed the removed employee files a claim for
employees health status. workers compensation payments for a
(B) Return. The employer may return lead-related disability, then the em-
the employee to his or her former job ployer shall continue to provide med-
status, end any special protective ical removal protection benefits pend-
measures provided to the employee, ing disposition of the claim. To the ex-
and remove any limitations placed tent that an award is made to the em-
upon the employee, consistent with the ployee for earnings lost during the pe-
medical findings, determinations, or riod of removal, the employers med-
recommendations of any of the physi- ical removal protection obligation
cians who have reviewed the employ- shall be reduced by such amount. The
ees health status, with two exceptions. employer shall receive no credit for
(1) If the initial removal, special pro- workers compensation payments re-
tection, or limitation of the employee ceived by the employee for treatment-
resulted from a final medical deter- related expenses.

98

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00108 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.62

(v) Other credits. The employers obli- (iv) The employer shall also provide
gation to provide medical removal pro- the training program at least annually
tection benefits to a removed employee for each employee who is subject to
shall be reduced to the extent that the lead exposure at or above the action
employee receives compensation for level on any day.
earnings lost during the period of re- (2) Training program. The employer
moval either from a publicly or em- shall assure that each employee is
ployer-funded compensation program, trained in the following:
or receives income from employment (i) The content of this standard and
with another employer made possible its appendices;
by virtue of the employees removal. (ii) The specific nature of the oper-
(vi) Voluntary removal or restriction of ations which could result in exposure
an employee. Where an employer, al- to lead above the action level;
though not required by this section to (iii) The purpose, proper selection,
do so, removes an employee from expo- fitting, use, and limitations of res-
sure to lead or otherwise places limita- pirators;
tions on an employee due to the effects (iv) The purpose and a description of
of lead exposure on the employees the medical surveillance program, and
medical condition, the employer shall
the medical removal protection pro-
provide medical removal protection
gram including information concerning
benefits to the employee equal to that
the adverse health effects associated
required by paragraph (k)(2) (i) and (ii)
with excessive exposure to lead (with
of this section.
particular attention to the adverse re-
(l) Communication of hazards.(1)
productive effects on both males and
General. (i) Hazard communication. The
females and hazards to the fetus and
employer shall include lead in the pro-
additional precautions for employees
gram established to comply with the
who are pregnant);
Hazard Communication Standard
(HCS) ( 1910.1200). The employer shall (v) The engineering controls and
ensure that each employee has access work practices associated with the em-
to labels on containers of lead and safe- ployees job assignment including
ty data sheets, and is trained in ac- training of employees to follow rel-
cordance with the provisions of HCS evant good work practices described in
and paragraph (l) of this section. The appendix B of this section;
employer shall ensure that at least the (vi) The contents of any compliance
following hazards are addressed: plan in effect;
(A) Reproductive/developmental tox- (vii) Instructions to employees that
icity; chelating agents should not routinely
(B) Central nervous system effects; be used to remove lead from their bod-
(C) Kidney effects; ies and should not be used at all except
(D) Blood effects; and under the direction of a licensed physi-
(E) Acute toxicity effects. cian; and
(ii) The employer shall train each (viii) The employees right of access
employee who is subject to exposure to to records under 29 CFR 1910.20.
lead at or above the action level on any (3) Access to information and training
day, or who is subject to exposure to materials. (i) The employer shall make
lead compounds which may cause skin readily available to all affected em-
or eye irritation (e.g., lead arsenate, ployees a copy of this standard and its
lead azide), in accordance with the re- appendices.
quirements of this section. The em- (ii) The employer shall provide, upon
ployer shall institute a training pro- request, all materials relating to the
gram and ensure employee participa- employee information and training
tion in the program. program to affected employees and
(iii) The employer shall provide the their designated representatives, and
training program as initial training to the Assistant Secretary and the Di-
prior to the time of job assignment or rector.
prior to the start up date for this re- (m) Signs(1) General. (i) The em-
quirement, whichever comes last. ployer shall post the following warning

99

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00109 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.62 29 CFR Ch. XVII (7112 Edition)

signs in each work area where an em- (E) The environmental variables that
ployees exposure to lead is above the could affect the measurement of em-
PEL. ployee exposure.
DANGER
(iii) The employer shall maintain
LEAD WORK AREA monitoring and other exposure assess-
MAY DAMAGE FERTILITY OR THE UN- ment records in accordance with the
BORN CHILD provisions of 29 CFR 1910.33.
CAUSES DAMAGE TO THE CENTRAL (2) Medical surveillance. (i) The em-
NERVOUS SYSTEM ployer shall establish and maintain an
DO NOT EAT, DRINK OR SMOKE IN THIS accurate record for each employee sub-
AREA
ject to medical surveillance as required
(ii) The employer shall ensure that by paragraph (j) of this section.
no statement appears on or near any (ii) This record shall include:
sign required by this paragraph (m) (A) The name, social security num-
that contradicts or detracts from the ber, and description of the duties of the
meaning of the required sign. employee;
(iii) The employer shall ensure that (B) A copy of the physicians written
signs required by this paragraph (m) opinions;
are illuminated and cleaned as nec- (C) Results of any airborne exposure
essary so that the legend is readily monitoring done on or for that em-
visible. ployee and provided to the physician;
(iv) The employer may use signs re- and
quired by other statutes, regulations or (D) Any employee medical com-
ordinances in addition to, or in com- plaints related to exposure to lead.
bination with, signs required by this (iii) The employer shall keep, or as-
paragraph (m). sure that the examining physician
(v) Prior to June 1, 2016, employers keeps, the following medical records:
may use the following legend in lieu of (A) A copy of the medical examina-
that specified in paragraph (m)(1)(i) of tion results including medical and
this section: work history required under paragraph
WARNING
(j) of this section;
LEAD WORK AREA (B) A description of the laboratory
POISON procedures and a copy of any standards
NO SMOKING OR EATING or guidelines used to interpret the test
(n) Recordkeeping(1) Exposure assess- results or references to that informa-
ment. (i) The employer shall establish tion;
and maintain an accurate record of all (C) A copy of the results of biological
monitoring and other data used in con- monitoring.
ducting employee exposure assess- (iv) The employer shall maintain or
ments as required in paragraph (d) of assure that the physician maintains
this section. medical records in accordance with the
(ii) Exposure monitoring records provisions of 29 CFR 1910.33.
shall include: (3) Medical removals. (i) The employer
(A) The date(s), number, duration, lo- shall establish and maintain an accu-
cation and results of each of the sam- rate record for each employee removed
ples taken if any, including a descrip- from current exposure to lead pursuant
tion of the sampling procedure used to to paragraph (k) of this section.
determine representative employee ex- (ii) Each record shall include:
posure where applicable; (A) The name and social security
(B) A description of the sampling and number of the employee;
analytical methods used and evidence (B) The date of each occasion that
of their accuracy; the employee was removed from cur-
(C) The type of respiratory protective rent exposure to lead as well as the
devices worn, if any; corresponding date on which the em-
(D) Name, social security number, ployee was returned to his or her
and job classification of the employee former job status;
monitored and of all other employees (C) A brief explanation of how each
whose exposure the measurement is in- removal was or is being accomplished;
tended to represent; and and

100

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00110 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.62

(D) A statement with respect to each employee exposure to lead requires


removal indicating whether or not the entry into an area where the use of res-
reason for the removal was an elevated pirators, protective clothing or equip-
blood lead level. ment is required, the employer shall
(iii) The employer shall maintain provide the observer with and assure
each medical removal record for at the use of such respirators, clothing
least the duration of an employees em- and equipment, and shall require the
ployment. observer to comply with all other ap-
(4) Objective data for exemption from re- plicable safety and health procedures.
quirement for initial monitoring. (i) For (ii) Without interfering with the
purposes of this section, objective data monitoring, observers shall be entitled
are information demonstrating that a to:
particular product or material con- (A) Receive an explanation of the
taining lead or a specific process, oper- measurement procedures;
ation, or activity involving lead cannot (B) Observe all steps related to the
release dust or fumes in concentrations monitoring of lead performed at the
at or above the action level under any place of exposure; and
expected conditions of use. Objective (C) Record the results obtained or re-
data can be obtained from an industry- ceive copies of the results when re-
wide study or from laboratory product turned by the laboratory.
test results from manufacturers of lead (p) Appendices. The information con-
containing products or materials. The tained in the appendices to this section
data the employer uses from an indus- is not intended by itself, to create any
try-wide survey must be obtained additional obligations not otherwise
under workplace conditions closely re- imposed by this standard nor detract
sembling the processes, types of mate- from any existing obligation.
rial, control methods, work practices
and environmental conditions in the APPENDIX A TO 1926.62SUBSTANCE DATA
SHEET FOR OCCUPATIONAL EXPOSURE TO LEAD
employers current operations.
(ii) The employer shall maintain the I. Substance Identification
record of the objective data relied upon A. Substance: Pure lead (Pb) is a heavy
for at least 30 years. metal at room temperature and pressure and
(5) Availability. The employer shall is a basic chemical element. It can combine
make available upon request all with various other substances to form nu-
records required to be maintained by merous lead compounds.
paragraph (n) of this section to affected B. Compounds covered by the standard: The
employees, former employees, and word lead when used in this interim final
their designated representatives, and standard means elemental lead, all inorganic
lead compounds and a class of organic lead
to the Assistant Secretary and the Di- compounds called lead soaps. This standard
rector for examination and copying. does not apply to other organic lead com-
(6) Transfer of records. (i) Whenever pounds.
the employer ceases to do business, the C. Uses: Exposure to lead occurs in several
successor employer shall receive and different occupations in the construction in-
retain all records required to be main- dustry, including demolition or salvage of
tained by paragraph (n) of this section. structures where lead or lead-containing ma-
(ii) The employer shall also comply terials are present; removal or encapsulation
of lead-containing materials, new construc-
with any additional requirements in-
tion, alteration, repair, or renovation of
volving the transfer of records set forth structures that contain lead or materials
in 29 CFR 1910.1020(h). containing lead; installation of products con-
(o) Observation of monitoring(1) Em- taining lead. In addition, there are construc-
ployee observation. The employer shall tion related activities where exposure to
provide affected employees or their lead may occur, including transportation,
designated representatives an oppor- disposal, storage, or containment of lead or
tunity to observe any monitoring of materials containing lead on construction
sites, and maintenance operations associated
employee exposure to lead conducted
with construction activities.
pursuant to paragraph (d) of this sec- D. Permissible exposure: The permissible ex-
tion. posure limit (PEL) set by the standard is 50
(2) Observation procedures. (i) When- micrograms of lead per cubic meter of air (50
ever observation of the monitoring of g/m3), averaged over an 8-hour workday.

101

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00111 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.62 29 CFR Ch. XVII (7112 Edition)
E. Action level: The interim final standard rapidly developing acute effects of lead, and
establishes an action level of 30 micrograms chronic effects which take longer to acquire.
of lead per cubic meter of air (30 g/m3), aver- Lead adversely affects numerous body sys-
aged over an 8-hour workday. The action tems, and causes forms of health impairment
level triggers several ancillary provisions of and disease which arise after periods of expo-
the standard such as exposure monitoring, sure as short as days or as long as several
medical surveillance, and training. years.
(2) Long-term (chronic) overexposure. Chron-
II. Health Hazard Data ic overexposure to lead may result in severe
damage to your blood-forming, nervous, uri-
A. Ways in which lead enters your body.
nary and reproductive systems. Some com-
When absorbed into your body in certain
mon symptoms of chronic overexposure in-
doses, lead is a toxic substance. The object of
clude loss of appetite, metallic taste in the
the lead standard is to prevent absorption of
mouth, anxiety, constipation, nausea, pallor,
harmful quantities of lead. The standard is
excessive tiredness, weakness, insomnia,
intended to protect you not only from the
headache, nervous irritability, muscle and
immediate toxic effects of lead, but also
joint pain or soreness, fine tremors, numb-
from the serious toxic effects that may not
ness, dizziness, hyperactivity and colic. In
become apparent until years of exposure lead colic there may be severe abdominal
have passed. Lead can be absorbed into your pain. Damage to the central nervous system
body by inhalation (breathing) and ingestion in general and the brain (encephalopathy) in
(eating). Lead (except for certain organic particular is one of the most severe forms of
lead compounds not covered by the standard, lead poisoning. The most severe, often fatal,
such as tetraethyl lead) is not absorbed form of encephalopathy may be preceded by
through your skin. When lead is scattered in vomiting, a feeling of dullness progressing to
the air as a dust, fume respiratory tract. In- drowsiness and stupor, poor memory, rest-
halation of airborne lead is generally the lessness, irritability, tremor, and convul-
most important source of occupational lead sions. It may arise suddenly with the onset
absorption. You can also absorb lead through of seizures, followed by coma, and death.
your digestive system if lead gets into your There is a tendency for muscular weakness
mouth and is swallowed. If you handle food, to develop at the same time. This weakness
cigarettes, chewing tobacco, or make-up may progress to paralysis often observed as
which have lead on them or handle them a characteristic wrist drop or foot drop
with hands contaminated with lead, this will and is a manifestation of a disease to the
contribute to ingestion. A significant por- nervous system called peripheral neurop-
tion of the lead that you inhale or ingest athy. Chronic overexposure to lead also re-
gets into your blood stream. Once in your sults in kidney disease with few, if any,
blood stream, lead is circulated throughout symptoms appearing until extensive and
your body and stored in various organs and most likely permanent kidney damage has
body tissues. Some of this lead is quickly fil- occurred. Routine laboratory tests reveal the
tered out of your body and excreted, but presence of this kidney disease only after
some remains in the blood and other tissues. about two-thirds of kidney function is lost.
As exposure to lead continues, the amount When overt symptoms of urinary dysfunc-
stored in your body will increase if you are tion arise, it is often too late to correct or
absorbing more lead than your body is ex- prevent worsening conditions, and progres-
creting. Even though you may not be aware sion to kidney dialysis or death is possible.
of any immediate symptoms of disease, this Chronic overexposure to lead impairs the re-
lead stored in your tissues can be slowly productive systems of both men and women.
causing irreversible damage, first to indi- Overexposure to lead may result in decreased
vidual cells, then to your organs and whole sex drive, impotence and sterility in men.
body systems. Lead can alter the structure of sperm cells
B. Effects of overexposure to lead(1) Short raising the risk of birth defects. There is evi-
term (acute) overexposure. Lead is a potent, dence of miscarriage and stillbirth in women
systemic poison that serves no known useful whose husbands were exposed to lead or who
function once absorbed by your body. Taken were exposed to lead themselves. Lead expo-
in large enough doses, lead can kill you in a sure also may result in decreased fertility,
matter of days. A condition affecting the and abnormal menstrual cycles in women.
brain called acute encephalopathy may arise The course of pregnancy may be adversely
which develops quickly to seizures, coma, affected by exposure to lead since lead
and death from cardiorespiratory arrest. A crosses the placental barrier and poses risks
short term dose of lead can lead to acute to developing fetuses. Children born of par-
encephalopathy. Short term occupational ex- ents either one of whom were exposed to ex-
posures of this magnitude are highly un- cess lead levels are more likely to have birth
usual, but not impossible. Similar forms of defects, mental retardation, behavioral dis-
encephalopathy may, however, arise from ex- orders or die during the first year of child-
tended, chronic exposure to lower doses of hood. Overexposure to lead also disrupts the
lead. There is no sharp dividing line between blood-forming system resulting in decreased

102

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00112 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.62
hemoglobin (the substance in the blood that maintain your BLL below 40 g/dl. The provi-
carries oxygen to the cells) and ultimately sions of the standard are designed with this
anemia. Anemia is characterized by weak- end in mind.
ness, pallor and fatigability as a result of de- Your employer has prime responsibility to
creased oxygen carrying capacity in the assure that the provisions of the standard
blood. are complied with both by the company and
(3) Health protection goals of the standard. by individual workers. You, as a worker,
Prevention of adverse health effects for most however, also have a responsibility to assist
workers from exposure to lead throughout a your employer in complying with the stand-
working lifetime requires that a workers ard. You can play a key role in protecting
blood lead level (BLL, also expressed as PbB) your own health by learning about the lead
be maintained at or below forty micrograms hazards and their control, learning what the
per deciliter of whole blood (40 g/dl). The standard requires, following the standard
blood lead levels of workers (both male and where it governs your own actions, and see-
female workers) who intend to have children ing that your employer complies with provi-
should be maintained below 30 g/dl to mini- sions governing his or her actions.
mize adverse reproductive health effects to (4) Reporting signs and symptoms of health
the parents and to the developing fetus. The problems. You should immediately notify
measurement of your blood lead level (BLL) your employer if you develop signs or symp-
is the most useful indicator of the amount of toms associated with lead poisoning or if you
lead being absorbed by your body. Blood lead desire medical advice concerning the effects
levels are most often reported in units of of current or past exposure to lead or your
milligrams (mg) or micrograms (g) of lead ability to have a healthy child. You should
(1 mg=1000 g) per 100 grams (100g), 100 milli- also notify your employer if you have dif-
liters (100 ml) or deciliter (dl) of blood. These ficulty breathing during a respirator fit test
three units are essentially the same. Some- or while wearing a respirator. In each of
time BLLs are expressed in the form of mg% these cases, your employer must make avail-
or g%. This is a shorthand notation for 100g, able to you appropriate medical examina-
100 ml, or dl. (References to BLL measure- tions or consultations. These must be pro-
ments in this standard are expressed in the vided at no cost to you and at a reasonable
form of g/dl.) time and place. The standard contains a pro-
BLL measurements show the amount of cedure whereby you can obtain a second
lead circulating in your blood stream, but do opinion by a physician of your choice if your
not give any information about the amount employer selected the initial physician.
of lead stored in your various tissues. BLL
measurements merely show current absorp- APPENDIX B TO 1926.62EMPLOYEE
tion of lead, not the effect that lead is hav- STANDARD SUMMARY
ing on your body or the effects that past lead
exposure may have already caused. Past re- This appendix summarizes key provisions
search into lead-related diseases, however, of the interim final standard for lead in con-
has focused heavily on associations between struction that you as a worker should be-
BLLs and various diseases. As a result, your come familiar with.
BLL is an important indicator of the likeli- I. Permissible Exposure Limit (PEL)
hood that you will gradually acquire a lead-
Paragraph (C)
related health impairment or disease.
Once your blood lead level climbs above 40 The standard sets a permissible exposure
g/dl, your risk of disease increases. There is limit (PEL) of 50 micrograms of lead per
a wide variability of individual response to cubic meter of air (50 g/m3), averaged over
lead, thus it is difficult to say that a par- an 8-hour workday which is referred to as a
ticular BLL in a given person will cause a time-weighted average (TWA). This is the
particular effect. Studies have associated highest level of lead in air to which you may
fatal encephalopathy with BLLs as low as 150 be permissibly exposed over an 8-hour work-
g/dl. Other studies have shown other forms day. However, since this is an 8-hour aver-
of diseases in some workers with BLLs well age, short exposures above the PEL are per-
below 80 g/dl. Your BLL is a crucial indi- mitted so long as for each 8-hour work day
cator of the risks to your health, but one your average exposure does not exceed this
other factor is also extremely important. level. This interim final standard, however,
This factor is the length of time you have takes into account the fact that your daily
had elevated BLLs. The longer you have an exposure to lead can extend beyond a typical
elevated BLL, the greater the risk that large 8-hour workday as the result of overtime or
quantities of lead are being gradually stored other alterations in your work schedule. To
in your organs and tissues (body burden). deal with this situation, the standard con-
The greater your overall body burden, the tains a formula which reduces your permis-
greater the chances of substantial perma- sible exposure when you are exposed more
nent damage. The best way to prevent all than 8 hours. For example, if you are exposed
forms of lead-related impairments and dis- to lead for 10 hours a day, the maximum per-
easesboth short term and long termis to mitted average exposure would be 40 g/m3.

103

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00113 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.62 29 CFR Ch. XVII (7112 Edition)
II. Exposure AssessmentParagraph (D) required to monitor the exposure of every
employee, but he or she must monitor a rep-
If lead is present in your workplace in any
resentative number of employees and job
quantity, your employer is required to make
types. Enough sampling must be done to en-
an initial determination of whether any em-
able each employees exposure level to be
ployees exposure to lead exceeds the action
reasonably represent full shift exposure. In
level (30 g/m3 averaged over an 8-hour day).
addition, these air samples must be taken
Employee exposure is that exposure which
under conditions which represent each em-
would occur if the employee were not using
ployees regular, daily exposure to lead.
a respirator. This initial determination re-
Sampling performed in the past 12 months
quires your employer to monitor workers may be used to determine exposures above
exposures unless he or she has objective data the action level if such sampling was con-
which can demonstrate conclusively that no ducted during work activities essentially
employee will be exposed to lead in excess of similar to present work conditions.
the action level. Where objective data is used The standard lists certain tasks which may
in lieu of actual monitoring the employer likely result in exposures to lead in excess of
must establish and maintain an accurate the PEL and, in some cases, exposures in ex-
record, documenting its relevancy in assess- cess of 50 times the PEL. If you are per-
ing exposure levels for current job condi- forming any of these tasks, your employer
tions. If such objective data is available, the must provide you with appropriate res-
employer need proceed no further on em- piratory protection, protective clothing and
ployee exposure assessment until such time equipment, change areas, hand washing fa-
that conditions have changed and the deter- cilities, biological monitoring, and training
mination is no longer valid. until such time that an exposure assessment
Objective data may be compiled from var- is conducted which demonstrates that your
ious sources, e.g., insurance companies and exposure level is below the PEL.
trade associations and information from sup- If you are exposed to lead and air sampling
pliers or exposure data collected from simi- is performed, your employer is required to
lar operations. Objective data may also com- notify you in writing within 5 working days
prise previously-collected sampling data in- of the air monitoring results which represent
cluding area monitoring. If it cannot be de- your exposure. If the results indicate that
termined through using objective data that your exposure exceeds the PEL (without re-
worker exposure is less than the action level, gard to your use of a respirator), then your
your employer must conduct monitoring or employer must also notify you of this in
must rely on relevant previous personal sam- writing, and provide you with a description
pling, if available. Where monitoring is re- of the corrective action that has been taken
quired for the initial determination, it may or will be taken to reduce your exposure.
be limited to a representative number of em- Your exposure must be rechecked by moni-
ployees who are reasonably expected to have toring, at least every six months if your ex-
the highest exposure levels. If your employer posure is at or over the action level but
has conducted appropriate air sampling for below the PEL. Your employer may dis-
lead in the past 12 months, he or she may use continue monitoring for you if 2 consecutive
these results, provided they are applicable to measurements, taken at least 7 days apart,
the same employee tasks and exposure condi- are at or below the action level. Air moni-
tions and meet the requirements for accu- toring must be repeated every 3 months if
racy as specified in the standard. As with ob- you are exposed over the PEL. Your em-
jective data, if such results are relied upon ployer must continue monitoring for you at
for the initial determination, your employer this frequency until 2 consecutive measure-
must establish and maintain a record as to ments, taken at least 7 days apart, are below
the relevancy of such data to current job the PEL but above the action level, at which
conditions. time your employer must repeat monitoring
If there have been any employee com- of your exposure every six months and may
plaints of symptoms which may be attrib- discontinue monitoring only after your expo-
utable to exposure to lead or if there is any sure drops to or below the action level. How-
other information or observations which ever, whenever there is a change of equip-
would indicate employee exposure to lead, ment, process, control, or personnel or a new
this must also be considered as part of the type of job is added at your workplace which
initial determination. may result in new or additional exposure to
If this initial determination shows that a lead, your employer must perform additional
reasonable possibility exists that any em- monitoring.
ployee may be exposed, without regard to
respirators, over the action level, your em- III. Methods of ComplianceParagraph (E)
ployer must set up an air monitoring pro- Your employer is required to assure that
gram to determine the exposure level rep- no employee is exposed to lead in excess of
resentative of each employee exposed to lead the PEL as an 8-hour TWA. The interim final
at your workplace. In carrying out this air standard for lead in construction requires
monitoring program, your employer is not employers to institute engineering and work

104

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00114 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.62
practice controls including administrative Your employer is required to select res-
controls to the extent feasible to reduce em- pirators from the types listed in Table I of
ployee exposure to lead. Where such controls the Respiratory Protection section of the
are feasible but not adequate to reduce expo- standard ( 1926.62 (f)). Any respirator chosen
sures below the PEL they must be used none- must be approved by the National Institute
theless to reduce exposures to the lowest for Occupational Safety and Health (NIOSH)
level that can be accomplished by these under the provisions of 42 CFR part 84. This
means and then supplemented with appro- respirator selection table will enable your
priate respiratory protection. employer to choose a type of respirator that
Your employer is required to develop and will give you a proper amount of protection
implement a written compliance program based on your airborne lead exposure. Your
prior to the commencement of any job where employer may select a type of respirator
employee exposures may reach the PEL as that provides greater protection than that
an 8-hour TWA. The interim final standard required by the standard; that is, one rec-
identifies the various elements that must be ommended for a higher concentration of lead
included in the plan. For example, employers than is present in your workplace. For exam-
are required to include a description of oper- ple, a powered air-purifying respirator
ations in which lead is emitted, detailing (PAPR) is much more protective than a typ-
other relevant information about the oper- ical negative pressure respirator, and may
ation such as the type of equipment used, also be more comfortable to wear. A PAPR
the type of material involved, employee job has a filter, cartridge, or canister to clean
responsibilities, operating procedures and the air, and a power source that continu-
maintenance practices. In addition, your em- ously blows filtered air into your breathing
ployers compliance plan must specify the zone. Your employer might make a PAPR
means that will be used to achieve compli- available to you to ease the burden of having
ance and, where engineering controls are re- to wear a respirator for long periods of time.
quired, include any engineering plans or The standard provides that you can obtain a
studies that have been used to select the PAPR upon request.
control methods. If administrative controls
Your employer must also start a Res-
involving job rotation are used to reduce em-
piratory Protection Program. This program
ployee exposure to lead, the job rotation
must include written procedures for the
schedule must be included in the compliance
proper selection, use, cleaning, storage, and
plan. The plan must also detail the type of
maintenance of respirators.
protective clothing and equipment, including
respirators, housekeeping and hygiene prac- Your employer must ensure that your res-
tices that will be used to protect you from pirator facepiece fits properly. Proper fit of
the adverse effects of exposure to lead. a respirator facepiece is critical to your pro-
The written compliance program must be tection from airborne lead. Obtaining a prop-
made available, upon request, to affected er fit on each employee may require your
employees and their designated representa- employer to make available several different
tives, the Assistant Secretary and the Direc- types of respirator masks. To ensure that
tor. your respirator fits properly and that face-
Finally, the plan must be reviewed and up- piece leakage is minimal, your employer
dated at least every 6 months to assure it re- must give you either a qualitative or quan-
flects the current status in exposure control. titative fit test as specified in appendix A of
the Respiratory Protection standard located
IV. Respiratory ProtectionParagraph (F) at 29 CFR 1910.134.
Your employer is required to provide and You must also receive from your employer
assure your use of respirators when your ex- proper training in the use of respirators.
posure to lead is not controlled below the Your employer is required to teach you how
PEL by other means. The employer must pay to wear a respirator, to know why it is need-
the cost of the respirator. Whenever you re- ed, and to understand its limitations.
quest one, your employer is also required to The standard provides that if your res-
provide you a respirator even if your air ex- pirator uses filter elements, you must be
posure level is not above the PEL. You given an opportunity to change the filter ele-
might desire a respirator when, for example, ments whenever an increase in breathing re-
you have received medical advice that your sistance is detected. You also must be per-
lead absorption should be decreased. Or, you mitted to periodically leave your work area
may intend to have children in the near fu- to wash your face and respirator facepiece
ture, and want to reduce the level of lead in whenever necessary to prevent skin irrita-
your body to minimize adverse reproductive tion. If you ever have difficulty in breathing
effects. While respirators are the least satis- during a fit test or while using a respirator,
factory means of controlling your exposure, your employer must make a medical exam-
they are capable of providing significant pro- ination available to you to determine wheth-
tection if properly chosen, fitted, worn, er you can safely wear a respirator. The re-
cleaned, maintained, and replaced when they sult of this examination may be to give you
stop providing adequate protection. a positive pressure respirator (which reduces

105

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00115 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.62 29 CFR Ch. XVII (7112 Edition)
breathing resistance) or to provide alter- 1. Where applicable, place disposal cover-
native means of protection. alls and shoe covers with the abatement
waste;
V. Protective Work Clothing and Equipment 2. Contaminated clothing which is to be
Paragraph (G) cleaned, laundered or disposed of must be
placed in closed containers in the change
If you are exposed to lead above the PEL
room.
as an 8-hour TWA, without regard to your
3. Clean protective gear, including res-
use of a respirator, or if you are exposed to
pirators, according to standard procedures;
lead compounds such as lead arsenate or lead
4. Wash hands and face again. If showers
azide which can cause skin and eye irrita-
are available, take a shower and wash hair.
tion, your employer must provide you with
If shower facilities are not available at the
protective work clothing and equipment ap-
work site, shower immediately at home and
propriate for the hazard. If work clothing is
wash hair.
provided, it must be provided in a clean and
dry condition at least weekly, and daily if VI. HousekeepingParagraph (H)
your airborne exposure to lead is greater
than 200 g/m3. Appropriate protective work Your employer must establish a house-
clothing and equipment can include cover- keeping program sufficient to maintain all
alls or similar full-body work clothing, surfaces as free as practicable of accumula-
gloves, hats, shoes or disposable shoe cover- tions of lead dust. Vacuuming is the pre-
lets, and face shields or vented goggles. Your ferred method of meeting this requirement,
employer is required to provide all such and the use of compressed air to clean floors
equipment at no cost to you. In addition, and other surfaces is generally prohibited
your employer is responsible for providing unless removal with compressed air is done
repairs and replacement as necessary, and in conjunction with ventilation systems de-
also is responsible for the cleaning, laun- signed to contain dispersal of the lead dust.
dering or disposal of protective clothing and Dry or wet sweeping, shoveling, or brushing
equipment. may not be used except where vacuuming or
The interim final standard requires that other equally effective methods have been
your employer assure that you follow good tried and do not work. Vacuums must be
work practices when you are working in used equipped with a special filter called a
areas where your exposure to lead may ex- high-efficiency particulate air (HEPA) filter
ceed the PEL. With respect to protective and emptied in a manner which minimizes
clothing and equipment, where appropriate, the reentry of lead into the workplace.
the following procedures should be observed VII. Hygiene Facilities and Practices
prior to beginning work: Paragraph (I)
1. Change into work clothing and shoe cov-
ers in the clean section of the designated The standard requires that hand washing
changing areas; facilities be provided where occupational ex-
2. Use work garments of appropriate pro- posure to lead occurs. In addition, change
tective gear, including respirators before en- areas, showers (where feasible), and
tering the work area; and lunchrooms or eating areas are to be made
3. Store any clothing not worn under pro- available to workers exposed to lead above
tective clothing in the designated changing the PEL. Your employer must assure that
area. except in these facilities, food and beverage
is not present or consumed, tobacco products
Workers should follow these procedures
are not present or used, and cosmetics are
upon leaving the work area:
not applied, where airborne exposures are
1. HEPA vacuum heavily contaminated
above the PEL. Change rooms provided by
protective work clothing while it is still
your employer must be equipped with sepa-
being worn. At no time may lead be removed
rate storage facilities for your protective
from protective clothing by any means
clothing and equipment and street clothes to
which result in uncontrolled dispersal of lead
avoid cross-contamination. After showering,
into the air;
no required protective clothing or equipment
2. Remove shoe covers and leave them in worn during the shift may be worn home. It
the work area; is important that contaminated clothing or
3. Remove protective clothing and gear in equipment be removed in change areas and
the dirty area of the designated changing not be worn home or you will extend your
area. Remove protective coveralls by care- exposure and expose your family since lead
fully rolling down the garment to reduce ex- from your clothing can accumulate in your
posure to dust. house, car, etc.
4. Remove respirators last; and Lunchrooms or eating areas may not be
5. Wash hands and face. entered with protective clothing or equip-
Workers should follow these procedures ment unless surface dust has been removed
upon finishing work for the day (in addition by vacuuming, downdraft booth, or other
to procedures described above): cleaning method. Finally, workers exposed

106

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00116 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.62
above the PEL must wash both their hands g/dl. A zinc protoporphyrin (ZPP) test is a
and faces prior to eating, drinking, smoking very useful blood test which measures an ad-
or applying cosmetics. verse metabolic effect of lead on your body
All of the facilities and hygiene practices and is therefore an indicator of lead toxicity.
just discussed are essential to minimize ad- If your BLL exceeds 40 g/dl the moni-
ditional sources of lead absorption from in- toring frequency must be increased from
halation or ingestion of lead that may accu- every 6 months to at least every 2 months
mulate on you, your clothes, or your posses- and not reduced until two consecutive BLLs
sions. Strict compliance with these provi- indicate a blood lead level below 40 g/dl.
sions can virtually eliminate several sources Each time your BLL is determined to be over
of lead exposure which significantly con- 40 g/dl, your employer must notify you of
tribute to excessive lead absorption. this in writing within five working days of
his or her receipt of the test results. The em-
VIII. Medical SurveillanceParagraph (J)
ployer must also inform you that the stand-
The medical surveillance program is part ard requires temporary medical removal
of the standards comprehensive approach to with economic protection when your BLL ex-
the prevention of lead-related disease. Its ceeds 50 g/dl. (See Discussion of Medical Re-
purpose is to supplement the main thrust of moval Protection-Paragraph (k).) Anytime
the standard which is aimed at minimizing your BLL exceeds 50 g/dl your employer
airborne concentrations of lead and sources must make available to you within two
of ingestion. Only medical surveillance can weeks of receipt of these test results a sec-
determine if the other provisions of the ond follow-up BLL test to confirm your BLL.
standard have affectively protected you as If the two tests both exceed 50 g/dl, and you
an individual. Compliance with the stand- are temporarily removed, then your em-
ards provision will protect most workers ployer must make successive BLL tests
from the adverse effects of lead exposure, but available to you on a monthly basis during
may not be satisfactory to protect individual the period of your removal.
workers (1) who have high body burdens of Medical examinations beyond the initial
lead acquired over past years, (2) who have one must be made available on an annual
additional uncontrolled sources of non-occu- basis if your blood lead level exceeds 40 g/dl
pational lead exposure, (3) who exhibit un- at any time during the preceding year and
usual variations in lead absorption rates, or you are being exposed above the airborne ac-
(4) who have specific non-work related med- tion level of 30 g/m3 for 30 or more days per
ical conditions which could be aggravated by year. The initial examination will provide
lead exposure (e.g., renal disease, anemia). In information to establish a baseline to which
addition, control systems may fail, or hy- subsequent data can be compared.
giene and respirator programs may be inad-
An initial medical examination to consist
equate. Periodic medical surveillance of indi-
of blood sampling and analysis for lead and
vidual workers will help detect those fail-
zinc protoporphyrin must also be made avail-
ures. Medical surveillance will also be impor-
able (prior to assignment) for each employee
tant to protect your reproductive ability-re-
being assigned for the first time to an area
gardless of whether you are a man or woman.
where the airborne concentration of lead
All medical surveillance required by the
equals or exceeds the action level at any
interim final standard must be performed by
time. In addition, a medical examination or
or under the supervision of a licensed physi-
cian. The employer must provide required consultation must be made available as soon
medical surveillance without cost to employ- as possible if you notify your employer that
ees and at a reasonable time and place. The you are experiencing signs or symptoms
standards medical surveillance program has commonly associated with lead poisoning or
two partsperiodic biological monitoring that you have difficulty breathing while
and medical examinations. Your employers wearing a respirator or during a respirator
obligation to offer you medical surveillance fit test. You must also be provided a medical
is triggered by the results of the air moni- examination or consultation if you notify
toring program. Full medical surveillance your employer that you desire medical ad-
must be made available to all employees who vice concerning the effects of current or past
are or may be exposed to lead in excess of exposure to lead on your ability to procreate
the action level for more than 30 days a year a healthy child.
and whose blood lead level exceeds 40 g/dl. Finally, appropriate follow-up medical ex-
Initial medical surveillance consisting of aminations or consultations may also be pro-
blood sampling and analysis for lead and zinc vided for employees who have been tempo-
protoporphyrin must be provided to all em- rarily removed from exposure under the
ployees exposed at any time (1 day) above medical removal protection provisions of the
the action level. standard. (See Part IX, below.)
Biological monitoring under the standard The standard specifies the minimum con-
must be provided at least every 2 months for tent of pre-assignment and annual medical
the first 6 months and every 6 months there- examinations. The content of other types of
after until your blood lead level is below 40 medical examinations and consultations is

107

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00117 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.62 29 CFR Ch. XVII (7112 Edition)
left up to the sound discretion of the exam- whether you can wear a powered air puri-
ining physician. Pre-assignment and annual fying respirator (PAPR) if you are found un-
medical examinations must include (1) a de- able to wear a negative pressure respirator.
tailed work history and medical history; (2) The medical surveillance program of the
a thorough physical examination, including interim lead standard may at some point in
an evaluation of your pulmonary status if time serve to notify certain workers that
you will be required to use a respirator; (3) a they have acquired a disease or other adverse
blood pressure measurement; and (4) a series medical condition as a result of occupational
of laboratory tests designed to check your lead exposure. If this is true, these workers
blood chemistry and your kidney function. might have legal rights to compensation
In addition, at any time upon your request, from public agencies, their employers, firms
a laboratory evaluation of male fertility will that supply hazardous products to their em-
be made (microscopic examination of a ployers, or other persons. Some states have
sperm sample), or a pregnancy test will be laws, including worker compensation laws,
given. that disallow a worker who learns of a job-
The standard does not require that you related health impairment to sue, unless the
participate in any of the medical procedures, worker sues within a short period of time
tests, etc. which your employer is required after learning of the impairment. (This pe-
to make available to you. Medical surveil- riod of time may be a matter of months or
lance can, however, play a very important years.) An attorney can be consulted about
role in protecting your health. You are these possibilities. It should be stressed that
strongly encouraged, therefore, to partici- OSHA is in no way trying to either encour-
pate in a meaningful fashion. The standard age or discourage claims or lawsuits. How-
contains a multiple physician review mecha- ever, since results of the standards medical
nism which will give you a chance to have a surveillance program can significantly affect
physician of your choice directly participate the legal remedies of a worker who has ac-
in the medical surveillance program. If you quired a job-related disease or impairment,
are dissatisfied with an examination by a it is proper for OSHA to make you aware of
physician chosen by your employer, you can this.
select a second physician to conduct an inde- The medical surveillance section of the
pendent analysis. The two doctors would at- standard also contains provisions dealing
tempt to resolve any differences of opinion, with chelation. Chelation is the use of cer-
and select a third physician to resolve any tain drugs (administered in pill form or in-
firm dispute. Generally your employer will jected into the body) to reduce the amount
choose the physician who conducts medical of lead absorbed in body tissues. Experience
surveillance under the lead standard-unless accumulated by the medical and scientific
you and your employer can agree on the communities has largely confirmed the effec-
choice of a physician or physicians. Some tiveness of this type of therapy for the treat-
companies and unions have agreed in ad- ment of very severe lead poisoning. On the
vance, for example, to use certain inde- other hand, it has also been established that
pendent medical laboratories or panels of there can be a long list of extremely harmful
physicians. Any of these arrangements are side effects associated with the use of
acceptable so long as required medical sur- chelating agents. The medical community
veillance is made available to workers. has balanced the advantages and disadvan-
The standard requires your employer to tages resulting from the use of chelating
provide certain information to a physician to agents in various circumstances and has es-
aid in his or her examination of you. This in- tablished when the use of these agents is ac-
formation includes (1) the standard and its ceptable. The standard includes these ac-
appendices, (2) a description of your duties as cepted limitations due to a history of abuse
they relate to occupational lead exposure, (3) of chelation therapy by some lead compa-
your exposure level or anticipated exposure nies. The most widely used chelating agents
level, (4) a description of any personal pro- are calcium disodium EDTA, (Ca Na2 EDTA),
tective equipment you wear, (5) prior blood Calcium Disodium Versenate (Versenate),
lead level results, and (6) prior written med- and d-penicillamine (pencillamine or
ical opinions concerning you that the em- Cupramine).
ployer has. After a medical examination or The standard prohibits prophylactic che-
consultation the physician must prepare a lation of any employee by any person the
written report which must contain (1) the employer retains, supervises or controls. Pro-
physicians opinion as to whether you have phylactic chelation is the routine use of
any medical condition which places you at chelating or similarly acting drugs to pre-
increased risk of material impairment to vent elevated blood levels in workers who
health from exposure to lead, (2) any rec- are occupationally exposed to lead, or the
ommended special protective measures to be use of these drugs to routinely lower blood
provided to you, (3) any blood lead level de- lead levels to predesignated concentrations
terminations, and (4) any recommended limi- believed to be safe. It should be empha-
tation on your use of respirators. This last sized that where an employer takes a worker
element must include a determination of who has no symptoms of lead poisoning and

108

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00118 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.62
has chelation carried out by a physician (ei- The standard does not give specific in-
ther inside or outside of a hospital) solely to structions dealing with what an employer
reduce the workers blood lead level, that must do with a removed worker. Your job as-
will generally be considered prophylactic signment upon removal is a matter for you,
chelation. The use of a hospital and a physi- your employer and your union (if any) to
cian does not mean that prophylactic chela- work out consistent with existing procedures
tion is not being performed. Routine chela- for job assignments. Each removal must be
tion to prevent increased or reduce current accomplished in a manner consistent with
blood lead levels is unacceptable whatever existing collective bargaining relationships.
the setting. Your employer is given broad discretion to
The standard allows the use of thera- implement temporary removals so long as no
peutic or diagnostic chelation if adminis- attempt is made to override existing agree-
tered under the supervision of a licensed ments. Similarly, a removed worker is pro-
physician in a clinical setting with thorough vided no right to veto an employers choice
and appropriate medical monitoring. Thera- which satisfies the standard.
peutic chelation responds to severe lead poi- In most cases, employers will likely trans-
soning where there are marked symptoms. fer removed employees to other jobs with
Diagnostic chelation involved giving a pa- sufficiently low lead exposure. Alternatively,
tient a dose of the drug then collecting all a workers hours may be reduced so that the
urine excreted for some period of time as an time weighted average exposure is reduced,
aid to the diagnosis of lead poisoning. or he or she may be temporarily laid off if no
In cases where the examining physician de- other alternative is feasible.
termines that chelation is appropriate, you In all of these situation, MRP benefits
must be notified in writing of this fact before must be provided during the period of re-
such treatment. This will inform you of a po- movali.e., you continue to receive the
tentially harmful treatment, and allow you same earnings, seniority, and other rights
to obtain a second opinion. and benefits you would have had if you had
not been removed. Earnings includes more
IX. Medical Removal ProtectionParagraph than just your base wage; it includes over-
(K) time, shift differentials, incentives, and
Excessive lead absorption subjects you to other compensation you would have earned if
increased risk of disease. Medical removal you had not been removed. During the period
protection (MRP) is a means of protecting of removal you must also be provided with
you when, for whatever reasons, other meth- appropriate follow-up medical surveillance.
ods, such as engineering controls, work prac- If you were removed because your blood lead
tices, and respirators, have failed to provide level was too high, you must be provided
the protection you need. MRP involves the with a monthly blood test. If a medical opin-
temporary removal of a worker from his or ion caused your removal, you must be pro-
her regular job to a place of significantly vided medical tests or examinations that the
lower exposure without any loss of earnings, doctor believes to be appropriate. If you do
seniority, or other employment rights or not participate in this follow up medical sur-
benefits. The purpose of this program is to veillance, you may lose your eligibility for
cease further lead absorption and allow your MRP benefits.
body to naturally excrete lead which has pre- When you are medically eligible to return
viously been absorbed. Temporary medical to your former job, your employer must re-
removal can result from an elevated blood turn you to your former job status. This
lead level, or a medical opinion. For up to 18 means that you are entitled to the position,
months, or for as long as the job the em- wages, benefits, etc., you would have had if
ployee was removed from lasts, protection is you had not been removed. If you would still
provided as a result of either form of re- be in your old job if no removal had occurred
moval. The vast majority of removed work- that is where you go back. If not, you are re-
ers, however, will return to their former jobs turned consistent with whatever job assign-
long before this eighteen month period ex- ment discretion your employer would have
pires. had if no removal had occurred. MRP only
You may also be removed from exposure seeks to maintain your rights, not expand
even if your blood lead level is below 50 g/ them or diminish them.
dl if a final medical determination indicates If you are removed under MRP and you are
that you temporarily need reduced lead ex- also eligible for worker compensation or
posure for medical reasons. If the physician other compensation for lost wages, your em-
who is implementing your employers med- ployers MRP benefits obligation is reduced
ical program makes a final written opinion by the amount that you actually receive
recommending your removal or other special from these other sources. This is also true if
protective measures, your employer must you obtain other employment during the
implement the physicians recommendation. time you are laid off with MRP benefits.
If you are removed in this manner, you may The standard also covers situations where
only be returned when the doctor indicates an employer voluntarily removes a worker
that it is safe for you to do so. from exposure to lead due to the effects of

109

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00119 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.62 29 CFR Ch. XVII (7112 Edition)
lead on the employees medical condition, pling and analytical techniques, the re-
even though the standard does not require sults of this sampling, and the type of
removal. In these situations MRP benefits respiratory protection being worn by
must still be provided as though the stand-
the person sampled. Such records are
ard required removal. Finally, it is impor-
tant to note that in all cases where removal to be retained for at least 30 years.
is required, respirators cannot be used as a Your employer is also required to keep
substitute. Respirators may be used before all records of biological monitoring
removal becomes necessary, but not as an al- and medical examination results.
ternative to a transfer to a low exposure job, These records must include the names
or to a lay-off with MRP benefits. of the employees, the physicians writ-
X. Employee Information and Training
ten opinion, and a copy of the results
Paragraph (L) of the examination. Medical records
must be preserved and maintained for
Your employer is required to provide an in- the duration of employment plus 30
formation and training program for all em-
years. However, if the employees dura-
ployees exposed to lead above the action
level or who may suffer skin or eye irritation tion of employment is less than one
from lead compounds such as lead arsenate year, the employer need not retain
or lead azide. The program must train these that employees medical records be-
employees regarding the specific hazards as- yond the period of employment if they
sociated with their work environment, pro- are provided to the employee upon ter-
tective measures which can be taken, includ- mination of employment.
ing the contents of any compliance plan in Recordkeeping is also required if you
effect, the danger of lead to their bodies (in- are temporarily removed from your job
cluding their reproductive systems), and
under the medical removal protection
their rights under the standard. All employ-
ees must be trained prior to initial assign- program. This record must include
ment to areas where there is a possibility of your name and social security number,
exposure over the action level. the date of your removal and return,
This training program must also be pro- how the removal was or is being ac-
vided at least annually thereafter unless fur- complished, and whether or not the
ther exposure above the action level will not reason for the removal was an elevated
occur. blood lead level. Your employer is re-
XI. SignsParagraph (M) quired to keep each medical removal
record only for as long as the duration
The standard requires that the following
warning sign be posted in work areas when
of an employees employment.
the exposure to lead is above the PEL: The standard requires that if you re-
quest to see or copy environmental
DANGER monitoring, blood lead level moni-
LEAD WORK AREA
MAY DAMAGE FERTILITY OR THE UN-
toring, or medical removal records,
BORN CHILD they must be made available to you or
CAUSES DAMAGE TO THE CENTRAL to a representative that you authorize.
NERVOUS SYSTEM Your union also has access to these
DO NOT EAT, DRINK OR SMOKE IN THIS records. Medical records other than
AREA BLLs must also be provided upon re-
Prior to June 1, 2016, employers may use quest to you, to your physician or to
the following legend in lieu of that specified any other person whom you may spe-
above: cifically designate. Your union does
WARNING not have access to your personal med-
LEAD WORK AREA ical records unless you authorize their
POISON access.
NO SMOKING OR EATING
XIII. Observation of Monitoring
* * * * * Paragraph (O)
When air monitoring for lead is per-
XII. RecordkeepingParagraph (N)
formed at your workplace as required
Your employer is required to keep all by this standard, your employer must
records of exposure monitoring for air- allow you or someone you designate to
borne lead. These records must include act as an observer of the monitoring.
the name and job classification of em- Observers are entitled to an expla-
ployees measured, details of the sam- nation of the measurement procedure,

110

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00120 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.62

and to record the results obtained. and supplemented with respirators to


Since results will not normally be meet the 50 g/m3 exposure limit.
available at the time of the moni- The standard also provides for a pro-
toring, observers are entitled to record gram of biological monitoring for em-
or receive the results of the monitoring ployees exposed to lead above the ac-
when returned by the laboratory. Your tion level at any time, and additional
employer is required to provide the ob- medical surveillance for all employees
server with any personal protective de- exposed to levels of inorganic lead
vices required to be worn by employees above 30 g/m3 (TWA) for more than 30
working in the area that is being mon- days per year and whose BLL exceeds
itored. The employer must require the
40 g/dl.
observer to wear all such equipment
and to comply with all other applicable The purpose of this document is to
safety and health procedures. outline the medical surveillance provi-
sions of the interim standard for inor-
XIV. For Additional Information ganic lead in construction, and to pro-
vide further information to the physi-
A. A copy of the interim standard for cian regarding the examination and
lead in construction can be obtained evaluation of workers exposed to inor-
free of charge by calling or writing the ganic lead.
OSHA Office of Publications, room N
Section 1 provides a detailed descrip-
3101, United States Department of
tion of the monitoring procedure in-
Labor, Washington, DC 20210: Tele-
phone (202) 2194667. cluding the required frequency of blood
testing for exposed workers, provisions
B. Additional information about the
standard, its enforcement, and your for medical removal protection (MRP),
employers compliance can be obtained the recommended right of the em-
from the nearest OSHA Area Office ployee to a second medical opinion,
listed in your telephone directory and notification and recordkeeping re-
under United States Government/De- quirements of the employer. A discus-
partment of Labor. sion of the requirements for respirator
use and respirator monitoring and
APPENDIX C TO 1926.62MEDICAL OSHAs position on prophylactic chela-
SURVEILLANCE GUIDELINES tion therapy are also included in this
section.
Introduction Section 2 discusses the toxic effects
The primary purpose of the Occupa- and clinical manifestations of lead poi-
tional Safety and Health Act of 1970 is soning and effects of lead intoxication
to assure, so far as possible, safe and on enzymatic pathways in heme syn-
healthful working conditions for every thesis. The adverse effects on both
working man and woman. The interim male and female reproductive capacity
final occupational health standard for and on the fetus are also discussed.
lead in construction is designed to pro- Section 3 outlines the recommended
tect workers exposed to inorganic lead medical evaluation of the worker ex-
including metallic lead, all inorganic posed to inorganic lead, including de-
lead compounds and organic lead soaps. tails of the medical history, physical
Under this interim final standard oc- examination, and recommended labora-
cupational exposure to inorganic lead tory tests, which are based on the toxic
is to be limited to 50 g/m3 effects of lead as discussed in Section 2.
(micrograms per cubic meter) based on Section 4 provides detailed informa-
an 8 hour time-weighted average tion concerning the laboratory tests
(TWA). This permissible exposure limit available for the monitoring of exposed
(PEL) must be achieved through a com-
workers. Included also is a discussion
bination of engineering, work practice
of the relative value of each test and
and administrative controls to the ex-
tent feasible. Where these controls are the limitations and precautions which
in place but are found not to reduce are necessary in the interpretation of
employee exposures to or below the the laboratory results.
PEL, they must be used nonetheless,

111

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00121 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.62 29 CFR Ch. XVII (7112 Edition)

I. Medical Surveillance and Monitoring more than 30 days per year. In addi-
Requirements for Workers Exposed to tion, a medical examination must be
Inorganic Lead provided as soon as possible after noti-
Under the interim final standard for fication by an employee that the em-
inorganic lead in the construction in- ployee has developed signs or symp-
dustry, initial medical surveillance toms commonly associated with lead
consisting of biological monitoring to intoxication, that the employee desires
include blood lead and ZPP level deter- medical advice regarding lead exposure
mination shall be provided to employ- and the ability to procreate a healthy
ees exposed to lead at or above the ac- child, or that the employee has dem-
tion level on any one day. In addition, onstrated difficulty in breathing dur-
a program of biological monitoring is ing a respirator fitting test or during
to be made available to all employees respirator use. An examination is also
exposed above the action level at any to be made available to each employee
time and additional medical surveil- removed from exposure to lead due to a
lance is to be made available to all em- risk of sustaining material impairment
ployees exposed to lead above 30 g/m3 to health, or otherwise limited or spe-
TWA for more than 30 days each year cially protected pursuant to medical
and whose BLL exceeds 40 g/dl. This recommendations.
program consists of periodic blood Results of biological monitoring or
sampling and medical evaluation to be the recommendations of an examining
performed on a schedule which is de- physician may necessitate removal of
fined by previous laboratory results,
an employee from further lead expo-
worker complaints or concerns, and the
sure pursuant to the standards med-
clinical assessment of the examining
physician. ical removal protection (MRP) pro-
Under this program, the blood lead gram. The object of the MRP program
level (BLL) of all employees who are is to provide temporary medical re-
exposed to lead above 30 g/m3 for more moval to workers either with substan-
than 30 days per year or whose blood tially elevated blood lead levels or oth-
lead is above 40 g/dl but exposed for no erwise at risk of sustaining material
more than 30 days per year is to be de- health impairment from continued sub-
termined at least every two months for stantial exposure to lead.
the first six months of exposure and Under the standards ultimate work-
every six months thereafter. The fre- er removal criteria, a worker is to be
quency is increased to every two removed from any work having an
months for employees whose last blood eight hour TWA exposure to lead of 30
lead level was 40 g/dl or above. For g/m3 when his or her blood lead level
employees who are removed from expo- reaches 50 g/dl and is confirmed by a
sure to lead due to an elevated blood second follow-up blood lead level per-
lead, a new blood lead level must be formed within two weeks after the em-
measured monthly. A zinc ployer receives the results of the first
protoporphyrin (ZPP) measurement is blood sampling test. Return of the em-
strongly recommended on each occa-
ployee to his or her job status depends
sion that a blood lead level measure-
on a workers blood lead level declining
ment is made.
An annual medical examination and to 40 g/dl.
consultation performed under the As part of the interim standard, the
guidelines discussed in Section 3 is to employer is required to notify in writ-
be made available to each employee ex- ing each employee whose blood lead
posed above 30 g/m3 for more than 30 level exceeds 40 g/dl. In addition each
days per year for whom a blood test such employee is to be informed that
conducted at any time during the pre- the standard requires medical removal
ceding 12 months indicated a blood lead with MRP benefits, discussed below,
level at or above 40 g/dl. Also, an ex- when an employees blood lead level ex-
amination is to be given to all employ- ceeds the above defined limit.
ees prior to their assignment to an In addition to the above blood lead
area in which airborne lead concentra- level criterion, temporary worker re-
tions reach or exceed the 30 g/m3 for moval may also take place as a result

112

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00122 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.62

of medical determinations and rec- appropriate as part of the employers


ommendations. Written medical opin- overall obligation to provide a safe and
ions must be prepared after each exam- healthful workplace. The provisions of
ination pursuant to the standard. If the MRP benefits during the employees re-
examining physician includes a med- moval period may, however, be condi-
ical finding, determination or opinion tioned upon participation in medical
that the employee has a medical condi- surveillance.
tion which places the employee at in- The lead standard provides for a mul-
creased risk of material health impair- tiple physician review in cases where
ment from exposure to lead, then the the employee wishes a second opinion
employee must be removed from expo- concerning potential lead poisoning or
sure to lead at or above 30 g/m3. Alter- toxicity. If an employee wishes a sec-
natively, if the examining physician ond opinion, he or she can make an ap-
recommends special protective meas- pointment with a physician of his or
ures for an employee (e.g., use of a her choice. This second physician will
powered air purifying respirator) or review the findings, recommendations
recommends limitations on an employ- or determinations of the first physician
ees exposure to lead, then the em- and conduct any examinations, con-
ployer must implement these rec- sultations or tests deemed necessary in
ommendations. an attempt to make a final medical de-
Recommendations may be more termination. If the first and second
stringent than the specific provisions physicians do not agree in their assess-
of the standard. The examining physi- ment they must try to resolve their
cian, therefore, is given broad flexi- differences. If they cannot reach an
bility to tailor special protective pro- agreement then they must designate a
cedures to the needs of individual em- third physician to resolve the dispute.
ployees. This flexibility extends to the The employer must provide exam-
evaluation and management of preg- ining and consulting physicians with
nant workers and male and female the following specific information: A
workers who are planning to raise chil- copy of the lead regulations and all ap-
dren. Based on the history, physical ex- pendices, a description of the employ-
amination, and laboratory studies, the ees duties as related to exposure, the
physician might recommend special exposure level or anticipated level to
protective measures or medical re- lead and any other toxic substances (if
moval for an employee who is pregnant applicable), a description of personal
or who is planning to conceive a child protective equipment used, blood lead
when, in the physicians judgment, levels, and all prior written medical
continued exposure to lead at the cur- opinions regarding the employee in the
rent job would pose a significant risk. employers possession or control. The
The return of the employee to his or employer must also obtain from the
her former job status, or the removal physician and provide the employee
of special protections or limitations, with a written medical opinion con-
depends upon the examining physician taining blood lead levels, the
determining that the employee is no physicianss opinion as to whether the
longer at increased risk of material im- employee is at risk of material impair-
pairment or that special measures are ment to health, any recommended pro-
no longer needed. tective measures for the employee if
During the period of any form of spe- further exposure is permitted, as well
cial protection or removal, the em- as any recommended limitations upon
ployer must maintain the workers an employees use of respirators.
earnings, seniority, and other employ- Employers must instruct each physi-
ment rights and benefits (as though the cian not to reveal to the employer in
worker had not been removed) for a pe- writing or in any other way his or her
riod of up to 18 months or for as long as findings, laboratory results, or diag-
the job the employee was removed noses which are felt to be unrelated to
from lasts if less than 18 months. This occupational lead exposure. They must
economic protection will maximize also instruct each physician to advise
meaningful worker participation in the the employee of any occupationally or
medical surveillance program, and is non-occupationally related medical

113

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00123 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.62 29 CFR Ch. XVII (7112 Edition)

condition requiring further treatment tunity to remove a worker from expo-


or evaluation. sure and allow the body to naturally
The standard provides for the use of excrete accumulated lead. As a diag-
respirators where engineering and nostic aid, the chelation mobilization
other primary controls are not effec- test using CA-EDTA has limited appli-
tive. However, the use of respirator cability. According to some investiga-
protection shall not be used in lieu of tors, the test can differentiate between
temporary medical removal due to ele- lead-induced and other nephropathies.
vated blood lead levels or findings that The test may also provide an esti-
an employee is at risk of material mation of the mobile fraction of the
health impairment. This is based on total body lead burden.
the numerous inadequacies of res- Employers are required to assure
pirators including skin rash where the that accurate records are maintained
facepiece makes contact with the skin, on exposure assessment, including en-
unacceptable stress to breathing in vironmental monitoring, medical sur-
some workers with underlying veillance, and medical removal for
cardiopulmonary impairment, dif- each employee. Exposure assessment
ficulty in providing adequate fit, the records must be kept for at least 30
tendency for respirators to create addi- years. Medical surveillance records
tional hazards by interfering with vi- must be kept for the duration of em-
sion, hearing, and mobility, and the ployment plus 30 years except in cases
difficulties of assuring the maximum where the employment was less than
effectiveness of a complicated work one year. If duration of employment is
practice program involving respirators. less than one year, the employer need
Respirators do, however, serve a useful not retain this record beyond the term
function where engineering and work of employment if the record is provided
practice controls are inadequate by to the employee upon termination of
providing supplementary, interim, or employment. Medical removal records
short-term protection, provided they also must be maintained for the dura-
are properly selected for the environ- tion of employment. All records re-
ment in which the employee will be quired under the standard must be
working, properly fitted to the em- made available upon request to the As-
ployee, maintained and cleaned peri- sistant Secretary of Labor for Occupa-
odically, and worn by the employee tional Safety and Health and the Direc-
when required. tor of the National Institute for Occu-
In its interim final standard on occu- pational Safety and Health. Employers
pational exposure to inorganic lead in must also make environmental and bi-
the construction industry, OSHA has ological monitoring and medical re-
prohibited prophylactic chelation. Di- moval records available to affected em-
agnostic and therapeutic chelation are ployees and to former employees or
permitted only under the supervision their authorized employee representa-
of a licensed physician with appro- tives. Employees or their specifically
priate medical monitoring in an ac- designated representatives have access
ceptable clinical setting. The decision to their entire medical surveillance
to initiate chelation therapy must be records.
made on an individual basis and take In addition, the standard requires
into account the severity of symptoms that the employer inform all workers
felt to be a result of lead toxicity along exposed to lead at or above 30 g/m3 of
with blood lead levels, ZPP levels, and the provisions of the standard and all
other laboratory tests as appropriate. its appendices, the purpose and descrip-
EDTA and penicillamine which are the tion of medical surveillance and provi-
primary chelating agents used in the sions for medical removal protection if
therapy of occupational lead poisoning temporary removal is required. An un-
have significant potential side effects derstanding of the potential health ef-
and their use must be justified on the fects of lead exposure by all exposed
basis of expected benefits to the work- employees along with full under-
er. Unless frank and severe symptoms standing of their rights under the lead
are present, therapeutic chelation is standard is essential for an effective
not recommended, given the oppor- monitoring program.

114

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00124 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.62

II. Adverse Health Effects of Inorganic 20% of the population would have 70%
Lead inhibition of ALA-D. There is an expo-
nential increase in ALA excretion at
Although the toxicity of lead has
blood lead levels greater than 40 g/dl.
been known for 2,000 years, the knowl-
Another enzyme, ferrochelatase, is
edge of the complex relationship be-
also inhibited at low blood lead levels.
tween lead exposure and human re-
Inhibition of ferrochelatase leads to in-
sponse is still being refined. Signifi-
creased free erythrocyte
cant research into the toxic properties
protoporphyrin (FEP) in the blood
of lead continues throughout the
which can then bind to zinc to yield
world, and it should be anticipated
that our understanding of thresholds of zinc protoporphyrin. At a blood lead
effects and margins of safety will be level of 50 g/dl or greater, nearly 100%
improved in future years. The provi- of the population will have an increase
sions of the lead standard are founded in FEP. There is also an exponential
on two prime medical judgments: First, relationship between blood lead levels
the prevention of adverse health effects greater than 40 g/dl and the associated
from exposure to lead throughout a ZPP level, which has led to the devel-
working lifetime requires that worker opment of the ZPP screening test for
blood lead levels be maintained at or lead exposure.
below 40 g/dl and second, the blood While the significance of these ef-
lead levels of workers, male or female, fects is subject to debate, it is OSHAs
who intend to parent in the near future position that these enzyme disturb-
should be maintained below 30 g/dl to ances are early stages of a disease proc-
minimize adverse reproductive health ess which may eventually result in the
effects to the parents and developing clinical symptoms of lead poisoning.
fetus. The adverse effects of lead on re- Whether or not the effects do progress
production are being actively re- to the later stages of clinical disease,
searched and OSHA encourages the disruption of these enzyme processes
physician to remain abreast of recent over a working lifetime is considered
developments in the area to best advise to be a material impairment of health.
pregnant workers or workers planning One of the eventual results of lead-in-
to conceive children. duced inhibition of enzymes in the
The spectrum of health effects caused heme synthesis pathway is anemia
by lead exposure can be subdivided into which can be asymptomatic if mild but
five developmental stages: Normal, associated with a wide array of symp-
physiological changes of uncertain sig- toms including dizziness, fatigue, and
nificance, pathophysiological changes, tachycardia when more severe. Studies
overt symptoms (morbidity), and mor- have indicated that lead levels as low
tality. Within this process there are no as 50 g/dl can be associated with a
sharp distinctions, but rather a con- definite decreased hemoglobin, al-
tinuum of effects. Boundaries between though most cases of lead-induced ane-
categories overlap due to the wide vari- mia, as well as shortened red-cell sur-
ation of individual responses and expo- vival times, occur at lead levels ex-
sures in the working population. ceeding 80 g/dl. Inhibited hemoglobin
OSHAs development of the lead stand- synthesis is more common in chronic
ard focused on pathophysiological cases whereas shortened erythrocyte
changes as well as later stages of dis- life span is more common in acute
ease. cases.
1. Heme Synthesis Inhibition. The In lead-induced anemias, there is
earliest demonstrated effect of lead in- usually a reticulocytosis along with
volves its ability to inhibit at least two the presence of basophilic stippling,
enzymes of the heme synthesis path- and ringed sideroblasts, although none
way at very low blood levels. Inhibition of the above are pathognomonic for
of delta aminolevulinic acid dehydrase lead-induced anemia.
(ALA-D) which catalyzes the conver- 2. Neurological Effects. Inorganic
sion of delta-aminolevulinic acid (ALA) lead has been found to have toxic ef-
to protoporphyrin is observed at a fects on both the central and periph-
blood lead level below 20 g/dl. At a eral nervous systems. The earliest
blood lead level of 40 g/dl, more than stages of lead-induced central nervous

115

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00125 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.62 29 CFR Ch. XVII (7112 Edition)

system effects first manifest them- potentials, and spontaneous patholog-


selves in the form of behavioral dis- ical activity including fibrillations and
turbances and central nervous system fasciculations. Whether these effects
symptoms including irritability, rest- occur at levels of 40 g/dl is undeter-
lessness, insomnia and other sleep dis- mined.
turbances, fatigue, vertigo, headache, While the peripheral neuropathies
poor memory, tremor, depression, and can occasionally be reversed with ther-
apathy. With more severe exposure, apy, again such recovery is not assured
symptoms can progress to drowsiness, particularly in the more severe
stupor, hallucinations, delirium, con- neuropathies and often improvement is
vulsions and coma. only partial. The lack of reversibility
The most severe and acute form of is felt to be due in part to segmental
lead poisoning which usually follows demyelination.
ingestion or inhalation of large 3. Gastrointestinal. Lead may also af-
amounts of lead is acute fect the gastrointestinal system pro-
encephalopathy which may arise pre- ducing abdominal colic or diffuse ab-
cipitously with the onset of intractable dominal pain, constipation,
seizures, coma, cardiorespiratory ar- obstipation, diarrhea, anorexia, nausea
rest, and death within 48 hours. and vomiting. Lead colic rarely devel-
While there is disagreement about ops at blood lead levels below 80 g/dl.
what exposure levels are needed to 4. Renal. Renal toxicity represents
produce the earliest symptoms, most one of the most serious health effects
experts agree that symptoms definitely of lead poisoning. In the early stages of
can occur at blood lead levels of 60 g/ disease nuclear inclusion bodies can
dl whole blood and therefore rec- frequently be identified in proximal
ommend a 40 g/dl maximum. The cen- renal tubular cells. Renal function re-
tral nervous system effects frequently mains normal and the changes in this
are not reversible following discon- stage are probably reversible. With
tinued exposure or chelation therapy more advanced disease there is progres-
and when improvement does occur, it is sive interstitial fibrosis and impaired
almost always only partial. renal function. Eventually extensive
The peripheral neuropathy resulting interstitial fibrosis ensues with scle-
from lead exposure characteristically rotic glomeruli and dilated and atro-
involves only motor function with phied proximal tubules; all represent
minimal sensory damage and has a end stage kidney disease. Azotemia can
marked predilection for the extensor be progressive, eventually resulting in
muscles of the most active extremity. frank uremia necessitating dialysis.
The peripheral neuropathy can occur There is occasionally associated hyper-
with varying degrees of severity. The tension and hyperuricemia with or
earliest and mildest form which can be without gout.
detected in workers with blood lead Early kidney disease is difficult to
levels as low as 50 g/dl is manifested detect. The urinalysis is normal in
by slowing of motor nerve conduction early lead nephropathy and the blood
velocity often without clinical symp- urea nitrogen and serum creatinine in-
toms. With progression of the neurop- crease only when two-thirds of kidney
athy there is development of painless function is lost. Measurement of cre-
extensor muscle weakness usually in- atinine clearance can often detect ear-
volving the extensor muscles of the fin- lier disease as can other methods of
gers and hand in the most active upper measurement of glomerular filtration
extremity, followed in severe cases by rate. An abnormal Ca-EDTA mobiliza-
wrist drop or, much less commonly, tion test has been used to differentiate
foot drop. between lead-induced and other
In addition to slowing of nerve con- nephropathies, but this procedure is
duction, electromyographical studies not widely accepted. A form of Fanconi
in patients with blood lead levels syndrome with aminoaciduria,
greater than 50 g/dl have dem- glycosuria, and hyperphosphaturia in-
onstrated a decrease in the number of dicating severe injury to the proximal
acting motor unit potentials, an in- renal tubules is occasionally seen in
crease in the duration of motor unit children.

116

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00126 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.62

5. Reproductive effects. Exposure to els in the fetus and newborn likewise


lead can have serious effects on repro- should not exceed 30 g/dl.
ductive function in both males and fe- Because of leads ability to pass
males. In male workers exposed to lead through the placental barrier and also
there can be a decrease in sexual drive, because of the demonstrated adverse
impotence, decreased ability to effects of lead on reproductive function
produce healthy sperm, and sterility. in both the male and female as well as
Malformed sperm (teratospermia), de- the risk of genetic damage of lead on
creased number of sperm both the ovum and sperm, OSHA rec-
(hypospermia), and sperm with de- ommends a 30 g/dl maximum permis-
creased motility (asthenospermia) can sible blood lead level in both males and
all occur. Teratospermia has been females who wish to bear children.
noted at mean blood lead levels of 53 6. Other toxic effects. Debate and re-
g/dl and hypospermia and search continue on the effects of lead
asthenospermia at 41 g/dl. Further- on the human body. Hypertension has
more, there appears to be a dose-re- frequently been noted in occupation-
sponse relationship for teratospermia ally exposed individuals although it is
in lead exposed workers. difficult to assess whether this is due
to leads adverse effects on the kidney
Women exposed to lead may experi-
or if some other mechanism is in-
ence menstrual disturbances including
volved. Vascular and electrocardio-
dysmenorrhea, menorrhagia and amen-
graphic changes have been detected but
orrhea. Following exposure to lead, have not been well characterized. Lead
women have a higher frequency of ste- is thought to impair thyroid function
rility, premature births, spontaneous and interfere with the pituitary-adre-
miscarriages, and stillbirths. nal axis, but again these effects have
Germ cells can be affected by lead not been well defined.
and cause genetic damage in the egg or
sperm cells before conception and re- III. Medical Evaluation
sult in failure to implant, miscarriage,
The most important principle in
stillbirth, or birth defects.
evaluating a worker for any occupa-
Infants of mothers with lead poi-
tional disease including lead poisoning
soning have a higher mortality during
is a high index of suspicion on the part
the first year and suffer from lowered of the examining physician. As dis-
birth weights, slower growth, and nerv- cussed in Section 2, lead can affect nu-
ous system disorders. merous organ systems and produce a
Lead can pass through the placental wide array of signs and symptoms,
barrier and lead levels in the mothers most of which are non-specific and sub-
blood are comparable to concentra- tle in nature at least in the early
tions of lead in the umbilical cord at stages of disease. Unless serious con-
birth. Transplacental passage becomes cern for lead toxicity is present, many
detectable at 1214 weeks of gestation of the early clues to diagnosis may eas-
and increases until birth. ily be overlooked.
There is little direct data on damage The crucial initial step in the med-
to the fetus from exposure to lead but ical evaluation is recognizing that a
it is generally assumed that the fetus workers employment can result in ex-
and newborn would be at least as sus- posure to lead. The worker will fre-
ceptible to neurological damage as quently be able to define exposures to
young children. Blood lead levels of 50 lead and lead containing materials but
60 g/dl in children can cause signifi- often will not volunteer this informa-
cant neurobehavioral impairments and tion unless specifically asked. In other
there is evidence of hyperactivity at situations the worker may not know of
blood levels as low as 25 g/dl. Given any exposures to lead but the suspicion
the overall body of literature con- might be raised on the part of the phy-
cerning the adverse health effects of sician because of the industry or occu-
lead in children, OSHA feels that the pation of the worker. Potential occupa-
blood lead level in children should be tional exposure to lead and its com-
maintained below 30 g/dl with a popu- pounds occur in many occupations in
lation mean of 15 g/dl. Blood lead lev- the construction industry, including

117

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00127 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.62 29 CFR Ch. XVII (7112 Edition)

demolition and salvaging operations, significant. The review of symptoms


removal or encapsulation of materials should include the following:
containing lead, construction, alter- 1. Generalweight loss, fatigue, de-
ation, repair or renovation of struc- creased appetite.
tures containing lead, transportation, 2. Head, Eyes, Ears, Nose, Throat
disposal, storage or containment of (HEENT)headaches, visual disturb-
lead or lead-containing materials on ances or decreased visual acuity, hear-
construction sites, and maintenance ing deficits or tinnitus, pigmentation
operations associated with construc- of the oral mucosa, or metallic taste in
tion activities. mouth.
Once the possibility for lead exposure 3. Cardio-pulmonaryshortness of
is raised, the focus can then be directed breath, cough, chest pains, palpita-
toward eliciting information from the tions, or orthopnea.
medical history, physical exam, and fi- 4. Gastrointestinalnausea, vom-
nally from laboratory data to evaluate iting, heartburn, abdominal pain, con-
the worker for potential lead toxicity. stipation or diarrhea.
A complete and detailed work history 5. Neurologicirritability, insomnia,
is important in the initial evaluation. weakness (fatigue), dizziness, loss of
A listing of all previous employment memory, confusion, hallucinations,
with information on job description, incoordination, ataxia, decreased
exposure to fumes or dust, known expo- strength in hands or feet, disturbances
sures to lead or other toxic substances, in gait, difficulty in climbing stairs, or
a description of any personal protec- seizures.
tive equipment used, and previous med- 6. Hematologicpallor, easy fatiga-
ical surveillance should all be included bility, abnormal blood loss, melena.
in the workers record. Where exposure 7. Reproductive (male and female and
to lead is suspected, information con- spouse where relevant)history of in-
cerning on-the-job personal hygiene, fertility, impotence, loss of libido, ab-
smoking or eating habits in work normal menstrual periods, history of
areas, laundry procedures, and use of miscarriages, stillbirths, or children
any protective clothing or respiratory with birth defects.
protection equipment should be noted. 8. Musculo-skeletalmuscle and
A complete work history is essential in joint pains.
the medical evaluation of a worker The physical examination should em-
with suspected lead toxicity, especially phasize the neurological, gastro-
when long term effects such as intestinal, and cardiovascular systems.
neurotoxicity and nephrotoxicity are The workers weight and blood pressure
considered. should be recorded and the oral mucosa
The medical history is also of funda- checked for pigmentation char-
mental importance and should include acteristic of a possible Burtonian or
a listing of all past and current med- lead line on the gingiva. It should be
ical conditions, current medications noted, however, that the lead line may
including proprietary drug intake, pre- not be present even in severe lead poi-
vious surgeries and hospitalizations, soning if good oral hygiene is prac-
allergies, smoking history, alcohol ticed.
consumption, and also non-occupa- The presence of pallor on skin exam-
tional lead exposures such as hobbies ination may indicate an anemia which,
(hunting, riflery). Also known child- if severe, might also be associated with
hood exposures should be elicited. Any a tachycardia. If an anemia is sus-
previous history of hematological, neu- pected, an active search for blood loss
rological, gastrointestinal, renal, psy- should be undertaken including poten-
chological, gynecological, genetic, or tial blood loss through the gastro-
reproductive problems should be spe- intestinal tract.
cifically noted. A complete neurological examination
A careful and complete review of sys- should include an adequate mental sta-
tems must be performed to assess both tus evaluation including a search for
recognized complaints and subtle or behavioral and psychological disturb-
slowly acquired symptoms which the ances, memory testing, evaluation for
worker might not appreciate as being irritability, insomnia, hallucinations,

118

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00128 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.62

and mental clouding. Gait and coordi- If a peripheral neuropathy is sus-


nation should be examined along with pected, nerve conduction studies are
close observation for tremor. A de- warranted both for diagnosis and as a
tailed evaluation of peripheral nerve basis to monitor any therapy.
function including careful sensory and If renal disease is questioned, a 24
motor function testing is warranted. hour urine collection for creatinine
Strength testing particularly of exten- clearance, protein, and electrolytes
sor muscle groups of all extremities is may be indicated. Elevated uric acid
of fundamental importance.
levels may result from lead-induced
Cranial nerve evaluation should also
be included in the routine examination. renal disease and a serum uric acid
The abdominal examination should level might be performed.
include auscultation for bowel sounds An electrocardiogram and chest x-
and abdominal bruits and palpation for ray may be obtained as deemed appro-
organomegaly, masses, and diffuse ab- priate.
dominal tenderness. Sophisticated and highly specialized
Cardiovascular examination should testing should not be done routinely
evaluate possible early signs of conges- and where indicated should be under
tive heart failure. Pulmonary status the direction of a specialist.
should be addressed particularly if res-
pirator protection is contemplated. IV. Laboratory Evaluation
As part of the medical evaluation,
the interim lead standard requires the The blood lead level at present re-
following laboratory studies: mains the single most important test
1. Blood lead level to monitor lead exposure and is the
2. Hemoglobin and hematocrit deter- test used in the medical surveillance
minations, red cell indices, and exam- program under the lead standard to
ination of the peripheral blood smear guide employee medical removal. The
to evaluate red blood cell morphology ZPP has several advantages over the
3. Blood urea nitrogen blood lead level. Because of its rel-
4. Serum creatinine atively recent development and the
5. Routine urinalysis with micro- lack of extensive data concerning its
scopic examination. interpretation, the ZPP currently re-
6. A zinc protoporphyrin level. mains an ancillary test.
In addition to the above, the physi- This section will discuss the blood
cian is authorized to order any further lead level and ZPP in detail and will
laboratory or other tests which he or outline their relative advantages and
she deems necessary in accordance disadvantages. Other blood tests cur-
with sound medical practice. The eval- rently available to evaluate lead expo-
uation must also include pregnancy sure will also be reviewed.
testing or laboratory evaluation of The blood lead level is a good index
male fertility if requested by the em- of current or recent lead absorption
ployee. Additional tests which are when there is no anemia present and
probably not warranted on a routine when the worker has not taken any
basis but may be appropriate when chelating agents. However, blood lead
blood lead and ZPP levels are equivocal
levels along with urinary lead levels do
include delta aminolevulinic acid and
not necessarily indicate the total body
coproporphyrin concentrations in the
urine, and dark-field illumination for burden of lead and are not adequate
detection of basophilic stippling in red measures of past exposure. One reason
blood cells. for this is that lead has a high affinity
If an anemia is detected further stud- for bone and up to 90% of the bodys
ies including a careful examination of total lead is deposited there. A very
the peripheral smear, reticulocyte important component of the total lead
count, stool for occult blood, serum body burden is lead in soft tissue (liver,
iron, total iron binding capacity, bili- kidney, and brain). This fraction of the
rubin, and, if appropriate, vitamin B12 lead body burden, the biologically ac-
and folate may be of value in attempt- tive lead, is not entirely reflected by
ing to identify the cause of the anemia. blood lead levels since it is a function

119

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00129 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.62 29 CFR Ch. XVII (7112 Edition)

of the dynamics of lead absorption, dis- faster, and less expensive to perform
tribution, deposition in bone and excre- and no contamination is possible.
tion. Following discontinuation of ex- Many investigators believe it is the
posure to lead, the excess body burden most reliable means of monitoring
is only slowly mobilized from bone and chronic lead absorption.
other relatively stable body stores and Zinc protoporphyrin results from the
excreted. Consequently, a high blood inhibition of the enzyme ferrochelatase
lead level may only represent recent which catalyzes the insertion of an
heavy exposure to lead without a sig- iron molecule into the protoporphyrin
nificant total body excess and likewise molecule, which then becomes heme. If
a low blood lead level does not exclude iron is not inserted into the molecule
an elevated total body burden of lead. then zinc, having a greater affinity for
Also due to its correlation with re- protoporphyrin, takes the place of the
cent exposures, the blood lead level iron, forming ZPP.
may vary considerably over short time An elevation in the level of circu-
intervals. lating ZPP may occur at blood lead
To minimize laboratory error and er- levels as low as 2030 g/dl in some
roneous results due to contamination, workers. Once the blood lead level has
blood specimens must be carefully col- reached 40 g/dl there is more marked
lected after thorough cleaning of the rise in the ZPP value from its normal
skin with appropriate methods using range of less than 100 g/dl100 ml. In-
lead-free blood containers and analyzed creases in blood lead levels beyond 40
by a reliable laboratory. Under the g/100 g are associated with exponential
standard, samples must be analyzed in increases in ZPP.
laboratories which are approved by Whereas blood lead levels fluctuate
OSHA. Analysis is to be made using over short time spans, ZPP levels re-
atomic absorption spectrophotometry, main relatively stable. ZPP is meas-
anodic stripping voltammetry or any ured directly in red blood cells and is
method which meets the accuracy re- present for the cells entire 120 day life-
quirements set forth by the standard. span. Therefore, the ZPP level in blood
The determination of lead in urine is reflects the average ZPP production
generally considered a less reliable over the previous 34 months and con-
monitoring technique than analysis of sequently the average lead exposure
whole blood primarily due to indi- during that time interval.
vidual variability in urinary excretion It is recommended that a hematocrit
capacity as well as the technical dif- be determined whenever a confirmed
ficulty of obtaining accurate 24 hour ZPP of 50 g/100 ml whole blood is ob-
urine collections. In addition, workers tained to rule out a significant under-
with renal insufficiency, whether due lying anemia. If the ZPP is in excess of
to lead or some other cause, may have 100 g/100 ml and not associated with
decreased lead clearance and con- abnormal elevations in blood lead lev-
sequently urine lead levels may under- els, the laboratory should be checked
estimate the true lead burden. There- to be sure that blood leads were deter-
fore, urine lead levels should not be mined using atomic absorption
used as a routine test. spectrophotometry anodic stripping
The zinc protoporphyrin test, unlike voltammetry, or any method which
the blood lead determination, measures meets the accuracy requirements set
an adverse metabolic effect of lead and forth by the standard by an OSHA ap-
as such is a better indicator of lead proved laboratory which is experienced
toxicity than the level of blood lead in lead level determinations. Repeat
itself. The level of ZPP reflects lead periodic blood lead studies should be
absorption over the preceding 3 to 4 obtained in all individuals with ele-
months, and therefore is a better indi- vated ZPP levels to be certain that an
cator of lead body burden. The ZPP re- associated elevated blood lead level has
quires more time than the blood lead not been missed due to transient fluc-
to read significantly elevated levels; tuations in blood leads.
the return to normal after dis- ZPP has a characteristic fluorescence
continuing lead exposure is also slower. spectrum with a peak at 594 nm which
Furthermore, the ZPP test is simpler, is detectable with a

120

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00130 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.64

hematofluorimeter. The emphasis on the medical surveillance


hematofluorimeter is accurate and of all workers exposed to levels of inor-
portable and can provide on-site, in- ganic lead above 30 g/m3 TWA. The
stantaneous results for workers who physician has a fundamental role in
can be frequently tested via a finger this surveillance program, and in the
prick. operation of the medical removal pro-
However, careful attention must be tection program.
given to calibration and quality con- Even with adequate worker edu-
trol procedures. Limited data on blood cation on the adverse health effects of
lead-ZPP correlations and the ZPP lev- lead and appropriate training in work
els which are associated with the ad- practices, personal hygiene and other
verse health effects discussed in Sec- control measures, the physician has a
tion 2 are the major limitations of the primary responsibility for evaluating
test. Also it is difficult to correlate potential lead toxicity in the worker.
ZPP levels with environmental expo- It is only through a careful and de-
sure and there is some variation of re- tailed medical and work history, a
sponse with age and sex. Nevertheless, complete physical examination and ap-
the ZPP promises to be an important propriate laboratory testing that an
diagnostic test for the early detection accurate assessment can be made.
of lead toxicity and its value will in- Many of the adverse health effects of
crease as more data is collected regard- lead toxicity are either irreversible or
ing its relationship to other manifesta- only partially reversible and therefore
tions of lead poisoning.
early detection of disease is very im-
Levels of delta-aminolevulinic acid
portant.
(ALA) in the urine are also used as a
This document outlines the medical
measure of lead exposure. Increasing
concentrations of ALA are believed to monitoring program as defined by the
result from the inhibition of the en- occupational safety and health stand-
zyme delta-aminolevulinic acid ard for inorganic lead. It reviews the
dehydrase (ALA-D). Although the test adverse health effects of lead poisoning
is relatively easy to perform, inexpen- and describes the important elements
sive, and rapid, the disadvantages in- of the history and physical examina-
clude variability in results, the neces- tions as they relate to these adverse ef-
sity to collect a complete 24 hour urine fects. Finally, the appropriate labora-
sample which has a specific gravity tory testing for evaluating lead expo-
greater than 1.010, and also the fact sure and toxicity is presented.
that ALA decomposes in the presence It is hoped that this review and dis-
of light. cussion will give the physician a better
The pattern of porphyrin excretion in understanding of the OSHA standard
the urine can also be helpful in identi- with the ultimate goal of protecting
fying lead intoxication. With lead poi- the health and well-being of the worker
soning, the urine concentrations of exposed to lead under his or her care.
coproporphyrins I and II, [58 FR 26627, May 4, 1993, as amended at 58
porphobilinogen and uroporphyrin I FR 34218, June 24, 1993; 61 FR 5510, Feb. 13,
rise. The most important increase, 1996; 63 FR 1296, Jan. 8, 1998; 70 FR 1143, Jan.
however, is that of coproporphyrin III; 5, 2005; 71 FR 16674, Apr. 3, 2006; 71 FR 50191,
levels may exceed 5,000 g/l in the urine Aug. 24, 2006; 73 FR 75588, Dec. 12, 2008; 76 FR
in lead poisoned individuals, but its 33611, June 8, 2011; 76 FR 80741, Dec. 27, 2011;
correlation with blood lead levels and 77 FR 17890, Mar. 26, 2012]
ZPP are not as good as those of ALA.
Increases in urinary porphyrins are not 1926.64 Process safety management
of highly hazardous chemicals.
diagnostic of lead toxicity and may be
seen in porphyria, some liver diseases, Purpose. This section contains re-
and in patients with high reticulocyte quirements for preventing or mini-
counts. mizing the consequences of cata-
Summary. The Occupational Safety strophic releases of toxic, reactive,
and Health Administrations interim flammable, or explosive chemicals.
standard for inorganic lead in the con- These releases may result in toxic, fire
struction industry places significant or explosion hazards.

121

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00131 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.64 29 CFR Ch. XVII (7112 Edition)

(a) Application. (1) This section ap- Highly hazardous chemical means a
plies to the following: substance possessing toxic, reactive,
(i) A process which involves a chem- flammable, or explosive properties and
ical at or above the specified threshold specified by paragraph (a)(1) of this
quantities listed in appendix A to this section.
section; Hot work means work involving elec-
(ii) A process which involves a Cat- tric or gas welding, cutting, brazing, or
egory 1 flammable gas (as defined in similar flame or spark-producing oper-
1910.1200(c)) or flammable liquid with ations.
a flashpoint below 100 F (37.8 C) on Normally unoccupied remote facility
site in one location, in a quantity of means a facility which is operated,
10,000 pounds (4535.9 kg) or more except maintained or serviced by employees
for: who visit the facility only periodically
(A) Hydrocarbon fuels used solely for to check its operation and to perform
workplace consumption as a fuel (e.g., necessary operating or maintenance
propane used for comfort heating, gaso- tasks. No employees are permanently
line for vehicle refueling), if such fuels stationed at the facility. Facilities
are not a part of a process containing meeting this definition are not contig-
another highly hazardous chemical uous with, and must be geographically
covered by this standard; remote from all other buildings, proc-
(B) Flammable liquids with a esses or persons.
flashpoint below 100 F (37.8 C) stored Process means any activity involving
in atmospheric tanks or transferred a highly hazardous chemical including
that are kept below their normal boil- any use, storage, manufacturing, han-
ing point without benefit of chilling or dling, or the on-site movement of such
refrigeration. chemicals, or combination of these ac-
(2) This section does not apply to: tivities. For purposes of this definition,
(i) Retail facilities; any group of vessels which are inter-
(ii) Oil or gas well drilling or serv- connected and separate vessels which
icing operations; or, are located such that a highly haz-
(iii) Normally unoccupied remote fa- ardous chemical could be involved in a
cilities. potential release shall be considered a
(b) Definitions. Atmospheric tank single process.
means a storage tank which has been Replacement in kind means a replace-
designed to operate at pressures from ment which satisfies the design speci-
atmospheric through 0.5 p.s.i.g. (pounds fication.
per square inch gauge, 3.45 Kpa). Trade secret means any confidential
Boiling point means the boiling point formula, pattern, process, device, infor-
of a liquid at a pressure of 14.7 pounds mation or compilation of information
per square inch absolute (p.s.i.a.) (760 that is used in an employers business,
mm.). For the purposes of this section, and that gives the employer an oppor-
where an accurate boiling point is un- tunity to obtain an advantage over
available for the material in question, competitors who do not know or use it.
or for mixtures which do not have a Appendix D contained in 1926.59 sets
constant boiling point, the 10 percent out the criteria to be used in evalu-
point of a distillation performed in ac- ating trade secrets.
cordance with the Standard Method of (c) Employee participation. (1) Employ-
Test for Distillation of Petroleum ers shall develop a written plan of ac-
Products, ASTM D-86-62, may be used tion regarding the implementation of
as the boiling point of the liquid. the employee participation required by
Catastrophic release means a major this paragraph.
uncontrolled emission, fire, or explo- (2) Employers shall consult with em-
sion, involving one or more highly haz- ployees and their representatives on
ardous chemicals, that presents serious the conduct and development of proc-
danger to employees in the workplace. ess hazards analyses and on the devel-
Facility means the buildings, con- opment of the other elements of proc-
tainers or equipment which contain a ess safety management in this stand-
process. ard.

122

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00132 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.64

(3) Employers shall provide to em- those affecting the safety and health of
ployees and their representatives ac- employees.
cess to process hazard analyses and to (ii) Where the original technical in-
all other information required to be de- formation no longer exists, such infor-
veloped under this standard. mation may be developed in conjunc-
(d) Process safety information. In ac- tion with the process hazard analysis
cordance with the schedule set forth in in sufficient detail to support the anal-
paragraph (e)(1) of this section, the em- ysis.
ployer shall complete a compilation of (3) Information pertaining to the equip-
written process safety information be- ment in the process. (i) Information per-
fore conducting any process hazard taining to the equipment in the process
analysis required by the standard. The shall include:
compilation of written process safety (A) Materials of construction;
information is to enable the employer (B) Piping and instrument diagrams
and the employees involved in oper- (P&IDs);
ating the process to identify and under- (C) Electrical classification;
stand the hazards posed by those proc- (D) Relief system design and design
esses involving highly hazardous basis;
chemicals. This process safety informa- (E) Ventilation system design;
tion shall include information per- (F) Design codes and standards em-
taining to the hazards of the highly ployed;
hazardous chemicals used or produced (G) Material and energy balances for
by the process, information pertaining processes built after May 26, 1992; and,
to the technology of the process, and (H) Safety systems (e.g. interlocks,
information pertaining to the equip- detection or suppression systems).
ment in the process. (ii) The employer shall document
(1) Information pertaining to the haz- that equipment complies with recog-
ards of the highly hazardous chemicals in nized and generally accepted good engi-
the process. This information shall con- neering practices.
sist of at least the following: (iii) For existing equipment designed
(i) Toxicity information; and constructed in accordance with
(ii) Permissible exposure limits; codes, standards, or practices that are
(iii) Physical data; no longer in general use, the employer
(iv) Reactivity data: shall determine and document that the
(v) Corrosivity data; equipment is designed, maintained, in-
(vi) Thermal and chemical stability spected, tested, and operating in a safe
data; and manner.
(vii) Hazardous effects of inadvertent (e) Process hazard analysis. (1) The
mixing of different materials that employer shall perform an initial proc-
could foreseeably occur. ess hazard analysis (hazard evaluation)
NOTE TO PARAGRAPH (d)(1): Safety data on processes covered by this standard.
sheets meeting the requirements of
The process hazard analysis shall be
1910.1200(g) may be used to comply with this
requirement to the extent they contain the appropriate to the complexity of the
information required by this paragraph process and shall identify, evaluate,
(d)(1). and control the hazards involved in the
(2) Information pertaining to the tech- process. Employers shall determine and
nology of the process. (i) Information document the priority order for con-
concerning the technology of the proc- ducting process hazard analyses based
ess shall include at least the following: on a rationale which includes such con-
(A) A block flow diagram or sim- siderations as extent of the process
plified process flow diagram (see appen- hazards, number of potentially affected
dix B to this section); employees, age of the process, and op-
(B) Process chemistry; erating history of the process. The
(C) Maximum intended inventory; process hazard analysis shall be con-
(D) Safe upper and lower limits for ducted as soon as possible, but not
such items as temperatures, pressures, later than the following schedule:
flows or compositions; and, (i) No less than 25 percent of the ini-
(E) An evaluation of the con- tial process hazards analyses shall be
sequences of deviations, including completed by May 26, 1994;

123

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00133 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.64 29 CFR Ch. XVII (7112 Edition)

(ii) No less than 50 percent of the ini- in engineering and process operations,
tial process hazards analyses shall be and the team shall include at least one
completed by May 26, 1995; employee who has experience and
(iii) No less than 75 percent of the knowledge specific to the process being
initial process hazards analyses shall evaluated. Also, one member of the
be completed by May 26, 1996; team must be knowledgeable in the
(iv) All initial process hazards anal- specific process hazard analysis meth-
yses shall be completed by May 26, 1997. odology being used.
(v) Process hazards analyses com- (5) The employer shall establish a
pleted after May 26, 1987 which meet system to promptly address the teams
the requirements of this paragraph are findings and recommendations; assure
acceptable as initial process hazards that the recommendations are resolved
analyses. These process hazard anal- in a timely manner and that the reso-
yses shall be updated and revalidated, lution is documented; document what
based on their completion date, in ac- actions are to be taken; complete ac-
cordance with paragraph (e)(6) of this tions as soon as possible; develop a
standard. written schedule of when these actions
(2) The employer shall use one or are to be completed; communicate the
more of the following methodologies actions to operating, maintenance and
that are appropriate to determine and other employees whose work assign-
evaluate the hazards of the process ments are in the process and who may
being analyzed. be affected by the recommendations or
(i) What-If; actions.
(ii) Checklist; (6) At least every five (5) years after
(iii) What-If/Checklist; the completion of the initial process
(iv) Hazard and Operability Study hazard analysis, the process hazard
(HAZOP); analysis shall be updated and revali-
(v) Failure Mode and Effects Analysis dated by a team meeting the require-
(FMEA); ments in paragraph (e)(4) of this sec-
(vi) Fault-Tree Analysis; or tion, to assure that the process hazard
(vii) An appropriate equivalent meth- analysis is consistent with the current
odology. process.
(3) The process hazard analysis shall (7) Employers shall retain process
address: hazards analyses and updates or re-
(i) The hazards of the process; validations for each process covered by
(ii) The identification of any previous this section, as well as the documented
incident which had a likely potential resolution of recommendations de-
for catastrophic consequences in the scribed in paragraph (e)(5) of this sec-
workplace; tion for the life of the process.
(iii) Engineering and administrative (f) Operating procedures. (1) The em-
controls applicable to the hazards and ployer shall develop and implement
their interrelationships such as appro- written operating procedures that pro-
priate application of detection meth- vide clear instructions for safely con-
odologies to provide early warning of ducting activities involved in each cov-
releases. (Acceptable detection meth- ered process consistent with the proc-
ods might include process monitoring ess safety information and shall ad-
and control instrumentation with dress at least the following elements.
alarms, and detection hardware such as (i) Steps for each operating phase:
hydrocarbon sensors.); (A) Initial startup;
(iv) Consequences of failure of engi- (B) Normal operations;
neering and administrative controls; (C) Temporary operations;
(v) Facility siting; (D) Emergency shutdown including
(vi) Human factors; and the conditions under which emergency
(vii) A qualitative evaluation of a shutdown is required, and the assign-
range of the possible safety and health ment of shutdown responsibility to
effects of failure of controls on employ- qualified operators to ensure that
ees in the workplace. emergency shutdown is executed in a
(4) The process hazard analysis shall safe and timely manner.
be performed by a team with expertise (E) Emergency operations;

124

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00134 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.64

(F) Normal shutdown; and, hazards, emergency operations includ-


(G) Startup following a turnaround, ing shutdown, and safe work practices
or after an emergency shutdown. applicable to the employees job tasks.
(ii) Operating limits: (ii) In lieu of initial training for
(A) Consequences of deviation; and those employees already involved in
(B) Steps required to correct or avoid operating a process on May 26, 1992, an
deviation. employer may certify in writing that
(iii) Safety and health consider- the employee has the required knowl-
ations: edge, skills, and abilities to safely
(A) Properties of, and hazards pre- carry out the duties and responsibil-
sented by, the chemicals used in the ities as specified in the operating pro-
process; cedures.
(B) Precautions necessary to prevent (2) Refresher training. Refresher train-
exposure, including engineering con- ing shall be provided at least every
trols, administrative controls, and per- three years, and more often if nec-
sonal protective equipment; essary, to each employee involved in
(C) Control measures to be taken if operating a process to assure that the
physical contact or airborne exposure employee understands and adheres to
occurs; the current operating procedures of the
(D) Quality control for raw materials process. The employer, in consultation
and control of hazardous chemical in- with the employees involved in oper-
ventory levels; and, ating the process, shall determine the
(E) Any special or unique hazards. appropriate frequency of refresher
(iv) Safety systems and their func- training.
tions.
(3) Training documentation. The em-
(2) Operating procedures shall be
ployer shall ascertain that each em-
readily accessible to employees who
ployee involved in operating a process
work in or maintain a process.
has received and understood the train-
(3) The operating procedures shall be
ing required by this paragraph. The
reviewed as often as necessary to as-
employer shall prepare a record which
sure that they reflect current oper-
ating practice, including changes that contains the identity of the employee,
result from changes in process chemi- the date of training, and the means
cals, technology, and equipment, and used to verify that the employee under-
changes to facilities. The employer stood the training.
shall certify annually that these oper- (h) Contractors(1) Application. This
ating procedures are current and accu- paragraph applies to contractors per-
rate. forming maintenance or repair, turn-
(4) The employer shall develop and around, major renovation, or specialty
implement safe work practices to pro- work on or adjacent to a covered proc-
vide for the control of hazards during ess. It does not apply to contractors
operations such as lockout/tagout; con- providing incidental services which do
fined space entry; opening process not influence process safety, such as
equipment or piping; and control over janitorial work, food and drink serv-
entrance into a facility by mainte- ices, laundry, delivery or other supply
nance, contractor, laboratory, or other services.
support personnel. These safe work (2) Employer responsibilities. (i) The
practices shall apply to employees and employer, when selecting a contractor,
contractor employees. shall obtain and evaluate information
(g) Training(1) Initial training. (i) regarding the contract employers safe-
Each employee presently involved in ty performance and programs.
operating a process, and each employee (ii) The employer shall inform con-
before being involved in operating a tract employers of the known potential
newly assigned process, shall be fire, explosion, or toxic release hazards
trained in an overview of the process related to the contractors work and
and in the operating procedures as the process.
specified in paragraph (f) of this sec- (iii) The employer shall explain to
tion. The training shall include empha- contract employers the applicable pro-
sis on the specific safety and health visions of the emergency action plan

125

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00135 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.64 29 CFR Ch. XVII (7112 Edition)

required by paragraph (n) of this sec- (2) The pre-startup safety review
tion. shall confirm that prior to the intro-
(iv) The employer shall develop and duction of highly hazardous chemicals
implement safe work practices con- to a process:
sistent with paragraph (f)(4) of this sec- (i) Construction and equipment is in
tion, to control the entrance, presence accordance with design specifications;
and exit of contract employers and (ii) Safety, operating, maintenance,
contract employees in covered process and emergency procedures are in place
areas. and are adequate;
(v) The employer shall periodically (iii) For new facilities, a process haz-
evaluate the performance of contract ard analysis has been performed and
employers in fulfilling their obliga- recommendations have been resolved
tions as specified in paragraph (h)(3) of or implemented before startup; and
this section. modified facilities meet the require-
(vi) The employer shall maintain a ments contained in management of
contract employee injury and illness change, paragraph (l).
log related to the contractors work in (iv) Training of each employee in-
process areas. volved in operating a process has been
(3) Contract employer responsibilities. completed.
(i) The contract employer shall assure (j) Mechanical integrity(1) Applica-
that each contract employee is trained tion. Paragraphs (j)(2) through (j)(6) of
in the work practices necessary to safe- this section apply to the following
ly perform his/her job. process equipment:
(ii) The contract employer shall as- (i) Pressure vessels and storage
sure that each contract employee is in- tanks;
structed in the known potential fire, (ii) Piping systems (including piping
explosion, or toxic release hazards re- components such as valves);
lated to his/her job and the process, (iii) Relief and vent systems and de-
and the applicable provisions of the vices;
emergency action plan.
(iv) Emergency shutdown systems;
(iii) The contract employer shall doc-
(v) Controls (including monitoring
ument that each contract employee
devices and sensors, alarms, and inter-
has received and understood the train-
locks) and,
ing required by this paragraph. The
contract employer shall prepare a (vi) Pumps.
record which contains the identity of (2) Written procedures. The employer
the contract employee, the date of shall establish and implement written
training, and the means used to verify procedures to maintain the on-going
that the employee understood the integrity of process equipment.
training. (3) Training for process maintenance
(iv) The contract employer shall as- activities. The employer shall train each
sure that each contract employee fol- employee involved in maintaining the
lows the safety rules of the facility in- on-going integrity of process equip-
cluding the safe work practices re- ment in an overview of that process
quired by paragraph (f)(4) of this sec- and its hazards and in the procedures
tion. applicable to the employees job tasks
(v) The contract employer shall ad- to assure that the employee can per-
vise the employer of any unique haz- form the job tasks in a safe manner.
ards presented by the contract employ- (4) Inspection and testing. (i) Inspec-
ers work, or of any hazards found by tions and tests shall be performed on
the contract employers work. process equipment.
(i) Pre-startup safety review. (1) The (ii) Inspection and testing procedures
employer shall perform a pre-startup shall follow recognized and generally
safety review for new facilities and for accepted good engineering practices.
modified facilities when the modifica- (iii) The frequency of inspections and
tion is significant enough to require a tests of process equipment shall be con-
change in the process safety informa- sistent with applicable manufacturers
tion. recommendations and good engineering

126

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00136 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.64

practices, and more frequently if deter- (2) The procedures shall assure that
mined to be necessary by prior oper- the following considerations are ad-
ating experience. dressed prior to any change:
(iv) The employer shall document (i) The technical basis for the pro-
each inspection and test that has been posed change;
performed on process equipment. The (ii) Impact of change on safety and
documentation shall identify the date health;
of the inspection or test, the name of (iii) Modifications to operating pro-
the person who performed the inspec- cedures;
tion or test, the serial number or other (iv) Necessary time period for the
identifier of the equipment on which change; and,
the inspection or test was performed, a (v) Authorization requirements for
description of the inspection or test the proposed change.
performed, and the results of the in- (3) Employees involved in operating a
spection or test. process and maintenance and contract
(5) Equipment deficiencies. The em- employees whose job tasks will be af-
ployer shall correct deficiencies in fected by a change in the process shall
equipment that are outside acceptable be informed of, and trained in, the
limits (defined by the process safety in- change prior to start-up of the process
formation in paragraph (d) of this sec- or affected part of the process.
tion) before further use or in a safe and
(4) If a change covered by this para-
timely manner when necessary means
graph results in a change in the process
are taken to assure safe operation.
safety information required by para-
(6) Quality assurance. (i) In the con-
graph (d) of this section, such informa-
struction of new plants and equipment,
tion shall be updated accordingly.
the employer shall assure that equip-
(5) If a change covered by this para-
ment as it is fabricated is suitable for
graph results in a change in the oper-
the process application for which they
ating procedures or practices required
will be used.
by paragraph (f) of this section, such
(ii) Appropriate checks and inspec-
procedures or practices shall be up-
tions shall be performed to assure that
dated accordingly.
equipment is installed properly and
consistent with design specifications (m) Incident investigation. (1) The em-
and the manufacturers instructions. ployer shall investigate each incident
(iii) The employer shall assure that which resulted in, or could reasonably
maintenance materials, spare parts and have resulted in a catastrophic release
equipment are suitable for the process of highly hazardous chemical in the
application for which they will be used. workplace.
(k) Hot work permit. (1) The employer (2) An incident investigation shall be
shall issue a hot work permit for hot initiated as promptly as possible, but
work operations conducted on or near a not later than 48 hours following the
covered process. incident.
(2) The permit shall document that (3) An incident investigation team
the fire prevention and protection re- shall be established and consist of at
quirements in 29 CFR 1926.352 have least one person knowledgeable in the
been implemented prior to beginning process involved, including a contract
the hot work operations; it shall indi- employee if the incident involved work
cate the date(s) authorized for hot of the contractor, and other persons
work; and identify the object on which with appropriate knowledge and experi-
hot work is to be performed. The per- ence to thoroughly investigate and
mit shall be kept on file until comple- analyze the incident.
tion of the hot work operations. (4) A report shall be prepared at the
(l) Management of change. (1) The em- conclusion of the investigation which
ployer shall establish and implement includes at a minimum:
written procedures to manage changes (i) Date of incident;
(except for replacements in kind) to (ii) Date investigation began;
process chemicals, technology, equip- (iii) A description of the incident;
ment, and procedures; and, changes to (iv) The factors that contributed to
facilities that affect a covered process. the incident; and,

127

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00137 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.64 29 CFR Ch. XVII (7112 Edition)

(v) Any recommendations resulting tion), emergency planning and response


from the investigation. (paragraph (n) of this section) and com-
(5) The employer shall establish a pliance audits (paragraph (o) of this
system to promptly address and resolve section) without regard to possible
the incident report findings and rec- trade secret status of such informa-
ommendations. Resolutions and correc- tion.
tive actions shall be documented. (2) Nothing in this paragraph shall
(6) The report shall be reviewed with preclude the employer from requiring
all affected personnel whose job tasks the persons to whom the information is
are relevant to the incident findings in- made available under paragraph (p)(1)
cluding contract employees where ap- of this section to enter into confiden-
plicable. tiality agreements not to disclose the
(7) Incident investigation reports information as set forth in 29 CFR
shall be retained for five years. 1926.59.
(n) Emergency planning and re- (3) Subject to the rules and proce-
sponse. The employer shall establish dures set forth in 29 CFR 1926.59(i) (1)
and implement an emergency action through (12), employees and their des-
plan for the entire plant in accordance ignated representatives shall have ac-
with the provisions of 29 CFR 1926.35(a). cess to trade secret information con-
In addition, the emergency action plan tained within the process hazard anal-
shall include procedures for handling ysis and other documents required to
small releases. Employers covered be developed by this standard.
under this standard may also be sub-
ject to the hazardous waste and emer- APPENDIX A TO 1926.64LIST OF HIGHLY HAZ-
ARDOUS CHEMICALS, TOXICS AND REACTIVES
gency response provisions contained in
(MANDATORY)
29 CFR 1926.65(a), (p) and (q).
(o) Compliance audits. (1) Employers This appendix contains a listing of toxic
shall certify that they have evaluated and reactive highly hazardous chemicals
compliance with the provisions of this which present a potential for a catastrophic
event at or above the threshold quantity.
section at least every three years to
verify that the procedures and prac-
Chemical Name CAS* TQ**
tices developed under the standard are
adequate and are being followed. Acetaldehyde ......................... 75-07-0 2500
(2) The compliance audit shall be Acrolein (2-Propenal) ............ 107-02-8 150
conducted by at least one person Acrylyl Chloride ..................... 814-68-6 250
knowledgeable in the process. Allyl Chloride ......................... 107-05-1 1000
(3) A report of the findings of the Allylamine .............................. 107-11-9 1000
audit shall be developed. Alkylaluminums ..................... Varies 5000
(4) The employer shall promptly de- Ammonia, Anhydrous ............ 7664-41-7 10000
termine and document an appropriate Ammonia solutions (greater
response to each of the findings of the than 44% ammonia by
weight) ............................... 7664-41-7 15000
compliance audit, and document that
Ammonium Perchlorate ......... 7790-98-9 500
deficiencies have been corrected. Ammonium Permanganate ... 7787-36-2 7500
(5) Employers shall retain the two (2) Arsine (also called Arsenic
most recent compliance audit reports. Hydride) ............................. 7784-42-1 100
(p) Trade secrets. (1) Employers shall Bis(Chloromethyl) Ether ........ 542-88-1 100
make all information necessary to Boron Trichloride ................... 10294-34-5 2500
comply with the section available to Boron Trifluoride .................... 7637-07-2 250
those persons responsible for compiling Bromine ................................. 7726-95-6 1500
the process safety information (re- Bromine Chloride .................. 13863-41-7 1500
quired by paragraph (d) of this section), Bromine Pentafluoride ........... 7789-30-2 2500
those assisting in the development of Bromine Trifluoride ................ 7787-71-5 15000
3-Bromopropyne (also called
the process hazard analysis (required
Propargyl Bromide) ............ 106-96-7 100
by paragraph (e) of this section), those Butyl Hydroperoxide (Ter-
responsible for developing the oper- tiary) ................................... 75-91-2 5000
ating procedures (required by para- Butyl Perbenzoate (Tertiary) 614-45-9 7500
graph (f) of this section), and those in- Carbonyl Chloride (see Phos-
volved in incident investigations (re- gene) .................................. 75-44-5 100
quired by paragraph (m) of this sec- * Carbonyl Fluoride ............... 353-50-4 2500

128

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00138 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.64

Chemical Name CAS* TQ** Chemical Name CAS* TQ**

Cellulose Nitrate (concentra- Ketene ................................... 463-51-4 100


tion greater than 12.6% ni- Methacrylaldehyde ................ 78-85-3 1000
trogen ................................. 9004-70-0 2500 Methacryloyl Chloride ............ 920-46-7 150
Chlorine ................................. 7782-50-5 1500 Methacryloyloxyethyl
Chlorine Dioxide .................... 10049-04-4 1000 Isocyanate ......................... 30674-80-7 100
Chlorine Pentrafluoride ......... 13637-63-3 1000 Methyl Acrylonitrile ................ 126-98-7 250
Chlorine Trifluoride ................ 7790-91-2 1000 Methylamine, Anhydrous ....... 74-89-5 1000
Chlorodiethylaluminum (also Methyl Bromide ..................... 74-83-9 2500
called Diethylaluminum Methyl Chloride ..................... 74-87-3 15000
Chloride) ............................ 96-10-6 5000 Methyl Chloroformate ............ 79-22-1 500
1-Chloro-2,4-Dinitrobenzene 97-00-7 5000 Methyl Ethyl Ketone Peroxide
Chloromethyl Methyl Ether .... 107-30-2 500 (concentration greater than
Chloropicrin ........................... 76-06-2 500 60%) .................................. 1338-23-4 5000
Chloropicrin and Methyl Bro- Methyl Fluoroacetate ............. 453-18-9 100
mide mixture ...................... None 1500 Methyl Fluorosulfate .............. 421-20-5 100
Chloropicrin and Methyl Chlo- Methyl Hydrazine .................. 60-34-4 100
ride mixture ........................ None 1500 Methyl Iodide ......................... 74-88-4 7500
Cumene Hydroperoxide ........ 80-15-9 5000 Methyl Isocyanate ................. 624-83-9 250
Cyanogen .............................. 460-19-5 2500 Methyl Mercaptan .................. 74-93-1 5000
Cyanogen Chloride ............... 506-77-4 500 Methyl Vinyl Ketone .............. 79-84-4 100
Cyanuric Fluoride .................. 675-14-9 100 Methyltrichlorosilane .............. 75-79-6 500
Diacetyl Peroxide (concentra- Nickel Carbonly (Nickel
tion greater than 70%) ....... 110-22-5 5000 Tetracarbonyl) .................... 13463-39-3 150
Diazomethane ....................... 334-88-3 500 Nitric Acid (94.5% by weight
Dibenzoyl Peroxide ............... 94-36-0 7500 or greater) .......................... 7697-37-2 500
Diborane ................................ 19287-45-7 100 Nitric Oxide ............................ 10102-43-9 250
Dibutyl Peroxide (Tertiary) .... 110-05-4 5000 Nitroaniline (para Nitroaniline 100-01-6 5000
Dichloro Acetylene ................ 7572-29-4 250 Nitromethane ......................... 75-52-5 2500
Dichlorosilane ........................ 4109-96-0 2500 Nitrogen Dioxide .................... 10102-44-0 250
Diethylzinc ............................. 557-20-0 10000 Nitrogen Oxides (NO; NO(2);
Diisopropyl N2O4; N2O3) ..................... 10102-44-0 250
Peroxydicarbonate ............. 105-64-6 7500 Nitrogen Tetroxide (also
Dilauroyl Peroxide ................. 105-74-8 7500 called Nitrogen Peroxide) .. 10544-72-6 250
Dimethyldichlorosilane .......... 75-78-5 1000 Nitrogen Trifluoride ................ 7783-54-2 5000
Dimethylhydrazine, 1,1- ........ 57-14-7 1000 Nitrogen Trioxide ................... 10544-73-7 250
Dimethylamine, Anhydrous ... 124-40-3 2500 Oleum (65% to 80% by
2,4-Dinitroaniline ................... 97-02-9 5000 weight; also called Fuming
Ethyl Methyl Ketone Peroxide Sulfuric Acid) ..................... 8014-94-7 1000
(also Methyl Ethyl Ketone Osmium Tetroxide ................. 20816-12-0 100
Peroxide; concentration Oxygen Difluoride (Fluorine
greater than 60%) .............. 1338-23-4 5000 Monoxide) .......................... 7783-41-7 100
Ethyl Nitrite ............................ 109-95-5 5000 Ozone .................................... 10028-15-6 100
Ethylamine ............................. 75-04-7 7500 Pentaborane .......................... 19624-22-7 100
Ethylene Fluorohydrin ........... 371-62-0 100 Peracetic Acid (concentration
Ethylene Oxide ...................... 75-21-8 5000 greater 60% Acetic Acid;
Ethyleneimine ........................ 151-56-4 1000 also called Peroxyacetic
Fluorine ................................. 7782-41-4 1000 Acid) ................................... 79-21-0 1000
Formaldehyde (Formalin) ...... 50-00-0 1000 Perchloric Acid (concentration
Furan ..................................... 110-00-9 500 greater than 60% by
Hexafluoroacetone ................ 684-16-2 5000 weight) ............................... 7601-90-3 5000
Hydrochloric Acid, Anhydrous 7647-01-0 5000 Perchloromethyl Mercaptan .. 594-42-3 150
Hydrofluoric Acid, Anhydrous 7664-39-3 1000 Perchloryl Fluoride ................ 7616-94-6 5000
Hydrogen Bromide ................ 10035-10-6 5000 Peroxyacetic Acid (concentra-
Hydrogen Chloride ................ 7647-01-0 5000 tion greater than 60% Ace-
Hydrogen Cyanide, Anhy- tic Acid; also called Per-
drous .................................. 74-90-8 1000 acetic Acid) ........................ 79-21-0 1000
Hydrogen Fluoride ................. 7664-39-3 1000 Phosgene (also called Car-
Hydrogen Peroxide (52% by bonyl Chloride) .................. 75-44-5 100
weight or greater) .............. 7722-84-1 7500 Phosphine (Hydrogen
Hydrogen Selenide ................ 7783-07-5 150 Phosphide) ......................... 7803-51-2 100
Hydrogen Sulfide ................... 7783-06-4 1500 Phosphorus Oxychloride
Hydroxylamine ....................... 7803-49-8 2500 (also called Phosphoryl
Iron, Pentacarbonyl ............... 13463-40-6 250 Chloride) ............................ 10025-87-3 1000
Isopropylamine ...................... 75-31-0 5000 Phosphorus Trichloride ......... 7719-12-2 1000

129

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00139 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.64 29 CFR Ch. XVII (7112 Edition)

Chemical Name CAS* TQ** Chemical Name CAS* TQ**

Phosphoryl Chloride (also Tetrafluoroethylene ............... 116-14-3 5000


called Phosphorus Tetrafluorohydrazine ............. 10036-47-2 5000
Oxychloride) ....................... 10025-87-3 1000 Tetramethyl Lead .................. 75-74-1 1000
Propargyl Bromide ................ 106-96-7 100 Thionyl Chloride .................... 7719-09-7 250
Propyl Nitrate ........................ 627-3-4 2500
Trichloro (chloromethyl) Sil-
Sarin ...................................... 107-44-8 100
ane ..................................... 1558-25-4 100
Selenium Hexafluoride .......... 7783-79-1 1000
Stibine (Antimony Hydride) ... 7803-52-3 500 Trichloro (dichlorophenyl) Sil-
Sulfur Dioxide (liquid) ............ 7446-09-5 1000 ane ..................................... 27137-85-5 2500
Sulfur Pentafluoride ............... 5714-22-7 250 Trichlorosilane ....................... 10025-78-2 5000
Sulfur Tetrafluoride ................ 7783-60-0 250 Trifluorochloroethylene .......... 79-38-9 10000
Sulfur Trioxide (also called Trimethyoxysilane ................. 2487-90-3 1500
Sulfuric Anhydride) ............ 7446-11-9 1000
Sulfuric Anhydride (also * Chemical Abstract Service Number
called Sulfur Trioxide) ........ 7446-11-9 1000 ** Threshold Quantity in Pounds (Amount
Tellurium Hexafluoride .......... 7783-80-4 250 necessary to be covered by this standard.)

130

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00140 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.64

APPENDIX B TO 1926.64BLOCK FLOW DIAGRAM AND SIMPLIFIED PROCESS


FLOW DIAGRAM (NONMANDATORY)

131
EC30OC91.008</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00141 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.64 29 CFR Ch. XVII (7112 Edition)

APPENDIX C TO 1926.64COMPLIANCE GUIDE- ment program requires a systematic ap-


LINES AND RECOMMENDATIONS FOR PROCESS proach to evaluating the whole process.
SAFETY MANAGEMENT (NONMANDATORY) Using this approach the process design, proc-
This appendix serves as a nonmandatory ess technology, operational and maintenance
guideline to assist employers and employees activities and procedures, nonroutine activi-
in complying with the requirements of this ties and procedures, emergency preparedness
section, as well as provides other helpful rec- plans and procedures, training programs, and
ommendations and information. Examples other elements which impact the process are
presented in this appendix are not the only all considered in the evaluation. The various
means of achieving the performance goals in lines of defense that have been incorporated
the standard. This appendix neither adds nor into the design and operation of the process
detracts from the requirements of the stand- to prevent or mitigate the release of haz-
ard. ardous chemicals need to be evaluated and
1. Introduction to Process Safety Manage- strengthened to assure their effectiveness at
ment. The major objective of process safety each level. Process safety management is the
management of highly hazardous chemicals proactive identification, evaluation and
is to prevent unwanted releases of hazardous mitigation or prevention of chemical re-
chemicals especially into locations which
leases that could occur as a result of failures
could expose employees and others to serious
in process, procedures or equipment.
hazards. An effective process safety manage-

132
EC30OC91.009</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00142 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.64
The process safety management standard ready established means and methods to
targets highly hazardous chemicals that keep employees and their representatives in-
have the potential to cause a catastrophic formed about relevant safety and health
incident. This standard as a whole is to aid issues and employers may be able to adapt
employers in their efforts to prevent or miti- these practices and procedures to meet their
gate episodic chemical releases that could obligations under this standard. Employers
lead to a catastrophe in the workplace and who have not implemented an occupational
possibly to the surrounding community. To safety and health program may wish to form
control these types of hazards, employers a safety and health committee of employees
need to develop the necessary expertise, ex- and management representatives to help the
periences, judgement and proactive initia- employer meet the obligations specified by
tive within their workforce to properly im- this standard. These committees can become
plement and maintain an effective process a significant ally in helping the employer to
safety management program as envisioned in implement and maintain an effective process
the OSHA standard. This OSHA standard is safety management program for all employ-
required by the Clean Air Act Amendments ees.
as is the Environmental Protection Agencys 3. Process Safety Information. Complete and
Risk Management Plan. Employers, who accurate written information concerning
merge the two sets of requirements into process chemicals, process technology, and
their process safety management program, process equipment is essential to an effective
will better assure full compliance with each process safety management program and to a
as well as enhancing their relationship with process hazards analysis. The compiled infor-
the local community. mation will be a necessary resource to a va-
While OSHA believes process safety man- riety of users including the team that will
agement will have a positive effect on the perform the process hazards analysis as re-
safety of employees in workplaces and also quired under paragraph (e); those developing
offers other potential benefits to employers
the training programs and the operating pro-
(increased productivity), smaller businesses
cedures; contractors whose employees will be
which may have limited resources available
working with the process; those conducting
to them at this time, might consider alter-
the pre-startup reviews; local emergency
native avenues of decreasing the risks asso-
preparedness planners; and insurance and en-
ciated with highly hazardous chemicals at
forcement officials.
their workplaces. One method which might
be considered is the reduction in the inven- The information to be compiled about the
tory of the highly hazardous chemical. This chemicals, including process intermediates,
reduction in inventory will result in a reduc- needs to be comprehensive enough for an ac-
tion of the risk or potential for a cata- curate assessment of the fire and explosion
strophic incident. Also, employers including characteristics, reactivity hazards, the safe-
small employers may be able to establish ty and health hazards to workers, and the
more efficient inventory control by reducing corrosion and erosion effects on the process
the quantities of highly hazardous chemicals equipment and monitoring tools. Current
on site below the established threshold quan- material safety data sheet (MSDS) informa-
tities. This reduction can be accomplished tion can be used to help meet this require-
by ordering smaller shipments and maintain- ment which must be supplemented with
ing the minimum inventory necessary for ef- process chemistry information including
ficient and safe operation. When reduced in- runaway reaction and over pressure hazards
ventory is not feasible, then the employer if applicable.
might consider dispersing inventory to sev- Process technology information will be a
eral locations on site. Dispersing storage part of the process safety information pack-
into locations where a release in one loca- age and it is expected that it will include
tion will not cause a release in another loca- diagrams of the type shown in appendix B of
tion is a practical method to also reduce the this section as well as employer established
risk or potential for catastrophic incidents. criteria for maximum inventory levels for
2. Employee Involvement in Process Safety process chemicals; limits beyond which
Management. Section 304 of the Clean Air Act would be considered upset conditions; and a
Amendments states that employers are to qualitative estimate of the consequences or
consult with their employees and their rep- results of deviation that could occur if oper-
resentatives regarding the employers efforts ating beyond the established process limits.
in the development and implementation of Employers are encouraged to use diagrams
the process safety management program ele- which will help users understand the process.
ments and hazard assessments. Section 304 A block flow diagram is used to show the
also requires employers to train and educate major process equipment and inter-
their employees and to inform affected em- connecting process flow lines and show flow
ployees of the findings from incident inves- rates, stream composition, temperatures,
tigations required by the process safety man- and pressures when necessary for clarity.
agement program. Many employers, under The block flow diagram is a simplified dia-
their safety and health programs, have al- gram.

133

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00143 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.64 29 CFR Ch. XVII (7112 Edition)
Process flow diagrams are more complex tant elements of the process safety manage-
and will show all main flow streams includ- ment program. A PHA is an organized and
ing valves to enhance the understanding of systematic effort to identify and analyze the
the process, as well as pressures and tem- significance of potential hazards associated
peratures on all feed and product lines with- with the processing or handling of highly
in all major vessels, in and out of headers hazardous chemicals. A PHA provides infor-
and heat exchangers, and points of pressure mation which will assist employers and em-
and temperature control. Also, materials of
ployees in making decisions for improving
construction information, pump capacities
safety and reducing the consequences of un-
and pressure heads, compressor horsepower
and vessel design pressures and temperatures wanted or unplanned releases of hazardous
are shown when necessary for clarity. In ad- chemicals. A PHA is directed toward ana-
dition, major components of control loops lyzing potential causes and consequences of
are usually shown along with key utilities fires, explosions, releases of toxic or flam-
on process flow diagrams. mable chemicals and major spills of haz-
Piping and instrument diagrams (P&Ids) ardous chemicals. The PHA focuses on equip-
may be the more appropriate type of dia- ment, instrumentation, utilities, human ac-
grams to show some of the above details and tions (routine and nonroutine), and external
to display the information for the piping de- factors that might impact the process. These
signer and engineering staff. The P&IDs are considerations assist in determining the haz-
to be used to describe the relationships be- ards and potential failure points or failure
tween equipment and instrumentation as modes in a process.
well as other relevant information that will The selection of a PHA methodology or
enhance clarity. Computer software pro-
technique will be influenced by many factors
grams which do P&Ids or other diagrams
including the amount of existing knowledge
useful to the information package, may be
used to help meet this requirement. about the process. Is it a process that has
The information pertaining to process been operated for a long period of time with
equipment design must be documented. In little or no innovation and extensive experi-
other words, what were the codes and stand- ence has been generated with its use? Or, is
ards relied on to establish good engineering it a new process or one which has been
practice. These codes and standards are pub- changed frequently by the inclusion of inno-
lished by such organizations as the American vative features? Also, the size and com-
Society of Mechanical Engineers, American plexity of the process will influence the deci-
Petroleum Institute, American National sion as to the appropriate PHA methodology
Standards Institute, National Fire Protec- to use. All PHA methodologies are subject to
tion Association, American Society for Test- certain limitations. For example, the check-
ing and Materials, National Board of Boiler list methodology works well when the proc-
and Pressure Vessel Inspectors, National As- ess is very stable and no changes are made,
sociation of Corrosion Engineers, American but it is not as effective when the process
Society of Exchange Manufacturers Associa-
has undergone extensive change. The check-
tion, and model building code groups.
In addition, various engineering societies list may miss the most recent changes and
issue technical reports which impact process consequently the changes would not be eval-
design. For example, the American Institute uated. Another limitation to be considered
of Chemical Engineers has published tech- concerns the assumptions made by the team
nical reports on topics such as two phase or analyst. The PHA is dependent on good
flow for venting devices. This type of tech- judgement and the assumptions made during
nically recognized report would constitute the study need to be documented and under-
good engineering practice. stood by the team and reviewer and kept for
For existing equipment designed and con- a future PHA.
structed many years ago in accordance with The team conducting the PHA need to un-
the codes and standards available at that derstand the methodology that is going to be
time and no longer in general use today, the used. A PHA team can vary in size from two
employer must document which codes and people to a number of people with varied
standards were used and that the design and operational and technical backgrounds.
construction along with the testing, inspec- Some team members may only be a part of
tion and operation are still suitable for the the team for a limited time. The team leader
intended use. Where the process technology
needs to be fully knowledgeable in the proper
requires a design which departs from the ap-
implementation of the PHA methodology
plicable codes and standards, the employer
that is to be used and should be impartial in
must document that the design and con-
struction is suitable for the intended pur- the evaluation. The other full or part time
pose. team members need to provide the team with
4. Process Hazard Analysis. A process hazard expertise in areas such as process tech-
analysis (PHA), sometimes called a process nology, process design, operating procedures
hazard evaluation, is one of the most impor-

134

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00144 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.64
and practices, including how the work is ac- less data, P&IDs, and process information is
tually performed, alarms, emergency proce- needed to perform a process hazard analysis.
dures, instrumentation, maintenance proce- Many small businesses have processes that
dures, both routine and nonroutine tasks, in- are not unique, such as cold storage lockers
cluding how the tasks are authorized, pro- or water treatment facilities. Where em-
curement of parts and supplies, safety and ployer associations have a number of mem-
health, and any other relevant subject as the bers with such facilities, a generic PHA,
need dictates. At least one team member evolved from a checklist or what-if ques-
must be familiar with the process. tions, could be developed and used by each
The ideal team will have an intimate employer effectively to reflect his/her par-
knowledge of the standards, codes, specifica- ticular process; this would simplify compli-
tions and regulations applicable to the proc- ance for them.
ess being studied. The selected team mem- When the employer has a number of proc-
bers need to be compatible and the team esses which require a PHA, the employer
leader needs to be able to manage the team must set up a priority system of which PHAs
and the PHA study. The team needs to be to conduct first. A preliminary or gross haz-
able to work together while benefiting from ard analysis may be useful in prioritizing the
the expertise of others on the team or out- processes that the employer has determined
side the team, to resolve issues, and to forge are subject to coverage by the process safety
a consensus on the findings of the study and management standard. Consideration should
the recommendations. first be given to those processes with the po-
The application of a PHA to a process may tential of adversely affecting the largest
involve the use of different methodologies number of employees. This prioritizing
for various parts of the process. For example, should consider the potential severity of a
a process involving a series of unit oper- chemical release, the number of potentially
ations of varying sizes, complexities, and affected employees, the operating history of
ages may use different methodologies and the process such as the frequency of chem-
team members for each operation. Then the ical releases, the age of the process and any
conclusions can be integrated into one final other relevant factors. These factors would
study and evaluation. A more specific exam- suggest a ranking order and would suggest
ple is the use of a checklist PHA for a stand- either using a weighing factor system or a
ard boiler or heat exchanger and the use of a systematic ranking method. The use of a
Hazard and Operability PHA for the overall preliminary hazard analysis would assist an
process. Also, for batch type processes like employer in determining which process
custom batch operations, a generic PHA of a should be of the highest priority and thereby
representative batch may be used where the employer would obtain the greatest im-
there are only small changes of monomer or provement in safety at the facility.
other ingredient ratios and the chemistry is Detailed guidance on the content and ap-
documented for the full range and ratio of plication of process hazard analysis meth-
batch ingredients. Another process that odologies is available from the American In-
might consider using a generic type of PHA stitute of Chemical Engineers Center for
is a gas plant. Often these plants are simply Chemical Process Safety (see appendix D).
moved from site to site and therefore, a ge- 5. Operating Procedures and Practices. Oper-
neric PHA may be used for these movable ating procedures describe tasks to be per-
plants. Also, when an employer has several formed, data to be recorded, operating condi-
similar size gas plants and no sour gas is tions to be maintained, samples to be col-
being processed at the site, then a generic lected, and safety and health precautions to
PHA is feasible as long as the variations of be taken. The procedures need to be tech-
the individual sites are accounted for in the nically accurate, understandable to employ-
PHA. Finally, when an employer has a large ees, and revised periodically to ensure that
continuous process which has several control they reflect current operations. The process
rooms for different portions of the process safety information package is to be used as
such as for a distillation tower and a blend- a resource to better assure that the oper-
ing operation, the employer may wish to do ating procedures and practices are consistent
each segment separately and then integrate with the known hazards of the chemicals in
the final results. the process and that the operating param-
Additionally, small businesses which are eters are accurate. Operating procedures
covered by this rule, will often have proc- should be reviewed by engineering staff and
esses that have less storage volume, less ca- operating personnel to ensure that they are
pacity, and less complicated than processes accurate and provide practical instructions
at a large facility. Therefore, OSHA would on how to actually carry out job duties safe-
anticipate that the less complex methodolo- ly.
gies would be used to meet the process haz- Operating procedures will include specific
ard analysis criteria in the standard. These instructions or details on what steps are to
process hazard analyses can be done in less be taken or followed in carrying out the
time and with a few people being involved. A stated procedures. These operating instruc-
less complex process generally means that tions for each procedure should include the

135

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00145 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.64 29 CFR Ch. XVII (7112 Edition)
applicable safety precautions and should within the process area, such as nonroutine
contain appropriate information on safety tasks, also must be maintained. The hazards
implications. For example, the operating of the tasks are to be conveyed to operating
procedures addressing operating parameters personnel in accordance with established
will contain operating instructions about procedures and to those performing the ac-
pressure limits, temperature ranges, flow tual tasks. When the work is completed, op-
rates, what to do when an upset condition erating personnel should be informed to pro-
occurs, what alarms and instruments are vide closure on the job.
pertinent if an upset condition occurs, and 6. Employee Training. All employees, includ-
other subjects. Another example of using op- ing maintenance and contractor employees,
erating instructions to properly implement involved with highly hazardous chemicals
operating procedures is in starting up or need to fully understand the safety and
shutting down the process. In these cases, health hazards of the chemicals and proc-
different parameters will be required from esses they work with for the protection of
those of normal operation. These operating themselves, their fellow employees and the
instructions need to clearly indicate the dis- citizens of nearby communities. Training
tinctions between startup and normal oper- conducted in compliance with 1926.59, the
ations such as the appropriate allowances for Hazard Communication standard, will help
heating up a unit to reach the normal oper- employees to be more knowledgeable about
ating parameters. Also the operating in- the chemicals they work with as well as fa-
structions need to describe the proper meth- miliarize them with reading and under-
od for increasing the temperature of the unit standing MSDS. However, additional train-
until the normal operating temperature pa- ing in subjects such as operating procedures
rameters are achieved. and safety work practices, emergency evacu-
Computerized process control systems add ation and response, safety procedures, rou-
complexity to operating instructions. These tine and nonroutine work authorization ac-
operating instructions need to describe the tivities, and other areas pertinent to process
logic of the software as well as the relation- safety and health will need to be covered by
ship between the equipment and the control an employers training program.
system; otherwise, it may not be apparent to In establishing their training programs,
the operator. employers must clearly define the employees
Operating procedures and instructions are to be trained and what subjects are to be
important for training operating personnel. covered in their training. Employers in set-
The operating procedures are often viewed as ting up their training program will need to
the standard operating practices (SOPs) for clearly establish the goals and objectives
operations. Control room personnel and oper- they wish to achieve with the training that
ating staff, in general, need to have a full un- they provide to their employees. The learn-
derstanding of operating procedures. If work- ing goals or objectives should be written in
ers are not fluent in English then procedures clear measurable terms before the training
and instructions need to be prepared in a sec- begins. These goals and objectives need to be
ond language understood by the workers. In tailored to each of the specific training mod-
addition, operating procedures need to be ules or segments. Employers should describe
changed when there is a change in the proc- the important actions and conditions under
ess as a result of the management of change which the employee will demonstrate com-
procedures. The consequences of operating petence or knowledge as well as what is ac-
procedure changes need to be fully evaluated ceptable performance.
and the information conveyed to the per- Hands-on-training where employees are
sonnel. For example, mechanical changes to able to use their senses beyond listening,
the process made by the maintenance depart- will enhance learning. For example, oper-
ment (like changing a valve from steel to ating personnel, who will work in a control
brass or other subtle changes) need to be room or at control panels, would benefit by
evaluated to determine if operating proce- being trained at a simulated control panel or
dures and practices also need to be changed. panels. Upset conditions of various types
All management of change actions must be could be displayed on the simulator, and
coordinated and integrated with current op- then the employee could go through the
erating procedures and operating personnel proper operating procedures to bring the
must be oriented to the changes in proce- simulator panel back to the normal oper-
dures before the change is made. When the ating parameters. A training environment
process is shutdown in order to make a could be created to help the trainee feel the
change, then the operating procedures must full reality of the situation but, of course,
be updated before startup of the process. under controlled conditions. This realistic
Training in how to handle upset conditions type of training can be very effective in
must be accomplished as well as what oper- teaching employees correct procedures while
ating personnel are to do in emergencies allowing them to also see the consequences
such as when a pump seal fails or a pipeline of what might happens if they do not follow
ruptures. Communication between operating established operating procedures. Other
personnel and workers performing work training techniques using videos or on-the-

136

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00146 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.64
job training can also be very effective for knowledge of work activities involving con-
teaching other job tasks, duties, or other im- tract employees working on or adjacent to
portant information. An effective training covered processes. Injury and illness logs of
program will allow the employee to fully both the employers employees and contract
participate in the training process and to employees allow an employer to have full
practice their skill or knowledge. knowledge of process injury and illness expe-
Employers need to periodically evaluate rience. This log will also contain informa-
their training programs to see if the nec- tion which will be of use to those auditing
essary skills, knowledge, and routines are process safety management compliance and
being properly understood and implemented those involved in incident investigations.
by their trained employees. The means or Contract employees must perform their
methods for evaluating the training should work safely. Considering that contractors
be developed along with the training pro- often perform very specialized and poten-
gram goals and objectives. Training program tially hazardous tasks such as confined space
evaluation will help employers to determine entry activities and nonroutine repair activi-
the amount of training their employees un- ties it is quite important that their activi-
derstood, and whether the desired results ties be controlled while they are working on
were obtained. If, after the evaluation, it ap- or near a covered process. A permit system
pears that the trained employees are not at or work authorization system for these ac-
the level of knowledge and skill that was ex- tivities would also be helpful to all affected
pected, the employer will need to revise the employers. The use of a work authorization
training program, provide retraining, or pro- system keeps an employer informed of con-
vide more frequent refresher training ses- tract employee activities, and as a benefit
sions until the deficiency is resolved. Those the employer will have better coordination
who conducted the training and those who and more management control over the work
received the training should also be con- being performed in the process area. A well
sulted as to how best to improve the training run and well maintained process where em-
process. If there is a language barrier, the ployee safety is fully recognized will benefit
language known to the trainees should be all of those who work in the facility whether
used to reinforce the training messages and they be contract employees or employees of
information. the owner.
Careful consideration must be given to as- 8. Pre-Startup Safety. For new processes,
sure that employees including maintenance the employer will find a PHA helpful in im-
and contract employees receive current and proving the design and construction of the
updated training. For example, if changes process from a reliability and quality point
are made to a process, impacted employees of view. The safe operation of the new proc-
must be trained in the changes and under- ess will be enhanced by making use of the
stand the effects of the changes on their job PHA recommendations before final installa-
tasks (e.g., any new operating procedures tions are completed. P&IDs are to be com-
pertinent to their tasks). Additionally, as al- pleted along with having the operating pro-
ready discussed the evaluation of the em- cedures in place and the operating staff
ployees absorption of training will certainly trained to run the process before startup.
influence the need for training. The initial startup procedures and normal
7. Contractors. Employers who use contrac- operating procedures need to be fully evalu-
tors to perform work in and around processes ated as part of the pre-startup review to as-
that involve highly hazardous chemicals, sure a safe transfer into the normal oper-
will need to establish a screening process so ating mode for meeting the process param-
that they hire and use contractors who ac- eters.
complish the desired job tasks without com- For existing processes that have been shut-
promising the safety and health of employ- down for turnaround, or modification, etc.,
ees at a facility. For contractors, whose safe- the employer must assure that any changes
ty performance on the job is not known to other than replacement in kind made to
the hiring employer, the employer will need the process during shutdown go through the
to obtain information on injury and illness management of change procedures. P&IDs
rates and experience and should obtain con- will need to be updated as necessary, as well
tractor references. Additionally, the em- as operating procedures and instructions. If
ployer must assure that the contractor has the changes made to the process during shut-
the appropriate job skills, knowledge and down are significant and impact the training
certifications (such as for pressure vessel program, then operating personnel as well as
welders). Contractor work methods and expe- employees engaged in routine and nonrou-
riences should be evaluated. For example, tine work in the process area may need some
does the contractor conducting demolition refresher or additional training in light of
work swing loads over operating processes or the changes. Any incident investigation rec-
does the contractor avoid such hazards? ommendations, compliance audits or PHA
Maintaining a site injury and illness log recommendations need to be reviewed as
for contractors is another method employers well to see what impacts they may have on
must use to track and maintain current the process before beginning the startup.

137

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00147 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.64 29 CFR Ch. XVII (7112 Edition)
9. Mechanical Integrity. Employers will need ety for Testing and Material, American Pe-
to review their maintenance programs and troleum Institute, National Fire Protection
schedules to see if there are areas where Association, American National Standards
breakdown maintenance is used rather Institute, American Society of Mechanical
than an on-going mechanical integrity pro- Engineers, and other groups, provide infor-
gram. Equipment used to process, store, or mation to help establish an effective testing
handle highly hazardous chemicals needs to and inspection frequency, as well as appro-
be designed, constructed, installed and main- priate methodologies.
tained to minimize the risk of releases of The applicable codes and standards provide
such chemicals. This requires that a mechan- criteria for external inspections for such
ical integrity program be in place to assure items as foundation and supports, anchor
the continued integrity of process equip- bolts, concrete or steel supports, guy wires,
ment. Elements of a mechanical integrity nozzles and sprinklers, pipe hangers, ground-
program include the identification and cat- ing connections, protective coatings and in-
egorization of equipment and instrumenta- sulation, and external metal surfaces of pip-
tion, inspections and tests, testing and in- ing and vessels, etc. These codes and stand-
spection frequencies, development of mainte- ards also provide information on methodolo-
nance procedures, training of maintenance gies for internal inspection, and a frequency
personnel, the establishment of criteria for formula based on the corrosion rate of the
acceptable test results, documentation of materials of construction. Also, erosion both
test and inspection results, and documenta- internal and external needs to be considered
tion of manufacturer recommendations as to along with corrosion effects for piping and
meantime to failure for equipment and in- valves. Where the corrosion rate is not
strumentation. known, a maximum inspection frequency is
The first line of defense an employer has recommended, and methods of developing
available is to operate and maintain the the corrosion rate are available in the codes.
process as designed, and to keep the chemi- Internal inspections need to cover items
cals contained. This line of defense is backed such as vessel shell, bottom and head; metal-
up by the next line of defense which is the lic linings; nonmetallic linings; thickness
controlled release of chemicals through measurements for vessels and piping; inspec-
venting to scrubbers or flares, or to surge or tion for erosion, corrosion, cracking and
overflow tanks which are designed to receive bulges; internal equipment like trays, baf-
such chemicals, etc. These lines of defense fles, sensors and screens for erosion, corro-
are the primary lines of defense or means to sion or cracking and other deficiencies.
prevent unwanted releases. The secondary Some of these inspections may be performed
lines of defense would include fixed fire pro- by state or local government inspectors
tection systems like sprinklers, water spray, under state and local statutes. However,
or deluge systems, monitor guns, etc., dikes, each employer needs to develop procedures
designed drainage systems, and other sys- to ensure that tests and inspections are con-
tems which would control or mitigate haz- ducted properly and that consistency is
ardous chemicals once an unwanted release maintained even where different employees
occurs. These primary and secondary lines of may be involved. Appropriate training is to
defense are what the mechanical integrity be provided to maintenance personnel to en-
program needs to protect and strengthen sure that they understand the preventive
these primary and secondary lines of de- maintenance program procedures, safe prac-
fenses where appropriate. tices, and the proper use and application of
The first step of an effective mechanical special equipment or unique tools that may
integrity program is to compile and cat- be required. This training is part of the over-
egorize a list of process equipment and in- all training program called for in the stand-
strumentation for inclusion in the program. ard.
This list would include pressure vessels, stor- A quality assurance system is needed to
age tanks, process piping, relief and vent help ensure that the proper materials of con-
systems, fire protection system components, struction are used, that fabrication and in-
emergency shutdown systems and alarms spection procedures are proper, and that in-
and interlocks and pumps. For the cat- stallation procedures recognize field instal-
egorization of instrumentation and the listed lation concerns. The quality assurance pro-
equipment the employer would prioritize gram is an essential part of the mechanical
which pieces of equipment require closer integrity program and will help to maintain
scrutiny than others. Meantime to failure of the primary and secondary lines of defense
various instrumentation and equipment that have been designed into the process to
parts would be known from the manufactur- prevent unwanted chemical releases or those
ers data or the employers experience with which control or mitigate a release. As
the parts, which would then influence the in- built drawings, together with certifications
spection and testing frequency and associ- of coded vessels and other equipment, and
ated procedures. Also, applicable codes and materials of construction need to be verified
standards such as the National Board Inspec- and retained in the quality assurance docu-
tion Code, or those from the American Soci- mentation. Equipment installation jobs need

138

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00148 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.64
to be properly inspected in the field for use changes in production rates, raw materials,
of proper materials and procedures and to as- experimentation, equipment unavailability,
sure that qualified craftsmen are used to do new equipment, new product development,
the job. The use of appropriate gaskets, change in catalyst and changes in operating
packing, bolts, valves, lubricants and weld- conditions to improve yield or quality.
ing rods need to be verified in the field. Also, Equipment changes include among others
procedures for installation of safety devices change in materials of construction, equip-
need to be verified, such as the torque on the ment specifications, piping pre-arrange-
bolts on ruptured disc installations, uniform ments, experimental equipment, computer
torque on flange bolts, proper installation of program revisions and changes in alarms and
pump seals, etc. If the quality of parts is a interlocks. Employers need to establish
problem, it may be appropriate to conduct means and methods to detect both technical
audits of the equipment suppliers facilities
changes and mechanical changes.
to better assure proper purchases of required
equipment which is suitable for its intended Temporary changes have caused a number
service. Any changes in equipment that may of catastrophes over the years, and employ-
become necessary will need to go through ers need to establish ways to detect tem-
the management of change procedures. porary changes as well as those that are per-
10. Nonroutine Work Authorizations. Nonrou- manent. It is important that a time limit for
tine work which is conducted in process temporary changes be established and mon-
areas needs to be controlled by the employer itored since, without control, these changes
in a consistent manner. The hazards identi- may tend to become permanent. Temporary
fied involving the work that is to be accom- changes are subject to the management of
plished must be communicated to those change provisions. In addition, the manage-
doing the work, but also to those operating ment of change procedures are used to insure
personnel whose work could affect the safety that the equipment and procedures are re-
of the process. A work authorization notice turned to their original or designed condi-
or permit must have a procedure that de- tions at the end of the temporary change.
scribes the steps the maintenance super- Proper documentation and review of these
visor, contractor representative or other per- changes is invaluable in assuring that the
son needs to follow to obtain the necessary safety and health considerations are being
clearance to get the job started. The work incorporated into the operating procedures
authorization procedures need to reference and the process.
and coordinate, as applicable, lockout/tagout Employers may wish to develop a form or
procedures, line breaking procedures, con- clearance sheet to facilitate the processing
fined space entry procedures and hot work
of changes through the management of
authorizations. This procedure also needs to
change procedures. A typical change form
provide clear steps to follow once the job is
may include a description and the purpose of
completed in order to provide closure for
the change, the technical basis for the
those that need to know the job is now com-
change, safety and health considerations,
pleted and equipment can be returned to nor-
mal. documentation of changes for the operating
11. Managing Change. To properly manage procedures, maintenance procedures, inspec-
changes to process chemicals, technology, tion and testing, P&IDs, electrical classifica-
equipment and facilities, one must define tion, training and communications, pre-
what is meant by change. In this process startup inspection, duration if a temporary
safety management standard, change in- change, approvals and authorization. Where
cludes all modifications to equipment, proce- the impact of the change is minor and well
dures, raw materials and processing condi- understood, a check list reviewed by an au-
tions other than replacement in kind. thorized person with proper communication
These changes need to be properly managed to others who are affected may be sufficient.
by identifying and reviewing them prior to However, for a more complex or significant
implementation of the change. For example, design change, a hazard evaluation procedure
the operating procedures contain the oper- with approvals by operations, maintenance,
ating parameters (pressure limits, tempera- and safety departments may be appropriate.
ture ranges, flow rates, etc.) and the impor- Changes in documents such as P&IDs, raw
tance of operating within these limits. While materials, operating procedures, mechanical
the operator must have the flexibility to integrity programs, electrical classifica-
maintain safe operation within the estab- tions, etc., need to be noted so that these re-
lished parameters, any operation outside of visions can be made permanent when the
these parameters requires review and ap- drawings and procedure manuals are up-
proval by a written management of change dated. Copies of process changes need to be
procedure. kept in an accessible location to ensure that
Management of change covers such as design changes are available to operating
changes in process technology and changes personnel as well as to PHA team members
to equipment and instrumentation. Changes when a PHA is being done or one is being up-
in process technology can result from dated.

139

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00149 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.64 29 CFR Ch. XVII (7112 Edition)
12. Investigation of Incidents. Incident inves- ferent emergency preparedness or tertiary
tigation is the process of identifying the un- lines of defense they plan to have and then
derlying causes of incidents and imple- develop the necessary plans and procedures,
menting steps to prevent similar events from and appropriately train employees in their
occurring. The intent of an incident inves- emergency duties and responsibilities and
tigation is for employers to learn from past then implement these lines of defense.
experiences and thus avoid repeating past Employers at a minimum must have an
mistakes. The incidents for which OSHA ex- emergency action plan which will facilitate
pects employers to become aware and to in- the prompt evacuation of employees when an
vestigate are the types of events which re- unwanted release of highly hazardous chem-
sult in or could reasonably have resulted in ical. This means that the employer will have
a catastrophic release. Some of the events a plan that will be activated by an alarm
are sometimes referred to as near misses, system to alert employees when to evacuate
meaning that a serious consequence did not and, that employees who are physically im-
occur, but could have. paired, will have the necessary support and
Employers need to develop in-house capa- assistance to get them to the safe zone as
bility to investigate incidents that occur in well. The intent of these requirements is to
their facilities. A team needs to be assem- alert and move employees to a safe zone
bled by the employer and trained in the tech- quickly. Delaying alarms or confusing
niques of investigation including how to con- alarms are to be avoided. The use of process
duct interviews of witnesses, needed docu- control centers or similar process buildings
mentation and report writing. A multi-dis- in the process area as safe areas is discour-
ciplinary team is better able to gather the aged. Recent catastrophes have shown that a
facts of the event and to analyze them and large life loss has occurred in these struc-
develop plausible scenarios as to what hap- tures because of where they have been sited
pened, and why. Team members should be se- and because they are not necessarily de-
lected on the basis of their training, knowl- signed to withstand over-pressures from
edge and ability to contribute to a team ef- shockwaves resulting from explosions in the
fort to fully investigate the incident. Em- process area.
ployees in the process area where the inci- Unwanted incidental releases of highly
dent occurred should be consulted, inter- hazardous chemicals in the process area
viewed or made a member of the team. Their must be addressed by the employer as to
knowledge of the events form a significant what actions employees are to take. If the
set of facts about the incident which oc- employer wants employees to evacuate the
curred. The report, its findings and rec- area, then the emergency action plan will be
ommendations are to be shared with those activated. For outdoor processes where wind
who can benefit from the information. The direction is important for selecting the safe
cooperation of employees is essential to an route to a refuge area, the employer should
effective incident investigation. The focus of place a wind direction indicator such as a
the investigation should be to obtain facts, wind sock or pennant at the highest point
and not to place blame. The team and the in- that can be seen throughout the process
vestigation process should clearly deal with area. Employees can move in the direction of
all involved individuals in a fair, open and cross wind to upwind to gain safe access to
consistent manner. the refuge area by knowing the wind direc-
13. Emergency Preparedness. Each employer tion.
must address what actions employees are to If the employer wants specific employees
take when there is an unwanted release of in the release area to control or stop the
highly hazardous chemicals. Emergency pre- minor emergency or incidental release, these
paredness or the employers tertiary (third) actions must be planned for in advance and
lines of defense are those that will be relied procedures developed and implemented.
on along with the secondary lines of defense Preplanning for handling incidental releases
when the primary lines of defense which are for minor emergencies in the process area
used to prevent an unwanted release fail to needs to be done, appropriate equipment for
stop the release. Employers will need to de- the hazards must be provided, and training
cide if they want employees to handle and conducted for those employees who will per-
stop small or minor incidental releases. form the emergency work before they re-
Whether they wish to mobilize the available spond to handle an actual release. The em-
resources at the plant and have them ployers training program, including the
brought to bear on a more significant re- Hazard Communication standard training is
lease. Or whether employers want their em- to address the training needs for employees
ployees to evacuate the danger area and who are expected to handle incidental or
promptly escape to a preplanned safe zone minor releases.
area, and allow the local community emer- Preplanning for releases that are more se-
gency response organizations to handle the rious than incidental releases is another im-
release. Or whether the employer wants to portant line of defense to be used by the em-
use some combination of these actions. Em- ployer. When a serious release of a highly
ployers will need to select how many dif- hazardous chemical occurs, the employer

140

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00150 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.64
through preplanning will have determined in tion of emergency response equipment, mu-
advance what actions employees are to take. tual aid information, and access to meteoro-
The evacuation of the immediate release logical or weather condition data and any
area and other areas as necessary would be dispersion modeling data.
accomplished under the emergency action 14. Compliance Audits. Employers need to
plan. If the employer wishes to use plant per- select a trained individual or assemble a
sonnel such as a fire brigade, spill control trained team of people to audit the process
team, a hazardous materials team, or use safety management system and program. A
employees to render aid to those in the im- small process or plant may need only one
mediate release area and control or mitigate knowledgeable person to conduct an audit.
the incident, these actions are covered by The audit is to include an evaluation of the
1926.65, the Hazardous Waste Operations and design and effectiveness of the process safety
Emergency Response (HAZWOPER) stand- management system and a field inspection of
ard. If outside assistance is necessary, such the safety and health conditions and prac-
as through mutual aid agreements between tices to verify that the employers systems
employers or local government emergency are effectively implemented. The audit
response organizations, these emergency re- should be conducted or lead by a person
sponders are also covered by HAZWOPER. knowledgeable in audit techniques and who
The safety and health protections required is impartial towards the facility or area
for emergency responders are the responsi- being audited. The essential elements of an
bility of their employers and of the on-scene audit program include planning, staffing,
incident commander. conducting the audit, evaluation and correc-
Responders may be working under very tive action, follow-up and documentation.
hazardous conditions and therefore the ob- Planning in advance is essential to the suc-
jective is to have them competently led by cess of the auditing process. Each employer
an on-scene incident commander and the needs to establish the format, staffing,
commanders staff, properly equipped to do scheduling and verification methods prior to
their assigned work safely, and fully trained conducting the audit. The format should be
to carry out their duties safely before they designed to provide the lead auditor with a
respond to an emergency. Drills, training ex- procedure or checklist which details the re-
ercises, or simulations with the local com- quirements of each section of the standard.
munity emergency response planners and re- The names of the audit team members
sponder organizations is one means to obtain should be listed as part of the format as well.
better preparedness. This close cooperation The checklist, if properly designed, could
and coordination between plant and local serve as the verification sheet which pro-
community emergency preparedness man- vides the auditor with the necessary infor-
agers will also aid the employer in com- mation to expedite the review and assure
plying with the Environmental Protection that no requirements of the standard are
Agencys Risk Management Plan criteria. omitted. This verification sheet format
One effective way for medium to large fa- could also identify those elements that will
cilities to enhance coordination and commu- require evaluation or a response to correct
nication during emergencies for on plant op- deficiencies. This sheet could also be used for
erations and with local community organiza- developing the follow-up and documentation
tions is for employers to establish and equip requirements.
an emergency control center. The emergency The selection of effective audit team mem-
control center would be sited in a safe zone bers is critical to the success of the program.
area so that it could be occupied throughout Team members should be chosen for their ex-
the duration of an emergency. The center perience, knowledge, and training and should
would serve as the major communication be familiar with the processes and with au-
link between the on-scene incident com- diting techniques, practices and procedures.
mander and plant or corporate management The size of the team will vary depending on
as well as with the local community offi- the size and complexity of the process under
cials. The communication equipment in the consideration. For a large, complex, highly
emergency control center should include a instrumented plant, it may be desirable to
network to receive and transmit information have team members with expertise in proc-
by telephone, radio or other means. It is im- ess engineering and design, process chem-
portant to have a backup communication istry, instrumentation and computer con-
network in case of power failure or one com- trols, electrical hazards and classifications,
munication means fails. The center should safety and health disciplines, maintenance,
also be equipped with the plant layout and emergency preparedness, warehousing or
community maps, utility drawings including shipping, and process safety auditing. The
fire water, emergency lighting, appropriate team may use part-time members to provide
reference materials such as a government for the depth of expertise required as well as
agency notification list, company personnel for what is actually done or followed, com-
phone list, SARA Title III reports and mate- pared to what is written.
rial safety data sheets, emergency plans and An effective audit includes a review of the
procedures manual, a listing with the loca- relevant documentation and process safety

141

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00151 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.64 29 CFR Ch. XVII (7112 Edition)
information, inspection of the physical fa- cluding an explanation where no action is
cilities, and interviews with all levels of taken on a finding, needs to be documented
plant personnel. Utilizing the audit proce- as to what was done and why.
dure and checklist developed in the It is important to assure that each defi-
preplanning stage, the audit team can sys- ciency identified is addressed, the corrective
tematically analyze compliance with the action to be taken noted, and the audit per-
provisions of the standard and any other cor- son or team responsible be properly docu-
porate policies that are relevant. For exam- mented by the employer. To control the cor-
ple, the audit team will review all aspects of rective action process, the employer should
the training program as part of the overall consider the use of a tracking system. This
audit. The team will review the written tracking system might include periodic sta-
training program for adequacy of content, tus reports shared with affected levels of
frequency of training, effectiveness of train- management, specific reports such as com-
ing in terms of its goals and objectives as pletion of an engineering study, and a final
well as to how it fits into meeting the stand- implementation report to provide closure for
ards requirements, documentation, etc. audit findings that have been through man-
Through interviews, the team can determine agement of change, if appropriate, and then
the employees knowledge and awareness of shared with affected employees and manage-
the safety procedures, duties, rules, emer- ment. This type of tracking system provides
gency response assignments, etc. During the the employer with the status of the correc-
inspection, the team can observe actual tive action. It also provides the documenta-
practices such as safety and health policies, tion required to verify that appropriate cor-
procedures, and work authorization prac- rective actions were taken on deficiencies
tices. This approach enables the team to identified in the audit.
identify deficiencies and determine where
corrective actions or improvements are nec- APPENDIX D TO 1926.64SOURCES OF
essary. FURTHER INFORMATION (NONMANDATORY)
An audit is a technique used to gather suf-
ficient facts and information, including sta- 1. Center for Chemical Process Safety,
tistical information, to verify compliance American Institute of Chemical Engineers,
with standards. Auditors should select as 345 East 47th Street, New York, NY 10017,
part of their preplanning a sample size suffi- (212) 705-7319.
cient to give a degree of confidence that the 2. Guidelines for Hazard Evaluation Pro-
audit reflects the level of compliance with cedures, American Institute of Chemical
the standard. The audit team, through this Engineers; 345 East 47th Street, New York,
systematic analysis, should document areas NY 10017.
which require corrective action as well as 3. Guidelines for Technical Management
those areas where the process safety man- of Chemical Process Safety, Center for
agement system is effective and working in Chemical Process Safety of the American In-
an effective manner. This provides a record stitute of Chemical Engineers; 345 East 47th
of the audit procedures and findings, and Street, New York, NY 10017.
serves as a baseline of operation data for fu- 4. Evaluating Process Safety in the Chem-
ture audits. It will assist future auditors in ical Industry, Chemical Manufacturers As-
determining changes or trends from previous sociation; 2501 M Street NW, Washington, DC
audits. 20037.
Corrective action is one of the most impor- 5. Safe Warehousing of Chemicals,
tant parts of the audit. It includes not only Chemical Manufacturers Association; 2501 M
addressing the identified deficiencies, but Street NW, Washington, DC 20037.
also planning, followup, and documentation. 6. Management of Process Hazards,
The corrective action process normally be- American Petroleum Institute (API Rec-
gins with a management review of the audit ommended Practice 750); 1220 L Street, N.W.,
findings. The purpose of this review is to de- Washington, DC 20005.
termine what actions are appropriate, and to 7. Improving Owner and Contractor Safe-
establish priorities, timetables, resource al- ty Performance, American Petroleum Insti-
locations and requirements and responsibil- tute (API Recommended Practice 2220); API,
ities. In some cases, corrective action may 1220 L Street N.W., Washington, DC 20005.
involve a simple change in procedure or 8. Chemical Manufacturers Association
minor maintenance effort to remedy the con- (CMAs Manager Guide), First Edition, Sep-
cern. Management of change procedures need tember 1991; CMA, 2501 M Street, N.W.,
to be used, as appropriate, even for what Washington, DC 20037.
may seem to be a minor change. Many of the 9. Improving Construction Safety Per-
deficiencies can be acted on promptly, while formance, Report A- 3, The Business Round-
some may require engineering studies or in- table; The Business Roundtable, 200 Park Av-
depth review of actual procedures and prac- enue, New York, NY 10166. (Report includes
tices. There may be instances where no ac- criteria to evaluate contractor safety per-
tion is necessary and this is a valid response formance and criteria to enhance contractor
to an audit finding. All actions taken, in- safety performance).

142

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00152 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65
10. Recommended Guidelines for Con- (ii) Corrective actions involving
tractor Safety and Health, Texas Chemical clean-up operations at sites covered by
Council; Texas Chemical Council, 1402 the Resource Conservation and Recov-
Nueces Street, Austin, TX 78701-1534.
11. Loss Prevention in the Process Indus- ery Act of 1976 (RCRA) as amended (42
tries, Volumes I and II; Frank P. Lees, U.S.C. 6901 et seq.);
Butterworth; London 1983. (iii) Voluntary clean-up operations at
12. Safety and Health Program Manage- sites recognized by Federal, state, local
ment Guidelines, 1989; U.S. Department of or other governmental bodies as uncon-
Labor, Occupational Safety and Health Ad- trolled hazardous waste sites;
ministration.
13. Safety and Health Guide for the Chem- (iv) Operations involving hazardous
ical Industry, 1986, (OSHA 3091); U.S. De- wastes that are conducted at treat-
partment of Labor, Occupational Safety and ment, storage, and disposal (TSD) fa-
Health Administration; 200 Constitution Av- cilities regulated by 40 CFR parts 264
enue, N.W., Washington, DC 20210. and 265 pursuant to RCRA; or by agen-
14. Review of Emergency Systems, June cies under agreement with U.S.E.P.A.
1988; U.S. Environmental Protection Agency
(EPA), Office of Solid Waste and Emergency to implement RCRA regulations; and
Response, Washington, DC 20460. (v) Emergency response operations
15. Technical Guidance for Hazards Anal- for releases of, or substantial threats of
ysis, Emergency Planning for Extremely releases of, hazardous substances with-
Hazardous Substances, December 1987; U.S. out regard to the location of the haz-
Environmental Protection Agency (EPA), ard.
Federal Emergency Management Adminis-
tration (FEMA) and U.S. Department of (2) Application. (i) All requirements of
Transportation (DOT), Washington, DC 20460. part 1910 and part 1926 of title 29 of the
16. Accident Investigation...A New Ap- Code of Federal Regulations apply pur-
proach, 1983, National Safety Council; 444 suant to their terms to hazardous
North Michigan Avenue, Chicago, IL 60611- waste and emergency response oper-
3991. ations whether covered by this section
17. Fire & Explosion Index Hazard Classi-
or not. If there is a conflict or overlap,
fication Guide, 6th Edition, May 1987, Dow
Chemical Company; Midland, Michigan 48674. the provision more protective of em-
18. Chemical Exposure Index, May 1988, ployee safety and health shall apply
Dow Chemical Company; Midland, Michigan without regard to 29 CFR 1926.20(e)(1).
48674. (ii) Hazardous substance clean-up op-
[58 FR 35115, June 30, 1993, as amended at 77 erations within the scope of paragraphs
FR 17890, Mar. 26, 2012] (a)(1)(i) through (a)(1)(iii) of this sec-
tion must comply with all paragraphs
1926.65 Hazardous waste operations of this section except paragraphs (p)
and emergency response. and (q).
(a) Scope, application, and definitions (iii) Operations within the scope of
(1) Scope. This section covers the fol- paragraph (a)(1)(iv) of this section
lowing operations, unless the employer must comply only with the require-
can demonstrate that the operation ments of paragraph (p) of this section.
does not involve employee exposure or
the reasonable possibility for employee NOTES AND EXCEPTIONS: (A) All provisions
of paragraph (p) of this section cover any
exposure to safety or health hazards: treatment, storage or disposal (TSD) oper-
(i) Clean-up operations required by a ation regulated by 40 CFR parts 264 and 265
governmental body, whether Federal, or by state law authorized under RCRA, and
state, local or other involving haz- required to have a permit or interim status
ardous substances that are conducted from EPA pursuant to 40 CFR 270.1 or from
at uncontrolled hazardous waste sites a state agency pursuant to RCRA.
(including, but not limited to, the (B) Employers who are not required to
EPAs National Priority Site List have a permit or interim status because they
(NPL), state priority site lists, sites are conditionally exempt small quantity
generators under 40 CFR 261.5 or are genera-
recommended for the EPA NPL, and
tors who qualify under 40 CFR 262.34 for ex-
initial investigations of government emptions from regulation under 40 CFR parts
identified sites which are conducted be- 264, 265 and 270 (excepted employers) are
fore the presence or absence of haz- not covered by paragraphs (p)(1) through
ardous substances has been (p)(7) of this section. Excepted employers
ascertained); who are required by the EPA or state agency

143

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00153 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)
to have their employees engage in emer- substance. Responses to incidental re-
gency response or who direct their employ- leases of hazardous substances where
ees to engage in emergency response are cov-
the substance can be absorbed, neutral-
ered by paragraph (p)(8) of this section, and
cannot be exempted by (p)(8)(i) of this sec- ized, or otherwise controlled at the
tion. Excepted employers who are not re- time of release by employees in the im-
quired to have employees engage in emer- mediate release area, or by mainte-
gency response, who direct their employees nance personnel are not considered to
to evacuate in the case of such emergencies be emergency responses within the
and who meet the requirements of paragraph
(p)(8)(i) of this section are exempt from the
scope of this standard. Responses to re-
balance of paragraph (p)(8) of this section. leases of hazardous substances where
(C) If an area is used primarily for treat- there is no potential safety or health
ment, storage or disposal, any emergency re- hazard (i.e., fire, explosion, or chemical
sponse operations in that area shall comply exposure) are not considered to be
with paragraph (p)(8) of this section. In other emergency responses.
areas not used primarily for treatment, stor-
age, or disposal, any emergency response op- Facility means (A) any building,
erations shall comply with paragraph (q) of structure, installation, equipment, pipe
this section. Compliance with the require- or pipeline (including any pipe into a
ments of paragraph (q) of this section shall sewer or publicly owned treatment
be deemed to be in compliance with the re- works), well, pit, pond, lagoon, im-
quirements of paragraph (p)(8) of this sec-
poundment, ditch, storage container,
tion.
motor vehicle, rolling stock, or air-
(iv) Emergency response operations craft, or (B) any site or area where a
for releases of, or substantial threats of hazardous substance has been depos-
releases of, hazardous substances which ited, stored, disposed of, or placed, or
are not covered by paragraphs (a)(1)(i) otherwise come to be located; but does
through (a)(1)(iv) of this section must not include any consumer product in
only comply with the requirements of consumer use or any water-borne ves-
paragraph (q) of this section. sel.
(3) DefinitionsBuddy system means a Hazardous materials response
system of organizing employees into
(HAZMAT) team means an organized
work groups in such a manner that
group of employees, designated by the
each employee of the work group is
designated to be observed by at least employer, who are expected to perform
one other employee in the work group. work to handle and control actual or
The purpose of the buddy system is to potential leaks or spills of hazardous
provide rapid assistance to employees substances requiring possible close ap-
in the event of an emergency. proach to the substance. The team
Clean-up operation means an oper- members perform responses to releases
ation where hazardous substances are or potential releases of hazardous sub-
removed, contained, incinerated, neu- stances for the purpose of control or
tralized, stabilized, cleared-up, or in stabilization of the incident. A
any other manner processed or handled HAZMAT team is not a fire brigade nor
with the ultimate goal of making the is a typical fire brigade a HAZMAT
site safer for people or the environ- team. A HAZMAT team, however, may
ment. be a separate component of a fire bri-
Decontamination means the removal gade or fire department.
of hazardous substances from employ- Hazardous substance means any sub-
ees and their equipment to the extent stance designated or listed under para-
necessary to preclude the occurrence of graphs (A) through (D) of this defini-
foreseeable adverse health affects. tion, exposure to which results or may
Emergency response or responding to result in adverse affects on the health
emergencies means a response effort by or safety of employees:
employees from outside the immediate
(A) Any substance defined under sec-
release area or by other designated re-
tion 101(14) of CERCLA;
sponders (i.e., mutual-aid groups, local
fire departments, etc.) to an occurrence (B) Any biological agent and other
which results, or is likely to result, in disease-causing agent which after re-
an uncontrolled release of a hazardous lease into the environment and upon

144

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00154 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65

exposure, ingestion, inhalation, or as- viduals ability to escape from a dan-


similation into any person, either di- gerous atmosphere.
rectly from the environment or indi- Oxygen deficiency means that con-
rectly by ingestion through food centration of oxygen by volume below
chains, will or may reasonably be an- which atmosphere supplying res-
ticipated to cause death, disease, be- piratory protection must be provided.
havioral abnormalities, cancer, genetic It exists in atmospheres where the per-
mutation, physiological malfunctions centage of oxygen by volume is less
(including malfunctions in reproduc- than 19.5 percent oxygen.
tion) or physical deformations in such Permissible exposure limit means the
persons or their offspring; exposure, inhalation or dermal permis-
(C) Any substance listed by the U.S. sible exposure limit specified either in
Department of Transportation as haz- 1926.55, elsewhere in subpart D, or in
ardous materials under 49 CFR 172.101 other pertinent sections of this part.
and appendices; and Published exposure level means the ex-
(D) Hazardous waste as herein de- posure limits published in NIOSH
fined. Recommendations for Occupational
Hazardous waste means(A) A waste Health Standards dated 1986 incor-
or combination of wastes as defined in porated by reference, or if none is spec-
40 CFR 261.3, or ified, the exposure limits published in
(B) Those substances defined as haz- the standards specified by the Amer-
ardous wastes in 49 CFR 171.8. ican Conference of Governmental In-
Hazardous waste operation means any dustrial Hygienists in their publication
operation conducted within the scope Threshold Limit Values and Biologi-
of this standard. cal Exposure Indices for 198788 dated
Hazardous waste site or Site means 1987 incorporated by reference.
any facility or location within the Post emergency response means that
scope of this standard at which haz- portion of an emergency response per-
ardous waste operations take place. formed after the immediate threat of a
Health hazard means a chemical or a release has been stabilized or elimi-
pathogen where acute or chronic nated and clean-up of the site has
health effects may occur in exposed begun. If post emergency response is
employees. It also includes stress due performed by an employers own em-
to temperature extremes. The term ployees who were part of the initial
health hazard includes chemicals that emergency response, it is considered to
are classified in accordance with the be part of the initial response and not
Hazard Communication Standard, post emergency response. However, if a
1910.1200, as posing one of the fol- group of an employers own employees,
lowing hazardous effects: acute tox- separate from the group providing ini-
icity (any route of exposure); skin cor- tial response, performs the clean-up op-
rosion or irritation; serious eye dam- eration, then the separate group of em-
age or eye irritation; respiratory or ployees would be considered to be per-
skin sensitization; germ cell mutage- forming post-emergency response and
nicity; carcinogenicity; reproductive subject to paragraph (q)(11) of this sec-
toxicity; specific target organ toxicity tion.
(single or repeated exposure); aspira- Qualified person means a person with
tion toxicity or simple asphyxiant. (See specific training, knowledge and expe-
Appendix A to 1910.1200Health Haz- rience in the area for which the person
ard Criteria (Mandatory) for the cri- has the responsibility and the author-
teria for determining whether a chem- ity to control.
ical is classified as a health hazard.) Site safety and health supervisor (or of-
IDLH or Immediately dangerous to life ficial) means the individual located on
or health means an atmospheric con- a hazardous waste site who is respon-
centration of any toxic, corrosive or sible to the employer and has the au-
asphyxiant substance that poses an im- thority and knowledge necessary to
mediate threat to life or would cause implement the site safety and health
irreversible or delayed adverse health plan and verify compliance with appli-
effects or would interfere with an indi- cable safety and health requirements.

145

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00155 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)

Small quantity generator means a gen- (F) The employers standard oper-
erator of hazardous wastes who in any ating procedures for safety and health;
calendar month generates no more and
than 1,000 kilograms (2,205 pounds) of (G) Any necessary interface between
hazardous waste in that month. general program and site specific ac-
Uncontrolled hazardous waste site, tivities.
means an area identified as an uncon- (iii) Site excavation. Site excavations
trolled hazardous waste site by a gov- created during initial site preparation
ernmental body, whether Federal, or during hazardous waste operations
state, local or other where an accumu- shall be shored or sloped as appropriate
lation of hazardous substances creates to prevent accidental collapse in ac-
a threat to the health and safety of in- cordance with subpart P of 29 CFR part
dividuals or the environment or both. 1926.
Some sites are found on public lands (iv) Contractors and sub-contractors.
such as those created by former munic- An employer who retains contractor or
ipal, county or state landfills where il- sub-contractor services for work in
legal or poorly managed waste disposal hazardous waste operations shall in-
has taken place. Other sites are found form those contractors, sub-contrac-
on private property, often belonging to tors, or their representatives of the
generators or former generators of haz- site emergency response procedures
ardous substance wastes. Examples of and any potential fire, explosion,
such sites include, but are not limited health, safety or other hazards of the
to, surface impoundments, landfills, hazardous waste operation that have
dumps, and tank or drum farms. Nor- been identified by the employer, in-
mal operations at TSD sites are not cluding those identified in the employ-
covered by this definition. ers information program.
(b) Safety and health program. (v) Program availability. The written
safety and health program shall be
NOTE TO (b): Safety and health programs made available to any contractor or
developed and implemented to meet other
subcontractor or their representative
Federal, state, or local regulations are con-
sidered acceptable in meeting this require- who will be involved with the haz-
ment if they cover or are modified to cover ardous waste operation; to employees;
the topics required in this paragraph. An ad- to employee designated representa-
ditional or separate safety and health pro- tives; to OSHA personnel, and to per-
gram is not required by this paragraph. sonnel of other Federal, state, or local
agencies with regulatory authority
(1) General. (i) Employers shall de-
over the site.
velop and implement a written safety
(2) Organizational structure part of the
and health program for their employ-
site program(i) The organizationa1
ees involved in hazardous waste oper-
structure part of the program shall es-
ations. The program shall be designed
tablish the specific chain of command
to identify, evaluate, and control safe-
and specify the overall responsibilities
ty and health hazards, and provide for
of supervisors and employees. It shall
emergency response for hazardous
include, at a minimum, the following
waste operations.
elements:
(ii) The written safety and health (A) A general supervisor who has the
program shall incorporate the fol- responsibility and authority to direct
lowing: all hazardous waste operations.
(A) An organizational structure; (B) A site safety and health super-
(B) A comprehensive workplan; visor who has the responsibility and
(C) A site-specific safety and health authority to develop and implement
plan which need not repeat the employ- the site safety and health plan and
ers standard operating procedures re- verify compliance.
quired in paragraph (b)(1)(ii)(F) of this (C) All other personnel needed for
section; hazardous waste site operations and
(D) The safety and health training emergency response and their general
program; functions and responsibilities.
(E) The medical surveillance pro- (D) The lines of authority, responsi-
gram; bility, and communication.

146

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00156 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65

(ii) The organizational structure (D) Medical surveillance require-


shall be reviewed and updated as nec- ments in accordance with the program
essary to reflect the current status of in paragraph (f) of this section.
waste site operations. (E) Frequency and types of air moni-
(3) Comprehensive workplan part of the toring, personnel monitoring, and envi-
site program. The comprehensive ronmental sampling techniques and in-
workplan part of the program shall ad- strumentation to be used, including
dress the tasks and objectives of the methods of maintenance and calibra-
site operations and the logistics and re- tion of monitoring and sampling equip-
sources required to reach those tasks ment to be used.
and objectives. (F) Site control measures in accord-
(i) The comprehensive workplan shall ance with the site control program re-
address anticipated clean-up activities quired in paragraph (d) of this section.
as well as normal operating procedures (G) Decontamination procedures in
which need not repeat the employers accordance with paragraph (k) of this
procedures available elsewhere. section.
(ii) The comprehensive workplan
(H) An emergency response plan
shall define work tasks and objectives
meeting the requirements of paragraph
and identify the methods for accom-
(l) of this section for safe and effective
plishing those tasks and objectives.
responses to emergencies, including
(iii) The comprehensive workplan
the necessary PPE and other equip-
shall establish personnel requirements
ment.
for implementing the plan.
(iv) The comprehensive workplan (I) Confined space entry procedures.
shall provide for the implementation of (J) A spill containment program
the training required in paragraph (e) meeting the requirements of paragraph
of this section. (j) of this section.
(v) The comprehensive workplan (iii) Pre-entry briefing. The site spe-
shall provide for the implementation of cific safety and health plan shall pro-
the required informational programs vide for pre-entry briefings to be held
required in paragraph (i) of this sec- prior to initiating any site activity,
tion. and at such other times as necessary to
(vi) The comprehensive workplan ensure that employees are apprised of
shall provide for the implementation of the site safety and health plan and
the medical surveillance program de- that this plan is being followed. The in-
scribed in paragraph (f) of this section. formation and data obtained from site
(4) Site-specific safety and health plan characterization and analysis work re-
part of the program(i) General. The site quired in paragraph (c) of this section
safety and health plan, which must be shall be used to prepare and update the
kept on site, shall address the safety site safety and health plan.
and health hazards of each phase of site (iv) Effectiveness of site safety and
operation and include the requirements health plan. Inspections shall be con-
and procedures for employee protec- ducted by the site safety and health su-
tion. pervisor or, in the absence of that indi-
(ii) Elements. The site safety and vidual, another individual who is
health plan, as a minimum, shall ad- knowledgeable in occupational safety
dress the following: and health, acting on behalf of the em-
(A) A safety and health risk or haz- ployer as necessary to determine the
ard analysis for each site task and op- effectiveness of the site safety and
eration found in the workplan. health plan. Any deficiencies in the ef-
(B) Employee training assignments fectiveness of the site safety and
to assure compliance with paragraph health plan shall be corrected by the
(e) of this section. employer.
(C) Personal protective equipment to (c) Site characterization and analysis
be used by employees for each of the (1) General. Hazardous waste sites shall
site tasks and operations being con- be evaluated in accordance with this
ducted as required by the personal pro- paragraph to identify specific site haz-
tective equipment program in para- ards and to determine the appropriate
graph (g)(5) of this section. safety and health control procedures

147

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00157 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)

needed to protect employees from the (5) Personal protective equipment. Per-
identified hazards. sonal protective equipment (PPE) shall
(2) Preliminary evaluation. A prelimi- be provided and used during initial site
nary evaluation of a sites characteris- entry in accordance with the following
tics shall be performed prior to site requirements:
entry by a qualified person in order to (i) Based upon the results of the pre-
aid in the selection of appropriate em- liminary site evaluation, an ensemble
ployee protection methods prior to site of PPE shall be selected and used dur-
entry. Immediately after initial site ing initial site entry which will provide
entry, a more detailed evaluation of protection to a level of exposure below
the sites specific characteristics shall permissible exposure limits and pub-
be performed by a qualified person in lished exposure levels for known or sus-
order to further identify existing site pected hazardous substances and
hazards and to further aid in the selec- health hazards, and which will provide
tion of the appropriate engineering protection against other known and
controls and personal protective equip-
suspected hazards identified during the
ment for the tasks to be performed.
preliminary site evaluation. If there is
(3) Hazard identification. All suspected no permissible exposure limit or pub-
conditions that may pose inhalation or
lished exposure level, the employer
skin absorption hazards that are imme-
may use other published studies and in-
diately dangerous to life or health
formation as a guide to appropriate
(IDLH), or other conditions that may
cause death or serious harm, shall be personal protective equipment.
identified during the preliminary sur- (ii) If positive-pressure self-contained
vey and evaluated during the detailed breathing apparatus is not used as part
survey. Examples of such hazards in- of the entry ensemble, and if res-
clude, but are not limited to, confined piratory protection is warranted by the
space entry, potentially explosive or potential hazards identified during the
flammable situations, visible vapor preliminary site evaluation, an escape
clouds, or areas where biological indi- self-contained breathing apparatus of
cators such as dead animals or vegeta- at least five minutes duration shall be
tion are located. carried by employees during initial site
(4) Required information. The fol- entry.
lowing information to the extent avail- (iii) If the preliminary site evalua-
able shall be obtained by the employer tion does not produce sufficient infor-
prior to allowing employees to enter a mation to identify the hazards or sus-
site: pected hazards of the site, an ensemble
(i) Location and approximate size of providing protection equivalent to
the site. Level B PPE shall be provided as min-
(ii) Description of the response activ- imum protection, and direct reading
ity and/or the job task to be performed. instruments shall be used as appro-
(iii) Duration of the planned em- priate for identifying IDLH conditions.
ployee activity. (See appendix B for a description of
(iv) Site topography and accessibility Level B hazards and the recommenda-
by air and roads. tions for Level B protective equip-
(v) Safety and health hazards ex- ment.)
pected at the site. (iv) Once the hazards of the site have
(vi) Pathways for hazardous sub- been identified, the appropriate PPE
stance dispersion. shall be selected and used in accord-
(vii) Present status and capabilities ance with paragraph (g) of this section.
of emergency response teams that (6) Monitoring. The following moni-
would provide assistance to hazardous toring shall be conducted during initial
waste clean-up site employees at the site entry when the site evaluation
time of an emergency. produces information that shows the
(viii) Hazardous substances and potential for ionizing radiation or
health hazards involved or expected at IDLH conditions, or when the site in-
the site, and their chemical and phys- formation is not sufficient reasonably
ical properties. to eliminate these possible conditions:

148

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00158 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65

(i) Monitoring with direct reading in- (2) Site control program. A site control
struments for hazardous levels of ion- program for protecting employees
izing radiation. which is part of the employers site
(ii) Monitoring the air with appro- safety and health program required in
priate direct reading test equipment paragraph (b) of this section shall be
(i.e., combustible gas meters, detector developed during the planning stages of
tubes) for IDLH and other conditions a hazardous waste clean-up operation
that may cause death or serious harm and modified as necessary as new infor-
(combustible or explosive atmospheres, mation becomes available.
oxygen deficiency, toxic substances). (3) Elements of the site control program.
(iii) Visually observing for signs of The site control program shall, as a
actual or potential IDLH or other dan- minimum, include: A site map; site
gerous conditions. work zones; the use of a buddy sys-
(iv) An ongoing air monitoring pro- tem; site communications including
gram in accordance with paragraph (h) alerting means for emergencies; the
of this section shall be implemented standard operating procedures or safe
after site characterization has deter- work practices; and, identification of
mined the site is safe for the start-up the nearest medical assistance. Where
of operations. these requirements are covered else-
(7) Risk identification. Once the pres-
where they need not be repeated.
ence and concentrations of specific
hazardous substances and health haz- (e) Training(1) General. (i) All em-
ards have been established, the risks ployees working on site (such as but
associated with these substances shall not limited to equipment operators,
be identified. Employees who will be general laborers and others) exposed to
working on the site shall be informed hazardous substances, health hazards,
of any risks that have been identified. or safety hazards and their supervisors
In situations covered by the Hazard and management responsible for the
Communication Standard, 29 CFR site shall receive training meeting the
1926.59, training required by that stand- requirements of this paragraph before
ard need not be duplicated. they are permitted to engage in haz-
ardous waste operations that could ex-
NOTE TO (c)(7). Risks to consider include, pose them to hazardous substances,
but are not limited to: safety, or health hazards, and they
(a) Exposures exceeding the permissible ex-
posure limits and published exposure levels. shall receive review training as speci-
(b) IDLH concentrations. fied in this paragraph.
(c) Potential skin absorption and irritation (ii) Employees shall not be permitted
sources. to participate in or supervise field ac-
(d) Potential eye irritation sources. tivities until they have been trained to
(e) Explosion sensitivity and flammability a level required by their job function
ranges.
(f) Oxygen deficiency. and responsibility.
(2) Elements to be covered. The train-
(8) Employee notification. Any infor- ing shall thoroughly cover the fol-
mation concerning the chemical, phys- lowing:
ical, and toxicologic properties of each (i) Names of personnel and alternates
substance known or expected to be responsible for site safety and health;
present on site that is available to the
(ii) Safety, health and other hazards
employer and relevant to the duties an
present on the site;
employee is expected to perform shall
be made available to the affected em- (iii) Use of personal protective equip-
ployees prior to the commencement of ment;
their work activities. The employer (iv) Work practices by which the em-
may utilize information developed for ployee can minimize risks from haz-
the hazard communication standard for ards;
this purpose. (v) Safe use of engineering controls
(d) Site control(1) General. Appro- and equipment on the site;
priate site control procedures shall be (vi) Medical surveillance require-
implemented to control employee expo- ments, including recognition of symp-
sure to hazardous substances before toms and signs which might indicate
clean-up work begins. overexposure to hazards; and

149

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00159 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)

(vii) The contents of paragraphs (G) sponsibility is employees covered by


through (J) of the site safety and paragraphs (e)(3)(ii) and (e)(3)(iii)) and
health plan set forth in paragraph at least eight additional hours of spe-
(b)(4)(ii) of this section. cialized training at the time of job as-
(3) Initial training. (i) General site signment on such topics as, but not
workers (such as equipment operators, limited to, the employers safety and
general laborers and supervisory per- health program and the associated em-
sonnel) engaged in hazardous substance ployee training program, personal pro-
removal or other activities which ex- tective equipment program, spill con-
pose or potentially expose workers to tainment program, and health hazard
hazardous substances and health haz- monitoring procedure and techniques.
ards shall receive a minimum of 40 (5) Qualifications for trainers. Trainers
hours of instruction off the site, and a shall be qualified to instruct employees
minimum of three days actual field ex- about the subject matter that is being
perience under the direct supervision of presented in training. Such trainers
a trained, experienced supervisor. shall have satisfactorily completed a
(ii) Workers on site only occasionally training program for teaching the sub-
for a specific limited task (such as, but jects they are expected to teach, or
not limited to, ground water moni- they shall have the academic creden-
toring, land surveying, or geo-physical tials and instructional experience nec-
surveying) and who are unlikely to be essary for teaching the subjects. In-
exposed over permissible exposure lim- structors shall demonstrate competent
its and published exposure limits shall instructional skills and knowledge of
receive a minimum of 24 hours of in- the applicable subject matter.
struction off the site, and the min-
(6) Training certification. Employees
imum of one day actual field experi-
and supervisors that have received and
ence under the direct supervision of a
successfully completed the training
trained, experienced supervisor.
and field experience specified in para-
(iii) Workers regularly on site who
graphs (e)(1) through (e)(4) of this sec-
work in areas which have been mon-
tion shall be certified by their instruc-
itored and fully characterized indi-
tor or the head instructor and trained
cating that exposures are under per-
supervisor as having successfully com-
missible exposure limits and published
exposure limits where respirators are pleted the necessary training. A writ-
not necessary, and the characterization ten certificate shall be given to each
indicates that there are no health haz- person so certified. Any person who has
ards or the possibility of an emergency not been so certified or who does not
developing, shall receive a minimum of meet the requirements of paragraph
24 hours of instruction off the site and (e)(9) of this section shall be prohibited
the minimum of one day actual field from engaging in hazardous waste oper-
experience under the direct supervision ations.
of a trained, experienced supervisor. (7) Emergency response. Employees
(iv) Workers with 24 hours of training who are engaged in responding to haz-
who are covered by paragraphs (e)(3)(ii) ardous emergency situations at haz-
and (e)(3)(iii) of this section, and who ardous waste clean-up sites that may
become general site workers or who are expose them to hazardous substances
required to wear respirators, shall have shall be trained in how to respond to
the additional 16 hours and two days of such expected emergencies.
training necessary to total the training (8) Refresher training. Employees spec-
specified in paragraph (e)(3)(i). ified in paragraph (e)(1) of this section,
(4) Management and supervisor train- and managers and supervisors specified
ing. On-site management and super- in paragraph (e)(4) of this section, shall
visors directly responsible for, or who receive eight hours of refresher train-
supervise employees engaged in, haz- ing annually on the items specified in
ardous waste operations shall receive paragraph (e)(2) and/or (e)(4) of this
40 hours initial training, and three section, any critique of incidents that
days of supervised field experience (the have occurred in the past year that can
training may be reduced to 24 hours serve as training examples of related
and one day if the only area of their re- work, and other relevant topics.

150

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00160 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65

(9) Equivalent training. Employers ployee covered under paragraph (f)(2) of


who can show by documentation or cer- this section on the following schedules:
tification that an employees work ex- (i) For employees covered under
perience and/or training has resulted in paragraphs (f)(2)(i), (f)(2)(ii), and
training equivalent to that training re- (f)(2)(iv):
quired in paragraphs (e)(1) through (A) Prior to assignment;
(e)(4) of this section shall not be re- (B) At least once every twelve
quired to provide the initial training months for each employee covered un-
requirements of those paragraphs to less the attending physician believes a
such employees and shall provide a longer interval (not greater than bien-
copy of the certification or documenta- nially) is appropriate;
tion to the employee upon request. (C) At termination of employment or
However, certified employees or em- reassignment to an area where the em-
ployees with equivalent training new ployee would not be covered if the em-
to a site shall receive appropriate, site ployee has not had an examination
specific training before site entry and within the last six months;
have appropriate supervised field expe- (D) As soon as possible upon notifica-
rience at the new site. Equivalent tion by an employee that the employee
training includes any academic train- has developed signs or symptoms indi-
ing or the training that existing em- cating possible overexposure to haz-
ployees might have already received ardous substances or health hazards, or
from actual hazardous waste site work that the employee has been injured or
experience. exposed above the permissible exposure
(f) Medical surveillance(1) General. limits or published exposure levels in
Employers engaged in operations speci- an emergency situation;
fied in paragraphs (a)(1)(i) through (E) At more frequent times, if the ex-
(a)(1)(iv) of this section and not cov- amining physician determines that an
ered by (a)(2)(iii) exceptions and em- increased frequency of examination is
ployers of employees specified in para- medically necessary.
graph (q)(9) shall institute a medical (ii) For employees covered under
surveillance program in accordance paragraph (f)(2)(iii) and for all employ-
with this paragraph. ees including those of employers cov-
ered by paragraph (a)(1)(v) who may
(2) Employees covered. The medical
have been injured, received a health
surveillance program shall be insti-
impairment, developed signs or symp-
tuted by the employer for the following
toms which may have resulted from ex-
employees:
posure to hazardous substances result-
(i) All employees who are or may be ing from an emergency incident, or ex-
exposed to hazardous substances or posed during an emergency incident to
health hazards at or above the permis- hazardous substances at concentra-
sible exposure limits or, if there is no tions above the permissible exposure
permissible exposure limit, above the limits or the published exposure levels
published exposure levels for these sub- without the necessary personal protec-
stances, without regard to the use of tive equipment being used:
respirators, for 30 days or more a year; (A) As soon as possible following the
(ii) All employees who wear a res- emergency incident or development of
pirator for 30 days or more a year or as signs or symptoms;
required by 1926.103; (B) At additional times, if the exam-
(iii) All employees who are injured, ining physician determines that follow-
become ill or develop signs or symp- up examinations or consultations are
toms due to possible overexposure in- medically necessary.
volving hazardous substances or health (4) Content of medical examinations and
hazards from an emergency response or consultations. (i) Medical examinations
hazardous waste operation; and required by paragraph (f)(3) of this sec-
(iv) Members of HAZMAT teams. tion shall include a medical and work
(3) Frequency of medical examinations history (or updated history if one is in
and consultations. Medical examina- the employees file) with special em-
tions and consultations shall be made phasis on symptoms related to the han-
available by the employer to each em- dling of hazardous substances and

151

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00161 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)

health hazards, and to fitness for duty (C) The results of the medical exam-
including the ability to wear any re- ination and tests if requested by the
quired PPE under conditions (i.e., tem- employee.
perature extremes) that may be ex- (D) A statement that the employee
pected at the work site. has been informed by the physician of
(ii) The content of medical examina- the results of the medical examination
tions or consultations made available and any medical conditions which re-
to employees pursuant to paragraph (f) quire further examination or treat-
shall be determined by the attending ment.
physician. The guidelines in the Occu- (ii) The written opinion obtained by
pational Safety and Health Guidance the employer shall not reveal specific
Manual for Hazardous Waste Site Activi- findings or diagnoses unrelated to oc-
ties (See appendix D, Reference #10) cupational exposures.
should be consulted. (8) Recordkeeping. (i) An accurate
(5) Examination bv a physician and record of the medical surveillance re-
costs. All medical examinations and quired by paragraph (f) of this section
procedures shall be performed by or shall be retained. This record shall be
under the supervision of a licensed phy- retained for the period specified and
sician, preferably one knowledgeable in meet the criteria of 29 CFR 1926.33.
occupational medicine, and shall be (ii) The record required in paragraph
provided without cost to the employee, (f)(8)(i) of this section shall include at
without loss of pay, and at a reason- least the following information:
able time and place. (A) The name and social security
number of the employee;
(6) Information provided to the physi-
(B) Physicians written opinions, rec-
cian. The employer shall provide one
ommended limitations, and results of
copy of this standard and its appen-
examinations and tests;
dices to the attending physician, and in
(C) Any employee medical com-
addition the following for each em-
plaints related to exposure to haz-
ployee:
ardous substances;
(i) A description of the employees (D) A copy of the information pro-
duties as they relate to the employees vided to the examining physician by
exposures. the employer, with the exception of the
(ii) The employees exposure levels or standard and its appendices.
anticipated exposure levels. (g) Engineering controls, work prac-
(iii) A description of any personal tices, and personal protective equipment
protective equipment used or to be for employee protection. Engineering
used. controls, work practices, personal pro-
(iv) Information from previous med- tective equipment, or a combination of
ical examinations of the employee these shall be implemented in accord-
which is not readily available to the ance with this paragraph to protect
examining physician. employees from exposure to hazardous
(v) Information required by 1926.103. substances and safety and health haz-
(7) Physicians written opinion. (i) The ards.
employer shall obtain and furnish the (1) Engineering controls, work practices
employee with a copy of a written and PPE for substances regulated either
opinion from the attending physician in 1926.55, elsewhere in subpart D, or in
containing the following: other pertinent sections of this part. (i)
(A) The physicians opinion as to Engineering controls and work prac-
whether the employee has any detected tices shall be instituted to reduce and
medical conditions which would place maintain employee exposure to or
the employee at increased risk of ma- below the permissible exposure limits
terial impairment of the employees for substances regulated either in
health from work in hazardous waste 1926.55 or other pertinent sections of
operations or emergency response, or this part, except to the extent that
from respirator use. such controls and practices are not fea-
(B) The physicians recommended sible.
limitations upon the employees as- NOTE TO (g)(1)(i): Engineering controls
signed work. which may be feasible include the use of

152

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00162 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65
pressurized cabs or control booths on equip- (iii) Positive pressure self-contained
ment, and/or the use of remotely operated breathing apparatus, or positive pres-
material handling equipment. Work prac- sure air-line respirators equipped with
tices which may be feasible are removing all
an escape air supply, shall be used
non-essential employees from potential ex-
posure during opening of drums, wetting when chemical exposure levels present
down dusty operations and locating employ- will create a substantial possibility of
ees upwind of possible hazards. immediate death, immediate serious
(ii) Whenever engineering controls and illness or injury, or impair the ability
work practices are not feasible or not re- to escape.
quired, any reasonable combination of engi- (iv) Totally-encapsulating chemical
neering controls, work practices and PPE protective suits (protection equivalent
shall be used to reduce and maintain em-
ployee exposures to or below the permissible
to Level A protection as recommended
exposure limits or dose limits for substances in appendix B) shall be used in condi-
regulated either in 1926.55 or other perti- tions where skin absorption of a haz-
nent sections of this part. ardous substance may result in a sub-
(iii) The employer shall not implement a stantial possibility of immediate
schedule of employee rotation as a means of death, immediate serious illness or in-
compliance with permissible exposure limits jury, or impair the ability to escape.
or dose limits except when there is no other (v) The level of protection provided
feasible way of complying with the airborne
or dermal dose limits for ionizing radiation.
by PPE selection shall be increased
(iv) The provisions of subpart D shall be when additional information on site
followed. conditions indicates that increased
protection is necessary to reduce em-
(2) Engineering controls, work practices, ployee exposures below permissible ex-
and PPE for substances not regulated ei- posure limits and published exposure
ther in 1926.55, elsewhere in subpart D, levels for hazardous substances and
or in other pertinent sections of this part. health hazards. (See appendix B for
An appropriate combination of engi- guidance on selecting PPE ensembles.)
neering controls, work practices and
personal protective equipment shall be NOTE TO (g)(3): The level of employee pro-
used to reduce and maintain employee tection provided may be decreased when ad-
ditional information or site conditions show
exposure to or below published expo-
that decreased protection will not result in
sure levels for hazardous substances hazardous exposures to employees.
and health hazards not regulated either
in 1926.55, elsewhere in subpart D, or (vi) Personal protective equipment
in other pertinent sections of this part. shall be selected and used to meet the
The employer may use the published requirements of subpart E of this part
literature and MSDS as a guide in and additional requirements specified
making the employers determination in this section.
as to what level of protection the em- (4) Totally-encapsulating chemical pro-
ployer believes is appropriate for haz- tective suits. (i) Totally-encapsulating
ardous substances and health hazards suits shall protect employees from the
for which there is no permissible expo- particular hazards which are identified
sure limit or published exposure limit. during site characterization and anal-
(3) Personal protective equipment selec- ysis.
tion. (i) Personal protective equipment (ii) Totally-encapsulating suits shall
(PPE) shall be selected and used which be capable of maintaining positive air
will protect employees from the haz- pressure. (See appendix A for a test
ards and potential hazards they are method which may be used to evaluate
likely to encounter as identified during this requirement.)
the site characterization and analysis. (iii) Totally-encapsulating suits shall
(ii) Personal protective equipment be capable of preventing inward test
selection shall be based on an evalua- gas leakage of more than 0.5 percent.
tion of the performance characteristics (See appendix A for a test method
of the PPE relative to the require- which may be used to evaluate this re-
ments and limitations of the site, the quirement.)
task-specific conditions and duration, (5) Personal protective equipment (PPE)
and the hazards and potential hazards program. A written personal protective
identified at the site. equipment program, which is part of

153

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00163 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)

the employers safety and health pro- condition such as the presence of flam-
gram required in paragraph (b) of this mable atmospheres or oxygen-deficient
section or required in paragraph (p)(1) environments.
of this section and which is also a part (3) Periodic monitoring. Periodic moni-
of the site-specific safety and health toring shall be conducted when the pos-
plan shall be established. The PPE pro- sibility of an IDLH condition or flam-
gram shall address the elements listed mable atmosphere has developed or
below. When elements, such as donning when there is indication that exposures
and doffing procedures, are provided by may have risen over permissible expo-
the manufacturer of a piece of equip- sure limits or published exposure levels
ment and are attached to the plan, since prior monitoring. Situations
they need not be rewritten into the where it shall be considered whether
plan as long as they adequately address the possibility that exposures have
the procedure or element. risen are as follows:
(i) PPE selection based upon site haz- (i) When work begins on a different
ards, portion of the site.
(ii) PPE use and limitations of the (ii) When contaminants other than
equipment, those previously identified are being
(iii) Work mission duration, handled.
(iv) PPE maintenance and storage, (iii) When a different type of oper-
(v) PPE decontamination and dis- ation is initiated (e.g., drum opening as
posal, opposed to exploratory well drilling).
(vi) PPE training and proper fitting, (iv) When employees are handling
(vii) PPE donning and doffing proce- leaking drums or containers or work-
dures, ing in areas with obvious liquid con-
(viii) PPE inspection procedures tamination (e.g., a spill or lagoon).
prior to, during, and after use, (4) Monitoring of high-risk employees.
(ix) Evaluation of the effectiveness of After the actual clean-up phase of any
the PPE program, and hazardous waste operation commences;
(x) Limitations during temperature for example, when soil, surface water
extremes, heat stress, and other appro- or containers are moved or disturbed;
priate medical considerations. the employer shall monitor those em-
(h) Monitoring(1) General. (i) Moni- ployees likely to have the highest ex-
toring shall be performed in accord- posures to hazardous substances and
health hazards likely to be present
ance with this paragraph where there
above permissible exposure limits or
may be a question of employee expo-
published exposure levels by using per-
sure to hazardous concentrations of
sonal sampling frequently enough to
hazardous substances in order to assure
characterize employee exposures. If the
proper selection of engineering con-
employees likely to have the highest
trols, work practices and personal pro-
exposure are over permissible exposure
tective equipment so that employees
limits or published exposure limits,
are not exposed to levels which exceed
then monitoring shall continue to de-
permissible exposure limits, or pub-
termine all employees likely to be
lished exposure levels if there are no
above those limits. The employer may
permissible exposure limits, for haz-
utilize a representative sampling ap-
ardous substances.
proach by documenting that the em-
(ii) Air monitoring shall be used to
ployees and chemicals chosen for moni-
identify and quantify airborne levels of
toring are based on the criteria stated
hazardous substances and safety and
above.
health hazards in order to determine
the appropriate level of employee pro- NOTE TO (h): It is not required to monitor
tection needed on site. employees engaged in site characterization
(2) Initial entry. Upon initial entry, operations covered by paragraph (c) of this
section.
representative air monitoring shall be
conducted to identify any IDLH condi- (i) Informational programs. Employers
tion, exposure over permissible expo- shall develop and implement a pro-
sure limits or published exposure lev- gram, which is part of the employers
els, exposure over a radioactive mate- safety and health program required in
rials dose limits or other dangerous paragraph (b) of this section, to inform

154

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00164 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65

employees, contractors, and sub- (ix) Drums and containers that can-
contractors (or their representative) not be moved without rupture, leakage,
actually engaged in hazardous waste or spillage shall be emptied into a
operations of the nature, level and de- sound container using a device classi-
gree of exposure likely as a result of fied for the material being transferred.
participation in such hazardous waste (x) A ground-penetrating system or
operations. Employees, contractors and other type of detection system or de-
subcontractors working outside of the vice shall be used to estimate the loca-
operations part of a site are not cov- tion and depth of buried drums or con-
ered by this standard. tainers.
(j) Handling drums and containers(1) (xi) Soil or covering material shall be
General. (i) Hazardous substances and removed with caution to prevent drum
contaminated soils, liquids, and other or container rupture.
residues shall be handled, transported, (xii) Fire extinguishing equipment
labeled, and disposed of in accordance meeting the requirements of subpart F
with this paragraph. of this part shall be on hand and ready
(ii) Drums and containers used dur- for use to control incipient fires.
ing the clean-up shall meet the appro- (2) Opening drums and containers. The
priate DOT, OSHA, and EPA regula- following procedures shall be followed
tions for the wastes that they contain. in areas where drums or containers are
(iii) When practical, drums and con- being opened:
tainers shall be inspected and their in-
(i) Where an airline respirator system
tegrity shall be assured prior to being
is used, connections to the source of air
moved. Drums or containers that can-
supply shall be protected from con-
not be inspected before being moved
tamination and the entire system shall
because of storage conditions (i.e., bur-
be protected from physical damage.
ied beneath the earth, stacked behind
(ii) Employees not actually involved
other drums, stacked several tiers high
in opening drums or containers shall be
in a pile, etc.) shall be moved to an ac-
kept a safe distance from the drums or
cessible location and inspected prior to
containers being opened.
further handling.
(iv) Unlabelled drums and containers (iii) If employees must work near or
shall be considered to contain haz- adjacent to drums or containers being
ardous substances and handled accord- opened, a suitable shield that does not
ingly until the contents are positively interfere with the work operation shall
identified and labeled. be placed between the employee and
(v) Site operations shall be organized the drums or containers being opened
to minimize the amount of drum or to protect the employee in case of acci-
container movement. dental explosion.
(vi) Prior to movement of drums or (iv) Controls for drum or container
containers, all employees exposed to opening equipment, monitoring equip-
the transfer operation shall be warned ment, and fire suppression equipment
of the potential hazards associated shall be located behind the explosion-
with the contents of the drums or con- resistant barrier.
tainers. (v) When there is a reasonable possi-
(vii) U.S. Department of Transpor- bility of flammable atmospheres being
tation specified salvage drums or con- present, material handling equipment
tainers and suitable quantities of prop- and hand tools shall be of the type to
er absorbent shall be kept available prevent sources of ignition.
and used in areas where spills, leaks, or (vi) Drums and containers shall be
ruptures may occur. opened in such a manner that excess
(viii) Where major spills may occur, a interior pressure will be safely re-
spill containment program, which is lieved. If pressure can not be relieved
part of the employers safety and from a remote location, appropriate
health program required in paragraph shielding shall be placed between the
(b) of this section, shall be imple- employee and the drums or containers
mented to contain and isolate the en- to reduce the risk of employee injury.
tire volume of the hazardous substance (vii) Employees shall not stand upon
being transferred. or work from drums or containers.

155

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00165 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)

(3) Material handling equipment. Mate- Transportation regulations. Employers and


rial handiing equipment used to trans- their shippers should refer to 49 CFR 173.21
fer drums and containers shall be se- and 173.50.
lected, positioned and operated to min- (6) Laboratory waste packs. In addition
imize sources of ignition related to the to the requirements of paragraph (j)(5)
equipment from igniting vapors re- of this section, the following pre-
leased from ruptured drums or con- cautions shall be taken, as a minimum,
tainers. in handling laboratory waste packs
(4) Radioactive wastes. Drums and con-
(lab packs):
tainers containing radioactive wastes
shall not be handled until such time as (i) Lab packs shall be opened only
their hazard to employees is properly when necessary and then only by an in-
assessed. dividual knowledgeable in the inspec-
(5) Shock sensitive wastes. As a min- tion, classification, and segregation of
imum, the following special pre- the containers within the pack accord-
cautions shall be taken when drums ing to the hazards of the wastes.
and containers containing or suspected (ii) If crystalline material is noted on
of containing shock-sensitive wastes any container, the contents shall be
are handled: handled as a shock-sensitive waste
(i) All non-essential employees shall until the contents are identified.
be evacuated from the area of transfer. (7) Sampling of drum and container
(ii) Material handling equipment contents. Sampling of containers and
shall be provided with explosive con- drums shall be done in accordance with
tainment devices or protective shields a sampling procedure which is part of
to protect equipment operators from the site safety and health plan devel-
exploding containers. oped for and available to employees
(iii) An employee alarm system capa- and others at the specific worksite.
ble of being perceived above sur- (8) Shipping and transport. (i) Drums
rounding light and noise conditions and containers shall be identified and
shall be used to signal the commence- classified prior to packaging for ship-
ment and completion of explosive ment.
waste handling activities. (ii) Drum or container staging areas
(iv) Continuous communications (i.e.,
shall be kept to the minimum number
portable radios, hand signals, tele-
necessary to identify and classify ma-
phones, as appropriate) shall be main-
terials safely and prepare them for
tained between the employee-in-charge
transport.
of the immediate handling area and
both the site safety and health super- (iii) Staging areas shall be provided
visor and the command post until such with adequate access and egress routes.
time as the handling operation is com- (iv) Bulking of hazardous wastes
pleted. Communication equipment or shall be permitted only after a thor-
methods that could cause shock sen- ough characterization of the materials
sitive materials to explode shall not be has been completed.
used. (9) Tank and vault procedures. (i)
(v) Drums and containers under pres- Tanks and vaults containing hazardous
sure, as evidenced by bulging or swell- substances shall be handled in a man-
ing, shall not be moved until such time ner similar to that for drums and con-
as the cause for excess pressure is de- tainers, taking into consideration the
termined and appropriate containment size of the tank or vault.
procedures have been implemented to (ii) Appropriate tank or vault entry
protect employees from explosive relief procedures as described in the employ-
of the drum. ers safety and health plan shall be fol-
(vi) Drums and containers containing lowed whenever employees must enter
packaged laboratory wastes shall be a tank or vault.
considered to contain shock-sensitive (k) Decontamination(1) General. Pro-
or explosive materials until they have cedures for all phases of decontamina-
been characterized. tion shall be developed and imple-
CAUTION: Shipping of shock sensitive wastes mented in accordance with this para-
may be prohibited under U.S. Department of graph.

156

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00166 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65

(2) Decontamination procedures. (i) A (8) Showers and change rooms. Where
decontamination procedure shall be de- the decontamination procedure indi-
veloped, communicated to employees cates a need for regular showers and
and implemented before any employees change rooms outside of a contami-
or equipment may enter areas on site nated area, they shall be provided and
where potential for exposure to haz- meet the requirements of 29 CFR
ardous substances exists. 1910.141. If temperature conditions pre-
(ii) Standard operating procedures vent the effective use of water, then
shall be developed to minimize em- other effective means for cleansing
ployee contact with hazardous sub- shall be provided and used.
stances or with equipment that has (l) Emergency response by employees at
contacted hazardous substances. uncontrolled hazardous waste sites(1)
(iii) All employees leaving a contami- Emergency response plan. (i) An emer-
nated area shall be appropriately de- gency response plan shall be developed
contaminated; all contaminated cloth- and implemented by all employers
ing and equipment leaving a contami- within the scope of paragraphs (a)(1)
nated area shall be appropriately dis- (i)(ii) of this section to handle antici-
posed of or decontaminated. pated emergencies prior to the com-
(iv) Decontamination procedures mencement of hazardous waste oper-
shall be monitored by the site safety ations. The plan shall be in writing and
and health supervisor to determine available for inspection and copying by
their effectiveness. When such proce- employees, their representatives,
dures are found to be ineffective, ap- OSHA personnel and other govern-
propriate steps shall be taken to cor- mental agencies with relevant respon-
rect any deficiencies. sibilities.
(3) Location. Decontamination shall (ii) Employers who will evacuate
be performed in geographical areas their employees from the danger area
that will minimize the exposure of when an emergency occurs, and who do
uncontaminated employees or equip- not permit any of their employees to
ment to contaminated employees or assist in handling the emergency, are
equipment. exempt from the requirements of this
(4) Equipment and solvents. All equip- paragraph if they provide an emer-
ment and solvents used for decon- gency action plan complying with
tamination shall be decontaminated or 1926.35 of this part.
disposed of properly. (2) Elements of an emergency response
(5) Personal protective clothing and plan. The employer shall develop an
equipment. (i) Protective clothing and emergency response plan for emer-
equipment shall be decontaminated, gencies which shall address, as a min-
cleaned, laundered, maintained or re- imum, the following:
placed as needed to maintain their ef- (i) Pre-emergency planning.
fectiveness. (ii) Personnel roles, lines of author-
(ii) Employees whose non-imper- ity, and communication.
meable clothing becomes wetted with (iii) Emergency recognition and pre-
hazardous substances shall imme- vention.
diately remove that clothing and pro- (iv) Safe distances and places of ref-
ceed to shower. The clothing shall be uge.
disposed of or decontaminated before it (v) Site security and control.
is removed from the work zone. (vi) Evacuation routes and proce-
(6) Unauthorized employees. Unauthor- dures.
ized employees shall not remove pro- (vii) Decontamination procedures
tective clothing or equipment from which are not covered by the site safe-
change rooms. ty and health plan.
(7) Commercial laundries or cleaning es- (viii) Emergency medical treatment
tablishments. Commercial laundries or and first aid.
cleaning establishments that decon- (ix) Emergency alerting and response
taminate protective clothing or equip- procedures.
ment shall be informed of the poten- (x) Critique of response and follow-
tially harmful effects of exposures to up.
hazardous substances. (xi) PPE and emergency equipment.

157

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00167 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)

(3) Procedures for handling emergency TABLE D65.1MINIMUM ILLUMINATION


incidents. (i) In addition to the ele- INTENSITIES IN FOOT-CANDLESContinued
ments for the emergency response plan
Foot-
required in paragraph (1)(2) of this sec- can- Area or operations
tion, the following elements shall be dles
included for emergency response plans: 5 ........ Tunnels, shafts, and general underground work
(A) Site topography, layout, and pre- areas. (Exception: Minimum of 10 foot-candles is
vailing weather conditions. required at tunnel and shaft heading during drilling
mucking, and scaling. Mine Safety and Health Ad-
(B) Procedures for reporting inci- ministration approved cap lights shall be accept-
dents to local, state, and federal gov- able for use in the tunnel heading.)
ernmental agencies. 10 ...... General shops (e.g., mechanical and electrical
equipment rooms, active storerooms, barracks or
(ii) The emergency response plan living quarters, locker or dressing rooms, dining
shall be a separate section of the Site areas, and indoor toilets and workrooms.)
Safety and Health Plan. 30 ...... First aid stations, infirmaries, and offices.
(iii) The emergency response plan
shall be compatible and integrated (n) Sanitation at temporary work-
with the disaster, fire and/or emer- places(1) Potable water. (i) An ade-
gency response plans of local, state, quate supply of potable water shall be
and federal agencies. provided on the site.
(iv) The emergency response plan (ii) Portable containers used to dis-
shall be rehearsed regularly as part of pense drinking water shall be capable
the overall training program for site of being tightly closed, and equipped
operations. with a tap. Water shall not be dipped
(v) The site emergency response plan from containers.
shall be reviewed periodically and, as (iii) Any container used to distribute
necessary, be amended to keep it cur- drinking water shall be clearly marked
rent with new or changing site condi- as to the nature of its contents and not
tions or information. used for any other purpose.
(vi) An employee alarm system shall (iv) Where single service cups (to be
be installed in accordance with 29 CFR used but once) are supplied, both a san-
1926.159 to notify employees of an emer- itary container for the unused cups and
gency situation; to stop work activities a receptacle for disposing of the used
if necessary; to lower background noise cups shall be provided.
in order to speed communication; and (2) Nonpotable water. (i) Outlets for
to begin emergency procedures. nonpotable water, such as water for
firefighting purposes, shall be identi-
(vii) Based upon the information
fied to indicate clearly that the water
available at time of the emergency, the
is unsafe and is not to be used for
employer shall evaluate the incident
drinking, washing, or cooking pur-
and the site response capabilities and
poses.
proceed with the appropriate steps to
(ii) There shall be no cross-connec-
implement the site emergency response
tion, open or potential, between a sys-
plan.
tem furnishing potable water and a
(m) Illumination. Areas accessible to
system furnishing nonpotable water.
employees shall be lighted to not less
(3) Toilet facilities. (i) Toilets shall be
than the minimum illumination inten-
provided for employees according to
sities listed in the following Table D
the following Table D65.2.
65.1 while any work is in progress:
TABLE D65.2TOILET FACILITIES
TABLE D65.1MINIMUM ILLUMINATION
INTENSITIES IN FOOT-CANDLES Number of employees Minimum number of facilities

Foot- 20 or fewer ............................. One.


can- Area or operations More than 20, fewer than 200 One toilet seat and one uri-
dles nal per 40 employees.
More than 200 ........................ One toilet seat and one uri-
5 ........ General site areas. nal per 50 employees.
3 ........ Excavation and waste areas, accessways, active
storage areas, loading platforms, refueling, and
field maintenance areas.
(ii) Under temporary field conditions,
5 ........ Indoors: Warehouses, corridors, hallways, and provisions shall be made to assure that
exitways. at least one toilet facility is available.

158

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00168 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65

(iii) Hazardous waste sites not pro- the worksite, shall provide employees
vided with a sanitary sewer shall be with a clean area where they can re-
provided with the following toilet fa- move, store, and put on street clothing.
cilities unless prohibited by local The second area, with an exit to the
codes: worksite, shall provide employees with
(A) Chemical toilets; an area where they can put on, remove
(B) Recirculating toilets; and store work clothing and personal
(C) Combustion toilets; or protective equipment.
(D) Flush toilets. (iii) Showers and change rooms shall
(iv) The requirements of this para- be located in areas where exposures are
graph for sanitation facilities shall not below the permissible exposure limits
apply to mobile crews having transpor- and published exposure levels. If this
tation readily available to nearby toi- cannot be accomplished, then a ven-
let facilities. tilation system shall be provided that
(v) Doors entering toilet facilities will supply air that is below the per-
shall be provided with entrance locks missible exposure limits and published
controlled from inside the facility. exposure levels.
(4) Food handling. All food service fa- (iv) Employers shall assure that em-
cilities and operations for employees ployees shower at the end of their work
shall meet the applicable laws, ordi- shift and when leaving the hazardous
nances, and regulations of the jurisdic- waste site.
tions in which they are located. (o) New technology programs. (1) The
(5) Temporary sleeping quarters. When employer shall develop and implement
temporary sleeping quarters are pro- procedures for the introduction of ef-
vided, they shall be heated, ventilated, fective new technologies and equip-
and lighted. ment developed for the improved pro-
(6) Washing facilities. The employer tection of employees working with haz-
shall provide adequate washing facili- ardous waste clean-up operations, and
ties for employees engaged in oper- the same shall be implemented as part
ations where hazardous substances of the site safety and health program
may be harmful to employees. Such fa- to assure that employee protection is
cilities shall be in near proximity to being maintained.
the worksite; in areas where exposures (2) New technologies, equipment or
are below permissible exposure limits control measures available to the in-
and published exposure levels and dustry, such as the use of foams,
which are under the controls of the em- absorbents, adsorbents, neutralizers, or
ployer; and shall be so equipped as to other means to suppress the level of air
enable employees to remove hazardous contaminates while excavating the site
substances from themselves. or for spill control, shall be evaluated
(7) Showers and change rooms. When by employers or their representatives.
hazardous waste clean-up or removal Such an evaluation shall be done to de-
operations commence on a site and the termine the effectiveness of the new
duration of the work will require six methods, materials, or equipment be-
months or greater time to complete, fore implementing their use on a large
the employer shall provide showers and scale for enhancing employee protec-
change rooms for all employees ex- tion. Information and data from manu-
posed to hazardous substances and facturers or suppliers may be used as
health hazards involved in hazardous part of the employers evaluation ef-
waste clean-up or removal operations. fort. Such evaluations shall be made
(i) Showers shall be provided and available to OSHA upon request.
shall meet the requirements of 29 CFR (p) Certain operations conducted under
1926.51(f)(4). the Resource Conservation and Recovery
(ii) Change rooms shall be provided Act of 1976 (RCRA). Employers con-
and shall meet the requirements of 29 ducting operations at treatment, stor-
CFR 1926.51(i). Change rooms shall con- age and disposal (TSD) facilities speci-
sist of two separate change areas sepa- fied in paragraph (a)(1)(iv) of this sec-
rated by the shower area required in tion shall provide and implement the
paragraph (n)(7)(i) of this section. One programs specified in this paragraph.
change area, with an exit leading off See the Notes and Exceptions to

159

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00169 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)

paragraph (a)(2)(iii) of this section for stances at TSD operations to enable


employers not covered.). the employees to perform their as-
(1) Safety and health program. The em- signed duties and functions in a safe
ployer shall develop and implement a and healthful manner so as not endan-
written safety and health program for ger themselves or other employees. The
employees involved in hazardous waste initial training shall be for 24 hours
operations that shall be available for and refresher training shall be for eight
inspection by employees, their rep- hours annually. Employees who have
resentatives and OSHA personnel. The received the initial training required
program shall be designed to identify, by this paragraph shall be given a writ-
evaluate and control safety and health ten certificate attesting that they have
hazards in their facilities for the pur- successfully completed the necessary
pose of employee protection, to provide training.
for emergency response meeting the re- (ii) Current employees. Employers who
quirements of paragraph (p)(8) of this can show by an employees previous
section and to address as appropriate work experience and/or training that
site analysis, engineering controls, the employee has had training equiva-
maximum exposure limits, hazardous lent to the initial training required by
waste handling procedures and uses of this paragraph, shall be considered as
new technologies. meeting the initial training require-
(2) Hazard communication program. ments of this paragraph as to that em-
The employer shall implement a haz- ployee. Equivalent training includes
ard communication program meeting the training that existing employees
the requirements of 29 CFR 1926.59 as might have already received from ac-
part of the employers safety and pro- tual site work experience. Current em-
gram. ployees shall receive eight hours of re-
NOTE TO 1926.65: The exemption for haz- fresher training annually.
ardous waste provided in 1926.59 is applica- (iii) Trainers. Trainers who teach ini-
ble to this section. tial training shall have satisfactorily
(3) Medical surveillance program. The completed a training course for teach-
employer shall develop and implement ing the subjects they are expected to
a medical surveillance program meet- teach or they shall have the academic
ing the requirements of paragraph (f) of credentials and instruction experience
this section. necessary to demonstrate a good com-
(4) Decontamination program. The em- mand of the subject matter of the
ployer shall develop and implement a courses and competent instructional
decontamination procedure meeting skills.
the requirements of paragraph (k) of (8) Emergency response program(i)
this section. Emergency response plan. An emergency
(5) New technology program. The em- response plan shall be developed and
ployer shall develop and implement implemented by all employers. Such
procedures meeting the requirements plans need not duplicate any of the
of paragraph (o) of this section for in- subjects fully addressed in the employ-
troducing new and innovative equip- ers contingency planning required by
ment into the workplace. permits, such as those issued by the
(6) Material handling program. Where U.S. Environmental Protection Agen-
employees will be handling drums or cy, provided that the contingency plan
containers, the employer shall develop is made part of the emergency response
and implement procedures meeting the plan. The emergency response plan
requirements of paragraphs (j)(1) (ii) shall be a written portion of the em-
through (viii) and (xi) of this section, ployers safety and health program re-
as well as (j)(3) and (j)(8) of this section quired in paragraph (p)(1) of this sec-
prior to starting such work. tion. Employers who will evacuate
(7) Training program(i) New employ- their employees from the worksite lo-
ees. The employer shall develop and im- cation when an emergency occurs and
plement a training program, which is who do not permit any of their employ-
part of the employers safety and ees to assist in handling the emergency
health program, for employees exposed are exempt from the requirements of
to health hazards or hazardous sub- paragraph (p)(8) if they provide an

160

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00170 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65

emergency action plan complying with ness training to recognize that an emer-
1926.35 of this part. gency response situation exists and they
(ii) Elements of an emergency response have been instructed to call the designated
outside fully-trained emergency response
plan. The employer shall develop an
team for assistance.
emergency response plan for emer-
gencies which shall address, as a min- (B) Employee members of TSD facil-
imum, the following areas to the ex- ity emergency response organizations
tent that they are not addressed in any shall be trained to a level of com-
specific program required in this para- petence in the recognition of health
graph: and safety hazards to protect them-
(A) Pre-emergency planning and co- selves and other employees. This would
ordination with outside parties. include training in the methods used to
(B) Personnel roles, lines of author- minimize the risk from safety and
ity, and communication. health hazards; in the safe use of con-
(C) Emergency recognition and pre- trol equipment; in the selection and
vention. use of appropriate personal protective
(D) Safe distances and places of ref- equipment; in the safe operating proce-
uge. dures to be used at the incident scene;
(E) Site security and control. in the techniques of coordination with
(F) Evacuation routes and proce- other employees to minimize risks; in
dures. the appropriate response to over expo-
(G) Decontamination procedures. sure from health hazards or injury to
(H) Emergency medical treatment themselves and other employees; and
and first aid. in the recognition of subsequent symp-
(I) Emergency alerting and response toms which may result from over expo-
procedures. sures.
(J) Critique of response and follow- (C) The employer shall certify that
up. each covered employee has attended
(K) PPE and emergency equipment. and successfully completed the train-
(iii) Training. (A) Training for emer- ing required in paragraph (p)(8)(iii) of
gency response employees shall be this section, or shall certify the em-
completed before they are called upon ployees competency at least yearly.
to perform in real emergencies. Such The method used to demonstrate com-
training shall include the elements of petency for certification of training
the emergency response plan, standard shall be recorded and maintained by
operating procedures the employer has the employer.
established for the job, the personal (iv) Procedures for handling emergency
protective equipment to be worn and incidents. (A) In addition to the ele-
procedures for handling emergency in- ments for the emergency response plan
cidents. required in paragraph (p)(8)(ii) of this
Exception #1: An employer need not train all section, the following elements shall be
employees to the degree specified if the included for emergency response plans
employer divides the work force in a man- to the extent that they do not repeat
ner such that a sufficient number of em- any information already contained in
ployees who have responsibility to control the emergency response plan:
emergencies have the training specified, (1) Site topography, layout, and pre-
and all other employees, who may first re-
vailing weather conditions.
spond to an emergency incident, have suffi-
cient awareness training to recognize that (2) Procedures for reporting incidents
an emergency response situation exists and to local, state, and federal govern-
that they are instructed in that case to mental agencies.
summon the fully trained employees and (B) The emergency response plan
not attempt control activities for which shall be compatible and integrated
they are not trained. with the disaster, fire and/or emer-
Exception #2: An employer need not train all gency response plans of local, state,
employees to the degree specified if ar-
and federal agencies.
rangements have been made in advance for
an outside fully-trained emergency re- (C) The emergency response plan
sponse team to respond in a reasonable pe- shall be rehearsed regularly as part of
riod and all employees, who may come to the overall training program for site
the incident first, have sufficient aware- operations.

161

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00171 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)

(D) The site emergency response plan imum, the following to the extent that
shall be reviewed periodically and, as they are not addressed elsewhere:
necessary, be amended to keep it cur- (i) Pre-emergency planning and co-
rent with new or changing site condi- ordination with outside parties.
tions or information. (ii) Personnel roles, lines of author-
(E) An employee alarm system shall ity, training, and communication.
be installed in accordance with 29 CFR (iii) Emergency recognition and pre-
1926.159 to notify employees of an emer- vention.
gency situation; to stop work activities
(iv) Safe distances and places of ref-
if necessary; to lower background noise
in order to speed communication; and uge.
to begin emergency procedures. (v) Site security and control.
(F) Based upon the information avail- (vi) Evacuation routes and proce-
able at time of the emergency, the em- dures.
ployer shall evaluate the incident and (vii) Decontamination.
the site response capabilities and pro- (viii) Emergency medical treatment
ceed with the appropriate steps to im- and first aid.
plement the site emergency response (ix) Emergency alerting and response
plan. procedures.
(q) Emerqency response to hazardous (x) Critique of response and follow-
substance releases. This paragraph cov- up.
ers employers whose employees are en- (xi) PPE and emergency equipment.
gaged in emergency response no matter
(xii) Emergency response organiza-
where it occurs except that it does not
tions may use the local emergency re-
cover employees engaged in operations
specified in paragraphs (a)(1)(i) through sponse plan or the state emergency re-
(a)(1)(iv) of this section. Those emer- sponse plan or both, as part of their
gency response organizations who have emergency response plan to avoid du-
developed and implemented programs plication. Those items of the emer-
equivalent to this paragraph for han- gency response plan that are being
dling releases of hazardous substances properly addressed by the SARA Title
pursuant to section 303 of the Super- III plans may be substituted into their
fund Amendments and Reauthorization emergency plan or otherwise kept to-
Act of 1986 (Emergency Planning and gether for the employer and employees
Community Right-to-Know Act of 1986, use.
42 U.S.C. 11003) shall be deemed to have (3) Procedures for handling emergency
met the requirements of this para- response. (i) The senior emergency re-
graph. sponse official responding to an emer-
(1) Emergency response plan. An emer- gency shall become the individual in
gency response plan shall be developed charge of a site-specific Incident Com-
and implemented to handle anticipated mand System (ICS). All emergency re-
emergencies prior to the commence- sponders and their communications
ment of emergency response oper- shall be coordinated and controlled
ations. The plan shall be in writing and through the individual in charge of the
available for inspection and copying by ICS assisted by the senior official
employees, their representatives and
present for each employer.
OSHA personnel. Employers who will
evacuate their employees from the NOTE TO (g)(3)(i): The senior official at an
danger area when an emergency occurs, emergency response is the most senior offi-
and who do not permit any of their em- cial on the site who has the responsibility
ployees to assist in handling the emer- for controlling the operations at the site.
gency, are exempt from the require- Initially it is the senior officer on the first-
ments of this paragraph if they provide due piece of responding emergency apparatus
an emergency action plan in accord- to arrive on the incident scene. As more sen-
ior officers arrive (i.e., battalion chief, fire
ance with 1926.35 of this part.
chief, state law enforcement official, site co-
(2) Elements of an emergency response ordinator, etc.) the position is passed up the
plan. The employer shall develop an line of authority which has been previously
emergency response plan for emer- established.
gencies which shall address, as a min-

162

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00172 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65

(ii) The individual in charge of the (viii) When activities are judged by
ICS shall identify, to the extent pos- the safety official to be an IDLH condi-
sible, all hazardous substances or con- tion and/or to involve an imminent
ditions present and shall address as ap- danger condition, the safety official
propriate site analysis, use of engineer- shall have the authority to alter, sus-
ing controls, maximum exposure lim- pend, or terminate those activities.
its, hazardous substance handling pro- The safety official shall immediately
cedures, and use of any new tech- inform the individual in charge of the
nologies. ICS of any actions needed to be taken
(iii) Based on the hazardous sub- to correct these hazards at the emer-
stances and/or conditions present, the gency scene.
individual in charge of the ICS shall (ix) After emergency operations have
implement appropriate emergency op- terminated, the individual in charge of
erations, and assure that the personal the ICS shall implement appropriate
protective equipment worn is appro- decontamination procedures.
priate for the hazards to be encoun-
(x) When deemed necessary for meet-
tered. However, personal protective
ing the tasks at hand, approved self-
equipment shall meet, at a minimum,
contained compressed air breathing ap-
the criteria contained in 29 CFR 1926.97
paratus may be used with approved cyl-
when worn while performing fire fight-
inders from other approved self-con-
ing operations beyond the incipient
tained compressed air breathing appa-
stage for any incident.
ratus provided that such cylinders are
(iv) Employees engaged in emergency
of the same capacity and pressure rat-
response and exposed to hazardous sub-
ing. All compressed air cylinders used
stances presenting an inhalation haz-
with self-contained breathing appa-
ard or potential inhalation hazard shall
wear positive pressure self-contained ratus shall meet U.S. Department of
breathing apparatus while engaged in Transportation and National Institute
emergency response, until such time for Occupational Safety and Health cri-
that the individual in charge of the ICS teria.
determines through the use of air mon- (4) Skilled support personnel. Per-
itoring that a decreased level of res- sonnel, not necessarily an employers
piratory protection will not result in own employees, who are skilled in the
hazardous exposures to employees. operation of certain equipment, such as
(v) The individual in charge of the mechanized earth moving or digging
ICS shall limit the number of emer- equipment or crane and hoisting equip-
gency response personnel at the emer- ment, and who are needed temporarily
gency site, in those areas of potential to perform immediate emergency sup-
or actual exposure to incident or site port work that cannot reasonably be
hazards, to those who are actively per- performed in a timely fashion by an
forming emergency operations. How- employers own employees, and who
ever, operations in hazardous areas will be or may be exposed to the haz-
shall be performed using the buddy sys- ards at an emergency response scene,
tem in groups of two or more. are not required to meet the training
(vi) Back-up personnel shall stand by required in this paragraph for the em-
with equipment ready to provide as- ployers regular employees. However,
sistance or rescue. Advance first aid these personnel shall be given an ini-
support personnel, as a minimum, shall tial briefing at the site prior to their
also stand by with medical equipment participation in any emergency re-
and transportation capability. sponse. The initial briefing shall in-
(vii) The individual in charge of the clude instruction in the wearing of ap-
ICS shall designate a safety official, propriate personal protective equip-
who is knowledgable in the operations ment, what chemical hazards are in-
being implemented at the emergency volved, and what duties are to be per-
response site, with specific responsi- formed. All other appropriate safety
bility to identify and evaluate hazards and health precautions provided to the
and to provide direction with respect employers own employees shall be
to the safety of operations for the used to assure the safety and health of
emergency at hand. these personnel.

163

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00173 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)

(5) Specialist employees. Employees Transportations Emergency Response


who, in the course of their regular job Guidebook.
duties, work with and are trained in (F) The ability to realize the need for
the hazards of specific hazardous sub- additional resources, and to make ap-
stances, and who will be called upon to propriate notifications to the commu-
provide technical advice or assistance nication center.
at a hazardous substance release inci- (ii) First responder operations level.
dent to the individual in charge, shall First responders at the operations level
receive training or demonstrate com- are individuals who respond to releases
petency in the area of their specializa- or potential releases of hazardous sub-
tion annually. stances as part of the initial response
(6) Training. Training shall be based to the site for the purpose of protecting
on the duties and function to be per- nearby persons, property, or the envi-
formed by each responder of an emer- ronment from the effects of the re-
gency response organization. The skill lease. They are trained to respond in a
and knowledge levels required for all defensive fashion without actually try-
new responders, those hired after the ing to stop the release. Their function
effective date of this standard, shall be is to contain the release from a safe
conveyed to them through training be- distance, keep it from spreading, and
fore they are permitted to take part in prevent exposures. First responders at
actual emergency operations on an in- the operational level shall have re-
cident. Employees who participate, or
ceived at least eight hours of training
are expected to participate, in emer-
or have had sufficient experience to ob-
gency response, shall be given training
jectively demonstrate competency in
in accordance with the following para-
the following areas in addition to those
graphs:
listed for the awareness level and the
(i) First responder awareness level. employer shall so certify:
First responders at the awareness level
(A) Knowledge of the basic hazard
are individuals who are likely to wit-
and risk assessment techniques.
ness or discover a hazardous substance
release and who have been trained to (B) Know how to select and use prop-
initiate an emergency response se- er personal protective equipment pro-
quence by notifying the proper authori- vided to the first responder operational
ties of the release. They would take no level.
further action beyond notifying the au- (C) An understanding of basic haz-
thorities of the release. First respond- ardous materials terms.
ers at the awareness level shall have (D) Know how to perform basic con-
sufficient training or have had suffi- trol, containment and/or confinement
cient experience to objectively dem- operations within the capabilities of
onstrate competency in the following the resources and personal protective
areas: equipment available with their unit.
(A) An understanding of what haz- (E) Know how to implement basic de-
ardous substances are, and the risks as- contamination procedures.
sociated with them in an incident. (F) An understanding of the relevant
(B) An understanding of the potential standard operating procedures and ter-
outcomes associated with an emer- mination procedures.
gency created when hazardous sub- (iii) Hazardous materials technician.
stances are present. Hazardous materials technicians are
(C) The ability to recognize the pres- individuals who respond to releases or
ence of hazardous substances in an potential releases for the purpose of
emergency. stopping the release. They assume a
(D) The ability to identify the haz- more aggressive role than a first re-
ardous substances, if possible. sponder at the operations level in that
(E) An understanding of the role of they will approach the point of release
the first responder awareness indi- in order to plug, patch or otherwise
vidual in the employers emergency re- stop the release of a hazardous sub-
sponse plan including site security and stance. Hazardous materials techni-
control and the U.S. Department of cians shall have received at least 24

164

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00174 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65

hours of training equal to the first re- (D) Be able to select and use proper
sponder operations level and in addi- specialized chemical personal protec-
tion have competency in the following tive equipment provided to the haz-
areas and the employer shall so certify: ardous materials specialist.
(A) Know how to implement the em- (E) Understand in-depth hazard and
ployers emergency response plan. risk techniques.
(B) Know the classification, identi- (F) Be able to perform specialized
fication and verification of known and control, containment, and/or confine-
unknown materials by using field sur- ment operations within the capabili-
vey instruments and equipment. ties of the resources and personal pro-
(C) Be able to function within an as- tective equipment available.
signed role in the Incident Command (G) Be able to determine and imple-
System. ment decontamination procedures.
(D) Know how to select and use prop- (H) Have the ability to develop a site
er specialized chemical personal pro- safety and control plan.
tective equipment provided to the haz- (I) Understand chemical, radiological
ardous materials technician. and toxicological terminology and be-
(E) Understand hazard and risk as- havior.
sessment techniques. (v) On scene incident commander. Inci-
(F) Be able to perform advance con- dent commanders, who will assume
trol, containment, and/or confinement control of the incident scene beyond
operations within the capabilities of the first responder awareness level,
the resources and personal protective shall receive at least 24 hours of train-
equipment available with the unit. ing equal to the first responder oper-
(G) Understand and implement de- ations level and in addition have com-
contamination procedures. petency in the following areas and the
(H) Understand termination proce- employer shall so certify:
dures. (A) Know and be able to implement
(I) Understand basic chemical and the employers incident command sys-
toxicological terminology and behav- tem.
ior. (B) Know how to implement the em-
(iv) Hazardous materials specialist. ployers emergency response plan.
Hazardous materials specialists are in- (C) Know and understand the hazards
dividuals who respond with and provide and risks associated with employees
support to hazardous materials techni- working in chemical protective cloth-
cians. Their duties parallel those of the ing.
hazardous materials technician, how- (D) Know how to implement the local
ever, those duties require a more di- emergency response plan.
rected or specific knowledge of the var- (E) Know of the state emergency re-
ious substances they may be called sponse plan and of the Federal Re-
upon to contain. The hazardous mate- gional Response Team.
rials specialist would also act as the (F) Know and understand the impor-
site liaison with Federal, state, local tance of decontamination procedures.
and other government authorities in (7) Trainers. Trainers who teach any
regards to site activities. Hazardous of the above training subjects shall
materials specialists shall have re- have satisfactorily completed a train-
ceived at least 24 hours of training ing course for teaching the subjects
equal to the technician level and in ad- they are expected to teach, such as the
dition have competency in the fol- courses offered by the U.S. National
lowing areas and the employer shall so Fire Academy, or they shall have the
certify: training and/or academic credentials
(A) Know how to implement the local and instructional experience necessary
emergency response plan. to demonstrate competent instruc-
(B) Understand classification, identi- tional skills and a good command of
fication and verification of known and the subject matter of the courses they
unknown materials by using advanced are to teach.
survey instruments and equipment. (8) Refresher training. (i) Those em-
(C) Know of the state emergency re- ployees who are trained in accordance
sponse plan. with paragraph (q)(6) of this section

165

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00175 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)

shall receive annual refresher training sonal protective equipment and decon-
of sufficient content and duration to tamination procedures. All equipment
maintain their competencies, or shall to be used in the performance of the
demonstrate competency in those areas clean-up work shall be in serviceable
at least yearly. condition and shall have been inspected
(ii) A statement shall be made of the prior to use.
training or competency, and if a state-
APPENDICES TO 1926.65HAZARDOUS WASTE
ment of competency is made, the em-
OPERATIONS AND EMERGENCY RESPONSE
ployer shall keep a record of the meth-
odology used to demonstrate com- NOTE: The following appendices serve as
petency. non-mandatory guidelines to assist employ-
(9) Medical surveillance and consulta- ees and employers in complying with the ap-
propriate requirements of this section. How-
tion. (i) Members of an organized and
ever 1926.65(g) makes mandatory in certain
designated HAZMAT team and haz- circumstances the use of Level A and Level
ardous materials specialists shall re- B PPE protection.
ceive a baseline physical examination
and be provided with medical surveil- APPENDIX A TO 1926.65PERSONAL
lance as required in paragraph (f) of PROTECTIVE EQUIPMENT TEST METHODS
this section. This appendix sets forth the non-manda-
(ii) Any emergency response employ- tory examples of tests which may be used to
ees who exhibits signs or symptoms evaluate compliance with 1926.65(g)(4) (ii)
which may have resulted from exposure and (iii). Other tests and other challenge
to hazardous substances during the agents may be used to evaluate compliance.
course of an emergency incident, either A. Totally-encapsulating chemical protective
immediately or subsequently, shall be suit pressure test
provided with medical consultation as
1.0Scope
required in paragraph (f)(3)(ii) of this
1.1 This practice measures the ability of a
section. gas tight totally-encapsulating chemical
(10) Chemical protective clothing. protective suit material, seams, and closures
Chemical protective clothing and to maintain a fixed positive pressure. The re-
equipment to be used by organized and sults of this practice allow the gas tight in-
designated HAZMAT team members, or tegrity of a totally-encapsulating chemical
to be used by hazardous materials spe- protective suit to be evaluated.
cialists, shall meet the requirements of 1.2 Resistance of the suit materials to
paragraphs (g) (3) through (5) of this permeation, penetration, and degradation by
specific hazardous substances is not deter-
section.
mined by this test method.
(11) Post-emergency response oper- 2.0Definition of terms
ations. Upon completion of the emer- 2.1 Totally-encapsulated chemical protective
gency response, if it is determined that suit (TECP suit) means a full body garment
it is necessary to remove hazardous which is constructed of protective clothing
substances, health hazards, and mate- materials; covers the wearers torso, head,
rials contaminated with them (such as arms, legs and respirator; may cover the
contaminated soil or other elements of wearers hands and feet with tightly at-
the natural environment) from the site tached gloves and boots; completely encloses
the wearer and respirator by itself or in com-
of the incident, the employer con-
bination with the wearers gloves and boots.
ducting the clean-up shall comply with 2.2 Protective clothing material means any
one of the following: material or combination of materials used in
(i) Meet all of the requirements of an item of clothing for the purpose of iso-
paragraphs (b) through (o) of this sec- lating parts of the body from direct contact
tion; or with a potentially hazardous liquid or gas-
(ii) Where the clean-up is done on eous chemicals.
plant property using plant or work- 2.3 Gas tight means, for the purpose of this
place employees, such employees shall test method, the limited flow of a gas under
pressure from the inside of a TECP suit to
have completed the training require-
atmosphere at a prescribed pressure and
ments of the following: 29 CFR 1926.35, time interval.
1926.59, and 1926.103, and other appro- 3.0Summary of test method
priate safety and health training made 3.1 The TECP suit is visually inspected and
necessary by the tasks that they are modified for the test. The test apparatus is
expected to be performed such as per- attached to the suit to permit inflation to

166

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00176 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65
the pre-test suit expansion pressure for re- sure to pressure (B), the suit test pressure.
moval of suit wrinkles and creases. The pres- Begin timing. At the end of three minutes,
sure is lowered to the test pressure and mon- record the suit pressure as pressure (C), the
itored for three minutes. If the pressure drop ending suit pressure. The difference between
is excessive, the TECP suit fails the test and the suit test pressure and the ending suit
is removed from service. The test is repeated test pressure (B-C) shall be defined as the
after leak location and repair. suit pressure drop.
4.0Required Supplies 6.1.6 If the suit pressure drop is more than
4.1 Source of compressed air. 20 percent of the suit test pressure (B) during
4.2 Test apparatus for suit testing, includ- the three-minute test period, the suit fails
ing a pressure measurement device with a the test and shall be removed from service.
sensitivity of at least 14 inch water gauge. 7.0Retest Procedure
4.3 Vent valve closure plugs or sealing 7.1 If the suit fails the test check for leaks
tape. by inflating the suit to pressure (A) and
4.4 Soapy water solution and soft brush. brushing or wiping the entire suit (including
4.5 Stop watch or appropriate timing de-
seams, closures, lens gaskets, glove-to-sleeve
vice.
joints, etc.) with a mild soap and water solu-
5.0Safety Precautions
tion. Observe the suit for the formation of
5.1 Care shall be taken to provide the cor-
soap bubbles, which is an indication of a
rect pressure safety devices required for the
leak. Repair all identified leaks.
source of compressed air used.
6.0Test Procedure 7.2 Retest the TECP suit as outlined in
6.1 Prior to each test, the tester shall per- Test procedure 6.0.
form a visual inspection of the suit. Check 8.0Report
the suit for seam integrity by visually exam- 8.1 Each TECP suit tested by this practice
ining the seams and gently pulling on the shall have the following information re-
seams. Ensure that all air supply lines, fit- corded:
tings, visor, zippers, and valves are secure 8.1.1 Unique identification number, identi-
and show no signs of deterioration. fying brand name, date of purchase, material
6.1.1 Seal off the vent valves along with of construction, and unique fit features, e.g.,
any other normal inlet or exhaust points special breathing apparatus.
(such as umbilical air line fittings or face 8.1.2 The actual values for test pressures
piece opening) with tape or other appropriate (A), (B), and (C) shall be recorded along with
means (caps, plugs, fixture, etc.). Care should the specific observation times. If the ending
be exercised in the sealing process not to pressure (C) is less than 80 percent of the test
damage any of the suit components. pressure (B), the suit shall be identified as
6.1.2 Close all closure assemblies. failing the test. When possible, the specific
6.1.3 Prepare the suit for inflation by pro- leak location shall be identified in the test
viding an improvised connection point on the records. Retest pressure data shall be re-
suit for connecting an airline. Attach the corded as an additional test.
pressure test apparatus to the suit to permit 8.1.3 The source of the test apparatus used
suit inflation from a compressed air source shall be identified and the sensitivity of the
equipped with a pressure indicating regu- pressure gauge shall be recorded.
lator. The leak tightness of the pressure test 8.1.4 Records shall be kept for each pres-
apparatus should be tested before and after sure test even if repairs are being made at
each test by closing off the end of the tubing the test location.
attached to the suit and assuring a pressure
of three inches water gauge for three min- CAUTION
utes can be maintained. If a component is re-
Visually inspect all parts of the suit to be
moved for the test, that component shall be
sure they are positioned correctly and se-
replaced and a second test conducted with
cured tightly before putting the suit back
another component removed to permit a
into service. Special care should be taken to
complete test of the ensemble.
examine each exhaust valve to make sure it
6.1.4 The pre-test expansion pressure (A)
is not blocked.
and the suit test pressure (B) shall be sup-
plied by the suit manufacturer, but in no Care should also be exercised to assure
case shall they be less than: (A)=three inches that the inside and outside of the suit is
water gauge; and (B)=two inches water completely dry before it is put into storage.
gauge. The ending suit pressure (C) shall be B. Totally-encapsulating chemical protective
no less than 80 percent of the test pressure suit qualitative leak test
(B); i.e., the pressure drop shall not exceed 20
percent of the test pressure (B). 1.0Scope
6.1.5 Inflate the suit until the pressure in- 1.1 This practice semi-qualitatively tests
side is equal to pressure (A), the pre-test ex- gas tight totally-encapsulating chemical
pansion suit pressure. Allow at least one protective suit integrity by detecting inward
minute to fill out the wrinkles in the suit. leakage of ammonia vapor. Since no modi-
Release sufficient air to reduce the suit pres- fications are made to the suit to carry out

167

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00177 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)
this test, the results from this practice pro- the test room and his stand-by person meas-
vide a realistic test for the integrity of the ures the ammonia concentration inside the
entire suit. suit using a low range ammonia length of
1.2 Resistance of the suit materials to per- stain detector tube or other more sensitive
meation, penetration, and degradation is not ammonia detector. A stand-by person is re-
determined by this test method. ASTM test quired to observe the test individual during
methods are available to test suit materials the test procedure; aid the person in donning
for these characteristics and the tests are and doffing the TECP suit; and monitor the
usually conducted by the manufacturers of suit interior. The intrusion coefficient of the
the suits. suit can be calculated by dividing the aver-
2.0Definition of terms age test area concentration by the interior
2.1 Totally-encapsulated chemical protective suit concentration. A colorimetric ammonia
suit (TECP suit) means a full body garment indicator strip of bromophenol blue or equiv-
which is constructed of protective clothing alent is placed on the inside of the suit face
materials; covers the wearers torso, head, piece lens so that the suited individual is
arms, legs and respirator; may cover the able to detect a color change and know if the
wearers hands and feet with tightly at- suit has a significant leak. If a color change
tached gloves and boots; completely encloses is observed the individual shall leave the test
the wearer and respirator by itself or in com- room immediately.
bination with the wearers gloves, and boots. 4.0Required supplies
2.2 Protective clothing material means any 4.1 A supply of concentrated aqueous am-
material or combination of materials used in monium hydroxide (58% by weight).
an item of clothing for the purpose of iso- 4.2 A supply of bromophenol/blue indi-
lating parts of the body from direct contact cating paper or equivalent, sensitive to 510
with a potentially hazardous liquid or gas- ppm ammonia or greater over a two-minute
eous chemicals. period of exposure. [pH 3.0 (yellow) to pH 4.6
2.3 Gas tight means, for the purpose of this (blue)]
test method, the limited flow of a gas under 4.3 A supply of high range (0.510 volume
pressure from the inside of a TECP suit to percent) and low range (5700 ppm) detector
atmosphere at a prescribed pressure and tubes for ammonia and the corresponding
time interval. sampling pump. More sensitive ammonia de-
2.4 Intrusion Coefficient means a number ex- tectors can be substituted for the low range
pressing the level of protection provided by a detector tubes to improve the sensitivity of
gas tight totally-encapsulating chemical this practice.
protective suit. The intrusion coefficient is 4.4 A shallow plastic pan (PVC) at least
calculated by dividing the test room chal- 12:14:1 and a half pint plastic container
lenge agent concentration by the concentra- (PVC) with tightly closing lid.
tion of challenge agent found inside the suit. 4.5 A graduated cylinder or other volu-
The accuracy of the intrusion coefficient is metric measuring device of at least 50 milli-
dependent on the challenge agent monitoring liters in volume with an accuracy of at least
methods. The larger the intrusion coefficient 1 milliliters.
the greater the protection provided by the
TECP suit. 5.0SAFETY PRECAUTIONS
3.0Summary of recommended practice 5.1 Concentrated aqueous ammonium hy-
3.1 The volume of concentrated aqueous droxide, NH4 OH, is a corrosive volatile liq-
ammonia solution (ammonia hydroxide NH4 uid requiring eye, skin, and respiratory pro-
OH) required to generate the test atmos- tection. The person conducting the test shall
phere is determined using the directions out- review the MSDS for aqueous ammonia.
lined in 6.1. The suit is donned by a person 5.2 Since the established permissible ex-
wearing the appropriate respiratory equip- posure limit for ammonia is 35 ppm as a 15
ment (either a positive pressure self-con- minute STEL, only persons wearing a posi-
tained breathing apparatus or a positive tive pressure self-contained breathing appa-
pressure supplied air respirator) and worn in- ratus or a positive pressure supplied air res-
side the enclosed test room. The con- pirator shall be in the chamber. Normally
centrated aqueous ammonia solution is only the person wearing the totally-encap-
taken by the suited individual into the test sulating suit will be inside the chamber. A
room and poured into an open plastic pan. A stand-by person shall have a positive pres-
two-minute evaporation period is observed sure self-contained breathing apparatus, or a
before the test room concentration is meas- positive pressure supplied air respirator
ured, using a high range ammonia length of available to enter the test area should the
stain detector tube. When the ammonia suited individual need assistance.
vapor reaches a concentration of between 5.3 A method to monitor the suited indi-
1000 and 1200 ppm, the suited individual vidual must be used during this test. Visual
starts a standardized exercise protocol to contact is the simplest but other methods
stress and flex the suit. After this protocol is using communication devices are acceptable.
completed, the test room concentration is 5.4 The test room shall be large enough to
measured again. The suited individual exits allow the exercise protocol to be carried out

168

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00178 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65
and then to be ventilated to allow for easy centration of 1000 ppm ammonia or greater
exhaust of the ammonia test atmosphere shall be generated before the exercises are
after the test(s) are completed. started.
5.5 Individuals shall be medically 6.7 To test the integrity of the suit the
screened for the use of respiratory protection following four minute exercise protocol
and checked for allergies to ammonia before should be followed:
participating in this test procedure. 6.7.1 Raising the arms above the head
with at least 15 raising motions completed in
6.0TEST PROCEDURE one minute.
6.1.1 Measure the test area to the nearest 6.7.2 Walking in place for one minute with
foot and calculate its volume in cubic feet. at least 15 raising motions of each leg in a
Multiply the test area volume by 0.2 milli- one-minute period.
liters of concentrated aqueous ammonia so- 6.7.3 Touching the toes with a least 10
lution per cubic foot of test area volume to complete motions of the arms from above
determine the approximate volume of con- the head to touching of the toes in a one-
centrated aqueous ammonia required to gen- minute period.
erate 1000 ppm in the test area. 6.7.4 Knee bends with at least 10 complete
6.1.2 Measure this volume from the supply standing and squatting motions in a one-
of concentrated aqueous ammonia and place minute period.
it into a closed plastic container. 6.8 If at any time during the test the col-
6.1.3 Place the container, several high orimetric indicating paper should change
range ammonia detector tubes, and the pump colors, the test should be stopped and section
in the clean test pan and locate it near the 6.10 and 6.12 initiated (See 4.2).
test area entry door so that the suited indi- 6.9 After completion of the test exercise,
vidual has easy access to these supplies. the test area concentration should be meas-
6.2.1 In a non-contaminated atmosphere, ured again using the high range colorimetric
open a pre-sealed ammonia indicator strip detector tube.
and fasten one end of the strip to the inside 6.10 Exit the test area.
of the suit face shield lens where it can be 6.11 The opening created by the suit zip-
seen by the wearer. Moisten the indicator per or other appropriate suit penetration
strip with distilled water. Care shall be should be used to determine the ammonia
taken not to contaminate the detector part concentration in the suit with the low range
of the indicator paper by touching it. A length of stain detector tube or other ammo-
small piece of masking tape or equivalent nia monitor. The internal TECP suit air
should be used to attach the indicator strip should be sampled far enough from the en-
to the interior of the suit face shield. closed test area to prevent a false ammonia
6.2.2 If problems are encountered with reading.
this method of attachment, the indicator 6.12 After completion of the measurement
strip can be attached to the outside of the of the suit interior ammonia concentration
respirator face piece lens being used during the test is concluded and the suit is doffed
the test. and the respirator removed.
6.3 Don the respiratory protective device 6.13 The ventilating fan for the test room
normally used with the suit, and then don should be turned on and allowed to run for
the TECP suit to be tested. Check to be sure enough time to remove the ammonia gas.
all openings which are intended to be sealed The fan shall be vented to the outside of the
(zippers, gloves, etc.) are completely sealed. building.
DO NOT, however, plug off any venting 6.14 Any detectable ammonia in the suit
valves. interior (five ppm ammonia (NH3) or more
6.4 Step into the enclosed test room such for the length of stain detector tube) indi-
as a closet, bathroom, or test booth, cates that the suit has failed the test. When
equipped with an exhaust fan. No air should other ammonia detectors are used a lower
be exhausted from the chamber during the level of detection is possible, and it should be
test because this will dilute the ammonia specified as the pass/fail criteria.
challenge concentrations. 6.15 By following this test method, an in-
6.5 Open the container with the pre-meas- trusion coefficient of approximately 200 or
ured volume of concentrated aqueous ammo- more can be measured with the suit in a
nia within the enclosed test room, and pour completely operational condition. If the in-
the liquid into the empty plastic test pan. trusion coefficient is 200 or more, then the
Wait two minutes to allow for adequate vola- suit is suitable for emergency response and
tilization of the concentrated aqueous am- field use.
monia. A small mixing fan can be used near
7.0Retest procedures
the evaporation pan to increase the evapo-
ration rate of the ammonia solution. 7.1 If the suit fails this test, check for
6.6 After two minutes a determination of leaks by following the pressure test in test A
the ammonia concentration within the above.
chamber should be made using the high 7.2 Retest the TECP suit as outlined in
range colorimetric detector tube. A con- the test procedure 6.0.

169

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00179 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)
8.0Report or skin contact); and the performance of the
PPE materials (and seams) in providing a bar-
8.1 Each gas tight totally-encapsulating
rier to these hazards. The amount of protec-
chemical protective suit tested by this prac-
tion provided by PPE is material-hazard spe-
tice shall have the following information re-
corded. cific. That is, protective equipment mate-
8.1.1 Unique identification number, iden- rials will protect well against some haz-
tifying brand name, date of purchase, mate- ardous substances and poorly, or not at all,
rial of construction, and unique suit fea- against others. In many instances, protec-
tures; e.g., special breathing apparatus. tive equipment materials cannot be found
8.1.2 General description of test room which will provide continuous protection
used for test. from the particular hazardous substance. In
8.1.3 Brand name and purchase date of these cases the breakthrough time of the
ammonia detector strips and color change protective material should exceed the work
data. durations.
8.1.4 Brand name, sampling range, and ex- Other factors in this selection process to
piration date of the length of stain ammonia be considered are matching the PPE to the
detector tubes. The brand name and model of employees work requirements and task-spe-
the sampling pump should also be recorded. cific conditions. The durability of PPE mate-
If another type of ammonia detector is used, rials, such as tear strength and seam
it should be identified along with its min- strength, should be considered in relation to
imum detection limit for ammonia. the employees tasks. The effects of PPE in
8.1.5 Actual test results shall list the two relation to heat stress and task duration are
test area concentrations, their average, the a factor in selecting and using PPE. In some
interior suit concentration, and the cal- cases layers of PPE may be necessary to pro-
culated intrusion coefficient. Retest data vide sufficient protection, or to protect ex-
shall be recorded as an additional test. pensive PPE inner garments, suits or equip-
8.2 The evaluation of the data shall be ment.
specified as suit passed or suit failed, The more that is known about the hazards
and the date of the test. Any detectable am- at the site, the easier the job of PPE selec-
monia (five ppm or greater for the length of tion becomes. As more information about
stain detector tube) in the suit interior indi- the hazards and conditions at the site be-
cates the suit has failed this test. When comes available, the site supervisor can
other ammonia detectors are used, a lower make decisions to up-grade or down-grade
level of detection is possible and it should be the level of PPE protection to match the
specified as the pass fail criteria. tasks at hand.
The following are guidelines which an em-
CAUTION ployer can use to begin the selection of the
Visually inspect all parts of the suit to be appropriate PPE. As noted above, the site in-
sure they are positioned correctly and se- formation may suggest the use of combina-
cured tightly before putting the suit back tions of PPE selected from the different pro-
into service. Special care should be taken to tection levels (i.e., A, B, C, or D) as being
examine each exhaust valve to make sure it more suitable to the hazards of the work. It
is not blocked. should be cautioned that the listing below
Care should also be exercised to assure does not fully address the performance of the
that the inside and outside of the suit is specific PPE material in relation to the spe-
completely dry before it is put into storage. cific hazards at the job site, and that PPE
selection, evaluation and re-selection is an
APPENDIX B TO 1926.65GENERAL DESCRIP- ongoing process until sufficient information
TION AND DISCUSSION OF THE LEVELS OF about the hazards and PPE performance is
PROTECTION AND PROTECTIVE GEAR obtained.
This appendix sets forth information about Part A. Personal protective equipment is
personal protective equipment (PPE) protec- divided into four categories based on the de-
tion levels which may be used to assist em- gree of protection afforded. (See Part B of
ployers in complying with the PPE require- this appendix for further explanation of Lev-
ments of this section. els A, B, C, and D hazards.)
As required by the standard, PPE must be I. Level A To be selected when the great-
selected which will protect employees from est level of skin, respiratory, and eye protec-
the specific hazards which they are likely to tion is required.
encounter during their work on-site. The following constitute Level A equip-
Selection of the appropriate PPE is a com- ment; it may be used as appropriate;
plex process which should take into consider- 1. Positive pressure, full face-piece self-
ation a variety of factors. Key factors in- contained breathing apparatus (SCBA), or
volved in this process are identification of positive pressure supplied air respirator with
the hazards, or suspected hazards; their escape SCBA, approved by the National In-
routes of potential hazard to employees (in- stitute for Occupational Safety and Health
halation, skin absorption, ingestion, and eye (NIOSH).

170

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00180 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65
2. Totally-encapsulating chemical-protec- 4. Boots, outer, chemical-resistant (dispos-
tive suit. able). 1
3. Coveralls. 1 5. Safety glasses or chemical splash
4. Long underwear. 1 goggles*.
5. Gloves, outer, chemical-resistant. 6. Hard hat. 1
6. Gloves, inner, chemical-resistant. 7. Escape mask. 1
7. Boots, chemical-resistant, steel toe and 8. Face shield. 1
shank. Part B. The types of hazards for which lev-
8. Hard hat (under suit). 1 els A, B, C, and D protection are appropriate
9. Disposable protective suit, gloves and are described below:
boots (depending on suit construction, may I. Level ALevel A protection should be
be worn over totally-encapsulating suit). used when:
II. Level BThe highest level of res- 1. The hazardous substance has been iden-
piratory protection is necessary but a lesser tified and requires the highest level of pro-
level of skin protection is needed. tection for skin, eyes, and the respiratory
The following constitute Level B equip- system based on either the measured (or po-
ment; it may be used as appropriate. tential for) high concentration of atmos-
1. Positive pressure, full-facepiece self-con- pheric vapors, gases, or particulates; or the
tained breathing apparatus (SCBA), or posi- site operations and work functions involve a
tive pressure supplied air respirator with es- high potential for splash, immersion, or ex-
cape SCBA (NIOSH approved). posure to unexpected vapors, gases, or par-
2. Hooded chemical-resistant clothing ticulates of materials that are harmful to
(overalls and long-sleeved jacket; coveralls; skin or capable of being absorbed through
one or two-piece chemical-splash suit; dis- the skin;
posable chemical-resistant overalls). 2. Substances with a high degree of hazard
3. Coveralls. 1 to the skin are known or suspected to be
4. Gloves, outer, chemical-resistant. present, and skin contact is possible; or
5. Gloves, inner, chemical-resistant. 3. Operations are being conducted in con-
6. Boots, outer, chemical-resistant steel fined, poorly ventilated areas, and the ab-
toe and shank. sence of conditions requiring Level A have
7. Boot-covers, outer, chemical-resistant not yet been determined.
(disposable). 1 II. Level BLevel B protection should be
8. Hard hat. 1 used when:
9. [Reserved] 1. The type and atmospheric concentration
10. Face shield. 1 of substances have been identified and re-
III. Level CThe concentration(s) and quire a high level of respiratory protection,
type(s) of airborne substance(s) is known and but less skin protection;
the criteria for using air purifying res- 2. The atmosphere contains less than 19.5
pirators are met. percent oxygen; or
The following constitute Level C equip- 3. The presence of incompletely identified
ment; it may be used as appropriate. vapors or gases is indicated by a direct-read-
1. Full-face or half-mask, air purifying res- ing organic vapor detection instrument, but
pirators (NIOSH approved). vapors and gases are not suspected of con-
2. Hooded chemical-resistant clothing taining high levels of chemicals harmful to
(overalls; two-piece chemical-splash suit; skin or capable of being absorbed through
disposable chemical-resistant overalls). the skin.
3. Coveralls. 1
4. Gloves, outer, chemical-resistant. NOTE: This involves atmospheres with
5. Gloves, inner, chemical-resistant. IDLH concentrations of specific substances
6. Boots (outer), chemical-resistant steel that present severe inhalation hazards and
toe and shank. 1 that do not represent a severe skin hazard;
7. Boot-covers, outer, chemical-resistant or that do not meet the criteria for use of
(disposable) 1. air-purifying respirators.
8. Hard hat. 1 III. Level CLevel C protection should be
9. Escape mask. 1 used when:
10. Face shield. 1 1. The atmospheric contaminants, liquid
IV. Level DA work uniform affording splashes, or other direct contact will not ad-
minimal protection, used for nuisance con- versely affect or be absorbed through any ex-
tamination only. posed skin;
The following constitute Level D equip- 2. The types of air contaminants have been
ment; it may be used as appropriate: identified, concentrations measured, and an
1. Coveralls.
air-purifying respirator is available that can
2. Gloves. 1
remove the contaminants; and
3. Boots/shoes, chemical-resistant steel toe
3. All criteria for the use of air-purifying
and shank.
respirators are met.
IV. Level DLevel D protection should be
1 Optional, as applicable. used when:

171

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00181 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)
1. The atmosphere contains no known haz- ty and health of employees at the site, and
ard; and the relationships with contractors or support
2. Work functions preclude splashes, im- services as to what each employers safety
mersion, or the potential for unexpected in- and health responsibilities are for their em-
halation of or contact with hazardous levels ployees on the site. Each contractor on the
of any chemicals. site needs to have its own safety and health
program so structured that it will smoothly
NOTE: As stated before, combinations of
interface with the program of the site coor-
personal protective equipment other than
dinator or principal contractor.
those described for Levels A, B, C, and D pro-
Also those employers involved with treat-
tection may be more appropriate and may be
ing, storing or disposal of hazardous waste as
used to provide the proper level of protec-
covered in paragraph (p) must have imple-
tion.
mented a safety and health program for their
As an aid in selecting suitable chemical
employees. This program is to include the
protective clothing, it should be noted that
hazard communication program required in
the National Fire Protection Association
paragraph (p)(1) and the training required in
(NFPA) has developed standards on chemical
paragraphs (p)(7) and (p)(8) as parts of the
protective clothing. The standards that have
employers comprehensive overall safety and
been adopted by include:
health program. This program is to be in
NFPA 1991Standard on Vapor-Protective
writing.
Suits for Hazardous Chemical Emergencies
Each site or workplace safety and health
(EPA Level A Protective Clothing).
program will need to include the following:
NFPA 1992Standard on Liquid Splash-
(1) Policy statements of the line of authority
Protective Suits for Hazardous Chemical
and accountability for implementing the
Emergencies (EPA Level B Protective Cloth-
program, the objectives of the program and
ing).
the role of the site safety and health super-
NFPA 1993Standard on Liquid Splash-
visor or manager and staff; (2) means or
Protective Suits for Non-emergency, Non-
methods for the development of procedures
flammable Hazardous Chemical Situations for identifying and controlling workplace
(EPA Level B Protective Clothing). hazards at the site; (3) means or methods for
These standards apply documentation and the development and communication to em-
performance requirements to the manufac- ployees of the various plans, work rules,
ture of chemical protective suits. Chemical standard operating procedures and practices
protective suits meeting these requirements that pertain to individual employees and su-
are labelled as compliant with the appro- pervisors; (4) means for the training of super-
priate standard. It is recommended that visors and employees to develop the needed
chemical protective suits that meet these skills and knowledge to perform their work
standards be used. in a safe and healthful manner; (5) means to
APPENDIX C TO 1926.65COMPLIANCE anticipate and prepare for emergency situa-
GUIDELINES tions; and (6) means for obtaining informa-
tion feedback to aid in evaluating the pro-
1. Occupational Safety and Health Program. gram and for improving the effectiveness of
Each hazardous waste site clean-up effort the program. The management and employ-
will require an occupational safety and ees should be trying continually to improve
health program headed by the site coordi- the effectiveness of the program thereby en-
nator or the employers representative. The hancing the protection being afforded those
purpose of the program will be the protec- working on the site.
tion of employees at the site and will be an Accidents on the site or workplace should
extension of the employers overall safety be investigated to provide information on
and health program. The program will need how such occurrences can be avoided in the
to be developed before work begins on the future. When injuries or illnesses occur on
site and implemented as work proceeds as the site or workplace, they will need to be
stated in paragraph (b). The program is to fa- investigated to determine what needs to be
cilitate coordination and communication of done to prevent this incident from occurring
safety and health issues among personnel re- again. Such information will need to be used
sponsible for the various activities which as feedback on the effectiveness of the pro-
will take place at the site. It will provide the gram and the information turned into posi-
overall means for planning and imple- tive steps to prevent any reoccurrence. Re-
menting the needed safety and health train- ceipt of employee suggestions or complaints
ing and job orientation of employees who relating to safety and health issues involved
will be working at the site. The program will with site or workplace activities is also a
provide the means for identifying and con- feedback mechanism that can be used effec-
trolling worksite hazards and the means for tively to improve the program and may serve
monitoring program effectiveness. The pro- in part as an evaluative tool(s).
gram will need to cover the responsibilities For the development and implementation
and authority of the site coordinator or the of the program to be the most effective, pro-
employers manager on the site for the safe- fessional safety and health personnel should

172

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00182 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65
be used. Certified Safety Professionals, ical surveillance program, the standard oper-
Board Certified Industrial Hygienists or Reg- ating procedures for the hazardous materials
istered Professional Safety Engineers are team including the use of plugging and
good examples of professional stature for patching equipment and other subject areas.
safety and health managers who will admin- Officers and leaders who may be expected
ister the employers program. to be in charge at an incident should be fully
2. Training. The training programs for em- knowledgeable of their companys incident
ployees subject to the requirements of para- command system. They should know where
graph (e) of this standard should address: the and how to obtain additional assistance and
safety and health hazards employees should be familiar with the local districts emer-
expect to find on hazardous waste clean-up gency response plan and the state emergency
sites; what control measures or techniques response plan.
are effective for those hazards; what moni- Specialist employees such as technical ex-
toring procedures are effective in character- perts, medical experts or environmental ex-
izing exposure levels; what makes an effec- perts that work with hazardous materials in
tive employers safety and health program; their regular jobs, who may be sent to the
what a site safety and health plan should in- incident scene by the shipper, manufacturer
clude; hands on training with personal pro- or governmental agency to advise and assist
tective equipment and clothing they may be the person in charge of the incident should
expected to use; the contents of the OSHA have training on an annual basis. Their
standard relevant to the employees duties training should include the care and use of
and function; and, employees responsibil- personal protective equipment including res-
ities under OSHA and other regulations. Su-
pirators; knowledge of the incident com-
pervisors will need training in their respon-
mand system and how they are to relate to
sibilities under the safety and health pro-
it; and those areas needed to keep them cur-
gram and its subject areas such as the spill
rent in their respective field as it relates to
containment program, the personal protec-
safety and health involving specific haz-
tive equipment program, the medical sur-
ardous substances.
veillance program, the emergency response
plan and other areas. Those skilled support personnel, such as
The training programs for employees sub- employees who work for public works depart-
ject to the requirements of paragraph (p) of ments or equipment operators who operate
this standard should address: the employers bulldozers, sand trucks, backhoes, etc., who
safety and health program elements impact- may be called to the incident scene to pro-
ing employees; the hazard communication vide emergency support assistance, should
program; the medical surveillance program; have at least a safety and health briefing be-
the hazards and the controls for such hazards fore entering the area of potential or actual
that employees need to know for their job exposure. These skilled support personnel,
duties and functions. All require annual re- who have not been a part of the emergency
fresher training. response plan and do not meet the training
The training programs for employees cov- requirements, should be made aware of the
ered by the requirements of paragraph (q) of hazards they face and should be provided all
this standard should address those com- necessary protective clothing and equipment
petencies required for the various levels of required for their tasks.
response such as: the hazards associated with There are two National Fire Protection As-
hazardous substances; hazard identification sociation standards, NFPA 472Standard
and awareness; notification of appropriate for Professional Competence of Responders
persons; the need for and use of personal pro- to Hazardous Material Incidents and NFPA
tective equipment including respirators; the 471Recommended Practice for Responding
decontamination procedures to be used; to Hazardous Material Incidents, which are
preplanning activities for hazardous sub- excellent resource documents to aid fire de-
stance incidents including the emergency partments and other emergency response or-
reponse plan; company standard operating ganizations in developing their training pro-
procedures for hazardous substance emer- gram materials. NFPA 472 provides guidance
gency responses; the use of the incident com- on the skills and knowledge needed for first
mand system and other subjects. Hands-on responder awareness level, first responder
training should be stressed whenever pos- operations level, hazmat technicians, and
sible. Critiques done after an incident which hazmat specialist. It also offers guidance for
include an evaluation of what worked and the officer corp who will be in charge of haz-
what did not and how could the incident be ardous substance incidents.
better handled the next time may be counted 3. Decontamination. Decontamination pro-
as training time. cedures should be tailored to the specific
For hazardous materials specialists (usu- hazards of the site, and may vary in com-
ally members of hazardous materials teams), plexity and number of steps, depending on
the training should address the care, use and/ the level of hazard and the employees expo-
or testing of chemical protective clothing in- sure to the hazard. Decontamination proce-
cluding totally encapsulating suits, the med- dures and PPE decontamination methods

173

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00183 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)
will vary depending upon the specific sub- the wearer from incorrect use and/or mal-
stance, since one procedure or method may function of the PPE. To accomplish these
not work for all substances. Evaluation of goals, a comprehensive PPE program should
decontamination methods and procedures include hazard identification, medical moni-
should be performed, as necessary, to assure toring, environmental surveillance, selec-
that employees are not exposed to hazards tion, use, maintenance, and decontamination
by re-using PPE. References in appendix D of PPE and its associated training.
may be used for guidance in establishing an The written PPE program should include
effective decontamination program. In addi- policy statements, procedures, and guide-
tion, the U.S. Coast Guards Manual, Policy lines. Copies should be made available to all
Guidance for Response to Hazardous Chem- employees, and a reference copy should be
ical Releases, U.S. Department of Transpor- made available at the worksite. Technical
tation, Washington, DC (COMDTINST data on equipment, maintenance manuals,
M16465.30) is a good reference for establishing relevant regulations, and other essential in-
an effective decontamination program. formation should also be collected and main-
4. Emergency response plans. States, along tained.
with designated districts within the states, 6. Incident command system (ICS). Paragraph
will be developing or have developed local 1926.65(q)(3)(ii) requires the implementation
emergency response plans. These state and of an ICS. The ICS is an organized approach
district plans should be utilized in the emer- to effectively control and manage operations
gency response plans called for in the stand- at an emergency incident. The individual in
ard. Each employer should assure that its charge of the ICS is the senior official re-
emergency response plan is compatible with sponding to the incident. The ICS is not
the local plan. The major reference being much different than the command post ap-
used to aid in developing the state and local
proach used for many years by the fire serv-
district plans is the Hazardous Materials
ice. During large complex fires involving sev-
Emergency Planning Guide, NRT1. The cur-
eral companies and many pieces of appa-
rent Emergency Response Guidebook from
ratus, a command post would be established.
the U.S. Department of Transportation,
This enabled one individual to be in charge of
CMAs CHEMTREC and the Fire Service
managing the incident, rather than having
Emergency Management Handbook may also
several officers from different companies
be used as resources.
making separate, and sometimes conflicting,
Employers involved with treatment, stor-
age, and disposal facilities for hazardous decisions. The individual in charge of the
waste, which have the required contingency command post would delegate responsibility
plan called for by their permit, would not for performing various tasks to subordinate
need to duplicate the same planning ele- officers. Additionally, all communications
ments. Those items of the emergency re- were routed through the command post to
sponse plan that are properly addressed in reduce the number of radio transmissions
the contingency plan may be substituted and eliminate confusion. However, strategy,
into the emergency response plan required in tactics, and all decisions were made by one
1926.65 or otherwise kept together for em- individual.
ployer and employee use. The ICS is a very similar system, except it
5. Personal protective equipment programs. is implemented for emergency response to
The purpose of personal protective clothing all incidents, both large and small, that in-
and equipment (PPE) is to shield or isolate volve hazardous substances.
individuals from the chemical, physical, and For a small incident, the individual in
biologic hazards that may be encountered at charge of the ICS may perform many tasks
a hazardous substance site. of the ICS. There may not be any, or little,
As discussed in appendix B, no single com- delegation of tasks to subordinates. For ex-
bination of protective equipment and cloth- ample, in response to a small incident, the
ing is capable of protecting against all haz- individual in charge of the ICS, in addition
ards. Thus PPE should be used in conjunc- to normal command activities, may become
tion with other protective methods and its the safety officer and may designate only
effectiveness evaluated periodically. one employee (with proper equipment) as a
The use of PPE can itself create significant back-up to provide assistance if needed.
worker hazards, such as heat stress, physical OSHA does recommend, however, that at
and psychological stress, and impaired vi- least two employees be designated as back-
sion, mobility, and communication. For any up personnel since the assistance needed
given situation, equipment and clothing may include rescue.
should be selected that provide an adequate To illustrate the operation of the ICS, the
level of protection. However, over-protec- following scenario might develop during a
tion, as well as under-protection, can be haz- small incident, such as an overturned tank
ardous and should be avoided where possible. truck with a small leak of flammable liquid.
Two basic objectives of any PPE program The first responding senior officer would
should be to protect the wearer from safety implement and take command of the ICS.
and health hazards, and to prevent injury to That person would size-up the incident and

174

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00184 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65
determine if additional personnel and appa- ter; standard operating procedures and safe
ratus were necessary; would determine what work practices; medical assistance and
actions to take to control the leak; and, de- triage area; hazard monitoring plan (air con-
termine the proper level of personal protec- taminate monitoring, etc.); decontamination
tive equipment. If additional assistance is procedures and area; and other relevant
not needed, the individual in charge of the areas. This plan should be a part of the em-
ICS would implement actions to stop and ployers emergency response plan or an ex-
control the leak using the fewest number of tension of it to the specific site.
personnel that can effectively accomplish 8. Medical surveillance programs. Workers
the tasks. The individual in charge of the handling hazardous substances may be ex-
ICS then would designate himself as the safe-
posed to toxic chemicals, safety hazards, bio-
ty officer and two other employees as a
logic hazards, and radiation. Therefore, a
back-up in case rescue may become nec-
medical surveillance program is essential to
essary. In this scenario, decontamination
procedures would not be necessary. assess and monitor workers health and fit-
A large complex incident may require ness for employment in hazardous waste op-
many employees and difficult, time-con- erations and during the course of work; to
suming efforts to control. In these situa- provide emergency and other treatment as
tions, the individual in charge of the ICS will needed; and to keep accurate records for fu-
want to delegate different tasks to subordi- ture reference.
nates in order to maintain a span of control The Occupational Safety and Health Guid-
that will keep the number of subordinates, ance Manual for Hazardous Waste Site Activi-
that are reporting, to a manageable level. ties developed by the National Institute for
Delegation of task at large incidents may Occupational Safety and Health (NIOSH),
be by location, where the incident scene is the Occupational Safety and Health Admin-
divided into sectors, and subordinate officers istration (OSHA), the U.S. Coast Guard
coordinate activities within the sector that (USCG), and the Environmental Protection
they have been assigned. Agency (EPA); October 1985 provides an ex-
Delegation of tasks can also be by func- cellent example of the types of medical test-
tion. Some of the functions that the indi- ing that should be done as part of a medical
vidual in charge of the ICS may want to del- surveillance program.
egate at a large incident are: medical serv- 9. New Technology and Spill Containment
ices; evacuation; water supply; resources Programs. Where hazardous substances may
(equipment, apparatus); media relations; be released by spilling from a container that
safety; and, site control (integrate activities will expose employees to the hazards of the
with police for crowd and traffic control). materials, the employer will need to imple-
Also for a large incident, the individual in ment a program to contain and control the
charge of the ICS will designate several em- spilled material. Diking and ditching, as well
ployees as back-up personnel; and a number
as use of absorbents like diatomaceous
of safety officers to monitor conditions and
earth, are traditional techniques which have
recommend safety precautions.
proven to be effective over the years. How-
Therefore, no matter what size or com-
ever, in recent years new products have come
plexity an incident may be, by implementing
an ICS there will be one individual in charge into the marketplace, the use of which com-
who makes the decisions and gives direc- plement and increase the effectiveness of
tions; and, all actions, and communications these traditional methods. These new prod-
are coordinated through one central point of ucts also provide emergency responders and
command. Such a system should reduce con- others with additional tools or agents to use
fusion, improve safety, organize and coordi- to reduce the hazards of spilled materials.
nate actions, and should facilitate effective These agents can be rapidly applied over a
management of the incident. large area and can be uniformly applied or
7. Site Safety and Control Plans. The safety otherwise can be used to build a small dam,
and security of response personnel and oth- thus improving the workers ability to con-
ers in the area of an emergeny response inci- trol spilled material. These application tech-
dent site should be of primary concern to the niques enhance the intimate contact be-
incident commander. The use of a site safety tween the agent and the spilled material al-
and control plan could greatly assist those in lowing for the quickest effect by the agent or
charge of assuring the safety and health of quickest control of the spilled material.
employees on the site. Agents are available to solidify liquid spilled
A comprehensive site safety and control materials, to suppress vapor generation from
plan should include the following: summary spilled materials, and to do both. Some spe-
analysis of hazards on the site and a risk cial agents, which when applied as rec-
analysis of those hazards; site map or ommended by the manufacturer, will react
sketch; site work zones (clean zone, transi- in a controlled manner with the spilled ma-
tion or decontamination zone, work or hot terial to neutralize acids or caustics, or
zone); use of the buddy system; site commu- greatly reduce the level of hazard of the
nications; command post or command cen- spilled material.

175

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00185 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)
There are several modern methods and de- follow the employers established standard
vices for use by emergency response per- operating procedures for spill control. All in-
sonnel or others involved with spill control volved workers need to be trained in the es-
efforts to safely apply spill control agents to tablished operating procedures; in the use
control spilled material hazards. These in- and care of spill control equipment; and in
clude portable pressurized applicators simi- the associated hazards and control of such
lar to hand-held portable fire extinguishing hazards of spill containment work.
devices, and nozzle and hose systems similar These new tools and agents are the things
to portable fire fighting foam systems which that employers will want to evaluate as part
allow the operator to apply the agent with- of their new technology program. The treat-
out having to come into contact with the ment of spills of hazardous substances or
spilled material. The operator is able to wastes at an emergency incident as part of
apply the agent to the spilled material from the immediate spill containment and control
a remote position. efforts is sometimes acceptable to EPA and a
The solidification of liquids provides for permit exception is described in 40 CFR
rapid containment and isolation of haz- 264.1(g)(8) and 265.1(c)(11).
ardous substance spills. By directing the
agent at run-off points or at the edges of the APPENDIX D TO 1926.65REFERENCES
spill, the reactant solid will automatically The following references may be consulted
create a barrier to slow or stop the spread of for further information on the subject of this
the material. Clean-up of hazardous sub- standard:
stances is greatly improved when solidifying 1. OSHA Instruction DFO CPL 2.70Janu-
agents, acid or caustic neutralizers, or acti- ary 29, 1986, Special Emphasis Program: Haz-
vated carbon adsorbents are used. Properly ardous Waste Sites.
applied, these agents can totally solidify liq- 2. OSHA Instruction DFO CPL 22.37A
uid hazardous substances or neutralize or ab- January 29, 1986, Technical Assistance and
sorb them, which results in materials which Guidelines for Superfund and Other Hazardous
are less hazardous and easier to handle, Waste Site Activities.
transport, and dispose of. The concept of 3. OSHA Instruction DTS CPL 2.74Janu-
spill treatment, to create less hazardous sub- ary 29, 1986, Hazardous Waste Activity Form,
stances, will improve the safety and level of OSHA 175.
protection of employees working at spill 4. Hazardous Waste Inspections Reference
clean-up operations or emergency response Manual, U.S. Department of Labor, Occupa-
operations to spills of hazardous substances. tional Safety and Health Administration,
The use of vapor suppression agents for 1986.
volatile hazardous substances, such as flam- 5. Memorandum of Understanding Among
mable liquids and those substances which the National Institute for Occupational Safe-
present an inhalation hazard, is important ty and Health, the Occupational Safety and
for protecting workers. The rapid and uni- Health Administration, the United States
form distribution of the agent over the sur- Coast Guard, and the United States Environ-
face of the spilled material can provide quick mental Protection Agency, Guidance for
vapor knockdown. There are temporary and Worker Protection During Hazardous Waste Site
long-term foam-type agents which are effec- Investigations and Clean-up and Hazardous
tive on vapors and dusts, and activated car- Substance Emergencies. December 18, 1980.
bon adsorption agents which are effective for 6. National Priorities List, 1st Edition, Octo-
vapor control and soaking-up of the liquid. ber 1984; U.S. Environmental Protection
The proper use of hose lines or hand-held Agency, Revised periodically.
portable pressurized applicators provides 7. The Decontamination of Response Per-
good mobility and permits the worker to de- sonnel, Field Standard Operating Procedures
liver the agent from a safe distance without (F.S.O.P.) 7; U.S. Environmental Protection
having to step into the untreated spilled ma- Agency, Office of Emergency and Remedial
terial. Some of these systems can be re- Response, Hazardous Response Support Divi-
charged in the field to provide coverage of sion, December 1984.
larger spill areas than the design limits of a 8. Preparation of a Site Safety Plan, Field
single charged applicator unit. Some of the Standard Operating Procedures (F.S.O.P.) 9;
more effective agents can solidify the liquid U.S. Environmental Protection Agency, Of-
flammable hazardous substances and at the fice of Emergency and Remedial Response,
same time elevate the flashpoint above 140 Hazardous Response Support Division, April
F so the resulting substance may be handled 1985.
as a nonhazardous waste material if it meets 9. Standard Operating Safety Guidelines; U.S.
the U.S. Environmental Protection Agencys Environmental Protection Agency, Office of
40 CFR part 261 requirements (See particu- Emergency and Remedial Response, Haz-
larly 261.21). ardous Response Support Division, Environ-
All workers performing hazardous sub- mental Response Team; November 1984.
stance spill control work are expected to 10. Occupational Safety and Health Guidance
wear the proper protective clothing and Manual for Hazardous Waste Site Activities,
equipment for the materials present and to National Institute for Occupational Safety

176

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00186 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65
and Health (NIOSH), Occupational Safety programs must be developed on the basis of
and Health Administration (OSHA), U.S. a needs assessment of the hazardous waste
Coast Guard (USCG), and Environmental site, RCRA/TSDF, or emergency response op-
Protection Agency (EPA); October 1985. eration in accordance with 29 CFR 1926.65.
11. Protecting Health and Safety at Haz- It is noted that the legal requirements are
ardous Waste Sites: An Overview, U.S. Envi- set forth in the regulatory text of 1926.65.
ronmental Protection Agency, EPA/625/985/ The guidance set forth here presents a highly
006; September 1985. effective program that in the areas covered
12. Hazardous Waste Sites and Hazardous would meet or exceed the regulatory require-
Substance Emergencies, NIOSH Worker Bul-
ments. In addition, other approaches could
letin, U.S. Department of Health and Human
meet the regulatory requirements.
Services, Public Health Service, Centers for
Disease Control, National Institute for Occu- Suggested General Criteria
pational Safety and Health; December 1982. Definitions:
13. Personal Protective Equipment for Haz- Competent means possessing the skills,
ardous Materials Incidents: A Selection Guide; knowledge, experience, and judgment to per-
U.S. Department of Health and Human Serv- form assigned tasks or activities satisfac-
ices, Public Health Service, Centers for Dis- torily as determined by the employer.
ease Control, National Institute for Occupa- Demonstration means the showing by actual
tional Safety and Health; October 1984. use of equipment or procedures.
14. Fire Service Emergency Management Hands-on training means training in a sim-
Handbook, International Association of Fire ulated work environment that permits each
Chiefs Foundation, 101 East Holly Avenue, student to have experience performing tasks,
Unit 10B, Sterling, VA 22170, January 1985. making decisions, or using equipment appro-
15. Emergency Response Guidebook, U.S De- priate to the job assignment for which the
partment of Transportation, Washington, training is being conducted.
DC, 1987. Initial training means training required
16. Report to the Congress on Hazardous Ma- prior to beginning work.
terials Training, Planning and Preparedness, Lecture means an interactive discourse
Federal Emergency Management Agency, with a class lead by an instructor.
Washington, DC, July 1986. Proficient means meeting a stated level of
17. Workbook for Fire Command, Alan V. achievement.
Brunacini and J. David Beageron, National Site-specific means individual training di-
Fire Protection Association, Batterymarch rected to the operations of a specific job site.
Park, Quincy, MA 02269, 1985.
Training hours means the number of hours
18. Fire Command, Alan V. Brunacini, Na-
devoted to lecture, learning activities, small
tional Fire Protection Association,
group work sessions, demonstration, evalua-
Batterymarch Park,, Quincy, MA 02269, 1985.
tions, or hands-on experience.
19. Incident Command System, Fire Protec-
tion Publications, Oklahoma State Univer- Suggested Core Criteria:
sity, Stillwater, OK 74078, 1983. 1. Training facility. The training facility
20. Site Emergency Response Planning, Chem- should have available sufficient resources,
ical Manufacturers Association, Washington, equipment, and site locations to perform di-
DC 20037, 1986. dactic and hands-on training when appro-
21. Hazardous Materials Emergency Planning priate. Training facilities should have suffi-
Guide, NRT1, Environmental Protection cient organization, support staff, and serv-
Agency, Washington, DC, March 1987. ices to conduct training in each of the
22. Community Teamwork: Working Together courses offered.
to Promote Hazardous Materials Transportation 2. Training Director. Each training program
Safety. U.S. Department of Transportation, should be under the direction of a training
Washington, DC, May 1983. director who is responsible for the program.
23. Disaster Planning Guide for Business and The Training Director should have a min-
Industry, Federal Emergency Management imum of two years of employee education ex-
Agency, Publication No. FEMA 141, August perience.
1987. 3. Instructors. Instructors should be deem
competent on the basis of previous docu-
APPENDIX TO 1926.65TRAINING CURRICULUM
mented experience in their area of instruc-
GUIDELINES
tion, successful completion of a train-the-
The following non-mandatory general cri- trainer program specific to the topics they
teria may be used for assistance in devel- will teach, and an evaluation of instruc-
oping site-specific training curriculum used tional competence by the Training Director.
to meet the training requirements of 29 CFR Instructors should be required to maintain
1926.65(e); 29 CFR 1926.65(p)(7), (p)(8)(iii); and professional competency by participating in
29 CFR 1926.65(q)(6), (q)(7), and (q)(8). These continuing education or professional devel-
are generic guidelines and they are not pre- opment programs or by completing success-
sented as a complete training curriculum for fully an annual refresher course and having
any specific employer. Site-specific training an annual review by the Training Director.

177

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00187 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)
The annual review by the Training Direc- riculum and any update should be approved
tor should include observation of an instruc- by the Training Director.
tors delivery, a review of those observations The proficiency assessment methods, re-
with the trainer, and an analysis of any in- gardless of the approach or combination of
structor or class evaluations completed by approaches used, should be justified, docu-
the students during the previous year. ment and approved by the Training Director.
4. Course materials. The Training Director The proficiency of those taking the addi-
should approve all course materials to be tional courses for supervisors should be eval-
used by the training provider. Course mate- uated and document by using proficiency as-
rials should be reviewed and updated at least sessment methods acceptable to the Training
annually. Materials and equipment should be Director. These proficiency assessment
in good working order and maintained prop- methods must reflect the additional respon-
erly. sibilities borne by supervisory personnel in
All written and audio-visual materials in hazardous waste operations or emergency re-
training curricula should be peer reviewed by sponse.
technically competent outside reviewers or 8. Course certificate. Written documentation
by a standing advisory committee. should be provided to each student who sat-
Reviews should possess expertise in the fol- isfactorily completes the training course.
lowing disciplines were applicable: occupa- The documentation should include:
tional health, industrial hygiene and safety, a. Students name.
chemical/environmental engineering, em- b. Course title.
ployee education, or emergency response. c. Course date.
One or more of the peer reviewers should be d. Statement that the student has success-
a employee experienced in the work activi- fully completed the course.
ties to which the training is directed.
e. Name and address of the training pro-
5. Students. The program for accepting stu-
vider.
dents should include:
f. An individual identification number for
a. Assurance that the student is or will be
the certificate.
involved in work where chemical exposures
g. List of the levels of personal protective
are likely and that the student possesses the
skills necessary to perform the work. equipment used by the student to complete
b. A policy on the necessary medical clear- the course.
ance. This documentation may include a certifi-
6. Ratios. Student-instructor ratios should cate and an appropriate wallet-sized lami-
not exceed 30 students per instructor. Hands- nated card with a photograph of the student
on activity requiring the use of personal pro- and the above information. When such
tective equipment should have the following course certificate cards are used, the indi-
student-instructor ratios. For Level C or vidual identification number for the training
Level D personal protective equipment the certificate should be shown on the card.
ratio should be 10 students per instructor. 9. Recordkeeping. Training providers should
For Level A or Level B personal protective maintain records listing the dates courses
equipment the ratio should be 5 students per were presented, the names of the individual
instructor. course attenders, the names of those stu-
7. Proficiency assessment. Proficiency should dents successfully completing each course,
be evaluated and documented by the use of a and the number of training certificates
written assessment and a skill demonstra- issued to each successful student. These
tion selected and developed by the Training records should be maintained for a minimum
Director and training staff. The assessment of five years after the date an individual par-
and demonstration should evaluate the ticipated in a training program offered by
knowledge and individual skills developed in the training provider. These records should
the course of training. The level of minimum be available and provided upon the students
achievement necessary for proficiency shall request or as mandated by law.
be specified in writing by the Training Direc- 10. Program quality control. The Training
tor. Director should conduct or direct an annual
If a written test is used, there should be a written audit of the training program. Pro-
minimum of 50 questions. If a written test is gram modifications to address deficiencies, if
used in combination with a skills demonstra- any, should be documented, approved, and
tion, a minimum of 25 questions should be implemented by the training provider. The
used. If a skills demonstration is used, the audit and the program modification docu-
tasks chosen and the means to rate success- ments should be maintained at the training
ful completion should be fully documented facility.
by the Training Director. Suggested Program Quality Control Criteria
The content of the written test or of the Factors listed here are suggested criteria
skill demonstration shall be relevant to the for determining the quality and appropriate-
objectives of the course. The written test ness of employee health and safety training
and skill demonstration should be updated as for hazardous waste operations and emer-
necessary to reflect changes in the cur- gency response.

178

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00188 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65
A. Training Plan. Adequacy and appropriateness of the facili-
Adequacy and appropriateness of the train- ties and resources for supporting the train-
ing programs curriculum development, in- ing program should be considered, including,
structor training, distribution of course ma- 1. Space and equipment to conduct the
terials, and direct student training should be training.
considered, including 2. Facilities for representative hands-on
1. The duration of training, course content, training.
and course schedules/agendas; 3. In the case of multiple-site programs,
2. The different training requirements of equipment and facilities at the satellite cen-
the various target populations, as specified ters.
in the appropriate generic training cur- 4. Adequacy and appropriateness of the
riculum; quality control and evaluations program to
3. The process for the development of cur- account for instructor performance.
riculum, which includes appropriate tech- 5. Adequacy and appropriateness of the
nical input, outside review, evaluation, pro- quality control and evaluation program to
gram pretesting. ensure appropriate course evaluation, feed-
4. The adequate and appropriate inclusion back, updating, and corrective action.
of hands-on, demonstration, and instruction 6. Adequacy and appropriateness of dis-
methods; ciplines and expertise being used within the
5. Adequate monitoring of student safety, quality control and evaluation program.
progress, and performance during the train- 7. Adequacy and appropriateness of the
ing. role of student evaluations to provide feed-
B. Program management, Training Director, back for training program improvement.
staff, and consultants. D. Quality control and evaluation.
Adequacy and appropriateness of staff per- Adequacy and appropriateness of quality
formance and delivering an effective training control and evaluation plans for training
program should be considered, including programs should be considered, including:
1. Demonstration of the training directors 1. A balanced advisory committee and/or
leadership in assuring quality of health and competent outside reviewers to give overall
safety training. policy guidance;
2. Demonstration of the competency of the 2. Clear and adequate definition of the
staff to meet the demands of delivering high composition and active programmatic role of
quality hazardous waste employee health the advisory committee or outside reviewers.
and safety training. 3. Adequacy of the minutes or reports of
3. Organization charts establishing clear the advisory committee or outside reviewers
lines of authority. meetings or written communication.
4. Clearly defined staff duties including the 4. Adequacy and appropriateness of the
relationship of the training staff to the over- quality control and evaluations program to
all program. account for instructor performance.
5. Evidence that the training organiza- 5. Adequacy and appropriateness of the
tional structure suits the needs of the train- quality control and evaluation program to
ing program. ensure appropriate course evaluation, feed-
6. Appropriateness and adequacy of the back, updating, and corrective action.
training methods used by the instructors. 6. Adequacy and appropriateness of dis-
7. Sufficiency of the time committed by
ciplines and expertise being used within the
the training director and staff to the train-
quality control and evaluation program.
ing program.
7. Adequacy and appropriateness of the
8. Adequacy of the ratio of training staff to
role of student evaluations to provide feed-
students.
back for training program improvement.
9. Availability and commitment of the
training program of adequate human and E. Students
equipment resources in the areas of Adequacy and appropriateness of the pro-
a. Health effects, gram for accepting students should be con-
b. Safety, sidered, including
c. Personal protective equipment (PPE), 1. Assurance that the student already pos-
d. Operational procedures, sess the necessary skills for their job, includ-
e. Employee protection practices/proce- ing necessary documentation.
dures. 2. Appropriateness of methods the program
10. Appropriateness of management con- uses to ensure that recruits are capable of
trols. satisfactorily completing training.
11. Adequacy of the organization and ap- 3. Review and compliance with any medical
propriate resources assigned to assure appro- clearance policy.
priate training. F. Institutional Environment and Administra-
12. In the case of multiple-site training tive Support. The adequacy and appropriate-
programs, adequacy of satellite centers man- ness of the institutional environment and
agement. administrative support system for the train-
C. Training facilities and resources. ing program should be considered, including

179

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00189 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)
1. Adequacy of the institutional commit- (6) Sanitation recommendation and equip-
ment to the employee training program. ment.
2. Adequacy and appropriateness of the ad- (7) Review and explanation of OSHAs haz-
ministrative structure and administrative ard-communication standard (29 CFR
support. 1910.1200) and lock-out-tag-out standard (29
G. Summary of Evaluation Questions Key CFR 1910.147).
questions for evaluating the quality and ap- (8) Review of other applicable standards in-
propriateness of an overall training program cluding but not limited to those in the con-
should include the following: struction standards (29 CFR part 1926).
1. Are the program objectives clearly stat- (9) Rights and responsibilities of employers
ed? and employees under applicable OSHA and
2. Is the program accomplishing its objec- EPA laws.
tives? b. Technical knowledge. (1) Type of poten-
3. Are appropriate facilities and staff avail- tial exposures to chemical, biological, and
able? radiological hazards; types of human re-
4. Is there an appropriate mix of classroom, sponses to these hazards and recognition of
demonstration, and hands-on training? those responses; principles of toxicology and
5. Is the program providing quality em- information about acute and chronic haz-
ployee health and safety training that fully ards; health and safety considerations of new
meets the intent of regulatory requirements? technology.
6. What are the programs main strengths? (2) Fundamentals of chemical hazards in-
7. What are the programs main weak- cluding but not limited to vapor pressure,
nesses? boiling points, flash points, ph, other phys-
8. What is recommended to improve the ical and chemical properties.
program? (3) Fire and explosion hazards of chemi-
9. Are instructors instructing according to cals.
their training outlines? (4) General safety hazards such as but not
10. Is the evaluation tool current and ap- limited to electrical hazards, powered equip-
propriate for the program content? ment hazards, motor vehicle hazards, walk-
11. Is the course material current and rel- ing-working surface hazards, excavation haz-
evant to the target group? ards, and hazards associated with working in
hot and cold temperature extremes.
Suggested Training Curriculum Guidelines (5) Review and knowledge of confined space
The following training curriculum guide- entry procedures in 29 CFR 1910.146.
lines are for those operations specifically (6) Work practices to minimize employee
identified in 29 CFR 1926.65 as requiring risk from site hazards.
training. Issues such as qualifications of in- (7) Safe use of engineering controls, equip-
structors, training certification, and similar ment, and any new relevant safety tech-
criteria appropriate to all categories of oper- nology or safety procedures.
ations addressed in 1926.65 have been covered (8) Review and demonstration of com-
in the preceding section and are not re-ad- petency with air sampling and monitoring
dressed in each of the generic guidelines. equipment that may be used in a site moni-
Basic core requirements for training pro- toring program.
grams that are addressed include (9) Container sampling procedures and
1. General Hazardous Waste Operations safeguarding; general drum and container
2. RCRA operationsTreatment, storage, handling procedures including special re-
and disposal facilities. quirement for laboratory waste packs,
3. Emergency Response. shock-sensitive wastes, and radioactive
A. General Hazardous Waste Operations and wastes.
Site-specific Training 1. Off-site training. (10) The elements of a spill control pro-
Minimum training course content for haz- gram.
ardous waste operations, required by 29 CFR (11) Proper use and limitations of material
1926.65(e), should include the following topics handling equipment.
or procedures: (12) Procedures for safe and healthful prep-
a. Regulatory knowledge. aration of containers for shipping and trans-
(1) A review of 29 CFR 1926.65 and the core port.
elements of an occupational safety and (13) Methods of communication including
health program. those used while wearing respiratory protec-
(2) The content of a medical surveillance tion.
program as outlined in 29 CFR 1926.65(f). c. Technical skills. (1) Selection, use main-
(3) The content of an effective site safety tenance, and limitations of personal protec-
and health plan consistent with the require- tive equipment including the components
ments of 29 CFR 1926.65(b)(4)(ii). and procedures for carrying out a respirator
(4) Emergency response plan and proce- program to comply with 29 CFR 1910.134.
dures as outlined in 29 CFR 1910.38 and 29 (2) Instruction in decontamination pro-
CFR 1926.65(l). grams including personnel, equipment, and
(5) Adequate illumination. hardware; hands-on training including level

180

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00190 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65
A, B, and C ensembles and appropriate de- (2) Activities and locations in their work
contamination lines; field activities includ- area where hazardous substance may be
ing the donning and doffing of protective present.
equipment to a level commensurate with the (3) Methods and observations that may be
employees anticipated job function and re- used to detect the present or release of a haz-
sponsibility and to the degree required by ardous chemical in the work area (such as
potential hazards. monitoring conducted by the employer, con-
(3) Sources for additional hazard informa- tinuous monitoring devices, visual appear-
tion; exercises using relevant manuals and ances, or other evidence (sight, sound or
hazard coding systems. smell) of hazardous chemicals being released,
d. Additional suggested items. (1) A lami- and applicable alarms from monitoring de-
nated, dated card or certificate with photo, vices that record chemical releases.
denoting limitations and level of protection (4) The physical and health hazards of sub-
for which the employee is trained should be stances known or potentially present in the
issued to those students successfully com- work area.
pleting a course. (5) The measures employees can take to
(2) Attendance should be required at all help protect themselves from work-site haz-
training modules, with successful comple- ards, including specific procedures the em-
tion of exercises and a final written or oral ployer has implemented.
examination with at least 50 questions. (6) An explanation of the labeling system
(3) A minimum of one-third of the program and material safety data sheets and how em-
should be devoted to hands-on exercises. ployees can obtain and use appropriate haz-
(4) A curriculum should be established for ard information.
the 8-hour refresher training required by 29 (7) The elements of the confined space pro-
CFR 1926.65(e)(8), with delivery of such gram including special PPE, permits, moni-
courses directed toward those areas of pre- toring requirements, communication proce-
vious training that need improvement or re- dures, emergency response, and applicable
emphasis. lock-out procedures.
(5) A curriculum should be established for b. The employer should provide hazardous
the required 8-hour training for supervisors. waste employees information and training
Demonstrated competency in the skills and and should provide a review and access to
knowledge provided in a 40-hour course the site safety and plan as follows:
should be a prerequisite for supervisor train- (1) Names of personnel and alternate re-
ing. sponsible for site safety and health.
2. Refresher training. The 8-hour annual re- (2) Safety and health hazards present on
fresher training required in 29 CFR the site.
1926.65(e)(8) should be conducted by qualified (3) Selection, use, maintenance, and limi-
training providers. Refresher training should tations of personal protective equipment
include at a minimum the following topics specific to the site.
and procedures: (4) Work practices by which the employee
(a) Review of and retraining on relevant can minimize risks from hazards.
topics covered in the 40-hour program, as ap- (5) Safe use of engineering controls and
propriate, using reports by the students on equipment available on site.
their work experiences. (6) Safe decontamination procedures estab-
(b) Update on developments with respect to lished to minimize employee contact with
material covered in the 40-hour course. hazardous substances, including:
(c) Review of changes to pertinent provi- (A) Employee decontamination,
sions of EPA or OSHA standards or laws. (B) Clothing decontamination, and
(d) Introduction of additional subject areas (C) Equipment decontamination.
as appropriate. (7) Elements of the site emergency re-
(e) Hands-on review of new or altered PPE sponse plan, including:
or decontamination equipment or proce- (A) Pre-emergency planning.
dures. Review of new developments in per- (B) Personnel roles and lines of authority
sonal protective equipment. and communication.
(f) Review of newly developed air and con- (C) Emergency recognition and prevention.
taminant monitoring equipment. (D) Safe distances and places of refuge.
3. On-site training. a. The employer should (E) Site security and control.
provide employees engaged in hazardous (F) Evacuation routes and procedures.
waste site activities with information and (G) Decontamination procedures not cov-
training prior to initial assignment into ered by the site safety and health plan.
their work area, as follows: (H) Emergency medical treatment and first
(1) The requirements of the hazard commu- aid.
nication program including the location and (I) Emergency equipment and procedures
availability of the written program, required for handling emergency incidents.
lists of hazardous chemicals, and material c. The employer should provide hazardous
safety data sheets. waste employees information and training

181

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00191 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)
on personal protective equipment used at the (g) A review of procedures to minimize ex-
site, such as the following: posure to hazardous waste and various type
(1) PPE to be used based upon known or an- of waste streams, including the materials
ticipated site hazards. handling program and spill containment pro-
(2) PPE limitations of materials and con- gram.
struction; limitations during temperature (h) A review of hazard communication pro-
extremes, heat stress, and other appropriate grams meeting the requirements of 29 CFR
medical considerations; use and limitations 1910.1200.
of respirator equipment as well as docu- (i) A review of medical surveillance pro-
mentation procedures as outlined in 29 CFR grams meeting the requirements of 29 CFR
1910.134. 1926.65(p)(3) including the recognition of
(3) PPE inspection procedures prior to, signs and symptoms of overexposure to haz-
during, and after use. ardous substance including known syner-
(4) PPE donning and doffing procedures. gistic interactions.
(5) PPE decontamination and disposal pro- (j) A review of decontamination programs
cedures. and procedures meeting the requirements of
(6) PPE maintenance and storage. 29 CFR 1926.65(p)(4).
(7) Task duration as related to PPE limita- (k) A review of an employers requirements
tions. to implement a training program and its ele-
d. The employer should instruct the em- ments.
ployee about the site medical surveillance (l) A review of the criteria and programs
program relative to the particular site, in- for proper selection and use of personal pro-
cluding tective equipment, including respirators.
(m) A review of the applicable appendices
(1) Specific medical surveillance programs
to 29 CFR 1926.65.
that have been adapted for the site.
(n) Principles of toxicology and biological
(2) Specific signs and symptoms related to
monitoring as they pertain to occupational
exposure to hazardous materials on the site.
health.
(3) The frequency and extent of periodic
(o) Rights and responsibilities of employ-
medical examinations that will be used on
ees and employers under applicable OSHA
the site.
and EPA laws.
(4) Maintenance and availability of
(p) Hands-on exercises and demonstrations
records.
of competency with equipment to illustrate
(5) Personnel to be contacted and proce-
the basic equipment principles that may be
dures to be followed when signs and symp-
used during the performance of work duties,
toms of exposures are recognized.
including the donning and doffing of PPE.
e. The employees will review and discuss (q) Sources of reference, efficient use of
the site safety plan as part of the training relevant manuals, and knowledge of hazard
program. The location of the site safety plan coding systems to include information con-
and all written programs should be discussed tained in hazardous waste manifests.
with employees including a discussion of the (r) At least 8 hours of hands-on training.
mechanisms for access, review, and ref- (s) Training in the job skills required for
erences described. an employees job function and responsi-
B. RCRA Operations Training for Treatment, bility before they are permitted to partici-
Storage and Disposal Facilities. pate in or supervise field activities.
1. As a minimum, the training course re- 2. The individual employer should provide
quired in 29 CFR 1926.65 (p) should include hazardous waste employees with information
the following topics: and training prior to an employees initial
(a) Review of the applicable paragraphs of assignment into a work area. The training
29 CFR 1926.65 and the elements of the em- and information should cover the following
ployers occupational safety and health plan. topics:
(b) Review of relevant hazards such as, but (a) The Emergency response plan and pro-
not limited to, chemical, biological, and ra- cedures including first aid.
diological exposures; fire and explosion haz- (b) A review of the employers hazardous
ards; thermal extremes; and physical haz- waste handling procedures including the ma-
ards. terials handling program and elements of the
(c) General safety hazards including those spill containment program, location of spill
associated with electrical hazards, powered response kits or equipment, and the names of
equipment hazards, lock-out-tag-out proce- those trained to respond to releases.
dures, motor vehicle hazards and walking- (c) The hazardous communication program
working surface hazards. meeting the requirements of 29 CFR
(d) Confined-space hazards and procedures. 1910.1200.
(e) Work practices to minimize employee (d) A review of the employers medical sur-
risk from workplace hazards. veillance program including the recognition
(f) Emergency response plan and proce- of signs and symptoms of exposure to rel-
dures including first aid meeting the require- evant hazardous substance including known
ments of paragraph (p)(8). synergistic interactions.

182

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00192 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.65
(e) A review of the employers decon- and the individuals responsible for the site
tamination program and procedures. where the response would be expected.
(f) An review of the employers training (1) Hazard recognition, including:
program and the parties responsible for that (A) Nature of hazardous substances
program. present,
(g) A review of the employers personal (B) Practical applications of hazard rec-
protective equipment program including the ognition, including presentations on biology,
proper selection and use of PPE based upon chemistry, and physics.
specific site hazards. (2) Principles of toxicology, biological
(h) All relevant site-specific procedures ad- monitoring, and risk assessment.
dressing potential safety and health hazards.
(3) Safe work practices and general site
This may include, as appropriate, biological
safety.
and radiological exposures, fire and explo-
sion hazards, thermal hazards, and physical (4) Engineering controls and hazardous
hazards such as electrical hazards, powered waste operations.
equipment hazards, lock-out-tag-out haz- (5) Site safety plans and standard oper-
ards, motor vehicle hazards, and walking- ating procedures.
working surface hazards. (6) Decontamination procedures and prac-
(i) Safe use engineering controls and equip- tices.
ment on site. (7) Emergency procedures, first aid, and
(j) Names of personnel and alternates re- self-rescue.
sponsible for safety and health. (8) Safe use of field equipment.
C. Emergency response training. (9) Storage, handling, use and transpor-
Federal OSHA standards in 29 CFR tation of hazardous substances.
1926.65(q) are directed toward private sector (10) Use, care, and limitations of personal
emergency responders. Therefore, the guide- protective equipment.
lines provided in this portion of the appendix (11) Safe sampling techniques.
are directed toward that employee popu- (12) Rights and responsibilities of employ-
lation. However, they also impact indirectly ees under OSHA and other related laws con-
through State OSHA or USEPA regulations cerning right-to-know, safety and health,
some public sector emergency responders. compensations and liability.
Therefore, the guidelines provided in this (13) Medical monitoring requirements.
portion of the appendix may be applied to (14) Community relations.
both employee populations. b. Suggested criteria for specific courses.
States with OSHA state plans must cover (1) First responder awareness level.
their employees with regulations at least as (A) Review of and demonstration of com-
effective as the Federal OSHA standards. petency in performing the applicable skills
Public employees in states without approved of 29 CFR 1926.65(q).
state OSHA programs covering hazardous
(B) Hands-on experience with the U.S. De-
waste operations and emergency response
partment of Transportations Emergency Re-
are covered by the U.S. EPA under 40 CFR
sponse Guidebook (ERG) and familiarization
311, a regulation virtually identical to
with OSHA standard 29 CFR 1926.60.
1926.65.
Since this is a non-mandatory appendix (C) Review of the principles and practices
and therefore not an enforceable standard, for analyzing an incident to determine both
OSHA recommends that those employers, the hazardous substances present and the
employees or volunteers in public sector basic hazard and response information for
emergency response organizations outside each hazardous substance present.
Federal OSHA jurisdiction consider the fol- (D) Review of procedures for implementing
lowing criteria in developing their own actions consistent with the local emergency
training programs. A unified approach to response plan, the organizations standard
training at the community level between operating procedures, and the current edi-
emergency response organizations covered tion of DOTs ERG including emergency no-
by Federal OSHA and those not covered di- tification procedures and follow-up commu-
rectly by Federal OSHA can help ensure an nications.
effective community response to the release (E) Review of the expected hazards includ-
or potential release of hazardous substances ing fire and explosions hazards, confined
in the community. space hazards, electrical hazards, powered
a. General considerations. equipment hazards, motor vehicle hazards,
Emergency response organizations are re- and walking-working surface hazards.
quired to consider the topics listed in (F) Awareness and knowledge of the com-
1926.65(q)(6). Emergency response organiza- petencies for the First Responder at the
tions may use some or all of the following Awareness Level covered in the National
topics to supplement those mandatory topics Fire Protection Associations Standard No.
when developing their response training pro- 472, Professional Competence of Responders to
grams. Many of the topics would require an Hazardous Materials Incidents.
interaction between the response provider (2) First responder operations level.

183

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00193 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.65 29 CFR Ch. XVII (7112 Edition)
(A) Review of and demonstration of com- proaching release sites and containing the
petency in performing the applicable skills release.
of 29 CFR 1926.65(q). (D) Review of procedures for implementing
(B) Hands-on experience with the U.S. De- continuing response actions consistent with
partment of Transportations Emergency Re- the local emergency response plan, the orga-
sponse Guidebook (ERG), manufacturer mate- nizations standard operating procedures,
rial safety data sheets, CHEMTREC/ and the current edition of DOTs ERG in-
CANUTEC, shipper or manufacturer contacts cluding extended emergency notification
and other relevant sources of information procedures and follow-up communications.
addressing hazardous substance releases. Fa- (E) Review of the principles and practice
miliarization with OSHA standard 29 CFR for proper selection and use of personal pro-
1926.60. tective equipment.
(C) Review of the principles and practices (F) Review of the principles and practices
for analyzing an incident to determine the of establishing exposure zones, proper decon-
hazardous substances present, the likely be- tamination and medical surveillance sta-
havior of the hazardous substance and its tions and procedures.
container, the types of hazardous substance (G) Review of the expected hazards includ-
transportation containers and vehicles, the ing fire and explosions hazards, confined
types and selection of the appropriate defen- space hazards, electrical hazards, powered
sive strategy for containing the release. equipment hazards, motor vehicle hazards,
(D) Review of procedures for implementing and walking-working surface hazards.
continuing response actions consistent with (H) Awareness and knowledge of the com-
the local emergency response plan, the orga- petencies for the Hazardous Materials Tech-
nizations standard operating procedures, nician covered in the National Fire Protec-
and the current edition of DOTs ERG in- tion Associations Standard No. 472, Profes-
cluding extended emergency notification sional Competence of Responders to Hazardous
procedures and follow-up communications. Materials Incidents.
(E) Review of the principles and practice (4) Hazardous materials specialist.
for proper selection and use of personal pro- (A) Review of and demonstration of com-
tective equipment. petency in performing the applicable skills
(F) Review of the principles and practice of of 29 CFR 1926.65(q).
personnel and equipment decontamination. (B) Hands-on experience with retrieval and
(G) Review of the expected hazards includ- use of written and electronic information
ing fire and explosions hazards, confined relative to response decision making includ-
space hazards, electrical hazards, powered ing but not limited to the U.S. Department
equipment hazards, motor vehicle hazards, of Transportations Emergency Response
and walking-working surface hazards. Guidebook (ERG), manufacturer material
(H) Awareness and knowledge of the com- safety data sheets, CHEMTREC/CANUTEC,
petencies for the First Responder at the Op- shipper or manufacturer contacts, computer
erations Level covered in the National Fire data bases and response models, and other
Protection Associations Standard No. 472, relevant sources of information addressing
Professional Competence of Responders to Haz- hazardous substance releases. Familiariza-
ardous Materials Incidents. tion with 29 CFR 1926.60.
(3) Hazardous materials technician. (C) Review of the principles and practices
(A) Review of and demonstration of com- for analyzing an incident to determine the
petency in performing the applicable skills hazardous substances present, their physical
of 29 CFR 1926.65(q). and chemical properties, and the likely be-
(B) Hands-on experience with written and havior of the hazardous substance and its
electronic information relative to response container, vessel, or vehicle.
decision making including but not limited to (D) Review of the principles and practices
the U.S. Department of Transportations for identification of the types of hazardous
Emergency Response Guidebook (ERG), manu- substance transportation containers, vessels
facturer material safety data sheets, and vehicles involved in the release; select-
CHEMTREC/CANUTEC, shipper or manufac- ing and using the various types of equipment
turer contacts, computer data bases and re- available for plugging or patching transpor-
sponse models, and other relevant sources of tation containers, vessels or vehicles; orga-
information addressing hazardous substance nizing and directing the use of multiple
releases. Familiarization with 29 CFR 1926.60. teams of hazardous material technicians and
(C) Review of the principles and practices selecting the appropriate strategy for ap-
for analyzing an incident to determine the proaching release sites and containing or
hazardous substances present, their physical stopping the release.
and chemical properties, the likely behavior (E) Review of procedures for implementing
of the hazardous substance and its container, continuing response actions consistent with
the types of hazardous substance transpor- the local emergency response plan, the orga-
tation containers and vehicles involved in nizations standard operating procedures, in-
the release, the appropriate strategy for ap- cluding knowledge of the available public

184

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00194 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.66
and private response resources, establish- higher levels of response when required by
ment of an incident command post, direction the changes to the response plan.
of hazardous material technician teams, and
[58 FR 35129, June 30, 1993, as amended at 59
extended emergency notification procedures FR 43275, Aug. 22, 1994: 61 FR 5510, Feb. 13,
and follow-up communications. 1996; 77 FR 17890, Mar. 26, 2012]
(F) Review of the principles and practice
for proper selection and use of personal pro- 1926.66 Criteria for design and con-
tective equipment. struction of spray booths.
(G) Review of the principles and practices
of establishing exposure zones and proper de- (a) Definitions applicable to this sec-
contamination, monitoring and medical sur- tion(1) Aerated solid powders. Aerated
veillance stations and procedures. powders shall mean any powdered ma-
(H) Review of the expected hazards includ- terial used as a coating material which
ing fire and explosions hazards, confined shall be fluidized within a container by
space hazards, electrical hazards, powered passing air uniformly from below. It is
equipment hazards, motor vehicle hazards, common practice to fluidize such mate-
and walking-working surface hazards. rials to form a fluidized powder bed and
(I) Awareness and knowledge of the com- then dip the part to be coated into the
petencies for the Off-site Specialist Em- bed in a manner similar to that used in
ployee covered in the National Fire Protec-
liquid dipping. Such beds are also used
tion Associations Standard No. 472, Profes-
sional Competence of Responders to Hazardous as sources for powder spray operations.
Materials Incidents. (2) Spraying area. Any area in which
(5) Incident commander. The incident com- dangerous quantities of flammable va-
mander is the individual who, at any one pors or mists, or combustible residues,
time, is responsible for and in control of the dusts, or deposits are present due to
response effort. This individual is the person the operation of spraying processes.
responsible for the direction and coordina- (3) Spray booth. A power-ventilated
tion of the response effort. An incident com- structure provided to enclose or accom-
manders position should be occupied by the modate a spraying operation to confine
most senior, appropriately trained individual
and limit the escape of spray, vapor,
present at the response site. Yet, as nec-
essary and appropriate by the level of re-
and residue, and to safely conduct or
sponse provided, the position may be occu- direct them to an exhaust system.
pied by many individuals during a particular (4) Waterwash spray booth. A spray
response as the need for greater authority, booth equipped with a water washing
responsibility, or training increases. It is system designed to minimize dusts or
possible for the first responder at the aware- residues entering exhaust ducts and to
ness level to assume the duties of incident permit the recovery of overspray fin-
commander until a more senior and appro- ishing material.
priately trained individual arrives at the re- (5) Dry spray booth. A spray booth not
sponse site.
equipped with a water washing system
Therefore, any emergency responder ex-
as described in paragraph (a)(4) of this
pected to perform as an incident commander
should be trained to fulfill the obligations of
section. A dry spray booth may be
the position at the level of response they will equipped with
be providing including the following: (i) Distribution or baffle plates to
(A) Ability to analyze a hazardous sub- promote an even flow of air through
stance incident to determine the magnitude the booth or cause the deposit of
of the response problem. overspray before it enters the exhaust
(B) Ability to plan and implement an ap- duct; or
propriate response plan within the capabili- (ii) Overspray dry filters to minimize
ties of available personnel and equipment. dusts; or
(C) Ability to implement a response to fa- (iii) Overspray dry filters to mini-
vorably change the outcome of the incident mize dusts or residues entering exhaust
in a manner consistent with the local emer-
ducts; or
gency response plan and the organizations
standard operating procedures.
(iv) Overspray dry filter rolls de-
(D) Ability to evaluate the progress of the
signed to minimize dusts or residues
emergency response to ensure that the re- entering exhaust ducts; or
sponse objectives are being met safely, effec- (v) Where dry powders are being
tively, and efficiently. sprayed, with powder collection sys-
(E) Ability to adjust the response plan to tems so arranged in the exhaust to cap-
the conditions of the response and to notify ture oversprayed material.

185

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00195 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.66 29 CFR Ch. XVII (7112 Edition)

(6) Fluidized bed. A container holding or filter rolls, if installed, shall con-
powder coating material which is aer- form to the following:
ated from below so as to form an air- (i) The spraying operations except
supported expanded cloud of such ma- electrostatic spraying operations shall
terial through which the preheated ob- be so designed, installed and main-
ject to be coated is immersed and tained that the average air velocity
transported. over the open face of the booth (or
(7) Electrostatic fluidized bed. A con- booth cross section during spraying op-
tainer holding powder coating material erations) shall be not less than 100 lin-
which is aerated from below so as to ear feet per minute. Electrostatic
form an air-supported expanded cloud spraying operations may be conducted
of such material which is electrically with an air velocity over the open face
charged with a charge opposite to the of the booth of not less than 60 linear
charge of the object to be coated; such feet per minute, or more, depending on
object is transported, through the con- the volume of the finishing material
tainer immediately above the charged being applied and its flammability and
and aerated materials in order to be explosion characteristics. Visible
coated. gauges or audible alarm or pressure ac-
(8) Approved. Shall mean approved tivated devices shall be installed to in-
and listed by a nationally recognized dicate or insure that the required air
testing laboratory. velocity is maintained. Filter rolls
(9) Listed. See approved in para- shall be inspected to insure proper re-
graph (a)(8) of this section. placement of filter media.
(b) Spray booths(1) Construction. (ii) All discarded filter pads and filter
Spray booths shall be substantially rolls shall be immediately removed to
constructed of steel, securely and rig- a safe, well-detached location or placed
idly supported, or of concrete or ma- in a water-filled metal container and
sonry except that aluminum or other disposed of at the close of the days op-
substantial noncombustible material eration unless maintained completely
may be used for intermittent or low in water.
volume spraying. Spray booths shall be (iii) The location of filters in a spray
designed to sweep air currents toward booth shall be so as to not reduce the
the exhaust outlet. effective booth enclosure of the arti-
(2) Interiors. The interior surfaces of cles being sprayed.
spray booths shall be smooth and con- (iv) Space within the spray booth on
tinuous without edges and otherwise the downstream and upstream sides of
designed to prevent pocketing of resi- filters shall be protected with approved
dues and facilitate cleaning and wash- automatic sprinklers.
ing without injury. (v) Filters or filter rolls shall not be
(3) Floors. The floor surface of a spray used when applying a spray material
booth and operators working area, if known to be highly susceptible to spon-
combustible, shall be covered with non- taneous heating and ignition.
combustible material of such character (vi) Clean filters or filter rolls shall
as to facilitate the safe cleaning and be noncombustible or of a type having
removal of residues. a combustibility not in excess of class
(4) Distribution or baffle plates. Dis- 2 filters as listed by Underwriters Lab-
tribution or baffle plates, if installed oratories, Inc. Filters and filter rolls
to promote an even flow of air through shall not be alternately used for dif-
the booth or cause the deposit of ferent types of coating materials,
overspray before it enters the exhaust where the combination of materials
duct, shall be of noncombustible mate- may be conducive to spontaneous igni-
rial and readily removable or acces- tion.
sible on both sides for cleaning. Such (6) Frontal area. Each spray booth
plates shall not be located in exhaust having a frontal area larger than 9
ducts. square feet shall have a metal deflector
(5) Dry type overspray collectors(ex- or curtain not less than 2 12 inches (5.35
haust air filters). In conventional dry cm) deep installed at the upper outer
type spray booths, overspray dry filters edge of the booth over the opening.

186

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00196 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.66

(7) Conveyors. Where conveyors are deposits of combustible residues may


arranged to carry work into or out of readily accumulate.
spray booths, the openings therefor (4) Wiring conformance. Electrical wir-
shall be as small as practical. ing and equipment shall conform to the
(8) Separation of operations. Each provisions of this paragraph and shall
spray booth shall be separated from otherwise be in accordance with sub-
other operations by not less than 3 feet part S of this part.
(0.912 m), or by a greater distance, or (5) Combustible residues, areas. Unless
by such partition or wall as to reduce specifically approved for locations con-
the danger from juxtaposition of haz- taining both deposits of readily ignit-
ardous operations. See also paragraph able residue and explosive vapors, there
(c)(1) of this section. shall be no electrical equipment in any
(9) Cleaning. Spray booths shall be so spraying area, whereon deposits of
installed that all portions are readily combustible residues may readily accu-
accessible for cleaning. A clear space of mulate, except wiring in rigid conduit
not less than 3 feet (0.912 m) on all or in boxes or fittings containing no
sides shall be kept free from storage or taps, splices, or terminal connections.
combustible construction. (6) Wiring type approved. Electrical
(10) Illumination. When spraying areas wiring and equipment not subject to
are illuminated through glass panels or deposits of combustible residues but lo-
other transparent materials, only fixed cated in a spraying area as herein de-
lighting units shall be used as a source fined shall be of explosion-proof type
of illumination. Panels shall effec- approved for Class I, group D locations
tively isolate the spraying area from and shall otherwise conform to the pro-
the area in which the lighting unit is visions of subpart S of this part, for
located, and shall be of a noncombus- Class I, Division 1, Hazardous Loca-
tible material of such a nature or so tions. Electrical wiring, motors, and
protected that breakage will be un- other equipment outside of but within
likely. Panels shall be so arranged that 20 feet (6.08 m) of any spraying area,
normal accumulations of residue on and not separated therefrom by parti-
the exposed surface of the panel will tions, shall not produce sparks under
not be raised to a dangerous tempera- normal operating conditions and shall
ture by radiation or conduction from otherwise conform to the provisions of
the source of illumination. subpart S of this part for Class I, Divi-
sion 2 Hazardous Locations.
(c) Electrical and other sources of igni-
(7) Lamps. Electric lamps outside of,
tion(1) Conformance. All electrical
but within 20 feet (6.08 m) of any spray-
equipment, open flames and other
ing area, and not separated therefrom
sources of ignition shall conform to the
by a partition, shall be totally enclosed
requirements of this paragraph, except
to prevent the falling of hot particles
as follows:
and shall be protected from mechanical
(i) Electrostatic apparatus shall con- injury by suitable guards or by loca-
form to the requirements of paragraphs tion.
(e) and (f) of this section; (8) Portable lamps. Portable electric
(ii) Drying, curing, and fusion appa- lamps shall not be used in any spraying
ratus shall conform to the require- area during spraying operations. Port-
ments of paragraph (g) of this section; able electric lamps, if used during
(iii) [Reserved] cleaning or repairing operations, shall
(iv) Powder coating equipment shall be of the type approved for hazardous
conform to the requirements of para- Class I locations.
graph (c)(1) of this section. (9) Grounding. (i) All metal parts of
(2) Minimum separation. There shall be spray booths, exhaust ducts, and piping
no open flame or spark producing systems conveying flammable or com-
equipment in any spraying area nor bustible liquids or aerated solids shall
within 20 feet (6.08 m) thereof, unless be properly electrically grounded in an
separated by a partition. effective and permanent manner.
(3) Hot surfaces. Space-heating appli- (d) Ventilation(1) Conformance. Ven-
ances, steampipes, or hot surfaces shall tilating and exhaust systems shall be
not be located in a spraying area where in accordance with the Standard for

187

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00197 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.66 29 CFR Ch. XVII (7112 Edition)

Blower and Exhaust Systems for Vapor substantially supported. Exhaust ducts
Removal, NFPA No. 911961, where ap- without dampers are preferred; how-
plicable and shall also conform to the ever, if dampers are installed, they
provisions of this section. shall be maintained so that they will
(2) General. All spraying areas shall be in a full open position at all times
be provided with mechanical ventila- the ventilating system is in operation.
tion adequate to remove flammable va- (i) Exhaust ducts shall be protected
pors, mists, or powders to a safe loca- against mechanical damage and have a
tion and to confine and control com- clearance from unprotected combus-
bustible residues so that life is not en- tible construction or other combustible
dangered. Mechanical ventilation shall material of not less than 18 inches
be kept in operation at all times while (45.72 cm).
spraying operations are being con- (ii) If combustible construction is
ducted and for a sufficient time there- provided with the following protection
after to allow vapors from drying coat- applied to all surfaces within 18 inches
ed articles and drying finishing mate- (45.72 cm), clearances may be reduced
rial residue to be exhausted. to the distances indicated:
(3) Independent exhaust. Each spray (a) 28-gage sheet metal on 1/4-inch as- 12 inches (30.48
bestos mill board. cm).
booth shall have an independent ex- (b) 28-gage sheet metal on 1/8-inch as- 9 inches (22.86
haust duct system discharging to the bestos mill board spaced out 1 inch cm).
exterior of the building, except that (2.54 cm) on noncombustible spacers.
(c) 22-gage sheet metal on 1-inch 3 inches (7.62
multiple cabinet spray booths in which rockwool batts reinforced with wire cm).
identical spray finishing material is mesh or the equivalent.
used with a combined frontal area of (d) Where ducts are protected with an ap-
not more than 18 square feet may have proved automatic sprinkler system,
properly maintained, the clearance re-
a common exhaust. If more than one quired in paragraph (d)(7)(i) of this sec-
fan serves one booth, all fans shall be tion may be reduced to 6 inches (15.24
so interconnected that one fan cannot cm).
operate without all fans being oper- (8) Discharge clearance. Unless the
ated. spray booth exhaust duct terminal is
(4) Fan-rotating element. The fan-ro- from a water-wash spray booth, the
tating element shall be nonferrous or terminal discharge point shall be not
nonsparking or the casing shall consist less than 6 feet from any combustible
of or be lined with such material. exterior wall or roof nor discharge in
There shall be ample clearance be- the direction of any combustible con-
tween the fan-rotating element and the struction or unprotected opening in
fan casing to avoid a fire by friction, any noncombustible exterior wall with-
necessary allowance being made for or- in 25 feet (7.6 m).
dinary expansion and loading to pre- (9) Air exhaust. Air exhaust from
vent contact between moving parts and spray operations shall not be directed
the duct or fan housing. Fan blades so that it will contaminate makeup air
shall be mounted on a shaft suffi- being introduced into the spraying area
ciently heavy to maintain perfect or other ventilating intakes, nor di-
alignment even when the blades of the rected so as to create a nuisance. Air
fan are heavily loaded, the shaft pref- exhausted from spray operations shall
erably to have bearings outside the not be recirculated.
duct and booth. All bearings shall be of (10) Access doors. When necessary to
the self-lubricating type, or lubricated facilitate cleaning, exhaust ducts shall
from the outside duct. be provided with an ample number of
(5) Electric motors. Electric motors access doors.
driving exhaust fans shall not be placed (11) Room intakes. Air intake openings
inside booths or ducts. See also para- to rooms containing spray finishing op-
graph (c) of this section. erations shall be adequate for the effi-
(6) Belts. Belts shall not enter the cient operation of exhaust fans and
duct or booth unless the belt and pul- shall be so located as to minimize the
ley within the duct or booth are thor- creation of dead air pockets.
oughly enclosed. (12) Drying spaces. Freshly sprayed
(7) Exhaust ducts. Exhaust ducts shall articles shall be dried only in spaces
be constructed of steel and shall be provided with adequate ventilation to

188

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00198 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.66

prevent the formation of explosive va- (7) Conveyors required. Goods being
pors. In the event adequate and reliable painted using this process are to be
ventilation is not provided such drying supported on conveyors. The conveyors
spaces shall be considered a spraying shall be so arranged as to maintain
area. safe distances between the goods and
(e) Fixed electrostatic apparatus(1) the electrodes or electrostatic atom-
Conformance. Where installation and izing heads at all times. Any irregu-
use of electrostatic spraying equip- larly shaped or other goods subject to
ment is used, such installation and use possible swinging or movement shall be
shall conform to all other paragraphs rigidly supported to prevent such
of this section, and shall also conform swinging or movement which would re-
to the requirements of this paragraph. duce the clearance to less than that
(2) Type approval. Electrostatic appa- specified in paragraph (e)(6) of this sec-
ratus and devices used in connection tion.
with coating operations shall be of ap- (8) Prohibition. This process is not ac-
proved types. ceptable where goods being coated are
(3) Location. Transformers, power manipulated by hand. When finishing
packs, control apparatus, and all other materials are applied by electrostatic
electrical portions of the equipment, equipment which is manipulated by
with the exception of high-voltage hand, see paragraph (f) of this section
grids, electrodes, and electrostatic for applicable requirements.
atomizing heads and their connections, (9) Fail-safe controls. Electrostatic ap-
shall be located outside of the spraying paratus shall be equipped with auto-
area, or shall otherwise conform to the matic controls which will operate with-
requirements of paragraph (c) of this out time delay to disconnect the power
section. supply to the high voltage transformer
(4) Support. Electrodes and electro- and to signal the operator under any of
static atomizing heads shall be ade- the following conditions:
quately supported in permanent loca- (i) Stoppage of ventilating fans or
tions and shall be effectively insulated failure of ventilating equipment from
from the ground. Electrodes and elec- any cause.
trostatic atomizing heads which are (ii) Stoppage of the conveyor car-
permanently attached to their bases, rying goods through the high voltage
supports, or reciprocators, shall be field.
deemed to comply with this section. (iii) Occurrence of a ground or of an
Insulators shall be nonporous and non- imminent ground at any point on the
combustible. high voltage system.
(5) Insulators, grounding. High-voltage (iv) Reduction of clearance below
leads to electrodes shall be properly in- that specified in paragraph (e)(6) of this
sulated and protected from mechanical section.
injury or exposure to destructive (10) Guarding. Adequate booths, fenc-
chemicals. Electrostatic atomizing ing, railings, or guards shall be so
heads shall be effectively and perma- placed about the equipment that they,
nently supported on suitable insulators either by their location or character or
and shall be effectively guarded both, assure that a safe isolation of the
against accidental contact or ground- process is maintained from plant stor-
ing. An automatic means shall be pro- age or personnel. Such railings, fenc-
vided for grounding the electrode sys- ing, and guards shall be of conducting
tem when it is electrically deenergized material, adequately grounded.
for any reason. All insulators shall be (11) Ventilation. Where electrostatic
kept clean and dry. atomization is used the spraying area
(6) Safe distance. A safe distance shall shall be so ventilated as to insure safe
be maintained between goods being conditions from a fire and health
painted and electrodes or electrostatic standpoint.
atomizing heads or conductors of at (12) Fire protection. All areas used for
least twice the sparking distance. A spraying, including the interior of the
suitable sign indicating this safe dis- booth, shall be protected by automatic
tance shall be conspicuously posted sprinklers where this protection is
near the assembly. available. Where this protection is not

189

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00199 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.66 29 CFR Ch. XVII (7112 Edition)

available, other approved automatic tained in metallic contact with the


extinguishing equipment shall be pro- conveyor or other grounded support.
vided. Hooks shall be regularly cleaned to in-
(f) Electrostatic hand spraying equip- sure this contact and areas of contact
ment(1) Application. This paragraph shall be sharp points or knife edges
shall apply to any equipment using where possible. Points of support of the
electrostatically charged elements for object shall be concealed from random
the atomization and/or, precipitation spray where feasible and where the ob-
of materials for coatings on articles, or jects being sprayed are supported from
for other similar purposes in which the a conveyor, the point of attachment to
atomizing device is hand held and ma- the conveyor shall be so located as to
nipulated during the spraying oper- not collect spray material during nor-
ation. mal operation.
(2) Conformance. Electrostatic hand (8) Interlocks. The electrical equip-
spraying equipment shall conform with ment shall be so interlocked with the
the other provisions of this section. ventilation of the spraying area that
(3) Equipment approval and specifica- the equipment cannot be operated un-
tions. Electrostatic hand spray appa- less the ventilation fans are in oper-
ratus and devices used in connection ation.
with coating operations shall be of ap- (9) Ventilation. The spraying oper-
proved types. The high voltage circuits ation shall take place within a spray
shall be designed so as to not produce area which is adequately ventilated to
a spark of sufficient intensity to ignite remove solvent vapors released from
any vapor-air mixtures nor result in the operation.
appreciable shock hazard upon coming (g) Drying, curing, or fusion appa-
in contact with a grounded object ratus(1) Conformance. Drying, curing,
under all normal operating conditions. or fusion apparatus in connection with
The electrostatically charged exposed spray application of flammable and
elements of the handgun shall be capa- combustible finishes shall conform to
ble of being energized only by a switch the Standard for Ovens and Furnaces,
which also controls the coating mate- NFPA 86A1969, where applicable and
rial supply. shall also conform with the following
(4) Electrical support equipment. Trans- requirements of this paragraph.
formers, powerpacks, control appa- (2) Alternate use prohibited. Spray
ratus, and all other electrical portions booths, rooms, or other enclosures used
of the equipment, with the exception of for spraying operations shall not alter-
the handgun itself and its connections nately be used for the purpose of dry-
to the power supply shall be located ing by any arrangement which will
outside of the spraying area or shall cause a material increase in the sur-
otherwise conform to the requirements face temperature of the spray booth,
of paragraph (c) of this section. room, or enclosure.
(5) Spray gun ground. The handle of (3) Adjacent system interlocked. Except
the spraying gun shall be electrically as specifically provided in paragraph
connected to ground by a metallic con- (g)(4) of this section, drying, curing, or
nection and to be so constructed that fusion units utilizing a heating system
the operator in normal operating posi- having open flames or which may
tion is in intimate electrical contact produce sparks shall not be installed in
with the grounded handle. a spraying area, but may be installed
(6) Grounding-general. All electrically adjacent thereto when equipped with
conductive objects in the spraying area an interlocked ventilating system ar-
shall be adequately grounded. This re- ranged to:
quirement shall apply to paint con- (i) Thoroughly ventilate the drying
tainers, wash cans, and any other ob- space before the heating system can be
jects or devices in the area. The equip- started;
ment shall carry a prominent perma- (ii) Maintain a safe atmosphere at
nently installed warning regarding the any source of ignition;
necessity for this grounding feature. (iii) Automatically shut down the
(7) Maintenance of grounds. Objects heating system in the event of failure
being painted or coated shall be main- of the ventilating system.

190

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00200 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.95

(4) Alternate use permitted. Auto- Subpart EPersonal Protective


mobile refinishing spray booths or en- and Life Saving Equipment
closures, otherwise installed and main-
tained in full conformity with this sec-
AUTHORITY: Section 107 of the Contract
tion, may alternately be used for dry- Work Hours and Safety Standards Act (40
ing with portable electrical infrared U.S.C. 3704); Sections 4, 6, and 8 of the Occu-
drying apparatus when conforming pational Safety and Health Act of 1970 (29
with the following: U.S.C. 653, 655, 657); Secretary of Labors
(i) Interior (especially floors) of Order No. 1271 (36 FR 8754), 876 (41 FR
spray enclosures shall be kept free of 25059), 983 (48 FR 35736),190 (55 FR 9033), 6
96 (62 FR 111), 32000 (62 FR 50017), 52002 (67
overspray deposits.
FR 650008), 52007 (72 FR 31159), 42010 (75 FR
(ii) During spray operations, the dry- 55355), or 12012 (77 FR 3912), as applicable;
ing apparatus and electrical connec- and 29 CFR part 1911.
tions and wiring thereto shall not be
EFFECTIVE DATE NOTE: At 77 FR 37600, June
located within spray enclosure nor in 22, 2012, the authority citation for subpart E
any other location where spray resi- was revised, effective Sep. 20, 2012. For the
dues may be deposited thereon. convenience of the user, the revised text is
(iii) The spraying apparatus, the dry- set forth as follows:
ing apparatus, and the ventilating sys- AUTHORITY: 40 U.S.C. 333; 29 U.S.C. 653, 655,
tem of the spray enclosure shall be 657; Secretary of Labors Order No. 1271 (36
FR 8754), 876 (41 FR 25059), 983 (48 FR 35736),
equipped with suitable interlocks so ar- 190 (55 FR 9033), 696 (62 FR 111), 52007 (72
ranged that: FR 31160), 42010 (75 FR 55355), or 12012 (77
(a) The spraying apparatus cannot be FR 3912), as applicable; and 29 CFR part 1911.
operated while the drying apparatus is
inside the spray enclosure. 1926.95 Criteria for personal protec-
(b) The spray enclosure will be tive equipment.
purged of spray vapors for a period of (a) Application. Protective equipment,
not less than 3 minutes before the dry- including personal protective equip-
ing apparatus can be energized. ment for eyes, face, head, and extrem-
(c) The ventilating system will main- ities, protective clothing, respiratory
tain a safe atmosphere within the en- devices, and protective shields and bar-
closure during the drying process and riers, shall be provided, used, and
the drying apparatus will automati- maintained in a sanitary and reliable
cally shut off in the event of failure of condition wherever it is necessary by
the ventilating system. reason of hazards of processes or envi-
(iv) All electrical wiring and equip- ronment, chemical hazards, radio-
ment of the drying apparatus shall con- logical hazards, or mechanical irri-
form with the applicable sections of tants encountered in a manner capable
subpart S of this part. Only equipment of causing injury or impairment in the
function of any part of the body
of a type approved for Class I, Division
through absorption, inhalation or
2 hazardous locations shall be located
physical contact.
within 18 inches (45.72 cm) of floor
(b) Employee-owned equipment. Where
level. All metallic parts of the drying
employees provide their own protective
apparatus shall be properly electrically
equipment, the employer shall be re-
bonded and grounded.
sponsible to assure its adequacy, in-
(v) The drying apparatus shall con- cluding proper maintenance, and sani-
tain a prominently located, perma- tation of such equipment.
nently attached warning sign indi- (c) Design. All personal protective
cating that ventilation should be main- equipment shall be of safe design and
tained during the drying period and construction for the work to be per-
that spraying should not be conducted formed.
in the vicinity that spray will deposit (d) Payment for protective equipment.
on apparatus. (1) Except as provided by paragraphs
[58 FR 35149, June 30, 1993] (d)(2) through (d)(6) of this section, the
protective equipment, including per-
sonal protective equipment (PPE), used

191

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00201 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.96 29 CFR Ch. XVII (7112 Edition)

to comply with this part, shall be pro- ard for Mens Safety-Toe Footwear,
vided by the employer at no cost to Z41.11967.
employees. [58 FR 35152, June 30, 1993]
(2) The employer is not required to
pay for non-specialty safety-toe protec- 1926.971926.98 [Reserved]
tive footwear (including steel-toe shoes
or steel-toe boots) and non-specialty 1926.100 Head protection.
prescription safety eyewear, provided (a) Employees working in areas
that the employer permits such items where there is a possible danger of head
to be worn off the job-site. injury from impact, or from falling or
(3) When the employer provides flying objects, or from electrical shock
metatarsal guards and allows the em- and burns, shall be protected by protec-
ployee, at his or her request, to use tive helmets.
shoes or boots with built-in metatarsal (b) Helmets for the protection of em-
protection, the employer is not re- ployees against impact and penetration
quired to reimburse the employee for of falling and flying objects shall meet
the shoes or boots. the specifications contained in Amer-
(4) The employer is not required to ican National Standards Institute,
pay for: Z89.11969, Safety Requirements for In-
(i) Everyday clothing, such as long- dustrial Head Protection.
sleeve shirts, long pants, street shoes, (c) Helmets for the head protection of
and normal work boots; or employees exposed to high voltage
(ii) Ordinary clothing, skin creams, electrical shock and burns shall meet
or other items, used solely for protec- the specifications contained in Amer-
tion from weather, such as winter ican National Standards Institute,
coats, jackets, gloves, parkas, rubber Z89.21971.
boots, hats, raincoats, ordinary sun-
EFFECTIVE DATE NOTE: At 77 FR 37600, June
glasses, and sunscreen.
22, 2012, 1926.100 was amended by adding
(5) The employer must pay for re- paragraphs (b)(1) through (b)(3) and removing
placement PPE, except when the em- paragraph (c), effective Sep. 20, 2012. For the
ployee has lost or intentionally dam- convenience of the user, the added text is set
aged the PPE. forth as follows:
(6) Where an employee provides ade-
1926.100 Head protection.
quate protective equipment he or she
owns pursuant to paragraph (b) of this
section, the employer may allow the * * * * *
employee to use it and is not required (b) * * *
to reimburse the employee for that (1) The employer must provide each em-
equipment. The employer shall not re- ployee with head protection that meets the
quire an employee to provide or pay for specifications contained in any of the fol-
his or her own PPE, unless the PPE is lowing consensus standards:
(i) American National Standards Institute
excepted by paragraphs (d)(2) through (ANSI) Z89.12009, American National
(d)(5) of this section. Standard for Industrial Head Protection,
(7) This section shall become effec- incorporated by reference in 1926.6;
tive on February 13, 2008. Employers (ii) American National Standards Institute
must implement the PPE payment re- (ANSI) Z89.12003, American National
quirements no later than May 15, 2008. Standard for Industrial Head Protection,
incorporated by reference in 1926.6; or
NOTE TO 1926.95(d): When the provisions of (iii) American National Standards Insti-
another OSHA standard specify whether or tute (ANSI) Z89.11997, American National
not the employer must pay for specific Standard for Personnel ProtectionProtec-
equipment, the payment provisions of that tive Headwear for Industrial WorkersRe-
standard shall prevail. quirements, incorporated by reference in
[58 FR 35152, June 30, 1993, as amended at 72 1926.6.
FR 64429, Nov. 15, 2007] (2) The employer must ensure that the
head protection provided for each employee
1926.96 Occupational foot protection. exposed to high-voltage electric shock and
burns also meets the specifications con-
Safety-toe footwear for employees tained in Section 9.7 (Electrical Insula-
shall meet the requirements and speci- tion) of any of the consensus standards
fications in American National Stand- identified in paragraph (b)(1) of this section.

192

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00202 Fmt 8010 Sfmt 8003 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.102
(3) OSHA will deem any head protection the requirements specified in American
device that the employer demonstrates is at National Standards Institute, Z87.1
least as effective as a head protection device
1968, Practice for Occupational and
constructed in accordance with one of the
consensus standards identified in paragraph Educational Eye and Face Protection.
(b)(1) of this section to be in compliance with (3) Employees whose vision requires
the requirements of this section. the use of corrective lenses in spec-
tacles, when required by this regula-
1926.101 Hearing protection. tion to wear eye protection, shall be
(a) Wherever it is not feasible to re- protected by goggles or spectacles of
duce the noise levels or duration of ex- one of the following types:
posures to those specified in Table D2, (i) Spectacles whose protective lenses
Permissible Noise Exposures, in provide optical correction;
1926.52, ear protective devices shall be (ii) Goggles that can be worn over
provided and used. corrective spectacles without dis-
(b) Ear protective devices inserted in
turbing the adjustment of the spec-
the ear shall be fitted or determined in-
tacles;
dividually by competent persons.
(c) Plain cotton is not an acceptable (iii) Goggles that incorporate correc-
protective device. tive lenses mounted behind the protec-
tive lenses.
1926.102 Eye and face protection. (4) Face and eye protection equip-
(a) General. (1) Employees shall be ment shall be kept clean and in good
provided with eye and face protection repair. The use of this type equipment
equipment when machines or oper- with structural or optical defects shall
ations present potential eye or face in- be prohibited.
jury from physical, chemical, or radi- (5) Table E1 shall be used as a guide
ation agents. in the selection of face and eye protec-
(2) Eye and face protection equip- tion for the hazards and operations
ment required by this part shall meet noted.

*Non-side shield spectacles are avail- **See Table E2, in paragraph (b) of
able for limited hazard use requiring this section, Filter Lens Shade Num-
only frontal protection. bers for Protection Against Radiant
EC30OC91.011</GPH>

Energy.

193
EC30OC91.010</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00203 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.102 29 CFR Ch. XVII (7112 Edition)

APPLICATIONS
Recommended protectors: Bold type numbers signify pre-
Operation Hazards ferred protection

AcetyleneBurning, Acety- Sparks, harmful rays, molten 7, 8, 9.


leneCutting, Acetylene metal, flying particles.
Welding.

Chemical Handling .................... Splash, acid burns, fumes ...... 2, 10 (For severe exposure add 10 over 2).

Chipping .................................... Flying particles ........................ 1, 3, 4, 5, 6, 7A, 8A.

Electric (arc) welding ................ Sparks, intense rays, molten 9, 11, (11 in combination with 4, 5, 6, in tinted lenses, advis-
metal. able).

Furnace operations ................... Glare, heat, molten metal ....... 7, 8, 9 (For severe exposure add 10).

GrindingLight ......................... Flying particles ........................ 1, 3, 4, 5, 6, 10.

GrindingHeavy ....................... Flying particles ........................ 1 , 3, 7A, 8A (For severe exposure add 10).

Laboratory ................................. Chemical splash, glass break- 2 (10 when in combination with 4, 5, 6).
age.

Machining .................................. Flying particles ........................ 1, 3, 4, 5, 6, 10.

Molten metals ........................... Heat, glare, sparks, splash ..... 7, 8, (10 in combination with 4, 5, 6, in tinted lenses).

Spot welding ............................. Flying particles, sparks ........... 1, 3, 4, 5, 6, 10.

(6) Protectors shall meet the fol- TABLE E2FILTER LENS SHADE NUMBERS FOR
lowing minimum requirements: PROTECTION AGAINST RADIANT ENERGY
(i) They shall provide adequate pro-
Shade
tection against the particular hazards Welding operation number
for which they are designed.
Shielded metal-arc welding 116-, 332-, 18-, 532-
(ii) They shall be reasonably com- inch diameter electrodes .................................. 10
fortable when worn under the des- Gas-shielded arc welding (nonferrous) 116-, 332-
ignated conditions. , 18-, 532-inch diameter electrodes .................. 11
Gas-shielded arc welding (ferrous) 116-, 332-,
(iii) They shall fit snugly and shall 18-, 532-inch diameter electrodes .................... 12
not unduly interfere with the move- Shielded metal-arc welding 316-, 732-, 14-inch
ments of the wearer. diameter electrodes ......................................... 12
516-, 38-inch diameter electrodes ........................ 14
(iv) They shall be durable.
Atomic hydrogen welding .................................... 1014
(v) They shall be capable of being dis- Carbon-arc welding ............................................. 14
infected. Soldering .............................................................. 2
(vi) They shall be easily cleanable. Torch brazing ....................................................... 3 or 4
Light cutting, up to 1 inch .................................... 3 or 4
(7) Every protector shall be distinctly Medium cutting, 1 inch to 6 inches ..................... 4 or 5
marked to facilitate identification Heavy cutting, over 6 inches ............................... 5 or 6
only of the manufacturer. Gas welding (light), up to 18-inch ....................... 4 or 5
Gas welding (medium), 18-inch to 12-inch .......... 5 or 6
(8) When limitations or precautions
Gas welding (heavy), over 12-inch ...................... 6 or 8
are indicated by the manufacturer,
they shall be transmitted to the user (2) Laser protection. (i) Employees
and care taken to see that such limita- whose occupation or assignment re-
tions and precautions are strictly ob- quires exposure to laser beams shall be
served. furnished suitable laser safety goggles
(b) Protection against radiant energy which will protect for the specific
(1) Selection of shade numbers for welding wavelength of the laser and be of opti-
filter. Table E2 shall be used as a guide cal density (O.D.) adequate for the en-
for the selection of the proper shade ergy involved. Table E3 lists the max-
numbers of filter lenses or plates used imum power or energy density for
in welding. Shades more dense than which adequate protection is afforded
those listed may be used to suit the in- by glasses of optical densities from 5
dividuals needs. through 8.

194

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00204 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.105

TABLE E3SELECTING LASER SAFETY GLASS The rope shall have a nominal breaking
strength of 5,400 pounds.
Attenuation
Intensity, CW max- (e) All safety belt and lanyard hard-
imum power den- Optical density ware shall be drop forged or pressed
sity (watts/cm2) Attenuation factor
(O.D.)
steel, cadmium plated in accordance
102 5 10 5 with type 1, Class B plating specified in
101 6 10 6
1.0 7 10 7 Federal Specification QQ-P-416. Sur-
10.0 8 10 8 face shall be smooth and free of sharp
edges.
Output levels falling between lines in (f) All safety belt and lanyard hard-
this table shall require the higher opti- ware, except rivets, shall be capable of
cal density. withstanding a tensile loading of 4,000
(ii) All protective goggles shall bear pounds without cracking, breaking, or
a label identifying the following data: taking a permanent deformation.
(a) The laser wavelengths for which
use is intended; 1926.105 Safety nets.
(b) The optical density of those wave- (a) Safety nets shall be provided
lengths;
when workplaces are more than 25 feet
(c) The visible light transmission.
above the ground or water surface, or
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6, other surfaces where the use of ladders,
1979, as amended at 58 FR 35160, June 30, 1993] scaffolds, catch platforms, temporary
floors, safety lines, or safety belts is
1926.103 Respiratory protection.
impractical.
NOTE: The requirements applicable to con- (b) Where safety net protection is re-
struction work under this section are iden-
tical to those set forth at 29 CFR 1910.134 of
quired by this part, operations shall
this chapter. not be undertaken until the net is in
place and has been tested.
[63 FR 1297; Jan. 8, 1998]
(c)(1) Nets shall extend 8 feet beyond
1926.104 Safety belts, lifelines, and the edge of the work surface where em-
lanyards. ployees are exposed and shall be in-
(a) Lifelines, safety belts, and lan- stalled as close under the work surface
yards shall be used only for employee as practical but in no case more than
safeguarding. Any lifeline, safety belt, 25 feet below such work surface. Nets
or lanyard actually subjected to in- shall be hung with sufficient clearance
service loading, as distinguished from to prevent users contact with the sur-
static load testing, shall be imme- faces or structures below. Such clear-
diately removed from service and shall ances shall be determined by impact
not be used again for employee safe- load testing.
guarding. (2) It is intended that only one level
(b) Lifelines shall be secured above of nets be required for bridge construc-
the point of operation to an anchorage tion.
or structural member capable of sup- (d) The mesh size of nets shall not ex-
porting a minimum dead weight of 5,400 ceed 6 inches by 6 inches. All new nets
pounds. shall meet accepted performance
(c) Lifelines used on rock-scaling op- standards of 17,500 foot-pounds min-
erations, or in areas where the lifeline
imum impact resistance as determined
may be subjected to cutting or abra-
and certified by the manufacturers,
sion, shall be a minimum of 78-inch
and shall bear a label of proof test.
wire core manila rope. For all other
lifeline applications, a minimum of 34- Edge ropes shall provide a minimum
inch manila or equivalent, with a min- breaking strength of 5,000 pounds.
imum breaking strength of 5,400 (e) Forged steel safety hooks or
pounds, shall be used. shackles shall be used to fasten the net
(d) Safety belt lanyard shall be a to its supports.
minimum of 12-inch nylon, or equiva- (f) Connections between net panels
lent, with a maximum length to pro- shall develop the full strength of the
vide for a fall of no greater than 6 feet. net.

195

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00205 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.106 29 CFR Ch. XVII (7112 Edition)

1926.106 Working over or near water. 25059), 983 (48 FR 35736),190 (55 FR 9033), 6
96 (62 FR 111), 32000 (62 FR 50017), 52002 (67
(a) Employees working over or near FR 650008), 52007 (72 FR 31159), 42010 (75 FR
water, where the danger of drowning 55355), or 12012 (77 FR 3912), as applicable;
exists, shall be provided with U.S. and 29 CFR part 1911.
Coast Guard-approved life jacket or
buoyant work vests. 1926.150 Fire protection.
(b) Prior to and after each use, the (a) General requirements. (1) The em-
buoyant work vests or life preservers ployer shall be responsible for the de-
shall be inspected for defects which velopment of a fire protection program
would alter their strength or buoy- to be followed throughout all phases of
ancy. Defective units shall not be used. the construction and demolition work,
(c) Ring buoys with at least 90 feet of and he shall provide for the firefighting
line shall be provided and readily avail- equipment as specified in this subpart.
able for emergency rescue operations. As fire hazards occur, there shall be no
Distance between ring buoys shall not delay in providing the necessary equip-
exceed 200 feet. ment.
(d) At least one lifesaving skiff shall (2) Access to all available firefighting
be immediately available at locations equipment shall be maintained at all
where employees are working over or times.
adjacent to water. (3) All firefighting equipment, pro-
vided by the employer, shall be con-
1926.107 Definitions applicable to spicuously located.
this subpart. (4) All firefighting equipment shall
(a) Contaminant means any material be periodically inspected and main-
which by reason of its action upon, tained in operating condition. Defec-
within, or to a person is likely to cause tive equipment shall be immediately
physical harm. replaced.
(b) Lanyard means a rope, suitable (5) As warranted by the project, the
for supporting one person. One end is employer shall provide a trained and
fastened to a safety belt or harness and equipped firefighting organization
the other end is secured to a substan- (Fire Brigade) to assure adequate pro-
tial object or a safety line. tection to life.
(c) Lifeline means a rope, suitable for (b) Water supply. (1) A temporary or
supporting one person, to which a lan- permanent water supply, of sufficient
yard or safety belt (or harness) is at- volume, duration, and pressure, re-
tached. quired to properly operate the fire-
fighting equipment shall be made
(d) O.D. means optical density and
available as soon as combustible mate-
refers to the light refractive character-
rials accumulate.
istics of a lens.
(2) Where underground water mains
(e) Radiant energy means energy that
are to be provided, they shall be in-
travels outward in all directions from
stalled, completed, and made available
its sources.
for use as soon as practicable.
(f) Safety belt means a device, usually
(c) Portable firefighting equipment(1)
worn around the waist which, by rea-
Fire extinguishers and small hose lines. (i)
son of its attachment to a lanyard and
A fire extinguisher, rated not less than
lifeline or a structure, will prevent a
2A, shall be provided for each 3,000
worker from falling.
square feet of the protected building
[44 FR 8577, Feb. 9, 1979] area, or major fraction thereof. Travel
distance from any point of the pro-
Subpart FFire Protection and tected area to the nearest fire extin-
Prevention guisher shall not exceed 100 feet.
(ii) One 55-gallon open drum of water
with two fire pails may be substituted
AUTHORITY: Section 107 of the Contract
Work Hours and Safety Standards Act (40
for a fire extinguisher having a 2A rat-
U.S.C. 3704); Sections 4, 6, and 8 of the Occu- ing.
pational Safety and Health Act of 1970 (29 (iii) A 12-inch diameter garden-type
U.S.C. 653, 655, 657); Secretary of Labors hose line, not to exceed 100 feet in
Order No. 1271 (36 FR 8754), 876 (41 FR length and equipped with a nozzle, may

196

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00206 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.150

be substituted for a 2A-rated fire extin- flammable or combustible liquids or 5


guisher, providing it is capable of dis- pounds of flammable gas are being used
charging a minimum of 5 gallons per on the jobsite. This requirement does
minute with a minimum hose stream not apply to the integral fuel tanks of
range of 30 feet horizontally. The gar- motor vehicles.
den-type hose lines shall be mounted (vii) Carbon tetrachloride and other
on conventional racks or reels. The toxic vaporizing liquid fire extin-
number and location of hose racks or guishers are prohibited.
reels shall be such that at least one
(viii) Portable fire extinguishers
hose stream can be applied to all points
shall be inspected periodically and
in the area.
(iv) One or more fire extinguishers, maintained in accordance with Mainte-
rated not less than 2A, shall be pro- nance and Use of Portable Fire Extin-
vided on each floor. In multistory guishers, NFPA No. 10A1970.
buildings, at least one fire extinguisher (ix) Fire extinguishers which have
shall be located adjacent to stairway. been listed or approved by a nationally
(v) Extinguishers and water drums, recognized testing laboratory, shall be
subject to freezing, shall be protected used to meet the requirements of this
from freezing. subpart.
(vi) A fire extinguisher, rated not less (x) Table F1 may be used as a guide
than 10B, shall be provided within 50 for selecting the appropriate portable
feet of wherever more than 5 gallons of fire extinguishers.

(2) Fire hose and connections. (i) One (ii) If fire hose connections are not
hundred feet, or less, of 112-inch hose, compatible with local firefighting
with a nozzle capable of discharging equipment, the contractor shall pro-
water at 25 gallons or more per minute, vide adapters, or equivalent, to permit
may be substituted for a fire extin- connections.
guisher rated not more than 2A in the (iii) During demolition involving
designated area provided that the hose combustible materials, charged hose
line can reach all points in the area. lines, supplied by hydrants, water tank

197
EC30OC91.012</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00207 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.151 29 CFR Ch. XVII (7112 Edition)

trucks with pumps, or equivalent, shall demolition until operations necessitate


be made available. their removal.
(d) Fixed firefighting equipment(1) [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
Sprinkler protection. (i) If the facility 1979, as amended at 58 FR 35162, June 30, 1993;
being constructed includes the instal- 61 FR 31432, June 20, 1996]
lation of automatic sprinkler protec-
tion, the installation shall closely fol- 1926.151 Fire prevention.
low the construction and be placed in (a) Ignition hazards. (1) Electrical wir-
service as soon as applicable laws per- ing and equipment for light, heat, or
mit following completion of each story. power purposes shall be installed in
(ii) During demolition or alterations, compliance with the requirements of
existing automatic sprinkler installa- subpart K of this part.
tions shall be retained in service as (2) Internal combustion engine pow-
long as reasonable. The operation of ered equipment shall be so located that
sprinkler control valves shall be per- the exhausts are well away from com-
mitted only by properly authorized bustible materials. When the exhausts
persons. Modification of sprinkler sys- are piped to outside the building under
tems to permit alterations or addi- construction, a clearance of at least 6
tional demolition should be expedited inches shall be maintained between
so that the automatic protection may such piping and combustible material.
be returned to service as quickly as (3) Smoking shall be prohibited at or
possible. Sprinkler control valves shall in the vicinity of operations which con-
be checked daily at close of work to as- stitute a fire hazard, and shall be con-
certain that the protection is in serv- spicuously posted: No Smoking or
ice. Open Flame.
(2) Standpipes. In all structures in (4) Portable battery powered lighting
which standpipes are required, or equipment, used in connection with the
storage, handling, or use of flammable
where standpipes exist in structures
gases or liquids, shall be of the type ap-
being altered, they shall be brought up
proved for the hazardous locations.
as soon as applicable laws permit, and
(5) The nozzle of air, inert gas, and
shall be maintained as construction
steam lines or hoses, when used in the
progresses in such a manner that they
cleaning or ventilation of tanks and
are always ready for fire protection
vessels that contain hazardous con-
use. The standpipes shall be provided
centrations of flammable gases or va-
with Siamese fire department connec-
pors, shall be bonded to the tank or
tions on the outside of the structure, at vessel shell. Bonding devices shall not
the street level, which shall be con- be attached or detached in hazardous
spicuously marked. There shall be at concentrations of flammable gases or
least one standard hose outlet at each vapors.
floor. (b) Temporary buildings. (1) No tem-
(e) Fire alarm devices. (1) An alarm porary building shall be erected where
system, e.g., telephone system, siren, it will adversely affect any means of
etc., shall be established by the em- exit.
ployer whereby employees on the site (2) Temporary buildings, when lo-
and the local fire department can be cated within another building or struc-
alerted for an emergency. ture, shall be of either noncombustible
(2) The alarm code and reporting in- construction or of combustible con-
structions shall be conspicuously post- struction having a fire resistance of
ed at phones and at employee en- not less than 1 hour.
trances. (3) Temporary buildings, located
(f) Fire cutoffs. (1) Fire walls and exit other than inside another building and
stairways, required for the completed not used for the storage, handling, or
buildings, shall be given construction use of flammable or combustible liq-
priority. Fire doors, with automatic uids, flammable gases, explosives, or
closing devices, shall be hung on open- blasting agents, or similar hazardous
ings as soon as practicable. occupancies, shall be located at a dis-
(2) Fire cutoffs shall be retained in tance of not less than 10 feet from an-
buildings undergoing alterations or other building or structure. Groups of

198

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00208 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.152

temporary buildings, not exceeding (5) Clearance of at least 36 inches


2,000 square feet in aggregate, shall, for shall be maintained between the top
the purposes of this part, be considered level of the stored material and the
a single temporary building. sprinkler deflectors.
(c) Open yard storage. (1) Combustible (6) Clearance shall be maintained
materials shall be piled with due re- around lights and heating units to pre-
gard to the stability of piles and in no vent ignition of combustible materials.
case higher than 20 feet. (7) A clearance of 24 inches shall be
(2) Driveways between and around maintained around the path of travel
combustible storage piles shall be at of fire doors unless a barricade is pro-
least 15 feet wide and maintained free vided, in which case no clearance is
from accumulation of rubbish, equip- needed. Material shall not be stored
ment, or other articles or materials. within 36 inches of a fire door opening.
Driveways shall be so spaced that a [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
maximum grid system unit of 50 feet 1979, as amended at 51 FR 25318, July 11, 1986]
by 150 feet is produced.
1926.152 Flammable liquids.
(3) The entire storage site shall be
kept free from accumulation of unnec- (a) General requirements. (1) Only ap-
essary combustible materials. Weeds proved containers and portable tanks
and grass shall be kept down and a reg- shall be used for storage and handling
ular procedure provided for the peri- of flammable liquids. Approved safety
odic cleanup of the entire area. cans or Department of Transportation
(4) When there is a danger of an un- approved containers shall be used for
derground fire, that land shall not be the handling and use of flammable liq-
used for combustible or flammable uids in quantities of 5 gallons or less,
storage. except that this shall not apply to
those flammable liquid materials
(5) Method of piling shall be solid
which are highly viscid (extremely
wherever possible and in orderly and
hard to pour), which may be used and
regular piles. No combustible material
handled in original shipping con-
shall be stored outdoors within 10 feet
tainers. For quantities of one gallon or
of a building or structure.
less, the original container may be
(6) Portable fire extinguishing equip- used, for storage, use and handling of
ment, suitable for the fire hazard in- flammable liquids.
volved, shall be provided at convenient, (2) Flammable liquids shall not be
conspicuously accessible locations in stored in areas used for exits, stair-
the yard area. Portable fire extin- ways, or normally used for the safe
guishers, rated not less than 2A, shall passage of people.
be placed so that maximum travel dis- (b) Indoor storage of flammable liquids.
tance to the nearest unit shall not ex- (1) No more than 25 gallons of flam-
ceed 100 feet. mable liquids shall be stored in a room
(d) Indoor storage. (1) Storage shall outside of an approved storage cabinet.
not obstruct, or adversely affect, For storage of liquefied petroleum gas,
means of exit. see 1926.153.
(2) All materials shall be stored, han- (2) Quantities of flammable liquid in
dled, and piled with due regard to their excess of 25 gallons shall be stored in
fire characteristics. an acceptable or approved cabinet
(3) Noncompatible materials, which meeting the following requirements:
may create a fire hazard, shall be seg- (i) Acceptable wooden storage cabi-
regated by a barrier having a fire re- nets shall be constructed in the fol-
sistance of at least 1 hour. lowing manner, or equivalent: The bot-
(4) Material shall be piled to mini- tom, sides, and top shall be constructed
mize the spread of fire internally and of an exterior grade of plywood at least
to permit convenient access for fire- 1 inch in thickness, which shall not
fighting. Stable piling shall be main- break down or delaminate under stand-
tained at all times. Aisle space shall be ard fire test conditions. All joints shall
maintained to safely accommodate the be rabbeted and shall be fastened in
widest vehicle that may be used within two directions with flathead wood
the building for firefighting purposes. screws. When more than one door is

199

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00209 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.152 29 CFR Ch. XVII (7112 Edition)

used, there shall be a rabbeted overlap (iv) Storage in inside storage rooms
of not less than 1 inch. Steel hinges shall comply with Table F2 following:
shall be mounted in such a manner as
to not lose their holding capacity due TABLE F2
to loosening or burning out of the Total al-
screws when subjected to fire. Such lowable
cabinets shall be painted inside and out Fire protection Fire resist- quantities
Maximum size
provided ance gals./sq.
with fire retardant paint. ft./floor
area
(ii) Approved metal storage cabinets
will be acceptable. Yes ................ 2 hrs ............. 500 sq. ft ...... 10
(iii) Cabinets shall be labeled in con- No .................. 2 hrs ............. 500 sq. ft ...... 4
Yes ................ 1 hr ............... 150 sq. ft ...... 5
spicuous lettering, Flammable-Keep
No .................. 1 hr ............... 150 sq. ft ...... 2
Away from Open Flames.
NOTE: Fire protection system shall be sprinkler, water spray,
(3) Not more than 60 gallons of Cat- carbon dioxide or other system approved by a nationally rec-
egory 1, 2 and/or 3 flammable liquids or ognized testing laboratory for this purpose.
120 gallons of Category 4 flammable (v) Electrical wiring and equipment
liquids shall be stored in any one stor- located in inside storage rooms shall be
age cabinet. Not more than three such approved for Class I, Division 1, Haz-
cabinets may be located in a single ardous Locations. For definition of
storage area. Quantities in excess of Class I, Division 1, Hazardous Loca-
this shall be stored in an inside storage tions, see 1926.449.
room. (vi) Every inside storage room shall
(4)(i) Inside storage rooms shall be be provided with either a gravity or a
constructed to meet the required fire- mechanical exhausting system. Such
resistive rating for their use. Such con- system shall commence not more than
struction shall comply with the test 12 inches above the floor and be de-
specifications set forth in Standard signed to provide for a complete
Methods of Fire Test of Building Con- change of air within the room at least
struction and Material, NFPA 2511969. 6 times per hour. If a mechanical ex-
(ii) Where an automatic extin- hausting system is used, it shall be
guishing system is provided, the sys- controlled by a switch located outside
tem shall be designed and installed in of the door. The ventilating equipment
an approved manner. Openings to other and any lighting fixtures shall be oper-
rooms or buildings shall be provided ated by the same switch. An electric
with noncombustible liquid-tight pilot light shall be installed adjacent
raised sills or ramps at least 4 inches in to the switch if Category 1, 2, or 3 flam-
height, or the floor in the storage area mable liquids are dispensed within the
shall be at least 4 inches below the sur- room. Where gravity ventilation is pro-
rounding floor. Openings shall be pro- vided, the fresh air intake, as well as
vided with approved self-closing fire the exhausting outlet from the room,
doors. The room shall be liquid-tight shall be on the exterior of the building
where the walls join the floor. A per- in which the room is located.
missible alternate to the sill or ramp is (vii) In every inside storage room
an open-grated trench, inside of the there shall be maintained one clear
room, which drains to a safe location. aisle at least 3 feet wide. Containers
Where other portions of the building or over 30 gallons capacity shall not be
other buildings are exposed, windows stacked one upon the other.
shall be protected as set forth in the (viii) Flammable liquids in excess of
Standard for Fire Doors and Windows, that permitted in inside storage rooms
NFPA No. 801970, for Class E or F shall be stored outside of buildings in
openings. Wood of at least 1-inch nomi- accordance with paragraph (c) of this
nal thickness may be used for shelving, section.
racks, dunnage, scuffboards, floor over- (5) Quantity. The quantity of flam-
lay, and similar installations. mable liquids kept in the vicinity of
(iii) Materials which will react with spraying operations shall be the min-
water and create a fire hazard shall not imum required for operations and
be stored in the same room with flam- should ordinarily not exceed a supply
mable liquids. for 1 day or one shift. Bulk storage of

200

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00210 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.152

portable containers of flammable liq- extinguisher, having a rating of not


uids shall be in a separate, constructed less than 20B units, shall be located
building detached from other impor- outside of, but not more than 10 feet
tant buildings or cut off in a standard from, the door opening into any room
manner. used for storage of more than 60 gal-
(c) Storage outside buildings. (1) Stor- lons of flammable liquids.
age of containers (not more than 60 (2) At least one portable fire extin-
gallons each) shall not exceed 1,100 gal- guisher having a rating of not less than
lons in any one pile or area. Piles or 20B units shall be located not less
groups of containers shall be separated than 25 feet, nor more than 75 feet,
by a 5-foot clearance. Piles or groups of from any flammable liquid storage
containers shall not be nearer than 20 area located outside.
feet to a building. (3) When sprinklers are provided,
(2) Within 200 feet of each pile of con- they shall be installed in accordance
tainers, there shall be a 12-foot-wide with the Standard for the Installation
access way to permit approach of fire of Sprinkler Systems, NFPA 131969.
control apparatus. (4) At least one portable fire extin-
(3) The storage area shall be graded guisher having a rating of not less than
in a manner to divert possible spills 20B:C units shall be provided on all
away from buildings or other expo- tank trucks or other vehicles used for
sures, or shall be surrounded by a curb
transporting and/or dispensing flam-
or earth dike at least 12 inches high.
mable liquids.
When curbs or dikes are used, provi-
(e) Dispensing liquids. (1) Areas in
sions shall be made for draining off ac-
cumulations of ground or rain water, which flammable liquids are trans-
or spills of flammable liquids. Drains ferred at one time, in quantities great-
shall terminate at a safe location and er than 5 gallons from one tank or con-
shall be accessible to operation under tainer to another tank or container,
fire conditions. shall be separated from other oper-
(4) Outdoor portable tank storage: (i) ations by 25-feet distance or by con-
Portable tanks shall not be nearer than struction having a fire resistance of at
20 feet from any building. Two or more least 1 hour. Drainage or other means
portable tanks, grouped together, hav- shall be provided to control spills. Ade-
ing a combined capacity in excess of quate natural or mechanical ventila-
2,200 gallons, shall be separated by a 5- tion shall be provided to maintain the
foot-clear area. Individual portable concentration of flammable vapor at or
tanks exceeding 1,100 gallons shall be below 10 percent of the lower flam-
separated by a 5-foot-clear area. mable limit.
(ii) Within 200 feet of each portable (2) Transfer of Category 1, 2, or 3
tank, there shall be a 12-foot-wide ac- flammable liquids from one container
cess way to permit approach of fire to another shall be done only when
control apparatus. containers are electrically inter-
(5) Storage areas shall be kept free of connected (bonded).
weeds, debris, and other combustible (3) Flammable liquids shall be drawn
material not necessary to the storage. from or transferred into vessels, con-
(6) Portable tanks, not exceeding 660 tainers, or tanks within a building or
gallons, shall be provided with emer- outside only through a closed piping
gency venting and other devices, as re- system, from safety cans, by means of
quired by chapters III and IV of NFPA a device drawing through the top, or
301969, The Flammable and Combus- from a container, or portable tanks, by
tible Liquids Code. gravity or pump, through an approved
(7) Portable tanks, in excess of 660 self-closing valve. Transferring by
gallons, shall have emergency venting means of air pressure on the container
and other devices, as required by chap- or portable tanks is prohibited.
ters II and III of The Flammable and (4) The dispensing units shall be pro-
Combustible Liquids Code, NFPA 30 tected against collision damage.
1969. (5) Dispensing devices and nozzles for
(d) Fire control for flammable liquid Category 1, 2, or 3 flammable liquids
storage. (1) At least one portable fire shall be of an approved type.

201

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00211 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.152 29 CFR Ch. XVII (7112 Edition)

(f) Handling liquids at point of final (10) The motors of all equipment
use. (1) Category 1, 2, or 3 flammable being fueled shall be shut off during
liquids shall be kept in closed con- the fueling operation.
tainers when not actually in use. (11) Each service or fueling area shall
(2) Leakage or spillage of flammable be provided with at least one fire extin-
liquids shall be disposed of promptly guisher having a rating of not less than
and safely. 20B:C located so that an extinguisher
(3) Category 1, 2, or 3 flammable liq- will be within 75 feet of each pump, dis-
uids may be used only where there are penser, underground fill pipe opening,
no open flames or other sources of igni- and lubrication or service area.
tion within 50 feet of the operation, un- (h) Scope. This section applies to the
less conditions warrant greater clear- handling, storage, and use of flam-
ance. mable liquids with a flashpoint at or
(g) Service and refueling areas. (1) below 199.4 F (93 C). This section does
Flammable liquids shall be stored in not apply to:
approved closed containers, in tanks (1) Bulk transportation of flammable
located underground, or in above- liquids; and
ground portable tanks. (2) Storage, handling, and use of fuel
(2) The tank trucks shall comply oil tanks and containers connected
with the requirements covered in the with oil burning equipment.
Standard for Tank Vehicles for Flam- (i) Tank storage(1) Design and con-
mable and Combustible Liquids, NFPA struction of tanks(i) Materials. (A)
No. 3851966. Tanks shall be built of steel except as
(3) The dispensing hose shall be an provided in paragraphs (i)(1)(i) (B)
approved type. through (E) of this section.
(4) The dispensing nozzle shall be an (B) Tanks may be built of materials
other than steel for installation under-
approved automatic-closing type with-
ground or if required by the properties
out a latch-open device.
of the liquid stored. Tanks located
(5) Underground tanks shall not be above ground or inside buildings shall
abandoned. be of noncombustible construction.
(6) Clearly identified and easily ac- (C) Tanks built of materials other
cessible switch(es) shall be provided at than steel shall be designed to speci-
a location remote from dispensing de- fications embodying principles recog-
vices to shut off the power to all dis- nized as good engineering design for
pensing devices in the event of an the material used.
emergency. (D) Unlined concrete tanks may be
(7)(i) Heating equipment of an ap- used for storing flammable liquids hav-
proved type may be installed in the lu- ing a gravity of 40 API or heavier.
brication or service area where there is Concrete tanks with special lining may
no dispensing or transferring of Cat- be used for other services provided the
egory 1, 2, or 3 flammable liquids, pro- design is in accordance with sound en-
vided the bottom of the heating unit is gineering practice.
at least 18 inches above the floor and is (E) [Reserved]
protected from physical damage. (F) Special engineering consideration
(ii) Heating equipment installed in shall be required if the specific gravity
lubrication or service areas, where Cat- of the liquid to be stored exceeds that
egory 1, 2, or 3 flammable liquids are of water or if the tanks are designed to
dispensed, shall be of an approved type contain flammable iquids at a liquid
for garages, and shall be installed at temperature below 0 F.
least 8 feet above the floor. (ii) Fabrication. (A) [Reserved]
(8) There shall be no smoking or open (B) Metal tanks shall be welded, riv-
flames in the areas used for fueling, eted, and caulked, brazed, or bolted, or
servicing fuel systems for internal constructed by use of a combination of
combustion engines, receiving or dis- these methods. Filler metal used in
pensing of flammable liquids. brazing shall be nonferrous metal or an
(9) Conspicuous and legible signs pro- alloy having a melting point above 1000
hibiting smoking shall be posted. F. and below that of the metal joined.

202

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00212 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.152

(iii) Atmospheric tanks. (A) Atmos- of the ASME Boiler and Pressure Ves-
pheric tanks shall be built in accord- sels Code, 1968.
ance with acceptable good standards of (C) Atmospheric tanks built accord-
design. Atmospheric tanks may be ing to Underwriters Laboratories, Inc.,
built in accordance with: requirements in paragraph (i)(1)(iii)(A)
(1) Underwriters Laboratories, Inc., of this section and shall be limited to
Subjects No. 142, Standard for Steel 2.5 p.s.i.g. under emergency venting
Aboveground Tanks for Flammable and conditions.
Combustible Liquids, 1968; No. 58, This paragraph may be used for oper-
Standard for Steel Underground Tanks ating pressures not exceeding 1 p.s.i.g.
for Flammable and Combustible Liq-
(D) Pressure vessels may be used as
uids, Fifth Edition, December 1961; or
low-pressure tanks.
No. 80, Standard for Steel Inside Tanks
(v) Pressure vessels. (A) The normal
for Oil-Burner Fuel, September 1963.
operating pressure of the vessel shall
(2) American Petroleum Institute
not exceed the design pressure of the
Standards No. 12A, Specification for
vessel.
Oil Storage Tanks with Riveted Shells,
Seventh Edition, September 1951, or (B) Pressure vessels shall be built in
No. 650, Welded Steel Tanks for Oil accordance with the Code for Unfired
Storage, Third Edition, 1966. Pressure Vessels, Section VIII of the
(3) American Petroleum Institute ASME Boiler and Pressure Vessel Code
Standards No. 12B, Specification for 1968.
Bolted Production Tanks, Eleventh (vi) Provisions for internal corrosion.
Edition, May 1958, and Supplement 1, When tanks are not designed in accord-
March 1962; No. 12D, Specification for ance with the American Petroleum In-
Large Welded Production Tanks, Sev- stitute, American Society of Mechan-
enth Edition, August 1957; or No. 12F, ical Engineers, or the Underwriters
Specification for Small Welded Produc- Laboratories, Inc.s, standards, or if
tion Tanks, Fifth Edition, March 1961. corrosion is anticipated beyond that
Tanks built in accordance with these provided for in the design formulas
standards shall be used only as produc- used, additional metal thickness or
tion tanks for storage of crude petro- suitable protective coatings or linings
leum in oil-producing areas. shall be provided to compensate for the
(B) Tanks designed for underground corrosion loss expected during the de-
service not exceeding 2,500 gallons sign life of the tank.
(9,462.5 L) capacity may be used above- (2) Installation of outside aboveground
ground. tanks. (i) [Reserved]
(C) Low-pressure tanks and pressure (ii) Spacing (shell-to-shell) between
vessels may be used as atmospheric aboveground tanks. (A) The distance be-
tanks. tween any two flammable liquid stor-
(D) Atmospheric tanks shall not be age tanks shall not be less than 3 feet
used for the storage of a flammable liq- (0.912 m).
uid at a temperature at or above its (B) Except as provided in paragraph
boiling point. (i)(2)(ii)(C) of this section, the distance
(iv) Low pressure tanks. (A) The nor- between any two adjacent tanks shall
mal operating pressure of the tank not be less than one-sixth the sum of
shall not exceed the design pressure of their diameters. When the diameter of
the tank. one tank is less than one-half the di-
(B) Low-pressure tanks shall be built ameter of the adjacent tank, the dis-
in accordance with acceptable stand- tance between the two tanks shall not
ards of design. Low-pressure tanks may be less than one-half the diameter of
be built in accordance with: the smaller tank.
(1) American Petroleum Institute (C) Where crude petroleum in con-
Standard No. 620. Recommended Rules junction with production facilities are
for the Design and Construction of located in noncongested areas and have
Large, Welded, Low-Pressure Storage capacities not exceeding 126,000 gallons
Tanks, Third Edition, 1966. (3,000 barrels), the distance between
(2) The principles of the Code for such tanks shall not be less than 3 feet
Unfired Pressure Vessels, Section VIII (0.912 m).

203

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00213 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.152 29 CFR Ch. XVII (7112 Edition)

(D) Where unstable flammable liquids (C) Low-pressure tanks and pressure
are stored, the distance between such vessels shall be adequately vented to
tanks shall not be less than one-half prevent development of pressure or
the sum of their diameters. vacuum, as a result of filling or
(E) When tanks are compacted in emptying and atmospheric tempera-
three or more rows or in an irregular ture changes, from exceeding the de-
pattern, greater spacing or other sign pressure of the tank or vessel.
means shall be provided so that inside Protection shall also be provided to
tanks are accessible for firefighting prevent overpressure from any pump
purposes. discharging into the tank or vessel
(F) The minimum separation between when the pump discharge pressure can
a liquefied petroleum gas container exceed the design pressure of the tank
and a flammable liquid storage tank or vessel.
shall be 20 feet (6.08 m), except in the (D) If any tank or pressure vessel has
case of flammable liquid tanks oper- more than one fill or withdrawal con-
ating at pressures exceeding 2.5 p.s.i.g. nection and simultaneous filling or
or equipped with emergency venting withdrawal can be made, the vent size
which will permit pressures to exceed shall be based on the maximum antici-
2.5 p.s.i.g. in which case the provisions pated simultaneous flow.
of paragraphs (i)(2)(ii) (A) and (B) of (E) Unless the vent is designed to
this section shall apply. Suitable limit the internal pressure 2.5 p.s.i. or
means shall be taken to prevent the ac- less, the outlet of vents and vent drains
cumulation of flammable liquids under shall be arranged to discharge in such
adjacent liquefied petroleum gas con- a manner as to prevent localized over-
tainers such as by diversion curbs or heating of any part of the tank in the
grading. When flammable liquid stor- event vapors from such vents are ig-
age tanks are within a diked area, the nited.
liquefied petroleum gas containers (F) Tanks and pressure vessels stor-
shall be outside the diked area and at ing Category 1 flammable liquids shall
least 10 feet (3.04 m) away from the be equipped with venting devices that
centerline of the wall of the diked area. shall be normally closed except when
The foregoing provisions shall not venting to pressure or vacuum condi-
apply when liquefied petroleum gas tions. Tanks and pressure vessels stor-
containers of 125 gallons (473.125 L) or ing Category 2 flammable liquids, or
less capacity are installed adjacent to Category 3 flammable liquids with a
fuel oil supply tanks of 550 gallons flashpoint below 100 F (37.8 C), shall
(2,081.75 L) or less capacity. be equipped with venting devices that
(iii) [Reserved] shall be normally closed except when
(iv) Normal venting for aboveground venting under pressure or vacuum con-
tanks. (A) Atmospheric storage tanks ditions, or with approved flame arrest-
shall be adequately vented to prevent ers.
the development of vacuum or pressure Exemption: Tanks of 3,000 bbls (bar-
sufficient to distort the roof of a cone rels) (84 m(3)) capacity or less con-
roof tank or exceeding the design pres- taining crude petroleum in crude-pro-
sure in the case of other atmospheric ducing areas; and, outside aboveground
tanks, as a result of filling or atmospheric tanks under 1,000 gallons
emptying, and atmospheric tempera- (3,785 L) capacity containing other
ture changes. than Category 1 flammable liquids may
(B) Normal vents shall be sized either have open vents. (See paragraph
in accordance with: (1) The American (i)(2)(vi)(B) of this section.)
Petroleum Institute Standard 2000 (G) Flame arresters or venting de-
(1968), Venting Atmospheric and Low- vices required in paragraph (i)(2)(iv)(F)
Pressure Storage Tanks; or (2) other of this section may be omitted for Cat-
accepted standard; or (3) shall be at egory 2 flammable liquids or Category
least as large as the filling or with- 3 flammable liquids with a flashpoint
drawal connection, whichever is larger below 100 F (37.8 C) where conditions
but in no case less than 114 inch (3.175 are such that their use may, in case of
cm) nominal inside diameter. obstruction, result in tank damage.

204

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00214 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.152

(v) Emergency relief venting for fire ex- if horizontal. If unstable liquids are
posure for aboveground tanks. (A) Every stored, the effects of heat or gas result-
aboveground storage tank shall have ing from polymerization, decomposi-
some form of construction or device tion, condensation, or self-reactivity
that will relieve excessive internal shall be taken into account. The total
pressure caused by exposure fires. capacity of both normal and emergency
(B) In a vertical tank the construc- venting devices shall be not less than
tion referred to in paragraph that derived from Table F10 except as
(i)(2)(v)(A) of this section may take the provided in paragraph (i)(2)(v) (E) or
form of a floating roof, lifter roof, a (F) of this section. Such device may be
weak roof-to-shell seam, or other ap- a self-closing manhole cover, or one
proved pressure relieving construction. using long bolts that permit the cover
The weak roof-to-shell seam shall be to lift under internal pressure, or an
constructed to fail preferential to any additional or larger relief valve or
other seam. valves. The wetted area of the tank
(C) Where entire dependence for shall be calculated on the basis of 55
emergency relief is placed upon pres- percent of the total exposed area of a
sure relieving devices, the total vent- sphere or spheroid, 75 percent of the
ing capacity of both normal and emer- total exposed area of a horizontal tank
gency vents shall be enough to prevent and the first 30 feet (9.12 m) above
rupture of the shell or bottom of the grade of the exposed shell area of a
tank if vertical, or of the shell or heads vertical tank.
TABLE F10WETTED AREA VERSUS CUBIC FEET (METERS) FREE AIR PER HOUR
[14.7 psia and 60 F. (15.55 C)]

Square feet (m2) CFH (m3H) Square feet (m2) CFH (m3H) Square feet (m2) CFH (m3H)

20 (1.84) 21,100 (590.8) 200 (18.4) 211,000 (5,908) 1,000 (90.2) 524,000 (14,672)
30 (2.76) 31,600 (884.8) 250 (23) 239,000 (6,692) 1,200 (110.4) 557,000 (15,596)
40 (3.68) 42,100 (1,178.8) 300 (27.6) 265,000 (7,420) 1,400 (128.8) 587,000 (16,436)
50 (4.6) 52,700 (1,475.6) 350 (32.2) 288,000 (8,064) 1,600 (147.2) 614,000 (17,192)
60 (5.52) 63,200 (1,769.6) 400 (36.8) 312,000 (8,736) 1,800 (165.6) 639,000 (17,892)
70 (6.44) 73,700 (2,063.6) 500 (46) 354,000 (9,912) 2,000 (180.4) 662,000 (18,536)
80 (7.36) 84,200 (2,357.6) 600 (55.2) 392,000 (10,976) 2,400 (220.8) 704,000 (19,712)
90 (8.28) 94,800 (2,654.4) 700 (64.4) 428,000 (11,984) 2,800 (257.6) 742,000 (20,776)
100 (9.2) 105,000 (2,940) 800 (73.6) 462,000 (12,936) and
120 (11.04) 126,000 (3,528) 900 (82.8) 493,000 (13,804) over
140 (12.88) 147,000 (4,116) 1,000 (90.2) 524,000 (14,672)
160 (14.72) 168,000 (4,704)
180 (16.56) 190,000 (5,320)
200 (18.4) 211,000 (5,908)

(D) For tanks and storage vessels de- (E) The total emergency relief vent-
signed for pressure over 1 p.s.i.g., the ing capacity for any specific stable liq-
total rate of venting shall be deter- uid may be determined by the fol-
mined in accordance with Table F10, lowing formula:
except that when the exposed wetted
V = 1337L M
area of the surface is greater than 2,800
square feet (257.6 m2), the total rate of V = Cubic feet (meters) of free air per hour
venting shall be calculated by the fol- from Table F10.
lowing formula: L = Latent heat of vaporization of specific
liquid in B.t.u. per pound.
CFH = 1,107A0.82 M = Molecular weight of specific liquids.
Where: (F) The required airflow rate of para-
CFH = Venting requirement, in cubic feet graph (i)(2)(v) (C) or (E) of this section
(meters) of free air per hour. may be multiplied by the appropriate
A = Exposed wetted surface, in square feet factor listed in the following schedule
(m2). when protection is provided as indi-
NOTE: The foregoing formula is based on cated. Only one factor may be used for
Q=21,000A0.82. any one tank.

205

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00215 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.152 29 CFR Ch. XVII (7112 Edition)
0.5 for drainage in accordance with para- located so that flammable vapors will
graph (i)(2)(vii)(B) of this section for tanks not be trapped by eaves or other ob-
over 200 square feet (18.4 m2) of wetted area. structions and shall be at least 5 feet
0.3 for approved water spray.
0.3 for approved insulation. (1.52 m) from building openings.
0.15 for approved water spray with approved (C) When tank vent piping is
insulation. manifolded, pipe sizes shall be such as
to discharge, within the pressure limi-
(G) The outlet of all vents and vent
tations of the system, the vapors they
drains on tanks equipped with emer-
may be required to handle when
gency venting to permit pressures ex-
manifolded tanks are subject to the
ceeding 2.5 p.s.i.g. shall be arranged to
same fire exposure.
discharge in such a way as to prevent
(vii) Drainage, dikes, and walls for
localized overheating of any part of the
aboveground tanks(A) Drainage and
tank, in the event vapors from such
diked areas. The area surrounding a
vents are ignited.
tank or a group of tanks shall be pro-
(H) Each commercial tank venting
device shall have stamped on it the vided with drainage as in paragraph
opening pressure, the pressure at which (i)(2)(vii)(B) of this section, or shall be
the valve reaches the full open posi- diked as provided in (i)(2)(vii)(C) of this
tion, and the flow capacity at the lat- section, to prevent accidental dis-
ter pressure, expressed in cubic feet charge of liquid from endangering ad-
(meters) per hour of air at 60 F. (15.55 joining property or reaching water-
C) and at a pressure of 14.7 p.s.i.a. ways.
(I) The flow capacity of tank venting (B) Drainage. Where protection of ad-
devices 12 inches (30.48 cm) and smaller joining property or waterways is by
in nominal pipe size shall be deter- means of a natural or manmade drain-
mined by actual test of each type and age system, such systems shall comply
size of vent. These flow tests may be with the following:
conducted by the manufacturer if cer- (1) [Reserved]
tified by a qualified impartial observer, (2) The drainage system shall termi-
or may be conducted by an outside nate in vacant land or other area or in
agency. The flow capacity of tank an impounding basin having a capacity
venting devices larger than 12 inches not smaller than that of the largest
(30.48 cm) nominal pipe size, including tank served. This termination area and
manhole covers with long bolts or the route of the drainage system shall
equivalent, may be calculated provided be so located that, if the flammable
that the opening pressure is actually liquids in the drainage system are ig-
measured, the rating pressure and cor- nited, the fire will not seriously expose
responding free orifice area are stated, tanks or adjoining property.
the word calculated appears on the (C) Diked areas. Where protection of
nameplate, and the computation is adjoining property or waterways is ac-
based on a flow coefficient of 0.5 ap- complished by retaining the liquid
plied to the rated orifice area. around the tank by means of a dike,
(vi) Vent piping for aboveground tanks. the volume of the diked area shall
(A) Vent piping shall be constructed in comply with the following require-
accordance with paragraph (c) of this ments:
section. (1) Except as provided in paragraph
(B) Where vent pipe outlets for tanks (i)(2)(vii)(C)(2) of this section, the volu-
storing Category 1 or 2 flammable liq- metric capacity of the diked area shall
uids, or Category 3 flammable liquids not be less than the greatest amount of
with a flashpoint below 100 F (37.8 C), liquid that can be released from the
are adjacent to buildings or public largest tank within the diked area, as-
ways, they shall be located so that the suming a full tank. The capacity of the
vapors are released at a safe point out- diked area enclosing more than one
side of buildings and not less than 12 tank shall be calculated by deducting
feet (3.658 m) above the adjacent the volume of the tanks other than the
ground level. In order to aid their dis- largest tank below the height of the
persion, vapors shall be discharged up- dike.
ward or horizontally away from closely (2) For a tank or group of tanks with
adjacent walls. Vent outlets shall be fixed roofs containing crude petroleum

206

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00216 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.152

with boilover characteristics, the volu- ings shall be so located with respect to
metric capacity of the diked area shall existing building foundations and sup-
be not less than the capacity of the ports that the loads carried by the lat-
largest tank served by the enclosure, ter cannot be transmitted to the tank.
assuming a full tank. The capacity of The distance from any part of a tank
the diked enclosure shall be calculated storing Category 1 or 2 flammable liq-
by deducting the volume below the uids, or Category 3 flammable liquids
height of the dike of all tanks within with a flashpoint below 100 F (37.8 C),
the enclosure. to the nearest wall of any basement or
(3) Walls of the diked area shall be of pit shall be not less than 1 foot (0.304
earth, steel, concrete or solid masonry m), and to any property line that may
designed to be liquidtight and to with- be built upon, not less than 3 feet (0.912
stand a full hydrostatic head. Earthen m). The distance from any part of a
walls 3 feet (0.912 m) or more in height tank storing Category 3 flammable liq-
shall have a flat section at the top not uids with a flashpoint at or above 100
less than 2 feet (0.608 m) wide. The F (37.8 C) or Category 4 flammable
slope of an earthen wall shall be con- liquids to the nearest wall of any base-
sistent with the angle of repose of the ment, pit or property line shall be not
material of which the wall is con- less than 1 foot (0.304 m).
structed. (ii) Depth and cover. Underground
(4) The walls of the diked area shall tanks shall be set on firm foundations
be restricted to an average height of 6 and surrounded with at least 6 inches
feet (1.824 m) above interior grade. (15.24 cm) of noncorrosive, inert mate-
(5) [Reserved] rials such as clean sand, earth, or grav-
(6) No loose combustible material, el well tamped in place. The tank shall
empty or full drum or barrel, shall be be placed in the hole with care since
permitted within the diked area. dropping or rolling the tank into the
(viii) Tank openings other than vents hole can break a weld, puncture or
for aboveground tanks. damage the tank, or scrape off the pro-
(A)(C) [Reserved] tective coating of coated tanks. Tanks
(D) Openings for gaging shall be pro- shall be covered with a minimum of 2
vided with a vaportight cap or cover. feet (0.608 m) of earth, or shall be cov-
(E) For Category 2 flammable liquids ered with not less than 1 foot (0.304 m)
or Category 3 flammable liquids with a of earth, on top of which shall be
flashpoint below 100 F (37.8 C), other placed a slab of reinforced concrete not
than crude oils, gasolines, and as- less than 4 inches (10.16 cm) thick.
phalts, the fill pipe shall be so designed When underground tanks are, or are
and installed as to minimize the possi- likely to be, subject to traffic, they
bility of generating static electricity. shall be protected against damage from
A fill pipe entering the top of a tank vehicles passing over them by at least
shall terminate within 6 inches (15.24 3 feet (0.912 m) of earth cover, or 18
cm) of the bottom of the tank and shall inches (45.72 cm) of well-tamped earth,
be installed to avoid excessive vibra- plus 6 inches (15.24 cm) of reinforced
tion. concrete or 8 inches (20.32 cm) of as-
(F) Filling and emptying connections phaltic concrete. When asphaltic or re-
which are made and broken shall be lo- inforced concrete paving is used as part
cated outside of buildings at a location of the protection, it shall extend at
free from any source of ignition and least 1 foot (0.304 m) horizontally be-
not less than 5 feet (1.52 m) away from yond the outline of the tank in all di-
any building opening. Such connection rections.
shall be closed and liquidtight when (iii) Corrosion protection. Corrosion
not in use. The connection shall be protection for the tank and its piping
properly identified. shall be provided by one or more of the
(3) Installation of underground tanks following methods:
(i) Location. Evacuation for under- (A) Use of protective coatings or
ground storage tanks shall be made wrappings;
with due care to avoid undermining of (B) Cathodic protection; or,
foundations of existing structures. Un- (C) Corrosion resistant materials of
derground tanks or tanks under build- construction.

207

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00217 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.152 29 CFR Ch. XVII (7112 Edition)

(iv) Vents. (A) Location and arrange- flammable vapors will not enter build-
ment of vents for Category 1 or 2 flam- ing openings, or be trapped under eaves
mable liquids, or Category 3 flammable or other obstructions. If the vent pipe
liquids with a flashpoint below 100 F is less than 10 feet (3.04 m) in length, or
(37.8 C). Vent pipes from tanks storing greater than 2 inches (5.08 cm) in nomi-
Category 1 or 2 flammable liquids, or nal inside diameter, the outlet shall be
Category 3 flammable liquids with a provided with a vacuum and pressure
flashpoint below 100 F (37.8 C), shall relief device or there shall be an ap-
be so located that the discharge point proved flame arrester located in the
is outside of buildings, higher than the
vent line at the outlet or within the
fill pipe opening, and not less than 12
approved distance from the outlet.
feet (3.658 m) above the adjacent
ground level. Vent pipes shall dis- (B) Size of vents. Each tank shall be
charge only upward in order to disperse vented through piping adequate in size
vapors. Vent pipes 2 inches (5.08 cm) or to prevent blow-back of vapor or liquid
less in nominal inside diameter shall at the fill opening while the tank is
not be obstructed by devices that will being filled. Vent pipes shall be not less
cause excessive back pressure. Vent than 114 inch (3.175 cm) nominal inside
pipe outlets shall be so located that diameter.
TABLE F11VENT LINE DIAMETERS
Pipe length 1
Maximum flow GPM (L)
50 feet (15.2 m) 100 feet (30.4 m) 200 feet (60.8 m)

Inches (cm) Inches (cm) Inches (cm)


100 (378.5) ...................................................................................... 114 (3.175) 114 (3.175) 114 (3.175)
200 (757) ......................................................................................... 114 (3.175) 114 (3.175) 114 (3.175)
300 (1,135.5) ................................................................................... 114 (3.175) 114 (3.175) 112 (3.81)
400 (1,514) ...................................................................................... 114 (3.175) 112 (3.81) 2 (5.08)
500 (1,892.5) ................................................................................... 112 (3.81) 112 (3.81) 2 (5.08)
600 (2,271) ...................................................................................... 112 (3.81) 2 (5.08) 2 (5.08)
700 (2,649.5) ................................................................................... 2 (5.08) 2 (5.08) 2 (5.08)
800 (3,028) ...................................................................................... 2 (5.08) 2 (5.08) 3 (7.62)
900 (3,406.5) ................................................................................... 2 (5.08) 2 (5.08) 3 (7.62)
1,000 (3,785) ................................................................................... 2 (5.08) 2 (5.08) 3 (7.62)
1 Vent lines of 50 ft. (15.2 m), 100 ft. (30.4 m), and 200 ft. (60.8 m) of pipe plus 7 ells.

(C) Location and arrangement of damage. The tank end of the vent pipe
vents for Category 3 flammable liquids shall enter the tank through the top.
with a flashpoint at or above 100 F (E) When tank vent piping is
(37.8 C) or Category 4 flammable liq- manifolded, pipe sizes shall be such as
uids. Vent pipes from tanks storing to discharge, within the pressure limi-
Category 3 flammable liquids with a tations of the system, the vapors they
flashpoint at or above 100 F (37.8 C) or may be required to handle when
Category 4 flammable liquids shall ter- manifolded tanks are filled simulta-
minate outside of the building and neously.
higher than the fill pipe opening. Vent (v) Tank openings other than vents. (A)
outlets shall be above normal snow Connections for all tank openings shall
be vapor or liquid tight.
level. They may be fitted with return
(B) Openings for manual gaging, if
bends, coarse screens or other devices
independent of the fill pipe, shall be
to minimize ingress of foreign mate-
provided with a liquid-tight cap or
rial. cover. If inside a building, each such
(D) Vent piping shall be constructed opening shall be protected against liq-
in accordance with paragraph (3)(iv)(C) uid overflow and possible vapor release
of this section. Vent pipes shall be so by means of a spring loaded check
laid as to drain toward the tank with- valve or other approved device.
out sags or traps in which liquid can (C) Fill and discharge lines shall
collect. They shall be located so that enter tanks only through the top. Fill
they will not be subjected to physical lines shall be sloped toward the tank.

208

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00218 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.152

(D) For Category 2 flammable liq- nection below the liquid level, except
uids, or Category 3 flammable liquids for connections used for emergency dis-
with a flashpoint below 100 F (37.8 C), posal, to prevent continued flow in the
other than crude oils, gasolines, and event of fire in the vicinity of the tank.
asphalts, the fill pipe shall be so de- This function may be incorporated in
signed and installed as to minimize the the valve required in paragraph
possibility of generating static elec- (i)(4)(iv)(B) of this section, and if a sep-
tricity by terminating within 6 inches arate valve, shall be located adjacent
(15.24 cm) of the bottom of the tank. to the valve required in paragraph
(E) Filling and emptying connections (i)(4)(iv)(B) of this section.
which are made and broken shall be lo- (D) Openings for manual gaging, if
cated outside of buildings at a location independent of the fill pipe (see para-
free from any source of ignition and graph (i)(4)(iv)(F) of this section), shall
not less than 5 feet (1.52 m) away from be provided with a vaportight cap or
any building opening. Such connection cover. Each such opening shall be pro-
shall be closed and liquidtight when tected against liquid overflow and pos-
not in use. The connection shall be sible vapor release by means of a spring
properly identified. loaded check valve or other approved
(4) Installation of tanks inside of build- device.
ings(i) Location. Tanks shall not be (E) For Category 2 flammable liquids,
permitted inside of buildings except as or Category 3 flammable liquids with a
provided in paragraphs (e), (g), (h), or flashpoint below 100 F (37.8 C), other
(i) of this section. than crude oils, gasolines, and as-
(ii) Vents. Vents for tanks inside of phalts, the fill pipe shall be so designed
buildings shall be as provided in para- and installed as to minimize the possi-
graphs (i)(2) (iv), (v), (vi)(B), and (3)(iv) bility of generating static electricity
of this section, except that emergency by terminating within 6 inches (15.24
venting by the use of weak roof seams cm) of the bottom of the tank.
on tanks shall not be permitted. Vents (F) The fill pipe inside of the tank
shall discharge vapors outside the shall be installed to avoid excessive vi-
buildings. bration of the pipe.
(iii) Vent piping. Vent piping shall be (G) The inlet of the fill pipe shall be
constructed in accordance with para- located outside of buildings at a loca-
graph (c) of this section. tion free from any source of ignition
(iv) Tank openings other than vents. and not less than 5 feet (1.52 m) away
(A) Connections for all tank openings from any building opening. The inlet of
shall be vapor or liquidtight. Vents are the fill pipe shall be closed and
covered in paragraph (i)(4)(ii) of this liquidtight when not in use. The fill
section. connection shall be properly identified.
(B) Each connection to a tank inside (H) Tanks inside buildings shall be
of buildings through which liquid can equipped with a device, or other means
normally flow shall be provided with shall be provided, to prevent overflow
an internal or an external valve lo- into the building.
cated as close as practical to the shell (5) Supports, foundations, and anchor-
of the tank. Such valves, when exter- age for all tank locations(i) General.
nal, and their connections to the tank Tank supports shall be installed on
shall be of steel except when the chem- firm foundations. Tank supports shall
ical characteristics of the liquid stored be of concrete, masonry, or protected
are incompatible with steel. When ma- steel. Single wood timber supports (not
terials other than steel are necessary, cribbing) laid horizontally may be used
they shall be suitable for the pressures, for outside aboveground tanks if not
structural stresses, and temperatures more than 12 inches (30.48 cm) high at
involved, including fire exposures. their lowest point.
(C) Flammable liquid tanks located (ii) Fire resistance. Steel supports or
inside of buildings, except in one-story exposed piling shall be protected by
buildings designed and protected for materials having a fire resistance rat-
flammable liquid storage, shall be pro- ing of not less than 2 hours, except that
vided with an automatic-closing heat- steel saddles need not be protected if
actuated valve on each withdrawal con- less than 12 inches (30.48 cm) high at

209

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00219 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.152 29 CFR Ch. XVII (7112 Edition)

their lowest point. Water spray protec- (D) Each horizontal tank so located
tion or its equivalent may be used in that more than 70 percent of its stor-
lieu of fire-resistive materials to pro- age capacity will be submerged at the
tect supports. established flood stage, shall be an-
(iii) Spheres. The design of the sup- chored, attached to a foundation of
porting structure for tanks such as concrete or of steel and concrete, of
spheres shall receive special engineer- sufficient weight to provide adequate
ing consideration. load for the tank when filled with flam-
(iv) Load distribution. Every tank mable liquid and submerged by flood
shall be so supported as to prevent the waters to the established flood stage,
excessive concentration of loads on the or adequately secured by other means.
supporting portion of the shell. (E) [Reserved]
(v) Foundations. Tanks shall rest on (F) At locations where there is no
the ground or on foundations made of ample and dependable water supply, or
concrete, masonry, piling, or steel. where filling of underground tanks
Tank foundations shall be designed to with liquids is impracticable because of
minimize the possibility of uneven set- the character of their contents, their
tling of the tank and to minimize cor- use, or for other reasons, each tank
rosion in any part of the tank resting shall be safeguarded against movement
on the foundation. when empty and submerged by high
(vi) Flood areas. Where a tank is lo- ground water or flood waters by an-
cated in an area that may be subjected choring, weighting with concrete or
to flooding, the applicable precautions other approved solid loading material,
outlined in this subdivision shall be ob- or securing by other means. Each such
served. tank shall be so constructed and in-
(A) No aboveground vertical storage stalled that it will safely resist exter-
tank containing a flammable liquid nal pressures due to high ground water
shall be located so that the allowable or flood waters.
liquid level within the tank is below (G) At locations where there is an
the established maximum flood stage, ample and dependable water supply
unless the tank is provided with a guid- available, underground tanks con-
ing structure such as described in para- taining flammable liquids, so installed
graphs (i)(5)(vi) (M), (N), and (O) of this that more than 70 percent of their stor-
section. age capacity will be submerged at the
(B) Independent water supply facili- maximum flood stage, shall be so an-
ties shall be provided at locations chored, weighted, or secured by other
where there is no ample and dependable means, as to prevent movement of such
public water supply available for load- tanks when filled with flammable liq-
ing partially empty tanks with water. uids, and submerged by flood waters to
(C) In addition to the preceding re- the established flood stage.
quirements, each tank so located that (H) Pipe connections below the allow-
more than 70 percent, but less than 100 able liquid level in a tank shall be pro-
percent, of its allowable liquid storage vided with valves or cocks located as
capacity will be submerged at the es- closely as practicable to the tank shell.
tablished maximum flood stage, shall Such valves and their connections to
be safeguarded by one of the following tanks shall be of steel or other mate-
methods: Tank shall be raised, or its rial suitable for use with the liquid
height shall be increased, until its top being stored. Cast iron shall not be per-
extends above the maximum flood mitted.
stage a distance equivalent to 30 per- (I) At locations where an independent
cent or more of its allowable liquid water supply is required, it shall be en-
storage capacity: Provided, however, tirely independent of public power and
That the submerged part of the tank water supply. Independent source of
shall not exceed two and one-half times water shall be available when flood wa-
the diameter. Or, as an alternative to ters reach a level not less than 10 feet
the foregoing, adequate noncombus- (3.04 m) below the bottom of the lowest
tible structural guides, designed to per- tank on a property.
mit the tank to float vertically with- (J) The self-contained power and
out loss of product, shall be provided. pumping unit shall be so located or so

210

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00220 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.152

designed that pumping into tanks may type designed to prevent breakage be-
be carried on continuously throughout tween the valve and the tank shell.
the rise in flood waters from a level 10 (T) All valves attached to tanks
feet (3.04 m) below the lowest tank to other than those used in connection
the level of the potential flood stage. with water loading operations shall be
(K) Capacity of the pumping unit closed and locked.
shall be such that the rate of rise of (U) If a tank is equipped with a swing
water in all tanks shall be equivalent line, the swing pipe shall be raised to
to the established potential average and secured at its highest position.
rate of rise of flood waters at any (V) Inspections. The Assistant Sec-
stage. retary or his designated representative
(L) Each independent pumping unit shall make periodic inspections of all
shall be tested periodically to insure plants where the storage of flammable
that it is in satisfactory operating con- liquids is such as to require compliance
dition. with the foregoing requirements, in
(M) Structural guides for holding order to assure the following:
floating tanks above their foundations (1) That all flammable liquid storage
shall be so designed that there will be tanks are in compliance with these re-
no resistance to the free rise of a tank, quirements and so maintained.
and shall be constructed of noncombus- (2) That detailed printed instructions
tible material. of what to do in flood emergencies are
(N) The strength of the structure properly posted.
shall be adequate to resist lateral (3) That station operators and other
movement of a tank subject to a hori- employees depended upon to carry out
zontal force in any direction equivalent such instructions are thoroughly in-
to not less than 25 pounds per square formed as to the location and operation
foot (1.05 kg m2) acting on the pro- of such valves and other equipment
jected vertical cross-sectional area of necessary to effect these requirements.
the tank. (vii) Earthquake areas. In areas sub-
(O) Where tanks are situated on ex- ject to earthquakes, the tank supports
posed points or bends in a shoreline and connections shall be designed to
where swift currents in flood waters resist damage as a result of such
will be present, the structures shall be shocks.
designed to withstand a unit force of (6) Sources of ignition. In locations
not less than 50 pounds per square foot where flammable vapors may be
(2.1 kg m2). present, precautions shall be taken to
(P) The filling of a tank to be pro- prevent ignition by eliminating or con-
tected by water loading shall be start- trolling sources of ignition. Sources of
ed as soon as flood waters reach a dan- ignition may include open flames,
gerous flood stage. The rate of filling lightning, smoking, cutting and weld-
shall be at least equal to the rate of ing, hot surfaces, frictional heat,
rise of the floodwaters (or the estab- sparks (static, electrical, and mechan-
lished average potential rate of rise). ical), spontaneous ignition, chemical
(Q) Sufficient fuel to operate the and physical-chemical reactions, and
water pumps shall be available at all radiant heat.
times to insure adequate power to fill (7) Testing(i) General. All tanks,
all tankage with water. whether shop built or field erected,
(R) All valves on connecting pipe- shall be strength tested before they are
lines shall be closed and locked in placed in service in accordance with
closed position when water loading has the applicable paragraphs of the code
been completed. under which they were built. The
(S) Where structural guides are pro- American Society of Mechanical Engi-
vided for the protection of floating neers (ASME) code stamp, American
tanks, all rigid connections between Petroleum Institute (API) monogram,
tanks and pipelines shall be discon- or the label of the Underwriters Lab-
nected and blanked off or blinded be- oratories, Inc., on a tank shall be evi-
fore the floodwaters reach the bottom dence of compliance with this strength
of the tank, unless control valves and test. Tanks not marked in accordance
their connections to the tank are of a with the above codes shall be strength

211

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00221 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.152 29 CFR Ch. XVII (7112 Edition)

tested before they are placed in service evidence of compliance with the fore-
in accordance with good engineering going provisions.
principles and reference shall be made (ii) Exceptions. This paragraph does
to the sections on testing in the codes not apply to any of the following:
listed in paragraphs (i)(1) (iii)(A), (A) Tubing or casing on any oil or gas
(iv)(B), or (v)(B) of this section. wells and any piping connected directly
(ii) Strength. When the vertical thereto.
length of the fill and vent pipes is such (B) Motor vehicle, aircraft, boat, or
that when filled with liquid the static portable or stationary engines.
head imposed upon the bottom of the (C) Piping within the scope of any ap-
tank exceeds 10 pounds per square inch plicable boiler and pressures vessel
(68.94 kPa), the tank and related piping code.
shall be tested hydrostatically to a (iii) Definitions. As used in this para-
pressure equal to the static head thus graph, piping systems consist of pipe,
imposed. tubing, flanges, bolting, gaskets,
(iii) Tightness. In addition to the valves, fittings, the pressure con-
strength test called for in paragraphs taining parts of other components such
(i)(7) (i) and (ii) of this section, all as expansion joints and strainers, and
tanks and connections shall be tested devices which serve such purposes as
for tightness. Except for underground mixing, separating, snubbing, distrib-
tanks, this tightness test shall be made uting, metering, or controlling flow.
at operating pressure with air, inert (2) Materials for piping, valves, and fit-
gas, or water prior to placing the tank tings(i) Required materials. Materials
in service. In the case of field-erected for piping, valves, or fittings shall be
tanks the strength test may be consid- steel, nodular iron, or malleable iron,
ered to be the test for tank tightness. except as provided in paragraphs (j)(2)
Underground tanks and piping, before (ii), (iii) and (iv) of this section.
(ii) Exceptions. Materials other than
being covered, enclosed, or placed in
steel, nodular iron, or malleable iron
use, shall be tested for tightness
may be used underground, or if re-
hydrostatically, or with air pressure at
quired by the properties of the flam-
not less than 3 pounds per square inch
mable liquid handled. Material other
(20.68 kPa) and not more than 5 pounds
than steel, nodular iron, or malleable
per square inch (34.47 kPa).
iron shall be designed to specifications
(iv) Repairs. All leaks or deforma- embodying principles recognized as
tions shall be corrected in an accept- good engineering practices for the ma-
able manner before the tank is placed terial used.
in service. Mechanical caulking is not (iii) Linings. Piping, valves, and fit-
permitted for correcting leaks in weld- tings may have combustible or non-
ed tanks except pinhole leaks in the combustible linings.
roof. (iv) Low-melting materials. When low-
(v) Derated operations. Tanks to be op- melting point materials such as alu-
erated at pressures below their design minum and brass or materials that
pressure may be tested by the applica- soften on fire exposure such as plastics,
ble provisions of paragraphs (i)(7) (i) or or non-ductile materials such as cast
(ii) of this section, based upon the pres- iron, are necessary, special consider-
sure developed under full emergency ation shall be given to their behavior
venting of the tank. on fire exposure. If such materials are
(j) Piping, valves, and fittings(1) Gen- used in above ground piping systems or
eral(i) Design. The design (including inside buildings, they shall be suitably
selection of materials) fabrication, as- protected against fire exposure or so
sembly, test, and inspection of piping located that any spill resulting from
systems containing flammable liquids the failure of these materials could not
shall be suitable for the expected work- unduly expose persons, important
ing pressures and structural stresses. buildings or structures or can be read-
Conformity with the applicable provi- ily controlled by remote valves.
sions of Pressure Piping, ANSI B31 se- (3) Pipe joints. Joints shall be made
ries and the provisions of this para- liquid tight. Welded or screwed joints
graph, shall be considered prima facie or approved connectors shall be used.

212

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00222 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.152

Threaded joints and connections shall (k) Marine service stations(1) Dis-
be made up tight with a suitable lubri- pensing. (i) The dispensing area shall be
cant or piping compound. Pipe joints located away from other structures so
dependent upon the friction character- as to provide room for safe ingress and
istics of combustible materials for me- egress of craft to be fueled. Dispensing
chanical continuity of piping shall not units shall in all cases be at least 20
be used inside buildings. They may be feet (6.08 m) from any activity involv-
used outside of buildings above or ing fixed sources of ignition.
below ground. If used above ground, the (ii) Dispensing shall be by approved
piping shall either be secured to pre- dispensing units with or without inte-
vent disengagement at the fitting or gral pumps and may be located on open
the piping system shall be so designed piers, wharves, or floating docks or on
that any spill resulting from such dis- shore or on piers of the solid fill type.
engagement could not unduly expose (iii) Dispensing nozzles shall be auto-
persons, important buildings or struc- matic-closing without a hold-open
tures, and could be readily controlled latch.
by remote valves. (2) Tanks and pumps. (i) Tanks, and
(4) Supports. Piping systems shall be pumps not integral with the dispensing
substantially supported and protected unit, shall be on shore or on a pier of
against physical damage and excessive the solid fill type, except as provided in
stresses arising from settlement, vibra- paragraphs (k)(2) (ii) and (iii) of this
tion, expansion, or contraction. section.
(5) Protection against corrosion. All (ii) Where shore location would re-
piping for flammable liquids, both quire excessively long supply lines to
aboveground and underground, where dispensers, tanks may be installed on a
subject to external corrosion, shall be pier provided that applicable portions
painted or otherwise protected. of paragraph (b) of this section relative
(6) Valves. Piping systems shall con- to spacing, diking, and piping are com-
tain a sufficient number of valves to plied with and the quantity so stored
operate the system properly and to does not exceed 1,100 gallons (4,163.5 L)
protect the plant. Piping systems in aggregate capacity.
connection with pumps shall contain a (iii) Shore tanks supplying marine
sufficient number of valves to control service stations may be located above
properly the flow of liquid in normal ground, where rock ledges or high
operation and in the event of physical water table make underground tanks
damage. Each connection to pipelines, impractical.
by which equipments such as tankcars (iv) Where tanks are at an elevation
or tank vehicles discharge liquids by which would produce gravity head on
means of pumps into storage tanks, the dispensing unit, the tank outlet
shall be provided with a check valve for shall be equipped with a pressure con-
automatic protection against backflow trol valve positioned adjacent to and
if the piping arrangement is such that outside the tank block valve specified
backflow from the system is possible. in 1926.152(c)(8) of this section, so ad-
(7) Testing. All piping before being justed that liquid cannot flow by grav-
covered, enclosed, or placed in use ity from the tank in case of piping or
shall be hydrostatically tested to 150 hose failure.
percent of the maximum anticipated (3) Piping. (i) Piping between shore
pressure of the system, or pneumati- tanks and dispensing units shall be as
cally tested to 110 percent of the max- described in paragraph (k)(2)(iii) of this
imum anticipated pressure of the sys- section, except that, where dispensing
tem, but not less than 5 pounds per is from a floating structure, suitable
square inch gage at the highest point lengths of oil-resistant flexible hose
of the system. This test shall be main- may be employed between the shore
tained for a sufficient time to complete piping and the piping on the floating
visual inspection of all joints and con- structure as made necessary by change
nections, but for at least 10 minutes. in water level or shoreline.

213

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00223 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.152 29 CFR Ch. XVII (7112 Edition)

214
ER26MR12.128</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00224 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.153

(ii) A readily accessible valve to shut and shall include all facilities used in
off the supply from shore shall be pro- connection therewith.
vided in each pipeline at or near the
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
approach to the pier and at the shore
1979, as amended at 51 FR 25318, July 11, 1986;
end of each pipeline adjacent to the 58 FR 35162, June 30, 1993; 63 FR 33469, June
point where flexible hose is attached. 18, 1998; 77 FR 17891, Mar. 26, 2012]
(iii) Piping shall be located so as to
be protected from physical damage. 1926.153 Liquefied petroleum gas
(iv) Piping handling Category 1 or 2 (LP-Gas).
flammable liquids, or Category 3 flam-
mable liquids with a flashpoint below (a) Approval of equipment and systems.
100 F (37.8 C), shall be grounded to (1) Each system shall have containers,
control stray currents. valves, connectors, manifold valve as-
(4) Definition; as used in this section: semblies, and regulators of an approved
Marine service station shall mean that type.
portion of a property where flammable (2) All cylinders shall meet the De-
liquids used as fuels are stored and dis- partment of Transportation specifica-
pensed from fixed equipment on shore, tion identification requirements pub-
piers, wharves, or floating docks into lished in 49 CFR part 178, Shipping
the fuel tanks of self-propelled craft, Container Specifications.

215
ER26MR12.129</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00225 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.153 29 CFR Ch. XVII (7112 Edition)

(3) Definition. As used in this section, (f) Requirements for appliances. (1) LP-
ContainersAll vessels, such as tanks, Gas consuming appliances shall be ap-
cylinders, or drums, used for transpor- proved types.
tation or storing liquefied petroleum (2) Any appliance that was originally
gases. manufactured for operation with a gas-
(b) Welding on LP-Gas containers. eous fuel other than LP-Gas, and is in
Welding is prohibited on containers. good condition, may be used with LP-
(c) Container valves and container ac- Gas only after it is properly converted,
cessories. (1) Valves, fittings, and acces- adapted, and tested for performance
sories connected directly to the con- with LP-Gas before the appliance is
tainer, including primary shut off placed in use.
valves, shall have a rated working pres- (g) Containers and regulating equip-
sure of at least 250 p.s.i.g. and shall be ment installed outside of buildings or
of material and design suitable for LP- structures. Containers shall be upright
Gas service. upon firm foundations or otherwise
(2) Connections to containers, except firmly secured. The possible effect on
safety relief connections, liquid level the outlet piping of settling shall be
gauging devices, and plugged openings, guarded against by a flexible connec-
shall have shutoff valves located as tion or special fitting.
close to the container as practicable. (h) Containers and equipment used in-
side of buildings or structures. (1) When
(d) Safety devices. (1) Every container
operational requirements make port-
and every vaporizer shall be provided
able use of containers necessary, and
with one or more approved safety relief
their location outside of buildings or
valves or devices. These valves shall be structures is impracticable, containers
arranged to afford free vent to the and equipment shall be permitted to be
outer air with discharge not less than 5 used inside of buildings or structures in
feet horizontally away from any open- accordance with paragraphs (h)(2)
ing into a building which is below such through (11) of this section.
discharge. (2) Containers in use means connected
(2) Shutoff valves shall not be in- for use.
stalled between the safety relief device (3) Systems utilizing containers hav-
and the container, or the equipment or ing a water capacity greater than 212
piping to which the safety relief device pounds (nominal 1 pound LP-Gas ca-
is connected, except that a shutoff pacity) shall be equipped with excess
valve may be used where the arrange- flow valves. Such excess flow valves
ment of this valve is such that full re- shall be either integral with the con-
quired capacity flow through the safety tainer valves or in the connections to
relief device is always afforded. the container valve outlets.
(3) Container safety relief devices and (4) Regulators shall be either directly
regulator relief vents shall be located connected to the container valves or to
not less than 5 feet in any direction manifolds connected to the container
from air openings into sealed combus- valves. The regulator shall be suitable
tion system appliances or mechanical for use with LP-Gas. Manifolds and fit-
ventilation air intakes. tings connecting containers to pressure
(e) Dispensing. (1) Filling of fuel con- regulator inlets shall be designed for at
tainers for trucks or motor vehicles least 250 p.s.i.g. service pressure.
from bulk storage containers shall be (5) Valves on containers having water
performed not less than 10 feet from capacity greater than 50 pounds (nomi-
the nearest masonry-walled building, nal 20 pounds LP-Gas capacity) shall be
or not less than 25 feet from the near- protected from damage while in use or
est building or other construction and, storage.
in any event, not less than 25 feet from (6) Aluminum piping or tubing shall
any building opening. not be used.
(2) Filling of portable containers or (7) Hose shall be designed for a work-
containers mounted on skids from stor- ing pressure of at least 250 p.s.i.g. De-
age containers shall be performed not sign, construction, and performance of
less than 50 feet from the nearest build- hose, and hose connections shall have
ing. their suitability determined by listing

216

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00226 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.153

by a nationally recognized testing (14) If two or more heater-container


agency. The hose length shall be as units, of either the integral or non-
short as practicable. Hoses shall be integral type, are located in an
long enough to permit compliance with unpartitioned area on the same floor,
spacing provisions of paragraphs (h)(1) the container or containers of each
through (13) of this section, without unit shall be separated from the con-
kinking or straining, or causing hose tainer or containers of any other unit
to be so close to a burner as to be dam- by at least 20 feet.
aged by heat. (15) When heaters are connected to
(8) Portable heaters, including sala- containers for use in an unpartitioned
manders, shall be equipped with an ap- area on the same floor, the total water
proved automatic device to shut off the capacity of containers, manifolded to-
flow of gas to the main burner, and gether for connection to a heater or
pilot if used, in the event of flame fail- heaters, shall not be greater than 735
ure. Such heaters, having inputs above
pounds (nominal 300 pounds LP-Gas ca-
50,000 B.t.u. per hour, shall be equipped
pacity). Such manifolds shall be sepa-
with either a pilot, which must be
rated by at least 20 feet.
lighted and proved before the main
burner can be turned on, or an elec- (16) Storage of containers awaiting
trical ignition system. use shall be in accordance with para-
graphs (j) and (k) of this section.
NOTE: The provisions of this subparagraph (i) Multiple container systems. (1)
do not apply to portable heaters under 7,500
B.t.u. per hour input when used with con-
Valves in the assembly of multiple con-
tainers having a maximum water capacity of tainer systems shall be arranged so
212 pounds. that replacement of containers can be
made without shutting off the flow of
(9) Container valves, connectors, reg- gas in the system. This provision is not
ulators, manifolds, piping, and tubing
to be construed as requiring an auto-
shall not be used as structural supports
matic changeover device.
for heaters.
(10) Containers, regulating equip- (2) Heaters shall be equipped with an
ment, manifolds, pipe, tubing, and hose approved regulator in the supply line
shall be located to minimize exposure between the fuel cylinder and the heat-
to high temperatures or physical dam- er unit. Cylinder connectors shall be
age. provided with an excess flow valve to
(11) Containers having a water capac- minimize the flow of gas in the event
ity greater than 212 pounds (nominal 1 the fuel line becomes ruptured.
pound LP-Gas capacity) connected for (3) Regulators and low-pressure relief
use shall stand on a firm and substan- devices shall be rigidly attached to the
tially level surface and, when nec- cylinder valves, clyinders, supporting
essary, shall be secured in an upright standards, the building walls, or other-
position. wise rigidly secured, and shall be so in-
(12) The maximum water capacity of stalled or protected from the elements.
individual containers shall be 245 (j) Storage of LPG containers. Storage
pounds (nominal 100 pounds LP-Gas ca- of LPG within buildings is prohibited.
pacity). (k) Storage outside of buildings. (1)
(13) For temporary heating, heaters Storage outside of buildings, for con-
(other than integral heater-container tainers awaiting use, shall be located
units) shall be located at least 6 feet from the nearest building or group of
from any LP-Gas container. This shall buildings, in accordance with the fol-
not prohibit the use of heaters specifi- lowing:
cally designed for attachment to the
container or to a supporting standard, TABLE F3
provided they are designed and in-
Distance
stalled so as to prevent direct or radi- Quantity of LP-Gas stored (feet)
ant heat application from the heater
onto the containers. Blower and radi- 500 lbs. or less .................................................... 0
ant type heaters shall not be directed 501 to 6,000 lbs ................................................... 10
6,001 to 10,000 lbs .............................................. 20
toward any LP-Gas container within 20
Over 10,000 lbs ................................................... 25
feet.

217

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00227 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.154 29 CFR Ch. XVII (7112 Edition)

(2) Containers shall be in a suitable dles but shall have adequate ferrous
ventilated enclosure or otherwise pro- metal supports.
tected against tampering. (ii) They shall not be located with
(l) Fire protection. Storage locations the outside bottom of the container
shall be provided with at least one ap- shell more than 5 feet (1.52 m) above
proved portable fire extinguisher hav- the surface of the ground unless fire-re-
ing a rating of not less than 20B:C. sisting supports are provided.
(m) Systems utilizing containers other (iii) The bottom of the skids shall not
than DOT containers(1) Application. be less than 2 inches (5.08 cm) or more
This paragraph applies specifically to than 12 inches (30.48 cm) below the out-
systems utilizing storage containers side bottom of the container shell.
other than those constructed in accord- (iv) Flanges, nozzles, valves, fittings,
ance with DOT specifications. Para- and the like, having communication
graph (b) of this section applies to this with the interior of the container, shall
paragraph unless otherwise noted in be protected against physical damage.
paragraph (b) of this section. (v) When not permanently located on
(2) Design pressure and classification of fire-resisting foundations, piping con-
storage containers. Storage containers nections shall be sufficiently flexible
shall be designed and classified in ac- to minimize the possibility of breakage
cordance with Table F31. or leakage of connections if the con-
tainer settles, moves, or is otherwise
TABLE F31 displaced.
(vi) Skids, or lugs for attachment of
Minimum design pressure of con- skids, shall be secured to the container
tainer, lb. per sq. in. gage
For gases in accordance with the code or rules
with vapor 1949 edition of ASME under which the container is designed
press. Not 1949 and Code (Par. U200,
Con- to exceed earlier edi- U201); 1950, 1952, and built (with a minimum factor of
tainer
type lb. per sq. tions of 1956, 1959, 1962, safety of four) to withstand loading in
in. gage at ASME 1965, and 1968 (Divi-
100 F. Code (Par. sion 1) editions of any direction equal to four times the
(37.8 C.) U68, U ASME Code; All edi- weight of the container and attach-
69) tions of API-ASME
Code 3 ments when filled to the maximum per-
missible loaded weight.
1 80 1 80 1 80 1 100
(4) Field welding where necessary
100 100 100 125
125 125 125 156
shall be made only on saddle plates or
150 150 150 187 brackets which were applied by the
175 175 175 219 manufacturer of the tank.
2 200 215 200 250 (n) When LP-Gas and one or more
1 New storage containers of the 80 type have not been au- other gases are stored or used in the
thorized since Dec. 31, 1947. same area, the containers shall be
2 Container type may be increased by increments of 25.
The minimum design pressure of containers shall be 100% of marked to identify their content.
the container type designation when constructed under 1949 Marking shall be in compliance with
or earlier editions of the ASME Code (Par. U68 and U69).
The minimum design pressure of containers shall be 125% of American National Standard Z48.1
the container type designation when constructed under: (1) 1954, Method of Marking Portable
the 1949 ASME Code (Par. U200 and U201), (2) 1950,
1952, 1956, 1959, 1962, 1965, and 1968 (Division 1) editions Compressed Gas Containers To Identify
of the ASME Code, and (3) all editions of the API-ASME the Material Contained.
Code.
3 Construction of containers under the API-ASME Code is (o) Damage from vehicles. When dam-
not authorized after July 1, 1961. age to LP-Gas systems from vehicular
(3) Containers with foundations at- traffic is a possibility, precautions
tached (portable or semiportable b con- against such damage shall be taken.
tainers with suitable steel runners [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
or skids and popularly known in the 1979, as amended at 58 FR 35170, June 30, 1993]
industry as skid tanks) shall be de-
signed, installed, and used in accord- 1926.154 Temporary heating devices.
ance with these rules subject to the fol- (a) Ventilation. (1) Fresh air shall be
lowing provisions: supplied in sufficient quantities to
(i) If they are to be used at a given maintain the health and safety of
general location for a temporary period workmen. Where natural means of
not to exceed 6 months they need not fresh air supply is inadequate, mechan-
have fire-resisting foundations or sad- ical ventilation shall be provided.

218

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00228 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.155

(2) When heaters are used in confined (2) Heaters designed for barometric
spaces, special care shall be taken to or gravity oil feed shall be used only
provide sufficient ventilation in order with the integral tanks.
to ensure proper combustion, maintain (3) [Reserved]
the health and safety of workmen, and (4) Heaters specifically designed and
limit temperature rise in the area. approved for use with separate supply
(b) Clearance and mounting. (1) Tem- tanks may be directly connected for
porary heating devices shall be in- gravity feed, or an automatic pump,
stalled to provide clearance to combus- from a supply tank.
tible material not less than the 1926.155 Definitions applicable to
amount shown in Table F4. this subpart.
(2) Temporary heating devices, which
(a) Approved, for the purpose of this
are listed for installation with lesser
subpart, means equipment that has
clearances than specified in Table F4,
been listed or approved by a nationally
may be installed in accordance with recognized testing laboratory such as
their approval. Factory Mutual Engineering Corp., or
Underwriters Laboratories, Inc., or
TABLE F4
Federal agencies such as Bureau of
Minimum clearance, (inches) Mines, or U.S. Coast Guard, which
issue approvals for such equipment.
Heating appliances Chimney
Sides Rear con- (b) Closed container means a container
nector so sealed by means of a lid or other de-
Room heater, circulating
vice that neither liquid nor vapor will
type .................................. 12 12 18 escape from it at ordinary tempera-
Room heater, radiant type .. 36 36 18 tures.
(c) [Reserved]
(3) Heaters not suitable for use on (d) Combustion means any chemical
wood floors shall not be set directly process that involves oxidation suffi-
upon them or other combustible mate- cient to produce light or heat.
rials. When such heaters are used, they (e) Fire brigade means an organized
shall rest on suitable heat insulating group of employees that are knowl-
material or at least 1-inch concrete, or edgeable, trained, and skilled in the
equivalent. The insulating material safe evacuation of employees during
shall extend beyond the heater 2 feet or emergency situations and in assisting
more in all directions. in fire fighting operations.
(4) Heaters used in the vicinity of (f) Fire resistance means so resistant
combustible tarpaulins, canvas, or to fire that, for specified time and
similar coverings shall be located at under conditions of a standard heat in-
least 10 feet from the coverings. The tensity, it will not fail structurally and
coverings shall be securely fastened to will not permit the side away from the
prevent ignition or upsetting of the fire to become hotter than a specified
heater due to wind action on the cov- temperature. For purposes of this part,
fire resistance shall be determined by
ering or other material.
the Standard Methods of Fire Tests of
(c) Stability. Heaters, when in use,
Building Construction and Materials,
shall be set horizontally level, unless NFPA 2511969.
otherwise permitted by the manufac- (g) Flammable means capable of being
turers markings. easily ignited, burning intensely, or
(d) Solid fuel salamanders. Solid fuel having a rapid rate of flame spread.
salamanders are prohibited in buildings (h) Flammable liquid means any liquid
and on scaffolds. having a vapor pressure not exceeding
(e) Oil-fired heaters. (1) Flammable 40 pounds per square inch (absolute) at
liquid-fired heaters shall be equipped 100 F (37.8 C) and having a flashpoint
with a primary safety control to stop at or below 199.4 F (93 C). Flammable
the flow of fuel in the event of flame liquids are divided into four categories
failure. Barometric or gravity oil feed as follows:
shall not be considered a primary safe- (1) Category 1 shall include liquids
ty control. having flashpoints below 73.4 F (23 C)

219

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00229 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.200 29 CFR Ch. XVII (7112 Edition)

and having a boiling point at or below inch (absolute), exerted by a volatile


95 F (35 C). liquid as determined by the Standard
(2) Category 2 shall include liquids Method of Test for Vapor Pressure of
having flashpoints below 73.4 F (23 C) Petroleum Products (Reid Method).
and having a boiling point above 95 F (ASTM D32358).
(35 C).
(3) Category 3 shall include liquids [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
having flashpoints at or above 73.4 F 1979, as amended at 77 FR 17894, Mar. 26, 2012]
(23 C) and at or below 140 F (60 C).
(4) Category 4 shall include liquids Subpart GSigns, Signals, and
having flashpoints above 140 F (60 C) Barricades
and at or below 199.4 F (93 C).
(i) Flash point of the liquid means the AUTHORITY: Sec. 107, Contract Work Hours
temperature at which it gives off vapor and Safety Standards Act (Construction
sufficient to form an ignitable mixture Safety Act) (40 U.S.C. 333); sections 4, 6, 8,
with the air near the surface of the liq- Occupational Safety and Health Act of 1970
uid or within the vessel used as deter- (29 U.S.C. 653, 655, 657); Secretary of Labors
mined by appropriate test procedure Order No. 1271 (36 FR 8754), 876 (41 FR
and apparatus as specified below. 25059), 983 (48 FR 35736), or 32000 (65 FR
(1) The flashpoint of liquids having a 50017) as applicable, 29 CFR part 1911.
viscosity less than 45 Saybolt Uni-
versal Second(s) at 100 F (37.8 C) and 1926.200 Accident prevention signs
a flashpoint below 175 F (79.4 C) shall and tags.
be determined in accordance with the (a) General. Signs and symbols re-
Standard Method of Test for Flash quired by this subpart shall be visible
Point by the Tag Closed Tester, ASTM at all times when work is being per-
D5669 (incorporated by reference; See formed, and shall be removed or cov-
1926.6), or an equivalent method as de- ered promptly when the hazards no
fined by 1910.1200 appendix B. longer exist.
(2) The flashpoints of liquids having a
(b) Danger signs. (1) Danger signs (see
viscosity of 45 Saybolt Universal Sec-
Figure G1) shall be used only where an
ond(s) or more at 175 F (79.4 C) or
higher shall be determined in accord- immediate hazard exists.
ance with the Standard Method of Test (2) Danger signs shall have red as the
for Flash Point by the Pensky Martens predominating color for the upper
Closed Tester, ASTM D9369 (incor- panel; black outline on the borders;
porated by reference; See 1926.6), or an and a white lower panel for additional
equivalent method as defined by sign wording.
1910.1200 appendix B. (c) Caution signs. (1) Caution signs
(j) Liquefied petroleum gases, LPG and (see Figure G2) shall be used only to
LP Gas mean and include any material warn against potential hazards or to
which is composed predominantly of caution against unsafe practices.
any of the following hydrocarbons, or (2) Caution signs shall have yellow as
mixtures of them, such as propane, pro- the predominating color; black upper
pylene, butane (normal butane or iso- panel and borders: yellow lettering of
butane), and butylenes. caution on the black panel; and the
(k) Portable tank means a closed con- lower yellow panel for additional sign
tainer having a liquid capacity more wording. Black lettering shall be used
than 60 U.S. gallons, and not intended for additional wording.
for fixed installation.
(l) Safety can means an approved
closed container, of not more than 5
gallons capacity, having a flash-arrest-
ing screen, spring-closing lid and spout
cover and so designed that it will safe-
ly relieve internal pressure when sub-
jected to fire exposure.
(m) Vapor pressure means the pres-
sure, measured in pounds per square

220

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00230 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.200

vision 3, September 3, 1993, FHWA-SA


94027 or Part VI of the Manual on Uni-
form Traffic Control Devices, Millen-
nium Edition, December 2000, FHWA,
which are incorporated by reference.
The Director of the Federal Register
approves this incorporation by ref-
erence in accordance with 5 U.S.C.
552(a) and 1 CFR part 51. You may ob-
tain a copy of the Millennium Edition
from the following organizations:
American Traffic Safety Services Asso-
ciation, 15 Riverside Parkway, Suite
100, Fredericksburg, VA 224061022;
Telephone: 18002313475; FAX: (540)
3681722; www.atssa.com; Institute of
Transportation Engineers, 1099 14th
(3) Standard color of the background Street, NW., Suite 300 West, Wash-
shall be yellow; and the panel, black ington, DC 200053438; FAX: (202) 289
with yellow letters. Any letters used 7722; www.ite.org; and American Asso-
against the yellow background shall be ciation of State Highway and Trans-
black. The colors shall be those of portation Officials; www.aashto.org;
opaque glossy samples as specified in Telephone: 18002313475; FAX: 1800
Table 1 of American National Standard 5255562. Electronic copies of the
Z53.11967. MUTCD 2000 are available for
(d) Exit signs. Exit signs, when re- downloading at http://
quired, shall be lettered in legible red mutcd.fhwa.dot.gov/kno-millennium.
letters, not less than 6 inches high, on Electronic copies of the 1988 Edition
a white field and the principal stroke MUTCD, Revision 3, are available for
of the letters shall be at least three- downloading at http://www.osha.gov/doc/
fourths inch in width. highwaylworkzones. Both documents
(e) Safety instruction signs. Safety in- are available for inspection at the
struction signs, when used, shall be OSHA Docket Office, Room N2625, U.S.
white with green upper panel with Department of Labor, 200 Constitution
white letters to convey the principal Avenue, NW., Washington, DC 20210 or
message. Any additional wording on at the National Archives and Records
the sign shall be black letters on the Administration (NARA). For informa-
white background. tion on the availability of this mate-
(f) Directional signs. Directional signs, rial at NARA, call 2027416030, or go
other than automotive traffic signs to: http://www.archives.gov/
specified in paragraph (g) of this sec- federallregister/
tion, shall be white with a black panel codeloflfederallregulations/
and a white directional symbol. Any ibrllocations.html.
additional wording on the sign shall be (h) Accident prevention tags. (1) Acci-
black letters on the white background. dent prevention tags shall be used as a
(g) Traffic signs. (1) Construction temporary means of warning employ-
areas shall be posted with legible traf- ees of an existing hazard, such as defec-
fic signs at points of hazard. tive tools, equipment, etc. They shall
(2) All traffic control signs or devices not be used in place of, or as a sub-
used for protection of construction stitute for, accident prevention signs.
workers shall conform to Part VI of (2) Specifications for accident pre-
the Manual of Uniform Traffic Control vention tags similar to those in Table
Devices (AMUTCD), 1988 Edition, Re- G1 shall apply.

221
EC30OC91.013</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00231 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.201 29 CFR Ch. XVII (7112 Edition)

(i) Additional rules. American Na- rules not specifically prescribed in this
tional Standards Institute (ANSI) subpart.
Z35.11968, Specifications for Accident
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
Prevention Signs, and Z35.21968, Speci- 1979, as amended at 58 FR 35173, June 30, 1993;
fications for Accident Prevention Tags, 67 FR 57736, Sept. 12, 2002; 69 FR 18803, Apr.
contain rules which are additional to 9, 2004]
the rules prescribed in this section.
The employer shall comply with ANSI 1926.201 Signaling.
Z35.11968 and Z35.21968 with respect to (a) Flaggers. Signaling by flaggers
and the use of flaggers, including warn-
ing garments worn by flaggers shall
conform to Part VI of the Manual on
Uniform Traffic Control Devices, (1988
Edition, Revision 3 or the Millennium

222
EC30OC91.014</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00232 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.250

Edition), which are incorporated by in pounds per square foot, shall be con-
reference in 1926.200(g)(2). spicuously posted in all storage areas,
(b) Crane and hoist signals. Regula- except for floor or slab on grade. Max-
tions for crane and hoist signaling will imum safe loads shall not be exceeded.
be found in applicable American Na- (3) Aisles and passageways shall be
tional Standards Institute standards. kept clear to provide for the free and
safe movement of material handling
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
1979, as amended at 67 FR 57736, Sept. 12, equipment or employees. Such areas
2002] shall be kept in good repair.
(4) When a difference in road or work-
1926.202 Barricades. ing levels exist, means such as ramps,
Barricades for protection of employ- blocking, or grading shall be used to
ees shall conform to Part VI of the ensure the safe movement of vehicles
Manual on Uniform Traffic Control De- between the two levels.
vices (1988 Edition, Revision 3 or Mil- (b) Material storage. (1) Material
lennium Edition), which are incor- stored inside buildings under construc-
porated by reference in 1926.200(g)(2). tion shall not be placed within 6 feet of
any hoistway or inside floor openings,
[67 FR 57736, Sept. 12, 2002] nor within 10 feet of an exterior wall
which does not extend above the top of
1926.203 Definitions applicable to the material stored.
this subpart.
(2) Each employee required to work
(a) Barricade means an obstruction to on stored material in silos, hoppers,
deter the passage of persons or vehi- tanks, and similar storage areas shall
cles. be equipped with personal fall arrest
(b) Signs are the warnings of hazard, equipment meeting the requirements
temporarily or permanently affixed or of subpart M of this part.
placed, at locations where hazards (3) Noncompatible materials shall be
exist. segregated in storage.
(c) Signals are moving signs, provided (4) Bagged materials shall be stacked
by workers, such as flaggers, or by de- by stepping back the layers and cross-
vices, such as flashing lights, to warn keying the bags at least every 10 bags
of possible or existing hazards. high.
(d) Tags are temporary signs, usually (5) Materials shall not be stored on
attached to a piece of equipment or scaffolds or runways in excess of sup-
part of a structure, to warn of existing plies needed for immediate operations.
or immediate hazards. (6) Brick stacks shall not be more
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6, than 7 feet in height. When a loose
1979, as amended at 67 FR 57736, Sept. 12, brick stack reaches a height of 4 feet,
2002] it shall be tapered back 2 inches in
every foot of height above the 4-foot
Subpart HMaterials Handling, level.
Storage, Use, and Disposal (7) When masonry blocks are stacked
higher than 6 feet, the stack shall be
tapered back one-half block per tier
AUTHORITY: 40 U.S.C. 3701; 29 U.S.C. 653, 655,
above the 6-foot level.
657; and Secretary of Labors Order No. 1271
(36 FR 8754), 876 (41 FR 25059), 983 (48 FR (8) Lumber:
35736), 190 (55 FR 9033), 42010 (75 FR 55355), (i) Used lumber shall have all nails
or 12012 (77 FR 3912), as applicable. Section withdrawn before stacking.
1926.250 also issued under 29 CFR part 1911. (ii) Lumber shall be stacked on level
and solidly supported sills.
1926.250 General requirements for (iii) Lumber shall be so stacked as to
storage. be stable and self-supporting.
(a) General. (1) All materials stored in (iv) Lumber piles shall not exceed 20
tiers shall be stacked, racked, blocked, feet in height provided that lumber to
interlocked, or otherwise secured to be handled manually shall not be
prevent sliding, falling or collapse. stacked more than 16 feet high.
(2) Maximum safe load limits of (9) Structural steel, poles, pipe, bar
floors within buildings and structures, stock, and other cylindrical materials,

223

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00233 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.251 29 CFR Ch. XVII (7112 Edition)

unless racked, shall be stacked and els, prefabricated structures and simi-
blocked so as to prevent spreading or lar materials, shall be marked to indi-
tilting. cate the safe working loads and shall
(c) Housekeeping. Storage areas shall be proof-tested prior to use to 125 per-
be kept free from accumulation of ma- cent of their rated load.
terials that constitute hazards from (5) Scope. This section applies to
tripping, fire, explosion, or pest harbor- slings used in conjunction with other
age. Vegetation control will be exer- material handling equipment for the
cised when necessary. movement of material by hoisting, in
(d) Dockboards (bridge plates). (1) Port- employments covered by this part. The
able and powered dockboards shall be types of slings covered are those made
strong enough to carry the load im- from alloy steel chain, wire rope, metal
posed on them. mesh, natural or synthetic fiber rope
(2) Portable dockboards shall be se- (conventional three strand construc-
cured in position, either by being an- tion), and synthetic web (nylon, poly-
chored or equipped with devices which ester, and polypropylene).
will prevent their slipping. (6) Inspections. Each day before being
(3) Handholds, or other effective used, the sling and all fastenings and
means, shall be provided on portable attachments shall be inspected for
dockboards to permit safe handling. damage or defects by a competent per-
(4) Positive protection shall be pro- son designated by the employer. Addi-
vided to prevent railroad cars from tional inspections shall be performed
being moved while dockboards or during sling use, where service condi-
bridge plates are in position. tions warrant. Damaged or defective
slings shall be immediately removed
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
1979, as amended at 49 FR 18295, Apr. 30, 1984; from service.
54 FR 24334, June 7, 1989; 58 FR 35173, June 30, (b) Alloy steel chains. (1) Welded alloy
1993; 59 FR 40729, Aug. 9, 1994; 61 FR 5510, Feb. steel chain slings shall have perma-
13, 1996] nently affixed durable identification
stating size, grade, rated capacity, and
1926.251 Rigging equipment for ma- sling manufacturer.
terial handling. (2) Hooks, rings, oblong links, pear-
(a) General. (1) Rigging equipment for shaped links, welded or mechanical
material handling shall be inspected coupling links, or other attachments,
prior to use on each shift and as nec- when used with alloy steel chains, shall
essary during its use to ensure that it have a rated capacity at least equal to
is safe. Defective rigging equipment that of the chain.
shall be removed from service. (3) Job or shop hooks and links, or
(2) Employers must ensure that rig- makeshift fasteners, formed from
ging equipment: bolts, rods, etc., or other such attach-
(i) Has permanently affixed and leg- ments, shall not be used.
ible identification markings as pre- (4) Employers must not use alloy
scribed by the manufacturer that indi- steel-chain slings with loads in excess
cate the recommended safe working of the rated capacities (i.e., working
load; load limits) indicated on the sling by
(ii) Not be loaded in excess of its rec- permanently affixed and legible identi-
ommended safe working load as pre- fication markings prescribed by the
scribed on the identification markings manufacturer.
by the manufacturer; and (5) Whenever wear at any point of
(iii) Not be used without affixed, leg- any chain link exceeds that shown in
ible identification markings, required Table H1, the assembly shall be re-
by paragraph (a)(2)(i) of this section. moved from service.
(3) Rigging equipment, when not in (6) Inspections. (i) In addition to the
use, shall be removed from the imme- inspection required by other para-
diate work area so as not to present a graphs of this section, a thorough peri-
hazard to employees. odic inspection of alloy steel chain
(4) Special custom design grabs, slings in use shall be made on a regular
hooks, clamps, or other lifting acces- basis, to be determined on the basis of
sories, for such units as modular pan- (A) frequency of sling use; (B) severity

224

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00234 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.251

of service conditions; (C) nature of lifts (i1) [Reserved]


being made; and (D) experience gained (6) Slings shall not be shortened with
on the service life of slings used in knots or bolts or other makeshift de-
similar circumstances. Such inspec- vices.
tions shall in no event be at intervals (7) Sling legs shall not be kinked.
greater than once every 12 months. (8) Slings used in a basket hitch shall
(ii) The employer shall make and have the loads balanced to prevent slip-
maintain a record of the most recent page.
month in which each alloy steel chain (9) Slings shall be padded or pro-
sling was thoroughly inspected, and tected from the sharp edges of their
shall make such record available for loads.
examination. (10) Hands or fingers shall not be
(c) Wire rope. (1) Employers must not placed between the sling and its load
use improved plow-steel wire rope and while the sling is being tightened
wire-rope slings with loads in excess of around the load.
the rated capacities (i.e., working load (11) Shock loading is prohibited.
limits) indicated on the sling by per- (12) A sling shall not be pulled from
manently affixed and legible identifica- under a load when the load is resting
tion markings prescribed by the manu- on the sling.
facturer. (13) Minimum sling lengths. (i) Cable
(2) Protruding ends of strands in laid and 6 19 and 6 37 slings shall
splices on slings and bridles shall be have a minimum clear length of wire
covered or blunted. rope 10 times the component rope di-
(3) Wire rope shall not be secured by ameter between splices, sleeves or end
knots, except on haul back lines on fittings.
scrapers. (ii) Braided slings shall have a min-
(4) The following limitations shall imum clear length of wire rope 40 times
apply to the use of wire rope: the component rope diameter between
(i) An eye splice made in any wire the loops or end fittings.
rope shall have not less than three full (iii) Cable laid grommets, strand laid
tucks. However, this requirement shall grommets and endless slings shall have
not operate to preclude the use of an- a minimum circumferential length of
other form of splice or connection 96 times their body diameter.
which can be shown to be as efficient (14) Safe operating temperatures. Fiber
and which is not otherwise prohibited. core wire rope slings of all grades shall
(ii) Except for eye splices in the ends be permanently removed from service
of wires and for endless rope slings, if they are exposed to temperatures in
each wire rope used in hoisting or low- excess of 200 F (93.33 C). When
ering, or in pulling loads, shall consist nonfiber core wire rope slings of any
of one continuous piece without knot grade are used at temperatures above
or splice. 400 F (204.44 C) or below minus 60 F
(iii) Eyes in wire rope bridles, slings, (15.55 C), recommendations of the sling
or bull wires shall not be formed by manufacturer regarding use at that
wire rope clips or knots. temperature shall be followed.
(iv) Wire rope shall not be used if, in (15) End attachments. (i) Welding of
any length of eight diameters, the end attachments, except covers to
total number of visible broken wires thimbles, shall be performed prior to
exceeds 10 percent of the total number the assembly of the sling.
of wires, or if the rope shows other (ii) All welded end attachments shall
signs of excessive wear, corrosion, or not be used unless proof tested by the
defect. manufacturer or equivalent entity at
(5) When U-bolt wire rope clips are twice their rated capacity prior to ini-
used to form eyes, Table H2 shall be tial use. The employer shall retain a
used to determine the number and certificate of the proof test, and make
spacing of clips. it available for examination.
(i) When used for eye splices, the U- (d) Natural rope, and synthetic fiber. (1)
bolt shall be applied so that the U Employers must not use natural- and
section is in contact with the dead end synthetic-fiber rope slings with loads
of the rope. in excess of the rated capacities (i.e.,

225

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00235 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.251 29 CFR Ch. XVII (7112 Edition)

working load limits) indicated on the accordance with any additional rec-
sling by permanently affixed and leg- ommendations of the manufacturer:
ible identification markings prescribed (i) In manila rope, eye splices shall
by the manufacturer. consist of at least three full tucks, and
(2) All splices in rope slings provided short splices shall consist of at least
by the employer shall be made in ac- six full tucks, three on each side of the
cordance with fiber rope manufacturers splice center line.
recommendations. (ii) In synthetic fiber rope, eye
(i) In manila rope, eye splices shall splices shall consist of at least four full
contain at least three full tucks, and tucks, and short splices shall consist of
short splices shall contain at least six at least eight full tucks, four on each
full tucks (three on each side of the side of the center line.
centerline of the splice). (iii) Strand end tails shall not be
(ii) In layed synthetic fiber rope, eye trimmed flush with the surface of the
splices shall contain at least four full rope immediately adjacent to the full
tucks, and short splices shall contain tucks. This applies to all types of fiber
at least eight full tucks (four on each rope and both eye and short splices.
side of the centerline of the splice). For fiber rope under 1 inch (2.54 cm) in
diameter, the tail shall project at least
(iii) Strand end tails shall not be
six rope diameters beyond the last full
trimmed short (flush with the surface
tuck. For fiber rope 1 inch (2.54 cm) in
of the rope) immediately adjacent to
diameter and larger, the tail shall
the full tucks. This precaution applies
project at least 6 inches (15.24 cm) be-
to both eye and short splices and all
yond the last full tuck. Where a pro-
types of fiber rope. For fiber ropes jecting tail interferes with the use of
under 1-inch diameter, the tails shall the sling, the tail shall be tapered and
project at least six rope diameters be- spliced into the body of the rope using
yond the last full tuck. For fiber ropes at least two additional tucks (which
1-inch diameter and larger, the tails will require a tail length of approxi-
shall project at least 6 inches beyond mately six rope diameters beyond the
the last full tuck. In applications last full tuck).
where the projecting tails may be ob- (iv) Fiber rope slings shall have a
jectionable, the tails shall be tapered minimum clear length of rope between
and spliced into the body of the rope eye splices equal to 10 times the rope
using at least two additional tucks diameter.
(which will require a tail length of ap- (v) Knots shall not be used in lieu of
proximately six rope diameters beyond splices.
the last full tuck). (vi) Clamps not designed specifically
(iv) For all eye splices, the eye shall for fiber ropes shall not be used for
be sufficiently large to provide an in- splicing.
cluded angle of not greater than 60 at (vii) For all eye splices, the eye shall
the splice when the eye is placed over be of such size to provide an included
the load or support. angle of not greater than 60 degrees at
(v) Knots shall not be used in lieu of the splice when the eye is placed over
splices. the load or support.
(3) Safe operating temperatures. Nat- (5) End attachments. Fiber rope slings
ural and synthetic fiber rope slings, ex- shall not be used if end attachments in
cept for wet frozen slings, may be used contact with the rope have sharp edges
in a temperature range from minus 20 or projections.
F (28.88 C) to plus 180 F (82.2 C) (6) Removal from service. Natural and
without decreasing the working load synthetic fiber rope slings shall be im-
limit. For operations outside this tem- mediately removed from service if any
perature range and for wet frozen of the following conditions are present:
slings, the sling manufacturers rec- (i) Abnormal wear.
ommendations shall be followed. (ii) Powdered fiber between strands.
(4) Splicing. Spliced fiber rope slings (iii) Broken or cut fibers.
shall not be used unless they have been (iv) Variations in the size or round-
spliced in accordance with the fol- ness of strands.
lowing minimum requirements and in (v) Discoloration or rotting.

226

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00236 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.251

(vi) Distortion of hardware in the at temperatures in excess of 200 F


sling. (93.33 C).
(7) Employers must use natural- and (8) Removal from service. Synthetic
synthetic-fiber rope slings that have web slings shall be immediately re-
permanently affixed and legible identi- moved from service if any of the fol-
fication markings that state the rated lowing conditions are present:
capacity for the type(s) of hitch(es) (i) Acid or caustic burns;
used and the angle upon which it is (ii) Melting or charring of any part of
based, type of fiber material, and the the sling surface;
number of legs if more than one. (iii) Snags, punctures, tears or cuts;
(e) Synthetic webbing (nylon, polyester, (iv) Broken or worn stitches; or
and polypropylene). (1) The employer (v) Distortion of fittings.
shall have each synthetic web sling (f) Shackles and hooks. (1) Employers
marked or coded to show: must not use shackles with loads in ex-
(i) Name or trademark of manufac- cess of the rated capacities (i.e., work-
turer. ing load limits) indicated on the shack-
(ii) Rated capacities for the type of le by permanently affixed and legible
hitch. identification markings prescribed by
the manufacturer.
(iii) Type of material.
(2) The manufacturers recommenda-
(2) Rated capacity shall not be ex- tions shall be followed in determining
ceeded. the safe working loads of the various
(3) Webbing. Synthetic webbing shall sizes and types of specific and identifi-
be of uniform thickness and width and able hooks. All hooks for which no ap-
selvage edges shall not be split from plicable manufacturers recommenda-
the webbings width. tions are available shall be tested to
(4) Fittings. Fittings shall be: twice the intended safe working load
(i) Of a minimum breaking strength before they are initially put into use.
equal to that of the sling; and The employer shall maintain a record
(ii) Free of all sharp edges that could of the dates and results of such tests.
in any way damage the webbing.
(5) Attachment of end fittings to web- TABLE H1MAXIMUM ALLOWABLE WEAR AT
bing and formation of eyes. Stitching ANY POINT OF LINK
shall be the only method used to at- Maximum
tach end fittings to webbing and to Chain size (inches) allowable
form eyes. The thread shall be in an wear (inch)
even pattern and contain a sufficient .........................................................................
14
3 64

number of stitches to develop the full .........................................................................


38
5 64

.........................................................................
12
7 64
breaking strength of the sling. 58 ......................................................................... 964
(6) Environmental conditions. When 34 ......................................................................... 532

synthetic web slings are used, the fol- 78 ......................................................................... 1164

lowing precautions shall be taken: 1 ........................................................................... 316

118 ....................................................................... 732


(i) Nylon web slings shall not be used 114 ....................................................................... 14

where fumes, vapors, sprays, mists or 138 ....................................................................... 932

liquids of acids or phenolics are 112 ....................................................................... 516

134 ....................................................................... 1132


present.
(ii) Polyester and polypropylene web
slings shall not be used where fumes, TABLE H2NUMBER AND SPACING OF U-BOLT
vapors, sprays, mists or liquids of WIRE ROPE CLIPS
caustics are present. Number of clips Minimum
(iii) Web slings with aluminum fit- Improved plow steel, rope spacing
diameter (inches) Drop Other
tings shall not be used where fumes, (inches)
forged material
vapors, sprays, mists or liquids of 12
..................................... 3 4 3
caustics are present. .....................................
58 3 4 334
(7) Safe operating temperatures. Syn- .....................................
34 4 5 412
thetic web slings of polyester and 78 ..................................... 4 5 514
1 ....................................... 5 6 6
nylon shall not be used at tempera- 118 ................................... 6 6 634
tures in excess of 180 F (82.2 C). Poly- 114 ................................... 6 7 712
propylene web slings shall not be used 138 ................................... 7 7 814

227

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00237 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.252 29 CFR Ch. XVII (7112 Edition)

TABLE H2NUMBER AND SPACING OF U-BOLT 1926.300 General requirements.


WIRE ROPE CLIPSContinued (a) Condition of tools. All hand and
Number of clips power tools and similar equipment,
Minimum
Improved plow steel, rope spacing whether furnished by the employer or
diameter (inches) Drop Other
forged material (inches) the employee, shall be maintained in a
safe condition.
112 ................................... 7 8 9 (b) Guarding. (1) When power operated
tools are designed to accommodate
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6, guards, they shall be equipped with
1979, as amended at 58 FR 35173, June 30, 1993; such guards when in use.
76 FR 33611, June 8, 2011; 77 FR 23118, Apr. 18, (2) Belts, gears, shafts, pulleys,
2012] sprockets, spindles, drums, fly wheels,
chains, or other reciprocating, rotating
1926.252 Disposal of waste materials. or moving parts of equipment shall be
(a) Whenever materials are dropped guarded if such parts are exposed to
more than 20 feet to any point lying contact by employees or otherwise cre-
outside the exterior walls of the build- ate a hazard. Guarding shall meet the
ing, an enclosed chute of wood, or requirements as set forth in American
equivalent material, shall be used. For National Standards Institute, B15.1
the purpose of this paragraph, an en- 1953 (R1958), Safety Code for Mechan-
closed chute is a slide, closed in on all ical Power-Transmission Apparatus.
sides, through which material is moved (3) Types of guarding. One or more
from a high place to a lower one. methods of machine guarding shall be
provided to protect the operator and
(b) When debris is dropped through
other employees in the machine area
holes in the floor without the use of
from hazards such as those created by
chutes, the area onto which the mate-
point of operation, ingoing nip points,
rial is dropped shall be completely en-
rotating parts, flying chips and sparks.
closed with barricades not less than 42
Examples of guarding methods are
inches high and not less than 6 feet barrier guards, two-hand tripping de-
back from the projected edge of the vices, electronic safety devices, etc.
opening above. Signs warning of the (4) Point of operation guarding. (i)
hazard of falling materials shall be Point of operation is the area on a ma-
posted at each level. Removal shall not chine where work is actually performed
be permitted in this lower area until upon the material being processed.
debris handling ceases above. (ii) The point of operation of ma-
(c) All scrap lumber, waste material, chines whose operation exposes an em-
and rubbish shall be removed from the ployee to injury, shall be guarded. The
immediate work area as the work pro- guarding device shall be in conformity
gresses. with any appropriate standards there-
(d) Disposal of waste material or de- for, or, in the absence of applicable spe-
bris by burning shall comply with local cific standards, shall be so designed
fire regulations. and constructed as to prevent the oper-
(e) All solvent waste, oily rags, and ator from having any part of his body
flammable liquids shall be kept in fire in the danger zone during the operating
resistant covered containers until re- cycle.
moved from worksite. (iii) Special handtools for placing and
removing material shall be such as to
Subpart IToolsHand and permit easy handling of material with-
Power out the operator placing a hand in the
danger zone. Such tools shall not be in
lieu of other guarding required by this
AUTHORITY: Sections 4, 6, and 8 of the Occu- section, but can only be used to supple-
pational Safety and Health Act of 1970 (29
ment protection provided.
U.S.C. 653, 655, 657); Secretary of Labors
Order No. 1271 (36 FR 8754), 876 (41 FR (iv) The following are some of the
25059), 983 (48 FR 35736), 190 (55 FR 9033), or machines which usually require point
52002 (67 FR 65008), as applicable; and 29 CFR of operation guarding:
part 1911. Section 1926.307 also issued under 5 (a) Guillotine cutters.
U.S.C. 553. (b) Shears.

228

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00238 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.300

(c) Alligator shears.


(d) Power presses.
(e) Milling machines.
(f) Power saws.
(g) Jointers.
(h) Portable power tools.
(i) Forming rolls and calenders.
(5) Exposure of blades. When the pe-
Figure I5 Figure I6
riphery of the blades of a fan is less
than 7 feet (2.128 m) above the floor or Incorrect
working level, the blades shall be Showing movable guard with size of opening
guarded. The guard shall have openings correct for full size wheel but too large for
no larger than 1/2 inch (1.27 cm). smaller wheel.
(6) Anchoring fixed machinery. Ma- (8) Bench and floor stands. The angu-
chines designed for a fixed location lar exposure of the grinding wheel pe-
shall be securely anchored to prevent riphery and sides for safety guards used
walking or moving.
on machines known as bench and floor
(7) Guarding of abrasive wheel machin-
stands should not exceed 90 or one-
eryexposure adjustment. Safety guards
fourth of the periphery. This exposure
of the types described in paragraphs (b)
(8) and (9) of this section, where the op- shall begin at a point not more than 65
erator stands in front of the opening, above the horizontal plane of the wheel
shall be constructed so that the periph- spindle. (See Figures I7 and I8 and
eral protecting member can be ad- paragraph (b)(7) of this section.)
justed to the constantly decreasing di-
ameter of the wheel. The maximum an-
gular exposure above the horizontal
plane of the wheel spindle as specified
in paragraphs (b) (8) and (9) of this sec-
tion shall never be exceeded, and the
distance between the wheel periphery
and the adjustable tongue or the end of
the peripheral member at the top shall Figure I7 Figure I8
never exceed 14 inch (0.635 cm). (See
Wherever the nature of the work requires
Figures I1 through I6.) contact with the wheel below the hori-
zontal plane of the spindle, the exposure
shall not exceed 125 (See Figures I9 and I
10.)

ER07MR96.004</GPH>
Figure I1 Figure I2
Correct
Showing adjustable tongue giving required
ER07MR96.003</GPH>
angle protection for all sizes of wheel used.
Figure I9 Figure I10
(9) Cylindrical grinders. The maximum
angular exposure of the grinding wheel
periphery and sides for safety guards
ER07MR96.002</GPH>

used on cylindrical grinding machines


shall not exceed 180. This exposure
shall begin at a point not more than 65
Figure I3 Figure I4 above the horizontal plane of the wheel
Correct spindle. (See Figures I11 and I12 and
ER07MR96.001</GPH>

Showing movable guard with opening small paragraph (b)(7) of this section.)
enough to give required protection for the
smallest size wheel used.

229
ER07MR96.000</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00239 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.301 29 CFR Ch. XVII (7112 Edition)

1926.301 Hand tools.


(a) Employers shall not issue or per-
mit the use of unsafe hand tools.
(b) Wrenches, including adjustable,
pipe, end, and socket wrenches shall
not be used when jaws are sprung to
the point that slippage occurs.
Figure I11 Figure I12 (c) Impact tools, such as drift pins,
wedges, and chisels, shall be kept free
(c) Personal protective equipment. Em-
of mushroomed heads.
ployees using hand and power tools and
(d) The wooden handles of tools shall
exposed to the hazard of falling, flying,
be kept free of splinters or cracks and
abrasive, and splashing objects, or ex-
shall be kept tight in the tool.
posed to harmful dusts, fumes, mists,
vapors, or gases shall be provided with 1926.302 Power-operated hand tools.
the particular personal protective
(a) Electric power-operated tools. (1)
equipment necessary to protect them
Electric power operated tools shall ei-
from the hazard. All personal protec-
ther be of the approved double-insu-
tive equipment shall meet the require-
lated type or grounded in accordance
ments and be maintained according to
with subpart K of this part.
subparts D and E of this part.
(2) The use of electric cords for hoist-
(d) Switches. (1) All hand-held pow-
ing or lowering tools shall not be per-
ered platen sanders, grinders with
mitted.
wheels 2-inch diameter or less, routers,
(b) Pneumatic power tools. (1) Pneu-
planers, laminate trimmers, nibblers, matic power tools shall be secured to
shears, scroll saws, and jigsaws with the hose or whip by some positive
blade shanks one-fourth of an inch means to prevent the tool from becom-
wide or less may be equipped with only ing accidentally disconnected.
a positive on-off control. (2) Safety clips or retainers shall be
(2) All hand-held powered drills, tap- securely installed and maintained on
pers, fastener drivers, horizontal, pneumatic impact (percussion) tools to
vertical, and angle grinders with prevent attachments from being acci-
wheels greater than 2 inches in diame- dentally expelled.
ter, disc sanders, belt sanders, recipro- (3) All pneumatically driven nailers,
cating saws, saber saws, and other staplers, and other similar equipment
similar operating powered tools shall provided with automatic fastener feed,
be equipped with a momentary contact which operate at more than 100 p.s.i.
on-off control and may have a lock- pressure at the tool shall have a safety
on control provided that turnoff can be device on the muzzle to prevent the
accomplished by a single motion of the tool from ejecting fasteners, unless the
same finger or fingers that turn it on. muzzle is in contact with the work sur-
(3) All other hand-held powered tools, face.
such as circular saws, chain saws, and (4) Compressed air shall not be used
percussion tools without positive ac- for cleaning purposes except where re-
cessory holding means, shall be duced to less than 30 p.s.i. and then
equipped with a constant pressure only with effective chip guarding and
switch that will shut off the power personal protective equipment which
when the pressure is released. meets the requirements of subpart E of
(4) The requirements of this para- this part. The 30 p.s.i. requirement does
graph shall become effective on July not apply for concrete form, mill scale
15, 1972. and similar cleaning purposes.
(5) Exception: This paragraph does (5) The manufacturers safe operating
not apply to concrete vibrators, con- pressure for hoses, pipes, valves, filters,
crete breakers, powered tampers, jack and other fittings shall not be exceed-
hammers, rock drills, and similar hand ed,
operated power tools. (6) The use of hoses for hoisting or
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6, lowering tools shall not be permitted.
1979, as amended at 58 FR 35175, June 30, 1993; (7) All hoses exceeding 12-inch inside
61 FR 9250, Mar. 7, 1996] diameter shall have a safety device at

230
ER07MR96.005</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00240 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.303

the source of supply or branch line to cordance with the manufacturers rec-
reduce pressure in case of hose failure. ommended procedure.
(8) Airless spray guns of the type (3) Any tool found not in proper
which atomize paints and fluids at high working order, or that develops a de-
pressures (1,000 pounds or more per fect during use, shall be immediately
square inch) shall be equipped with removed from service and not used
automatic or visible manual safety de- until properly repaired.
vices which will prevent pulling of the (4) Personal protective equipment
trigger to prevent release of the paint shall be in accordance with subpart E
or fluid until the safety device is of this part.
manually released. (5) Tools shall not be loaded until
(9) In lieu of the above, a diffuser nut just prior to the intended firing time.
Neither loaded nor empty tools are to
which will prevent high pressure, high
be pointed at any employees. Hands
velocity release, while the nozzle tip is
shall be kept clear of the open barrel
removed, plus a nozzle tip guard which
end.
will prevent the tip from coming into
(6) Loaded tools shall not be left un-
contact with the operator, or other attended.
equivalent protection, shall be pro- (7) Fasteners shall not be driven into
vided. very hard or brittle materials includ-
(10) Abrasive blast cleaning nozzles. ing, but not limited to, cast iron,
The blast cleaning nozzles shall be glazed tile, surface-hardened steel,
equipped with an operating valve which glass block, live rock, face brick, or
must be held open manually. A support hollow tile.
shall be provided on which the nozzle (8) Driving into materials easily pen-
may be mounted when it is not in use. etrated shall be avoided unless such
(c) Fuel powered tools. (1) All fuel pow- materials are backed by a substance
ered tools shall be stopped while being that will prevent the pin or fastener
refueled, serviced, or maintained, and from passing completely through and
fuel shall be transported, handled, and creating a flying missile hazard on the
stored in accordance with subpart F of other side.
this part. (9) No fastener shall be driven into a
(2) When fuel powered tools are used spalled area caused by an unsatisfac-
in enclosed spaces, the applicable re- tory fastening.
quirements for concentrations of toxic (10) Tools shall not be used in an ex-
gases and use of personal protective plosive or flammable atmosphere.
equipment, as outlined in subparts D (11) All tools shall be used with the
and E of this part, shall apply. correct shield, guard, or attachment
(d) Hydraulic power tools. (1) The fluid recommended by the manufacturer.
used in hydraulic powered tools shall (12) Powder-actuated tools used by
be fire-resistant fluids approved under employees shall meet all other applica-
Schedule 30 of the U.S. Bureau of ble requirements of American National
Mines, Department of the Interior, and Standards Institute, A10.31970, Safety
shall retain its operating characteris- Requirements for Explosive-Actuated
tics at the most extreme temperatures Fastening Tools.
to which it will be exposed. [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
(2) The manufacturers safe operating 1979, as amended at 58 FR 35175, June 30, 1993]
pressures for hoses, valves, pipes, fil-
ters, and other fittings shall not be ex- 1926.303 Abrasive wheels and tools.
ceeded. (a) Power. All grinding machines
(e) Powder-actuated tools. (1) Only em- shall be supplied with sufficient power
ployees who have been trained in the to maintain the spindle speed at safe
operation of the particular tool in use levels under all conditions of normal
shall be allowed to operate a powder- operation.
actuated tool. (b) Guarding. (1) Grinding machines
(2) The tool shall be tested each day shall be equipped with safety guards in
before loading to see that safety de- conformance with the requirements of
vices are in proper working condition. American National Standards Insti-
The method of testing shall be in ac- tute, B7.11970, Safety Code for the Use,

231

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00241 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.303 29 CFR Ch. XVII (7112 Edition)

Care and Protection of Abrasive (i) When the work location makes it
Wheels, and paragraph (d) of this sec- impossible, a wheel equipped with safe-
tion. ty flanges, as described in paragraph
(2) Guard design. The safety guard (c)(6) of this section, shall be used;
shall cover the spindle end, nut, and (ii) When wheels 2 inches or less in
flange projections. The safety guard diameter which are securely mounted
shall be mounted so as to maintain on the end of a steel mandrel are used.
proper alignment with the wheel, and (4) Portable abrasive wheels used for
the strength of the fastenings shall ex- internal grinding shall be provided
ceed the strength of the guard, except: with safety flanges (protection flanges)
(i) Safety guards on all operations meeting the requirements of paragraph
where the work provides a suitable (c)(6) of this section, except as follows:
measure of protection to the operator, (i) When wheels 2 inches or less in di-
may be so constructed that the spindle ameter which are securely mounted on
end, nut, and outer flange are exposed; the end of a steel mandrel are used;
and where the nature of the work is (ii) If the wheel is entirely within the
such as to entirely cover the side of the work being ground while in use.
wheel, the side covers of the guard may (5) When safety guards are required,
be omitted; and they shall be so mounted as to main-
(ii) The spindle end, nut, and outer tain proper alignment with the wheel,
and the guard and its fastenings shall
flange may be exposed on machines de-
be of sufficient strength to retain frag-
signed as portable saws.
ments of the wheel in case of acci-
(c) Use of abrasive wheels. (1) Floor
dental breakage. The maximum angu-
stand and bench mounted abrasive lar exposure of the grinding wheel pe-
wheels, used for external grinding, riphery and sides shall not exceed 180.
shall be provided with safety guards (6) When safety flanges are required,
(protection hoods). The maximum an- they shall be used only with wheels de-
gular exposure of the grinding wheel signed to fit the flanges. Only safety
periphery and sides shall be not more flanges, of a type and design and prop-
than 90, except that when work re- erly assembled so as to ensure that the
quires contact with the wheel below pieces of the wheel will be retained in
the horizontal plane of the spindle, the case of accidental breakage, shall be
angular exposure shall not exceed 125. used.
In either case, the exposure shall begin (7) All abrasive wheels shall be close-
not more than 65 above the horizontal ly inspected and ring-tested before
plane of the spindle. Safety guards mounting to ensure that they are free
shall be strong enough to withstand from cracks or defects.
the effect of a bursting wheel. (8) Grinding wheels shall fit freely on
(2) Floor and bench-mounted grinders the spindle and shall not be forced on.
shall be provided with work rests The spindle nut shall be tightened only
which are rigidly supported and readily enough to hold the wheel in place.
adjustable. Such work rests shall be (9) All employees using abrasive
kept at a distance not to exceed one- wheels shall be protected by eye pro-
eighth inch from the surface of the tection equipment in accordance with
wheel. the requirements of subpart E of this
(3) Cup type wheels used for external part, except when adequate eye protec-
grinding shall be protected by either a tion is afforded by eye shields which
revolving cup guard or a band type are permanently attached to the bench
guard in accordance with the provi- or floor stand.
sions of the American National Stand- (d) Other requirements. All abrasive
ards Institute, B7.11970 Safety Code wheels and tools used by employees
for the Use, Care, and Protection of Ab- shall meet other applicable require-
rasive Wheels. All other portable abra- ments of American National Standards
sive wheels used for external grinding, Institute, B7.11970, Safety Code for the
shall be provided with safety guards Use, Care and Protection of Abrasive
(protection hoods) meeting the require- Wheels.
ments of paragraph (c)(5) of this sec- (e) Work rests. On offhand grinding
tion, except as follows: machines, work rests shall be used to

232

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00242 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.304

support the work. They shall be of (f) Other requirements. All wood-
rigid construction and designed to be working tools and machinery shall
adjustable to compensate for wheel meet other applicable requirements of
wear. Work rests shall be kept adjusted American National Standards Insti-
closely to the wheel with a maximum tute, 01.11961, Safety Code for Wood-
opening of 18 inch (0.3175 cm) to pre- working Machinery.
vent the work from being jammed be- (g) Radial saws. (1) The upper hood
tween the wheel and the rest, which shall completely enclose the upper por-
may cause wheel breakage. The work tion of the blade down to a point that
rest shall be securely clamped after will include the end of the saw arbor.
each adjustment. The adjustment shall
The upper hood shall be constructed in
not be made with the wheel in motion.
such a manner and of such material
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6, that it will protect the operator from
1979, as amended at 58 FR 35175, June 30, 1993] flying splinters, broken saw teeth, etc.,
and will deflect sawdust away from the
1926.304 Woodworking tools. operator. The sides of the lower ex-
(a) Disconnect switches. All fixed posed portion of the blade shall be
power driven woodworking tools shall guarded to the full diameter of the
be provided with a disconnect switch blade by a device that will automati-
that can either be locked or tagged in cally adjust itself to the thickness of
the off position. the stock and remain in contact with
(b) Speeds. The operating speed shall stock being cut to give maximum pro-
be etched or otherwise permanently tection possible for the operation being
marked on all circular saws over 20 performed.
inches in diameter or operating at over (h) Hand-fed crosscut table saws. (1)
10,000 peripheral feet per minute. Any Each circular crosscut table saw shall
saw so marked shall not be operated at
be guarded by a hood which shall meet
a speed other than that marked on the
all the requirements of paragraph (i)(1)
blade. When a marked saw is reten-
sioned for a different speed, the mark- of this section for hoods for circular
ing shall be corrected to show the new ripsaws.
speed. (i) Hand-fed ripsaws. (1) Each circular
(c) Self-feed. Automatic feeding de- hand-fed ripsaw shall be guarded by a
vices shall be installed on machines hood which shall completely enclose
whenever the nature of the work will that portion of the saw above the table
permit. Feeder attachments shall have and that portion of the saw above the
the feed rolls or other moving parts material being cut. The hood and
covered or guarded so as to protect the mounting shall be arranged so that the
operator from hazardous points. hood will automatically adjust itself to
(d) Guarding. All portable, power- the thickness of and remain in contact
driven circular saws shall be equipped with the material being cut but it shall
with guards above and below the base not offer any considerable resistance to
plate or shoe. The upper guard shall insertion of material to saw or to pas-
cover the saw to the depth of the teeth, sage of the material being sawed. The
except for the minimum arc required hood shall be made of adequate
to permit the base to be tilted for bevel strength to resist blows and strains in-
cuts. The lower guard shall cover the cidental to reasonable operation, ad-
saw to the depth of the teeth, except justing, and handling, and shall be so
for the minimum arc required to allow designed as to protect the operator
proper retraction and contact with the from flying splinters and broken saw
work. When the tool is withdrawn from teeth. It shall be made of material that
the work, the lower guard shall auto- is soft enough so that it will be un-
matically and instantly return to the
likely to cause tooth breakage. The
covering position.
hood shall be so mounted as to insure
(e) Personal protective equipment. All
that its operation will be positive, reli-
personal protective equipment pro-
able, and in true alignment with the
vided for use shall conform to subpart
E of this part.

233

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00243 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.305 29 CFR Ch. XVII (7112 Edition)

saw; and the mounting shall be ade- in providing and utilizing compressed
quate in strength to resist any reason- air for performing operations such as
able side thrust or other force tending cleaning, drilling, hoisting, and chip-
to throw it out of line. ping. On the other hand, however, this
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6, section does not deal with the special
1979, as amended at 58 FR 35175, June 30, 1993; problems created by using compressed
61 FR 9251, Mar. 7, 1996] air to convey materials nor the prob-
lems created when men work in com-
1926.305 Jackslever and ratchet, pressed air as in tunnels and caissons.
screw, and hydraulic.
This section is not intended to apply to
(a) General requirements. (1) The man- compressed air machinery and equip-
ufacturers rated capacity shall be leg- ment used on transportation vehicles
ibly marked on all jacks and shall not such as steam railroad cars, electric
be exceeded. railway cars, and automotive equip-
(2) All jacks shall have a positive ment.
stop to prevent overtravel.
(b) [Reserved] (2) New and existing equipment. (i) All
(c) Blocking. When it is necessary to new air receivers installed after the ef-
provide a firm foundation, the base of fective date of these regulations shall
the jack shall be blocked or cribbed. be constructed in accordance with the
Where there is a possibility of slippage 1968 edition of the A.S.M.E. Boiler and
of the metal cap of the jack, a wood Pressure Vessel Code Section VIII.
block shall be placed between the cap (ii) All safety valves used shall be
and the load. constructed, installed, and maintained
(d)(1) Operation and maintenance. (i) in accordance with the A.S.M.E. Boiler
After the load has been raised, it shall and Pressure Vessel Code, Section VIII
be cribbed, blocked, or otherwise se- Edition 1968.
cured at once. (b) Installation and equipment require-
(ii) Hydraulic jacks exposed to freez- ments(1) Installation. Air receivers
ing temperatures shall be supplied with shall be so installed that all drains,
an adequate antifreeze liquid. handholes, and manholes therein are
(iii) All jacks shall be properly lubri- easily accessible. Under no cir-
cated at regular intervals. cumstances shall an air receiver be
(iv) Each jack shall be thoroughly in- buried underground or located in an in-
spected at times which depend upon accessible place.
the service conditions. Inspections
(2) Drains and traps. A drain pipe and
shall be not less frequent than the fol-
valve shall be installed at the lowest
lowing:
(a) For constant or intermittent use point of every air receiver to provide
at one locality, once every 6 months, for the removal of accumulated oil and
(b) For jacks sent out of shop for spe- water. Adequate automatic traps may
cial work, when sent out and when re- be installed in addition to drain valves.
turned, The drain valve on the air receiver
(c) For a jack subjected to abnormal shall be opened and the receiver com-
load or shock, immediately before and pletely drained frequently and at such
immediately thereafter. intervals as to prevent the accumula-
(v) Repair or replacement parts shall tion of excessive amounts of liquid in
be examined for possible defects. the receiver.
(vi) Jacks which are out of order (3) Gages and valves. (i) Every air re-
shall be tagged accordingly, and shall ceiver shall be equipped with an indi-
not be used until repairs are made. cating pressure gage (so located as to
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6, be readily visible) and with one or
1979, as amended at 55 FR 42328, Oct. 18, 1990; more spring-loaded safety valves. The
58 FR 35176, June 30, 1993] total relieving capacity of such safety
valves shall be such as to prevent pres-
1926.306 Air receivers. sure in the receiver from exceeding the
(a) General requirements(1) Applica- maximum allowable working pressure
tion. This section applies to compressed of the receiver by more than 10 per-
air receivers, and other equipment used cent.

234

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00244 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.307

(ii) No valve of any type shall be (i) With an enclosure of sheet, per-
placed between the air receiver and its forated, or expanded metal, or woven
safety valve or valves. wire;
(iii) Safety appliances, such as safety (ii) With guard rails placed not less
valves, indicating devices and control- than 15 inches (38.1 cm) nor more than
ling devices, shall be constructed, lo- 20 inches (50.8 cm) from rim. When
cated, and installed so that they can- flywheel extends into pit or is within 12
not be readily rendered inoperative by inches (30.48 cm) of floor, a standard
any means, including the elements. toeboard shall also be provided;
(iv) All safety valves shall be tested
(iii) When the upper rim of flywheel
frequently and at regular intervals to
determine whether they are in good op- protrudes through a working floor, it
erating condition. shall be entirely enclosed or sur-
rounded by a guardrail and toeboard.
[58 FR 35176, June 30, 1993] (iv) For flywheels with smooth rims 5
1926.307 Mechanical power-trans- feet (1.52 m) or less in diameter, where
mission apparatus. the preceding methods cannot be ap-
plied, the following may be used: A
(a) General requirements. (1) This sec-
disk attached to the flywheel in such
tion covers all types and shapes of
power-transmission belts, except the manner as to cover the spokes of the
following when operating at two hun- wheel on the exposed side and present a
dred and fifty (250) feet per minute or smooth surface and edge, at the same
less: (i) Flat belts 1 inch (2.54 cm) or time providing means for periodic in-
less in width, (ii) flat belts 2 inches spection. An open space, not exceeding
(5.08 cm) or less in width which are free 4 inches (10.16 cm) in width, may be left
from metal lacings or fasteners, (iii) between the outside edge of the disk
round belts 12 inch (1.27 cm) or less in and the rim of the wheel if desired, to
diameter; and (iv) single strand V- facilitate turning the wheel over.
belts, the width of which is thirteen Where a disk is used, the keys or other
thirty-seconds (1332) inch or less. dangerous projections not covered by
(2) Vertical and inclined belts (para- disk shall be cut off or covered. This
graphs (e) (3) and (4) of this section) if subdivision does not apply to flywheels
not more than 212 inches (6.35 cm) wide with solid web centers.
and running at a speed of less than one (v) Adjustable guard to be used for
thousand (1,000) feet per minute, and if starting engine or for running adjust-
free from metal lacings or fastenings ment may be provided at the flywheel
may be guarded with a nip-point belt of gas or oil engines. A slot opening for
and pulley guard. jack bar will be permitted.
(3) For the Textile Industry, because (vi) Wherever flywheels are above
of the presence of excessive deposits of working areas, guards shall be in-
lint, which constitute a serious fire
stalled having sufficient strength to
hazard, the sides and face sections only
hold the weight of the flywheel in the
of nip-point belt and pulley guards are
event of a shaft or wheel mounting fail-
required, provided the guard shall ex-
ure.
tend at least 6 inches (15.24 cm) beyond
the rim of the pulley on the in-running (2) Cranks and connecting rods. Cranks
and off-running sides of the belt and at and connecting rods, when exposed to
least 2 inches (5.08 cm) away from the contact, shall be guarded in accordance
rim and face of the pulley in all other with paragraphs (m) and (n) of this sec-
directions. tion, or by a guardrail as described in
(4) This section covers the principal paragraph (o)(5) of this section.
features with which power trans- (3) Tail rods or extension piston rods.
mission safeguards shall comply. Tail rods or extension piston rods shall
(b) Prime-mover guards(1) Flywheels. be guarded in accordance with para-
Flywheels located so that any part is 7 graphs (m) and (o) of this section, or by
feet (2.128 m) or less above floor or a guardrail on sides and end, with a
platform shall be guarded in accord- clearance of not less than 15 (38.1 cm)
ance with the requirements of this sub- nor more than 20 inches (50.8 cm) when
paragraph: rod is fully extended.

235

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00245 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.307 29 CFR Ch. XVII (7112 Edition)

(c) Shafting(1) Installation. (i) Each (i) The basement, tower, or room oc-
continuous line of shafting shall be se- cupied by transmission equipment is
cured in position against excessive end- locked against unauthorized entrance.
wise movement. (ii) The vertical clearance in passage-
(ii) Inclined and vertical shafts, par- ways between the floor and power
ticularly inclined idler shafts, shall be transmission beams, ceiling, or any
securely held in position against end- other objects, is not less than 5 ft. 6 in.
wise thrust. (1.672 m).
(2) Guarding horizontal shafting. (i) All (iii) The intensity of illumination
exposed parts of horizontal shafting 7 conforms to the requirements of ANSI
feet (2.128 m) or less from floor or A11.11965 (R1970).
working platform, excepting runways (iv) [Reserved]
used exclusively for oiling, or running (v) The route followed by the oiler is
adjustments, shall be protected by a protected in such manner as to prevent
stationary casing enclosing shafting accident.
completely or by a trough enclosing (d) Pulleys(1) Guarding. Pulleys, any
sides and top or sides and bottom of parts of which are 7 feet (2.128 m) or
shafting as location requires. less from the floor or working plat-
(ii) Shafting under bench machines form, shall be guarded in accordance
shall be enclosed by a stationary cas- with the standards specified in para-
ing, or by a trough at sides and top or graphs (m) and (o) of this section. Pul-
sides and bottom, as location requires. leys serving as balance wheels (e.g.,
The sides of the trough shall come punch presses) on which the point of
contact between belt and pulley is
within at least 6 inches (15.24 cm) of
more than 6 ft. 6 in. (1.976 m) from the
the underside of table, or if shafting is
floor or platform may be guarded with
located near floor within 6 inches (15.24
a disk covering the spokes.
cm) of floor. In every case the sides of
(2) Location of pulleys. (i) Unless the
trough shall extend at least 2 inches
distance to the nearest fixed pulley,
(5.08 cm) beyond the shafting or protu-
clutch, or hanger exceeds the width of
berance. the belt used, a guide shall be provided
(3) Guarding vertical and inclined to prevent the belt from leaving the
shafting. Vertical and inclined shafting pulley on the side where insufficient
7 feet (2.128 m) or less from floor or clearance exists.
working platform, excepting mainte- (ii) [Reserved]
nance runways, shall be enclosed with (3) Broken pulleys. Pulleys with
a stationary casing in accordance with cracks, or pieces broken out of rims,
requirements of paragraphs (m) and (o) shall not be used.
of this section. (4) Pulley speeds. Pulleys intended to
(4) Projecting shaft ends. (i) Projecting operate at rim speed in excess of manu-
shaft ends shall present a smooth edge facturers normal recommendations
and end and shall not project more shall be specially designed and care-
than one-half the diameter of the shaft fully balanced for the speed at which
unless guarded by nonrotating caps or they are to operate.
safety sleeves. (e) Belt, rope, and chain drives(1)
(ii) Unused keyways shall be filled up Horizontal belts and ropes. (i) Where
or covered. both runs of horizontal belts are 7 feet
(5) Power-transmission apparatus lo- (2.128 m) or less from the floor level,
cated in basements. All mechanical the guard shall extend to at least 15
power transmission apparatus located inches (38.1 cm) above the belt or to a
in basements, towers, and rooms used standard height except that where both
exclusively for power transmission runs of a horizontal belt are 42 inches
equipment shall be guarded in accord- (106.68 cm) or less from the floor, the
ance with this section, except that the belt shall be fully enclosed.
requirements for safeguarding belts, (ii) In powerplants or power-develop-
pulleys, and shafting need not be com- ment rooms, a guardrail may be used
plied with when the following require- in lieu of the guard required by para-
ments are met: graph (e)(1)(i) of this section.

236

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00246 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.307

(2) Overhead horizontal belts. (i) Over- (5) Cone-pulley belts. (i) The cone belt
head horizontal belts, with lower parts and pulley shall be equipped with a belt
7 feet (2.128 m) or less from the floor or shifter so constructed as to adequately
platform, shall be guarded on sides and guard the nip point of the belt and pul-
bottom in accordance with paragraph ley. If the frame of the belt shifter does
(o)(3) of this section. not adequately guard the nip point of
(ii) Horizontal overhead belts more the belt and pulley, the nip point shall
than 7 feet (2.128 m) above floor or plat- be further protected by means of a
form shall be guarded for their entire vertical guard placed in front of the
length under the following conditions: pulley and extending at least to the top
(a) If located over passageways or of the largest step of the cone.
work places and traveling 1,800 feet or (ii) If the belt is of the endless type
more per minute. or laced with rawhide laces, and a belt
(b) If center to center distance be- shifter is not desired, the belt will be
tween pulleys is 10 feet (3.04 m) or considered guarded if the nip point of
more. the belt and pulley is protected by a
(c) If belt is 8 inches (20.32 cm) or nip point guard located in front of the
more in width. cone extending at least to the top of
(iii) Where the upper and lower runs the largest step of the cone, and formed
of horizontal belts are so located that to show the contour of the cone in
passage of persons between them would order to give the nip point of the belt
be possible, the passage shall be either: and pulley the maximum protection.
(a) Completely barred by a guardrail (iii) If the cone is located less than 3
or other barrier in accordance with feet (0.912 m) from the floor or working
paragraphs (m) and (o) of this section; platform, the cone pulley and belt shall
or be guarded to a height of 3 feet (0.912
(b) Where passage is regarded as nec- m) regardless of whether the belt is
essary, there shall be a platform over
endless or laced with rawhide.
the lower run guarded on either side by
(6) Belt tighteners. (i) Suspended
a railing completely filled in with wire
counterbalanced tighteners and all
mesh or other filler, or by a solid bar-
parts thereof shall be of substantial
rier. The upper run shall be so guarded
construction and securely fastened; the
as to prevent contact therewith either
bearings shall be securely capped.
by the worker or by objects carried by
Means must be provided to prevent
him. In powerplants only the lower run
tightener from falling, in case the belt
of the belt need be guarded.
breaks.
(iv) Overhead chain and link belt
drives are governed by the same rules (ii) Where suspended counterweights
as overhead horizontal belts and shall are used and not guarded by location,
be guarded in the same manner as they shall be so encased as to prevent
belts. accident.
(3) Vertical and inclined belts. (i) (f) Gears, sprockets, and chains(1)
Vertical and inclined belts shall be en- Gears. Gears shall be guarded in accord-
closed by a guard conforming to stand- ance with one of the following meth-
ards in paragraphs (m) and (o) of this ods:
section. (i) By a complete enclosure; or
(ii) All guards for inclined belts shall (ii) By a standard guard as described
be arranged in such a manner that a in paragraph (o) of this section, at
minimum clearance of 7 feet (2.128 m) least 7 feet (2.128 m) high extending 6
is maintained between belt and floor at inches (15.24 cm) above the mesh point
any point outside of guard. of the gears; or
(4) Vertical belts. Vertical belts run- (iii) By a band guard covering the
ning over a lower pulley more than 7 face of gear and having flanges ex-
feet (2.128 m) above floor or platform tended inward beyond the root of the
shall be guarded at the bottom in the teeth on the exposed side or sides.
same manner as horizontal overhead Where any portion of the train of gears
belts, if conditions are as stated in guarded by a band guard is less than 6
paragraphs (e)(2)(ii) (a) and (c) of this feet (1.824 m) from the floor a disk
section. guard or a complete enclosure to the

237

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00247 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.307 29 CFR Ch. XVII (7112 Edition)

height of 6 feet (1.824 m) shall be re- ing surfaces. Bolts, nuts, and setscrews
quired. will, however, be permitted where they
(2) Hand-operated gears. Paragraph are covered with safety sleeves or
(f)(1) of this section does not apply to where they are used parallel with the
hand-operated gears used only to ad- shafting and are countersunk or else do
just machine parts and which do not not extend beyond the flange of the
continue to move after hand power is coupling.
removed. However, the guarding of (j) Bearings and facilities for oiling. All
these gears is highly recommended. drip cups and pans shall be securely
(3) Sprockets and chains. All sprocket fastened.
wheels and chains shall be enclosed un- (k) Guarding of clutches, cutoff cou-
less they are more than 7 feet (2.128 m) plings, and clutch pulleys(1) Guards.
above the floor or platform. Where the Clutches, cutoff couplings, or clutch
drive extends over other machine or pulleys having projecting parts, where
working areas, protection against fall- such clutches are located 7 feet (2.128
ing shall be provided. This subpara- m) or less above the floor or working
graph does not apply to manually oper- platform, shall be enclosed by a sta-
ated sprockets. tionary guard constructed in accord-
(4) Openings for oiling. When frequent ance with this section. A U type
oiling must be done, openings with guard is permissible.
hinged or sliding self-closing covers (2) Engine rooms. In engine rooms a
shall be provided. All points not read- guardrail, preferably with toeboard,
ily accessible shall have oil feed tubes may be used instead of the guard re-
if lubricant is to be added while ma- quired by paragraph (k)(1) of this sec-
chinery is in motion. tion, provided such a room is occupied
(g) Guarding friction drives. The driv- only by engine room attendants.
ing point of all friction drives when ex- (l) Belt shifters, clutches, shippers,
posed to contact shall be guarded, all poles, perches, and fasteners(1) Belt
arm or spoke friction drives and all shifters. (i) Tight and loose pulleys on
web friction drives with holes in the all new installations made on or after
web shall be entirely enclosed, and all August 31, 1971, shall be equipped with
projecting belts on friction drives a permanent belt shifter provided with
where exposed to contact shall be mechanical means to prevent belt from
guarded. creeping from loose to tight pulley. It
(h) Keys, setscrews, and other projec- is recommended that old installations
tions. (1) All projecting keys, setscrews, be changed to conform to this rule.
and other projections in revolving (ii) Belt shifter and clutch handles
parts shall be removed or made flush or shall be rounded and be located as far
guarded by metal cover. This subpara- as possible from danger of accidental
graph does not apply to keys or contact, but within easy reach of the
setscrews within gear or sprocket cas- operator. Where belt shifters are not
ings or other enclosures, nor to keys, directly located over a machine or
setscrews, or oilcups in hubs of pulleys bench, the handles shall be cut off 6 ft.
less than 20 inches (50.8 cm) in diame- 6 in. (1.976 m) above floor level.
ter where they are within the plane of (2) Belt shippers and shipper poles. The
the rim of the pulley. use of belt poles as substitutes for me-
(2) It is recommended, however, that chanical shifters is not recommended.
no projecting setscrews or oilcups be (3) Belt perches. Where loose pulleys
used in any revolving pulley or part of or idlers are not practicable, belt
machinery. perches in form of brackets, rollers,
(i) Collars and couplings(1) Collars. etc., shall be used to keep idle belts
All revolving collars, including split away from the shafts.
collars, shall be cylindrical, and screws (4) Belt fasteners. Belts which of ne-
or bolts used in collars shall not cessity must be shifted by hand and
project beyond the largest periphery of belts within 7 feet (2.128 m) of the floor
the collar. or working platform which are not
(2) Couplings. Shaft couplings shall be guarded in accordance with this sec-
so constructed as to present no hazard tion shall not be fastened with metal in
from bolts, nuts, setscrews, or revolv- any case, nor with any other fastening

238

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00248 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.307

which by construction or wear will essary, to sustain safely the weight and
constitute an accident hazard. stress likely to be imposed by the
(m) Standard guardsgeneral require- guard. The interior surface of all
ments(1) Materials. (i) Standard condi- guards, by which is meant the surface
tions shall be secured by the use of the of the guard with which a belt will
following materials. Expanded metal, come in contact, shall be smooth and
perforated or solid sheet metal, wire free from all projections of any char-
mesh on a frame of angle iron, or iron acter, except where construction de-
pipe securely fastened to floor or to mands it; protruding shallow round-
frame of machine. head rivets may be used. Overhead belt
(ii) All metal should be free from guards shall be at least one-quarter
burrs and sharp edges. wider than belt which they protect, ex-
(2) Methods of manufacture. (i) Ex- cept that this clearance need not in
panded metal, sheet or perforated any case exceed 6 inches (15.24 cm) on
metal, and wire mesh shall be securely each side. Overhead rope drive and
fastened to frame. block and roller-chain-drive guards
(n) [Reserved] shall be not less than 6 inches (15.24
(o) Approved materials(1) Minimum cm) wider than the drive on each side.
requirements. The materials and dimen- In overhead silent chain-drive guards
sions specified in this paragraph shall where the chain is held from lateral
apply to all guards, except horizontal displacement on the sprockets, the side
overhead belts, rope, cable, or chain clearances required on drives of 20 inch
guards more than 7 feet (2.128 m) above (50.8 cm) centers or under shall be not
floor, or platform. less than 14 inch (0.635 cm) from the
(i) [Reserved] nearest moving chain part, and on
(a) All guards shall be rigidly braced drives of over 20 inch (50.8 cm) centers
every 3 feet (0.912 m) or fractional part a minimum of 12 inch (1.27 cm) from
of their height to some fixed part of the nearest moving chain part.
machinery or building structure. (4) Guards for horizontal overhead rope
Where guard is exposed to contact with and chain drives. Overhead-rope and
moving equipment additional strength chain-drive guard construction shall
may be necessary. conform to the rules for overhead-belt
(2) Wood guards. (i) Wood guards may guard.
be used in the woodworking and chem- (5) Guardrails and toeboards. (i) Guard-
ical industries, in industries where the rail shall be 42 inches (106.68 cm) in
presence of fumes or where manufac- height, with midrail between top rail
turing conditions would cause the and floor.
rapid deterioration of metal guards; (ii) Posts shall be not more than 8
also in construction work and in loca- feet (2.432 m) apart; they are to be per-
tions outdoors where extreme cold or manent and substantial, smooth, and
extreme heat make metal guards and free from protruding nails, bolts, and
railings undesirable. In all other indus- splinters. If made of pipe, the post shall
tries, wood guards shall not be used. be 114 inches (3.175 cm) inside diameter,
(3) Guards for horizontal overhead or larger. If made of metal shapes or
belts. (i) Guards for horizontal overhead bars, their section shall be equal in
belts shall run the entire length of the strength to that of 112 (3.81 cm) by 112
belt and follow the line of the pulley to (3.81 cm) by 316 inch angle iron. If made
the ceiling or be carried to the nearest of wood, the posts shall be two by four
wall, thus enclosing the belt effec- (2 4) inches or larger. The upper rail
tively. Where belts are so located as to shall be two by four (2 4) inches, or
make it impracticable to carry the two one by four (1 4) strips, one at the
guard to wall or ceiling, construction top and one at the side of posts. The
of guard shall be such as to enclose midrail may be one by four (1 4)
completely the top and bottom runs of inches or more. Where panels are fitted
belt and the face of pulleys. with expanded metal or wire mesh the
(ii) [Reserved] middle rails may be omitted. Where
(iii) Suitable reinforcement shall be guard is exposed to contact with mov-
provided for the ceiling rafters or over- ing equipment, additional strength
head floor beams, where such is nec- may be necessary.

239

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00249 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.350 29 CFR Ch. XVII (7112 Edition)

(iii) Toeboards shall be 4 inches (10.16 (3) Cylinders shall be moved by tilt-
cm) or more in height, of wood, metal, ing and rolling them on their bottom
or of metal grill not exceeding 1 inch edges. They shall not be intentionally
(2.54 cm) mesh. dropped, struck, or permitted to strike
(p) Care of equipment(1) General. All each other violently.
power-transmission equipment shall be (4) When cylinders are transported by
inspected at intervals not exceeding 60 powered vehicles, they shall be secured
days and be kept in good working con- in a vertical position.
dition at all times. (5) Valve protection caps shall not be
(2) Shafting. (i) Shafting shall be kept used for lifting cylinders from one
in alignment, free from rust and excess vertical position to another. Bars shall
oil or grease. not be used under valves or valve pro-
(ii) Where explosives, explosive dusts, tection caps to pry cylinders loose
flammable vapors or flammable liquids when frozen. Warm, not boiling, water
exist, the hazard of static sparks from shall be used to thaw cylinders loose.
shafting shall be carefully considered. (6) Unless cylinders are firmly se-
(3) Bearings. Bearings shall be kept in cured on a special carrier intended for
alignment and properly adjusted. this purpose, regulators shall be re-
(4) Hangers. Hangers shall be in- moved and valve protection caps put in
spected to make certain that all sup- place before cylinders are moved.
porting bolts and screws are tight and (7) A suitable cylinder truck, chain,
that supports of hanger boxes are ad- or other steadying device shall be used
justed properly. to keep cylinders from being knocked
(5) Pulleys. (i) Pulleys shall be kept in over while in use.
proper alignment to prevent belts from (8) When work is finished, when cyl-
running off. inders are empty, or when cylinders are
(6) Care of belts. moved at any time, the cylinder valve
(i) [Reserved] shall be closed.
(9) Compressed gas cylinders shall be
(ii) Inspection shall be made of belts,
secured in an upright position at all
lacings, and fasteners and such equip-
times except, if necessary, for short pe-
ment kept in good repair.
riods of time while cylinders are actu-
(7) Lubrication. The regular oilers
ally being hoisted or carried.
shall wear tight-fitting clothing. Ma-
(10) Oxygen cylinders in storage shall
chinery shall be oiled when not in mo-
be separated from fuel-gas cylinders or
tion, wherever possible.
combustible materials (especially oil
[58 FR 35176, June 30, 1993, as amended at 69 or grease), a minimum distance of 20
FR 31882, June 8, 2004] feet (6.1 m) or by a noncombustible bar-
rier at least 5 feet (1.5 m) high having
Subpart JWelding and Cutting a fire-resistance rating of at least one-
half hour.
AUTHORITY: Sec. 107, Contract Work Hours
(11) Inside of buildings, cylinders
and Safety Standards Act (Construction shall be stored in a well-protected,
Safety Act) (40 U.S.C. 333); secs. 4, 6, 8, Occu- well-ventilated, dry location, at least
pational Safety and Health Act of 1970 (29 20 feet (6.1 m) from highly combustible
U.S.C. 653, 655, 657); Secretary of Labors materials such as oil or excelsior. Cyl-
Order No. 1271 (36 FR 8754), 876 (41 FR inders should be stored in definitely as-
25059), or 983 (48 FR 35736), as applicable. signed places away from elevators,
stairs, or gangways. Assigned storage
1926.350 Gas welding and cutting. places shall be located where cylinders
(a) Transporting, moving, and storing will not be knocked over or damaged
compressed gas cylinders. (1) Valve pro- by passing or falling objects, or subject
tection caps shall be in place and se- to tampering by unauthorized persons.
cured. Cylinders shall not be kept in
(2) When cylinders are hoisted, they unventilated enclosures such as lockers
shall be secured on a cradle, and cupboards.
slingboard, or pallet. They shall not be (12) The in-plant handling, storage,
hoisted or transported by means of and utilization of all compressed gases
magnets or choker slings. in cylinders, portable tanks, rail

240

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00250 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.350

tankcars, or motor vehicle cargo tanks the regulator. For quick closing, valves
shall be in accordance with Compressed on fuel gas cylinders shall not be
Gas Association Pamphlet P11965. opened more than 112 turns. When a
(b) Placing cylinders. (1) Cylinders special wrench is required, it shall be
shall be kept far enough away from the left in position on the stem of the valve
actual welding or cutting operation so while the cylinder is in use so that the
that sparks, hot slag, or flame will not fuel gas flow can be shut off quickly in
reach them. When this is impractical, case of an emergency. In the case of
fire resistant shields shall be provided. manifolded or coupled cylinders, at
(2) Cylinders shall be placed where least one such wrench shall always be
they cannot become part of an elec- available for immediate use. Nothing
trical circuit. Electrodes shall not be shall be placed on top of a fuel gas cyl-
struck against a cylinder to strike an inder, when in use, which may damage
arc. the safety device or interfere with the
(3) Fuel gas cylinders shall be placed quick closing of the valve.
with valve end up whenever they are in (3) Fuel gas shall not be used from
use. They shall not be placed in a loca- cylinders through torches or other de-
tion where they would be subject to vices which are equipped with shutoff
open flame, hot metal, or other sources valves without reducing the pressure
of artificial heat. through a suitable regulator attached
(4) Cylinders containing oxygen or to the cylinder valve or manifold.
acetylene or other fuel gas shall not be (4) Before a regulator is removed
taken into confined spaces. from a cylinder valve, the cylinder
(c) Treatment of cylinders. (1) Cyl- valve shall always be closed and the
inders, whether full or empty, shall not gas released from the regulator.
be used as rollers or supports.
(5) If, when the valve on a fuel gas
(2) No person other than the gas sup-
cylinder is opened, there is found to be
plier shall attempt to mix gases in a
a leak around the valve stem, the valve
cylinder. No one except the owner of
shall be closed and the gland nut tight-
the cylinder or person authorized by
ened. If this action does not stop the
him, shall refill a cylinder. No one
shall use a cylinders contents for pur- leak, the use of the cylinder shall be
poses other than those intended by the discontinued, and it shall be properly
supplier. All cylinders used shall meet tagged and removed from the work
the Department of Transportation re- area. In the event that fuel gas should
quirements published in 49 CFR part leak from the cylinder valve, rather
178, subpart C, Specification for Cyl- than from the valve stem, and the gas
inders. cannot be shut off, the cylinder shall
(3) No damaged or defective cylinder be properly tagged and removed from
shall be used. the work area. If a regulator attached
(d) Use of fuel gas. The employer shall to a cylinder valve will effectively stop
thoroughly instruct employees in the a leak through the valve seat, the cyl-
safe use of fuel gas, as follows: inder need not be removed from the
(1) Before a regulator to a cylinder work area.
valve is connected, the valve shall be (6) If a leak should develop at a fuse
opened slightly and closed imme- plug or other safety device, the cyl-
diately. (This action is generally inder shall be removed from the work
termed cracking and is intended to area.
clear the valve of dust or dirt that (e) Fuel gas and oxygen manifolds. (1)
might otherwise enter the regulator.) Fuel gas and oxygen manifolds shall
The person cracking the valve shall bear the name of the substance they
stand to one side of the outlet, not in contain in letters at least 1-inch high
front of it. The valve of a fuel gas cyl- which shall be either painted on the
inder shall not be cracked where the manifold or on a sign permanently at-
gas would reach welding work, sparks, tached to it.
flame, or other possible sources of igni- (2) Fuel gas and oxygen manifolds
tion. shall be placed in safe, well ventilated,
(2) The cylinder valve shall always be and accessible locations. They shall
opened slowly to prevent damage to not be located within enclosed spaces.

241

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00251 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.351 29 CFR Ch. XVII (7112 Edition)

(3) Manifold hose connections, in- for leaking shutoff valves, hose cou-
cluding both ends of the supply hose plings, and tip connections. Defective
that lead to the manifold, shall be such torches shall not be used.
that the hose cannot be interchanged (3) Torches shall be lighted by fric-
between fuel gas and oxygen manifolds tion lighters or other approved devices,
and supply header connections. Adapt- and not by matches or from hot work.
ers shall not be used to permit the (h) Regulators and gauges. Oxygen and
interchange of hose. Hose connections fuel gas pressure regulators, including
shall be kept free of grease and oil. their related gauges, shall be in proper
(4) When not in use, manifold and working order while in use.
header hose connections shall be (i) Oil and grease hazards. Oxygen cyl-
capped. inders and fittings shall be kept away
(5) Nothing shall be placed on top of from oil or grease. Cylinders, cylinder
a manifold, when in use, which will caps and valves, couplings, regulators,
damage the manifold or interfere with hose, and apparatus shall be kept free
the quick closing of the valves. from oil or greasy substances and shall
(f) Hose. (1) Fuel gas hose and oxygen not be handled with oily hands or
hose shall be easily distinguishable gloves. Oxygen shall not be directed at
from each other. The contrast may be oily surfaces, greasy clothes, or within
made by different colors or by surface a fuel oil or other storage tank or ves-
characteristics readily distinguishable sel.
by the sense of touch. Oxygen and fuel (j) Additional rules. For additional de-
gas hoses shall not be interchangeable. tails not covered in this subpart, appli-
A single hose having more than one gas cable technical portions of American
passage shall not be used. National Standards Institute, Z49.1
(2) When parallel sections of oxygen 1967, Safety in Welding and Cutting,
and fuel gas hose are taped together, shall apply.
not more than 4 inches out of 12 inches [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
shall be covered by tape. 1979, as amended at 55 FR 42328, Oct. 18, 1990;
(3) All hose in use, carrying acety- 58 FR 35179, June 30, 1993]
lene, oxygen, natural or manufactured
fuel gas, or any gas or substance which 1926.351 Arc welding and cutting.
may ignite or enter into combustion, (a) Manual electrode holders. (1) Only
or be in any way harmful to employees, manual electrode holders which are
shall be inspected at the beginning of specifically designed for arc welding
each working shift. Defective hose and cutting, and are of a capacity capa-
shall be removed from service. ble of safely handling the maximum
(4) Hose which has been subject to rated current required by the elec-
flashback, or which shows evidence of trodes, shall be used.
severe wear or damage, shall be tested (2) Any current-carrying parts pass-
to twice the normal pressure to which ing through the portion of the holder
it is subject, but in no case less than which the arc welder or cutter grips in
300 p.s.i. Defective hose, or hose in his hand, and the outer surfaces of the
doubtful condition, shall not be used. jaws of the holder, shall be fully insu-
(5) Hose couplings shall be of the type lated against the maximum voltage en-
that cannot be unlocked or discon- countered to ground.
nected by means of a straight pull (b) Welding cables and connectors. (1)
without rotary motion. All arc welding and cutting cables shall
(6) Boxes used for the storage of gas be of the completely insulated, flexible
hose shall be ventilated. type, capable of handling the max-
(7) Hoses, cables, and other equip- imum current requirements of the
ment shall be kept clear of passage- work in progress, taking into account
ways, ladders and stairs. the duty cycle under which the arc
(g) Torches. (1) Clogged torch tip welder or cutter is working.
openings shall be cleaned with suitable (2) Only cable free from repair or
cleaning wires, drills, or other devices splices for a minimum distance of 10
designed for such purpose. feet from the cable end to which the
(2) Torches in use shall be inspected electrode holder is connected shall be
at the beginning of each working shift used, except that cables with standard

242

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00252 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.352

insulated connectors or with splices ther through a third wire in the cable
whose insulating quality is equal to containing the circuit conductor or
that of the cable are permitted. through a separate wire which is
(3) When it becomes necessary to con- grounded at the source of the current.
nect or splice lengths of cable one to Grounding circuits, other than by
another, substantial insulated connec- means of the structure, shall be
tors of a capacity at least equivalent to checked to ensure that the circuit be-
that of the cable shall be used. If con- tween the ground and the grounded
nections are effected by means of cable power conductor has resistance low
lugs, they shall be securely fastened to- enough to permit sufficient current to
gether to give good electrical contact, flow to cause the fuse or circuit break-
and the exposed metal parts of the lugs er to interrupt the current.
shall be completely insulated. (6) All ground connections shall be
(4) Cables in need of repair shall not inspected to ensure that they are me-
be used. When a cable, other than the chanically strong and electrically ade-
cable lead referred to in paragraph quate for the required current.
(b)(2) of this section, becomes worn to (d) Operating instructions. Employers
the extent of exposing bare conductors, shall instruct employees in the safe
the portion thus exposed shall be pro- means of arc welding and cutting as
tected by means of rubber and friction follows:
tape or other equivalent insulation. (1) When electrode holders are to be
(c) Ground returns and machine left unattended, the electrodes shall be
grounding. (1) A ground return cable removed and the holders shall be so
shall have a safe current carrying ca- placed or protected that they cannot
pacity equal to or exceeding the speci- make electrical contact with employ-
fied maximum output capacity of the ees or conducting objects.
arc welding or cutting unit which it (2) Hot electrode holders shall not be
services. When a single ground return dipped in water; to do so may expose
cable services more than one unit, its the arc welder or cutter to electric
safe current-carrying capacity shall shock.
equal or exceed the total specified (3) When the arc welder or cutter has
maximum output capacities of all the occasion to leave his work or to stop
units which it services. work for any appreciable length of
(2) Pipelines containing gases or time, or when the arc welding or cut-
flammable liquids, or conduits con- ting machine is to be moved, the power
taining electrical circuits, shall not be supply switch to the equipment shall
used as a ground return. For welding be opened.
on natural gas pipelines, the technical (4) Any faulty or defective equipment
portions of regulations issued by the shall be reported to the supervisor.
Department of Transportation, Office (5) See 1926.406(c) for additional re-
of Pipeline Safety, 49 CFR part 192, quirements.
Minimum Federal Safety Standards for (e) Shielding. Whenever practicable,
Gas Pipelines, shall apply. all arc welding and cutting operations
(3) When a structure or pipeline is shall be shielded by noncombustible or
employed as a ground return circuit, it flameproof screens which will protect
shall be determined that the required employees and other persons working
electrical contact exists at all joints. in the vicinity from the direct rays of
The generation of an arc, sparks, or the arc.
heat at any point shall cause rejection
of the structures as a ground circuit. [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
(4) When a structure or pipeline is 1979, as amended at 51 FR 25318, July 11, 1986]
continuously employed as a ground re-
turn circuit, all joints shall be bonded, 1926.352 Fire prevention.
and periodic inspections shall be con- (a) When practical, objects to be
ducted to ensure that no condition of welded, cut, or heated shall be moved
electrolysis or fire hazard exists by vir- to a designated safe location or, if the
tue of such use. objects to be welded, cut, or heated
(5) The frames of all arc welding and cannot be readily moved, all movable
cutting machines shall be grounded ei- fire hazards in the vicinity shall be

243

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00253 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.353 29 CFR Ch. XVII (7112 Edition)

taken to a safe place, or otherwise pro- pails, and other containers which con-
tected. tain or have contained flammable liq-
(b) If the object to be welded, cut, or uids shall be kept closed. Empty con-
heated cannot be moved and if all the tainers shall be removed to a safe area
fire hazards cannot be removed, posi- apart from hot work operations or open
tive means shall be taken to confine flames.
the heat, sparks, and slag, and to pro- (i) Drums containers, or hollow
tect the immovable fire hazards from structures which have contained toxic
them. or flammable substances shall, before
(c) No welding, cutting, or heating welding, cutting, or heating is under-
shall be done where the application of taken on them, either be filled with
flammable paints, or the presence of water or thoroughly cleaned of such
other flammable compounds, or heavy substances and ventilated and tested.
dust concentrations creates a hazard. For welding, cutting and heating on
(d) Suitable fire extinguishing equip- steel pipelines containing natural gas,
ment shall be immediately available in the pertinent portions of regulations
the work area and shall be maintained issued by the Department of Transpor-
in a state of readiness for instant use. tation, Office of Pipeline Safety, 49
(e) When the welding, cutting, or CFR part 192, Minimum Federal Safety
heating operation is such that normal Standards for Gas Pipelines, shall
fire prevention precautions are not suf- apply.
ficient, additional personnel shall be (j) Before heat is applied to a drum,
assigned to guard against fire while the container, or hollow structure, a vent
actual welding, cutting, or heating op- or opening shall be provided for the re-
eration is being performed, and for a lease of any built-up pressure during
sufficient period of time after comple- the application of heat.
tion of the work to ensure that no pos-
sibility of fire exists. Such personnel 1926.353 Ventilation and protection
shall be instructed as to the specific in welding, cutting, and heating.
anticipated fire hazards and how the
firefighting equipment provided is to (a) Mechanical ventilation. For pur-
be used. poses of this section, mechanical ven-
(f) When welding, cutting, or heating tilation shall meet the following re-
is performed on walls, floors, and ceil- quirements:
ings, since direct penetration of sparks (1) Mechanical ventilation shall con-
or heat transfer may introduce a fire sist of either general mechanical ven-
hazard to an adjacent area, the same tilation systems or local exhaust sys-
precautions shall be taken on the oppo- tems.
site side as are taken on the side on (2) General mechanical ventilation
which the welding is being performed. shall be of sufficient capacity and so
(g) For the elimination of possible arranged as to produce the number of
fire in enclosed spaces as a result of gas air changes necessary to maintain
escaping through leaking or improp- welding fumes and smoke within safe
erly closed torch valves, the gas supply limits, as defined in subpart D of this
to the torch shall be positively shut off part.
at some point outside the enclosed (3) Local exhaust ventilation shall
space whenever the torch is not to be consist of freely movable hoods in-
used or whenever the torch is left unat- tended to be placed by the welder or
tended for a substantial period of time, burner as close as practicable to the
such as during the lunch period. Over- work. This system shall be of sufficient
night and at the change of shifts, the capacity and so arranged as to remove
torch and hose shall be removed from fumes and smoke at the source and
the confined space. Open end fuel gas keep the concentration of them in the
and oxygen hoses shall be immediately breathing zone within safe limits as de-
removed from enclosed spaces when fined in subpart D of this part.
they are disconnected from the torch (4) Contaminated air exhausted from
or other gas-consuming device. a working space shall be discharged
(h) Except when the contents are into the open air or otherwise clear of
being removed or transferred, drums, the source of intake air.

244

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00254 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.353

(5) All air replacing that withdrawn (2) Welding, cutting, or heating in
shall be clean and respirable. any enclosed spaces involving the met-
(6) Oxygen shall not be used for ven- als specified in this subparagraph shall
tilation purposes, comfort cooling, be performed with local exhaust ven-
blowing dust from clothing, or for tilation in accordance with the require-
cleaning the work area. ments of paragraph (a) of this section,
(b) Welding, cutting, and heating in or employees shall be protected by air
confined spaces. (1) Except as provided line respirators in accordance with the
in paragraph (b)(2) of this section, and requirements of subpart E of this part:
paragraph (c)(2) of this section, either (i) Metals containing lead, other than
general mechanical or local exhaust as an impurity, or metals coated with
ventilation meeting the requirements lead-bearing materials;
of paragraph (a) of this section shall be (ii) Cadmium-bearing or cadmium-
provided whenever welding, cutting, or coated base metals;
heating is performed in a confined (iii) Metals coated with mercury-
space. bearing metals;
(2) When sufficient ventilation can- (iv) Beryllium-containing base or
not be obtained without blocking the filler metals. Because of its high tox-
means of access, employees in the con- icity, work involving beryllium shall
fined space shall be protected by air be done with both local exhaust ven-
tilation and air line respirators.
line respirators in accordance with the
(3) Employees performing such oper-
requirements of subpart E of this part,
ations in the open air shall be pro-
and an employee on the outside of such
tected by filter-type respirators in ac-
a confined space shall be assigned to
cordance with the requirements of sub-
maintain communication with those
part E of this part, except that employ-
working within it and to aid them in
ees performing such operations on be-
an emergency.
ryllium-containing base or filler met-
(3) Lifelines. Where a welder must
als shall be protected by air line res-
enter a confined space through a man-
pirators in accordance with the re-
hole or other small opening, means
quirements of subpart E of this part.
shall be provided for quickly removing
(4) Other employees exposed to the
him in case of emergency. When safety
same atmosphere as the welders or
belts and lifelines are used for this pur-
burners shall be protected in the same
pose they shall be so attached to the
manner as the welder or burner.
welders body that his body cannot be
(d) Inert-gas metal-arc welding. (1)
jammed in a small exit opening. An at-
Since the inert-gas metal-arc welding
tendant with a pre-planned rescue pro- process involves the production of
cedure shall be stationed outside to ob- ultra-violet radiation of intensities of 5
serve the welder at all times and be ca- to 30 times that produced during
pable of putting rescue operations into shielded metal-arc welding, the decom-
effect. position of chlorinated solvents by ul-
(c) Welding, cutting, or heating of met- traviolet rays, and the liberation of
als of toxic significance. (1) Welding, cut- toxic fumes and gases, employees shall
ting, or heating in any enclosed spaces not be permitted to engage in, or be ex-
involving the metals specified in this posed to the process until the following
subparagraph shall be performed with special precautions have been taken:
either general mechanical or local ex- (i) The use of chlorinated solvents
haust ventilation meeting the require- shall be kept at least 200 feet, unless
ments of paragraph (a) of this section: shielded, from the exposed arc, and sur-
(i) Zinc-bearing base or filler metals faces prepared with chlorinated sol-
or metals coated with zinc-bearing ma- vents shall be thoroughly dry before
terials; welding is permitted on such surfaces.
(ii) Lead base metals; (ii) Employees in the area not pro-
(iii) Cadmium-bearing filler mate- tected from the arc by screening shall
rials; be protected by filter lenses meeting
(iv) Chromium-bearing metals or the requirements of subpart E of this
metals coated with chromium-bearing part. When two or more welders are ex-
materials. posed to each others arc, filter lens

245

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00255 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.354 29 CFR Ch. XVII (7112 Edition)

goggles of a suitable type, meeting the the area to be heated to prevent igni-
requirements of subpart E of this part, tion.
shall be worn under welding helmets. (c) Protection against toxic preserva-
Hand shields to protect the welder tive coatings: (1) In enclosed spaces, all
against flashes and radiant energy surfaces covered with toxic preserva-
shall be used when either the helmet is tives shall be stripped of all toxic coat-
lifted or the shield is removed. ings for a distance of at least 4 inches
(iii) Welders and other employees from the area of heat application, or
who are exposed to radiation shall be the employees shall be protected by air
suitably protected so that the skin is line respirators, meeting the require-
covered completely to prevent burns ments of subpart E of this part.
and other damage by ultraviolet rays. (2) In the open air, employees shall be
Welding helmets and hand shields shall protected by a respirator, in accord-
be free of leaks and openings, and free ance with requirements of subpart E of
of highly reflective surfaces. this part.
(iv) When inert-gas metal-arc weld- (d) The preservative coatings shall be
ing is being performed on stainless removed a sufficient distance from the
steel, the requirements of paragraph area to be heated to ensure that the
(c)(2) of this section shall be met to temperature of the unstripped metal
protect against dangerous concentra- will not be appreciably raised. Artifi-
tions of nitrogen dioxide. cial cooling of the metal surrounding
(e) General welding, cutting, and heat- the heating area may be used to limit
ing. (1) Welding, cutting, and heating, the size of the area required to be
not involving conditions or materials cleaned.
described in paragraph (b), (c), or (d) of
this section, may normally be done Subpart KElectrical
without mechanical ventilation or res-
piratory protective equipment, but
AUTHORITY: Sections 6 and 8 of the Occupa-
where, because of unusual physical or
tional Safety and Health Act of 1970 (29
atmospheric conditions, an unsafe ac- U.S.C. 655 and 657); sec. 107, Contract Work
cumulation of contaminants exists, Hours and Safety Standards Act (40 U.S.C.
suitable mechanical ventilation or res- 333); Secretary of Labors Order No. 983 (48
piratory protective equipment shall be FR 35736) or 190 (55 FR 9033), as applicable;
provided. 29 CFR part 1911.
(2) Employees performing any type of SOURCE: 51 FR 25318, July 11, 1986, unless
welding, cutting, or heating shall be otherwise noted.
protected by suitable eye protective
equipment in accordance with the re- GENERAL
quirements of subpart E of this part.
1926.400 Introduction.
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
1979, as amended at 55 FR 42328, Oct. 18, 1990; This subpart addresses electrical
58 FR 35179, June 30, 1993] safety requirements that are necessary
for the practical safeguarding of em-
1926.354 Welding, cutting, and heat- ployees involved in construction work
ing in way of preservative coatings. and is divided into four major divisions
(a) Before welding, cutting, or heat- and applicable definitions as follows:
ing is commenced on any surface cov- (a) Installation safety requirements. In-
ered by a preservative coating whose stallation safety requirements are con-
flammability is not known, a test shall tained in 1926.402 through 1926.408. In-
be made by a competent person to de- cluded in this category are electric
termine its flammability. Preservative equipment and installations used to
coatings shall be considered to be high- provide electric power and light on
ly flammable when scrapings burn with jobsites.
extreme rapidity. (b) Safety-related work practices. Safe-
(b) Precautions shall be taken to pre- ty-related work practices are contained
vent ignition of highly flammable in 1926.416 and 1926.417. In addition to
hardened preservative coatings. When covering the hazards arising from the
coatings are determined to be highly use of electricity at jobsites, these reg-
flammable, they shall be stripped from ulations also cover the hazards arising

246

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00256 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.403

from the accidental contact, direct or (b) Examination, installation, and use
indirect, by employees with all ener- of equipment(1) Examination. The em-
gized lines, above or below ground, ployer shall ensure that electrical
passing through or near the jobsite. equipment is free from recognized haz-
(c) Safety-related maintenance and en- ards that are likely to cause death or
vironmental considerations. Safety-re- serious physical harm to employees.
lated maintenance and environmental Safety of equipment shall be deter-
considerations are contained in mined on the basis of the following
1926.431 and 1926.432. considerations:
(d) Safety requirements for special (i) Suitability for installation and
equipment. Safety requirements for spe- use in conformity with the provisions
cial equipment are contained in of this subpart. Suitability of equip-
1926.441. ment for an identified purpose may be
(e) Definitions. Definitions applicable evidenced by listing, labeling, or cer-
to this subpart are contained in tification for that identified purpose.
1926.449. (ii) Mechanical strength and dura-
bility, including, for parts designed to
1926.401 [Reserved] enclose and protect other equipment,
the adequacy of the protection thus
INSTALLATION SAFETY REQUIREMENTS provided.
(iii) Electrical insulation.
1926.402 Applicability. (iv) Heating effects under conditions
(a) Covered. Sections 1926.402 through of use.
1926.408 contain installation safety re- (v) Arcing effects.
quirements for electrical equipment (vi) Classification by type, size, volt-
and installations used to provide elec- age, current capacity, specific use.
tric power and light at the jobsite. (vii) Other factors which contribute
These sections apply to installations, to the practical safeguarding of em-
both temporary and permanent, used ployees using or likely to come in con-
on the jobsite; but these sections do tact with the equipment.
not apply to existing permanent instal- (2) Installation and use. Listed, la-
lations that were in place before the beled, or certified equipment shall be
construction activity commenced. installed and used in accordance with
instructions included in the listing, la-
NOTE: If the electrical installation is made beling, or certification.
in accordance with the National Electrical (c) Interrupting rating. Equipment in-
Code ANSI/NFPA 701984, exclusive of For- tended to break current shall have an
mal Interpretations and Tentative Interim interrupting rating at system voltage
Amendments, it will be deemed to be in com-
pliance with 1926.403 through 1926.408, ex-
sufficient for the current that must be
cept for 1926.404(b)(1) and 1926.405(a)(2)(ii) interrupted.
(E), (F), (G), and (J). (d) Mounting and cooling of equip-
ment(1) Mounting. Electric equipment
(b) Not covered. Sections 1926.402 shall be firmly secured to the surface
through 1926.408 do not cover installa- on which it is mounted. Wooden plugs
tions used for the generation, trans- driven into holes in masonry, concrete,
mission, and distribution of electric plaster, or similar materials shall not
energy, including related communica- be used.
tion, metering, control, and trans- (2) Cooling. Electrical equipment
formation installations. (However, which depends upon the natural cir-
these regulations do cover portable and culation of air and convection prin-
vehicle-mounted generators used to ciples for cooling of exposed surfaces
provide power for equipment used at shall be installed so that room air flow
the jobsite.) See subpart V of this part over such surfaces is not prevented by
for the construction of power distribu- walls or by adjacent installed equip-
tion and transmission lines. ment. For equipment designed for floor
mounting, clearance between top sur-
1926.403 General requirements. faces and adjacent surfaces shall be
(a) Approval. All electrical conduc- provided to dissipate rising warm air.
tors and equipment shall be approved. Electrical equipment provided with

247

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00257 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.403 29 CFR Ch. XVII (7112 Edition)

ventilating openings shall be installed (i) Working clearances. Except as re-


so that walls or other obstructions do quired or permitted elsewhere in this
not prevent the free circulation of air subpart, the dimension of the working
through the equipment. space in the direction of access to live
(e) Splices. Conductors shall be parts operating at 600 volts or less and
spliced or joined with splicing devices likely to require examination, adjust-
designed for the use or by brazing, ment, servicing, or maintenance while
welding, or soldering with a fusible alive shall not be less than indicated in
metal or alloy. Soldered splices shall Table K1. In addition to the dimen-
first be so spliced or joined as to be me- sions shown in Table K1, workspace
chanically and electrically secure shall not be less than 30 inches (762
without solder and then soldered. All mm) wide in front of the electric equip-
splices and joints and the free ends of ment. Distances shall be measured
conductors shall be covered with an in- from the live parts if they are exposed,
sulation equivalent to that of the con- or from the enclosure front or opening
ductors or with an insulating device if the live parts are enclosed. Walls
designed for the purpose. constructed of concrete, brick, or tile
(f) Arcing parts. Parts of electric are considered to be grounded. Working
equipment which in ordinary operation space is not required in back of assem-
produce arcs, sparks, flames, or molten blies such as dead-front switchboards
metal shall be enclosed or separated or motor control centers where there
and isolated from all combustible ma- are no renewable or adjustable parts
terial. such as fuses or switches on the back
(g) Marking. Electrical equipment and where all connections are acces-
shall not be used unless the manufac- sible from locations other than the
turers name, trademark, or other de- back.
scriptive marking by which the organi-
zation responsible for the product may TABLE K1WORKING CLEARANCES
be identified is placed on the equip- Minimum clear distance
ment and unless other markings are Nominal voltage to ground for conditions 1
provided giving voltage, current, watt- (a) (b) (c)
age, or other ratings as necessary. The
marking shall be of sufficient dura- Feet 2 Feet 2 Feet 2
0150 ......................................... 3 3 3
bility to withstand the environment in-
151600 ..................................... 3 312 4
volved.
1 Conditions (a), (b), and (c) are as follows: (a) Exposed live
(h) Identification of disconnecting parts on one side and no live or grounded parts on the other
means and circuits. Each disconnecting side of the working space, or exposed live parts on both sides
means required by this subpart for mo- effectively guarded by insulating material. Insulated wire or in-
sulated busbars operating at not over 300 volts are not con-
tors and appliances shall be legibly sidered live parts. (b) Exposed live parts on one side and
marked to indicate its purpose, unless grounded parts on the other side. (c) Exposed live parts on
both sides of the workspace [not guarded as provided in Con-
located and arranged so the purpose is dition (a)] with the operator between.
2 Note: For International System of Units (SI): one
evident. Each service, feeder, and foot=0.3048m.
branch circuit, at its disconnecting
means or overcurrent device, shall be (ii) Clear spaces. Working space re-
legibly marked to indicate its purpose, quired by this subpart shall not be used
unless located and arranged so the pur- for storage. When normally enclosed
pose is evident. These markings shall live parts are exposed for inspection or
be of sufficient durability to withstand servicing, the working space, if in a
the environment involved. passageway or general open space,
(i) 600 Volts, nominal, or less. This shall be guarded.
paragraph applies to equipment oper- (iii) Access and entrance to working
ating at 600 volts, nominal, or less. space. At least one entrance shall be
(1) Working space about electric equip- provided to give access to the working
ment. Sufficient access and working space about electric equipment.
space shall be provided and maintained (iv) Front working space. Where there
about all electric equipment to permit are live parts normally exposed on the
ready and safe operation and mainte- front of switchboards or motor control
nance of such equipment. centers, the working space in front of

248

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00258 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.403

such equipment shall not be less than 3 by a wall, screen, or fence, access to
feet (914 mm). which is controlled by lock and key or
(v) Headroom. The minimum head- other equivalent means, are considered
room of working spaces about service to be accessible to qualified persons
equipment, switchboards, panelboards, only. A wall, screen, or fence less than
or motor control centers shall be 6 feet 8 feet (2.44 m) in height is not consid-
3 inches (1.91 m). ered adequate to prevent access unless
(2) Guarding of live parts. (i) Except as it has other features that provide a de-
required or permitted elsewhere in this gree of isolation equivalent to an 8-foot
subpart, live parts of electric equip- (2.44-m) fence. The entrances to all
ment operating at 50 volts or more buildings, rooms or enclosures con-
shall be guarded against accidental taining exposed live parts or exposed
contact by cabinets or other forms of conductors operating at over 600 volts,
enclosures, or by any of the following nominal, shall be kept locked or shall
means: be under the observation of a qualified
(A) By location in a room, vault, or person at all times.
similar enclosure that is accessible (i) Installations accessible to qualified
only to qualified persons. persons only. Electrical installations
(B) By partitions or screens so ar- having exposed live parts shall be ac-
ranged that only qualified persons will cessible to qualified persons only and
have access to the space within reach shall comply with the applicable provi-
of the live parts. Any openings in such sions of paragraph (j)(3) of this section.
partitions or screens shall be so sized
(ii) Installations accessible to unquali-
and located that persons are not likely
fied persons. Electrical installations
to come into accidental contact with
that are open to unqualified persons
the live parts or to bring conducting
shall be made with metal-enclosed
objects into contact with them.
equipment or shall be enclosed in a
(C) By location on a balcony, gallery,
vault or in an area, access to which is
or platform so elevated and arranged as
controlled by a lock. Metal-enclosed
to exclude unqualified persons.
switchgear, unit substations, trans-
(D) By elevation of 8 feet (2.44 m) or
formers, pull boxes, connection boxes,
more above the floor or other working
and other similar associated equipment
surface and so installed as to exclude
unqualified persons. shall be marked with appropriate cau-
(ii) In locations where electric equip- tion signs. If equipment is exposed to
ment would be exposed to physical physical damage from vehicular traffic,
damage, enclosures or guards shall be guards shall be provided to prevent
so arranged and of such strength as to such damage. Ventilating or similar
prevent such damage. openings in metal-enclosed equipment
(iii) Entrances to rooms and other shall be designed so that foreign ob-
guarded locations containing exposed jects inserted through these openings
live parts shall be marked with con- will be deflected from energized parts.
spicuous warning signs forbidding un- (3) Workspace about equipment. Suffi-
qualified persons to enter. cient space shall be provided and main-
(j) Over 600 volts, nominal(1) General. tained about electric equipment to per-
Conductors and equipment used on cir- mit ready and safe operation and main-
cuits exceeding 600 volts, nominal, tenance of such equipment. Where en-
shall comply with all applicable provi- ergized parts are exposed, the min-
sions of paragraphs (a) through (g) of imum clear workspace shall not be less
this section and with the following pro- than 6 feet 6 inches (1.98 m) high (meas-
visions which supplement or modify ured vertically from the floor or plat-
those requirements. The provisions of form), or less than 3 feet (914 mm) wide
paragraphs (j)(2), (j)(3), and (j)(4) of this (measured parallel to the equipment).
section do not apply to equipment on The depth shall be as required in Table
the supply side of the service conduc- K2. The workspace shall be adequate
tors. to permit at least a 90-degree opening
(2) Enclosure for electrical installations. of doors or hinged panels.
Electrical installations in a vault, (i) Working space. The minimum clear
room, closet or in an area surrounded working space in front of electric

249

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00259 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.404 29 CFR Ch. XVII (7112 Edition)

equipment such as switchboards, con- TABLE K3ELEVATION OF UNGUARDED


trol panels, switches, circuit breakers, ENERGIZED PARTS ABOVE WORKING SPACE
motor controllers, relays, and similar
Nominal voltage between
equipment shall not be less than speci- phases Minimum elevation
fied in Table K2 unless otherwise spec-
6017,500 .............................. 8 feet 6 inches. 1
ified in this subpart. Distances shall be 7,50135,000 ......................... 9 feet.
measured from the live parts if they Over 35kV .............................. 9 feet+0.37 inches per kV
are exposed, or from the enclosure above 35kV.
front or opening if the live parts are 1 NOTE: For SI units: one inch=25.4 mm; one foot=0.3048
enclosed. However, working space is m.
not required in back of equipment such (4) Entrance and access to workspace.
as deadfront switchboards or control At least one entrance not less than 24
assemblies where there are no renew- inches (610 mm) wide and 6 feet 6 inches
able or adjustable parts (such as fuses (1.98 m) high shall be provided to give
or switches) on the back and where all access to the working space about elec-
connections are accessible from loca- tric equipment. On switchboard and
tions other than the back. Where rear control panels exceeding 48 inches (1.22
access is required to work on de-ener- m) in width, there shall be one en-
gized parts on the back of enclosed trance at each end of such board where
equipment, a minimum working space practicable. Where bare energized parts
of 30 inches (762 mm) horizontally shall at any voltage or insulated energized
be provided. parts above 600 volts are located adja-
cent to such entrance, they shall be
TABLE K2MINIMUM DEPTH OF CLEAR WORK- guarded.
ING SPACE IN FRONT OF ELECTRIC EQUIP-
MENT [51 FR 25318, July 11, 1986, as amended at 61
FR 5510, Feb. 13, 1996]
Conditions 1
Nominal voltage to ground 1926.404 Wiring design and protec-
(a) (b) (c) tion.
Feet 2 Feet 2 Feet 2 (a) Use and identification of grounded
601 to 2,500 .............................. 3 4 5 and grounding conductors(1) Identifica-
2,501 to 9,000 ........................... 4 5 6 tion of conductors. A conductor used as
9,001 to 25,000 ......................... 5 6 9 a grounded conductor shall be identifi-
25,001 to 75 kV ......................... 6 8 10
Above 75kV ............................... 8 10 12
able and distinguishable from all other
conductors. A conductor used as an
1Conditions (a), (b), and (c) are as follows: (a) Exposed live
parts on one side and no live or grounded parts on the other
equipment grounding conductor shall
side of the working space, or exposed live parts on both sides be identifiable and distinguishable
effectively guarded by insulating materials. Insulated wire or from all other conductors.
insulated busbars operating at not over 300 volts are not con-
sidered live parts. (b) Exposed live parts on one side and (2) Polarity of connections. No ground-
grounded parts on the other side. Walls constructed of con- ed conductor shall be attached to any
crete, brick, or tile are considered to be grounded surfaces.
(c) Exposed live parts on both sides of the workspace [not terminal or lead so as to reverse des-
guarded as provided in Condition (a)] with the operator be- ignated polarity.
tween.
2 NOTE: For SI units: one foot=0.3048 m. (3) Use of grounding terminals and de-
vices. A grounding terminal or ground-
(ii) Lighting outlets and points of con- ing-type device on a receptacle, cord
trol. The lighting outlets shall be so ar- connector, or attachment plug shall
ranged that persons changing lamps or not be used for purposes other than
making repairs on the lighting system grounding.
will not be endangered by live parts or (b) Branch circuits(1) Ground-fault
other equipment. The points of control protection(i) General. The employer
shall be so located that persons are not shall use either ground fault circuit in-
likely to come in contact with any live terrupters as specified in paragraph
part or moving part of the equipment (b)(1)(ii) of this section or an assured
while turning on the lights. equipment grounding conductor pro-
(iii) Elevation of unguarded live parts. gram as specified in paragraph
Unguarded live parts above working (b)(1)(iii) of this section to protect em-
space shall be maintained at elevations ployees on construction sites. These re-
not less than specified in Table K3. quirements are in addition to any

250

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00260 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.404

other requirements for equipment (1) All equipment grounding conduc-


grounding conductors. tors shall be tested for continuity and
(ii) Ground-fault circuit interrupters. shall be electrically continuous.
All 120-volt, single-phase, 15- and 20- (2) Each receptacle and attachment
ampere receptacle outlets on construc- cap or plug shall be tested for correct
tion sites, which are not a part of the attachment of the equipment ground-
permanent wiring of the building or ing conductor. The equipment ground-
structure and which are in use by em- ing conductor shall be connected to its
ployees, shall have approved ground- proper terminal.
fault circuit interrupters for personnel (E) All required tests shall be per-
protection. Receptacles on a two-wire, formed:
single-phase portable or vehicle- (1) Before first use;
mounted generator rated not more (2) Before equipment is returned to
than 5kW, where the circuit conductors service following any repairs;
of the generator are insulated from the (3) Before equipment is used after
generator frame and all other grounded any incident which can be reasonably
surfaces, need not be protected with suspected to have caused damage (for
ground-fault circuit interrupters. example, when a cord set is run over);
(iii) Assured equipment grounding con- and
ductor program. The employer shall es- (4) At intervals not to exceed 3
tablish and implement an assured months, except that cord sets and re-
equipment grounding conductor pro- ceptacles which are fixed and not ex-
gram on construction sites covering all posed to damage shall be tested at in-
cord sets, receptacles which are not a tervals not exceeding 6 months.
part of the building or structure, and (F) The employer shall not make
equipment connected by cord and plug available or permit the use by employ-
which are available for use or used by ees of any equipment which has not
employees. This program shall comply met the requirements of this paragraph
with the following minimum require- (b)(1)(iii) of this section.
ments: (G) Tests performed as required in
(A) A written description of the pro- this paragraph shall be recorded. This
gram, including the specific procedures test record shall identify each recep-
adopted by the employer, shall be tacle, cord set, and cord- and plug-con-
available at the jobsite for inspection nected equipment that passed the test
and copying by the Assistant Secretary and shall indicate the last date it was
and any affected employee. tested or the interval for which it was
(B) The employer shall designate one tested. This record shall be kept by
or more competent persons (as defined means of logs, color coding, or other ef-
in 1926.32(f)) to implement the pro- fective means and shall be maintained
gram. until replaced by a more current
(C) Each cord set, attachment cap, record. The record shall be made avail-
plug and receptacle of cord sets, and able on the jobsite for inspection by
any equipment connected by cord and the Assistant Secretary and any af-
plug, except cord sets and receptacles fected employee.
which are fixed and not exposed to (2) Outlet devices. Outlet devices shall
damage, shall be visually inspected be- have an ampere rating not less than
fore each days use for external defects, the load to be served and shall comply
such as deformed or missing pins or in- with the following:
sulation damage, and for indications of (i) Single receptacles. A single recep-
possible internal damage. Equipment tacle installed on an individual branch
found damaged or defective shall not circuit shall have an ampere rating of
be used until repaired. not less than that of the branch cir-
(D) The following tests shall be per- cuit.
formed on all cord sets, receptacles (ii) Two or more receptacles. Where
which are not a part of the permanent connected to a branch circuit sup-
wiring of the building or structure, and plying two or more receptacles or out-
cord- and plug-connected equipment re- lets, receptacle ratings shall conform
quired to be grounded: to the values listed in Table K4.

251

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00261 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.404 29 CFR Ch. XVII (7112 Edition)

(iii) Receptacles used for the connection least 3 feet (914 mm) from windows,
of motors. The rating of an attachment doors, fire escapes, or similar loca-
plug or receptacle used for cord- and tions. Conductors run above the top
plug-connection of a motor to a branch level of a window are considered to be
circuit shall not exceed 15 amperes at out of reach from that window and,
125 volts or 10 amperes at 250 volts if therefore, do not have to be 3 feet (914
individual overload protection is omit- mm) away.
ted. (iv) Clearance over roofs. Conductors
TABLE K4RECEPTACLE RATINGS FOR above roof space accessible to employ-
VARIOUS SIZE CIRCUITS ees on foot shall have a clearance from
the highest point of the roof surface of
Receptacle not less than 8 feet (2.44 m) vertical
Circuit rating amperes rating amperes
clearance for insulated conductors, not
15 ................................................................... Not over 15. less than 10 feet (3.05 m) vertical or di-
20 ................................................................... 15 or 20.
30 ................................................................... 30.
agonal clearance for covered conduc-
40 ................................................................... 40 or 50. tors, and not less than 15 feet (4.57 m)
50 ................................................................... 50. for bare conductors, except that:
(A) Where the roof space is also ac-
(c) Outside conductors and lamps(1) cessible to vehicular traffic, the
600 volts, nominal, or less. Paragraphs
vertical clearance shall not be less
(c)(1)(i) through (c)(1)(iv) of this sec-
than 18 feet (5.49 m), or
tion apply to branch circuit, feeder,
and service conductors rated 600 volts, (B) Where the roof space is not nor-
nominal, or less and run outdoors as mally accessible to employees on foot,
open conductors. fully insulated conductors shall have a
(i) Conductors on poles. Conductors vertical or diagonal clearance of not
supported on poles shall provide a hori- less than 3 feet (914 mm), or
zontal climbing space not less than the (C) Where the voltage between con-
following: ductors is 300 volts or less and the roof
(A) Power conductors below commu- has a slope of not less than 4 inches (102
nication conductors30 inches (762 mm) in 12 inches (305 mm), the clear-
mm) . ance from roofs shall be at least 3 feet
(B) Power conductors alone or above (914 mm), or
communication conductors: 300 volts or (D) Where the voltage between con-
less24 inches (610 mm); more than 300 ductors is 300 volts or less and the con-
volts30 inches (762 mm). ductors do not pass over more than 4
(C) Communication conductors below feet (1.22 m) of the overhang portion of
power conductors: with power conduc- the roof and they are terminated at a
tors 300 volts or less24 inches (610 through-the-roof raceway or support,
mm); more than 300 volts30 inches the clearance from roofs shall be at
(762 mm). least 18 inches (457 mm).
(ii) Clearance from ground. Open con-
(2) Location of outdoor lamps. Lamps
ductors shall conform to the following
for outdoor lighting shall be located
minimum clearances:
(A) 10 feet (3.05 m)above finished below all live conductors, trans-
grade, sidewalks, or from any platform formers, or other electric equipment,
or projection from which they might be unless such equipment is controlled by
reached. a disconnecting means that can be
(B) 12 feet (3.66 m)over areas sub- locked in the open position or unless
ject to vehicular traffic other than adequate clearances or other safe-
truck traffic. guards are provided for relamping oper-
(C) 15 feet (4.57 m)over areas other ations.
than those specified in paragraph (d) Services(1) Disconnecting means
(c)(1)(ii)(D) of this section that are sub- (i) General. Means shall be provided to
ject to truck traffic. disconnect all conductors in a building
(D) 18 feet (5.49 m)over public or other structure from the service-en-
streets, alleys, roads, and driveways. trance conductors. The disconnecting
(iii) Clearance from building openings. means shall plainly indicate whether it
Conductors shall have a clearance of at is in the open or closed position and

252

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00262 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.404

shall be installed at a readily acces- (v) Arcing or suddenly moving parts.


sible location nearest the point of en- Fuses and circuit breakers shall be so
trance of the service-entrance conduc- located or shielded that employees will
tors. not be burned or otherwise injured by
(ii) Simultaneous opening of poles. their operation.
Each service disconnecting means shall (vi) Circuit breakers(A) Circuit
simultaneously disconnect all breakers shall clearly indicate whether
ungrounded conductors. they are in the open (off) or closed (on)
(2) Services over 600 volts, nominal. The position.
following additional requirements (B) Where circuit breaker handles on
apply to services over 600 volts, nomi- switchboards are operated vertically
nal. rather than horizontally or
(i) Guarding. Service-entrance con- rotationally, the up position of the
ductors installed as open wires shall be handle shall be the closed (on) position.
guarded to make them accessible only (C) If used as switches in 120-volt, flu-
to qualified persons. orescent lighting circuits, circuit
(ii) Warning signs. Signs warning of breakers shall be marked SWD.
high voltage shall be posted where un- (2) Over 600 volts, nominal. Feeders
authorized employees might come in and branch circuits over 600 volts,
contact with live parts. nominal, shall have short-circuit pro-
(e) Overcurrent protection(1) 600 tection.
volts, nominal, or less. The following re- (f) Grounding. Paragraphs (f)(1)
quirements apply to overcurrent pro- through (f)(11) of this section contain
tection of circuits rated 600 volts, grounding requirements for systems,
nominal, or less. circuits, and equipment.
(i) Protection of conductors and equip- (1) Systems to be grounded. The fol-
ment. Conductors and equipment shall lowing systems which supply premises
be protected from overcurrent in ac- wiring shall be grounded:
cordance with their ability to safely (i) Three-wire DC systems. All 3-wire
conduct current. Conductors shall have DC systems shall have their neutral
sufficient ampacity to carry the load. conductor grounded.
(ii) Grounded conductors. Except for (ii) Two-wire DC systems. Two-wire DC
motor-running overload protection, systems operating at over 50 volts
overcurrent devices shall not interrupt through 300 volts between conductors
the continuity of the grounded con- shall be grounded unless they are rec-
ductor unless all conductors of the cir- tifier-derived from an AC system com-
cuit are opened simultaneously. plying with paragraphs (f)(1)(iii),
(iii) Disconnection of fuses and thermal (f)(1)(iv), and (f)(1)(v) of this section.
cutouts. Except for devices provided for (iii) AC circuits, less than 50 volts. AC
current-limiting on the supply side of circuits of less than 50 volts shall be
the service disconnecting means, all grounded if they are installed as over-
cartridge fuses which are accessible to head conductors outside of buildings or
other than qualified persons and all if they are supplied by transformers
fuses and thermal cutouts on circuits and the transformer primary supply
over 150 volts to ground shall be pro- system is ungrounded or exceeds 150
vided with disconnecting means. This volts to ground.
disconnecting means shall be installed (iv) AC systems, 50 volts to 1000 volts.
so that the fuse or thermal cutout can AC systems of 50 volts to 1000 volts
be disconnected from its supply with- shall be grounded under any of the fol-
out disrupting service to equipment lowing conditions, unless exempted by
and circuits unrelated to those pro- paragraph (f)(1)(v) of this section:
tected by the overcurrent device. (A) If the system can be so grounded
(iv) Location in or on premises. Over- that the maximum voltage to ground
current devices shall be readily acces- on the ungrounded conductors does not
sible. Overcurrent devices shall not be exceed 150 volts;
located where they could create an em- (B) If the system is nominally rated
ployee safety hazard by being exposed 480Y/277 volt, 3-phase, 4-wire in which
to physical damage or located in the the neutral is used as a circuit con-
vicinity of easily ignitible material. ductor;

253

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00263 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.404 29 CFR Ch. XVII (7112 Edition)

(C) If the system is nominally rated (B) The generator supplies only
240/120 volt, 3-phase, 4-wire in which equipment located on the vehicle and/
the midpoint of one phase is used as a or cord- and plug-connected equipment
circuit conductor; or through receptacles mounted on the
(D) If a service conductor is vehicle or on the generator, and
uninsulated. (C) The noncurrent-carrying metal
(v) Exceptions. AC systems of 50 volts parts of equipment and the equipment
to 1000 volts are not required to be grounding conductor terminals of the
grounded if the system is separately receptacles are bonded to the generator
derived and is supplied by a trans- frame, and
former that has a primary voltage rat- (D) The system complies with all
ing less than 1000 volts, provided all of other provisions of this section.
the following conditions are met: (iii) Neutral conductor bonding. A neu-
(A) The system is used exclusively tral conductor shall be bonded to the
for control circuits, generator frame if the generator is a
(B) The conditions of maintenance component of a separately derived sys-
and supervision assure that only quali- tem. No other conductor need be bond-
fied persons will service the installa- ed to the generator frame.
tion, (4) Conductors to be grounded. For AC
(C) Continuity of control power is re- premises wiring systems the identified
quired, and conductor shall be grounded.
(D) Ground detectors are installed on (5) Grounding connections(i) Ground-
the control system. ed system. For a grounded system, a
(2) Separately derived systems. Where grounding electrode conductor shall be
paragraph (f)(1) of this section requires used to connect both the equipment
grounding of wiring systems whose grounding conductor and the grounded
power is derived from generator, trans- circuit conductor to the grounding
former, or converter windings and has electrode. Both the equipment ground-
no direct electrical connection, includ- ing conductor and the grounding elec-
ing a solidly connected grounded cir- trode conductor shall be connected to
cuit conductor, to supply conductors the grounded circuit conductor on the
originating in another system, para- supply side of the service disconnecting
graph (f)(5) of this section shall also means, or on the supply side of the sys-
apply. tem disconnecting means or overcur-
(3) Portable and vehicle-mounted gen- rent devices if the system is separately
erators(i) Portable generators. Under derived.
the following conditions, the frame of a (ii) Ungrounded systems. For an
portable generator need not be ground- ungrounded service-supplied system,
ed and may serve as the grounding the equipment grounding conductor
electrode for a system supplied by the shall be connected to the grounding
generator: electrode conductor at the service
(A) The generator supplies only equipment. For an ungrounded sepa-
equipment mounted on the generator rately derived system, the equipment
and/or cord- and plug-connected equip- grounding conductor shall be con-
ment through receptacles mounted on nected to the grounding electrode con-
the generator, and ductor at, or ahead of, the system dis-
(B) The noncurrent-carrying metal connecting means or overcurrent de-
parts of equipment and the equipment vices.
grounding conductor terminals of the (6) Grounding path. The path to
receptacles are bonded to the generator ground from circuits, equipment, and
frame. enclosures shall be permanent and con-
(ii) Vehicle-mounted generators. Under tinuous.
the following conditions the frame of a (7) Supports, enclosures, and equipment
vehicle may serve as the grounding to be grounded(i) Supports and enclo-
electrode for a system supplied by a sures for conductors. Metal cable trays,
generator located on the vehicle: metal raceways, and metal enclosures
(A) The frame of the generator is for conductors shall be grounded, ex-
bonded to the vehicle frame, and cept that:

254

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00264 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.404

(A) Metal enclosures such as sleeves posed noncurrent-carrying metal parts


that are used to protect cable assem- of cord- and plug-connected equipment
blies from physical damage need not be which may become energized shall be
grounded; and grounded:
(B) Metal enclosures for conductors (A) If in a hazardous (classified) loca-
added to existing installations of open tion (see 1926.407).
wire, knob-and-tube wiring, and non- (B) If operated at over 150 volts to
metallic-sheathed cable need not be ground, except for guarded motors and
grounded if all of the following condi- metal frames of electrically heated ap-
tions are met: pliances if the appliance frames are
(1) Runs are less than 25 feet (7.62 m); permanently and effectively insulated
(2) Enclosures are free from probable from ground.
contact with ground, grounded metal, (C) If the equipment is one of the
metal laths, or other conductive mate- types listed in paragraphs
rials; and (f)(7)(iv)(C)(1) through (f)(7)(iv)(C)(5) of
(3) Enclosures are guarded against this section. However, even though the
employee contact. equipment may be one of these types,
(ii) Service equipment enclosures. Metal it need not be grounded if it is exempt-
enclosures for service equipment shall ed by paragraph (f)(7)(iv)(C)(6).
be grounded. (1) Hand held motor-operated tools;
(iii) Fixed equipment. Exposed noncur- (2) Cord- and plug-connected equip-
rent-carrying metal parts of fixed ment used in damp or wet locations or
equipment which may become ener- by employees standing on the ground
gized shall be grounded under any of or on metal floors or working inside of
the following conditions: metal tanks or boilers;
(A) If within 8 feet (2.44 m) vertically (3) Portable and mobile X-ray and as-
or 5 feet (1.52 m) horizontally of ground sociated equipment;
or grounded metal objects and subject (4) Tools likely to be used in wet and/
to employee contact. or conductive locations; and
(B) If located in a wet or damp loca- (5) Portable hand lamps.
tion and subject to employee contact. (6) Tools likely to be used in wet and/
(C) If in electrical contact with or conductive locations need not be
metal. grounded if supplied through an iso-
(D) If in a hazardous (classified) loca- lating transformer with an ungrounded
tion. secondary of not over 50 volts. Listed
(E) If supplied by a metal-clad, or labeled portable tools and appli-
metal-sheathed, or grounded metal ances protected by a system of double
raceway wiring method. insulation, or its equivalent, need not
(F) If equipment operates with any be grounded. If such a system is em-
terminal at over 150 volts to ground; ployed, the equipment shall be distinc-
however, the following need not be tively marked to indicate that the tool
grounded: or appliance utilizes a system of double
(1) Enclosures for switches or circuit insulation.
breakers used for other than service (v) Nonelectrical equipment. The metal
equipment and accessible to qualified parts of the following nonelectrical
persons only; equipment shall be grounded: Frames
(2) Metal frames of electrically heat- and tracks of electrically operated
ed appliances which are permanently cranes; frames of nonelectrically driv-
and effectively insulated from ground; en elevator cars to which electric con-
and ductors are attached; hand-operated
(3) The cases of distribution appa- metal shifting ropes or cables of elec-
ratus such as transformers and capaci- tric elevators, and metal partitions,
tors mounted on wooden poles at a grill work, and similar metal enclo-
height exceeding 8 feet (2.44 m) above sures around equipment of over IkV be-
ground or grade level. tween conductors.
(iv) Equipment connected by cord and (8) Methods of grounding equipment
plug. Under any of the conditions de- (i) With circuit conductors. Noncurrent-
scribed in paragraphs (f)(7)(iv)(A) carrying metal parts of fixed equip-
through (f)(7)(iv)(C) of this section, ex- ment, if required to be grounded by

255

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00265 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.405 29 CFR Ch. XVII (7112 Edition)

this subpart, shall be grounded by an (A) Portable and mobile high voltage
equipment grounding conductor which equipment shall be supplied from a sys-
is contained within the same raceway, tem having its neutral grounded
cable, or cord, or runs with or encloses through an impedance. If a delta-con-
the circuit conductors. For DC circuits nected high voltage system is used to
only, the equipment grounding con- supply the equipment, a system neu-
ductor may be run separately from the tral shall be derived.
circuit conductors. (B) Exposed noncurrent-carrying
(ii) Grounding conductor. A conductor metal parts of portable and mobile
used for grounding fixed or movable equipment shall be connected by an
equipment shall have capacity to con- equipment grounding conductor to the
duct safely any fault current which point at which the system neutral im-
may be imposed on it. pedance is grounded.
(iii) Equipment considered effectively (C) Ground-fault detection and relay-
grounded. Electric equipment is consid- ing shall be provided to automatically
ered to be effectively grounded if it is de-energize any high voltage system
secured to, and in electrical contact component which has developed a
with, a metal rack or structure that is ground fault. The continuity of the
provided for its support and the metal equipment grounding conductor shall
rack or structure is grounded by the be continuously monitored so as to de-
method specified for the noncurrent- energize automatically the high volt-
carrying metal parts of fixed equip- age feeder to the portable equipment
ment in paragraph (f)(8)(i) of this sec- upon loss of continuity of the equip-
tion. Metal car frames supported by ment grounding conductor.
metal hoisting cables attached to or (D) The grounding electrode to which
running over metal sheaves or drums of the portable or mobile equipment sys-
grounded elevator machines are also tem neutral impedance is connected
considered to be effectively grounded. shall be isolated from and separated in
(9) Bonding. If bonding conductors are the ground by at least 20 feet (6.1 m)
used to assure electrical continuity, from any other system or equipment
they shall have the capacity to conduct grounding electrode, and there shall be
any fault current which may be im- no direct connection between the
posed. grounding electrodes, such as buried
(10) Made electrodes. If made elec- pipe, fence or like objects.
trodes are used, they shall be free from (iii) Grounding of equipment. All non-
nonconductive coatings, such as paint current-carrying metal parts of port-
or enamel; and, if practicable, they able equipment and fixed equipment in-
shall be embedded below permanent cluding their associated fences,
moisture level. A single electrode con- housings, enclosures, and supporting
sisting of a rod, pipe or plate which has structures shall be grounded. However,
a resistance to ground greater than 25 equipment which is guarded by loca-
ohms shall be augmented by one addi- tion and isolated from ground need not
tional electrode installed no closer be grounded. Additionally, pole-mount-
than 6 feet (1.83 m) to the first elec- ed distribution apparatus at a height
trode. exceeding 8 feet (2.44 m) above ground
(11) Grounding of systems and circuits or grade level need not be grounded.
of 1000 volts and over (high voltage)(i) [51 FR 25318, July 11, 1986, as amended at 54
General. If high voltage systems are FR 24334, June 7, 1989; 61 FR 5510, Feb. 13,
grounded, they shall comply with all 1996]
applicable provisions of paragraphs
(f)(1) through (f)(10) of this section as 1926.405 Wiring methods, compo-
supplemented and modified by this nents, and equipment for general
paragraph (f)(11). use.
(ii) Grounding of systems supplying (a) Wiring methods. The provisions of
portable or mobile equipment. Systems this paragraph do not apply to conduc-
supplying portable or mobile high volt- tors which form an integral part of
age equipment, other than substations equipment such as motors, controllers,
installed on a temporary basis, shall motor control centers and like equip-
comply with the following: ment.

256

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00266 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.405

(1) General requirements(i) Electrical (C) Receptacles shall be of the


continuity of metal raceways and enclo- grounding type. Unless installed in a
sures. Metal raceways, cable armor, and complete metallic raceway, each
other metal enclosures for conductors branch circuit shall contain a separate
shall be metallically joined together equipment grounding conductor, and
into a continuous electric conductor all receptacles shall be electrically
and shall be so connected to all boxes, connected to the grounding conductor.
fittings, and cabinets as to provide ef- Receptacles for uses other than tem-
fective electrical continuity. porary lighting shall not be installed
(ii) Wiring in ducts. No wiring systems on branch circuits which supply tem-
of any type shall be installed in ducts porary lighting. Receptacles shall not
used to transport dust, loose stock or be connected to the same ungrounded
flammable vapors. No wiring system of conductor of multiwire circuits which
any type shall be installed in any duct supply temporary lighting.
used for vapor removal or in any shaft (D) Disconnecting switches or plug
containing only such ducts. connectors shall be installed to permit
(2) Temporary wiring(i) Scope. The the disconnection of all ungrounded
provisions of paragraph (a)(2) of this conductors of each temporary circuit.
section apply to temporary electrical (E) All lamps for general illumina-
power and lighting wiring methods tion shall be protected from accidental
which may be of a class less than would contact or breakage. Metal-case sock-
be required for a permanent installa- ets shall be grounded.
tion. Except as specifically modified in (F) Temporary lights shall not be
paragraph (a)(2) of this section, all suspended by their electric cords unless
other requirements of this subpart for cords and lights are designed for this
permanent wiring shall apply to tem- means of suspension.
porary wiring installations. Temporary (G) Portable electric lighting used in
wiring shall be removed immediately wet and/or other conductive locations,
upon completion of construction or the as for example, drums, tanks, and ves-
purpose for which the wiring was in- sels, shall be operated at 12 volts or
stalled. less. However, 120-volt lights may be
(ii) General requirements for temporary used if protected by a ground-fault cir-
wiring(A) Feeders shall originate in a cuit interrupter.
distribution center. The conductors (H) A box shall be used wherever a
shall be run as multiconductor cord or change is made to a raceway system or
cable assemblies or within raceways; a cable system which is metal clad or
or, where not subject to physical dam- metal sheathed.
age, they may be run as open conduc- (I) Flexible cords and cables shall be
tors on insulators not more than 10 feet protected from damage. Sharp corners
(3.05 m) apart. and projections shall be avoided. Flexi-
(B) Branch circuits shall originate in ble cords and cables may pass through
a power outlet or panelboard. Conduc- doorways or other pinch points, if pro-
tors shall be run as multiconductor tection is provided to avoid damage.
cord or cable assemblies or open con- (J) Extension cord sets used with
ductors, or shall be run in raceways. portable electric tools and appliances
All conductors shall be protected by shall be of three-wire type and shall be
overcurrent devices at their ampacity. designed for hard or extra-hard usage.
Runs of open conductors shall be lo- Flexible cords used with temporary and
cated where the conductors will not be portable lights shall be designed for
subject to physical damage, and the hard or extra-hard usage.
conductors shall be fastened at inter-
vals not exceeding 10 feet (3.05 m). No NOTE: The National Electrical Code, ANSI/
branch-circuit conductors shall be laid NFPA 70, in Article 400, Table 4004, lists
various types of flexible cords, some of which
on the floor. Each branch circuit that are noted as being designed for hard or extra-
supplies receptacles or fixed equipment hard usage. Examples of these types of flexi-
shall contain a separate equipment ble cords include hard service cord (types S,
grounding conductor if the branch cir- ST, SO, STO) and junior hard service cord
cuit is run as open conductors. (types SJ, SJO, SJT, SJTO).

257

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00267 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.405 29 CFR Ch. XVII (7112 Edition)

(iii) Guarding. For temporary wiring throw is vertical, a locking device shall
over 600 volts, nominal, fencing, bar- be provided to ensure that the blades
riers, or other effective means shall be remain in the open position when so
provided to prevent access of other set.
than authorized and qualified per- (d) Switchboards and panelboards.
sonnel. Switchboards that have any exposed
(b) Cabinets, boxes, and fittings(1) live parts shall be located in perma-
Conductors entering boxes, cabinets, or nently dry locations and accessible
fittings. Conductors entering boxes, only to qualified persons. Panelboards
cabinets, or fittings shall be protected shall be mounted in cabinets, cutout
from abrasion, and openings through boxes, or enclosures designed for the
which conductors enter shall be effec- purpose and shall be dead front. How-
tively closed. Unused openings in cabi- ever, panelboards other than the dead
nets, boxes, and fittings shall also be front externally-operable type are per-
effectively closed. mitted where accessible only to quali-
(2) Covers and canopies. All pull boxes, fied persons. Exposed blades of knife
junction boxes, and fittings shall be switches shall be dead when open.
provided with covers. If metal covers (e) Enclosures for damp or wet loca-
are used, they shall be grounded. In en- tions(1) Cabinets, fittings, and boxes.
ergized installations each outlet box Cabinets, cutout boxes, fittings, boxes,
shall have a cover, faceplate, or fixture and panelboard enclosures in damp or
canopy. Covers of outlet boxes having wet locations shall be installed so as to
holes through which flexible cord pend- prevent moisture or water from enter-
ants pass shall be provided with bush- ing and accumulating within the enclo-
ings designed for the purpose or shall sures. In wet locations the enclosures
have smooth, well-rounded surfaces on shall be weatherproof.
which the cords may bear. (2) Switches and circuit breakers.
(3) Pull and junction boxes for systems Switches, circuit breakers, and switch-
over 600 volts, nominal. In addition to boards installed in wet locations shall
other requirements in this section for be enclosed in weatherproof enclosures.
pull and junction boxes, the following (f) Conductors for general wiring. All
shall apply to these boxes for systems conductors used for general wiring
over 600 volts, nominal: shall be insulated unless otherwise per-
(i) Complete enclosure. Boxes shall mitted in this subpart. The conductor
provide a complete enclosure for the insulation shall be of a type that is
contained conductors or cables. suitable for the voltage, operating tem-
(ii) Covers. Boxes shall be closed by perature, and location of use. Insulated
covers securely fastened in place. Un- conductors shall be distinguishable by
derground box covers that weigh over appropriate color or other means as
100 pounds (43.6 kg) meet this require- being grounded conductors,
ment. Covers for boxes shall be perma- ungrounded conductors, or equipment
nently marked HIGH VOLTAGE. grounding conductors.
The marking shall be on the outside of (g) Flexible cords and cables(1) Use of
the box cover and shall be readily visi- flexible cords and cables(i) Permitted
ble and legible. uses. Flexible cords and cables shall be
(c) Knife switches. Single-throw knife suitable for conditions of use and loca-
switches shall be so connected that the tion. Flexible cords and cables shall be
blades are dead when the switch is in used only for:
the open position. Single-throw knife (A) Pendants;
switches shall be so placed that gravity (B) Wiring of fixtures;
will not tend to close them. Single- (C) Connection of portable lamps or
throw knife switches approved for use appliances;
in the inverted position shall be pro- (D) Elevator cables;
vided with a locking device that will (E) Wiring of cranes and hoists;
ensure that the blades remain in the (F) Connection of stationary equip-
open position when so set. Double- ment to facilitate their frequent inter-
throw knife switches may be mounted change;
so that the throw will be either (G) Prevention of the transmission of
vertical or horizontal. However, if the noise or vibration; or

258

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00268 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.405

(H) Appliances where the fastening nominal, shall consist of No. 8 or larger
means and mechanical connections are conductors employing flexible strand-
designed to permit removal for mainte- ing. Cables operated at over 2000 volts
nance and repair. shall be shielded for the purpose of con-
(ii) Attachment plugs for cords. If used fining the voltage stresses to the insu-
as permitted in paragraphs (g)(1)(i)(C), lation. Grounding conductors shall be
(g)(1)(i)(F), or (g)(1)(i)(H) of this sec- provided. Connectors for these cables
tion, the flexible cord shall be equipped shall be of a locking type with provi-
with an attachment plug and shall be sions to prevent their opening or clos-
energized from a receptacle outlet. ing while energized. Strain relief shall
(iii) Prohibited uses. Unless necessary be provided at connections and termi-
for a use permitted in paragraph nations. Portable cables shall not be
(g)(1)(i) of this section, flexible cords operated with splices unless the splices
and cables shall not be used: are of the permanent molded, vulcan-
(A) As a substitute for the fixed wir- ized, or other equivalent type. Termi-
ing of a structure; nation enclosures shall be marked with
(B) Where run through holes in walls, a high voltage hazard warning, and ter-
ceilings, or floors; minations shall be accessible only to
(C) Where run through doorways, authorized and qualified personnel.
windows, or similar openings, except as (i) Fixture wires(1) General. Fixture
permitted in paragraph (a)(2)(ii)(1) of wires shall be suitable for the voltage,
this section; temperature, and location of use. A fix-
(D) Where attached to building sur- ture wire which is used as a grounded
faces; or conductor shall be identified.
(E) Where concealed behind building (2) Uses permitted. Fixture wires may
walls, ceilings, or floors. be used:
(2) Identification, splices, and termi- (i) For installation in lighting, fix-
nations(i) Identification. A conductor tures and in similar equipment where
of a flexible cord or cable that is used enclosed or protected and not subject
as a grounded conductor or an equip- to bending or twisting in use; or
ment grounding conductor shall be dis- (ii) For connecting lighting fixtures
tinguishable from other conductors. to the branch-circuit conductors sup-
(ii) Marking. Type SJ, SJO, SJT, plying the fixtures.
SJTO, S, SO, ST, and STO cords shall (3) Uses not permitted. Fixture wires
not be used unless durably marked on shall not be used as branch-circuit con-
the surface with the type designation, ductors except as permitted for Class 1
size, and number of conductors. power-limited circuits.
(iii) Splices. Flexible cords shall be (j) Equipment for general use(1)
used only in continuous lengths with- Lighting fixtures, lampholders, lamps,
out splice or tap. Hard service flexible and receptacles(i) Live parts. Fixtures,
cords No. 12 or larger may be repaired lampholders, lamps, rosettes, and re-
if spliced so that the splice retains the ceptacles shall have no live parts nor-
insulation, outer sheath properties, mally exposed to employee contact.
and usage characteristics of the cord However, rosettes and cleat-type
being spliced. lampholders and receptacles located at
(iv) Strain relief. Flexible cords shall least 8 feet (2.44 m) above the floor may
be connected to devices and fittings so have exposed parts.
that strain relief is provided which will (ii) Support. Fixtures, lampholders,
prevent pull from being directly trans- rosettes, and receptacles shall be se-
mitted to joints or terminal screws. curely supported. A fixture that weighs
(v) Cords passing through holes. Flexi- more than 6 pounds (2.72 kg) or exceeds
ble cords and cables shall be protected 16 inches (406 mm) in any dimension
by bushings or fittings where passing shall not be supported by the screw
through holes in covers, outlet boxes, shell of a lampholder.
or similar enclosures. (iii) Portable lamps. Portable lamps
(h) Portable cables over 600 volts, nomi- shall be wired with flexible cord and an
nal. Multiconductor portable cable for attachment plug of the polarized or
use in supplying power to portable or grounding type. If the portable lamp
mobile equipment at over 600 volts, uses an Edison-based lampholder, the

259

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00269 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.405 29 CFR Ch. XVII (7112 Edition)

grounded conductor shall be identified (iii) Rating. Each appliance shall be


and attached to the screw shell and the marked with its rating in volts and
identified blade of the attachment amperes or volts and watts.
plug. In addition, portable handlamps (4) Motors. This paragraph applies to
shall comply with the following: motors, motor circuits, and control-
(A) Metal shell, paperlined lers.
lampholders shall not be used; (i) In sight from. If specified that one
(B) Handlamps shall be equipped with piece of equipment shall be in sight
a handle of molded composition or from another piece of equipment, one
other insulating material; shall be visible and not more than 50
(C) Handlamps shall be equipped with feet (15.2 m) from the other.
a substantial guard attached to the (ii) Disconnecting means(A) A dis-
lampholder or handle; connecting means shall be located in
sight from the controller location. The
(D) Metallic guards shall be grounded
controller disconnecting means for
by the means of an equipment ground-
motor branch circuits over 600 volts,
ing conductor run within the power
nominal, may be out of sight of the
supply cord.
controller, if the controller is marked
(iv) Lampholders. Lampholders of the with a warning label giving the loca-
screw-shell type shall be installed for tion and identification of the dis-
use as lampholders only. Lampholders connecting means which is to be locked
installed in wet or damp locations shall in the open position.
be of the weatherproof type. (B) The disconnecting means shall
(v) Fixtures. Fixtures installed in wet disconnect the motor and the con-
or damp locations shall be identified troller from all ungrounded supply con-
for the purpose and shall be installed ductors and shall be so designed that
so that water cannot enter or accumu- no pole can be operated independently.
late in wireways, lampholders, or other (C) If a motor and the driven machin-
electrical parts. ery are not in sight from the controller
(2) Receptacles, cord connectors, and at- location, the installation shall comply
tachment plugs (caps)(i) Configuration. with one of the following conditions:
Receptacles, cord connectors, and at- (1) The controller disconnecting
tachment plugs shall be constructed so means shall be capable of being locked
that no receptacle or cord connector in the open position.
will accept an attachment plug with a (2) A manually operable switch that
different voltage or current rating than will disconnect the motor from its
that for which the device is intended. source of supply shall be placed in
However, a 20-ampere T-slot receptacle sight from the motor location.
or cord connector may accept a 15-am- (D) The disconnecting means shall
pere attachment plug of the same volt- plainly indicate whether it is in the
age rating. Receptacles connected to open (off) or closed (on) position.
circuits having different voltages, fre- (E) The disconnecting means shall be
quencies, or types of current (ac or dc) readily accessible. If more than one
on the same premises shall be of such disconnect is provided for the same
design that the attachment plugs used equipment, only one need be readily
on these circuits are not interchange- accessible.
able. (F) An individual disconnecting
(ii) Damp and wet locations. A recep- means shall be provided for each
tacle installed in a wet or damp loca- motor, but a single disconnecting
tion shall be designed for the location. means may be used for a group of mo-
(3) Appliances(i) Live parts. Appli- tors under any one of the following
ances, other than those in which the conditions:
current-carrying parts at high tem- (1) If a number of motors drive spe-
peratures are necessarily exposed, shall cial parts of a single machine or piece
have no live parts normally exposed to of apparatus, such as a metal or wood-
employee contact. working machine, crane, or hoist;
(ii) Disconnecting means. A means (2) If a group of motors is under the
shall be provided to disconnect each protection of one set of branch-circuit
appliance. protective devices; or

260

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00270 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.405

(3) If a group of motors is in a single (C) Transformers which are an inte-


room in sight from the location of the gral part of an X-ray, high frequency,
disconnecting means. or electrostatic-coating apparatus;
(iii) Motor overload, short-circuit, and (D) Transformers used with Class 2
ground-fault protection. Motors, motor- and Class 3 circuits, sign and outline
control apparatus, and motor branch- lighting, electric discharge lighting,
circuit conductors shall be protected and power-limited fire-protective sig-
against overheating due to motor over- naling circuits.
loads or failure to start, and against (ii) Operating voltage. The operating
short-circuits or ground faults. These voltage of exposed live parts of trans-
provisions do not require overload pro- former installations shall be indicated
tection that will stop a motor where a by warning signs or visible markings
shutdown is likely to introduce addi- on the equipment or structure.
tional or increased hazards, as in the (iii) Transformers over 35 kV. Dry-
case of fire pumps, or where continued type, high fire point liquid-insulated,
operation of a motor is necessary for a and askarel-insulated transformers in-
safe shutdown of equipment or process stalled indoors and rated over 35 kV
and motor overload sensing devices are shall be in a vault.
connected to a supervised alarm. (iv) Oil-insulated transformers. If they
(iv) Protection of live partsall present a fire hazard to employees, oil-
voltages(A) Stationary motors having insulated transformers installed in-
commutators, collectors, and brush doors shall be in a vault.
rigging located inside of motor end (v) Fire protection. Combustible mate-
brackets and not conductively con- rial, combustible buildings and parts of
nected to supply circuits operating at buildings, fire escapes, and door and
more than 150 volts to ground need not window openings shall be safeguarded
have such parts guarded. Exposed live from fires which may originate in oil-
parts of motors and controllers oper- insulated transformers attached to or
ating at 50 volts or more between ter- adjacent to a building or combustible
minals shall be guarded against acci- material.
dental contact by any of the following: (vi) Transformer vaults. Transformer
(1) By installation in a room or en- vaults shall be constructed so as to
closure that is accessible only to quali- contain fire and combustible liquids
fied persons; within the vault and to prevent unau-
(2) By installation on a balcony, gal- thorized access. Locks and latches
lery, or platform, so elevated and ar- shall be so arranged that a vault door
ranged as to exclude unqualified per- can be readily opened from the inside.
sons; or (vii) Pipes and ducts. Any pipe or duct
(3) By elevation 8 feet (2.44 m) or system foreign to the vault installa-
more above the floor. tion shall not enter or pass through a
(B) Where live parts of motors or con- transformer vault.
trollers operating at over 150 volts to (viii) Material storage. Materials shall
ground are guarded against accidental not be stored in transformer vaults.
contact only by location, and where ad- (6) Capacitors(i) Drainage of stored
justment or other attendance may be charge. All capacitors, except surge ca-
necessary during the operation of the pacitors or capacitors included as a
apparatus, insulating mats or plat- component part of other apparatus,
forms shall be provided so that the at- shall be provided with an automatic
tendant cannot readily touch live parts means of draining the stored charge
unless standing on the mats or plat- and maintaining the discharged state
forms. after the capacitor is disconnected
(5) Transformers(i) Application. The from its source of supply.
following paragraphs cover the instal- (ii) Over 600 volts. Capacitors rated
lation of all transformers, except: over 600 volts, nominal, shall comply
(A) Current transformers; with the following additional require-
(B) Dry-type transformers installed ments:
as a component part of other appa- (A) Isolating or disconnecting switch-
ratus; es (with no interrupting rating) shall

261

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00271 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.406 29 CFR Ch. XVII (7112 Edition)

be interlocked with the load inter- examination, adjustment, servicing, or


rupting device or shall be provided maintenance while alive shall be a
with prominently displayed caution minimum of 2 feet 6 inches (762 mm).
signs to prevent switching load cur- Where controls are enclosed in cabi-
rent. nets, the door(s) shall open at least 90
(B) For series capacitors the proper degrees or be removable, or the instal-
switching shall be assured by use of at lation shall provide equivalent access.
least one of the following: (4) Grounding. All exposed metal
(1) Mechanically sequenced isolating parts of cranes, monorail hoists, hoists
and bypass switches, and accessories including pendant con-
(2) Interlocks, or trols shall be metallically joined to-
(3) Switching procedure prominently gether into a continuous electrical con-
displayed at the switching location. ductor so that the entire crane or hoist
[51 FR 25318, July 11, 1986, as amended at 61 will be grounded in accordance with
FR 5510, Feb. 13, 1996] 1926.404(f). Moving parts, other than
removable accessories or attachments,
1926.406 Specific purpose equipment having metal-to-metal bearing surfaces
and installations. shall be considered to be electrically
(a) Cranes and hoists. This paragraph connected to each other through the
applies to the installation of electric bearing surfaces for grounding pur-
equipment and wiring used in connec- poses. The trolley frame and bridge
tion with cranes, monorail hoists, frame shall be considered as elec-
hoists, and all runways. trically grounded through the bridge
(1) Disconnecting means(i) Runway and trolley wheels and its respective
conductor disconnecting means. A readily tracks unless conditions such as paint
accessible disconnecting means shall or other insulating materials prevent
be provided between the runway con- reliable metal-to-metal contact. In this
tact conductors and the power supply. case a separate bonding conductor
(ii) Disconnecting means for cranes and shall be provided.
monorail hoists. A disconnecting means, (b) Elevators, escalators, and moving
capable of being locked in the open po- walks(1) Disconnecting means. Ele-
sition, shall be provided in the leads vators, escalators, and moving walks
from the runway contact conductors or shall have a single means for dis-
other power supply on any crane or connecting all ungrounded main power
monorail hoist. supply conductors for each unit.
(A) If this additional disconnecting
(2) Control panels. If control panels
means is not readily accessible from
are not located in the same space as
the crane or monorail hoist operating
the drive machine, they shall be lo-
station, means shall be provided at the
cated in cabinets with doors or panels
operating station to open the power
capable of being locked closed.
circuit to all motors of the crane or
monorail hoist. (c) Electric weldersdisconnecting
(B) The additional disconnect may be means(1) Motor-generator, AC trans-
omitted if a monorail hoist or hand- former, and DC rectifier arc welders. A
propelled crane bridge installation disconnecting means shall be provided
meets all of the following: in the supply circuit for each motor-
(1) The unit is floor controlled; generator arc welder, and for each AC
(2) The unit is within view of the transformer and DC rectifier arc welder
power supply disconnecting means; and which is not equipped with a dis-
(3) No fixed work platform has been connect mounted as an integral part of
provided for servicing the unit. the welder.
(2) Control. A limit switch or other (2) Resistance welders. A switch or cir-
device shall be provided to prevent the cuit breaker shall be provided by which
load block from passing the safe upper each resistance welder and its control
limit of travel of any hoisting mecha- equipment can be isolated from the
nism. supply circuit. The ampere rating of
(3) Clearance. The dimension of the this disconnecting means shall not be
working space in the direction of ac- less than the supply conductor
cess to live parts which may require ampacity.

262

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00272 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.407

(d) X-Ray equipment(1) Disconnecting cations shall be approved as intrinsi-


means(i) General. A disconnecting cally safe or approved for the haz-
means shall be provided in the supply ardous (classified) location or safe for
circuit. The disconnecting means shall the hazardous (classified) location. Re-
be operable from a location readily ac- quirements for each of these options
cessible from the X-ray control. For are as follows:
equipment connected to a 120-volt (1) Intrinsically safe. Equipment and
branch circuit of 30 amperes or less, a associated wiring approved as intrinsi-
grounding-type attachment plug cap cally safe is permitted in any haz-
and receptacle of proper rating may ardous (classified) location included in
serve as a disconnecting means. its listing or labeling.
(ii) More than one piece of equipment. (2) Approved for the hazardous (classi-
If more than one piece of equipment is fied) location(i) General. Equipment
operated from the same high-voltage shall be approved not only for the class
circuit, each piece or each group of of location but also for the ignitible or
equipment as a unit shall be provided combustible properties of the specific
with a high-voltage switch or equiva- gas, vapor, dust, or fiber that will be
lent disconnecting means. This dis- present.
connecting means shall be constructed,
enclosed, or located so as to avoid con- NOTE: NFPA 70, the National Electrical
Code, lists or defines hazardous gases, va-
tact by employees with its live parts.
pors, and dusts by Groups characterized by
(2) ControlRadiographic and their ignitible or combustible properties.
fluoroscopic types. Radiographic and
fluoroscopic-type equipment shall be (ii) Marking. Equipment shall not be
effectively enclosed or shall have inter- used unless it is marked to show the
locks that deenergize the equipment class, group, and operating tempera-
automatically to prevent ready access ture or temperature range, based on
to live current-carrying parts. operation in a 40-degree C ambient, for
which it is approved. The temperature
1926.407 Hazardous (classified) loca- marking shall not exceed the ignition
tions. temperature of the specific gas, vapor,
(a) Scope. This section sets forth re- or dust to be encountered. However,
quirements for electric equipment and the following provisions modify this
wiring in locations which are classified marking requirement for specific
depending on the properties of the equipment:
flammable vapors, liquids or gases, or (A) Equipment of the non-heat-pro-
combustible dusts or fibers which may ducing type (such as junction boxes,
be present therein and the likelihood conduit, and fitting) and equipment of
that a flammable or combustible con- the heat-producing type having a max-
centration or quantity is present. Each imum temperature of not more than
room, section or area shall be consid- 100 degrees C (212 degrees F) need not
ered individually in determining its have a marked operating temperature
classification. These hazardous (classi- or temperature range.
fied) locations are assigned six designa- (B) Fixed lighting fixtures marked
tions as follows: for use only in Class I, Division 2 loca-
Class I, Division 1 tions need not be marked to indicate
Class I, Division 2 the group.
Class II, Division 1 (C) Fixed general-purpose equipment
Class II, Division 2 in Class I locations, other than lighting
Class III, Division l fixtures, which is acceptable for use in
Class III, Division 2 Class I, Division 2 locations need not be
For definitions of these locations see marked with the class, group, division,
1926.449. All applicable requirements or operating temperature.
in this subpart apply to all hazardous (D) Fixed dust-tight equipment,
(classified) locations, unless modified other than lighting fixtures, which is
by provisions of this section. acceptable for use in Class II, Division
(b) Electrical installations. Equipment, 2 and Class III locations need not be
wiring methods, and installations of marked with the class, group, division,
equipment in hazardous (classified) lo- or operating temperature.

263

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00273 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.408 29 CFR Ch. XVII (7112 Edition)

(3) Safe for the hazardous (classified) grounded. Open runs of insulated wires
location. Equipment which is safe for and cables having a bare lead sheath or
the location shall be of a type and de- a braided outer covering shall be sup-
sign which the employer demonstrates ported in a manner designed to prevent
will provide protection from the haz- physical damage to the braid or sheath.
ards arising from the combustibility (ii) Installations emerging from the
and flammability of vapors, liquids, ground. Conductors emerging from the
gases, dusts, or fibers. ground shall be enclosed in raceways.
Raceways installed on poles shall be of
NOTE: The National Electrical Code, NFPA
70, contains guidelines for determining the rigid metal conduit, intermediate
type and design of equipment and installa- metal conduit, PVC schedule 80 or
tions which will meet this requirement. The equivalent extending from the ground
guidelines of this document address electric line up to a point 8 feet (2.44 m) above
wiring, equipment, and systems installed in finished grade. Conductors entering a
hazardous (classified) locations and contain building shall be protected by an enclo-
specific provisions for the following: wiring sure from the ground line to the point
methods, wiring connections, conductor in-
of entrance. Metallic enclosures shall
sulation, flexible cords, sealing and drainage,
transformers, capacitors, switches, circuit be grounded.
breakers, fuses, motor controllers, recep- (2) Interrupting and isolating devices
tacles, attachment plugs, meters, relays, in- (i) Circuit breakers. Circuit breakers lo-
struments, resistors, generators, motors, cated indoors shall consist of metal-en-
lighting fixtures, storage battery charging closed or fire-resistant, cell-mounted
equipment, electric cranes, electric hoists units. In locations accessible only to
and similar equipment, utilization equip- qualified personnel, open mounting of
ment, signaling systems, alarm systems, re-
circuit breakers is permitted. A means
mote control systems, local loud speaker and
communication systems, ventilation piping, of indicating the open and closed posi-
live parts, lightning surge protection, and tion of circuit breakers shall be pro-
grounding. Compliance with these guidelines vided.
will constitute one means, but not the only (ii) Fused cutouts. Fused cutouts in-
means, of compliance with this paragraph. stalled in buildings or transformer
(c) Conduits. All conduits shall be vaults shall be of a type identified for
threaded and shall be made wrench- the purpose. They shall be readily ac-
tight. Where it is impractical to make cessible for fuse replacement.
a threaded joint tight, a bonding jump- (iii) Equipment isolating means. A
er shall be utilized. means shall be provided to completely
isolate equipment for inspection and
[51 FR 25318, July 11, 1986, as amended at 61 repairs. Isolating means which are not
FR 5510, Feb. 13, 1996] designed to interrupt the load current
of the circuit shall be either
1926.408 Special systems. interlocked with a circuit interrupter
(a) Systems over 600 volts, nominal. or provided with a sign warning
Paragraphs (a)(1) through (a)(4) of this against opening them under load.
section contain general requirements (3) Mobile and portable equipment(i)
for all circuits and equipment operated Power cable connections to mobile ma-
at over 600 volts. chines. A metallic enclosure shall be
(1) Wiring methods for fixed installa- provided on the mobile machine for en-
tions(i) Above ground. Above-ground closing the terminals of the power
conductors shall be installed in rigid cable. The enclosure shall include pro-
metal conduit, in intermediate metal visions for a solid connection for the
conduit, in cable trays, in cablebus, in ground wire(s) terminal to ground ef-
other suitable raceways, or as open fectively the machine frame. The
runs of metal-clad cable designed for method of cable termination used shall
the use and purpose. However, open prevent any strain or pull on the cable
runs of non-metallic-sheathed cable or from stressing the electrical connec-
of bare conductors or busbars may be tions. The enclosure shall have provi-
installed in locations which are acces- sion for locking so only authorized
sible only to qualified persons. Metallic qualified persons may open it and shall
shielding components, such as tapes, be marked with a sign warning of the
wires, or braids for conductors, shall be presence of energized parts.

264

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00274 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.408

(ii) Guarding live parts. All energized (v) Grounding and bonding. All non-
switching and control parts shall be en- energized metal parts of electric equip-
closed in effectively grounded metal ment and metal raceways and cable
cabinets or enclosures. Circuit break- sheaths shall be grounded and bonded
ers and protective equipment shall to all metal pipes and rails at the por-
have the operating means projecting tal and at intervals not exceeding 1000
through the metal cabinet or enclosure feet (305 m) throughout the tunnel.
so these units can be reset without (b) Class 1, Class 2, and Class 3 remote
locked doors being opened. Enclosures control, signaling, and power-limited cir-
and metal cabinets shall be locked so cuits(1) Classification. Class 1, Class 2,
that only authorized qualified persons or Class 3 remote control, signaling, or
have access and shall be marked with a power-limited circuits are character-
sign warning of the presence of ener- ized by their usage and electrical power
gized parts. Collector ring assemblies limitation which differentiates them
on revolving-type machines (shovels, from light and power circuits. These
draglines, etc.) shall be guarded. circuits are classified in accordance
(4) Tunnel installations(i) Applica- with their respective voltage and power
tion. The provisions of this paragraph limitations as summarized in para-
apply to installation and use of high- graphs (b)(1)(i) through (b)(1)(iii) of
voltage power distribution and utiliza- this section.
tion equipment which is associated
(i) Class 1 circuits(A) A Class 1
with tunnels and which is portable and/
power-limited circuit is supplied from
or mobile, such as substations, trailers,
a source having a rated output of not
cars, mobile shovels, draglines, hoists,
more than 30 volts and 1000 volt-am-
drills, dredges, compressors, pumps,
peres.
conveyors, and underground exca-
vators. (B) A Class 1 remote control circuit
(ii) Conductors. Conductors in tunnels or a Class 1 signaling circuit has a volt-
shall be installed in one or more of the age which does not exceed 600 volts;
following: however, the power output of the
(A) Metal conduit or other metal source need not be limited.
raceway, (ii) Class 2 and Class 3 circuits(A)
(B) Type MC cable, or Power for Class 2 and Class 3 circuits is
(C) Other suitable multiconductor limited either inherently (in which no
cable. overcurrent protection is required) or
Conductors shall also be so located or by a combination of a power source and
guarded as to protect them from phys- overcurrent protection.
ical damage. Multiconductor portable (B) The maximum circuit voltage is
cable may supply mobile equipment. 150 volts AC or DC for a Class 2 inher-
An equipment grounding conductor ently limited power source, and 100
shall be run with circuit conductors in- volts AC or DC for a Class 3 inherently
side the metal raceway or inside the limited power source.
multiconductor cable jacket. The (C) The maximum circuit voltage is
equipment grounding conductor may 30 volts AC and 60 volts DC for a Class
be insulated or bare. 2 power source limited by overcurrent
(iii) Guarding live parts. Bare termi- protection, and 150 volts AC or DC for
nals of transformers, switches, motor a Class 3 power source limited by over-
controllers, and other equipment shall current protection.
be enclosed to prevent accidental con- (iii) Application. The maximum cir-
tact with energized parts. Enclosures cuit voltages in paragraphs (b)(1)(i) and
for use in tunnels shall be drip-proof, (b)(1)(ii) of this section apply to sinus-
weatherproof, or submersible as re- oidal AC or continuous DC power
quired by the environmental condi- sources, and where wet contact occur-
tions. rence is not likely.
(iv) Disconnecting means. A dis- (2) Marking. A Class 2 or Class 3
connecting means that simultaneously power supply unit shall not be used un-
opens all ungrounded conductors shall less it is durably marked where plainly
be installed at each transformer or visible to indicate the class of supply
motor location. and its electrical rating.

265

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00275 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.4091926.415 29 CFR Ch. XVII (7112 Edition)

(c) Communications systems(1) Scope. conductors of electric light and power


These provisions for communication circuits of over 150 volts to ground as
systems apply to such systems as cen- necessary to avoid the possibility of
tral-station-connected and non-cen- the antenna or structure falling into or
tral-station-connected telephone cir- making accidental contact with such
cuits, radio receiving and transmitting circuits.
equipment, and outside wiring for fire (5) Grounding(i) Lead-in conductors.
and burglar alarm, and similar central If exposed to contact with electric
station systems. These installations light or power conductors, the metal
need not comply with the provisions of sheath of aerial cables entering build-
1926.403 through 1926.408(b), except ings shall be grounded or shall be inter-
1926.404(c)(1)(ii) and 1926.407. rupted close to the entrance to the
(2) Protective devices(i) Circuits ex- building by an insulating joint or
posed to power conductors. Communica- equivalent device. Where protective de-
tion circuits so located as to be ex- vices are used, they shall be grounded.
posed to accidental contact with light (ii) Antenna structures. Masts and
or power conductors operating at over metal structures supporting antennas
300 volts shall have each circuit so ex- shall be permanently and effectively
posed provided with an approved pro- grounded without splice or connection
tector. in the grounding conductor.
(ii) Antenna lead-ins. Each conductor
(iii) Equipment enclosures. Transmit-
of a lead-in from an outdoor antenna
ters shall be enclosed in a metal frame
shall be provided with an antenna dis-
or grill or separated from the operating
charge unit or other means that will
space by a barrier, all metallic parts of
drain static charges from the antenna
which are effectively connected to
system.
ground. All external metal handles and
(3) Conductor location(i) Outside of
controls accessible to the operating
buildings(A) Receiving distribution
personnel shall be effectively grounded.
lead-in or aerial-drop cables attached
Unpowered equipment and enclosures
to buildings and lead-in conductors to
shall be considered grounded where
radio transmitters shall be so installed
connected to an attached coaxial cable
as to avoid the possibility of accidental
with an effectively grounded metallic
contact with electric light or power
shield.
conductors.
(B) The clearance between lead-in [51 FR 25318, July 11, 1986, as amended at 61
conductors and any lightning protec- FR 5510, Feb. 13, 1996]
tion conductors shall not be less than 6
feet (1.83 m). 1926.4091926.415 [Reserved]
(ii) On poles. Where practicable, com-
munication conductors on poles shall SAFETY-RELATED WORK PRACTICES
be located below the light or power
1926.416 General requirements.
conductors. Communications conduc-
tors shall not be attached to a cross- (a) Protection of employees(1) No em-
arm that carries light or power conduc- ployer shall permit an employee to
tors. work in such proximity to any part of
(iii) Inside of buildings. Indoor anten- an electric power circuit that the em-
nas, lead-ins, and other communication ployee could contact the electric power
conductors attached as open conduc- circuit in the course of work, unless
tors to the inside of buildings shall be the employee is protected against elec-
located at least 2 inches (50.8 mm) from tric shock by deenergizing the circuit
conductors of any light or power or and grounding it or by guarding it ef-
Class 1 circuits unless a special and fectively by insulation or other means.
equally protective method of conductor (2) In work areas where the exact lo-
separation is employed. cation of underground electric
(4) Equipment location. Outdoor metal powerlines is unknown, employees
structures supporting antennas, as well using jack-hammers, bars, or other
as self-supporting antennas such as hand tools which may contact a line
vertical rods or dipole structures, shall shall be provided with insulated protec-
be located as far away from overhead tive gloves.

266

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00276 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.441

(3) Before work is begun the em- (c) Tags. Tags shall be placed to iden-
ployer shall ascertain by inquiry or di- tify plainly the equipment or circuits
rect observation, or by instruments, being worked on.
whether any part of an energized elec- [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
tric power circuit, exposed or con- 1979, as amended at 55 FR 42328, Oct. 18, 1990;
cealed, is so located that the perform- 58 FR 35181, June 30, 1993; 61 FR 9251, Mar. 7,
ance of the work may bring any person, 1996; 61 FR 41739, Aug. 12, 1996]]
tool, or machine into physical or elec-
trical contact with the electric power 1926.4181926.430 [Reserved]
circuit. The employer shall post and SAFETY-RELATED MAINTENANCE AND
maintain proper warning signs where ENVIRONMENTAL CONSIDERATIONS
such a circuit exists. The employer
shall advise employees of the location 1926.431 Maintenance of equipment.
of such lines, the hazards involved, and The employer shall ensure that all
the protective measures to be taken. wiring components and utilization
(b) Passageways and open spaces-(1) equipment in hazardous locations are
Barriers or other means of guarding maintained in a dust-tight, dust-igni-
shall be provided to ensure that work- tion-proof, or explosion-proof condi-
space for electrical equipment will not tion, as appropriate. There shall be no
be used as a passageway during periods loose or missing screws, gaskets,
when energized parts of electrical threaded connections, seals, or other
equipment are exposed. impairments to a tight condition.
(2) Working spaces, walkways, and
similar locations shall be kept clear of 1926.432 Environmental deteriora-
cords so as not to create a hazard to tion of equipment.
employees. (a) Deteriorating agents(1) Unless
(c) Load ratings. In existing installa- identified for use in the operating envi-
tions, no changes in circuit protection ronment, no conductors or equipment
shall be made to increase the load in shall be located:
excess of the load rating of the circuit (i) In damp or wet locations;
wiring. (ii) Where exposed to gases, fumes,
(d) Fuses. When fuses are installed or vapors, liquids, or other agents having
removed with one or both terminals en- a deteriorating effect on the conduc-
ergized, special tools insulated for the tors or equipment; or
(iii) Where exposed to excessive tem-
voltage shall be used.
peratures.
(e) Cords and cables. (1) Worn or (2) Control equipment, utilization
frayed electric cords or cables shall not equipment, and busways approved for
be used. use in dry locations only shall be pro-
(2) Extension cords shall not be fas- tected against damage from the weath-
tened with staples, hung from nails, or er during building construction.
suspended by wire. (b) Protection against corrosion. Metal
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6, raceways, cable armor, boxes, cable
1979, as amended at 55 FR 42328, Oct. 18, 1990; sheathing, cabinets, elbows, couplings,
58 FR 35179, June 30, 1993; 61 FR 9251, Mar. 7, fittings, supports, and support hard-
1996; 61 FR 41738, Aug. 12, 1996] ware shall be of materials appropriate
for the environment in which they are
1926.417 Lockout and tagging of cir- to be installed.
cuits.
1926.4331926.440 [Reserved]
(a) Controls. Controls that are to be
deactivated during the course of work SAFETY REQUIREMENTS FOR SPECIAL
on energized or deenergized equipment EQUIPMENT
or circuits shall be tagged.
(b) Equipment and circuits. Equipment 1926.441 Batteries and battery charg-
or circuits that are deenergized shall ing.
be rendered inoperative and shall have (a) General requirements(1) Batteries
tags attached at all points where such of the unsealed type shall be located in
equipment or circuits can be energized. enclosures with outside vents or in well

267

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00277 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.4421926.448 29 CFR Ch. XVII (7112 Edition)

ventilated rooms and shall be arranged (b) With respect to an installation or


so as to prevent the escape of fumes, equipment of a kind which no qualified
gases, or electrolyte spray into other testing laboratory accepts, certifies,
areas. lists, labels, or determines to be safe, if
(2) Ventilation shall be provided to it is inspected or tested by another
ensure diffusion of the gases from the Federal agency, or by a State, munic-
battery and to prevent the accumula- ipal, or other local authority respon-
tion of an explosive mixture. sible for enforcing occupational safety
(3) Racks and trays shall be substan- provisions of the National Electrical
tial and shall be treated to make them Code, and found in compliance with
resistant to the electrolyte. those provisions; or
(4) Floors shall be of acid resistant (c) With respect to custom-made
construction unless protected from equipment or related installations
acid accumulations. which are designed, fabricated for, and
(5) Face shields, aprons, and rubber intended for use by a particular cus-
gloves shall be provided for workers tomer, if it is determined to be safe for
handling acids or batteries. its intended use by its manufacturer on
(6) Facilities for quick drenching of the basis of test data which the em-
the eyes and body shall be provided ployer keeps and makes available for
within 25 feet (7.62 m) of battery han- inspection to the Assistant Secretary
dling areas. and his authorized representatives.
(7) Facilities shall be provided for Accepted. An installation is accept-
flushing and neutralizing spilled elec- ed if it has been inspected and found
trolyte and for fire protection. to be safe by a qualified testing labora-
(b) Charging(1) Battery charging in- tory.
stallations shall be located in areas Accessible. (As applied to wiring
designated for that purpose. methods.) Capable of being removed or
(2) Charging apparatus shall be pro- exposed without damaging the building
tected from damage by trucks. structure or finish, or not permanently
(3) When batteries are being charged, closed in by the structure or finish of
the vent caps shall be kept in place to the building. (See concealed and ex-
avoid electrolyte spray. Vent caps shall posed.)
be maintained in functioning condi- Accessible. (As applied to equipment.)
tion. Admitting close approach; not guarded
by locked doors, elevation, or other ef-
1926.4421926.448 [Reserved]
fective means. (SeeReadily acces-
DEFINITIONS sible.)
Ampacity. The current in amperes a
1926.449 Definitions applicable to conductor can carry continuously
this subpart. under the conditions of use without ex-
The definitions given in this section ceeding its temperature rating.
apply to the terms used in subpart K. Appliances. Utilization equipment,
The definitions given here for ap- generally other than industrial, nor-
proved and qualified person apply, mally built in standardized sizes or
instead of the definitions given in types, which is installed or connecetcd
1926.32, to the use of these terms in as a unit to perform one or more func-
subpart K. tions.
Acceptable. An installation or equip- Approved. Acceptable to the author-
ment is acceptable to the Assistant ity enforcing this subpart. The author-
Secretary of Labor, and approved with- ity enforcing this subpart is the Assist-
in the meaning of this subpart K: ant Secretary of Labor for Occupa-
(a) If it is accepted, or certified, or tional Safety and Health. The defini-
listed, or labeled, or otherwise deter- tion of acceptable indicates what is
mined to be safe by a qualified testing acceptable to the Assistant Secretary
laboratory capable of determining the of Labor, and therefore approved with-
suitability of materials and equipment in the meaning of this subpart.
for installation and use in accordance Askarel. A generic term for a group of
with this standard; or nonflammable synthetic chlorinated

268

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00278 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.449

hydrocarbons used as electrical insu- matically on a predetermined overcur-


lating media. Askarels of various rent without injury to itself when
compositional types are used. Under properly applied within its rating.
arcing conditions the gases produced, (b) (Over 600 volts, nominal.) A
while consisting predominantly of non- switching device capable of making,
combustible hydrogen chloride, can in- carrying, and breaking currents under
clude varying amounts of combustible normal circuit conditions, and also
gases depending upon the askarel type. making, carrying for a specified time,
Attachment plug (Plug cap)(Cap). A de- and breaking currents under specified
vice which, by insertion in a recep- abnormal circuit conditions, such as
tacle, establishes connection between those of short circuit.
the conductors of the attached flexible Class I locations. Class I locations are
cord and the conductors connected per- those in which flammable gases or va-
manently to the receptacle. pors are or may be present in the air in
Automatic. Self-acting, operating by quantities sufficient to produce explo-
its own mechanism when actuated by sive or ignitible mixtures. Class I loca-
some impersonal influence, as for ex- tions include the following:
ample, a change in current strength, (a) Class I, Division 1. A Class I, Divi-
pressure, temperature, or mechanical sion 1 location is a location:
configuration. (1) In which ignitible concentrations
Bare conductor. See Conductor. of flammable gases or vapors may exist
Bonding. The permanent joining of under normal operating conditions; or
metallic parts to form an electrically (2) In which ignitible concentrations
conductive path which will assure elec- of such gases or vapors may exist fre-
trical continuity and the capacity to quently because of repair or mainte-
conduct safely any current likely to be nance operations or because of leakage;
imposed. or
Bonding jumper. A reliable conductor
(3) In which breakdown or faulty op-
to assure the required electrical con-
eration of equipment or processes
ductivity between metal parts required
might release ignitible concentrations
to be electrically connected.
of flammable gases or vapors, and
Branch circuit. The circuit conductors
might also cause simultaneous failure
between the final overcurrent device
of electric equipment.
protecting the circuit and the outlet(s).
Building. A structure which stands NOTE: This classification usually includes
alone or which is cut off from adjoining locations where volatile flammable liquids
structures by fire walls with all open- or liquefied flammable gases are transferred
ings therein protected by approved fire from one container to another; interiors of
doors. spray booths and areas in the vicinity of
spraying and painting operations where vola-
Cabinet. An enclosure designed either tile flammable solvents are used; locations
for surface or flush mounting, and pro- containing open tanks or vats of volatile
vided with a frame, mat, or trim in flammable liquids; drying rooms or compart-
which a swinging door or doors are or ments for the evaporation of flammable sol-
may be hung. vents; inadequately ventilated pump rooms
Certified. Equipment is certified if for flammable gas or for volatile flammable
it: liquids; and all other locations where ignit-
(a) Has been tested and found by a ible concentrations of flammable vapors or
gases are likely to occur in the course of nor-
qualified testing laboratory to meet mal operations.
applicable test standards or to be safe
for use in a specified manner, and (b) Class I, Division 2. A Class I, Divi-
(b) Is of a kind whose production is sion 2 location is a location:
periodically inspected by a qualified (1) In which volatile flammable liq-
testing laboratory. Certified equipment uids or flammable gases are handled,
must bear a label, tag, or other record processed, or used, but in which the
of certification. hazardous liquids, vapors, or gases will
Circuit breaker(a) (600 volts nomi- normally be confined within closed
nal, or less.) A device designed to open containers or closed systems from
and close a circuit by nonautomatic which they can escape only in case of
means and to open the circuit auto- accidental rupture or breakdown of

269

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00279 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.449 29 CFR Ch. XVII (7112 Edition)

such containers or systems, or in case tion through simultaneous failure of


of abnormal operation of equipment; or electric equipment, operation of pro-
(2) In which ignitible concentrations tection devices, or from other causes,
of gases or vapors are normally pre- or
vented by positive mechanical ventila- (3) In which combustible dusts of an
tion, and which might become haz- electrically conductive nature may be
ardous through failure or abnormal op- present.
erations of the ventilating equipment; NOTE: Combustible dusts which are elec-
or trically nonconductive include dusts pro-
(3) That is adjacent to a Class I, Divi- duced in the handling and processing of grain
sion 1 location, and to which ignitible and grain products, pulverized sugar and
concentrations of gases or vapors cocoa, dried egg and milk powders, pulver-
might occasionally be communicated ized spices, starch and pastes, potato and
unless such communication is pre- woodflour, oil meal from beans and seed,
vented by adequate positive-pressure dried hay, and other organic materials which
may produce combustible dusts when proc-
ventilation from a source of clean air, essed or handled. Dusts containing magne-
and effective safeguards against ven- sium or aluminum are particularly haz-
tilation failure are provided. ardous and the use of extreme caution is nec-
NOTE: This classification usually includes essary to avoid ignition and explosion.
locations where volatile flammable liquids (b) Class II, Division 2. A Class II, Di-
or flammable gases or vapors are used, but vision 2 location is a location in which:
which would become hazardous only in case (1) Combustible dust will not nor-
of an accident or of some unusual operating
condition. The quantity of flammable mate-
mally be in suspension in the air in
rial that might escape in case of accident, quantities sufficient to produce explo-
the adequacy of ventilating equipment, the sive or ignitible mixtures, and dust ac-
total area involved, and the record of the in- cumulations are normally insufficient
dustry or business with respect to explosions to interfere with the normal operation
or fires are all factors that merit consider- of electrical equipment or other appa-
ation in determining the classification and ratus; or
extent of each location. (2) Dust may be in suspension in the
Piping without valves, checks, meters, and
similar devices would not ordinarily intro-
air as a result of infrequent malfunc-
duce a hazardous condition even though used tioning of handling or processing
for flammable liquids or gases. Locations equipment, and dust accumulations re-
used for the storage of flammable liquids or sulting therefrom may be ignitible by
of liquefied or compressed gases in sealed abnormal operation or failure of elec-
containers would not normally be considered trical equipment or other apparatus.
hazardous unless also subject to other haz-
ardous conditions. NOTE: This classification includes loca-
Electrical conduits and their associated tions where dangerous concentrations of sus-
enclosures separated from process fluids by a pended dust would not be likely but where
single seal or barrier are classed as a Divi- dust accumulations might form on or in the
sion 2 location if the outside of the conduit vicinity of electric equipment. These areas
and enclosures is a nonhazardous location. may contain equipment from which appre-
ciable quantities of dust would escape under
Class II locations. Class II locations abnormal operating conditions or be adja-
are those that are hazardous because of cent to a Class II Division 1 location, as de-
the presence of combustible dust. Class scribed above, into which an explosive or ig-
II locations include the following: nitible concentration of dust may be put into
(a) Class II, Division 1. A Class II, Di- suspension under abnormal operating condi-
tions.
vision 1 location is a location:
(1) In which combustible dust is or Class III locations. Class III locations
may be in suspension in the air under are those that are hazardous because of
normal operating conditions, in quan- the presence of easily ignitible fibers
tities sufficient to produce explosive or or flyings but in which such fibers or
ignitible mixtures; or flyings are not likely to be in suspen-
(2) Where mechanical failure or ab- sion in the air in quantities sufficient
normal operation of machinery or to produce ignitible mixtures. Class 111
equipment might cause such explosive locations include the following:
or ignitible mixtures to be produced, (a) Class III, Division 1. A Class III,
and might also provide a source of igni- Division 1 location is a location in

270

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00280 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.449

which easily ignitible fibers or mate- Dead front. Without live parts ex-
rials producing combustible flyings are posed to a person on the operating side
handled, manufactured, or used. of the equipment.
Device. A unit of an electrical system
NOTE: Easily ignitible fibers and flyings in-
which is intended to carry but not uti-
clude rayon, cotton (including cotton linters
and cotton waste), sisal or henequen, istle,
lize electric energy.
jute, hemp, tow, cocoa fiber, oakum, baled Disconnecting means. A device, or
waste kapok, Spanish moss, excelsior, saw- group of devices, or other means by
dust, woodchips, and other material of simi- which the conductors of a circuit can
lar nature. be disconnected from their source of
supply.
(b) Class III, Division 2. A Class III, Disconnecting (or Isolating) switch.
Division 2 location is a location in (Over 600 volts, nominal.) A mechanical
which easily ignitible fibers are stored switching device used for isolating a
or handled, except in process of manu- circuit or equipment from a source of
facture. power.
Collector ring. A collector ring is an Dry location. See Location.
assembly of slip rings for transferring Enclosed. Surrounded by a case, hous-
electrical energy from a stationary to ing, fence or walls which will prevent
a rotating member. persons from accidentally contacting
Concealed. Rendered inaccessible by energized parts.
the structure or finish of the building. Enclosure. The case or housing of ap-
Wires in concealed raceways are con- paratus, or the fence or walls sur-
sidered concealed, even though they rounding an installation to prevent
may become accessible by withdrawing personnel from accidentally contacting
them. [See Accessible. (As applied to energized parts, or to protect the
wiring methods.)] equipment from physical damage.
Conductor(a) Bare. A conductor hav- Equipment. A general term including
ing no covering or electrical insulation material, fittings, devices, appliances,
whatsoever. fixtures, apparatus, and the like, used
(b) Covered. A conductor encased as a part of, or in connection with, an
within material of composition or electrical installation.
thickness that is not recognized as Equipment grounding conductor. See
electrical insulation. Grounding conductor, equipment.
(c) Insulated. A conductor encased Explosion-proof apparatus. Apparatus
within material of composition and enclosed in a case that is capable of
thickness that is recognized as elec- withstanding an explosion of a speci-
trical insulation. fied gas or vapor which may occur
within it and of preventing the ignition
Controller. A device or group of de-
of a specified gas or vapor surrounding
vices that serves to govern, in some
the enclosure by sparks, flashes, or ex-
predetermined manner, the electric
plosion of the gas or vapor within, and
power delivered to the apparatus to
which operates at such an external
which it is connected.
temperature that it will not ignite a
Covered conductor. See Conductor. surrounding flammable atmosphere.
Cutout. (Over 600 volts, nominal.) An Exposed. (As applied to live parts.)
assembly of a fuse support with either Capable of being inadvertently touched
a fuseholder, fuse carrier, or dis- or approached nearer than a safe dis-
connecting blade. The fuseholder or tance by a person. It is applied to parts
fuse carrier may include a conducting not suitably guarded, isolated, or insu-
element (fuse link), or may act as the lated. (See Accessible and Con-
disconnecting blade by the inclusion of cealed.)
a nonfusible member. Exposed. (As applied to wiring meth-
Cutout box. An enclosure designed for ods.) On or attached to the surface or
surface mounting and having swinging behind panels designed to allow access.
doors or covers secured directly to and [See Accessible. (As applied to wiring
telescoping with the walls of the box methods.)]
proper. (See Cabinet.) Exposed. (For the purposes of
Damp location. See Location. 1926.408(d), Communications systems.)

271

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00281 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.449 29 CFR Ch. XVII (7112 Edition)

Where the circuit is in such a position at the service equipment or at the


that in case of failure of supports or in- source of a separately derived system.
sulation, contact with another circuit Grounding electrode conductor. The
may result. conductor used to connect the ground-
Externally operable. Capable of being ing electrode to the equipment ground-
operated without exposing the operator ing conductor and/or to the grounded
to contact with live parts. conductor of the circuit at the service
Feeder. All circuit conductors be- equipment or at the source of a sepa-
tween the service equipment, or the rately derived system.
generator switchboard of an isolated Ground-fault circuit interrupter. A de-
plant, and the final branch-circuit vice for the protection of personnel
overcurrent device. that functions to deenergize a circuit
Festoon lighting. A string of outdoor or portion thereof within an estab-
lights suspended between two points lished period of time when a current to
more than 15 feet (4.57 m) apart. ground exceeds some predetermined
Fitting. An accessory such as a lock- value that is less than that required to
nut, bushing, or other part of a wiring operate the overcurrent protective de-
system that is intended primarily to vice of the supply circuit.
perform a mechanical rather than an Guarded. Covered, shielded, fenced,
electrical function. enclosed, or otherwise protected by
Fuse. (Over 600 volts, nominal.) An means of suitable covers, casings, bar-
overcurrent protective device with a riers, rails, screens, mats, or platforms
circuit opening fusible part that is to remove the likelihood of approach
heated and severed by the passage of to a point of danger or contact by per-
overcurrent through it. A fuse com- sons or objects.
prises all the parts that form a unit ca- Hoistway. Any shaftway, hatchway,
pable of performing the prescribed well hole, or other vertical opening or
functions. It may or may not be the space in which an elevator or dumb-
complete device necessary to connect waiter is designed to operate.
it into an electrical circuit. Identified (conductors or terminals).
Ground. A conducting connection, Identified, as used in reference to a
whether intentional or accidental, be- conductor or its terminal, means that
tween an electrical circuit or equip- such conductor or terminal can be rec-
ment and the earth, or to some con- ognized as grounded.
ducting body that serves in place of the Identified (for the use). Recognized as
earth. suitable for the specific purpose, func-
Grounded. Connected to earth or to tion, use, environment, application,
some conducting body that serves in etc. where described as a requirement
place of the earth. in this standard. Suitability of equip-
Grounded, effectively (Over 600 volts, ment for a specific purpose, environ-
nominal.) Permanently connected to ment, or application is determined by a
earth through a ground connection of qualified testing laboratory where such
sufficiently low impedance and having identification includes labeling or list-
sufficient ampacity that ground fault ing.
current which may occur cannot build Insulated conductor. See Conductor.
up to voltages dangerous to personnel. Interrupter switch. (Over 600 volts,
Grounded conductor. A system or cir- nominal.) A switch capable of making,
cuit conductor that is intentionally carrying, and interrupting specified
grounded. currents.
Grounding conductor. A conductor Intrinsically safe equipment and associ-
used to connect equipment or the ated wiring. Equipment and associated
grounded circuit of a wiring system to wiring in which any spark or thermal
a grounding electrode or electrodes. effect, produced either normally or in
Grounding conductor, equipment. The specified fault conditions, is incapable,
conductor used to connect the noncur- under certain prescribed test condi-
rent-carrying metal parts of equip- tions, of causing ignition of a mixture
ment, raceways, and other enclosures of flammable or combustible material
to the system grounded conductor and/ in air in its most easily ignitible con-
or the grounding electrode conductor centration.

272

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00282 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.449

Isolated. Not readily accessible to circuit, or ground fault. A current in


persons unless special means for access excess of rating may be accommodated
are used. by certain equipment and conductors
Isolated power system. A system com- for a given set of conditions. Hence the
prising an isolating transformer or its rules for overcurrent protection are
equivalent, a line isolation monitor, specific for particular situations.
and its ungrounded circuit conductors. Overload. Operation of equipment in
Labeled. Equipment or materials to excess of normal, full load rating, or of
which has been attached a label, sym- a conductor in excess of rated
bol or other identifying mark of a ampacity which, when it persists for a
qualified testing laboratory which indi- sufficient length of time, would cause
cates compliance with appropriate damage or dangerous overheating. A
standards or performance in a specified
fault, such as a short circuit or ground
manner.
fault, is not an overload.
Lighting outlet. An outlet intended for
(SeeOvercurrent.)
the direct connection of a lampholder,
a lighting fixture, or a pendant cord Panelboard. A single panel or group of
terminating in a lampholder. panel units designed for assembly in
Listed. Equipment or materials in- the form of a single panel; including
cluded in a list published by a qualified buses, automatic overcurrent devices,
testing laboratory whose listing states and with or without switches for the
either that the equipment or material control of light, heat, or power cir-
meets appropriate standards or has cuits; designed to be placed in a cabi-
been tested and found suitable for use net or cutout box placed in or against
in a specified manner. a wall or partition and accessible only
Location(a) Damp location. Partially from the front. (See Switchboard.)
protected locations under canopies, Portable X-ray. X-ray equipment de-
marquees, roofed open porches, and signed to be hand-carried.
like locations, and interior locations Power fuse. (Over 600 volts, nominal.)
subject to moderate degrees of mois- See Fuse.
ture, such as some basements. Power outlet. An enclosed assembly
(b) Dry location. A location not nor- which may include receptacles, circuit
mally subject to dampness or wetness. breakers, fuseholders, fused switches,
A location classified as dry may be buses and watt-hour meter mounting
temporarily subject to dampness or means; intended to serve as a means
wetness, as in the case of a building for distributing power required to oper-
under construction. ate mobile or temporarily installed
(c) Wet location. Installations under- equipment.
ground or in concrete slabs or masonry Premises wiring system. That interior
in direct contact with the earth, and
and exterior wiring, including power,
locations subject to saturation with
lighting, control, and signal circuit
water or other liquids, such as loca-
wiring together with all of its associ-
tions exposed to weather and unpro-
ated hardware, fittings, and wiring de-
tected.
vices, both permanently and tempo-
Mobile X-ray. X-ray equipment
mounted on a permanent base with rarily installed, which extends from
wheels and/or casters for moving while the load end of the service drop, or load
completely assembled. end of the service lateral conductors to
Motor control center. An assembly of the outlet(s). Such wiring does not in-
one or more enclosed sections having a clude wiring internal to appliances, fix-
common power bus and principally con- tures, motors, controllers, motor con-
taining motor control units. trol centers, and similar equipment.
Outlet. A point on the wiring system Qualified person. One familiar with
at which current is taken to supply the construction and operation of the
utilization equipment. equipment and the hazards involved.
Overcurrent. Any current in excess of Qualified testing laboratory. A prop-
the rated current of equipment or the erly equipped and staffed testing lab-
ampacity of a conductor. It may result oratory which has capabilities for and
from overload (see definition), short which provides the following services:

273

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00283 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.449 29 CFR Ch. XVII (7112 Edition)

(a) Experimental testing for safety of Sealable equipment. Equipment en-


specified items of equipment and mate- closed in a case or cabinet that is pro-
rials referred to in this standard to de- vided with a means of sealing or lock-
termine compliance with appropriate ing so that live parts cannot be made
test standards or performance in a accessible without opening the enclo-
specified manner; sure. The equipment may or may not
(b) Inspecting the run of such items be operable without opening the enclo-
of equipment and materials at fac- sure.
tories for product evaluation to assure Separately derived system. A premises
compliance with the test standards; wiring system whose power is derived
(c) Service-value determinations from generator, transformer, or con-
through field inspections to monitor verter windings and has no direct elec-
the proper use of labels on products trical connection, including a solidly
and with authority for recall of the connected grounded circuit conductor,
label in the event a hazardous product to supply conductors originating in an-
is installed; other system.
(d) Employing a controlled procedure Service. The conductors and equip-
for identifying the listed and/or labeled ment for delivering energy from the
equipment or materials tested; and electricity supply system to the wiring
system of the premises served.
(e) Rendering creditable reports or
Service conductors. The supply con-
findings that are objective and without
ductors that extend from the street
bias of the tests and test methods em-
main or from transformers to the serv-
ployed.
ice equipment of the premises supplied.
Raceway. A channel designed ex- Service drop. The overhead service
pressly for holding wires, cables, or conductors from the last pole or other
busbars, with additional functions as aerial support to and including the
permitted in this subpart. Raceways splices, if any, connecting to the serv-
may be of metal or insulating material, ice-entrance conductors at the building
and the term includes rigid metal con- or other structure.
duit, rigid nonmetallic conduit, inter- Service-entrance conductors, overhead
mediate metal conduit, liquidtight system. The service conductors between
flexible metal conduit, flexible metal- the terminals of the service equipment
lic tubing, flexible metal conduit, elec- and a point usually outside the build-
trical metallic tubing, underfloor race- ing, clear of building walls, where
ways, cellular concrete floor raceways, joined by tap or splice to the service
cellular metal floor raceways, surface drop.
raceways, wireways, and busways. Service-entrance conductors, under-
Readily accessible. Capable of being ground system. The service conductors
reached quickly for operation, renewal, between the terminals of the service
or inspections, without requiring those equipment and the point of connection
to whom ready access is requisite to to the service lateral. Where service
climb over or remove obstacles or to equipment is located outside the build-
resort to portable ladders, chairs, etc. ing walls, there may be no service-en-
(See Accessible.) trance conductors, or they may be en-
Receptacle. A receptacle is a contact tirely outside the building.
device installed at the outlet for the Service equipment. The necessary
connection of a single attachment equipment, usually consisting of a cir-
plug. A single receptacle is a single cuit breaker or switch and fuses, and
contact device with no other contact their accessories, located near the
device on the same yoke. A multiple point of entrance of supply conductors
receptacle is a single device containing to a building or other structure, or an
two or more receptacles. otherwise defined area, and intended to
Receptacle outlet. An outlet where one constitute the main control and means
or more receptacles are installed. of cutoff of the supply.
Remote-control circuit. Any electric Service raceway. The raceway that en-
circuit that controls any other circuit closes the service-entrance conductors.
through a relay or an equivalent de- Signaling circuit. Any electric circuit
vice. that energizes signaling equipment.

274

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00284 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.450

Switchboard. A large single panel, Volatile flammable liquid. A flammable


frame, or assembly of panels which liquid having a flash point below 38 de-
have switches, buses, instruments, grees C (100 degrees F) or whose tem-
overcurrent and other protective de- perature is above its flash point, or a
vices mounted on the face or back or Class II combustible liquid having a
both. Switchboards are generally ac- vapor pressure not exceeding 40 psia
cessible from the rear as well as from (276 kPa) at 38 C (100 F) whose tem-
the front and are not intended to be in- perature is above its flash point.
stalled in cabinets. (See Panelboard.) Voltage. (Of a circuit.) The greatest
Switches(a) General-use switch. A root-mean-square (effective) difference
switch intended for use in general dis- of potential between any two conduc-
tribution and branch circuits. It is tors of the circuit concerned.
rated in amperes, and it is capable of Voltage, nominal. A nominal value as-
interrupting its rated current at its signed to a circuit or system for the
rated voltage. purpose of conveniently designating its
(b) General-use snap switch. A form of voltage class (as 120/240, 480Y/277, 600,
general-use switch so constructed that etc.). The actual voltage at which a cir-
it can be installed in flush device boxes cuit operates can vary from the nomi-
or on outlet box covers, or otherwise nal within a range that permits satis-
used in conjunction with wiring sys- factory operation of equipment.
tems recognized by this subpart. Voltage to ground. For grounded cir-
(c) Isolating switch. A switch intended cuits, the voltage between the given
for isolating an electric circuit from conductor and that point or conductor
the source of power. It has no inter- of the circuit that is grounded; for
rupting rating, and it is intended to be ungrounded circuits, the greatest volt-
operated only after the circuit has been age between the given conductor and
opened by some other means. any other conductor of the circuit.
(d) Motor-circuit switch. A switch, Watertight. So constructed that mois-
rated in horsepower, capable of inter- ture will not enter the enclosure.
rupting the maximum operating over-
Weatherproof. So constructed or pro-
load current of a motor of the same
tected that exposure to the weather
horsepower rating as the switch at the
will not interfere with successful oper-
rated voltage.
ation. Rainproof, raintight, or water-
Switching devices. (Over 600 volts,
tight equipment can fulfill the require-
nominal.) Devices designed to close
ments for weatherproof where varying
and/or open one or more electric cir-
weather conditions other than wetness,
cuits. Included in this category are cir-
cuit breakers, cutouts, disconnecting such as snow, ice, dust, or temperature
(or isolating) switches, disconnecting extremes, are not a factor.
means, and interrupter switches. Wet location. See Location.
Transportable X-ray. X-ray equipment
installed in a vehicle or that may read- Subpart LScaffolds
ily be disassembled for transport in a
vehicle. AUTHORITY: Section 107, Contract Work
Utilization equipment. Utilization Hours and Safety Standards Act (Construc-
equipment means equipment which uti- tion Safety Act)(40 U.S.C. 333); Secs. 4, 6, 8,
lizes electric energy for mechanical, Occupational Safety and Health Act of 1970
chemical, heating, lighting, or similar (29 U.S.C. 653, 655, 657); Secretary of Labors
useful purpose. Order Nos. 190 (55 FR 9033) and 52007 (72 FR
31159); and 29 CFR part 1911.
Utilization system. A utilization sys-
tem is a system which provides electric SOURCE: 61 FR 46104, Aug. 30, 1996, unless
power and light for employee work- otherwise noted.
places, and includes the premises wir-
ing system and utilization equipment. 1926.450 Scope, application and defi-
nitions applicable to this subpart.
Ventilated. Provided with a means to
permit circulation of air sufficient to (a) Scope and application. This sub-
remove an excess of heat, fumes, or va- part applies to all scaffolds used in
pors. workplaces covered by this part. It

275

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00285 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.450 29 CFR Ch. XVII (7112 Edition)

does not apply to crane or derrick sus- on sloped surfaces such as crawling
pended personnel platforms. The cri- boards.
teria for aerial lifts are set out exclu- Competent person means one who is
sively in 1926.453. capable of identifying existing and pre-
(b) Definitions. Adjustable suspension dictable hazards in the surroundings or
scaffold means a suspension scaffold working conditions which are unsani-
equipped with a hoist(s) that can be op- tary, hazardous, or dangerous to em-
erated by an employee(s) on the scaf- ployees, and who has authorization to
fold. take prompt corrective measures to
Bearer (putlog) means a horizontal eliminate them.
transverse scaffold member (which Continuous run scaffold (Run scaffold)
may be supported by ledgers or run- means a two- point or multi-point ad-
ners) upon which the scaffold platform justable suspension scaffold con-
rests and which joins scaffold uprights, structed using a series of inter-
posts, poles, and similar members. connected braced scaffold members or
Boatswains chair means a single- supporting structures erected to form a
point adjustable suspension scaffold continuous scaffold.
consisting of a seat or sling designed to Coupler means a device for locking
support one employee in a sitting posi- together the tubes of a tube and cou-
tion. pler scaffold.
Body belt (safety belt) means a strap Crawling board (chicken ladder) means
with means both for securing it about a supported scaffold consisting of a
the waist and for attaching it to a lan- plank with cleats spaced and secured to
yard, lifeline, or deceleration device. provide footing, for use on sloped sur-
Body harness means a design of straps faces such as roofs.
which may be secured about the em- Deceleration device means any mecha-
ployee in a manner to distribute the nism, such as a rope grab, rip-stitch
fall arrest forces over at least the lanyard, specially-woven lanyard, tear-
thighs, pelvis, waist, chest and shoul- ing or deforming lanyard, or automatic
ders, with means for attaching it to self-retracting lifeline lanyard, which
other components of a personal fall ar- dissipates a substantial amount of en-
rest system. ergy during a fall arrest or limits the
Brace means a rigid connection that energy imposed on an employee during
holds one scaffold member in a fixed fall arrest.
position with respect to another mem- Double pole (independent pole) scaffold
ber, or to a building or structure. means a supported scaffold consisting
Bricklayers square scaffold means a of a platform(s) resting on cross beams
supported scaffold composed of framed (bearers) supported by ledgers and a
squares which support a platform. double row of uprights independent of
Carpenters bracket scaffold means a support (except ties, guys, braces) from
supported scaffold consisting of a plat- any structure.
form supported by brackets attached to Equivalent means alternative designs,
building or structural walls. materials or methods to protect
Catenary scaffold means a suspension against a hazard which the employer
scaffold consisting of a platform sup- can demonstrate will provide an equal
ported by two essentially horizontal or greater degree of safety for employ-
and parallel ropes attached to struc- ees than the methods, materials or de-
tural members of a building or other signs specified in the standard.
structure. Additional support may be Exposed power lines means electrical
provided by vertical pickups. power lines which are accessible to em-
Chimney hoist means a multi-point ployees and which are not shielded
adjustable suspension scaffold used to from contact. Such lines do not include
provide access to work inside chim- extension cords or power tool cords.
neys. (See Multi-point adjustable sus- Eye or Eye splice means a loop with or
pension scaffold.) without a thimble at the end of a wire
Cleat means a structural block used rope.
at the end of a platform to prevent the Fabricated decking and planking
platform from slipping off its supports. means manufactured platforms made
Cleats are also used to provide footing of wood (including laminated wood, and

276

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00286 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.450

solid sawn wood planks), metal or Lean-to scaffold means a supported


other materials. scaffold which is kept erect by tilting
Fabricated frame scaffold (tubular it toward and resting it against a
welded frame scaffold) means a scaffold building or structure.
consisting of a platform(s) supported Lifeline means a component con-
on fabricated end frames with integral sisting of a flexible line that connects
posts, horizontal bearers, and inter- to an anchorage at one end to hang
mediate members. vertically (vertical lifeline), or that
Failure means load refusal, breakage, connects to anchorages at both ends to
or separation of component parts. Load stretch horizontally (horizontal life-
refusal is the point where the ultimate line), and which serves as a means for
strength is exceeded. connecting other components of a per-
Float (ship) scaffold means a suspen- sonal fall arrest system to the anchor-
sion scaffold consisting of a braced age.
platform resting on two parallel bear- Lower levels means areas below the
ers and hung from overhead supports level where the employee is located
by ropes of fixed length. and to which an employee can fall.
Form scaffold means a supported scaf- Such areas include, but are not limited
fold consisting of a platform supported to, ground levels, floors, roofs, ramps,
by brackets attached to formwork. runways, excavations, pits, tanks, ma-
Guardrail system means a vertical bar- terials, water, and equipment.
rier, consisting of, but not limited to, Masons adjustable supported scaffold
toprails, midrails, and posts, erected to (see Self-contained adjustable scaf-
prevent employees from falling off a fold).
scaffold platform or walkway to lower Masons multi-point adjustable suspen-
levels. sion scaffold means a continuous run
suspension scaffold designed and used
Hoist means a manual or power-oper-
for masonry operations.
ated mechanical device to raise or
Maximum intended load means the
lower a suspended scaffold.
total load of all persons, equipment,
Horse scaffold means a supported scaf-
tools, materials, transmitted loads,
fold consisting of a platform supported
and other loads reasonably anticipated
by construction horses (saw horses).
to be applied to a scaffold or scaffold
Horse scaffolds constructed of metal
component at any one time.
are sometimes known as trestle scaf-
Mobile scaffold means a powered or
folds.
unpowered, portable, caster or wheel-
Independent pole scaffold (see Double mounted supported scaffold.
pole scaffold). Multi-level suspended scaffold means a
Interior hung scaffold means a suspen- two-point or multi-point adjustable
sion scaffold consisting of a platform suspension scaffold with a series of
suspended from the ceiling or roof platforms at various levels resting on
structure by fixed length supports. common stirrups.
Ladder jack scaffold means a sup- Multi-point adjustable suspension scaf-
ported scaffold consisting of a platform fold means a suspension scaffold con-
resting on brackets attached to lad- sisting of a platform(s) which is sus-
ders. pended by more than two ropes from
Ladder stand means a mobile, fixed- overhead supports and equipped with
size, self-supporting ladder consisting means to raise and lower the platform
of a wide flat tread ladder in the form to desired work levels. Such scaffolds
of stairs. include chimney hoists.
Landing means a platform at the end Needle beam scaffold means a platform
of a flight of stairs. suspended from needle beams.
Large area scaffold means a pole scaf- Open sides and ends means the edges
fold, tube and coupler scaffold, systems of a platform that are more than 14
scaffold, or fabricated frame scaffold inches (36 cm) away horizontally from
erected over substantially the entire a sturdy, continuous, vertical surface
work area. For example: a scaffold (such as a building wall) or a sturdy,
erected over the entire floor area of a continuous horizontal surface (such as
room. a floor), or a point of access. Exception:

277

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00287 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.450 29 CFR Ch. XVII (7112 Edition)

For plastering and lathing operations rience, has successfully demonstrated


the horizontal threshold distance is 18 his/her ability to solve or resolve prob-
inches (46 cm). lems related to the subject matter, the
Outrigger means the structural mem- work, or the project.
ber of a supported scaffold used to in- Rated load means the manufacturers
crease the base width of a scaffold in specified maximum load to be lifted by
order to provide support for and in- a hoist or to be applied to a scaffold or
creased stability of the scaffold. scaffold component.
Outrigger beam (Thrustout) means the Repair bracket scaffold means a sup-
structural member of a suspension ported scaffold consisting of a platform
scaffold or outrigger scaffold which supported by brackets which are se-
provides support for the scaffold by ex- cured in place around the circum-
tending the scaffold point of attach- ference or perimeter of a chimney,
ment to a point out and away from the stack, tank or other supporting struc-
structure or building. ture by one or more wire ropes placed
Outrigger scaffold means a supported around the supporting structure.
scaffold consisting of a platform rest- Roof bracket scaffold means a rooftop
ing on outrigger beams (thrustouts) supported scaffold consisting of a plat-
projecting beyond the wall or face of form resting on angular-shaped sup-
the building or structure, the inboard ports.
ends of which are secured inside the
Runner (ledger or ribbon) means the
building or structure.
lengthwise horizontal spacing or brac-
Overhand bricklaying means the proc-
ing member which may support the
ess of laying bricks and masonry units
bearers.
such that the surface of the wall to be
jointed is on the opposite side of the Scaffold means any temporary ele-
wall from the mason, requiring the vated platform (supported or sus-
mason to lean over the wall to com- pended) and its supporting structure
plete the work. It includes mason tend- (including points of anchorage), used
ing and electrical installation incor- for supporting employees or materials
porated into the brick wall during the or both.
overhand bricklaying process. Self-contained adjustable scaffold
Personal fall arrest system means a means a combination supported and
system used to arrest an employees suspension scaffold consisting of an ad-
fall. It consists of an anchorage, con- justable platform(s) mounted on an
nectors, a body belt or body harness independent supporting frame(s) not a
and may include a lanyard, decelera- part of the object being worked on, and
tion device, lifeline, or combinations of which is equipped with a means to per-
these. mit the raising and lowering of the
Platform means a work surface ele- platform(s). Such systems include roll-
vated above lower levels. Platforms ing roof rigs, rolling outrigger systems,
can be constructed using individual and some masons adjustable supported
wood planks, fabricated planks, fab- scaffolds.
ricated decks, and fabricated plat- Shore scaffold means a supported scaf-
forms. fold which is placed against a building
Pole scaffold (see definitions for or structure and held in place with
Single-pole scaffold and Double props.
(independent) pole scaffold). Single-point adjustable suspension scaf-
Power operated hoist means a hoist fold means a suspension scaffold con-
which is powered by other than human sisting of a platform suspended by one
energy. rope from an overhead support and
Pump jack scaffold means a supported equipped with means to permit the
scaffold consisting of a platform sup- movement of the platform to desired
ported by vertical poles and movable work levels.
support brackets. Single-pole scaffold means a supported
Qualified means one who, by posses- scaffold consisting of a platform(s)
sion of a recognized degree, certificate, resting on bearers, the outside ends of
or professional standing, or who by ex- which are supported on runners secured
tensive knowledge, training, and expe- to a single row of posts or uprights, and

278

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00288 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.451

the inner ends of which are supported Two-point suspension scaffold (swing
on or in a structure or building wall. stage) means a suspension scaffold con-
Stair tower (Scaffold stairway/tower) sisting of a platform supported by
means a tower comprised of scaffold hangers (stirrups) suspended by two
components and which contains inter- ropes from overhead supports and
nal stairway units and rest platforms. equipped with means to permit the
These towers are used to provide access raising and lowering of the platform to
to scaffold platforms and other ele- desired work levels.
vated points such as floors and roofs. Unstable objects means items whose
Stall load means the load at which strength, configuration, or lack of sta-
the prime-mover of a power-operated bility may allow them to become dis-
hoist stalls or the power to the prime- located and shift and therefore may
mover is automatically disconnected. not properly support the loads imposed
Step, platform, and trestle ladder scaf- on them. Unstable objects do not con-
fold means a platform resting directly stitute a safe base support for scaf-
on the rungs of step ladders or trestle folds, platforms, or employees. Exam-
ladders. ples include, but are not limited to,
Stilts means a pair of poles or similar barrels, boxes, loose brick, and con-
supports with raised footrests, used to crete blocks.
permit walking above the ground or Vertical pickup means a rope used to
working surface. support the horizontal rope in catenary
Stonesetters multi-point adjustable sus- scaffolds.
pension scaffold means a continuous run Walkway means a portion of a scaf-
suspension scaffold designed and used fold platform used only for access and
for stonesetters operations. not as a work level.
Supported scaffold means one or more Window jack scaffold means a plat-
platforms supported by outrigger form resting on a bracket or jack
beams, brackets, poles, legs, uprights, which projects through a window open-
posts, frames, or similar rigid support. ing.
Suspension scaffold means one or [61 FR 46104, Aug. 30, 1996, as amended at 75
more platforms suspended by ropes or FR 48133, Aug. 9, 2010]
other non-rigid means from an over-
head structure(s). 1926.451 General requirements.
System scaffold means a scaffold con- This section does not apply to aerial
sisting of posts with fixed connection lifts, the criteria for which are set out
points that accept runners, bearers, exclusively in 1926.453.
and diagonals that can be inter- (a) Capacity. (1) Except as provided in
connected at predetermined levels. paragraphs (a)(2), (a)(3), (a)(4), (a)(5)
Tank builders scaffold means a sup- and (g) of this section, each scaffold
ported scaffold consisting of a platform and scaffold component shall be capa-
resting on brackets that are either di- ble of supporting, without failure, its
rectly attached to a cylindrical tank or own weight and at least 4 times the
attached to devices that are attached maximum intended load applied or
to such a tank. transmitted to it.
Top plate bracket scaffold means a (2) Direct connections to roofs and
scaffold supported by brackets that floors, and counterweights used to bal-
hook over or are attached to the top of ance adjustable suspension scaffolds,
a wall. This type of scaffold is similar shall be capable of resisting at least 4
to carpenters bracket scaffolds and times the tipping moment imposed by
form scaffolds and is used in residen- the scaffold operating at the rated load
tial construction for setting trusses. of the hoist, or 1.5 (minimum) times
Tube and coupler scaffold means a sup- the tipping moment imposed by the
ported or suspended scaffold consisting scaffold operating at the stall load of
of a platform(s) supported by tubing, the hoist, whichever is greater.
erected with coupling devices con- (3) Each suspension rope, including
necting uprights, braces, bearers, and connecting hardware, used on non-ad-
runners. justable suspension scaffolds shall be
Tubular welded frame scaffold (see capable of supporting, without failure,
Fabricated frame scaffold). at least 6 times the maximum intended

279

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00289 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.451 29 CFR Ch. XVII (7112 Edition)

load applied or transmitted to that each scaffold platform and walkway


rope. shall be at least 18 inches (46 cm) wide.
(4) Each suspension rope, including (i) Each ladder jack scaffold, top
connecting hardware, used on adjust- plate bracket scaffold, roof bracket
able suspension scaffolds shall be capa- scaffold, and pump jack scaffold shall
ble of supporting, without failure, at be at least 12 inches (30 cm) wide.
least 6 times the maximum intended There is no minimum width require-
load applied or transmitted to that ment for boatswains chairs.
rope with the scaffold operating at ei-
ther the rated load of the hoist, or 2 NOTE TO PARAGRAPH (b)(2)(i): Pursuant to
an administrative stay effective November
(minimum) times the stall load of the
29, 1996 and published in the FEDERAL REG-
hoist, whichever is greater. ISTER on November 25, 1996, the requirement
(5) The stall load of any scaffold hoist in paragraph (b)(2)(i) that roof bracket scaf-
shall not exceed 3 times its rated load. folds be at least 12 inches wide is stayed
(6) Scaffolds shall be designed by a until November 25, 1997 or until rulemaking
qualified person and shall be con- regarding the minimum width of roof brack-
structed and loaded in accordance with et scaffolds has been completed, whichever is
that design. Non-mandatory appendix later.
A to this subpart contains examples of (ii) Where scaffolds must be used in
criteria that will enable an employer areas that the employer can dem-
to comply with paragraph (a) of this onstrate are so narrow that platforms
section. and walkways cannot be at least 18
(b) Scaffold platform construction. (1) inches (46 cm) wide, such platforms and
Each platform on all working levels of walkways shall be as wide as feasible,
scaffolds shall be fully planked or and employees on those platforms and
decked between the front uprights and walkways shall be protected from fall
the guardrail supports as follows: hazards by the use of guardrails and/or
(i) Each platform unit (e.g., scaffold personal fall arrest systems.
plank, fabricated plank, fabricated
(3) Except as provided in paragraphs
deck, or fabricated platform) shall be
(b)(3) (i) and (ii) of this section, the
installed so that the space between ad-
front edge of all platforms shall not be
jacent units and the space between the
more than 14 inches (36 cm) from the
platform and the uprights is no more
face of the work, unless guardrail sys-
than 1 inch (2.5 cm) wide, except where
the employer can demonstrate that a tems are erected along the front edge
wider space is necessary (for example, and/or personal fall arrest systems are
to fit around uprights when side brack- used in accordance with paragraph (g)
ets are used to extend the width of the of this section to protect employees
platform). from falling.
(ii) Where the employer makes the (i) The maximum distance from the
demonstration provided for in para- face for outrigger scaffolds shall be 3
graph (b)(1)(i) of this section, the plat- inches (8 cm);
form shall be planked or decked as (ii) The maximum distance from the
fully as possible and the remaining face for plastering and lathing oper-
open space between the platform and ations shall be 18 inches (46 cm).
the uprights shall not exceed 912 inches (4) Each end of a platform, unless
(24.1 cm). cleated or otherwise restrained by
Exception to paragraph (b)(1): The re- hooks or equivalent means, shall ex-
quirement in paragraph (b)(1) to pro- tend over the centerline of its support
vide full planking or decking does not at least 6 inches (15 cm).
apply to platforms used solely as walk- (5)(i) Each end of a platform 10 feet or
ways or solely by employees per- less in length shall not extend over its
forming scaffold erection or disman- support more than 12 inches (30 cm) un-
tling. In these situations, only the less the platform is designed and in-
planking that the employer establishes stalled so that the cantilevered portion
is necessary to provide safe working of the platform is able to support em-
conditions is required. ployees and/or materials without tip-
(2) Except as provided in paragraphs ping, or has guardrails which block em-
(b)(2)(i) and (b)(2)(ii) of this section, ployee access to the cantilevered end.

280

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00290 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.451

(ii) Each platform greater than 10 nent to a level below that required by
feet in length shall not extend over its paragraph (a)(1) of this section.
support more than 18 inches (46 cm), (c) Criteria for supported scaffolds. (1)
unless it is designed and installed so Supported scaffolds with a height to
that the cantilevered portion of the base width (including outrigger sup-
platform is able to support employees ports, if used) ratio of more than four
without tipping, or has guardrails to one (4:1) shall be restrained from tip-
which block employee access to the ping by guying, tying, bracing, or
cantilevered end. equivalent means, as follows:
(6) On scaffolds where scaffold planks (i) Guys, ties, and braces shall be in-
are abutted to create a long platform, stalled at locations where horizontal
each abutted end shall rest on a sepa- members support both inner and outer
rate support surface. This provision legs.
does not preclude the use of common (ii) Guys, ties, and braces shall be in-
support members, such as T sec- stalled according to the scaffold manu-
tions, to support abutting planks, or facturers recommendations or at the
hook on platforms designed to rest on closest horizontal member to the 4:1
common supports. height and be repeated vertically at lo-
(7) On scaffolds where platforms are cations of horizontal members every 20
overlapped to create a long platform, feet (6.1 m) or less thereafter for scaf-
the overlap shall occur only over sup- folds 3 feet (0.91 m) wide or less, and
ports, and shall not be less than 12 every 26 feet (7.9 m) or less thereafter
inches (30 cm) unless the platforms are for scaffolds greater than 3 feet (0.91 m)
nailed together or otherwise restrained wide. The top guy, tie or brace of com-
to prevent movement. pleted scaffolds shall be placed no fur-
(8) At all points of a scaffold where ther than the 4:1 height from the top.
the platform changes direction, such as Such guys, ties and braces shall be in-
turning a corner, any platform that stalled at each end of the scaffold and
rests on a bearer at an angle other than at horizontal intervals not to exceed 30
a right angle shall be laid first, and feet (9.1 m) (measured from one end
platforms which rest at right angles [not both] towards the other).
over the same bearer shall be laid sec- (iii) Ties, guys, braces, or outriggers
ond, on top of the first platform. shall be used to prevent the tipping of
(9) Wood platforms shall not be cov- supported scaffolds in all cir-
ered with opaque finishes, except that cumstances where an eccentric load,
platform edges may be covered or such as a cantilevered work platform,
marked for identification. Platforms is applied or is transmitted to the scaf-
may be coated periodically with wood fold.
preservatives, fire-retardant finishes, (2) Supported scaffold poles, legs,
and slip-resistant finishes; however, posts, frames, and uprights shall bear
the coating may not obscure the top or on base plates and mud sills or other
bottom wood surfaces. adequate firm foundation.
(10) Scaffold components manufac- (i) Footings shall be level, sound,
tured by different manufacturers shall rigid, and capable of supporting the
not be intermixed unless the compo- loaded scaffold without settling or dis-
nents fit together without force and placement.
the scaffolds structural integrity is (ii) Unstable objects shall not be used
maintained by the user. Scaffold com- to support scaffolds or platform units.
ponents manufactured by different (iii) Unstable objects shall not be
manufacturers shall not be modified in used as working platforms.
order to intermix them unless a com- (iv) Front-end loaders and similar
petent person determines the resulting pieces of equipment shall not be used
scaffold is structurally sound. to support scaffold platforms unless
(11) Scaffold components made of dis- they have been specifically designed by
similar metals shall not be used to- the manufacturer for such use.
gether unless a competent person has (v) Fork-lifts shall not be used to
determined that galvanic action will support scaffold platforms unless the
not reduce the strength of any compo- entire platform is attached to the fork

281

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00291 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.451 29 CFR Ch. XVII (7112 Edition)

and the fork-lift is not moved hori- (v) Counterweights shall not be re-
zontally while the platform is occu- moved from an outrigger beam until
pied. the scaffold is disassembled.
(3) Supported scaffold poles, legs, (vi) Outrigger beams which are not
posts, frames, and uprights shall be stabilized by bolts or other direct con-
plumb and braced to prevent swaying nections to the floor or roof deck shall
and displacement. be secured by tiebacks.
(d) Criteria for suspension scaffolds. (1) (vii) Tiebacks shall be equivalent in
All suspension scaffold support devices, strength to the suspension ropes.
such as outrigger beams, cornice (viii) Outrigger beams shall be placed
hooks, parapet clamps, and similar de- perpendicular to its bearing support
vices, shall rest on surfaces capable of (usually the face of the building or
supporting at least 4 times the load im- structure). However, where the em-
posed on them by the scaffold oper- ployer can demonstrate that it is not
ating at the rated load of the hoist (or possible to place an outrigger beam
at least 1.5 times the load imposed on perpendicular to the face of the build-
them by the scaffold at the stall capac- ing or structure because of obstruc-
ity of the hoist, whichever is greater). tions that cannot be moved, the out-
(2) Suspension scaffold outrigger rigger beam may be placed at some
beams, when used, shall be made of other angle, provided opposing angle
structural metal or equivalent tiebacks are used.
strength material, and shall be re- (ix) Tiebacks shall be secured to a
strained to prevent movement. structurally sound anchorage on the
(3) The inboard ends of suspension building or structure. Sound anchor-
scaffold outrigger beams shall be sta- ages include structural members, but
bilized by bolts or other direct connec- do not include standpipes, vents, other
tions to the floor or roof deck, or they piping systems, or electrical conduit.
shall have their inboard ends stabilized (x) Tiebacks shall be installed per-
by counterweights, except masons pendicular to the face of the building
multi-point adjustable suspension scaf- or structure, or opposing angle
fold outrigger beams shall not be sta- tiebacks shall be installed. Single
bilized by counterweights. tiebacks installed at an angle are pro-
(i) Before the scaffold is used, direct hibited.
connections shall be evaluated by a (4) Suspension scaffold outrigger
competent person who shall confirm, beams shall be:
based on the evaluation, that the sup- (i) Provided with stop bolts or shack-
porting surfaces are capable of sup- les at both ends;
porting the loads to be imposed. In ad- (ii) Securely fastened together with
dition, masons multi-point adjustable the flanges turned out when channel
suspension scaffold connections shall iron beams are used in place of I-
be designed by an engineer experienced beams;
in such scaffold design. (iii) Installed with all bearing sup-
(ii) Counterweights shall be made of ports perpendicular to the beam center
non-flowable material. Sand, gravel line;
and similar materials that can be eas- (iv) Set and maintained with the web
ily dislocated shall not be used as in a vertical position; and
counterweights. (v) When an outrigger beam is used,
(iii) Only those items specifically de- the shackle or clevis with which the
signed as counterweights shall be used rope is attached to the outrigger beam
to counterweight scaffold systems. shall be placed directly over the center
Construction materials such as, but line of the stirrup.
not limited to, masonry units and rolls (5) Suspension scaffold support de-
of roofing felt, shall not be used as vices such as cornice hooks, roof
counterweights. hooks, roof irons, parapet clamps, or
(iv) Counterweights shall be secured similar devices shall be:
by mechanical means to the outrigger (i) Made of steel, wrought iron, or
beams to prevent accidental displace- materials of equivalent strength;
ment. (ii) Supported by bearing blocks; and

282

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00292 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.451

(iii) Secured against movement by (vi) Evidence that the secondary


tiebacks installed at right angles to brake has been activated during an
the face of the building or structure, or overspeed condition and has engaged
opposing angle tiebacks shall be in- the suspension rope.
stalled and secured to a structurally (11) Swaged attachments or spliced
sound point of anchorage on the build- eyes on wire suspension ropes shall not
ing or structure. Sound points of an- be used unless they are made by the
chorage include structural members, wire rope manufacturer or a qualified
but do not include standpipes, vents, person.
other piping systems, or electrical con- (12) When wire rope clips are used on
duit. suspension scaffolds:
(iv) Tiebacks shall be equivalent in (i) There shall be a minimum of 3
strength to the hoisting rope. wire rope clips installed, with the clips
(6) When winding drum hoists are a minimum of 6 rope diameters apart;
used on a suspension scaffold, they (ii) Clips shall be installed according
shall contain not less than four wraps to the manufacturers recommenda-
of the suspension rope at the lowest tions;
point of scaffold travel. When other (iii) Clips shall be retightened to the
types of hoists are used, the suspension manufacturers recommendations after
ropes shall be long enough to allow the the initial loading;
scaffold to be lowered to the level (iv) Clips shall be inspected and re-
below without the rope end passing tightened to the manufacturers rec-
through the hoist, or the rope end shall ommendations at the start of each
be configured or provided with means workshift thereafter;
to prevent the end from passing (v) U-bolt clips shall not be used at
through the hoist. the point of suspension for any scaffold
(7) The use of repaired wire rope as hoist;
suspension rope is prohibited. (vi) When U-bolt clips are used, the
(8) Wire suspension ropes shall not be U-bolt shall be placed over the dead
joined together except through the use end of the rope, and the saddle shall be
of eye splice thimbles connected with placed over the live end of the rope.
shackles or coverplates and bolts. (13) Suspension scaffold power-oper-
(9) The load end of wire suspension ated hoists and manual hoists shall be
ropes shall be equipped with proper size tested by a qualified testing labora-
thimbles and secured by eyesplicing or tory.
equivalent means. (14) Gasoline-powered equipment and
(10) Ropes shall be inspected for de- hoists shall not be used on suspension
fects by a competent person prior to scaffolds.
each workshift and after every occur- (15) Gears and brakes of power-oper-
rence which could affect a ropes integ- ated hoists used on suspension scaf-
rity. Ropes shall be replaced if any of folds shall be enclosed.
the following conditions exist: (16) In addition to the normal oper-
(i) Any physical damage which im- ating brake, suspension scaffold power-
pairs the function and strength of the operated hoists and manually operated
rope. hoists shall have a braking device or
(ii) Kinks that might impair the locking pawl which engages automati-
tracking or wrapping of rope around cally when a hoist makes either of the
the drum(s) or sheave(s). following uncontrolled movements: an
(iii) Six randomly distributed broken instantaneous change in momentum or
wires in one rope lay or three broken an accelerated overspeed.
wires in one strand in one rope lay. (17) Manually operated hoists shall
(iv) Abrasion, corrosion, scrubbing, require a positive crank force to de-
flattening or peening causing loss of scend.
more than one-third of the original di- (18) Two-point and multi-point sus-
ameter of the outside wires. pension scaffolds shall be tied or other-
(v) Heat damage caused by a torch or wise secured to prevent them from
any damage caused by contact with swaying, as determined to be necessary
electrical wires. based on an evaluation by a competent

283

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00293 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.451 29 CFR Ch. XVII (7112 Edition)

person. Window cleaners anchors shall cm) above the scaffold supporting
not be used for this purpose. level;
(19) Devices whose sole function is to (ii) Be provided with rest platforms
provide emergency escape and rescue at 12 foot (3.7 m) maximum vertical in-
shall not be used as working platforms. tervals;
This provision does not preclude the (iii) Have a minimum step width of 16
use of systems which are designed to inches (41 cm), except that mobile scaf-
function both as suspension scaffolds fold stairway-type ladders shall have a
and emergency systems. minimum step width of 1112 inches (30
(e) Access. This paragraph applies to cm); and
scaffold access for all employees. Ac- (iv) Have slip-resistant treads on all
cess requirements for employees erect- steps and landings.
ing or dismantling supported scaffolds (4) Stairtowers (scaffold stairway/
are specifically addressed in paragraph towers) shall be positioned such that
(e)(9) of this section. their bottom step is not more than 24
(1) When scaffold platforms are more inches (61 cm.) above the scaffold sup-
than 2 feet (0.6 m) above or below a porting level.
point of access, portable ladders, hook- (i) A stairrail consisting of a toprail
on ladders, attachable ladders, stair and a midrail shall be provided on each
towers (scaffold stairways/towers), side of each scaffold stairway.
stairway-type ladders (such as ladder (ii) The toprail of each stairrail sys-
stands), ramps, walkways, integral pre- tem shall also be capable of serving as
fabricated scaffold access, or direct ac- a handrail, unless a separate handrail
cess from another scaffold, structure, is provided.
personnel hoist, or similar surface
(iii) Handrails, and toprails that
shall be used. Crossbraces shall not be
serve as handrails, shall provide an
used as a means of access.
adequate handhold for employees
(2) Portable, hook-on, and attachable
grasping them to avoid falling.
ladders (Additional requirements for
(iv) Stairrail systems and handrails
the proper construction and use of
shall be surfaced to prevent injury to
portable ladders are contained in sub-
employees from punctures or lacera-
part X of this partStairways and
tions, and to prevent snagging of cloth-
Ladders):
ing.
(i) Portable, hook-on, and attachable
ladders shall be positioned so as not to (v) The ends of stairrail systems and
tip the scaffold; handrails shall be constructed so that
(ii) Hook-on and attachable ladders they do not constitute a projection
shall be positioned so that their bot- hazard.
tom rung is not more than 24 inches (61 (vi) Handrails, and toprails that are
cm) above the scaffold supporting used as handrails, shall be at least 3
level; inches (7.6 cm) from other objects.
(iii) When hook-on and attachable (vii) Stairrails shall be not less than
ladders are used on a supported scaffold 28 inches (71 cm) nor more than 37
more than 35 feet (10.7 m) high, they inches (94 cm) from the upper surface
shall have rest platforms at 35-foot of the stairrail to the surface of the
(10.7 m) maximum vertical intervals. tread, in line with the face of the riser
(iv) Hook-on and attachable ladders at the forward edge of the tread.
shall be specifically designed for use (viii) A landing platform at least 18
with the type of scaffold used; inches (45.7 cm) wide by at least 18
(v) Hook-on and attachable ladders inches (45.7 cm) long shall be provided
shall have a minimum rung length of at each level.
1112 inches (29 cm); and (ix) Each scaffold stairway shall be at
(vi) Hook-on and attachable ladders least 18 inches (45.7 cm) wide between
shall have uniformly spaced rungs with stairrails.
a maximum spacing between rungs of (x) Treads and landings shall have
1634 inches. slip-resistant surfaces.
(3) Stairway-type ladders shall: (xi) Stairways shall be installed be-
(i) Be positioned such that their bot- tween 40 degrees and 60 degrees from
tom step is not more than 24 inches (61 the horizontal.

284

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00294 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.451

(xii) Guardrails meeting the require- inches (61 cm) vertically from the other
ments of paragraph (g)(4) of this sec- surface.
tion shall be provided on the open sides (9) Effective September 2, 1997, access
and ends of each landing. for employees erecting or dismantling
(xiii) Riser height shall be uniform, supported scaffolds shall be in accord-
within 14 inch, (0.6 cm) for each flight ance with the following:
of stairs. Greater variations in riser (i) The employer shall provide safe
height are allowed for the top and bot- means of access for each employee
tom steps of the entire system, not for erecting or dismantling a scaffold
each flight of stairs. where the provision of safe access is
(xiv) Tread depth shall be uniform,
feasible and does not create a greater
within 14 inch, for each flight of stairs.
hazard. The employer shall have a com-
(5) Ramps and walkways. (i) Ramps
petent person determine whether it is
and walkways 6 feet (1.8 m) or more
feasible or would pose a greater hazard
above lower levels shall have guardrail
to provide, and have employees use a
systems which comply with subpart M
of this partFall Protection; safe means of access. This determina-
(ii) No ramp or walkway shall be in- tion shall be based on site conditions
clined more than a slope of one (1) and the type of scaffold being erected
vertical to three (3) horizontal (20 de- or dismantled.
grees above the horizontal). (ii) Hook-on or attachable ladders
(iii) If the slope of a ramp or a walk- shall be installed as soon as scaffold
way is steeper than one (1) vertical in erection has progressed to a point that
eight (8) horizontal, the ramp or walk- permits safe installation and use.
way shall have cleats not more than (iii) When erecting or dismantling tu-
fourteen (14) inches (35 cm) apart which bular welded frame scaffolds, (end)
are securely fastened to the planks to frames, with horizontal members that
provide footing. are parallel, level and are not more
(6) Integral prefabricated scaffold ac- than 22 inches apart vertically may be
cess frames shall: used as climbing devices for access,
(i) Be specifically designed and con- provided they are erected in a manner
structed for use as ladder rungs; that creates a usable ladder and pro-
(ii) Have a rung length of at least 8 vides good hand hold and foot space.
inches (20 cm); (iv) Cross braces on tubular welded
(iii) Not be used as work platforms frame scaffolds shall not be used as a
when rungs are less than 1112 inches in means of access or egress.
length, unless each affected employee (f) Use. (1) Scaffolds and scaffold com-
uses fall protection, or a positioning ponents shall not be loaded in excess of
device, which complies with 1926.502; their maximum intended loads or rated
(iv) Be uniformly spaced within each capacities, whichever is less.
frame section; (2) The use of shore or lean-to scaf-
(v) Be provided with rest platforms at folds is prohibited.
35-foot (10.7 m) maximum vertical in-
(3) Scaffolds and scaffold components
tervals on all supported scaffolds more
shall be inspected for visible defects by
than 35 feet (10.7 m) high; and
(vi) Have a maximum spacing be- a competent person before each work
tween rungs of 1634 inches (43 cm). Non- shift, and after any occurrence which
uniform rung spacing caused by joining could affect a scaffolds structural in-
end frames together is allowed, pro- tegrity.
vided the resulting spacing does not ex- (4) Any part of a scaffold damaged or
ceed 1634 inches (43 cm). weakened such that its strength is less
(7) Steps and rungs of ladder and than that required by paragraph (a) of
stairway type access shall line up this section shall be immediately re-
vertically with each other between rest paired or replaced, braced to meet
platforms. those provisions, or removed from serv-
(8) Direct access to or from another ice until repaired.
surface shall be used only when the (5) Scaffolds shall not be moved hori-
scaffold is not more than 14 inches (36 zontally while employees are on them,
cm) horizontally and not more than 24 unless they have been designed by a

285

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00295 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.451 29 CFR Ch. XVII (7112 Edition)

registered professional engineer spe- Scaffolds shall not be erected, used,


cifically for such movement or, for mo- dismantled, altered, or moved such
bile scaffolds, where the provisions of that they or any conductive material
1926.452(w) are followed. handled on them might come closer to
(6) The clearance between scaffolds exposed and energized power lines than
and power lines shall be as follows: as follows:
Insulated lines Minimum distance Alternatives
voltage

Less than 300 volts .......................... 3 feet (0.9 m).


300 volts to 50 kv ............................ 10 feet (3.1m).
More than 50 kv ............................... 10 feet (3.1 m) plus 0.4 inches (1.0 cm) for 2 times the length of the line insulator, but
each 1 kv over 50 kv. never less than 10 feet (3.1 m).

Uninsulated lines Minimum distance Alternatives


voltage

Less than 50 kv ............................... 10 feet (3.1 m).


More than 50 kv ............................... 10 feet (3.1 m) plus 0.4 inches (1.0 cm) for 2 times the length of the line insulator, but
each 1 kv over 50 kv. never less than 10 feet (3.1 m).

EXCEPTION TO PARAGRAPH (f)(6): Scaffolds tect against the corrosive substances,


and materials may be closer to power lines or shall be of a material that will not
than specified above where such clearance is be damaged by the substance being
necessary for performance of work, and only
after the utility company, or electrical sys- used.
tem operator, has been notified of the need (12) Work on or from scaffolds is pro-
to work closer and the utility company, or hibited during storms or high winds
electrical system operator, has deenergized unless a competent person has deter-
the lines, relocated the lines, or installed mined that it is safe for employees to
protective coverings to prevent accidental be on the scaffold and those employees
contact with the lines.
are protected by a personal fall arrest
(7) Scaffolds shall be erected, moved, system or wind screens. Wind screens
dismantled, or altered only under the shall not be used unless the scaffold is
supervision and direction of a com- secured against the anticipated wind
petent person qualified in scaffold erec- forces imposed.
tion, moving, dismantling or alter- (13) Debris shall not be allowed to ac-
ation. Such activities shall be per- cumulate on platforms.
formed only by experienced and trained (14) Makeshift devices, such as but
employees selected for such work by not limited to boxes and barrels, shall
the competent person. not be used on top of scaffold platforms
(8) Employees shall be prohibited
to increase the working level height of
from working on scaffolds covered with
employees.
snow, ice, or other slippery material
except as necessary for removal of such (15) Ladders shall not be used on scaf-
materials. folds to increase the working level
(9) Where swinging loads are being height of employees, except on large
hoisted onto or near scaffolds such that area scaffolds where employers have
the loads might contact the scaffold, satisfied the following criteria:
tag lines or equivalent measures to (i) When the ladder is placed against
control the loads shall be used. a structure which is not a part of the
(10) Suspension ropes supporting ad- scaffold, the scaffold shall be secured
justable suspension scaffolds shall be of against the sideways thrust exerted by
a diameter large enough to provide suf- the ladder;
ficient surface area for the functioning (ii) The platform units shall be se-
of brake and hoist mechanisms. cured to the scaffold to prevent their
(11) Suspension ropes shall be shield- movement;
ed from heat-producing processes. (iii) The ladder legs shall be on the
When acids or other corrosive sub- same platform or other means shall be
stances are used on a scaffold, the provided to stabilize the ladder against
ropes shall be shielded, treated to pro- unequal platform deflection, and

286

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00296 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.451

(iv) The ladder legs shall be secured suspension scaffold support systems on
to prevent them from slipping or being floors, roofs, and other elevated surfaces are
pushed off the platform. set forth in subpart M of this part.
(16) Platforms shall not deflect more (i) Each employee on a boatswains
than 160 of the span when loaded. chair, catenary scaffold, float scaffold,
(17) To reduce the possibility of weld-
needle beam scaffold, or ladder jack
ing current arcing through the suspen-
scaffold shall be protected by a per-
sion wire rope when performing weld-
ing from suspended scaffolds, the fol- sonal fall arrest system;
lowing precautions shall be taken, as (ii) Each employee on a single-point
applicable: or two-point adjustable suspension
(i) An insulated thimble shall be used scaffold shall be protected by both a
to attach each suspension wire rope to personal fall arrest system and guard-
its hanging support (such as cornice rail system;
hook or outrigger). Excess suspension (iii) Each employee on a crawling
wire rope and any additional inde- board (chicken ladder) shall be pro-
pendent lines from grounding shall be tected by a personal fall arrest system,
insulated; a guardrail system (with minimum 200
(ii) The suspension wire rope shall be pound toprail capacity), or by a three-
covered with insulating material ex- fourth inch (1.9 cm) diameter grabline
tending at least 4 feet (1.2 m) above the or equivalent handhold securely fas-
hoist. If there is a tail line below the tened beside each crawling board;
hoist, it shall be insulated to prevent (iv) Each employee on a self-con-
contact with the platform. The portion
tained adjustable scaffold shall be pro-
of the tail line that hangs free below
tected by a guardrail system (with
the scaffold shall be guided or retained,
or both, so that it does not become minimum 200 pound toprail capacity)
grounded; when the platform is supported by the
(iii) Each hoist shall be covered with frame structure, and by both a per-
insulated protective covers; sonal fall arrest system and a guardrail
(iv) In addition to a work lead at- system (with minimum 200 pound top-
tachment required by the welding proc- rail capacity) when the platform is sup-
ess, a grounding conductor shall be ported by ropes;
connected from the scaffold to the (v) Each employee on a walkway lo-
structure. The size of this conductor cated within a scaffold shall be pro-
shall be at least the size of the welding tected by a guardrail system (with
process work lead, and this conductor minimum 200 pound toprail capacity)
shall not be in series with the welding installed within 912 inches (24.1 cm) of
process or the work piece; and along at least one side of the walk-
(v) If the scaffold grounding lead is way.
disconnected at any time, the welding (vi) Each employee performing
machine shall be shut off; and overhand bricklaying operations from
(vi) An active welding rod or a supported scaffold shall be protected
uninsulated welding lead shall not be
from falling from all open sides and
allowed to contact the scaffold or its
ends of the scaffold (except at the side
suspension system.
(g) Fall protection. (1) Each employee next to the wall being laid) by the use
on a scaffold more than 10 feet (3.1 m) of a personal fall arrest system or
above a lower level shall be protected guardrail system (with minimum 200
from falling to that lower level. Para- pound toprail capacity).
graphs (g)(1) (i) through (vii) of this (vii) For all scaffolds not otherwise
section establish the types of fall pro- specified in paragraphs (g)(1)(i) through
tection to be provided to the employees (g)(1)(vi) of this section, each employee
on each type of scaffold. Paragraph shall be protected by the use of per-
(g)(2) of this section addresses fall pro- sonal fall arrest systems or guardrail
tection for scaffold erectors and dis- systems meeting the requirements of
mantlers. paragraph (g)(4) of this section.
NOTE TO PARAGRAPH (g)(1): The fall protec-
tion requirements for employees installing

287

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00297 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.451 29 CFR Ch. XVII (7112 Edition)

(2) Effective September 2, 1997, the be attached to the same point on the
employer shall have a competent per- scaffold or personal fall arrest system.
son determine the feasibility and safe- (4) Guardrail systems installed to
ty of providing fall protection for em- meet the requirements of this section
ployees erecting or dismantling sup- shall comply with the following provi-
ported scaffolds. Employers are re- sions (guardrail systems built in ac-
quired to provide fall protection for cordance with appendix A to this sub-
employees erecting or dismantling sup- part will be deemed to meet the re-
ported scaffolds where the installation quirements of paragraphs (g)(4) (vii),
and use of such protection is feasible (viii), and (ix) of this section):
and does not create a greater hazard. (i) Guardrail systems shall be in-
(3) In addition to meeting the re- stalled along all open sides and ends of
quirements of 1926.502(d), personal fall platforms. Guardrail systems shall be
arrest systems used on scaffolds shall installed before the scaffold is released
be attached by lanyard to a vertical for use by employees other than erec-
lifeline, horizontal lifeline, or scaffold tion/dismantling crews.
structural member. Vertical lifelines (ii) The top edge height of toprails or
shall not be used when overhead com- equivalent member on supported scaf-
ponents, such as overhead protection folds manufactured or placed in service
or additional platform levels, are part after January 1, 2000 shall be installed
of a single-point or two-point adjust- between 38 inches (0.97 m) and 45 inches
able suspension scaffold. (1.2 m) above the platform surface. The
(i) When vertical lifelines are used, top edge height on supported scaffolds
they shall be fastened to a fixed safe manufactured and placed in service be-
point of anchorage, shall be inde- fore January 1, 2000, and on all sus-
pendent of the scaffold, and shall be pended scaffolds where both a guardrail
protected from sharp edges and abra- and a personal fall arrest system are
sion. Safe points of anchorage include required shall be between 36 inches (0.9
structural members of buildings, but m) and 45 inches (1.2 m). When condi-
do not include standpipes, vents, other tions warrant, the height of the top
piping systems, electrical conduit, out- edge may exceed the 45-inch height,
rigger beams, or counterweights. provided the guardrail system meets
(ii) When horizontal lifelines are all other criteria of paragraph (g)(4).
used, they shall be secured to two or (iii) When midrails, screens, mesh,
more structural members of the scaf- intermediate vertical members, solid
fold, or they may be looped around panels, or equivalent structural mem-
both suspension and independent sus- bers are used, they shall be installed
pension lines (on scaffolds so equipped) between the top edge of the guardrail
above the hoist and brake attached to system and the scaffold platform.
the end of the scaffold. Horizontal life- (iv) When midrails are used, they
lines shall not be attached only to the shall be installed at a height approxi-
suspension ropes. mately midway between the top edge of
(iii) When lanyards are connected to the guardrail system and the platform
horizontal lifelines or structural mem- surface.
bers on a single-point or two-point ad- (v) When screens and mesh are used,
justable suspension scaffold, the scaf- they shall extend from the top edge of
fold shall be equipped with additional the guardrail system to the scaffold
independent support lines and auto- platform, and along the entire opening
matic locking devices capable of stop- between the supports.
ping the fall of the scaffold in the event (vi) When intermediate members
one or both of the suspension ropes (such as balusters or additional rails)
fail. The independent support lines are used, they shall not be more than
shall be equal in number and strength 19 inches (48 cm) apart.
to the suspension ropes. (vii) Each toprail or equivalent mem-
(iv) Vertical lifelines, independent ber of a guardrail system shall be capa-
support lines, and suspension ropes ble of withstanding, without failure, a
shall not be attached to each other, nor force applied in any downward or hori-
shall they be attached to or use the zontal direction at any point along its
same point of anchorage, nor shall they top edge of at least 100 pounds (445 n)

288

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00298 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.451

for guardrail systems installed on sin- points at each upright shall be no more
gle-point adjustable suspension scaf- than 48 inches (1.3 m) apart.
folds or two-point adjustable suspen- (h) Falling object protection. (1) In ad-
sion scaffolds, and at least 200 pounds dition to wearing hardhats each em-
(890 n) for guardrail systems installed ployee on a scaffold shall be provided
on all other scaffolds. with additional protection from falling
(viii) When the loads specified in hand tools, debris, and other small ob-
paragraph (g)(4)(vii) of this section are jects through the installation of
applied in a downward direction, the toeboards, screens, or guardrail sys-
top edge shall not drop below the tems, or through the erection of debris
height above the platform surface that nets, catch platforms, or canopy struc-
is prescribed in paragraph (g)(4)(ii) of tures that contain or deflect the falling
this section.
objects. When the falling objects are
(ix) Midrails, screens, mesh, inter-
too large, heavy or massive to be con-
mediate vertical members, solid pan-
tained or deflected by any of the above-
els, and equivalent structural members
listed measures, the employer shall
of a guardrail system shall be capable
of withstanding, without failure, a place such potential falling objects
force applied in any downward or hori- away from the edge of the surface from
zontal direction at any point along the which they could fall and shall secure
midrail or other member of at least 75 those materials as necessary to prevent
pounds (333 n) for guardrail systems their falling.
with a minimum 100 pound toprail ca- (2) Where there is a danger of tools,
pacity, and at least 150 pounds (666 n) materials, or equipment falling from a
for guardrail systems with a minimum scaffold and striking employees below,
200 pound toprail capacity. the following provisions apply:
(x) Suspension scaffold hoists and (i) The area below the scaffold to
non-walk-through stirrups may be used which objects can fall shall be barri-
as end guardrails, if the space between caded, and employees shall not be per-
the hoist or stirrup and the side guard- mitted to enter the hazard area; or
rail or structure does not allow passage (ii) A toeboard shall be erected along
of an employee to the end of the scaf- the edge of platforms more than 10 feet
fold. (3.1 m) above lower levels for a distance
(xi) Guardrails shall be surfaced to sufficient to protect employees below,
prevent injury to an employee from except on float (ship) scaffolds where
punctures or lacerations, and to pre- an edging of 34 112 inch (2 4 cm)
vent snagging of clothing. wood or equivalent may be used in lieu
(xii) The ends of all rails shall not of toeboards;
overhang the terminal posts except (iii) Where tools, materials, or equip-
when such overhang does not con- ment are piled to a height higher than
stitute a projection hazard to employ- the top edge of the toeboard, paneling
ees. or screening extending from the
(xiii) Steel or plastic banding shall
toeboard or platform to the top of the
not be used as a toprail or midrail.
guardrail shall be erected for a dis-
(xiv) Manila or plastic (or other syn-
tance sufficient to protect employees
thetic) rope being used for toprails or
below; or
midrails shall be inspected by a com-
petent person as frequently as nec- (iv) A guardrail system shall be in-
essary to ensure that it continues to stalled with openings small enough to
meet the strength requirements of prevent passage of potential falling ob-
paragraph (g) of this section. jects; or
(xv) Crossbracing is acceptable in (v) A canopy structure, debris net, or
place of a midrail when the crossing catch platform strong enough to with-
point of two braces is between 20 inches stand the impact forces of the poten-
(0.5 m) and 30 inches (0.8 m) above the tial falling objects shall be erected
work platform or as a toprail when the over the employees below.
crossing point of two braces is between (3) Canopies, when used for falling ob-
38 inches (0.97 m) and 48 inches (1.3 m) ject protection, shall comply with the
above the work platform. The end following criteria:

289

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00299 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.452 29 CFR Ch. XVII (7112 Edition)

(i) Canopies shall be installed be- (2) Crossbracing shall be installed be-
tween the falling object hazard and the tween the inner and outer sets of poles
employees. on double pole scaffolds.
(ii) When canopies are used on sus- (3) Diagonal bracing in both direc-
pension scaffolds for falling object pro- tions shall be installed across the en-
tection, the scaffold shall be equipped tire inside face of double-pole scaffolds
with additional independent support used to support loads equivalent to a
lines equal in number to the number of uniformly distributed load of 50 pounds
points supported, and equivalent in (222 kg) or more per square foot (929
strength to the strength of the suspen- square cm).
sion ropes. (4) Diagonal bracing in both direc-
(iii) Independent support lines and tions shall be installed across the en-
suspension ropes shall not be attached tire outside face of all double- and sin-
to the same points of anchorage. gle-pole scaffolds.
(4) Where used, toeboards shall be: (5) Runners and bearers shall be in-
(i) Capable of withstanding, without stalled on edge.
failure, a force of at least 50 pounds
(6) Bearers shall extend a minimum
(222 n) applied in any downward or hor-
of 3 inches (7.6 cm) over the outside
izontal direction at any point along the
edges of runners.
toeboard (toeboards built in accord-
ance with appendix A to this subpart (7) Runners shall extend over a min-
will be deemed to meet this require- imum of two poles, and shall be sup-
ment); and ported by bearing blocks securely at-
(ii) At least three and one-half inches tached to the poles.
(9 cm) high from the top edge of the (8) Braces, bearers, and runners shall
toeboard to the level of the walking/ not be spliced between poles.
working surface. Toeboards shall be se- (9) Where wooden poles are spliced,
curely fastened in place at the outer- the ends shall be squared and the upper
most edge of the platform and have not section shall rest squarely on the lower
more than 14 inch (0.7 cm) clearance section. Wood splice plates shall be
above the walking/working surface. provided on at least two adjacent sides,
Toeboards shall be solid or with open- and shall extend at least 2 feet (0.6 m)
ings not over one inch (2.5 cm) in the on either side of the splice, overlap the
greatest dimension. abutted ends equally, and have at least
the same cross-sectional areas as the
[61 FR 46107, Aug. 30, 1996, as corrected and pole. Splice plates of other materials of
amended at 61 FR 59831, 59832, Nov. 25, 1996]
equivalent strength may be used.
EFFECTIVE DATE NOTE: At 61 FR 59832, Nov. (10) Pole scaffolds over 60 feet in
25, 1996, 1926.451(b)(2)(i) was amended and height shall be designed by a registered
certain requirements stayed until Nov. 25,
1997, or until further rulemaking has been
professional engineer, and shall be con-
completed, whichever is later. structed and loaded in accordance with
that design. Non-mandatory appendix
1926.452 Additional requirements ap- A to this subpart contains examples of
plicable to specific types of scaf- criteria that will enable an employer
folds. to comply with design and loading re-
In addition to the applicable require- quirements for pole scaffolds under 60
ments of 1926.451, the following re- feet in height.
quirements apply to the specific types (b) Tube and coupler scaffolds. (1)
of scaffolds indicated. Scaffolds not When platforms are being moved to the
specifically addressed by 1926.452, such next level, the existing platform shall
as but not limited to systems scaffolds, be left undisturbed until the new bear-
must meet the requirements of ers have been set in place and braced
1926.451. prior to receiving the new platforms.
(a) Pole scaffolds. (1) When platforms (2) Transverse bracing forming an
are being moved to the next level, the X across the width of the scaffold
existing platform shall be left undis- shall be installed at the scaffold ends
turbed until the new bearers have been and at least at every third set of posts
set in place and braced, prior to receiv- horizontally (measured from only one
ing the new platforms. end) and every fourth runner

290

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00300 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.452

vertically. Bracing shall extend diago- (10) Tube and coupler scaffolds over
nally from the inner or outer posts or 125 feet in height shall be designed by
runners upward to the next outer or a registered professional engineer, and
inner posts or runners. Building ties shall be constructed and loaded in ac-
shall be installed at the bearer levels cordance with such design. Non-manda-
between the transverse bracing and tory appendix A to this subpart con-
shall conform to the requirements of tains examples of criteria that will en-
1926.451(c)(1). able an employer to comply with de-
(3) On straight run scaffolds, longitu- sign and loading requirements for tube
dinal bracing across the inner and and coupler scaffolds under 125 feet in
outer rows of posts shall be installed height.
diagonally in both directions, and shall (c) Fabricated frame scaffolds (tubular
extend from the base of the end posts welded frame scaffolds). (1) When mov-
upward to the top of the scaffold at ap- ing platforms to the next level, the ex-
proximately a 45 degree angle. On scaf- isting platform shall be left undis-
folds whose length is greater than their turbed until the new end frames have
height, such bracing shall be repeated been set in place and braced prior to re-
beginning at least at every fifth post. ceiving the new platforms.
On scaffolds whose length is less than (2) Frames and panels shall be braced
their height, such bracing shall be in- by cross, horizontal, or diagonal
stalled from the base of the end posts braces, or combination thereof, which
upward to the opposite end posts, and secure vertical members together lat-
then in alternating directions until erally. The cross braces shall be of such
reaching the top of the scaffold. Brac- length as will automatically square
ing shall be installed as close as pos- and align vertical members so that the
sible to the intersection of the bearer erected scaffold is always plumb, level,
and post or runner and post. and square. All brace connections shall
(4) Where conditions preclude the at- be secured.
tachment of bracing to posts, bracing (3) Frames and panels shall be joined
shall be attached to the runners as together vertically by coupling or
close to the post as possible. stacking pins or equivalent means.
(5) Bearers shall be installed trans-
(4) Where uplift can occur which
versely between posts, and when cou-
would displace scaffold end frames or
pled to the posts, shall have the in-
panels, the frames or panels shall be
board coupler bear directly on the run-
locked together vertically by pins or
ner coupler. When the bearers are cou-
equivalent means.
pled to the runners, the couplers shall
(5) Brackets used to support canti-
be as close to the posts as possible.
levered loads shall:
(6) Bearers shall extend beyond the
posts and runners, and shall provide (i) Be seated with side-brackets par-
full contact with the coupler. allel to the frames and end-brackets at
(7) Runners shall be installed along 90 degrees to the frames;
the length of the scaffold, located on (ii) Not be bent or twisted from these
both the inside and outside posts at positions; and
level heights (when tube and coupler (iii) Be used only to support per-
guardrails and midrails are used on sonnel, unless the scaffold has been de-
outside posts, they may be used in lieu signed for other loads by a qualified en-
of outside runners). gineer and built to withstand the tip-
(8) Runners shall be interlocked on ping forces caused by those other loads
straight runs to form continuous being placed on the bracket-supported
lengths, and shall be coupled to each section of the scaffold.
post. The bottom runners and bearers (6) Scaffolds over 125 feet (38.0 m) in
shall be located as close to the base as height above their base plates shall be
possible. designed by a registered professional
(9) Couplers shall be of a structural engineer, and shall be constructed and
metal, such as drop-forged steel, malle- loaded in accordance with such design.
able iron, or structural grade alu- (d) Plasterers, decorators, and large
minum. The use of gray cast iron is area scaffolds. Scaffolds shall be con-
prohibited. structed in accordance with paragraphs

291

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00301 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.452 29 CFR Ch. XVII (7112 Edition)

(a), (b), or (c) of this section, as appro- (h) Roof bracket scaffolds. (1) Scaffold
priate. brackets shall be constructed to fit the
(e) Bricklayers square scaffolds pitch of the roof and shall provide a
(squares). (1) Scaffolds made of wood level support for the platform.
shall be reinforced with gussets on (2) Brackets (including those pro-
both sides of each corner. vided with pointed metal projections)
(2) Diagonal braces shall be installed shall be anchored in place by nails un-
on all sides of each square. less it is impractical to use nails. When
(3) Diagonal braces shall be installed nails are not used, brackets shall be se-
between squares on the rear and front cured in place with first-grade manila
sides of the scaffold, and shall extend rope of at least three-fourth inch (1.9
from the bottom of each square to the cm) diameter, or equivalent.
top of the next square. (i) Outrigger scaffolds. (1) The inboard
(4) Scaffolds shall not exceed three end of outrigger beams, measured from
tiers in height, and shall be so con- the fulcrum point to the extreme point
structed and arranged that one square of anchorage, shall be not less than one
rests directly above the other. The and one-half times the outboard end in
upper tiers shall stand on a continuous length.
row of planks laid across the next (2) Outrigger beams fabricated in the
lower tier, and shall be nailed down or shape of an I-beam or channel shall be
otherwise secured to prevent displace- placed so that the web section is
ment. vertical.
(3) The fulcrum point of outrigger
(f) Horse scaffolds. (1) Scaffolds shall
beams shall rest on secure bearings at
not be constructed or arranged more
least 6 inches (15.2 cm) in each hori-
than two tiers or 10 feet (3.0 m) in
zontal dimension.
height, whichever is less.
(4) Outrigger beams shall be secured
(2) When horses are arranged in tiers, in place against movement, and shall
each horse shall be placed directly over be securely braced at the fulcrum point
the horse in the tier below. against tipping.
(3) When horses are arranged in tiers, (5) The inboard ends of outrigger
the legs of each horse shall be nailed beams shall be securely anchored ei-
down or otherwise secured to prevent ther by means of braced struts bearing
displacement. against sills in contact with the over-
(4) When horses are arranged in tiers, head beams or ceiling, or by means of
each tier shall be crossbraced. tension members secured to the floor
(g) Form scaffolds and carpenters joists underfoot, or by both.
bracket scaffolds. (1) Each bracket, ex- (6) The entire supporting structure
cept those for wooden bracket-form shall be securely braced to prevent any
scaffolds, shall be attached to the sup- horizontal movement.
porting formwork or structure by (7) To prevent their displacement,
means of one or more of the following: platform units shall be nailed, bolted,
nails; a metal stud attachment device; or otherwise secured to outriggers.
welding; hooking over a secured struc- (8) Scaffolds and scaffold components
tural supporting member, with the shall be designed by a registered pro-
form wales either bolted to the form or fessional engineer and shall be con-
secured by snap ties or tie bolts ex- structed and loaded in accordance with
tending through the form and securely such design.
anchored; or, for carpenters bracket (j) Pump jack scaffolds. (1) Pump jack
scaffolds only, by a bolt extending brackets, braces, and accessories shall
through to the opposite side of the be fabricated from metal plates and an-
structures wall. gles. Each pump jack bracket shall
(2) Wooden bracket-form scaffolds have two positive gripping mechanisms
shall be an integral part of the form to prevent any failure or slippage.
panel. (2) Poles shall be secured to the
(3) Folding type metal brackets, structure by rigid triangular bracing or
when extended for use, shall be either equivalent at the bottom, top, and
bolted or secured with a locking-type other points as necessary. When the
pin. pump jack has to pass bracing already

292

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00302 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.452

installed, an additional brace shall be (m) Crawling boards (chicken ladders).


installed approximately 4 feet (1.2 m) (1) Crawling boards shall extend from
above the brace to be passed, and shall the roof peak to the eaves when used in
be left in place until the pump jack has connection with roof construction, re-
been moved and the original brace re- pair, or maintenance.
installed. (2) Crawling boards shall be secured
(3) When guardrails are used for fall to the roof by ridge hooks or by means
protection, a workbench may be used that meet equivalent criteria (e.g.,
as the toprail only if it meets all the strength and durability).
requirements in paragraphs (g)(4) (ii), (n) Step, platform, and trestle ladder
(vii), (viii), and (xiii) of 1926.451. scaffolds. (1) Scaffold platforms shall
(4) Work benches shall not be used as not be placed any higher than the sec-
scaffold platforms. ond highest rung or step of the ladder
(5) When poles are made of wood, the supporting the platform.
pole lumber shall be straight-grained, (2) All ladders used in conjunction
free of shakes, large loose or dead with step, platform and trestle ladder
knots, and other defects which might scaffolds shall meet the pertinent re-
impair strength. quirements of subpart X of this part
(6) When wood poles are constructed Stairways and Ladders, except that
of two continuous lengths, they shall job-made ladders shall not be used to
be joined together with the seam par- support such scaffolds.
allel to the bracket. (3) Ladders used to support step, plat-
(7) When two by fours are spliced to form, and trestle ladder scaffolds shall
make a pole, mending plates shall be be placed, fastened, or equipped with
installed at all splices to develop the devices to prevent slipping.
full strength of the member. (4) Scaffolds shall not be bridged one
(k) Ladder jack scaffolds. (1) Platforms to another.
shall not exceed a height of 20 feet (6.1
(o) Single-point adjustable suspension
m).
scaffolds. (1) When two single-point ad-
(2) All ladders used to support ladder
justable suspension scaffolds are com-
jack scaffolds shall meet the require-
bined to form a two-point adjustable
ments of subpart X of this partStair-
suspension scaffold, the resulting two-
ways and Ladders, except that job-
point scaffold shall comply with the re-
made ladders shall not be used to sup-
quirements for two-point adjustable
port ladder jack scaffolds.
suspension scaffolds in paragraph (p) of
(3) The ladder jack shall be so de-
this section.
signed and constructed that it will bear
on the side rails and ladder rungs or on (2) The supporting rope between the
the ladder rungs alone. If bearing on scaffold and the suspension device shall
rungs only, the bearing area shall in- be kept vertical unless all of the fol-
clude a length of at least 10 inches (25.4 lowing conditions are met:
cm) on each rung. (i) The rigging has been designed by a
(4) Ladders used to support ladder qualified person, and
jacks shall be placed, fastened, or (ii) The scaffold is accessible to res-
equipped with devices to prevent slip- cuers, and
ping. (iii) The supporting rope is protected
(5) Scaffold platforms shall not be to ensure that it will not chafe at any
bridged one to another. point where a change in direction oc-
(l) Window jack scaffolds. (1) Scaffolds curs, and
shall be securely attached to the win- (iv) The scaffold is positioned so that
dow opening. swinging cannot bring the scaffold into
(2) Scaffolds shall be used only for contact with another surface.
the purpose of working at the window (3) Boatswains chair tackle shall
opening through which the jack is consist of correct size ball bearings or
placed. bushed blocks containing safety hooks
(3) Window jacks shall not be used to and properly eye-spliced minimum
support planks placed between one win- five-eighth (58) inch (1.6 cm) diameter
dow jack and another, or for other ele- first-grade manila rope, or other rope
ments of scaffolding. which will satisfy the criteria (e.g.,

293

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00303 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.452 29 CFR Ch. XVII (7112 Edition)

strength and durability) of manila (6) Passage may be made from one
rope. platform to another only when the
(4) Boatswains chair seat slings shall platforms are at the same height, are
be reeved through four corner holes in abutting, and walk-through stirrups
the seat; shall cross each other on the specifically designed for this purpose
underside of the seat; and shall be are used.
rigged so as to prevent slippage which (q) Multi-point adjustable suspension
could cause an out-of-level condition. scaffolds, stonesetters multi-point adjust-
(5) Boatswains chair seat slings shall able suspension scaffolds, and masons
be a minimum of five-eight (58) inch multi-point adjustable suspension scaf-
(1.6 cm) diameter fiber, synthetic, or folds. (1) When two or more scaffolds
other rope which will satisfy the cri- are used they shall not be bridged one
teria (e.g., strength, slip resistance, du- to another unless they are designed to
rability, etc.) of first grade manila be bridged, the bridge connections are
rope. articulated, and the hoists are properly
(6) When a heat-producing process sized.
such as gas or arc welding is being con- (2) If bridges are not used, passage
ducted, boatswains chair seat slings may be made from one platform to an-
shall be a minimum of three-eight (38) other only when the platforms are at
inch (1.0 cm) wire rope. the same height and are abutting.
(7) Non-cross-laminated wood boat- (3) Scaffolds shall be suspended from
swains chairs shall be reinforced on metal outriggers, brackets, wire rope
their underside by cleats securely fas- slings, hooks, or means that meet
tened to prevent the board from split- equivalent criteria (e.g., strength, du-
ting. rability).
(p) Two-point adjustable suspension (r) Catenary scaffolds. (1) No more
scaffolds (swing stages). The following than one platform shall be placed be-
requirements do not apply to two-point tween consecutive vertical pickups,
adjustable suspension scaffolds used as and no more than two platforms shall
masons or stonesetters scaffolds. be used on a catenary scaffold.
Such scaffolds are covered by para- (2) Platforms supported by wire ropes
graph (q) of this section. shall have hook-shaped stops on each
(1) Platforms shall not be more than end of the platforms to prevent them
36 inches (0.9 m) wide unless designed from slipping off the wire ropes. These
by a qualified person to prevent unsta- hooks shall be so placed that they will
ble conditions. prevent the platform from falling if
(2) The platform shall be securely fas- one of the horizontal wire ropes breaks.
tened to hangers (stirrups) by U-bolts (3) Wire ropes shall not be tightened
or by other means which satisfy the re- to the extent that the application of a
quirements of 1926.451(a). scaffold load will overstress them.
(3) The blocks for fiber or synthetic (4) Wire ropes shall be continuous
ropes shall consist of at least one dou- and without splices between anchors.
ble and one single block. The sheaves (s) Float (ship) scaffolds. (1) The plat-
of all blocks shall fit the size of the form shall be supported by a minimum
rope used. of two bearers, each of which shall
(4) Platforms shall be of the ladder- project a minimum of 6 inches (15.2 cm)
type, plank-type, beam-type, or light- beyond the platform on both sides.
metal type. Light metal-type plat- Each bearer shall be securely fastened
forms having a rated capacity of 750 to the platform.
pounds or less and platforms 40 feet (2) Rope connections shall be such
(12.2 m) or less in length shall be tested that the platform cannot shift or slip.
and listed by a nationally recognized (3) When only two ropes are used
testing laboratory. with each float:
(5) Two-point scaffolds shall not be (i) They shall be arranged so as to
bridged or otherwise connected one to provide four ends which are securely
another during raising and lowering fastened to overhead supports.
operations unless the bridge connec- (ii) Each supporting rope shall be
tions are articulated (attached), and hitched around one end of the bearer
the hoists properly sized. and pass under the platform to the

294

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00304 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.452

other end of the bearer where it is level, and squared. All brace connec-
hitched again, leaving sufficient rope tions shall be secured.
at each end for the supporting ties. (i) Scaffolds constructed of tube and
(t) Interior hung scaffolds. (1) Scaf- coupler components shall also comply
folds shall be suspended only from the with the requirements of paragraph (b)
roof structure or other structural of this section;
member such as ceiling beams. (ii) Scaffolds constructed of fab-
(2) Overhead supporting members ricated frame components shall also
(roof structure, ceiling beams, or other comply with the requirements of para-
structural members) shall be inspected graph (c) of this section.
and checked for strength before the (2) Scaffold casters and wheels shall
scaffold is erected. be locked with positive wheel and/or
(3) Suspension ropes and cables shall wheel and swivel locks, or equivalent
be connected to the overhead sup- means, to prevent movement of the
porting members by shackles, clips, scaffold while the scaffold is used in a
thimbles, or other means that meet stationary manner.
equivalent criteria (e.g., strength, du- (3) Manual force used to move the
rability). scaffold shall be applied as close to the
(u) Needle beam scaffolds. (1) Scaffold base as practicable, but not more than
support beams shall be installed on 5 feet (1.5 m) above the supporting sur-
edge. face.
(2) Ropes or hangers shall be used for (4) Power systems used to propel mo-
supports, except that one end of a nee- bile scaffolds shall be designed for such
dle beam scaffold may be supported by use. Forklifts, trucks, similar motor
a permanent structural member. vehicles or add-on motors shall not be
(3) The ropes shall be securely at- used to propel scaffolds unless the scaf-
tached to the needle beams. fold is designed for such propulsion sys-
(4) The support connection shall be tems.
arranged so as to prevent the needle (5) Scaffolds shall be stabilized to
beam from rolling or becoming dis- prevent tipping during movement.
placed. (6) Employees shall not be allowed to
(5) Platform units shall be securely ride on scaffolds unless the following
attached to the needle beams by bolts conditions exist:
or equivalent means. Cleats and over- (i) The surface on which the scaffold
hang are not considered to be adequate is being moved is within 3 degrees of
means of attachment. level, and free of pits, holes, and ob-
(v) Multi-level suspended scaffolds. (1) structions;
Scaffolds shall be equipped with addi- (ii) The height to base width ratio of
tional independent support lines, equal the scaffold during movement is two to
in number to the number of points sup- one or less, unless the scaffold is de-
ported, and of equivalent strength to signed and constructed to meet or ex-
the suspension ropes, and rigged to ceed nationally recognized stability
support the scaffold in the event the test requirements such as those listed
suspension rope(s) fail. in paragraph (x) of appendix A to this
(2) Independent support lines and sus- subpart (ANSI/SIA A92.5 and A92.6);
pension ropes shall not be attached to (iii) Outrigger frames, when used, are
the same points of anchorage. installed on both sides of the scaffold;
(3) Supports for platforms shall be at- (iv) When power systems are used,
tached directly to the support stirrup the propelling force is applied directly
and not to any other platform. to the wheels, and does not produce a
(w) Mobile scaffolds. (1) Scaffolds shall speed in excess of 1 foot per second (.3
be braced by cross, horizontal, or di- mps); and
agonal braces, or combination thereof, (v) No employee is on any part of the
to prevent racking or collapse of the scaffold which extends outward beyond
scaffold and to secure vertical mem- the wheels, casters, or other supports.
bers together laterally so as to auto- (7) Platforms shall not extend out-
matically square and align the vertical ward beyond the base supports of the
members. Scaffolds shall be plumb, scaffold unless outrigger frames or

295

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00305 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.453 29 CFR Ch. XVII (7112 Edition)

equivalent devices are used to ensure (9) U-bolt wire rope clips shall not be
stability. used on any wire rope used to secure
(8) Where leveling of the scaffold is brackets or to serve as an anchor for
necessary, screw jacks or equivalent personal fall arrest systems.
means shall be used. (10) The employer shall ensure that
(9) Caster stems and wheel stems materials shall not be dropped to the
shall be pinned or otherwise secured in outside of the supporting structure.
scaffold legs or adjustment screws. (11) Scaffold erection shall progress
(10) Before a scaffold is moved, each in only one direction around any struc-
employee on the scaffold shall be made ture.
aware of the move. (y) Stilts. Stilts, when used, shall be
(x) Repair bracket scaffolds. (1) Brack- used in accordance with the following
ets shall be secured in place by at least requirements:
one wire rope at least 12 inch (1.27 cm) (1) An employee may wear stilts on a
in diameter. scaffold only if it is a large area scaf-
(2) Each bracket shall be attached to fold.
the securing wire rope (or ropes) by a (2) When an employee is using stilts
positive locking device capable of pre- on a large area scaffold where a guard-
venting the unintentional detachment rail system is used to provide fall pro-
of the bracket from the rope, or by tection, the guardrail system shall be
equivalent means. increased in height by an amount equal
(3) Each bracket, at the contact point to the height of the stilts being used by
between the supporting structure and the employee.
the bottom of the bracket, shall be pro- (3) Surfaces on which stilts are used
vided with a shoe (heel block or foot) shall be flat and free of pits, holes and
capable of preventing the lateral move- obstructions, such as debris, as well as
ment of the bracket. other tripping and falling hazards.
(4) Platforms shall be secured to the (4) Stilts shall be properly main-
brackets in a manner that will prevent tained. Any alteration of the original
the separation of the platforms from equipment shall be approved by the
the brackets and the movement of the manufacturer.
platforms or the brackets on a com-
pleted scaffold. 1926.453 Aerial lifts.
(5) When a wire rope is placed around (a) General requirements. (1) Unless
the structure in order to provide a safe otherwise provided in this section, aer-
anchorage for personal fall arrest sys- ial lifts acquired for use on or after
tems used by employees erecting or January 22, 1973 shall be designed and
dismantling scaffolds, the wire rope constructed in conformance with the
shall meet the requirements of subpart applicable requirements of the Amer-
M of this part, but shall be at least 516 ican National Standards for Vehicle
inch (0.8 cm) in diameter. Mounted Elevating and Rotating Work
(6) Each wire rope used for securing Platforms, ANSI A92.21969, including
brackets in place or as an anchorage appendix. Aerial lifts acquired before
for personal fall arrest systems shall be January 22, 1973 which do not meet the
protected from damage due to contact requirements of ANSI A92.21969, may
with edges, corners, protrusions, or not be used after January 1, 1976, un-
other discontinuities of the supporting less they shall have been modified so as
structure or scaffold components. to conform with the applicable design
(7) Tensioning of each wire rope used and construction requirements of ANSI
for securing brackets in place or as an A92.21969. Aerial lifts include the fol-
anchorage for personal fall arrest sys- lowing types of vehicle-mounted aerial
tems shall be by means of a turnbuckle devices used to elevate personnel to
at least 1 inch (2.54 cm) in diameter, or job-sites above ground:
by equivalent means. (i) Extensible boom platforms;
(8) Each turnbuckle shall be con- (ii) Aerial ladders;
nected to the other end of its rope by (iii) Articulating boom platforms;
use of an eyesplice thimble of a size ap- (iv) Vertical towers; and
propriate to the turnbuckle to which it (v) A combination of any such de-
is attached. vices. Aerial equipment may be made

296

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00306 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.453

of metal, wood, fiberglass reinforced an aerial lift on an incline, provided


plastic (FRP), or other material; may they can be safely installed.
be powered or manually operated; and (viii) An aerial lift truck shall not be
are deemed to be aerial lifts whether or moved when the boom is elevated in a
not they are capable of rotating about working position with men in the bas-
a substantially vertical axis. ket, except for equipment which is spe-
(2) Aerial lifts may be field modi- cifically designed for this type of oper-
fied for uses other than those in- ation in accordance with the provisions
tended by the manufacturer provided of paragraphs (a) (1) and (2) of this sec-
the modification has been certified in tion.
writing by the manufacturer or by any (ix) Articulating boom and extensible
other equivalent entity, such as a na- boom platforms, primarily designed as
tionally recognized testing laboratory, personnel carriers, shall have both
to be in conformity with all applicable platform (upper) and lower controls.
provisions of ANSI A92.21969 and this Upper controls shall be in or beside the
section and to be at least as safe as the platform within easy reach of the oper-
equipment was before modification. ator. Lower controls shall provide for
(b) Specific requirements(1) Ladder overriding the upper controls. Controls
trucks and tower trucks. Aerial ladders shall be plainly marked as to their
shall be secured in the lower traveling function. Lower level controls shall not
position by the locking device on top of be operated unless permission has been
the truck cab, and the manually oper- obtained from the employee in the lift,
ated device at the base of the ladder be- except in case of emergency.
fore the truck is moved for highway (x) Climbers shall not be worn while
travel. performing work from an aerial lift.
(2) Extensible and articulating boom (xi) The insulated portion of an aerial
platforms. (i) Lift controls shall be test- lift shall not be altered in any manner
ed each day prior to use to determine that might reduce its insulating value.
that such controls are in safe working
(xii) Before moving an aerial lift for
condition.
travel, the boom(s) shall be inspected
(ii) Only authorized persons shall op- to see that it is properly cradled and
erate an aerial lift. outriggers are in stowed position ex-
(iii) Belting off to an adjacent pole, cept as provided in paragraph
structure, or equipment while working (b)(2)(viii) of this section.
from an aerial lift shall not be per- (3) Electrical tests. All electrical tests
mitted. shall conform to the requirements of
(iv) Employees shall always stand ANSI A92.21969 section 5. However
firmly on the floor of the basket, and equivalent d.c.; voltage tests may be
shall not sit or climb on the edge of the used in lieu of the a.c. voltage specified
basket or use planks, ladders, or other in A92.21969; d.c. voltage tests which
devices for a work position. are approved by the equipment manu-
(v) A body belt shall be worn and a facturer or equivalent entity shall be
lanyard attached to the boom or bas- considered an equivalent test for the
ket when working from an aerial lift. purpose of this paragraph (b)(3).
NOTE TO PARAGRAPH (b)(2)(v): As of Janu- (4) Bursting safety factor. The provi-
ary 1, 1998, subpart M of this part sions of the American National Stand-
( 1926.502(d)) provides that body belts are not ards Institute standard ANSI A92.2
acceptable as part of a personal fall arrest 1969, section 4.9 Bursting Safety Factor
system. The use of a body belt in a tethering shall apply to all critical hydraulic and
system or in a restraint system is acceptable
pneumatic components. Critical com-
and is regulated under 1926.502(e).
ponents are those in which a failure
(vi) Boom and basket load limits would result in a free fall or free rota-
specified by the manufacturer shall not tion of the boom. All noncritical com-
be exceeded. ponents shall have a bursting safety
(vii) The brakes shall be set and when factor of at least 2 to 1.
outriggers are used, they shall be posi- (5) Welding standards. All welding
tioned on pads or a solid surface. Wheel shall conform to the following stand-
chocks shall be installed before using ards as applicable:

297

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00307 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.454 29 CFR Ch. XVII (7112 Edition)

(i) Standard Qualification Procedure, (3) The proper use of the scaffold, and
AWS B3.041. the proper handling of materials on the
(ii) Recommended Practices for scaffold;
Automotive Welding Design, AWS (4) The maximum intended load and
D8.461. the load-carrying capacities of the
(iii) Standard Qualification of Weld- scaffolds used; and
ing Procedures and Welders for Piping (5) Any other pertinent requirements
and Tubing, AWS D10.969. of this subpart.
(b) The employer shall have each em-
(iv) Specifications for Welding High-
ployee who is involved in erecting, dis-
way and Railway Bridges, AWS D2.069.
assembling, moving, operating, repair-
NOTE TO 1926.453: Non-mandatory appen- ing, maintaining, or inspecting a scaf-
dix C to this subpart lists examples of na- fold trained by a competent person to
tional consensus standards that are consid- recognize any hazards associated with
ered to provide employee protection equiva- the work in question. The training
lent to that provided through the application shall include the following topics, as
of ANSI A92.21969, where appropriate. This applicable:
incorporation by reference was approved by (1) The nature of scaffold hazards;
the Director of the Federal Register in ac-
(2) The correct procedures for erect-
cordance with 5 U.S.C. 552(a) and 1 CFR part
51. Copies may be obtained from the Amer-
ing, disassembling, moving, operating,
ican National Standards Institute. Copies repairing, inspecting, and maintaining
may be inspected at the Docket Office, Occu- the type of scaffold in question;
pational Safety and Health Administration, (3) The design criteria, maximum in-
U.S. Department of Labor, 200 Constitution tended load-carrying capacity and in-
Avenue, NW., room N2634, Washington, DC or tended use of the scaffold;
at the National Archives and Records Ad- (4) Any other pertinent requirements
ministration (NARA). For information on of this subpart.
the availability of this material at NARA, (c) When the employer has reason to
call 2027416030, or go to: http:// believe that an employee lacks the
www.archives.gov/federallregister/ skill or understanding needed for safe
codeloflfederallregulations/
ibrllocations.html.
work involving the erection, use or dis-
mantling of scaffolds, the employer
[61 FR 46116, Aug. 30, 1996; 61 FR 59832, Nov. shall retrain each such employee so
25, 1996, as amended at 69 FR 18803, Apr. 9, that the requisite proficiency is re-
2004] gained. Retraining is required in at
least the following situations:
1926.454 Training requirements. (1) Where changes at the worksite
This section supplements and clari- present a hazard about which an em-
fies the requirements of 1926.21(b)(2) ployee has not been previously trained;
as these relate to the hazards of work or
on scaffolds. (2) Where changes in the types of
(a) The employer shall have each em- scaffolds, fall protection, falling object
ployee who performs work while on a protection, or other equipment present
scaffold trained by a person qualified a hazard about which an employee has
in the subject matter to recognize the not been previously trained; or
hazards associated with the type of (3) Where inadequacies in an affected
scaffold being used and to understand employees work involving scaffolds in-
the procedures to control or minimize dicate that the employee has not re-
those hazards. The training shall in- tained the requisite proficiency.
clude the following areas, as applica- NON-MANDATORY APPENDICES
ble:
(1) The nature of any electrical haz- (NON-MANDATORY) APPENDIX A TO SUB-
ards, fall hazards and falling object PART L OF PART 1926SCAFFOLD
hazards in the work area; SPECIFICATIONS
(2) The correct procedures for dealing
This appendix provides non-mandatory
with electrical hazards and for erect- guidelines to assist employers in complying
ing, maintaining, and disassembling with the requirements of subpart L of this
the fall protection systems and falling part. An employer may use these guidelines
object protection systems being used; and tables as a starting point for designing

298

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00308 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. L, App. A
scaffold systems. However, the guidelines do (z) Tank builders scaffolds.
not provide all the information necessary to
build a complete system, and the employer is 1. GENERAL GUIDELINES AND TABLES
still responsible for designing and assem- (a) The following tables, and the tables in
bling these components in such a way that Part 2Specific guidelines and tables, as-
the completed system will meet the require- sume that all load-carrying timber members
ments of 1926.451(a). Scaffold components (except planks) of the scaffold are a min-
which are not selected and loaded in accord- imum of 1,500 lb-f/in2 (stress grade) construc-
ance with this Appendix, and components for tion grade lumber. All dimensions are nomi-
which no specific guidelines or tables are nal sizes as provided in the American
given in this appendix (e.g., joints, ties, com- Softwood Lumber Standards, dated January
ponents for wood pole scaffolds more than 60 1970, except that, where rough sizes are
feet in height, components for heavy-duty noted, only rough or undressed lumber of the
horse scaffolds, components made with other size specified will satisfy minimum require-
materials, and components with other di- ments.
mensions, etc.) must be designed and con- (b) Solid sawn wood used as scaffold planks
structed in accordance with the capacity re- shall be selected for such use following the
quirements of 1926.451(a), and loaded in ac- grading rules established by a recognized
cordance with 1926.451(d)(1). lumber grading association or by an inde-
pendent lumber grading inspection agency.
Index to appendix A for Subpart L
Such planks shall be identified by the grade
1. General guidelines and tables. stamp of such association or agency. The as-
2. Specific guidelines and tables. sociation or agency and the grading rules
(a) Pole scaffolds: under which the wood is graded shall be cer-
Single-pole wood pole scaffolds. tified by the Board of Review, American
Independent wood pole scaffolds. Lumber Standard Committee, as set forth in
(b) Tube and coupler scaffolds. the American Softwood Lumber Standard of
(c) Fabricated frame scaffolds. the U.S. Department of Commerce.
(d) Plasterers, decorators and large area (i) Allowable spans shall be determined in
scaffolds. compliance with the National Design Speci-
(e) Bricklayers square scaffolds. fication for Wood Construction published by
(f) Horse scaffolds. the National Forest Products Association;
(g) Form scaffolds and carpenters bracket paragraph 5 of ANSI A10.81988 Scaffolding-
scaffolds. Safety Requirements published by the Amer-
(h) Roof bracket scaffolds. ican National Standards Institute; or for 210
(i) Outrigger scaffolds (one level). inch (nominal) or 29 inch (rough) solid sawn
(j) Pump jack scaffolds. wood planks, as shown in the following table:
(k) Ladder jack scaffolds.
(l) Window jack scaffolds. Maximum per- Maximum per-
(m) Crawling boards (chicken ladders). missible span missible span
Maximum intended nominal using full thick-
(n) Step, platform and trestle ladder scaf- using nominal
load ness un- thickness
folds. (lb/ft2) dressed lumber
(o) Single-point adjustable suspension scaf- lumber (ft)
(ft)
folds.
(p) Two-point adjustable suspension scaf- 25 ....................................... 10 8
folds. 50 ....................................... 8 6
(q)(1) Stonesetters multi-point adjustable 75 ....................................... 6
suspension scaffolds.
(2) Masons multi-point adjustable suspen- (ii) The maximum permissible span for 114
sion scaffolds. 9-inch or wider wood plank of full thick-
(r) Catenary scaffolds. ness with a maximum intended load of 50 lb/
(s) Float (ship) scaffolds. ft.2 shall be 4 feet.
(t) Interior hung scaffolds. (c) Fabricated planks and platforms may
(u) Needle beam scaffolds. be used in lieu of solid sawn wood planks.
(v) Multi-level suspension scaffolds. Maximum spans for such units shall be as
(w) Mobile scaffolds. recommended by the manufacturer based on
(x) Repair bracket scaffolds. the maximum intended load being calculated
(y) Stilts. as follows:

Rated load Intended load


capacity

Light-duty ................... 25 pounds per square foot applied uniformly over the entire span area.
Medium-duty .............. 50 pounds per square foot applied uniformly over the entire span area.
Heavy-duty ................. 75 pounds per square foot applied uniformly over the entire span area.
One-person ................ 250 pounds placed at the center of the span (total 250 pounds).
Two-person ................ 250 pounds placed 18 inches to the left and right of the center of the span (total 500 pounds).

299

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00309 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. L, App. A 29 CFR Ch. XVII (7112 Edition)

Rated load Intended load


capacity

Three-person ............. 250 pounds placed at the center of the span and 250 pounds placed 18 inches to the left and right of
the center of the span (total 750 pounds).

NOTE: Platform units used to make scaf- 114 inch 114 inch structural angle iron; or
fold platforms intended for light-duty use 1 inch .070 inch wall steel tubing; or
shall be capable of supporting at least 25 1.990 inch .058 inch wall aluminum tub-
pounds per square foot applied uniformly ing.
over the entire unit-span area, or a 250-pound (iv) Posts shall be equivalent in strength
point load placed on the unit at the center of to 2 inch by 4 inch lumber; or
the span, whichever load produces the great- 114 inch 114 inch 18 structural angle
er shear force. iron; or
(d) Guardrails shall be as follows: 1 inch .070 inch wall steel tubing; or
(i) Toprails shall be equivalent in strength 1.990 inch .058 inch wall aluminum tub-
to 2 inch by 4 inch lumber; or ing.
114 inch 18 inch structural angle iron; or
(v) Distance between posts shall not exceed
1 inch .070 inch wall steel tubing; or 1.990
8 feet.
inch .058 inch wall aluminum tubing.
(e) Overhead protection shall consist of 2
(ii) Midrails shall be equivalent in strength
inch nominal planking laid tight, or 34-inch
to 1 inch by 6 inch lumber; or
plywood.
114 inch 114 inch 18 inch structural
angle iron; or (f) Screen installed between toeboards and
1 inch .070 inch wall steel tubing; or midrails or toprails shall consist of No. 18
1.990 inch .058 inch wall aluminum tub- gauge U.S. Standard wire one inch mesh.
ing.
2. SPECIFIC GUIDELINES AND TABLES.
(iii) Toeboards shall be equivalent in
strength to 1 inch by 4 inch lumber; or (a) Pole Scaffolds.

SINGLE POLE WOOD POLE SCAFFOLDS


Light duty up to Light duty up to Medium duty up to Heavy duty up to
20 feet high 60 feet high 60 feet high 60 feet high

Maximum intended load (lbs/ft 2) ................... 25 ......................... 25 ......................... 50 ......................... 75


Poles or uprights ........................................... 24 in ................... 44 in ................... 44 in ................... 46 in.
Maximum pole spacing (longitudinal) ............ 6 feet ................... 10 feet ................. 8 feet ................... 6 feet
Maximum pole spacing (transverse) ............. 5 feet ................... 5 feet ................... 5 feet ................... 5 feet
Runners ......................................................... 14 in ................... 1149 in ............... 210 in ................. 210 in.
Bearers and maximum spacing of bearers:
3 feet ............................................... 24 in ................... 24 in ................... 210 in. or 34 in 210 in. or 35 in.
5 feet ............................................... 26 in. or 34 in .. 26 in. or 34 in. 210 in. or 34 in 210 in. or 35 in.
(rough).
6 feet ............................................... .............................. .............................. 210 in. or 34 in 210 in. or 35 in.
8 feet ............................................... .............................. .............................. 210 in. or 34 in
Planking ......................................................... 1149 in ............... 210 in ................. 210 in ................. 210 in.
Maximum vertical spacing of horizontal 7 feet ................... 9 feet ................... 7 feet ................... 6 ft. 6 in.
members.
Bracing horizontal .......................................... 14 in ................... 14 in ................... 16 in. or 1144 in 24 in.
Bracing diagonal ............................................ 14 in ................... 14 in ................... 14 in ................... 24 in.
Tie-ins ............................................................ 14 in ................... 14 in ................... 14 in ................... 14 in.
NOTE: All members except planking are used on edge. All wood bearers shall be reinforced with 3162 inch steel strip, or the
equivalent, secured to the lower edges for the entire length of the bearer.

INDEPENDENT WOOD POLE SCAFFOLDS


Light duty up to Light duty up to Medium duty up to Heavy duty up to
20 feet high 60 feet high 60 feet high 60 feet high

Maximum intended load ................................ 25 lbs/ft2 .............. 25 lbs/ft2 .............. 50 lbs/ft2 .............. 75 lbs/ft2.
Poles or uprights ........................................... 24 in ................... 44 in ................... 44 in ................... 44 in.
Maximum pole spacing (longitudinal) ............ 6 feet ................... 10 feet ................. 8 feet ................... 6 feet.
Maximum (transverse) ................................... 6 feet ................... 10 feet ................. 8 feet ................... 8 feet.
Runners ......................................................... 1144 in ............... 1149 in ............... 210 in ................. 210 in.
Bearers and maximum spacing of bearers:
3 feet ............................................... 24 in ................... 24 in ................... 210 in ................. 210 in. (rough).
6 feet ............................................... 26 in. or 34 in .. 210 in. (rough) or 210 in ................. 210 in. (rough).
38 in.
8 feet ............................................... 26 in. or 34 in .. 210 in. (rough) or 210 in .................
38 in.

300

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00310 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. L, App. A

INDEPENDENT WOOD POLE SCAFFOLDSContinued


Light duty up to Light duty up to Medium duty up to Heavy duty up to
20 feet high 60 feet high 60 feet high 60 feet high

10 feet ............................................. 26 in. or 34 in .. 210 in. (rough) or ..............................


33 in.
Planking ......................................................... 1149 in ............... 210 in ................. 210 in ................. 210 in.
Maximum vertical spacing of horizontal 7 feet ................... 7 feet ................... 6 feet ................... 6 feet.
members.
Bracing horizontal .......................................... 14 in ................... 14 in ................... 16 in. or 1144 in 24 in.
Bracing diagonal ............................................ 14 in ................... 14 in ................... 14 in ................... 24 in.
Tie-ins ............................................................ 14 in ................... 14 in ................... 14 in ................... 14 in.
NOTE: All members except planking are used on edge. All wood bearers shall be reinforced with 3162 inch steel strip, or the
equivalent, secured to the lower edges for the entire length of the bearer.

(b) Tube and coupler scaffolds.

MINIMUM SIZE OF MEMBERS


Light duty Medium duty Heavy duty

Maximum intended load .......... 25 lbs/ft2 ................................. 50 lbs/ft2 ................................. 75 lbs/ft2.


Posts, runners and braces ...... Nominal 2 in. (1.90 inches) Nominal 2 in. (1.90 inches) Nominal 2 in. (1.90 inches)
OD steel tube or pipe. OD steel tube or pipe. OD steel tube or pipe.
Bearers .................................... Nominal 2 in. (1.90 inches) .... Nominal 2 in. (1.90 inches) .... Nominal 212 in. (2.375 in.).
OD steel tube or pipe and a OD steel tube or pipe and a OD steel tube or pipe and a
maximum post spacing of 4 maximum post spacing of 4 maximum post spacing of 6
ft.10 ft.. ft.7 ft. or. ft.6 ft.
Nominal 212 in. (2.375 in.).
OD steel tube or pipe and a
maximum post spacing of 6
ft.8 ft.*.
Maximum runner spacing 6 ft. 6 in .................................. 6 ft. 6 in .................................. 6 ft. 6 in.
vertically.
* Bearers shall be installed in the direction of the shorter dimension.
NOTE: Longitudinal diagonal bracing shall be installed at an angle of 45 (5).

MAXIMUM NUMBER OF PLANKED LEVELS


Maximum number of addi-
tional planked levels Maximum
height of
Me- scaffold
Light Heavy
dium (in feet)
duty duty
duty

Number of Working Levels:


1 ...................................................................................................................... 16 11 6 125
2 ...................................................................................................................... 11 1 0 125
3 ...................................................................................................................... 6 0 0 125
4 ...................................................................................................................... 1 0 0 125

(c) Fabricated frame scaffolds. Because of Maximum height: 5 ft.


their prefabricated nature, no additional Gussets: 1 6 in.
guidelines or tables for these scaffolds are Braces: 1 8 in.
being adopted in this Appendix. Legs: 2 6 in.
(d) Plasterers, decorators, and large area Bearers (horizontal members): 2 6 in.
scaffolds. The guidelines for pole scaffolds or (f) Horse scaffolds.
tube and coupler scaffolds (Appendix A (a) Maximum intended load (light duty): 25 lb/
and (b)) may be applied. ft.2 **
(e) Bricklayers square scaffolds. Maximum intended load (medium duty): 50
Maximum intended load: 50 lb/ft.2* lb/ft.2 **
Maximum width: 5 ft. Horizontal members or bearers:
Light duty: 2 4 in.
* The squares shall be set not more than 8
feet apart for light duty scaffolds and not ** Horses shall be spaced not more than 8
more than 5 feet apart for medium duty scaf- feet apart for light duty loads, and not more
folds. than 5 feet apart for medium duty loads.

301

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00311 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. L, App. A 29 CFR Ch. XVII (7112 Edition)
Medium duty: 3 4 in. center to center, staggered uniformly from
Legs: 2 4 in. the opposite outside edges.
Longitudinal brace between legs: 1 6 in. (k) Ladder jack scaffolds. Maximum in-
Gusset brace at top of legs: 1 8 in. tended load25 lb/ft2. However, not more
Half diagonal braces: 2 4 in. than two employees shall occupy any plat-
(g) Form scaffolds and carpenters bracket form at any one time. Maximum span be-
scaffolds. tween supports shall be 8 feet.
(1) Brackets shall consist of a triangular- (l) Window jack scaffolds. Not more than
shaped frame made of wood with a cross-sec- one employee shall occupy a window jack
tion not less than 2 inches by 3 inches, or of scaffold at any one time.
114 inch 114 inch 18 inch structural angle (m) Crawling boards (chicken ladders).
iron. Crawling boards shall be not less than 10
(2) Bolts used to attach brackets to struc- inches wide and 1 inch thick, with cleats
tures shall not be less than 58 inches in di- having a minimum 1 112 inch cross-sec-
ameter. tional area. The cleats shall be equal in
(3) Maximum bracket spacing shall be 8 length to the width of the board and spaced
feet on centers. at equal intervals not to exceed 24 inches.
(4) No more than two employees shall oc- (n) Step, platform, and trestle ladder scaf-
cupy any given 8 feet of a bracket or form folds. No additional guidelines or tables are
scaffold at any one time. Tools and materials given.
shall not exceed 75 pounds in addition to the
(o) Single-point adjustable suspension scaf-
occupancy.
folds. Maximum intended load250 lbs. Wood
(5) Wooden figure-four scaffolds:
seats for boatswains chairs shall be not less
Maximum intended load: 25 lb/ft.2 than 1 inch thick if made of non-laminated
Uprights: 2 4 in. or 2 6 in. wood, or 58 inches thick if made of marine
Bearers (two): 1 6 in. quality plywood.
Braces: 1 6 in. (p) Two-point adjustable suspension scaffolds.
Maximum length of bearers (unsupported): 3
(1) In addition to direct connections to build-
ft. 6 in.
ings (except window cleaners anchors) ac-
(i) Outrigger bearers shall consist of two
ceptable ways to prevent scaffold sway in-
pieces of 1 6 inch lumber nailed on opposite
clude angulated roping and static lines. An-
sides of the vertical support.
gulated roping is a system of platform sus-
(ii) Bearers for wood figure-four brackets
pension in which the upper wire rope sheaves
shall project not more than 3 feet 6 inches
or suspension points are closer to the plane
from the outside of the form support, and
of the building face than the corresponding
shall be braced and secured to prevent tip-
attachment points on the platform, thus
ping or turning. The knee or angle brace
causing the platform to press against the
shall intersect the bearer at least 3 feet from
face of the building. Static lines are separate
the form at an angle of approximately 45 de-
ropes secured at their top and bottom ends
grees, and the lower end shall be nailed to a
closer to the plane of the building face than
vertical support.
the outermost edge of the platform. By draw-
(6) Metal bracket scaffolds:
ing the static line taut, the platform is
Maximum intended load: 25 lb/ft.2 drawn against the face of the building.
Uprights: 2 4 inch (2) On suspension scaffolds designed for a
Bearers: As designed.
working load of 500 pounds, no more than
Braces: As designed.
two employees shall be permitted on the
(7) Wood bracket scaffolds: scaffold at one time. On suspension scaffolds
Maximum intended load: 25 lb/ft.2 with a working load of 750 pounds, no more
Uprights: 2 4 in or 2 6 in than three employees shall be permitted on
Bearers: 2 6 in the scaffold at one time.
Maximum scaffold width: 3 ft 6 in (3) Ladder-type platforms. The side string-
Braces: 1 6 in er shall be of clear straight-grained spruce.
(h) Roof bracket scaffolds. No specific guide- The rungs shall be of straight-grained oak,
lines or tables are given. ash, or hickory, at least 118 inches in diame-
(i) Outrigger scaffolds (single level). No spe- ter, with 78 inch tenons mortised into the
cific guidelines or tables are given. side stringers at least 78 inch. The stringers
(j) Pump jack scaffolds. Wood poles shall not shall be tied together with tie rods not less
exceed 30 feet in height. Maximum intended than 14 inch in diameter, passing through
load500 lbs between poles; applied at the the stringers and riveted up tight against
center of the span. Not more than two em- washers on both ends. The flooring strips
ployees shall be on a pump jack scaffold at shall be spaced not more than 58 inch apart,
one time between any two supports. When 2 except at the side rails where the space may
4s are spliced together to make a 4 4 inch be 1 inch. Ladder-type platforms shall be
wood pole, they shall be spliced with 10 constructed in accordance with the following
penny common nails no more than 12 inches table:

302

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00312 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. L, App. A

SCHEDULE FOR LADDER-TYPE PLATFORMS

Length of Platform ................................ 12 feet .............. 14 & 16 feet ...... 18 & 20 feet.
Side stringers, minimum cross section
(finished sizes):
At ends .......................................... 134 234 in ...... 134 234 in ...... 134 3 in.
At middle ....................................... 134 334 in ...... 134 334 in ...... 134 4 in.
Reinforcing strip (minimum) ................. A18 78 inch steel reinforcing strip shall be attached
to the side or underside, full length.
Rungs ................................................... Rungs shall be 118 inch minimum diameter with at
least 78 inch in diameter tenons, and the maximum
spacing shall be 12 inches to center.
Tie rods:
Number (minimum) ........................ 3 ....................... 4 ....................... 4
Diameter (minimum) ...................... inch ..............
14 inch ..............
14 inch
14

Flooring, minimum finished size ........... 12 234 in ........ 12 234 in ........ 12 234 in.

SCHEDULE FOR LADDER-TYPE PLATFORMS

Length of Platform ............................................................... 22 & 24 ft .......... 28 & 30 ft.


Side stringers, minimum cross section (finished sizes):
At ends ......................................................................... 1343 in ............ 134 312 in.
At middle ...................................................................... 134 414 in ...... 134 5 in.
Reinforcing strip (minimum) ................................................ A18 78-inch steel reinforcing strip
shall be attached to the side or
underside, full length.
Rungs .................................................................................. Rungs shall be 118 inch minimum
diameter with at least 78 inch in
diameter tenons, and the max-
imum spacing shall be 12 inches
to center. Tie rods.
Number (minimum) ....................................................... 5 ....................... 6.
Diameter (minimum) ..................................................... 14 in .................. 14 in.

Flooring, minimum finished size .......................................... 12 234 in ........ 12 234 in.

(4) Plank-Type Platforms. Plank-type plat- suspension scaffolds. No specific guidelines or


forms shall be composed of not less than tables are given for these scaffolds.
nominal 2 8 inch unspliced planks, con- (2) Masons multi-point adjustable suspension
nected together on the underside with cleats scaffolds. Maximum intended load50 lb/ft2.
at intervals not exceeding 4 feet, starting 6 Each outrigger beam shall be at least a
inches from each end. A bar or other effec- standard 7 inch, 15.3 pound steel I-beam, at
tive means shall be securely fastened to the least 15 feet long. Such beams shall not
platform at each end to prevent the platform project more than 6 feet 6 inches beyond the
from slipping off the hanger. The span be- bearing point. Where the overhang exceeds 6
tween hangers for plank-type platforms shall feet 6 inches, outrigger beams shall be com-
not exceed 10 feet. posed of stronger beams or multiple beams.
(5) Beam-Type Platforms. Beam platforms (r) Catenary scaffolds. (1) Maximum in-
shall have side stringers of lumber not less tended load500 lbs.
than 2 6 inches set on edge. The span be- (2) Not more than two employees shall be
tween hangers shall not exceed 12 feet when permitted on the scaffold at one time.
beam platforms are used. The flooring shall (3) Maximum capacity of come-along shall
be supported on 2 6 inch cross beams, laid be 2,000 lbs.
flat and set into the upper edge of the string- (4) Vertical pickups shall be spaced not
ers with a snug fit, at intervals of not more more than 50 feet apart.
than 4 feet, securely nailed to the cross (5) Ropes shall be equivalent in strength to
beams. Floor-boards shall not be spaced at least 12 inch (1.3 cm) diameter improved
more than 12 inch apart. plow steel wire rope.
(q)(1) Multi-point adjustable suspension scaf- (s) Float (ship) scaffolds. (1) Maximum in-
folds and stonesetters multi-point adjustable tended load750 lbs.

303

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00313 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. L, App. C 29 CFR Ch. XVII (7112 Edition)
(2) Platforms shall be made of 34 inch ply- (4) Scaffold planks of rough full-dimen-
wood, equivalent in rating to American Ply- sioned 2-inch (5.1 cm)12-inch (30.5 cm) Doug-
wood Association Grade B-B, Group I, Exte- las Fir or Southern Yellow Pine of Select
rior. Structural Grade shall be used. Douglas Fir
(3) Bearers shall be made from 24 inch, or planks shall have a fiber stress of at least
110 inch rough lumber. They shall be free of 1900 lb/in2 (130,929 n/cm2) and a modulus of
knots and other flaws. elasticity of at least 1,900,000 lb/in2
(4) Ropes shall be equivalent in strength to (130,929,000 n/cm2), while Yellow Pine planks
at least 1 inch (2.5 cm) diameter first grade shall have a fiber stress of at least 2500 lb/in2
manila rope. (172,275 n/cm2) and a modulus of elasticity of
(t) Interior hung scaffolds. at least 2,000,000 lb/in2 (137,820,000 n/cm2).
Bearers (use on edge): 210 in. (5) Guardrails shall be constructed of a
taut wire or synthetic rope, and shall be sup-
Maximum intended load: Maximum span
ported by angle irons attached to brackets
25 lb/ft.2: 10 ft.
welded to the steel plates. These guardrails
50 lb/ft.2: 10 ft.
shall comply with 1926.451(e)(4). Guardrail
75 lb/ft.2: 7 ft.
supports shall be located at no greater than
(u) Needle beam scaffolds. 10 feet 6 inch intervals.
Maximum intended load: 25 lb/ft.2
Beams: 46 in. (NON-MANDATORY) APPENDIX B TO SUB-
Maximum platform span: 8 ft. PART L OF PART 1926CRITERIA FOR
Maximum beam span: 10 ft. DETERMINING THE FEASIBILITY OF
(1) Ropes shall be attached to the needle PROVIDING SAFE ACCESS AND FALL
beams by a scaffold hitch or an eye splice. PROTECTION FOR SCAFFOLD EREC-
The loose end of the rope shall be tied by a TORS AND DISMANTLERS [RE-
bowline knot or by a round turn and a half
SERVED]
hitch.
(2) Ropes shall be equivalent in strength to
(NON-MANDATORY) APPENDIX C TO SUB-
at least 1 inch (2.5 cm) diameter first grade
manila rope. PART L OF PART 1926LIST OF NA-
(v) Multi-level suspension scaffolds. No addi- TIONAL CONSENSUS STANDARDS
tional guidelines or tables are being given
ANSI/SIA A92.21990 Vehicle-Mounted Ele-
for these scaffolds.
vating and Rotating Aerial Devices
(w) Mobile Scaffolds. Stability test as de- ANSI/SIA A92.31990 Manually Propelled Ele-
scribed in the ANSI A92 series documents, as vating Aerial Platforms
appropriate for the type of scaffold, can be ANSI/SIA A92.51990 Boom Supported Ele-
used to establish stability for the purpose of vating Work Platforms
1926.452(w)(6). ANSI/SIA A92.61990 Self-Propelled Elevating
(x) Repair bracket scaffolds. No additional Work Platforms
guidelines or tables are being given for these ANSI/SIA A92.71990 Airline Ground Support
scaffolds. Vehicle-Mounted Vertical Lift Devices
(y) Stilts. No specific guidelines or tables ANSI/SIA A92.81993 Vehicle-Mounted Bridge
are given. Inspection and Maintenance Devices
(z) Tank builders scaffold. ANSI/SIA A92.91993 Mast-Climbing Work
(1) The maximum distance between brack- Platforms
ets to which scaffolding and guardrail sup-
ports are attached shall be no more than 10 (NON-MANDATORY) APPENDIX D TO SUB-
feet 6 inches. PART L OF PART 1926LIST OF
(2) Not more than three employees shall TRAINING TOPICS FOR SCAFFOLD
occupy a 10 feet 6 inch span of scaffold plank-
ERECTORS AND DISMANTLERS
ing at any time.
(3) A taut wire or synthetic rope supported This appendix D is provided to serve as a
on the scaffold brackets shall be installed at guide to assist employers when evaluating
the scaffold plank level between the inner- the training needs of employees erecting or
most edge of the scaffold platform and the dismantling supported scaffolds.
curved plate structure of the tank shell to The Agency believes that employees erect-
serve as a safety line in lieu of an inner ing or dismantling scaffolds should be
guardrail assembly where the space between trained in the following topics:
the scaffold platform and the tank exceeds 12 General Overview of Scaffolding
inches (30.48 cm). In the event the open space regulations and standards
on either side of the rope exceeds 12 inches erection/dismantling planning
(30.48 cm), a second wire or synthetic rope PPE and proper procedures
appropriately placed, or guardrails in ac- fall protection
cordance with 1926.451(e)(4), shall be in- materials handling
stalled in order to reduce that open space to access
less than 12 inches (30.48 cm). working platforms

304

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00314 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. L, App. E
foundations general safety
guys, ties and braces access and platforms
Tubular Welded Frame Scaffolds erection/dismantling procedures
specific regulations and standards buttresses, cantilevers, & bridges
components System Scaffolds
parts inspection
specific regulations and standards
erection/dismantling planning
guys, ties and braces components
fall protection parts inspection
general safety erection/dismantling planning
access and platforms guys, ties and braces
erection/dismantling procedures fall protection
rolling scaffold assembly general safety
putlogs access and platforms
Tube and Clamp Scaffolds erection/dismantling procedures
specific regulations and standards buttresses, cantilevers, & bridges
components
parts inspection Scaffold erectors and dismantlers should
erection/dismantling planning all receive the general overview, and, in ad-
guys, ties and braces dition, specific training for the type of sup-
fall protection ported scaffold being erected or dismantled.

(NON-MANDATORY) APPENDIX E TO SUBPART L OF PART 1926DRAWINGS AND


ILLUSTRATIONS
This appendix provides drawings of particular types of scaffolds and scaffold components,
and graphic illustrations of bracing patterns and tie spacing patterns.
This appendix is intended to provide visual guidance to assist the user in complying with
the requirements of subpart L, part 1926.

305

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00315 Fmt 8010 Sfmt 8026 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. L, App. E 29 CFR Ch. XVII (7112 Edition)

306
ER30au96.000</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00316 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. L, App. E

HOISTS MUST BE ELECTRONICALLY ISOLATED FROM SCAFFOLD

307
ER30au96.001

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00317 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. L, App. E 29 CFR Ch. XVII (7112 Edition)

308
ER30au96.002</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00318 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. L, App. E

309
ER30au96.003</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00319 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. L, App. E 29 CFR Ch. XVII (7112 Edition)

310
ER30au96.004</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00320 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. L, App. E

311
ER30au96.005</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00321 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. L, App. E 29 CFR Ch. XVII (7112 Edition)

312
ER30au96.006</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00322 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. L, App. E

313
ER30au96.007</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00323 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.500 29 CFR Ch. XVII (7112 Edition)

[61 FR 46122, Aug. 30, 1996; 61 FR 59832, Nov. 25, 1996]

Subpart MFall Protection 1926.500 Scope, application, and defi-


nitions applicable to this subpart.
AUTHORITY: Section 3704 of the Contract (a) Scope and application. (1) This sub-
Work Hours and Safety Standards Act (Con- part sets forth requirements and cri-
struction Safety Act) (40 U.S.C. 3701); Sec- teria for fall protection in construction
tions 4, 6 and 8 of the Occupational Safety workplaces covered under 29 CFR part
and Health Act of 1970 (29 U.S.C. 653, 655, 657); 1926. Exception: The provisions of this
Secretary of Labors Order Nos. 190 (55 FR
subpart do not apply when employees
9033), 696 (62 FR 111), 32000 (65 FR 50017),
and 52007 (72 FR 31159); and 29 CFR part 1911. are making an inspection, investiga-
tion, or assessment of workplace condi-
SOURCE: 59 FR 40730, Aug. 9, 1994, unless tions prior to the actual start of con-
otherwise noted.
struction work or after all construc-
tion work has been completed.

314
ER30au96.008</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00324 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.500

(2) Section 1926.501 sets forth those belts, lanyards and lifelines used for
workplaces, conditions, operations, and fall protection during tank and com-
circumstances for which fall protection munication and broadcast tower erec-
shall be provided except as follows: tion. Paragraphs (b),(c) and (f) of
(i) Requirements relating to fall pro- 1926.107 provide definitions for the
tection for employees working on scaf- pertinent terms.)
folds are provided in subpart L of this (v) Criteria for steps, handholds, lad-
part. ders, and grabrails/guardrails/railings
(ii) Requirements relating to fall pro- required by subpart CC are provided in
tection for employees working on subpart CC. Sections 1926.502(a), (c)
cranes and derricks are provided in through (e), and (i) apply to activities
subpart CC of this part. covered under subpart CC unless other-
(iii) Fall protection requirements for wise stated in subpart CC. No other
employees performing steel erection paragraphs of 1926.502 apply to subpart
work (except for towers and tanks) are CC.
provided in subpart R of this part. (4) Section 1926.503 sets forth require-
(iv) Requirements relating to fall ments for training in the installation
protection for employees working on and use of fall protection systems, ex-
certain types of equipment used in tun- cept in relation to steel erection ac-
neling operations are provided in sub- tivities and the use of equipment cov-
part S of this part. ered by subpart CC.
(v) Requirements relating to fall pro- (b) Definitions.
tection for employees engaged in the Anchorage means a secure point of at-
erection of tanks and communication tachment for lifelines, lanyards or de-
and broadcast towers are provided in celeration devices.
1926.105. Body belt (safety belt) means a strap
(vi) Requirements relating to fall with means both for securing it about
protection for employees engaged in the waist and for attaching it to a lan-
the construction of electric trans- yard, lifeline, or deceleration device.
mission and distribution lines and Body harness means straps which
equipment are provided in subpart V of may be secured about the employee in
this part. a manner that will distribute the fall
(vii) Requirements relating to fall arrest forces over at least the thighs,
protection for employees working on pelvis, waist, chest and shoulders with
stairways and ladders are provided in means for attaching it to other compo-
subpart X of this part. nents of a personal fall arrest system.
(3) Section 1926.502 sets forth the re- Buckle means any device for holding
quirements for the installation, con- the body belt or body harness closed
struction, and proper use of fall protec- around the employees body.
tion required by part 1926, except as Connector means a device which is
follows: used to couple (connect) parts of the
(i) Performance requirements for personal fall arrest system and posi-
guardrail systems used on scaffolds and tioning device systems together. It
performance requirements for falling may be an independent component of
object protection used on scaffolds are the system, such as a carabiner, or it
provided in subpart L of this part. may be an integral component of part
(ii) Performance requirements for of the system (such as a buckle or dee-
stairways, stairrail systems, and hand- ring sewn into a body belt or body har-
rails are provided in subpart X of this ness, or a snap-hook spliced or sewn to
part. a lanyard or self-retracting lanyard).
(iii) Additional performance require- Controlled access zone (CAZ) means an
ments for personal climbing equip- area in which certain work (e.g.,
ment, linemans body belts, safety overhand bricklaying) may take place
straps, and lanyards are provided in without the use of guardrail systems,
subpart V of this part. personal fall arrest systems, or safety
(iv) Section 1926.502 does not apply to net systems and access to the zone is
the erection of tanks and communica- controlled.
tion and broadcast towers. (Note: Sec- Dangerous equipment means equip-
tion 1926.104 sets the criteria for body ment (such as pickling or galvanizing

315

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00325 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.500 29 CFR Ch. XVII (7112 Edition)

tanks, degreasing units, machinery, a floor, roof, or other walking/working


electrical equipment, and other units) surface.
which, as a result of form or function, Infeasible means that it is impossible
may be hazardous to employees who to perform the construction work using
fall onto or into such equipment. a conventional fall protection system
Deceleration device means any mecha- (i.e., guardrail system, safety net sys-
nism, such as a rope grab, rip-stitch tem, or personal fall arrest system) or
lanyard, specially-woven lanyard, tear- that it is technologically impossible to
ing or deforming lanyards, automatic use any one of these systems to provide
self-retracting lifelines/lanyards, etc., fall protection.
which serves to dissipate a substantial Lanyard means a flexible line of rope,
amount of energy during a fall arrest, wire rope, or strap which generally has
or otherwise limit the energy imposed a connector at each end for connecting
on an employee during fall arrest. the body belt or body harness to a de-
Deceleration distance means the addi- celeration device, lifeline, or anchor-
tional vertical distance a falling em- age.
ployee travels, excluding lifeline elon- Leading edge means the edge of a
gation and free fall distance, before floor, roof, or formwork for a floor or
stopping, from the point at which the other walking/working surface (such as
deceleration device begins to operate. the deck) which changes location as ad-
It is measured as the distance between ditional floor, roof, decking, or
the location of an employees body belt formwork sections are placed, formed,
or body harness attachment point at or constructed. A leading edge is con-
the moment of activation (at the onset sidered to be an unprotected side and
of fall arrest forces) of the deceleration edge during periods when it is not ac-
device during a fall, and the location of tively and continuously under con-
that attachment point after the em- struction.
ployee comes to a full stop. Lifeline means a component con-
Equivalent means alternative designs, sisting of a flexible line for connection
materials, or methods to protect to an anchorage at one end to hang
against a hazard which the employer vertically (vertical lifeline), or for con-
can demonstrate will provide an equal nection to anchorages at both ends to
or greater degree of safety for employ- stretch horizontally (horizontal life-
ees than the methods, materials or de- line), and which serves as a means for
signs specified in the standard. connecting other components of a per-
Failure means load refusal, breakage, sonal fall arrest system to the anchor-
or separation of component parts. Load age.
refusal is the point where the ultimate Low-slope roof means a roof having a
strength is exceeded. slope less than or equal to 4 in 12
Free fall means the act of falling be- (vertical to horizontal).
fore a personal fall arrest system be- Lower levels means those areas or sur-
gins to apply force to arrest the fall. faces to which an employee can fall.
Free fall distance means the vertical Such areas or surfaces include, but are
displacement of the fall arrest attach- not limited to, ground levels, floors,
ment point on the employees body belt platforms, ramps, runways, exca-
or body harness between onset of the vations, pits, tanks, material, water,
fall and just before the system begins equipment, structures, or portions
to apply force to arrest the fall. This thereof.
distance excludes deceleration dis- Mechanical equipment means all
tance, and lifeline/lanyard elongation, motor or human propelled wheeled
but includes any deceleration device equipment used for roofing work, ex-
slide distance or self-retracting life- cept wheelbarrows and mopcarts.
line/lanyard extension before they op- Opening means a gap or void 30
erate and fall arrest forces occur. inches (76 cm) or more high and 18
Guardrail system means a barrier inches (48 cm) or more wide, in a wall
erected to prevent employees from fall- or partition, through which employees
ing to lower levels. can fall to a lower level.
Hole means a gap or void 2 inches (5.1 Overhand bricklaying and related work
cm) or more in its least dimension, in means the process of laying bricks and

316

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00326 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.501

masonry units such that the surface of permit the hook to receive an object
the wall to be jointed is on the opposite and, when released, automatically
side of the wall from the mason, requir- closes to retain the object. Snaphooks
ing the mason to lean over the wall to are generally one of two types:
complete the work. Related work in- (1) The locking type with a self-clos-
cludes mason tending and electrical in- ing, self-locking keeper which remains
stallation incorporated into the brick closed and locked until unlocked and
wall during the overhand bricklaying pressed open for connection or dis-
process. connection; or
Personal fall arrest system means a (2) The non-locking type with a self-
system used to arrest an employee in a closing keeper which remains closed
fall from a working level. It consists of until pressed open for connection or
an anchorage, connectors, a body belt disconnection. As of January 1, 1998,
or body harness and may include a lan- the use of a non-locking snaphook as
yard, deceleration device, lifeline, or part of personal fall arrest systems and
suitable combinations of these. As of positioning device systems is prohib-
January 1, 1998, the use of a body belt ited.
for fall arrest is prohibited. Steep roof means a roof having a slope
Positioning device system means a body greater than 4 in 12 (vertical to hori-
belt or body harness system rigged to zontal).
allow an employee to be supported on Toeboard means a low protective bar-
an elevated vertical surface, such as a rier that will prevent the fall of mate-
wall, and work with both hands free rials and equipment to lower levels and
while leaning. provide protection from falls for per-
Rope grab means a deceleration de- sonnel.
vice which travels on a lifeline and Unprotected sides and edges means any
automatically, by friction, engages the side or edge (except at entrances to
lifeline and locks so as to arrest the points of access) of a walking/working
fall of an employee. A rope grab usu- surface, e.g., floor, roof, ramp, or run-
ally employs the principle of inertial way where there is no wall or guardrail
locking, cam/level locking, or both. system at least 39 inches (1.0 m) high.
Roof means the exterior surface on Walking/working surface means any
the top of a building. This does not in- surface, whether horizontal or vertical
clude floors or formwork which, be- on which an employee walks or works,
cause a building has not been com- including, but not limited to, floors,
pleted, temporarily become the top roofs, ramps, bridges, runways,
surface of a building. formwork and concrete reinforcing
Roofing work means the hoisting, steel but not including ladders, vehi-
storage, application, and removal of cles, or trailers, on which employees
roofing materials and equipment, in- must be located in order to perform
cluding related insulation, sheet metal, their job duties.
and vapor barrier work, but not includ- Warning line system means a barrier
ing the construction of the roof deck. erected on a roof to warn employees
Safety-monitoring system means a safe- that they are approaching an unpro-
ty system in which a competent person tected roof side or edge, and which des-
is responsible for recognizing and warn- ignates an area in which roofing work
ing employees of fall hazards. may take place without the use of
Self-retracting lifeline/lanyard means a guardrail, body belt, or safety net sys-
deceleration device containing a drum- tems to protect employees in the area.
wound line which can be slowly ex- Work area means that portion of a
tracted from, or retracted onto, the walking/working surface where job du-
drum under slight tension during nor- ties are being performed.
mal employee movement, and which, [59 FR 40730, Aug. 9, 1994, as amended at 60
after onset of a fall, automatically FR 39255, Aug. 2, 1995; 66 FR 5265, Jan. 18,
locks the drum and arrests the fall. 2001; 75 FR 48133, Aug. 9, 2010]
Snaphook means a connector com-
prised of a hook-shaped member with a 1926.501 Duty to have fall protection.
normally closed keeper, or similar ar- (a) General. (1) This section sets forth
rangement, which may be opened to requirements for employers to provide

317

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00327 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.501 29 CFR Ch. XVII (7112 Edition)

fall protection systems. All fall protec- (3) Hoist areas. Each employee in a
tion required by this section shall con- hoist area shall be protected from fall-
form to the criteria set forth in ing 6 feet (1.8 m) or more to lower lev-
1926.502 of this subpart. els by guardrail systems or personal
(2) The employer shall determine if fall arrest systems. If guardrail sys-
the walking/working surfaces on which tems, [or chain, gate, or guardrail] or
its employees are to work have the portions thereof, are removed to facili-
strength and structural integrity to tate the hoisting operation (e.g., dur-
support employees safely. Employees ing landing of materials), and an em-
shall be allowed to work on those sur- ployee must lean through the access
faces only when the surfaces have the opening or out over the edge of the ac-
requisite strength and structural integ- cess opening (to receive or guide equip-
rity. ment and materials, for example), that
(b)(1) Unprotected sides and edges. employee shall be protected from fall
Each employee on a walking/working hazards by a personal fall arrest sys-
surface (horizontal and vertical sur- tem.
face) with an unprotected side or edge (4) Holes. (i) Each employee on walk-
which is 6 feet (1.8 m) or more above a ing/working surfaces shall be protected
lower level shall be protected from fall- from falling through holes (including
ing by the use of guardrail systems, skylights) more than 6 feet (1.8 m)
safety net systems, or personal fall ar- above lower levels, by personal fall ar-
rest systems. rest systems, covers, or guardrail sys-
tems erected around such holes.
(2) Leading edges. (i) Each employee
(ii) Each employee on a walking/
who is constructing a leading edge 6
working surface shall be protected
feet (1.8 m) or more above lower levels
from tripping in or stepping into or
shall be protected from falling by
through holes (including skylights) by
guardrail systems, safety net systems,
covers.
or personal fall arrest systems. Excep-
(iii) Each employee on a walking/
tion: When the employer can dem-
working surface shall be protected
onstrate that it is infeasible or creates from objects falling through holes (in-
a greater hazard to use these systems, cluding skylights) by covers.
the employer shall develop and imple- (5) Formwork and reinforcing steel.
ment a fall protection plan which Each employee on the face of formwork
meets the requirements of paragraph or reinforcing steel shall be protected
(k) of 1926.502. from falling 6 feet (1.8 m) or more to
NOTE: There is a presumption that it is fea- lower levels by personal fall arrest sys-
sible and will not create a greater hazard to
tems, safety net systems, or posi-
implement at least one of the above-listed
fall protection systems. Accordingly, the
tioning device systems.
employer has the burden of establishing that (6) Ramps, runways, and other walk-
it is appropriate to implement a fall protec- ways. Each employee on ramps, run-
tion plan which complies with 1926.502(k) ways, and other walkways shall be pro-
for a particular workplace situation, in lieu tected from falling 6 feet (1.8 m) or
of implementing any of those systems. more to lower levels by guardrail sys-
(ii) Each employee on a walking/ tems.
working surface 6 feet (1.8 m) or more (7) Excavations. (i) Each employee at
above a lower level where leading edges the edge of an excavation 6 feet (1.8 m)
are under construction, but who is not or more in depth shall be protected
engaged in the leading edge work, shall from falling by guardrail systems,
be protected from falling by a guard- fences, or barricades when the exca-
rail system, safety net system, or per- vations are not readily seen because of
sonal fall arrest system. If a guardrail plant growth or other visual barrier;
system is chosen to provide the fall (ii) Each employee at the edge of a
protection, and a controlled access well, pit, shaft, and similar excavation
zone has already been established for 6 feet (1.8 m) or more in depth shall be
leading edge work, the control line protected from falling by guardrail sys-
may be used in lieu of a guardrail along tems, fences, barricades, or covers.
the edge that parallels the leading (8) Dangerous equipment. (i) Each em-
edge. ployee less than 6 feet (1.8 m) above

318

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00328 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.501

dangerous equipment shall be pro- not limited to the erection of wall pan-
tected from falling into or onto the els, columns, beams, and floor and roof
dangerous equipment by guardrail sys- tees) and related operations such as
tems or by equipment guards. grouting of precast concrete members,
(ii) Each employee 6 feet (1.8 m) or who is 6 feet (1.8 m) or more above
more above dangerous equipment shall lower levels shall be protected from
be protected from fall hazards by falling by guardrail systems, safety net
guardrail systems, personal fall arrest systems, or personal fall arrest sys-
systems, or safety net systems. tems, unless another provision in para-
(9) Overhand bricklaying and related graph (b) of this section provides for an
work. (i) Except as otherwise provided alternative fall protection measure.
in paragraph (b) of this section, each Exception: When the employer can
employee performing overhand brick- demonstrate that it is infeasible or cre-
laying and related work 6 feet (1.8 m) ates a greater hazard to use these sys-
or more above lower levels, shall be tems, the employer shall develop and
protected from falling by guardrail sys- implement a fall protection plan which
tems, safety net systems, personal fall meets the requirements of paragraph
arrest systems, or shall work in a con- (k) of 1926.502.
trolled access zone. NOTE: There is a presumption that it is fea-
(ii) Each employee reaching more sible and will not create a greater hazard to
than 10 inches (25 cm) below the level implement at least one of the above-listed
of the walking/working surface on fall protection systems. Accordingly, the
which they are working, shall be pro- employer has the burden of establishing that
tected from falling by a guardrail sys- it is appropriate to implement a fall protec-
tion plan which complies with 1926.502(k)
tem, safety net system, or personal fall
for a particular workplace situation, in lieu
arrest system. of implementing any of those systems.
NOTE: Bricklaying operations performed on
(13) Residential construction. Each em-
scaffolds are regulated by subpart LScaf-
folds of this part. ployee engaged in residential construc-
(10) Roofing work on Low-slope roofs. tion activities 6 feet (1.8 m) or more
Except as otherwise provided in para- above lower levels shall be protected
graph (b) of this section, each employee by guardrail systems, safety net sys-
engaged in roofing activities on low- tem, or personal fall arrest system un-
slope roofs, with unprotected sides and less another provision in paragraph (b)
edges 6 feet (1.8 m) or more above lower of this section provides for an alter-
levels shall be protected from falling native fall protection measure. Excep-
by guardrail systems, safety net sys- tion: When the employer can dem-
tems, personal fall arrest systems, or a onstrate that it is infeasible or creates
combination of warning line system a greater hazard to use these systems,
and guardrail system, warning line sys- the employer shall develop and imple-
tem and safety net system, or warning ment a fall protection plan which
line system and personal fall arrest meets the requirements of paragraph
system, or warning line system and (k) of 1926.502.
safety monitoring system. Or, on roofs NOTE: There is a presumption that it is fea-
50-feet (15.25 m) or less in width (see ap- sible and will not create a greater hazard to
pendix A to subpart M of this part), the implement at least one of the above-listed
fall protection systems. Accordingly, the
use of a safety monitoring system employer has the burden of establishing that
alone [i.e. without the warning line it is appropriate to implement a fall protec-
system] is permitted. tion plan which complies with 1926.502(k)
(11) Steep roofs. Each employee on a for a particular workplace situation, in lieu
steep roof with unprotected sides and of implementing any of those systems.
edges 6 feet (1.8 m) or more above lower (14) Wall openings. Each employee
levels shall be protected from falling working on, at, above, or near wall
by guardrail systems with toeboards, openings (including those with chutes
safety net systems, or personal fall ar- attached) where the outside bottom
rest systems. edge of the wall opening is 6 feet (1.8 m)
(12) Precast concrete erection. Each em- or more above lower levels and the in-
ployee engaged in the erection of pre- side bottom edge of the wall opening is
cast concrete members (including, but less than 39 inches (1.0 m) above the

319

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00329 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.502 29 CFR Ch. XVII (7112 Edition)

walking/working surface, shall be pro- guardrail system meets all other cri-
tected from falling by the use of a teria of this paragraph.
guardrail system, a safety net system, NOTE: When employees are using stilts, the
or a personal fall arrest system. top edge height of the top rail, or equivalent
(15) Walking/working surfaces not oth- member, shall be increased an amount equal
erwise addressed. Except as provided in to the height of the stilts.
1926.500(a)(2) or in 1926.501 (b)(1) (2) Midrails, screens, mesh, inter-
through (b)(14), each employee on a mediate vertical members, or equiva-
walking/working surface 6 feet (1.8 m) lent intermediate structural members
or more above lower levels shall be pro- shall be installed between the top edge
tected from falling by a guardrail sys- of the guardrail system and the walk-
tem, safety net system, or personal fall ing/working surface when there is no
arrest system. wall or parapet wall at least 21 inches
(c) Protection from falling objects. (53 cm) high.
When an employee is exposed to falling (i) Midrails, when used, shall be in-
objects, the employer shall have each stalled at a height midway between the
employee wear a hard hat and shall im- top edge of the guardrail system and
plement one of the following measures: the walking/working level.
(1) Erect toeboards, screens, or (ii) Screens and mesh, when used,
guardrail systems to prevent objects shall extend from the top rail to the
from falling from higher levels; or, walking/working level and along the
(2) Erect a canopy structure and keep entire opening between top rail sup-
potential fall objects far enough from ports.
the edge of the higher level so that (iii) Intermediate members (such as
those objects would not go over the balusters), when used between posts,
edge if they were accidentally dis- shall be not more than 19 inches (48
placed; or, cm) apart.
(3) Barricade the area to which ob- (iv) Other structural members (such
jects could fall, prohibit employees as additional midrails and architec-
from entering the barricaded area, and tural panels) shall be installed such
keep objects that may fall far enough that there are no openings in the
away from the edge of a higher level so guardrail system that are more than 19
that those objects would not go over inches (.5 m) wide.
the edge if they were accidentally dis- (3) Guardrail systems shall be capa-
placed. ble of withstanding, without failure, a
force of at least 200 pounds (890 N) ap-
1926.502 Fall protection systems cri- plied within 2 inches (5.1 cm) of the top
teria and practices. edge, in any outward or downward di-
(a) General. (1) Fall protection sys- rection, at any point along the top
tems required by this part shall comply edge.
with the applicable provisions of this (4) When the 200 pound (890 N) test
section. load specified in paragraph (b)(3) of
(2) Employers shall provide and in- this section is applied in a downward
stall all fall protection systems re- direction, the top edge of the guardrail
quired by this subpart for an employee, shall not deflect to a height less than
and shall comply with all other perti- 39 inches (1.0 m) above the walking/
nent requirements of this subpart be- working level. Guardrail system com-
fore that employee begins the work ponents selected and constructed in ac-
that necessitates the fall protection. cordance with the appendix B to sub-
(b) Guardrail systems. Guardrail sys- part M of this part will be deemed to
tems and their use shall comply with meet this requirement.
the following provisions: (5) Midrails, screens, mesh, inter-
(1) Top edge height of top rails, or mediate vertical members, solid pan-
equivalent guardrail system members, els, and equivalent structural members
shall be 42 inches (1.1 m) plus or minus shall be capable of withstanding, with-
3 inches (8 cm) above the walking/ out failure, a force of at least 150
working level. When conditions war- pounds (666 N) applied in any downward
rant, the height of the top edge may or outward direction at any point
exceed the 45-inch height, provided the along the midrail or other member.

320

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00330 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.502

(6) Guardrail systems shall be so sur- are working, but in no case more than
faced as to prevent injury to an em- 30 feet (9.1 m) below such level. When
ployee from punctures or lacerations, nets are used on bridges, the potential
and to prevent snagging of clothing. fall area from the walking/working sur-
(7) The ends of all top rails and face to the net shall be unobstructed.
midrails shall not overhang the ter- (2) Safety nets shall extend outward
minal posts, except where such over- from the outermost projection of the
hang does not constitute a projection work surface as follows:
hazard.
Minimum required horizontal
(8) Steel banding and plastic banding Vertical distance from working distance of outer edge of net
shall not be used as top rails or level to horizontal plane of net from the edge of the working
surface
midrails.
(9) Top rails and midrails shall be at Up to 5 feet ............................ 8 feet.
More than 5 feet up to 10 feet 10 feet.
least one-quarter inch (0.6 cm) nominal More than 10 feet ................... 13 feet.
diameter or thickness to prevent cuts
and lacerations. If wire rope is used for (3) Safety nets shall be installed with
top rails, it shall be flagged at not sufficient clearance under them to pre-
more than 6-foot (1.8 m) intervals with vent contact with the surface or struc-
high-visibility material. tures below when subjected to an im-
(10) When guardrail systems are used pact force equal to the drop test speci-
at hoisting areas, a chain, gate or re- fied in paragraph (c)(4) of this section.
movable guardrail section shall be (4) Safety nets and their installations
placed across the access opening be- shall be capable of absorbing an impact
tween guardrail sections when hoisting force equal to that produced by the
operations are not taking place. drop test specified in paragraph (c)(4)(i)
(11) When guardrail systems are used of this section.
at holes, they shall be erected on all (i) Except as provided in paragraph
unprotected sides or edges of the hole. (c)(4)(ii) of this section, safety nets and
(12) When guardrail systems are used safety net installations shall be drop-
around holes used for the passage of tested at the jobsite after initial in-
materials, the hole shall have not more stallation and before being used as a
than two sides provided with remov- fall protection system, whenever relo-
able guardrail sections to allow the cated, after major repair, and at 6-
passage of materials. When the hole is month intervals if left in one place.
not in use, it shall be closed over with The drop-test shall consist of a 400
a cover, or a guardrail system shall be pound (180 kg) bag of sand 30 2 inches
provided along all unprotected sides or (76 5 cm) in diameter dropped into the
edges. net from the highest walking/working
(13) When guardrail systems are used surface at which employees are exposed
around holes which are used as points to fall hazards, but not from less than
of access (such as ladderways), they 42 inches (1.1 m) above that level.
shall be provided with a gate, or be so (ii) When the employer can dem-
offset that a person cannot walk di- onstrate that it is unreasonable to per-
rectly into the hole. form the drop-test required by para-
(14) Guardrail systems used on ramps graph (c)(4)(i) of this section, the em-
and runways shall be erected along ployer (or a designated competent per-
each unprotected side or edge. son) shall certify that the net and net
(15) Manila, plastic or synthetic rope installation is in compliance with the
being used for top rails or midrails provisions of paragraphs (c)(3) and
shall be inspected as frequently as nec- (c)(4)(i) of this section by preparing a
essary to ensure that it continues to certification record prior to the net
meet the strength requirements of being used as a fall protection system.
paragraph (b)(3) of this section. The certification record must include
(c) Safety net systems. Safety net sys- an identification of the net and net in-
tems and their use shall comply with stallation for which the certification
the following provisions: record is being prepared; the date that
(1) Safety nets shall be installed as it was determined that the identified
close as practicable under the walking/ net and net installation were in com-
working surface on which employees pliance with paragraph (c)(3) of this

321

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00331 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.502 29 CFR Ch. XVII (7112 Edition)

section and the signature of the person ing, breaking, or taking permanent de-
making the determination and certifi- formation.
cation. The most recent certification (5) Snaphooks shall be sized to be
record for each net and net installation compatible with the member to which
shall be available at the jobsite for in- they are connected to prevent uninten-
spection. tional disengagement of the snaphook
(5) Defective nets shall not be used. by depression of the snaphook keeper
Safety nets shall be inspected at least by the connected member, or shall be a
once a week for wear, damage, and locking type snaphook designed and
other deterioration. Defective compo- used to prevent disengagement of the
nents shall be removed from service. snaphook by the contact of the
Safety nets shall also be inspected snaphook keeper by the connected
after any occurrence which could affect member. Effective January 1, 1998, only
the integrity of the safety net system. locking type snaphooks shall be used.
(6) Materials, scrap pieces, equip- (6) Unless the snaphook is a locking
ment, and tools which have fallen into type and designed for the following
the safety net shall be removed as soon connections, snaphooks shall not be en-
as possible from the net and at least gaged:
before the next work shift. (i) directly to webbing, rope or wire
(7) The maximum size of each safety rope;
net mesh opening shall not exceed 36 (ii) to each other;
square inches (230 cm 2) nor be longer (iii) to a Dee-ring to which another
than 6 inches (15 cm) on any side, and snaphook or other connector is at-
the opening, measured center-to-center tached;
of mesh ropes or webbing, shall not be (iv) to a horizontal lifeline; or
longer than 6 inches (15 cm). All mesh (v) to any object which is incom-
crossings shall be secured to prevent patibly shaped or dimensioned in rela-
enlargement of the mesh opening. tion to the snaphook such that unin-
(8) Each safety net (or section of it) tentional disengagement could occur
shall have a border rope for webbing by the connected object being able to
with a minimum breaking strength of depress the snaphook keeper and re-
5,000 pounds (22.2 kN). lease itself.
(9) Connections between safety net (7) On suspended scaffolds or similar
panels shall be as strong as integral work platforms with horizontal life-
net components and shall be spaced not lines which may become vertical life-
more than 6 inches (15 cm) apart. lines, the devices used to connect to a
(d) Personal fall arrest systems. Per- horizontal lifeline shall be capable of
sonal fall arrest systems and their use locking in both directions on the life-
shall comply with the provisions set line.
forth below. Effective January 1, 1998, (8) Horizontal lifelines shall be de-
body belts are not acceptable as part of signed, installed, and used, under the
a personal fall arrest system. Note: The supervision of a qualified person, as
use of a body belt in a positioning de- part of a complete personal fall arrest
vice system is acceptable and is regu- system, which maintains a safety fac-
lated under paragraph (e) of this sec- tor of at least two.
tion. (9) Lanyards and vertical lifelines
(1) Connectors shall be drop forged, shall have a minimum breaking
pressed or formed steel, or made of strength of 5,000 pounds (22.2 kN).
equivalent materials. (10) (i) Except as provided in para-
(2) Connectors shall have a corrosion- graph (d)(10)(ii) of this section, when
resistant finish, and all surfaces and vertical lifelines are used, each em-
edges shall be smooth to prevent dam- ployee shall be attached to a separate
age to interfacing parts of the system. lifeline.
(3) Dee-rings and snaphooks shall (ii) During the construction of eleva-
have a minimum tensile strength of tor shafts, two employees may be at-
5,000 pounds (22.2 kN). tached to the same lifeline in the
(4) Dee-rings and snaphooks shall be hoistway, provided both employees are
proof-tested to a minimum tensile load working atop a false car that is
of 3,600 pounds (16 kN) without crack- equipped with guardrails; the strength

322

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00332 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.502

of the lifeline is 10,000 pounds [5,000 ergy of an employee free falling a dis-
pounds per employee attached] (44.4 tance of 6 feet (1.8 m), or the free fall
kN); and all other criteria specified in distance permitted by the system,
this paragraph for lifelines have been whichever is less.
met. NOTE: If the personal fall arrest system
(11) Lifelines shall be protected meets the criteria and protocols contained in
against being cut or abraded. appendix C to subpart M, and if the system
(12) Self-retracting lifelines and lan- is being used by an employee having a com-
bined person and tool weight of less than 310
yards which automatically limit free pounds (140 kg), the system will be consid-
fall distance to 2 feet (0.61 m) or less ered to be in compliance with the provisions
shall be capable of sustaining a min- of paragraph (d)(16) of this section. If the
imum tensile load of 3,000 pounds (13.3 system is used by an employee having a com-
kN) applied to the device with the life- bined tool and body weight of 310 pounds (140
line or lanyard in the fully extended kg) or more, then the employer must appro-
position. priately modify the criteria and protocols of
(13) Self-retracting lifelines and lan- the appendix to provide proper protection for
such heavier weights, or the system will not
yards which do not limit free fall dis- be deemed to be in compliance with the re-
tance to 2 feet (0.61 m) or less, ripstitch quirements of paragraph (d)(16) of this sec-
lanyards, and tearing and deforming tion.
lanyards shall be capable of sustaining (17) The attachment point of the
a minimum tensile load of 5,000 pounds body belt shall be located in the center
(22.2 kN) applied to the device with the of the wearers back. The attachment
lifeline or lanyard in the fully extended point of the body harness shall be lo-
position. cated in the center of the wearers back
(14) Ropes and straps (webbing) used near shoulder level, or above the wear-
in lanyards, lifelines, and strength ers head.
components of body belts and body har- (18) Body belts, harnesses, and com-
nesses shall be made from synthetic fi- ponents shall be used only for em-
bers. ployee protection (as part of a personal
(15) Anchorages used for attachment fall arrest system or positioning device
of personal fall arrest equipment shall system) and not to hoist materials.
be independent of any anchorage being (19) Personal fall arrest systems and
used to support or suspend platforms components subjected to impact load-
and capable of supporting at least 5,000 ing shall be immediately removed from
pounds (22.2 kN) per employee at- service and shall not be used again for
tached, or shall be designed, installed, employee protection until inspected
and used as follows: and determined by a competent person
(i) as part of a complete personal fall to be undamaged and suitable for
arrest system which maintains a safety reuse.
factor of at least two; and (20) The employer shall provide for
(ii) under the supervision of a quali- prompt rescue of employees in the
fied person. event of a fall or shall assure that em-
(16) Personal fall arrest systems, ployees are able to rescue themselves.
when stopping a fall, shall: (21) Personal fall arrest systems shall
(i) limit maximum arresting force on be inspected prior to each use for wear,
an employee to 900 pounds (4 kN) when damage and other deterioration, and
used with a body belt; defective components shall be removed
(ii) limit maximum arresting force from service.
on an employee to 1,800 pounds (8 kN) (22) Body belts shall be at least one
when used with a body harness; and five-eighths (158) inches (4.1 cm)
(iii) be rigged such that an employee wide.
can neither free fall more than 6 feet (23) Personal fall arrest systems shall
(1.8 m), nor contact any lower level; not be attached to guardrail systems,
(iv) bring an employee to a complete nor shall they be attached to hoists ex-
stop and limit maximum deceleration cept as specified in other subparts of
distance an employee travels to 3.5 feet this part.
(1.07 m); and, (24) When a personal fall arrest sys-
(v) have sufficient strength to with- tem is used at hoist areas, it shall be
stand twice the potential impact en- rigged to allow the movement of the

323

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00333 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.502 29 CFR Ch. XVII (7112 Edition)

employee only as far as the edge of the (9) Positioning device systems shall
walking/working surface. be inspected prior to each use for wear,
(e) Positioning device systems. Posi- damage, and other deterioration, and
tioning device systems and their use defective components shall be removed
shall conform to the following provi- from service.
sions: (10) Body belts, harnesses, and com-
(1) Positioning devices shall be rigged ponents shall be used only for em-
such that an employee cannot free fall ployee protection (as part of a personal
more than 2 feet (.6 m). fall arrest system or positioning device
(2) Positioning devices shall be se- system) and not to hoist materials.
cured to an anchorage capable of sup- (f) Warning line systems. Warning line
porting at least twice the potential im-
systems [See 1926.501(b)(10)] and their
pact load of an employees fall or 3,000
use shall comply with the following
pounds (13.3 kN), whichever is greater.
provisions:
(3) Connectors shall be drop forged,
pressed or formed steel, or made of (1) The warning line shall be erected
equivalent materials. around all sides of the roof work area.
(4) Connectors shall have a corrosion- (i) When mechanical equipment is
resistant finish, and all surfaces and not being used, the warning line shall
edges shall be smooth to prevent dam- be erected not less than 6 feet (1.8 m)
age to interfacing parts of this system. from the roof edge.
(5) Connecting assemblies shall have (ii) When mechanical equipment is
a minimum tensile strength of 5,000 being used, the warning line shall be
pounds (22.2 kN) erected not less than 6 feet (1.8 m) from
(6) Dee-rings and snaphooks shall be the roof edge which is parallel to the
proof-tested to a minimum tensile load direction of mechanical equipment op-
of 3,600 pounds (16 kN) without crack- eration, and not less than 10 feet (3.1
ing, breaking, or taking permanent de- m) from the roof edge which is perpen-
formation. dicular to the direction of mechanical
(7) Snaphooks shall be sized to be equipment operation.
compatible with the member to which (iii) Points of access, materials han-
they are connected to prevent uninten- dling areas, storage areas, and hoisting
tional disengagement of the snaphook areas shall be connected to the work
by depression of the snaphook keeper area by an access path formed by two
by the connected member, or shall be a warning lines.
locking type snaphook designed and (iv) When the path to a point of ac-
used to prevent disengagement of the cess is not in use, a rope, wire, chain,
snaphook by the contact of the or other barricade, equivalent in
snaphook keeper by the connected strength and height to the warning
member. As of January 1, 1998, only line, shall be placed across the path at
locking type snaphooks shall be used. the point where the path intersects the
(8) Unless the snaphook is a locking warning line erected around the work
type and designed for the following
area, or the path shall be offset such
connections, snaphooks shall not be en-
that a person cannot walk directly into
gaged:
the work area.
(i) directly to webbing, rope or wire
rope; (2) Warning lines shall consist of
(ii) to each other; ropes, wires, or chains, and supporting
(iii) to a Dee-ring to which another stanchions erected as follows:
snaphook or other connector is at- (i) The rope, wire, or chain shall be
tached; flagged at not more than 6-foot (1.8 m)
(iv) to a horizontal lifeline; or intervals with high-visibility material;
(v) to any object which is incom- (ii) The rope, wire, or chain shall be
patibly shaped or dimensioned in rela- rigged and supported in such a way
tion to the snaphook such that unin- that its lowest point (including sag) is
tentional disengagement could occur no less than 34 inches (.9 m) from the
by the connected object being able to walking/working surface and its high-
depress the snaphook keeper and re- est point is no more than 39 inches (1.0
lease itself. m) from the walking/working surface;

324

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00334 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.502

(iii) After being erected, with the proximately parallel to the unpro-
rope, wire, or chain attached, stan- tected or leading edge.
chions shall be capable of resisting, (iv) The control line shall be con-
without tipping over, a force of at least nected on each side to a guardrail sys-
16 pounds (71 N) applied horizontally tem or wall.
against the stanchion, 30 inches (.8 m) (2) When used to control access to
above the walking/working surface, areas where overhand bricklaying and
perpendicular to the warning line, and related work are taking place:
in the direction of the floor, roof, or (i) The controlled access zone shall
platform edge; be defined by a control line erected not
(iv) The rope, wire, or chain shall less than 10 feet (3.1 m) nor more than
have a minimum tensile strength of 500 15 feet (4.5 m) from the working edge.
pounds (2.22 kN), and after being at- (ii) The control line shall extend for
tached to the stanchions, shall be capa- a distance sufficient for the controlled
ble of supporting, without breaking, access zone to enclose all employees
the loads applied to the stanchions as performing overhand bricklaying and
prescribed in paragraph (f)(2)(iii) of related work at the working edge and
this section; and shall be approximately parallel to the
(v) The line shall be attached at each working edge.
stanchion in such a way that pulling on (iii) Additional control lines shall be
one section of the line between stan- erected at each end to enclose the con-
chions will not result in slack being trolled access zone.
taken up in adjacent sections before
(iv) Only employees engaged in
the stanchion tips over.
overhand bricklaying or related work
(3) No employee shall be allowed in
shall be permitted in the controlled ac-
the area between a roof edge and a
cess zone.
warning line unless the employee is
performing roofing work in that area. (3) Control lines shall consist of
(4) Mechanical equipment on roofs ropes, wires, tapes, or equivalent mate-
shall be used or stored only in areas rials, and supporting stanchions as fol-
where employees are protected by a lows:
warning line system, guardrail system, (i) Each line shall be flagged or oth-
or personal fall arrest system. erwise clearly marked at not more
(g) Controlled access zones. Controlled than 6-foot (1.8 m) intervals with high-
access zones [See 1926.501(b)(9) and visibility material.
1926.502(k)] and their use shall con- (ii) Each line shall be rigged and sup-
form to the following provisions. ported in such a way that its lowest
(1) When used to control access to point (including sag) is not less than 39
areas where leading edge and other op- inches (1 m) from the walking/working
erations are taking place the con- surface and its highest point is not
trolled access zone shall be defined by more than 45 inches (1.3 m) [50 inches
a control line or by any other means (1.3 m) when overhand bricklaying op-
that restricts access. erations are being performed] from the
(i) When control lines are used, they walking/working surface.
shall be erected not less than 6 feet (1.8 (iii) Each line shall have a minimum
m) nor more than 25 feet (7.7 m) from breaking strength of 200 pounds (.88
the unprotected or leading edge, except kN).
when erecting precast concrete mem- (4) On floors and roofs where guard-
bers. rail systems are not in place prior to
(ii) When erecting precast concrete the beginning of overhand bricklaying
members, the control line shall be operations, controlled access zones
erected not less than 6 feet (1.8 m) nor shall be enlarged, as necessary, to en-
more than 60 feet (18 m) or half the close all points of access, material han-
length of the member being erected, dling areas, and storage areas.
whichever is less, from the leading (5) On floors and roofs where guard-
edge. rail systems are in place, but need to
(iii) The control line shall extend be removed to allow overhand brick-
along the entire length of the unpro- laying work or leading edge work to
tected or leading edge and shall be ap- take place, only that portion of the

325

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00335 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.502 29 CFR Ch. XVII (7112 Edition)

guardrail necessary to accomplish that ment, and materials that may be im-
days work shall be removed. posed on the cover at any one time.
(h) Safety monitoring systems. Safety (3) All covers shall be secured when
monitoring systems [See installed so as to prevent accidental
1926.501(b)(10) and 1926.502(k)] and displacement by the wind, equipment,
their use shall comply with the fol- or employees.
lowing provisions: (4) All covers shall be color coded or
(1) The employer shall designate a they shall be marked with the word
competent person to monitor the safe- HOLE or COVER to provide warn-
ty of other employees and the em- ing of the hazard.
ployer shall ensure that the safety NOTE: This provision does not apply to cast
monitor complies with the following iron manhole covers or steel grates used on
requirements: streets or roadways.
(i) The safety monitor shall be com- (j) Protection from falling objects. Fall-
petent to recognize fall hazards; ing object protection shall comply with
(ii) The safety monitor shall warn the following provisions:
(1) Toeboards, when used as falling
the employee when it appears that the
object protection, shall be erected
employee is unaware of a fall hazard or
along the edge of the overhead walking/
is acting in an unsafe manner;
working surface for a distance suffi-
(iii) The safety monitor shall be on
cient to protect employees below.
the same walking/working surface and
(2) Toeboards shall be capable of
within visual sighting distance of the
withstanding, without failure, a force
employee being monitored;
of at least 50 pounds (222 N) applied in
(iv) The safety monitor shall be close any downward or outward direction at
enough to communicate orally with any point along the toeboard.
the employee; and (3) Toeboards shall be a minimum of
(v) The safety monitor shall not have 312 inches (9 cm) in vertical height
other responsibilities which could take from their top edge to the level of the
the monitors attention from the moni- walking/working surface. They shall
toring function. have not more than 14 inch (0.6 cm)
(2) Mechanical equipment shall not clearance above the walking/working
be used or stored in areas where safety surface. They shall be solid or have
monitoring systems are being used to openings not over 1 inch (2.5 cm) in
monitor employees engaged in roofing greatest dimension.
operations on low-slope roofs. (4) Where tools, equipment, or mate-
(3) No employee, other than an em- rials are piled higher than the top edge
ployee engaged in roofing work [on of a toeboard, paneling or screening
low-sloped roofs] or an employee cov- shall be erected from the walking/
ered by a fall protection plan, shall be working surface or toeboard to the top
allowed in an area where an employee of a guardrail systems top rail or
is being protected by a safety moni- midrail, for a distance sufficient to
toring system. protect employees below.
(4) Each employee working in a con- (5) Guardrail systems, when used as
trolled access zone shall be directed to falling object protection, shall have all
comply promptly with fall hazard openings small enough to prevent pas-
warnings from safety monitors. sage of potential falling objects.
(i) Covers. Covers for holes in floors, (6) During the performance of
roofs, and other walking/working sur- overhand bricklaying and related work:
faces shall meet the following require- (i) No materials or equipment except
ments: masonry and mortar shall be stored
(1) Covers located in roadways and within 4 feet (1.2 m) of the working
vehicular aisles shall be capable of sup- edge.
porting, without failure, at least twice (ii) Excess mortar, broken or scat-
the maximum axle load of the largest tered masonry units, and all other ma-
vehicle expected to cross over the terials and debris shall be kept clear
cover. from the work area by removal at reg-
(2) All other covers shall be capable ular intervals.
of supporting, without failure, at least (7) During the performance of roofing
twice the weight of employees, equip- work:

326

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00336 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.503

(i) Materials and equipment shall not (7) The fall protection plan shall
be stored within 6 feet (1.8 m) of a roof identify each location where conven-
edge unless guardrails are erected at tional fall protection methods cannot
the edge. be used. These locations shall then be
(ii) Materials which are piled, classified as controlled access zones
grouped, or stacked near a roof edge and the employer must comply with
shall be stable and self-supporting. the criteria in paragraph (g) of this sec-
(8) Canopies, when used as falling ob- tion.
ject protection, shall be strong enough (8) Where no other alternative meas-
to prevent collapse and to prevent pen- ure has been implemented, the em-
etration by any objects which may fall ployer shall implement a safety moni-
onto the canopy. toring system in conformance with
(k) Fall protection plan. This option is 1926.502(h).
available only to employees engaged in (9) The fall protection plan must in-
leading edge work, precast concrete clude a statement which provides the
erection work, or residential construc- name or other method of identification
tion work (See 1926.501(b)(2), (b)(12), for each employee who is designated to
and (b)(13)) who can demonstrate that work in controlled access zones. No
other employees may enter controlled
it is infeasible or it creates a greater
access zones.
hazard to use conventional fall protec-
(10) In the event an employee falls, or
tion equipment. The fall protection
some other related, serious incident oc-
plan must conform to the following
curs, (e.g., a near miss) the employer
provisions.
shall investigate the circumstances of
(1) The fall protection plan shall be the fall or other incident to determine
prepared by a qualified person and de- if the fall protection plan needs to be
veloped specifically for the site where changed (e.g. new practices, proce-
the leading edge work, precast concrete dures, or training) and shall implement
work, or residential construction work those changes to prevent similar types
is being performed and the plan must of falls or incidents.
be maintained up to date.
(2) Any changes to the fall protection 1926.503 Training requirements.
plan shall be approved by a qualified The following training provisions
person. supplement and clarify the require-
(3) A copy of the fall protection plan ments of 1926.21 regarding the hazards
with all approved changes shall be addressed in subpart M of this part.
maintained at the job site. (a) Training Program. (1) The em-
(4) The implementation of the fall ployer shall provide a training program
protection plan shall be under the su- for each employee who might be ex-
pervision of a competent person. posed to fall hazards. The program
(5) The fall protection plan shall doc- shall enable each employee to recog-
ument the reasons why the use of con- nize the hazards of falling and shall
ventional fall protection systems train each employee in the procedures
(guardrail systems, personal fall arrest to be followed in order to minimize
systems, or safety nets systems) are in- these hazards.
feasible or why their use would create (2) The employer shall assure that
a greater hazard. each employee has been trained, as
(6) The fall protection plan shall in- necessary, by a competent person
clude a written discussion of other qualified in the following areas:
measures that will be taken to reduce (i) The nature of fall hazards in the
or eliminate the fall hazard for workers work area;
who cannot be provided with protec- (ii) The correct procedures for erect-
tion from the conventional fall protec- ing, maintaining, disassembling, and
tion systems. For example, the em- inspecting the fall protection systems
ployer shall discuss the extent to to be used;
which scaffolds, ladders, or vehicle (iii) The use and operation of guard-
mounted work platforms can be used to rail systems, personal fall arrest sys-
provide a safer working surface and tems, safety net systems, warning line
thereby reduce the hazard of falling. systems, safety monitoring systems,

327

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00337 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. M, App. A 29 CFR Ch. XVII (7112 Edition)

controlled access zones, and other pro- that the employee has not retained the
tection to be used; requisite understanding or skill.
(iv) The role of each employee in the NOTE: The following appendices to subpart
safety monitoring system when this M of this part serve as non-mandatory guide-
system is used; lines to assist employers in complying with
(v) The limitations on the use of me- the appropriate requirements of subpart M of
chanical equipment during the per- this part.
formance of roofing work on low-sloped
roofs; APPENDIX A TO SUBPART M OF PART
(vi) The correct procedures for the 1926DETERMINING ROOF WIDTHS
handling and storage of equipment and Non-mandatory Guidelines for Complying With
materials and the erection of overhead 1926.501(b)(10)
protection; and
(vii) The role of employees in fall (1) This appendix serves as a guideline to
assist employers complying with the require-
protection plans; ments of 1926.501(b)(10). Section
(viii) The standards contained in this 1910.501(b)(10) allows the use of a safety mon-
subpart. itoring system alone as a means of providing
(b) Certification of training. (1) The fall protection during the performance of
employer shall verify compliance with roofing operations on low-sloped roofs 50 feet
paragraph (a) of this section by pre- (15.25 m) or less in width. Each example in
paring a written certification record. the appendix shows a roof plan or plans and
The written certification record shall indicates where each roof or roof area is to
contain the name or other identity of be measured to determine its width. Section
views or elevation views are shown where ap-
the employee trained, the date(s) of the
propriate. Some examples show correct
training, and the signature of the per- and incorrect subdivisions of irregularly
son who conducted the training or the shaped roofs divided into smaller, regularly
signature of the employer. If the em- shaped areas. In all examples, the dimension
ployer relies on training conducted by selected to be the width of an area is the
another employer or completed prior to lesser of the two primary dimensions of the
the effective date of this section, the area, as viewed from above. Example A
certification record shall indicate the shows that on a simple rectangular roof,
date the employer determined the prior width is the lesser of the two primary overall
dimensions. This is also the case with roofs
training was adequate rather than the which are sloped toward or away from the
date of actual training. roof center, as shown in Example B.
(2) The latest training certification (2) Many roofs are not simple rectangles.
shall be maintained. Such roofs may be broken down into sub-
(c) Retraining. When the employer has areas as shown in Example C. The process of
reason to believe that any affected em- dividing a roof area can produce many dif-
ployee who has already been trained ferent configurations. Example C gives the
does not have the understanding and general rule of using dividing lines of min-
skill required by paragraph (a) of this imum length to minimize the size and num-
ber of the areas which are potentially less
section, the employer shall retrain than 50 feet (15.25 m) wide. The intent is to
each such employee. Circumstances minimize the number of roof areas where
where retraining is required include, safety monitoring systems alone are suffi-
but are not limited to, situations cient protection.
where: (3) Roofs which are comprised of several
(1) Changes in the workplace render separate, non-contiguous roof areas, as in
previous training obsolete; or Example D, may be considered as a series of
(2) Changes in the types of fall pro- individual roofs. Some roofs have pent-
tection systems or equipment to be houses, additional floors, courtyard open-
ings, or similar architectural features; Ex-
used render previous training obsolete; ample E shows how the rule for dividing
or roofs into subareas is applied to such con-
(3) Inadequacies in an affected em- figurations. Irregular, non-rectangular roofs
ployees knowledge or use of fall pro- must be considered on an individual basis, as
tection systems or equipment indicate shown in Example F.

328

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00338 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. M, App. A

EXAMPLE A: RECTANGULAR SHAPED ROOFS

EXAMPLE B: SLOPED RECTANGULAR SHAPED ROOFS

EXAMPLE C: IRREGULARLY SHAPED ROOFS the size of roof areas where the safety moni-
WITH RECTANGULAR SHAPED SECTIONS toring system alone can be used
Such roofs are to be divided into sub-areas [1926.502(b)(10)]. Dotted lines are used in the
by using dividing lines of minimum length to examples to show the location of dividing
minimize the size and number of the areas lines. W denotes incorrect measurements of
which are potentially less than or equal to 50 width.
feet (15.25 meters) in width, in order to limit ER09AU94.001</GPH>

329
ER09AU94.000</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00339 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. M, App. A 29 CFR Ch. XVII (7112 Edition)

330
ER09AU94.002</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00340 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. M, App. A

EXAMPLE D: SEPARATE, NON-CONTIGUOUS ROOF AREAS

EXAMPLE E: ROOFS WITH PENTHOUSES, OPEN feet (15.25 meters) in width, in order to limit
COURTYARDS, ADDITIONAL FLOORS, ETC. the size of roof areas where the safety moni-
Such roofs are to be divided into sub-areas toring system alone can be used
by using dividing lines of minimum length to [1926.502(b)(10)]. Dotted lines are used in the
minimize the size and number of the areas examples to show the location of dividing
which are potentially less than or equal to 50

331
ER09AU94.003</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00341 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. M, App. A 29 CFR Ch. XVII (7112 Edition)
lines. W denotes incorrect measurements of
width.

332
ER09AU94.004</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00342 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. M, App. B

EXAMPLE F: IRREGULAR, NON-RECTANGULAR SHAPED ROOFS

APPENDIX B TO SUBPART M OF PART plying with these requirements. An employer


1926GUARDRAIL SYSTEMS may use these guidelines as a starting point
for designing guardrail systems. However,
Non-Mandatory Guidelines for Complying with the guidelines do not provide all the infor-
1926.502(b) mation necessary to build a complete sys-
The standard requires guardrail systems tem, and the employer is still responsible for
and components to be designed and built to designing and assembling these components
meet the requirements of 1926.502 (b) (3), (4), in such a way that the completed system
and (5). This appendix serves as a non-man- will meet the requirements of 1926.502(b) (3),
datory guideline to assist employers in com- (4), and (5). Components for which no specific

333
ER09AU94.005</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00343 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. M, App. C 29 CFR Ch. XVII (7112 Edition)
guidelines are given in this appendix (e.g., of 38 inches plus or minus 4 inches (96 cm
joints, base connections, components made plus or minus 10 cm).
with other materials, and components with (5) The lanyard or lifeline used to create
other dimensions) must also be designed and the free fall distance should be supplied with
constructed in such a way that the com- the system, or in its absence, the least elas-
pleted system meets the requirements of tic lanyard or lifeline available to be used
1926.502. with the system.
(1) For wood railings: Wood components (6) The test weight for each test should be
shall be minimum 1500 lb-ft/in2 fiber (stress hoisted to the required level and should be
grade) construction grade lumber; the posts quickly released without having any appre-
shall be at least 2-inch by 4-inch (5 cm10 ciable motion imparted to it.
cm) lumber spaced not more than 8 feet (2.4 (7) The systems performance should be
m) apart on centers; the top rail shall be at evaluated taking into account the range of
least 2-inch by 4-inch (5 cm10 cm) lumber, environmental conditions for which it is de-
the intermediate rail shall be at least 1-inch signed to be used.
by 6-inch (2.5 cm15 cm) lumber. All lumber (8) Following the test, the system need not
dimensions are nominal sizes as provided by be capable of further operation.
the American Softwood Lumber Standards, (c) Strength test. (1) During the testing of
dated January 1970. all systems, a test weight of 300 pounds plus
or minus 5 pounds (135 kg plus or minus 2.5
(2) For pipe railings: posts, top rails, and
kg) should be used. (See paragraph (b)(4) of
intermediate railings shall be at least one
this section.)
and one-half inches nominal diameter
(2) The test consists of dropping the test
(schedule 40 pipe) with posts spaced not more
weight once. A new unused system should be
than 8 feet (2.4 m) apart on centers. used for each test.
(3) For structural steel railings: posts, top (3) For lanyard systems, the lanyard
rails, and intermediate rails shall be at least length should be 6 feet plus or minus 2 inches
2-inch by 2-inch (5 cm10 cm) by 38-inch (1.1 (1.83 m plus or minus 5 cm) as measured from
cm) angles, with posts spaced not more than the fixed anchorage to the attachment on
8 feet (2.4 m) apart on centers. the body belt or body harness.
(4) For rope-grab-type deceleration sys-
APPENDIX C TO SUBPART M OF PART tems, the length of the lifeline above the
1926PERSONAL FALL ARREST SYSTEMS centerline of the grabbing mechanism to the
lifelines anchorage point should not exceed
Non-Mandatory Guidelines for Complying With 2 feet (0.61 m).
1926.502(d) (5) For lanyard systems, for systems with
deceleration devices which do not automati-
I. Test methods for personal fall arrest systems
cally limit free fall distance to 2 feet (0.61 m)
and positioning device systems(a) General.
or less, and for systems with deceleration de-
This appendix serves as a non-mandatory
vices which have a connection distance in ex-
guideline to assist employers comply with
cess of 1 foot (0.3 m) (measured between the
the requirements in 1926.502(d). Paragraphs
centerline of the lifeline and the attachment
(b), (c), (d) and (e) of this appendix describe
point to the body belt or harness), the test
test procedures which may be used to deter-
weight should be rigged to free fall a dis-
mine compliance with the requirements in
tance of 7.5 feet (2.3 m) from a point that is
1926.502 (d)(16). As noted in appendix D of
1.5 feet (.46 m) above the anchorage point, to
this subpart, the test methods listed here in
its hanging location (6 feet below the anchor-
appendix C can also be used to assist employ-
age). The test weight should fall without in-
ers comply with the requirements in
terference, obstruction, or hitting the floor
1926.502(e) (3) and (4) for positioning device
or ground during the test. In some cases a
systems.
non-elastic wire lanyard of sufficient length
(b) General conditions for all tests in the ap- may need to be added to the system (for test
pendix to 1926.502(d). (1) Lifelines, lanyards purposes) to create the necessary free fall
and deceleration devices should be attached distance.
to an anchorage and connected to the body- (6) For deceleration device systems with
belt or body harness in the same manner as integral lifelines or lanyards which auto-
they would be when used to protect employ- matically limit free fall distance to 2 feet
ees. (0.61 m) or less, the test weight should be
(2) The anchorage should be rigid, and rigged to free fall a distance of 4 feet (1.22
should not have a deflection greater than m).
0.04 inches (1 mm) when a force of 2,250 (7) Any weight which detaches from the
pounds (10 kN) is applied. belt or harness has failed the strength test.
(3) The frequency response of the load (d) Force test(1) General. The test consists
measuring instrumentation should be 500 Hz. of dropping the respective test weight once
(4) The test weight used in the strength as specified in paragraph (d)(2)(i) or (d)(3)(i)
and force tests should be a rigid, metal, cy- of this section. A new, unused system should
lindrical or torso-shaped object with a girth be used for each test.

334

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00344 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. M, App. C
(2) For lanyard systems. (i) A test weight of (3) Other self-activating-type deceleration de-
220 pounds plus or minus 3 pounds (100 kg vices. The locking mechanisms of other self-
plus or minus 1.6 kg) should be used. (See activating-type deceleration devices de-
paragraph (b)(4) of this appendix). signed for more than one arrest should lock
(ii) Lanyard length should be 6 feet plus or each of 1,000 times as they would in normal
minus two inches (1.83 m plus or minus 5 cm) service.
as measured from the fixed anchorage to the II. Additional non-mandatory guidelines for
attachment on the body belt or body har- personal fall arrest systems. The following in-
ness. formation constitutes additional guidelines
(iii) The test weight should fall free from for use in complying with requirements for a
the anchorage level to its hanging location personal fall arrest system.
(a total of 6 feet (1.83 m) free fall distance) (a) Selection and use considerations. (1) The
without interference, obstruction, or hitting kind of personal fall arrest system selected
the floor or ground during the test. should match the particular work situation,
(3) For all other systems. (i) A test weight of and any possible free fall distance should be
220 pounds plus or minus 3 pounds (100 kg kept to a minimum. Consideration should be
plus or minus 1.6 kg) should be used. (See given to the particular work environment.
paragraph (b)(4) of this appendix) For example, the presence of acids, dirt,
(ii) The free fall distance to be used in the moisture, oil, grease, etc., and their effect on
test should be the maximum fall distance the system, should be evaluated. Hot or cold
physically permitted by the system during environments may also have an adverse ef-
normal use conditions, up to a maximum fect on the system. Wire rope should not be
free fall distance for the test weight of 6 feet
used where an electrical hazard is antici-
(1.83 m), except as follows:
pated. As required by the standard, the em-
(A) For deceleration systems which have a ployer must plan to have means available to
connection link or lanyard, the test weight
promptly rescue an employee should a fall
should free fall a distance equal to the con-
occur, since the suspended employee may not
nection distance (measured between the cen-
be able to reach a work level independently.
terline of the lifeline and the attachment
point to the body belt or harness). (2) Where lanyards, connectors, and life-
lines are subject to damage by work oper-
(B) For deceleration device systems with
ations such as welding, chemical cleaning,
integral lifelines or lanyards which auto-
and sandblasting, the component should be
matically limit free fall distance to 2 feet
(0.61 m) or less, the test weight should free protected, or other securing systems should
fall a distance equal to that permitted by the be used. The employer should fully evaluate
system in normal use. (For example, to test the work conditions and environment (in-
a system with a self-retracting lifeline or cluding seasonal weather changes) before se-
lanyard, the test weight should be supported lecting the appropriate personal fall protec-
and the system allowed to retract the life- tion system. Once in use, the systems effec-
line or lanyard as it would in normal use. tiveness should be monitored. In some cases,
The test weight would then be released and a program for cleaning and maintenance of
the force and deceleration distance meas- the system may be necessary.
ured). (b) Testing considerations. Before pur-
(4) A system fails the force test if the re- chasing or putting into use a personal fall
corded maximum arresting force exceeds arrest system, an employer should obtain
1,260 pounds (5.6 kN) when using a body belt, from the supplier information about the sys-
and/or exceeds 2,520 pounds (11.2 kN) when tem based on its performance during testing
using a body harness. so that the employer can know if the system
(5) The maximum elongation and decelera- meets this standard. Testing should be done
tion distance should be recorded during the using recognized test methods. This appendix
force test. contains test methods recognized for evalu-
(e) Deceleration device tests(1) General. The ating the performance of fall arrest systems.
device should be evaluated or tested under Not all systems may need to be individually
the environmental conditions, (such as rain, tested; the performance of some systems
ice, grease, dirt, type of lifeline, etc.), for may be based on data and calculations de-
which the device is designed. rived from testing of similar systems, pro-
(2) Rope-grab-type deceleration devices. (i) vided that enough information is available
Devices should be moved on a lifeline 1,000 to demonstrate similarity of function and
times over the same length of line a distance design.
of not less than 1 foot (30.5 cm), and the (c) Component compatibility considerations.
mechanism should lock each time. Ideally, a personal fall arrest system is de-
(ii) Unless the device is permanently signed, tested, and supplied as a complete
marked to indicate the type(s) of lifeline system. However, it is common practice for
which must be used, several types (different lanyards, connectors, lifelines, deceleration
diameters and different materials), of life- devices, body belts and body harnesses to be
lines should be used to test the device. interchanged since some components wear

335

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00345 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. M, App. C 29 CFR Ch. XVII (7112 Edition)
out before others. The employer and em- can rescue themselves should a fall occur.
ployee should realize that not all compo- The availability of rescue personnel, ladders
nents are interchangeable. For instance, a or other rescue equipment should be evalu-
lanyard should not be connected between a ated. In some situations, equipment which
body belt (or harness) and a deceleration de- allows employees to rescue themselves after
vice of the self-retracting type since this can the fall has been arrested may be desirable,
result in additional free fall for which the such as devices which have descent capa-
system was not designed. Any substitution bility.
or change to a personal fall arrest system (g) Inspection considerations. As required by
should be fully evaluated or tested by a com- 1926.502(d)(21), personal fall arrest systems
petent person to determine that it meets the must be regularly inspected. Any component
standard, before the modified system is put with any significant defect, such as cuts,
in use. tears, abrasions, mold, or undue stretching;
(d) Employee training considerations. Thor- alterations or additions which might affect
ough employee training in the selection and its efficiency; damage due to deterioration;
use of personal fall arrest systems is impera- contact with fire, acids, or other corrosives;
tive. Employees must be trained in the safe distorted hooks or faulty hook springs;
use of the system. This should include the tongues unfitted to the shoulder of buckles;
following: application limits; proper anchor- loose or damaged mountings; non-func-
ing and tie-off techniques; estimation of free tioning parts; or wearing or internal deterio-
fall distance, including determination of de- ration in the ropes must be withdrawn from
celeration distance, and total fall distance to service immediately, and should be tagged or
prevent striking a lower level; methods of marked as unusable, or destroyed.
use; and inspection and storage of the sys- (h) Tie-off considerations. (1) One of the
tem. Careless or improper use of the equip- most important aspects of personal fall pro-
ment can result in serious injury or death. tection systems is fully planning the system
Employers and employees should become fa- before it is put into use. Probably the most
miliar with the material in this Appendix, as overlooked component is planning for suit-
well as manufacturers recommendations, able anchorage points. Such planning should
before a system is used. Of uppermost impor- ideally be done before the structure or build-
tance is the reduction in strength caused by ing is constructed so that anchorage points
certain tie-offs (such as using knots, tying can be incorporated during construction for
around sharp edges, etc.) and maximum per- use later for window cleaning or other build-
mitted free fall distance. Also, to be stressed ing maintenance. If properly planned, these
are the importance of inspections prior to anchorage points may be used during con-
use, the limitations of the equipment, and struction, as well as afterwards.
unique conditions at the worksite which may (i) Properly planned anchorages should be
be important in determining the type of sys- used if they are available. In some cases, an-
tem to use. chorages must be installed immediately
(e) Instruction considerations. Employers prior to use. In such cases, a registered pro-
should obtain comprehensive instructions fessional engineer with experience in design-
from the supplier as to the systems proper ing fall protection systems, or another quali-
use and application, including, where appli- fied person with appropriate education and
cable: experience should design an anchor point to
(1) The force measured during the sample be installed.
force test; (ii) In other cases, the Agency recognizes
(2) The maximum elongation measured for that there will be a need to devise an anchor
lanyards during the force test; point from existing structures. Examples of
(3) The deceleration distance measured for what might be appropriate anchor points are
deceleration devices during the force test; steel members or I-beams if an acceptable
(4) Caution statements on critical use limi- strap is available for the connection (do not
tations; use a lanyard with a snaphook clipped onto
(5) Application limits; itself); large eye-bolts made of an appro-
(6) Proper hook-up, anchoring and tie-off priate grade steel; guardrails or railings if
techniques, including the proper dee-ring or they have been designed for use as an anchor
other attachment point to use on the body point; or masonry or wood members only if
belt and harness for fall arrest; the attachment point is substantial and pre-
(7) Proper climbing techniques; cautions have been taken to assure that
(8) Methods of inspection, use, cleaning, bolts or other connectors will not pull
and storage; and through. A qualified person should be used to
(9) Specific lifelines which may be used. evaluate the suitable of these make shift
This information should be provided to em- anchorages with a focus on proper strength.
ployees during training. (2) Employers and employees should at all
(f) Rescue considerations. As required by times be aware that the strength of a per-
1926.502(d)(20), when personal fall arrest sys- sonal fall arrest system is based on its being
tems are used, the employer must assure attached to an anchoring system which does
that employees can be promptly rescued or not reduce the strength of the system (such

336

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00346 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. M, App. C
as a properly dimensioned eye-bolt/snap- greatly reduced if the force is applied at an
hook anchorage). Therefore, if a means of at- angle to this axis (in the direction of shear).
tachment is used that will reduce the Also, care should be exercised in selecting
strength of the system, that component the proper diameter of the eye to avoid acci-
should be replaced by a stronger one, but one dental disengagement of snap-hooks not de-
that will also maintain the appropriate max- signed to be compatible for the connection.
imum arrest force characteristics. (8) Due to the significant reduction in the
(3) Tie-off using a knot in a rope lanyard or strength of the lifeline/lanyard (in some
lifeline (at any location) can reduce the life- cases, as much as a 70 percent reduction), the
line or lanyard strength by 50 percent or sliding hitch knot (prusik) should not be
more. Therefore, a stronger lanyard or life- used for lifeline/lanyard connections except
line should be used to compensate for the in emergency situations where no other
weakening effect of the knot, or the lanyard available system is practical. The one-and-
length should be reduced (or the tie-off loca- one sliding hitch knot should never be used
tion raised) to minimize free fall distance, or because it is unreliable in stopping a fall.
the lanyard or lifeline should be replaced by The two-and-two, or three-and-three
one which has an appropriately incorporated knot (preferable) may be used in emergency
connector to eliminate the need for a knot. situations; however, care should be taken to
(4) Tie-off of a rope lanyard or lifeline limit free fall distance to a minimum be-
around an H or I beam or similar sup- cause of reduced lifeline/lanyard strength.
port can reduce its strength as much as 70 (i) Vertical lifeline considerations. As re-
percent due to the cutting action of the quired by the standard, each employee must
beam edges. Therefore, use should be made of have a separate lifeline [except employees
a webbing lanyard or wire core lifeline engaged in constructing elevator shafts who
around the beam; or the lanyard or lifeline are permitted to have two employees on one
should be protected from the edge; or free lifeline] when the lifeline is vertical. The
fall distance should be greatly minimized. reason for this is that in multiple tie-offs to
(5) Tie-off where the line passes over or a single lifeline, if one employee falls, the
around rough or sharp surfaces reduces movement of the lifeline during the arrest of
strength drastically. Such a tie-off should be the fall may pull other employees lanyards,
avoided or an alternative tie-off rigging causing them to fall as well.
should be used. Such alternatives may in- (j) Snap-hook considerations. (1) Although
clude use of a snap-hook/dee ring connection, not required by this standard for all connec-
wire rope tie-off, an effective padding of the tions until January 1, 1998, locking
surfaces, or an abrasion-resistance strap snaphooks designed for connection to suit-
around or over the problem surface. able objects (of sufficient strength) are high-
(6) Horizontal lifelines may, depending on ly recommended in lieu of the nonlocking
their geometry and angle of sag, be subjected type. Locking snaphooks incorporate a posi-
to greater loads than the impact load im- tive locking mechanism in addition to the
posed by an attached component. When the spring loaded keeper, which will not allow
angle of horizontal lifeline sag is less than 30 the keeper to open under moderate pressure
degrees, the impact force imparted to the without someone first releasing the mecha-
lifeline by an attached lanyard is greatly nism. Such a feature, properly designed, ef-
amplified. For example, with a sag angle of fectively prevents roll-out from occurring.
15 degrees, the force amplification is about (2) As required by 1926.502(d)(6), the fol-
2:1 and at 5 degrees sag, it is about 6:1. De- lowing connections must be avoided (unless
pending on the angle of sag, and the lines properly designed locking snaphooks are
elasticity, the strength of the horizontal life- used) because they are conditions which can
line and the anchorages to which it is at- result in roll-out when a nonlocking
tached should be increased a number of snaphook is used:
times over that of the lanyard. Extreme care (i) Direct connection of a snaphook to a
should be taken in considering a horizontal horizontal lifeline.
lifeline for multiple tie-offs. The reason for (ii) Two (or more) snaphooks connected to
this is that in multiple tie-offs to a hori- one dee-ring.
zontal lifeline, if one employee falls, the (iii) Two snaphooks connected to each
movement of the falling employee and the other.
horizontal lifeline during arrest of the fall (iv) A snaphook connected back on its inte-
may cause other employees to fall also. Hori- gral lanyard.
zontal lifeline and anchorage strength should (v) A snaphook connected to a webbing
be increased for each additional employee to loop or webbing lanyard.
be tied off. For these and other reasons, the (vi) Improper dimensions of the dee-ring,
design of systems using horizontal lifelines rebar, or other connection point in relation
must only be done by qualified persons. Test- to the snaphook dimensions which would
ing of installed lifelines and anchors prior to allow the snaphook keeper to be depressed
use is recommended. by a turning motion of the snaphook.
(7) The strength of an eye-bolt is rated (k) Free fall considerations. The employer
along the axis of the bolt and its strength is and employee should at all times be aware

337

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00347 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. M, App. D 29 CFR Ch. XVII (7112 Edition)
that a systems maximum arresting force is be considered. In addition, when a body belt
evaluated under normal use conditions es- is used, the employees body will go through
tablished by the manufacturer, and in no a horizontal position to a jack-knifed posi-
case using a free fall distance in excess of 6 tion during the arrest of all falls. Thus, ob-
feet (1.8 m). A few extra feet of free fall can structions which might interfere with this
significantly increase the arresting force on motion should be avoided or a severe injury
the employee, possibly to the point of caus- could occur.
ing injury. Because of this, the free fall dis- (n) Other considerations. Because of the de-
tance should be kept at a minimum, and, as sign of some personal fall arrest systems, ad-
required by the standard, in no case greater ditional considerations may be required for
than 6 feet (1.8 m). To help assure this, the proper tie-off. For example, heavy decelera-
tie-off attachment point to the lifeline or an- tion devices of the self-retracting type
chor should be located at or above the con- should be secured overhead in order to avoid
nection point of the fall arrest equipment to the weight of the device having to be sup-
belt or harness. (Since otherwise additional
ported by the employee. Also, if self- retract-
free fall distance is added to the length of
ing equipment is connected to a horizontal
the connecting means (i.e. lanyard)). Attach-
lifeline, the sag in the lifeline should be
ing to the working surface will often result
minimized to prevent the device from sliding
in a free fall greater than 6 feet (1.8 m). For
down the lifeline to a position which creates
instance, if a 6 foot (1.8 m) lanyard is used,
a swing hazard during fall arrest. In all
the total free fall distance will be the dis-
tance from the working level to the body cases, manufacturers instructions should be
belt (or harness) attachment point plus the 6 followed.
feet (1.8 m) of lanyard length. Another im-
portant consideration is that the arresting APPENDIX D TO SUBPART M OF PART
force which the fall system must withstand 1926POSITIONING DEVICE SYSTEMS
also goes up with greater distances of free
fall, possibly exceeding the strength of the Non-Mandatory Guidelines for Complying With
system. 1926.502(e)
(l) Elongation and deceleration distance con- I. Testing Methods For Positioning Device
siderations. Other factors involved in a proper Systems. This appendix serves as a non-man-
tie-off are elongation and deceleration dis- datory guideline to assist employers comply
tance. During the arresting of a fall, a lan- with the requirements for positioning device
yard will experience a length of stretching or systems in 1926.502(e). Paragraphs (b), (c),
elongation, whereas activation of a decelera- (d) and (e) of appendix C of subpart M relat-
tion device will result in a certain stopping ing to 1926.502(d)Personal Fall Arrest Sys-
distance. These distances should be available temsset forth test procedures which may
with the lanyard or devices instructions and
be used, along with the procedures listed
must be added to the free fall distance to ar-
below, to determine compliance with the re-
rive at the total fall distance before an em-
quirements for positioning device systems in
ployee is fully stopped. The additional stop-
1926.502(e) (3) and (4) of subpart M.
ping distance may be very significant if the
lanyard or deceleration device is attached (a) General. (1) Single strap positioning de-
near or at the end of a long lifeline, which vices shall have one end attached to a fixed
may itself add considerable distance due to anchorage and the other end connected to a
its own elongation. As required by the stand- body belt or harness in the same manner as
ard, sufficient distance to allow for all of they would be used to protect employees.
these factors must also be maintained be- Double strap positioning devices, similar to
tween the employee and obstructions below, window cleaners belts, shall have one end of
to prevent an injury due to impact before the the strap attached to a fixed anchorage and
system fully arrests the fall. In addition, a the other end shall hang free. The body belt
minimum of 12 feet (3.7 m) of lifeline should or harness shall be attached to the strap in
be allowed below the securing point of a rope the same manner as it would be used to pro-
grab type deceleration device, and the end tect employees. The two strap ends shall be
terminated to prevent the device from slid- adjusted to their maximum span.
ing off the lifeline. Alternatively, the lifeline (2) The fixed anchorage shall be rigid, and
should extend to the ground or the next shall not have a deflection greater than .04
working level below. These measures are inches (1 mm) when a force of 2,250 pounds
suggested to prevent the worker from inad- (10 kN) is applied.
vertently moving past the end of the lifeline (3) During the testing of all systems, a test
and having the rope grab become disengaged weight of 250 pounds plus or minus 3 pounds
from the lifeline. (113 kg plus or minus 1.6 kg) shall be used.
(m) Obstruction considerations. The location The weight shall be a rigid object with a
of the tie-off should also consider the hazard girth of 38 inches plus or minus 4 inches (96
of obstructions in the potential fall path of cm plus or minus 10 cm).
the employee. Tie-offs which minimize the (4) Each test shall consist of dropping the
possibilities of exaggerated swinging should specified weight one time without failure of

338

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00348 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. M, App. E
the system being tested. A new system shall SAMPLE FALL PROTECTION PLANS
be used for each test.
(5) The test weight for each test shall be Fall Protection Plan For Precast/Prestress
Concrete Structures
hoisted exactly 4 feet (1.2 m above its at
rest position), and shall be dropped so as to This Fall Protection Plan is specific for
permit a vertical free fall of 4 feet (1.2 m). the following project:
(6) The test is failed whenever any break- Location of Job lllllllllllllll
age or slippage occurs which permits the Erecting Company lllllllllllll
weight to fall free of the system. Date Plan Prepared or Modified llllll
(7) Following the test, the system need not Plan Prepared By llllllllllllll
be capable of further operation; however, all Plan Approved By llllllllllllll
such incapacities shall be readily apparent. Plan Supervised By lllllllllllll
The following Fall Protection Plan is a
II. Inspection Considerations. As required in
sample program prepared for the prevention
1926.502 (e)(5), positioning device systems of injuries associated with falls. A Fall Pro-
must be regularly inspected. Any component tection Plan must be developed and evalu-
with any significant defect, such as cuts, ated on a site by site basis. It is rec-
tears, abrasions, mold, or undue stretching; ommended that erectors discuss the written
alterations or additions which might affect Fall Protection Plan with their OSHA Area
its efficiency; damage due to deterioration; Office prior to going on a jobsite.
contact with fire, acids, or other corrosives;
distorted hooks or faulty hook springs; I. STATEMENT OF COMPANY POLICY
tongues unfitted to the shoulder of buckles; (Company Name) is dedicated to the pro-
loose or damaged mountings; non-func- tection of its employees from on-the-job in-
tioning parts; or wearing or internal deterio- juries. All employees of (Company Name)
ration in the ropes must be withdrawn from have the responsibility to work safely on the
service immediately, and should be tagged or job. The purpose of this plan is: (a) To sup-
marked as unusable, or destroyed. plement our standard safety policy by pro-
viding safety standards specifically designed
APPENDIX E TO SUBPART M OF PART to cover fall protection on this job and; (b) to
1926SAMPLE FALL PROTECTION PLAN ensure that each employee is trained and
made aware of the safety provisions which
Non-Mandatory Guidelines for Complying With are to be implemented by this plan prior to
1926.502(k) the start of erection.
This Fall Protection Plan addresses the
Employers engaged in leading edge work, use of other than conventional fall protec-
precast concrete construction work and resi- tion at a number of areas on the project, as
dential construction work who can dem- well as identifying specific activities that re-
onstrate that it is infeasible or creates a quire non-conventional means of fall protec-
greater hazard to use conventional fall pro- tion. These areas include:
tection systems must develop and follow a a. Connecting activity (point of erection).
fall protection plan. Below are sample fall b. Leading edge work.
protection plans developed for precast con- c. Unprotected sides or edge.
crete construction and residential work that d. Grouting.
could be tailored to be site specific for other This plan is designed to enable employers
precast concrete or residential jobsite. This and employees to recognize the fall hazards
sample plan can be modified to be used for on this job and to establish the procedures
that are to be followed in order to prevent
other work involving leading edge work. The
falls to lower levels or through holes and
sample plan outlines the elements that must
openings in walking/working surfaces. Each
be addressed in any fall protection plan. The employee will be trained in these procedures
reasons outlined in this sample fall protec- and strictly adhere to them except when
tion plan are for illustrative purposes only doing so would expose the employee to a
and are not necessarily a valid, acceptable greater hazard. If, in the employees opinion,
rationale (unless the conditions at the job this is the case, the employee is to notify the
site are the same as those covered by these foreman of the concern and the concern ad-
sample plans) for not using conventional fall dressed before proceeding.
protection systems for a particular precast Safety policy and procedure on any one
concrete or residential construction work- project cannot be administered, imple-
site. However, the sample plans provide guid- mented, monitored and enforced by any one
ance to employers on the type of information individual. The total objective of a safe, ac-
that is required to be discussed in fall pro- cident free work environment can only be ac-
tection plans. complished by a dedicated, concerted effort
by every individual involved with the project
from management down to the last em-
ployee. Each employee must understand

339

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00349 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. M, App. E 29 CFR Ch. XVII (7112 Edition)
their value to the company; the costs of acci- Only individuals with the appropriate experi-
dents, both monetary, physical, and emo- ence, skills, and training will be authorized
tional; the objective of the safety policy and as designated erectors. All employees that
procedures; the safety rules that apply to the will be working as designated erectors under
safety policy and procedures; and what their the safety monitoring system shall have
individual role is in administering, imple- been trained and instructed in the following
menting, monitoring, and compliance of areas:
their safety policy and procedures. This al- 1. Recognition of the fall hazards in the
lows for a more personal approach to compli- work area (at the leading edge and when
ance through planning, training, under- making initial connectionspoint of erec-
standing and cooperative effort, rather than tion).
by strict enforcement. If for any reason an 2. Avoidance of fall hazards using estab-
unsafe act persists, strict enforcement will lished work practices which have been made
be implemented. known to the employees.
It is the responsibility of (name of com- 3. Recognition of unsafe practices or work-
petent person) to implement this Fall Pro- ing conditions that could lead to a fall, such
tection Plan. (Name of Competent Person) is as windy conditions.
responsible for continual observational safe- 4. The function, use, and operation of safe-
ty checks of their work operations and to en- ty monitoring systems, guardrail systems,
force the safety policy and procedures. The body belt/harness systems, control zones and
foreman also is responsible to correct any other protection to be used.
unsafe acts or conditions immediately. It is 5. The correct procedure for erecting,
the responsibility of the employee to under- maintaining, disassembling and inspecting
stand and adhere to the procedures of this the system(s) to be used.
plan and to follow the instructions of the 6. Knowledge of construction sequence or
foreman. It is also the responsibility of the the erection plan.
employee to bring to managements atten- A conference will take place prior to start-
tion any unsafe or hazardous conditions or ing work involving all members of the erec-
acts that may cause injury to either them- tion crew, crane crew and supervisors of any
selves or any other employees. Any changes other concerned contractors. This conference
to this Fall Protection Plan must be ap- will be conducted by the precast concrete
proved by (name of Qualified Person). erection supervisor in charge of the project.
During the pre-work conference, erection
II. FALL PROTECTION SYSTEMS TO BE USED ON procedures and sequences pertinent to this
THIS PROJECT job will be thoroughly discussed and safety
Where conventional fall protection is in- practices to be used throughout the project
feasible or creates a greater hazard at the will be specified. Further, all personnel will
leading edge and during initial connecting be informed that the controlled access zones
activity, we plan to do this work using a are off limits to all personnel other than
safety monitoring system and expose only a those designated erectors specifically
minimum number of employees for the time trained to work in that area.
necessary to actually accomplish the job.
Safety Monitoring System
The maximum number of workers to be mon-
itored by one safety monitor is six (6). We A safety monitoring system means a fall
are designating the following trained em- protection system in which a competent per-
ployees as designated erectors and they are son is responsible for recognizing and warn-
permitted to enter the controlled access ing employees of fall hazards. The duties of
zones and work without the use of conven- the safety monitor are to:
tional fall protection. 1. Warn by voice when approaching the
Safety monitor: open edge in an unsafe manner.
Designated erector: 2. Warn by voice if there is a dangerous sit-
Designated erector: uation developing which cannot be seen by
another person involved with product place-
Designated erector:
ment, such as a member getting out of con-
Designated erector:
trol.
Designated erector:
3. Make the designated erectors aware they
Designated erector: are in a dangerous area.
The safety monitor shall be identified by 4. Be competent in recognizing fall haz-
wearing an orange hard hat. The designated ards.
erectors will be identified by one of the fol- 5. Warn employees when they appear to be
lowing methods: unaware of a fall hazard or are acting in an
1. They will wear a blue colored arm band, unsafe manner.
or 6. Be on the same walking/working surface
2. They will wear a blue colored hard hat, as the monitored employees and within vis-
or ual sighting distance of the monitored em-
3. They will wear a blue colored vest. ployees.

340

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00350 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. M, App. E
7. Be close enough to communicate orally ers will not be removed without the approval
with the employees. of the erection foreman.
8. Not allow other responsibilities to en- Precast concrete column erection through
cumber monitoring. If the safety monitor be- the existing deck requires that many holes
comes too encumbered with other respon- be provided through this deck. These are to
sibilities, the monitor shall (1) stop the erec- be covered and protected. Except for the
tion process; and (2) turn over other respon- opening being currently used to erect a col-
sibilities to a designated erector; or (3) turn umn, all opening protection is to be left un-
over the safety monitoring function to an- disturbed. The opening being uncovered to
other designated, competent person. The erect a column will become part of the point
safety monitoring system shall not be used of erection and will be addressed as part of
when the wind is strong enough to cause this Fall Protection Plan. This uncovering is
loads with large surface areas to swing out of to be done at the erection foremans direc-
radius, or result in loss of control of the tion and will only occur immediately prior
load, or when weather conditions cause the to feeding the column through the open-
walking-working surfaces to become icy or ing. Once the end of the column is through
slippery. the slab opening, there will no longer exist a
fall hazard at this location.
Control Zone System
III. IMPLEMENTATION OF FALL PROTECTION
A controlled access zone means an area PLAN
designated and clearly marked, in which
leading edge work may take place without The structure being erected is a multistory
the use of guardrail, safety net or personal total precast concrete building consisting of
fall arrest systems to protect the employees columns, beams, wall panels and hollow core
in the area. Control zone systems shall com- slabs and double tee floor and roof members.
ply with the following provisions: The following is a list of the products and
1. When used to control access to areas erection situations on this job:
where leading edge and other operations are
Columns
taking place the controlled access zone shall
be defined by a control line or by any other For columns 10 ft to 36 ft long, employees
means that restricts access. disconnecting crane hooks from columns will
When control lines are used, they shall be work from a ladder and wear a body belt/har-
erected not less than 6 feet (l.8 m) nor more ness with lanyard and be tied off when both
than 60 feet (18 m) or half the length of the hands are needed to disconnect. For tying
member being erected, whichever is less, off, a vertical lifeline will be connected to
from the leading edge. the lifting eye at the top of the column,
2. The control line shall extend along the prior to lifting, to be used with a manually
entire length of the unprotected or leading operated or mobile rope grab. For columns
edge and shall be approximately parallel to too high for the use of a ladder, 36 ft and
the unprotected or leading edge. higher, an added cable will be used to reduce
3. The control line shall be connected on the height of the disconnecting point so that
each side to a guardrail system or wall. a ladder can be used. This cable will be left
4. Control lines shall consist of ropes, in place until a point in erection that it can
wires, tapes, or equivalent materials, and be removed safely. In some cases, columns
supporting stanchions as follows: will be unhooked from the crane by using an
5. Each line shall be flagged or otherwise erection tube or shackle with a pull pin
clearly marked at not more than 6-foot (1.8 which is released from the ground after the
m) intervals with high- visibility material. column is stabilized.
6. Each line shall be rigged and supported The column will be adequately connected
in such a way that its lowest point (includ- and/or braced to safely support the weight of
ing sag) is not less than 39 inches (1 m) from a ladder with an employee on it.
the walking/working surface and its highest
point is not more than 45 inches (1.3 m) from Inverted Tee Beams
the walking/working surface. Employees erecting inverted tee beams, at
7. Each line shall have a minimum break- a height of 6 to 40 ft, will erect the beam,
ing strength of 200 pounds (.88 kN). make initial connections, and final align-
ment from a ladder. If the employee needs to
Holes
reach over the side of the beam to bar or
All openings greater than 12 in.12 in. will make an adjustment to the alignment of the
have perimeter guarding or covering. All beam, they will mount the beam and be tied
predetermined holes will have the plywood off to the lifting device in the beam after en-
covers made in the precasters yard and suring the load has been stabilized on its
shipped with the member to the jobsite. bearing. To disconnect the crane from the
Prior to cutting holes on the job, proper pro- beam an employee will stand a ladder
tection for the hole must be provided to pro- against the beam. Because the use of ladders
tect the workers. Perimeter guarding or cov- is not practical at heights above 40 ft, beams

341

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00351 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. M, App. E 29 CFR Ch. XVII (7112 Edition)
will be initially placed with the use of tag under the control of the safety monitor for
lines and their final alignment made by a fall protection and are directed to stay a
person on a manlift or similar employee po- minimum of six (6) ft from the edge. In the
sitioning systems. event a designated erector must move from
one end of a member, which has just been
Spandrel Beams placed at the leading edge, they must first
Spandrel beams at the exterior of the move away from the leading edge a min-
building will be aligned as closely as possible imum of six (6) ft and then progress to the
with the use of tag lines with the final place- other end while maintaining the minimum
ment of the spandrel beam made from a lad- distance of six (6) ft at all times.
der at the open end of the structure. A ladder Erection of double tees, where conditions
will be used to make the initial connections require bearing of one end into a closed
and a ladder will be used to disconnect the pocket and the other end on a beam ledge,
crane. The other end of the beam will be restricting the tee legs from going directly
placed by the designated erector from the into the pockets, require special consider-
double tee deck under the observation of the ations. The tee legs that are to bear in the
safety monitor. closed pocket must hang lower than those at
The beams will be adequately connected the beam bearing. The double tee will be
and/or braced to safely support the weight of two-lined in order to elevate one end high-
er than the other to allow for the low end to
a ladder with an employee on it.
be ducked into the closed pocket using the
Floor and Roof Members following procedure.
The double tee will be rigged with a stand-
During installation of the precast concrete ard four-way spreader off of the main load
floor and/or roof members, the work deck line. An additional choker will be attached
continuously increases in area as more and to the married point of the two-legged
more units are being erected and positioned. spreader at the end of the tee that is to be
Thus, the unprotected floor/roof perimeter is elevated. The double tee will be hoisted with
constantly modified with the leading edge the main load line and swung into a position
changing location as each member is in- as close as possible to the tees final bearing
stalled. The fall protection for workers at elevation. When the tee is in this position
the leading edge shall be assured by properly and stabilized, the whip line load block will
constructed and maintained control zone be lowered to just above the tee deck. At this
lines not more than 60 ft away from the lead- time, two erectors will walk out on the sus-
ing edge supplemented by a safety moni- pended tee deck at midspan of the tee mem-
toring system to ensure the safety of all des- ber and pull the load block to the end of the
ignated erectors working within the area de- tee to be elevated and attach the additional
fined by the control zone lines. choker to the load block. The possibility of
The hollow core slabs erected on the ma- entanglement with the crane lines and other
sonry portion of the building will be erected obstacles during this two lining process
and grouted using the safety monitoring sys- while raising and lowering the crane block
tem. Grout will be placed in the space be- on that second line could be hazardous to an
tween the end of the slab and face shell of encumbered employee. Therefore, the des-
the concrete masonry by dumping from a ignated erectors will not tie off during any
wheelbarrow. The grout in the keyways be- part of this process. While the designated
tween the slabs will be dumped from a wheel- erectors are on the double tee, the safety
barrow and then spread with long handled monitoring system will be used. After at-
tools, allowing the worker to stand erect fac- taching the choker, the two erectors then
ing toward the unprotected edge and back step back on the previously erected tee deck
from any work deck edge. and signal the crane operator to hoist the
Whenever possible, the designated erectors load with the whip line to the elevation that
will approach the incoming member at the will allow for enough clearance to let the low
leading edge only after it is below waist end tee legs slide into the pockets when the
height so that the member itself provides main load line is lowered. The erector, who
protection against falls. is handling the lowered end of the tee at the
Except for the situations described below, closed pocket bearing, will step out on the
when the arriving floor or roof member is suspended tee. An erection bar will then be
within 2 to 3 inches of its final position, the placed between the end of the tee leg and the
designated erectors can then proceed to their inside face of the pocketed spandrel member.
position of erection at each end of the mem- The tee is barred away from the pocketed
ber under the control of the safety monitor. member to reduce the friction and lateral
Crane hooks will be unhooked from double force against the pocketed member. As the
tee members by designated erectors under tee is being lowered, the other erector re-
the direction and supervision of the safety mains on the tee which was previously erect-
monitor. ed to handle the other end. At this point the
Designated erectors, while waiting for the tee is slowly lowered by the crane to a point
next floor or roof member, will be constantly where the tee legs can freely slide into the

342

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00352 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. M, App. E
pockets. The erector working the lowered IV. CONVENTIONAL FALL PROTECTION CONSID-
end of the tee must keep pressure on the bar ERED FOR THE POINT OF ERECTION OR LEAD-
between the tee and the face of the pocketed ING EDGE ERECTION OPERATIONS
spandrel member to very gradually let the
A. Personal Fall Arrest Systems
tee legs slide into the pocket to its proper
bearing dimension. The tee is then slowly In this particular erection sequence and
lowered into its final erected position. procedure, personal fall arrest systems re-
The designated erector should be allowed quiring body belt/harness systems, lifelines
onto the suspended double tee, otherwise and lanyards will not reduce possible hazards
there is no control over the horizontal move- to workers and will create offsetting hazards
ment of the double tee and this movement during their usage at the leading edge of pre-
cast/prestressed concrete construction.
could knock the spandrel off of its bearing or
Leading edge erection and initial connec-
the column out of plumb. The control nec- tions are conducted by employees who are
essary to prevent hitting the spandrel can specifically trained to do this type of work
only be done safely from the top of the dou- and are trained to recognize the fall hazards.
ble tee being erected. The nature of such work normally exposes
Loadbearing Wall Panels: The erection of the employee to the fall hazard for a short
the loadbearing wall panels on the elevated period of time and installation of fall protec-
decks requires the use of a safety monitor tion systems for a short duration is not fea-
and a controlled access zone that is a min- sible because it exposes the installers of the
imum of 25 ft and a maximum of 12 the system to the same fall hazard, but for a
length of the wall panels away from the un- longer period of time.
protected edge, so that designated erectors 1. It is necessary that the employee be able
can move freely and unencumbered when re- to move freely without encumbrance in order
ceiving the panels. Bracing, if required for to guide the sections of precast concrete into
their final position without having lifelines
stability, will be installed by ladder. After
attached which will restrict the employees
the braces are secured, the crane will be dis-
ability to move about at the point of erec-
connected from the wall by using a ladder. tion.
The wall to wall connections will also be per- 2. A typical procedure requires 2 or more
formed from a ladder. workers to maneuver around each other as a
Non-Loadbearing Panels (Cladding): The concrete member is positioned to fit into the
locating of survey lines, panel layout and structure. If they are each attached to a life-
other installation prerequisites (prewelding, line, part of their attention must be diverted
etc.) for non-loadbearing panels (cladding) from their main task of positioning a mem-
will not commence until floor perimeter and ber weighing several tons to the task of
floor openings have been protected. In some avoiding entanglements of their lifelines or
areas, it is necessary because of panel con- avoiding tripping over lanyards. Therefore, if
figuration to remove the perimeter protec- these workers are attached to lanyards,
tion as the cladding is being installed. Re- more fall potential would result than from
moval of perimeter protection will be per- not using such a device.
In this specific erection sequence and pro-
formed on a bay to bay basis, just ahead of
cedure, retractable lifelines do not solve the
cladding erection to minimize temporarily
problem of two workers becoming tangled. In
unprotected floor edges. Those workers with- fact, such a tangle could prevent the lifeline
in 6 ft of the edge, receiving and positioning from retracting as the worker moved, thus
the cladding when the perimeter protection potentially exposing the worker to a fall
is removed shall be tied off. greater than 6 ft. Also, a worker crossing
over the lifeline of another worker can cre-
Detailing ate a hazard because the movement of one
Employees exposed to falls of six (6) feet or person can unbalance the other. In the event
more to lower levels, who are not actively of a fall by one person there is a likelihood
engaged in leading edge work or connecting that the other person will be caused to fall
as well. In addition, if contamination such as
activity, such as welding, bolting, cutting,
grout (during hollow core grouting) enters
bracing, guying, patching, painting or other
the retractable housing it can cause exces-
operations, and who are working less than
sive wear and damage to the device and
six (6) ft from an unprotected edge will be could clog the retracting mechanism as the
tied off at all times or guardrails will be in- lanyard is dragged across the deck. Obstruct-
stalled. Employees engaged in these activi- ing the cable orifice can defeat the devices
ties but who are more than six (6) ft from an shock absorbing function, produce cable
unprotected edge as defined by the control slack and damage, and adversely affect cable
zone lines, do not require fall protection but extraction and retraction.
a warning line or control lines must be erect- 3. Employees tied to a lifeline can be
ed to remind employees they are approach- trapped and crushed by moving structural
ing an area where fall protection is required. members if the employee becomes restrained

343

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00353 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. M, App. E 29 CFR Ch. XVII (7112 Edition)
by the lanyard or retractable lifeline and ation of erectors position is done before the
cannot get out of the path of the moving members are cast. Any hole or other attach-
load. ment must be approved by the engineer who
The sudden movement of a precast con- designed the member. It is possible that
crete member being raised by a crane can be some design restrictions will not allow a
caused by a number of factors. When this member to be weakened by an additional
happens, a connector may immediately have hole; however, it is anticipated that such sit-
to move a considerable distance to avoid in- uations would be the exception, not the rule.
jury. If a tied off body belt/harness is being Attachment points, other than on the deck
used, the connector could be trapped. There- surface, will require removal and/or
fore, there is a greater risk of injury if the patching. In order to remove and/or patch
connector is tied to the structure for this these points, requires the employee to be ex-
specific erection sequence and procedure. posed to an additional fall hazard at an un-
When necessary to move away from a re- protected perimeter. The fact that attach-
tractable device, the worker cannot move at ment points could be available anywhere on
a rate greater than the device locking speed the structure does not eliminate the hazards
typically 3.5 to 4.5 ft/sec. When moving to- of using these points for tying off as dis-
ward the device it is necessary to move at a cussed above. A logical point for tying off on
rate which does not permit cable slack to double tees would be using the lifting loops,
build up. This slack may cause cable retrac- except that they must be cut off to eliminate
tion acceleration and cause a worker to lose a tripping hazard at an appropriate time.
their balance by applying a higher than nor- 5. Providing attachment at a point above
mal jerking force on the body when the cable the walking/working surface would also cre-
suddenly becomes taut after building up mo- ate fall exposures for employees installing
mentum. This slack can also cause damage their devices. Final positioning of a precast
to the internal spring-loaded drum, uneven concrete member requires it to be moved in
coiling of cable on the drum, and possible such a way that it must pass through the
cable damage. area that would be occupied by the lifeline
The factors causing sudden movements for and the lanyards attached to the point
this location include: above. Resulting entanglements of lifelines
and lanyards on a moving member could pull
(a) Cranes employees from the work surface. Also, the
structure is being created and, in most cases,
(1) Operator error. there is no structure above the members
(2) Site conditions (soft or unstable being placed.
ground). (a) Temporary structural supports, in-
(3) Mechanical failure. stalled to provide attaching points for life-
(4) Structural failure. lines limit the space which is essential for
(5) Rigging failure. orderly positioning, alignment and place-
(6) Crane signal/radio communication fail- ment of the precast concrete members. To
ure. keep the lanyards a reasonable and manage-
(b) Weather Conditions able length, lifeline supports would nec-
essarily need to be in proximity to the posi-
(1) Wind (strong wind/sudden gusting)par- tioning process. A sudden shift of the precast
ticularly a problem with the large surface concrete member being positioned because of
areas of precast concrete members. wind pressure or crane movement could
(2) Snow/rain (visibility). make it strike the temporary supporting
(3) Fog (visibility). structure, moving it suddenly and causing
(4) Coldcausing slowed reactions or me- tied off employees to fall.
chanical problems. (b) The time in manhours which would be
(c) Structure/Product Conditions. expended in placing and maintaining tem-
(1) Lifting Eye failure. porary structural supports for lifeline at-
(2) Bearing failure or slippage. taching points could exceed the expended
(3) Structure shifting. manhours involved in placing the precast
(4) Bracing failure. concrete members. No protection could be
(5) Product failure. provided for the employees erecting the tem-
(d) Human Error. porary structural supports and these sup-
(1) Incorrect tag line procedure. ports would have to be moved for each suc-
(2) Tag line hang-up. cessive step in the construction process, thus
(3) Incorrect or misunderstood crane sig- greatly increasing the employees exposure
nals. to the fall hazard.
(4) Misjudged elevation of member. (c) The use of a cable strung horizontally
(5) Misjudged speed of member. between two columns to provide tie off lines
(6) Misjudged angle of member. for erecting or walking a beam for con-
4. Anchorages or special attachment points necting work is not feasible and creates a
could be cast into the precast concrete mem- greater hazard on this multi-story building
bers if sufficient preplanning and consider- for the following reasons:

344

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00354 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. M, App. E
(1) If a connector is to use such a line, it ty block/retractable lifeline anchored to the
must be installed between the two columns. walking-working surface; and the potential
To perform this installation requires an for swing hazards is increased.
erector to have more fall exposure time at- Manufacturers also require that workers
taching the cable to the columns than would not work at a level where the point of
be spent to make the beam to column con- snaphook attachment to the body harness is
nection itself. above the device because this will increase
(2) If such a line is to be installed so that the free fall distance and the deceleration
an erector can walk along a beam, it must be distance and will cause higher forces on the
overhead or below him. For example, if a body in the event of an accidental fall.
connector must walk along a 24 in. wide Manufacturers recommend an anchorage
beam, the presence of a line next to the con- for the retractable lifeline which is immov-
nector at waist level, attached directly to ably fixed in space and is independent of the
the columns, would prevent the connector users support systems. A moveable anchor-
from centering their weight over the beam age is one which can be moved around (such
and balancing themselves. Installing the line as equipment or wheeled vehicles) or which
above the connector might be possible on the can deflect substantially under shock load-
first level of a two-story column; however, ing (such as a horizontal cable or very flexi-
the column may extend only a few feet above ble beam). In the case of a very flexible an-
the floor level at the second level or be flush chorage, a shock load applied to the anchor-
with the floor level. Attaching the line to age during fall arrest can cause oscillation of
the side of the beam could be a solution; the flexible anchorage such that the retract-
however, it would require the connector to
able brake mechanism may undergo one or
attach the lanyard below foot level which
more cycles of locking/unlocking/locking
would most likely extend a fall farther than
(ratchet effect) until the anchorage deflec-
6 ft.
tion is dampened. Therefore, use of a move-
(3) When lines are strung over every beam,
able anchorage involves critical engineering
it becomes more and more difficult for the
and safety factors and should only be consid-
crane operator to lower a precast concrete
ered after fixed anchorage has been deter-
member into position without the member
mined to be not feasible.
becoming fouled. Should the member become
entangled, it could easily dislodge the line Horizontal cables used as an anchorage
from a column. If a worker is tied to it at present an additional hazard due to amplifi-
the time, a fall could be caused. cation of the horizontal component of max-
6. The ANSI A10.141991 American National imum arrest force (of a fall) transmitted to
Standard for Construction and Demolition the points where the horizontal cable is at-
OperationsRequirements for Safety Belts, tached to the structure. This amplification
Harnesses, Lanyards and Lifelines for Con- is due to the angle of sag of a horizontal
struction and Demolition Use, states that cable and is most severe for small angles of
the anchor point of a lanyard or deceleration sag. For a cable sag angle of 2 degrees the
device should, if possible, be located above horizontal force on the points of cable at-
the wearers belt or harness attachment. tachment can be amplified by a factor of 15.
ANSI A10.14 also states that a suitable an- It is also necessary to install the retract-
chorage point is one which is located as high able device vertically overhead to minimize
as possible to prevent contact with an ob- swing falls. If an object is in the workers
struction below should the worker fall. Most swing path (or that of the cable) hazardous
manufacturers also warn in the users hand- situations exist: (1) due to the swing, hori-
book that the safety block/retractable life- zontal speed of the user may be high enough
line must be positioned above the D-ring to cause injury when an obstacle in the
(above the work space of the intended user) swing fall path is struck by either the user
and OSHA recommends that fall arrest and or the cable; (2) the total vertical fall dis-
restraint equipment be used in accordance tance of the user may be much greater than
with the manufacturers instructions. if the user had fallen only vertically without
Attachment of a retractable device to a a swing fall path.
horizontal cable near floor level or using the With retractable lines, overconfidence may
inserts in the floor or roof members may re- cause the worker to engage in inappropriate
sult in increased free fall due to the dorsal behavior, such as approaching the perimeter
D-ring of the full-body harness riding higher of a floor or roof at a distance appreciably
than the attachment point of the snaphook greater than the shortest distance between
to the cable or insert (e.g., 6 foot tall worker the anchorage point and the leading edge.
with a dorsal D-ring at 5 feet above the floor Though the retractable lifeline may arrest a
or surface, reduces the working length to workers fall before he or she has fallen a few
only one foot, by placing the anchorage five feet, the lifeline may drag along the edge of
feet away from the fall hazard). In addition, the floor or beam and swing the worker like
impact loads may exceed maximum fall ar- a pendulum until the line has moved to a po-
rest forces (MAF) because the fall arrest D- sition where the distance between the an-
ring would be 4 to 5 feet higher than the safe- chorage point and floor edge is the shortest

345

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00355 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. M, App. E 29 CFR Ch. XVII (7112 Edition)
distance between those two points. Accom- time necessary to position and secure the
panying this pendulum swing is a lowering of concrete member.
the worker, with the attendant danger that 4. Use of safety nets on exposed perimeter
he or she may violently impact the floor or wall openings and opensided floors, causes
some obstruction below. attachment points to be left in architectural
The risk of a cable breaking is increased if concrete which must be patched and filled
a lifeline is dragged sideways across the with matching material after the net sup-
rough surface or edge of a concrete member porting hardware is removed. In order to
at the same moment that the lifeline is patch these openings, additional numbers of
being subjected to a maximum impact load- employees must be suspended by swing
ing during a fall. The typical 316 in. cable in stages, boatswain chairs or other devices,
a retractable lifeline has a breaking strength thereby increasing the amount of fall expo-
of from 3000 to 3700 lbs. sure time to employees.
7. The competent person, who can take 5. Installed safety nets pose an additional
into account the specialized operations being hazard at the perimeter of the erected struc-
performed on this project, should determine ture where limited space is available in
when and where a designated erector cannot which members can be turned after being
use a personal fall arrest system. lifted from the ground by the crane. There
B. Safety Net Systems would be a high probability that the member
being lifted could become entangled in net
The nature of this particular precast con- hardware, cables, etc.
crete erection worksite precludes the safe 6. The use of safety nets where structural
use of safety nets where point of erection or wall panels are being erected would prevent
leading edge work must take place. movement of panels to point of installation.
1. To install safety nets in the interior To be effective, nets would necessarily have
high bay of the single story portion of the to provide protection across the area where
building poses rigging attachment problems. structural supporting wall panels would be
Structural members do not exist to which set and plumbed before roof units could be
supporting devices for nets can be attached placed.
in the area where protection is required. As 7. Use of a tower crane for the erection of
the erection operation advances, the loca- the high rise portion of the structure poses a
tion of point of erection or leading edge work particular hazard in that the crane operator
changes constantly as each member is at- cannot see or judge the proximity of the load
tached to the structure. Due to this constant in relation to the structure or nets. If the
change it is not feasible to set net sections signaler is looking through nets and sup-
and build separate structures to support the porting structural devices while giving in-
nets. structions to the crane operator, it is not
2. The nature of the erection process for possible to judge precise relationships be-
the precast concrete members is such that tween the load and the structure itself or to
an installed net would protect workers as nets and supporting structural devices. This
they position and secure only one structural could cause the load to become entangled in
member. After each member is stabilized the the net or hit the structure causing poten-
net would have to be moved to a new loca- tial damage.
tion (this could mean a move of 8 to 10 ft or
the possibility of a move to a different level C. Guardrail Systems
or area of the structure) to protect workers
placing the next piece in the construction se- On this particular worksite, guardrails,
quence. The result would be the installation barricades, ropes, cables or other perimeter
and dismantling of safety nets repeatedly guarding devices or methods on the erection
throughout the normal work day. As the floor will pose problems to safe erection pro-
time necessary to install a net, test, and re- cedures. Typically, a floor or roof is erected
move it is significantly greater than the by placing 4 to 10 ft wide structural members
time necessary to position and secure a pre- next to one another and welding or grouting
cast concrete member, the exposure time for them together. The perimeter of a floor and
the worker installing the safety net would be roof changes each time a new member is
far longer than for the workers whom the net placed into position. It is unreasonable and
is intended to protect. The time exposure re- virtually impossible to erect guardrails and
peats itself each time the nets and sup- toe boards at the ever changing leading edge
porting hardware must be moved laterally or of a floor or roof.
upward to provide protection at the point of 1. To position a member safely it is nec-
erection or leading edge. essary to remove all obstructions extending
3. Strict interpretation of 1926.502(c) re- above the floor level near the point of erec-
quires that operations shall not be under- tion. Such a procedure allows workers to
taken until the net is in place and has been swing a new member across the erected sur-
tested. With the point of erection constantly face as necessary to position it properly
changing, the time necessary to install and without worrying about knocking material
test a safety net significantly exceeds the off of this surface.

346

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00356 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. M, App. E
Hollow core slab erection on the masonry area that could be erected more safely by the
wall requires installation of the perimeter use of these fall protection measures, the
protection where the masonry wall has to be foreman should be notified.
constructed. This means the guardrail is in- A. Scaffolds are not used because:
stalled then subsequently removed to con- 1. The leading edge of the building is con-
tinue the masonry construction. The erector stantly changing and the scaffolding would
will be exposed to a fall hazard for a longer have to be moved at very frequent intervals.
period of time while installing and removing Employees erecting and dismantling the
perimeter protection than while erecting the scaffolding would be exposed to fall hazards
slabs. for a greater length of time than they would
In hollow core work, as in other precast by merely erecting the precast concrete
concrete erection, others are not typically member.
on the work deck until the precast concrete 2. A scaffold tower could interfere with the
erection is complete. The deck is not com- safe swinging of a load by the crane.
plete until the leveling, aligning, and grout- 3. Power lines, terrain and site do not
ing of the joints is done. It is normal prac- allow for the safe use of scaffolding.
tice to keep others off the deck until at least B. Vehicle mounted platforms are not used
the next day after the installation is com- because:
plete to allow the grout to harden. 1. A vehicle mounted platform will not
2. There is no permanent boundary until reach areas on the deck that are erected over
all structural members have been placed in other levels.
the floor or roof. At the leading edge, work- 2. The leading edge of the building is usu-
ers are operating at the temporary edge of ally over a lower level of the building and
the structure as they work to position the this lower level will not support the weight
next member in the sequence. Compliance of a vehicle mounted platform.
with the standard would require a guardrail 3. A vehicle mounted platform could inter-
and toe board be installed along this edge. fere with the safe swinging of a load by the
However, the presence of such a device would crane, either by the crane swinging the load
prevent a new member from being swung over or into the equipment.
over the erected surface low enough to allow 4. Power lines and surrounding site work
workers to control it safely during the posi- do not allow for the safe use of a vehicle
tioning process. Further, these employees mounted platform.
would have to work through the guardrail to C. Crane suspended personnel platforms are
align the new member and connect it to the not used because:
structure. The guardrail would not protect 1. A second crane close enough to suspend
an employee who must lean through it to do any employee in the working and erecting
the necessary work, rather it would hinder area could interfere with the safe swinging of
the employee to such a degree that a greater a load by the crane hoisting the product to
hazard is created than if the guardrail were be erected.
absent. 2. Power lines and surrounding site work
3. Guardrail requirements pose a hazard at do not allow for the safe use of a second
the leading edge of installed floor or roof crane on the job.
sections by creating the possibility of em-
ployees being caught between guardrails and VI. ENFORCEMENT
suspended loads. The lack of a clear work
area in which to guide the suspended load Constant awareness of and respect for fall
into position for placement and welding of hazards, and compliance with all safety rules
members into the existing structure creates are considered conditions of employment.
still further hazards. The jobsite Superintendent, as well as indi-
4. Where erection processes require precast viduals in the Safety and Personnel Depart-
concrete stairways or openings to be in- ment, reserve the right to issue disciplinary
stalled as an integral part of the overall warnings to employees, up to and including
erection process, it must also be recognized termination, for failure to follow the guide-
that guardrails or handrails must not project lines of this program.
above the surface of the erection floor. Such
guardrails should be terminated at the level VII. ACCIDENT INVESTIGATIONS
of the erection floor to avoid placing haz- All accidents that result in injury to work-
ardous obstacles in the path of a member ers, regardless of their nature, shall be inves-
being positioned. tigated and reported. It is an integral part of
any safety program that documentation take
V. OTHER FALL PROTECTION MEASURES place as soon as possible so that the cause
CONSIDERED FOR THIS JOB
and means of prevention can be identified to
The following is a list and explanation of prevent a reoccurrence.
other fall protection measures available and In the event that an employee falls or
an explanation of limitations for use on this there is some other related, serious incident
particular jobsite. If during the course of occurring, this plan shall be reviewed to de-
erecting the building the employee sees an termine if additional practices, procedures,

347

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00357 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. M, App. E 29 CFR Ch. XVII (7112 Edition)
or training need to be implemented to pre- In these cases, conventional fall protection
vent similar types of falls or incidents from systems may not be the safest choice for
occurring. builders. This plan is designed to enable em-
ployers and employees to recognize the fall
VIII. CHANGES TO PLAN hazards associated with this job and to es-
Any changes to the plan will be approved tablish the safest procedures that are to be
by (name of the qualified person). This plan followed in order to prevent falls to lower
shall be reviewed by a qualified person as the levels or through holes and openings in walk-
job progresses to determine if additional ing/working surfaces.
practices, procedures or training needs to be Each employee will be trained in these pro-
implemented by the competent person to im- cedures and will strictly adhere to them ex-
prove or provide additional fall protection. cept when doing so would expose the em-
Workers shall be notified and trained, if nec- ployee to a greater hazard. If, in the employ-
essary, in the new procedures. A copy of this ees opinion, this is the case, the employee is
plan and all approved changes shall be main- to notify the competent person of their con-
tained at the jobsite. cern and have the concern addressed before
proceeding.
Sample Fall Protection Plan for Residential It is the responsibility of (name of com-
Construction petent person) to implement this Fall Pro-
tection Plan. Continual observational safety
(INSERT COMPANY NAME) checks of work operations and the enforce-
This Fall Protection Plan Is Specific For ment of the safety policy and procedures
The Following Project: shall be regularly enforced. The crew super-
Location of Job lllllllllllllll visor or foreman (insert name) is responsible
Date Plan Prepared or Modified llllll for correcting any unsafe practices or condi-
Plan Prepared By llllllllllllll tions immediately.
Plan Approved By llllllllllllll It is the responsibility of the employer to
Plan Supervised By lllllllllllll ensure that all employees understand and
The following Fall Protection Plan is a adhere to the procedures of this plan and to
sample program prepared for the prevention follow the instructions of the crew super-
of injuries associated with falls. A Fall Pro- visor. It is also the responsibility of the em-
tection Plan must be developed and evalu- ployee to bring to managements attention
ated on a site by site basis. It is rec- any unsafe or hazardous conditions or prac-
ommended that builders discuss the written tices that may cause injury to either them-
Fall Protection Plan with their OSHA Area selves or any other employees. Any changes
Office prior to going on a jobsite. to the Fall Protection Plan must be ap-
proved by (name of qualified person).
I. STATEMENT OF COMPANY POLICY
II. FALL PROTECTION SYSTEMS TO BE USED ON
(Your company name here) is dedicated to THIS JOB
the protection of its employees from on-the-
job injuries. All employees of (Your company Installation of roof trusses/rafters, exterior
name here) have the responsibility to work wall erection, roof sheathing, floor sheathing
safely on the job. The purpose of the plan is and joist/truss activities will be conducted
to supplement our existing safety and health by employees who are specifically trained to
program and to ensure that every employee do this type of work and are trained to rec-
who works for (Your company name here) ognize the fall hazards. The nature of such
recognizes workplace fall hazards and takes work normally exposes the employee to the
the appropriate measures to address those fall hazard for a short period of time. This
hazards. Plan details how (Your company name here)
This Fall Protection Plan addresses the will minimize these hazards.
use of conventional fall protection at a num-
Controlled Access Zones
ber of areas on the project, as well as identi-
fies specific activities that require non-con- When using the Plan to implement the fall
ventional means of fall protection. During protection options available, workers must
the construction of residential buildings be protected through limited access to high
under 48 feet in height, it is sometimes infea- hazard locations. Before any non-conven-
sible or it creates a greater hazard to use tional fall protection systems are used as
conventional fall protection systems at spe- part of the work plan, a controlled access
cific areas or for specific tasks. The areas or zone (CAZ) shall be clearly defined by the
tasks may include, but are not limited to: competent person as an area where a recog-
a. Setting and bracing of roof trusses and nized hazard exists. The demarcation of the
rafters; CAZ shall be communicated by the com-
b. Installation of floor sheathing and petent person in a recognized manner, either
joists; through signs, wires, tapes, ropes or chains.
c. Roof sheathing operations; and (Your company name here) shall take the
d. Erecting exterior walls. following steps to ensure that the CAZ is

348

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00358 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. M, App. E
clearly marked or controlled by the com- exposed to fall hazards while working from
petent person: the top plate installing trusses/rafters:
All access to the CAZ must be restricted Only the following trained workers will
to authorized entrants; be allowed to work on the top plate during
All workers who are permitted in the roof truss or rafter installation:
CAZ shall be listed in the appropriate sec- llllllllllllllllllllllll
tions of the Plan (or be visibly identifiable llllllllllllllllllllllll
by the competent person) prior to implemen- llllllllllllllllllllllll
tation;
Workers shall have no other duties to
The competent person shall ensure that
perform during truss/rafter erection proce-
all protective elements of the CAZ be imple-
dures;
mented prior to the beginning of work.
All trusses/rafters will be adequately
Installation Procedures for Roof Truss and braced before any worker can use the truss/
Rafter Erection rafter as a support;
Workers will remain on the top plate
During the erection and bracing of roof using the previously stabilized truss/rafter as
trusses/rafters, conventional fall protection a support while other trusses/rafters are
may present a greater hazard to workers. On being erected;
this job, safety nets, guardrails and personal Workers will leave the area of the se-
fall arrest systems will not provide adequate cured trusses only when it is necessary to se-
fall protection because the nets will cause cure another truss/rafter;
the walls to collapse, while there are no suit- The first two trusses/rafters will be set
able attachment or anchorage points for from ladders leaning on side walls at points
guardrails or personal fall arrest systems. where the walls can support the weight of
On this job, requiring workers to use a lad- the ladder; and
der for the entire installation process will A worker will climb onto the interior top
cause a greater hazard because the worker plate via a ladder to secure the peaks of the
must stand on the ladder with his back or first two trusses/rafters being set.
side to the front of the ladder. While erecting
The workers responsible for detaching
the truss or rafter the worker will need both
trusses from cranes and/or securing trusses
hands to maneuver the truss and therefore
at the peaks traditionally are positioned at
cannot hold onto the ladder. In addition, lad-
the peak of the trusses/rafters. There are
ders cannot be adequately protected from
also situations where workers securing
movement while trusses are being maneu-
rafters to ridge beams will be positioned on
vered into place. Many workers may experi-
top of the ridge beam.
ence additional fatigue because of the in-
(Your company name here) shall take the
crease in overhead work with heavy mate-
following steps to protect workers who are
rials, which can also lead to a greater haz-
exposed to fall hazards while securing truss-
ard.
es/rafters at the peak of the trusses/ridge
Exterior scaffolds cannot be utilized on
beam:
this job because the ground, after recent
Only the following trained workers will
backfilling, cannot support the scaffolding.
be allowed to work at the peak during roof
In most cases, the erection and dismantling
truss or rafter installation:
of the scaffold would expose workers to a
greater fall hazard than erection of the llllllllllllllllllllllll
trusses/rafters. llllllllllllllllllllllll
On all walls eight feet or less, workers will llllllllllllllllllllllll
install interior scaffolds along the interior Once truss or rafter installation begins,
wall below the location where the trusses/ workers not involved in that activity shall
rafters will be erected. Sawhorse scaffolds not stand or walk below or adjacent to the
constructed of 46 inch sawhorses and 210 roof opening or exterior walls in any area
planks will often allow workers to be ele- where they could be struck by falling ob-
vated high enough to allow for the erection jects;
of trusses and rafters without working on Workers shall have no other duties than
the top plate of the wall. securing/bracing the trusses/ridge beam;
In structures that have walls higher than Workers positioned at the peaks or in the
eight feet and where the use of scaffolds and webs of trusses or on top of the ridge beam
ladders would create a greater hazard, safe shall work from a stable position, either by
working procedures will be utilized when sitting on a ridge seat or other equivalent
working on the top plate and will be mon- surface that provides additional stability or
itored by the crew supervisor. During all by positioning themselves in previously sta-
stages of truss/rafter erection the stability of bilized trusses/rafters and leaning into and
the trusses/rafters will be ensured at all reaching through the trusses/rafters;
times. Workers shall not remain on or in the
(Your company name here) shall take the peak/ridge any longer than necessary to safe-
following steps to protect workers who are ly complete the task.

349

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00359 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. M, App. E 29 CFR Ch. XVII (7112 Edition)
Roof Sheathing Operations are installed. For roofs with pitches in ex-
cess of 9-in-12, slide guards will be installed
Workers typically install roof sheathing
at four-foot intervals.
after all trusses/rafters and any permanent
truss bracing is in place. Roof structures are When wet weather (rain, snow, or sleet)
unstable until some sheathing is installed, so are present, roof sheathing operations shall
workers installing roof sheathing cannot be be suspended unless safe footing can be as-
protected from fall hazards by conventional sured for those workers installing sheathing.
fall protection systems until it is determined When strong winds (above 40 miles per
that the roofing system can be used as an an- hour) are present, roof sheathing operations
chorage point. At that point, employees are to be suspended unless wind breakers are
shall be protected by a personal fall arrest erected.
system.
Trusses/rafters are subject to collapse if a Installation of Floor Joists and Sheathing
worker falls while attached to a single truss During the installation of floor sheathing/
with a belt/harness. Nets could also cause joists (leading edge construction), the fol-
collapse, and there is no place to attach lowing steps shall be taken to protect work-
guardrails. ers:
All workers will ensure that they have se- Only the following trained workers will
cure footing before they attempt to walk on
be allowed to install floor joists or sheath-
the sheathing, including cleaning shoes/boots
ing:
of mud or other slip hazards.
To minimize the time workers must be ex- llllllllllllllllllllllll
posed to a fall hazard, materials will be llllllllllllllllllllllll
staged to allow for the quickest installation llllllllllllllllllllllll
of sheathing. Materials for the operations shall be con-
(Your company name here) shall take the veniently staged to allow for easy access to
following steps to protect workers who are workers;
exposed to fall hazards while installing roof The first floor joists or trusses will be
sheathing: rolled into position and secured either from
Once roof sheathing installation begins, the ground, ladders or sawhorse scaffolds;
workers not involved in that activity shall Each successive floor joist or truss will
not stand or walk below or adjacent to the be rolled into place and secured from a plat-
roof opening or exterior walls in any area form created from a sheet of plywood laid
where they could be struck by falling ob- over the previously secured floor joists or
jects; trusses;
The competent person shall determine
Except for the first row of sheathing
the limits of this area, which shall be clearly
which will be installed from ladders or the
communicated to workers prior to place-
ground, workers shall work from the estab-
ment of the first piece of roof sheathing;
lished deck; and
The competent person may order work
on the roof to be suspended for brief periods Any workers not assisting in the leading
as necessary to allow other workers to pass edge construction while leading edges still
through such areas when this would not cre- exist (e.g. cutting the decking for the install-
ate a greater hazard; ers) shall not be permitted within six feet of
Only qualified workers shall install roof the leading edge under construction.
sheathing;
Erection of Exterior Walls
The bottom row of roof sheathing may be
installed by workers standing in truss webs; During the construction and erection of ex-
After the bottom row of roof sheathing is terior walls, employers shall take the fol-
installed, a slide guard extending the width lowing steps to protect workers:
of the roof shall be securely attached to the Only the following trained workers will
roof. Slide guards are to be constructed of no be allowed to erect exterior walls:
less than nominal 4 height capable of lim-
llllllllllllllllllllllll
iting the uncontrolled slide of workers.
Workers should install the slide guard while llllllllllllllllllllllll
standing in truss webs and leaning over the llllllllllllllllllllllll
sheathing; A painted line six feet from the perim-
Additional rows of roof sheathing may be eter will be clearly marked prior to any wall
installed by workers positioned on pre- erection activities to warn of the approach-
viously installed rows of sheathing. A slide ing unprotected edge;
guard can be used to assist workers in re- Materials for operations shall be conven-
taining their footing during successive iently staged to minimize fall hazards; and
sheathing operations; and Workers constructing exterior walls
Additional slide guards shall be securely shall complete as much cutting of materials
attached to the roof at intervals not to ex- and other preparation as possible away from
ceed 13 feet as successive rows of sheathing the edge of the deck.

350

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00360 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.551
III. ENFORCEMENT operation for the pilot and ground per-
Constant awareness of and respect for fall sonnel.
hazards, and compliance with all safety rules (c) Slings and tag lines. Load shall be
are considered conditions of employment. properly slung. Tag lines shall be of a
The crew supervisor or foreman, as well as length that will not permit their being
individuals in the Safety and Personnel De- drawn up into rotors. Pressed sleeve,
partment, reserve the right to issue discipli-
swedged eyes, or equivalent means
nary warnings to employees, up to and in-
cluding termination, for failure to follow the shall be used for all freely suspended
guidelines of this program. loads to prevent hand splices from
spinning open or cable clamps from
IV. ACCIDENT INVESTIGATIONS loosening.
All accidents that result in injury to work- (d) Cargo hooks. All electrically oper-
ers, regardless of their nature, shall be inves- ated cargo hooks shall have the elec-
tigated and reported. It is an integral part of trical activating device so designed and
any safety program that documentation take installed as to prevent inadvertent op-
place as soon as possible so that the cause
eration. In addition, these cargo hooks
and means of prevention can be identified to
prevent a reoccurrence. shall be equipped with an emergency
In the event that an employee falls or mechanical control for releasing the
there is some other related, serious incident load. The hooks shall be tested prior to
occurring, this plan shall be reviewed to de- each days operation to determine that
termine if additional practices, procedures, the release functions properly, both
or training need to be implemented to pre- electrically and mechanically.
vent similar types of falls or incidents from
(e) Personal protective equipment. (1)
occurring.
Personal protective equipment for em-
V. CHANGES TO PLAN ployees receiving the load shall consist
Any changes to the plan will be approved of complete eye protection and hard
by (name of the qualified person). This plan hats secured by chinstraps.
shall be reviewed by a qualified person as the (2) Loose-fitting clothing likely to
job progresses to determine if additional flap in the downwash, and thus be
practices, procedures or training needs to be snagged on hoist line, shall not be
implemented by the competent person to im- worn.
prove or provide additional fall protection.
(f) Loose gear and objects. Every prac-
Workers shall be notified and trained, if nec-
essary, in the new procedures. A copy of this tical precaution shall be taken to pro-
plan and all approved changes shall be main- vide for the protection of the employ-
tained at the jobsite. ees from flying objects in the rotor
downwash. All loose gear within 100
[59 FR 40730, Aug. 9, 1994]
feet of the place of lifting the load, de-
positing the load, and all other areas
Subpart NHelicopters, Hoists, susceptible to rotor downwash shall be
Elevators, and Conveyors secured or removed.
(g) Housekeeping. Good housekeeping
AUTHORITY: Section 3704 of the Contract shall be maintained in all helicopter
Work Hours and Safety Standards Act (40 loading and unloading areas.
U.S.C. 3701); Sections 4, 6, and 8 of the Occu- (h) Operator responsibility. The heli-
pational Safety and Health Act of 1970 (29 copter operator shall be responsible for
U.S.C. 653, 655, 657); Secretary of Labors
Order Nos. 1271 (36 FR 8754), 876 (41 FR
size, weight, and manner in which
25059), or 983 (49 FR 35736), and 52007 (72 FR loads are connected to the helicopter.
31159). If, for any reason, the helicopter oper-
ator believes the lift cannot be made
1926.550 [Reserved] safely, the lift shall not be made.
(i) Hooking and unhooking loads. When
1926.551 Helicopters. employees are required to perform
(a) Helicopter regulations. Helicopter work under hovering craft, a safe
cranes shall be expected to comply means of access shall be provided for
with any applicable regulations of the employees to reach the hoist line hook
Federal Aviation Administration. and engage or disengage cargo slings.
(b) Briefing. Prior to each days oper- Employees shall not perform work
ation a briefing shall be conducted. under hovering craft except when nec-
This briefing shall set forth the plan of essary to hook or unhook loads.

351

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00361 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.551 29 CFR Ch. XVII (7112 Edition)

(j) Static charge. Static charge on the structure, or allowed to foul on any
suspended load shall be dissipated with fixed structure.
a grounding device before ground per- (m) Visibility. When visibility is re-
sonnel touch the suspended load, or duced by dust or other conditions,
protective rubber gloves shall be worn ground personnel shall exercise special
by all ground personnel touching the caution to keep clear of main and sta-
suspended load. bilizing rotors. Precautions shall also
(k) Weight limitation. The weight of an be taken by the employer to eliminate
external load shall not exceed the man- as far as practical reduced visibility.
(n) Signal systems. Signal systems be-
ufacturers rating.
tween aircrew and ground personnel
(l) Ground lines. Hoist wires or other
shall be understood and checked in ad-
gear, except for pulling lines or con- vance of hoisting the load. This applies
ductors that are allowed to pay out to either radio or hand signal systems.
from a container or roll off a reel, shall Hand signals shall be as shown in Fig-
not be attached to any fixed ground ure N1.

352

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00362 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.551

(o) Approach distance. No unauthor- (p) Approaching helicopter. Whenever


ized person shall be allowed to ap- approaching or leaving a helicopter
proach within 50 feet of the helicopter with blades rotating, all employees
when the rotor blades are turning. shall remain in full view of the pilot

353
EC30OC91.015</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00363 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.552 29 CFR Ch. XVII (7112 Edition)

and keep in a crouched position. Em- inches; and three thirty-seconds inch
ployees shall avoid the area from the for diameters 114 to 112 inches.
cockpit or cabin rearward unless au- (4) Hoisting ropes shall be installed
thorized by the helicopter operator to in accordance with the wire rope manu-
work there. facturers recommendations.
(q) Personnel. Sufficient ground per- (5) The installation of live booms on
sonnel shall be provided when required hoists is prohibited.
for safe helicopter loading and unload- (6) The use of endless belt-type
ing operations. manlifts on construction shall be pro-
(r) Communications. There shall be hibited.
constant reliable communication be- (b) Material hoists. (1)(i) Operating
tween the pilot, and a designated em- rules shall be established and posted at
ployee of the ground crew who acts as the operators station of the hoist.
a signalman during the period of load- Such rules shall include signal system
ing and unloading. This signalman and allowable line speed for various
shall be distinctly recognizable from loads. Rules and notices shall be posted
other ground personnel. on the car frame or crosshead in a con-
(s) Fires. Open fires shall not be per- spicuous location, including the state-
mitted in an area that could result in ment No Riders Allowed.
such fires being spread by the rotor (ii) No person shall be allowed to ride
downwash. on material hoists except for the pur-
poses of inspection and maintenance.
1926.552 Material hoists, personnel (2) All entrances of the hoistways
hoists, and elevators.
shall be protected by substantial gates
(a) General requirements. (1) The em- or bars which shall guard the full width
ployer shall comply with the manufac- of the landing entrance. All hoistway
turers specifications and limitations entrance bars and gates shall be paint-
applicable to the operation of all hoists ed with diagonal contrasting colors,
and elevators. Where manufacturers such as black and yellow stripes.
specifications are not available, the (i) Bars shall be not less than 2- by 4-
limitations assigned to the equipment inch wooden bars or the equivalent, lo-
shall be based on the determinations of cated 2 feet from the hoistway line.
a professional engineer competent in Bars shall be located not less than 36
the field. inches nor more than 42 inches above
(2) Rated load capacities, rec- the floor.
ommended operating speeds, and spe- (ii) Gates or bars protecting the en-
cial hazard warnings or instructions trances to hoistways shall be equipped
shall be posted on cars and platforms. with a latching device.
(3) Wire rope shall be removed from (3) Overhead protective covering of 2-
service when any of the following con- inch planking, 34-inch plywood, or
ditions exists: other solid material of equivalent
(i) In hoisting ropes, six randomly strength, shall be provided on the top
distributed broken wires in one rope of every material hoist cage or plat-
lay or three broken wires in one strand form.
in one rope lay; (4) The operators station of a hoist-
(ii) Abrasion, scrubbing, flattening, ing machine shall be provided with
or peening, causing loss of more than overhead protection equivalent to tight
one-third of the original diameter of planking not less than 2 inches thick.
the outside wires; The support for the overhead protec-
(iii) Evidence of any heat damage re- tion shall be of equal strength.
sulting from a torch or any damage (5) Hoist towers may be used with or
caused by contact with electrical without an enclosure on all sides. How-
wires; ever, whichever alternative is chosen,
(iv) Reduction from nominal diame- the following applicable conditions
ter of more than three sixty-fourths shall be met:
inch for diameters up to and including (i) When a hoist tower is enclosed, it
three-fourths inch; one-sixteenth inch shall be enclosed on all sides for its en-
for diameters seven-eights to 118 tire height with a screen enclosure of

354

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00364 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.552

-inch mesh, No. 18 U.S. gauge wire or


12 (6) A door or gate shall be provided at
equivalent, except for landing access. each entrance to the car which shall
(ii) When a hoist tower is not en- protect the full width and height of the
closed, the hoist platform or car shall car entrance opening.
be totally enclosed (caged) on all sides (7) Overhead protective covering of 2-
for the full height between the floor inch planking, 34-inch plywood or other
and the overhead protective covering solid material or equivalent strength
with 12-inch mesh of No. 14 U.S. gauge shall be provided on the top of every
wire or equivalent. The hoist platform personnel hoist.
enclosure shall include the required (8) Doors or gates shall be provided
gates for loading and unloading. A 6- with electric contacts which do not
foot high enclosure shall be provided allow movement of the hoist when door
on the unused sides of the hoist tower or gate is open.
at ground level. (9) Safeties shall be capable of stop-
ping and holding the car and rated load
(6) Car arresting devices shall be in-
when traveling at governor tripping
stalled to function in case of rope fail-
speed.
ure. (10) Cars shall be provided with a ca-
(7) All material hoist towers shall be pacity and data plate secured in a con-
designed by a licensed professional en- spicuous place on the car or crosshead.
gineer. (11) Internal combustion engines
(8) All material hoists shall conform shall not be permitted for direct drive.
to the requirements of ANSI A10.51969, (12) Normal and final terminal stop-
Safety Requirements for Material ping devices shall be provided.
Hoists. (13) An emergency stop switch shall
(c) Personnel hoists. (1) Hoist towers be provided in the car and marked
outside the structure shall be enclosed Stop.
for the full height on the side or sides (14) Ropes: (i) The minimum number
used for entrance and exit to the struc- of hoisting ropes used shall be three for
ture. At the lowest landing, the enclo- traction hoists and two for drum-type
sure on the sides not used for exit or hoists.
entrance to the structure shall be en- (ii) The minimum diameter of hoist-
closed to a height of at least 10 feet. ing and counterweight wire ropes shall
Other sides of the tower adjacent to be 12-inch.
floors or scaffold platforms shall be en- (iii) Safety factors:
closed to a height of 10 feet above the
level of such floors or scaffolds. MINIMUM FACTORS OF SAFETY FOR SUSPENSION
(2) Towers inside of structures shall WIRE ROPES
be enclosed on all four sides through- Minimum
out the full height. Rope speed in feet per minute factor of
safety
(3) Towers shall be anchored to the
structure at intervals not exceeding 25 50 ......................................................................... 7.60
75 ......................................................................... 7.75
feet. In addition to tie-ins, a series of 100 ....................................................................... 7.95
guys shall be installed. Where tie-ins 125 ....................................................................... 8.10
are not practical the tower shall be an- 150 ....................................................................... 8.25
chored by means of guys made of wire 175 ....................................................................... 8.40
200 ....................................................................... 8.60
rope at least one-half inch in diameter, 225 ....................................................................... 8.75
securely fastened to anchorage to en- 250 ....................................................................... 8.90
sure stability. 300 ....................................................................... 9.20
350 ....................................................................... 9.50
(4) Hoistway doors or gates shall be 400 ....................................................................... 9.75
not less than 6 feet 6 inches high and 450 ....................................................................... 10.00
500 ....................................................................... 10.25
shall be provided with mechanical 550 ....................................................................... 10.45
locks which cannot be operated from 600 ....................................................................... 10.70
the landing side, and shall be acces-
sible only to persons on the car. (15) Following assembly and erection
(5) Cars shall be permanently en- of hoists, and before being put in serv-
closed on all sides and the top, except ice, an inspection and test of all func-
sides used for entrance and exit which tions and safety devices shall be made
have car gates or doors. under the supervision of a competent

355

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00365 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.553 29 CFR Ch. XVII (7112 Edition)

person. A similar inspection and test is (c) Evidence of any heat damage from
required following major alteration of any cause;
an existing installation. All hoists (d) Reductions from nominal diame-
shall be inspected and tested at not ter of more than three-sixty-fourths
more than 3-month intervals. The em- inch for diameters to and including
ployer shall prepare a certification three-fourths inch, one-sixteenth inch
record which includes the date the in- for diameters seven-eights inch to 118
spection and test of all functions and inches inclusive, three-thirty-seconds
safety devices was performed; the sig- inch for diameters 114 to 112 inches in-
nature of the person who performed the clusive;
inspection and test; and a serial num- (e) In standing ropes, more than two
ber, or other identifier, for the hoist broken wires in one lay in sections be-
that was inspected and tested. The yond end connections or more than one
most recent certification record shall broken wire at an end connection.
be maintained on file. (d) Permanent elevators under the
(16) All personnel hoists used by em- care and custody of the employer and
ployees shall be constructed of mate- used by employees for work covered by
rials and components which meet the this Act shall comply with the require-
specifications for materials, construc- ments of American National Standards
tion, safety devices, assembly, and Institute A17.11965 with addenda
structural integrity as stated in the A17.1a1967, A17.1b1968, A17.1c1969,
American National Standard A10.4 A17.1d1970, and inspected in accord-
1963, Safety Requirements for Work- ance with A17.21960 with addenda
mens Hoists. The requirements of this A17.2a1965, A17.2b1967.
paragraph (c)(16) do not apply to canti-
lever type personnel hoists. [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
1979, as amended at 52 FR 36382, Sept. 28,
(17) (i) Personnel hoists used in
1987]
bridge tower construction shall be ap-
proved by a registered professional en- 1926.553 Base-mounted drum hoists.
gineer and erected under the super-
vision of a qualified engineer com- (a) General requirements. (1) Exposed
petent in this field. moving parts such as gears, projecting
(ii) When a hoist tower is not en- screws, setscrews, chain, cables, chain
closed, the hoist platform or car shall sprockets, and reciprocating or rotat-
be totally enclosed (caged) on all sides ing parts, which constitute a hazard,
for the full height between the floor shall be guarded.
and the overhead protective covering (2) All controls used during the nor-
with 34-inch mesh of No. 14 U.S. gauge mal operation cycle shall be located
wire or equivalent. The hoist platform within easy reach of the operators sta-
enclosure shall include the required tion.
gates for loading and unloading. (3) Electric motor operated hoists
(iii) These hoists shall be inspected shall be provided with:
and maintained on a weekly basis. (i) A device to disconnect all motors
Whenever the hoisting equipment is ex- from the line upon power failure and
posed to winds exceeding 35 miles per not permit any motor to be restarted
hour it shall be inspected and put in until the controller handle is brought
operable condition before reuse. to the off position;
(iv) Wire rope shall be taken out of (ii) Where applicable, an overspeed
service when any of the following con- preventive device;
ditions exist: (iii) A means whereby remotely oper-
(a) In running ropes, six randomly ated hoists stop when any control is in-
distributed broken wires in one lay or effective.
three broken wires in one strand in one (4) All base-mounted drum hoists in
lay; use shall meet the applicable require-
(b) Wear of one-third the original di- ments for design, construction, instal-
ameter of outside individual wires. lation, testing, inspection, mainte-
Kinking, crushing, bird caging, or any nance, and operations, as prescribed by
other damage resulting in distortion of the manufacturer.
the rope structure; (b) Specific requirements. [Reserved]

356

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00366 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.600

(c) This section does not apply to (5) Where a conveyor passes over
base-mounted drum hoists used in con- work areas, aisles, or thoroughfares,
junction with derricks. Base-mounted suitable guards shall be provided to
drum hoists used in conjunction with protect employees required to work
derricks must conform to 1926.1436(e). below the conveyors.
[44 FR 8577, Feb. 9, 1979 as amended at 75 FR (6) All crossovers, aisles, and passage-
48134, Aug. 9, 2010] ways shall be conspicuously marked by
suitable signs, as required by subpart G
1926.554 Overhead hoists. of this part.
(a) General requirements. (1) The safe (7) Conveyors shall be locked out or
working load of the overhead hoist, as otherwise rendered inoperable, and
determined by the manufacturer, shall tagged out with a Do Not Operate
be indicated on the hoist, and this safe tag during repairs and when operation
working load shall not be exceeded. is hazardous to employees performing
(2) The supporting structure to which maintenance work.
the hoist is attached shall have a safe (8) All conveyors in use shall meet
working load equal to that of the hoist. the applicable requirements for design,
(3) The support shall be arranged so construction, inspection, testing,
as to provide for free movement of the maintenance, and operation, as pre-
hoist and shall not restrict the hoist scribed in the ANSI B20.11957, Safety
from lining itself up with the load. Code for Conveyors, Cableways, and
(4) The hoist shall be installed only Related Equipment.
in locations that will permit the oper-
ator to stand clear of the load at all Subpart OMotor Vehicles,
times. Mechanized Equipment, and
(5) Air hoists shall be connected to an
air supply of sufficient capacity and
Marine Operations
pressure to safely operate the hoist. All
air hoses supplying air shall be posi- AUTHORITY: Section 107, Construction
tively connected to prevent their be- Work Hours and Safety Standards Act (Con-
struction Safety Act) (40 U.S.C. 333); Secs. 4,
coming disconnected during use. 6, 8, Occupational Safety and Health Act of
(6) All overhead hoists in use shall 1970 (29 U.S.C. 653, 655, 657); Secretary of La-
meet the applicable requirements for bors Order No. 1271 (36 FR 8754), 876 (41 FR
construction, design, installation, test- 25059), 983 (48 FR 35736), 190 (55 FR 9033), 6
ing, inspection, maintenance, and oper- 96 (62 FR 111), or 52007 (72 FR 31159), as ap-
ation, as prescribed by the manufac- plicable. Section 1926.602 also issued under 29
turer. CFR part 1911.
(b) Specific requirements. [Reserved]
1926.600 Equipment.
1926.555 Conveyors. (a) General requirements. (1) All equip-
(a) General requirements. (1) Means for ment left unattended at night, adja-
stopping the motor or engine shall be cent to a highway in normal use, or ad-
provided at the operators station. Con- jacent to construction areas where
veyor systems shall be equipped with work is in progress, shall have appro-
an audible warning signal to be sound- priate lights or reflectors, or barri-
ed immediately before starting up the cades equipped with appropriate lights
conveyor. or reflectors, to identify the location of
(2) If the operators station is at a re- the equipment.
mote point, similar provisions for stop- (2) A safety tire rack, cage, or equiv-
ping the motor or engine shall be pro- alent protection shall be provided and
vided at the motor or engine location. used when inflating, mounting, or dis-
(3) Emergency stop switches shall be mounting tires installed on split rims,
arranged so that the conveyor cannot or rims equipped with locking rings or
be started again until the actuating similar devices.
stop switch has been reset to running (3) (i) Heavy machinery, equipment,
or on position. or parts thereof, which are suspended
(4) Screw conveyors shall be guarded or held aloft by use of slings, hoists, or
to prevent employee contact with turn- jacks shall be substantially blocked or
ing flights. cribbed to prevent falling or shifting

357

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00367 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.601 29 CFR Ch. XVII (7112 Edition)

before employees are permitted to (v) Cage-type boom guards, insu-


work under or between them. Bulldozer lating links, or proximity warning de-
and scraper blades, end-loader buckets, vices may be used on cranes, but the
dump bodies, and similar equipment, use of such devices shall not alter the
shall be either fully lowered or blocked requirements of any other regulation
when being repaired or when not in of this part even if such device is re-
use. All controls shall be in a neutral quired by law or regulation;
position, with the motors stopped and (vi) Any overhead wire shall be con-
brakes set, unless work being per- sidered to be an energized line unless
formed requires otherwise. and until the person owning such line
(ii) Whenever the equipment is or the electrical utility authorities in-
parked, the parking brake shall be set. dicate that it is not an energized line
Equipment parked on inclines shall and it has been visibly grounded;
have the wheels chocked and the park- (vii) Prior to work near transmitter
ing brake set. towers where an electrical charge can
be induced in the equipment or mate-
(4) The use, care and charging of all
rials being handled, the transmitter
batteries shall conform to the require-
shall be de-energized or tests shall be
ments of subpart K of this part.
made to determine if electrical charge
(5) All cab glass shall be safety glass, is induced on the crane. The following
or equivalent, that introduces no visi- precautions shall be taken when nec-
ble distortion affecting the safe oper- essary to dissipate induced voltages:
ation of any machine covered by this (A) The equipment shall be provided
subpart. with an electrical ground directly to
(6) All equipment covered by this the upper rotating structure sup-
subpart shall comply with the fol- porting the boom; and
lowing requirements when working or (B) Ground jumper cables shall be at-
being moved in the vicinity of power tached to materials being handled by
lines or energized transmitters, except boom equipment when electrical
where electrical distribution and trans- charge is induced while working near
mission lines have been deenergized energized transmitters. Crews shall be
and visibly grounded at point of work provided with nonconductive poles hav-
or where insulating barriers, not a part ing large alligator clips or other simi-
of or an attachment to the equipment lar protection to attach the ground
or machinery, have been erected to pre- cable to the load.
vent physical contact with the lines: (C) Combustible and flammable ma-
(i) For lines rated 50 kV or below, terials shall be removed from the im-
minimum clearance between the lines mediate area prior to operations.
and any part of the crane or load shall (7) Rolling railroad cars. Derail and/or
be 10 feet; bumper blocks shall be provided on
(ii) For lines rated over 50 kV, min- spur railroad tracks where a rolling car
imum clearance between the lines and could contact other cars being worked,
any part of the crane or load shall be 10 enter a building, work or traffic area.
feet plus 0.4 inch for each 1 kV over 50 (b) Specific requirements. [Reserved]
kV, or twice the length of the line in- [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
sulator, but never less than 10 feet; 1979, as amended at 58 FR 35183, June 30, 1993;
(iii) In transit with no load and boom 75 FR 48134, Aug. 9, 2010]
lowered, the equipment clearance shall
be a minimum of 4 feet for voltages 1926.601 Motor vehicles.
less than 50 kV, and 10 feet for voltages (a) Coverage. Motor vehicles as cov-
over 50 kV, up to and including 345 kV, ered by this part are those vehicles
and 16 feet for voltages up to and in- that operate within an off-highway job-
cluding 750 kV; site, not open to public traffic. The re-
(iv) A person shall be designated to quirements of this section do not apply
observe clearance of the equipment and to equipment for which rules are pre-
give timely warning for all operations scribed in 1926.602.
where it is difficult for the operator to (b) General requirements. (1) All vehi-
maintain the desired clearance by vis- cles shall have a service brake system,
ual means; an emergency brake system, and a

358

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00368 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.602

parking brake system. These systems while maintenance or inspection work


may use common components, and is being done.
shall be maintained in operable condi- (11) Operating levers controlling
tion. hoisting or dumping devices on haulage
(2)(i) Whenever visibility conditions bodies shall be equipped with a latch or
warrant additional light, all vehicles, other device which will prevent acci-
or combinations of vehicles, in use dental starting or tripping of the mech-
shall be equipped with at least two anism.
headlights and two taillights in oper- (12) Trip handles for tailgates of
able condition. dump trucks shall be so arranged that,
(ii) All vehicles, or combination of in dumping, the operator will be in the
vehicles, shall have brake lights in op- clear.
erable condition regardless of light (13) (i) All rubber-tired motor vehicle
conditions. equipment manufactured on or after
(3) All vehicles shall be equipped with May 1, 1972, shall be equipped with
an adequate audible warning device at fenders. All rubber-tired motor vehicle
the operators station and in an oper- equipment manufactured before May 1,
able condition. 1972, shall be equipped with fenders not
(4) No employer shall use any motor later than May 1, 1973.
vehicle equipment having an ob-
(ii) Mud flaps may be used in lieu of
structed view to the rear unless:
fenders whenever motor vehicle equip-
(i) The vehicle has a reverse signal
ment is not designed for fenders.
alarm audible above the surrounding
noise level or: (14) All vehicles in use shall be
(ii) The vehicle is backed up only checked at the beginning of each shift
when an observer signals that it is safe to assure that the following parts,
to do so. equipment, and accessories are in safe
(5) All vehicles with cabs shall be operating condition and free of appar-
equipped with windshields and powered ent damage that could cause failure
wipers. Cracked and broken glass shall while in use: service brakes, including
be replaced. Vehicles operating in trailer brake connections; parking sys-
areas or under conditions that cause tem (hand brake); emergency stopping
fogging or frosting of the windshields system (brakes); tires; horn; steering
shall be equipped with operable mechanism; coupling devices; seat
defogging or defrosting devices. belts; operating controls; and safety
(6) All haulage vehicles, whose pay devices. All defects shall be corrected
load is loaded by means of cranes, before the vehicle is placed in service.
power shovels, loaders, or similar These requirements also apply to
equipment, shall have a cab shield and/ equipment such as lights, reflectors,
or canopy adequate to protect the oper- windshield wipers, defrosters, fire ex-
ator from shifting or falling materials. tinguishers, etc., where such equip-
(7) Tools and material shall be se- ment is necessary.
cured to prevent movement when
transported in the same compartment 1926.602 Material handling equip-
ment.
with employees.
(8) Vehicles used to transport em- (a) Earthmoving equipment; General. (1)
ployees shall have seats firmly secured These rules apply to the following
and adequate for the number of em- types of earthmoving equipment:
ployees to be carried. scrapers, loaders, crawler or wheel
(9) Seat belts and anchorages meet- tractors, bulldozers, off-highway
ing the requirements of 49 CFR part 571 trucks, graders, agricultural and indus-
(Department of Transportation, Fed- trial tractors, and similar equipment.
eral Motor Vehicle Safety Standards) The promulgation of specific rules for
shall be installed in all motor vehicles. compactors and rubber-tired skid-
(10) Trucks with dump bodies shall be steer equipment is reserved pending
equipped with positive means of sup- consideration of standards currently
port, permanently attached, and capa- being developed.
ble of being locked in position to pre- (2) Seat belts. (i) Seat belts shall be
vent accidental lowering of the body provided on all equipment covered by

359

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00369 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.602 29 CFR Ch. XVII (7112 Edition)

this section and shall meet the require- present no hazard to personnel from
ments of the Society of Automotive flying materials.
Engineers, J3861969, Seat Belts for (6) Rollover protective structures
Construction Equipment. Seat belts for (ROPS). See subpart W of this part for
agricultural and light industrial trac- requirements for rollover protective
tors shall meet the seat belt require- structures and overhead protection.
ments of Society of Automotive Engi- (7) Rollover protective structures for off-
neers J333a1970, Operator Protection highway trucks. The promulgation of
for Agricultural and Light Industrial standards for rollover protective struc-
Tractors. tures for off-highway trucks is reserved
(ii) Seat belts need not be provided pending further study and develop-
for equipment which is designed only ment.
for standup operation. (8) Specific effective datesbrakes and
(iii) Seat belts need not be provided fenders. (i) Equipment mentioned in
for equipment which does not have paragraph (a)(4) and (5) of this section,
roll-over protective structure (ROPS) and manufactured after January 1,
or adequate canopy protection. 1972, which is used by any employer
(3) Access roadways and grades. (i) No after that date, shall comply with the
employer shall move or cause to be applicable rules prescribed therein con-
moved construction equipment or vehi- cerning brakes and fenders. Equipment
cles upon any access roadway or grade mentioned in paragraphs (a) (4) and (5)
unless the access roadway or grade is of this section, and manufactured be-
constructed and maintained to accom- fore January 1, 1972, which is used by
modate safely the movement of the any employer after that date, shall
equipment and vehicles involved. meet the applicable rules prescribed
(ii) Every emergency access ramp herein not later than June 30, 1973. It
and berm used by an employer shall be should be noted that, as permitted
constructed to restrain and control under 1926.2, employers may request
runaway vehicles. variations from the applicable brakes
(4) Brakes. All earthmoving equip- and fender standards required by this
ment mentioned in this 1926.602(a) subpart. Employers wishing to seek
shall have a service braking system ca- variations from the applicable brakes
pable of stopping and holding the and fenders rules may submit any re-
equipment fully loaded, as specified in quests for variations after the publica-
Society of Automotive Engineers SAE- tion of this document in the FEDERAL
J237, Loader Dozer1971, J236, Graders
REGISTER. Any statements intending to
1971, and J319b, Scrapers1971. Brake
meet the requirements of 1926.2(b)(4),
systems for self-propelled rubber-tired
should specify how the variation would
off-highway equipment manufactured
protect the safety of the employees by
after January 1, 1972 shall meet the ap-
providing for any compensating re-
plicable minimum performance criteria
strictions on the operation of equip-
set forth in the following Society of
ment.
Automotive Engineers Recommended
(ii) Notwithstanding the provisions of
Practices:
Self-Propelled Scrapers ................ SAE J319b1971.
paragraphs (a)(5) and (a)(8)(i) of this
Self-Propelled Graders ................. SAE J2361971. section, the requirement that fenders
Trucks and Wagons ...................... SAE J1661971. be installed on pneumatic-tired
Front End Loaders and Dozers .... SAE J2371971. earthmoving haulage equipment, is
(5) Fenders. Pneumatic-tired earth- suspended pending reconsideration of
moving haulage equipment (trucks, the requirement.
scrapers, tractors, and trailing units) (9) Audible alarms. (i) All
whose maximum speed exceeds 15 miles bidirectional machines, such as rollers,
per hour, shall be equipped with fend- compacters, front-end loaders, bull-
ers on all wheels to meet the require- dozers, and similar equipment, shall be
ments of Society of Automotive Engi- equipped with a horn, distinguishable
neers SAE J321a1970, Fenders for from the surrounding noise level,
Pneumatic-Tired Earthmoving Haulage which shall be operated as needed when
Equipment. An employer may, of the machine is moving in either direc-
course, at any time seek to show under tion. The horn shall be maintained in
1926.2, that the uncovered wheels an operative condition.

360

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00370 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.602

(ii) No employer shall permit accordingly. In no case shall the origi-


earthmoving or compacting equipment nal safety factor of the equipment be
which has an obstructed view to the reduced.
rear to be used in reverse gear unless (iii) If a load is lifted by two or more
the equipment has in operation a re- trucks working in unison, the propor-
verse signal alarm distinguishable tion of the total load carried by any
from the surrounding noise level or an one truck shall not exceed its capacity.
employee signals that it is safe to do (iv) Steering or spinner knobs shall
so. not be attached to the steering wheel
(10) Scissor points. Scissor points on
unless the steering mechanism is of a
all front-end loaders, which constitute
type that prevents road reactions from
a hazard to the operator during normal
operation, shall be guarded. causing the steering handwheel to spin.
(b) Excavating and other equipment. (1) The steering knob shall be mounted
Tractors covered in paragraph (a) of within the periphery of the wheel.
this section shall have seat belts as re- (v) All high lift rider industrial
quired for the operators when seated in trucks shall be equipped with overhead
the normal seating arrangement for guards which meet the configuration
tractor operation, even though back- and structural requirements as defined
hoes, breakers, or other similar attach- in paragraph 421 of American National
ments are used on these machines for Standards Institute B56.11969, Safety
excavating or other work. Standards for Powered Industrial
(2) For the purposes of this subpart Trucks.
and of subpart N of this part, the no- (vi) All industrial trucks in use shall
menclatures and descriptions for meas- meet the applicable requirements of
urement of dimensions of machinery design, construction, stability, inspec-
and attachments shall be as described tion, testing, maintenance, and oper-
in Society of Automotive Engineers ation, as defined in American National
1970 Handbook, pages 1088 through 1103. Standards Institute B56.11969, Safety
(3) The safety requirements, ratios, Standards for Powered Industrial
or limitations applicable to machines
Trucks.
or attachment usage covered in Power
Crane and Shovel Associations Stand- (vii) Unauthorized personnel shall
ards No. 1 and No. 2 of 1968, and No. 3 not be permitted to ride on powered in-
of 1969, shall be complied with, and dustrial trucks. A safe place to ride
shall apply to cranes, machines, and shall be provided where riding of
attachments under this part. trucks is authorized.
(c) Lifting and hauling equipment (viii) Whenever a truck is equipped
(other than equipment covered under sub- with vertical only, or vertical and hori-
part N of this part). (1) Industrial trucks zontal controls elevatable with the lift-
shall meet the requirements of ing carriage or forks for lifting per-
1926.600 and the following: sonnel, the following additional pre-
(i) Lift trucks, stackers, etc., shall cautions shall be taken for the protec-
have the rated capacity clearly posted tion of personnel being elevated.
on the vehicle so as to be clearly visi- (A) Use of a safety platform firmly
ble to the operator. When auxiliary re- secured to the lifting carriage and/or
movable counterweights are provided forks.
by the manufacturer, corresponding al- (B) Means shall be provided whereby
ternate rated capacities also shall be personnel on the platform can shut off
clearly shown on the vehicle. These power to the truck.
ratings shall not be exceeded.
(C) Such protection from falling ob-
(ii) No modifications or additions
which affect the capacity or safe oper- jects as indicated necessary by the op-
ation of the equipment shall be made erating conditions shall be provided.
without the manufacturers written ap- (d) Powered industrial truck operator
proval. If such modifications or training.
changes are made, the capacity, oper- NOTE: The requirements applicable to con-
ation, and maintenance instruction struction work under this paragraph are
plates, tags, or decals shall be changed

361

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00371 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.603 29 CFR Ch. XVII (7112 Edition)
identical to those set forth at 1910.178(l) of vided with the same protection as re-
this chapter. quired for steam lines.
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6, (10) Safety chains, or equivalent
1979, as amended at 58 FR 35183, June 30, 1993; means, shall be provided for each hose
63 FR 66274, Dec. 1, 1998] connection to prevent the line from
thrashing around in case the coupling
1926.603 Pile driving equipment. becomes disconnected.
(a) General requirements. (1) Boilers (11) Steam line controls shall consist
and piping systems which are a part of, of two shutoff valves, one of which
or used with, pile driving equipment shall be a quick-acting lever type with-
shall meet the applicable requirements in easy reach of the hammer operator.
of the American Society of Mechanical (12) Guys, outriggers, thrustouts, or
Engineers, Power Boilers (section I). counterbalances shall be provided as
(2) All pressure vessels which are a necessary to maintain stability of pile
part of, or used with, pile driving driver rigs.
equipment shall meet the applicable (b) Pile driving from barges and floats.
requirements of the American Society Barges or floats supporting pile driving
of Mechanical Engineers, Pressure Ves- operations shall meet the applicable
sels (section VIII). requirements of 1926.605.
(c) Pile driving equipment. (1) Engi-
(3) Overhead protection, which will
neers and winchmen shall accept sig-
not obscure the vision of the operator
nals only from the designated signal-
and which meets the requirements of
men.
subpart N of this part, shall be pro-
(2) All employees shall be kept clear
vided. Protection shall be the equiva-
when piling is being hoisted into the
lent of 2-inch planking or other solid
leads.
material of equivalent strength.
(3) When piles are being driven in an
(4) Stop blocks shall be provided for excavated pit, the walls of the pit shall
the leads to prevent the hammer from be sloped to the angle of repose or
being raised against the head block. sheet-piled and braced.
(5) A blocking device, capable of safe- (4) When steel tube piles are being
ly supporting the weight of the ham- blown out, employees shall be kept
mer, shall be provided for placement in well beyond the range of falling mate-
the leads under the hammer at all rials.
times while employees are working (5) When it is necessary to cut off the
under the hammer. tops of driven piles, pile driving oper-
(6) Guards shall be provided across ations shall be suspended except where
the top of the head block to prevent the cutting operations are located at
the cable from jumping out of the least twice the length of the longest
sheaves. pile from the driver.
(7) When the leads must be inclined (6) When driving jacked piles, all ac-
in the driving of batter piles, provi- cess pits shall be provided with ladders
sions shall be made to stabilize the and bulkheaded curbs to prevent mate-
leads. rial from falling into the pit.
(8) Fixed leads shall be provided with
ladder, and adequate rings, or similar 1926.604 Site clearing.
attachment points, so that the loft (a) General requirements. (1) Employ-
worker may engage his safety belt lan- ees engaged in site clearing shall be
yard to the leads. If the leads are pro- protected from hazards of irritant and
vided with loft platforms(s), such plat- toxic plants and suitably instructed in
form(s) shall be protected by standard the first aid treatment available.
guardrails. (2) All equipment used in site clear-
(9) Steam hose leading to a steam ing operations shall be equipped with
hammer or jet pipe shall be securely rollover guards meeting the require-
attached to the hammer with an ade- ments of this subpart. In addition,
quate length of at least 14-inch diame- rider-operated equipment shall be
ter chain or cable to prevent whipping equipped with an overhead and rear
in the event the joint at the hammer is canopy guard meeting the following re-
broken. Air hammer hoses shall be pro- quirements:

362

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00372 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.606

(i) The overhead covering on this so located that the load will not pass
canopy structure shall be of not less over employees.
than 18-inch steel plate or 14-inch (c) Working surfaces of barges. (1) Em-
woven wire mesh with openings no ployees shall not be permitted to walk
greater than 1 inch, or equivalent. along the sides of covered lighters or
(ii) The opening in the rear of the barges with coamings more than 5 feet
canopy structure shall be covered with high, unless there is a 3-foot clear
not less than 14-inch woven wire mesh walkway, or a grab rail, or a taut
with openings no greater than 1 inch. handline is provided.
(b) Specific requirements. [Reserved] (2) Decks and other working surfaces
1926.605 Marine operations and shall be maintained in a safe condition.
equipment. (3) Employees shall not be permitted
to pass fore and aft, over, or around
(a) Material handling operations. (1)
deckloads, unless there is a safe pas-
Operations fitting the definition of
sage.
material handling shall be per-
formed in conformance with applicable (4) Employees shall not be permitted
requirements of part 1918, Safety and to walk over deckloads from rail to
Health Regulations for Longshoring coaming unless there is a safe passage.
of this chapter. The term longshoring If it is necessary to stand at the out-
operations means the loading, unload- board or inboard edge of the deckload
ing, moving, or handling of construc- where less than 24 inches of bulwark,
tion materials, equipment and supplies, rail, coaming, or other protection ex-
etc. into, in, on, or out of any vessel ists, all employees shall be provided
from a fixed structure or shore-to-ves- with a suitable means of protection
sel, vessel-to-shore or fixed structure against falling from the deckload.
or vessel-to-vessel. (d) First-aid and lifesaving equipment.
(b) Access to barges. (1) Ramps for ac- (1) Provisions for rendering first aid
cess of vehicles to or between barges and medical assistance shall be in ac-
shall be of adequate strength, provided cordance with subpart D of this part.
with side boards, well maintained, and (2) The employer shall ensure that
properly secured. there is in the vicinity of each barge in
(2) Unless employees can step safely use at least one U.S. Coast Guard-ap-
to or from the wharf, float, barge, or proved 30-inch lifering with not less
river towboat, either a ramp, meeting than 90 feet of line attached, and at
the requirements of paragraph (b)(1) of least one portable or permanent ladder
this section, or a safe walkway, shall which will reach the top of the apron
be provided. to the surface of the water. If the above
(3) Jacobs ladders shall be of the equipment is not available at the pier,
double rung or flat tread type. They the employer shall furnish it during
shall be well maintained and properly the time that he is working the barge.
secured. (3) Employees walking or working on
(4) A Jacobs ladder shall either hang the unguarded decks of barges shall be
without slack from its lashings or be protected with U.S. Coast Guard-ap-
pulled up entirely. proved work vests or buoyant vests.
(5) When the upper end of the means (e) Commercial diving operations. Com-
of access rests on or is flush with the mercial diving operations shall be sub-
top of the bulwark, substantial steps ject to subpart T of part 1910,
properly secured and equipped with at 1910.4011910.441, of this chapter.
least one substantial hand rail approxi-
mately 33 inches in height, shall be [39 FR 22801, June 24, 1974, as amended at 42
provided between the top of the bul- FR 37674, July 22, 1977]
wark and the deck.
(6) Obstructions shall not be laid on 1926.606 Definitions applicable to
this subpart.
or across the gangway.
(7) The means of access shall be ade- (a) ApronThe area along the water-
quately illuminated for its full length. front edge of the pier or wharf.
(8) Unless the structure makes it im- (b) BulwarkThe side of a ship above
possible, the means of access shall be the upper deck.

363

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00373 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.650 29 CFR Ch. XVII (7112 Edition)

(c) CoamingThe raised frame, as system, and its sudden movement into
around a hatchway in the deck, to keep the excavation, either by falling or
out water. sliding, in sufficient quantity so that it
(d) Jacobs ladderA marine ladder of could entrap, bury, or otherwise injure
rope or chain with wooden or metal and immobilize a person.
rungs. Competent person means one who is
(e) Rail, for the purpose of 1926.605, capable of identifying existing and pre-
means a light structure serving as a dictable hazards in the surroundings,
guard at the outer edge of a ships or working conditions which are unsan-
deck. itary, hazardous, or dangerous to em-
ployees, and who has authorization to
Subpart PExcavations take prompt corrective measures to
eliminate them.
AUTHORITY: Sec. 107, Contract Worker Cross braces mean the horizontal
Hours and Safety Standards Act (Construc- members of a shoring system installed
tion Safety Act) (40 U.S.C. 333); Secs. 4, 6, 8, perpendicular to the sides of the exca-
Occupational Safety and Hea1th Act of 1970 vation, the ends of which bear against
(29 U.S.C. 653, 655, 657); Secretary of Labors either uprights or wales.
Order No. 1271 (36 FR 8754), 876 (41 FR
Excavation means any man-made cut,
25059), or 983 (48 FR 35736), as applicable, and
29 CFR part 1911. cavity, trench, or depression in an
earth surface, formed by earth re-
SOURCE: 54 FR 45959, Oct. 31, 1989, unless moval.
otherwise noted.
Faces or sides means the vertical or
1926.650 Scope, application, and defi- inclined earth surfaces formed as a re-
nitions applicable to this subpart. sult of excavation work.
(a) Scope and application. This sub- Failure means the breakage, displace-
part applies to all open excavations ment, or permanent deformation of a
made in the earths surface. Exca- structural member or connection so as
vations are defined to include trenches. to reduce its structural integrity and
(b) Definitions applicable to this sub- its supportive capabilities.
part. Hazardous atmosphere means an at-
Accepted engineering practices means mosphere which by reason of being ex-
those requirements which are compat- plosive, flammable, poisonous, corro-
ible with standards of practice required sive, oxidizing, irritating, oxygen defi-
by a registered professional engineer. cient, toxic, or otherwise harmful, may
Aluminum Hydraulic Shoring means a cause death, illness, or injury.
pre-engineered shoring system com- Kickout means the accidental release
prised of aluminum hydraulic cylinders or failure of a cross brace.
(crossbraces) used in conjunction with Protective system means a method of
vertical rails (uprights) or horizontal protecting employees from cave-ins,
rails (walers). Such system is designed, from material that could fall or roll
specifically to support the sidewalls of from an excavation face or into an ex-
an excavation and prevent cave-ins. cavation, or from the collapse of adja-
Bell-bottom pier hole means a type of cent structures. Protective systems in-
shaft or footing excavation, the bottom clude support systems, sloping and
of which is made larger than the cross benching systems, shield systems, and
section above to form a belled shape. other systems that provide the nec-
Benching (Benching system) means a essary protection.
method of protecting employees from Ramp means an inclined walking or
cave-ins by excavating the sides of an working surface that is used to gain ac-
excavation to form one or a series of cess to one point from another, and is
horizontal levels or steps, usually with constructed from earth or from struc-
vertical or near-vertical surfaces be- tural materials such as steel or wood.
tween levels. Registered Professional Engineer means
Cave-in means the separation of a a person who is registered as a profes-
mass of soil or rock material from the sional engineer in the state where the
side of an excavation, or the loss of soil work is to be performed. However, a
from under a trench shield or support professional engineer, registered in any

364

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00374 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.651

state is deemed to be a registered pro- cent structure, underground installa-


fessional engineer within the meaning tion, or the sides of an excavation.
of this standard when approving de- Tabulated data means tables and
signs for manufactured protective charts approved by a registered profes-
systems or tabulated data to be sional engineer and used to design and
used in interstate commerce. construct a protective system.
Sheeting means the members of a Trench (Trench excavation) means a
shoring system that retain the earth in narrow excavation (in relation to its
position and in turn are supported by length) made below the surface of the
other members of the shoring system. ground. In general, the depth is greater
Shield (Shield system) means a struc- than the width, but the width of a
ture that is able to withstand the
trench (measured at the bottom) is not
forces imposed on it by a cave-in and
greater than 15 feet (4.6 m). If forms or
thereby protect employees within the
other structures are installed or con-
structure. Shields can be permanent
structed in an excavation so as to re-
structures or can be designed to be
portable and moved along as work pro- duce the dimension measured from the
gresses. Additionally, shields can be ei- forms or structure to the side of the ex-
ther premanufactured or job-built in cavation to 15 feet (4.6 m) or less
accordance with 1926.652 (c)(3) or (measured at the bottom of the exca-
(c)(4). Shields used in trenches are usu- vation), the excavation is also consid-
ally referred to as trench boxes or ered to be a trench.
trench shields. Trench box. See Shield.
Shoring (Shoring system) means a Trench shield. See Shield.
structure such as a metal hydraulic, Uprights means the vertical members
mechanical or timber shoring system of a trench shoring system placed in
that supports the sides of an exca- contact with the earth and usually po-
vation and which is designed to prevent sitioned so that individual members do
cave-ins. not contact each other. Uprights
Sides. See Faces. placed so that individual members are
Sloping (Sloping system) means a closely spaced, in contact with or
method of protecting employees from interconnected to each other, are often
cave-ins by excavating to form sides of called sheeting.
an excavation that are inclined away Wales means horizontal members of a
from the excavation so as to prevent shoring system placed parallel to the
cave-ins. The angle of incline required excavation face whose sides bear
to prevent a cave-in varies with dif- against the vertical members of the
ferences in such factors as the soil shoring system or earth.
type, environmental conditions of ex-
posure, and application of surcharge 1926.651 Specific excavation require-
loads. ments.
Stable rock means natural solid min-
(a) Surface encumbrances. All surface
eral material that can be excavated
encumbrances that are located so as to
with vertical sides and will remain in-
create a hazard to employees shall be
tact while exposed. Unstable rock is
considered to be stable when the rock removed or supported, as necessary, to
material on the side or sides of the ex- safeguard employees.
cavation is secured against caving-in (b) Underground installations. (1) The
or movement by rock bolts or by an- estimated location of utility installa-
other protective system that has been tions, such as sewer, telephone, fuel,
designed by a registered professional electric, water lines, or any other un-
engineer. derground installations that reason-
Structural ramp means a ramp built of ably may be expected to be encoun-
steel or wood, usually used for vehicle tered during excavation work, shall be
access. Ramps made of soil or rock are determined prior to opening an exca-
not considered structural ramps. vation.
Support system means a structure (2) Utility companies or owners shall
such as underpinning, bracing, or shor- be contacted within established or cus-
ing, which provides support to an adja- tomary local response times, advised of

365

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00375 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.651 29 CFR Ch. XVII (7112 Edition)

the proposed work, and asked to estab- (d) Exposure to vehicular traffic. Em-
lish the location of the utility under- ployees exposed to public vehicular
ground installations prior to the start traffic shall be provided with, and shall
of actual excavation. When utility wear, warning vests or other suitable
companies or owners cannot respond to garments marked with or made of
a request to locate underground utility reflectorized or high-visibility mate-
installations within 24 hours (unless a rial.
longer period is required by state or (e) Exposure to falling loads. No em-
local law), or cannot establish the ployee shall be permitted underneath
exact location of these installations, loads handled by lifting or digging
the employer may proceed, provided equipment. Employees shall be re-
the employer does so with caution, and quired to stand away from any vehicle
provided detection equipment or other being loaded or unloaded to avoid being
acceptable means to locate utility in- struck by any spillage or falling mate-
stallations are used. rials. Operators may remain in the
(3) When excavation operations ap- cabs of vehicles being loaded or un-
proach the estimated location of under- loaded when the vehicles are equipped,
ground installations, the exact loca- in accordance with 1926.601(b)(6), to
tion of the installations shall be deter- provide adequate protection for the op-
mined by safe and acceptable means. erator during loading and unloading
(4) While the excavation is open, un- operations.
derground installations shall be pro- (f) Warning system for mobile equip-
tected, supported or removed as nec-
ment. When mobile equipment is oper-
essary to safeguard employees.
ated adjacent to an excavation, or
(c) Access and egress(1) Structural when such equipment is required to ap-
ramps. (i) Structural ramps that are proach the edge of an excavation, and
used solely by employees as a means of
the operator does not have a clear and
access or egress from excavations shall
direct view of the edge of the exca-
be designed by a competent person.
vation, a warning system shall be uti-
Structural ramps used for access or
lized such as barricades, hand or me-
egress of equipment shall be designed
by a competent person qualified in chanical signals, or stop logs. If pos-
structural design, and shall be con- sible, the grade should be away from
structed in accordance with the design. the excavation.
(ii) Ramps and runways constructed (g) Hazardous atmospheres(1) Testing
of two or more structural members and controls. In addition to the require-
shall have the structural members con- ments set forth in subparts D and E of
nected together to prevent displace- this part (29 CFR 1926.501926.107) to
ment. prevent exposure to harmful levels of
(iii) Structural members used for atmospheric contaminants and to as-
ramps and runways shall be of uniform sure acceptable atmospheric condi-
thickness. tions, the following requirements shall
(iv) Cleats or other appropriate apply:
means used to connect runway struc- (i) Where oxygen deficiency
tural members shall be attached to the (atmospheres containing less than 19.5
bottom of the runway or shall be at- percent oxygen) or a hazardous atmos-
tached in a manner to prevent tripping. phere exists or could reasonably be ex-
(v) Structural ramps used in lieu of pected to exist, such as in excavations
steps shall be provided with cleats or in landfill areas or excavations in areas
other surface treatments on the top where hazardous substances are stored
surface to prevent slipping. nearby, the atmospheres in the exca-
(2) Means of egress from trench exca- vation shall be tested before employees
vations. A stairway, ladder, ramp or enter excavations greater than 4 feet
other safe means of egress shall be lo- (1.22 m) in depth.
cated in trench excavations that are 4 (ii) Adequate precautions shall be
feet (1.22 m) or more in depth so as to taken to prevent employee exposure to
require no more than 25 feet (7.62 m) of atmospheres containing less than 19.5
lateral travel for employees. percent oxygen and other hazardous

366

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00376 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.651

atmospheres. These precautions in- (3) If excavation work interrupts the


clude providing proper respiratory pro- natural drainage of surface water (such
tection or ventilation in accordance as streams), diversion ditches, dikes, or
with subparts D and E of this part re- other suitable means shall be used to
spectively. prevent surface water from entering
(iii) Adequate precaution shall be the excavation and to provide adequate
taken such as providing ventilation, to drainage of the area adjacent to the ex-
prevent employee exposure to an at- cavation. Excavations subject to runoff
mosphere containing a concentration from heavy rains will require an in-
of a flammable gas in excess of 20 per- spection by a competent person and
cent of the lower flammable limit of compliance with paragraphs (h)(1) and
the gas. (h)(2) of this section.
(iv) When controls are used that are (i) Stability of adjacent structures. (1)
intended to reduce the level of atmos- Where the stability of adjoining build-
pheric contaminants to acceptable lev- ings, walls, or other structures is en-
els, testing shall be conducted as often dangered by excavation operations,
as necessary to ensure that the atmos- support systems such as shoring, brac-
phere remains safe. ing, or underpinning shall be provided
(2) Emergency rescue equipment. (i) to ensure the stability of such struc-
Emergency rescue equipment, such as tures for the protection of employees.
breathing apparatus, a safety harness (2) Excavation below the level of the
and line, or a basket stretcher, shall be base or footing of any foundation or re-
readily available where hazardous at- taining wall that could be reasonably
mospheric conditions exist or may rea- expected to pose a hazard to employees
sonably be expected to develop during shall not be permitted except when:
work in an excavation. This equipment (i) A support system, such as under-
shall be attended when in use. pinning, is provided to ensure the safe-
(ii) Employees entering bell-bottom ty of employees and the stability of the
pier holes, or other similar deep and structure; or
confined footing excavations, shall (ii) The excavation is in stable rock;
wear a harness with a life-line securely or
attached to it. The lifeline shall be sep- (iii) A registered professional engi-
arate from any line used to handle ma- neer has approved the determination
terials, and shall be individually at- that the structure is sufficently re-
tended at all times while the employee moved from the excavation so as to be
wearing the lifeline is in the exca- unaffected by the excavation activity;
vation. or
(h) Protection from hazards associated (iv) A registered professional engi-
with water accumulation. (1) Employees neer has approved the determination
shall not work in excavations in which that such excavation work will not
there is accumulated water, or in exca- pose a hazard to employees.
vations in which water is accumu- (3) Sidewalks, pavements, and appur-
lating, unless adequate precautions tenant structure shall not be under-
have been taken to protect employees mined unless a support system or an-
against the hazards posed by water ac- other method of protection is provided
cumulation. The precautions necessary to protect employees from the possible
to protect employees adequately vary collapse of such structures.
with each situation, but could include (j) Protection of employees from loose
special support or shield systems to rock or soil. (1) Adequate protection
protect from cave-ins, water removal shall be provided to protect employees
to control the level of accumulating from loose rock or soil that could pose
water, or use of a safety harness and a hazard by falling or rolling from an
lifeline. excavation face. Such protection shall
(2) If water is controlled or prevented consist of scaling to remove loose ma-
from accumulating by the use of water terial; installation of protective barri-
removal equipment, the water removal cades at intervals as necessary on the
equipment and operations shall be face to stop and contain falling mate-
monitored by a competent person to rial; or other means that provide equiv-
ensure proper operation. alent protection.

367

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00377 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.652 29 CFR Ch. XVII (7112 Edition)

(2) Employees shall be protected from (ii) Excavations are less than 5 feet
excavated or other materials or equip- (1.52m) in depth and examination of the
ment that could pose a hazard by fall- ground by a competent person provides
ing or rolling into excavations. Protec- no indication of a potential cave-in.
tion shall be provided by placing and (2) Protective systems shall have the
keeping such materials or equipment capacity to resist without failure all
at least 2 feet (.61 m) from the edge of loads that are intended or could rea-
excavations, or by the use of retaining sonably be expected to be applied or
devices that are sufficient to prevent transmitted to the system.
materials or equipment from falling or (b) Design of sloping and benching sys-
rolling into excavations, or by a com- tems. The slopes and configurations of
bination of both if necessary. sloping and benching systems shall be
(k) Inspections. (1) Daily inspections selected and constructed by the em-
of excavations, the adjacent areas, and ployer or his designee and shall be in
protective systems shall be made by a accordance with the requirements of
competent person for evidence of a sit- paragraph (b)(1); or, in the alternative,
uation that could result in possible paragraph (b)(2); or, in the alternative,
cave-ins, indications of failure of pro- paragraph (b)(3), or, in the alternative,
tective systems, hazardous paragraph (b)(4), as follows:
atmospheres, or other hazardous condi- (1) Option (1)Allowable configurations
tions. An inspection shall be conducted and slopes. (i) Excavations shall be
by the competent person prior to the sloped at an angle not steeper than one
start of work and as needed throughout and one-half horizontal to one vertical
the shift. Inspections shall also be (34 degrees measured from the hori-
made after every rainstorm or other zontal), unless the employer uses one
hazard increasing occurrence. These in- of the other options listed below.
spections are only required when em- (ii) Slopes specified in paragraph
ployee exposure can be reasonably an- (b)(1)(i) of this section, shall be exca-
ticipated. vated to form configurations that are
(2) Where the competent person finds in accordance with the slopes shown
evidence of a situation that could re- for Type C soil in appendix B to this
sult in a possible cave-in, indications subpart.
of failure of protective systems, haz- (2) Option (2)Determination of slopes
ardous atmospheres, or other haz- and configurations using Appendices A
ardous conditions, exposed employees and B. Maximum allowable slopes, and
shall be removed from the hazardous allowable configurations for sloping
area until the necessary precautions and benching systems, shall be deter-
have been taken to ensure their safety. mined in accordance with the condi-
(l) Walkways shall be provided where tions and requirements set forth in ap-
employees or equipment are required pendices A and B to this subpart.
or permitted to cross over excavations. (3) Option (3)Designs using other tab-
Guardrails which comply with ulated data. (i) Designs of sloping or
1926.502(b) shall be provided where benching systems shall be selected
walkways are 6 feet (1.8 m) or more from and be in accordance with tab-
above lower levels. ulated data, such as tables and charts.
(ii) The tabulated data shall be in
[54 FR 45959, Oct. 31, 1989, as amended by 59 written form and shall include all of
FR 40730, Aug. 9, 1994] the following:
(A) Identification of the parameters
1926.652 Requirements for protective that affect the selection of a sloping or
systems.
benching system drawn from such data;
(a) Protection of employees in exca- (B) Identification of the limits of use
vations. (1) Each employee in an exca- of the data, to include the magnitude
vation shall be protected from cave-ins and configuration of slopes determined
by an adequate protective system de- to be safe;
signed in accordance with paragraph (C) Explanatory information as may
(b) or (c) of this section except when: be necessary to aid the user in making
(i) Excavations are made entirely in a correct selection of a protective sys-
stable rock; or tem from the data.

368

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00378 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.652

(iii) At least one copy of the tab- protective systems that are drawn
ulated data which identifies the reg- from manufacturers tabulated data
istered professional engineer who ap- shall be in accordance with all speci-
proved the data, shall be maintained at fications, recommendations, and limi-
the jobsite during construction of the tations issued or made by the manufac-
protective system. After that time the turer.
data may be stored off the jobsite, but (ii) Deviation from the specifications,
a copy of the data shall be made avail- recommendations, and limitations
able to the Secretary upon request. issued or made by the manufacturer
(4) Option (4)Design by a registered shall only be allowed after the manu-
professional engineer. (i) Sloping and facturer issues specific written ap-
benching systems not utilizing Option proval.
(1) or Option (2) or Option (3) under (iii) Manufacturers specifications,
paragraph (b) of this section shall be recommendations, and limitations, and
approved by a registered professional manufacturers approval to deviate
engineer. from the specifications, recommenda-
(ii) Designs shall be in written form tions, and limitations shall be in writ-
and shall include at least the following: ten form at the jobsite during con-
(A) The magnitude of the slopes that struction of the protective system.
were determined to be safe for the par- After that time this data may be
ticular project; stored off the jobsite, but a copy shall
(B) The configurations that were de- be made available to the Secretary
termined to be safe for the particular upon request.
project; and (3) Option (3)Designs using other tab-
(C) The identity of the registered pro- ulated data. (i) Designs of support sys-
fessional engineer approving the de- tems, shield systems, or other protec-
sign. tive systems shall be selected from and
(iii) At least one copy of the design be in accordance with tabulated data,
shall be maintained at the jobsite such as tables and charts.
while the slope is being constructed. (ii) The tabulated data shall be in
After that time the design need not be written form and include all of the fol-
at the jobsite, but a copy shall be made lowing:
available to the Secretary upon re- (A) Identification of the parameters
quest. that affect the selection of a protective
(c) Design of support systems, shield system drawn from such data;
systems, and other protective systems. De- (B) Identification of the limits of use
signs of support systems shield sys- of the data;
tems, and other protective systems (C) Explanatory information as may
shall be selected and constructed by be necessary to aid the user in making
the employer or his designee and shall a correct selection of a protective sys-
be in accordance with the requirements tem from the data.
of paragraph (c)(1); or, in the alter- (iii) At least one copy of the tab-
native, paragraph (c)(2); or, in the al- ulated data, which identifies the reg-
ternative, paragraph (c)(3); or, in the istered professional engineer who ap-
alternative, paragraph (c)(4) as follows: proved the data, shall be maintained at
(1) Option (1)Designs using appen- the jobsite during construction of the
dices A, C and D. Designs for timber protective system. After that time the
shoring in trenches shall be determined data may be stored off the jobsite, but
in accordance with the conditions and a copy of the data shall be made avail-
requirements set forth in appendices A able to the Secretary upon request.
and C to this subpart. Designs for alu- (4) Option (4)Design by a registered
minum hydraulic shoring shall be in professional engineer. (i) Support sys-
accordance with paragraph (c)(2) of this tems, shield systems, and other protec-
section, but if manufacturers tab- tive systems not utilizing Option 1, Op-
ulated data cannot be utilized, designs tion 2 or Option 3, above, shall be ap-
shall be in accordance with appendix D. proved by a registered professional en-
(2) Option (2)Designs Using Manufac- gineer.
turers Tabulated Data. (i) Design of sup- (ii) Designs shall be in written form
port systems, shield systems, or other and shall include the following:

369

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00379 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.652 29 CFR Ch. XVII (7112 Edition)

(A) A plan indicating the sizes, types, stalling other structural members to
and configurations of the materials to carry the loads imposed on the support
be used in the protective system; and system.
(B) The identity of the registered (v) Removal shall begin at, and
professional engineer approving the de- progress from, the bottom of the exca-
sign. vation. Members shall be released slow-
(iii) At least one copy of the design ly so as to note any indication of pos-
shall be maintained at the jobsite dur- sible failure of the remaining members
ing construction of the protective sys- of the structure or possible cave-in of
tem. After that time, the design may the sides of the excavation.
be stored off the jobsite, but a copy of (vi) Backfilling shall progress to-
the design shall be made available to gether with the removal of support sys-
the Secretary upon request. tems from excavations.
(d) Materials and equipment. (1) Mate- (2) Additional requirements for support
rials and equipment used for protective systems for trench excavations. (i) Exca-
systems shall be free from damage or vation of material to a level no greater
defects that might impair their proper than 2 feet (.61 m) below the bottom of
function. the members of a support system shall
(2) Manufactured materials and be permitted, but only if the system is
equipment used for protective systems designed to resist the forces calculated
shall be used and maintained in a man- for the full depth of the trench, and
ner that is consistent with the rec- there are no indications while the
ommendations of the manufacturer, trench is open of a possible loss of soil
and in a manner that will prevent em- from behind or below the bottom of the
ployee exposure to hazards. support system.
(3) When material or equipment that (ii) Installation of a support system
is used for protective systems is dam- shall be closely coordinated with the
aged, a competent person shall exam- excavation of trenches.
ine the material or equipment and (f) Sloping and benching systems. Em-
evaluate its suitability for continued ployees shall not be permitted to work
use. If the competent person cannot as- on the faces of sloped or benched exca-
sure the material or equipment is able vations at levels above other employ-
to support the intended loads or is oth- ees except when employees at the lower
erwise suitable for safe use, then such levels are adequately protected from
material or equipment shall be re- the hazard of falling, rolling, or sliding
moved from service, and shall be evalu- material or equipment.
ated and approved by a registered pro- (g) Shield systems(1) General. (i)
fessional engineer before being re- Shield systems shall not be subjected
turned to service. to loads exceeding those which the sys-
(e) Installation and removal of sup- tem was designed to withstand.
port(1) General. (i) Members of sup- (ii) Shields shall be installed in a
port systems shall be securely con- manner to restrict lateral or other haz-
nected together to prevent sliding, fall- ardous movement of the shield in the
ing, kickouts, or other predictable fail- event of the application of sudden lat-
ure. eral loads.
(ii) Support systems shall be in- (iii) Employees shall be protected
stalled and removed in a manner that from the hazard of cave-ins when enter-
protects employees from cave-ins, ing or exiting the areas protected by
structural collapses, or from being shields.
struck by members of the support sys- (iv) Employees shall not be allowed
tem. in shields when shields are being in-
(iii) Individual members of support stalled, removed, or moved vertically.
systems shall not be subjected to loads (2) Additional requirement for shield
exceeding those which those members systems used in trench excavations. Exca-
were designed to withstand. vations of earth material to a level not
(iv) Before temporary removal of in- greater than 2 feet (.61 m) below the
dividual members begins, additional bottom of a shield shall be permitted,
precautions shall be taken to ensure but only if the shield is designed to re-
the safety of employees, such as in- sist the forces calculated for the full

370

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00380 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. P, App. A

depth of the trench, and there are no strength. Some moist granular soils exhibit
indications while the trench is open of apparent cohesion. Granular soil cannot be
a possible loss of soil from behind or molded when moist and crumbles easily
when dry.
below the bottom of the shield. Layered system means two or more dis-
tinctly different soil or rock types arranged
APPENDIX A TO SUBPART P OF PART in layers. Micaceous seams or weakened
1926SOIL CLASSIFICATION planes in rock or shale are considered lay-
ered.
(a) Scope and application(1) Scope. This
Moist soil means a condition in which a soil
appendix describes a method of classifying
looks and feels damp. Moist cohesive soil can
soil and rock deposits based on site and envi-
easily be shaped into a ball and rolled into
ronmental conditions, and on the structure
small diameter threads before crumbling.
and composition of the earth deposits. The
Moist granular soil that contains some cohe-
appendix contains definitions, sets forth re- sive material will exhibit signs of cohesion
quirements, and describes acceptable visual between particles.
and manual tests for use in classifying soils. Plastic means a property of a soil which al-
(2) Application. This appendix applies when lows the soil to be deformed or molded with-
a sloping or benching system is designed in out cracking, or appreciable volume change.
accordance with the requirements set forth Saturated soil means a soil in which the
in 1926.652(b)(2) as a method of protection voids are filled with water. Saturation does
for employees from cave-ins. This appendix not require flow. Saturation, or near satura-
also applies when timber shoring for exca- tion, is necessary for the proper use of in-
vations is designed as a method of protection struments such as a pocket penetrometer or
from cave-ins in accordance with appendix C sheer vane.
to subpart P of part 1926, and when alu- Soil classification system means, for the pur-
minum hydraulic shoring is designed in ac- pose of this subpart, a method of catego-
cordance with appendix D. This appendix rizing soil and rock deposits in a hierarchy
also applies if other protective systems are of Stable Rock, Type A, Type B, and Type C,
designed and selected for use from data pre- in decreasing order of stability. The cat-
pared in accordance with the requirements egories are determined based on an analysis
set forth in 1926.652(c), and the use of the of the properties and performance character-
data is predicated on the use of the soil clas- istics of the deposits and the environmental
sification system set forth in this appendix. conditions of exposure.
(b) Definitions. The definitions and exam- Stable rock means natural solid mineral
ples given below are based on, in whole or in matter that can be excavated with vertical
part, the following: American Society for sides and remain intact while exposed.
Testing Materials (ASTM) Standards D65385 Submerged soil means soil which is under-
and D2488; The Unified Soils Classification water or is free seeping.
System, The U.S. Department of Agriculture Type A means cohesive soils with an
(USDA) Textural Classification Scheme; and unconfined compressive strength of 1.5 ton
The National Bureau of Standards Report per square foot (tsf) (144 kPa) or greater. Ex-
BSS121. amples of cohesive soils are: clay, silty clay,
Cemented soil means a soil in which the par- sandy clay, clay loam and, in some cases,
ticles are held together by a chemical agent, silty clay loam and sandy clay loam. Ce-
such as calcium carbonate, such that a hand- mented soils such as caliche and hardpan are
size sample cannot be crushed into powder or also considered Type A. However, no soil is
individual soil particles by finger pressure. Type A if:
Cohesive soil means clay (fine grained soil), (i) The soil is fissured; or
or soil with a high clay content, which has (ii) The soil is subject to vibration from
cohesive strength. Cohesive soil does not heavy traffic, pile driving, or similar effects;
crumble, can be excavated with vertical or
sideslopes, and is plastic when moist. Cohe- (iii) The soil has been previously disturbed;
sive soil is hard to break up when dry, and or
exhibits significant cohesion when sub- (iv) The soil is part of a sloped, layered
merged. Cohesive soils include clayey silt, system where the layers dip into the exca-
sandy clay, silty clay, clay and organic clay. vation on a slope of four horizontal to one
Dry soil means soil that does not exhibit vertical (4H:1V) or greater; or
visible signs of moisture content. (v) The material is subject to other factors
Fissured means a soil material that has a that would require it to be classified as a less
tendency to break along definite planes of stable material.
fracture with little resistance, or a material Type B means:
that exhibits open cracks, such as tension (i) Cohesive soil with an unconfined com-
cracks, in an exposed surface. pressive strength greater than 0.5 tsf (48
Granular soil means gravel, sand, or silt, kPa) but less than 1.5 tsf (144 kPa); or
(coarse grained soil) with little or no clay (ii) Granular cohesionless soils including:
content. Granular soil has no cohesive angular gravel (similar to crushed rock),

371

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00381 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. P, App. A 29 CFR Ch. XVII (7112 Edition)
silt, silt loam, sandy loam and, in some (4) Layered systems. In a layered system,
cases, silty clay loam and sandy clay loam. the system shall be classified in accordance
(iii) Previously disturbed soils except those with its weakest layer. However, each layer
which would otherwise be classed as Type C may be classified individually where a more
soil. stable layer lies under a less stable layer.
(iv) Soil that meets the unconfined com- (5) Reclassification. If, after classifying a de-
pressive strength or cementation require- posit, the properties, factors, or conditions
ments for Type A, but is fissured or subject affecting its classification change in any
to vibration; or way, the changes shall be evaluated by a
(v) Dry rock that is not stable; or competent person. The deposit shall be re-
(vi) Material that is part of a sloped, lay- classified as necessary to reflect the changed
ered system where the layers dip into the ex- circumstances.
cavation on a slope less steep than four hori- (d) Acceptable visual and manual tests(1)
zontal to one vertical (4H:1V), but only if the Visual tests. Visual analysis is conducted to
material would otherwise be classified as determine qualitative information regarding
Type B. the excavation site in general, the soil adja-
Type C means: cent to the excavation, the soil forming the
(i) Cohesive soil with an unconfined com- sides of the open excavation, and the soil
pressive strength of 0.5 tsf (48 kPa) or less; or taken as samples from excavated material.
(ii) Granular soils including gravel, sand, (i) Observe samples of soil that are exca-
and loamy sand; or vated and soil in the sides of the excavation.
(iii) Submerged soil or soil from which Estimate the range of particle sizes and the
water is freely seeping; or relative amounts of the particle sizes. Soil
(iv) Submerged rock that is not stable, or that is primarily composed of fine-grained
(v) Material in a sloped, layered system material is cohesive material. Soil composed
where the layers dip into the excavation or a primarily of coarse-grained sand or gravel is
slope of four horizontal to one vertical granular material.
(4H:1V) or steeper. (ii) Observe soil as it is excavated. Soil
Unconfined compressive strength means the that remains in clumps when excavated is
load per unit area at which a soil will fail in cohesive. Soil that breaks up easily and does
compression. It can be determined by labora- not stay in clumps is granular.
tory testing, or estimated in the field using (iii) Observe the side of the opened exca-
a pocket penetrometer, by thumb penetra- vation and the surface area adjacent to the
tion tests, and other methods. excavation. Crack-like openings such as ten-
Wet soil means soil that contains signifi- sion cracks could indicate fissured material.
cantly more moisture than moist soil, but in If chunks of soil spall off a vertical side, the
such a range of values that cohesive material soil could be fissured. Small spalls are evi-
will slump or begin to flow when vibrated. dence of moving ground and are indications
Granular material that would exhibit cohe- of potentially hazardous situations.
sive properties when moist will lose those co- (iv) Observe the area adjacent to the exca-
hesive properties when wet. vation and the excavation itself for evidence
(c) Requirements(1) Classification of soil of existing utility and other underground
and rock deposits. Each soil and rock deposit structures, and to identify previously dis-
shall be classified by a competent person as turbed soil.
Stable Rock, Type A, Type B, or Type C in (v) Observe the opened side of the exca-
accordance with the definitions set forth in vation to identify layered systems. Examine
paragraph (b) of this appendix. layered systems to identify if the layers
(2) Basis of classification. The classification slope toward the excavation. Estimate the
of the deposits shall be made based on the re- degree of slope of the layers.
sults of at least one visual and at least one (vi) Observe the area adjacent to the exca-
manual analysis. Such analyses shall be con- vation and the sides of the opened exca-
ducted by a competent person using tests de- vation for evidence of surface water, water
scribed in paragraph (d) below, or in other seeping from the sides of the excavation, or
recognized methods of soil classification and the location of the level of the water table.
testing such as those adopted by the Amer- (vii) Observe the area adjacent to the exca-
ica Society for Testing Materials, or the U.S. vation and the area within the excavation
Department of Agriculture textural classi- for sources of vibration that may affect the
fication system. stability of the excavation face.
(3) Visual and manual analyses. The visual (2) Manual tests. Manual analysis of soil
and manual analyses, such as those noted as samples is conducted to determine quan-
being acceptable in paragraph (d) of this ap- titative as well as qualitative properties of
pendix, shall be designed and conducted to soil and to provide more information in
provide sufficient quantitative and quali- order to classify soil properly.
tative information as may be necessary to (i) Plasticity. Mold a moist or wet sample of
identify properly the properties, factors, and soil into a ball and attempt to roll it into
conditions affecting the classification of the threads as thin as 18-inch in diameter. Cohe-
deposits. sive material can be successfully rolled into

372

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00382 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. P, App. B
threads without crumbling. For example, if the two, pulverize the dried clumps of the
at least a two inch (50 mm) length of 18-inch sample by hand or by stepping on them. If
thread can be held on one end without tear- the clumps do not pulverize easily, the mate-
ing, the soil is cohesive. rial is cohesive with fissures. If they pul-
(ii) Dry strength. If the soil is dry and verize easily into very small fragments, the
crumbles on its own or with moderate pres- material is granular.
sure into individual grains or fine powder, it
is granular (any combination of gravel, sand, APPENDIX B TO SUBPART P OF PART
or silt). If the soil is dry and falls into 1926SLOPING AND BENCHING
clumps which break up into smaller clumps,
but the smaller clumps can only be broken (a) Scope and application. This appendix
up with difficulty, it may be clay in any contains specifications for sloping and
combination with gravel, sand or silt. If the benching when used as methods of protecting
dry soil breaks into clumps which do not employees working in excavations from
break up into small clumps and which can cave-ins. The requirements of this appendix
only be broken with difficulty, and there is apply when the design of sloping and bench-
no visual indication the soil is fissured, the ing protective systems is to be performed in
soil may be considered unfissured. accordance with the requirements set forth
(iii) Thumb penetration. The thumb penetra- in 1926.652(b)(2).
tion test can be used to estimate the (b) Definitions.
unconfined compressive strength of cohesive Actual slope means the slope to which an
soils. (This test is based on the thumb pene- excavation face is excavated.
tration test described in American Society Distress means that the soil is in a condi-
for Testing and Materials (ASTM) Standard tion where a cave-in is imminent or is likely
designation D2488Standard Recommended to occur. Distress is evidenced by such phe-
Practice for Description of Soils (Visual nomena as the development of fissures in the
Manual Procedure).) Type A soils with an face of or adjacent to an open excavation;
unconfined compressive strength of 1.5 tsf the subsidence of the edge of an excavation;
can be readily indented by the thumb; how- the slumping of material from the face or
ever, they can be penetrated by the thumb the bulging or heaving of material from the
only with very great effort. Type C soils with bottom of an excavation; the spalling of ma-
an unconfined compressive strength of 0.5 tsf terial from the face of an excavation; and
can be easily penetrated several inches by ravelling, i.e., small amounts of material
the thumb, and can be molded by light finger such as pebbles or little clumps of material
pressure. This test should be conducted on suddenly separating from the face of an exca-
an undisturbed soil sample, such as a large vation and trickling or rolling down into the
clump of spoil, as soon as practicable after excavation.
excavation to keep to a miminum the effects Maximum allowable slope means the steep-
of exposure to drying influences. If the exca- est incline of an excavation face that is ac-
vation is later exposed to wetting influences ceptable for the most favorable site condi-
(rain, flooding), the classification of the soil tions as protection against cave-ins, and is
must be changed accordingly. expressed as the ratio of horizontal distance
(iv) Other strength tests. Estimates of to vertical rise (H:V).
unconfined compressive strength of soils can Short term exposure means a period of time
also be obtained by use of a pocket pene- less than or equal to 24 hours that an exca-
trometer or by using a hand-operated vation is open.
shearvane. (c) Requirements(1) Soil classification. Soil
(v) Drying test. The basic purpose of the and rock deposits shall be classified in ac-
drying test is to differentiate between cohe- cordance with appendix A to subpart P of
sive material with fissures, unfissured cohe- part 1926.
sive material, and granular material. The (2) Maximum allowable slope. The maximum
procedure for the drying test involves drying allowable slope for a soil or rock deposit
a sample of soil that is approximately one shall be determined from Table B1 of this
inch thick (2.54 cm) and six inches (15.24 cm) appendix.
in diameter until it is thoroughly dry: (3) Actual slope. (i) The actual slope shall
(A) If the sample develops cracks as it not be steeper than the maximum allowable
dries, significant fissures are indicated. slope.
(B) Samples that dry without cracking are (ii) The actual slope shall be less steep
to be broken by hand. If considerable force is than the maximum allowable slope, when
necessary to break a sample, the soil has sig- there are signs of distress. If that situation
nificant cohesive material content. The soil occurs, the slope shall be cut back to an ac-
can be classified as a unfissured cohesive ma- tual slope which is at least 12 horizontal to
terial and the unconfined compressive one vertical (12H:1V) less steep than the
strength should be determined. maximum allowable slope.
(C) If a sample breaks easily by hand, it is (iii) When surcharge loads from stored ma-
either a fissured cohesive material or a terial or equipment, operating equipment, or
granular material. To distinguish between traffic are present, a competent person shall

373

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00383 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. P, App. B 29 CFR Ch. XVII (7112 Edition)
determine the degree to which the actual adjacent structures shall be evaluated in ac-
slope must be reduced below the maximum cordance with 1926.651(i).
allowable slope, and shall assure that such (4) Configurations. Configurations of slop-
reduction is achieved. Surcharge loads from ing and benching systems shall be in accord-
ance with Figure B1.

Figure B1

Slope Configurations
(All slopes stated below are in the horizontal to vertical ratio)

B1.1 Excavations made in Type A soil.


1. All simple slope excavation 20 feet or less in depth shall have a maximum allowable slope
of 34:1.

SIMPLE SLOPEGENERAL
EC30OC91.017</GPH>

Exception: Simple slope excavations which are open 24 hours or less (short term) and which
are 12 feet or less in depth shall have a maximum allowable slope of 12:1.

374
EC30OC91.016</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00384 Fmt 8010 Sfmt 8026 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. P, App. B

SIMPLE SLOPESHORT TERM


2. All benched excavations 20 feet or less in depth shall have a maximum allowable slope
of 34 to 1 and maximum bench dimensions as follows:

SIMPLE BENCH

EC30OC91.019</GPH> EC30OC91.020</GPH>

MULTIPLE BENCH
3. All excavations 8 feet or less in depth which have unsupported vertically sided lower por-
tions shall have a maximum vertical side of 312 feet.

375
EC30OC91.018</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00385 Fmt 8010 Sfmt 8026 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. P, App. B 29 CFR Ch. XVII (7112 Edition)

UNSUPPORTED VERTICALLY SIDED LOWER PORTIONMAXIMUM 8 FEET IN DEPTH


All excavations more than 8 feet but not more than 12 feet in depth which unsupported
vertically sided lower portions shall have a maximum allowable slope of 1:1 and a maximum
vertical side of 312 feet.

UNSUPPORTED VERTICALLY SIDED LOWER PORTIONMAXIMUM 12 FEET IN DEPTH


All excavations 20 feet or less in depth which have vertically sided lower portions that are
supported or shielded shall have a maximum allowable slope of 34:1. The support or shield sys-
tem must extend at least 18 inches above the top of the vertical side.

EC30OC91.022</GPH> EC30OC91.023</GPH>

SUPPORTED OR SHIELDED VERTICALLY SIDED LOWER PORTION


4. All other simple slope, compound slope, and vertically sided lower portion excavations
shall be in accordance with the other options permitted under 1926.652(b).

376
EC30OC91.021</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00386 Fmt 8010 Sfmt 8026 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. P, App. B
B1.2 Excavations Made in Type B Soil
1. All simple slope excavations 20 feet or less in depth shall have a maximum allowable
slope of 1:1.

SIMPLE SLOPE
2. All benched excavations 20 feet or less in depth shall have a maximum allowable slope
of 1:1 and maximum bench dimensions as follows:

SINGLE BENCH

EC30OC91.025</GPH> EC30OC91.026</GPH>

MULTIPLE BENCH
3. All excavations 20 feet or less in depth which have vertically sided lower portions shall
be shielded or supported to a height at least 18 inches above the top of the vertical side. All
such excavations shall have a maximum allowable slope of 1:1.

377
EC30OC91.024</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00387 Fmt 8010 Sfmt 8026 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. P, App. B 29 CFR Ch. XVII (7112 Edition)

VERTICALLY SIDED LOWER PORTION


4. All other sloped excavations shall be in accordance with the other options permitted in
1926.652(b).

B1.3 Excavations Made in Type C Soil


1. All simple slope excavations 20 feet or less in depth shall have a maximum allowable
slope of 112:1.

SIMPLE SLOPE
2. All excavations 20 feet or less in depth which have vertically sided lower portions shall
be shielded or supported to a height at least 18 inches above the top of the vertical side. All
such excavations shall have a maximum allowable slope of 112:1.

EC30OC91.028</GPH> EC30OC91.029</GPH>

VERTICAL SIDED LOWER PORTION


3. All other sloped excavations shall be in accordance with the other options permitted in
1926.652(b).

378
EC30OC91.027</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00388 Fmt 8010 Sfmt 8026 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. P, App. B
B1.4 Excavations Made in Layered Soils
1. All excavations 20 feet or less in depth made in layered soils shall have a maximum al-
lowable slope for each layer as set forth below.

379
EC30OC91.030</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00389 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. P, App. C 29 CFR Ch. XVII (7112 Edition)

2. All other sloped excavations shall be in accordance with the other options permitted in
1926.652(b).

APPENDIX C TO SUBPART P OF PART (b) Soil Classification. In order to use the


1926TIMBER SHORING FOR TRENCHES data presented in this appendix, the soil type
or types in which the excavation is made
(a) Scope. This appendix contains informa- must first be determined using the soil clas-
tion that can be used timber shoring is pro- sification method set forth in appendix A of
vided as a method of protection from cave- subpart P of this part.
ins in trenches that do not exceed 20 feet (6.1 (c) Presentation of Information. Information
m) in depth. This appendix must be used is presented in several forms as follows:
when design of timber shoring protective (1) Information is presented in tabular
systems is to be performed in accordance form in Tables C1.1, C1.2, and C1.3, and Ta-
with 1926.652(c)(1). Other timber shoring bles C2.1, C2.2 and C2.3 following para-
configurations; other systems of support graph (g) of the appendix. Each table pre-
such as hydraulic and pneumatic systems; sents the minimum sizes of timber members
and other protective systems such as slop- to use in a shoring system, and each table
ing, benching, shielding, and freezing sys- contains data only for the particular soil
tems must be designed in accordance with type in which the excavation or portion of
the requirements set forth in 1926.652(b) and
1926.652(c).

380
EC30OC91.031</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00390 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. P, App. C
the excavation is made. The data are ar- (B) When vertical loads imposed on cross
ranged to allow the user the flexibility to se- braces exceed a 240-pound gravity load dis-
lect from among several acceptable configu- tributed on a one-foot section of the center
rations of members based on varying the of the crossbrace.
horizontal spacing of the crossbraces. Stable (C) When surcharge loads are present from
rock is exempt from shoring requirements equipment weighing in excess of 20,000
and therefore, no data are presented for this pounds.
condition. (D) When only the lower portion of a
(2) Information concerning the basis of the trench is shored and the remaining portion
tabular data and the limitations of the data of the trench is sloped or benched unless:
is presented in paragraph (d) of this appen- The sloped portion is sloped at an angle less
dix, and on the tables themselves. steep than three horizontal to one vertical;
(3) Information explaining the use of the or the members are selected from the tables
tabular data is presented in paragraph (e) of for use at a depth which is determined from
this appendix. the top of the overall trench, and not from
(4) Information illustrating the use of the the toe of the sloped portion.
tabular data is presented in paragraph (f) of (e) Use of Tables. The members of the shor-
this appendix.
ing system that are to be selected using this
(5) Miscellaneous notations regarding Ta-
information are the cross braces, the
bles C1.1 through C1.3 and Tables C2.1
uprights, and the wales, where wales are re-
through C2.3 are presented in paragraph (g)
quired. Minimum sizes of members are speci-
of this Appendix.
fied for use in different types of soil. There
(d) Basis and limitations of the data(1) Di-
are six tables of information, two for each
mensions of timber members. (i) The sizes of the
soil type. The soil type must first be deter-
timber members listed in Tables C1.1
through C1.3 are taken from the National mined in accordance with the soil classifica-
Bureau of Standards (NBS) report, Rec- tion system described in appendix A to sub-
ommended Technical Provisions for Con- part P of part 1926. Using the appropriate
struction Practice in Shoring and Sloping of table, the selection of the size and spacing of
Trenches and Excavations. In addition, the members is then made. The selection is
where NBS did not recommend specific sizes based on the depth and width of the trench
of members, member sizes are based on an where the members are to be installed and,
analysis of the sizes required for use by ex- in most instances, the selection is also based
isting codes and on empirical practice. on the horizontal spacing of the crossbraces.
(ii) The required dimensions of the mem- Instances where a choice of horizontal spac-
bers listed in Tables C1.1 through C1.3 refer ing of crossbracing is available, the hori-
to actual dimensions and not nominal di- zontal spacing of the crossbraces must be
mensions of the timber. Employers wanting chosen by the user before the size of any
to use nominal size shoring are directed to member can be determined. When the soil
Tables C2.1 through C2.3, or have this type, the width and depth of the trench, and
choice under 1926.652(c)(3), and are referred the horizontal spacing of the crossbraces are
to The Corps of Engineers, The Bureau of known, the size and vertical spacing of the
Reclamation or data from other acceptable crossbraces, the size and vertical spacing of
sources. the wales, and the size and horizontal spac-
(2) Limitation of application. (i) It is not in- ing of the uprights can be read from the ap-
tended that the timber shoring specification propriate table.
apply to every situation that may be experi- (f) Examples to Illustrate the Use of Tables C
enced in the field. These data were developed 1.1 through C1.3.
to apply to the situations that are most (1) Example 1.
commonly experienced in current trenching A trench dug in Type A soil is 13 feet deep
practice. Shoring systems for use in situa- and five feet wide.
tions that are not covered by the data in this From Table C1.1, for acceptable arrange-
appendix must be designed as specified in ments of timber can be used.
1926.652(c).
(ii) When any of the following conditions Arrangement #B1
are present, the members specified in the ta- Space 44 crossbraces at six feet hori-
bles are not considered adequate. Either an zontally and four feet vertically.
alternate timber shoring system must be de-
Wales are not required.
signed or another type of protective system
Space 38 uprights at six feet horizontally.
designed in accordance with 1926.652.
(A) When loads imposed by structures or This arrangement is commonly called skip
by stored material adjacent to the trench shoring.
weigh in excess of the load imposed by a two- Arrangement #B2
foot soil surcharge. The term adjacent as
used here means the area within a horizontal Space 46 crossbraces at eight feet hori-
distance from the edge of the trench equal to zontally and four feet vertically.
the depth of the trench. Space 88 wales at four feet vertically.

381

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00391 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. P, App. C 29 CFR Ch. XVII (7112 Edition)
Space 26 uprights at four feet hori- Space 1212 wales at five feet vertically.
zontally. Position 26 uprights in a close sheeting
configuration unless water pressure must be
Arrangement #B3 resisted. Tight sheeting must be used where
Space 66 crossbraces at 10 feet hori- water must be retained.
zontally and four feet vertically. (4) Example 4.
Space 810 wales at four feet vertically. A trench dug in Type C soil is 20 feet deep
Space 26 uprights at five feet hori- and 11 feet wide. The size and spacing of
zontally. members for the section of trench that is
over 15 feet in depth is determined using
Arrangement #B4
Table C1.3. Only one arrangement of mem-
Space 66 crossbraces at 12 feet hori- bers is provided.
zontally and four feet vertically. Space 810 crossbraces at six feet hori-
Space 1010 wales at four feet vertically. zontally and five feet vertically.
Spaces 38 uprights at six feet hori- Space 1212 wales at five feet vertically.
zontally.
Use 36 tight sheeting.
(2) Example 2.
A trench dug in Type B soil in 13 feet deep Use of Tables C2.1 through C2.3 would fol-
and five feet wide. From Table C1.2 three low the same procedures.
acceptable arrangements of members are (g) Notes for all Tables.
listed. 1. Member sizes at spacings other than in-
dicated are to be determined as specified in
Arrangement #B1 1926.652(c), Design of Protective Systems.
Space 66 crossbraces at six feet hori- 2. When conditions are saturated or sub-
zontally and five feet vertically. merged use Tight Sheeting. Tight Sheeting
Space 88 wales at five feet vertically. refers to the use of specially-edged timber
Space 26 uprights at two feet hori- planks (e.g., tongue and groove) at least
zontally. three inches thick, steel sheet piling, or
similar construction that when driven or
Arrangement #B2 placed in position provide a tight wall to re-
Space 68 crossbraces at eight feet hori- sist the lateral pressure of water and to pre-
zontally and five feet vertically. vent the loss of backfill material. Close
Space 1010 wales at five feet vertically. Sheeting refers to the placement of planks
Space 26 uprights at two feet hori- side-by-side allowing as little space as pos-
zontally. sible between them.
3. All spacing indicated is measured center
Arrangement #B3 to center.
Space 88 crossbraces at 10 feet hori- 4. Wales to be installed with greater di-
zontally and five feet vertically. mension horizontal.
Space 1012 wales at five feet vertically. 5. If the vertical distance from the center
Space 26 uprights at two feet vertically. of the lowest crossbrace to the bottom of the
(3) Example 3. trench exceeds two and one-half feet,
A trench dug in Type C soil is 13 feet deep uprights shall be firmly embedded or a
and five feet wide. mudsill shall be used. Where uprights are
From Table C1.3 two acceptable arrange- embedded, the vertical distance from the
ments of members can be used. center of the lowest crossbrace to the bot-
tom of the trench shall not exceed 36 inches.
Arrangement #B1 When mudsills are used, the vertical dis-
Space 88 crossbraces at six feet hori- tance shall not exceed 42 inches. Mudsills are
zontally and five feet vertically. wales that are installed at the toe of the
Space 1012 wales at five feet vertically. trench side.
Position 26 uprights as closely together as 6. Trench jacks may be used in lieu of or in
possible. combination with timber crossbraces.
If water must be retained use special 7. Placement cf crossbraces. When the
tongue and groove uprights to form tight vertical spacing of crossbraces is four feet,
sheeting. place the top crossbrace no more than two
feet below the top of the trench. When the
Arrangement #B2
vertical spacing of crossbraces is five feet,
Space 810 crossbraces at eight feet hori- place the top crossbrace no more than 2.5
zontally and five feet vertically. feet below the top of the trench.

382

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00392 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. P, App. C

383
EC30OC91.032</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00393 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. P, App. C 29 CFR Ch. XVII (7112 Edition)

384
EC30OC91.033</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00394 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. P, App. C

385
EC30OC91.034</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00395 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. P, App. C 29 CFR Ch. XVII (7112 Edition)

386
EC30OC91.035</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00396 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. P, App. C

387
EC30OC91.036</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00397 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. P, App. D 29 CFR Ch. XVII (7112 Edition)

APPENDIX D TO SUBPART P OF PART do not exceed 20 feet (6.1m) in depth. This ap-
1926ALUMINUM HYDRAULIC SHOR- pendix must be used when design of the alu-
ING FOR TRENCHES minum hydraulic protective system cannot
be performed in accordance with
(a) Scope. This appendix contains informa- 1926.652(c)(2).
tion that can be used when aluminum hy- (b) Soil Classification. In order to use data
draulic shoring is provided as a method of presented in this appendix, the soi1 type or
protection against cave-ins in trenches that types in which the excavation is made must

388
EC30OC91.037</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00398 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. P, App. D
first be determined using the soil classifica- bles are not considered adequate. In this
tion method set forth in appendix A of sub- case, an alternative aluminum hydraulic
part P of part 1926. shoring system or other type of protective
(c) Presentation of Information. Information system must be designed in accordance with
is presented in several forms as follows: 1926.652.
(1) Information is presented in tabular (A) When vertical loads imposed on cross
form in Tables D1.1, D1.2, D1.3 and E1.4. braces exceed a 100 Pound gravity load dis-
Each table presents the maximum vertical tributed on a one foot section of the center
and horizontal spacings that may be used of the hydraulic cylinder.
with various aluminum member sizes and (B) When surcharge loads are present from
various hydraulic cylinder sizes. Each table equipment weighing in excess of 20,000
contains data only for the particular soil pounds.
type in which the excavation or portion of (C) When only the lower portion or a
the excavation is made. Tables D1.1 and D trench is shored and the remaining portion
1.2 are for vertical shores in Types A and B of the trench is sloped or benched unless:
soil. Tables D1.3 and D1.4 are for horizontal The sloped portion is sloped at an angle less
waler systems in Types B and C soil. steep than three horizontal to one vertical;
(2) Information concerning the basis of the or the members are selected from the tables
tabular data and the limitations of the data for use at a depth which is determined from
is presented in paragraph (d) of this appen- the top of the overall trench, and not from
dix. the toe of the sloped portion.
(3) Information explaining the use of the (e) Use of Tables D1.1, D1.2, D1.3 and D
tabular data is presented in paragraph (e) of 1.4. The members of the shoring system that
this appendix. are to be selected using this information are
(4) Information illustrating the use of the the hydraulic cylinders, and either the
tabular data is presented in paragraph (f) of vertical shores or the horizontal wales. When
this appendix. a waler system is used the vertical timber
(5) Miscellaneous notations (footnotes) re- sheeting to be used is also selected from
garding Table D1.1 through D1.4 are pre- these tables. The Tables D1.1 and D1.2 for
sented in paragraph (g) of this appendix. vertical shores are used in Type A and B
(6) Figures, illustrating typical installa- soils that do not require sheeting. Type B
tions of hydraulic shoring, are included just soils that may require sheeting, and Type C
prior to the Tables. The illustrations page is soils that always require sheeting are found
entitled Aluminum Hydraulic Shoring; in the horizontal wale Tables D1.3 and D1.4.
Typical Installations. The soil type must first be determined in ac-
(d) Basis and limitations of the data. (1) cordance with the soil classification system
Vertical shore rails and horizontal wales are described in appendix A to subpart P of part
those that meet the Section Modulus re- 1926. Using the appropriate table, the selec-
quirements in the D1 Tables. Aluminum tion of the size and spacing of the members
material is 6061T6 or material of equivalent is made. The selection is based on the depth
strength and properties. and width of the trench where the members
(2) Hydraulic cylinders specifications. (i) 2- are to be installed. In these tables the
inch cylinders shall be a minimum 2-inch in- vertical spacing is held constant at four feet
side diameter with a minimum safe working on center. The tables show the maximum
capacity of no less than 18,000 pounds axial horizontal spacing of cylinders allowed for
compressive load at maximum extension. each size of wale in the waler system tables,
Maximum extension is to include full range and in the vertical shore tables, the hydrau-
of cylinder extensions as recommended by lic cylinder horizontal spacing is the same as
product manufaturer. the vertical shore spacing.
(ii) 3-inch cylinders shall be a minimum 3- (f) Example to Illustrate the Use of the Tables:
inch inside diameter with a safe working ca- (1) Example 1:
pacity of not less than 30,000 pounds axial A trench dug in Type A soil is 6 feet deep
compressive load at extensions as rec- and 3 feet wide. From Table D1.1: Find
ommended by product manufacturer. vertical shores and 2 inch diameter cylinders
(3) Limitation of application. spaced 8 feet on center (o.c.) horizontally and
(i) It is not intended that the aluminum 4 feet on center (o.c.) vertically. (See Figures
hydraulic specification apply to every situa- 1 & 3 for typical installations.)
tion that may be experienced in the field. (2) Example 2:
These data were developed to apply to the A trench is dug in Type B soil that does
situations that are most commonly experi- not require sheeting, 13 feet deep and 5 feet
enced in current trenching practice. Shoring wide. From Table D1.2: Find vertical shores
systems for use in situations that are not and 2 inch diameter cylinders spaced 6.5 feet
covered by the data in this appendix must be o.c. horizontally and 4 feet o.c. vertically.
otherwise designed as specified in (See Figures 1 & 3 for typical installations.)
1926.652(c). (3) A trench is dug in Type B soil that does
(ii) When any of the following conditions not require sheeting, but does experience
are present, the members specified in the Ta- some minor raveling of the trench face. The

389

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00399 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. P, App. D 29 CFR Ch. XVII (7112 Edition)
trench is 16 feet deep and 9 feet wide. From (2) 2 inch diameter cylinders, at this width,
Table D1.2: Find vertical shores and 2 inch shall have structural steel tube
diameter cylinder (with special oversleeves (3.53.50.1875) oversleeves, or structural
as designated by footnote #B2) spaced 5.5 feet oversleeves of manufacturers specification,
o.c. horizontally and 4 feet o.c. vertically, extending the full, collapsed length.
plywood (per footnote (g)(7) to the D1 Table) (3) Hydraulic cylinders capacities. (i) 2
should be used behind the shores. (See Fig- inch cylinders shall be a minimum 2-inch in-
ures 2 & 3 for typical installations.) side diameter with a safe working capacity
(4) Example 4: A trench is dug in pre- of not less than 18,000 pounds axial compres-
viously disturbed Type B soil, with charac- sive load at maximum extension. Maximum
teristics of a Type C soil, and will require extension is to include full range of cylinder
sheeting. The trench is 18 feet deep and 12 extensions as recommended by product man-
feet wide. 8 foot horizontal spacing between ufacturer.
cylinders is desired for working space. From (ii) 3-inch cylinders shall be a minimum 3-
Table D1.3: Find horizontal wale with a sec- inch inside diameter with a safe work capac-
tion modulus of 14.0 spaced at 4 feet o.c. ity of not less than 30,000 pounds axial com-
vertically and 3 inch diameter cylinder pressive load at maximum extension. Max-
spaced at 9 feet maximum o.c. horizontally. imum extension is to include full range of
312 timber sheeting is required at close cylinder extensions as recommended by
spacing vertically. (See Figure 4 for typical product manufacturer.
installation.)
(4) All spacing indicated is measured cen-
(5) Example 5: A trench is dug in Type C
ter to center.
soil, 9 feet deep and 4 feet wide. Horizontal
cylinder spacing in excess of 6 feet is desired (5) Vertical shoring rails shall have a min-
for working space. From Table D1.4: Find imum section modulus of 0.40 inch.
horizontal wale with a section modulus of 7.0 (6) When vertical shores are used, there
and 2 inch diameter cylinders spaced at 6.5 must be a minimum of three shores spaced
feet o.c. horizontally. Or, find horizontal equally, horizontally, in a group.
wale with a 14.0 section modulus and 3 inch (7) Plywood shall be 1.125 in. thick
diameter cylinder spaced at 10 feet o.c. hori- softwood or 0.75 inch. thick, 14 ply, arctic
zontally. Both wales are spaced 4 feet o.c. white birch (Finland form). Please note that
vertically. 312 timber sheeting is required plywood is not intended as a structural
at close spacing vertically. (See Figure 4 for member, but only for prevention of local rav-
typical installation.) eling (sloughing of the trench face) between
(g) Footnotes, and general notes, for Tables shores.
D1.1, D1.2, D1.3, and D1.4. (8) See appendix C for timber specifica-
(1) For applications other than those listed tions.
in the tables, refer to 1926.652(c)(2) for use of (9) Wales are calculated for simple span
manufacturers tabulated data. For trench conditions.
depths in excess of 20 feet, refer to (10) See appendix D, item (d), for basis and
1926.652(c)(2) and 1926.652(c)(3). limitations of the data.

390

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00400 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. P, App. D

391
EC30OC91.038</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00401 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. P, App. D 29 CFR Ch. XVII (7112 Edition)

392
EC30OC91.039</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00402 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. P, App. D

393
EC30OC91.040</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00403 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. P, App. D 29 CFR Ch. XVII (7112 Edition)

394
EC30OC91.041</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00404 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. P, App. D

395
EC30OC91.042</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00405 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. P, App. E 29 CFR Ch. XVII (7112 Edition)

APPENDIX E TO SUBPART P OF PART 1926ALTERNATIVES TO TIMBER SHORING

396
EC30OC91.043</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00406 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. P, App. F

APPENDIX F TO SUBPART P OF PART part P for excavations 20 feet or less in


1926SELECTION OF PROTECTIVE depth. Protective systems for use in exca-
SYSTEMS vations more than 20 feet in depth must be
designed by a registered professional engi-
The following figures are a graphic sum- neer in accordance with 1926.652 (b) and (c).
mary of the requirements contained in sub-

397
EC30OC91.044</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00407 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. P, App. F 29 CFR Ch. XVII (7112 Edition)

398
EC30OC91.045</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00408 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. P, App. F

399
EC30OC91.046</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00409 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. P, App. F 29 CFR Ch. XVII (7112 Edition)

400
EC30OC91.047</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00410 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.701

Subpart QConcrete and forms and shores are removed, in order


Masonry Construction to support partially cured concrete and
construction loads.
(7) Shore means a supporting member
AUTHORITY: Sec. 107, Contract Work Hours that resists a compressive force im-
and Safety Standards Act (Construction
Safety Act) (40 U.S.C. 333); Secs. 4, 6 and 8
posed by a load.
Occupational Safety and Health Act of 1970 (8) Vertical slip forms means forms
(29 U.S.C. 653, 655, and 657); Secretary of La- which are jacked vertically during the
bors Order No. 1271 (36 FR 8754), 876 (41 FR placement of concrete.
25059), 983 (48 FR 35736), or 190 (55 FR 9033), (9) Jacking operation means the task
as applicable; and 29 CFR part 1911. of lifting a slab (or group of slabs)
SOURCE: 53 FR 22643, June 16, 1988, unless vertically from one location to another
otherwise noted. (e.g., from the casting location to a
temporary (parked) location, or from a
1926.700 Scope, application, and defi- temporary location to another tem-
nitions applicable to this subpart. porary location, or to its final location
(a) Scope and application. This sub- in the structure), during the construc-
part sets forth requirements to protect tion of a building/structure where the
all construction employees from the lift-slab process is being used.
hazards associated with concrete and [53 FR 22643, June 16, 1988, as amended at 55
masonry construction operations per- FR 42328, Oct. 18, 1990]
formed in workplaces covered under 29
CFR part 1926. In addition to the re- 1926.701 General requirements.
quirements in subpart Q, other rel- (a) Construction loads. No construc-
evant provisions in parts 1910 and 1926 tion loads shall be placed on a concrete
apply to concrete and masonry con- structure or portion of a concrete
struction operations. structure unless the employer deter-
(b) Definitions applicable to this sub- mines, based on information received
part. In addition to the definitions set from a person who is qualified in struc-
forth in 1926.32, the following defini- tural design, that the structure or por-
tions apply to this subpart. tion of the structure is capable of sup-
(1) Bull float means a tool used to porting the loads.
spread out and smooth concrete. (b) Reinforcing steel. All protruding
(2) Formwork means the total system reinforcing steel, onto and into which
of support for freshly placed or par- employees could fall, shall be guarded
tially cured concrete, including the to eliminate the hazard of impalement.
mold or sheeting (form) that is in con- (c) Post-tensioning operations. (1) No
tact with the concrete as well as all employee (except those essential to the
supporting members including shores, post-tensioning operations) shall be
reshores, hardware, braces, and related permitted to be behind the jack during
hardware. tensioning operations.
(3) Lift slab means a method of con- (2) Signs and barriers shall be erected
crete construction in which floor, and to limit employee access to the post-
roof slabs are cast on or at ground level tensioning area during tensioning oper-
and, using jacks, lifted into position. ations.
(4) Limited access zone means an area (d) Riding concrete buckets. No em-
alongside a masonry wall, which is ployee shall be permitted to ride con-
under construction, and which is clear- crete buckets.
ly demarcated to limit access by em- (e) Working under loads. (1) No em-
ployees. ployee shall be permitted to work
(5) Precast concrete means concrete under concrete buckets while buckets
members (such as walls, panels, slabs, are being elevated or lowered into posi-
columns, and beams) which have been tion.
formed, cast, and cured prior to final (2) To the extent practical, elevated
placement in a structure. concrete buckets shall be routed so
(6) Reshoring means the construction that no employee, or the fewest num-
operation in which shoring equipment ber of employees, are exposed to the
(also called reshores or reshoring hazards associated with falling con-
equipment) is placed, as the original crete buckets.

401

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00411 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.702 29 CFR Ch. XVII (7112 Edition)

(f) Personal protective equipment. No (g) Tremies. Sections of tremies and


employee shall be permitted to apply a similar concrete conveyances shall be
cement, sand, and water mixture secured with wire rope (or equivalent
through a pneumatic hose unless the materials) in addition to the regular
employee is wearing protective head couplings or connections.
and face equipment. (h) Bull floats. Bull float handles,
[53 FR 22643, June 16, 1988, as amended at 59 used where they might contact ener-
FR 40730, Aug. 9, 1994] gized electrical conductors, shall be
constructed of nonconductive material
1926.702 Requirements for equip- or insulated with a nonconductive
ment and tools. sheath whose electrical and mechan-
(a) Bulk cement storage. (1) Bulk stor- ical characteristics provide the equiva-
age bins, containers, and silos shall be lent protection of a handle constructed
equipped with the following: of nonconductive material.
(i) Conical or tapered bottoms; and (i) Masonry saws. (1) Masonry saws
(ii) Mechanical or pneumatic means shall be guarded with a semicircular
of starting the flow of material. enclosure over the blade.
(2) No employee shall be permitted to (2) A method for retaining blade frag-
enter storage facilities unless the ejec- ments shall be incorporated in the de-
tion system has been shut down, locked sign of the semicircular enclosure.
out, and tagged to indicate that the (j) Lockout/Tagout Procedures. (1) No
ejection system is not to be operated. employee shall be permitted to perform
(b) Concrete mixers. Concrete mixers maintenance or repair activity on
with one cubic yard (.8 m3) or larger equipment (such as compressors, mix-
loading skips shall be equipped with ers, screens or pumps used for concrete
the following: and masonry construction activities)
(1) A mechanical device to clear the where the inadvertent operation of the
skip of materials; and equipment could occur and cause in-
(2) Guardrails installed on each side jury, unless all potentially hazardous
of the skip. energy sources have been locked out
(c) Power concrete trowels. Powered and tagged.
and rotating type concrete troweling
(2) Tags shall read Do Not Start or
machines that are manually guided
similar language to indicate that the
shall be equipped with a control switch
equipment is not to be operated.
that will automatically shut off the
power whenever the hands of the oper- 1926.703 Requirements for cast-in-
ator are removed from the equipment place concrete.
handles.
(d) Concrete buggies. Concrete buggy (a) General requirements for formwork.
handles shall not extend beyond the (1) Formwork shall be designed, fab-
wheels on either side of the buggy. ricated, erected, supported, braced and
(e) Concrete pumping systems. (1) Con- maintained so that it will be capable of
crete pumping systems using discharge supporting without failure all vertical
pipes shall be provided with pipe sup- and lateral loads that may reasonably
ports designed for 100 percent overload. be anticipated to be applied to the
(2) Compressed air hoses used on con- formwork. Formwork which is de-
crete pumping system shall be provided signed, fabricated, erected, supported,
with positive fail-safe joint connectors braced and maintained in conformance
to prevent separation of sections when with the appendix to this section will
pressurized. be deemed to meet the requirements of
(f) Concrete buckets. (1) Concrete this paragraph.
buckets equipped with hydraulic or (2) Drawings or plans, including all
pneumatic gates shall have positive revisions, for the jack layout,
safety latches or similar safety devices formwork (including shoring equip-
installed to prevent premature or acci- ment), working decks, and scaffolds,
dental dumping. shall be available at the jobsite.
(2) Concrete buckets shall be de- (b) Shoring and reshoring. (1) All shor-
signed to prevent concrete from hang- ing equipment (including equipment
ing up on top and the sides. used in reshoring operations) shall be

402

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00412 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.703

inspected prior to erection to deter- (c) Vertical slip forms. (1) The steel
mine that the equipment meets the re- rods or pipes on which jacks climb or
quirements specified in the formwork by which the forms are lifted shall be
drawings. (i) Specifically designed for that pur-
(2) Shoring equipment found to be pose; and
damaged such that its strength is re- (ii) Adequately braced where not en-
duced to less than that required by cased in concrete.
1926.703(a)(1) shall not be used for (2) Forms shall be designed to pre-
shoring. vent excessive distortion of the struc-
(3) Erected shoring equipment shall ture during the jacking operation.
be inspected immediately prior to, dur- (3) All vertical slip forms shall be
ing, and immediately after concrete provided with scaffolds or work plat-
placement. forms where employees are required to
(4) Shoring equipment that is found work or pass.
to be damaged or weakened after erec- (4) Jacks and vertical supports shall
tion, such that its strength is reduced be positioned in such a manner that
to less than that required by the loads do not exceed the rated ca-
1926.703(a)(1), shall be immediately re- pacity of the jacks.
inforced. (5) The jacks or other lifting devices
(5) The sills for shoring shall be shall be provided with mechanical dogs
sound, rigid, and capable of carrying or other automatic holding devices to
the maximum intended load. support the slip forms whenever failure
(6) All base plates, shore heads, ex- of the power supply or lifting mecha-
tension devices, and adjustment screws nism occurs.
shall be in firm contact, and secured (6) The form structure shall be main-
when necessary, with the foundation tained within all design tolerances
and the form. specified for plumbness during the
jacking operation.
(7) Eccentric loads on shore heads
(7) The predetermined safe rate of lift
and similar members shall be prohib-
shall not be exceeded.
ited unless these members have been
(d) Reinforcing steel. (1) Reinforcing
designed for such loading.
steel for walls, piers, columns, and
(8) Whenever single post shores are
similar vertical structures shall be
used one on top of another (tiered), the
adequately supported to prevent over-
employer shall comply with the fol-
turning and to prevent collapse.
lowing specific requirements in addi-
(2) Employers shall take measures to
tion to the general requirements for
prevent unrolled wire mesh from re-
formwork:
coiling. Such measures may include,
(i) The design of the shoring shall be but are not limited to, securing each
prepared by a qualified designer and end of the roll or turning over the roll.
the erected shoring shall be inspected (e) Removal of formwork. (1) Forms
by an engineer qualified in structural and shores (except those used for slabs
design. on grade and slip forms) shall not be
(ii) The single post shores shall be removed until the employer determines
vertically aligned. that the concrete has gained sufficient
(iii) The single post shores shall be strength to support its weight and su-
spliced to prevent misalignment. perimposed loads. Such determination
(iv) The single post shores shall be shall be based on compliance with one
adequately braced in two mutually per- of the following:
pendicular directions at the splice (i) The plans and specifications stipu-
level. Each tier shall also be diagonally late conditions for removal of forms
braced in the same two directions. and shores, and such conditions have
(9) Adjustment of single post shores been followed, or
to raise formwork shall not be made (ii) The concrete has been properly
after the placement of concrete. tested with an appropriate ASTM
(10) Reshoring shall be erected, as the standard test method designed to indi-
original forms and shores are removed, cate the concrete compressive
whenever the concrete is required to strength, and the test results indicate
support loads in excess of its capacity. that the concrete has gained sufficient

403

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00413 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.704 29 CFR Ch. XVII (7112 Edition)

strength to support its weight and su- 1926.705 Requirements for lift-slab
perimposed loads. construction operations.
(2) Reshoring shall not be removed (a) Lift-slab operations shall be de-
until the concrete being supported has signed and planned by a registered pro-
attained adequate strength to support fessional engineer who has experience
its weight and all loads in place upon in lift-slab construction. Such plans
it. and designs shall be implemented by
the employer and shall include detailed
APPENDIX TO 1926.703(a)(1)
instructions and sketches indicating
GENERAL REQUIREMENTS FOR FORMWORK the prescribed method of erection.
These plans and designs shall also in-
(This appendix is non-mandatory.) clude provisions for ensuring lateral
This appendix serves as a non-mandatory stability of the building/structure dur-
guideline to assist employers in complying ing construction.
with the formwork requirements in (b) Jacks/lifting units shall be
1926.703(a)(1). Formwork which has been de- marked to indicate their rated capac-
signed, fabricated, erected, braced, supported ity as established by the manufacturer.
and maintained in accordance with Sections (c) Jacks/lifting units shall not be
6 and 7 of the American National Standard loaded beyond their rated capacity as
for Construction and Demolition Oper- established by the manufacturer.
ationsConcrete and Masonry Work, ANSI
(d) Jacking equipment shall be capa-
A10.91983, shall be deemed to be in compli-
ance with the provision of 1926.703(a)(1).
ble of supporting at least two and one-
half times the load being lifted during
[53 FR 22643, June 16, 1988, as amended at 61 jacking operations and the equipment
FR 5510, Feb. 13, 1996] shall not be overloaded. For the pur-
pose of this provision, jacking equip-
1926.704 Requirements for precast ment includes any load bearing compo-
concrete.
nent which is used to carry out the lift-
(a) Precast concrete wall units, ing operation(s). Such equipment in-
structural framing, and tilt-up wall cludes, but is not limited, to the fol-
panels shall be adequately supported to lowing: threaded rods, lifting attach-
prevent overturning and to prevent col- ments, lifting nuts, hook-up collars, T-
lapse until permanent connections are caps, shearheads, columns, and foot-
completed. ings.
(b) Lifting inserts which are embed- (e) Jacks/lifting units shall be de-
ded or otherwise attached to tilt-up signed and installed so that they will
precast concrete members shall be ca- neither lift nor continue to lift when
pable of supporting at least two times they are loaded in excess of their rated
the maximum intended load applied or capacity.
transmitted to them. (f) Jacks/lifting units shall have a
(c) Lifting inserts which are embed- safety device installed which will cause
ded or otherwise attached to precast the jacks/lifting units to support the
concrete members, other than the tilt- load in any position in the event any
up members, shall be capable of sup- jack/lifting unit malfunctions or loses
porting at least four times the max- its lifting ability.
imum intended load applied or trans- (g) Jacking operations shall be syn-
mitted to them. chronized in such a manner to ensure
(d) Lifting hardware shall be capable even and uniform lifting of the slab.
of supporting at least five times the During lifting, all points at which the
slab is supported shall be kept within 1/
maximum intended load applied or
2 inch of that needed to maintain the
transmitted to the lifting hardware.
slab in a level position.
(e) No employee shall be permitted (h) If leveling is automatically con-
under precast concrete members being trolled, a device shall be installed that
lifted or tilted into position except will stop the operation when the 12inch
those employees required for the erec- tolerance set forth in paragraph (g) of
tion of those members. this section is exceeded or where there
[53 FR 22643, June 16, 1988, as amended at 54 is a malfunction in the jacking (lifting)
FR 41088, Oct. 5, 1989] system.

404

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00414 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.705

(i) If leveling is maintained by man- until the wedges at that column have
ual controls, such controls shall be lo- been secured.
cated in a central location and at- (m) All welding on temporary and
tended by a competent person while permanent connections shall be per-
lifting is in progress. In addition to formed by a certified welder, familiar
meeting the definition in 1926.32(f), with the welding requirements speci-
the competent person must be experi- fied in the plans and specifications for
enced in the lifting operation and with the lift-slab operation.
the lifting equipment being used. (n) Load transfer from jacks/lifting
(j) The maximum number of manu- units to building columns shall not be
ally controlled jacks/lifting units on executed until the welds on the column
one slab shall be limited to a number shear plates (weld blocks) are cooled to
that will permit the operator to main- air temperature.
tain the slab level within specified tol- (o) Jacks/lifting units shall be posi-
erances of paragraph (g) of this section, tively secured to building columns so
but in no case shall that number ex- that they do not become dislodged or
ceed 14. dislocated.
(k)(1) No employee, except those es- (p) Equipment shall be designed and
sential to the jacking operation, shall installed so that the lifting rods cannot
be permitted in the building/structure slip out of position or the employer
while any jacking operation is taking shall institute other measures, such as
place unless the building/structure has the use of locking or blocking devices,
been reinforced sufficiently to ensure which will provide positive connection
its integrity during erection. The between the lifting rods and attach-
phrase reinforced sufficiently to en- ments and will prevent components
from disengaging during lifting oper-
sure its integrity used in this para-
ations.
graph means that a registered profes-
sional engineer, independent of the en- APPENDIX TO 1926.705LIFT-SLAB
gineer who designed and planned the OPERATIONS
lifting operation, has determined from
(This appendix is non-mandatory.)
the plans that if there is a loss of sup-
port at any jack location, that loss will In paragraph 1926.705(k), OSHA requires
be confined to that location and the employees to be removed from the building/
structure during jacking operations unless
structure as a whole will remain sta-
an independent registered professional engi-
ble. neer, other than the engineer who designed
(2) Under no circumstances, shall any and planned the lifting operation, has deter-
employee who is not essential to the mined that the building/structure has been
jacking operation be permitted imme- sufficiently reinforced to insure the integ-
diately beneath a slab while it is being rity of the building/structure. One method to
lifted. comply with this provision is for the em-
ployer to ensure that continuous bottom
(3) For the purpose of paragraph (k) steel is provided in every slab and in both di-
of this section, a jacking operation be- rections through every wall or column head
gins when a slab or group of slabs is area. (Column head area means the distance
lifted and ends when such slabs are se- between lines that are one and one half
cured (with either temporary connec- times the thickness of the slab or drop panel.
tions or permanent connections). These lines are located outside opposite
faces of the outer edges of the shearhead sec-
(4) Employers who comply with ap- tionsSee Figure 1). The amount of bottom
pendix A to 1926.705 shall be consid- steel shall be established by assuming loss of
ered to be in compliance with the pro- support at a given lifting jack and then de-
visions of paragraphs (k)(1) through termining the steel necessary to carry, by
(k)(3) of this section. catenary action over the span between sur-
(l) When making temporary connec- rounding supports, the slab service dead load
plus any service dead and live loads likely to
tions to support slabs, wedges shall be
be acting on the slab during jacking. In addi-
secured by tack welding, or an equiva- tion, the surrounding supports must be capa-
lent method of securing the wedges to ble of resisting any additional load trans-
prevent them from falling out of posi- ferred to them as a result of the loss of sup-
tion. Lifting rods may not be released port at the lifting jack considered.

405

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00415 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.706 29 CFR Ch. XVII (7112 Edition)

[55 FR 42328, Oct. 18, 1990]

1926.706 Requirements for masonry constructed plus four feet, and shall
construction. run the entire length of the wall.
(a) A limited access zone shall be es- (3) The limited access zone shall be
tablished whenever a masonry wall is established on the side of the wall
being constructed. The limited access which will be unscaffolded.
zone shall conform to the following. (4) The limited access zone shall be
(1) The limited access zone shall be restricted to entry by employees ac-
established prior to the start of con- tively engaged in constructing the
struction of the wall. wall. No other employees shall be per-
(2) The limited access zone shall be mitted to enter the zone.
equal to the height of the wall to be

406
EC30OC91.048</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00416 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.750

(5) The limited access zone shall re- Insulating Concrete for Compressive
main in place until the wall is ade- Strength (ASTM C51386).
quately supported to prevent over- Test Method for Comprehensive Strength
of Lightweight Insulating Concrete (ASTM
turning and to prevent collapse unless
C49586).
the height of wall is over eight feet, in Method of Making, Accelerating Curing,
which case, the limited access zone and Testing of Concrete Compression Test
shall remain in place until the require- Specimens (ASTM C68481).
ments of paragraph (b) of this section Test Method for Compressive Strength of
have been met. Concrete Using Portions of Beams Broken in
(b) All masonry walls over eight feet Flexure (ASTM C11668 (1980)).
in height shall be adequately braced to
prevent overturning and to prevent col- Subpart RSteel Erection
lapse unless the wall is adequately sup-
ported so that it will not overturn or AUTHORITY: Section 3704 of the Contract
collapse. The bracing shall remain in Work Hours and Safety Standards Act (40
place until permanent supporting ele- U.S.C. 3701); Sections 4, 6, and 8 of the Occu-
ments of the structure are in place. pational Safety and Health Act of 1970 (29
U.S.C. 653, 655, 657); Secretary of Labors
APPENDIX A TO SUBPART Q OF PART Order Nos. 32000 (65 FR 50017), 52002 (67 FR
1926REFERENCES TO SUBPART Q OF 65008), and 52007 (72 FR 31159); and 29 CFR
PART 1926 part 1911.
SOURCE: 66 FR 5265, Jan. 18, 2001, unless
(This appendix is non-mandatory.)
otherwise noted.
The following non-mandatory references
provide information which can be helpful in 1926.750 Scope.
understanding and complying with the re-
quirements contained in subpart Q.
(a) This subpart sets forth require-
Accident Prevention Manual for Indus- ments to protect employees from the
trial Operations; Eighth Edition; National hazards associated with steel erection
Safety Council. activities involved in the construction,
Building Code Requirements for Rein- alteration, and/or repair of single and
forced Concrete (ACI 31883). multi-story buildings, bridges, and
Formwork for Concrete (ACI SP4). other structures where steel erection
Recommended Practice for Concrete
occurs. The requirements of this sub-
Formwork (ACI 34778).
Safety Requirements for Concrete and part apply to employers engaged in
Masonry Work (ANSI A10.91983). steel erection unless otherwise speci-
Standard Test Method for Compressive fied. This subpart does not cover elec-
Strength of Cylindrical Concrete Specimens trical transmission towers, commu-
(ASTM C3986). nication and broadcast towers, or
Standard Test Method for Making and tanks.
Curing Concrete Test Specimens in the Field
(ASTM C3185). NOTE TO PARAGRAPH (a): Examples of struc-
Standard Test Method for Penetration tures where steel erection may occur include
Resistance of Hardened Concrete (ASTM but are not limited to the following: Single
C80382). and multi-story buildings; systems-engi-
Standard Test Method for Compressive neered metal buildings; lift slab/tilt-up
Strength of Concrete Cylinders Cast In-Place structures; energy exploration structures;
in Cylindrical Molds (ASTM C87385). energy production, transfer and storage
Standard Method for Developing Early structures and facilities; auditoriums; malls;
Age Compressive Test Values and Projecting amphitheaters; stadiums; power plants;
Later Age Strengths (ASTM C91880). mills; chemical process structures; bridges;
Recommended Practice for Inspection trestles; overpasses; underpasses; viaducts;
and Testing Agencies for Concrete, Steel and aqueducts; aerospace facilities and struc-
Bituminous Materials as Used in Construc- tures; radar and communication structures;
tion (ASTM E32977). light towers; signage; billboards; score-
Method of Making and Curing Concrete boards; conveyor systems; conveyor supports
Test Specimens in the Laboratory (ASTM and related framing; stairways; stair towers;
C19288). fire escapes; draft curtains; fire containment
Methods of Obtaining and Testing Drilled structures; monorails; aerialways; catwalks;
Cores and Sawed Beams of Concrete (ASTM curtain walls; window walls; store fronts; el-
C4287). evator fronts; entrances; skylights; metal
Methods of Securing, Preparing and Test- roofs; industrial structures; hi-bay struc-
ing Specimens from Hardened Lightweight tures; rail, marine and other transportation

407

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00417 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.751 29 CFR Ch. XVII (7112 Edition)
structures; sound barriers; water process and pansion joint assemblies; slide bear-
water containment structures; air and cable ings; hydraulic structures; fascias; sof-
supported structures; space frames; geodesic fit panels; penthouse enclosures; sky-
domes; canopies; racks and rack support
structures and frames; platforms; walkways;
lights; joint fillers; gaskets; sealants
balconies; atriums; penthouses; car dumpers; and seals; doors; windows; hardware;
stackers/reclaimers; cranes and craneways; detention/security equipment and
bins; hoppers; ovens; furnaces; stacks; doors, windows and hardware; con-
amusement park structures and rides; and veying systems; building specialties;
artistic and monumental structures. building equipment; machinery and
(b)(1) Steel erection activities in- plant equipment, furnishings and spe-
clude hoisting, laying out, placing, cial construction.
connecting, welding, burning, guying, (c) The duties of controlling contrac-
bracing, bolting, plumbing and rigging tors under this subpart include, but are
structural steel, steel joists and metal not limited to, the duties specified in
buildings; installing metal decking, 1926.752 (a) and (c), 1926.755(b)(2),
curtain walls, window walls, siding sys- 1926.759(b), and 1926.760(e).
tems, miscellaneous metals, orna-
mental iron and similar materials; and 1926.751 Definitions.
moving point-to-point while per- Anchored bridging means that the
forming these activities. steel joist bridging is connected to a
(2) The following activities are cov- bridging terminus point.
ered by this subpart when they occur Bolted diagonal bridging means diago-
during and are a part of steel erection nal bridging that is bolted to a steel
activities: rigging, hoisting, laying out, joist or joists.
placing, connecting, guying, bracing,
Bridging clip means a device that is
dismantling, burning, welding, bolting,
attached to the steel joist to allow the
grinding, sealing, caulking, and all re-
bolting of the bridging to the steel
lated activities for construction, alter-
joist.
ation and/or repair of materials and as-
semblies such as structural steel; fer- Bridging terminus point means a wall,
rous metals and alloys; non-ferrous a beam, tandem joists (with all bridg-
metals and alloys; glass; plastics and ing installed and a horizontal truss in
synthetic composite materials; struc- the plane of the top chord) or other ele-
tural metal framing and related brac- ment at an end or intermediate
ing and assemblies; anchoring devices; point(s) of a line of bridging that pro-
structural cabling; cable stays; perma- vides an anchor point for the steel joist
nent and temporary bents and towers; bridging.
falsework for temporary supports of Choker means a wire rope or syn-
permanent steel members; stone and thetic fiber rigging assembly that is
other non-precast concrete architec- used to attach a load to a hoisting de-
tural materials mounted on steel vice.
frames; safety systems for steel erec- Cold forming means the process of
tion; steel and metal joists; metal using press brakes, rolls, or other
decking and raceway systems and ac- methods to shape steel into desired
cessories; metal roofing and acces- cross sections at room temperature.
sories; metal siding; bridge flooring; Column means a load-carrying
cold formed steel framing; elevator vertical member that is part of the pri-
beams; grillage; shelf racks; multi-pur- mary skeletal framing system. Col-
pose supports; crane rails and acces- umns do not include posts.
sories; miscellaneous, architectural Competent person (also defined in
and ornamental metals and metal 1926.32) means one who is capable of
work; ladders; railings; handrails; identifying existing and predictable
fences and gates; gratings; trench cov- hazards in the surroundings or working
ers; floor plates; castings; sheet metal conditions which are unsanitary, haz-
fabrications; metal panels and panel ardous, or dangerous to employees, and
wall systems; louvers; column covers; who has authorization to take prompt
enclosures and pockets; stairs; per- corrective measures to eliminate them.
forated metals; ornamental iron work, Connector means an employee who,
expansion control including bridge ex- working with hoisting equipment, is

408

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00418 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.751

placing and connecting structural Double connection seat means a struc-


members and/or components. tural attachment that, during the in-
Constructibility means the ability to stallation of a double connection, sup-
erect structural steel members in ac- ports the first member while the sec-
cordance with subpart R without hav- ond member is connected.
ing to alter the over-all structural de- Erection bridging means the bolted di-
sign. agonal bridging that is required to be
Construction load (for joist erection) installed prior to releasing the hoisting
means any load other than the weight cables from the steel joists.
of the employee(s), the joists and the Fall restraint system means a fall pro-
bridging bundle. tection system that prevents the user
Controlled Decking Zone (CDZ) means from falling any distance. The system
an area in which certain work (for ex- is comprised of either a body belt or
ample, initial installation and place- body harness, along with an anchorage,
ment of metal decking) may take place connectors and other necessary equip-
without the use of guardrail systems, ment. The other components typically
personal fall arrest systems, fall re- include a lanyard, and may also in-
straint systems, or safety net systems clude a lifeline and other devices.
and where access to the zone is con- Final interior perimeter means the pe-
trolled. rimeter of a large permanent open
Controlled load lowering means low- space within a building such as an atri-
ering a load by means of a mechanical um or courtyard. This does not include
hoist drum device that allows a hoisted openings for stairways, elevator shafts,
load to be lowered with maximum con- etc.
trol using the gear train or hydraulic Girt (in systems-engineered metal build-
components of the hoist mechanism. ings) means a Z or C shaped mem-
Controlled load lowering requires the ber formed from sheet steel spanning
use of the hoist drive motor, rather between primary framing and sup-
than the load hoist brake, to lower the porting wall material.
load. Headache ball means a weighted hook
Controlling contractor means a prime that is used to attach loads to the hoist
contractor, general contractor, con- load line of the crane.
struction manager or any other legal Hoisting equipment means commer-
entity which has the overall responsi- cially manufactured lifting equipment
bility for the construction of the designed to lift and position a load of
projectits planning, quality and com- known weight to a location at some
pletion. known elevation and horizontal dis-
Critical lift means a lift that (1) ex- tance from the equipments center of
ceeds 75 percent of the rated capacity rotation. Hoisting equipment in-
of the crane or derrick, or (2) requires cludes but is not limited to cranes, der-
the use of more than one crane or der- ricks, tower cranes, barge-mounted
rick. derricks or cranes, gin poles and gan-
Decking hole means a gap or void try hoist systems. A come-a-long (a
more than 2 inches (5.1 cm) in its least mechanical device, usually consisting
dimension and less than 12 inches (30.5 of a chain or cable attached at each
cm) in its greatest dimension in a end, that is used to facilitate move-
floor, roof or other walking/working ment of materials through leverage) is
surface. Pre-engineered holes in cel- not considered hoisting equipment.
lular decking (for wires, cables, etc.) Leading edge means the unprotected
are not included in this definition. side and edge of a floor, roof, or
Derrick floor means an elevated floor formwork for a floor or other walking/
of a building or structure that has been working surface (such as deck) which
designated to receive hoisted pieces of changes location as additional floor,
steel prior to final placement. roof, decking or formwork sections are
Double connection means an attach- placed, formed or constructed.
ment method where the connection Metal decking means a commercially
point is intended for two pieces of steel manufactured, structural grade, cold
which share common bolts on either rolled metal panel formed into a series
side of a central piece. of parallel ribs; for this subpart, this

409

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00419 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.751 29 CFR Ch. XVII (7112 Edition)

includes metal floor and roof decks, sional responsible for the design of
standing seam metal roofs, other metal structural steel framing and whose seal
roof systems and other products such appears on the structural contract doc-
as bar gratings, checker plate, ex- uments.
panded metal panels, and similar prod- Purlin (in systems-engineered metal
ucts. After installation and proper fas- buildings) means a Z or C shaped
tening, these decking materials serve a member formed from sheet steel span-
combination of functions including, ning between primary framing and sup-
but not limited to: a structural ele- porting roof material.
ment designed in combination with the
Qualified person (also defined in
structure to resist, distribute and
1926.32) means one who, by possession
transfer loads, stiffen the structure and
provide a diaphragm action; a walking/ of a recognized degree, certificate, or
working surface; a form for concrete professional standing, or who by exten-
slabs; a support for roofing systems; sive knowledge, training, and experi-
and a finished floor or roof. ence, has successfully demonstrated
Multiple lift rigging means a rigging the ability to solve or resolve problems
assembly manufactured by wire rope relating to the subject matter, the
rigging suppliers that facilitates the work, or the project.
attachment of up to five independent Safety deck attachment means an ini-
loads to the hoist rigging of a crane. tial attachment that is used to secure
Opening means a gap or void 12 an initially placed sheet of decking to
inches (30.5 cm) or more in its least di- keep proper alignment and bearing
mension in a floor, roof or other walk- with structural support members.
ing/working surface. For the purposes Shear connector means headed steel
of this subpart, skylights and smoke studs, steel bars, steel lugs, and similar
domes that do not meet the strength devices which are attached to a struc-
requirements of 1926.754(e)(3) shall be tural member for the purpose of
regarded as openings. achieving composite action with con-
Permanent floor means a structurally crete.
completed floor at any level or ele-
Steel erection means the construction,
vation (including slab on grade).
Personal fall arrest system means a alteration or repair of steel buildings,
system used to arrest an employee in a bridges and other structures, including
fall from a working level. A personal the installation of metal decking and
fall arrest system consists of an an- all planking used during the process of
chorage, connectors, a body harness erection.
and may include a lanyard, decelera- Steel joist means an open web, sec-
tion device, lifeline, or suitable com- ondary load-carrying member of 144
bination of these. The use of a body feet (43.9 m) or less, designed by the
belt for fall arrest is prohibited. manufacturer, used for the support of
Positioning device system means a body floors and roofs. This does not include
belt or body harness rigged to allow an structural steel trusses or cold-formed
employee to be supported on an ele- joists.
vated, vertical surface, such as a wall Steel joist girder means an open web,
or column and work with both hands primary load-carrying member, de-
free while leaning. signed by the manufacturer, used for
Post means a structural member with the support of floors and roofs. This
a longitudinal axis that is essentially does not include structural steel truss-
vertical, that: (1) weighs 300 pounds or es.
less and is axially loaded (a load press-
Steel truss means an open web mem-
es down on the top end), or (2) is not
ber designed of structural steel compo-
axially loaded, but is laterally re-
strained by the above member. Posts nents by the project structural engi-
typically support stair landings, wall neer of record. For the purposes of this
framing, mezzanines and other sub- subpart, a steel truss is considered
structures. equivalent to a solid web structural
Project structural engineer of record member.
means the registered, licensed profes-

410

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00420 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.753

Structural steel means a steel member, erect steel unless it has received writ-
or a member made of a substitute ma- ten notification that the concrete in
terial (such as, but not limited to, fi- the footings, piers and walls or the
berglass, aluminum or composite mem- mortar in the masonry piers and walls
bers). These members include, but are has attained, on the basis of an appro-
not limited to, steel joists, joist gird- priate ASTM standard test method of
ers, purlins, columns, beams, trusses, field-cured samples, either 75 percent
splices, seats, metal decking, girts, and of the intended minimum compressive
all bridging, and cold formed metal design strength or sufficient strength
framing which is integrated with the to support the loads imposed during
structural steel framing of a building. steel erection.
Systems-engineered metal building (c) Site layout. The controlling con-
means a metal, field-assembled build- tractor shall ensure that the following
ing system consisting of framing, roof is provided and maintained:
and wall coverings. Typically, many of (1) Adequate access roads into and
these components are cold-formed through the site for the safe delivery
shapes. These individual parts are fab- and movement of derricks, cranes,
ricated in one or more manufacturing trucks, other necessary equipment, and
facilities and shipped to the job site for the material to be erected and means
assembly into the final structure. The and methods for pedestrian and vehic-
engineering design of the system is ular control. Exception: this require-
normally the responsibility of the sys- ment does not apply to roads outside of
tems-engineered metal building manu- the construction site.
facturer. (2) A firm, properly graded, drained
Tank means a container for holding area, readily accessible to the work
gases, liquids or solids. with adequate space for the safe stor-
Unprotected sides and edges means any age of materials and the safe operation
side or edge (except at entrances to of the erectors equipment.
points of access) of a walking/working (d) Pre-planning of overhead hoisting
surface, for example a, floor, roof, ramp operations. All hoisting operations in
or runway, where there is no wall or steel erection shall be pre-planned to
guardrail system at least 39 inches (1.0 ensure that the requirements of
m) high. 1926.753(d) are met.
1926.752 Site layout, site-specific (e) Site-specific erection plan. Where
erection plan and construction se- employers elect, due to conditions spe-
quence. cific to the site, to develop alternate
means and methods that provide em-
(a) Approval to begin steel erection. Be-
ployee protection in accordance with
fore authorizing the commencement of
1926.753(c)(5), 1926.757(a)(4) or
steel erection, the controlling con-
1926.757(e)(4), a site-specific erection
tractor shall ensure that the steel erec-
plan shall be developed by a qualified
tor is provided with the following writ-
person and be available at the work
ten notifications:
site. Guidelines for establishing a site-
(1) The concrete in the footings, piers
specific erection plan are contained in
and walls and the mortar in the ma-
appendix A to this subpart.
sonry piers and walls has attained, on
the basis of an appropriate ASTM 1926.753 Hoisting and rigging.
standard test method of field-cured
samples, either 75 percent of the in- (a) All the provisions of subpart CC
tended minimum compressive design apply to hoisting and rigging with the
strength or sufficient strength to sup- exception of 1926.1431(a).
port the loads imposed during steel (b) In addition, paragraphs (c)
erection. through (e) of this section apply re-
(2) Any repairs, replacements and garding the hazards associated with
modifications to the anchor bolts were hoisting and rigging.
conducted in accordance with (c) General. (1) Pre-shift visual in-
1926.755(b). spection of cranes.
(b) Commencement of steel erection. A (i) Cranes being used in steel erection
steel erection contractor shall not activities shall be visually inspected

411

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00421 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.753 29 CFR Ch. XVII (7112 Edition)

prior to each shift by a competent per- (2) A qualified rigger (a rigger who is
son; the inspection shall include obser- also a qualified person) shall inspect
vation for deficiencies during oper- the rigging prior to each shift in ac-
ation. At a minimum this inspection cordance with 1926.251.
shall include the following: (3) The headache ball, hook or load
(A) All control mechanisms for mal- shall not be used to transport per-
adjustments; sonnel except as provided in paragraph
(B) Control and drive mechanism for (c)(4) of this section.
excessive wear of components and con- (4) Cranes or derricks may be used to
tamination by lubricants, water or hoist employees on a personnel plat-
other foreign matter; form when work under this subpart is
(C) Safety devices, including but not being conducted, provided that all pro-
limited to boom angle indicators, boom visions of 1926.1431 (except for
stops, boom kick out devices, anti-two 1926.1431(a)) are met.
block devices, and load moment indica- (5) Safety latches on hooks shall not
tors where required; be deactivated or made inoperable ex-
(D) Air, hydraulic, and other pressur- cept:
ized lines for deterioration or leakage, (i) When a qualified rigger has deter-
particularly those which flex in normal mined that the hoisting and placing of
operation; purlins and single joists can be per-
(E) Hooks and latches for deforma- formed more safely by doing so; or
tion, chemical damage, cracks, or (ii) When equivalent protection is
wear; provided in a site-specific erection
(F) Wire rope reeving for compliance plan.
with hoisting equipment manufactur- (d) Working under loads. (1) Routes for
ers specifications; suspended loads shall be pre-planned to
(G) Electrical apparatus for malfunc- ensure that no employee is required to
tioning, signs of excessive deteriora- work directly below a suspended load
tion, dirt, or moisture accumulation; except for:
(H) Hydraulic system for proper fluid (i) Employees engaged in the initial
level; connection of the steel; or
(I) Tires for proper inflation and con- (ii) Employees necessary for the
dition; hooking or unhooking of the load.
(J) Ground conditions around the (2) When working under suspended
hoisting equipment for proper support, loads, the following criteria shall be
including ground settling under and met:
around outriggers, ground water accu- (i) Materials being hoisted shall be
mulation, or similar conditions; rigged to prevent unintentional dis-
(K) The hoisting equipment for level placement;
position; and (ii) Hooks with self-closing safety
(L) The hoisting equipment for level latches or their equivalent shall be
position after each move and setup. used to prevent components from slip-
(ii) If any deficiency is identified, an ping out of the hook; and
immediate determination shall be (iii) All loads shall be rigged by a
made by the competent person as to qualified rigger
whether the deficiency constitutes a (e) Multiple lift rigging procedure. (1) A
hazard. multiple lift shall only be performed if
(iii) If the deficiency is determined to the following criteria are met:
constitute a hazard, the hoisting equip- (i) A multiple lift rigging assembly is
ment shall be removed from service used;
until the deficiency has been corrected. (ii) A maximum of five members are
(iv) The operator shall be responsible hoisted per lift;
for those operations under the opera- (iii) Only beams and similar struc-
tors direct control. Whenever there is tural members are lifted; and
any doubt as to safety, the operator (iv) All employees engaged in the
shall have the authority to stop and multiple lift have been trained in these
refuse to handle loads until safety has procedures in accordance with
been assured. 1926.761(c)(1).

412

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00422 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.754

(v) No crane is permitted to be used porate by reference. (See http://


for a multiple lift where such use is www.fhwa.dot.gov/bridge/lrfd/index.htm.)
contrary to the manufacturers speci- (b) The following additional require-
fications and limitations. ments shall apply for multi-story
(2) Components of the multiple lift structures:
rigging assembly shall be specifically (1) The permanent floors shall be in-
designed and assembled with a max- stalled as the erection of structural
imum capacity for total assembly and members progresses, and there shall be
for each individual attachment point. not more than eight stories between
This capacity, certified by the manu- the erection floor and the upper-most
facturer or a qualified rigger, shall be permanent floor, except where the
based on the manufacturers specifica- structural integrity is maintained as a
tions with a 5 to 1 safety factor for all result of the design.
components. (2) At no time shall there be more
(3) The total load shall not exceed: than four floors or 48 feet (14.6 m),
(i) The rated capacity of the hoisting whichever is less, of unfinished bolting
equipment specified in the hoisting or welding above the foundation or up-
equipment load charts; permost permanently secured floor, ex-
(ii) The rigging capacity specified in cept where the structural integrity is
the rigging rating chart. maintained as a result of the design.
(4) The multiple lift rigging assembly (3) A fully planked or decked floor or
shall be rigged with members: nets shall be maintained within two
(i) Attached at their center of grav- stories or 30 feet (9.1 m), whichever is
ity and maintained reasonably level; less, directly under any erection work
(ii) Rigged from top down; and being performed.
(iii) Rigged at least 7 feet (2.1 m) (c) Walking/working surfacesshear
apart. connectors and other similar devices(1)
(5) The members on the multiple lift Tripping hazards. Shear connectors
rigging assembly shall be set from the (such as headed steel studs, steel bars
bottom up. or steel lugs), reinforcing bars, de-
(6) Controlled load lowering shall be formed anchors or threaded studs shall
used whenever the load is over the con- not be attached to the top flanges of
nectors. beams, joists or beam attachments so
that they project vertically from or
[66 FR 5265, Jan. 18, 2001, as amended at 75
horizontally across the top flange of
FR 48134, Aug. 9, 2010]
the member until after the metal deck-
1926.754 Structural steel assembly. ing, or other walking/working surface,
has been installed.
(a) Structural stability shall be (2) Installation of shear connectors on
maintained at all times during the composite floors, roofs and bridge decks.
erection process. When shear connectors are used in con-
NOTE TO PARAGRAPH (a): Federal Highway struction of composite floors, roofs and
Administration (FHWA) regulations incor- bridge decks, employees shall lay out
porate by reference a number of standards, and install the shear connectors after
policies, and standard specifications pub- the metal decking has been installed,
lished by the American Association of State using the metal decking as a working
Highway and Transportation Officials
(AASHTO) and other organizations. (See 23
platform. Shear connectors shall not be
CFR 625.4). Many of these incorporated pro- installed from within a controlled
visions may be relevant to maintaining decking zone (CDZ), as specified in
structural stability during the erection proc- 1926.760(c)(8).
ess. For instance, as of May 17, 2010, in many (d) Plumbing-up. (1) When deemed
cases FHWA requires a Registered Engineer necessary by a competent person,
to prepare and seal working drawings for plumbing-up equipment shall be in-
falsework used in highway bridge construc- stalled in conjunction with the steel
tion. (See AASHTO Specifications for High-
way Bridges, Div. II, 3.2.1, 15th edition, 1992,
erection process to ensure the stability
which FHWA incorporates by reference in 23 of the structure.
CFR 625.4). FHWA also encourages compli- (2) When used, plumbing-up equip-
ance with AASHTO Specifications that the ment shall be in place and properly in-
FHWA regulations do not currently incor- stalled before the structure is loaded

413

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00423 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.755 29 CFR Ch. XVII (7112 Edition)

with construction material such as (ii) All covers shall be secured when
loads of joists, bundles of decking or installed to prevent accidental dis-
bundles of bridging. placement by the wind, equipment or
(3) Plumbing-up equipment shall be employees.
removed only with the approval of a (iii) All covers shall be painted with
competent person. high-visibility paint or shall be marked
(e) Metal decking(1) Hoisting, landing with the word HOLE or COVER to
and placing of metal decking bundles. (i) provide warning of the hazard.
Bundle packaging and strapping shall (iv) Smoke dome or skylight fixtures
not be used for hoisting unless specifi- that have been installed, are not con-
cally designed for that purpose. sidered covers for the purpose of this
(ii) If loose items such as dunnage, section unless they meet the strength
flashing, or other materials are placed requirements of paragraph (e)(3)(i) of
on the top of metal decking bundles to this section.
be hoisted, such items shall be secured (4) Decking gaps around columns. Wire
to the bundles. mesh, exterior plywood, or equivalent,
(iii) Bundles of metal decking on shall be installed around columns
joists shall be landed in accordance where planks or metal decking do not
with 1926.757(e)(4). fit tightly. The materials used must be
(iv) Metal decking bundles shall be of sufficient strength to provide fall
landed on framing members so that protection for personnel and prevent
enough support is provided to allow the objects from falling through.
bundles to be unbanded without dis- (5) Installation of metal decking. (i) Ex-
lodging the bundles from the supports. cept as provided in 1926.760(c), metal
(v) At the end of the shift or when en- decking shall be laid tightly and imme-
vironmental or jobsite conditions re- diately secured upon placement to pre-
quire, metal decking shall be secured vent accidental movement or displace-
against displacement. ment.
(2) Roof and floor holes and openings. (ii) During initial placement, metal
Metal decking at roof and floor holes decking panels shall be placed to en-
and openings shall be installed as fol- sure full support by structural mem-
lows: bers.
(i) Framed metal deck openings shall (6) Derrick floors. (i) A derrick floor
have structural members turned down shall be fully decked and/or planked
to allow continuous deck installation and the steel member connections com-
except where not allowed by structural pleted to support the intended floor
design constraints or constructibility. loading.
(ii) Roof and floor holes and openings (ii) Temporary loads placed on a der-
shall be decked over. Where large size, rick floor shall be distributed over the
configuration or other structural de- underlying support members so as to
sign does not allow openings to be prevent local overloading of the deck
decked over (such as elevator shafts, material.
stair wells, etc.) employees shall be
protected in accordance with [66 FR 5265, Jan. 18, 2001, as amended at 71
1926.760(a)(1). FR 2885, Jan. 18, 2006; 71 FR 16674, Apr. 3,
(iii) Metal decking holes and open- 2006; 75 FR 27429, May 17, 2010]
ings shall not be cut until immediately
1926.755 Column anchorage.
prior to being permanently filled with
the equipment or structure needed or (a) General requirements for erection
intended to fulfill its specific use and stability. (1) All columns shall be an-
which meets the strength requirements chored by a minimum of 4 anchor rods
of paragraph (e)(3) of this section, or (anchor bolts).
shall be immediately covered. (2) Each column anchor rod (anchor
(3) Covering roof and floor openings. (i) bolt) assembly, including the column-
Covers for roof and floor openings shall to-base plate weld and the column
be capable of supporting, without fail- foundation, shall be designed to resist
ure, twice the weight of the employees, a minimum eccentric gravity load of
equipment and materials that may be 300 pounds (136.2 kg) located 18 inches
imposed on the cover at any one time. (.46m) from the extreme outer face of

414

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00424 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.757

the column in each direction at the top tached seat or equivalent connection
of the column shaft. device is supplied with the member to
(3) Columns shall be set on level fin- secure the first member and prevent
ished floors, pre-grouted leveling the column from being displaced (See
plates, leveling nuts, or shim packs appendix H to this subpart for exam-
which are adequate to transfer the con- ples of equivalent connection devices).
struction loads. (2) If a seat or equivalent device is
(4) All columns shall be evaluated by used, the seat (or device) shall be de-
a competent person to determine signed to support the load during the
whether guying or bracing is needed; if double connection process. It shall be
guying or bracing is needed, it shall be adequately bolted or welded to both a
installed. supporting member and the first mem-
(b) Repair, replacement or field modi- ber before the nuts on the shared bolts
fication of anchor rods (anchor bolts). (1) are removed to make the double con-
Anchor rods (anchor bolts) shall not be nection.
repaired, replaced or field-modified (d) Column splices. Each column splice
without the approval of the project shall be designed to resist a minimum
structural engineer of record. eccentric gravity load of 300 pounds
(2) Prior to the erection of a column, (136.2 kg) located 18 inches (.46 m) from
the controlling contractor shall pro- the extreme outer face of the column
vide written notification to the steel in each direction at the top of the col-
erector if there has been any repair, re- umn shaft.
placement or modification of the an- (e) Perimeter columns. Perimeter col-
chor rods (anchor bolts) of that col- umns shall not be erected unless:
umn. (1) The perimeter columns extend a
minimum of 48 inches (1.2 m) above the
1926.756 Beams and columns. finished floor to permit installation of
(a) General. (1) During the final plac- perimeter safety cables prior to erec-
ing of solid web structural members, tion of the next tier, except where
the load shall not be released from the constructibility does not allow (see ap-
hoisting line until the members are se- pendix F to this subpart);
cured with at least two bolts per con- (2) The perimeter columns have holes
nection, of the same size and strength or other devices in or attached to pe-
as shown in the erection drawings, rimeter columns at 4245 inches (107114
drawn up wrench-tight or the equiva- cm) above the finished floor and the
lent as specified by the project struc- midpoint between the finished floor
tural engineer of record, except as and the top cable to permit installa-
specified in paragraph (b) of this sec- tion of perimeter safety cables required
tion. by 1926.760(a)(2), except where
(2) A competent person shall deter- constructibility does not allow. (See
mine if more than two bolts are nec- appendix F to this subpart).
essary to ensure the stability of canti-
levered members; if additional bolts 1926.757 Open web steel joists.
are needed, they shall be installed. (a) General. (1) Except as provided in
(b) Diagonal bracing. Solid web struc- paragraph (a)(2) of this section, where
tural members used as diagonal brac- steel joists are used and columns are
ing shall be secured by at least one bolt not framed in at least two directions
per connection drawn up wrench-tight with solid web structural steel mem-
or the equivalent as specified by the bers, a steel joist shall be field-bolted
project structural engineer of record. at the column to provide lateral sta-
(c) (1) Double connections at columns bility to the column during erection.
and/or at beam webs over a column. When For the installation of this joist:
two structural members on opposite (i) A vertical stabilizer plate shall be
sides of a column web, or a beam web provided on each column for steel
over a column, are connected sharing joists. The plate shall be a minimum of
common connection holes, at least one 6 inch by 6 inch (152 mm by 152 mm)
bolt with its wrench-tight nut shall re- and shall extend at least 3 inches (76
main connected to the first member mm) below the bottom chord of the
unless a shop-attached or field-at- joist with a 1316 inch (21 mm) hole to

415

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00425 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.757 29 CFR Ch. XVII (7112 Edition)

provide an attachment point for guying fabricated to allow for field bolting
or plumbing cables. during erection.
(ii) The bottom chords of steel joists (ii) These connections shall be field-
at columns shall be stabilized to pre- bolted unless constructibility does not
vent rotation during erection. allow.
(iii) Hoisting cables shall not be re- (9) Steel joists and steel joist girders
leased until the seat at each end of the shall not be used as anchorage points
steel joist is field-bolted, and each end for a fall arrest system unless written
of the bottom chord is restrained by approval to do so is obtained from a
the column stabilizer plate. qualified person.
(2) Where constructibility does not
(10) A bridging terminus point shall
allow a steel joist to be installed at the
be established before bridging is in-
column:
stalled. (See appendix C to this sub-
(i) an alternate means of stabilizing
joists shall be installed on both sides part.)
near the column and shall: (b) Attachment of steel joists and steel
(A) provide stability equivalent to joist girders. (1) Each end of K series
paragraph (a)(1) of this section; steel joists shall be attached to the
(B) be designed by a qualified person; support structure with a minimum of
(C) be shop installed; and two 18-inch (3 mm) fillet welds 1 inch
(D) be included in the erection draw- (25 mm) long or with two 12-inch (13
ings. mm) bolts, or the equivalent.
(ii) hoisting cables shall not be re- (2) Each end of LH and DLH se-
leased until the seat at each end of the ries steel joists and steel joist girders
steel joist is field-bolted and the joist shall be attached to the support struc-
is stabilized. ture with a minimum of two 14-inch (6
(3) Where steel joists at or near col- mm) fillet welds 2 inches (51 mm) long,
umns span 60 feet (18.3 m) or less, the or with two 34-inch (19 mm) bolts, or
joist shall be designed with sufficient the equivalent.
strength to allow one employee to re- (3) Except as provided in paragraph
lease the hoisting cable without the (b)(4) of this section, each steel joist
need for erection bridging. shall be attached to the support struc-
(4) Where steel joists at or near col- ture, at least at one end on both sides
umns span more than 60 feet (18.3 m), of the seat, immediately upon place-
the joists shall be set in tandem with ment in the final erection position and
all bridging installed unless an alter- before additional joists are placed.
native method of erection, which pro- (4) Panels that have been pre-assem-
vides equivalent stability to the steel bled from steel joists with bridging
joist, is designed by a qualified person shall be attached to the structure at
and is included in the site-specific erec- each corner before the hoisting cables
tion plan. are released.
(5) A steel joist or steel joist girder
(c) Erection of steel joists. (1) Both
shall not be placed on any support
sides of the seat of one end of each
structure unless such structure is sta-
steel joist that requires bridging under
bilized.
(6) When steel joist(s) are landed on a Tables A and B shall be attached to the
structure, they shall be secured to pre- support structure before hoisting ca-
vent unintentional displacement prior bles are released.
to installation. (2) For joists over 60 feet, both ends
(7) No modification that affects the of the joist shall be attached as speci-
strength of a steel joist or steel joist fied in paragraph (b) of this section and
girder shall be made without the ap- the provisions of paragraph (d) of this
proval of the project structural engi- section met before the hoisting cables
neer of record. are released.
(8) Field-bolted joists. (i) Except for (3) On steel joists that do not require
steel joists that have been pre-assem- erection bridging under Tables A and
bled into panels, connections of indi- B, only one employee shall be allowed
vidual steel joists to steel structures in on the joist until all bridging is in-
bays of 40 feet (12.2 m) or more shall be stalled and anchored.

416

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00426 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.757

TABLE AERECTION BRIDGING FOR SHORT TABLE AERECTION BRIDGING FOR SHORT
SPAN JOISTS SPAN JOISTSContinued
Joist Span Joist Span

8L1 ................................................................. NM 14KCS2 ......................................................... NM


10K1 .............................................................. NM 14KCS3 ......................................................... NM
12K1 .............................................................. 230 16KCS2 ......................................................... NM
12K3 .............................................................. NM 16KCS3 ......................................................... NM
12K5 .............................................................. NM 16KCS4 ......................................................... NM
14K1 .............................................................. 270 16KCS5 ......................................................... NM
14K3 .............................................................. NM 18KCS2 ......................................................... 350
14K4 .............................................................. NM 18KCS3 ......................................................... NM
14K6 .............................................................. NM 18KCS4 ......................................................... NM
16K2 .............................................................. 290 18KCS5 ......................................................... NM
16K3 .............................................................. 300 20KCS2 ......................................................... 360
16K4 .............................................................. 320 20KCS3 ......................................................... 390
16K5 .............................................................. 320 20KCS4 ......................................................... NM
16K6 .............................................................. NM 20KCS5 ......................................................... NM
16K7 .............................................................. NM 22KCS2 ......................................................... 360
16K9 .............................................................. NM 22KCS3 ......................................................... 400
18K3 .............................................................. 310 22KCS4 ......................................................... NM
18K4 .............................................................. 320 22KCS5 ......................................................... NM
18K5 .............................................................. 330 24KCS2 ......................................................... 390
18K6 .............................................................. 350 24KCS3 ......................................................... 440
18K7 .............................................................. NM 24KCS4 ......................................................... NM
18K9 .............................................................. NM 24KCS5 ......................................................... NM
18K10 ............................................................ NM 26KCS2 ......................................................... 390
20K3 .............................................................. 320 26KCS3 ......................................................... 440
20K4 .............................................................. 340 26KCS4 ......................................................... NM
20K5 .............................................................. 340 26KCS5 ......................................................... NM
20K6 .............................................................. 360 28KCS2 ......................................................... 400
20K7 .............................................................. 390 28KCS3 ......................................................... 450
20K9 .............................................................. 390 28KCS4 ......................................................... 530
20K10 ............................................................ NM 28KCS5 ......................................................... 530
22K4 .............................................................. 340 30KC53 .......................................................... 450
22K5 .............................................................. 350 30KCS4 ......................................................... 540
22K6 .............................................................. 360 30KCS5 ......................................................... 540
22K7 .............................................................. 400
22K9 .............................................................. 400 NM=diagonal bolted bridging not mandatory for joists under
40 feet.
22K10 ............................................................ 400
22K11 ............................................................ 400
24K4 .............................................................. 360 TABLE BERECTION BRIDGING FOR LONG SPAN
24K5 .............................................................. 380 JOISTS
24K6 .............................................................. 390
24K7 .............................................................. 430 Joist Span
24K8 .............................................................. 430
24K9 .............................................................. 440 18LH02 .................................. 330.
24K10 ............................................................ NM 18LH03 .................................. NM.
24K12 ............................................................ NM 18LH04 .................................. NM.
26K5 .............................................................. 380 18LH05 .................................. NM.
26K6 .............................................................. 390 18LH06 .................................. NM.
26K7 .............................................................. 430 18LH07 .................................. NM.
26K8 .............................................................. 440 18LH08 .................................. NM.
26K9 .............................................................. 450 18LH09 .................................. NM.
26K10 ............................................................ 490 20LH02 .................................. 330.
26K12 ............................................................ NM 20LH03 .................................. 380.
28K6 .............................................................. 400 20LH04 .................................. NM.
28K7 .............................................................. 430 20LH05 .................................. NM.
28K8 .............................................................. 440 20LH06 .................................. NM.
28K9 .............................................................. 450 20LH07 .................................. NM.
28K10 ............................................................ 490 20LH08 .................................. NM.
28K12 ............................................................ 530 20LH09 .................................. NM.
30K7 .............................................................. 440 20LH10 .................................. NM.
30K8 .............................................................. 450 24LH03 .................................. 350.
30K9 .............................................................. 450 24LH04 .................................. 390.
30K10 ............................................................ 500 24LH05 .................................. 400.
30K11 ............................................................ 520 24LH06 .................................. 450.
30K12 ............................................................ 540 24LH07 .................................. NM.
10KCS1 ......................................................... NM 24LH08 .................................. NM.
10KCS2 ......................................................... NM 24LH09 .................................. NM.
10KCS3 ......................................................... NM 24LH10 .................................. NM.
12KCS1 ......................................................... NM 24LH11 .................................. NM.
12KCS2 ......................................................... NM 28LH05 .................................. 420.
12KCS3 ......................................................... NM 28LH06 .................................. 420.
14KCS1 ......................................................... NM 28LH07 .................................. NM.

417

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00427 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.757 29 CFR Ch. XVII (7112 Edition)

TABLE BERECTION BRIDGING FOR LONG SPAN (ii) Two rows of bolted diagonal erec-
JOISTSContinued tion bridging shall be installed near
the third points of the steel joist;
Joist Span
(iii) Hoisting cables shall not be re-
28LH08 .................................. NM. leased until this bolted diagonal erec-
28LH09 .................................. NM. tion bridging is installed and anchored;
28LH10 .................................. NM. and
28LH11 .................................. NM.
28LH12 .................................. NM. (iv) No more than two employees
28LH13 .................................. NM. shall be allowed on these spans until
32LH06 .................................. 470 through 600. all other bridging is installed and an-
32LH07 .................................. 470 through 600. chored.
32LH08 .................................. 550 through 600.
32LH09 .................................. NM through 600.
(3) Where the span of the steel joist is
32LH10 .................................. NM through 600. over 100 feet (30.5 m) through 144 feet
32LH11 .................................. NM through 600. (43.9 m), the following shall apply:
32LH12 .................................. NM through 600. (i) All rows of bridging shall be
32LH13 .................................. NM through 600. bolted diagonal bridging;
32LH14 .................................. NM through 600.
32LH15 .................................. NM through 600. (ii) Hoisting cables shall not be re-
36LH07 .................................. 470 through 600. leased until all bridging is installed
36LH08 .................................. 470 through 600. and anchored; and
36LH09 .................................. 570 through 600. (iii) No more than two employees
36LH10 .................................. NM through 600.
36LH11 .................................. NM through 600.
shall be allowed on these spans until
36LH12 .................................. NM through 600. all bridging is installed and anchored.
36LH13 .................................. NM through 600. (4) For steel members spanning over
36LH14 .................................. NM through 600. 144 feet (43.9 m), the erection methods
36LH15 .................................. NM through 600.
used shall be in accordance with
NM = diagonal bolted bridging not mandatory for joists 1926.756.
under 40 feet.
(5) Where any steel joist specified in
(4) Employees shall not be allowed on paragraphs (c)(2) and (d)(1), (d)(2), and
steel joists where the span of the steel (d)(3) of this section is a bottom chord
joist is equal to or greater than the bearing joist, a row of bolted diagonal
span shown in Tables A and B except in bridging shall be provided near the sup-
accordance with 1926.757(d). port(s). This bridging shall be installed
(5) When permanent bridging ter- and anchored before the hoisting
minus points cannot be used during cable(s) is released.
erection, additional temporary bridg- (6) When bolted diagonal erection
ing terminus points are required to bridging is required by this section, the
provide stability. (See appendix C of following shall apply:
this subpart.) (i) The bridging shall be indicated on
(d) Erection bridging. (1) Where the the erection drawing;
span of the steel joist is equal to or (ii) The erection drawing shall be the
greater than the span shown in Tables exclusive indicator of the proper place-
A and B, the following shall apply: ment of this bridging;
(i) A row of bolted diagonal erection (iii) Shop-installed bridging clips, or
bridging shall be installed near the functional equivalents, shall be used
midspan of the steel joist; where the bridging bolts to the steel
(ii) Hoisting cables shall not be re- joists;
leased until this bolted diagonal erec- (iv) When two pieces of bridging are
tion bridging is installed and anchored; attached to the steel joist by a com-
and mon bolt, the nut that secures the first
(iii) No more than one employee shall piece of bridging shall not be removed
be allowed on these spans until all from the bolt for the attachment of the
other bridging is installed and an- second; and
chored. (v) Bridging attachments shall not
(2) Where the span of the steel joist is protrude above the top chord of the
over 60 feet (18.3 m) through 100 feet steel joist.
(30.5 m), the following shall apply: (e) Landing and placing loads. (1) Dur-
(i) All rows of bridging shall be ing the construction period, the em-
bolted diagonal bridging; ployer placing a load on steel joists

418

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00428 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.760

shall ensure that the load is distrib- each flange before the hoisting equip-
uted so as not to exceed the carrying ment is released.
capacity of any steel joist. (d) Construction loads shall not be
(2) Except for paragraph (e)(4) of this placed on any structural steel frame-
section, no construction loads are al- work unless such framework is safely
lowed on the steel joists until all bridg- bolted, welded or otherwise adequately
ing is installed and anchored and all secured.
joist-bearing ends are attached. (e) In girt and eave strut-to-frame
(3) The weight of a bundle of joist connections, when girts or eave struts
bridging shall not exceed a total of share common connection holes, at
1,000 pounds (454 kg). A bundle of joist least one bolt with its wrench-tight
bridging shall be placed on a minimum nut shall remain connected to the first
of three steel joists that are secured at member unless a manufacturer-sup-
one end. The edge of the bridging bun- plied, field-attached seat or similar
dle shall be positioned within 1 foot (.30 connection device is present to secure
m) of the secured end. the first member so that the girt or
(4) No bundle of decking may be eave strut is always secured against
placed on steel joists until all bridging displacement.
has been installed and anchored and all (f) Both ends of all steel joists or
joist bearing ends attached, unless all cold-formed joists shall be fully bolted
of the following conditions are met: and/or welded to the support structure
(i) The employer has first determined before:
from a qualified person and docu- (1) Releasing the hoisting cables;
mented in a site-specific erection plan (2) Allowing an employee on the
that the structure or portion of the joists; or
structure is capable of supporting the (3) Allowing any construction loads
load; on the joists.
(g) Purlins and girts shall not be used
(ii) The bundle of decking is placed
as an anchorage point for a fall arrest
on a minimum of three steel joists;
system unless written approval is ob-
(iii) The joists supporting the bundle tained from a qualified person.
of decking are attached at both ends; (h) Purlins may only be used as a
(iv) At least one row of bridging is in- walking/working surface when install-
stalled and anchored; ing safety systems, after all permanent
(v) The total weight of the bundle of bridging has been installed and fall
decking does not exceed 4,000 pounds protection is provided.
(1816 kg); and (i) Construction loads may be placed
(vi) Placement of the bundle of deck- only within a zone that is within 8 feet
ing shall be in accordance with para- (2.5 m) of the center-line of the primary
graph (e)(5) of this section. support member.
(5) The edge of the construction load
shall be placed within 1 foot (.30 m) of 1926.759 Falling object protection.
the bearing surface of the joist end. (a) Securing loose items aloft. All mate-
rials, equipment, and tools, which are
1926.758 Systems-engineered metal not in use while aloft, shall be secured
buildings.
against accidental displacement.
(a) All of the requirements of this (b) Protection from falling objects other
subpart apply to the erection of sys- than materials being hoisted. The con-
tems-engineered metal buildings ex- trolling contractor shall bar other con-
cept 1926.755 (column anchorage) and struction processes below steel erec-
1926.757 (open web steel joists). tion unless overhead protection for the
(b) Each structural column shall be employees below is provided.
anchored by a minimum of four anchor
rods (anchor bolts). 1926.760 Fall protection.
(c) Rigid frames shall have 50 percent (a) General requirements. (1) Except as
of their bolts or the number of bolts provided by paragraph (a)(3) of this sec-
specified by the manufacturer (which- tion, each employee engaged in a steel
ever is greater) installed and tightened erection activity who is on a walking/
on both sides of the web adjacent to working surface with an unprotected

419

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00429 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.761 29 CFR Ch. XVII (7112 Edition)

side or edge more than 15 feet (4.6 m) (4) Each employee working in a CDZ
above a lower level shall be protected shall have completed CDZ training in
from fall hazards by guardrail systems, accordance with 1926.761.
safety net systems, personal fall arrest (5) Unsecured decking in a CDZ shall
systems, positioning device systems or not exceed 3,000 square feet (914.4 m2).
fall restraint systems. (6) Safety deck attachments shall be
(2) Perimeter safety cables. On multi- performed in the CDZ from the leading
story structures, perimeter safety ca- edge back to the control line and shall
bles shall be installed at the final inte- have at least two attachments for each
rior and exterior perimeters of the metal decking panel.
floors as soon as the metal decking has (7) Final deck attachments and in-
been installed. stallation of shear connectors shall not
(3) Connectors and employees work- be performed in the CDZ.
ing in controlled decking zones shall be (d) Criteria for fall protection equip-
protected from fall hazards as provided ment. (1) Guardrail systems, safety net
in paragraphs (b) and (c) of this sec- systems, personal fall arrest systems,
tion, respectively. positioning device systems and their
(b) Connectors. Each connector shall: components shall conform to the cri-
(1) Be protected in accordance with teria in 1926.502 (see appendix G to
paragraph (a)(1) of this section from this subpart).
fall hazards of more than two stories or (2) Fall arrest system components
30 feet (9.1 m) above a lower level, shall be used in fall restraint systems
whichever is less; and shall conform to the criteria in
(2) Have completed connector train- 1926.502 (see appendix G). Either body
ing in accordance with 1926.761; and belts or body harnesses shall be used in
(3) Be provided, at heights over 15 fall restraint systems.
and up to 30 feet above a lower level, (3) Perimeter safety cables shall
with a personal fall arrest system, po- meet the criteria for guardrail systems
sitioning device system or fall re- in 1926.502 (see appendix G).
straint system and wear the equipment
(e) Custody of fall protection. Fall pro-
necessary to be able to be tied off; or be
tection provided by the steel erector
provided with other means of protec-
shall remain in the area where steel
tion from fall hazards in accordance
erection activity has been completed,
with paragraph (a)(1) of this section.
to be used by other trades, only if the
(c) Controlled Decking Zone (CDZ). A
controlling contractor or its author-
controlled decking zone may be estab-
ized representative:
lished in that area of the structure
(1) Has directed the steel erector to
over 15 and up to 30 feet above a lower
leave the fall protection in place; and
level where metal decking is initially
being installed and forms the leading (2) Has inspected and accepted con-
edge of a work area. In each CDZ, the trol and responsibility of the fall pro-
following shall apply: tection prior to authorizing persons
(1) Each employee working at the other than steel erectors to work in
leading edge in a CDZ shall be pro- the area.
tected from fall hazards of more than
1926.761 Training.
two stories or 30 feet (9.1 m), whichever
is less. The following provisions supplement
(2) Access to a CDZ shall be limited the requirements of 1926.21 regarding
to only those employees engaged in the hazards addressed in this subpart.
leading edge work. (a) Training personnel. Training re-
(3) The boundaries of a CDZ shall be quired by this section shall be provided
designated and clearly marked. The by a qualified person(s).
CDZ shall not be more than 90 feet (27.4 (b) Fall hazard training. The employer
m) wide and 90 (27.4 m) feet deep from shall train each employee exposed to a
any leading edge. The CDZ shall be fall hazard in accordance with the re-
marked by the use of control lines or quirements of this section. The em-
the equivalent. Examples of acceptable ployer shall institute a training pro-
procedures for demarcating CDZs can gram and ensure employee participa-
be found in appendix D to this subpart. tion in the program.

420

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00430 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. R, App. A

(c) Special training programs. In addi- inspection(s) are held between the erector
tion to the training required in para- and the controlling contractor, and others
graphs (a) and (b) of this section, the such as the project engineer and fabricator
before the start of steel erection. The pur-
employer shall provide special training
pose of such conference(s) is to develop and
to employees engaged in the following review the site-specific erection plan that
activities. will meet the requirements of this section.
(1) Multiple lift rigging procedure. The (c) Components of a site-specific erection
employer shall ensure that each em- plan. In developing a site-specific erection
ployee who performs multiple lift rig- plan, a steel erector considers the following
ging has been provided training in the elements:
following areas: (1) The sequence of erection activity, de-
(i) The nature of the hazards associ- veloped in coordination with the controlling
ated with multiple lifts; and contractor, that includes the following:
(ii) The proper procedures and equip- (i) Material deliveries:
(ii) Material staging and storage; and
ment to perform multiple lifts required
(iii) Coordination with other trades and
by 1926.753(e). construction activities.
(2) Connector procedures. The em- (2) A description of the crane and derrick
ployer shall ensure that each connector selection and placement procedures, includ-
has been provided training in the fol- ing the following:
lowing areas: (i) Site preparation;
(i) The nature of the hazards associ- (ii) Path for overhead loads; and
ated with connecting; and (iii) Critical lifts, including rigging sup-
(ii) The establishment, access, proper plies and equipment.
connecting techniques and work prac- (3) A description of steel erection activities
tices required by 1926.756(c) and and procedures, including the following:
(i) Stability considerations requiring tem-
1926.760(b).
porary bracing and guying;
(3) Controlled Decking Zone Procedures. (ii) Erection bridging terminus point;
Where CDZs are being used, the em- (iii) Anchor rod (anchor bolt) notifications
ployer shall assure that each employee regarding repair, replacement and modifica-
has been provided training in the fol- tions;
lowing areas: (iv) Columns and beams (including joists
(i) The nature of the hazards associ- and purlins);
ated with work within a controlled (v) Connections;
decking zone; and (vi) Decking; and
(ii) The establishment, access, proper (vii) Ornamental and miscellaneous iron.
installation techniques and work prac- (4) A description of the fall protection pro-
cedures that will be used to comply with
tices required by 1926.760(c) and
1926.760.
1926.754(e). (5) A description of the procedures that
[66 FR 5265, Jan. 18, 2001, as amended at 73 will be used to comply with 1926.759.
FR 75589, Dec. 12, 2008] (6) A description of the special procedures
required for hazardous non-routine tasks.
APPENDIX A TO SUBPART R OF PART (7) A certification for each employee who
1926GUIDELINES FOR ESTABLISHING has received training for performing steel
THE COMPONENTS OF A SITE-SPECIFIC erection operations as required by 1926.761.
ERECTION PLAN: NON-MANDATORY (8) A list of the qualified and competent
persons.
GUIDELINES FOR COMPLYING WITH
(9) A description of the procedures that
1926.752(e) will be utilized in the event of rescue or
(a) General. This appendix serves as a emergency response.
guideline to assist employers who elect to (d) Other plan information. The plan:
develop a site-specific erection plan in ac- (1) Includes the identification of the site
cordance with 1926.752(e) with alternate and project; and
means and methods to provide employee pro- (2) Is signed and dated by the qualified per-
tection in accordance with 1926.752(e), son(s) responsible for its preparation and
1926.753(c)(5), 1926.757(a)(4) and modification.
1926.757(e)(4).
(b) Development of a site-specific erection APPENDIX B TO SUBPART R OF PART 1926
plan. Pre-construction conference(s) and site [RESERVED]

421

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00431 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. R, App. C 29 CFR Ch. XVII (7112 Edition)

APPENDIX C TO SUBPART R OF PART 1926ILLUSTRATIONS OF BRIDGING TERMINUS


POINTS: NON-MANDATORY

422
ER18JA01.021</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00432 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. R, App. C

423
ER18JA01.022</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00433 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. R, App. D 29 CFR Ch. XVII (7112 Edition)

APPENDIX D TO SUBPART R OF PART metal deck and other operations connected


1926ILLUSTRATION OF THE USE OF with leading edge work are taking place, the
controlled decking zone (CDZ) is defined by a
CONTROL LINES TO DEMARCATE CON-
control line or by any other means that re-
TROLLED DECKING ZONES (CDZS): stricts access.
NON-MANDATORY GUIDELINES FOR (i) A control line for a CDZ is erected not
COMPLYING WITH 1926.760(c)(3) less than 6 feet (1.8 m) nor more than 90 feet
(27.4 m) from the leading edge.
(1) When used to control access to areas (ii) Control lines extend along the entire
where leading edge and initial securement of length of the unprotected or leading edge

424
ER18JA01.023</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00434 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. R, App. G
and are approximately parallel to the unpro- NOTE: When employees are using stilts, the
tected or leading edge. top edge height of the top rail, or equivalent
(iii) Control lines are connected on each member, shall be increased an amount equal
side to a guardrail system, wall, stanchion or to the height of the stilts.
other suitable anchorage. (2) Midrails, screens, mesh, intermediate
(2) Control lines consist of ropes, wires, vertical members, or equivalent inter-
tapes, or equivalent materials, and sup- mediate structural members shall be in-
porting stanchions as follows: stalled between the top edge of the guardrail
(i) Each line is rigged and supported in system and the walking/working surface
such a way that its lowest point (including when there is no wall or parapet wall at least
sag) is not less than 39 inches (1.0 m) from 21 inches (53 cm) high.
the walking/working surface and its highest
(i) Midrails, when used, shall be installed
point is not more than 45 inches (1.3 m) from
at a height midway between the top edge of
the walking/working surface.
the guardrail system and the walking/work-
(ii) Each line has a minimum breaking
ing level.
strength of 200 pounds (90.8 kg).
(ii) Screens and mesh, when used, shall ex-
tend from the top rail to the walking/work-
APPENDIX E TO SUBPART R OF PART
ing level and along the entire opening be-
1926TRAINING: NON-MANDATORY tween top rail supports.
GUIDELINES FOR COMPLYING WITH (iii) Intermediate members (such as balus-
1926.761 ters), when used between posts, shall be not
more than 19 inches (48 cm) apart.
The training requirements of 1926.761 will
(iv) Other structural members (such as ad-
be deemed to have been met if employees
ditional midrails and architectural panels)
have completed a training course on steel
shall be installed such that there are no
erection, including instruction in the provi-
openings in the guardrail system that are
sions of this standard, that has been ap-
more than 19 inches (.5 m) wide.
proved by the U.S. Department of Labor Bu-
(3) Guardrail systems shall be capable of
reau of Apprenticeship.
withstanding, without failure, a force of at
least 200 pounds (890 N) applied within 2
APPENDIX F TO SUBPART R OF PART inches (5.1 cm) of the top edge, in any out-
1926PERIMETER COLUMNS: NON- ward or downward direction, at any point
MANDATORY GUIDELINES FOR COM- along the top edge.
PLYING WITH 1926.756(e) TO PRO- (4) When the 200 pound (890 N) test load
TECT THE UNPROTECTED SIDE OR specified in paragraph (b)(3) of this section
EDGE OF A WALKING/WORKING SUR- ( 1926.502) is applied in a downward direc-
FACE tion, the top edge of the guardrail shall not
deflect to a height less than 39 inches (1.0 m)
In multi-story structures, when holes in above the walking/working level. Guardrail
the column web are used for perimeter safety system components selected and constructed
cables, the column splice must be placed suf- in accordance with the appendix B to subpart
ficiently high so as not to interfere with any M of this part will be deemed to meet this re-
attachments to the column necessary for the quirement.
column splice. Column splices are rec- (5) Midrails, screens, mesh, intermediate
ommended to be placed at every other or vertical members, solid panels, and equiva-
fourth levels as design allows. Column lent structural members shall be capable of
splices at third levels are detrimental to the withstanding, without failure, a force of at
erection process and should be avoided if pos- least 150 pounds (666 N) applied in any down-
sible. ward or outward direction at any point along
the midrail or other member.
APPENDIX G TO SUBPART R OF PART (6) Guardrail systems shall be so surfaced
1926 1926.502 (b)(e) FALL PROTEC- as to prevent injury to an employee from
TION SYSTEMS CRITERIA AND PRAC- punctures or lacerations, and to prevent
TICES snagging of clothing.
(7) The ends of all top rails and midrails
(b) Guardrail systems. Guardrail sys- shall not overhang the terminal posts, ex-
tems and their use shall comply with the fol- cept where such overhang does not con-
lowing provisions: stitute a projection hazard.
(1) Top edge height of top rails, or equiva- (8) Steel banding and plastic banding shall
lent guardrail system members, shall be 42 not be used as top rails or midrails.
inches (1.1 m) plus or minus 3 inches (8 cm) (9) Top rails and midrails shall be at least
above the walking/working level. When con- one-quarter inch (0.6 cm) nominal diameter
ditions warrant, the height of the top edge or thickness to prevent cuts and lacerations.
may exceed the 45-inch height, provided the If wire rope is used for top rails, it shall be
guardrail system meets all other criteria of flagged at not more than 6-foot intervals
this paragraph ( 1926.502(b)). with high-visibility material.

425

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00435 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. R, App. G 29 CFR Ch. XVII (7112 Edition)
(10) When guardrail systems are used at (14) Guardrail systems used on ramps and
hoisting areas, a chain, gate or removable runways shall be erected along each unpro-
guardrail section shall be placed across the tected side or edge.
access opening between guardrail sections (15) Manila, plastic or synthetic rope being
when hoisting operations are not taking used for top rails or midrails shall be in-
place. spected as frequently as necessary to ensure
(11) When guardrail systems are used at that it continues to meet the strength re-
holes, they shall be erected on all unpro- quirements of paragraph (b)(3) of this section
tected sides or edges of the hole. ( 1926.502).
(12) When guardrail systems are used
(c) Safety net systems. Safety net systems
around holes used for the passage of mate-
and their use shall comply with the fol-
rials, the hole shall have not more than two
lowing provisions:
sides provided with removable guardrail sec-
tions to allow the passage of materials. (1) Safety nets shall be installed as close as
When the hole is not in use, it shall be closed practicable under the walking/working sur-
over with a cover, or a guardrail system face on which employees are working, but in
shall be provided along all unprotected sides no case more than 30 feet (9.1 m) below such
or edges. level. When nets are used on bridges, the po-
(13) When guardrail systems are used tential fall area from the walking/working
around holes which are used as points of ac- surface to the net shall be unobstructed.
cess (such as ladderways), they shall be pro- (2) Safety nets shall extend outward from
vided with a gate, or be so offset that a per- the outermost projection of the work surface
son cannot walk directly into the hole. as follows:

Minimum required horizontal distance of outer edge of net from


Vertical distance from working level to horizontal plane of net the edge of the working surface

Up to 5 feet .................................................................................. 8 feet


More than 5 feet up to 10 feet .................................................... 10 feet
More than 10 feet ........................................................................ 13 feet

(3) Safety nets shall be installed with suffi- certification record must include an identi-
cient clearance under them to prevent con- fication of the net and net installation for
tact with the surface or structures below which the certification record is being pre-
when subjected to an impact force equal to pared; the date that it was determined that
the drop test specified in paragraph (4) of the identified net and net installation were
this section [ 1926.502]. in compliance with paragraph (c)(3) of this
(4) Safety nets and their installations shall section ( 1926.502) and the signature of the
be capable of absorbing an impact force person making the determination and cer-
equal to that produced by the drop test spec- tification. The most recent certification
ified in paragraph (c)(4)(i) of this section record for each net and net installation shall
[ 1926.502]. be available at the jobsite for inspection.
(i) Except as provided in paragraph (5) Defective nets shall not be used. Safety
(c)(4)(ii) of this section ( 1926.502), safety nets shall be inspected at least once a week
nets and safety net installations shall be for wear, damage, and other deterioration.
drop-tested at the jobsite after initial instal- Defective components shall be removed from
lation and before being used as a fall protec- service. Safety nets shall also be inspected
tion system, whenever relocated, after major after any occurrence which could affect the
repair, and at 6-month intervals if left in one
integrity of the safety net system.
place. The drop-test shall consist of a 400
(6) Materials, scrap pieces, equipment, and
pound (180 kg) bag of sand 30+ or 2 inches
(76+ or 5 cm) in diameter dropped into the tools which have fallen into the safety net
net from the highest walking/working sur- shall be removed as soon as possible from the
face at which employees are exposed to fall net and at least before the next work shift.
hazards, but not from less than 42 inches (1.1 (7) The maximum size of each safety net
m) above that level. mesh opening shall not exceed 36 square
(ii) When the employer can demonstrate inches (230 cm) nor be longer than 6 inches
that it is unreasonable to perform the drop- (15 cm) on any side, and the opening, meas-
test required by paragraph (c)(4)(i) of this ured center-to-center of mesh ropes or web-
section ( 1926.502), the employer (or a des- bing, shall not be longer than 6 inches (15
ignated competent person) shall certify that cm). All mesh crossings shall be secured to
the net and net installation is in compliance prevent enlargement of the mesh opening.
with the provisions of paragraphs (c)(3) and (8) Each safety net (or section of it) shall
(c)(4)(i) of this section ( 1926.502) by pre- have a border rope for webbing with a min-
paring a certification record prior to the net imum breaking strength of 5,000 pounds (22.2
being used as a fall protection system. The kN).

426

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00436 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. R, App. G
(9) Connections between safety net panels (9) Lanyards and vertical lifelines shall
shall be as strong as integral net components have a minimum breaking strength of 5,000
and shall be spaced not more than 6 inches pounds (22.2 kN).
(15 cm) apart. (10)(i) Except as provided in paragraph
(d) Personal fall arrest systems. Per- (d)(10)(ii) of this section [ 1926.502], when
sonal fall arrest systems and their use shall vertical lifelines are used, each employee
comply with the provisions set forth below. shall be attached to a separate lifeline.
Effective January 1, 1998, body belts are not (ii) During the construction of elevator
acceptable as part of a personal fall arrest shafts, two employees may be attached to
system. the same lifeline in the hoistway, provided
both employees are working atop a false car
NOTE: The use of a body belt in a posi- that is equipped with guardrails; the
tioning device system is acceptable and is strength of the lifeline is 10,000 pounds [5,000
regulated under paragraph (e) of this section pounds per employee attached] (44.4 kN); and
( 1926.502). all other criteria specified in this paragraph
(1) Connectors shall be drop forged, pressed for lifelines have been met.
or formed steel, or made of equivalent mate- (11) Lifelines shall be protected against
rials. being cut or abraded.
(2) Connectors shall have a corrosion-re- (12) Self-retracting lifelines and lanyards
sistant finish, and all surfaces and edges which automatically limit free fall distance
shall be smooth to prevent damage to inter- to 2 feet (0.61 m) or less shall be capable of
facing parts of the system. sustaining a minimum tensile load of 3,000
(3) Dee-rings and snaphooks shall have a pounds (13.3 kN) applied to the device with
minimum tensile strength of 5,000 pounds the lifeline or lanyard in the fully extended
(22.2 kN). position.
(13) Self-retracting lifelines and lanyards
(4) Dee-rings and snaphooks shall be proof-
which do not limit free fall distance to 2 feet
tested to a minimum tensile load of 3,600
(0.61 m) or less, ripstitch lanyards, and tear-
pounds (16 kN) without cracking, breaking,
ing and deforming lanyards shall be capable
or taking permanent deformation.
of sustaining a minimum tensile load of 5,000
(5) Snaphooks shall be sized to be compat-
pounds (22.2 kN) applied to the device with
ible with the member to which they are con-
the lifeline or lanyard in the fully extended
nected to prevent unintentional disengage-
position.
ment of the snaphook by depression of the
(14) Ropes and straps (webbing) used in lan-
snaphook keeper by the connected member,
yards, lifelines, and strength components of
or shall be a locking type snaphook designed
body belts and body harnesses shall be made
and used to prevent disengagement of the
from synthetic fibers.
snaphook by the contact of the snaphook
(15) Anchorages used for attachment of
keeper by the connected member. Effective
personal fall arrest equipment shall be inde-
January 1, 1998, only locking type snaphooks
pendent of any anchorage being used to sup-
shall be used.
port or suspend platforms and capable of sup-
(6) Unless the snaphook is a locking type porting at least 5,000 pounds (22.2 kN) per
and designed for the following connections, employee attached, or shall be designed, in-
snaphooks shall not be engaged: stalled, and used as follows:
(i) directly to webbing, rope or wire rope; (i) as part of a complete personal fall ar-
(ii) to each other; rest system which maintains a safety factor
(iii) to a dee-ring to which another of at least two; and
snaphook or other connector is attached; (ii) under the supervision of a qualified
(iv) to a horizontal lifeline; or person.
(v) to any object which is incompatibly (16) Personal fall arrest systems, when
shaped or dimensioned in relation to the stopping a fall, shall:
snaphook such that unintentional disengage- (i) limit maximum arresting force on an
ment could occur by the connected object employee to 900 pounds (4 kN) when used
being able to depress the snaphook keeper with a body belt;
and release itself. (ii) limit maximum arresting force on an
(7) On suspended scaffolds or similar work employee to 1,800 pounds (8 kN) when used
platforms with horizontal lifelines which with a body harness;
may become vertical lifelines, the devices (iii) be rigged such that an employee can
used to connect to a horizontal lifeline shall neither free fall more than 6 feet (1.8 m), nor
be capable of locking in both directions on contact any lower level;
the lifeline. (iv) bring an employee to a complete stop
(8) Horizontal lifelines shall be designed, and limit maximum deceleration distance an
installed, and used, under the supervision of employee travels to 3.5 feet (1.07 m); and,
a qualified person, as part of a complete per- (v) have sufficient strength to withstand
sonal fall arrest system, which maintains a twice the potential impact energy of an em-
safety factor of at least two. ployee free falling a distance of 6 feet (1.8 m),

427

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00437 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. R, App. H 29 CFR Ch. XVII (7112 Edition)
or the free fall distance permitted by the (2) Positioning devices shall be secured to
system, whichever is less. an anchorage capable of supporting at least
twice the potential impact load of an em-
NOTE: If the personal fall arrest system
ployees fall or 3,000 pounds (13.3 kN), which-
meets the criteria and protocols contained in
appendix C to subpart M, and if the system ever is greater.
is being used by an employee having a com- (3) Connectors shall be drop forged, pressed
bined person and tool weight of less than 310 or formed steel, or made of equivalent mate-
pounds (140 kg), the system will be consid- rials.
ered to be in compliance with the provisions (4) Connectors shall have a corrosion-re-
of paragraph (d)(16) of this section [ 1926.502]. sistant finish, and all surfaces and edges
If the system is used by an employee having shall be smooth to prevent damage to inter-
a combined tool and body weight of 310 facing parts of this system.
pounds (140 kg) or more, then the employer (5) Connecting assemblies shall have a
must appropriately modify the criteria and minimum tensile strength of 5,000 pounds
protocols of the appendix to provide proper (22.2 kN)
protection for such heavier weights, or the (6) Dee-rings and snaphooks shall be proof-
system will not be deemed to be in compli- tested to a minimum tensile load of 3,600
ance with the requirements of paragraph pounds (16 kN) without cracking, breaking,
(d)(16) of this section ( 1926.502). or taking permanent deformation.
(7) Snaphooks shall be sized to be compat-
(17) The attachment point of the body belt
ible with the member to which they are con-
shall be located in the center of the wearers
nected to prevent unintentional disengage-
back. The attachment point of the body har-
ment of the snaphook by depression of the
ness shall be located in the center of the
wearers back near shoulder level, or above snaphook keeper by the connected member,
the wearers head. or shall be a locking type snaphook designed
(18) Body belts, harnesses, and components and used to prevent disengagement of the
shall be used only for employee protection snaphook by the contact of the snaphook
(as part of a personal fall arrest system or keeper by the connected member. As of Jan-
positioning device system) and not to hoist uary 1, 1998, only locking type snaphooks
materials. shall be used.
(19) Personal fall arrest systems and com- (8) Unless the snaphook is a locking type
ponents subjected to impact loading shall be and designed for the following connections,
immediately removed from service and shall snaphooks shall not be engaged:
not be used again for employee protection (i) directly to webbing, rope or wire rope;
until inspected and determined by a com- (ii) to each other;
petent person to be undamaged and suitable (iii) to a dee-ring to which another
for reuse. snaphook or other connector is attached;
(20) The employer shall provide for prompt (iv) to a horizontal lifeline; or to depress
rescue of employees in the event of a fall or the snaphook keeper and release itself.
shall assure that employees are able to res- (v) to any object which is incompatibly
cue themselves. shaped or dimensioned in relation to the
(21) Personal fall arrest systems shall be snaphook such that unintentional disengage-
inspected prior to each use for wear, damage ment could occur by the connected object
and other deterioration, and defective com- being able to depress the snaphook keeper
ponents shall be removed from service. and release itself.
(22) Body belts shall be at least one and (9) Positioning device systems shall be in-
five-eighths (158) inches (4.1 cm) wide. spected prior to each use for wear, damage,
(23) Personal fall arrest systems shall not and other deterioration, and defective com-
be attached to guardrail systems, nor shall ponents shall be removed from service.
they be attached to hoists except as specified (10) Body belts, harnesses, and components
in other subparts of this Part. shall be used only for employee protection
(24) When a personal fall arrest system is (as part of a personal fall arrest system or
used at hoist areas, it shall be rigged to positioning device system) and not to hoist
allow the movement of the employee only as materials.
far as the edge of the walking/working sur-
face. APPENDIX H TO SUBPART R OF PART
(e) Positioning device systems. Positioning
1926DOUBLE CONNECTIONS: ILLUS-
device systems and their use shall conform
to the following provisions: TRATION OF A CLIPPED END CONNEC-
(1) Positioning devices shall be rigged such TION AND A STAGGERED CONNECTION:
that an employee cannot free fall more than NON-MANDATORY GUIDELINES FOR
2 feet (.9 m). COMPLYING WITH 1926.756(c)(1)

428

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00438 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. R, App. H

Clipped end connections are connection member to remain in place. The notch(es)
material on the end of a structural member fits around the nut or bolt head of the oppos-
which has a notch at the bottom and/or top ing member to allow the second member to
to allow the bolt(s) of the first member be bolted up without removing the bolt(s)
placed on the opposite side of the central holding the first member.

Staggered connections are connection ma- Subpart SUnderground Con-


terial on a structural member in which all of
the bolt holes in the common member web struction, Caissons,
are not shared by the two incoming members Cofferdams and Compressed
in the final connection. The extra hole in the Air
column web allows the erector to maintain
at least a one bolt connection at all times
AUTHORITY: Sec. 107, Contract Work Hours
while making the double connection.
and Safety Standards Act (40 U.S.C. 333);
ER18JA01.025</GPH>

secs. 4, 6, and 8 of the Occupational Safety


and Health Act of 1970 (29 U.S.C. 653, 655, 657);

429
ER18JA01.024</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00439 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.800 29 CFR Ch. XVII (7112 Edition)
Secretary of Labors Orders 1271 (36 FR ronmental controls are effective, and
8754), 876 (41 FR 25059), 983 (48 FR 35736), 1 when the remaining construction ac-
90 (55 FR 9033), 696 (62 FR 111), or 52007 (72
tivity will not cause any environ-
FR 31159) as applicable.
mental hazard or structural failure
1926.800 Underground construction. within the facilities.
(a) Scope and application. (1) This sec- (d) Safety instruction. All employees
tion applies to the construction of un- shall be instructed in the recognition
derground tunnels, shafts, chambers, and avoidance of hazards associated
and passageways. This section also ap- with underground construction activi-
plies to cut-and-cover excavations ties including, where appropriate, the
which are both physically connected to following subjects:
ongoing underground construction op- (1) Air monitoring;
erations within the scope of this sec- (2) Ventilation;
tion, and covered in such a manner as (3) Illumination;
to create conditions characteristic of (4) Communications;
underground construction. (5) Flood control;
(2) This section does not apply to the (6) Mechanical equipment;
following:
(7) Personal protective equipment;
(i) Excavation and trenching oper-
ations covered by subpart P of this (8) Explosives;
part, such as foundation operations for (9) Fire prevention and protection;
above-ground structures that are not and
physically connected to underground (10) Emergency procedures, including
construction operations, and surface evacuation plans and check-in/check-
excavation; nor out systems.
(ii) Underground electrical trans- (e) Notification. (1) Oncoming shifts
mission and distribution lines, as ad- shall be informed of any hazardous oc-
dressed in subpart V of this part. currences or conditions that have af-
(b) Access and egress. (1) The employer fected or might affect employee safety,
shall provide and maintain safe means including liberation of gas, equipment
of access and egress to all work sta- failures, earth or rock slides, cave-ins,
tions. floodings, fires or explosions.
(2) The employer shall provide access (2) The employer shall establish and
and egress in such a manner that em- maintain direct communications for
ployees are protected from being coordination of activities with other
struck by excavators, haulage ma- employers whose operations at the job-
chines, trains and other mobile equip- site affect or may affect the safety of
ment. employees underground.
(3) The employer shall control access
(f) Communications. (1) When natural
to all openings to prevent unauthorized
unassisted voice communication is in-
entry underground. Unused chutes,
effective, a power-assisted means of
manways, or other openings shall be
voice communication shall be used to
tightly covered, bulkheaded, or fenced
off, and shall be posted with warning provide communication between the
signs indicating Keep Out or similar work face, the bottom of the shaft, and
language. Completed or unused sec- the surface.
tions of the underground facility shall (2) Two effective means of commu-
be barricaded. nication, at least one of which shall be
(c) Check-in/check-out. The employer voice communication, shall be provided
shall maintain a check-in/check-out in all shafts which are being developed
procedure that will ensure that above- or used either for personnel access or
ground personnel can determine an ac- for hoisting. Additional requirements
curate count of the number of persons for hoist operator communication are
underground in the event of an emer- contained in paragraph (t)(3)(xiv) of
gency. However, this procedure is not this section.
required when the construction of un- (3) Powered communication systems
derground facilities designed for shall operate on an independent power
human occupancy has been sufficiently supply, and shall be installed so that
completed so that the permanent envi- the use of or disruption of any one

430

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00440 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.800

phone or signal location will not dis- (5) Rescue teams. (i) On jobsites where
rupt the operation of the system from 25 or more employees work under-
any other location. ground at one time, the employer shall
(4) Communication systems shall be provide (or make arrangements in ad-
tested upon initial entry of each shift vance with locally available rescue
to the underground, and as often as services to provide) at least two 5-per-
necessary at later times, to ensure that son rescue teams, one on the jobsite or
they are in working order. within one-half hour travel time from
(5) Any employee working alone un- the entry point, and the other within 2
derground in a hazardous location, who hours travel time.
is both out of the range of natural un- (ii) On jobsites where less than 25 em-
assisted voice communication and not ployees work underground at one time,
under observation by other persons, the employer shall provide (or make
shall be provided with an effective arrangements in advance with locally
means of obtaining assistance in an available rescue services to provide) at
emergency. least one 5-person rescue team to be ei-
(g) Emergency provisions(1) Hoisting ther on the jobsite or within one-half
capability. When a shaft is used as a hour travel time from the entry point.
means of egress, the employer shall (iii) Rescue team members shall be
make advance arrangements for power- qualified in rescue procedures, the use
assisted hoisting capability to be read- and limitations of breathing apparatus,
ily available in an emergency, unless and the use of firefighting equipment.
the regular hoisting means can con- Qualifications shall be reviewed not
tinue to function in the event of an less than annually.
electrical power failure at the jobsite.
(iv) On jobsites where flammable or
Such hoisting means shall be designed
noxious gases are encountered or an-
so that the load hoist drum is powered
ticipated in hazardous quantities, res-
in both directions of rotation and so
cue team members shall practice don-
that the brake is automatically applied
ning and using self-contained breathing
upon power release or failure.
apparatus monthly.
(2) Self-rescuers. The employer must
(v) The employer shall ensure that
provide self-rescuers approved by the
rescue teams are familiar with condi-
National Institute for Occupational
tions at the jobsite.
Safety and Health under 42 CFR part
84. The respirators must be imme- (h) Hazardous classifications(1) Po-
diately available to all employees at tentially gassy operations. Underground
work stations in underground areas construction operations shall be classi-
where employees might be trapped by fied as potentially gassy if either:
smoke or gas. The selection, issuance, (i) Air monitoring discloses 10 per-
use, and care of respirators must be in cent or more of the lower explosive
accordance with 29 CFR 1926.103. limit for methane or other flammable
(3) Designated person. At least one gases measured at 12 inches (304.8 mm)
designated person shall be on duty 0.25 inch (6.35 mm) from the roof, face,
above ground whenever any employee floor or walls in any underground work
is working underground. This des- area for more than a 24-hour period; or
ignated person shall be responsible for (ii) The history of the geographical
securing immediate aid and keeping an area or geological formation indicates
accurate count of employees under- that 10 percent or more of the lower ex-
ground in case of emergency. The des- plosive limit for methane or other
ignated person must not be so busy flammable gases is likely to be encoun-
with other responsibilities that the tered in such underground operations.
counting function is encumbered. (2) Gassy operations. Underground
(4) Emergency lighting. Each employee construction operations shall be classi-
underground shall have an acceptable fied as gassy if:
portable hand lamp or cap lamp in his (i) Air monitoring discloses 10 per-
or her work area for emergency use, cent or more of the lower explosive
unless natural light or an emergency limit for methane or other flammable
lighting system provides adequate illu- gases measured at 12 inches (304.8 mm)
mination for escape. 0.25 inch (6.35 mm) from the roof, face,

431

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00441 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.800 29 CFR Ch. XVII (7112 Edition)

floor or walls in any underground work (ii) Installation of new equipment, or


area for three consecutive days; or conversion of existing equipment, to
(ii) There has been an ignition of comply with this paragraph (i); and
methane or of other flammable gases (iii) Installation of above-ground con-
emanating from the strata that indi- trols for reversing the air flow.
cates the presence of such gases; or (j) Air quality and monitoring(1) Gen-
(iii) The underground construction eral. Air quality limits and control re-
operation is both connected to an un- quirements for construction are found
derground work area which is cur- in 1926.55, except as modified by this
rently classified as gassy and is also section.
subject to a continuous course of air (i)(A) The employer shall assign a
containing the flammable gas con- competent person who shall perform all
centration. air monitoring required by this sec-
(3) Declassification to potentially gassy tion.
operations. Underground construction (B) Where this paragraph requires
gassy operations may be declassified to monitoring of airborne contaminants
Potentially Gassy when air monitoring as often as necessary, the competent
results remain under 10 percent of the person shall make a reasonable deter-
lower explosive limit for methane or mination as to which substances to
other flammable gases for three con- monitor and how frequently to mon-
secutive days. itor, considering at least the following
(i) Gassy operations-additional require- factors:
ments. (1) Only acceptable equipment, (1) Location of jobsite: Proximity to
maintained in suitable condition, shall fuel tanks, sewers, gas lines, old land-
be used in gassy operations. fills, coal deposits, and swamps;
(2) Mobile diesel-powered equipment (2) Geology: Geological studies of the
used in gassy operations shall be either jobsite, particularly involving the soil
approved in accordance with the re- type and its permeability;
quirements of 30 CFR part 36 (formerly (3) History: Presence of air contami-
Schedule 31) by MSHA, or shall be dem- nants in nearby jobsites, changes in
onstrated by the employer to be fully levels of substances monitored on the
equivalent to such MSHA-approved prior shift; and
equipment, and shall be operated in ac- (4) Work practices and jobsite condi-
cordance with that part. tions: The use of diesel engines, use of
(3) Each entrance to a gassy oper- explosives, use of fuel gas, volume and
ation shall be prominently posted with flow of ventilation, visible atmospheric
signs notifying all entrants of the conditions, decompression of the at-
gassy classification. mosphere, welding, cutting and hot
(4) Smoking shall be prohibited in all work, and employees physical reac-
gassy operations and the employer tions to working underground.
shall be responsible for collecting all (ii)(A) The atmosphere in all under-
personal sources of ignition, such as ground work areas shall be tested as
matches and lighters, from all persons often as necessary to assure that the
entering a gassy operation. atmosphere at normal atmospheric
(5) A fire watch as described in pressure contains at least 19.5 percent
1926.352(e) shall be maintained when oxygen and no more than 22 percent ox-
hot work is performed. ygen.
(6) Once an operation has met the cri- (B) Tests for oxygen content shall be
teria in paragraph (h)(2) warranting made before tests for air contaminants.
classification as gassy, all operations (iii)(A) The atmosphere in all under-
in the affected area, except the fol- ground work areas shall be tested
lowing, shall be discontinued until the quantitatively for carbon monoxide, ni-
operation either is in compliance with trogen dioxide, hydrogen sulfide, and
all of the gassy operation requirements other toxic gases, dusts, vapors, mists,
or has been declassified in accordance and fumes as often as necessary to en-
with paragraph (h)(3) of this section: sure that the permissible exposure lim-
(i) Operations related to the control its prescribed in 1926.55 are not ex-
of the gas concentration; ceeded.

432

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00442 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.800

(B) The atmosphere in all under- that air contaminants may be present
ground work areas shall be tested in sufficient quantity to be dangerous
quantitatively for methane and other to life, the employer shall:
flammable gases as often as necessary (A) Prominently post a notice at all
to determine: entrances to the underground jobsite
(1) Whether action is to be taken to inform all entrants of the hazardous
under paragraphs (j)(1)(vii), (viii), and condition; and
(ix), of this section; and (B) Ensure that the necessary pre-
(2) Whether an operation is to be cautions are taken.
classified potentially gassy or gassy (vii) Whenever five percent or more
under paragraph (h) of this section. of the lower explosive limit for meth-
(C) If diesel-engine or gasoline-engine ane or other flammable gases is de-
driven ventilating fans or compressors tected in any underground work area(s)
are used, an initial test shall be made or in the air return, steps shall be
of the inlet air of the fan or com- taken to increase ventilation air vol-
pressor, with the engines operating, to ume or otherwise control the gas con-
ensure that the air supply is not con- centration, unless the employer is op-
taminated by engine exhaust. erating in accordance with the poten-
(D) Testing shall be performed as tially gassy or gassy operation require-
often as necessary to ensure that the ments. Such additional ventilation
ventilation requirements of paragraph
controls may be discontinued when gas
(k) of this section are met.
concentrations are reduced below five
(iv) When rapid excavation machines
percent of the lower explosive limit,
are used, a continuous flammable gas
but shall be reinstituted whenever the
monitor shall be operated at the face
five percent level is exceeded.
with the sensor(s) placed as high and
(viii) Whenever 10 percent or more of
close to the front of the machines cut-
the lower explosive limit for methane
ter head as practicable.
or other flammable gases is detected in
(v)(A) Whenever air monitoring indi-
the vicinity of welding, cutting, or
cates the presence of 5 ppm or more of
other hot work, such work shall be sus-
hydrogen sulfide, a test shall be con-
pended until the concentration of such
ducted in the affected underground
flammable gas is reduced to less than
work area(s), at least at the beginning
10 percent of the lower explosive limit.
and midpoint of each shift, until the
concentration of hydrogen sulfide has (ix) Whenever 20 percent or more of
been less than 5 ppm for 3 consecutive the lower explosive limit for methane
days. or other flammable gases is detected in
(B) Whenever hydrogen sulfide is de- any underground work area(s) or in the
tected in an amount exceeding 10 ppm, air return:
a continuous sampling and indicating (A) All employees, except those nec-
hydrogen sulfide monitor shall be used essary to eliminate the hazard, shall be
to monitor the affected work area. immediately withdrawn to a safe loca-
(C) Employees shall be informed tion above ground; and
when a concentration of 10 ppm hydro- (B) Electrical power, except for ac-
gen sulfide is exceeded. ceptable pumping and ventilation
(D) The continuous sampling and in- equipment, shall be cut off to the area
dicating hydrogen sulfide monitor shall endangered by the flammable gas until
be designed, installed, and maintained the concentration of such gas is re-
to provide a visual and aural alarm duced to less than 20 percent of the
when the hydrogen sulfide concentra- lower explosive limit.
tion reaches 20 ppm to signal that addi- (2) Additional monitoring for potentially
tional measures, such as respirator use, gassy and gassy operations. Operations
increased ventilation, or evacuation, which meet the criteria for potentially
might be necessary to maintain hydro- gassy and gassy operations set forth in
gen sulfide exposure below the permis- paragraph (h) of this section shall be
sible exposure limit. subject to the additional monitoring
(vi) When the competent person de- requirements of this paragraph.
termines, on the basis of air moni- (i) A test for oxygen content shall be
toring results or other information, conducted in the affected underground

433

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00443 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.800 29 CFR Ch. XVII (7112 Edition)

work areas and work areas imme- (2) A minimum of 200 cubic feet (5.7
diately adjacent to such areas at least m3) of fresh air per minute shall be sup-
at the beginning and midpoint of each plied for each employee underground.
shift. (3) The linear velocity of air flow in
(ii) When using rapid excavation ma- the tunnel bore, in shafts, and in all
chines, continuous automatic flam- other underground work areas shall be
mable gas monitoring equipment shall at least 30 feet (9.15 m) per minute
be used to monitor the air at the head- where blasting or rock drilling is con-
ing, on the rib, and in the return air ducted, or where other conditions like-
duct. The continuous monitor shall sig- ly to produce dust, fumes, mists, va-
nal the heading, and shut down electric pors, or gases in harmful or explosive
power in the affected underground quantities are present.
work area, except for acceptable pump- (4) The direction of mechanical air
ing and ventilation equipment, when 20 flow shall be reversible.
percent or more of the lower explosive (5) Following blasting, ventilation
limit for methane or other flammable systems shall exhaust smoke and
gases is encountered. fumes to the outside atmosphere before
(iii) A manual flammable gas mon- work is resumed in affected areas.
itor shall be used as needed, but at
(6) Ventilation doors shall be de-
least at the beginning and midpoint of
signed and installed so that they re-
each shift, to ensure that the limits
main closed when in use, regardless of
prescribed in paragraphs (h) and (j) are
the direction of the air flow.
not exceeded. In addition, a manual
electrical shut down control shall be (7) When ventilation has been re-
provided near the heading. duced to the extent that hazardous lev-
els of methane or flammable gas may
(iv) Local gas tests shall be made
have accumulated, a competent person
prior to and continuously during any
shall test all affected areas after ven-
welding, cutting, or other hot work.
tilation has been restored and shall de-
(v) In underground operations driven
termine whether the atmosphere is
by drill-and-blast methods, the air in
within flammable limits before any
the affected area shall be tested for
power, other than for acceptable equip-
flammable gas prior to re-entry after
ment, is restored or work is resumed.
blasting, and continuously when em-
ployees are working underground. (8) Whenever the ventilation system
has been shut down with all employees
(3) Recordkeeping. A record of all air
out of the underground area, only com-
quality tests shall be maintained above
petent persons authorized to test for
ground at the worksite and be made
air contaminants shall be allowed un-
available to the Secretary of Labor
upon request. The record shall include derground until the ventilation has
the location, date, time, substance and been restored and all affected areas
amount monitored. Records of expo- have been tested for air contaminants
sures to toxic substances shall be re- and declared safe.
tained in accordance with 1910.33 of (9) When drilling rock or concrete,
this chapter. All other air quality test appropriate dust control measures
records shall be retained until comple- shall be taken to maintain dust levels
tion of the project. within limits set in 1926.55. Such
(k) Ventilation. (1)(i) Fresh air shall measures may include, but are not lim-
be supplied to all underground work ited to, wet drilling, the use of vacuum
areas in sufficient quantities to pre- collectors, and water mix spray sys-
vent dangerous or harmful accumula- tems.
tion of dusts, fumes, mists, vapors or (10)(i) Internal combustion engines,
gases. except diesel-powered engines on mo-
(ii) Mechanical ventilation shall be bile equipment, are prohibited under-
provided in all underground work areas ground.
except when the employer can dem- (ii) Mobile diesel-powered equipment
onstrate that natural ventilation pro- used underground in atmospheres other
vides the necessary air quality through than gassy operations shall be either
sufficient air volume and air flow. approved by MSHA in accordance with

434

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00444 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.800

the provisions of 30 CFR part 32 (for- ed in areas having fire or explosion


merly Schedule 24), or shall be dem- hazards.
onstrated by the employer to be fully (3) The employer may store under-
equivalent to such MSHA-approved ground no more than a 24-hour supply
equipment, and shall be operated in ac- of diesel fuel for the underground
cordance with that part. (Each brake equipment used at the worksite.
horsepower of a diesel engine requires (4) The piping of diesel fuel from the
at least 100 cubic feet (28.32 m3) of air surface to an underground location is
per minute for suitable operation in ad- permitted only if:
dition to the air requirements for per- (i) Diesel fuel is contained at the sur-
sonnel. Some engines may require a face in a tank whose maximum capac-
greater amount of air to ensure that ity is no more than the amount of fuel
the allowable levels of carbon mon- required to supply for a 24-hour period
oxide, nitric oxide, and nitrogen diox- the equipment serviced by the under-
ide are not exceeded.) ground fueling station; and
(11) Potentially gassy or gassy oper-
(ii) The surface tank is connected to
ations shall have ventilation systems
the underground fueling station by an
installed which shall:
acceptable pipe or hose system that is
(i) Be constructed of fire-resistant
controlled at the surface by a valve,
materials; and
and at the shaft bottom by a hose noz-
(ii) Have acceptable electrical sys-
zle; and
tems, including fan motors.
(iii) The pipe is empty at all times
(12) Gassy operations shall be pro-
except when transferring diesel fuel
vided with controls located above
from the surface tank to a piece of
ground for reversing the air flow of
equipment in use underground; and
ventilation systems.
(13) In potentially gassy or gassy op- (iv) Hoisting operations in the shaft
erations, wherever mine-type ventila- are suspended during refueling oper-
tion systems using an offset main fan ations if the supply piping in the shaft
installed on the surface are used, they is not protected from damage.
shall be equipped with explosion-doors (5)(i) Gasoline shall not be carried,
or a weak-wall having an area at least stored, or used underground.
equivalent to the cross-sectional area (ii) Acetylene, liquefied petroleum
of the airway. gas, and Methylacetylene Propadiene
(l) Illumination. (1) Illumination re- Stabilized gas may be used under-
quirements applicable to underground ground only for welding, cutting and
construction operations are found in other hot work, and only in accordance
Table D3 of 1926.56 of this part. with subpart J of this part, and para-
(2) Only acceptable portable lighting graphs (j), (k), (m), and (n) of this sec-
equipment shall be used within 50 feet tion.
(15.24 m) of any underground heading (6) Oil, grease, and diesel fuel stored
during explosives handling. underground shall be kept in tightly
(m) Fire prevention and control. Fire sealed containers in fire-resistant areas
prevention and protection require- at least 300 feet (91.44 m) from under-
ments applicable to underground con- ground explosive magazines, and at
struction operations are found in sub- least 100 feet (30.48 m) from shaft sta-
part F of this part, except as modified tions and steeply inclined passageways.
by the following additional standards. Storage areas shall be positioned or
(1) Open flames and fires are prohib- diked so that the contents of ruptured
ited in all underground construction or overturned containers will not flow
operations except as permitted for from the storage area.
welding, cutting and other hot work (7) Flammable or combustible mate-
operations in paragraph (n) of this sec- rials shall not be stored above ground
tion. within 100 feet (30.48 m) of any access
(2) (i) Smoking may be allowed only opening to any underground operation.
in areas free of fire and explosion haz- Where this is not feasible because of
ards. space limitations at the jobsite, such
(ii) Readily visible signs prohibiting materials may be located within the
smoking and open flames shall be post- 100-foot limit, provided that:

435

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00445 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.800 29 CFR Ch. XVII (7112 Edition)

(i) They are located as far as prac- protection to ensure safe access of em-
ticable from the opening; and ployees and equipment. Adjacent areas
(ii) Either a fire-resistant barrier of shall be scaled or otherwise secured to
not less than one-hour rating is placed prevent loose soil, rock, or fractured
between the stored material and the materials from endangering the portal
opening, or additional precautions are and access area.
taken which will protect the materials (2) Subsidence areas. The employer
from ignition sources. shall ensure ground stability in haz-
(8) Fire-resistant hydraulic fluids ardous subsidence areas by shoring, by
shall be used in hydraulically-actuated filling in, or by erecting barricades and
underground machinery and equipment posting warning signs to prevent entry.
unless such equipment is protected by (3) Underground areas. (i)(A) A com-
a fire suppression system or by multi- petent person shall inspect the roof,
purpose fire extinguisher(s) rated at of face, and walls of the work area at the
sufficient capacity for the type and size start of each shift and as often as nec-
of hydraulic equipment involved, but essary to determine ground stability.
rated at least 4A:40B:C. (B) Competent persons conducting
(9)(i) Electrical installations in un- such inspections shall be protected
derground areas where oil, grease, or from loose ground by location, ground
diesel fuel are stored shall be used only support or equivalent means.
for lighting fixtures. (ii) Ground conditions along
(ii) Lighting fixtures in storage haulageways and travelways shall be
areas, or within 25 feet (7.62 m) of un- inspected as frequently as necessary to
derground areas where oil, grease, or ensure safe passage.
diesel fuel are stored, shall be approved
(iii) Loose ground that might be haz-
for Class I, Division 2 locations, in ac-
ardous to employees shall be taken
cordance with subpart K of this part.
down, scaled or supported.
(10) Leaks and spills of flammable or
combustible fluids shall be cleaned up (iv) (A) Torque wrenches shall be
immediately. used wherever bolts that depend on
(11) A fire extinguisher of at least torsionally applied force are used for
4A:40B:C rating or other equivalent ex- ground support.
tinguishing means shall be provided at (B) A competent person shall deter-
the head pulley and at the tail pulley mine whether rock bolts meet the nec-
of underground belt conveyors. essary torque, and shall determine the
(12) Any structure located under- testing frequency in light of the bolt
ground or within 100 feet (30.48 m) of an system, ground conditions and the dis-
opening to the underground shall be tance from vibration sources.
constructed of material having a fire- (v) Suitable protection shall be pro-
resistance rating of at least one hour. vided for employees exposed to the haz-
(n) Welding, cutting, and other hot ard of loose ground while installing
work. In addition to the requirements ground support systems.
of subpart J of this part, the following (vi) Support sets shall be installed so
requirements shall apply to under- that the bottoms have sufficient an-
ground welding, cutting, and other hot chorage to prevent ground pressures
work. from dislodging the support base of the
(1) No more than the amount of fuel sets. Lateral bracing (collar bracing,
gas and oxygen cylinders necessary to tie rods, or spreaders) shall be provided
perform welding, cutting, or other hot between immediately adjacent sets to
work during the next 24-hour period ensure added stability.
shall be permitted underground. (vii) Damaged or dislodged ground
(2) Noncombustible barriers shall be supports that create a hazardous condi-
installed below welding, cutting, or tion shall be promptly repaired or re-
other hot work being done in or over a placed. When replacing supports, the
shaft or raise. new supports shall be installed before
(o) Ground support(1) Portal areas. the damaged supports are removed.
Portal openings and access areas shall (viii) A shield or other type of sup-
be guarded by shoring, fencing, head port shall be used to maintain a safe
walls, shotcreting or other equivalent travelway for employees working in

436

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00446 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.800

dead-end areas ahead of any support re- (q) Drilling. (1) A competent person
placement operation. shall inspect all drilling and associated
(4) Shafts. (i) Shafts and wells over 5 equipment prior to each use. Equip-
feet (1.53 m) in depth that employees ment defects affecting safety shall be
must enter shall be supported by a corrected before the equipment is used.
steel casing, concrete pipe, timber, (2) The drilling area shall be in-
solid rock or other suitable material. spected for hazards before the drilling
(ii) (A) The full depth of the shaft operation is started.
shall be supported by casing or bracing (3) Employees shall not be allowed on
except where the shaft penetrates into a drill mast while the drill bit is in op-
solid rock having characteristics that eration or the drill machine is being
will not change as a result of exposure. moved.
Where the shaft passes through earth (4) When a drill machine is being
into solid rock, or through solid rock moved from one drilling area to an-
into earth, and where there is potential other, drill steel, tools, and other
for shear, the casing or bracing shall equipment shall be secured and the
extend at least 5 feet (1.53 m) into the mast shall be placed in a safe position.
solid rock. When the shaft terminates (5) Receptacles or racks shall be pro-
in solid rock, the casing or bracing vided for storing drill steel located on
shall extend to the end of the shaft or jumbos.
5 feet (1.53 m) into the solid rock, (6) Employees working below jumbo
whichever is less. decks shall be warned whenever drill-
(B) The casing or bracing shall ex- ing is about to begin.
tend 42 inches (1.07 m) plus or minus 3 (7) Drills on columns shall be an-
inches (8 cm) above ground level, ex- chored firmly before starting drilling,
cept that the minimum casing height
and shall be retightened as necessary
may be reduced to 12 inches (0.3 m),
thereafter.
provided that a standard railing is in-
(8) (i) The employer shall provide me-
stalled; that the ground adjacent to the
chanical means on the top deck of a
top of the shaft is sloped away from the
jumbo for lifing unwieldy or heavy ma-
shaft collar to prevent entry of liquids;
and that effective barriers are used to terial.
prevent mobile equipment operating (ii) When jumbo decks are over 10
near the shaft from jumping over the 12 feet (3.05 m) in height, the employer
inch (0.3 m) barrier. shall install stairs wide enough for two
(iii) After blasting operations in persons.
shafts, a competent person shall deter- (iii) Jumbo decks more than 10 feet
mine if the walls, ladders, timbers, (3.05 m) in height shall be equipped
blocking, or wedges have loosened. If with guardrails on all open sides, ex-
so, necessary repairs shall be made be- cluding access openings of platforms,
fore employees other than those as- unless an adjacent surface provides
signed to make the repairs are allowed equivalent fall protection.
in or below the affected areas. (iv) (A) Only employees assisting the
(p) Blasting. This paragraph applies in operator shall be allowed to ride on
addition to the requirements for blast- jumbos, unless the jumbo meets the re-
ing and explosives operations, includ- quirements of paragraph (r)(6)(ii) of
ing handling of misfires, which are this section.
found in subpart U of this part. (B) Jumbos shall be chocked to pre-
(1) Blasting wires shall be kept clear vent movement while employees are
of electrical lines, pipes, rails, and working on them.
other conductive material, excluding (v) (A) Walking and working surfaces
earth, to prevent explosives initiation of jumbos shall be maintained to pre-
or employee exposure to electric cur- vent the hazards of slipping, tripping
rent. and falling.
(2) Following blasting, an employee (B) Jumbo decks and stair treads
shall not enter a work area until the shall be designed to be slip-resistent
air quality meets the requirements of and secured to prevent accidental dis-
paragraph (j) of this section. placement.

437

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00447 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.800 29 CFR Ch. XVII (7112 Edition)

(9) Scaling bars shall be available at (ii) No employee shall ride haulage
scaling operations and shall be main- equipment unless it is equipped with
tained in good condition at all times. seating for each passenger and protects
Blunted or severely worn bars shall not passengers from being struck, crushed,
be used. or caught between other equipment or
(10) (i) Blasting holes shall not be surfaces. Members of train crews may
drilled through blasted rock (muck) or ride on a locomotive if it is equipped
water. with handholds and nonslip steps or
(ii) Employees in a shaft shall be pro- footboards. Requirements applicable to
tected either by location or by suitable Underground Construction for motor
barrier(s) if powered mechanical load- vehicle transportation of employees
ing equipment is used to remove muck are found in 1926.601 of this part.
containing unfired explosives. (7) Powered mobile haulage equip-
(11) A caution sign reading Buried ment, including trains, shall not be left
Line, or similar wording shall be post-
unattended unless the master switch or
ed where air lines are buried or other-
motor is turned off; operating controls
wise hidden by water or debris.
are in neutral or park position; and the
(r) Haulage. (1)(i) A competent person
brakes are set, or equivalent pre-
shall inspect haulage equipment before
cautions are taken to prevent rolling.
each shift.
(ii) Equipment defects affecting safe- (8) Whenever rails serve as a return
ty and health shall be corrected before for a trolley circuit, both rails shall be
the equipment is used. bonded at every joint and crossbonded
(2) Powered mobile haulage equip- every 200 feet (60.96 m).
ment shall have suitable means of stop- (9) When dumping cars by hand, the
ping. car dumps shall have tiedown chains,
(3)(i) Power mobile haulage equip- bumper blocks, or other locking or
ment, including trains, shall have audi- holding devices to prevent the cars
ble warning devices to warn employees from overturning.
to stay clear. The operator shall sound (10) Rocker-bottom or bottom-dump
the warning device before moving the cars shall be equipped with positive
equipment and whenever necessary locking devices to prevent unintended
during travel. dumping.
(ii) The operator shall assure that (11) Equipment to be hauled shall be
lights which are visible to employees loaded and secured to prevent sliding
at both ends of any mobile equipment, or dislodgement.
including a train, are turned on when- (12)(i) Mobile equipment, including
ever the equipment is operating. rail-mounted equipment, shall be
(4) In those cabs where glazing is stopped for manual connecting or serv-
used, the glass shall be safety glass, or ice work.
its equivalent, and shall be maintained (ii) Employees shall not reach be-
and cleaned so that vision is not ob- tween moving cars during coupling op-
structed.
erations.
(5) Anti-roll back devices or brakes
(iii) Couplings shall not be aligned,
shall be installed on inclined conveyor
drive units to prevent conveyors from shifted or cleaned on moving cars or lo-
inadvertently running in reverse. comotives.
(6)(i) (A) Employees shall not be per- (13)(i) Safety chains or other connec-
mitted to ride a power-driven chain, tions shall be used in addition to cou-
belt, or bucket conveyor unless the plers to connect man cars or powder
conveyor is specifically designed for cars whenever the locomotive is uphill
the transportation of persons. of the cars.
(B) Endless belt-type manlifts are (ii) When the grade exceeds one per-
prohibited in underground construc- cent and there is a potential for run-
tion. away cars, safety chains or other con-
(C) General requirements also appli- nections shall be used in addition to
cable to underground construction for couplers to connect haulage cars or, as
use of conveyors in construction are an alternative, the locomotive must be
found in 1926.555 of this part. downhill of the train.

438

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00448 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.801

(iii) Such safety chains or other con- cept as modified by this paragraph (t),
nections shall be capable of maintain- the following provisions of subpart N of
ing connection between cars in the this part apply: Requirements for ma-
event of either coupler disconnect, fail- terial hoists are found in 1926.552(a)
ure or breakage. and (b) of this part. Requirements for
(14) Parked rail equipment shall be personnel hoists are found in the per-
chocked, blocked, or have brakes set to sonnel hoists requirements of
prevent inadvertent movement. 1926.552(a) and (c) of this part and in
(15) Berms, bumper blocks, safety the elevator requirement of
hooks, or equivalent means shall be 1926.552(a) and (d) of this part.
provided to prevent overtravel and (u) Definitions. AcceptAny de-
overturning of haulage equipment at vice, equipment, or appliance that is
dumping locations. either approved by MSHA and main-
(16) Bumper blocks or equivalent tained in permissible condition, or is
stopping devices shall be provided at listed or labeled for the class and loca-
all track dead ends. tion under subpart K of this part.
(17)(i) Only small handtools, lunch Rapid Excavation MachineTun-
pails or similar small items may be nel boring machines, shields,
transported with employees in man- roadheaders, or any other similar exca-
cars, or on top of a locomotive. vation machine.
(ii) When small hand tools or other [54 FR 23850, June 2, 1989; 58 FR 35311, June
small items are carried on top of a lo- 30, 1993, as amended at 61 FR 5510, Feb. 13,
comotive, the top shall be designed or 1996; 63 FR 1297, Jan. 8, 1998; 71 FR 16674, Apr.
modified to retain them while trav- 3, 2006; 75 FR 48135, Aug. 9, 2010]
eling.
(18)(i) Where switching facilities are 1926.801 Caissons.
available, occupied personnel-cars shall (a) Wherever, in caisson work in
be pulled, not pushed. If personnel-cars which compressed air is used, and the
must be pushed and visibility of the working chamber is less than 11 feet in
track ahead is hampered, then a quali- length, and when such caissons are at
fied person shall be stationed in the any time suspended or hung while work
lead car to give signals to the loco- is in progress so that the bottom of the
motive operator. excavation is more than 9 feet below
(ii) Crew trips shall consist of per- the deck of the working chamber, a
sonnel-loads only. shield shall be erected therein for the
(s) Electrical safety. This paragraph protection of the employees.
applies in addition to the general re- (b) Shafts shall be subjected to a hy-
quirements for electrical safety which drostatic or air-pressure test, at which
are found in subpart K of this part. pressure they shall be tight. The shaft
(1) Electric power lines shall be insu- shall be stamped on the outside shell
lated or located away from water lines, about 12 inches from each flange to
telephone lines, air lines, or other con- show the pressure to which they have
ductive materials so that a damaged been subjected.
circuit will not energize the other sys- (c) Whenever a shaft is used, it shall
tems. be provided, where space permits, with
(2) Lighting circuits shall be located a safe, proper, and suitable staircase
so that movement of personnel or for its entire length, including landing
equipment will not damage the circuits platforms, not more than 20 feet apart.
or disrupt service. Where this is impracticable, suitable
(3) Oil-filled transformers shall not ladders shall be installed with landing
be used underground unless they are lo- platforms located about 20 feet apart to
cated in a fire-resistant enclosure suit- break the climb.
ably vented to the outside and sur- (d) All caissons having a diameter or
rounded by a dike to retain the con- side greater than 10 feet shall be pro-
tents of the transformers in the event vided with a man lock and shaft for the
of rupture. exclusive use of employees.
(t) Hoisting unique to underground con- (e) In addition to the gauge in the
struction. Employers must comply with locks, an accurate gauge shall be main-
1926.1501(g) of 1926 subpart DD. Ex- tained on the outer and inner side of

439

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00449 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.802 29 CFR Ch. XVII (7112 Edition)

each bulkhead. These gauges shall be (3) In the event an employee is absent
accessible at all times and kept in ac- from work for 10 days, or is absent due
curate working order. to sickness or injury, he shall not re-
(f) In caisson operations where em- sume work until he is reexamined by
ployees are exposed to compressed air the physician, and his physical condi-
working environments, the require- tion reported, as provided in this para-
ments contained in 1926.803 shall be graph, to be such as to permit him to
complied with. work in compressed air.
(4) After an employee has been em-
1926.802 Cofferdams. ployed continuously in compressed air
(a) If overtopping of the cofferdam by for a period designated by the physi-
high waters is possible, means shall be cian, but not to exceed 1 year, he shall
provided for controlled flooding of the be reexamined by the physician to de-
work area. termine if he is still physically quali-
(b) Warning signals for evacuation of fied to engage in compressed air work.
employees in case of emergency shall (5) Such physician shall at all times
be developed and posted. keep a complete and full record of ex-
(c) Cofferdam walkways, bridges, or aminations made by him. The physi-
ramps with at least two means of rapid cian shall also keep an accurate record
exit shall be provided with guardrails of any decompression illness or other
as specified in subpart M of this part. illness or injury incapacitating any
(d) Cofferdams located close to navi- employee for work, and of all loss of
gable shipping channels shall be pro- life that occurs in the operation of a
tected from vessels in transit, where tunnel, caisson, or other compartment
possible. in which compressed air is used.
(6) Records shall be available for the
1926.803 Compressed air. inspection of the Secretary or his rep-
(a) General provisions. (1) There shall resentatives, and a copy thereof shall
be present, at all times, at least one be forwarded to OSHA within 48 hours
competent person designated by and following the occurrence of the acci-
representing the employer, who shall dent, death, injury, or decompression
be familiar with this subpart in all re- illness. It shall state as fully as pos-
spects, and responsible for full compli- sible the cause of said death or decom-
ance with these and other applicable pression illness, and the place where
subparts. the injured or sick employee was
(2) Every employee shall be in- taken, and such other relative informa-
structed in the rules and regulations tion as may be required by the Sec-
which concern his safety or the safety retary.
of others. (7) A fully equipped first aid station
(b) Medical attendance, examination, shall be provided at each tunnel project
and regulations. (1) There shall be re- regardless of the number of persons
tained one or more licensed physicians employed. An ambulance or transpor-
familiar with and experienced in the tation suitable for a litter case shall be
physical requirements and the medical at each project.
aspects of compressed air work and the (8) Where tunnels are being excavated
treatment of decompression illness. He from portals more than 5 road miles
shall be available at all times while apart, a first aid station and transpor-
work is in progress in order to provide tation facilities shall be provided at
medical supervision of employees em- each portal.
ployed in compressed air work. He (9) A medical lock shall be estab-
shall himself be physically qualified lished and maintained in immediate
and be willing to enter a pressurized working order whenever air pressure in
environment. the working chamber is increased
(2) No employee shall be permitted to above the normal atmosphere.
enter a compressed air environment (10) The medical lock shall:
until he has been examined by the phy- (i) Have at least 6 feet of clear head-
sician and reported by him to be phys- room at the center, and be subdivided
ically qualified to engage in such work. into not less than two compartments;

440

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00450 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.803

(ii) Be readily accessible to employ- (11) Identification badges shall be


ees working under compressed air; furnished to all employees, indicating
(iii) Be kept ready for immediate use that the wearer is a compressed air
for at least 5 hours subsequent to the worker. A permanent record shall be
emergence of any employee from the kept of all identification badges issued.
working chamber; The badge shall give the employees
(iv) Be properly heated, lighted and name, address of the medical lock, the
ventilated; telephone number of the licensed phy-
(v) Be maintained in a sanitary con- sician for the compressed air project,
dition; and contain instructions that in case of
(vi) Have a nonshatterable port emergency of unknown or doubtful
through which the occupant(s) may be cause or illness, the wearer shall be
kept under constant observation; rushed to the medical lock. The badge
(vii) Be designed for a working pres- shall be worn at all timesoff the job,
sure of 75 p.s.i.g. as well as on the job.
(c) Telephone and signal communica-
(viii) Be equipped with internal con-
tion. (1) Effective and reliable means of
trols which may be overridden by ex-
communication, such as bells, whistles,
ternal controls;
or telephones, shall be maintained, at
(ix) Be provided with air pressure
all times between all the following lo-
gauges to show the air pressure within
cations:
each compartment to observers inside
(i) The working chamber face;
and outside the medical lock. (ii) The working chamber side of the
(x) Be equipped with a manual type man lock near the door;
sprinkler system that can be activated (iii) The interior of the man lock;
inside the lock or by the outside lock (iv) Lock attendants station;
tender. (v) The compressor plant;
(xi) Be provided with oxygen lines (vi) The first-aid station;
and fittings leading into external (vii) The emergency lock (if one is re-
tanks. The lines shall be fitted with quired); and
check valves to prevent reverse flow. (viii) The special decompression
The oxygen system inside the chamber chamber (if one is required).
shall be of a closed circuit design and (d) Signs and records. (1) The time of
be so designed as to automatically shut decompression shall be posted in each
off the oxygen supply whenever the fire man lock as follows:
system is activated.
(xii) Be in constant charge of an at- TIME OF DECOMPRESSION FOR THIS LOCK
tendant under the direct control of the ll pounds to ll pounds in ll minutes.
retained physician. The attendant shall ll pounds to ll pounds in ll minutes.
be trained in the use of the lock and (Signed by) llllll (Superintendent)
suitably instructed regarding steps to This form shall be posted in the Man Lock at
be taken in the treatment of employee all times.
exhibiting symptoms compatible with (2) Any code of signals used shall be
a diagnosis of decompression illness; conspicuously posted near workplace
(xiii) Be adjacent to an adequate entrances and such other locations as
emergency medical facility; may be necessary to bring them to the
(xiv) The medical facility shall be attention of all employees concerned.
equipped with demand-type oxygen in- (3) For each 8-hour shift, a record of
halation equipment approved by the employees employed under air pressure
U.S. Bureau of Mines; shall be kept by an employee who shall
(xv) Be capable of being maintained remain outside the lock near the en-
at a temperature, in use, not to exceed trance. This record shall show the pe-
90 F. nor be less than 70 F.; and riod each employee spends in the air
(xvi) Be provided with sources of air, chamber and the time taken from de-
free of oil and carbon monoxide, for compression. A copy shall be submitted
normal and emergency use, which are to the appointed physician after each
capable of raising the air pressure in shift.
the lock from 0 to 75 p.s.i.g. in 5 min- (e) Compression. (1) Every employee
utes. going under air pressure for the first

441

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00451 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.803 29 CFR Ch. XVII (7112 Edition)

time shall be instructed on how to He shall be stationed at the lock con-


avoid excessive discomfort. trols on the free air side during the pe-
(2) During the compression of em- riod of compression and decompression
ployees, the pressure shall not be in- and shall remain at the lock control
creased to more than 3 p.s.i.g. within station whenever there are men in the
the first minute. The pressure shall be working chamber or in the man lock.
held at 3 p.s.i.g. and again at 7 p.s.i.g. (iii) Except where air pressure in the
sufficiently long to determine if any working chamber is below 12 p.s.i.g.,
employees are experiencing discomfort. each man lock shall be equipped with
(3) After the first minute the pres- automatic controls which, through
sure shall be raised uniformly and at a taped programs, cams, or similar appa-
rate not to exceed 10 p.s.i. per minute. ratus, shall automatically regulate de-
(4) If any employee complains of dis- compressions. It shall also be equipped
comfort, the pressure shall be held to with manual controls to permit the
determine if the symptoms are re- lock attendant to override the auto-
lieved. If, after 5 minutes the discom- matic mechanism in the event of an
fort does not disappear, the lock at- emergency, as provided in paragraph
tendant shall gradually reduce the (g)(1)(viii) of this section.
pressure until the employee signals (iv) A manual control, which can be
that the discomfort has ceased. If he used in the event of an emergency,
does not indicate that the discomfort shall be placed inside the man lock.
has disappeared, the lock attendant
(v) A clock, thermometer, and con-
shall reduce the pressure to atmos-
tinuous recording pressure gauge with
pheric and the employee shall be re-
a 4-hour graph shall be installed out-
leased from the lock.
side of each man lock and shall be
(5) No employee shall be subjected to
changed prior to each shifts decom-
pressure exceeding 50 pounds per
pression. The chart shall be of suffi-
square inch except in emergency.
cient size to register a legible record of
(f) Decompression. (1) Decompression
variations in pressure within the man
to normal condition shall be in accord-
lock and shall be visible to the lock at-
ance with the Decompression Tables in
appendix A of this subpart. tendant. A copy of each graph shall be
(2) In the event it is necessary for an submitted to the appointed physician
employee to be in compressed air more after each shift. In addition, a pressure
than once in a 24-hour period, the ap- gauge, clock, and thermometer shall
pointed physician shall be responsible also be installed in each man lock. Ad-
for the establishment of methods and ditional fittings shall be provided so
procedures of decompression applicable that test gauges may be attached
to repetitive exposures. whenever necessary.
(3) If decanting is necessary, the ap- (vi) Except where air pressure is
pointed physician shall establish proce- below 12 p.s.i.g. and there is no danger
dures before any employee is permitted of rapid flooding, all caissons having a
to be decompressed by decanting meth- working area greater than 150 square
ods. The period of time that the em- feet, and each bulkhead in tunnels of 14
ployees spend at atmospheric pressure feet or more in diameter, or equivalent
between the decompression following area, shall have at least two locks in
the shift and recompression shall not perfect working condition, one of
exceed 5 minutes. which shall be used exclusively as a
(g) Man locks and special decompres- man lock, the other, as a materials
sion chambers(1) Man locks. (i) Except lock.
in emergency, no employees employed (vii) Where only a combination man-
in compressed air shall be permitted to and-materials lock is required, this
pass from the working chamber to at- single lock shall be of sufficient capac-
mospheric pressure until after decom- ity to hold the employees constituting
pression, in accordance with the proce- two successive shifts.
dures in this subpart. (viii) Emergency locks shall be large
(ii) The lock attendant in charge of a enough to hold an entire heading shift
man lock shall be under the direct su- and a limit maintained of 12 p.s.i.g.
pervision of the appointed physician. There shall be a chamber available for

442

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00452 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.803

oxygen decompression therapy to 28 employee and shall be posted at the


p.s.i.g. chamber entrance. The posted capacity
(ix) The man lock shall be large shall not be exceeded, except in case of
enough so that those using it are not emergency.
compelled to be in a cramped position, (ii) Each special decompression
and shall not have less than 5 feet clear chamber shall be equipped with the fol-
head room at the center and a min- lowing:
imum of 30 cubic feet of air space per (a) A clock or clocks suitably placed
occupant. so that the attendant and the chamber
(x) Locks on caissons shall be so lo- occupants can readily ascertain the
cated that the bottom door shall be not time;
less than 3 feet above the water level (b) Pressure gauges which will indi-
surrounding the caisson on the outside. cate to the attendants and to the
(The water level, where it is affected by chamber occupants the pressure in the
tides, is construed to mean high tide.) chamber;
(xi) In addition to the pressure gauge (c) Valves to enable the attendant to
in the locks, an accurate pressure control the supply and discharge of
gauge shall be maintained on the outer compressed air into and from the
and inner side of each bulkhead. These chamber;
gauges shall be accessible at all times (d) Valves and pipes, in connection
and shall be kept in accurate working with the air supply and exhaust, ar-
order. ranged so that the chamber pressure
(xii) Man locks shall have an observa- can be controlled from within and
tion port at least 4 inches in diameter without;
located in such a position that all oc-
(e) Effective means of oral inter-
cupants of the man lock may be ob-
communication between the attendant,
served from the working chamber and
occupants of the chamber, and the air
from the free air side of the lock.
compressor plant; and
(xiii) Adequate ventilation in the
lock shall be provided. (f) An observation port at the en-
(xiv) Man locks shall be maintained trance to permit observation of the
at a minimum temperature of 70 F. chamber occupants.
(xv) When locks are not in use and (iii) Seating facilities in special de-
employees are in the working chamber, compression chambers shall be so ar-
lock doors shall be kept open to the ranged as to permit a normal sitting
working chamber, where practicable. posture without cramping. Seating
(xvi) Provision shall be made to space, not less than 18 inches by 24
allow for rescue parties to enter the inches wide, shall be provided per occu-
tunnel if the working force is disabled. pant.
(xvii) A special decompression cham- (iv) Adequate toilet and washing fa-
ber of sufficient size to accommodate cilities, in a screened or enclosed re-
the entire force of employees being de- cess, shall be provided. Toilet bowls
compressed at the end of a shift shall shall have a built-in protector on the
be provided whenever the regularly es- rim so that an air space is created
tablished working period requires a when the seat lid is closed.
total time of decompression exceeding (v) Fresh and pure drinking water
75 minutes. shall be available. This may be accom-
(2) Special decompression chamber. (i) plished by either piping water into the
The headroom in the special decom- special decompression chamber and
pression chamber shall be not less than providing drinking fountains, or by
a minimum 7 feet and the cubical con- providing individual canteens, or by
tent shall provide at least 50 cubic feet some other sanitary means. Commu-
of airspace for each employee. For each nity drinking vessels are prohibited.
occupant, there shall be provided 4 (vi) No refuse or discarded material
square feet of free walking area and 3 of any kind shall be permitted to accu-
square feet of seating space, exclusive mulate, and the chamber shall be kept
of area required for lavatory and toilet clean.
facilities. The rated capacity shall be (vii) Unless the special decompres-
based on the stated minimum space per sion chamber is serving as the man

443

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00453 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.803 29 CFR Ch. XVII (7112 Edition)

lock to atmospheric pressure, the spe- ply and a point beyond the locks with
cial decompression chamber shall be one of the lines extending to within 100
situated, where practicable, adjacent feet of the working face.
to the man lock on the atmospheric (7) All high- and low-pressure air sup-
pressure side of the bulkhead. A pas- ply lines shall be equipped with check
sageway shall be provided, connecting valves.
the special chamber with the man lock, (8) Low-pressure air shall be regu-
to permit employees in the process of lated automatically. In addition,
decompression to move from the man manually operated valves shall be pro-
lock to the special chamber without a vided for emergency conditions.
reduction in the ambient pressure from
(9) The air intakes for all air com-
that designated for the next stage of
pressors shall be located at a place
decompression. The passageway shall
be so arranged as to not interfere with where fumes, exhaust, gases, and other
the normal operation of the man lock, air contaminants will be at a min-
nor with the release of the occupants of imum.
the special chamber to atmospheric (10) Gauges indicating the pressure in
pressure upon the completion of the de- the working chamber shall be installed
compression procedure. in the compressor building, the lock at-
(h) Compressor plant and air supply. (1) tendants station, and at the employ-
At all times there shall be a thor- ers field office.
oughly experienced, competent, and re- (i) Ventilation and air quality. (1) Ex-
liable person on duty at the air control haust valves and exhaust pipes shall be
valves as a gauge tender who shall reg- provided and operated so that the
ulate the pressure in the working working chamber shall be well venti-
areas. During tunneling operations, lated, and there shall be no pockets of
one gauge tender may regulate the dead air. Outlets may be required at in-
pressure in not more than two head- termediate points along the main low-
ings: Provided, That the gauge and con- pressure air supply line to the heading
trols are all in one location. In caisson to eliminate such pockets of dead air.
work, there shall be a gauge tender for Ventilating air shall be not less than 30
each caisson. cubic feet per minute.
(2) The low air compressor plant shall (2) The air in the workplace shall be
be of sufficient capacity to not only analyzed by the employer not less than
permit the work to be done safely, but once each shift, and records of such
shall also provide a margin to meet tests shall be kept on file at the place
emergencies and repairs. where the work is in progress. The test
(3) Low air compressor units shall results shall be within the threshold
have at least two independent and sep- limit values specified in subpart D of
arate sources of power supply and each
this part, for hazardous gases, and
shall be capable of operating the entire
within 10 percent of the lower explosive
low air plant and its accessory sys-
limit of flammable gases. If these lim-
tems.
its are not met, immediate action to
(4) The capacity, arrangement, and
correct the situation shall be taken by
number of compressors shall be suffi-
cient to maintain the necessary pres- the employer.
sure without overloading the equip- (3) The temperature of all working
ment and to assure maintenance of chambers which are subjected to air
such pressure in the working chamber pressure shall, by means of after-cool-
during periods of breakdown, repair, or ers or other suitable devices, be main-
emergency. tained at a temperature not to exceed
(5) Switching from one independent 85 F.
source of power supply to the other (4) Forced ventilation shall be pro-
shall be done periodically to ensure the vided during decompression. During
workability of the apparatus in an the entire decompression period, forced
emergency. ventilation through chemical or me-
(6) Duplicate low-pressure air chanical air purifying devices that will
feedlines and regulating valves shall be ensure a source of fresh air shall be
provided between the source of air sup- provided.

444

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00454 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.803

(5) Whenever heat-producing ma- (3) All parts of caissons and other
chines (moles, shields) are used in com- working compartments shall be kept in
pressed air tunnel operations, a posi- a sanitary condition.
tive means of removing the heat build- (l) Fire prevention and protection. (1)
up at the heading shall be provided. Firefighting equipment shall be avail-
(j) Electricity. (1) All lighting in com- able at all times and shall be main-
pressed-air chambers shall be by elec- tained in working condition.
tricity exclusively, and two inde- (2) While welding or flame-cutting is
pendent electric-lighting systems with being done in compressed air, a
independent sources of supply shall be firewatch with a fire hose or approved
used. The emergency source shall be extinguisher shall stand by until such
arranged to become automatically op- operation is completed.
erative in the event of failure of the (3) Shafts and caissons containing
regularly used source. flammable material of any kind, either
(2) The minimum intensity of light above or below ground, shall be pro-
on any walkway, ladder, stairway, or vided with a waterline and a fire hose
working level shall be not less than 10 connected thereto, so arranged that all
foot-candles, and in all workplaces the points of the shaft or caisson are with-
lighting shall at all times be such as to in reach of the hose stream.
enable employees to see clearly. (4) Fire hose shall be at least 112
inches in nominal diameter; the water
(3) All electrical equipment and wir-
pressure shall at all times be adequate
ing for light and power circuits shall
for efficient operation of the type of
comply with the requirements of sub-
nozzle used; and the water supply shall
part K of this part for use in damp,
be such as to ensure an uninterrupted
hazardous, high temperature, and com-
flow. Fire hose, when not in use, shall
pressed air environments.
be located or guarded to prevent injury
(4) External parts of lighting fixtures thereto.
and all other electrical equipment, (5) The power house, compressor
when within 8 feet of the floor, shall be house, and all buildings housing ven-
constructed of noncombustible, non- tilating equipment, shall be provided
absorptive, insulating materials, ex- with at least one hose connection in
cept that metal may be used if it is ef- the water line, with a fire hose con-
fectively grounded. nected thereto. A fire hose shall be
(5) Portable lamps shall be equipped maintained within reach of structures
with noncombustible, nonabsorptive, of wood over or near shafts.
insulating sockets, approved handles, (6) Tunnels shall be provided with a
basket guards, and approved cords. 2-inch minimum diameter water line
(6) The use of worn or defective port- extending into the working chamber
able and pendant conductors is prohib- and to within 100 feet of the working
ited. face. Such line shall have hose outlets
(k) Sanitation. (1) Sanitary, heated, with 100 feet of fire hose attached and
lighted, and ventilated dressing rooms maintained as follows: One at the
and drying rooms shall be provided for working face; one immediately inside
all employees engaged in compressed of the bulkhead of the working cham-
air work. Such rooms shall contain ber; and one immediately outside such
suitable benches and lockers. Bathing bulkhead. In addition, hose outlets
accommodations (showers at the ratio shall be provided at 200-foot intervals
of one to 10 employees per shift), throughout the length of the tunnel,
equipped with running hot and cold and 100 feet of fire hose shall be at-
water, and suitable and adequate toilet tached to the outlet nearest to any lo-
accommodations, shall be provided. cation where flammable material is
One toilet for each 15 employees, or being kept or stored or where any
fractional part thereof, shall be pro- flame is being used.
vided. (7) In addition to fire hose protection
(2) When the toilet bowl is shut by a required by this subpart, on every floor
cover, there should be an air space so of every building not under compressed
that the bowl or bucket does not im- air, but used in connection with the
plode when pressure is increased. compressed air work, there shall be

445

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00455 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.804 29 CFR Ch. XVII (7112 Edition)

provided at least one approved fire ex- lected, stored, transported, and used as
tinguisher of the proper type for the specified in subpart U of this part.
hazard involved. At least two approved (m) Bulkheads and safety screens. (1)
fire extinguishers shall be provided in Intermediate bulkheads with locks, or
the working chamber as follows: One at intermediate safety screens or both,
the working face and one immediately are required where there is the danger
inside the bulkhead (pressure side). Ex- of rapid flooding.
tinguishers in the working chamber (2) In tunnels 16 feet or more in di-
shall use water as the primary extin- ameter, hanging walkways shall be
guishing agent and shall not use any provided from the face to the man lock
extinguishing agent which could be as high in the tunnel as practicable,
harmful to the employees in the work- with at least 6 feet of head room. Walk-
ing chamber. The fire extinguisher ways shall be constructed of non-
shall be protected from damage. combustible material. Standard rail-
(8) Highly combustible materials ings shall be securely installed
shall not be used or stored in the work- throughout the length of all walkways
ing chamber. Wood, paper, and similar on open sides in accordance with sub-
combustible material shall not be used part M of this part. Where walkways
in the working chamber in quantities are ramped under safety screens, the
which could cause a fire hazard. The walkway surface shall be skidproofed
compressor building shall be con- by cleats or by equivalent means.
structed of non-combustible material. (3) Bulkheads used to contain com-
(9) Man locks shall be equipped with pressed air shall be tested, where prac-
a manual type fire extinguisher system ticable, to prove their ability to resist
that can be activated inside the man the highest air pressure which may be
lock and also by the outside lock at- expected to be used.
tendant. In addition, a fire hose and
portable fire extinguisher shall be pro- [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
vided inside and outside the man lock. 1979, as amended at 47 FR 14696, 14706, Apr. 6,
1982; 51 FR 25318, July 11, 1986; 61 FR 5510,
The portable fire extinguisher shall be
Feb. 13, 1996]
the dry chemical type.
(10) Equipment, fixtures, and fur- 1926.804 Definitions applicable to
niture in man locks and special decom- this subpart.
pression chambers shall be constructed
of noncombustible materials. Bedding, (a) BulkheadAn airtight structure
etc., shall be chemically treated so as separating the working chamber from
to be fire resistant. free air or from another chamber under
(11) Head frames shall be constructed a lesser pressure than the working
of structural steel or open frame-work pressure.
fireproofed timber. Head houses and (b) CaissonA wood, steel, concrete
other temporary surface buildings or or reinforced concrete, air- and water-
structures within 100 feet of the shaft, tight chamber in which it is possible
caisson, or tunnel opening shall be for men to work under air pressure
built of fire-resistant materials. greater than atmospheric pressure to
(12) No oil, gasoline, or other combus- excavate material below water level.
tible material shall be stored within (c) DecantingA method used for de-
100 feet of any shaft, caisson, or tunnel compressing under emergency cir-
opening, except that oils may be stored cumstances. In this procedure, the em-
in suitable tanks in isolated fireproof ployees are brought to atmospheric
buildings, provided such buildings are pressure with a very high gas tension
not less than 50 feet from any shaft, in the tissues and then immediately re-
caisson, or tunnel opening, or any compressed in a second and separate
building directly connected thereto. chamber or lock.
(13) Positive means shall be taken to (d) Emergency locksA lock designed
prevent leaking flammable liquids to hold and permit the quick passage of
from flowing into the areas specifically an entire shift of employees.
mentioned in the preceding paragraph. (e) High airAir pressure used to sup-
(14) All explosives used in connection ply power to pneumatic tools and de-
with compressed air work shall be se- vices.

446

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00456 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. S, App. A

(f) Low airAir supplied to pressurize APPENDIX A TO SUBPART S OF PART


working chambers and locks. 1926DECOMPRESSION TABLES
(g) Man lockA chamber through
1. Explanation. The decompression tables
which men pass from one air pressure
are computed for working chamber pressures
environment into another. from 0 to 14 pounds, and from 14 to 50 pounds
(h) Materials lockA chamber per square inch gauge inclusive by 2-pound
through which materials and equip- increments and for exposure times for each
ment pass from one air pressure envi- pressure extending from one-half to over 8
ronment into another. hours inclusive. Decompressions will be con-
(i) Medical lockA special chamber in ducted by two or more stages with a max-
which employees are treated for de- imum of four stages, the latter for a working
compression illness. It may also be chamber pressure of 40 pounds per square
used in preemployment physical ex- inch gauge or over.
aminations to determine the adapt- Stage 1 consists of a reduction in ambient
ability of the prospective employee to pressure ranging from 10 to a maximum of 16
pounds per square inch, but in no instance
changes in pressure.
will the pressure be reduced below 4 pounds
(j) Normal conditionOne during at the end of stage 1. This reduction in pres-
which exposure to compressed air is sure in stage 1 will always take place at a
limited to a single continuous working rate not greater than 5 pounds per minute.
period followed by a single decompres- Further reduction in pressure will take
sion in any given 24-hour period; the place during stage 2 and subsequent stages as
total time of exposure to compressed required at a slower rate, but in no event at
air during the single continuous work- a rate greater than 1 pound per minute.
ing period is not interrupted by expo- Decompression Table No. 1 indicates in the
sure to normal atmospheric pressure, body of the table the total decompression
and a second exposure to compressed time in minutes for various combinations of
air does not occur until at least 12 con- working chamber pressure and exposure
secutive hours of exposure to normal time.
atmospheric pressure has elapsed since Decompression Table No. 2 indicates for
the employee has been under pressure. the same various combinations of working
chamber pressure and exposure time the fol-
(k) PressureA force acting on a unit lowing:
area. Usually shown as pounds per a. The number of stages required;
square inch. (p.s.i.) b. The reduction in pressure and the ter-
(l) Absolute pressure (p.s.i.a.)The minal pressure for each required stage;
sum of the atmospheric pressure and c. The time in minutes through which the
gauge pressure (p.s.i.g.). reduction in pressure is accomplished for
(m) Atmospheric pressureThe pres- each required stage;
sure of air at sea level, usually 14.7 d. The pressure reduction rate in minutes
p.s.i.a. (1 atmosphere), or 0 p.s.i.g. per pound for each required stage;
(n) Gauge pressure (p.s.i.g.)Pressure IMPORTANT NOTE: The Pressure Reduction
measured by a gauge and indicating in Each Stage is Accomplished at a Uniform
the pressure exceeding atmospheric. Rate. Do Not Interpolate Between Values
(o) Safety screenAn air- and water- Shown on the Tables. Use the Next Higher
tight diaphragm placed across the Value of Working Chamber Pressure or Expo-
sure Time Should the Actual Working Cham-
upper part of a compressed air tunnel
ber Pressure or the Actual Exposure Time,
between the face and bulkhead, in Respectively, Fall Between Those for Which
order to prevent flooding the crown of Calculated Values Are Shown in the Body of
the tunnel between the safety screen the Tables.
and the bulkhead, thus providing a safe
means of refuge and exit from a flood- Examples Minutes
ing or flooded tunnel.
Example No. 1: 4 hours working period at 20
(p) Special decompression chamberA pounds gauge.
chamber to provide greater comfort of Decompression Table No. 1: 20 pounds for 4
employees when the total decompres- hours, total decompression time ...................... 43
sion time exceeds 75 minutes. Decompression Table No. 2:
Stage 1: Reduce pressure from 20 pounds
(q) Working chamberThe space or to 4 pounds at the uniform rate of 5
compartment under air pressure in pounds per minute.
which the work is being done. Elapsed time stage 1: 16/5 ................... 3

447

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00457 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. S, App. A 29 CFR Ch. XVII (7112 Edition)

Examples Minutes Examples Minutes

Stage 2 (final stage): Reduce pressure at a Stage 2: Reduce pressure at a uniform rate
uniform rate from 4 pounds to 0-pound from 8 pounds to 4 pounds over a period
gage over a period of 40 minutes. of 4 minutes. Rate, 1 pound per minute
Rate0.10 pound per minute or 10 minutes elapsed time, stage 2 ............................... 4
per pound. Transfer men to special decompression
Stage 2 (final) elapsed time ......................... 40 chamber maintaining the 4-pound pres-
sure during the transfer operation.
Total time .............................................. 43 Stage 3 (final stage): In the special decom-
Example No. 2: 5-hour working period at 24 pression chamber, reduce the pressure at
pounds gage. a uniform rate from 4 pounds to 0-pound
Decompression Table No. 1: 24 pounds for 5
gage over a period of 110 minutes. Rate,
hours, total decompression time ...................... 117
0.037 pound per minute or 27.5 minutes
Decompression Table No. 2:
per pound. Stage 3 (final) elapsed time ... 110
Stage 1: Reduce pressure from 24 pounds
to 8 pounds at the uniform rate of 5
Total time .............................................. 117
pounds per minute.
Elapsed time stage 1: 16/5 ................... 3

DECOMPRESSION TABLE NO. 1TOTAL DECOMPRESSION TIME


Working period hours
Work pressure p.s.i.g.
12 Over
1 112 2 3 4 5 6 7 8 8

9 to 12 ........................................ 3 3 3 3 3 3 3 3 3 3 3
14 ................................................ 6 6 6 6 6 6 6 6 16 16 33
16 ................................................ 7 7 7 7 7 7 17 33 48 48 62
18 ................................................ 7 7 7 8 11 17 48 63 63 73 87
20 ................................................ 7 7 8 15 15 43 63 73 83 103 113
22 ................................................ 9 9 16 24 38 68 93 103 113 128 133
24 ................................................ 11 12 23 27 52 92 117 122 127 137 151
26 ................................................ 13 14 29 34 69 104 126 141 142 142 163
28 ................................................ 15 23 31 41 98 127 143 153 153 165 183
30 ................................................ 17 28 38 62 105 143 165 168 178 188 204
32 ................................................ 19 35 43 85 126 163 178 193 203 213 226
34 ................................................ 21 39 58 98 151 178 195 218 223 233 248
36 ................................................ 24 44 63 113 170 198 223 233 243 253 273
38 ................................................ 28 49 73 128 178 203 223 238 253 263 278
40 ................................................ 31 49 84 143 183 213 233 248 258 278 288
42 ................................................ 37 56 102 144 189 215 245 260 263 268 293
44 ................................................ 43 64 118 154 199 234 254 264 269 269 293
46 ................................................ 44 74 139 171 214 244 269 274 289 299 318
48 ................................................ 51 89 144 189 229 269 299 309 319 319 ..........
50 ................................................ 58 94 164 209 249 279 309 329 .......... .......... ..........

DECOMPRESSION TABLE NO. 2


[Do not interpolate, use next higher value for conditions not computed]

Decompression data
Working
Working chamber pressure Total time
period Pressure reduc. p.s.i.g. Time in Pressure
p.s.i.g. decom-
hours Stage No. stage min- reduc. rate press min-
utes Min/pound
From To utes

14 ................................................
12 1 14 4 2 0.20 6
2 4 0 4 1.00 6
1 1 14 4 2 0.20 6
2 4 0 4 1.00 6
112 1 14 4 2 0.20 6
2 4 0 4 1.00 6
2 1 14 4 2 0.20 6
2 4 0 4 1.00 6
3 1 14 4 2 0.20 6
2 4 0 4 1.00 6
4 1 14 0 2 0.20 6
2 4 0 4 1.00 6
5 1 14 4 2 0.20 6
2 4 0 4 1.00 6
6 1 14 4 2 0.20 ..................
2 4 0 4 1.00 6
7 1 14 4 2 0.20 ..................
2 4 0 14 3.50 16

448

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00458 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. S, App. A

DECOMPRESSION TABLE NO. 2Continued


[Do not interpolate, use next higher value for conditions not computed]

Decompression data
Working
Working chamber pressure Total time
period Pressure reduc. p.s.i.g. Time in Pressure
p.s.i.g. decom-
hours Stage No. stage min- reduc. rate press min-
utes Min/pound
From To utes

8 1 14 4 2 0.20 ..................
2 4 0 14 3.50 16
Over 8 1 14 4 2 0.20 ..................
2 4 0 30 7.50 32
16 ................................................ 12 1 16 4 3 0.20 ..................
2 4 0 4 1.00 7
1 1 16 4 3 0.20 7
2 4 0 4 1.00 7
112 1 16 4 3 0.20 ..................
2 4 0 4 1.00 7
2 1 16 4 3 0.20 ..................
2 4 0 4 1.00 7
3 1 16 4 3 0.20 ..................
2 4 0 4 1.00 7
4 1 14 4 3 0.20 ..................
2 4 0 4 1.00 7
5 1 14 4 3 0.20 7
2 4 0 4 3.50 17
6 1 14 4 3 0.20 ..................
2 4 0 30 7.50 33
7 1 14 4 3 0.20 ..................
2 4 0 45 11.25 48
8 1 14 4 3 0.20 ..................
2 4 0 45 11.25 48
Over 8 1 14 4 3 0.20 ..................
2 4 0 60 15.00 63
18 ................................................ 12 1 18 4 3 0.20 ..................
2 4 0 4 1.00 7
1 1 18 4 3 0.20 ..................
2 4 0 4 1.00 7
1
12 1 18 4 3 0.20 ..................
2 4 0 4 1.00 7
2 1 18 4 3 0.20 ..................
2 4 0 5 1.25 8
3 1 18 4 3 0.20 ..................
2 4 0 8 2.00 11
4 1 18 4 3 0.20 ..................
2 4 0 14 3.50 17
5 1 18 4 3 0.20 ..................
2 4 0 45 11.25 48
6 1 18 4 3 0.20 ..................
2 4 0 60 15.00 63
7 1 18 4 3 0.20 ..................
2 4 0 60 15.00 63
8 1 18 4 3 0.20 ..................
2 4 0 70 17.50 73
Over 8 1 18 4 3 0.20 ..................
2 4 0 84 21.00 87
20 ................................................ 12 1 20 4 3 0.20 ..................
2 4 0 4 1.00 7
1 1 20 4 3 0.20 ..................
2 4 0 4 1.00 7
112 1 20 4 3 0.20 ..................
2 4 0 5 1.25 8
2 1 20 4 3 0.20 ..................
2 4 0 12 3.00 15
3 1 20 4 3 0.20 ..................
2 4 0 12 3.00 15
4 1 20 4 3 0.20 ..................
2 4 0 40 10.00 43
5 1 20 4 3 0.20 ..................
2 4 0 60 15.00 63
6 1 20 4 3 0.20 ..................
2 4 0 70 17.50 73
7 1 20 4 3 0.20 ..................
2 4 0 80 20.00 83

449

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00459 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. S, App. A 29 CFR Ch. XVII (7112 Edition)

DECOMPRESSION TABLE NO. 2Continued


[Do not interpolate, use next higher value for conditions not computed]

Decompression data
Working
Working chamber pressure Total time
period Pressure reduc. p.s.i.g. Time in Pressure
p.s.i.g. decom-
hours Stage No. stage min- reduc. rate press min-
utes Min/pound
From To utes

8 1 20 4 3 0.20 ..................
2 4 0 100 25.00 103
Over 8 1 20 4 3 0.20 ..................
2 4 0 110 27.50 113
22 ................................................ 12 1 22 6 3 0.20 ..................
2 6 0 6 1.00 9
1 1 22 6 3 0.20 ..................
2 6 0 6 1.00 9
112 1 22 6 3 0.20 ..................
2 6 0 13 2.20 16
2 1 22 6 3 0.20 ..................
2 6 0 21 3.50 24
3 1 22 6 3 0.20 ..................
2 6 0 35 5.85 38
4 1 22 6 3 0.20 ..................
2 6 0 65 10.83 68
5 1 22 6 3 0.20 ..................
2 6 0 90 15.00 93
6 1 22 6 3 0.20 ..................
2 4 0 100 16.67 103
7 1 22 6 3 0.20 ..................
2 6 0 110 18.35 113
8 1 22 6 3 0.20 ..................
2 6 0 125 20.80 128
Over 8 1 22 6 3 0.20 ..................
2 6 0 130 21.70 133
24 ................................................ 12 1 24 8 3 0.20 ..................
2 8 4 4 1.00 ..................
3 4 0 4 1.00 11
1 1 24 8 3 0.20 ..................
2 8 4 4 1.00 ..................
3 4 0 5 1.25 12
112 1 24 8 3 0.20 ..................
2 8 4 4 1.00 ..................
3 4 0 16 4.00 23
2 1 24 8 3 0.20 ..................
2 8 4 4 1.00 ..................
3 4 0 20 5.00 27
3 1 24 8 3 0.20 ..................
2 8 4 4 1.00 ..................
3 4 0 45 11.25 52
4 1 24 8 3 0.20 ..................
2 8 4 4 1.00 ..................
3 4 0 85 21.25 92
5 1 24 8 3 0.20 ..................
2 8 4 4 1.00 ..................
3 4 0 110 27.50 117
6 1 24 8 3 0.20 ..................
2 8 4 4 1.00 ..................
3 4 0 115 28.80 122
7 1 24 8 3 0.20 ..................
2 8 4 4 1.00 ..................
3 4 0 120 30.00 127
8 1 24 8 3 0.20 ..................
2 8 4 4 1.00 ..................
3 4 0 130 32.50 137
Over 8 1 24 8 3 0.20 ..................
2 8 4 8 2.00 ..................
3 4 0 140 35.00 151
26 ................................................ 12 1 26 10 3 0.20 ..................
2 10 4 6 1.00 ..................
3 4 0 4 1.00 13
1 1 26 10 3 0.20 ..................
2 10 4 6 1.00 ..................
3 4 0 5 1.25 14
112 1 26 10 3 0.20 ..................

450

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00460 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. S, App. A

DECOMPRESSION TABLE NO. 2Continued


[Do not interpolate, use next higher value for conditions not computed]

Decompression data
Working
Working chamber pressure Total time
period Pressure reduc. p.s.i.g. Time in Pressure
p.s.i.g. decom-
hours Stage No. stage min- reduc. rate press min-
utes Min/pound
From To utes

2 10 4 6 1.00 ..................
3 4 0 20 5.00 29
2 1 26 10 3 0.20 ..................
2 10 4 6 1.00 ..................
3 4 0 25 6.25 34
3 1 26 10 3 0.20 ..................
2 10 4 6 1.00 ..................
3 4 0 60 15.00 69
4 1 26 10 3 0.20 ..................
2 10 4 6 1.00 ..................
3 4 0 95 23.75 104
5 1 26 10 3 0.20 ..................
2 10 4 8 1.33 ..................
3 4 0 115 28.80 126
6 1 26 10 3 0.20 ..................
2 10 4 8 1.33 ..................
3 4 0 130 32.50 141
7 1 26 10 3 2.20 ..................
2 10 4 9 1.50 ..................
3 4 0 130 32.50 142
8 1 26 10 3 0.20 ..................
2 10 4 9 1.50 ..................
3 4 0 130 32.50 142
Over 8 1 26 10 3 0.20 ..................
2 10 4 30 5.00 ..................
3 4 0 30 32.50 163
28 ................................................ 12 1 28 12 3 0.20 ..................
2 12 4 8 1.00 ..................
3 4 0 4 1.00 15
1 1 28 12 3 0.20 ..................
2 12 4 8 1.00 ..................
3 4 0 12 3.00 23
112 1 28 12 3 0.20 ..................
2 12 4 8 1.00 ..................
3 4 0 20 5.00 31
2 1 28 12 3 0.20 ..................
2 12 4 8 1.00 ..................
3 4 0 30 7.50 41
3 1 28 12 3 0.20 ..................
2 12 4 10 1.25 ..................
3 4 0 85 21.20 98
4 1 28 12 3 0.20 ..................
2 12 4 14 1.75 ..................
3 4 0 110 27.50 127
5 1 28 12 3 0.20 ..................
2 12 4 20 2.50 ..................
3 4 0 120 30.00 143
6 1 28 12 3 0.20 ..................
2 12 4 20 2.50 ..................
3 4 0 130 32.50 153
7 1 28 12 3 0.20 ..................
2 12 4 20 2.50 ..................
3 4 0 120 32.50 153
8 1 28 12 3 0.20 ..................
2 12 4 32 4.00 ..................
3 4 0 130 32.50 165
Over 8 1 28 12 3 0.20 ..................
2 12 4 50 6.25 ..................
3 4 0 130 32.50 183
30 ................................................ 12 1 30 14 3 0.20 ..................
2 14 4 10 1.00 ..................
3 4 0 4 1.00 17
1 1 30 14 3 0.20 ..................
2 14 4 10 1.00 ..................
3 4 0 15 3.75 28
112 1 30 14 3 0.20 ..................

451

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00461 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. S, App. A 29 CFR Ch. XVII (7112 Edition)

DECOMPRESSION TABLE NO. 2Continued


[Do not interpolate, use next higher value for conditions not computed]

Decompression data
Working
Working chamber pressure Total time
period Pressure reduc. p.s.i.g. Time in Pressure
p.s.i.g. decom-
hours Stage No. stage min- reduc. rate press min-
utes Min/pound
From To utes

2 14 4 10 1.00 ..................
3 4 0 25 6.25 38
2 1 30 14 3 0.20 ..................
2 14 4 14 1.40 ..................
3 4 0 45 11.25 62
3 1 30 14 3 0.20 ..................
2 14 4 17 1.70 ..................
3 4 0 85 21.20 105
4 1 30 14 3 0.20 ..................
2 14 4 30 3.00 ..................
3 4 0 110 27.50 143
5 1 30 14 3 0.20 ..................
2 14 4 35 3.50 ..................
3 4 0 130 32.50 165
6 1 30 14 3 0.20 ..................
2 14 4 35 3.50 ..................
3 4 0 130 32.50 168
7 1 30 14 3 0.20 ..................
2 14 4 45 4.50 ..................
3 4 0 130 32.50 178
8 1 30 14 3 0.20 ..................
2 14 4 55 5.50 ..................
3 4 0 130 32.50 188
Over 8 1 30 14 3 0.20 ..................
2 14 4 71 7.10 ..................
3 4 0 130 32.50 204
32 ................................................ 12 1 32 16 3 0.20 ..................
2 16 4 12 1.00 ..................
3 4 0 4 1.00 19
1 1 32 16 3 0.20 ..................
2 16 4 12 1.00 ..................
3 4 0 20 5.00 35
112 1 32 16 3 0.20 ..................
2 16 4 15 1.25 ..................
3 4 0 25 6.25 43
2 1 32 16 3 0.20 ..................
2 16 4 22 1.83 ..................
3 4 0 60 15.00 85
3 1 32 16 3 0.20 ..................
2 16 4 28 2.33 ..................
3 4 0 95 23.75 126
4 1 32 16 3 0.20 ..................
2 16 4 40 3.33 ..................
3 4 0 120 30.00 163
5 1 32 16 3 0.20 ..................
2 16 4 45 3.75 ..................
3 4 0 130 32.50 178
6 1 32 16 3 0.20 ..................
2 16 4 60 5.00 ..................
3 4 0 130 32.50 193
7 1 32 16 3 0.20 ..................
2 16 4 70 5.83 ..................
3 4 0 130 32.50 203
8 1 32 16 3 0.20 ..................
2 16 4 80 6.67 ..................
3 4 0 130 32.50 213
Over 8 1 32 16 3 0.20 ..................
2 16 4 93 7.75 ..................
3 4 0 130 32.50 226
34 ................................................ 12 1 34 18 3 0.20 ..................
2 18 4 14 1.00 ..................
3 4 0 4 1.00 21
1 1 34 18 3 0.20 ..................
2 18 4 14 1.00 ..................
3 4 0 22 5.50 39
112 1 34 18 3 0.20 ..................

452

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00462 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. S, App. A

DECOMPRESSION TABLE NO. 2Continued


[Do not interpolate, use next higher value for conditions not computed]

Decompression data
Working
Working chamber pressure Total time
period Pressure reduc. p.s.i.g. Time in Pressure
p.s.i.g. decom-
hours Stage No. stage min- reduc. rate press min-
utes Min/pound
From To utes

2 18 4 25 1.80 ..................
3 4 0 30 7.50 58
2 1 34 18 3 0.20 ..................
2 18 4 35 2.50 ..................
3 4 0 60 15.00 98
3 1 34 18 3 0.20 ..................
2 18 4 43 3.10 ..................
3 4 0 105 26.25 151
4 1 34 18 3 0.20 ..................
2 18 4 55 3.93 ..................
3 4 0 120 30.00 178
5 1 34 18 3 0.20 ..................
2 18 4 62 4.43 ..................
3 4 0 130 32.50 195
6 1 34 18 3 0.20 ..................
2 18 4 85 6.07 ..................
3 4 0 130 32.50 218
7 1 34 18 3 0.20 ..................
2 18 4 90 6.43 ..................
3 4 0 130 32.50 223
8 1 34 18 3 0.20 ..................
2 18 4 100 7.15 ..................
3 4 0 130 32.50 233
Over 8 1 34 18 3 0.20 ..................
2 18 4 115 8.23 ..................
3 4 0 130 32.50 248
36 ................................................ 12 1 36 20 3 0.20 ..................
2 20 4 16 1.00 ..................
3 4 0 5 1.25 24
1 1 36 20 3 0.20 ..................
2 20 4 16 1.00 ..................
3 4 0 25 6.25 44
112 1 36 20 3 0.20 ..................
2 20 4 30 1.88 ..................
3 4 0 30 7.50 63
2 1 36 20 3 0.20 ..................
2 20 4 40 2.50 ..................
3 4 0 70 17.50 113
3 1 36 20 3 0.20 ..................
2 20 4 52 3.25 ..................
3 4 0 115 28.75 170
4 1 36 20 3 0.20 ..................
2 20 4 65 4.06 ..................
3 4 0 130 32.50 198
5 1 36 20 3 0.20 ..................
2 20 4 90 5.63 ..................
3 4 0 130 32.50 223
6 1 36 20 3 0.20 ..................
2 20 4 100 6.25 ..................
3 4 0 130 32.50 233
7 1 36 20 3 0.20 ..................
2 20 4 110 6.88 ..................
3 4 0 130 32.50 243
8 1 36 20 3 0.20 ..................
2 20 4 120 7.50 ..................
3 4 0 130 32.50 253
Over 8 1 36 20 3 0.20 ..................
2 20 4 140 8.75 ..................
3 4 0 130 32.50 273
38 ................................................ 12 1 38 22 3 0.20 ..................
2 22 6 16 1.00 ..................
3 6 0 9 1.50 28
1 1 38 22 3 0.20 ..................
2 22 6 16 1.00 ..................
3 6 0 30 5.00 49
112 1 38 22 3 0.20 ..................

453

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00463 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. S, App. A 29 CFR Ch. XVII (7112 Edition)

DECOMPRESSION TABLE NO. 2Continued


[Do not interpolate, use next higher value for conditions not computed]

Decompression data
Working
Working chamber pressure Total time
period Pressure reduc. p.s.i.g. Time in Pressure
p.s.i.g. decom-
hours Stage No. stage min- reduc. rate press min-
utes Min/pound
From To utes

2 22 6 20 1.25 ..................
3 6 0 50 8.34 73
2 1 38 22 3 0.20 ..................
2 22 6 30 1.88 ..................
3 6 0 95 15.83 128
3 1 38 22 3 0.20 ..................
2 22 6 35 2.19 ..................
3 6 0 140 23.35 178
4 1 38 22 3 0.20 ..................
2 22 6 50 3.12 ..................
3 6 0 150 25.00 203
5 1 38 22 3 0.20 ..................
2 22 6 55 3.44 ..................
3 6 0 165 27.50 223
6 1 38 22 3 0.20 ..................
2 22 6 70 4.38 ..................
3 6 0 165 27.50 238
7 1 38 22 3 0.20 ..................
2 22 6 85 5.32 ..................
3 6 0 165 27.50 253
8 1 38 22 3 0.20 ..................
2 22 6 95 5.93 ..................
3 6 0 165 27.50 263
Over 8 1 38 22 3 0.20 ..................
2 22 6 110 6.88 ..................
3 6 0 165 27.50 278
40 ................................................ 12 1 40 24 3 0.20 ..................
2 24 8 16 1.00 ..................
3 8 4 4 1.00 ..................
4 4 0 8 2.00 31
1 1 40 24 3 0.20 ..................
2 24 8 16 1.00 ..................
3 8 4 5 1.25 ..................
4 4 0 25 6.25 49
112 1 40 24 3 0.20 ..................
2 24 8 16 1.00 ..................
3 8 4 20 5.00 ..................
4 4 0 45 11.25 84
2 2 40 24 3 0.20 ..................
1 24 8 25 1.56 ..................
3 8 4 20 5.00 ..................
4 4 0 95 23.75 143
3 1 40 24 3 0.20 ..................
2 24 8 30 1.88 ..................
3 8 4 30 7.50 ..................
4 4 0 120 30.00 183
4 1 40 24 3 0.20 ..................
2 24 8 45 2.81 ..................
3 8 4 35 8.75 ..................
4 4 0 130 32.50 213
5 1 40 24 3 0.20 ..................
2 24 8 47 2.94 ..................
3 8 4 53 13.25 ..................
4 4 0 130 32.50 233
6 1 40 24 3 0.20 ..................
2 24 8 55 3.44 ..................
3 8 4 60 15.00 ..................
4 4 0 130 32.50 248
7 1 40 24 3 0.20 ..................
2 24 8 65 4.06 ..................
3 8 4 60 15.00 ..................
4 4 0 130 32.50 258
8 1 40 24 3 0.20 ..................
2 24 8 75 4.70 ..................
3 8 4 60 15.00 ..................
4 4 0 130 32.50 268

454

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00464 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. S, App. A

DECOMPRESSION TABLE NO. 2Continued


[Do not interpolate, use next higher value for conditions not computed]

Decompression data
Working
Working chamber pressure Total time
period Pressure reduc. p.s.i.g. Time in Pressure
p.s.i.g. decom-
hours Stage No. stage min- reduc. rate press min-
utes Min/pound
From To utes

Over 8 1 40 24 3 0.20 ..................


2 24 8 95 5.93 ..................
3 8 4 60 15.00 ..................
4 4 0 130 32.50 288
42 ................................................ 12 1 42 26 3 0.20 ..................
2 26 10 16 1.00 ..................
3 10 4 6 1.00 ..................
4 4 0 12 3.00 37
1 1 42 26 3 0.20 ..................
2 26 10 16 1.00 ..................
3 10 4 12 2.00 ..................
4 4 0 25 6.25 56
112 1 42 26 3 0.20 ..................
2 26 10 16 1.00 ..................
3 10 4 23 3.83 ..................
4 4 0 60 15.00 102
2 1 42 26 3 0.20 ..................
2 26 10 16 1.00 ..................
3 10 4 30 5.00 ..................
4 4 0 95 23.75 144
3 1 42 26 3 0.20 ..................
2 26 10 16 1.00 ..................
3 10 4 50 8.34 ..................
4 4 0 120 30.00 189
4 1 42 26 3 0.20 ..................
2 26 10 17 1.06 ..................
3 10 4 65 10.83 ..................
4 4 0 130 32.50 215
5 1 42 26 3 0.20 ..................
2 26 10 27 1.69 ..................
3 10 4 85 14.18 ..................
4 4 0 130 32.50 245
6 1 42 26 3 0.20 ..................
2 26 10 27 1.69 ..................
3 10 4 100 16.67 ..................
4 4 0 130 32.50 260
7 1 42 26 3 0.20 ..................
2 26 10 30 1.88 ..................
3 10 4 100 16.67 ..................
4 4 0 130 32.50 263
8 1 42 26 3 0.20 ..................
2 26 10 35 2.19 ..................
3 10 4 100 16.67 ..................
4 4 0 130 32.50 268
Over 8 1 42 26 3 0.20 ..................
2 26 10 60 3.75 ..................
3 10 4 100 16.67 ..................
4 4 0 130 32.50 293
44 ................................................ 12 1 44 28 3 0.20 ..................
2 28 12 16 1.00 ..................
3 12 4 8 1.00 ..................
4 4 0 16 4.00 43
1 1 44 28 3 0.20 ..................
2 28 12 16 1.00 ..................
3 12 4 20 2.50 ..................
4 4 0 25 6.25 64
112 1 44 28 3 0.20 ..................
2 28 12 16 1.00 ..................
3 12 4 27 3.38 ..................
4 4 0 72 18.00 118
2 1 44 28 3 0.20 ..................
2 28 12 16 1.00 ..................
3 12 4 40 5.00 ..................
4 4 0 95 23.75 154
3 1 44 28 3 0.20 ..................
2 28 12 16 1.00 ..................

455

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00465 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. S, App. A 29 CFR Ch. XVII (7112 Edition)

DECOMPRESSION TABLE NO. 2Continued


[Do not interpolate, use next higher value for conditions not computed]

Decompression data
Working
Working chamber pressure Total time
period Pressure reduc. p.s.i.g. Time in Pressure
p.s.i.g. decom-
hours Stage No. stage min- reduc. rate press min-
utes Min/pound
From To utes

3 12 4 60 7.50 ..................
4 4 0 120 30.00 199
4 1 44 28 3 0.20 ..................
2 28 12 16 1.00 ..................
3 12 4 85 10.62 ..................
4 4 0 130 32.50 234
5 1 44 28 3 0.20 ..................
2 28 12 16 1.00 ..................
3 12 4 105 13.13 ..................
4 4 0 130 32.50 254
6 1 44 28 3 0.20 ..................
2 28 12 16 1.00 ..................
3 12 4 115 14.38 ..................
4 4 0 130 32.50 264
7 1 44 28 3 0.20 ..................
2 28 12 16 1.00 ..................
3 12 4 120 15.00 ..................
4 4 0 130 32.50 269
8 1 44 28 3 0.20 ..................
2 28 12 16 1.00 ..................
3 12 4 120 15.00 ..................
4 4 0 130 32.50 269
Over 8 1 44 28 3 0.20 ..................
2 28 12 40 2.50 ..................
3 12 4 120 15.00 ..................
4 4 0 130 32.50 293
46 ................................................ 12 1 46 30 3 0.20 ..................
2 30 14 16 1.00 ..................
3 14 4 10 1.00 ..................
4 4 0 15 3.75 44
1 1 46 30 3 0.20 ..................
2 30 14 16 1.00 ..................
3 14 4 25 2.50 ..................
4 4 0 30 7.50 74
112 1 46 30 3 0.20 ..................
2 30 14 16 1.00 ..................
3 14 4 35 3.50 ..................
4 4 0 85 21.20 139
2 1 46 30 3 0.20 ..................
2 30 14 16 1.00 ..................
3 14 4 47 4.70 ..................
4 4 0 105 26.25 171
3 1 46 30 3 0.20 ..................
2 30 14 16 1.00 ..................
3 14 4 65 6.50 ..................
4 4 0 130 32.50 214
4 1 46 30 3 0.20 ..................
2 30 14 16 1.00 ..................
3 14 4 95 9.50 ..................
4 4 0 130 32.50 244
5 1 46 30 3 0.20 ..................
2 30 14 16 1.00 ..................
3 14 4 120 12.00 ..................
4 4 0 130 32.50 269
6 1 46 30 3 0.20 ..................
2 30 14 16 1.00 ..................
3 14 4 125 12.50 ..................
4 4 0 130 32.50 274
7 1 46 30 3 0.20 ..................
2 34 14 16 1.00 ..................
3 10 4 140 14.00 ..................
4 4 0 130 32.50 289
8 1 46 30 3 0.20 ..................
2 30 14 16 1.00 ..................
3 14 4 150 15.00 ..................
4 4 0 130 32.50 299

456

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00466 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. S, App. A

DECOMPRESSION TABLE NO. 2Continued


[Do not interpolate, use next higher value for conditions not computed]

Decompression data
Working
Working chamber pressure Total time
period Pressure reduc. p.s.i.g. Time in Pressure
p.s.i.g. decom-
hours Stage No. stage min- reduc. rate press min-
utes Min/pound
From To utes

Over 8 1 46 30 3 0.20 ..................


2 30 14 25 1.56 ..................
3 14 4 160 16.00 ..................
4 4 0 130 32.50 318
48 ................................................ 12 1 48 32 3 0.20 ..................
2 32 16 16 1.00 ..................
3 16 4 12 1.00 ..................
4 4 0 20 5.00 51
1 1 48 32 3 0.20 ..................
2 32 16 16 1.00 ..................
3 16 4 35 2.92 ..................
4 4 0 35 8.75 89
112 1 48 32 3 0.20 ..................
2 32 16 16 1.00 ..................
3 16 4 45 3.75 ..................
4 4 0 80 20.00 144
2 1 48 32 3 0.20 ..................
2 32 16 16 1.00 ..................
3 16 4 60 5.00 ..................
4 4 0 110 27.50 189
3 1 48 32 3 0.20 ..................
2 32 16 16 1.00 ..................
3 16 4 90 7.50 ..................
4 4 0 120 30.00 229
4 1 48 32 3 0.20 ..................
2 32 16 16 1.00 ..................
3 16 4 120 10.00 ..................
4 4 0 130 32.50 269
5 1 48 32 3 0.20 ..................
2 32 16 16 1.00 ..................
3 16 4 140 11.67 ..................
4 4 0 130 32.50 209
6 1 48 32 3 0.20 ..................
2 32 16 16 1.00 ..................
3 16 4 160 13.33 ..................
4 4 0 130 32.50 309
7 1 48 32 3 0.20 ..................
2 32 16 16 1.00 ..................
3 16 4 170 14.17 ..................
4 4 0 130 32.50 ..................
8 1 48 32 3 0.20 ..................
2 32 16 16 1.00 ..................
3 16 4 170 14.17 ..................
4 4 0 130 32.50 ..................
50 ................................................ 12 1 50 34 3 0.20 ..................
2 34 18 16 1.00 ..................
3 18 4 14 1.00 ..................
4 4 0 25 6.25 58
1 1 50 34 3 0.20 ..................
2 34 18 16 1.00 ..................
3 18 4 40 2.86 ..................
4 4 0 35 8.75 94
112 1 50 34 3 0.20 ..................
2 34 18 16 1.00 ..................
3 18 4 55 3.93 ..................
4 4 0 90 22.50 164
2 1 50 34 3 0.20 ..................
2 34 18 16 1.00 ..................
3 18 4 70 5.00 ..................
4 4 0 120 30.00 209
3 1 50 34 3 0.20 ..................
2 34 18 16 1.00 ..................
3 18 4 100 7.15 ..................
4 4 0 130 32.50 249
4 1 50 34 3 0.20 ..................
2 34 18 16 1.00 ..................

457

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00467 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.850 29 CFR Ch. XVII (7112 Edition)

DECOMPRESSION TABLE NO. 2Continued


[Do not interpolate, use next higher value for conditions not computed]

Decompression data
Working
Working chamber pressure Total time
period Pressure reduc. p.s.i.g. Time in Pressure
p.s.i.g. decom-
hours Stage No. stage min- reduc. rate press min-
utes Min/pound
From To utes

3 18 4 130 8.58 ..................


4 4 0 130 32.50 279
5 1 50 34 3 0.20 ..................
2 34 18 16 1.00 ..................
3 18 4 160 11.42 ..................

DECOMPRESSION TABLE NO. 2CONTINUED


[Do not interpolate, use next higher value for conditions not computed]

Decompression data
Working
Working chamber pressure Total time
period Pressure reduc. p.s.i.g. Time in Pressure
p.s.i.g. decom-
hours Stage No. stage min- reduc. rate press min-
utes Min/pound
From To utes

4 4 0 130 32.50 309


6 1 50 34 3 0.20 ..................
2 34 18 16 1.00 ..................
3 18 4 180 12.85 ..................
4 4 0 130 32.50 329

[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6. 1979; as amended at 58 FR 35311, June 30, 1993]

Subpart TDemolition trolled, outside the building line before


demolition work is started. In each
AUTHORITY: Sec. 107, Contract Work Hours case, any utility company which is in-
and Safety Standards Act (Construction volved shall be notified in advance.
Safety Act) (40 U.S.C. 333); secs. 4, 6, 8, Occu- (d) If it is necessary to maintain any
pational Safety and Health Act of 1970 (29 power, water or other utilities during
U.S.C. 653, 655, 657); Secretary of Labors demolition, such lines shall be tempo-
Order No. 1271 (36 FR 8754), 876 (41 FR
rarily relocated, as necessary, and pro-
25059), or 983 (48 FR 35736), as applicable.
tected.
1926.850 Preparatory operations. (e) It shall also be determined if any
(a) Prior to permitting employees to type of hazardous chemicals, gases, ex-
start demolition operations, an engi- plosives, flammable materials, or simi-
neering survey shall be made, by a larly dangerous substances have been
competent person, of the structure to used in any pipes, tanks, or other
determine the condition of the fram- equipment on the property. When the
ing, floors, and walls, and possibility of presence of any such substances is ap-
unplanned collapse of any portion of parent or suspected, testing and purg-
the structure. Any adjacent structure ing shall be performed and the hazard
where employees may be exposed shall eliminated before demolition is start-
also be similarly checked. The em- ed.
ployer shall have in writing evidence (f) Where a hazard exists from frag-
that such a survey has been performed. mentation of glass, such hazards shall
(b) When employees are required to be removed.
work within a structure to be demol- (g) Where a hazard exists to employ-
ished which has been damaged by fire, ees falling through wall openings, the
flood, explosion, or other cause, the opening shall be protected to a height
walls or floor shall be shored or braced. of approximately 42 inches.
(c) All electric, gas, water, steam, (h) When debris is dropped through
sewer, and other service lines shall be
holes in the floor without the use of
shut off, capped, or otherwise con-

458

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00468 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.853

chutes, the area onto which the mate- not less than two floors below the floor
rial is dropped shall be completely en- on which work is being performed, and
closed with barricades not less than 42 access to the floor where the work is in
inches high and not less than 6 feet progress shall be through a properly
back from the projected edge of the lighted, protected, and separate pas-
opening above. Signs, warning of the sageway.
hazard of falling materials, shall be
posted at each level. Removal shall not 1926.852 Chutes.
be permitted in this lower area until (a) No material shall be dropped to
debris handling ceases above. any point lying outside the exterior
(i) All floor openings, not used as ma- walls of the structure unless the area is
terial drops, shall be covered over with effectively protected.
material substantial enough to support (b) All materials chutes, or sections
the weight of any load which may be thereof, at an angle of more than 45
imposed. Such material shall be prop- from the horizontal, shall be entirely
erly secured to prevent its accidental enclosed, except for openings equipped
movement. with closures at or about floor level for
(j) Except for the cutting of holes in the insertion of materials. The open-
floors for chutes, holes through which ings shall not exceed 48 inches in
to drop materials, preparation of stor- height measured along the wall of the
age space, and similar necessary pre- chute. At all stories below the top
paratory work, the demolition of exte- floor, such openings shall be kept
rior walls and floor construction shall closed when not in use.
begin at the top of the structure and
(c) A substantial gate shall be in-
proceed downward. Each story of exte-
stalled in each chute at or near the dis-
rior wall and floor construction shall
charge end. A competent employee
be removed and dropped into the stor-
shall be assigned to control the oper-
age space before commencing the re-
ation of the gate, and the backing and
moval of exterior walls and floors in
loading of trucks.
the story next below.
(d) When operations are not in
(k) Employee entrances to multi-
progress, the area surrounding the dis-
story structures being demolished shall
charge end of a chute shall be securely
be completely protected by sidewalk
closed off.
sheds or canopies, or both, providing
protection from the face of the build- (e) Any chute opening, into which
ing for a minimum of 8 feet. All such workmen dump debris, shall be pro-
canopies shall be at least 2 feet wider tected by a substantial guardrail ap-
than the building entrances or open- proximately 42 inches above the floor
ings (1 foot wider on each side thereof), or other surface on which the men
and shall be capable of sustaining a stand to dump the material. Any space
load of 150 pounds per square foot. between the chute and the edge of
openings in the floors through which it
1926.851 Stairs, passageways, and passes shall be solidly covered over.
ladders. (f) Where the material is dumped
(a) Only those stairways, passage- from mechanical equipment or wheel-
ways, and ladders, designated as means barrows, a securely attached toeboard
of access to the structure of a building, or bumper, not less than 4 inches thick
shall be used. Other access ways shall and 6 inches high, shall be provided at
be entirely closed at all times. each chute opening.
(b) All stairs, passageways, ladders (g) Chutes shall be designed and con-
and incidental equipment thereto, structed of such strength as to elimi-
which are covered by this section, shall nate failure due to impact of materials
be periodically inspected and main- or debris loaded therein.
tained in a clean safe condition.
(c) In a multistory building, when a 1926.853 Removal of materials
stairwell is being used, it shall be prop- through floor openings.
erly illuminated by either natural or Any openings cut in a floor for the
artificial means, and completely and disposal of materials shall be no larger
substantially covered over at a point in size than 25 percent of the aggregate

459

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00469 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.854 29 CFR Ch. XVII (7112 Edition)

of the total floor area, unless the lat- braced or adjoining structures have
eral supports of the removed flooring been properly underpinned.
remain in place. Floors weakened or (i) Walls, which are to serve as re-
otherwise made unsafe by demolition taining walls against which debris will
operations shall be shored to carry be piled, shall not be so used unless ca-
safely the intended imposed load from pable of safely supporting the imposed
demolition operations. load.

1926.854 Removal of walls, masonry 1926.855 Manual removal of floors.


sections, and chimneys.
(a) Openings cut in a floor shall ex-
(a) Masonry walls, or other sections tend the full span of the arch between
of masonry, shall not be permitted to supports.
fall upon the floors of the building in (b) Before demolishing any floor
such masses as to exceed the safe car- arch, debris and other material shall be
rying capacities of the floors. removed from such arch and other ad-
(b) No wall section, which is more jacent floor area. Planks not less than
than one story in height, shall be per- 2 inches by 10 inches in cross section,
mitted to stand alone without lateral full size undressed, shall be provided
bracing, unless such wall was origi- for, and shall be used by employees to
nally designed and constructed to stand on while breaking down floor
stand without such lateral support, and arches between beams. Such planks
is in a condition safe enough to be self- shall be so located as to provide a safe
supporting. All walls shall be left in a support for the workmen should the
stable condition at the end of each arch between the beams collapse. The
shift. open space between planks shall not
(c) Employees shall not be permitted exceed 16 inches.
to work on the top of a wall when (c) Safe walkways, not less than 18
weather conditions constitute a haz- inches wide, formed of planks not less
ard. than 2 inches thick if wood, or of equiv-
(d) Structural or load-supporting alent strength if metal, shall be pro-
members on any floor shall not be cut vided and used by workmen when nec-
or removed until all stories above such essary to enable them to reach any
a floor have been demolished and re- point without walking upon exposed
moved. This provision shall not pro- beams.
hibit the cutting of floor beams for the (d) Stringers of ample strength shall
disposal of materials or for the instal- be installed to support the flooring
lation of equipment, provided that the planks, and the ends of such stringers
requirements of 1926.853 and 1926.855 shall be supported by floor beams or
are met. girders, and not by floor arches alone.
(e) Floor openings within 10 feet of (e) Planks shall be laid together over
any wall being demolished shall be solid bearings with the ends overlap-
planked solid, except when employees ping at least 1 foot.
are kept out of the area below. (f) When floor arches are being re-
(f) In buildings of skeleton-steel moved, employees shall not be allowed
construction, the steel framing may be in the area directly underneath, and
left in place during the demolition of such an area shall be barricaded to pre-
masonry. Where this is done, all steel vent access to it.
beams, girders, and similar structural (g) Demolition of floor arches shall
supports shall be cleared of all loose not be started until they, and the sur-
material as the masonry demolition rounding floor area for a distance of 20
progresses downward. feet, have been cleared of debris and
(g) Walkways or ladders shall be pro- any other unnecessary materials.
vided to enable employees to safely
reach or leave any scaffold or wall. 1926.856 Removal of walls, floors,
(h) Walls, which serve as retaining and material with equipment.
walls to support earth or adjoining (a) Mechanical equipment shall not
structures, shall not be demolished be used on floors or working surfaces
until such earth has been properly unless such floors or surfaces are of

460

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00470 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.860

sufficient strength to support the im- (d) Any structural member being dis-
posed load. membered shall not be overstressed.
(b) Floor openings shall have curbs or [44 FR 8577, Feb. 9, 1979 , 75 FR 48135, Aug. 9,
stop-logs to prevent equipment from 2010]
running over the edge.
(c) Mechanical equipment used shall 1926.859 Mechanical demolition.
meet the requirements specified in sub- (a) No workers shall be permitted in
parts N and O and 1926.1501 of 1926 any area, which can be adversely af-
subpart DD. fected by demolition operations, when
[44 FR 8577, Feb. 9, 1979 , 75 FR 48135, Aug. 9, balling or clamming is being per-
2010] formed. Only those workers necessary
for the performance of the operations
1926.857 Storage. shall be permitted in this area at any
(a) The storage of waste material and other time.
debris on any floor shall not exceed the (b) The weight of the demolition ball
allowable floor loads. shall not exceed 50 percent of the
(b) In buildings having wooden floor cranes rated load, based on the length
construction, the flooring boards may of the boom and the maximum angle of
be removed from not more than one operation at which the demolition ball
floor above grade to provide storage will be used, or it shall not exceed 25
space for debris, provided falling mate- percent of the nominal breaking
rial is not permitted to endanger the strength of the line by which it is sus-
stability of the structure. pended, whichever results in a lesser
(c) When wood floor beams serve to value.
brace interior walls or free-standing (c) The crane boom and loadline shall
exterior walls, such beams shall be left be as short as possible.
in place until other equivalent support (d) The ball shall be attached to the
can be installed to replace them. loadline with a swivel-type connection
(d) Floor arches, to an elevation of to prevent twisting of the loadline, and
not more than 25 feet above grade, may shall be attached by positive means in
be removed to provide storage area for such manner that the weight cannot
debris: Provided, That such removal become accidentally disconnected.
does not endanger the stability of the (e) When pulling over walls or por-
structure. tions thereof, all steel members af-
(e) Storage space into which material fected shall have been previously cut
is dumped shall be blocked off, except free.
for openings necessary for the removal (f) All roof cornices or other such or-
of material. Such openings shall be namental stonework shall be removed
kept closed at all times when material prior to pulling walls over.
is not being removed. (g) During demoliton, continuing in-
spections by a competent person shall
1926.858 Removal of steel construc-
be made as the work progresses to de-
tion.
tect hazards resulting from weakened
(a) When floor arches have been re- or deteriorated floors, or walls, or loos-
moved, planking in accordance with ened material. No employee shall be
1926.855(b) shall be provided for the permitted to work where such hazards
workers engaged in razing the steel exist until they are corrected by shor-
framing. ing, bracing, or other effective means.
(b) Cranes, derricks, and other hoist-
ing equipment used shall meet the re- 1926.860 Selective demolition by ex-
quirements specified in 1926.1501 of plosives.
1926 subpart DD. Selective demolition by explosives
(c) Steel construction shall be dis- shall be conducted in accordance with
mantled column length by column the applicable sections of subpart U of
length, and tier by tier (columns may this part.
be in two-story lengths).

461

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00471 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.900 29 CFR Ch. XVII (7112 Edition)

Subpart UBlasting and the Use precaution including, but not limited
of Explosives to, visual and audible warning signals,
flags, or barricades, to ensure employee
safety.
AUTHORITY: Sec. 107, Contract Work Hours
and Safety Standards Act (40 U.S.C. 333);
(j) Insofar as possible, blasting oper-
secs. 4, 6, 8, Occupational Safety and Health ations above ground shall be conducted
Act of 1970 (29 U.S.C. 653, 655, 657); Secretary between sunup and sundown.
of Labors Order No. 1271 (36 FR 8754), 876 (k) Due precautions shall be taken to
(41 FR 25059), 983 (48 FR 35736), or 696 (62 FR prevent accidental discharge of electric
111), as applicable; and 29 CFR part 1911. blasting caps from current induced by
radar, radio transmitters, lightning,
1926.900 General provisions. adjacent powerlines, dust storms, or
(a) The employer shall permit only other sources of extraneous electricity.
authorized and qualified persons to These precautions shall include:
handle and use explosives. (1) Detonators shall be short-
(b) Smoking, firearms, matches, open circuited in holes which have been
flame lamps, and other fires, flame or primed and shunted until wired into
heat producing devices and sparks shall the blasting circuit.
be prohibited in or near explosive mag- (2) The suspension of all blasting op-
azines or while explosives are being erations and removal of persons from
handled, transported or used. the blasting area during the approach
(c) No person shall be allowed to han- and progress of an electric storm;
dle or use explosives while under the (3) (i) The prominent display of ade-
influence of intoxicating liquors, nar- quate signs, warning against the use of
cotics, or other dangerous drugs. mobile radio transmitters, on all roads
(d) All explosives shall be accounted within 1,000 feet of blasting operations.
for at all times. Explosives not being Whenever adherence to the 1,000-foot
used shall be kept in a locked maga- distance would create an operational
zine, unavailable to persons not au- handicap, a competent person shall be
thorized to handle them. The employer consulted to evaluate the particular
shall maintain an inventory and use situation, and alternative provisions
record of all explosives. Appropriate may be made which are adequately de-
authorities shall be notified of any signed to prevent any premature firing
loss, theft, or unauthorized entry into of electric blasting caps. A description
a magazine. of any such alternatives shall be re-
(e) No explosives or blasting agents duced to writing and shall be certified
shall be abandoned. as meeting the purposes of this subdivi-
(f) No fire shall be fought where the sion by the competent person con-
fire is in imminent danger of contact sulted. The description shall be main-
with explosives. All employees shall be tained at the construction site during
removed to a safe area and the fire area the duration of the work, and shall be
guarded against intruders. available for inspection by representa-
(g) Original containers, or Class II tives of the Secretary of Labor.
magazines, shall be used for taking det- (ii) Specimens of signs which would
onators and other explosives from stor- meet the requirements of paragraph
age magazines to the blasting area. (k)(3) of this section are the following:
(h) When blasting is done in con-
gested areas or in proximity to a struc-
ture, railway, or highway, or any other
installation that may be damaged, the
blaster shall take special precautions
in the loading, delaying, initiation, and
confinement of each blast with mats or
other methods so as to control the
throw of fragments, and thus prevent
bodily injury to employees.
(i) Employees authorized to prepare
explosive charges or conduct blasting (4) Ensuring that mobile radio trans-
operations shall use every reasonable mitters which are less than 100 feet

462
EC30OC91.049</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00472 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.901

away from electric blasting caps, in (4) The building shall be well venti-
other than original containers, shall be lated.
deenergized and effectively locked; (5) Heating units which do not depend
(5) Compliance with the rec- on combustion processes, when prop-
ommendations of The Institute of the erly designed and located, may be used
Makers of Explosives with regard to in the building. All direct sources of
blasting in the vicinity of radio trans- heat shall be provided exclusively from
mitters as stipulated in Radio Fre- units located outside the mixing build-
quency EnergyA Potential Hazard in ing.
the Use of Electric Blasting Caps, IME (6) All internal-combustion engines
Publication No. 20, March 1971. used for electric power generation shall
(l) Empty boxes and paper and fiber be located outside the mixing plant
packing materials, which have pre- building, or shall be properly venti-
viously contained high explosives, lated and isolated by a firewall. The ex-
shall not be used again for any purpose, haust systems on all such engines shall
but shall be destroyed by burning at an be located so any spark emission can-
approved location. not be a hazard to any materials in or
(m) Explosives, blasting agents, and adjacent to the plant.
blasting supplies that are obviously de- (t) Buildings used for the mixing of
teriorated or damaged shall not be water gels shall conform to the re-
used. quirements of this subdivision.
(n) Delivery and issue of explosives (1) Buildings shall be of noncombus-
shall only be made by and to author- tible construction or sheet metal on
ized persons and into authorized maga- wood studs.
zines or approved temporary storage or (2) Floors in a mixing plant shall be
handling areas. of concrete or of other nonabsorbent
(o) Blasting operations in the prox- materials.
imity of overhead power lines, commu- (3) Where fuel oil is used all fuel oil
nication lines, utility services, or other storage facilities shall be separated
services and structures shall not be from the mixing plant and located in
carried on until the operators and/or such a manner that in case of tank rup-
owners have been notified and meas- ture, the oil will drain away from the
ures for safe control have been taken. mixing plant building.
(p) The use of black powder shall be (4) The building shall be well venti-
prohibited. lated.
(q) All loading and firing shall be di- (5) Heating units that do not depend
rected and supervised by competent on combustion processes, when prop-
persons thoroughly experienced in this erly designed and located, may be used
field.
in the building. All direct sources of
(r) All blasts shall be fired elec- heat shall be provided exclusively from
trically with an electric blasting ma- units located outside of the mixing
chine or properly designed electric building.
power source, except as provided in
(6) All internal-combustion engines
1926.906 (a) and (r).
used for electric power generation shall
(s) Buildings used for the mixing of be located outside the mixing plant
blasting agents shall conform to the re-
building, or shall be properly venti-
quirements of this section.
lated and isolated by a firewall. The ex-
(1) Buildings shall be of noncombus- haust systems on all such engines shall
tible construction or sheet metal on be located so any spark emission can-
wood studs. not be a hazard to any materials in or
(2) Floors in a mixing plant shall be adjacent to the plant.
of concrete or of other nonabsorbent
materials. [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
(3) All fuel oil storage facilities shall 1979, as amended at 58 FR 35183, June 30, 1993]
be separated from the mixing plant and
located in such a manner that in case 1926.901 Blaster qualifications.
of tank rupture, the oil will drain away (a) A blaster shall be able to under-
from the mixing plant building. stand and give written and oral orders.

463

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00473 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.902 29 CFR Ch. XVII (7112 Edition)

(b) A blaster shall be in good physical (g) All vehicles used for the transpor-
condition and not be addicted to nar- tation of explosives shall have tight
cotics, intoxicants, or similar types of floors and any exposed spark-producing
drugs. metal on the inside of the body shall be
(c) A blaster shall be qualified, by covered with wood, or other non-
reason of training, knowledge, or expe- sparking material, to prevent contact
rience, in the field of transporting, with containers of explosives.
storing, handling, and use of explo- (h) Every motor vehicle or convey-
sives, and have a working knowledge of ance used for transporting explosives
State and local laws and regulations shall be marked or placarded on both
which pertain to explosives. sides, the front, and the rear with the
(d) Blasters shall be required to fur- word Explosives in red letters, not
nish satisfactory evidence of com- less than 4 inches in height, on white
petency in handling explosives and per- background. In addition to such mark-
forming in a safe manner the type of ing or placarding, the motor vehicle or
blasting that will be required. conveyance may display, in such a
(e) The blaster shall be knowledge- manner that it will be readily visible
able and competent in the use of each from all directions, a red flag 18 inches
type of blasting method used. by 30 inches, with the word Explo-
sives painted, stamped, or sewed
1926.902 Surface transportation of thereon, in white letters, at least 6
explosives. inches in height.
(a) Transportation of explosives shall (i) Each vehicle used for transpor-
meet the provisions of Department of tation of explosives shall be equipped
Transportation regulations contained with a fully charged fire extinguisher,
in 46 CFR parts 146149, Water Carriers; in good condition. An Underwriters
49 CFR parts 171179, Highways and Laboratory-approved extinguisher of
Railways; 49 CFR part 195, Pipelines; not less than 10-ABC rating will meet
and 49 CFR parts 390397, Motor Car- the minimum requirement. The driver
riers. shall be trained in the use of the extin-
guisher on his vehicle.
(b) Motor vehicles or conveyances
(j) Motor vehicles or conveyances
transporting explosives shall only be
carrying explosives, blasting agents, or
driven by, and be in the charge of, a li-
blasting supplies, shall not be taken in-
censed driver who is physically fit. He
side a garage or shop for repairs or
shall be familiar with the local, State,
servicing.
and Federal regulation governing the
transportation of explosives. (k) No motor vehicle transporting ex-
plosives shall be left unattended.
(c) No person shall smoke, or carry
matches or any other flame-producing [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
device, nor shall firearms or loaded 1979, as amended at 58 FR 35311, June 30, 1993]
cartridges be carried while in or near a
motor vehicle or conveyance trans- 1926.903 Underground transpor-
porting explosives. tation of explosives.
(d) Explosives, blasting agents, and (a) All explosives or blasting agents
blasting supplies shall not be trans- in transit underground shall be taken
ported with other materials or cargoes. to the place of use or storage without
Blasting caps (including electric) shall delay.
not be transported in the same vehicle (b) The quantity of explosives or
with other explosives. blasting agents taken to an under-
(e) Vehicles used for transporting ex- ground loading area shall not exceed
plosives shall be strong enough to the amount estimated to be necessary
carry the load without difficulty, and for the blast.
shall be in good mechanical condition. (c) Explosives in transit shall not be
(f) When explosives are transported left unattended.
by a vehicle with an open body, a Class (d) The hoist operator shall be noti-
II magazine or original manufacturers fied before explosives or blasting
container shall be securely mounted on agents are transported in a shaft con-
the bed to contain the cargo. veyance.

464

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00474 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.905

(e) Trucks used for the transpor- (p) Explosives, blasting agents, or
tation of explosives underground shall blasting supplies shall not be trans-
have the electrical system checked ported with other materials.
weekly to detect any failures which (q) Explosives or blasting agents, not
may constitute an electrical hazard. A in original containers, shall be placed
certification record which includes the in a suitable container when trans-
date of the inspection; the signature of ported manually.
the person who performed the inspec- (r) Detonators, primers, and other ex-
tion; and a serial number, or other plosives shall be carried in separate
identifier, of the truck inspected shall containers when transported manually.
be prepared and the most recent cer-
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
tification record shall be maintained 1979, as amended at 52 FR 36382, Sept. 28,
on file. 1987]
(f) The installation of auxiliary
lights on truck beds, which are pow- 1926.904 Storage of explosives and
ered by the trucks electrical system, blasting agents.
shall be prohibited. (a) Explosives and related materials
(g) Explosives and blasting agents shall be stored in approved facilities
shall be hoisted, lowered, or conveyed required under the applicable provi-
in a powder car. No other materials, sions of the Bureau of Alcohol, Tobacco
supplies, or equipment shall be trans- and Firearms regulations contained in
ported in the same conveyance at the 27 CFR part 55, Commerce in Explo-
same time. sives.
(h) No one, except the operator, his (b) Blasting caps, electric blasting
helper, and the powderman, shall be caps, detonating primers, and primed
permitted to ride on a conveyance cartridges shall not be stored in the
transporting explosives and blasting same magazine with other explosives
agents. or blasting agents.
(i) No person shall ride in any shaft
(c) Smoking and open flames shall
conveyance transporting explosives
not be permitted within 50 feet of ex-
and blasting agents.
plosives and detonator storage maga-
(j) No explosives or blasting agents
zine.
shall be transported on any loco-
(d) No explosives or blasting agents
motive. At least two car lengths shall
shall be permanently stored in any un-
separate the locomotive from the pow-
derground operation until the oper-
der car.
ation has been developed to the point
(k) No explosives or blasting agents
where at least two modes of exit have
shall be transported on a man haul
been provided.
trip.
(e) Permanent underground storage
(l) The car or conveyance containing
magazines shall be at least 300 feet
explosives or blasting agents shall be
from any shaft, adit, or active under-
pulled, not pushed, whenever possible.
ground working area.
(m) The powder car or conveyance es-
(f) Permanent underground maga-
pecially built for the purpose of trans-
zines containing detonators shall not
porting explosives or blasting agents
be located closer than 50 feet to any
shall bear a reflectorized sign on each
magazine containing other explosives
side with the word Explosives in let-
or blasting agents.
ters, not less than 4 inches in height;
upon a background of sharply con- [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
trasting color. 1979, as amended at 58 FR 35311, June 30, 1993]
(n) Compartments for transporting
detonators and explosives in the same 1926.905 Loading of explosives or
car or conveyance shall be physically blasting agents.
separated by a distance of 24 inches or (a) Procedures that permit safe and
by a solid partition at least 6 inches efficient loading shall be established
thick. before loading is started.
(o) Detonators and other explosives (b) All drill holes shall be sufficiently
shall not be transported at the same large to admit freely the insertion of
time in any shaft conveyance. the cartridges of explosives.

465

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00475 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.906 29 CFR Ch. XVII (7112 Edition)

(c) Tamping shall be done only with used; however, explosives complying
wood rods or plastic tamping poles with the requirements of Fume Class 2
without exposed metal parts, but non- and Fume Class 3 may be used if ade-
sparking metal connectors may be used quate ventilation has been provided.
for jointed poles. Violent tamping shall (o) All blast holes in open work shall
be avoided. The primer shall never be be stemmed to the collar or to a point
tamped. which will confine the charge.
(d) No holes shall be loaded except (p) Warning signs, indicating a blast
those to be fired in the next round of area, shall be maintained at all ap-
blasting. After loading, all remaining proaches to the blast area. The warn-
explosives and detonators shall be im- ing sign lettering shall not be less than
mediately returned to an authorized 4 inches in height on a contrasting
magazine. background.
(e) Drilling shall not be started until (q) A bore hole shall never be sprung
all remaining butts of old holes are ex- when it is adjacent to or near a hole
amined for unexploded charges, and if that is loaded. Flashlight batteries
any are found, they shall be refired be- shall not be used for springing holes.
fore work proceeds. (r) Drill holes which have been
(f) No person shall be allowed to sprung or chambered, and which are
deepen drill holes which have con- not water-filled, shall be allowed to
tained explosives or blasting agents. cool before explosives are loaded.
(g) No explosives or blasting agents (s) No loaded holes shall be left unat-
shall be left unattended at the blast tended or unprotected.
site. (t) The blaster shall keep an accu-
(h) Machines and all tools not used rate, up-to-date record of explosives,
for loading explosives into bore holes blasting agents, and blasting supplies
shall be removed from the immediate used in a blast and shall keep an accu-
location of holes before explosives are rate running inventory of all explosives
delivered. Equipment shall not be oper- and blasting agents stored on the oper-
ated within 50 feet of loaded holes. ation.
(i) No activity of any nature other (u) When loading blasting agents
than that which is required for loading pneumatically over electric blasting
holes with explosives shall be per- caps, semiconductive delivery hose
mitted in a blast area. shall be used and the equipment shall
(j) Powerlines and portable electric be bonded and grounded.
cables for equipment being used shall [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
be kept a safe distance from explosives 1979, as amended at 58 FR 35184, June 30, 1993]
or blasting agents being loaded into
drill holes. Cables in the proximity of 1926.906 Initiation of explosive
the blast area shall be deenergized and chargeselectric blasting.
locked out by the blaster. (a) Electric blasting caps shall not be
(k) Holes shall be checked prior to used where sources of extraneous elec-
loading to determine depth and condi- tricity make the use of electric blast-
tions. Where a hole has been loaded ing caps dangerous. Blasting cap leg
with explosives but the explosives have wires shall be kept short-circuited
failed to detonate, there shall be no (shunted) until they are connected into
drilling within 50 feet of the hole. the circuit for firing.
(l) When loading a long line of holes (b) Before adopting any system of
with more than one loading crew, the electrical firing, the blaster shall con-
crews shall be separated by practical duct a thorough survey for extraneous
distance consistent with efficient oper- currents, and all dangerous currents
ation and supervision of crews. shall be eliminated before any holes
(m) No explosive shall be loaded or are loaded.
used underground in the presence of (c) In any single blast using electric
combustible gases or combustible blasting caps, all caps shall be of the
dusts. same style or function, and of the same
(n) No explosives other than those in manufacture.
Fume Class 1, as set forth by the Insti- (d) Electric blasting shall be carried
tute of Makers of Explosives, shall be out by using blasting circuits or power

466

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00476 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.907

circuits in accordance with the electric shall not be in excess of its rated ca-
blasting cap manufacturers rec- pacity. Furthermore, in primary blast-
ommendations, or an approved con- ing, a series circuit shall contain no
tractor or his designated representa- more caps than the limits rec-
tive. ommended by the manufacturer of the
(e) When firing a circuit of electric electric blasting caps in use.
blasting caps, care must be exercised to (p) The blaster shall be in charge of
ensure that an adequate quantity of de- the blasting machines, and no other
livered current is available, in accord- person shall connect the leading wires
ance with the manufacturers rec- to the machine.
ommendations. (q) Blasters, when testing circuits to
(f) Connecting wires and lead wires charged holes, shall use only blasting
shall be insulated single solid wires of galvanometers or other instruments
sufficient current-carrying capacity. that are specifically designed for this
(g) Bus wires shall be solid single purpose.
wires of sufficient current-carrying ca- (r) Whenever the possibility exists
pacity. that a leading line or blasting wire
(h) When firing electrically, the insu- might be thrown over a live powerline
lation on all firing lines shall be ade- by the force of an explosion, care shall
quate and in good condition. be taken to see that the total length of
(i) A power circuit used for firing wires are kept too short to hit the
electric blasting caps shall not be lines, or that the wires are securely an-
grounded. chored to the ground. If neither of
(j) In underground operations when these requirements can be satisfied, a
firing from a power circuit, a safety nonelectric system shall be used.
switch shall be placed in the perma- (s) In electrical firing, only the man
nent firing line at intervals. This making leading wire connections shall
switch shall be made so it can be fire the shot. All connections shall be
locked only in the Off position and made from the bore hole back to the
shall be provided with a short- source of firing current, and the lead-
circuiting arrangement of the firing ing wires shall remain shorted and not
lines to the cap circuit. be connected to the blasting machine
(k) In underground operations there or other source of current until the
shall be a lightning gap of at least 5 charge is to be fired.
feet in the firing system ahead of the (t) After firing an electric blast from
main firing switch; that is, between a blasting machine, the leading wires
this switch and the source of power. shall be immediately disconnected
This gap shall be bridged by a flexible from the machine and short-circuited.
jumper cord just before firing the blast. [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
(l) When firing from a power circuit, 1979, as amended at 63 FR 33469, June 18, 1998]
the firing switch shall be locked in the
open or Off position at all times, ex- 1926.907 Use of safety fuse.
cept when firing. It shall be so designed (a) Safety fuse shall only be used
that the firing lines to the cap circuit where sources of extraneous electricity
are automatically short-circuited when make the use of electric blasting caps
the switch is in the Off position. dangerous. The use of a fuse that has
Keys to this switch shall be entrusted been hammered or injured in any way
only to the blaster. shall be forbidden.
(m) Blasting machines shall be in (b) The hanging of a fuse on nails or
good condition and the efficiency of other projections which will cause a
the machine shall be tested periodi- sharp bend to be formed in the fuse is
cally to make certain that it can de- prohibited.
liver power at its rated capacity. (c) Before capping safety fuse, a short
(n) When firing with blasting ma- length shall be cut from the end of the
chines, the connections shall be made supply reel so as to assure a fresh cut
as recommended by the manufacturer end in each blasting cap.
of the electric blasting caps used. (d) Only a cap crimper of approved
(o) The number of electric blasting design shall be used for attaching
caps connected to a blasting machine blasting caps to safety fuse. Crimpers

467

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00477 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.908 29 CFR Ch. XVII (7112 Edition)

shall be kept in good repair and acces- (d) Detonating cord shall be handled
sible for use. and used with care to avoid damaging
(e) No unused cap or short capped or severing the cord during and after
fuse shall be placed in any hole to be loading and hooking-up.
blasted; such unused detonators shall (e) Detonating cord connections shall
be removed from the working place and be competent and positive in accord-
destroyed. ance with approved and recommended
(f) No fuse shall be capped, or primers methods. Knot-type or other cord-to-
made up, in any magazine or near any cord connections shall be made only
possible source of ignition. with detonating cord in which the ex-
(g) No one shall be permitted to carry plosive core is dry.
detonators or primers of any kind on (f) All detonating cord trunklines and
his person. branchlines shall be free of loops, sharp
(h) The minimum length of safety kinks, or angles that direct the cord
fuse to be used in blasting shall be as back toward the oncoming line of deto-
required by State law, but shall not be nation.
less than 30 inches. (g) All detonating cord connections
(i) At least two men shall be present shall be inspected before firing the
when multiple cap and fuse blasting is blast.
done by hand lighting methods. (h) When detonating cord milli-
(j) Not more than 12 fuses shall be second-delay connectors or short-inter-
lighted by each blaster when hand val-delay electric blasting caps are
lighting devices are used. However, used with detonating cord, the practice
when two or more safety fuses in a shall conform strictly to the manufac-
group are lighted as one by means of turers recommendations.
igniter cord, or other similar fuse- (i) When connecting a blasting cap or
lighting devices, they may be consid- an electric blasting cap to detonating
ered as one fuse. cord, the cap shall be taped or other-
(k) The so-called drop fuse method wise attached securely along the side
of dropping or pushing a primer or any or the end of the detonating cord, with
explosive with a lighted fuse attached the end of the cap containing the ex-
is forbidden. plosive charge pointed in the direction
(l) Cap and fuse shall not be used for in which the detonation is to proceed.
firing mudcap charges unless charges (j) Detonators for firing the trunk-
are separated sufficiently to prevent line shall not be brought to the loading
one charge from dislodging other shots area nor attached to the detonating
in the blast. cord until everything else is in readi-
(m) When blasting with safety fuses, ness for the blast.
consideration shall be given to the
length and burning rate of the fuse. 1926.909 Firing the blast.
Sufficient time, with a margin of safe- (a) A code of blasting signals equiva-
ty, shall always be provided for the lent to Table U1, shall be posted on
blaster to reach a place of safety. one or more conspicuous places at the
operation, and all employees shall be
1926.908 Use of detonating cord. required to familiarize themselves with
(a) Care shall be taken to select a the code and conform to it. Danger
detonating cord consistent with the signs shall be placed at suitable loca-
type and physical condition of the bore tions.
hole and stemming and the type of ex- (b) Before a blast is fired, a loud
plosives used. warning signal shall be given by the
(b) Detonating cord shall be handled blaster in charge, who has made cer-
and used with the same respect and tain that all surplus explosives are in a
care given other explosives. safe place and all employees, vehicles,
(c) The line of detonating cord ex- and equipment are at a safe distance,
tending out of a bore hole or from a or under sufficient cover.
charge shall be cut from the supply (c) Flagmen shall be safely stationed
spool before loading the remainder of on highways which pass through the
the bore hole or placing additional danger zone so as to stop traffic during
charges. blasting operations.

468

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00478 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.913

(d) It shall be the duty of the blaster remain away from the charge for at
to fix the time of blasting. least 1 hour. Misfires shall be handled
(e) Before firing an underground under the direction of the person in
blast, warning shall be given, and all charge of the blasting. All wires shall
possible entries into the blasting area, be carefully traced and a search made
and any entrances to any working for unexploded charges.
place where a drift, raise, or other (e) No drilling, digging, or picking
opening is about to hole through, shall shall be permitted until all missed
be carefully guarded. The blaster shall holes have been detonated or the au-
make sure that all employees are out thorized representative has approved
of the blast area before firing a blast. that work can proceed.
TABLE U1 1926.912 Underwater blasting.
WARNING SIGNALA 1-minute series of long (a) A blaster shall conduct all blast-
blasts 5 minutes prior to blast signal.
BLAST SIGNALA series of short blasts 1
ing operations, and no shot shall be
minute prior to the shot. fired without his approval.
ALL CLEAR SIGNALA prolonged blast fol- (b) Loading tubes and casings of dis-
lowing the inspection of blast area. similar metals shall not be used be-
cause of possible electric transient cur-
1926.910 Inspection after blasting. rents from galvanic action of the met-
(a) Immediately after the blast has als and water.
been fired, the firing line shall be dis- (c) Only water-resistant blasting caps
connected from the blasting machine, and detonating cords shall be used for
or where power switches are used, they all marine blasting. Loading shall be
shall be locked open or in the off posi- done through a nonsparking metal
tion. loading tube when tube is necessary.
(b) Sufficient time shall be allowed, (d) No blast shall be fired while any
not less than 15 minutes in tunnels, for vessel under way is closer than 1,500
the smoke and fumes to leave the feet to the blasting area. Those on
blasted area before returning to the board vessels or craft moored or an-
shot. An inspection of the area and the chored within 1,500 feet shall be noti-
surrounding rubble shall be made by fied before a blast is fired.
the blaster to determine if all charges (e) No blast shall be fired while any
have been exploded before employees swimming or diving operations are in
are allowed to return to the operation, progress in the vicinity of the blasting
and in tunnels, after the muck pile has area. If such operations are in progress,
been wetted down. signals and arrangements shall be
agreed upon to assure that no blast
1926.911 Misfires. shall be fired while any person is in the
(a) If a misfire is found, the blaster water.
shall provide proper safeguards for ex- (f) Blasting flags shall be displayed.
cluding all employees from the danger (g) The storage and handling of ex-
zone. plosives aboard vessels used in under-
(b) No other work shall be done ex- water blasting operations shall be ac-
cept that necessary to remove the haz- cording to provisions outlined herein
ard of the misfire and only those em- on handling and storing explosives.
ployees necessary to do the work shall (h) When more than one charge is
remain in the danger zone. placed under water, a float device shall
(c) No attempt shall be made to ex- be attached to an element of each
tract explosives from any charged or charge in such manner that it will be
misfired hole; a new primer shall be released by the firing. Misfires shall be
put in and the hole reblasted. If re- handled in accordance with the re-
firing of the misfired hole presents a quirements of 1926.911.
hazard, the explosives may be removed
by washing out with water or, where 1926.913 Blasting in excavation work
the misfire is under water, blown out under compressed air.
with air. (a) Detonators and explosives shall
(d) If there are any misfires while not be stored or kept in tunnels, shafts,
using cap and fuse, all employees shall or caissons. Detonators and explosives

469

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00479 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.914 29 CFR Ch. XVII (7112 Edition)

for each round shall be taken directly this part and covered by a license or
from the magazines to the blasting permit issued under authority of the
zone and immediately loaded. Deto- Bureau of Alcohol, Tobacco and Fire-
nators and explosives left over after arms. (See 27 CFR part 55)
loading a round shall be removed from (c) Blast areaThe area in which ex-
the working chamber before the con- plosives loading and blasting oper-
necting wires are connected up. ations are being conducted.
(b) When detonators or explosives are (d) BlasterThe person or persons au-
brought into an air lock, no employee thorized to use explosives for blasting
except the powderman, blaster, lock purposes and meeting the qualifica-
tender and the employees necessary for tions contained in 1926.901.
carrying, shall be permitted to enter (e) Blasting agentA blasting agent is
the air lock. No other material, sup- any material or mixture consisting of a
plies, or equipment shall be locked fuel and oxidizer used for blasting, but
through with the explosives. not classified an explosive and in which
(c) Detonators and explosives shall be none of the ingredients is classified as
taken separately into pressure working an explosive provided the furnished
chambers. (mixed) product cannot be detonated
(d) The blaster or powderman shall be with a No. 8 test blasting cap when
responsible for the receipt, unloading, confined. A common blasting agent
storage, and on-site transportation of presently in use is a mixture of ammo-
explosives and detonators. nium nitrate (NH4 NO3) and carbo-
(e) All metal pipes, rails, air locks, naceous combustibles, such as fuel oil
and steel tunnel lining shall be elec- or coal, and may either be procured,
trically bonded together and grounded premixed and packaged from explosives
at or near the portal or shaft, and such companies or mixed in the field.
pipes and rails shall be cross-bonded to- (f) Blasting capA metallic tube
gether at not less than 1,000-foot inter- closed at one end, containing a charge
vals throughout the length of the tun- of one or more detonating compounds,
nel. In addition, each low air supply and designed for and capable of detona-
pipe shall be grounded at its delivery tion from the sparks or flame from a
end. safety fuse inserted and crimped into
(f) The explosives suitable for use in the open end.
wet holes shall be water-resistant and (g) Block holingThe breaking of
shall be Fume Class 1. boulders by firing a charge of explo-
(g) When tunnel excavation in rock sives that has been loaded in a drill
face is approaching mixed face, and hole.
when tunnel excavation is in mixed (h) ConveyanceAny unit for trans-
face, blasting shall be performed with porting explosives or blasting agents,
light charges and with light burden on including but not limited to trucks,
each hole. Advance drilling shall be trailers, rail cars, barges, and vessels.
performed as tunnel excavation in rock (i) Detonating cordA flexible cord
face approaches mixed face, to deter- containing a center core of high explo-
mine the general nature and extent of sives which when detonated, will have
rock cover and the remaining distance sufficient strength to detonate other
ahead to soft ground as excavation ad- cap-sensitive explosives with which it
vances. is in contact.
(j) DetonatorBlasting caps, electric
1926.914 Definitions applicable to blasting caps, delay electric blasting
this subpart. caps, and nonelectric delay blasting
(a) American Table of Distances (also caps.
known as Quantity Distance Tables) (k) Electric blasting capA blasting
means American Table of Distances for cap designed for and capable of detona-
Storage of Explosives as revised and tion by means of an electric current.
approved by the Institute of the Mak- (l) Electric blasting circuitry
ers of Explosives, June 5, 1964. (1) Bus wire. An expendable wire,
(b) Approved storage facilityA facil- used in parallel or series, in parallel
ity for the storage of explosive mate- circuits, to which are connected the leg
rials conforming to the requirements of wires of electric blasting caps.

470

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00480 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.914

(2) Connecting wire. An insulated ex- ment in conjunction with and capable
pendable wire used between electric of being detonated by a detonation im-
blasting caps and the leading wires or pulse or signal from miniaturized deto-
between the bus wire and the leading nating cord.
wires. (t) Primary blastingThe blasting op-
(3) Leading wire. An insulated wire eration by which the original rock for-
used between the electric power source mation is dislodged from its natural lo-
and the electric blasting cap circuit. cation.
(4) Permanent blasting wire. A per-
manently mounted insulated wire used (u) PrimerA cartridge or container
between the electric power source and of explosives into which a detonator or
the electric blasting cap circuit. detonating cord is inserted or attached.
(m) Electric delay blasting capsCaps (v) Safety fuseA flexible cord con-
designed to detonate at a predeter- taining an internal burning medium by
mined period of time after energy is which fire is conveyed at a continuous
applied to the ignition system. and uniform rate for the purpose of fir-
(n) Explosives(1) Any chemical com- ing blasting caps.
pound, mixture, or device, the primary (w) Secondary blastingThe reduction
or common purpose of which is to func- of oversize material by the use of ex-
tion by explosion; that is, with sub- plosives to the dimension required for
stantially instantaneous release of gas handling, including mudcapping and
and heat, unless such compound, mix- blockholing.
ture or device is otherwise specifically (x) StemmingA suitable inert incom-
classified by the U.S. Department of
bustible material or device used to con-
Transportation.
(2) All material which is classified as fine or separate explosives in a drill
Class A, Class B, and Class C Explo- hole, or to cover explosives in mud-cap-
sives by the U.S. Department of Trans- ping.
portation. (y) SpringingThe creation of a pock-
(3) Classification of explosives by the et in the bottom of a drill hole by the
U.S. Department of Transportation is use of a moderate quantity of explo-
as follows: sives in order that larger quantities or
Class A Explosives. Possessing detonating
explosives may be inserted therein.
hazard, such as dynamite, nitroglycerin, pic- (z) Water gels, or slurry explosivesA
ric acid, lead azide, fulminate of mercury, wide variety of materials used for
black powder, blasting caps, and detonating blasting. They all contain substantial
primers. proportions of water and high propor-
Class B Explosives. Possessing flammable
hazard, such as propellant explosives, includ-
tions of ammonium nitrate, some of
ing some smokeless propellants. which is in solution in the water. Two
Class C Explosives. Include certain types of broad classes of water gels are: (1)
manufactured articles which contain Class A Those which are sensitized by a mate-
or Class B explosives, or both, as compo- rial classed as an explosive, such as
nents, but in restricted quantities.
TNT or smokeless powder, and (2) those
(o) Fuse lightersSpecial devices for which contain no ingredient classified
the purpose of igniting safety fuse. as an explosive; these are sensitized
(p) MagazineAny building or struc- with metals such as aluminum or with
ture, other than an explosives manu- other fuels. Water gels may be
facturing building, used for the storage premixed at an explosives plant or
of explosives. mixed at the site immediately before
(q) MisfireAn explosive charge delivery into the bore hole.
which failed to detonate. (aa) Semiconductive hose.
(r) Mud-capping (sometimes known as
Semiconductive hosea hose with an
bulldozing, adobe blasting, or dobying).
electrical resistance high enough to
The blasting of boulders by placing a
quantity of explosives against a rock, limit flow of stray electric currents to
boulder, or other object without con- safe levels, yet not so high as to pre-
fining the explosives in a drill hole. vent drainage of static electric charges
(s) Nonelectric delay blasting capA to ground; hose of not more than 2
blasting cap with an integral delay ele- megohms resistance over its entire

471

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00481 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.950 29 CFR Ch. XVII (7112 Edition)

length and of not less than 5,000 ohms mined to be deenergized by tests or
per foot meets the requirement. other appropriate methods or means.
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6, (3) Operating voltage of equipment
1979, as amended at 58 FR 35184 and 35311, and lines shall be determined before
June 30, 1993] working on or near energized parts.
(c) Clearances. The provisions of para-
Subpart VPower Transmission graph (c) (1) or (2) of this section shall
and Distribution be observed.
(1) No employee shall be permitted to
approach or take any conductive object
AUTHORITY: Section 3704 of the Contract
Work Hours and Safety Standards Act (40
without an approved insulating handle
U.S.C. 3701); Secs. 4, 6, and 8 of the Occupa- closer to exposed energized parts than
tional Safety and Health Act of 1970 (29 shown in Table V1, unless:
U.S.C. 653, 655, 657); Secretary of Labors (i) The employee is insulated or
Order Nos. 1271 (36 FR 8754); 876 (41 FR guarded from the energized part (gloves
25059); 983 (48 FR 35736, 190 (55 FR 9033), and or gloves with sleeves rated for the
52007 (72 FR 31159). Section 1926.951 also voltage involved shall be considered in-
issued under 29 CFR part 1911.
sulation of the employee from the en-
1926.950 General requirements. ergized part), or
(ii) The energized part is insulated or
(a) Application. The occupational guarded from him and any other con-
safety and health standards contained ductive object at a different potential,
in this subpart V shall apply to the or
construction of electric transmission
(iii) The employee is isolated, insu-
and distribution lines and equipment.
lated, or guarded from any other con-
(1) As used in this subpart V the term
ductive object(s), as during live-line
construction includes the erection of
bare-hand work.
new electric transmission and distribu-
tion lines and equipment, and the al- (2) (i) The minimum working dis-
teration, conversion, and improvement tance and minimum clear hot stick dis-
of existing electric transmission and tances stated in Table V1 shall not be
distribution lines and equipment. violated. The minimum clear hot stick
(2) Existing electric transmission and distance is that for the use of live-line
distribution lines and electrical equip- tools held by linemen when performing
ment need not be modified to conform live-line work.
to the requirements of applicable (ii) Conductor support tools, such as
standards in this subpart V, until such link sticks, strain carriers, and insu-
work as described in paragraph (a)(1) of lator cradles, may be used: Provided,
this section is to be performed on such That the clear insulation is at least as
lines or equipment. long as the insulator string or the min-
(3) The standards set forth in this imum distance specified in Table V1
subpart V provide minimum require- for the operating voltage.
ments for safety and health. Employers
may require adherence to additional TABLE V1ALTERNATING CURRENTMINIMUM
standards which are not in conflict DISTANCES
with the standards contained in this Minimum
subpart V. working
Voltage range (phase to phase) kilovolt) and clear
(b) Initial inspections, tests, or deter- hot stick
minations. (1) Existing conditions shall distance
be determined before starting work, by
2.1 to 15 .............................................................. 2 ft. 0 in.
an inspection or a test. Such condi- 15.1 to 35 ............................................................ 2 ft. 4 in.
tions shall include, but not be limited 35.1 to 46 ............................................................ 2 ft. 6 in.
to, energized lines and equipment, con- 46.1 to 72.5 ......................................................... 3 ft. 0 in.
ditions of poles, and the location of cir- 72.6 to 121 .......................................................... 3 ft. 4 in.
cuits and equipment, including power 138 to 145 ........................................................... 3 ft. 6 in.
161 to 169 ........................................................... 3 ft. 8 in.
and communication lines, CATV and
230 to 242 ........................................................... 5 ft. 0 in.
fire alarm circuits. 345 to 362 ........................................................... 17 ft. 0 in.
(2) Electric equipment and lines shall 500 to 552 ........................................................... 1 11 ft. 0

be considered energized until deter- in.

472

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00482 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.950

TABLE V1ALTERNATING CURRENTMINIMUM (vii) Upon completion of work on de-


DISTANCESContinued energized lines or equipment, each des-
ignated employee in charge shall deter-
Minimum
working mine that all employees in his crew are
Voltage range (phase to phase) kilovolt) and clear clear, that protective grounds installed
hot stick
distance by his crew have been removed, and he
shall report to the designated author-
700 to 765 ........................................................... 1 15 ft. 0 ity that all tags protecting his crew
in.
may be removed.
1 NOTE: For 345362 kv., 500552 kv., and 700765 kv.,
(2) When a crew working on a line or
the minimum working distance and the minimum clear hot
stick distance may be reduced provided that such distances equipment can clearly see that the
are not less than the shortest distance between the energized means of disconnecting from electric
part and a grounded surface.
energy are visibly open or visibly
(d) Deenergizing lines and equipment. locked-out, the provisions of para-
(1) When deenergizing lines and equip- graphs (d)(i), and (ii) of this section
ment operated in excess of 600 volts, shall apply:
and the means of disconnecting from (i) Guards or barriers shall be erected
electric energy is not visibly open or as necessary to adjacent energized
visibly locked out, the provisions of lines.
paragraphs (d)(1) (i) through (vii) of (ii) Upon completion of work on de-
this section shall be complied with: energized lines or equipment, each des-
(i) The particular section of line or ignated employee in charge shall deter-
equipment to be deenergized shall be mine that all employees in his crew are
clearly identified, and it shall be iso- clear, that protective grounds installed
lated from all sources of voltage. by his crew have been removed, and he
(ii) Notification and assurance from shall report to the designated author-
the designated employee shall be ob- ity that all tags protecting his crew
tained that: may be removed.
(a) All switches and disconnectors (e) Emergency procedures and first aid.
through which electric energy may be (1) The employer shall provide training
supplied to the particular section of or require that his employees are
line or equipment to be worked have knowledgeable and proficient in:
been deenergized; (i) Procedures involving emergency
situations, and
(b) All switches and disconnectors are
(ii) First-aid fundamentals including
plainly tagged indicating that men are
resuscitation.
at work;
(2) In lieu of paragraph (e)(1) of this
(c) And that where design of such section the employer may comply with
switches and disconnectors permits, the provisions of 1926.50(c) regarding
they have been rendered inoperable. first-aid requirements.
(iii) After all designated switches and (f) Night work. When working at
disconnectors have been opened, ren- night, spotlights or portable lights for
dered inoperable, and tagged, visual in- emergency lighting shall be provided
spection or tests shall be conducted to as needed to perform the work safely.
insure that equipment or lines have (g) Work near and over water. When
been deenergized. crews are engaged in work over or near
(iv) Protective grounds shall be ap- water and when danger of drowning ex-
plied on the disconnected lines or ists, suitable protection shall be pro-
equipment to be worked on. vided as stated in 1926.104, or 1926.105,
(v) Guards or barriers shall be erect- or 1926.106.
ed as necessary to adjacent energized (h) Sanitation facilities. The require-
lines. ments of 1926.51 of subpart D of this
(vi) When more than one independent part shall be complied with for sanita-
crew requires the same line or equip- tion facilities.
ment to be deenergized, a prominent (i) Hydraulic fluids. All hydraulic
tag for each such independent crew fluids used for the insulated sections of
shall be placed on the line or equip- derrick trucks, aerial lifts, and hydrau-
ment by the designated employee in lic tools which are used on or around
charge. energized lines and equipment shall be

473

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00483 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.951 29 CFR Ch. XVII (7112 Edition)

of the insulating type. The require- (4)(i) Lifelines and lanyards shall
ments for fire resistant fluids of comply with the provisions of 1926.502.
1926.302(d)(1) do not apply to hydraulic (ii) Safety lines are not intended to
tools covered by this paragraph. be subjected to shock loading and are
used for emergency rescue such as low-
1926.951 Tools and protective equip- ering a man to the ground. Such safety
ment. lines shall be a minimum of one-half-
(a) Protective equipment. (1)(i) Rubber inch diameter and three or four strand
protective equipment shall be in ac- first-grade manila or its equivalent in
cordance with the provisions of the strength (2,650 lb.) and durability.
American National Standards Institute (5) Defective ropes shall be replaced.
(ANSI), ANSI J6 series, as follows: (c) Ladders. (1) Portable metal or con-
ductive ladders shall not be used near
Item Standard
energized lines or equipment except as
Rubber insulating gloves ..................... J6.61971. may be necessary in specialized work
Rubber matting for use around electric J6.71935 (R1971). such as in high voltage substations
apparatus. where nonconductive ladders might
Rubber insulating blankets .................. J6.41971.
Rubber insulating hoods ..................... J6.21950 (R1971). present a greater hazard than conduc-
Rubber insulating line hose ................. J6.11950 (R1971). tive ladders. Conductive or metal lad-
Rubber insulating sleeves ................... J6.51971. ders shall be prominently marked as
conductive and all necessary pre-
(ii) Rubber protective equipment cautions shall be taken when used in
shall be visually inspected prior to use. specialized work.
(iii) In addition, an air test shall (2) Hook or other type ladders used in
be performed for rubber gloves prior to structures shall be positively secured
use. to prevent the ladder from being acci-
(iv) Protective equipment of material dentally displaced.
other than rubber shall provide equal (d) Live-line tools. (1) Only live-line
or better electrical and mechanical tool poles having a manufacturers cer-
protection. tification to withstand the following
(2) Protective hats shall be in accord- minimum tests shall be used:
ance with the provisions of ANSI Z89.2 (i) 100,000 volts per foot of length for
1971 Industrial Protective Helmets for 5 minutes when the tool is made of fi-
Electrical Workers, Class B, and shall berglass; or
be worn at the jobsite by employees (ii) 75,000 volts per foot of length for
who are exposed to the hazards of fall- 3 minutes when the tool is made of
ing objects, electric shock, or burns. wood; or
(b) Personal climbing equipment. (1) (iii) Other tests equivalent to para-
Body belts with straps or lanyards graph (d) (i) or (ii) of this section as ap-
shall be worn to protect employees propriate.
working at elevated locations on poles, (2) All live-line tools shall be visually
towers, or other structures except inspected before use each day. Tools to
where such use creates a greater haz- be used shall be wiped clean and if any
ard to the safety of the employees, in hazardous defects are indicated such
which case other safeguards shall be tools shall be removed from service.
employed. (e) Measuring tapes or measuring ropes.
(2) Body belts and safety straps shall Measuring tapes or measuring ropes
meet the requirements of 1926.959. In which are metal or contain conductive
addition to being used as an employee strands shall not be used when working
safeguarding item, body belts with ap- on or near energized parts.
proved tool loops may be used for the (f) Handtools. (1) Switches for all pow-
purpose of holding tools. Body belts ered hand tools shall comply with
shall be free from additional metal 1926.300(d).
hooks and tool loops other than those (2) All portable electric handtools
permitted in 1926.959. shall:
(3) Body belts and straps shall be in- (i) Be equipped with three-wire cord
spected before use each day to deter- having the ground wire permanently
mine that they are in safe working connected to the tool frame and means
condition. for grounding the other end; or

474

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00484 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.953

(ii) Be of the double insulated type (c) Cranes and other lifting equipment.
and permanently labeled as Double (1) All equipment shall comply with
Insulated; or subparts CC and O of this part, as ap-
(iii) Be connected to the power sup- plicable.
ply by means of an isolating trans- (2) Digger derricks used for augering
former, or other isolated power supply. holes for poles carrying electric lines,
(3) All hydraulic tools which are used placing and removing poles, or for han-
on or around energized lines or equip- dling associated materials to be in-
ment shall use nonconducting hoses stalled or removed from the poles must
having adequate strength for the nor- comply with 29 CFR 1910.269.
mal operating pressures. It should be (3) With the exception of equipment
noted that the provisions of certified for work on the proper volt-
1926.302(d)(2) shall also apply. age, mechanical equipment shall not be
(4) All pneumatic tools which are operated closer to any energized line or
used on or around energized lines or equipment than the clearances set
equipment shall: forth in 1926.950(c) unless, in addition
(i) Have nonconducting hoses having to the requirements in 1926.1410:
adequate strength for the normal oper- (i) The mechanical equipment is in-
ating pressures, and sulated, or
(ii) Have an accumulator on the com- (ii) The mechanical equipment is
pressor to collect moisture. considered as energized.
[44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6, NOTE TO PARAGRAPH (C)(3): In accordance
1979, as amended at 59 FR 40730, Aug. 9, 1994] with 29 CFR 1926.1400(g), compliance with 29
CFR 1910.269(p) will be deemed compliance
1926.952 Mechanical equipment. with 1926.1407 through 1926.1411, including
1926.1410.
(a) General. (1) Visual inspections
shall be made of the equipment to de- [44 FR 8577, Feb. 9, 1979 , 75 FR 48135, Aug. 9,
termine that it is in good condition 2010]
each day the equipment is to be used.
1926.953 Material handling.
(2) Tests shall be made at the begin-
ning of each shift during which the (a) Unloading. Prior to unloading
equipment is to be used to determine steel, poles, cross arms and similar ma-
that the brakes and operating systems terial, the load shall be thoroughly ex-
are in proper working condition. amined to ascertain if the load has
(3) No employer shall use any motor shifted, binders or stakes have broken
vehicle equipment having an ob- or the load is otherwise hazardous to
structed view to the rear unless: employees.
(i) The vehicle has a reverse signal (b) Pole hauling. (1) During pole haul-
alarm audible above the surrounding ing operations, all loads shall be se-
noise level or: cured to prevent displacement and a
(ii) The vehicle is backed up only red flag shall be displayed at the trail-
when an observer signals that it is safe ing end of the longest pole.
to do so. (2) Precautions shall be exercised to
(b) Aerial lifts. (1) The provisions of prevent blocking of roadways or endan-
1926.556, subpart N of this part, shall gering other traffic.
apply to the utilization of aerial lifts. (3) When hauling poles during the
(2) When working near energized hours of darkness, illuminated warning
lines or equipment, aerial lift trucks devices shall be attached to the trail-
shall be grounded or barricaded and ing end of the longest pole.
considered as energized equipment, or (c) Storage. (1) No materials or equip-
the aerial lift truck shall be insulated ment shall be stored under energized
for the work being performed. bus, energized lines, or near energized
(3) Equipment or material shall not equipment, if it is practical to store
be passed between a pole or structure them elsewhere.
and an aerial lift while an employee (2) When materials or equipment are
working from the basket is within stored under energized lines or near en-
reaching distance of energized conduc- ergized equipment, applicable clear-
tors or equipment that are not covered ances shall be maintained as stated in
with insulating protective equipment. Table V1; and extraordinary caution

475

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00485 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.954 29 CFR Ch. XVII (7112 Edition)

shall be exercised when moving mate- (2) When removing grounds, the
rials near such energized equipment. grounding device shall first be removed
(d) Tag line. Where hazards to em- fromt the line or equipment using insu-
ployees exist tag lines or other suitable lating tools or other suitable devices.
devices shall be used to control loads (f) Grounds shall be placed between
being handled by hoisting equipment. work location and all sources of energy
(e) Oil filled equipment. During con- and as close as practicable to the work
struction or repair of oil filled equip- location, or grounds shall be placed at
ment the oil may be stored in tem- the work location. If work is to be per-
porary containers other than those re- formed at more than one location in a
quired in 1926.152, such as pillow line section, the line section must be
tanks. grounded and short circuited at one lo-
(f) Framing. During framing oper- cation in the line section and the con-
ations, employees shall not work under ductor to be worked on shall be
a pole or a structure suspended by a grounded at each work location. The
crane, A-frame or similar equipment minimum distance shown in Table V1
unless the pole or structure is ade- shall be maintained from ungrounded
quately supported. conductors at the work location. Where
(g) Attaching the load. The hoist rope the making of a ground is impracti-
shall not be wrapped around the load. cable, or the conditions resulting
This provision shall not apply to elec- therefrom would be more hazardous
tric construction crews when setting or than working on the lines or equip-
removing poles. ment without grounding, the grounds
may be omitted and the line or equip-
1926.954 Grounding for protection of ment worked as energized.
employees. (g) Testing without grounds. Grounds
(a) General. All conductors and equip- may be temporarily removed only
ment shall be treated as energized when necessary for test purposes and
until tested or otherwise determined to extreme caution shall be exercised dur-
be deenergized or until grounded. ing the test procedures.
(b) New construction. New lines or (h) Grounding electrode. When ground-
equipment may be considered deener- ing electrodes are utilized, such elec-
gized and worked as such where: trodes shall have a resistance to
(1) The lines or equipment are ground low enough to remove the dan-
grounded, or ger of harm to personnel or permit
(2) The hazard of induced voltages is prompt operation of protective devices.
not present, and adequate clearances or (i) Grounding to tower. Grounding to
other means are implemented to pre- tower shall be made with a tower
vent contact with energized lines or clamp capable of conducting the antici-
equipment and the new lines or equip- pated fault current.
ment. (j) Ground lead. A ground lead, to be
(c) Communication conductors. Bare attached to either a tower ground or
wire communication conductors on driven ground, shall be capable of con-
power poles or structures shall be ducting the anticipated fault current
treated as energized lines unless pro- and shall have a minimum conductance
tected by insulating materials. of No. 2 AWG copper.
(d) Voltage testing. Deenergized con-
ductors and equipment which are to be 1926.955 Overhead lines.
grounded shall be tested for voltage. (a) Overhead lines. (1) When working
Results of this voltage test shall deter- on or with overhead lines the provi-
mine the subsequent procedures as re- sions of paragraphs (a) (2) through (8)
quired in 1926.950(d). of this section shall be complied with
(e) Attaching grounds. (1) When at- in addition to other applicable provi-
taching grounds, the ground end shall sions of this subpart.
be attached first, and the other end (2) Prior to climbing poles, ladders,
shall be attached and removed by scaffolds, or other elevated structures,
means of insulated tools or other suit- an inspection shall be made to deter-
able devices. mine that the structures are capable of

476

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00486 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.955

sustaining the additional or unbal- (3)(i) A designated employee shall be


anced stresses to which they will be used in directing mobile equipment ad-
subjected. jacent to footing excavations.
(3) Where poles or structures may be (ii) No one shall be permitted to re-
unsafe for climbing, they shall not be main in the footing while equipment is
climbed until made safe by guying, being spotted for placement.
bracing, or other adequate means. (iii) Where necessary to assure the
(4) Before installing or removing wire stability of mobile equipment the loca-
or cable, strains to which poles and tion of use for such equipment shall be
structures will be subjected shall be graded and leveled.
considered and necessary action taken (4)(i) Tower assembly shall be carried
to prevent failure of supporting struc- out with a minimum exposure of em-
tures. ployees to falling objects when working
(5)(i) When setting, moving, or re- at two or more levels on a tower.
moving poles using cranes, derricks, (ii) Guy lines shall be used as nec-
gin poles, A-frames, or other mecha- essary to maintain sections or parts of
nized equipment near energized lines or sections in position and to reduce the
equipment, precautions shall be taken possibility of tipping.
to avoid contact with energized lines or (iii) Members and sections being as-
equipment, except in bare-hand live- sembled shall be adequately supported.
line work, or where barriers or protec- (5) When assembling and erecting
tive devices are used. towers the provisions of paragraphs
(b)(5) (i), (ii) and (iii) of this section
(ii) Equipment and machinery oper-
shall be complied with:
ating adjacent to energized lines or
(i) The construction of transmission
equipment shall comply with
towers and the erecting of poles, hoist-
1926.952(c)(2).
ing machinery, site preparation ma-
(6)(i) Unless using suitable protective chinery, and other types of construc-
equipment for the voltage involved, tion machinery shall conform to the
employees standing on the ground shall applicable requirements of this part.
avoid contacting equipment or machin- (ii) No one shall be permitted under a
ery working adjacent to energized lines tower which is in the process of erec-
or equipment. tion or assembly, except as may be re-
(ii) Lifting equipment shall be bond- quired to guide and secure the section
ed to an effective ground or it shall be being set.
considered energized and barricaded (iii) When erecting towers using
when utilized near energized equip- hoisting equipment adjacent to ener-
ment or lines. gized transmission lines, the lines shall
(7) Pole holes shall not be left unat- be deenergized when practical. If the
tended or unguarded in areas where lines are not deenergized, extraor-
employees are currently working. dinary caution shall be exercised to
(8) Tag lines shall be of a nonconduc- maintain the minimum clearance dis-
tive type when used near energized tances required by 1926.950(c), includ-
lines. ing Table V1.
(b) Metal tower construction. (1) When (6)(i) Erection cranes shall be set on
working in unstable material the exca- firm level foundations and when the
vation for pad- or pile-type footings in cranes are so equipped outriggers shall
excess of 5 feet deep shall be either be used.
sloped to the angle of repose as re- (ii) Tag lines shall be utilized to
quired in 1926.652 or shored if entry is maintain control of tower sections
required. Ladders shall be provided for being raised and positioned, except
access to pad- or pile-type footing ex- where the use of such lines would cre-
cavations in excess of 4 feet. ate a greater hazard.
(2) When working in unstable mate- (iii) The loadline shall not be de-
rial provision shall be made for clean- tached from a tower section until the
ing out auger-type footings without re- section is adequately secured.
quiring an employee to enter the foot- (iv) Except during emergency res-
ing unless shoring is used to protect toration procedures erection shall be
the employee. discontinued in the event of high wind

477

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00487 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.955 29 CFR Ch. XVII (7112 Edition)

or other adverse weather conditions reels, guard structures, tielines, or


which would make the work hazardous. other means to prevent accidental con-
(v) Equipment and rigging shall be tact with energized circuits.
regularly inspected and maintained in (6) Guard structure members shall be
safe operating condition. sound and of adequate dimension and
(7) Adequate traffic control shall be strength, and adequately supported.
maintained when crossing highways (7)(i) Catch-off anchors, rigging, and
and railways with equipment as re- hoists shall be of ample capacity to
quired by the provisions of 1926.200(g) prevent loss of the lines.
(1) and (2). (ii) The manufacturers load rating
(8) A designated employee shall be shall not be exceeded for stringing
utilized to determine that required lines, pulling lines, sock connections,
clearance is maintained in moving and all load-bearing hardware and ac-
equipment under or near energized cessories.
lines. (iii) Pulling lines and accessories
(c) Stringing or removing deenergized shall be inspected regularly and re-
conductors. (1) When stringing or re- placed or repaired when damaged or
moving deenergized conductors, the when dependability is doubtful. The
provisions of paragraphs (c) (2) through provisions of 1926.251(c)(4)(ii) (con-
(12) of this section shall be complied cerning splices) shall not apply.
with.
(8) Conductor grips shall not be used
(2) Prior to stringing operations a
on wire rope unless designed for this
briefing shall be held setting forth the
application.
plan of operation and specifying the
(9) While the conductor or pulling
type of equipment to be used, ground-
line is being pulled (in motion) employ-
ing devices and procedures to be fol-
ees shall not be permitted directly
lowed, crossover methods to be em-
under overhead operations, nor shall
ployed, and the clearance authoriza-
any employee be permitted on the
tion required.
crossarm.
(3) Where there is a possibility of the
conductor accidentally contacting an (10) A transmission clipping crew
energized circuit or receiving a dan- shall have a minimum of two struc-
gerous induced voltage buildup, to fur- tures clipped in between the crew and
ther protect the employee from the the conductor being sagged. When
hazards of the conductor, the con- working on bare conductors, clipping
ductor being installed or removed shall and tying crews shall work between
be grounded or provisions made to in- grounds at all times. The grounds shall
sulate or isolate the employee. remain intact until the conductors are
(4)(i) If the existing line is deener- clipped in, except on dead end struc-
gized, proper clearance authorization tures.
shall be secured and the line grounded (11)(i) Except during emergency res-
on both sides of the crossover or, the toration procedures, work from struc-
line being strung or removed shall be tures shall be discontinued when ad-
considered and worked as energized. verse weather (such as high wind or ice
(ii) When crossing over energized on structures) makes the work haz-
conductors in excess of 600 volts, rope ardous.
nets or guard structures shall be in- (ii) Stringing and clipping operations
stalled unless provision is made to iso- shall be discontinued during the
late or insulate the workman or the en- progress of an electrical storm in the
ergized conductor. Where practical the immediate vicinity.
automatic reclosing feature of the cir- (12)(i) Reel handling equipment, in-
cuit interrupting device shall be made cluding pulling and braking machines,
inoperative. In addition, the line being shall have ample capacity, operate
strung shall be grounded on either side smoothly, and be leveled and aligned in
of the crossover or considered and accordance with the manufacturers
worked as energized. operating instructions.
(5) Conductors being strung in or re- (ii) Reliable communications be-
moved shall be kept under positive tween the reel tender and pulling rig
control by the use of adequate tension operator shall be provided.

478

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00488 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.955

(iii) Each pull shall be snubbed or be carried out on either an insulated


dead ended at both ends before subse- platform or on a conductive metallic
quent pulls. grounding mat bonded to both grounds.
(d) Stringing adjacent to energized When a grounding mat is used, it is
lines. (1) Prior to stringing parallel to recommended that the grounding mat
an existing energized transmission line be roped off and an insulated walkway
a competent determination shall be provided for access to the mat.
made to ascertain whether dangerous (8)(i) All conductors, subconductors,
induced voltage buildups will occur, and overhead ground conductors shall
particularly during switching and be bonded to the tower at any isolated
ground fault conditions. When there is tower where it may be necessary to
a possibility that such dangerous in- complete work on the transmission
duced voltage may exist the employer line.
shall comply with the provisions of (ii) Work on dead-end towers shall re-
paragraphs (d) (2) through (9) of this quire grounding on all deenergized
section in addition to the provisions of lines.
paragraph (c) of this 1926.955, unless (iii) Grounds may be removed as soon
the line is worked as energized. as the work is completed: Provided,
(2) When stringing adjacent to ener- That the line is not left open circuited
gized lines the tension stringing meth- at the isolated tower at which work is
od or other methods which preclude un- being completed.
intentional contact between the lines (9) When performing work from the
being pulled and any employee shall be structures, clipping crews and all oth-
used. ers working on conductors, subconduc-
(3) All pulling and tensioning equip- tors, or overhead ground conductors
ment shall be isolated, insulated, or ef- shall be protected by individual
fectively grounded. grounds installed at every work loca-
(4) A ground shall be installed be- tion.
tween the tensioning reel setup and the (e) Live-line bare-hand work. In addi-
first structure in order to ground each tion to any other applicable standards
bare conductor, subconductor, and contained elsewhere in this subpart all
overhead ground conductor during live-line bare-hand work shall be per-
stringing operations. formed in accordance with the fol-
(5) During stringing operations, each lowing requirements:
bare conductor, subconductor, and (1) Employees shall be instructed and
overhead ground conductor shall be trained in the live-line bare-hand tech-
grounded at the first tower adjacent to nique and the safety requirements per-
both the tensioning and pulling setup tinent thereto before being permitted
and in increments so that no point is to use the technique on energized cir-
more than 2 miles from a ground. cuits.
(i) The grounds shall be left in place (2) Before using the live-line bare-
until conductor installation is com- hand technique on energized high-volt-
pleted. age conductors or parts, a check shall
(ii) Such grounds shall be removed as be made of:
the last phase of aerial cleanup. (i) The voltage rating of the circuit
(iii) Except for moving type grounds, on which the work is to be performed;
the grounds shall be placed and re- (ii) The clearances to ground of lines
moved with a hot stick. and other energized parts on which
(6) Conductors, subconductors, and work is to be performed; and
overhead ground conductors shall be (iii) The voltage limitations of the
grounded at all dead-end or catch-off aerial-lift equipment intended to be
points. used.
(7) A ground shall be located at each (3) Only equipment designed, tested,
side and within 10 feet of working areas and intended for live-line bare-hand
where conductors, subconductors, or work shall be used.
overhead ground conductors are being (4) All work shall be personally su-
spliced at ground level. The two ends pervised by a person trained and quali-
to be spliced shall be bonded to each fied to perform live-line bare-hand
other. It is recommended that splicing work.

479

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00489 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.955 29 CFR Ch. XVII (7112 Edition)

(5) The automatic reclosing feature by paragraph (e)(12) (i) and (ii) of this
of circuit interrupting devices shall be section.
made inoperative where practical be- (i) The upper controls shall be within
fore working on any energized line or easy reach of the employee in the bas-
equipment. ket. If a two basket type lift is used ac-
(6) Work shall not be performed dur- cess to the controls shall be within
ing the progress of an electrical storm easy reach from either basket.
in the immediate vicinity. (ii) The lower set of controls shall be
(7) A conductive bucket liner or other located near base of the boom that will
suitable conductive device shall be pro- permit over-ride operation of equip-
vided for bonding the insulated aerial ment at any time.
device to the energized line or equip- (13) Ground level lift control shall
ment. not be operated unless permission has
(i) The employee shall be connected been obtained from the employee in
to the bucket liner by use of conduc- lift, except in case of emergency.
tive shoes, leg clips, or other suitable (14) Before the employee contacts the
means. energized part to be worked on, the
(ii) Where necessary, adequate elec- conductive bucket liner shall be bond-
trostatic shielding for the voltage ed to the energized conductor by means
being worked or conductive clothing of a positive connection which shall re-
shall be provided. main attached to the energized con-
(8) Only tools and equipment in- ductor until the work on the energized
circuit is completed.
tended for live-line bare-hand work
shall be used, and such tools and equip- (15) The minimum clearance dis-
ment shall be kept clean and dry. tances for live-line bare-hand work
shall be as specified in Table V2.
(9) Before the boom is elevated, the
These minimum clearance distances
outriggers on the aerial truck shall be
shall be maintained from all grounded
extended and adjusted to stabilize the
objects and from lines and equipment
truck and the body of the truck shall
at a different potential than that to
be bonded to an effective ground, or
which the insulated aerial device is
barricaded and considered as energized
bonded unless such grounded objects or
equipment.
other lines and equipment are covered
(10) Before moving the aerial lift into by insulated guards. These distances
the work position, all controls (ground shall be maintained when approaching,
level and bucket) shall be checked and leaving, and when bonded to the ener-
tested to determine that they are in gized circuit.
proper working condition.
(11) Arm current tests shall be made TABLE V2MINIMUM CLEARANCE DISTANCES
before starting work each day, each FOR LIVE-LINE BARE-HAND WORK (ALTER-
time during the day when higher volt- NATING CURRENT)
age is going to be worked and when
changed conditions indicate a need for Distance in feet and
inches for maximum
additional tests. Aerial buckets used Voltage range (phase-to-phase) voltage
for bare-hand live-line work shall be kilovolts
Phase to Phase to
subjected to an arm current test. This ground phase
test shall consist of placing the bucket
2.1 to 15 ........................................ 20 20
in contact with an energized source 15.1 to 35 ...................................... 24 24
equal to the voltage to be worked upon 35.1 to 46 ...................................... 26 26
for a minimum time of three (3) min- 46.1 to 72.5 ................................... 30 30
utes. the leakage current shall not ex- 72.6 to 121 .................................... 34 46
ceed 1 microampere per kilo-volt of 138 to 145 ..................................... 36 50
161 to 169 ..................................... 38 56
nominal line-to-line voltage. Work op- 230 to 242 ..................................... 50 84
erations shall be suspended imme- 345 to 362 ..................................... 1 70 1 134

diately upon any indication of a mal- 500 to 552 ..................................... 1 110 1 200

700 to 765 ..................................... 1 150 1 310


function in the equipment.
(12) All aerial lifts to be used for live- 1 For 345362kv., 500552kv., and 700765kv., the min-
imum clearance distance may be reduced provided the dis-
line bare-hand work shall have dual tances are not made less than the shortest distance between
controls (lower and upper) as required the energized part and a grounded surface.

480

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00490 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.956

(16) When approaching, leaving, or for oxygen deficiency and the presence
bonding to an energized circuit the of explosive gases or fumes;
minimum distances in Table V2 shall (ii) Where unsafe conditions are de-
be maintained between all parts of the tected, by testing or other means, the
insulated boom assembly and any work area shall be ventilated and oth-
grounded parts (including the lower erwise made safe before entry;
arm or portions of the truck). (iii) Provisions shall be made for an
(17) When positioning the bucket adequate continuous supply of air.
alongside an energized bushing or insu- (b) Work in manholes. (1) While work
lator string, the minimum line-to- is being performed in manholes, an em-
ground clearances of Table V2 must be ployee shall be available in the imme-
maintained between all parts of the diate vicinity to render emergency as-
bucket and the grounded end of the sistance as may be required. This shall
bushing or insulator string. not preclude the employee in the im-
(18)(i) The use of handlines between mediate vicinity from occasionally en-
buckets, booms, and the ground is pro- tering a manhole to provide assistance,
hibited. other than emergency. This require-
(ii) No conductive materials over 36 ment does not preclude a qualified em-
inches long shall be placed in the buck- ployee, working alone, from entering
et, except for appropriate length jump- for brief periods of time, a manhole
ers, armor rods, and tools. where energized cables or equipment
(iii) Nonconductive-type handlines are in service, for the purpose of in-
may be used from line to ground when spection, housekeeping, taking read-
not supported from the bucket. ings, or similar work if such work can
(19) The bucket and upper insulated be performed safely.
boom shall not be overstressed by at- (2) When open flames must be used or
tempting to lift or support weights in smoking is permitted in manholes,
excess of the manufacturers rating. extra precautions shall be taken to
provide adequate ventilation.
(20)(i) A minimum clearance table (as
(3) Before using open flames in a
shown in table V2) shall be printed on
manhole or excavation in an area
a plate of durable nonconductive mate-
where combustible gases or liquids may
rial, and mounted in the buckets or its
be present, such as near a gasoline
vicinity so as to be visible to the oper-
service station, the atmosphere of the
ator of the boom.
manhole or excavation shall be tested
(ii) It is recommended that insulated
and found safe or cleared of the com-
measuring sticks be used to verify
bustible gases or liquids.
clearance distances.
(c) Trenching and excavating. (1) Dur-
1926.956 Underground lines. ing excavation or trenching, in order to
prevent the exposure of employees to
(a) Guarding and ventilating street the hazards created by damage to dan-
opening used for access to underground gerous underground facilities, efforts
lines or equipment. (1) Appropriate shall be made to determine the loca-
warning signs shall be promptly placed tion of such facilities and work con-
when covers of manholes, handholes, or ducted in a manner designed to avoid
vaults are removed. What is an appro- damage.
priate warning sign is dependent upon (2) Trenching and excavation oper-
the nature and location of the hazards ations shall comply with 1926.651 and
involved. 1926.652.
(2) Before an employee enters a street (3) When underground facilities are
opening, such as a manhole or an exposed (electric, gas, water, tele-
unvented vault, it shall be promptly phone, etc.) they shall be protected as
protected with a barrier, temporary necessary to avoid damage.
cover, or other suitable guard. (4) Where multiple cables exist in an
(3) When work is to be performed in a excavation, cables other than the one
manhole or unvented vault: being worked on shall be protected as
(i) No entry shall be permitted unless necessary.
forced ventilation is provided or the at- (5) When multiple cables exist in an
mosphere is found to be safe by testing excavation, the cable to be worked on

481

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00491 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.957 29 CFR Ch. XVII (7112 Edition)

shall be identified by electrical means (2) All mobile cranes and derricks
unless its identity is obvious by reason shall be effectively grounded when
of distinctive appearance. being moved or operated in close prox-
(6) Before cutting into a cable or imity to energized lines or equipment,
opening a splice, the cable shall be or the equipment shall be considered
identified and verified to be the proper energized.
cable. (3) Fenders shall not be required for
(7) When working on buried cable or lowboys used for transporting large
on cable in manholes, metallic sheath electrical equipment, transformers, or
continuity shall be maintained by breakers.
bonding across the opening or by equiv- (f) Storage. The storage requirements
alent means. of 1926.953(c) shall be complied with.
(g) Substation fences. (1) When a sub-
1926.957 Construction in energized
substations. station fence must be expanded or re-
moved for construction purposes, a
(a) Work near energized equipment fa- temporary fence affording similar pro-
cilities. (1) When construction work is tection when the site is unattended,
performed in an energized substation, shall be provided. Adequate inter-
authorization shall be obtained from connection with ground shall be main-
the designated, authorized person be- tained between temporary fence and
fore work is started. permanent fence.
(2) When work is to be done in an en- (2) All gates to all unattended sub-
ergized substation, the following shall stations shall be locked, except when
be determined: work is in progress.
(i) What facilities are energized, and (h) Footing excavation. (1) Excavation
(ii) What protective equipment and for auger, pad and piling type footings
precautions are necessary for the safe- for structures and towers shall require
ty of personnel. the same precautions as for metal
(3) Extraordinary caution shall be ex- tower construction (see 1926.955(b)(1)).
ercised in the handling of busbars,
(2) No employee shall be permitted to
tower steel, materials, and equipment
enter an unsupported auger-type exca-
in the vicinity of energized facilities.
vation in unstable material for any
The requirements set forth in
purpose. Necessary clean-out in such
1926.950(c), shall be complied with.
cases shall be accomplished without
(b) Deenergized equipment or lines.
entry.
When it is necessary to deenergize
equipment or lines for protection of 1926.958 External load helicopters.
employees, the requirements of
1926.950(d) shall be complied with. In all operations performed using a
(c) Barricades and barriers. (1) Barri- rotorcraft for moving or placing exter-
cades or barriers shall be installed to nal loads, the provisions of 1926.551 of
prevent accidental contact with ener- subpart N of this part shall be complied
gized lines or equipment. with.
(2) Where appropriate, signs indi-
cating the hazard shall be posted near 1926.959 Linemans body belts, safety
straps, and lanyards.
the barricade or barrier. These signs
shall comply with 1926.200. (a) General requirements. The require-
(d) Control panels. (1) Work on or ad- ments of paragraphs (a) and (b) of this
jacent to energized control panels shall section shall be complied with for all
be performed by designated employees. linemans body belts, safety straps and
(2) Precaution shall be taken to pre- lanyards acquired for use after the ef-
vent accidental operation of relays or fective date of this subpart.
other protective devices due to jarring, (1) Hardware for linemans body
vibration, or improper wiring. belts, safety straps, and lanyards shall
(e) Mechanized equipment. (1) Use of be drop forged or pressed steel and have
vehicles, gin poles, cranes, and other a corrosive resistive finish tested to
equipment in restricted or hazardous American Society for Testing and Ma-
areas shall at all times be controlled terials B11764 (50-hour test). Surfaces
by designated employees. shall be smooth and free of sharp edges.

482

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00492 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.960

(2) All buckles shall withstand a (6) The keeper of snaphooks shall
2,000-pound tensile test with a max- have a spring tension that will not
imum permanent deformation no allow the keeper to begin to open with
greater than one sixty-fourth inch. a weight of 212 pounds or less, but the
(3) D rings shall withstand a 5,000- keeper of snaphooks shall begin to
pound tensile test without failure. open with a weight of four (4) pounds,
Failure of a D ring shall be considered when the weight is supported on the
cracking or breaking. keeper against the end of the nose.
(4) Snaphooks shall withstand a 5,000- (7) Testing of linemans safety straps,
pound tensile test without failure. body belts and lanyards shall be in ac-
Failure of a snaphook shall be distor- cordance with the following procedure:
tion sufficient to release the keeper. (i) Attach one end of the safety strap
(b) Specific requirements. (1)(i) All fab- or lanyard to a rigid support, the other
ric used for safety straps shall with- end shall be attached to a 250-pound
stand an A.C. dielectric test of not less canvas bag of sand:
than 25,000 volts per foot dry for 3 (ii) Allow the 250-pound canvas bag of
minutes, without visible deterioration. sand to free fall 4 feet for (safety strap
(ii) All fabric and leather used shall test) and 6 feet for (lanyard test); in
be tested for leakage current and shall each case stopping the fall of the 250-
not exceed 1 milliampere when a pound bag:
potention of 3,000 volts is applied to the
(iii) Failure of the strap or lanyard
electrodes positioned 12 inches apart.
shall be indicated by any breakage, or
(iii) Direct current tests may be per-
slippage sufficient to permit the bag to
mitted in lieu of alternating current
tests. fall free of the strap or lanyard. The
(2) The cushion part of the body belt entire body belt assembly shall be
shall: tested using one D ring. A safety strap
(i) Contain no exposed rivets on the or lanyard shall be used that is capable
inside; of passing the impact loading test
(ii) Be at least three (3) inches in and attached as required in paragraph
width; (b)(7)(i) of this section. The body belt
(iii) Be at least five thirty-seconds shall be secured to the 250-pound bag of
(532) inch thick, if made of leather; and sand at a point to simulate the waist of
(iv) Have pocket tabs that extended a man and allowed to drop as stated in
at least 112 inches down and three (3) paragraph (b)(7)(ii) of this section.
inches back of the inside of circle of Failure of the body belt shall be indi-
each D ring for riveting on plier or tool cated by any breakage, or slippage suf-
pockets. On shifting D belts, this meas- ficient to permit the bag to fall free of
urement for pocket tabs shall be taken the body belt.
when the D ring section is centered.
(3) A maximum of four (4) tool loops 1926.960 Definitions applicable to
this subpart.
shall be so situated on the body belt
that four (4) inches of the body belt in (a) Alive or live (energized). The term
the center of the back, measuring from means electrically connected to a
D ring to D ring, shall be free of tool source of potential difference, or elec-
loops, and any other attachments. trically charged so as to have a poten-
(4) Suitable copper, steel, or equiva- tial significantly different from that of
lent liners shall be used around bar of the earth in the vicinity. The term
D rings to prevent wear between these live is sometimes used in place of
members and the leather or fabric en- the term current-carrying, where
closing them. the intent is clear, to avoid repetition
(5) All stitching shall be of a min- of the longer term.
imum 42-pound weight nylon or equiva- (b) Automatic circuit recloser. The term
lent thread and shall be lock stitched. means a self-controlled device for auto-
Stitching parallel to an edge shall not matically interrupting and reclosing
be less than three-sixteenths (316) inch an alternating current circuit with a
from edge of narrowest member caught predetermined sequence of opening and
by the thread. The use of cross stitch- reclosing followed by resetting, hold
ing on leather is prohibited. closed, or lockout operation.

483

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00493 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.960 29 CFR Ch. XVII (7112 Edition)

(c) Barrier. The term means a phys- sidered as supply lines of the same voltage
ical obstruction which is intended to and are to be so run.
prevent contact with energized lines or (k) Conductor. The term means a ma-
equipment. terial, usually in the form of a wire,
(d) Barricade. The term means a phys- cable, or bus bar suitable for carrying
ical obstruction such as tapes, screens, an electric current.
or cones intended to warn and limit ac- (l) Conductor shielding. The term
cess to a hazardous area. means an envelope which encloses the
(e) Bond. The term means an elec- conductor of a cable and provides an
trical connection from one conductive equipotential surface in contact with
element to another for the purpose of the cable insulation.
minimizing potential differences or (m) Current-carrying part. The term
providing suitable conductivity for means a conducting part intended to be
fault current or for mitigation of leak- connected in an electric circuit to a
age current and electrolytic action. source of voltage. Non-current-car-
(f) Bushing. The term means an insu- rying parts are those not intended to
lating structure including a through be so connected.
conductor, or providing a passageway (n) Dead (deenergized). The term
for such a conductor, with provision for means free from any electrical connec-
mounting on a barrier, conducting or tion to a source of potential difference
otherwise, for the purpose of insulating and from electrical charges: Not having
the conductor from the barrier and a potential difference from that of
conducting current from one side of the earth.
barrier to the other. NOTE: The term is used only with reference
(g) Cable. The term means a con- to current-carrying parts which are some-
ductor with insulation, or a stranded times alive (energized).
conductor with or without insulation (o) Designated employee. The term
and other coverings (single-conductor means a qualified person delegated to
cable) or a combination of conductors perform specific duties under the con-
insulated from one another (multiple- ditions existing.
conductor cable). (p) Effectively grounded. The term
(h) Cable sheath. The term means a means intentionally connected to earth
protective covering applied to cables. through a ground connection or con-
NOTE: A cable sheath may consist of mul- nections of sufficiently low impedance
tiple layers of which one or more is conduc- and having sufficient current-carrying
tive. capacity to prevent the buildup of
voltages which may result in undue
(i) Circuit. The term means a con- hazard to connected equipment or to
ductor or system of conductors persons.
through which an electric current is in- (q) Electric line trucks. The term
tended to flow. means a truck used to transport men,
(j) Communication lines. The term tools, and material, and to serve as a
means the conductors and their sup- traveling workshop for electric power
porting or containing structures which line construction and maintenance
are used for public or private signal or work. It is sometimes equipped with a
communication service, and which op- boom and auxiliary equipment for set-
erate at potentials not exceeding 400 ting poles, digging holes, and elevating
volts to ground or 750 volts between material or men.
any two points of the circuit, and the (r) Enclosed. The term means sur-
transmitted power of which does not rounded by a case, cage, or fence,
exceed 150 watts. When operating at which will protect the contained equip-
less than 150 volts no limit is placed on ment and prevent accidental contact of
the capacity of the system. a person with live parts.
NOTE: Telephone, telegraph, railroad sig-
(s) Equipment. This is a general term
nal, data, clock, fire, police-alarm, commu-
nity television antenna, and other systems which includes fittings, devices, appli-
conforming with the above are included. ances, fixtures, apparatus, and the like,
Lines used for signaling purposes, but not in- used as part of, or in connection with,
cluded under the above definition, are con- an electrical power transmission and

484

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00494 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.960

distribution system, or communication at least one conductor or point (usu-


systems. ally the middle wire, or neutral point
(t) Exposed. The term means not iso- of transformer or generator windings)
lated or guarded. is intentionally grounded, either sol-
(u) Electric supply lines. The term idly or through a current-limiting de-
means those conductors used to trans- vice (not a current-interrupting de-
mit electric energy and their necessary vice).
supporting or containing structures. (ee) Hotline tools and ropes. The term
Signal lines of more than 400 volts to means those tools and ropes which are
ground are always supply lines within especially designed for work on ener-
the meaning of the rules, and those of gized high voltage lines and equipment.
less than 400 volts to ground may be Insulated aerial equipment especially
considered as supply lines, if so run and designed for work on energized high
operated throughout. voltage lines and equipment shall be
(v) Guarded. The term means pro- considered hot line.
tected by personnel, covered, fenced, or (ff) Insulated. The term means sepa-
enclosed by means of suitable casings, rated from other conducting surfaces
barrier rails, screens, mats, platforms, by a dielectric substance (including air
or other suitable devices in accordance space) offering a high resistance to the
with standard barricading techniques passage of current.
designed to prevent dangerous ap- NOTE: When any object is said to be insu-
proach or contact by persons or ob- lated, it is understood to be insulated in
jects. suitable manner for the conditions to which
NOTE: Wires, which are insulated but not it is subjected. Otherwise, it is within the
otherwise protected, are not considered as purpose of this subpart, uninsulated. Insu-
guarded. lating covering of conductors is one means of
(w) Ground. (Reference). The term making the conductor insulated.
means that conductive body, usually (gg) Insulation (as applied to cable).
earth, to which an electric potential is The term means that which is relied
referenced. upon to insulate the conductor from
(x) Ground (as a noun). The term other conductors or conducting parts
means a conductive connection wheth- or from ground.
er intentional or accidental, by which (hh) Insulation shielding. The term
an electric circuit or equipment is con- means an envelope which encloses the
nected to reference ground. insulation of a cable and provides an
(y) Ground (as a verb). The term equipotential surface in contact with
means the connecting or establishment cable insulation.
of a connection, whether by intention (ii) Isolated. The term means an ob-
or accident of an electric circuit or ject that is not readily accessible to
equipment to reference ground. persons unless special means of access
(z) Grounding electrode (ground elec- are used.
trode). The term grounding electrode (jj) Manhole. The term means a sub-
means a conductor embedded in the surface enclosure which personnel may
earth, used for maintaining ground po- enter and which is used for the purpose
tential on conductors connected to it, of installing, operating, and maintain-
and for dissipating into the earth cur- ing equipment and/or cable.
rent conducted to it. (kk) Pulling tension. The term means
(aa) Grounding electrode resistance. the longitudinal force exerted on a
The term means the resistance of the cable during installation.
grounding electrode to earth. (ll) Qualified person. The term means
(bb) Grounding electrode conductor a person who by reason of experience or
(grounding conductor). The term means training is familiar with the operation
a conductor used to connect equipment to be performed and the hazards in-
or the grounded circuit of a wiring sys- volved.
tem to a grounding electrode. (mm) Switch. The term means a de-
(cc) Grounded conductor. The term vice for opening and closing or chang-
means a system or circuit conductor ing the connection of a circuit. In these
which is intentionally grounded. rules, a switch is understood to be
(dd) Grounded system. The term manually operable, unless otherwise
means a system of conductors in which stated.

485

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00495 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1000 29 CFR Ch. XVII (7112 Edition)

(nn) Tag. The term means a system 1926.1000 Rollover protective struc-
or method of identifying circuits, sys- tures (ROPS) for material handling
tems or equipment for the purpose of equipment.
alerting persons that the circuit, sys- (a) Coverage. (1) This section applies
tem or equipment is being worked on. to the following types of material han-
(oo) Unstable material. The term
dling equipment: To all rubber-tired,
means earth material, other than run-
self-propelled scrapers, rubber-tired
ning, that because of its nature or the
front-end loaders, rubber-tired dozers,
influence of related conditions, cannot
be depended upon to remain in place wheel-type agricultural and industrial
without extra support, such as would tractors, crawler tractors, crawler-type
be furnished by a system of shoring. loaders, and motor graders, with or
(pp) Vault. The term means an enclo- without attachments, that are used in
sure above or below ground which per- construction work. This requirement
sonnel may enter and is used for the does not apply to sideboom pipelaying
purpose of installing, operating, and/or tractors.
maintaining equipment and/or cable. (2) The promulgation of specific
(qq) Voltage. The term means the ef- standards for rollover protective struc-
fective (rms) potential difference be- tures for compactors and rubber-tired
tween any two conductors or between a skid-steer equipment is reserved pend-
conductor and ground. Voltages are ex- ing consideration of standards cur-
pressed in nominal values. The nominal rently being developed.
voltage of a system or circuit is the (b) Equipment manufactured on or after
value assigned to a system or circuit of September 1, 1972. Material handling
a given voltage class for the purpose of machinery described in paragraph (a)
convenient designation. The operating of this section and manufactured on or
voltage of the system may vary above after September 1, 1972, shall be
or below this value. equipped with rollover protective
(rr) Voltage of an effectively grounded structures which meet the minimum
circuit. The term means the voltage be- performance standards prescribed in
tween any conductor and ground unless 1926.1001 and 1926.1002, as applicable.
otherwise indicated.
(ss) Voltage of a circuit not effectively (c) Equipment manufactured before Sep-
grounded. The term means the voltage tember 1, 1972. (1) All material handling
between any two conductors. If one cir- equipment described in paragraph (a)
cuit is directly connected to and sup- of this section and manufactured or
plied from another circuit of higher placed in service (owned or operated by
voltage (as in the case of an the employer) prior to September 1,
autotransformer), both are considered 1972, shall be fitted with rollover pro-
as of the higher voltage, unless the cir- tective structures no later than the
cuit of lower voltage is effectively dates listed below:
grounded, in which case its voltage is (i) Machines manufactured on or
not determined by the circuit of higher after January 1, 1972, shall be fitted no
voltage. Direct connection implies later than April 1, 1973.
electric connection as distinguished (ii) Machines manufactured between
from connection merely through elec- July 1, 1971, and December 31, 1971,
tromagnetic or electrostatic induction. shall be fitted no later than July 1,
1973.
Subpart WRollover Protective (iii) Machines manufactured between
Structures; Overhead Protection July 1, 1970, and June 30, 1971, shall be
fitted no later than January 1, 1974.
AUTHORITY: Section 3704 of the Contract (iv) Machines manufactured between
Work Hours and Safety Standards Act (40 July 1, 1969, and June 30, 1970, shall be
U.S.C. 3701); Sections 4, 6, and 8 of the Occu- fitted no later than July 1, 1974.
pational Safety and Health Act of 1970 (29 (v) Machines manufactured before
U.S.C. 653, 655, 657); and Secretary of Labors
July 1, 1969: Reserved pending further
Order No. 1271 (36 FR 8754), 876 (41 FR
25059), 983 (48 FR 35736), 190 (55 FR 9033), 6 study, development, and review.
96 (62 FR 111), 32000 (65 FR 50017), or 52002 (2) Rollover protective structures and
(67 FR 65008), as applicable. supporting attachment shall meet the

486

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00496 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1001

minimum performance criteria de- 1926.1001 Minimum performance cri-


tailed in 1926.1001 and 1926.1002, as ap- teria for rollover protective struc-
plicable or shall be designed, fab- tures for designated scrapers, load-
ricated, and installed in a manner ers, dozers, graders, and crawler
tractors.
which will support, based on the ulti-
mate strength of the metal, at least (a) General. This section prescribes
two times the weight of the prime minimum performance criteria for roll-
mover applied at the point of impact. over protective structures (ROPS) for
(i) The design objective shall be to rubber-tired self-propelled scrapers;
rubber-tired front-end loaders and rub-
minimize the likelihood of a complete
ber-tired dozers; crawler tractors, and
overturn and thereby minimize the
crawler-type loaders, and motor grad-
possibility of the operator being
ers. The vehicle and ROPS as a system
crushed as a result of a rollover or shall have the structural characteris-
upset. tics prescribed in paragraph (f) of this
(ii) The design shall provide a section for each type of machine de-
vertical clearance of at least 52 inches scribed in this paragraph.
from the work deck to the ROPS at the (b) The static laboratory test pre-
point of ingress or egress. scribed herein will determine the ade-
(d) Remounting. ROPS removed for quacy of the structures used to protect
any reason, shall be remounted with the operator under the following condi-
equal quality, or better, bolts or weld- tions:
ing as required for the original mount- (1) For rubber-tired self-propelled
ing. scrapers, rubber-tired front-end load-
(e) Labeling. Each ROPS shall have ers, and rubber-tired dozers: Operating
the following information permanently between 0 and 10 miles per hour over
affixed to the structure: hard clay where rollover would be lim-
(1) Manufacturer or fabricators name ited to a maximum roll angle of 360
and address; down a slope of 30 maximum.
(2) For motor graders: Operating be-
(2) ROPS model number, if any;
tween 0 and 10 miles per hour over hard
(3) Machine make, model, or series clay where rollover would be limited to
number that the structure is designed 360 down a slope of 30 maximum.
to fit. (3) For crawler tractors and crawler-
(f) Machines meeting certain existing type loaders: Operating between 0 and
governmental requirements. Any machine 10 miles per hour over hard clay where
in use, equipped with rollover protec- rollover would be limited to a max-
tive structures, shall be deemed in imum roll angle of 360 down a slope of
compliance with this section if it 45.
meets the rollover protective structure (c) Facilities and apparatus. (1) The
requirements of the State of Cali- following material is necessary:
fornia, the U.S. Army Corps of Engi- (i) Material, equipment, and tiedown
neers, or the Bureau of Reclamation of means adequate to insure that the
the U.S. Department of the Interior in ROPS and its vehicle frame absorb the
effect on April 5, 1972. The require- applied energy.
ments in effect are: (ii) Equipment necessary to measure
(1) State of California: Construction and apply loads to the ROPS. Adequate
Safety Orders, issued by the Depart- means to measure deflections and
lengths should also be provided.
ment of Industrial Relations pursuant
(iii) Recommended, but not manda-
to Division 5, Labor Code, 6312, State
tory, types of test setups are illus-
of California.
trated in Figure W1 for all types of
(2) U.S. Army Corps of Engineers: equipment to which this section ap-
General Safety Requirements, EM385 plies; and in Figure W2 for rubber-
11 (March 1967). tired self-propelled scrapers; Figure W
(3) Bureau of Reclamation, U.S. De- 3 for rubber-tired front-end loaders,
partment of the Interior: Safety and rubber-tired dozers, and motor graders;
Health Regulations for Construction. and Figure W4 for crawler tractors
Part II (September 1971). and crawler-type loaders.

487

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00497 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1001 29 CFR Ch. XVII (7112 Edition)

(2) Table W1 contains a listing of the (e) Test procedure. The test procedure
required apparatus for all types of shall include the following, in the se-
equipment described in paragraph (a) quence indicated:
of this section. (1) Energy absorbing capabilities of
ROPS shall be verified when loaded lat-
TABLE W1 erally by incrementally applying a dis-
tributed load to the longitudinal out-
Means to measure Accuracy
side top member of the ROPS, as shown
Deflection of ROPS, inches .......... 5% of deflection meas- in Figure W1, W2, or W3, as applica-
ured. ble. The distributed load must be ap-
Vehicle weight, pounds ................ 5% of the weight meas- plied so as to result in approximately
ured.
Force applied to frame, pounds ... 5% of force measured. uniform deflection of the ROPS. The
Dimensions of critical zone, 0.5 in. load increments should correspond
inches. with approximately 0.5 in. ROPS de-
flection increment in the direction of
(d) Vehicle condition. The ROPS to be the load application, measured at the
tested must be attached to the vehicle ROPS top edge. Should the operators
structure in the same manner as it will seat be offcenter, the load shall be ap-
be attached during vehicle use. A to- plied on the offcenter side. For each ap-
tally assembled vehicle is not required. plied load increment, the total load
However, the vehicle structure and (lb.) versus corresponding deflection
frame which support the ROPS must (in.) shall be plotted, and the area
represent the actual vehicle installa- under the load -deflection curve shall
tion. All normally detachable windows, be calculated. This area is equal to the
panels, or nonstructural fittings shall energy (in.-lb.) absorbed by the ROPS.
be removed so that they do not con- For a typical load-deflection curve and
tribute to the strength of the ROPS. calculation method, see Figure W5.

488
EC30OC91.050</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00498 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1001

EC30OC91.052</GPH>

489
EC30OC91.051</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00499 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1001 29 CFR Ch. XVII (7112 Edition)

Incremental loading shall be continued


until the ROPS has absorbed the
amount of energy and the minimum
applied load specified under paragraph
(f) of this section has been reached or
surpassed.
(2) To cover the possibility of the ve-
hicle coming to rest on its top, the sup-
port capability shall be verified by ap-
plying a distributed vertical load to
the top of the ROPS so as to result in
approximately uniform deflection (see
Figure W1). The load magnitude is
specified in paragraph (f)(2)(iii) of this (f) Performance requirements(1) Gen-
section. eral performance requirements. (i) No re-
(3) The low temperature impact pairs or straightening of any member
strength of the material used in the shall be carried out between each pre-
ROPS shall be verified by suitable ma- scribed test.
terial tests or material certification (ii) During each test, no part of the
(see paragraph (f)(2)(iv) of this section). ROPS shall enter the critical zone as
detailed in SAE J397 (1969). Deforma-
tion of the ROPS shall not allow the
plane of the ground to enter this zone.
(2) Specific performance requirements.
(i) The energy requirement for pur-
poses of meeting the requirements of
paragraph (e)(1) of this section is to be
determined by referring to the plot of
the energy versus weight of vehicle (see
Figure W6 for rubber-tired self-pro-
pelled scrapers; Figure W7 for rubber-
tired front-end loaders and rubber-tired
dozers; Figure W8 for crawler tractors
and crawler-type loaders; and Figure
W9 for motor graders). For purposes of
this section, force and weight are
measured as pounds (lb.); energy (U) is
measured as inch-pounds.
EC30OC91.054</GPH>

490
EC30OC91.053</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00500 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1001

(ii) The applied load must attain at (iv) Material used in the ROPS must
least a value which is determined by have the capability of performing at
multiplying the vehicle weight by the zero degrees Fahrenheit, or exhibit
corresponding factor shown in Figure Charpy V notch impact strength of 8
W10 for rubber-tired self-propelled foot-pounds at minus 20 Fahrenheit.
scrapers; in Figure W11 for rubber- This is a standard Charpy specimen as
tired front-end loaders and rubber-tired described in American Society of Test-
dozers; in Figure W12 for crawler trac- ing and Materials A 370, Methods and
tors and crawler-type loaders; and in Definitions for Mechanical Testing of
Figure W13 for motor graders. Steel Products (available at each Re-
(iii) The load magnitude for purposes gional Office of the Occupational Safe-
of compliance with paragraph (e)(2) of ty and Health Administration). The
this section is equal to the vehicle purpose of this requirement is to re-
weight. The test of load magnitude duce the tendency of brittle fracture
shall only be made after the require- associated with dynamic loading, low
ments of paragraph (f)(2)(i) of this sec- temperature operation, and stress rais-
tion are met. ers which cannot be entirely avoided
on welded structures.

EC30OC91.056</GPH>

491
EC30OC91.055</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00501 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1001 29 CFR Ch. XVII (7112 Edition)

weight of the vehicle plus the heaviest


attachment.

EC30OC91.060</GPH>

(g) Definitions. For purposes of this


section, vehicle weight means the
EC30OC91.058</GPH> EC30OC91.059</GPH>

manufacturers maximum weight of


the prime mover for rubber-tired self-
propelled scrapers. For other types of
equipment to which this section ap-
plies, vehicle weight means the man-
ufacturers maximum recommended

492
EC30OC91.057</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00502 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1002

of interpretation arise. The rec-


ommended practices appear in the 1971
SAE Handbook, which may be exam-
ined in each of the Regional Offices of
the Occupational Safety and Health
Administration.

1926.1002 Protective frames (roll-


over protective structures, known
as ROPS) for wheel-type agricul-
tural and industrial tractors used
in construction.
(a) General. (1) The purpose of this
section is to set forth requirements for
frames used to protect operators of
wheel-type agricultural and industrial
tractors that will minimize the possi-
bility of operator injury resulting from
accidental upsets during normal oper-
ation. With respect to agricultural and
industrial tractors, the provisions of 29
CFR 1926.1001 and 1926.1003 for rubber-
tired dozers and rubber-tired loaders
may be used instead of the require-
ments of this section.
(2) The protective frame that is the
subject of this standard is a structure
mounted to the tractor that extends
above the operators seat and conforms
generally to Figure W14.
(3) When an overhead weather shield
is attached to the protective frame, it
may be in place during testing, pro-
vided that it does not contribute to the
strength of the protective frame. When
such an overhead weather shield is at-
tached, it must meet the requirements
of paragraph (i) of this section.
(4) For overhead protection require-
ments, see 29 CFR 1926.1003.
(h) Source of standard. This standard (5) The following provisions address
is derived from, and restates, the fol- requirements for protective enclosures.
lowing Society of Automotive Engi- (i) When protective enclosures are
neers Recommended Practices: SAE used on wheel-type agricultural and in-
J320a, Minimum Performance Criteria dustrial tractors, they shall meet the
for Roll-Over Protective Structure for requirements of Society of Automotive
Rubber-Tired, Self-Propelled Scrapers; Engineers (SAE) standard J1681970
SAE J394, Minimum Performance Cri- (Protective enclosurestest proce-
teria for Roll-Over Protective Struc- dures and performance requirements),
ture for Rubber-Tired Front End Load- which is incorporated by reference. The
ers and Rubber-Tired Dozers; SAE J395, incorporation by reference was ap-
Minimum Performance Criteria for proved by the Director of the Federal
Roll-Over Protective Structure for Register in accordance with 5 U.S.C.
Crawler Tractors and Crawler-Type 552(a) and 1 CFR part 51.
Loaders; and SAE J396, Minimum Per- (ii) SAE standard J1681970 appears in
formance Criteria for Roll-Over Protec- the 1971 SAE Handbook, or it may be
tive Structure for Motor Graders. examined at: any OSHA Regional Of-
EC30OC91.062</GPH>

These recommended practices shall be fice; the OSHA Docket Office, U.S. De-
resorted to in the event that questions partment of Labor, 200 Constitution

493
EC30OC91.061</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00503 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1002 29 CFR Ch. XVII (7112 Edition)

Avenue, NW., Room N2625, Wash- (6) The low-temperature impact


ington, DC 20210 (telephone: (202) 693 strength of the material used in the
2350 (TTY number: (877) 8895627)); or protective structure shall be verified
the National Archives and Records Ad- by suitable material tests or material
ministration (NARA). (For informa- certifications according to 29 CFR
tion on the availability of this mate- 1926.1001(f)(2)(iv).
rial at NARA, telephone (202) 7416030 (e) Test procedure for vehicle overturn
or access the NARA Web site at (1) Vehicle weight. The weight of the
www.archives.gov/federallregister/ tractor, for purposes of this section, in-
codeloflfederallregulations/ cludes the protective frame, all fuels,
ibrllocations.html.) Copies may be pur- and other components required for nor-
chased from the Society of Automotive mal use of the tractor. Ballast must be
Engineers, 400 Commonwealth Drive,
added when necessary to achieve a
Warrendale, Pennsylvania 150960001.
minimum total weight of 130 lb (59 kg)
(b) Applicability. The requirements of per maximum power-takeoff horse-
this section apply to wheel-type agri-
power at the rated engine speed. The
cultural and industrial tractors used in
weight of the front end must be at
construction work. See paragraph (j) of
least 33 lb (15 kg) per maximum power-
this section for definitions of agricul-
tural tractors set forth in paragraph (i) takeoff horsepower. In case power-
of this section. takeoff horsepower is unavailable, 95
(c) Performance requirements. (1) Ei- percent of net engine flywheel horse-
ther a laboratory test or a field test is power shall be used.
required to determine the performance (2) Agricultural tractors shall be
requirements set forth in paragraph (i) tested at the weight set forth in para-
of this section. graph (e)(1) of this section.
(2) A laboratory test may be either (3) Industrial tractors shall be tested
static or dynamic. The laboratory test with items of integral or mounted
must be under conditions of repeatable equipment and ballast that are sold as
and controlled loading to permit anal- standard equipment or approved by the
ysis of the protective frame. vehicle manufacturer for use with the
(3) A field-upset test, when used, vehicle when the protective frame is
shall be conducted under reasonably expected to provide protection for the
controlled conditions, both rearward operator with such equipment in-
and sideways to verify the effectiveness stalled. The total vehicle weight and
of the protective frame under actual front-end weight as tested shall not be
dynamic conditions. less than the weights established in
(d) Test proceduresgeneral. (1) The paragraph (e)(1) of this section.
tractor used shall be the tractor with (4) The following provisions address
the greatest weight on which the pro- soil bank test conditions.
tective frame is to be used. (i) The test shall be conducted on a
(2) A new protective frame and dry, firm soil bank as illustrated in
mounting connections of the same de- Figure W15. The soil in the impact
sign shall be used for each test proce- area shall have an average cone index
dure. in the 0-in. to 6-in. (0-mm to 153-mm)
(3) Instantaneous and permanent layer not less than 150 according to
frame deformation shall be measured American Society of Agricultural En-
and recorded for each segment of the gineers (ASAE) recommendation
test.
ASAE R313.11971 (Soil cone pene-
(4) Dimensions relative to the seat trometer), as reconfirmed in 1975,
shall be determined with the seat un-
which is incorporated by reference. The
loaded and adjusted to its highest and
incorporation by reference was ap-
most rearward latched position pro-
vided for a seated operator. proved by the Director of the Federal
Register in accordance with 5 U.S.C.
(5) When the seat is offset, the frame
loading shall be on the side with the 552(a) and 1 CFR part 51. The path of
least space between the centerline of vehicle travel shall be 12 2 to the top
the seat and the upright. edge of the bank.

494

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00504 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1002

(ii) ASAE recommendation ASAE to which the protective frame is at-


R313.11971, as reconfirmed in 1975, ap- tached, including the mounting parts.
pears in the 1977 Agricultural Engi- (ii) The protective frame shall be in-
neers Yearbook, or it may be examined strumented with the necessary equip-
at: any OSHA Regional Office; the ment to obtain the required load-de-
OSHA Docket Office, U.S. Department flection data at the locations and di-
of Labor, 200 Constitution Avenue, rections specified in Figures W16, W
NW., Room N2625, Washington, DC 17, and W18.
20210 (telephone: (202) 6932350 (TTY (iii) The protective frame and mount-
number: (877) 8895627)); or the National ing connections shall be instrumented
Archives and Records Administration with the necessary recording equip-
(NARA). (For information on the ment to obtain the required load-de-
availability of this material at NARA, flection data to be used in calculating
telephone (202) 7416030 or access the FSB (see paragraph (j)(3) of this sec-
NARA Web site at www.archives.gov/ tion). The gauges shall be placed on
federallregister/ mounting connections before the in-
codeloflfederallregulations/ stallation load is applied.
ibrllocations.html). Copies may be pur- (2) Test procedure. (i) The side-load
chased from the American Society of application shall be at the upper ex-
Agricultural Engineers 2950 Niles Road, tremity of the frame upright at a 90
St. Joseph, MI 49085. angle to the centerline of the vehicle.
(5) The upper edge of the bank shall The side load L shall be applied accord-
be equipped with an 18-in. (457-mm) ing to Figure W16. L and D shall be re-
high ramp as described in Figure W15 corded simultaneously. The test shall
to assist in tipping the vehicle. be stopped when:
(6) The front and rear wheel-tread
(A) The strain energy absorbed by
settings, when adjustable, shall be at
the frame is equal to the required input
the position nearest to halfway be-
energy (Eis);
tween the minimum and maximum set-
(B) Deflection of the frame exceeds
tings obtainable on the vehicle. When
the allowable deflection; or
only two settings are obtainable, the
minimum setting shall be used. (C) The frame load limit occurs be-
(7) Vehicle overturn testsideways and fore the allowable deflection is reached
rearward. (i) The tractor shall be driven in the side load.
under its own power along the specified (ii) The LD diagram (see Figure W
path of travel at a minimum speed of 10 19 for an example) shall be constructed
mph (16 kph), or maximum vehicle using the data obtained according to
speed when under 10 mph (16 kph), up paragraph (g)(2)(i) of this section.
the ramp as described in paragraph (iii) The modified LmDm diagram
(d)(5) of this section to induce sideways shall be constructed according to para-
overturn. graph (g)(2)(ii) and Figure W20 of this
(ii) Rear upset shall be induced by en- section. The strain energy absorbed by
gine power with the tractor operating the frame (Eu) shall then be deter-
in gear to obtain 3 to 5 mph (4.8 to 8 mined.
kph) at maximum governed engine (iv) Eis, FER, and FSB shall be cal-
rpm, preferably by driving forward di- culated.
rectly up a minimum slope of two (v) The test procedure shall be re-
vertical to one horizontal. The engine peated on the same frame using L (rear
clutch may be used to aid in inducing input; see Figure W18) and Eir. Rear-
the upset. load application shall be distributed
(f) Other test procedures. When the uniformly along a maximum projected
field-upset test is not used to deter- dimension of 27 in. (686 mm) and a max-
mine ROPS performance, either the imum area of 160 sq. in. (1,032 sq. cm)
static test or the dynamic test, con- normal to the direction of load applica-
tained in paragraph (g) or (h) of this tion. The load shall be applied to the
section, shall be made. upper extremity of the frame at the
(g) Static test(1) Test conditions. (i) point that is midway between the cen-
The laboratory mounting base shall in- terline of the seat and the inside of the
clude that part of the tractor chassis frame upright.

495

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00505 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1002 29 CFR Ch. XVII (7112 Edition)

(h) Dynamic test(1) Test conditions. three times its depth (see Figures W22
(i) The protective frame and tractor and W23).
shall meet the requirements of para- (v) Means shall be provided for indi-
graphs (e)(2) or (3) of this section, as cating the maximum instantaneous de-
appropriate. flection along the line of impact. A
(ii) The dynamic loading shall be pro- simple friction device is illustrated in
duced by using a 4,410-lb (2,000-kg) Figure W18.
weight acting as a pendulum. The im- (vi) No repair or adjustments may be
pact face of the weight shall be 27 1 carried out during the test.
in. by 27 1 in. (686 25 mm by 686 25 (vii) When any cables, props, or
mm), and shall be constructed so that blocking shift or break during the test,
its center of gravity is within 1.0 in. the test shall be repeated.
(25.4 mm) of its geometric center. The (2) Test procedure. (i) General. The
weight shall be suspended from a pivot frame shall be evaluated by imposing
point 18 to 22 ft (5.5 to 6.7 m) above the dynamic loading to the rear, followed
point of impact on the frame, and shall by a load to the side on the same
be conveniently and safely adjustable frame. The pendulum dropped from the
for height (see Figure W21). height (see the definition of H in
paragraph (j)(3) of this section) imposes
(iii) For each phase of testing, the
the dynamic load. The position of the
tractor shall be restrained from mov-
pendulum shall be so selected that the
ing when the dynamic load is applied.
initial point of impact on the frame
The restraining members shall be 0.50-
shall be in line with the arc of travel of
to 0.63-in. (12.5- to 16.0-mm) steel cable,
the center of gravity of the pendulum.
and points for attaching restraining
A quick-release mechanism should be
members shall be located an appro-
used but, when used, it shall not influ-
priate distance behind the rear axle ence the attitude of the block.
and in front of the front axle to provide (ii) Impact at rear. The tractor shall
a 15 to 30 angle between the restrain- be restrained properly according to
ing cable and the horizontal. The re- paragraphs (h)(1)(iii) and (h)(1)(iv) of
straining cables shall either be in the this section. The tractor shall be posi-
plane in which the center of gravity of tioned with respect to the pivot point
the pendulum will swing, or more than of the pendulum so that the pendulum
one restraining cable shall give a re- is 20 from the vertical prior to impact
sultant force in this plane (see Figure as shown in Figure W22. The impact
W22). shall be applied to the upper extremity
(iv) The wheel-tread setting shall of the frame at the point that is mid-
comply with the requirements of para- way between the centerline of the
graph (e)(6) of this section. The tires frame and the inside of the frame up-
shall have no liquid ballast, and shall right of a new frame.
be inflated to the maximum operating (iii) Impact at side. The blocking and
pressure recommended by the tire man- restraining shall conform to para-
ufacturer. With the specified tire infla- graphs (h)(1)(iii) and (h)(1)(iv) of this
tion, the restraining cables shall be section. The center point of impact
tightened to provide tire deflection of 6 shall be that structural member of the
to 8 percent of the nominal tire-section protective frame likely to hit the
width. After the vehicle is restrained ground first in a sideways accidental
properly, a wooden beam that is 6-in. upset. The side impact shall be applied
6-in. (150 mm 150 mm) shall be driven to the side opposite that used for rear
tightly against the appropriate wheels impact.
and clamped. For the test to the side, (i) Performance requirements(1) Gen-
an additional wooden beam shall be eral. (i) The frame, overhead weather
placed as a prop against the wheel shield, fenders, or other parts in the
nearest to the operators station, and operator area may be deformed in these
shall be secured to the floor so that tests, but shall not shatter or leave
when it is positioned against the wheel sharp edges exposed to the operator, or
rim, it is at an angle of 25 to 40 to the violate the dimensions shown in Fig-
horizontal. It shall have a length 20 to ures W16 and W17, and specified as
25 times its depth, and a width two to follows:

496

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00506 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1002

D = 2 in. (51 mm) inside of the frame rubber-tired loaders and dozers de-
upright to the vertical centerline of scribed in 29 CFR 1926.1001), used in op-
the seat; erations such as landscaping, construc-
E = 30 in. (762 mm); tion services, loading, digging, grounds
F = Not less than 0 in. (0 mm) and not keeping, and highway maintenance.
more than 12 in. (305 mm), measured (3) The following symbols, terms, and
at the centerline of the seat backrest explanations apply to this section:
to the crossbar along the line of load Eis = Energy input to be absorbed dur-
application as shown in Figure W17; ing side loading in ft-lb (Eis in J
and [joules]);
G = 24 in. (610 mm). Eis = 723 + 0.4 W ft-lb (E is = 100 + 0.12
(ii) The material and design combina- W , J);
tion used in the protective structure Eir = Energy input to be absorbed dur-
must be such that the structure can ing rear loading in ft-lb (E ir in J);
meet all prescribed performance tests Eir = 0.47 W ft-lb (E ir = 0.14 W, J);
at 0 F (18 C) according to 29 CFR W = Tractor weight as specified by 29
1926.1001(f)(2)(iv). CFR 1926.1002(e)(1) and (e)(3), in lb (W
(2) Vehicle overturn performance re- , kg);
quirements. The requirements of this L = Static load, lb (kg);
paragraph (i) must be met in both side
D = Deflection under L, in. (mm);
and rear overturns.
LD = Static load-deflection diagram;
(3) Static test performance requirements.
Design factors shall be incorporated in LmDm = Modified static load-deflection
each design to withstand an overturn diagram (Figure W20). To account
test as specified by this paragraph (i). for an increase in strength due to an
The structural requirements will be increase in strain rate, raise L in the
met generally when FER is greater plastic range L K;
than 1.0 and FSB is greater than K1 in K = Increase in yield strength induced
both side and rear loadings. by higher rate of loading (1.3 for hot,
(4) Dynamic test performance require- rolled, low-carbon steel 10101030).
ments. Design factors shall be incor- Low carbon is preferable; however,
porated in each design to withstand the when higher carbon or other material
overturn test specified by this para- is used, K must be determined in the
graph (i). The structural requirements laboratory. Refer to Norris, C.H.,
will be met generally when the dimen- Hansen, R.J., Holley, M.J., Biggs,
sions in this paragraph (i) are used dur- J.M., Namyet, S., and Minami, J.V.,
ing both side and rear loads. Structural Design for Dynamic Loads,
(j) Definitions applicable to this section. McGraw-Hill, New York, 1959, p. 3;
(1) Agricultural tractor means a Lmax = Maximum observed static load;
wheel-type vehicle of more than 20 en- Load Limit = Point on a continuous L
gine horsepower, used in construction D curve at which the observed static
work, that is designed to furnish the load is 0.8 Lmax (refer to Figure W19);
power to pull, propel, or drive imple- Eu = Strain energy absorbed by the
ments. (SAE standard J333a1970 (Op- frame, ft-lb (J); area under the LmDm
erator protection for wheel-type agri- curve;
cultural and industrial tractors) de- FER = Factor of energy ratio, FER =
fines agricultural tractor as a EuEis; also, FER = EuEir;
wheel-type vehicle of more than 20 en- Pb = Maximum observed force in
gine horsepower designed to furnish mounting connection under a static
the power to pull, carry, propel, or load, L, lb (kg);
drive implements that are designed for Pu = Ultimate force capacity of mount-
agricultural usage. Since this part ing connection, lb (kg);
1926 applies only to construction work, FSB = Design margin for a mounting
the SAE definition of agricultural connection (PuPb)1; and
tractor is adopted for purposes of this H = Vertical height of lift of 4,410-lb
subpart.) (2,000-kg) weight, in. (H, mm). The
(2) Industrial tractor means that weight shall be pulled back so that
class of wheel-type tractors of more the height of its center of gravity
than 20 engine horsepower (other than above the point of impact is defined

497

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00507 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1003 29 CFR Ch. XVII (7112 Edition)

as follows: H = 4.92 + 0.00190 W (H = (c) Test proceduresgeneral. (1) The


125 + 0.107 W) (see Figure W24). requirements of 29 CFR 1926.1002(d), (e),
(k) Source of standard. The standard and (f) shall be met.
in this section is derived from, and re- (2) Static and dynamic rear load ap-
states, in part, Society of Automotive plication shall be distributed uni-
Engineers (SAE) standard J334a-1970 formly along a maximum projected di-
(Protective frame test procedures and mension of 27 in. (686 mm), and a max-
performance requirements). The SAE imum area of 160 sq. in. (1,032 sq. cm),
standard appears in the 1971 SAE Hand- normal to the direction of load applica-
book, which may be examined at any tion. The load shall be applied to the
OSHA regional office. upper extremity of the frame at the
[70 FR 76985, Dec. 29, 2005, as amended at 71 point that is midway between the cen-
FR 41129, July 20, 2006] terline of the seat and the inside of the
frame upright.
1926.1003 Overhead protection for (3) The static and dynamic side load
operators of agricultural and indus- application shall be distributed uni-
trial tractors used in construction. formly along a maximum projected di-
(a) General(1) Purpose. When over- mension of 27 in. (686 mm), and a max-
head protection is provided on wheel- imum area of 160 sq. in. (1,032 sq. cm),
type agricultural and industrial trac- normal to the direction of load applica-
tors, the overhead protection shall be tion. The direction of load application
designed and installed according to the is the same as in 29 CFR 1926.1002 (g)
requirements contained in this section. and (h). To simulate the characteris-
The provisions of 29 CFR 1926.1001 for tics of the structure during an upset,
rubber-tired dozers and rubber-tired the center of load application may be
loaders may be used instead of the located from a point 24 in. (610 mm) (K)
standards contained in this section. forward to 12 in. (305 mm) (L) rearward
The purpose of this standard is to mini- of the front of the seat backrest, to
mize the possibility of operator injury best use the structural strength (see
resulting from overhead hazards such Figure W25).
as flying and falling objects, and at the
(d) Drop test procedures. (1) The same
same time to minimize the possibility
frame shall be subjected to the drop
of operator injury from the cover itself
test following either the static or dy-
in the event of accidental upset.
(2) Applicability. This standard applies namic test.
to wheel-type agricultural and indus- (2) A solid steel sphere or material of
trial tractors used in construction equivalent spherical dimension weigh-
work (see 29 CFR 1926.1002(b) and (j)). ing 100 lb (45.4 kg) shall be dropped
In the case of machines to which 29 once from a height 10 ft (3.08 m) above
CFR 1926.604 (relating to site clearing) the overhead cover.
also applies, the overhead protection (3) The point of impact shall be on
may be either the type of protection the overhead cover at a point within
provided in 29 CFR 1926.604, or the type the zone of protection as shown in Fig-
of protection provided by this section. ure W26, which is furthest removed
(b) Overhead protection. When over- from major structural members.
head protection is installed on wheel- (e) Crush test procedure. (1) The same
type agricultural or industrial tractors frame shall be subjected to the crush
used in construction work, it shall test following the drop test and static
meet the requirements of this para- or dynamic test.
graph. The overhead protection may be (2) The test load shall be applied as
constructed of a solid material. When shown in Figure W27, with the seat po-
grid or mesh is used, the largest per- sitioned as specified in 29 CFR
missible opening shall be such that the 1926.1002(d)(4). Loading cylinders shall
maximum circle that can be inscribed be mounted pivotally at both ends.
between the elements of the grid or Loads applied by each cylinder shall be
mesh is 1.5 in. (38 mm) in diameter. The equal within two percent, and the sum
overhead protection shall not be in- of the loads of the two cylinders shall
stalled in such a way as to become a be two times the tractor weight as set
hazard in the case of upset. forth in 29 CFR 1926.1002(e)(1). The

498

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00508 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. W, App. A

maximum width of the beam illus- (3) Crush test performance require-
trated in Figure W27 shall be 6 in. (152 ments. The protected zone as described
mm). in Figure W28 must not be violated.
(f) Performance requirements. (1) Gen- (g) Source of standard. This standard
eral. The performance requirements set is derived from, and restates, in part,
forth in 29 CFR 1926.1002(i)(2), (3), and the portions of Society of Automotive
(4) shall be met. Engineers (SAE) standard J1671970
(2) Drop test performance requirements.
(Protective frame with overhead pro-
(i) Instantaneous deformation due to
tectiontest procedures and perform-
impact of the sphere shall not enter
the protected zone as illustrated in ance requirements), which pertain to
Figures W25, W26, and W28. overhead protection requirements. The
(ii) In addition to the dimensions set SAE standard appears in the 1971 SAE
forth in 29 CFR 1926.1002(i)(1)(i), the fol- Handbook, which may be examined at
lowing dimensions apply to Figure W any OSHA regional office.
28: [70 FR 76985, Dec. 29, 2005]
H = 17.5 in. (444 mm); and
J = 2 in. (50.8 mm), measured from the APPENDIX A TO SUBPART W TO PART
outer periphery of the steering wheel. 1926FIGURES W14 THROUGH W28

499
ER20JY06.009</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00509 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. W, App. A 29 CFR Ch. XVII (7112 Edition)

500
ER20JY06.010</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00510 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. W, App. A

501
ER20JY06.011</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00511 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. W, App. A 29 CFR Ch. XVII (7112 Edition)

502
ER20JY06.012</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00512 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. W, App. A

ER20JY06.014</GPH>

503
ER20JY06.013</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00513 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. W, App. A 29 CFR Ch. XVII (7112 Edition)

504
ER20JY06.015</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00514 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. W, App. A

505
ER20JY06.016</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00515 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. W, App. A 29 CFR Ch. XVII (7112 Edition)

506
ER20JY06.017</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00516 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. W, App. A

507
ER20JY06.018</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00517 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. W, App. A 29 CFR Ch. XVII (7112 Edition)

508
ER20JY06.019</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00518 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. W, App. A

509
ER20JY06.020</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00519 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. W, App. A 29 CFR Ch. XVII (7112 Edition)

510
ER20JY06.021</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00520 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. W, App. A

511
ER20JY06.022</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00521 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1050 29 CFR Ch. XVII (7112 Edition)

[70 FR 76985, Dec. 29, 2005, as amended at 71 tional requirements for ladders used on
FR 41130, July 20, 2006] or with scaffolds are contained in sub-
part LScaffolds. This subpart does
Subpart XStairways and Ladders not apply to integral components of
equipment covered by subpart CC. Sub-
AUTHORITY: Section 107, Contract Work part CC exclusively sets forth the cir-
Hours and Safety Standards Act (Construc- cumstances when ladders and stair-
tion Safety Act](40 U.S.C. 333); Secs. 4, 6, 8, ways must be provided on equipment
Occupational Safety and Health Act of 1970
(29 U.S.C. 653, 655, 657); Secretary of Labors covered by subpart CC.
Order Nos. 190 (55 FR 9033), 52007 (72 FR (b) Definitions. Cleat means a ladder
31159); and 29 CFR part 1911. crosspiece of rectangular cross section
SOURCE: 55 FR 47687, Nov. 14, 1990, unless placed on edge upon which a person
otherwise noted. may step while ascending or descend-
ing a ladder.
1926.1050 Scope, application, and Double-cleat ladder means a ladder
definitions applicable to this sub-
part. similar in construction to a single-
cleat ladder, but with a center rail to
(a) Scope and application. This sub- allow simultaneous two-way traffic for
part applies to all stairways and lad- employees ascending or descending.
ders used in construction, alteration,
Equivalent means alternative designs,
repair (including painting and deco-
rating), and demolition workplaces materials, or methods that the em-
covered under 29 CFR part 1926, and ployer can demonstrate will provide an
also sets forth, in specified cir- equal or greater degree of safety for
cumstances, when ladders and stair- employees than the method or item
ways are required to be provided. Addi- specified in the standard.

512
ER20JY06.023</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00522 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1050

Extension trestle ladder means a self- Point of access means all areas used
supporting portable ladder, adjustable by employees for work-related passage
in length, consisting of a trestle ladder from one area or level to another. Such
base and a vertically adjustable exten- open areas include doorways,
sion section, with a suitable means for 1passageways, stairway openings, stud-
locking the ladders together. ded walls, and various other permanent
Failure means load refusal, breakage, or temporary openings used for such
or separation of component parts. Load travel.
refusal is the point where the struc- Portable ladder means a ladder that
tural members lose their ability to can be readily moved or carried.
carry the loads. Riser height means the vertical dis-
Fixed ladder means a ladder that can- tance from the top of a tread to the top
not be readily moved or carried be- of the next higher tread or platform/
cause it is an integral part of a build- landing or the distance from the top of
ing or structure. A side-step fixed ladder a platform/landing to the top of the
is a fixed ladder that requires a person next higher tread or platform/landing.
getting off at the top to step to the Side-step fixed ladder. See Fixed lad-
side of the ladder side rails to reach the der.
landing. A through fixed ladder is a Single-cleat ladder means a ladder
fixed ladder that requires a person get- consisting of a pair of side rails, con-
ting off at the top to step between the nected together by cleats, rungs, or
side rails of the ladder to reach the steps.
landing. Single-rail ladder means a portable
Handrail means a rail used to provide ladder with rungs, cleats, or steps
employees with a handhold for support. mounted on a single rail instead of the
Individual-rung/step ladders means normal two rails used on most other
ladders without a side rail or center ladders.
rail support. Such ladders are made by Spiral stairway means a series of steps
mounting individual steps or rungs di- attached to a vertical pole and pro-
rectly to the side or wall of the struc- gressing upward in a winding fashion
ture. within a cylindrical space.
Job-made ladder means a ladder that Stairrail system means a vertical bar-
is fabricated by employees, typically at rier erected along the unprotected
the construction site, and is not com- sides and edges of a stariway to pre-
mercially manufactured. This defini- vent employees from falling to lower
tion does not apply to any individual- levels. The top surface of a stairrail
rung/step ladders. system may also be a handrail.
Ladder stand. A mobile fixed size self- Step stool (ladder type) means a self-
supporting ladder consisting of a wide supporting, foldable, portable ladder,
flat tread ladder in the form of stairs. nonadjustable in length, 32 inches or
The assenbly may include handrails. less in overall size, with flat steps and
Lower levels means those areas to without a pail shelf, designed to be
which an employee can fall from a climbed on the ladder top cap as well
stairway or ladder. Such areas include as all steps. The side rails may con-
ground levels, floors, roofs, ramps, run- tinue above the top cap.
ways, excavations, pits, tanks, mate- Through fixed ladder. See Fixed lad-
rial, water, equipment, and similar sur- der.
faces. It does not include the surface Tread depth means the horizontal dis-
from which the employee falls. tance from front to back of a tread (ex-
Maximum intended load means the cluding nosing, if any).
total load of all employees, equipment, Unprotected sides and edges means any
tools, materials, transmitted loads, side or edge (except at entrances to
and other loads anticipated to be ap- points of access) of a stairway where
plied to a ladder component at any one there is no stairrail system or wall 36
time. inches (.9 m) or more in height, and
Nosing means that portion of a tread any side or edge (except at entrances to
projecting beyond the face of the riser points of access) of a stairway landing,
immediately below. or ladder platform where there is no

513

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00523 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1051 29 CFR Ch. XVII (7112 Edition)

wall or guardrail system 39 inches (1 m) (2) Stairs shall be installed between


or more in height. 30 and 50 from horizontal.
[55 FR 47687, Nov. 14, 1990; 56 FR 2585, Jan. 23,
(3) Riser height and tread depth shall
1991, as amended at 58 FR 35184, June 30, 1993; be uniform within each flight of stairs,
75 FR 48135, Aug. 9, 2010] including any foundation structure
used as one or more treads of the
1926.1051 General requirements. stairs. Variations in riser height or
(a) A stairway or ladder shall be pro- tread depth shall not be over 14-inch
vided at all personnel points of access (0.6 cm) in any stairway system.
where there is a break in elevation of (4) Where doors or gates open directly
19 inches (48 cm) or more, and no ramp, on a stairway, a platform shall be pro-
runway, sloped embankment, or per- vided, and the swing of the door shall
sonnel hoist is provided. not reduce the effective width of the
(1) Employees shall not use any spi- platform to less than 20 inches (51 cm).
ral stairways that will not be a perma- (5) Metal pan landings and metal pan
nent part of the structure on which treads, when used, shall be secured in
construction work is being performed. place before filling with concrete or
(2) A double-cleated ladder or two or other material.
more separate ladders shall be provided (6) All parts of stairways shall be free
when ladders are the only mean of ac- of hazardous projections, such as pro-
cess or exit from a working area for 25 truding nails.
or more employees, or when a ladder is (7) Slippery conditions on stairways
to serve simultaneous two-way traffic. shall be eliminated before the stair-
(3) When a building or structure has ways are used to reach other levels.
only one point of access between levels, (b) Temporary service. The following
that point of access shall be kept clear requirements apply to all stairways as
to permit free passage of employees. indicated:
When work must be performed or (1) Except during stairway construc-
equipment must be used such that free tion, foot traffic is prohibited on stair-
passage at that point of access is re- ways with pan stairs where the treads
stricted, a second point of access shall and/or landings are to be filled in with
be provided and used. concrete or other material at a later
(4) When a building or structure has date, unless the stairs are temporarily
two or more points of access between fitted with wood or other solid mate-
levels, at least one point of access shall rial at least to the top edge of each
be kept clear to permit free passage of pan. Such temporary treads and land-
employees. ings shall be replaced when worn below
(b) Employers shall provide and in- the level of the top edge of the pan.
stall all stairway and ladder fall pro- (2) Except during stairway construc-
tection systems required by this sub- tion, foot traffic is prohibited on skel-
part and shall comply with all other eton metal stairs where permanent
pertinent requirements of this subpart treads and/or landings are to be in-
before employees begin the work that stalled at a later date, unless the stairs
necessitates the installation and use of are fitted with secured temporary
stairways, ladders, and their respective treads and landings long enough to
fall protection systems. cover the entire tread and/or landing
area.
1926.1052 Stairways. (3) Treads for temporary service shall
(a) General. The following require- be made of wood or other solid mate-
ments apply to all stairways as indi- rial, and shall be installed the full
cated: width and depth of the stair.
(1) Stairways that will not be a per- (c) Stairrails and handrails. The fol-
manent part of the structure on which lowing requirements apply to all stair-
construction work is being performed ways as indicated:
shall have landings of not less than 30 (1) Stairways having four or more ris-
inches (76 cm) in the direction of travel ers or rising more than 30 inches (76
and extend at least 22 inches (56 cm) in cm), whichever is less, shall be
width at every 12 feet (3.7 m) or less of equipped with:
vertical rise. (i) At least one handrail; and

514

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00524 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1053

(ii) One stairrail system along each surface of the tread, in line with the
unprotected side or edge. face of the riser at the forward edge of
NOTE: When the top edge of a stairrail sys- the tread.
tem also serves as a handrail, paragraph (7) When the top edge of a stairrail
(c)(7) of this section applies. system also serves as a handrail, the
(2) Winding and spiral stairways shall height of the top edge shall be not
be equipped with a handrail offset suf- more than 37 inches (94 cm) nor less
ficiently to prevent walking on those than 36 inches (91.5 cm) from the upper
portions of the stairways where the surface of the stairrail system to the
tread width is less than 6 inches (15 surface of the tread, in line with the
cm). face of the riser at the forward edge of
(3) The height of stairrails shall be as the tread.
follows:
(8) Stairrail systems and handrails
(i) Stairrails installed after March 15,
shall be so surfaced as to prevent in-
1991, shall be not less than 36 inches
(91.5 cm) from the upper surface of the jury to employees from punctures or
stairrail system to the surface of the lacerations, and to prevent snagging of
tread, in line with the face of the riser clothing.
at the forward edge of the tread. (9) Handrails shall provide an ade-
(ii) Stairrails installed before March quate handhold for employees grasping
15, 1991, shall be not less than 30 inches them to avoid falling.
(76 cm) nor more than 34 inches (86 cm) (10) The ends of stairrail systems and
from the upper surface of the stairrail handrails shall be constructed so as not
system to the surface of the tread, in to constitute a projection hazard.
line with the face of the riser at the (11) Handrails that will not be a per-
forward edge of the tread. manent part of the structure being
(4) Midrails, screens, mesh, inter- built shall have a minimum clearance
mediate vertical members, or equiva- of 3 inches (8 cm) between the handrail
lent intermediate structural members, and walls, stairrail systems, and other
shall be provided between the top rail objects.
of the stairrail system and the stair- (12) Unprotected sides and edges of
way steps. stairway landings shall be provided
(i) Midrails, when used, shall be lo- with guardrail systems. Guardrail sys-
cated at a height midway between the tem criteria are contained in subpart
top edge of the stairrail system and the M of this part.
stairway steps.
[55 FR 47687, Nov. 14, 1990; 56 FR 2585, Jan. 23,
(ii) Screens or mesh, when used, shall
1991; 56 FR 5061, Feb. 7, 1991; 56 FR 41794, Aug.
extend from the top rail to the stair- 23, 1991]
way step, and along the entire opening
between top rail supports. 1926.1053 Ladders.
(iii) When intermediate vertical
members, such as balusters, are used (a) General. The following require-
between posts, they shall be not more ments apply to all ladders as indicated,
than 19 inches (48 cm) apart. including job-made ladders.
(iv) Other structural members, when (1) Ladders shall be capable of sup-
used, shall be installed such that there porting the following loads without
are no openings in the stairrail system failure:
that are more than 19 inches (48 cm) (i) Each self-supporting portable lad-
wide. der: At least four times the maximum
(5) Handrails and the top rails of intended load, except that each extra-
stairrail systems shall be capable of heavy-duty type 1A metal or plastic
withstanding, without failure, a force ladder shall sustain at least 3.3 times
of at least 200 pounds (890 n) applied the maximum intended load. The abil-
within 2 inches (5 cm) of the top edge, ity of a ladder to sustain the loads in-
in any downward or outward direction, dicated in this paragraph shall be de-
at any point along the top edge. termined by applying or transmitting
(6) The height of handrails shall be the requisite load to the ladder in a
not more than 37 inches (94 cm) nor downward vertical direction. Ladders
less than 30 inches (76 cm) from the built and tested in conformance with
upper surface of the handrail to the the applicable provisions of appendix A

515

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00525 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1053 29 CFR Ch. XVII (7112 Edition)

of this subpart will be deemed to meet lines of the rungs, cleats, and steps.
this requirement. The rung spacing on the extension sec-
(ii) Each portable ladder that is not tion of the extension trestle ladder
self-supporting: At least four times the shall be not less than 6 inches (15 cm)
maximum intended load, except that nor more than 12 inches (31 cm), as
each extra-heavy-duty type 1A metal measured between center lines of the
or plastic ladders shall sustain at least rungs, cleats, and steps.
3.3 times the maximum intended load. (4)(i) The minimum clear distance be-
The ability of a ladder to sustain the tween the sides of individual-rung/step
loads indicated in this paragraph shall ladders and the minimum clear dis-
be determined by applying or transmit- tance between the side rails of other
ting the requisite load to the ladder in fixed ladders shall be 16 inches (41 cm).
a downward vertical direction when the (ii) The minimum clear distance be-
ladder is placed at an angle of 7512 de- tween side rails for all portable ladders
grees from the horizontal. Ladders shall be 1112 inches (29 cm).
built and tested in conformance with (5) The rungs of individual-rung/step
the applicable provisions of appendix A ladders shall be shaped such that em-
will be deemed to meet this require- ployees feet cannot slide off the end of
ment. the rungs.
(iii) Each fixed ladder: At least two (6)(i) The rungs and steps of fixed
loads of 250 pounds (114 kg) each, con- metal ladders manufactured after
centrated between any two consecutive March 15, 1991, shall be corrugated,
attachments (the number and position knurled, dimpled, coated with skid-re-
of additional concentrated loads of 250 sistant material, or otherwise treated
pounds (114 kg) each, determined from to minimize slipping.
anticipated usage of the ladder, shall (ii) The rungs and steps of portable
also be included), plus anticipated metal ladders shall be corrugated,
loads caused by ice buildup, winds, rig- knurled, dimpled, coated with skid-re-
ging, and impact loads resulting from sistant material, or otherwise treated
the use of ladder safety devices. Each to minimize slipping.
step or rung shall be capable of sup- (7) Ladders shall not be tied or fas-
porting a single concentrated load of at tened together to provide longer sec-
least 250 pounds (114 kg) applied in the tions unless they are specifically de-
middle of the step or rung. Ladders signed for such use.
built in conformance with the applica- (8) A metal spreader or locking de-
ble provisions of appendix A will be vice shall be provided on each step-
deemed to meet this requirement. ladder to hold the front and back sec-
(2) Ladder rungs, cleats, and steps tions in an open position when the lad-
shall be parallel, level, and uniformly der is being used.
spaced when the ladder is in position (9) When splicing is required to ob-
for use. tain a given length of side rail, the re-
(3)(i) Rungs, cleats, and steps of port- sulting side rail must be at least equiv-
able ladders (except as provided below) alent in strength to a one-piece side
and fixed ladders (including individual- rail made of the same material.
rung/step ladders) shall be spaced not (10) Except when portable ladders are
less than 10 inches (25 cm) apart, nor used to gain access to fixed ladders
more than 14 inches (36 cm) apart, as (such as those on utility towers, bill-
measured between center lines of the boards, and other structures where the
rungs, cleats, and steps. bottom of the fixed ladder is elevated
(ii) Rungs, cleats, and steps of step to limit access), when two or more sep-
stools shall be not less than 8 inches (20 arate ladders are used to reach an ele-
cm) apart, nor more than 12 inches (31 vated work area, the ladders shall be
cm) apart, as measured between center offset with a platform or landing be-
lines of the rungs, cleats, and steps. tween the ladders. (The requirements
(iii) Rungs, cleats, and steps of the to have guardrail systems with
base section of extension trestle lad- toeboards for falling object and over-
ders shall not be less than 8 inches (20 head protection on platforms and land-
cm) nor more than 18 inches (46 cm) ings are set forth in subpart M of this
apart, as measured between center part.)

516

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00526 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1053

(11) Ladder components shall be sur- ladders shall be equipped with one of
faced so as to prevent injury to an em- the following:
ployee from punctures or lacerations, (i) Ladder safety devices; or
and to prevent snagging of clothing. (ii) Self-retracting lifelines, and rest
(12) Wood ladders shall not be coated platforms at intervals not to exceed 150
with any opaque covering, except for feet (45.7 m); or
identification or warning labels which (iii) A cage or well, and multiple lad-
may be placed on one face only of a der sections, each ladder section not to
side rail. exceed 50 feet (15.2 m) in length. Ladder
(13) The minimum perpendicular sections shall be offset from adjacent
clearance between fixed ladder rungs, sections, and landing platforms shall
cleats, and steps, and any obstruction be provided at maximum intervals of 50
behind the ladder shall be 7 inches (18 feet (15.2 m).
cm), except in the case of an elevator (20) Cages for fixed ladders shall con-
pit ladder, for which a minimum per- form to all of the following:
pendicular clearance of 412 inches (11 (i) Horizontal bands shall be fastened
cm) is required. to the side rails of rail ladders, or di-
(14) The minimum perpendicular rectly to the structure, building, or
clearance between the center line of equipment for individual-rung ladders;
fixed ladder rungs, cleats, and steps, (ii) Vertical bars shall be on the in-
and any obstruction on the climbing side of the horizontal bands and shall
side of the ladder shall be 30 inches (76 be fastened to them;
cm), except as provided in paragraph (iii) Cages shall extend not less than
(a)(15) of this section. 27 inches (68 cm), or more than 30
(15) When unavoidable obstructions inches (76 cm) from the centerline of
are encountered, the minimum perpen- the step or rung (excluding the flare at
dicular clearance between the center- the bottom of the cage), and shall not
line of fixed ladder rungs, cleats, and be less than 27 inches (68 cm) in width;
steps, and the obstruction on the (iv) The inside of the cage shall be
climbing side of the ladder may be re- clear of projections;
duced to 24 inches (61 cm), provided (v) Horizontal bands shall be spaced
that a deflection device is installed to not more than 4 feet (1.2 m) on center
guide employees around the obstruc- vertically;
tion. (vi) Vertical bars shall be spaced at
(16) Through fixed ladders at their intervals not more than 912 inches (24
point of access/egress shall have a step- cm) on center horizontally;
across distance of not less than 7 (vii) The bottom of the cage shall be
inches (18 cm) nor more than 12 inches at a level not less than 7 feet (2.1 m)
(30 cm) as measured from the center- nor more than 8 feet (2.4 m) above the
line of the steps or rungs to the nearest point of access to the bottom of the
edge of the landing area. If the normal ladder. The bottom of the cage shall be
step-across distance exceeds 12 inches flared not less than 4 inches (10 cm) all
(30 cm), a landing platform shall be around within the distance between the
provided to reduce the distance to the bottom horizontal band and the next
specified limit. higher band;
(17) Fixed ladders without cages or (viii) The top of the cage shall be a
wells shall have a clear width to the minimum of 42 inches (1.1 m) above the
nearest permanent object of at least 15 top of the platform, or the point of ac-
inches (38 cm) on each side of the cen- cess at the top of the ladder, with pro-
terline of the ladder. vision for access to the platform or
(18) Fixed ladders shall be provided other point of access.
with cages, wells, ladder safety devices, (21) Wells for fixed ladders shall con-
or self-retracting lifelines where the form to all of the following:
length of climb is less than 24 feet (7.3 (i) They shall completely encircle the
m) but the top of the ladder is at a dis- ladder;
tance greater than 24 feet (7.3 m) above (ii) They shall be free of projections;
lower levels. (iii) Their inside face on the climbing
(19) Where the total length of a climb side of the ladder shall extend not less
equals or exceeds 24 feet (7.3 m), fixed than 27 inches (68 cm) nor more than 30

517

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00527 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1053 29 CFR Ch. XVII (7112 Edition)

inches (76 cm) from the centerline of the access level shall be the top of the
the step or rung; parapet.
(iv) The inside clear width shall be at (25) For through-fixed-ladder exten-
least 30 inches (76 cm); sions, the steps or rungs shall be omit-
(v) The bottom of the wall on the ac- ted from the extension and the exten-
cess side shall start at a level not less sion of the side rails shall be flared to
than 7 feet (2.1 m) nor more than 8 feet provide not less than 24 inches (61 cm)
(2.4 m) above the point of access to the nor more than 30 inches (76 cm) clear-
bottom of the ladder. ance between side rails. Where ladder
(22) Ladder safety devices, and re- safety devices are provided, the max-
lated support systems, for fixed ladders imum clearance between side rails of
shall conform to all of the following: the extensions shall not exceed 36
(i) They shall be capable of with- inches (91 cm).
standing without failure a drop test (26) For side-step fixed ladders, the
consisting of an 18-inch (41 cm) drop of side rails and the steps or rungs shall
a 500-pound (226 kg) weight; be continuous in the extension.
(ii) They shall permit the employee (27) Individual-rung/step ladders, ex-
using the device to ascend or descend cept those used where their access
without continually having to hold, openings are covered with manhole
push or pull any part of the device, covers or hatches, shall extend at least
leaving both hands free for climbing;
42 inches (1.1 m) above an access level
(iii) They shall be activated within 2
or landing platform either by the con-
feet (.61 m) after a fall occurs, and
tinuation of the rung spacings as hori-
limit the descending velocity of an em-
zontal grab bars or by providing
ployee to 7 feet/sec. (2.1 m/sec.) or less;
vertical grab bars that shall have the
(iv) The connection between the car-
same lateral spacing as the vertical
rier or lifeline and the point of attach-
legs of the rungs.
ment to the body belt or harness shall
(b) Use. The following requirements
not exceed 9 inches (23 cm) in length.
apply to the use of all ladders, includ-
(23) The mounting of ladder safety
ing job-made ladders, except as other-
devices for fixed ladders shall conform
wise indicated:
to the following:
(i) Mountings for rigid carriers shall (1) When portable ladders are used for
be attached at each end of the carrier, access to an upper landing surface, the
with intermediate mountings, as nec- ladder side rails shall extend at least 3
essary, spaced along the entire length feet (.9 m) above the upper landing sur-
of the carrier, to provide the strength face to which the ladder is used to gain
necessary to stop employees falls. access; or, when such an extension is
(ii) Mountings for flexible carriers not possible because of the ladders
shall be attached at each end of the length, then the ladder shall be secured
carrier. When the system is exposed to at its top to a rigid support that will
wind, cable guides for flexible carriers not deflect, and a grasping device, such
shall be installed at a minimum spac- as a grabrail, shall be provided to as-
ing of 25 feet (7.6 m) and maximum sist employees in mounting and dis-
spacing of 40 feet (12.2 m) along the en- mounting the ladder. In no case shall
tire length of the carrier, to prevent the extension be such that ladder de-
wind damage to the system. flection under a load would, by itself,
(iii) The design and installation of cause the ladder to slip off its support.
mountings and cable guides shall not (2) Ladders shall be maintained free
reduce the design strength of the lad- of oil, grease, and other slipping haz-
der. ards.
(24) The side rails of through or side- (3) Ladders shall not be loaded be-
step fixed ladders shall extend 42 inches yond the maximum intended load for
(1.1 m) above the top of the access level which they were built, nor beyond
or landing platform served by the lad- their manufacturers rated capacity.
der. For a parapet ladder, the access (4) Ladders shall be used only for the
level shall be the roof if the parapet is purpose for which they were designed.
cut to permit passage through the (5)(i) Non-self-supporting ladders
parapet; if the parapet is continuous, shall be used at an angle such that the

518

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00528 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1060

horizontal distance from the top sup- climbing on both front and rear sec-
port to the foot of the ladder is ap- tions.
proximately one-quarter of the work- (15) Ladders shall be inspected by a
ing length of the ladder (the distance competent person for visible defects on
along the ladder between the foot and a periodic basis and after any occur-
the top support). rence that could affect their safe use.
(ii) Wood job-made ladders with (16) Portable ladders with structural
spliced side rails shall be used at an defects, such as, but not limited to,
angle such that the horizontal distance broken or missing rungs, cleats, or
is one-eighth the working length of the steps, broken or split rails, corroded
ladder. components, or other faulty or defec-
(iii) Fixed ladders shall be used at a tive components, shall either be imme-
pitch no greater than 90 degrees from diately marked in a manner that read-
the horizontal, as measured to the ily identifies them as defective, or be
back side of the ladder. tagged with Do Not Use or similar
(6) Ladders shall be used only on sta- language, and shall be withdrawn from
ble and level surfaces unless secured to service until repaired.
prevent accidental displacement. (17) Fixed ladders with structural de-
(7) Ladders shall not be used on slip- fects, such as, but not limited to, bro-
pery surfaces unless secured or pro- ken or missing rungs, cleats, or steps,
vided with slip-resistant feet to pre- broken or split rails, or corroded com-
vent accidental displacement. Slip-re- ponents, shall be withdrawn from serv-
sistant feet shall not be used as a sub- ice until repaired. The requirement to
stitute for care in placing, lashing, or withdraw a defective ladder from serv-
holding a ladder that is used upon slip- ice is satisfied if the ladder is either:
pery surfaces including, but not lim- (i) Immediately tagged with Do Not
ited to, flat metal or concrete surfaces Use or similar language,
that are constructed so they cannot be (ii) Marked in a manner that readily
prevented from becoming slippery. identifies it as defective;
(8) Ladders placed in any location (iii) Or blocked (such as with a ply-
where they can be displaced by work- wood attachment that spans several
place activities or traffic, such as in rungs).
passageways, doorways, or driveways, (18) Ladder repairs shall restore the
shall be secured to prevent accidental ladder to a condition meeting its origi-
displacement, or a barricade shall be nal design criteria, before the ladder is
used to keep the activities or traffic returned to use.
away from the ladder. (19) Single-rail ladders shall not be
(9) The area around the top and bot- used.
tom of ladders shall be kept clear. (20) When ascending or descending a
(10) The top of a non-self-supporting ladder, the user shall face the ladder.
ladder shall be placed with the two (21) Each employee shall use at least
rails supported equally unless it is one hand to grasp the ladder when pro-
equipped with a single support attach- gressing up and/or down the ladder.
ment. (22) An employee shall not carry any
(11) Ladders shall not be moved, object or load that could cause the em-
shifted, or extended while occupied. ployee to lose balance and fall.
(12) Ladders shall have nonconduc- [55 FR 47687, Nov. 14, 1990; 56 FR 2585, Jan. 23,
tive siderails if they are used where the 1991, as amended at 56 FR 41794, Aug. 23, 1991]
employee or the ladder could contact
exposed energized electrical equip- 1926.10541926.1059 [Reserved]
ment, except as provided in
1926.951(c)(1) of this part. 1926.1060 Training requirements.
(13) The top or top step of a step- The following training provisions
ladder shall not be used as a step. clarify the requirements of
(14) Cross-bracing on the rear section 1926.21(b)(2), regarding the hazards ad-
of stepladders shall not be used for dressed in subpart X.
climbing unless the ladders are de- (a) The employer shall provide a
signed and provided with steps for training program for each employee

519

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00529 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. X, App. A 29 CFR Ch. XVII (7112 Edition)

using ladders and stairways, as nec- U.S.C. 653, 655, 657); Sec. 107, Contract Work
essary. The program shall enable each Hours and Safety Standards Act (the Con-
employee to recognize hazards related struction Safety Standards Act) (40 U.S.C.
333); Sec. 41, Longshore and Harbor Workers
to ladders and stairways, and shall
Compensation Act (33 U.S.C. 941); Secretary
train each employee in the procedures of Labors Order No. 1271 (36 FR 8754), 876
to be followed to minimize these haz- (41 FR 25059), 983 (48 FR 35736), 190 (55 FR
ards. 9033), 32000 (65 FR 50017) or 52002 (67 FR
(1) The employer shall ensure that 65008) as applicable; and 29 CFR part 1911.
each employee has been trained by a SOURCE: 58 FR 35184, June 30, 1993, unless
competent person in the following otherwise noted.
areas, as applicable:
(i) The nature of fall hazards in the GENERAL
work area;
(ii) The correct procedures for erect- 1926.1071 Scope and application.
ing, maintaining, and disassembling NOTE: The requirements applicable to con-
the fall protection systems to be used; struction work under this section are iden-
(iii) The proper construction, use, tical to those set forth at 1910.401 of this
placement, and care in handling of all chapter.
stairways and ladders; [61 FR 31432, June 20, 1996]
(iv) The maximum intended load-car-
rying capacities of ladders used; and 1926.1072 Definitions.
(v) The standards contained in this
NOTE: The provisions applicable to con-
subpart. struction work under this section are iden-
(b) Retraining shall be provided for tical to those set forth at 1910.402 of this
each employee as necessary so that the chapter.
employee maintains the understanding
[61 FR 31432, June 20, 1996]
and knowledge acquired through com-
pliance with this section. PERSONNEL REQUIREMENTS
APPENDIX A TO SUBPART X OF PART 1926.1076 Qualifications of dive team.
1926LADDERS
NOTE: The requirements applicable to con-
This appendix serves as a non-mandatory struction work under this section are iden-
guideline to assist employers in complying tical to those set forth at 1910.410 of this
with the ladder loading and strength require- chapter.
ments of 1926.1053(a)(1). A ladder designed
and built in accordance with the applicable [61 FR 31432, June 20, 1996]
national consensus standards, as set forth
below, will be considered to meet the re- GENERAL OPERATIONS PROCEDURES
quirements of 1926.1053(a)(1):
Manufactured portable wood ladders: 1926.1080 Safe practices manual.
American National Standards Institute NOTE: The requirements applicable to con-
(ANSI) A14.11982American National struction work under this section are iden-
Standard for Ladders-Portable Wood-Safety tical to those set forth at 1910.420 of this
Requirements. chapter.
Manufactured portable metal ladders:
ANSI A14.21982American National Stand- [61 FR 31432, June 20, 1996]
ard for LaddersPortable Metal-Safety Re-
quirements. 1926.1081 Pre-dive procedures.
Manufactured fixed ladders: ANSI A14.3 NOTE: The requirements applicable to con-
1984American National Standard for Lad- struction work under this section are iden-
ders-Fixed-Safety Requirements. tical to those set forth at 1910.421 of this
Job-made ladders: ANSI A14.41979Safe- chapter.
ty Requirements for Job-Made Ladders.
Plastic ladders: ANSI A14.51982Amer- [61 FR 31432, June 20, 1996]
ican National Standard for Ladders-Portable
Reinforced Plastic-Safety Requirements. 1926.1082 Procedures during dive.
NOTE: The requirements applicable to con-
Subpart YDiving struction work under this section are iden-
tical to those set forth at 1910.422 of this
chapter.
AUTHORITY: Sections 4, 6, and 8 of the Occu-
pational Safety and Health Act of 1970 (29 [61 FR 31432, June 20, 1996]

520

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00530 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

1926.1083 Post-dive procedures. APPENDIX A TO SUBPART Y OF PART


1926EXAMPLES OF CONDITIONS
NOTE: The requirements applicable to con-
struction work under this section are iden-
WHICH MAY RESTRICT OR LIMIT EX-
tical to those set forth at 1910.423 of this POSURE TO HYPERBARIC CONDITIONS
chapter.
NOTE: The requirements applicable to con-
[61 FR 31432, June 20, 1996] struction work under this appendix A are
identical to those set forth at appendix A to
SPECIFIC OPERATIONS PROCEDURES Subpart T of part 1910 of this chapter.
[61 FR 31432, June 20, 1996]
1926.1084 SCUBA diving.
NOTE: The requirements applicable to con- APPENDIX B TO SUBPART Y OF PART
struction work under this section are iden- 1926GUIDELINES FOR SCIENTIFIC DIVING
tical to those set forth at 1910.424 of this
chapter. NOTE: The requirements applicable to con-
struction work under this appendix B are
[61 FR 31432, June 20, 1996] identical to those set forth at appendix B to
subpart T of part 1910 of this chapter.
1926.1085 Surface-supplied air div-
[61 FR 31433, June 20, 1996]
ing.
NOTE: The requirements applicable to con-
struction work under this section are iden-
Subpart ZToxic and Hazardous
tical to those set forth at 1910.425 of this Substances
chapter.
[61 FR 31432, June 20, 1996] AUTHORITY: Section107 of the Contract
Work Hours and Safety Standards Act (40
1926.1086 Mixed-gas diving. U.S.C. 3704); Sections 4, 6, and 8 of the Occu-
pational Safety and Health Act of 1970 (29
NOTE: The requirements applicable to con- U.S.C. 653, 655, 657); and Secretary of Labors
struction work under this section are iden- Order No. 1271 (36 FR 8754), 876 (41 FR
tical to those set forth at 1910.426 of this 25059), 983 (48 FR 35736), 190 (55 FR 9033), 6
chapter. 96 (62 FR 111), 32000 (65 FR 50017), 52002 (67
FR 65008), 52007 (72 FR 31159), 42010 (75 FR
[61 FR 31432, June 20, 1996] 55355), or 12012 (77 FR 3912) as applicable;
and 29 CFR part 1911.
1926.1087 Liveboating.
Section 1926.1102 not issued under 29 U.S.C.
NOTE: The requirements applicable to con- 655 or 29 CFR part 1911; also issued under 5
struction work under this section are iden- U.S.C. 553.
tical to those set forth at 1910.427 of this
chapter. 1926.1100 [Reserved]
[61 FR 31432, June 20, 1996]
1926.1101 Asbestos.
EQUIPMENT PROCEDURES AND (a) Scope and application. This section
REQUIREMENTS regulates asbestos exposure in all work
as defined in 29 CFR 1910.12(b), includ-
1926.1090 Equipment. ing but not limited to the following:
NOTE: The requirements applicable to con- (1) Demolition or salvage of struc-
struction work under this section are iden- tures where asbestos is present;
tical to those set forth at 1910.430 of this (2) Removal or encapsulation of ma-
chapter. terials containing asbestos;
[61 FR 31432, June 20, 1996] (3) Construction, alteration, repair,
maintenance, or renovation of struc-
RECORDKEEPING tures, substrates, or portions thereof,
that contain asbestos;
1926.1091 Recordkeeping require- (4) Installation of products con-
ments. taining asbestos;
NOTE: The requirements applicable to con- (5) Asbestos spill/emergency cleanup;
struction work under this section are iden- and
tical to those set forth at 1910.440 of this (6) Transportation, disposal, storage,
chapter.
containment of and housekeeping ac-
[61 FR 31432, June 20, 1996] tivities involving asbestos or products

521

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00531 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

containing asbestos, on the site or lo- sheeting, roofing and siding shingles,
cation at which construction activities and construction mastics.
are performed. Class III asbestos work means repair
(7) Coverage under this standard and maintenance operations, where
shall be based on the nature of the ACM, including TSI and surfacing
work operation involving asbestos ex- ACM and PACM, is likely to be dis-
posure. turbed.
(8) This section does not apply to as- Class IV asbestos work means mainte-
bestos-containing asphalt roof coat- nance and custodial activities during
ings, cements and mastics. which employees contact but do not
(b) Definitions. disturb ACM or PACM and activities to
Aggressive method means removal or clean up dust, waste and debris result-
disturbance of building material by ing from Class I, II, and III activities.
sanding, abrading, grinding or other Clean room means an uncontaminated
method that breaks, crumbles, or dis- room having facilities for the storage
integrates intact ACM. of employees street clothing and
Amended water means water to which uncontaminated materials and equip-
surfactant (wetting agent) has been ment.
added to increase the ability of the liq- Closely resemble means that the major
uid to penetrate ACM. workplace conditions which have con-
tributed to the levels of historic asbes-
Asbestos includes chrysotile, amosite,
tos exposure, are no more protective
crocidolite, tremolite asbestos,
than conditions of the current work-
anthophyllite asbestos, actinolite as-
place.
bestos, and any of these minerals that
Competent person means, in addition
has been chemically treated and/or al-
to the definition in 29 CFR 1926.32 (f),
tered. For purposes of this standard,
one who is capable of identifying exist-
asbestos includes PACM, as defined
ing asbestos hazards in the workplace
below.
and selecting the appropriate control
Asbestos-containing material (ACM),
strategy for asbestos exposure, who has
means any material containing more
the authority to take prompt correc-
than one percent asbestos.
tive measures to eliminate them, as
Assistant Secretary means the Assist- specified in 29 CFR 1926.32(f): in addi-
ant Secretary of Labor for Occupa- tion, for Class I and Class II work who
tional Safety and Health, U.S. Depart- is specially trained in a training course
ment of Labor, or designee. which meets the criteria of EPAs
Authorized person means any person Model Accreditation Plan (40 CFR part
authorized by the employer and re- 763) for supervisor, or its equivalent
quired by work duties to be present in and, for Class III and Class IV work,
regulated areas. who is trained in a manner consistent
Building/facility owner is the legal en- with EPA requirements for training of
tity, including a lessee, which exercises local education agency maintenance
control over management and record and custodial staff as set forth at 40
keeping functions relating to a build- CFR 763.92 (a)(2).
ing and/or facility in which activities Critical barrier means one or more
covered by this standard take place. layers of plastic sealed over all open-
Certified Industrial Hygienist (CIH) ings into a work area or any other
means one certified in the practice of similarly placed physical barrier suffi-
industrial hygiene by the American cient to prevent airborne asbestos in a
Board of Industrial Hygiene. work area from migrating to an adja-
Class I asbestos work means activities cent area.
involving the removal of TSI and sur- Decontamination area means an en-
facing ACM and PACM. closed area adjacent and connected to
Class II asbestos work means activities the regulated area and consisting of an
involving the removal of ACM which is equipment room, shower area, and
not thermal system insulation or sur- clean room, which is used for the de-
facing material. This includes, but is contamination of workers, materials,
not limited to, the removal of asbestos- and equipment that are contaminated
containing wallboard, floor tile and with asbestos.

522

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00532 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

Demolition means the wrecking or Modification for purposes of para-


taking out of any load-supporting graph (g)(6)(ii), means a changed or al-
structural member and any related tered procedure, material or compo-
razing, removing, or stripping of asbes- nent of a control system, which re-
tos products. places a procedure, material or compo-
Director means the Director, National nent of a required system. Omitting a
Institute for Occupational Safety and procedure or component, or reducing or
Health, U.S. Department of Health and diminishing the stringency or strength
Human Services, or designee. of a material or component of the con-
Disturbance means activities that dis- trol system is not a modification for
rupt the matrix of ACM or PACM, purposes of paragraph (g)(6) of this sec-
crumble or pulverize ACM or PACM, or tion.
generate visible debris from ACM or Negative Initial Exposure Assessment
PACM. In no event shall the amount of means a demonstration by the em-
ACM or PACM so disturbed exceed that ployer, which complies with the cri-
which can be contained in one glove teria in paragraph (f)(2)(iii) of this sec-
bag or waste bag which shall not ex- tion, that employee exposure during an
ceed 60 inches in length and width. operation is expected to be consist-
Employee exposure means that expo- ently below the PELs.
sure to airborne asbestos that would PACM means presumed asbestos
occur if the employee were not using containing material.
respiratory protective equipment. Presumed Asbestos Containing Material
Equipment room (change room) means means thermal system insulation and
a contaminated room located within surfacing material found in buildings
the decontamination area that is sup- constructed no later than 1980. The des-
plied with impermeable bags or con- ignation of a material as PACM may
tainers for the disposal of contami- be rebutted pursuant to paragraph
nated protective clothing and equip- (k)(5) of this section.
ment. Project Designer means a person who
Fiber means a particulate form of as- has successfully completed the train-
bestos, 5 micrometers or longer, with a ing requirements for an abatement
length-to-diameter ratio of at least 3 to project designer established by 40
1. U.S.C. 763.90(g).
Glovebag means not more than a 6060 Regulated area means: an area estab-
inch impervious plastic bag-like enclo- lished by the employer to demarcate
sure affixed around an asbestos-con- areas where Class I, II, and III asbestos
taining material, with glove-like ap- work is conducted, and any adjoining
pendages through which material and area where debris and waste from such
tools may be handled. asbestos work accumulate; and a work
High-efficiency particulate air (HEPA) area within which airborne concentra-
filter means a filter capable of trapping tions of asbestos, exceed or there is a
and retaining at least 99.97 percent of reasonable possibility they may exceed
all mono-dispersed particles of 0.3 mi- the permissible exposure limit. Re-
crometers in diameter. quirements for regulated areas are set
Homogeneous area means an area of out in paragraph (e) of this section.
surfacing material or thermal system Removal means all operations where
insulation that is uniform in color and ACM and/or PACM is taken out or
texture. stripped from structures or substrates,
Industrial hygienist means a profes- and includes demolition operations.
sional qualified by education, training, Renovation means the modifying of
and experience to anticipate, recog- any existing structure, or portion
nize, evaluate and develop controls for thereof.
occupational health hazards. Repair means overhauling, rebuild-
Intact means that the ACM has not ing, reconstructing, or reconditioning
crumbled, been pulverized, or otherwise of structures or substrates, including
deteriorated so that the asbestos is no encapsulation or other repair of ACM
longer likely to be bound with its ma- or PACM attached to structures or sub-
trix. strates.

523

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00533 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

Surfacing material means material (3) In addition, all employers of em-


that is sprayed, troweled-on or other- ployees exposed to asbestos hazards
wise applied to surfaces (such as acous- shall comply with applicable protective
tical plaster on ceilings and fire- provisions to protect their employees.
proofing materials on structural mem- For example, if employees working im-
bers, or other materials on surfaces for mediately adjacent to a Class I asbes-
acoustical, fireproofing, and other pur- tos job are exposed to asbestos due to
poses). the inadequate containment of such
Surfacing ACM means surfacing mate- job, their employer shall either remove
rial which contains more than 1% as- the employees from the area until the
bestos. enclosure breach is repaired; or per-
Thermal system insulation (TSI) means form an initial exposure assessment
ACM applied to pipes, fittings, boilers, pursuant to (f) of this section.
breeching, tanks, ducts or other struc- (4) All employers of employees work-
tural components to prevent heat loss ing adjacent to regulated areas estab-
or gain. lished by another employer on a multi-
Thermal system insulation ACM is employer work-site, shall take steps on
thermal system insulation which con- a daily basis to ascertain the integrity
tains more than 1% asbestos. of the enclosure and/or the effective-
ness of the control method relied on by
(c) Permissible exposure limits (PELS)
the primary asbestos contractor to as-
(1) Time-weighted average limit (TWA).
sure that asbestos fibers do not mi-
The employer shall ensure that no em-
grate to such adjacent areas.
ployee is exposed to an airborne con-
(5) All general contractors on a con-
centration of asbestos in excess of 0.1 struction project which includes work
fiber per cubic centimeter of air as an covered by this standard shall be
eight (8) hour time-weighted average deemed to exercise general supervisory
(TWA), as determined by the method authority over the work covered by
prescribed in appendix A to this sec- this standard, even though the general
tion, or by an equivalent method. contractor is not qualified to serve as
(2) Excursion limit. The employer shall the asbestos competent person as de-
ensure that no employee is exposed to fined by paragraph (b) of this section.
an airborne concentration of asbestos As supervisor of the entire project, the
in excess of 1.0 fiber per cubic centi- general contractor shall ascertain
meter of air (1 f/cc) as averaged over a whether the asbestos contractor is in
sampling period of thirty (30) minutes, compliance with this standard, and
as determined by the method pre- shall require such contractor to come
scribed in appendix A to this section, into compliance with this standard
or by an equivalent method. when necessary.
(d) Multi-employer worksites. (1) On (e) Regulated areas. (1) All Class I, II
multi-employer worksites, an employer and III asbestos work shall be con-
performing work requiring the estab- ducted within regulated areas. All
lishment of a regulated area shall in- other operations covered by this stand-
form other employers on the site of the ard shall be conducted within a regu-
nature of the employers work with as- lated area where airborne concentra-
bestos and/or PACM, of the existence of tions of asbestos exceed, or there is a
and requirements pertaining to regu- reasonable possibility they may exceed
lated areas, and the measures taken to a PEL. Regulated areas shall comply
ensure that employees of such other with the requirements of paragraphs
employers are not exposed to asbestos. (2), (3),(4) and (5) of this section.
(2) Asbestos hazards at a multi-em- (2) Demarcation. The regulated area
ployer work site shall be abated by the shall be demarcated in any manner
contractor who created or controls the that minimizes the number of persons
source of asbestos contamination. For within the area and protects persons
example, if there is a significant outside the area from exposure to air-
breach of an enclosure containing Class borne asbestos. Where critical barriers
I work, the employer responsible for or negative pressure enclosures are
erecting the enclosure shall repair the used, they may demarcate the regu-
breach immediately. lated area. Signs shall be provided and

524

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00534 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

displayed pursuant to the requirements workplace. The assessment must be


of paragraph (k)(7) of this section. completed in time to comply with re-
(3) Access. Access to regulated areas quirements which are triggered by ex-
shall be limited to authorized persons posure data or the lack of a negative
and to persons authorized by the Act or exposure assessment, and to provide
regulations issued pursuant thereto. information necessary to assure that
(4) Respirators. All persons entering a all control systems planned are appro-
regulated area where employees are re- priate for that operation and will work
quired pursuant to paragraph (h)(1) of properly.
this section to wear respirators shall (ii) Basis of Initial Exposure Assess-
be supplied with a respirator selected ment: Unless a negative exposure as-
in accordance with paragraph (h)(2) of sessment has been made pursuant to
this section. paragraph (f)(2)(iii) of this section, the
(5) Prohibited activities. The employer initial exposure assessment shall, if
shall ensure that employees do not eat, feasible, be based on monitoring con-
drink, smoke, chew tobacco or gum, or ducted pursuant to paragraph (f)(1)(iii)
apply cosmetics in the regulated area. of this section. The assessment shall
(6) Competent Persons. The employer take into consideration both the moni-
shall ensure that all asbestos work per- toring results and all observations, in-
formed within regulated areas is super- formation or calculations which indi-
vised by a competent person, as defined cate employee exposure to asbestos, in-
in paragraph (b) of this section. The cluding any previous monitoring con-
duties of the competent person are set ducted in the workplace, or of the oper-
out in paragraph (o) of this section. ations of the employer which indicate
(f) Exposure assessments and moni- the levels of airborne asbestos likely to
toring(1) General monitoring criteria. (i) be encountered on the job. For Class I
Each employer who has a workplace or asbestos work, until the employer con-
work operation where exposure moni- ducts exposure monitoring and docu-
toring is required under this section ments that employees on that job will
shall perform monitoring to determine not be exposed in excess of the PELs,
accurately the airborne concentrations or otherwise makes a negative expo-
of asbestos to which employees may be sure assessment pursuant to paragraph
exposed. (f)(2)(iii) of this section, the employer
(ii) Determinations of employee ex- shall presume that employees are ex-
posure shall be made from breathing posed in excess of the TWA and excur-
zone air samples that are representa- sion limit.
tive of the 8-hour TWA and 30-minute (iii) Negative Exposure Assessment:
short-term exposures of each employee. For any one specific asbestos job which
(iii) Representative 8-hour TWA em- will be performed by employees who
ployee exposure shall be determined on have been trained in compliance with
the basis of one or more samples rep- the standard, the employer may dem-
resenting full-shift exposure for em- onstrate that employee exposures will
ployees in each work area. Representa- be below the PELs by data which con-
tive 30-minute short-term employee ex- form to the following criteria;
posures shall be determined on the (A) Objective data demonstrating
basis of one or more samples rep- that the product or material con-
resenting 30 minute exposures associ- taining asbestos minerals or the activ-
ated with operations that are most ity involving such product or material
likely to produce exposures above the cannot release airborne fibers in con-
excursion limit for employees in each centrations exceeding the TWA and ex-
work area. cursion limit under those work condi-
(2) Initial Exposure Assessment. (i) tions having the greatest potential for
Each employer who has a workplace or releasing asbestos; or
work operation covered by this stand- (B) Where the employer has mon-
ard shall ensure that a competent per- itored prior asbestos jobs for the PEL
son conducts an exposure assessment and the excursion limit within 12
immediately before or at the initiation months of the current or projected job,
of the operation to ascertain expected the monitoring and analysis were per-
exposures during that operation or formed in compliance with the asbestos

525

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00535 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

standard in effect; and the data were (4) Termination of monitoring. (i) If the
obtained during work operations con- periodic monitoring required by para-
ducted under workplace conditions graph (f)(3) of this section reveals that
closely resembling the processes, employee exposures, as indicated by
type of material, control methods, statistically reliable measurements,
work practices, and environmental are below the permissible exposure
conditions used and prevailing in the limit and excursion limit the employer
employers current operations, the op- may discontinue monitoring for those
erations were conducted by employees employees whose exposures are rep-
whose training and experience are no resented by such monitoring.
more extensive than that of employees (ii) Additional monitoring. Notwith-
performing the current job, and these standing the provisions of paragraph (f)
data show that under the conditions (2) and (3), and (f)(4) of this section, the
prevailing and which will prevail in the employer shall institute the exposure
current workplace there is a high de- monitoring required under paragraph
gree of certainty that employee expo- (f)(3) of this section whenever there has
sures will not exceed the TWA and ex- been a change in process, control
cursion limit; or equipment, personnel or work practices
(C) The results of initial exposure that may result in new or additional
monitoring of the current job made exposures above the permissible expo-
from breathing zone air samples that sure limit and/or excursion limit or
are representative of the 8-hour TWA when the employer has any reason to
and 30-minute short-term exposures of suspect that a change may result in
each employee covering operations new or additional exposures above the
which are most likely during the per- permissible exposure limit and/or ex-
formance of the entire asbestos job to cursion limit. Such additional moni-
result in exposures over the PELs. toring is required regardless of whether
(3) Periodic monitoring(i) Class I and a negative exposure assessment was
II operations. The employer shall con- previously produced for a specific job.
duct daily monitoring that is rep- (5) Employee notification of monitoring
resentative of the exposure of each em- results. The employer must, as soon as
ployee who is assigned to work within possible but no later than 5 working
a regulated area who is performing days after the receipt of the results of
Class I or II work, unless the employer any monitoring performed under this
pursuant to (f)(2)(iii) of this section, section, notify each affected employee
has made a negative exposure assess- of these results either individually in
ment for the entire operation. writing or by posting the results in an
(ii) All operations under the standard appropriate location that is accessible
other than Class I and II operations. to employees.
The employer shall conduct periodic (6) Observation of monitoring. (i) The
monitoring of all work where exposures employer shall provide affected em-
are expected to exceed a PEL, at inter- ployees and their designated represent-
vals sufficient to document the valid- atives an opportunity to observe any
ity of the exposure prediction. monitoring of employee exposure to as-
(iii) Exception: When all employees bestos conducted in accordance with
required to be monitored daily are this section.
equipped with supplied-air respirators (ii) When observation of the moni-
operated in the pressure demand mode, toring of employee exposure to asbes-
or other positive pressure mode res- tos requires entry into an area where
pirator, the employer may dispense the use of protective clothing or equip-
with the daily monitoring required by ment is required, the observer shall be
this paragraph. However, employees provided with and be required to use
performing Class I work using a con- such clothing and equipment and shall
trol method which is not listed in para- comply with all other applicable safety
graph (g)(4) (i), (ii), or (iii) of this sec- and health procedures.
tion or using a modification of a listed (g) Methods of compliance. (1) Engi-
control method, shall continue to be neering controls and work practices for
monitored daily even if they are all operations covered by this section.
equipped with supplied-air respirators. The employer shall use the following

526

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00536 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

engineering controls and work prac- with the requirements of paragraph (h)
tices in all operations covered by this of this section.
section, regardless of the levels of ex- (3) Prohibitions. The following work
posure: practices and engineering controls
(i) Vacuum cleaners equipped with shall not be used for work related to
HEPA filters to collect all debris and asbestos or for work which disturbs
dust containing ACM and PACM, ex- ACM or PACM, regardless of measured
cept as provided in paragraph (g)(8)(ii) levels of asbestos exposure or the re-
of this section in the case of roofing sults of initial exposure assessments:
material. (i) High-speed abrasive disc saws that
(ii) Wet methods, or wetting agents, are not equipped with point of cut ven-
to control employee exposures during tilator or enclosures with HEPA fil-
asbestos handling, mixing, removal, tered exhaust air.
cutting, application, and cleanup, ex- (ii) Compressed air used to remove
cept where employers demonstrate asbestos, or materials containing as-
that the use of wet methods is infeasi- bestos, unless the compressed air is
ble due to for example, the creation of used in conjunction with an enclosed
electrical hazards, equipment malfunc- ventilation system designed to capture
tion, and, in roofing, except as provided the dust cloud created by the com-
in paragraph (g)(8)(ii) of this section; pressed air.
and (iii) Dry sweeping, shoveling or other
dry clean-up of dust and debris con-
(iii) Prompt clean-up and disposal of
taining ACM and PACM.
wastes and debris contaminated with
(iv) Employee rotation as a means of
asbestos in leak-tight containers ex-
reducing employee exposure to asbes-
cept in roofing operations, where the
tos.
procedures specified in paragraph
(4) Class I Requirements. In addition to
(g)(8)(ii) of this section apply.
the provisions of paragraphs (g) (1) and
(2) In addition to the requirements of
(2) of this section, the following engi-
paragraph (g)(1) of this section, the em-
neering controls and work practices
ployer shall use the following control
and procedures shall be used.
methods to achieve compliance with
(i) All Class I work, including the in-
the TWA permissible exposure limit
stallation and operation of the control
and excursion limit prescribed by para-
system shall be supervised by a com-
graph (c) of this section;
petent person as defined in paragraph
(i) Local exhaust ventilation (b) of this section;
equipped with HEPA filter dust collec- (ii) For all Class I jobs involving the
tion systems; removal of more than 25 linear or 10
(ii) Enclosure or isolation of proc- square feet of thermal system insula-
esses producing asbestos dust; tion or surfacing material; for all other
(iii) Ventilation of the regulated area Class I jobs, where the employer can-
to move contaminated air away from not produce a negative exposure assess-
the breathing zone of employees and ment pursuant to paragraph (f)(2)(iii)
toward a filtration or collection device of this section, or where employees are
equipped with a HEPA filter; working in areas adjacent to the regu-
(iv) Use of other work practices and lated area, while the Class I work is
engineering controls that the Assistant being performed, the employer shall
Secretary can show to be feasible. use one of the following methods to en-
(v) Wherever the feasible engineering sure that airborne asbestos does not
and work practice controls described migrate from the regulated area:
above are not sufficient to reduce em- (A) Critical barriers shall be placed
ployee exposure to or below the permis- over all the openings to the regulated
sible exposure limit and/or excursion area, except where activities are per-
limit prescribed in paragraph (c) of this formed outdoors; or
section, the employer shall use them to (B) The employer shall use another
reduce employee exposure to the lowest barrier or isolation method which pre-
levels attainable by these controls and vents the migration of airborne asbes-
shall supplement them by the use of tos from the regulated area, as verified
respiratory protection that complies by perimeter area surveillance during

527

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00537 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

each work shift at each boundary of (2) At least 4 air changes per hour
the regulated area, showing no visible shall be maintained in the NPE,
asbestos dust; and perimeter area mon- (3) A minimum of 0.02 column
itoring showing that clearance levels inches of water pressure differential,
contained in 40 CFR part 763, subpt. E, relative to outside pressure, shall be
of the EPA Asbestos in Schools Rule maintained within the NPE as evi-
are met, or that perimeter area levels, denced by manometric measurements,
measured by Phase Contrast Micros- (4) The NPE shall be kept under neg-
copy (PCM) are no more than back- ative pressure throughout the period of
ground levels representing the same its use, and
area before the asbestos work began. (5) Air movement shall be directed
The results of such monitoring shall be away from employees performing as-
made known to the employer no later bestos work within the enclosure, and
than 24 hours from the end of the work toward a HEPA filtration or a collec-
shift represented by such monitoring. tion device.
Exception: For work completed out- (B) Work Practices:
doors where employees are not working (1) Before beginning work within the
in areas adjacent to the regulated enclosure and at the beginning of each
areas, this paragraph (g)(4)(ii) is satis- shift, the NPE shall be inspected for
fied when the specific control methods breaches and smoke-tested for leaks,
in paragraph (g)(5) of this section are and any leaks sealed.
used. (2) Electrical circuits in the enclo-
(iii) For all Class I jobs, HVAC sys- sure shall be deactivated, unless
tems shall be isolated in the regulated equipped with ground-fault circuit in-
area by sealing with a double layer of terrupters.
6 mil plastic or the equivalent; (ii) Glove bag systems may be used to
(iv) For all Class I jobs, impermeable remove PACM and/or ACM from
dropcloths shall be placed on surfaces straight runs of piping and elbows and
beneath all removal activity; other connections with the following
(v) For all Class I jobs, all objects specifications and work practices:
within the regulated area shall be cov- (A) Specifications:
ered with impermeable dropcloths or (1) Glovebags shall be made of 6 mil
plastic sheeting which is secured by thick plastic and shall be seamless at
duct tape or an equivalent. the bottom.
(vi) For all Class I jobs where the em- (2) Glovebags used on elbows and
ployer cannot produce a negative expo- other connections must be designed for
sure assessment, or where exposure that purpose and used without modi-
monitoring shows that a PEL is ex- fications.
ceeded, the employer shall ventilate (B) Work Practices:
the regulated area to move contami- (1) Each glovebag shall be installed
nated air away from the breathing zone so that it completely covers the cir-
of employees toward a HEPA filtration cumference of pipe or other structure
or collection device. where the work is to be done.
(5) Specific control methods for Class I (2) Glovebags shall be smoke-tested
work. In addition, Class I asbestos work for leaks and any leaks sealed prior to
shall be performed using one or more of use.
the following control methods pursu- (3) Glovebags may be used only once
ant to the limitations stated below: and may not be moved.
(i) Negative Pressure Enclosure (4) Glovebags shall not be used on
(NPE) systems: NPE systems may be surfaces whose temperature exceeds 150
used where the configuration of the F.
work area does not make the erection (5) Prior to disposal, glovebags shall
of the enclosure infeasible, with the be collapsed by removing air within
following specifications and work prac- them using a HEPA vacuum.
tices. (6) Before beginning the operation,
(A) Specifications: loose and friable material adjacent to
(1) The negative pressure enclosure the glovebag/box operation shall be
(NPE) may be of any configuration, wrapped and sealed in two layers of six

528

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00538 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

mil plastic or otherwise rendered in- (5) An aperture at the base of the box
tact, shall serve as a bagging outlet for
(7) Where system uses attached waste waste ACM and water:
bag, such bag shall be connected to col- (6) A back-up generator shall be
lection bag using hose or other mate- present on site:
rial which shall withstand pressure of (7) Waste bags shall consist of 6 mil
ACM waste and water without losing thick plastic double-bagged before they
its integrity: are filled or plastic thicker than 6 mil.
(8) Sliding valve or other device shall (B) Work practices:
separate waste bag from hose to ensure (1) At least two persons shall perform
no exposure when waste bag is discon- the removal:
nected: (2) The box shall be smoke-tested for
(9) At least two persons shall perform leaks and any leaks sealed prior to
Class I glovebag removal operations. each use.
(iii) Negative Pressure Glove Bag Sys- (3) Loose or damaged ACM adjacent
tems. Negative pressure glove bag sys- to the box shall be wrapped and sealed
tems may be used to remove ACM or in two layers of 6 mil plastic prior to
PACM from piping. the job, or otherwise made intact prior
(A) Specifications: In addition to spec- to the job.
ifications for glove bag systems above, (4) A HEPA filtration system shall be
negative pressure glove bag systems used to maintain pressure barrier in
shall attach HEPA vacuum systems or box.
other devices to bag to prevent collapse (v) Water Spray Process System. A
during removal. water spray process system may be
(B) Work Practices: (1) The employer used for removal of ACM and PACM
shall comply with the work practices from cold line piping if, employees car-
for glove bag systems in paragraph rying out such process have completed
(g)(5)(ii)(B)(4) of this section. a 40-hour separate training course in
(2) The HEPA vacuum cleaner or its use, in addition to training required
other device used to prevent collapse of for employees performing Class I work.
bag during removal shall run contin- The system shall meet the following
ually during the operation until it is specifications and shall be performed
completed at which time the bag shall by employees using the following work
be collapsed prior to removal of the practices.
bag from the pipe. (A) Specifications:
(3) Where a separate waste bag is (1) Piping shall be surrounded on 3
used along with a collection bag and sides by rigid framing,
discarded after one use, the collection (2) A 360 degree water spray, deliv-
bag may be reused if rinsed clean with ered through nozzles supplied by a high
amended water before reuse. pressure separate water line, shall be
(iv) Negative Pressure Glove Box formed around the piping.
Systems: Negative pressure glove boxes (3) The spray shall collide to form a
may be used to remove ACM or PACM fine aerosol which provides a liquid
from pipe runs with the following spec- barrier between workers and the ACM
ifications and work practices. and PACM.
(A) Specifications: (B) Work Practices:
(1) Glove boxes shall be constructed (1) The system shall be run for at
with rigid sides and made from metal least 10 minutes before removal begins.
or other material which can withstand (2) All removal shall take place with-
the weight of the ACM and PACM and in the water barrier.
water used during removal: (3) The system shall be operated by
(2) A negative pressure generator at least three persons, one of whom
shall be used to create negative pres- shall not perform removal, but shall
sure in the system: check equipment, and ensure proper
(3) An air filtration unit shall be at- operation of the system.
tached to the box: (4) After removal, the ACM and
(4) The box shall be fitted with gloved PACM shall be bagged while still inside
apertures: the water barrier.

529

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00539 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

(vi) A small walk-in enclosure which criteria in paragraph (g)(4)(ii)(B) of


accommodates no more than two per- this section.
sons (mini-enclosure) may be used if (A) Where the TSI or surfacing mate-
the disturbance or removal can be com- rial to be removed is 25 linear or 10
pletely contained by the enclosure with square feet or less , the evaluation re-
the following specifications and work quired in paragraph (g)(6) of this sec-
practices. tion may be performed by a com-
(A) Specifications: petent person, and may omit consid-
(1) The fabricated or job-made enclo- eration of perimeter or clearance moni-
sure shall be constructed of 6 mil plas- toring otherwise required.
tic or equivalent: (B) The evaluation of employee expo-
(2) The enclosure shall be placed sure required in paragraph (g)(6) of this
under negative pressure by means of a section, shall include and be based on
HEPA filtered vacuum or similar ven- sampling and analytical data rep-
tilation unit: resenting employee exposure during
(B) Work practices: the use of such method under worst-
(1) Before use, the mini-enclosure case conditions and by employees
shall be inspected for leaks and smoke- whose training and experience are
tested to detect breaches, and any equivalent to employees who are to
breaches sealed. perform the current job.
(2) Before reuse, the interior shall be (7) Work Practices and Engineering
completely washed with amended Controls for Class II work.
water and HEPA-vacuumed. (i) All Class II work shall be super-
(3) During use, air movement shall be vised by a competent person as defined
directed away from the employees in paragraph (b) of this section.
breathing zone within the mini-enclo- (ii) For all indoor Class II jobs, where
sure. the employer has not produced a nega-
(6) Alternative control methods for Class tive exposure assessment pursuant to
I work. Class I work may be performed paragraph (f)(2)(iii) of this section, or
using a control method which is not where during the job, changed condi-
referenced in paragraph (g)(5) of this tions indicate there may be exposure
section, or which modifies a control above the PEL or where the employer
method referenced in paragraph (g)(5)of does not remove the ACM in a substan-
this section, if the following provisions tially intact state, the employer shall
are complied with: use one of the following methods to en-
(i) The control method shall enclose, sure that airborne asbestos does not
contain or isolate the processes or migrate from the regulated area;
source of airborne asbestos dust, or (A) Critical barriers shall be placed
otherwise capture or redirect such dust over all openings to the regulated area;
before it enters the breathing zone of or,
employees. (B) The employer shall use another
(ii) A certified industrial hygienist or barrier or isolation method which pre-
licensed professional engineer who is vents the migration of airborne asbes-
also qualified as a project designer as tos from the regulated area, as verified
defined in paragraph (b) of this section, by perimeter area monitoring or clear-
shall evaluate the work area, the pro- ance monitoring which meets the cri-
jected work practices and the engineer- teria set out in paragraph (g)(4)(ii)(B)
ing controls and shall certify in writ- of this section.
ing that the planned control method is (C) Impermeable dropcloths shall be
adequate to reduce direct and indirect placed on surfaces beneath all removal
employee exposure to below the PELs activity;
under worst-case conditions of use, and (iii) [Reserved]
that the planned control method will (iv) All Class II asbestos work shall
prevent asbestos contamination out- be performed using the work practices
side the regulated area, as measured by and requirements set out above in
clearance sampling which meets the re- paragraph (g)(1) (i) through (g)(1)(iii) of
quirements of EPAs Asbestos in this section.
Schools rule issued under AHERA, or (8) Additional Controls for Class II
perimeter monitoring which meets the work. Class II asbestos work shall also

530

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00540 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

be performed by complying with the shall ensure that the following work
work practices and controls designated practices are followed:
for each type of asbestos work to be (A) Roofing material shall be re-
performed, set out in this paragraph. moved in an intact state to the extent
Where more than one control method feasible.
may be used for a type of asbestos (B) Wet methods shall be used to re-
work, the employer may choose one or move roofing materials that are not in-
a combination of designated control tact, or that will be rendered not in-
methods. Class II work also may be tact during removal, unless such wet
performed using a method allowed for methods are not feasible or will create
Class I work, except that glove bags safety hazards.
and glove boxes are allowed if they (C) Cutting machines shall be con-
fully enclose the Class II material to be tinuously misted during use, unless a
removed. competent person determines that
(i) For removing vinyl and asphalt misting substantially decreases worker
flooring materials which contain ACM safety.
or for which in buildings constructed (D) When removing built-up roofs
no later than 1980, the employer has with asbestos-containing roofing felts
not verified the absence of ACM pursu- and an aggregate surface using a power
ant to paragraph (g)(8)(i)(I) of this sec- roof cutter, all dust resulting from the
tion. The employer shall ensure that cutting operation shall be collected by
employees comply with the following a HEPA dust collector, or shall be
work practices and that employees are HEPA vacuumed by vacuuming along
trained in these practices pursuant to the cut line. When removing built-up
paragraph (k)(9): roofs with asbestos-containing roofing
(A) Flooring or its backing shall not felts and a smooth surface using a
be sanded. power roof cutter, the dust resulting
(B) Vacuums equipped with HEPA fil- from the cutting operation shall be col-
ter, disposable dust bag, and metal lected either by a HEPA dust collector
floor tool (no brush) shall be used to or HEPA vacuuming along the cut line,
clean floors. or by gently sweeping and then care-
(C) Resilient sheeting shall be re- fully and completely wiping up the
moved by cutting with wetting of the still-wet dust and debris left along the
snip point and wetting during cut line. The dust and debris shall be
delamination. Rip-up of resilient sheet immediately bagged or placed in cov-
floor material is prohibited. ered containers.
(D) All scraping of residual adhesive (E) Asbestos-containing material
and/or backing shall be performed that has been removed from a roof
using wet methods. shall not be dropped or thrown to the
(E) Dry sweeping is prohibited. ground. Unless the material is carried
(F) Mechanical chipping is prohibited or passed to the ground by hand, it
unless performed in a negative pressure shall be lowered to the ground via cov-
enclosure which meets the require- ered, dust-tight chute, crane or hoist:
ments of paragraph (g)(5)(i) of this sec- (1) Any ACM that is not intact shall
tion. be lowered to the ground as soon as is
(G) Tiles shall be removed intact, un- practicable, but in any event no later
less the employer demonstrates that than the end of the work shift. While
intact removal is not possible. the material remains on the roof it
(H) When tiles are heated and can be shall either be kept wet, placed in an
removed intact, wetting may be omit- impermeable waste bag, or wrapped in
ted. plastic sheeting.
(I) Resilient flooring material includ- (2) Intact ACM shall be lowered to
ing associated mastic and backing the ground as soon as is practicable,
shall be assumed to be asbestos-con- but in any event no later than the end
taining unless an industrial hygienist of the work shift.
determines that it is asbestos-free (F) Upon being lowered, unwrapped
using recognized analytical techniques. material shall be transferred to a
(ii) For removing roofing material closed receptacle in such manner so as
which contains ACM the employer to preclude the dispersion of dust.

531

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00541 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

(G) Roof level heating and ventila- (v) When performing any other Class
tion air intake sources shall be isolated II removal of asbestos containing ma-
or the ventilation system shall be shut terial for which specific controls have
down. not been listed in paragraph (g)(8)(iv)
(H) Notwithstanding any other provi- (A) through (D) of this section, the em-
sion of this section, removal or repair ployer shall ensure that the following
of sections of intact roofing less than work practices are complied with.
25 square feet in area does not require (A) The material shall be thoroughly
use of wet methods or HEPA wetted with amended water prior to
vacuuming as long as manual methods and during its removal.
which do not render the material non- (B) The material shall be removed in
intact are used to remove the material an intact state unless the employer
and no visible dust is created by the re- demonstrates that intact removal is
moval method used. In determining not possible.
whether a job involves less than 25 (C) Cutting, abrading or breaking the
square feet, the employer shall include material shall be prohibited unless the
all removal and repair work performed employer can demonstrate that meth-
on the same roof on the same day. ods less likely to result in asbestos
(iii) When removing cementitious as- fiber release are not feasible.
bestos-containing siding and shingles (D) Asbestos-containing material re-
or transite panels containing ACM on moved, shall be immediately bagged or
building exteriors (other than roofs, wrapped, or kept wetted until trans-
where paragraph (g)(8)(ii) of this sec- ferred to a closed receptacle, no later
tion applies) the employer shall ensure than the end of the work shift.
that the following work practices are (vi) Alternative Work Practices and
followed: Controls. Instead of the work practices
(A) Cutting, abrading or breaking and controls listed in paragraph (g)(8)
siding, shingles, or transite panels, (i) through (v) of this section, the em-
shall be prohibited unless the employer ployer may use different or modified
can demonstrate that methods less engineering and work practice controls
likely to result in asbestos fiber re- if the following provisions are complied
lease cannot be used. with.
(B) Each panel or shingle shall be (A) The employer shall demonstrate
sprayed with amended water prior to by data representing employee expo-
removal. sure during the use of such method
(C) Unwrapped or unbagged panels or under conditions which closely resem-
shingles shall be immediately lowered ble the conditions under which the
to the ground via covered dust-tight method is to be used, that employee ex-
chute, crane or hoist, or placed in an posure will not exceed the PELs under
impervious waste bag or wrapped in any anticipated circumstances.
plastic sheeting and lowered to the (B) A competent person shall evalu-
ground no later than the end of the ate the work area, the projected work
work shift. practices and the engineering controls,
(D) Nails shall be cut with flat, sharp and shall certify in writing, that the
instruments. different or modified controls are ade-
(iv) When removing gaskets con- quate to reduce direct and indirect em-
taining ACM, the employer shall en- ployee exposure to below the PELs
sure that the following work practices under all expected conditions of use
are followed: and that the method meets the require-
(A) If a gasket is visibly deteriorated ments of this standard. The evaluation
and unlikely to be removed intact, re- shall include and be based on data rep-
moval shall be undertaken within a resenting employee exposure during
glovebag as described in paragraph the use of such method under condi-
(g)(5)(ii) of this section. tions which closely resemble the condi-
(B) [Reserved] tions under which the method is to be
(C) The gasket shall be immediately used for the current job, and by em-
placed in a disposal container. ployees whose training and experience
(D) Any scraping to remove residue are equivalent to employees who are to
must be performed wet. perform the current job.

532

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00542 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

(9) Work Practices and Engineering (ii) Employers of employees who


Controls for Class III asbestos work. Class clean up waste and debris in, and em-
III asbestos work shall be conducted ployers in control of, areas where fri-
using engineering and work practice able thermal system insulation or sur-
controls which minimize the exposure facing material is accessible, shall as-
to employees performing the asbestos sume that such waste and debris con-
work and to bystander employees. tain asbestos.
(i) The work shall be performed using (11) Alternative methods of compliance
wet methods. for installation, removal, repair, and
(ii) To the extent feasible, the work maintenance of certain roofing and pipe-
shall be performed using local exhaust line coating materials. Notwithstanding
ventilation. any other provision of this section, an
(iii) Where the disturbance involves
employer who complies with all provi-
drilling, cutting, abrading, sanding,
sions of this paragraph (g)(11) when in-
chipping, breaking, or sawing of ther-
stalling, removing, repairing, or main-
mal system insulation or surfacing ma-
taining intact pipeline asphaltic wrap,
terial, the employer shall use imper-
meable dropcloths, and shall isolate or roof flashings which contain asbes-
the operation using mini-enclosures or tos fibers encapsulated or coated by bi-
glove bag systems pursuant to para- tuminous or resinous compounds shall
graph (g)(5) of this section or another be deemed to be in compliance with
isolation method. this section. If an employer does not
(iv) Where the employer does not comply with all provisions of this para-
produce a negative exposure assess- graph (g)(11) or if during the course of
ment for a job, or where monitoring the job the material does not remain
results show the PEL has been exceed- intact, the provisions of paragraph
ed, the employer shall contain the area (g)(8) of this section apply instead of
using impermeable dropcloths and this paragraph (g)(11).
plastic barriers or their equivalent, or (i) Before work begins and as needed
shall isolate the operation using a con- during the job, a competent person who
trol system listed in and in compliance is capable of identifying asbestos haz-
with paragraph (g)(5) of this section. ards in the workplace and selecting the
(v) Employees performing Class III appropriate control strategy for asbes-
jobs, which involve the disturbance of tos exposure, and who has the author-
thermal system insulation or surfacing ity to take prompt corrective measures
material, or where the employer does to eliminate such hazards, shall con-
not produce a negative exposure as- duct an inspection of the worksite and
sessment or where monitoring results determine that the roofing material is
show a PEL has been exceeded, shall intact and will likely remain intact.
wear respirators which are selected, (ii) All employees performing work
used and fitted pursuant to provisions
covered by this paragraph (g)(11) shall
of paragraph (h) of this section.
be trained in a training program that
(10) Class IV asbestos work. Class IV
meets the requirements of paragraph
asbestos jobs shall be conducted by em-
ployees trained pursuant to the asbes- (k)(9)(viii) of this section.
tos awareness training program set out (iii) The material shall not be sand-
in paragraph (k)(9) of this section. In ed, abraded, or ground. Manual meth-
addition, all Class IV jobs shall be con- ods which do not render the material
ducted in conformity with the require- non-intact shall be used.
ments set out in paragraph (g)(1) of (iv) Material that has been removed
this section, mandating wet methods, from a roof shall not be dropped or
HEPA vacuums, and prompt clean up thrown to the ground. Unless the mate-
of debris containing ACM or PACM. rial is carried or passed to the ground
(i) Employees cleaning up debris and by hand, it shall be lowered to the
waste in a regulated area where res- ground via covered, dust-tight chute,
pirators are required shall wear res- crane or hoist. All such material shall
pirators which are selected, used and be removed from the roof as soon as is
fitted pursuant to provisions of para- practicable, but in any event no later
graph (h) of this section. than the end of the work shift.

533

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00543 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

(v) Where roofing products which ployees will be impaired by the em-
have been labeled as containing asbes- ployees respirator use. Such employ-
tos pursuant to paragraph (k)(8) of this ees must be assigned to another job or
section are installed on non-residential given the opportunity to transfer to a
roofs during operations covered by this different position that they can per-
paragraph (g)(11), the employer shall form. If such a transfer position is
notify the building owner of the pres- available, it must be with the same em-
ence and location of such materials no ployer, in the same geographical area,
later than the end of the job. and with the same seniority, status,
(vi) All removal or disturbance of rate of pay, and other job benefits the
pipeline asphaltic wrap shall be per- employee had just prior to such trans-
formed using wet methods. fer.
(h) Respiratory protection(1) General. (3) Respirator selection. (i) Employers
For employees who use respirators re- must:
quired by this section, the employer (A) Select, and provide to employees,
must provide each employee an appro- the appropriate respirators specified in
priate respirator that complies with paragraph (d)(3)(i)(A) of 29 CFR
the requirements of this paragraph. 1910.134; however, employers must not
Respirators must be used during: select or use filtering facepiece res-
(i) Class I asbestos work. pirators for use against asbestos fibers.
(ii) Class II asbestos work when ACM (B) Provide HEPA filters for powered
is not removed in a substantially in- and non-powered air-purifying res-
tact state. pirators.
(iii) Class II and III asbestos work (ii) Employers must provide an em-
that is not performed using wet meth- ployee with tight-fitting, powered air-
ods, except for removal of ACM from purifying respirator (PAPR) instead of
sloped roofs when a negative-exposure a negative pressure respirator selected
assessment has been conducted and according to paragraph (h)(3)(i)(A) of
ACM is removed in an intact state. this standard when the employee
(iv) Class II and III asbestos work for chooses to use a PAPR and it provides
which a negative-exposure assessment adequate protection to the employee.
has not been conducted. (iii) Employers must provide employ-
(v) Class III asbestos work when TSI ees with an air-purifying half mask res-
or surfacing ACM or PACM is being pirator, other than a filtering facepiece
disturbed. respirator, whenever the employees
(vi) Class IV asbestos work performed perform:
within regulated areas where employ- (A) Class II or Class III asbestos work
ees who are performing other work are for which no negative exposure assess-
required to use respirators. ment is available.
(vii) Work operations covered by this (B) Class III asbestos work involving
section for which employees are ex- disturbance of TSI or surfacing ACM or
posed above the TWA or excursion PACM.
limit. (iv) Employers must provide employ-
(viii) Emergencies. ees with:
(2) Respirator program. (i) The em- (A) A tight-fitting powered air-puri-
ployer must implement a respiratory fying respirator or a full facepiece, sup-
protection program in accordance with plied-air respirator operated in the
1910.134 (b) through (d) (except pressure-demand mode and equipped
(d)(1)(iii)), and (f) through (m), which with either HEPA egress cartridges or
covers each employee required by this an auxiliary positive-pressure, self-con-
section to use a respirator. tained breathing apparatus (SCBA)
(ii) No employee shall be assigned to whenever the employees are in a regu-
asbestos work that requires respirator lated area performing Class I asbestos
use if, based on their most recent med- work for which a negative exposure as-
ical examination, the examining physi- sessment is not available and the expo-
cian determines that the employee will sure assessment indicates that the ex-
be unable to function normally while posure level will be at or below 1 f/cc as
using a respirator, or that the safety or an 8-hour time-weighted average
health of the employee or other em- (TWA).

534

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00544 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

(B) A full facepiece supplied-air res- (j) Hygiene facilities and practices for
pirator operated in the pressure-de- employees. (1) Requirements for employ-
mand mode and equipped with an auxil- ees performing Class I asbestos jobs in-
iary positive-pressure SCBA whenever volving over 25 linear or 10 square feet
the employees are in a regulated area of TSI or surfacing ACM and PACM.
performing Class I asbestos work for (i) Decontamination areas. The em-
which a negative exposure assessment ployer shall establish a decontamina-
is not available and the exposure as- tion area that is adjacent and con-
sessment indicates that the exposure nected to the regulated area for the de-
level will be above 1 f/cc as an 8-hour contamination of such employees. The
TWA. decontamination area shall consist of
(i) Protective clothing(1) General. The an equipment room, shower area, and
employer shall provide or require the clean room in series. The employer
use of protective clothing, such as cov- shall ensure that employees enter and
eralls or similar whole-body clothing, exit the regulated area through the de-
head coverings, gloves, and foot cov- contamination area.
erings for any employee exposed to air- (A) Equipment room. The equipment
borne concentrations of asbestos that room shall be supplied with imper-
exceed the TWA and/or excursion limit meable, labeled bags and containers for
prescribed in paragraph (c) of this sec- the containment and disposal of con-
tion, or for which a required negative taminated protective equipment.
exposure assessment is not produced, (B) Shower area. Shower facilities
or for any employee performing Class I shall be provided which comply with 29
operations which involve the removal CFR 1910.141(d)(3), unless the employer
of over 25 linear or 10 square feet of TSI can demonstrate that they are not fea-
or surfacing ACM and PACM. sible. The showers shall be adjacent
(2) Laundering. (i) The employer shall both to the equipment room and the
clean room, unless the employer can
ensure that laundering of contami-
demonstrate that this location is not
nated clothing is done so as to prevent
feasible. Where the employer can dem-
the release of airborne asbestos in ex-
onstrate that it is not feasible to lo-
cess of the TWA or excursion limit pre-
cate the shower between the equipment
scribed in paragraph (c) of this section.
room and the clean room, or where the
(ii) Any employer who gives contami- work is performed outdoors, the em-
nated clothing to another person for ployers shall ensure that employees:
laundering shall inform such person of (1) Remove asbestos contamination
the requirement in paragraph (i)(2)(i) from their worksuits in the equipment
of this section to effectively prevent room using a HEPA vacuum before pro-
the release of airborne asbestos in ex- ceeding to a shower that is not adja-
cess of the TWA and excursion limit cent to the work area; or
prescribed in paragraph (c) of this sec- (2) Remove their contaminated
tion. worksuits in the equipment room, then
(3) Contaminated clothing. Contami- don clean worksuits, and proceed to a
nated clothing shall be transported in shower that is not adjacent to the work
sealed impermeable bags, or other area.
closed, impermeable containers, and be (C) Clean change room. The clean
labeled in accordance with paragraph room shall be equipped with a locker or
(k) of this section. appropriate storage container for each
(4) Inspection of protective clothing. (i) employees use. When the employer can
The competent person shall examine demonstrate that it is not feasible to
worksuits worn by employees at least provide a clean change area adjacent to
once per workshift for rips or tears the work area or where the work is per-
that may occur during performance of formed outdoors, the employer may
work. permit employees engaged in Class I
(ii) When rips or tears are detected asbestos jobs to clean their protective
while an employee is working, rips and clothing with a portable HEPA-
tears shall be immediately mended, or equipped vacuum before such employ-
the worksuit shall be immediately re- ees leave the regulated area. Following
placed. showering, such employees however

535

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00545 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

must then change into street clothing on the floor or horizontal working sur-
in clean change areas provided by the face.
employer which otherwise meet the re- (ii) The area must be of sufficient
quirements of this section. size as to accommodate cleaning of
(ii) Decontamination area entry proce- equipment and removing personal pro-
dures. The employer shall ensure that tective equipment without spreading
employees: contamination beyond the area (as de-
(A) Enter the decontamination area termined by visible accumulations).
through the clean room; (iii) Work clothing must be cleaned
(B) Remove and deposit street cloth- with a HEPA vacuum before it is re-
ing within a locker provided for their moved.
use; and (iv) All equipment and surfaces of
(C) Put on protective clothing and containers filled with ACM must be
respiratory protection before leaving cleaned prior to removing them from
the clean room. the equipment room or area.
(D) Before entering the regulated (v) The employer shall ensure that
area, the employer shall ensure that employees enter and exit the regulated
employees pass through the equipment area through the equipment room or
room. area.
(iii) Decontamination area exit proce- (3) Requirements for Class IV work.
dures. The employer shall ensure that: Employers shall ensure that employees
(A) Before leaving the regulated area, performing Class IV work within a reg-
employees shall remove all gross con- ulated area comply with the hygiene
tamination and debris from their pro- practice required of employees per-
tective clothing. forming work which has a higher clas-
(B) Employees shall remove their sification within that regulated area.
protective clothing in the equipment Otherwise employers of employees
room and deposit the clothing in la- cleaning up debris and material which
beled impermeable bags or containers. is TSI or surfacing ACM or identified
(C) Employees shall not remove their as PACM shall provide decontamina-
respirators in the equipment room. tion facilities for such employees
(D) Employees shall shower prior to which are required by paragraph (j)(2)
entering the clean room. of this section.
(E) After showering, employees shall (4) Smoking in work areas. The em-
enter the clean room before changing ployer shall ensure that employees do
into street clothes. not smoke in work areas where they
(iv) Lunch Areas. Whenever food or are occupationally exposed to asbestos
beverages are consumed at the work- because of activities in that work area.
site where employees are performing (k) Communication of hazards(1)
Class I asbestos work, the employer Hazard communication. (i) This section
shall provide lunch areas in which the applies to the communication of infor-
airborne concentrations of asbestos are mation concerning asbestos hazards in
below the permissible exposure limit construction activities to facilitate
and/or excursion limit. compliance with this standard. Most
(2) Requirements for Class I work in- asbestos-related construction activi-
volving less than 25 linear or 10 square ties involve previously installed build-
feet of TSI or surfacing ACM and ing materials. Building owners often
PACM, and for Class II and Class III as- are the only and/or best sources of in-
bestos work operations where expo- formation concerning them. Therefore,
sures exceed a PEL or where there is they, along with employers of poten-
no negative exposure assessment pro- tially exposed employees, are assigned
duced before the operation. specific information conveying and re-
(i) The employer shall establish an tention duties under this section. In-
equipment room or area that is adja- stalled Asbestos Containing Building
cent to the regulated area for the de- Material. Employers and building own-
contamination of employees and their ers shall identify TSI and sprayed or
equipment which is contaminated with troweled on surfacing materials in
asbestos which shall consist of an area buildings as asbestos-containing, un-
covered by an impermeable drop cloth less they determine in compliance with

536

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00546 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

paragraph (k)(5) of this section that (C) On multi-employer worksites, all


the material is not asbestos-con- employers of employees who will be
taining. Asphalt and vinyl flooring ma- performing work within or adjacent to
terial installed no later than 1980 must areas containing such materials;
also be considered as asbestos con- (D) Tenants who will occupy areas
taining unless the employer, pursuant containing such material.
to paragraph (g)(8)(i)(I) of this section (3) Duties of employers whose em-
determines that it is not asbestos-con- ployees perform work subject to this
taining. If the employer/building owner standard in or adjacent to areas con-
has actual knowledge, or should have taining ACM and PACM. Building/facil-
known through the exercise of due dili- ity owners whose employees perform
gence, that other materials are asbes-
such work shall comply with these pro-
tos-containing, they too must be treat-
visions to the extent applicable.
ed as such. When communicating infor-
mation to employees pursuant to this (i) Before work in areas containing
standard, owners and employers shall ACM and PACM is begun; employers
identify PACM as ACM. Additional shall identify the presence, location,
requirements relating to communica- and quantity of ACM, and/or PACM
tion of asbestos work on multi-em- therein pursuant to paragraph (k)(1)(i)
ployer worksites are set out in para- of this section.
graph (d) of this section. (ii) Before work under this standard
(ii) The employer shall include asbes- is performed employers of employees
tos in the program established to com- who will perform such work shall in-
ply with the Hazard Communication form the following persons of the loca-
Standard (HCS) ( 1910.1200). The em- tion and quantity of ACM and/or PACM
ployer shall ensure that each employee present in the area and the precautions
has access to labels on containers of as- to be taken to insure that airborne as-
bestos and safety data sheets, and is bestos is confined to the area.
trained in accordance with the provi- (A) Owners of the building/facility;
sions of HCS and paragraphs (k)(9) and (B) Employees who will perform such
(10) of this section. The employer shall work and employers of employees who
provide information on at least the fol- work and/or will be working in adja-
lowing hazards: Cancer and lung ef- cent areas.
fects. (iii) Within 10 days of the completion
(2) Duties of building and facility own- of such work, the employer whose em-
ers. (i) Before work subject to this ployees have performed work subject to
standard is begun, building and facility this standard, shall inform the build-
owners shall determine the presence, ing/facility owner and employers of
location, and quantity of ACM and/or employees who will be working in the
PACM at the work site pursuant to
area of the current location and quan-
paragraph (k)(1)(i) of this section.
tity of PACM and/or ACM remaining in
(ii) Building and/or facility owners
the area and final monitoring results,
shall notify the following persons of
if any.
the presence, location and quantity of
ACM or PACM, at the work sites in (4) In addition to the above require-
their buildings and facilities. Notifica- ments, all employers who discover
tion either shall be in writing, or shall ACM and/or PACM on a worksite shall
consist of a personal communication convey information concerning the
between the owner and the person to presence, location and quantity of such
whom notification must be given or newly discovered ACM and/or PACM to
their authorized representatives: the owner and to other employers of
(A) Prospective employers applying employees working at the work site,
or bidding for work whose employees within 24 hours of the discovery.
reasonably can be expected to work in (5) Criteria to rebut the designation
or adjacent to areas containing such of installed material as PACM. (i) At
material; any time, an employer and/or building
(B) Employees of the owner who will owner may demonstrate, for purposes
work in or adjacent to areas containing of this standard, that PACM does not
such material: contain asbestos. Building owners and/

537

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00547 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

or employers are not required to com- the extent feasible, that employees
municate information about the pres- who come in contact with these signs
ence of building material for which can comprehend them. Means to ensure
such a demonstration pursuant to the employee comprehension may include
requirements of paragraph (k)(5)(ii) of the use of foreign languages, picto-
this section has been made. However, graphs, graphics, and awareness train-
in all such cases, the information, data ing.
and analysis supporting the determina- (7) Signs. (i) Warning signs that de-
tion that PACM does not contain as- marcate the regulated area shall be
bestos, shall be retained pursuant to provided and displayed at each location
paragraph (n) of this section. where a regulated area is required to be
(ii) An employer or owner may dem- established by paragraph (e) of this sec-
onstrate that PACM does not contain tion. Signs shall be posted at such a
more than 1% asbestos by the fol- distance from such a location that an
lowing: (A) Having a completed inspec- employee may read the signs and take
tion conducted pursuant to the require- necessary protective steps before en-
ments of AHERA (40 CFR part 763, sub- tering the area marked by the signs.
part E) which demonstrates that the (ii) (A) The warning signs required by
material is not ACM; or paragraph (k)(7) of this section shall
(B) Performing tests of the material bear the following information.
containing PACM which demonstrate
that no ACM is present in the material. DANGER
ASBESTOS
Such tests shall include analysis of
MAY CAUSE CANCER
bulk samples collected in the manner
CAUSES DAMAGE TO LUNGS
described in 40 CFR 763.86. The tests,
AUTHORIZED PERSONNEL ONLY
evaluation and sample collection shall
be conducted by an accredited inspec- (B) In addition, where the use of res-
tor or by a CIH. Analysis of samples pirators and protective clothing is re-
shall be performed by persons or lab- quired in the regulated area under this
oratories with proficiency dem- section, the warning signs shall include
onstrated by current successful partici- the following:
pation in a nationally recognized test-
ing program such as the National Vol- WEAR RESPIRATORY PROTECTION AND
untary Laboratory Accreditation Pro- PROTECTIVE CLOTHING IN THIS AREA
gram (NVLAP) or the National Insti-
tute for Standards and Technology (C) Prior to June 1, 2016, employers
(NIST) or the Round Robin for bulk may use the following legend in lieu of
samples administered by the American that specified in paragraph (k)(7)(ii)(A)
Industrial Hygiene Association (AIHA) of this section:
or an equivalent nationally-recognized DANGER
round robin testing program. ASBESTOS
(iii) The employer and/or building CANCER AND LUNG DISEASE HAZARD
owner may demonstrate that flooring AUTHORIZED PERSONNEL ONLY
material including associated mastic
and backing does not contain asbestos, (D) Prior to June 1, 2016, employers
by a determination of an industrial hy- may use the following legend in lieu of
gienist based upon recognized analyt- that specified in paragraph (k)(7)(ii)(B)
ical techniques showing that the mate- of this section:
rial is not ACM. RESPIRATORS AND PROTECTIVE
(6) At the entrance to mechanical CLOTHING ARE REQUIRED IN THIS AREA
rooms/areas in which employees rea-
sonably can be expected to enter and (iii) The employer shall ensure that
which contain ACM and/or PACM, the employees working in and contiguous
building owner shall post signs which to regulated areas comprehend the
identify the material which is present, warning signs required to be posted by
its location, and appropriate work paragraph (k)(7)(i) of this section.
practices which, if followed, will ensure Means to ensure employee comprehen-
that ACM and/or PACM will not be dis- sion may include the use of foreign lan-
turbed. The employer shall ensure, to guages, pictographs and graphics.

538

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00548 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

(8) Labels. (i) Labels shall be affixed be affixed or posted so that employees
to all products containing asbestos and will be notified of what materials con-
to all containers containing such prod- tain PACM and/or ACM. The employer
ucts, including waste containers. shall attach such labels in areas where
Where feasible, installed asbestos prod- they will clearly be noticed by employ-
ucts shall contain a visible label. ees who are likely to be exposed, such
(ii) The employer shall ensure that as at the entrance to mechanical room/
such labels comply with paragraphs (k) areas. Signs required by paragraph
of this section. (k)(6) of this section may be posted in
(iii) The employer shall ensure that lieu of labels so long as they contain
labels of bags or containers of protec- information required for labelling. The
tive clothing and equipment, scrap, employer shall ensure, to the extent
waste, and debris containing asbestos feasible, that employees who come in
fibers bear the following information: contact with these signs or labels can
DANGER comprehend them. Means to ensure em-
CONTAINS ASBESTOS FIBERS ployee comprehension may include the
MAY CAUSE CANCER use of foreign languages, pictographs,
CAUSES DAMAGE TO LUNGS
graphics, and awareness training.
DO NOT BREATHE DUST
AVOID CREATING DUST (9) Employee Information and Training.
(i) The employer shall train each em-
(iv) (A) Prior to June 1, 2015, employ- ployee who is likely to be exposed in
ers may include the following informa- excess of a PEL, and each employee
tion on raw materials, mixtures or la- who performs Class I through IV asbes-
bels of bags or containers of protective tos operations, in accordance with the
clothing and equipment, scrap, waste, requirements of this section. Such
and debris containing asbestos fibers in
training shall be conducted at no cost
lieu of the labeling requirements in
to the employee. The employer shall
paragraphs (k)(8)(ii) and (k)(8)(iii) of
institute a training program and en-
this section:
sure employee participation in the pro-
DANGER gram.
CONTAINS ASBESTOS FIBERS (ii) Training shall be provided prior
AVOID CREATING DUST
CANCER AND LUNG DISEASE HAZARD
to or at the time of initial assignment
and at least annually thereafter.
(B) Labels shall also contain a warn- (iii) Training for Class I operations
ing statement against breathing asbes- and for Class II operations that require
tos fibers. the use of critical barriers (or equiva-
(v) Labels shall contain a warning lent isolation methods) and/or negative
statement against breathing asbestos pressure enclosures under this section
fibers. shall be the equivalent in curriculum,
(vi) The provisions for labels required
training method and length to the EPA
by paragraphs (k)(8)(i) through
Model Accreditation Plan (MAP) asbes-
(k)(8)(iii) of this section do not apply
tos abatement workers training (40
where:
(A) Asbestos fibers have been modi- CFR part 763, subpart E, appendix C).
fied by a bonding agent, coating, bind- (iv) Training for other Class II work.
er, or other material, provided that the (A) For work with asbestos con-
manufacturer can demonstrate that, taining roofing materials, flooring ma-
during any reasonably foreseeable use, terials, siding materials, ceiling tiles,
handling, storage, disposal, processing, or transite panels, training shall in-
or transportation, no airborne con- clude at a minimum all the elements
centrations of asbestos fibers in excess included in paragraph (k)(9)(viii) of
of the permissible exposure limit and/ this section and in addition, the spe-
or excursion limit will be released, or cific work practices and engineering
(B) Asbestos is present in a product controls set forth in paragraph (g) of
in concentrations less than 1.0 percent. this section which specifically relate to
(vii) When a building owner or em- that category. Such course shall in-
ployer identifies previously installed clude hands-on training and shall
PACM and/or ACM, labels or signs shall take at least 8 hours.

539

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00549 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

(B) An employee who works with flooring material, or flooring material


more than one of the categories of ma- where the absence of asbestos has not
terial specified in paragraph yet been certified; and instruction in
(k)(9)(iv)(A) of this section shall re- recognition of damage, deterioration,
ceive training in the work practices ap- and delamination of asbestos con-
plicable to each category of material taining building materials. Such course
that the employee removes and each shall take at least 2 hours.
removal method that the employee (vii) Training for employees who are
uses. likely to be exposed in excess of the
(C) For Class II operations not in- PEL and who are not otherwise re-
volving the categories of material spec- quired to be trained under paragraph
ified in paragraph (k)(9)(iv)(A) of this (k)(9)(iii) through (vi) of this section,
section, training shall be provided shall meet the requirements of para-
which shall include at a minimum all graph (k)(9)(viii) of this section.
the elements included in paragraph (viii) The training program shall be
(k)(9)(viii) of this section and in addi- conducted in a manner that the em-
tion, the specific work practices and ployee is able to understand. In addi-
engineering controls set forth in para- tion to the content required by provi-
graph (g) of this section which specifi- sions in paragraphs (k)(9)(iii) through
cally relate to the category of material (vi) of this section, the employer shall
being removed, and shall include ensure that each such employee is in-
hands-on training in the work prac- formed of the following:
tices applicable to each category of (A) Methods of recognizing asbestos,
material that the employee removes including the requirement in paragraph
and each removal method that the em- (k)(1) of this section to presume that
ployee uses. certain building materials contain as-
(v) Training for Class III employees bestos;
shall be consistent with EPA require- (B) The health effects associated with
ments for training of local education asbestos exposure;
agency maintenance and custodial staff (C) The relationship between smok-
as set forth at 40 CFR 763.92(a)(2). Such ing and asbestos in producing lung can-
a course shall also include hands-on cer;
training and shall take at least 16 (D) The nature of operations that
hours. Exception: For Class III oper- could result in exposure to asbestos,
ations for which the competent person the importance of necessary protective
determines that the EPA curriculum controls to minimize exposure includ-
does not adequately cover the training ing, as applicable, engineering con-
needed to perform that activity, train- trols, work practices, respirators,
ing shall include as a minimum all the housekeeping procedures, hygiene fa-
elements included in paragraph cilities, protective clothing, decon-
(k)(9)(viii) of this section and in addi- tamination procedures, emergency pro-
tion, the specific work practices and cedures, and waste disposal procedures,
engineering controls set forth in para- and any necessary instruction in the
graph (g) of this section which specifi- use of these controls and procedures;
cally relate to that activity, and shall where Class III and IV work will be or
include hands-on training in the is performed, the contents of EPA 20T
work practices applicable to each cat- 2003, Managing Asbestos In-Place
egory of material that the employee July 1990 or its equivalent in content;
disturbs. (E) The purpose, proper use, fitting
(vi) Training for employees per- instructions, and limitations of res-
forming Class IV operations shall be pirators as required by 29 CFR 1910.134;
consistent with EPA requirements for (F) The appropriate work practices
training of local education agency for performing the asbestos job;
maintenance and custodial staff as set (G) Medical surveillance program re-
forth at 40 CFR 763.92(a)(1). Such a quirements;
course shall include available informa- (H) The content of this standard in-
tion concerning the locations of ther- cluding appendices;
mal system insulation and surfacing (I) The names, addresses and phone
ACM/PACM, and asbestos-containing numbers of public health organizations

540

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00550 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

which provide information, materials (ii) Sanding of flooring material is


and/or conduct programs concerning prohibited.
smoking cessation. The employer may (iii) Stripping of finishes shall be
distribute the list of such organiza- conducted using low abrasion pads at
tions contained in appendix J to this speeds lower than 300 rpm and wet
section, to comply with this require- methods.
ment; and (iv) Burnishing or dry buffing may be
(J) The requirements for posting performed only on flooring which has
signs and affixing labels and the mean- sufficient finish so that the pad cannot
ing of the required legends for such contact the flooring material.
signs and labels. (4) Waste and debris and accom-
(10) Access to training materials. (i) panying dust in an area containing ac-
The employer shall make readily avail- cessible thermal system insulation or
able to affected employees without surfacing ACM/PACM or visibly dete-
cost, written materials relating to the riorated ACM:
employee training program, including (i) Shall not be dusted or swept dry,
a copy of this regulation. or vacuumed without using a HEPA fil-
(ii) The employer shall provide to the ter;
Assistant Secretary and the Director, (ii) Shall be promptly cleaned up and
upon request, all information and disposed of in leak tight containers.
training materials relating to the em- (m) Medical surveillance. (1) General
ployee information and training pro- (i) Employees covered. (A) The employer
gram. shall institute a medical surveillance
(iii) The employer shall inform all program for all employees who for a
employees concerning the availability combined total of 30 or more days per
of self-help smoking cessation program year are engaged in Class I, II and III
material. Upon employee request, the work or are exposed at or above a per-
employer shall distribute such mate- missible exposure limit. For purposes
rial, consisting of NIH Publication No, of this paragraph, any day in which a
891647, or equivalent self-help mate- worker engages in Class II or Class III
rial, which is approved or published by operations or a combination thereof on
a public health organization listed in intact material for one hour or less
appendix J to this section. (taking into account the entire time
(l) Housekeeping(1) Vacuuming. spent on the removal operation, includ-
Where vacuuming methods are se- ing cleanup) and, while doing so, ad-
lected, HEPA filtered vacuuming heres fully to the work practices speci-
equipment must be used. The equip- fied in this standard, shall not be
ment shall be used and emptied in a counted.
manner that minimizes the reentry of (B) For employees otherwise required
asbestos into the workplace. by this standard to wear a negative
(2) Waste disposal. Asbestos waste, pressure respirator, employers shall en-
scrap, debris, bags, containers, equip- sure employees are physically able to
ment, and contaminated clothing con- perform the work and use the equip-
signed for disposal shall be collected ment. This determination shall be
and disposed of in sealed, labeled, im- made under the supervision of a physi-
permeable bags or other closed, la- cian.
beled, impermeable containers except (ii) Examination. (A) The employer
in roofing operations, where the proce- shall ensure that all medical examina-
dures specified in paragraph (g)(8)(ii) of tions and procedures are performed by
this section apply. or under the supervision of a licensed
(3) Care of asbestos-containing flooring physician, and are provided at no cost
material. (i) All vinyl and asphalt floor- to the employee and at a reasonable
ing material shall be maintained in ac- time and place.
cordance with this paragraph unless (B) Persons other than such licensed
the building/facility owner dem- physicians who administer the pul-
onstrates, pursuant to paragraph monary function testing required by
(g)(8)(i)(I) of this section that the floor- this section shall complete a training
ing does not contain asbestos. course in spirometry sponsored by an

541

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00551 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

appropriate academic or professional ducted in accordance with appendix E


institution. to this section.
(2) Medical examinations and consulta- (D) Any other examinations or tests
tions. (i) Frequency. The employer deemed necessary by the examining
shall make available medical examina- physician.
tions and consultations to each em- (3) Information provided to the physi-
ployee covered under paragraph cian. The employer shall provide the
(m)(1)(i) of this section on the fol- following information to the exam-
lowing schedules: ining physician:
(A) Prior to assignment of the em- (i) A copy of this standard and Ap-
ployee to an area where negative-pres- pendices D, E, and I to this section;
sure respirators are worn; (ii) A description of the affected em-
(B) When the employee is assigned to ployees duties as they relate to the
an area where exposure to asbestos employees exposure;
may be at or above the permissible ex- (iii) The employees representative
posure limit for 30 or more days per exposure level or anticipated exposure
year, or engage in Class I, II, or III level;
work for a combined total of 30 or more (iv) A description of any personal
days per year, a medical examination protective and respiratory equipment
must be given within 10 working days used or to be used; and
following the thirtieth day of exposure; (v) Information from previous med-
(C) And at least annually thereafter. ical examinations of the affected em-
(D) If the examining physician deter- ployee that is not otherwise available
mines that any of the examinations to the examining physician.
should be provided more frequently (4) Physicians written opinion. (i) The
than specified, the employer shall pro- employer shall obtain a written opin-
vide such examinations to affected em- ion from the examining physician. This
ployees at the frequencies specified by written opinion shall contain the re-
the physician. sults of the medical examination and
(E) Exception: No medical examina- shall include:
tion is required of any employee if ade- (A) The physicians opinion as to
quate records show that the employee whether the employee has any detected
has been examined in accordance with medical conditions that would place
this paragraph within the past 1-year the employee at an increased risk of
period. material health impairment from expo-
(ii) Content. Medical examinations sure to asbestos;
made available pursuant to paragraphs (B) Any recommended limitations on
(m)(2)(i)(A) through (m)(2)(i)(C) of this the employee or on the use of personal
section shall include: protective equipment such as res-
(A) A medical and work history with pirators; and
special emphasis directed to the pul- (C) A statement that the employee
monary, cardiovascular, and gastro- has been informed by the physician of
intestinal systems. the results of the medical examination
(B) On initial examination, the and of any medical conditions that
standardized questionnaire contained may result from asbestos exposure.
in part 1 of appendix D to this section, (D) A statement that the employee
and, on annual examination, the abbre- has been informed by the physician of
viated standardized questionnaire con- the increased risk of lung cancer at-
tained in part 2 of appendix D to this tributable to the combined effect of
section. smoking and asbestos exposure.
(C) A physical examination directed (ii) The employer shall instruct the
to the pulmonary and gastrointestinal physician not to reveal in the written
systems, including a chest roentgeno- opinion given to the employer specific
gram to be administered at the discre- findings or diagnoses unrelated to oc-
tion of the physician, and pulmonary cupational exposure to asbestos.
function tests of forced vital capacity (iii) The employer shall provide a
(FVC) and forced expiratory volume at copy of the physicians written opinion
one second (FEV(1)). Interpretation to the affected employee within 30 days
and classification of chest shall be con- from its receipt.

542

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00552 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

(n) Recordkeeping. (1) Objective data (F) Name, social security number,
relied on pursuant to paragraph (f) to and exposure of the employees whose
this section. (i) Where the employer exposures are represented.
has relied on objective data that dem- (iii) The employer shall maintain
onstrates that products made from or this record for at least thirty (30)
containing asbestos or the activity in- years, in accordance with 29 CFR
volving such products or material are 1910.33.
not capable of releasing fibers of asbes- (3) Medical surveillance. (i) The em-
tos in concentrations at or above the ployer shall establish and maintain an
permissible exposure limit and/or ex- accurate record for each employee sub-
cursion limit under the expected condi- ject to medical surveillance by para-
tions of processing, use, or handling to graph (m) of this section, in accordance
satisfy the requirements of paragraph with 29 CFR 1910.33.
(f), the employer shall establish and (ii) The record shall include at least
maintain an accurate record of objec- the following information:
tive data reasonably relied upon in sup- (A) The name and social security
port of the exemption. number of the employee;
(ii) The record shall include at least (B) A copy of the employees medical
examination results, including the
the following information:
medical history, questionnaire re-
(A) The product qualifying for ex-
sponses, results of any tests, and physi-
emption; cians recommendations.
(B) The source of the objective data; (C) Physicians written opinions;
(C) The testing protocol, results of (D) Any employee medical com-
testing, and/or analysis of the material plaints related to exposure to asbestos;
for the release of asbestos; and
(D) A description of the operation ex- (E) A copy of the information pro-
empted and how the data support the vided to the physician as required by
exemption; and paragraph (m) of this section.
(E) Other data relevant to the oper- (iii) The employer shall ensure that
ations, materials, processing, or em- this record is maintained for the dura-
ployee exposures covered by the ex- tion of employment plus thirty (30)
emption. years, in accordance with 29 CFR
(iii) The employer shall maintain 1910.33.
this record for the duration of the em- (4) Training records. The employer
ployers reliance upon such objective shall maintain all employee training
data. records for one (1) year beyond the last
(2) Exposure measurements. (i) The em- date of employment by that employer.
ployer shall keep an accurate record of (5) Data to Rebut PACM. Where the
all measurements taken to monitor building owner and employer have re-
employee exposure to asbestos as pre- lied on data to demonstrate that PACM
scribed in paragraph (f) of this section. is not asbestos-containing, such data
NOTE: The employer may utilize the shall be maintained for as long as they
services of competent organizations are relied upon to rebut the presump-
such as industry trade associations and tion.
employee associations to maintain the (6) Records of required notifications.
records required by this section. Where the building owner has commu-
nicated and received information con-
(ii) This record shall include at least
cerning the identification, location and
the following information:
quantity of ACM and PACM, written
(A) The date of measurement; records of such notifications and their
(B) The operation involving exposure content shall be maintained by the
to asbestos that is being monitored; building owner for the duration of own-
(C) Sampling and analytical methods ership and shall be transferred to suc-
used and evidence of their accuracy; cessive owners of such buildings/facili-
(D) Number, duration, and results of ties.
samples taken; (7) Availability. (i) The employer,
(E) Type of protective devices worn, upon written request, shall make all
if any; and records required to be maintained by

543

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00553 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

this section available to the Assistant and ensure that it is conducted as re-
Secretary and the Director for exam- quired by paragraph (f) of this section;
ination and copying. (E) Ensure that employees working
(ii) The employer must comply with within the enclosure and/or using glove
the requirements concerning avail- bags wear respirators and protective
ability of records set forth in 29 CFR clothing as required by paragraphs (h)
1910.1020. and (i) of this section;
(8) Transfer of records. The employer (F) Ensure through on-site super-
must comply with the requirements vision, that employees set up, use, and
concerning transfer of records set forth remove engineering controls, use work
in 29 CFR 1910.1020(h). practices and personal protective
(o) Competent person. (1) General. On equipment in compliance with all re-
all construction worksites covered by quirements;
this standard, the employer shall des- (G) Ensure that employees use the
ignate a competent person, having the hygiene facilities and observe the de-
qualifications and authorities for en- contamination procedures specified in
suring worker safety and health re- paragraph (j) of this section;
quired by subpart C, General Safety (H) Ensure that through on-site in-
and Health Provisions for Construction spection, engineering controls are func-
(29 CFR 1926.20 through 1926.32). tioning properly and employees are
using proper work practices; and,
(2) Required inspections by the com-
(I) Ensure that notification require-
petent person. Section 1926.20(b)(2)
ment in paragraph (k) of this section
which requires health and safety pre-
are met.
vention programs to provide for fre-
(ii) [Reserved]
quent and regular inspections of the
(4) Training for the competent person.
job sites, materials, and equipment to
(i) For Class I and II asbestos work the
be made by competent persons, is in-
competent person shall be trained in
corporated.
all aspects of asbestos removal and
(3) Additional inspections. In addition, handling, including: abatement, instal-
the competent person shall make fre- lation, removal and handling; the con-
quent and regular inspections of the tents of this standard; the identifica-
job sites, in order to perform the duties tion of asbestos; removal procedures,
set out below in paragraph (o)(3)(i) of where appropriate; and other practices
this section. For Class I jobs, on-site for reducing the hazard. Such training
inspections shall be made at least once shall be obtained in a comprehensive
during each work shift, and at any course for supervisors that meets the
time at employee request. For Class II, criteria of EPAs Model Accreditation
III, and IV jobs, on-site inspections Plan (40 CFR part 763, subpart E, ap-
shall be made at intervals sufficient to pendix C), such as a course conducted
assess whether conditions have by an EPA-approved or state-approved
changed, and at any reasonable time at training provider, certified by EPA or a
employee request. state, or a course equivalent in strin-
(i) On all worksites where employees gency, content, and length.
are engaged in Class I or II asbestos (ii) For Class III and IV asbestos
work, the competent person designated work, the competent person shall be
in accordance with paragraph (e)(6) of trained in aspects of asbestos handling
this section shall perform or supervise appropriate for the nature of the work,
the following duties, as applicable: to include procedures for setting up
(A) Set up the regulated area, enclo- glove bags and mini-enclosures, prac-
sure, or other containment; tices for reducing asbestos exposures,
(B) Ensure (by on-site inspection) the use of wet methods, the contents of
integrity of the enclosure or contain- this standard, and the identification of
ment; asbestos. Such training shall include
(C) Set up procedures to control successful completion of a course that
entry to and exit from the enclosure is consistent with EPA requirements
and/or area; for training of local education agency
(D) Supervise all employee exposure maintenance and custodial staff as set
monitoring required by this section forth at 40 CFR 763.92(a)(2), or its

544

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00554 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

equivalent in stringency, content and 5. Ship the samples in a rigid container


length. Competent persons for Class III with sufficient packing material to prevent
and IV work, may also be trained pur- dislodging the collected fibers. Packing ma-
terial that has a high electrostatic charge on
suant to the requirements of paragraph its surface (e.g., expanded polystyrene) can-
(o)(4)(i) of this section. not be used because such material can cause
(p) Appendices. (1) Appendices A, C, D, loss of fibers to the sides of the cassette.
and E to this section are incorporated 6. Calibrate each personal sampling pump
as part of this section and the contents before and after use with a representative fil-
of these appendices are mandatory. ter cassette installed between the pump and
the calibration devices.
(2) Appendices B, F, H, I, J, and K to 7. Personal samples shall be taken in the
this section are informational and are breathing zone of the employee (i.e., at-
not intended to create any additional tached to or near the collar or lapel near the
obligations not otherwise imposed or workers face).
to detract from any existing obliga- 8. Fiber counts shall be made by positive
tions. phase contrast using a microscope with an 8
to 10 X eyepiece and a 40 to 45 X objective for
APPENDIX A TO 1926.1101OSHA REFERENCE a total magnification of approximately 400 X
METHODMANDATORY and a numerical aperture of 0.65 to 0.75. The
microscope shall also be fitted with a green
This mandatory appendix specifies the pro- or blue filter.
cedure for analyzing air samples for asbestos 9. The microscope shall be fitted with a
and specifies quality control procedures that Walton-Beckett eyepiece graticule cali-
must be implemented by laboratories per- brated for a field diameter of 100 microm-
forming the analysis. The sampling and ana- eters (2 micrometers).
lytical methods described below represent 10. The phase-shift detection limit of the
the elements of the available monitoring microscope shall be about 3 degrees meas-
methods (such as appendix B of this regula- ured using the HSE phase shift test slide as
tion, the most current version of the OSHA outlined below.
method ID160, or the most current version a. Place the test slide on the microscope
of the NIOSH Method 7400). All employers stage and center it under the phase objec-
who are required to conduct air monitoring tive.
under paragraph (f) of the standard are re- b. Bring the blocks of grooved lines into
quired to utilize analytical laboratories that focus.
use this procedure, or an equivalent method, NOTE: The slide consists of seven sets of
for collecting and analyzing samples. grooved lines (ca. 20 grooves to each block)
in descending order of visibility from sets 1
Sampling and Analytical Procedure to 7, seven being the least visible. The re-
quirements for asbestos counting are that
1. The sampling medium for air samples the microscope optics must resolve the
shall be mixed cellulose ester filter mem- groooved lines in set 3 completely, although
branes. These shall be designated by the they may appear somewhat faint, and that
manufacturer as suitable for asbestos count- the grooved lines in sets 6 and 7 must be in-
ing. See below for rejection of blanks. visible. Sets 4 and 5 must be at least par-
2. The preferred collection device shall be tially visible but may vary slightly in visi-
the 25-mm diameter cassette with an open- bility between microscopes. A microscope
faced 50-mm electrically conductive exten- that fails to meet these requirements has ei-
sion cowl. The 37-mm cassette may be used if ther too low or too high a resolution to be
necessary but only if written justification used for asbestos counting.
for the need to use the 37-mm filter cassette c. If the image deteriorates, clean and ad-
accompanies the sample results in the em- just the microscope optics. If the problem
ployees exposure monitoring record. Do not persists, cosult the microscope manufac-
reuse or reload cassettes for asbestos sample turer.
collection. 11. Each set of samples taken will include
3. An air flow rate between 0.5 liter/min 10% field blanks or a minimum of 2 field
and 2.5 liters/min shall be selected for the 25/ blanks. These blanks must come from the
mm cassette. If the 37-mm cassette is used, same lot as the filters used for sample collec-
an air flow rate between 1 liter/min and 2.5 tion. The field blank results shall be aver-
liters/min shall be selected. aged and subtracted from the analytical re-
4. Where possible, a sufficient air volume sults before reporting. A set consists of any
for each air sample shall be collected to sample or group of samples for which an
yield between 100 and 1,300 fibers per square evaluation for this standard must be made.
millimeter on the membrane filter. If a filter Any samples represented by a field blank
darkens in appearance or if loose dust is seen having a fiber count in excess of the detec-
on the filter, a second sample shall be start- tion limit of the method being used shall be
ed. rejected.

545

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00555 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)
12. The samples shall be mounted by the itor the variability of counting by each
acetone/triacetin method or a method with microscopist and between microscopists. In a
an equivalent index of refraction and similar company with more than one laboratory, the
clarity. program shall include all laboratories, and
13. Observe the following counting rules. shall also evaluate the laboratory-to-labora-
a. Count only fibers equal to or longer than tory variability.
5 micrometers. Measure the length of curved 2a. Interlaboratory program. Each labora-
fibers along the curve. tory analyzing asbestos samples for compli-
b. In the absence of other information, ance determination shall implement an
count all particles as asbestos, that have a interlaboratory quality assurance program
length-to-width ratio (aspect ratio) of 3:1 or that, as a minimum, includes participation
greater. of at least two other independent labora-
c. Fibers lying entirely within the bound- tories. Each laboratory shall participate in
ary of the Walton-Beckett graticule field round robin testing at least once every 6
shall receive a count of 1. Fibers crossing the months with at least all the other labora-
boundary once, having one end within the tories in its interlaboratory quality assur-
circle, shall receive the count of one half ance group. Each laboratory shall submit
(12). Do not count any fiber that crosses the slides typical of its own workload for use in
graticule boundary more than once. Reject this program. The round robin shall be de-
and do not count any other fibers even signed and results analyzed using appro-
though they may be visible outside the grati- priate statistical methodology.
cule area. b. All laboratories should also participate
d. Count bundles of fibers as one fiber un- in a national sample testing scheme such as
less individual fibers can be identified by ob- the Proficiency Analytical Testing Program
serving both ends of an individual fiber. (PAT), or the Asbestos Registry sponsored by
e. Count enough graticule fields to yield the American Industrial Hygiene Association
100 fibers. Count a minimum of 20 fields; stop (AIHA).
counting at 100 fields regardless of fiber 3. All individuals performing asbestos anal-
count. ysis must have taken the NIOSH course for
14. Blind recounts shall be conducted at sampling and evaluating airborne asbestos
the rate of 10 percent. dust or an equivalent course.
4. When the use of different microscopes
Quality Control Procedures
contributes to differences between counters
1. Intralaboratory program. Each labora- and laboratories, the effect of the different
tory and/or each company with more than microscope shall be evaluated and the micro-
one microscopist counting slides shall estab- scope shall be replaced, as necessary.
lish a statistically designed quality assur- 5. Current results of these quality assur-
ance program involving blind recounts and ance programs shall be posted in each lab-
comparisons between microscopists to mon- oratory to keep the microscopists informed.

APPENDIX B TO 1926.1101SAMPLING AND ANALYSIS (NON-MANDATORY)


Matrix Air:
OSHA Permissible Exposure Limits:
Time Weighted Average ......................................................................................................................... 0.1 fiber/cc
Excursion Level (30 minutes) ................................................................................................................. 1.0 fiber/cc
Collection Procedure:
A known volume of air is drawn through a 25-mm diameter cassette containing a mixed-cellulose ester filter. The cassette must
be equipped with an electrically conductive 50-mm extension cowl. The sampling time and rate are chosen to give a fiber density
of between 100 to 1,300 fibers/mm2 on the filter.

Recommended Sampling Rate ..................................................................................................................... 0.5 to 5.0 liters/minute


(L/min)
Recommended Air Volumes:
Minimum ................................................................................................................................................. 25 L
Maximum ................................................................................................................................................ 2,400 L

Analytical Procedure: by USDOL-OSHA. Similar products from


A portion of the sample filter is cleared other sources can be substituted.
and prepared for asbestos fiber counting by
Phase Contrast Microscopy (PCM) at 400X. 1. Introduction
Commercial manufacturers and products This method describes the collection of
mentioned in this method are for descriptive airborne asbestos fibers using calibrated
use only and do not constitute endorsements sampling pumps with mixed-cellulose ester

546

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00556 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101
(MCE) filters and analysis by phase contrast 1.1. History
microscopy (PCM). Some terms used are
Early surveys to determine asbestos expo-
unique to this method and are defined below:
sures were conducted using impinger counts
Asbestos: A term for naturally occurring fi-
of total dust with the counts expressed as
brous minerals. Asbestos includes chrysotile,
million particles per cubic foot. The British
crocidolite, amosite (cummingtonite-
Asbestos Research Council recommended fil-
grunerite asbestos), tremolite asbestos, ac-
ter membrane counting in 1969. In July 1969,
tinolite asbestos, anthophyllite asbestos, and
the Bureau of Occupational Safety and
any of these minerals that have been chemi-
Health published a filter membrane method
cally treated and/or altered. The precise
for counting asbestos fibers in the United
chemical formulation of each species will
States. This method was refined by NIOSH
vary with the location from which it was
and published as P & CAM 239. On May 29,
mined. Nominal compositions are listed:
1971, OSHA specified filter membrane sam-
Chrysotile .......... Mg3 Si2 O5(OH)4 pling with phase contrast counting for eval-
Crocidolite ......... Na2 Fe32+ Fe23+ Si8 uation of asbestos exposures at work sites in
O22(OH)2 the United States. The use of this technique
Amosite ............. (Mg,Fe)7 Si8 O22(OH)2 was again required by OSHA in 1986. Phase
Tremolite-actin- contrast microscopy has continued to be the
olite ................ Ca2(Mg,Fe)5 Si8 O22(OH)2 method of choice for the measurement of oc-
Anthophyllite .... (Mg,Fe)7 Si8 O22(OH)2 cupational exposure to asbestos.
Asbestos Fiber: A fiber of asbestos which 1.2. Principle
meets the criteria specified below for a fiber.
Aspect Ratio: The ratio of the length of a Air is drawn through a MCE filter to cap-
fiber to its diameter (e.g. 3:1, 5:1 aspect ra- ture airborne asbestos fibers. A wedge shaped
tios). portion of the filter is removed, placed on a
Cleavage Fragments: Mineral particles glass microscope slide and made transparent.
formed by comminution of minerals, espe- A measured area (field) is viewed by PCM.
cially those characterized by parallel sides All the fibers meeting defined criteria for as-
and a moderate aspect ratio (usually less bestos are counted and considered a measure
than 20:1). of the airborne asbestos concentration.
Detection Limit: The number of fibers nec-
1.3. Advantages and Disadvantages
essary to be 95% certain that the result is
greater than zero. There are four main advantages of PCM
Differential Counting: The term applied to over other methods:
the practice of excluding certain kinds of fi- (1) The technique is specific for fibers.
bers from the fiber count because they do Phase contrast is a fiber counting technique
not appear to be asbestos. which excludes non-fibrous particles from
Fiber: A particle that is 5 m or longer, the analysis.
with a length-to-width ratio of 3 to 1 or (2) The technique is inexpensive and does
longer. not require specialized knowledge to carry
Field: The area within the graticule circle out the analysis for total fiber counts.
that is superimposed on the microscope (3) The analysis is quick and can be per-
image. formed on-site for rapid determination of air
Set: The samples which are taken, sub- concentrations of asbestos fibers.
mitted to the laboratory, analyzed, and for (4) The technique has continuity with his-
which, interim or final result reports are torical epidemiological studies so that esti-
generated. mates of expected disease can be inferred
Tremolite, Anthophyllite, and Actinolite: The from long-term determinations of asbestos
non-asbestos form of these minerals which exposures.
meet the definition of a fiber. It includes any The main disadvantage of PCM is that it
of these minerals that have been chemically does not positively identify asbestos fibers.
treated and/or altered. Other fibers which are not asbestos may be
Walton-Beckett Graticule: An eyepiece grati- included in the count unless differential
cule specifically designed for asbestos fiber counting is performed. This requires a great
counting. It consists of a circle with a pro- deal of experience to adequately differen-
jected diameter of 100 2 m (area of about tiate asbestos from non-asbestos fibers. Posi-
0.00785 mm2) with a crosshair having tic- tive identification of asbestos must be per-
marks at 3-m intervals in one direction and formed by polarized light or electron micros-
5-m in the orthogonal direction. There are copy techniques. A further disadvantage of
marks around the periphery of the circle to PCM is that the smallest visible fibers are
demonstrate the proper sizes and shapes of about 0.2 m in diameter while the finest as-
fibers. This design is reproduced in Figure 1. bestos fibers may be as small as 0.02 m in
The disk is placed in one of the microscope diameter. For some exposures, substantially
eyepieces so that the design is superimposed more fibers may be present than are actually
on the field of view. counted.

547

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00557 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)
1.4. Workplace Exposure 3. Method PerformancePrecision and
Accuracy
Asbestos is used by the construction indus-
try in such products as shingles, floor tiles, Precision is dependent upon the total num-
asbestos cement, roofing felts, insulation ber of fibers counted and the uniformity of
and acoustical products. Non-construction the fiber distribution on the filter. A general
uses include brakes, clutch facings, paper, rule is to count at least 20 and not more than
paints, plastics, and fabrics. One of the most 100 fields. The count is discontinued when 100
significant exposures in the workplace is the fibers are counted, provided that 20 fields
removal and encapsulation of asbestos in have already been counted. Counting more
schools, public buildings, and homes. Many than 100 fibers results in only a small gain in
workers have the potential to be exposed to precision. As the total count drops below 10
asbestos during these operations. fibers, an accelerated loss of precision is
About 95% of the asbestos in commercial noted.
use in the United States is chrysotile. Cro- At this time, there is no known method to
cidolite and amosite make up most of the re- determine the absolute accuracy of the as-
mainder. Anthophyllite and tremolite or ac- bestos analysis. Results of samples prepared
tinolite are likely to be encountered as con- through the Proficiency Analytical Testing
taminants in various industrial products. (PAT) Program and analyzed by the OSHA-
SLTC showed no significant bias when com-
1.5. Physical Properties pared to PAT reference values. The PAT
samples were analyzed from 1987 to 1989
Asbestos fiber possesses a high tensile (N=36) and the concentration range was from
strength along its axis, is chemically inert, 120 to 1,300 fibers/mm2.
non-combustible, and heat resistant. It has a
high electrical resistance and good sound ab- 4. Interferences
sorbing properties. It can be weaved into ca-
bles, fabrics or other textiles, and also mat- Fibrous substances, if present, may inter-
ted into asbestos papers, felts, or mats. fere with asbestos analysis.
Some common fibers are:
2. Range and Detection Limit fiberglass
2.1. The ideal counting range on the filter anhydrite
is 100 to 1,300 fibers/mm2. With a Walton- plant fibers
Beckett graticule this range is equivalent to perlite veins
0.8 to 10 fibers/field. Using NIOSH counting gypsum
statistics, a count of 0.8 fibers/field would some synthetic fibers
give an approximate coefficient of variation membrane structures
(CV) of 0.13. sponge spicules
2.2. The detection limit for this method is diatoms
4.0 fibers per 100 fields or 5.5 fibers/mm2. This microorganisms
was determined using an equation to esti- wollastonite
mate the maximum CV possible at a specific The use of electron microscopy or optical
concentration (95% confidence) and a Lower tests such as polarized light, and dispersion
Control Limit of zero. The CV value was staining may be used to differentiate these
then used to determine a corresponding con- materials from asbestos when necessary.
centration from historical CV vs fiber rela-
tionships. As an example: 5. Sampling
Lower Control Limit (95% Confidence) = 5.1. Equipment
AC1.645(CV)(AC)
5.1.1. Sample assembly (The assembly is
Where:
shown in Figure 3). Conductive filter holder
AC = Estimate of the airborne fiber con- consisting of a 25-mm diameter, 3-piece cas-
centration (fibers/cc) Setting the Lower sette having a 50-mm long electrically con-
Control Limit=0 and solving for CV: ductive extension cowl. Backup pad, 25-mm,
0 = AC1.645(CV)(AC) cellulose. Membrane filter, mixed-cellulose
CV = 0.61 ester (MCE), 25-mm, plain, white, 0.4 to 1.2-
This value was compared with CV vs. count m pore size.
curves. The count at which CV = 0.61 for NOTES:
Leidel-Busch counting statistics or for an (a) DO NOT RE-USE CASSETTES.
OSHA Salt Lake Technical Center (OSHA- (b) Fully conductive cassettes are required
SLTC) CV curve (see appendix A for further to reduce fiber loss to the sides of the cas-
information) was 4.4 fibers or 3.9 fibers per sette due to electrostatic attraction.
100 fields, respectively. Although a lower de- (c) Purchase filters which have been selected
tection limit of 4 fibers per 100 fields is sup- by the manufacturer for asbestos counting
ported by the OSHA-SLTC data, both data or analyze representative filters for fiber
sets support the 4.5 fibers per 100 fields value. background before use. Discard the filter

548

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00558 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101
lot if more than 4 fibers/100 fields are lar or lapel of the employee using spring
found. clips or other similar devices.
(d) To decrease the possibility of contamina- 5.2.7. A suggested minimum air volume
tion, the sampling system (filter-backup when sampling to determine TWA compli-
pad-cassette) for asbestos is usually ance is 25 L. For Excursion Limit (30 min
preassembled by the manufacturer. sampling time) evaluations, a minimum air
(e) Other cassettes, such as the Bell-mouth, volume of 48 L is recommended.
may be used within the limits of their vali- 5.2.8. The most significant problem when
dation. sampling for asbestos is overloading the fil-
ter with non-asbestos dust. Suggested max-
5.1.2. Gel bands for sealing cassettes.
imum air sample volumes for specific envi-
5.1.3. Sampling pump. ronments are:
Each pump must be a battery operated,
self-contained unit small enough to be Environment Air Vol. (L)
placed on the monitored employee and not
interfere with the work being performed. The Asbestos removal operations (visible 100.
dust).
pump must be capable of sampling at the col-
Asbestos removal operations (little 240.
lection rate for the required sampling time. dust).
5.1.4. Flexible tubing, 6-mm bore. Office environments ............................. 400 to 2,400.
5.1.5. Pump calibration.
Stopwatch and bubble tube/burette or elec- CAUTION: Do not overload the filter with
tronic meter. dust. High levels of non-fibrous dust par-
5.2. Sampling Procedure ticles may obscure fibers on the filter and
5.2.1. Seal the point where the base and lower the count or make counting impos-
cowl of each cassette meet with a gel band or sible. If more than about 25 to 30% of the
tape. field area is obscured with dust, the result
5.2.2. Charge the pumps completely before may be biased low. Smaller air volumes may
beginning. be necessary when there is excessive non-as-
5.2.3. Connect each pump to a calibration bestos dust in the air.
cassette with an appropriate length of 6-mm While sampling, observe the filter with a
bore plastic tubing. Do not use luer connec- small flashlight. If there is a visible layer of
torsthe type of cassette specified above has dust on the filter, stop sampling, remove and
built-in adapters. seal the cassette, and replace with a new
5.2.4. Select an appropriate flow rate for sampling assembly. The total dust loading
the situation being monitored. The sampling should not exceed 1 mg.
flow rate must be between 0.5 and 5.0 L/min 5.2.9. Blank samples are used to determine
for personal sampling and is commonly set if any contamination has occurred during
between 1 and 2 L/min. Always choose a flow sample handling. Prepare two blanks for the
rate that will not produce overloaded filters. first 1 to 20 samples. For sets containing
5.2.5. Calibrate each sampling pump before greater than 20 samples, prepare blanks as
and after sampling with a calibration cas- 10% of the samples. Handle blank samples in
sette in-line (Note: This calibration cassette the same manner as air samples with one ex-
should be from the same lot of cassettes used ception: Do not draw any air through the
for sampling). Use a primary standard (e.g. blank samples. Open the blank cassette in
bubble burette) to calibrate each pump. If the place where the sample cassettes are
possible, calibrate at the sampling site. mounted on the employee. Hold it open for
about 30 seconds. Close and seal the cassette
NOTE: If sampling site calibration is not appropriately. Store blanks for shipment
possible, environmental influences may af- with the sample cassettes.
fect the flow rate. The extent is dependent 5.2.10. Immediately after sampling, close
on the type of pump used. Consult with the and seal each cassette with the base and
pump manufacturer to determine dependence plastic plugs. Do not touch or puncture the
on environmental influences. If the pump is filter membrane as this will invalidate the
affected by temperature and pressure analysis.
changes, correct the flow rate using the for- 5.2.11 Attach and secure a sample seal
mula shown in the section Sampling Pump around each sample cassette in such a way
Flow Rate Corrections at the end of this ap- as to assure that the end cap and base plugs
pendix. cannot be removed without destroying the
5.2.6. Connect each pump to the base of seal. Tape the ends of the seal together since
each sampling cassette with flexible tubing. the seal is not long enough to be wrapped
Remove the end cap of each cassette and end-to-end. Also wrap tape around the cas-
take each air sample open face. Assure that sette at each joint to keep the seal secure.
each sample cassette is held open side down 5.3.1. Send the samples to the laboratory
in the employees breathing zone during with paperwork requesting asbestos analysis.
sampling. The distance from the nose/mouth List any known fibrous interferences present
of the employee to the cassette should be during sampling on the paperwork. Also,
about 10 cm. Secure the cassette on the col- note the workplace operation(s) sampled.

549

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00559 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)
5.3.2. Secure and handle the samples in 6.2.15. Micropipette, 5 L.
such that they will not rattle during ship-
ment nor be exposed to static electricity. Do 6.3. Reagents
not ship samples in expanded polystyrene 6.3.1. Acetone (HPLC grade).
peanuts, vermiculite, paper shreds, or excel- 6.3.2. Triacetin (glycerol triacetate).
sior. Tape sample cassettes to sheet bubbles 6.3.3. Lacquer or nail polish.
and place in a container that will cushion
the samples in such a manner that they will 6.4. Standard Preparation
not rattle.
5.3.3. To avoid the possibility of sample A way to prepare standard asbestos sam-
contamination, always ship bulk samples in ples of known concentration has not been de-
separate mailing containers. veloped. It is possible to prepare replicate
samples of nearly equal concentration. This
6. Analysis has been performed through the PAT pro-
gram. These asbestos samples are distributed
6.1. Safety Precautions by the AIHA to participating laboratories.
6.1.1. Acetone is extremely flammable and Since only about one-fourth of a 25-mm
precautions must be taken not to ignite it. sample membrane is required for an asbestos
Avoid using large containers or quantities of count, any PAT sample can serve as a
acetone. Transfer the solvent in a ventilated standard for replicate counting.
laboratory hood. Do not use acetone near
any open flame. For generation of acetone 6.5. Sample Mounting
vapor, use a spark free heat source. NOTE: See Safety Precautions in Section
6.1.2. Any asbestos spills should be cleaned 6.1. before proceeding. The objective is to
up immediately to prevent dispersal of fi- produce samples with a smooth (non-grainy)
bers. Prudence should be exercised to avoid background in a medium with a refractive
contamination of laboratory facilities or ex- index of approximately 1.46. The technique
posure of personnel to asbestos. Asbestos below collapses the filter for easier focusing
spills should be cleaned up with wet methods and produces permanent mounts which are
and/or a High Efficiency Particulate-Air useful for quality control and interlabora-
(HEPA) filtered vacuum. tory comparison.
CAUTION: Do not use a vacuum without a
HEPA filterIt will disperse fine asbestos fi- An aluminum block or similar device is re-
bers in the air. quired for sample preparation.
6.5.1. Heat the aluminum block to about 70
6.2. Equipment C. The hot block should not be used on any
surface that can be damaged by either the
6.2.1. Phase contrast microscope with bin-
heat or from exposure to acetone.
ocular or trinocular head.
6.2.2. Widefield or Huygenian 10X eyepieces 6.5.2. Ensure that the glass slides and cover
(NOTE: The eyepiece containing the grati- glasses are free of dust and fibers.
cule must be a focusing eyepiece. Use a 40X 6.5.3. Remove the top plug to prevent a
phase objective with a numerical aperture of vacuum when the cassette is opened. Clean
0.65 to 0.75). the outside of the cassette if necessary. Cut
6.2.3. Kohler illumination (if possible) with the seal and/or tape on the cassette with a
green or blue filter. razor blade. Very carefully separate the base
6.2.4. Walton-Beckett Graticule, type G22 from the extension cowl, leaving the filter
with 100 2 m projected diameter. and backup pad in the base.
6.2.5. Mechanical stage. A rotating me- 6.5.4. With a rocking motion cut a tri-
chanical stage is convenient for use with po- angular wedge from the filter using the scal-
larized light. pel. This wedge should be one-sixth to one-
6.2.6. Phase telescope. fourth of the filter. Grasp the filter wedge
6.2.7. Stage micrometer with 0.01-mm sub- with the forceps on the perimeter of the fil-
divisions. ter which was clamped between the cassette
6.2.8. Phase-shift test slide, mark II (Avail- pieces. DO NOT TOUCH the filter with your
able from PTR optics Ltd., and also finger. Place the filter on the glass slide
McCrone). sample side up. Static electricity will usu-
6.2.9. Precleaned glass slides, 25 mm75 ally keep the filter on the slide until it is
mm. One end can be frosted for convenience cleared.
in writing sample numbers, etc., or paste-on 6.5.5. Place the tip of the micropipette con-
labels can be used. taining about 200 L acetone into the alu-
6.2.10. Cover glass #112. minum block. Insert the glass slide into the
6.2.11. Scalpel (#10, curved blade). receiving slot in the aluminum block. Inject
6.2.12. Fine tipped forceps. the acetone into the block with slow, steady
6.2.13. Aluminum block for clearing filter pressure on the plunger while holding the pi-
(see appendix D and Figure 4). pette firmly in place. Wait 3 to 5 seconds for
6.2.14. Automatic adjustable pipette, 100- to the filter to clear, then remove the pipette
500-L. and slide from the aluminum block.

550

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00560 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101
6.5.6. Immediately (less than 30 seconds) (4) Most samples will contain asbestos fi-
place 2.5 to 3.5 L of triacetin on the filter bers with fiber diameters less than 1 m.
(NOTE: Waiting longer than 30 seconds will Look carefully for faint fiber images. The
result in increased index of refraction and small diameter fibers will be very hard to
decreased contrast between the fibers and see. However, they are an important con-
the preparation. This may also lead to sepa- tribution to the total count.
ration of the cover slip from the slide). (5) Count only fibers equal to or longer
6.5.7. Lower a cover slip gently onto the fil- than 5 m. Measure the length of curved fi-
ter at a slight angle to reduce the possibility bers along the curve.
of forming air bubbles. If more than 30 sec- (6) Count fibers which have a length to
onds have elapsed between acetone exposure width ratio of 3:1 or greater.
and triacetin application, glue the edges of (7) Count all the fibers in at least 20 fields.
the cover slip to the slide with lacquer or Continue counting until either 100 fibers are
nail polish. counted or 100 fields have been viewed;
6.5.8. If clearing is slow, warm the slide for whichever occurs first. Count all the fibers
15 min on a hot plate having a surface tem- in the final field.
perature of about 50 C to hasten clearing. (8) Fibers lying entirely within the bound-
The top of the hot block can be used if the ary of the Walton-Beckett graticule field
slide is not heated too long. shall receive a count of 1. Fibers crossing the
6.5.9. Counting may proceed immediately boundary once, having one end within the
after clearing and mounting are completed. circle shall receive a count of 12. Do not
count any fiber that crosses the graticule
6.6. Sample Analysis boundary more than once. Reject and do not
count any other fibers even though they may
Completely align the microscope according be visible outside the graticule area. If a
to the manufacturers instructions. Then, fiber touches the circle, it is considered to
align the microscope using the following cross the line.
general alignment routine at the beginning (9) Count bundles of fibers as one fiber un-
of every counting session and more often if less individual fibers can be clearly identi-
necessary. fied and each individual fiber is clearly not
6.6.1. Alignment connected to another counted fiber. See Fig-
(1) Clean all optical surfaces. Even a small ure 1 for counting conventions.
amount of dirt can significantly degrade the (10) Record the number of fibers in each
image. field in a consistent way such that filter
(2) Rough focus the objective on a sample. non-uniformity can be assessed.
(3) Close down the field iris so that it is (11) Regularly check phase ring alignment.
visible in the field of view. Focus the image (12) When an agglomerate (mass of mate-
of the iris with the condenser focus. Center rial) covers more than 25% of the field of
the image of the iris in the field of view. view, reject the field and select another. Do
(4) Install the phase telescope and focus on not include it in the number of fields count-
the phase rings. Critically center the rings. ed.
Misalignment of the rings results in astig- (13) Perform a blind recount of 1 in every
matism which will degrade the image. 10 filter wedges (slides). Re-label the slides
(5) Place the phase-shift test slide on the using a person other than the original
microscope stage and focus on the lines. The counter.
analyst must see line set 3 and should see at
least parts of 4 and 5 but, not see line set 6 6.7. Fiber Identification
or 6. A microscope/microscopist combination As previously mentioned in Section 1.3.,
which does not pass this test may not be PCM does not provide positive confirmation
used. of asbestos fibers. Alternate differential
6.6.2. Counting Fibers counting techniques should be used if dis-
(1) Place the prepared sample slide on the crimination is desirable. Differential count-
mechanical stage of the microscope. Position ing may include primary discrimination
the center of the wedge under the objective based on morphology, polarized light anal-
lens and focus upon the sample. ysis of fibers, or modification of PCM data
(2) Start counting from one end of the by Scanning Electron or Transmission Elec-
wedge and progress along a radial line to the tron Microscopy.
other end (count in either direction from pe- A great deal of experience is required to
rimeter to wedge tip). Select fields ran- routinely and correctly perform differential
domly, without looking into the eyepieces, counting. It is discouraged unless it is le-
by slightly advancing the slide in one direc- gally necessary. Then, only if a fiber is obvi-
tion with the mechanical stage control. ously not asbestos should it be excluded from
(3) Continually scan over a range of focal the count. Further discussion of this tech-
planes (generally the upper 10 to 15 m of the nique can be found in reference 8.10.
filter surface) with the fine focus control If there is a question whether a fiber is as-
during each field count. Spend at least 5 to bestos or not, follow the rule:
15 seconds per field. WHEN IN DOUBT, COUNT.

551

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00561 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)
6.8. Analytical RecommendationsQuality T=Sample collection time (min)
Control System 1,000=Conversion of L to cc
NOTE: The collection area of a filter is sel-
6.8.1. All individuals performing asbestos
dom equal to 385 mm2. It is appropriate for
analysis must have taken the NIOSH course
laboratories to routinely monitor the exact
for sampling and evaluating airborne asbes-
diameter using an inside micrometer. The
tos or an equivalent course. collection area is calculated according to the
6.8.2. Each laboratory engaged in asbestos
formula:
counting shall set up a slide trading arrange-
ment with at least two other laboratories in Area = (d/2)2
order to compare performance and eliminate
inbreeding of error. The slide exchange oc- 7.2. Short-Cut Calculation
curs at least semiannually. The round robin Since a given analyst always has the same
results shall be posted where all analysts can interpupillary distance, the number of fields
view individual analysts results. per filter for a particular analyst will remain
6.8.3. Each laboratory engaged in asbestos constant for a given size filter. The field size
counting shall participate in the Proficiency for that analyst is constant (i.e. the analyst
Analytical Testing Program, the Asbestos is using an assigned microscope and is not
Analyst Registry or equivalent. changing the reticle).
6.8.4. Each analyst shall select and count For example, if the exposed area of the fil-
prepared slides from a slide bank. These ter is always 385 mm2 and the size of the field
are quality assurance counts. The slide bank is always 0.00785 mm2 the number of fields
shall be prepared using uniformly distributed per filter will always be 49,000. In addition it
samples taken from the workload. Fiber den- is necessary to convert liters of air to cc.
sities should cover the entire range routinely These three constants can then be combined
analyzed by the laboratory. These slides are such that ECA/(1,000MFA)=49. The previous
counted blind by all counters to establish an equation simplifies to:
original standard deviation. This historical
distribution is compared with the quality as- FB BFB
surance counts. A counter must have 95% of 49
all quality control samples counted within FL BFL
three standard deviations of the historical AC =
mean. This count is then integrated into a FR T
new historical mean and standard deviation
for the slide. 7.3. Recount Calculations
The analyses done by the counters to es-
As mentioned in step 13 of Section 6.6.2., a
tablish the slide bank may be used for an in-
blind recount of 10% of the slides is per-
terim quality control program if the data are
formed. In all cases, differences will be ob-
treated in a proper statistical fashion.
served between the first and second counts of
7. Calculations the same filter wedge. Most of these dif-
ferences will be due to chance alone, that is,
7.1. Calculate the estimated airborne asbes- due to the random variability (precision) of
tos fiber concentration on the filter sample the count method. Statistical recount cri-
using the following formula: teria enables one to decide whether observed
differences can be explained due to chance
FB BFB alone or are probably due to systematic dif-
ECA ferences between analysts, microscopes, or

AC = FL BFL other biasing factors.


The following recount criterion is for a
1000 FR T MFA pair of counts that estimate AC in fibers/cc.
where: The criterion is given at the type-I error
level. That is, there is 5% maximum risk
AC=Airborne fiber concentration that we will reject a pair of counts for the
FB=Total number of fibers greater than 5 m reason that one might be biased, when the
counted large observed difference is really due to
FL=Total number of fields counted on the chance.
filter Reject a pair of counts if:
BFB=Total number of fibers greater than 5
m counted in the blank
AC 2 AC1 > 2.78
ER29JN95.002</GPH>

BFL=Total number of fields counted on the


blank

( )
ECA=Effective collecting area of filter (385
mm2 nominal for a 25-mm filter.) AC AVG CVFB
FR=Pump flow rate (L/min)
MFA=Microscope count field area (mm2). Where:
ER10AU94.034</GPH>

This is 0.00785 mm2 for a Walton-Beckett AC1=lower estimated airborne fiber con-
Graticule. centration

552
ER10AU94.033</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00562 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101
AC2=higher estimated airborne fiber con- 8.10. Dixon, W.C., Applications of Optical Mi-
centration croscopy in Analysis of Asbestos and Quartz,
ACavg=average of the two concentration esti- Analytical Techniques in Occupational
mates Health Chemistry, edited by D.D. Dollberg
CVFB=CV for the average of the two con- and A.W. Verstuyft. Wash. DC: American
centration estimates Chemical Society, (ACS Symposium Series
If a pair of counts are rejected by this cri- 120) 1980. pp. 1341.
terion then, recount the rest of the filters in
the submitted set. Apply the test and reject Quality Control
any other pairs failing the test. Rejection The OSHA asbestos regulations require
shall include a memo to the industrial hy- each laboratory to establish a quality con-
gienist stating that the sample failed a sta- trol program. The following is presented as
tistical test for homogeneity and the true air an example of how the OSHA-SLTC con-
concentration may be significantly different structed its internal CV curve as part of
than the reported value. meeting this requirement. Data is from 395
samples collected during OSHA compliance
7.4. Reporting Results inspections and analyzed from October 1980
Report results to the industrial hygienist through April 1986.
as fibers/cc. Use two significant figures. If Each sample was counted by 2 to 5 dif-
multiple analyses are performed on a sam- ferent counters independently of one an-
ple, an average of the results is to be re- other. The standard deviation and the CV
ported unless any of the results can be re- statistic was calculated for each sample.
jected for cause. This data was then plotted on a graph of CV
vs. fibers/mm2. A least squares regression
8. References was performed using the following equation:
8.1. Dreesen, W.C., et al., U.S. Public Health CV = antilog10[A(log10(x))2+B(log10(x))+C]
Service: A Study of Asbestosis in the Asbestos where:
Textile Industry (Public Health Bulletin No. x = the number of fibers/mm2
241), U.S. Treasury Dept., Washington, DC, Application of least squares gave:
1938. A = 0.182205
8.2. Asbestos Research Council: The Measure- B = 0.973343
ment of Airborne Asbestos Dust by the Mem- C = 0.327499
brane Filter Method (Technical Note), Asbes- Using these values, the equation becomes:
tos Research Council, Rockdale, Lancashire,
Great Britain, 1969. CV = antilog10[0.182205(log10(x))2
8.3. Bayer, S.G., Zumwalde, R.D., Brown, 0.973343(log10(x))+0.327499]
T.A., Equipment and Procedure for Mounting Sampling Pump Flow Rate Corrections
Millipore Filters and Counting Asbestos Fibers
by Phase Contrast Microscopy, Bureau of Oc- This correction is used if a difference
cupational Health, U.S. Dept. of Health, Edu- greater than 5% in ambient temperature and/
cation and Welfare, Cincinnati, OH, 1969. or pressure is noted between calibration and
8.4. NIOSH Manual of Analytical Methods, sampling sites and the pump does not com-
2nd ed., Vol. 1 (DHEW/NIOSH Pub. No. 77 pensate for the differences.
157A). National Institute for Occupational
Safety and Health, Cincinnati, OH, 1977. pp.
239123921.
P T
8.5. Asbestos, Code of Federal Regulations Q act = Q cal cal act
29 CFR 1910.1001. 1971. Pact Tcal
8.6. Occupational Exposure to Asbestos,
Tremolite, Anthophyllite, and Actinolite. Final Where:
Rule, FEDERAL REGISTER 51:119 (20 June 1986). Qact = actual flow rate
pp. 2261222790. Qcal = calibrated flow rate (if a rotameter was
8.7. Asbestos, Tremolite, Anthophyllite, and used, the rotameter value)
Actinolite, Code of Federal Regulations Pcal = uncorrected air pressure at calibration
1910.1001. 1988. pp. 711752. Pact = uncorrected air pressure at sampling
8.8. Criteria for a Recommended Standard site
Occupational Exposure to Asbestos (DHEW/ Tact = temperature at sampling site (K)
NIOSH Pub. No. HSM 7210267), National In- Tcal = temperature at calibration (K)
stitute for Occupational Safety and Health,
Walton-Beckett Graticule
NIOSH, Cincinnati, OH, 1972. pp. III1III24.
8.9. Leidel, N.A., Bayer, S.G., Zumwalde, When ordering the Graticule for asbestos
R.D., Busch, K.A., USPHS/NIOSH Membrane counting, specify the exact disc diameter
Filter Method for Evaluating Airborne Asbestos needed to fit the ocular of the microscope
Fibers (DHEW/NIOSH Pub. No. 79127). Na- and the diameter (mm) of the circular count-
tional Institute for Occupational Safety and ing area. Instructions for measuring the di-
Health, Cincinnati, OH, 1979. mensions necessary are listed:

553
ER10AU94.036</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00563 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)
(1) Insert any available graticule into the (7) Each eyepiece-objective-reticle com-
focusing eyepiece and focus so that the grati- bination on the microscope must be cali-
cule lines are sharp and clear. brated. Should any of the three be changed
(2) Align the microscope. (by zoom adjustment, disassembly, replace-
(3) Place a stage micrometer on the micro- ment, etc.), the combination must be recali-
scope object stage and focus the microscope brated. Calibration may change if interpupil-
on the graduated lines. lary distance is changed.
(4) Measure the magnified grid length, PL
Measure the field diameter, D (acceptable
(m), using the stage micrometer.
(5) Remove the graticule from the micro- range: 100 2 m) with a stage micrometer
scope and measure its actual grid length, AL upon receipt of the graticule from the manu-
(mm). This can be accomplished by using a facturer. Determine the field area (mm2).
mechanical stage fitted with verniers, or a Field Area = (D/2) 2
jewelers loupe with a direct reading scale. If D = 100 m=0.1 mm, then
(6) Let D=100 m. Calculate the circle di- Field Area = (0.1 mm/2) 2=0.00785 mm 2
ameter, dc (mm), for the Walton-Beckett
The Graticule is available from: Graticules
graticule and specify the diameter when
Ltd., Morley Road, Tonbridge TN9 IRN,
making a purchase:
Kent, England (Telephone 01144732359061).
AL D Also available from PTR Optics Ltd., 145
dc = Newton Street, Waltham, MA 02154 [tele-
PL phone (617) 8916000] or McCrone Accessories
and Components, 2506 S. Michigan Ave., Chi-
Example: If PL=108 m, AL=2.93 mm and
D=100 m, then, cago, IL 60616 [phone (312)-8427100]. The
graticule is custom made for each micro-
2.93 100 scope.
dc = = 2.71mm
108

ER10AU94.038</GPH></EXAMPLE>

554
ER10AU94.037</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00564 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

COUNTS FOR THE FIBERS IN THE FIGURE istered to all employees who are exposed to
asbestos above the permissible exposure
Structure No. Count Explanation limit, and who will therefore be included in
1 to 6 ............. 1 Single fibers all contained within the their employers medical surveillance pro-
Circle. gram. Part 1 of the appendix contains the
7 .....................
12 Fiber crosses circle once. Initial Medical Questionnaire, which must be
8 ..................... 0 Fiber too short. obained for all new hires who will be covered
9 ..................... 2 Two crossing fibers.
10 ................... 0 Fiber outside graticule.
by the medical surveillance requirements.
11 ................... 0 Fiber crosses graticule twice. Part 2 includes the abbreviated Periodical
12 ................... 12 Although split, fiber only crosses Medical Questionnaire, which must be ad-
once. ministered to all employees who are pro-
vided periodic medical examinations under
APPENDIX C TO 1926.1101 [RESERVED] the medical surveillance provisions of the
standard.
APPENDIX D TO 1926.1101MEDICAL
QUESTIONNAIRES; MANDATORY
This mandatory appendix contains the
medical questionnaires that must be admin-

555
ER10au94.025</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00565 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

556
EC30OC91.064</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00566 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

557
EC30OC91.065</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00567 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

558
EC30OC91.066</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00568 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

559
EC30OC91.067</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00569 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

560
EC30OC91.068</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00570 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

561
EC30OC91.069</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00571 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

562
EC30OC91.070</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00572 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

563
EC30OC91.071</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00573 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

564
EC30OC91.072</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00574 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

565
EC30OC91.073</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00575 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)

566
EC30OC91.074</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00576 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

APPENDIX E TO 1926.1101INTERPRETATION APPENDIX F TO 1926.1101WORK PRACTICES


AND CLASSIFICATION OF CHEST ROENTGENO- AND ENGINEERING CONTROLS FOR CLASS I
GRAMSMANDATORY ASBESTOS OPERATIONS (NON-MANDATORY)
(a) Chest roentgenograms shall be inter- This is a non-mandatory appendix to the
preted and classified in accordance with a asbestos standards for construction and for
professionally accepted classification system shipyards. It describes criteria and proce-
and recorded on an interpretation form fol- dures for erecting and using negative pres-
lowing the format of the CDC/NIOSH (M) 2.8 sure enclosures for Class I Asbestos Work,
form. As a minimum, the content within the when NPEs are used as an allowable control
bold lines of this form (items 1 through 4) method to comply with paragraph (g)(5)(i) of
shall be included. This form is not to be sub- this section. Many small and variable details
mitted to NIOSH. are involved in the erection of a negative
(b) Roentgenograms shall be interpreted pressure enclosure. OSHA and most partici-
and classified only by a B-reader, a board eli- pants in the rulemaking agreed that only the
gible/certified radiologist, or an experienced major, more performance oriented criteria
should be made mandatory. These criteria
physician with known s.
are set out in paragraph (g) of this section.
(c) All interpreters, whenever interpreting
In addition, this appendix includes these
chest roentgenograms made under this sec- mandatory specifications and procedures in
tion, shall have immediately available for its guidelines in order to make this appendix
reference a complete set of the ILO-U/C coherent and helpful. The mandatory nature
International Classification of Radiographs of the criteria which appear in the regu-
for Pneumoconioses, 1980. latory text is not changed because they are
included in this non-mandatory appendix.

567
EC30OC91.075</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00577 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)
Similarly, the additional criteria and proce- A physical description of the work area;
dures included as guidelines in the appendix, A description of the approximate amount of
do not become mandatory because manda- material to be removed;
tory criteria are also included in these com- A schedule for turning off and sealing exist-
prehensive guidelines. ing ventilation systems;
In addition, none of the criteria, both man- Personnel hygiene procedures;
datory and recommended, are meant to A description of personal protective equip-
specify or imply the need for use of patented ment and clothing to be worn by employ-
or licensed methods or equipment. Rec- ees;
ommended specifications included in this at- A description of the local exhaust ventila-
tachment should not discourage the use of tion systems to be used and how they are
creative alternatives which can be shown to to be tested;
reliably achieve the objectives of negative- A description of work practices to be ob-
pressure enclosures. served by employees;
Requirements included in this appendix, An air monitoring plan;
cover general provisions to be followed in all
A description of the method to be used to
asbestos jobs, provisions which must be fol-
transport waste material; and
lowed for all Class I asbestos jobs, and provi-
The location of the dump site.
sions governing the construction and testing
of negative pressure enclosures. The first Materials and Equipment Necessary for Asbestos
category includes the requirement for use of Removal
wet methods, HEPA vacuums, and imme-
diate bagging of waste; Class I work must Although individual asbestos removal
conform to the following provisions: projects vary in terms of the equipment re-
oversight by competent person quired to accomplish the removal of the ma-
use of critical barriers over all openings terials, some equipment and materials are
to work area common to most asbestos removal oper-
isolation of HVAC systems ations.
use of impermeable dropcloths and cov- Plastic sheeting used to protect horizontal
erage of all objects within regulated areas surfaces, seal HVAC openings or to seal
In addition, more specific requirements for vertical openings and ceilings should have a
NPEs include: minimum thickness of 6 mils. Tape or other
maintenance of 0.02 inches water gauge adhesive used to attach plastic sheeting
within enclosure should be of sufficient adhesive strength to
manometric measurements support the weight of the material plus all
air movement away from employees per- stresses encountered during the entire dura-
forming removal work tion of the project without becoming de-
smoke testing or equivalent for detection tached from the surface.
of leaks and air direction Other equipment and materials which
deactivation of electrical circuits, if not should be available at the beginning of each
provided with ground-fault circuit inter- project are:
rupters. HEPA Filtered Vacuum is essential for
cleaning the work area after the asbestos
Planning the Project has been removed. It should have a long
The standard requires that an exposure as- hose capable of reaching out-of-the-way
sessment be conducted before the asbestos places, such as areas above ceiling tiles,
job is begun [ 1926.1101 (f)(1)]. Information behind pipes, etc.
needed for that assessment, includes data re- Portable air ventilation systems installed
lating to prior similar jobs, as applied to the to provide the negative air pressure and air
specific variables of the current job. The in- removal from the enclosure must be
formation needed to conduct the assessment equipped with a HEPA filter. The number
will be useful in planning the project, and in and capacity of units required to ventilate
complying with any reporting requirements an enclosure depend on the size of the area
under this standard, when significant to be ventilated. The filters for these sys-
changes are being made to a control system tems should be designed in such a manner
listed in the standard, [see also those of that they can be replaced when the air flow
USEPA (40 CFR 61, subpart M). Thus, al- volume is reduced by the build-up of dust
though the standard does not explicitly re- in the filtration material. Pressure moni-
quire the preparation of a written asbestos toring devices with alarms and strip chart
removal plan, the usual constituents of such recorders attached to each system to indi-
a plan, i.e., a description of the enclosure, cate the pressure differential and the loss
the equipment, and the procedures to be used due to dust buildup on the filter are rec-
throughout the project, must be determined ommended.
before the enclosure can be erected. The fol- Water sprayers should be used to keep the
lowing information should be included in the asbestos material as saturated as possible
planning of the system: during removal; the sprayers will provide a

568

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00578 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101
fine mist that minimizes the impact of the sheeting should be secured with duct tape or
spray on the material. an equivalent method to provide a tight seal
Water used to saturate the asbestos con- around the object.
taining material can be amended by adding Bagging Waste: In addition to the require-
at least 15 milliliters (14 ounce) of wetting ment for immediate bagging of waste for dis-
agent in 1 liter (1 pint) of water. An exam- posal, it is further recommended that the
ple of a wetting agent is a 50/50 mixture of waste material be double-bagged and sealed
polyoxyethylene ether and in plastic bags designed for asbestos disposal.
polyoxyethylene polyglycol ester. The bags should be stored in a waste storage
Backup power supplies are recommended, area that can be controlled by the workers
especially for ventilation systems. conducting the removal. Filters removed
Shower and bath water should be with from air handling units and rubbish removed
mixed hot and cold water faucets. Water from the area are to be bagged and handled
that has been used to clean personnel or as hazardous waste.
equipment should either be filtered or be
collected and discarded as asbestos waste. Constructing the Enclosure
Soap and shampoo should be provided to The enclosure should be constructed to
aid in removing dust from the workers provide an air-tight seal around ducts and
skin and hair. openings into existing ventilation systems
See paragraphs (h) and (i) of this section and around penetrations for electrical con-
for appropriate respiratory protection and duits, telephone wires, water lines, drain
protective clothing. pipes, etc. Enclosures should be both airtight
See paragraph (k) of this section for re- and watertight except for those openings de-
quired signs and labels. signed to provide entry and/or air flow con-
trol.
Preparing the Work Area
Size: An enclosure should be the minimum
Disabling HVAC Systems: The power to volume to encompass all of the working sur-
the heating, ventilation, and air condi- faces yet allow unencumbered movement by
tioning systems that service the restricted the worker(s), provide unrestricted air flow
area must be deactivated and locked off. All past the worker(s), and ensure walking sur-
ducts, grills, access ports, windows and vents faces can be kept free of tripping hazards.
must be sealed off with two layers of plastic Shape: The enclosure may be any shape
to prevent entrainment of contaminated air. that optimizes the flow of ventilation air
Operating HVAC Systems in the Restricted past the worker(s).
Area: If components of a HVAC system lo- Structural Integrity: The walls, ceilings
cated in the restricted area are connected to and floors must be supported in such a man-
a system that will service another zone dur- ner that portions of the enclosure will not
ing the project, the portion of the duct in the fall down during normal use.
restricted area must be sealed and pressur- Openings: It is not necessary that the
ized. Necessary precautions include caulking structure be airtight; openings may be de-
the duct joints, covering all cracks and open- signed to direct air flow. Such openings
ings with two layers of sheeting, and pres- should be located at a distance from active
surizing the duct throughout the duration of removal operations. They should be designed
the project by restricting the return air flow. to draw air into the enclosure under all an-
The power to the fan supplying the positive ticipated circumstances. In the event that
pressure should be locked on to prevent negative pressure is lost, they should be
pressure loss. fitted with either HEPA filters to trap dust
Sealing Elevators: If an elevator shaft is or automatic trap doors that prevent dust
located in the restricted area, it should be ei- from escaping the enclosure. Openings for
ther shut down or isolated by sealing with exits should be controlled by an airlock or a
two layers of plastic sheeting. The sheeting vestibule.
should provide enough slack to accommo- Barrier Supports: Frames should be con-
date the pressure changes in the shaft with- structed to support all unsupported spans of
out breaking the air-tight seal. sheeting.
Removing Mobile Objects: All movable ob- Sheeting: Walls, barriers, ceilings, and
jects should be cleaned and removed from floors should be lined with two layers of
the work area before an enclosure is con- plastic sheeting having a thickness of at
structed unless moving the objects creates a least 6 mil.
hazard. Mobile objects will be assumed to be Seams: Seams in the sheeting material
contaminated and should be either cleaned should be minimized to reduce the possibili-
with amended water and a HEPA vacuum ties of accidental rips and tears in the adhe-
and then removed from the area or wrapped sive or connections. All seams in the sheet-
and then disposed of as hazardous waste. ing should overlap, be staggered and not be
Cleaning and Sealing Surfaces: After located at corners or wall-to-floor joints.
cleaning with water and a HEPA vacuum, Areas Within an Enclosure: Each enclosure
surfaces of stationary objects should be cov- consists of a work area, a decontamination
ered with two layers of plastic sheeting. The area, and waste storage area. The work area

569

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00579 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)
where the asbestos removal operations occur figuration, and shape of the enclosure as well
should be separated from both the waste as ambient and mechanical air pressure con-
storage area and the contamination control ditions around the enclosure.
area by physical curtains, doors, and/or air- Air Flow Patterns: The flow of air past
flow patterns that force any airborne con- each worker shall be enhanced by posi-
tamination back into the work area. tioning the intakes and exhaust ports to re-
See paragraph (j) of this section for re- move contaminated air from the workers
quirements for hygiene facilities. breathing zone, by positioning HEPA vacu-
During egress from the work area, each um cleaners to draw air from the workers
worker should step into the equipment room, breathing zone, by forcing relatively
clean tools and equipment, and remove gross uncontaminated air past the worker toward
contamination from clothing by wet clean- an exhaust port, or by using a combination
ing and HEPA vacuuming. Before entering of methods to reduce the workers exposure.
the shower area, foot coverings, head cov- Air Handling Unit Exhaust: The exhaust
erings, hand coverings, and coveralls are re- plume from air handling units should be lo-
moved and placed in impervious bags for dis- cated away from adjacent personnel and in-
posal or cleaning. Airline connections from takes for HVAC systems.
airline respirators with HEPA disconnects Air Flow Volume: The air flow volume
and power cables from powered air-purifying (cubic meters per minute) exhausted (re-
respirators (PAPRs) will be disconnected moved) from the workplace must exceed the
just prior to entering the shower room. amount of makeup air supplied to the enclo-
sure. The rate of air exhausted from the en-
Establishing Negative Pressure Within the closure should be designed to maintain a
Enclosure negative pressure in the enclosure and air
Negative Pressure: Air is to be drawn into movement past each worker. The volume of
the enclosure under all anticipated condi- air flow removed from the enclosure should
tions and exhausted through a HEPA filter replace the volume of the container at every
for 24 hours a day during the entire duration 5 to 15 minutes. Air flow volume will need to
of the project. be relatively high for large enclosures, enclo-
Air Flow Tests: Air flow patterns will be sures with awkward shapes, enclosures with
checked before removal operations begin, at multiple openings, and operations employing
least once per operating shift and any time several workers in the enclosure.
there is a question regarding the integrity of Air Flow Velocity: At each opening, the air
the enclosure. The primary test for air flow flow velocity must visibly drag air into
is to trace air currents with smoke tubes or the enclosure. The velocity of air flow within
other visual methods. Flow checks are made the enclosure must be adequate to remove
at each opening and at each doorway to dem- airborne contamination from each workers
onstrate that air is being drawn into the en- breathing zone without disturbing the asbes-
closure and at each workers position to tos-containing material on surfaces.
show that air is being drawn away from the Airlocks: Airlocks are mechanisms on
breathing zone. doors and curtains that control the air flow
Monitoring Pressure Within the Enclosure: patterns in the doorways. If air flow occurs,
After the initial air flow patterns have been the patterns through doorways must be such
checked, the static pressure must be mon- that the air flows toward the inside of the
itored within the enclosure. Monitoring may enclosure. Sometimes vestibules, double
be made using manometers, pressure gauges, doors, or double curtains are used to prevent
or combinations of these devices. It is rec- air movement through the doorways. To use
ommended that they be attached to alarms a vestibule, a worker enters a chamber by
and strip chart recorders at points identified opening the door or curtain and then closing
by the design engineer. the entry before opening the exit door or
Corrective Actions: If the manometers or curtain.
pressure gauges demonstrate a reduction in Airlocks should be located between the
pressure differential below the required equipment room and shower room, between
level, work should cease and the reason for the shower room and the clean room, and be-
the change investigated and appropriate tween the waste storage area and the outside
changes made. The air flow patterns should of the enclosure. The air flow between adja-
be retested before work begins again. cent rooms must be checked using smoke
Pressure Differential: The design param- tubes or other visual tests to ensure the flow
eters for static pressure differentials be- patterns draw air toward the work area with-
tween the inside and outside of enclosures out producing eddies.
typically range from 0.02 to 0.10 inches of
Monitoring for Airborne Concentrations
water gauge, depending on conditions. All
zones inside the enclosure must have less In addition to the breathing zone samples
pressure than the ambient pressure outside taken as outlined in paragraph (f) of this sec-
of the enclosure (0.02 inches water gauge tion, samples of air should be taken to dem-
differential). Design specifications for the onstrate the integrity of the enclosure, the
differential vary according to the size, con- cleanliness of the clean room and shower

570

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00580 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101
area, and the effectiveness of the HEPA fil- C. The potential for an asbestos-containing
ter. If the clean room is shown to be con- product to release breathable fibers depends
taminated, the room must be relocated to an largely on its degree of friability. Friable
uncontaminated area. means that the material can be crumbled
Samples taken near the exhaust of port- with hand pressure and is therefore likely to
able ventilation systems must be done with emit fibers. The fibrous fluffy sprayed-on
care. materials used for fireproofing, insulation,
or sound proofing are considered to be fri-
General Work Practices able, and they readily release airborne fibers
Preventing dust dispersion is the primary if disturbed. Materials such as vinyl-asbestos
means of controlling the spread of asbestos floor tile or roofing felt are considered non-
within the enclosure. Whenever practical, friable if intact and generally do not emit
the point of removal should be isolated, en- airborne fibers unless subjected to sanding,
closed, covered, or shielded from the workers sawing and other aggressive operations. As-
in the area. Waste asbestos containing mate- bestos-cement pipe or sheet can emit air-
rials must be bagged during or immediately borne fibers if the materials are cut or
after removal; the material must remain sawed, or if they are broken.
saturated until the waste container is sealed. D. Permissible exposure: Exposure to air-
Waste material with sharp points or cor- borne asbestos fibers may not exceed 0.1 fi-
ners must be placed in hard air-tight con- bers per cubic centimeter of air (0.1 f/cc)
tainers rather than bags. averaged over the 8-hour workday, and 1
Whenever possible, large components fiber per cubic centimeter of air (1.0 f/cc)
should be sealed in plastic sheeting and re- averaged over a 30 minute work period.
moved intact.
Bags or containers of waste will be moved II. Health Hazard Data
to the waste holding area, washed, and A. Asbestos can cause disabling respiratory
wrapped in a bag with the appropriate labels. disease and various types of cancers if the fi-
Cleaning the Work Area bers are inhaled. Inhaling or ingesting fibers
from contaminated clothing or skin can also
Surfaces within the work area should be result in these diseases. The symptoms of
kept free of visible dust and debris to the ex- these diseases generally do not appear for 20
tent feasible. Whenever visible dust appears or more years after initial exposure.
on surfaces, the surfaces within the enclo- B. Exposure to asbestos has been shown to
sure must be cleaned by wiping with a wet cause lung cancer, mesothelioma, and cancer
sponge, brush, or cloth and then vacuumed of the stomach and colon. Mesothelioma is a
with a HEPA vacuum. rare cancer of the thin membrane lining of
All surfaces within the enclosure should be the chest and abdomen. Symptoms of meso-
cleaned before the exhaust ventilation sys- thelioma include shortness of breath, pain in
tem is deactivated and the enclosure is dis- the walls of the chest, and/or abdominal
assembled. An approved encapsulant may be pain.
sprayed onto areas after the visible dust has
been removed. III. Respirators and Protective Clothing
APPENDIX G TO 1926.1101 [RESERVED] A. Respirators: You are required to wear a
respirator when performing tasks that result
APPENDIX H TO 1926.1101SUBSTANCE TECH- in asbestos exposure that exceeds the per-
NICAL INFORMATION FOR ASBESTOS. NON- missible exposure limit (PEL) of 0.1 f/cc and
MANDATORY when performing certain designated oper-
ations. Air-purifying respirators equipped
I. Substance Identification with a high-efficiency particulate air
A. Substance: Asbestos is the name of a (HEPA) filter can be used where airborne as-
class of magnesium-silicate minerals that bestos fiber concentrations do not exceed 1.0
occur in fibrous form. Minerals that are in- f/cc; otherwise, more protective respirators
cluded in this group are chrysotile, crocid- such as air-supplied, positive-pressure, full
olite, amosite, anthophyllite asbestos, facepiece respirators must be used. Dispos-
tremolite asbestos, and actinolite asbestos. able respirators or dust masks are not per-
B. Asbestos is and was used in the manu- mitted to be used for asbestos work. For ef-
facture of heat-resistant clothing, auto- fective protection, respirators must fit your
motive brake and clutch linings, and a vari- face and head snugly. Your employer is re-
ety of building materials including floor quired to conduct a fit test when you are
tiles, roofing felts, ceiling tiles, asbestos-ce- first assigned a respirator and every 6
ment pipe and sheet, and fire-resistant months thereafter. Respirators should not be
drywall. Asbestos is also present in pipe and loosened or removed in work situations
boiler insulation materials and in sprayed-on where their use is required.
materials located on beams, in crawlspaces, B. Protective Clothing: You are required to
and between walls. wear protective clothing in work areas where

571

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00581 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)
asbestos fiber concentrations exceed the per- aminations. These exposure records must be
missible exposure limit (PEL) of 0.1 f/cc. kept for at least thirty (30) years. Medical
records must be kept for the period of your
IV. Disposal Procedures and Clean-up employment plus thirty (30) years.
A. Wastes that are generated by processes D. Your employer is required to release
where asbestos is present include: your exposure and medical records to your
1. Empty asbestos shipping containers. physician or designated representative upon
2. Process wastes such as cuttings, trim- your written request.
mings, or reject materials.
3. Housekeeping waste from wet-sweeping APPENDIX I TO 1926.1101MEDICAL SURVEIL-
or HEPA-vacuuming. LANCE GUIDELINES FOR ASBESTOS, NON-
4. Asbestos fireproofing or insulating mate- MANDATORY
rial that is removed from buildings.
5. Asbestos-containing building products I. Route of Entry
removed during building renovation or dem- Inhalation, ingestion.
olition.
6. Contaminated disposable protective II. Toxicology
clothing.
B. Empty shipping bags can be flattened Clinical evidence of the adverse effects as-
under exhaust hoods and packed into air- sociated with exposure to asbestos is present
tight containers for disposal. Empty ship- in the form of several well-conducted epide-
ping drums are difficult to clean and should miological studies of occupationally exposed
be sealed. workers, family contacts of workers, and
C. Vacuum bags or disposable paper filters persons living near asbestos mines. These
should not be cleaned, but should be sprayed studies have shown a definite association be-
with a fine water mist and placed into a la- tween exposure to asbestos and an increased
beled waste container. incidence of lung cancer, pleural and peri-
D. Process waste and housekeeping waste toneal mesothelioma, gastrointestinal can-
should be wetted with water or a mixture of cer, and asbestosis. The latter is a disabling
water and surfactant prior to packaging in fibrotic lung disease that is caused only by
disposable containers. exposure to asbestos. Exposure to asbestos
E. Asbestos-containing material that is re- has also been associated with an increased
moved from buildings must be disposed of in incidence of esophageal, kidney, laryngeal,
leak-tight 6-mil plastic bags, plastic-lined pharyngeal, and buccal cavity cancers. As
cardboard containers, or plastic-lined metal with other known chronic occupational dis-
containers. These wastes, which are removed eases, disease associated with asbestos gen-
while wet, should be sealed in containers be- erally appears about 20 years following the
fore they dry out to minimize the release of first occurrence of exposure: There are no
asbestos fibers during handling. known acute effects associated with expo-
sure to asbestos.
V. Access to Information Epidemiological studies indicate that the
A. Each year, your employer is required to risk of lung cancer among exposed workers
inform you of the information contained in who smoke cigarettes is greatly increased
this standard and appendices for asbestos. In over the risk of lung cancer among non-ex-
addition, your employer must instruct you posed smokers or exposed nonsmokers. These
in the proper work practices for handling as- studies suggest that cessation of smoking
bestos-containing materials, and the correct will reduce the risk of lung cancer for a per-
use of protective equipment. son exposed to asbestos but will not reduce it
B. Your employer is required to determine to the same level of risk as that existing for
whether you are being exposed to asbestos. an exposed worker who has never smoked.
Your employer must treat exposure to ther- III. Signs and Symptoms of Exposure-Related
mal system insulation and sprayed-on and Disease
troweled-on surfacing material as asbestos
exposure, unless results of laboratory anal- The signs and symptoms of lung cancer or
ysis show that the material does not contain gastrointestinal cancer induced by exposure
asbestos. You or your representative has the to asbestos are not unique, except that a
right to observe employee measurements and chest X-ray of an exposed patient with lung
to record the results obtained. Your em- cancer may show pleural plaques, pleural
ployer is required to inform you of your ex- calcification, or pleural fibrosis. Symptoms
posure, and, if you are exposed above the per- characteristic of mesothelioma include
missible exposure limit, he or she is required shortness of breath, pain in the walls of the
to inform you of the actions that are being chest, or abdominal pain. Mesothelioma has
taken to reduce your exposure to within the a much longer latency period compared with
permissible limit. lung cancer (40 years versus 1520 years), and
C. Your employer is required to keep mesothelioma is therefore more likely to be
records of your exposures and medical ex- found among workers who were first exposed

572

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00582 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101
to asbestos at an early age. Mesothelioma is (iii) A physical examination including a
always fatal. chest roentgenogram and pulmonary func-
Asbestosis is pulmonary tibrosis caused by tion test that includes measurement of the
the accumulation of asbestos fibers in the employees forced vital capacity (FVC) and
lungs. Symptoms include shortness of forced expiratory volume at one second
breath, coughing, fatigue, and vague feelings (FEV1).
of sickness. When the fibrosis worsens, short- (iv) Any laboratory or other test that the
ness of breath occurs even at rest. The diag- examining physician deems by sound med-
nosis of asbestosis is based on a history of ical practice to be necessary.
exposure to asbestos, the presence of charac-
The employer is required to make the pre-
teristics radiologic changes, end-inspiratory
crackles (rales), and other clinical features scribed tests available at least annually to
of fibrosing lung disease. Pleural plaques and those employees covered; more often than
thickening are observed on X-rays taken specified if recommended by the examining
during the early stages of the disease. Asbes- physician; and upon termination of employ-
tosis is often a progressive disease even in ment.
the absence of continued exposure, although The employer is required to provide the
this appears to be a highly individualized physician with the following information: A
characteristic. In severe cases, death may be copy of this standard and appendices; a de-
caused by respiratory or cardiac failure. scription of the employees duties as they re-
late to asbestos exposure; the employees
IV. Surveillance and Preventive Considerations representative level of exposure to asbestos;
As noted above, exposure to asbestos has a description of any personal protective and
been linked to an increased risk of lung can- respiratory equipment used; and information
cer, mesothelioma, gastrointestinal cancer, from previous medical examinations of the
and asbestosis among occupationally ex- affected employee that is not otherwise
posed workers. Adequate screening tests to available to the physician. Making this in-
determine an employees potential for devel- formation available to the physician will aid
oping serious chronic diseases, such as a can- in the evaluation of the employees health in
cer, from exposure to asbestos do not pres- relation to assigned duties and fitness to
ently exist. However, some tests, particu- wear personal protective equipment, if re-
larly chest X-rays and pulmonary function quired.
tests, may indicate that an employee has The employer is required to obtain a writ-
been overexposed to asbestos increasing his ten opinion from the examining physician
or her risk of developing exposure related containing the results of the medical exam-
chronic diseases. It is important for the phy- ination; the physicians opinion as to wheth-
sician to become familiar with the operating
er the employee has any detected medical
conditions in which occupational exposure to
conditions that would place the employee at
asbestos is likely to occur. This is particu-
an increased risk of exposure-related disease;
larly important in evaluating medical and
work histories and in conducting physical any recommended limitations on the em-
examinations. When an active employee has ployee or on the use of personal protective
been identified as having been overexposed equipment; and a statement that the em-
to asbestos measures taken by the employer ployee has been informed by the physician of
to eliminate or mitigate further exposure the results of the medical examination and
should also lower the risk of serious long- of any medical conditions related to asbestos
term consequences. exposure that require further explanation or
The employer is required to institute a treatment. This written opinion must not re-
medical surveillance program for all employ- veal specific findings or diagnoses unrelated
ees who are or will be exposed to asbestos at to exposure to asbestos, and a copy of the
or above the permissible exposure limit (0.1 opinion must be provided to the affected em-
fiber per cubic centimeter of air). All exami- ployee.
nations and procedures must be performed
by or under the supervision of a licensed APPENDIX J TO 1926.1101SMOKING CES-
physician, at a reasonable time and place, SATION PROGRAM INFORMATION FOR ASBES-
and at no cost to the employee. TOSNON-MANDATORY
Although broad latitude is given to the
physician in prescribing specific tests to be The following organizations provide smok-
included in the medical surveillance pro- ing cessation information.
gram, OSHA requires inclusion of the fol- 1. The National Cancer Institute operates a
lowing elements in the routine examination: toll-free Cancer Information Service (CIS)
(i) Medical and work histories with special with trained personnel to help you. Call 1
emphasis directed to symptoms of the res- 8004CANCER* to reach the CIS office serv-
piratory system, cardiovascular system, and ing your area, or write: Office of Cancer
digestive tract. Communications, National Cancer Institute,
(ii) Completion of the respiratory disease National Institutes of Health, Building 31
questionnaire contained in appendix D. Room 10A24, Bethesda, Maryland 20892.

573

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00583 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)
2. American Cancer Society, 3340 Peachtree ID191
Road, N.E., Atlanta, Georgia 30026, (404) Matrix: Bulk
3203333 Collection Procedure:
The American Cancer Society (ACS) is a Collect approximately 1 to 2 grams of each
voluntary organization composed of 58 divi- type of material and place into separate
sions and 3,100 local units. Through The 20 mL scintillation vials.
Great American Smokeout in November, Analytical Procedure:
the annual Cancer Crusade in April, and nu- A portion of each separate phase is ana-
merous educational materials, ACS helps lyzed by gross examination, phase-polar
people learn about the health hazards of examination, and central stop dispersion
smoking and become successful ex-smokers. microscopy.
3. American Heart Association, 7320 Green- Commercial manufacturers and products
ville Avenue, Dallas, Texas 75231, (214) 750 mentioned in this method are for descriptive
5300 use only and do not constitute endorsements
by USDOL-OSHA. Similar products from
The American Heart Association (AHA) is other sources may be substituted.
a voluntary organization with 130,000 mem-
bers (physicians, scientists, and laypersons) 1. Introduction
in 55 state and regional groups. AHA pro-
duces a variety of publications and audio- This method describes the collection and
visual materials about the effects of smok- analysis of asbestos bulk materials by light
ing on the heart. AHA also has developed a microscopy techniques including phase-
guidebook for incorporating a weight-control polar illumination and central-stop disper-
component into smoking cessation pro- sion microscopy. Some terms unique to as-
grams. bestos analysis are defined below:
Amphibole: A family of minerals whose
4. American Lung Association, 1740 Broad-
crystals are formed by long, thin units which
way, New York, New York 10019, (212) 245
have two thin ribbons of double chain sili-
8000
cate with a brucite ribbon in between. The
A voluntary organization of 7,500 members shape of each unit is similar to an I beam.
(physicians, nurses, and laypersons), the Minerals important in asbestos analysis in-
American Lung Association (ALA) conducts clude cummingtonite-grunerite, crocidolite,
numerous public information programs tremolite-actinolite and anthophyllite.
about the health effects of smoking. ALA Asbestos: A term for naturally occurring fi-
has 59 state and 85 local units. The organiza- brous minerals. Asbestos includes chrysotile,
tion actively supports legislation and infor- cummingtonite-grunerite asbestos (amosite),
mation campaigns for non-smokers rights anthophyllite asbestos, tremolite asbestos,
and provides help for smokers who want to crocidolite, actinolite asbestos and any of
quit, for example, through Freedom From these minerals which have been chemically
Smoking, a self-help smoking cessation treated or altered. The precise chemical for-
program. mulation of each species varies with the lo-
5. Office on Smoking and Health, U.S. De- cation from which it was mined. Nominal
partment of Health and Human Services, compositions are listed:
5600 Fishers Lane, Park Building, Room Chrysotile...............................Mg3 Si2 O5(OH)4
110, Rockville, Maryland 20857 Crocidolite (Riebeckite asbestos)..............Na2
The Office on Smoking and Health (OSH) is Fe32+Fe23+Si8 O22(OH)2
the Department of Health and Human Serv- Cummingtonite-Grunerite asbestos
ices lead agency in smoking control. OSH (Amosite) .................(Mg,Fe)7 Si8 O22(OH)2
has sponsored distribution of publications on Tremolite-Actinolite asbestos .....Ca2(Mg,Fe)5
smoking-related topics, such as free flyers on Si8 O22(OH)2
relapse after initial quitting, helping a Anthophyllite asbestos ................(Mg,Fe)7 Si8
friend or family member quit smoking, the O22(OH)2
health hazards of smoking, and the effects of Asbestos Fiber: A fiber of asbestos meeting
parental smoking on teenagers. the criteria for a fiber. (See section 3.5. of
*In Hawaii, on Oahu call 5241234 (call col- this Appendix)
lect from neighboring islands), Aspect Ratio: The ratio of the length of a
Spanish-speaking staff members are avail- fiber to its diameter usually defined as
able during daytime hours to callers from length : width, e.g. 3:1.
the following areas: California, Florida, Brucite: A sheet mineral with the composi-
Georgia, Illinois, New Jersey (area code 201), tion Mg(OH)2.
New York, and Texas. Consult your local Central Stop Dispersion Staining (microscope):
telephone directory for listings of local chap- This is a dark field microscope technique
ters. that images particles using only light re-
fracted by the particle, excluding light that
APPENDIX K TO 1926.1101POLARIZED LIGHT
travels through the particle unrefracted.
MICROSCOPY OF ASBESTOS (NON-MANDATORY)
This is usually accomplished with a McCrone
Method number: objective or other arrangement which places

574

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00584 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101
a circular stop with apparent aperture equal tos mines. Although known to be injurious
to the objective aperture in the back focal for centuries, the first modern references to
plane of the microscope. its toxicity were by the British Labor
Cleavage Fragments: Mineral particles Inspectorate when it banned asbestos dust
formed by the comminution of minerals, es- from the workplace in 1898. Asbestosis cases
pecially those characterized by relatively were described in the literature after the
parallel sides and moderate aspect ratio. turn of the century. Cancer was first sus-
Differential Counting: The term applied to pected in the mid 1930s and a causal link to
the practice of excluding certain kinds of fi- mesothelioma was made in 1965. Because of
bers from a phase contrast asbestos count
the public concern for worker and public
because they are not asbestos.
safety with the use of this material, several
Fiber: A particle longer than or equal to 5
m with a length to width ratio greater than different types of analysis were applied to
or equal to 3:1. This may include cleavage the determination of asbestos content. Light
fragments. (see section 3.5 of this appendix). microscopy requires a great deal of experi-
Phase Contrast: Contrast obtained in the ence and craft. Attempts were made to apply
microscope by causing light scattered by less subjective methods to the analysis. X-
small particles to destructively interfere ray diffraction was partially successful in
with unscattered light, thereby enhancing determining the mineral types but was un-
the visibility of very small particles and par- able to separate out the fibrous portions
ticles with very low intrinsic contrast. from the non-fibrous portions. Also, the min-
Phase Contrast Microscope: A microscope imum detection limit for asbestos analysis
configured with a phase mask pair to create by X-ray diffraction (XRD) is about 1%. Dif-
phase contrast. The technique which uses ferential Thermal Analysis (DTA) was no
this is called Phase Contrast Microscopy more successful. These provide useful cor-
(PCM). roborating information when the presence of
Phase-Polar Analysis: This is the use of po- asbestos has been shown by microscopy;
larized light in a phase contrast microscope. however, neither can determine the dif-
It is used to see the same size fibers that are ference between fibrous and non-fibrous min-
visible in air filter analysis. Although fibers
erals when both habits are present. The same
finer than 1 m are visible, analysis of these
is true of Infrared Absorption (IR).
is inferred from analysis of larger bundles
that are usually present. When electron microscopy was applied to
Phase-Polar Microscope: The phase-polar asbestos analysis, hundreds of fibers were
microscope is a phase contrast microscope discovered present too small to be visible in
which has an analyzer, a polarizer, a first any light microscope. There are two dif-
order red plate and a rotating phase con- ferent types of electron microscope used for
denser all in place so that the polarized light asbestos analysis: Scanning Electron Micro-
image is enhanced by phase contrast. scope (SEM) and Transmission Electron Mi-
Sealing Encapsulant: This is a product croscope (TEM). Scanning Electron Micros-
which can be applied, preferably by spraying, copy is useful in identifying minerals. The
onto an asbestos surface which will seal the SEM can provide two of the three pieces of
surface so that fibers cannot be released. information required to identify fibers by
Serpentine: A mineral family consisting of electron microscopy: morphology and chem-
minerals with the general composition istry. The third is structure as determined
Mg3(Si2 O5(OH)4 having the magnesium in by Selected Area Electron Diffraction
brucite layer over a silicate layer. Minerals SAED which is performed in the TEM. Al-
important in asbestos analysis included in
though the resolution of the SEM is suffi-
this family are chrysotile, lizardite,
cient for very fine fibers to be seen, accuracy
antigorite.
of chemical analysis that can be performed
1.1. History on the fibers varies with fiber diameter in fi-
bers of less than 0.2 m diameter. The TEM
Light microscopy has been used for well
is a powerful tool to identify fibers too small
over 100 years for the determination of min-
to be resolved by light microscopy and
eral species. This analysis is carried out
using specialized polarizing microscopes as should be used in conjunction with this
well as bright field microscopes. The identi- method when necessary. The TEM can pro-
fication of minerals is an on-going process vide all three pieces of information required
with many new minerals described each for fiber identification. Most fibers thicker
year. The first recorded use of asbestos was than 1 m can adequately be defined in the
in Finland about 2500 B.C. where the mate- light microscope. The light microscope re-
rial was used in the mud wattle for the wood- mains as the best instrument for the deter-
en huts the people lived in as well as mination of mineral type. This is because
strengthening for pottery. Adverse health as- the minerals under investigation were first
pects of the mineral were noted nearly 2000 described analytically with the light micro-
years ago when Pliny the Younger wrote scope. It is inexpensive and gives positive
about the poor health of slaves in the asbes- identification for most samples analyzed.

575

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00585 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)
Further, when optical techniques are inad- (c) The analysis is quick, requires little
equate, there is ample indication that alter- preparation time, and can be performed on-
native techniques should be used for com- site if a suitably equipped microscope is
plete identification of the sample. available.
The disadvantages are:
1.2. Principle (a) Even using phase-polar illumination,
Minerals consist of atoms that may be ar- not all the fibers present may be seen. This
ranged in random order or in a regular ar- is a problem for very low asbestos concentra-
rangement. Amorphous materials have tions where agglomerations or large bundles
atoms in random order while crystalline ma- of fibers may not be present to allow identi-
terials have long range order. Many mate- fication by inference.
rials are transparent to light, at least for (b) The method requires a great degree of
small particles or for thin sections. The sophistication on the part of the
properties of these materials can be inves- microscopist. An analyst is only as useful as
tigated by the effect that the material has his mental catalog of images. Therefore, a
on light passing through it. The six asbestos microscopists accuracy is enhanced by expe-
minerals are all crystalline with particular rience. The mineralogical training of the an-
alyst is very important. It is the basis on
properties that have been identified and cat-
which subjective decisions are made.
aloged. These six minerals are anisotropic.
(c) The method uses only a tiny amount of
They have a regular array of atoms, but the
material for analysis. This may lead to sam-
arrangement is not the same in all direc-
pling bias and false results (high or low).
tions. Each major direction of the crystal
This is especially true if the sample is se-
presents a different regularity. Light pho-
verely inhomogeneous.
tons travelling in each of these main direc-
(d) Fibers may be bound in a matrix and
tions will encounter different electrical not distinguishable as fibers so identifica-
neighborhoods, affecting the path and time tion cannot be made.
of travel. The techniques outlined in this
method use the fact that light traveling 1.4. Method Performance
through fibers or crystals in different direc-
tions will behave differently, but predict- 1.4.1. This method can be used for deter-
ably. The behavior of the light as it travels mination of asbestos content from 0 to 100%
through a crystal can be measured and com- asbestos. The detection limit has not been
pared with known or determined values to adequately determined, although for selected
identify the mineral species. Usually, Polar- samples, the limit is very low, depending on
the number of particles examined. For most-
ized Light Microscopy (PLM) is performed
ly homogeneous, finely divided samples, with
with strain-free objectives on a bright-field
no difficult fibrous interferences, the detec-
microscope platform. This would limit the
tion limit is below 1%. For inhomogeneous
resolution of the microscope to about 0.4 m.
samples (most samples), the detection limit
Because OSHA requires the counting and
remains undefined. NIST has conducted pro-
identification of fibers visible in phase con-
ficiency testing of laboratories on a national
trast, the phase contrast platform is used to
scale. Although each round is reported sta-
visualize the fibers with the polarizing ele-
tistically with an average, control limits,
ments added into the light path. Polarized
etc., the results indicate a difficulty in es-
light methods cannot identify fibers finer tablishing precision especially in the low
than about 1 m in diameter even though concentration range. It is suspected that
they are visible. The finest fibers are usually there is significant bias in the low range es-
identified by inference from the presence of pecially near 1%. EPA tried to remedy this
larger, identifiable fiber bundles. When fibers by requiring a mandatory point counting
are present, but not identifiable by light mi- scheme for samples less than 10%. The point
croscopy, use either SEM or TEM to deter- counting procedure is tedious, and may in-
mine the fiber identity. troduce significant biases of its own. It has
1.3. Advantages and Disadvantages not been incorporated into this method.
1.4.2. The precision and accuracy of the
The advantages of light microcopy are: quantitation tests performed in this method
(a) Basic identification of the materials are unknown. Concentrations are easier to
was first performed by light microscopy and determine in commercial products where as-
gross analysis. This provides a large base of bestos was deliberately added because the
published information against which to amount is usually more than a few percent.
check analysis and analytical technique. An analysts results can be calibrated
(b) The analysis is specific to fibers. The against the known amounts added by the
minerals present can exist in asbestiform, fi- manufacturer. For geological samples, the
brous, prismatic, or massive varieties all at degree of homogeneity affects the precision.
the same time. Therefore, bulk methods of 1.4.3. The performance of the method is an-
analysis such as X-ray diffraction, IR anal- alyst dependent. The analyst must choose
ysis, DTA, etc. are inappropriate where the carefully and not necessarily randomly the
material is not known to be fibrous. portions for analysis to assure that detection

576

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00586 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101
of asbestos occurs when it is present. For States is composed of minerals which may
this reason, the analyst must have adequate contain asbestos. Fortunately, the actual
training in sample preparation, and experi- formation of great amounts of asbestos is
ence in the location and identification of as- relatively rare. Nonetheless, there are loca-
bestos in samples. This is usually accom- tions in which environmental exposure can
plished through substantial on-the-job train- be severe such as in the Serpentine Hills of
ing as well as formal education in min- California.
eralogy and microscopy. There are thousands of uses for asbestos in
industry and the home. Asbestos abatement
1.5. Interferences
workers are the most current segment of the
Any material which is long, thin, and population to have occupational exposure to
small enough to be viewed under the micro- great amounts of asbestos. If the material is
scope can be considered an interference for undisturbed, there is no exposure. Exposure
asbestos. There are literally hundreds of occurs when the asbestos-containing mate-
interferences in workplaces. The techniques rial is abraded or otherwise disturbed during
described in this method are normally suffi- maintenance operations or some other activ-
cient to eliminate the interferences. An ana- ity. Approximately 95% of the asbestos in
lysts success in eliminating the inter- place in the United States is chrysotile.
ferences depends on proper training. Amosite and crocidolite make up nearly
Asbestos minerals belong to two mineral all the difference. Tremolite and
families: the serpentines and the amphiboles. anthophyllite make up a very small percent-
In the serpentine family, the only common age. Tremolite is found in extremely small
fibrous mineral is chrysotile. Occasionally, amounts in certain chrysotile deposits. Ac-
the mineral antigorite occurs in a fibril tinolite exposure is probably greatest from
habit with morphology similar to the environmental sources, but has been identi-
amphiboles. The amphibole minerals consist fied in vermiculite containing, sprayed-on
of a score of different minerals of which only insulating materials which may have been
five are regulated by federal standard: certified as asbestos-free.
amosite, crocidolite, anthophyllite asbestos,
tremolite asbestos and actinolite asbestos. 1.7. Physical and Chemical Properties
These are the only amphibole minerals that
have been commercially exploited for their The nominal chemical compositions for
fibrous properties; however, the rest can and the asbestos minerals were given in Section
do occur occasionally in asbestiform habit. 1. Compared to cleavage fragments of the
In addition to the related mineral inter- same minerals, asbestiform fibers possess a
ferences, other minerals common in building high tensile strength along the fiber axis.
material may present a problem for some They are chemically inert, non-combustible,
microscopists: gypsum, anhydrite, brucite, and heat resistant. Except for chrysotile,
quartz fibers, talc fibers or ribbons, wollas- they are insoluble in Hydrochloric acid
tonite, perlite, attapulgite, etc. Other fi- (HCl). Chrysotile is slightly soluble in HCl.
brous materials commonly present in work- Asbestos has high electrical resistance and
places are: fiberglass, mineral wool, ceramic good sound absorbing characteristics. It can
wool, refractory ceramic fibers, kevlar, be woven into cables, fabrics or other tex-
nomex, synthetic fibers, graphite or carbon tiles, or matted into papers, felts, and mats.
fibers, cellulose (paper or wood) fibers, metal
fibers, etc. 1.8. Toxicology (This section is for Informa-
Matrix embedding material can sometimes tion Only and Should Not Be Taken as
be a negative interference. The analyst may OSHA Policy)
not be able to easily extract the fibers from
Possible physiologic results of respiratory
the matrix in order to use the method.
exposure to asbestos are mesothelioma of the
Where possible, remove the matrix before
pleura or peritoneum, interstitial fibrosis,
the analysis, taking careful note of the loss
asbestosis, pneumoconiosis, or respiratory
of weight. Some common matrix materials
are: vinyl, rubber, tar, paint, plant fiber, ce- cancer. The possible consequences of asbes-
ment, and epoxy. A further negative inter- tos exposure are detailed in the NIOSH Cri-
ference is that the asbestos fibers themselves teria Document or in the OSHA Asbestos
may be either too small to be seen in Phase Standards 29 CFR 1910.1001 and 29 CFR
contrast Microscopy (PCM) or of a very low 1926.1101 and 29 CFR 1915.1001.
fibrous quality, having the appearance of
2. Sampling Procedure
plant fibers. The analysts ability to deal
with these materials increases with experi- 2.1. Equipment for sampling
ence.
(a) Tube or cork borer sampling device
1.6. Uses and Occupational Exposure (b) Knife
Asbestos is ubiquitous in the environment. (c) 20 mL scintillation vial or similar vial
More than 40% of the land area of the United (d) Sealing encapsulant

577

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00587 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)
2.2. Safety Precautions 3. Analysis
Asbestos is a known carcinogen. Take care The analysis of asbestos samples can be di-
when sampling. While in an asbestos-con- vided into two major parts: sample prepara-
taining atmosphere, a properly selected and tion and microscopy. Because of the different
fit-tested respirator should be worn. Take asbestos uses that may be encountered by
samples in a manner to cause the least the analyst, each sample may need different
amount of dust. Follow these general guide- preparation steps. The choices are outlined
lines: below. There are several different tests that
(a) Do not make unnecessary dust. are performed to identify the asbestos spe-
(b) Take only a small amount (1 to 2 g). cies and determine the percentage. They will
be explained below.
(c) Tightly close the sample container.
(d) Use encapsulant to seal the spot where 3.1. Safety
the sample was taken, if necessary.
(a) Do not create unnecessary dust. Handle
2.3. Sampling Procedure the samples in HEPA-filter equipped hoods.
If samples are received in bags, envelopes or
Samples of any suspect material should be other inappropriate container, open them
taken from an inconspicuous place. Where only in a hood having a face velocity at or
the material is to remain, seal the sampling greater than 100 fpm. Transfer a small
wound with an encapsulant to eliminate the amount to a scintillation vial and only han-
potential for exposure from the sample site. dle the smaller amount.
Microscopy requires only a few milligrams of (b) Open samples in a hood, never in the
material. The amount that will fill a 20 mL open lab area.
scintillation vial is more than adequate. Be (c) Index of refraction oils can be toxic.
sure to collect samples from all layers and Take care not to get this material on the
phases of material. If possible, make sepa- skin. Wash immediately with soap and water
rate samples of each different phase of the if this happens.
material. This will aid in determining the (d) Samples that have been heated in the
actual hazard. DO NOT USE ENVELOPES, muffle furnace or the drying oven may be
PLASTIC OR PAPER BAGS OF ANY KIND TO hot. Handle them with tongs until they are
COLLECT SAMPLES. The use of plastic bags cool enough to handle.
presents a contamination hazard to labora- (e) Some of the solvents used, such as THF
tory personnel and to other samples. When (tetrahydrofuran), are toxic and should only
these containers are opened, a bellows effect be handled in an appropriate fume hood and
blows fibers out of the container onto every- according to instructions given in the Mate-
thing, including the person opening the con- rial Safety Data Sheet (MSDS).
tainer.
3.2. Equipment
If a cork-borer type sampler is available,
push the tube through the material all the (a) Phase contrast microscope with 10x, 16x
way, so that all layers of material are sam- and 40x objectives, 10x wide-field eyepieces,
pled. Some samplers are intended to be dis- G22 Walton-Beckett graticule, Whipple
posable. These should be capped and sent to disk, polarizer, analyzer and first order red
the laboratory. If a non-disposable cork or gypsum plate, 100 Watt illuminator, rotat-
borer is used, empty the contents into a scin- ing position condenser with oversize phase
tillation vial and send to the laboratory. rings, central stop dispersion objective,
Vigorously and completely clean the cork Kohler illumination and a rotating mechan-
borer between samples. ical stage.
(b) Stereo microscope with reflected light
2.4 Shipment illumination, transmitted light illumina-
tion, polarizer, analyzer and first order red
Samples packed in glass vials must not or gypsum plate, and rotating stage.
touch or they might break in shipment. (c) Negative pressure hood for the stereo
(a) Seal the samples with a sample seal microscope
over the end to guard against tampering and (d) Muffle furnace capable of 600 C
to identify the sample. (e) Drying oven capable of 50150 C
(b) Package the bulk samples in separate (f) Aluminum specimen pans
packages from the air samples. They may (g) Tongs for handling samples in the fur-
cross-contaminate each other and will inval- nace
idate the results of the air samples. (h) High dispersion index of refraction oils
(c) Include identifying paperwork with the (Special for dispersion staining.)
samples, but not in contact with the sus- n = 1.550
pected asbestos. n = 1.585
(d) To maintain sample accountability, n = 1.590
ship the samples by certified mail, overnight n = 1.605
express, or hand carry them to the labora- n = 1.620
tory. n = 1.670

578

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00588 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101
n = 1.680 lower temperatures for 1 to 2 h may have a
n = 1.690 measurable effect on the optical properties
(i) A set of index of refraction oils from of the minerals. If the analyst is unsure of
about n=1.350 to n=2.000 in n=0.005 incre- what to expect, a sample of standard asbes-
ments. (Standard for Becke line analysis.) tos should be heated to the same tempera-
(j) Glass slides with painted or frosted ends ture for the same length of time so that it
13 inches 1mm (thick, precleaned. can be examined for the proper interpreta-
(k) Cover Slips 2222 mm, #112 tion.
(l) Paper clips or dissection needles
(m) Hand grinder (c) Samples With Organic InterferenceTHF
(n) Scalpel with both #10 and #11 blades Vinyl asbestos tile is the most common
(o) 0.1 molar HCl material treated with this solvent, although,
(p) Decalcifying solution (Baxter Scientific substances containing tar will sometimes
Products) Ethylenediaminetetraacetic Acid, yield to this treatment. Select a portion of
Tetrasodium ..........................................0.7 g/l the material and then grind it up if possible.
Sodium Potassium Tartrate .........8.0 mg/liter Weigh the sample and place it in a test tube.
Hydrochloric Acid ..........................99.2 g/liter Add sufficient THF to dissolve the organic
Sodium Tartrate.............................0.14 g/liter matrix. This is usually about 4 to 5 mL. Re-
(q) Tetrahydrofuran (THF) member, THF is highly flammable. Filter the
(r) Hotplate capable of 60 C remaining material through a tared silver
(s) Balance membrane, dry and weigh to determine how
(t) Hacksaw blade much is left after the solvent extraction.
(u) Ruby mortar and pestle Further process the sample to remove car-
bonate or mount directly.
3.3. Sample Pre-Preparation (d) Samples With Carbonate Interference
Sample preparation begins with pre-prepa- Carbonate material is often found on fibers
ration which may include chemical reduc- and sometimes must be removed in order to
tion of the matrix, heating the sample to perform dispersion microscopy. Weigh out a
dryness or heating in the muffle furnace. The portion of the material and place it in a test
end result is a sample which has been re- tube. Add a sufficient amount of 0.1 M HCl or
duced to a powder that is sufficiently fine to decalcifying solution in the tube to react all
fit under the cover slip. Analyze different the carbonate as evidenced by gas formation;
phases of samples separately, e.g., tile and i.e., when the gas bubbles stop, add a little
the tile mastic should be analyzed separately more solution. If no more gas forms, the re-
as the mastic may contain asbestos while action is complete. Filter the material out
the tile may not. through a tared silver membrane, dry and
(a) Wet Samples weigh to determine the weight lost.
Samples with a high water content will not
3.4. Sample Preparation
give the proper dispersion colors and must be
dried prior to sample mounting. Remove the Samples must be prepared so that accurate
lid of the scintillation vial, place the bottle determination can be made of the asbestos
in the drying oven and heat at 100 C to dry- type and amount present. The following
ness (usually about 2 h). Samples which are steps are carried out in the low-flow hood (a
not submitted to the lab in glass must be re- low-flow hood has less than 50 fpm flow):
moved and placed in glass vials or aluminum (1) If the sample has large lumps, is hard,
weighing pans before placing them in the or cannot be made to lie under a cover slip,
drying oven. the grain size must be reduced. Place a small
(b) Samples With Organic InterferenceMuf- amount between two slides and grind the
fle Furnace material between them or grind a small
These may include samples with tar as a amount in a clean mortar and pestle. The
matrix, vinyl asbestos tile, or any other or- choice of whether to use an alumina, ruby,
ganic that can be reduced by heating. Re- or diamond mortar depends on the hardness
move the sample from the vial and weigh in of the material. Impact damage can alter the
a balance to determine the weight of the sub- asbestos mineral if too much mechanical
mitted portion. Place the sample in a muffle shock occurs. (Freezer mills can completely
furnace at 500 C for 1 to 2 h or until all obvi- destroy the observable crystallinity of asbes-
ous organic material has been removed. Re- tos and should not be used). For some sam-
trieve, cool and weigh again to determine ples, a portion of material can be shaved off
the weight loss on ignition. This is necessary with a scalpel, ground off with a hand grind-
to determine the asbestos content of the sub- er or hack saw blade.
mitted sample, because the analyst will be The preparation tools should either be dis-
looking at a reduced sample. posable or cleaned thoroughly. Use vigorous
NOTE: Heating above 600 C will cause the scrubbing to loosen the fibers during the
sample to undergo a structural change washing. Rinse the implements with copious
which, given sufficient time, will convert the amounts of water and air-dry in a dust-free
chrysotile to forsterite. Heating even at environment.

579

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00589 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)
(2) If the sample is powder or has been re- This is useful to identify asbestos in severely
duced as in (1) above, it is ready to mount. inhomogeneous samples.
Place a glass slide on a piece of optical tis- When it is determined that amphiboles
sue and write the identification on the paint- may be present, repeat the above process
ed or frosted end. Place two drops of index of using the appropriate high-dispersion oils
refraction medium n=1.550 on the slide. (The until an identification is made or all six as-
medium n=1.550 is chosen because it is the bestos minerals have been ruled out. Note
matching index for chrysotile. Dip the end of that percent determination must be done in
a clean paper-clip or dissecting needle into the index medium 1.550 because amphiboles
the droplet of refraction medium on the slide tend to disappear in their matching medi-
to moisten it. Then dip the probe into the ums.
powder sample. Transfer what sticks on the
probe to the slide. The material on the end of 3.5. Analytical procedure
the probe should have a diameter of about 3 NOTE: This method presumes some knowl-
mm for a good mount. If the material is very edge of mineralogy and optical petrography.
fine, less sample may be appropriate. For The analysis consists of three parts: The
non-powder samples such as fiber mats, for- determination of whether there is asbestos
ceps should be used to transfer a small present, what type is present and the deter-
amount of material to the slide. Stir the ma- mination of how much is present. The gen-
terial in the medium on the slide, spreading eral flow of the analysis is:
it out and making the preparation as uni- (1) Gross examination.
form as possible. Place a cover-slip on the (2) Examination under polarized light on
preparation by gently lowering onto the the stereo microscope.
slide and allowing it to fall trapdoor fash- (3) Examination by phase-polar illumina-
ion on the preparation to push out any bub- tion on the compound phase microscope.
bles. Press gently on the cover slip to even (4) Determination of species by dispersion
out the distribution of particulate on the stain. Examination by Becke line analysis
slide. If there is insufficient mounting oil on may also be used; however, this is usually
the slide, one or two drops may be placed more cumbersome for asbestos determina-
near the edge of the coverslip on the slide. tion.
Capillary action will draw the necessary (5) Difficult samples may need to be ana-
amount of liquid into the preparation. Re- lyzed by SEM or TEM, or the results from
move excess oil with the point of a labora- those techniques combined with light mi-
tory wiper. croscopy for a definitive identification.
Treat at least two different areas of each Identification of a particle as asbestos re-
phase in this fashion. Choose representative quires that it be asbestiform. Description of
areas of the sample. It may be useful to se- particles should follow the suggestion of
lect particular areas or fibers for analysis. Campbell. (Figure 1)

580

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00590 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101

For the purpose of regulation, the mineral ily parted from it. Asbestos fibers are very
must be one of the six minerals covered and long compared with their widths. The fibers
must be in the asbestos growth habit. Large have a very high tensile strength as dem-
specimen samples of asbestos generally have onstrated by bending without breaking. As-
the gross appearance of wood. Fibers are eas- bestos fibers exist in bundles that are easily

581
ER10AU94.026</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00591 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)
parted, show longitudinal fine structure and venience. Examine with the polarizing stereo
may be tufted at the ends showing bundle microscope. Estimate the percentage of as-
of sticks morphology. In the microscope bestos based on the amount of birefringent
some of these properties may not be observ- fiber present.
able. Amphiboles do not always show stri- (3) Examine the slides on the phase-polar
ations along their length even when they are microscopes at magnifications of 160 and
asbestos. Neither will they always show tuft- 400. Note the morphology of the fibers.
ing. They generally do not show a curved na- Long, thin, very straight fibers with little
ture except for very long fibers. Asbestos and curvature are indicative of fibers from the
asbestiform minerals are usually character- amphibole family. Curved, wavy fibers are
ized in groups by extremely high aspect ra- usually indicative of chrysotile. Estimate
tios (greater than 100:1). While aspect ratio the percentage of asbestos on the phase-polar
analysis is useful for characterizing popu- microscope under conditions of crossed
lations of fibers, it cannot be used to identify polars and a gypsum plate. Fibers smaller
individual fibers of intermediate to short as- than 1.0 m in thickness must be identified
pect ratio. Observation of many fibers is by inference to the presence of larger, identi-
often necessary to determine whether a sam- fiable fibers and morphology. If no larger fi-
ple consists of cleavage fragments or of as- bers are visible, electron microscopy should
bestos fibers. be performed. At this point, only a tentative
Most cleavage fragments of the asbestos identification can be made. Full identifica-
minerals are easily distinguishable from true tion must be made with dispersion micros-
asbestos fibers. This is because true cleavage copy. Details of the tests are included in the
fragments usually have larger diameters appendices.
than 1 m. Internal structure of particles (4) Once fibers have been determined to be
larger than this usually shows them to have present, they must be identified. Adjust the
no internal fibrillar structure. In addition, microscope for dispersion mode and observe
cleavage fragments of the monoclinic the fibers. The microscope has a rotating
amphiboles show inclined extinction under stage, one polarizing element, and a system
crossed polars with no compensator. Asbes- for generating dark-field dispersion micros-
tos fibers usually show extinction at zero de- copy (see Section 4.6. of this appendix). Align
grees or ambiguous extinction if any at all. a fiber with its length parallel to the polar-
Morphologically, the larger cleavage frag- izer and note the color of the Becke lines.
ments are obvious by their blunt or stepped Rotate the stage to bring the fiber length
ends showing prismatic habit. Also, they perpendicular to the polarizer and note the
tend to be acicular rather than filiform. color. Repeat this process for every fiber or
Where the particles are less than 1 m in fiber bundle examined. The colors must be
diameter and have an aspect ratio greater consistent with the colors generated by
than or equal to 3:1, it is recommended that standard asbestos reference materials for a
the sample be analyzed by SEM or TEM if positive identification. In n=1.550,
there is any question whether the fibers are amphiboles will generally show a yellow to
cleavage fragments or asbestiform particles. straw-yellow color indicating that the fiber
Care must be taken when analyzing by indices of refraction are higher than the liq-
electron microscopy because the inter- uid. If long, thin fibers are noted and the col-
ferences are different from those in light mi- ors are yellow, prepare further slides as
croscopy and may structurally be very simi- above in the suggested matching liquids list-
lar to asbestos. The classic interference is ed below:
between anthophyllite and biopyribole or in-
termediate fiber. Use the same morpho- Type of asbestos Index of refraction
logical clues for electron microscopy as are
Chrysotile ............................... n=1.550.
used for light microscopy, e.g. fibril split-
Amosite .................................. n=1.670 or 1.680.
ting, internal longitudinal striation, fraying, Crocidolite .............................. n=1.690.
curvature, etc. Anthophyllite .......................... n=1.605 and 1.620.
(1) Gross examination: Tremolite ................................ n=1.605 and 1.620.
Examine the sample, preferably in the Actinolite ................................ n=1.620.
glass vial. Determine the presence of any ob-
vious fibrous component. Estimate a per- Where more than one liquid is suggested,
centage based on previous experience and the first is preferred; however, in some cases
current observation. Determine whether any this liquid will not give good dispersion
pre-preparation is necessary. Determine the color. Take care to avoid interferences in the
number of phases present. This step may be other liquid; e.g., wollastonite in n=1.620 will
carried out or augmented by observation at give the same colors as tremolite. In n=1.605
6 to 40 under a stereo microscope. wollastonite will appear yellow in all direc-
(2) After performing any necessary pre- tions. Wollastonite may be determined under
preparation, prepare slides of each phase as crossed polars as it will change from blue to
described above. Two preparations of the yellow as it is rotated along its fiber axis by
same phase in the same index medium can be tapping on the cover slip. Asbestos minerals
made side-by-side on the same glass for con- will not change in this way.

582

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00592 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101
Determination of the angle of extinction Step 3. Microvisual estimation determines
may, when present, aid in the determination that 5% of the sample is chrysotile asbes-
of anthophyllite from tremolite. True asbes- tos.
tos fibers usually have 0 extinction or am- The reported result is:
biguous extinction, while cleavage fragments
have more definite extinction. R = (Microvisual result in percent) (Frac-
Continue analysis until both preparations tion remaining after step 2) (Fraction re-
have been examined and all present species maining of original sample after step 1)
of asbestos are identified. If there are no fi- R = (5)(.30)(.60)=0.9%
bers present, or there is less than 0.1% (8) Report the percent and type of asbestos
present, end the analysis with the minimum present. For samples where asbestos was
number of slides (2). identified, but is less than 1.0%, report As-
(5) Some fibers have a coating on them bestos present, less than 1.0%. There must
which makes dispersion microscopy very dif- have been at least two observed fibers or
ficult or impossible. Becke line analysis or fiber bundles in the two preparations to be
electron microscopy may be performed in reported as present. For samples where as-
those cases. Determine the percentage by bestos was not seen, report as None De-
light microscopy. TEM analysis tends to tected.
overestimate the actual percentage present.
(6) Percentage determination is an esti- Auxiliary Information
mate of occluded area, tempered by gross ob- Because of the subjective nature of asbes-
servation. Gross observation information is tos analysis, certain concepts and procedures
used to make sure that the high magnifica- need to be discussed in more depth. This in-
tion microscopy does not greatly over- or formation will help the analyst understand
under- estimate the amount of fiber present. why some of the procedures are carried out
This part of the analysis requires a great the way they are.
deal of experience. Satisfactory models for
asbestos content analysis have not yet been 4.1. Light
developed, although some models based on
metallurgical grain-size determination have Light is electromagnetic energy. It travels
found some utility. Estimation is more eas- from its source in packets called quanta. It
ily handled in situations where the grain is instructive to consider light as a plane
sizes visible at about 160 are about the same wave. The light has a direction of travel.
and the sample is relatively homogeneous. Perpendicular to this and mutually perpen-
View all of the area under the cover slip to dicular to each other, are two vector compo-
make the percentage determination. View nents. One is the magnetic vector and the
the fields while moving the stage, paying at- other is the electric vector. We shall only be
tention to the clumps of material. These are concerned with the electric vector. In this
not usually the best areas to perform disper- description, the interaction of the vector and
sion microscopy because of the interference the mineral will describe all the observable
from other materials. But, they are the areas phenomena. From a light source such a mi-
most likely to represent the accurate per- croscope illuminator, light travels in all dif-
centage in the sample. Small amounts of as- ferent direction from the filament.
bestos require slower scanning and more fre- In any given direction away from the fila-
quent analysis of individual fields. ment, the electric vector is perpendicular to
Report the area occluded by asbestos as the direction of travel of a light ray. While
the concentration. This estimate does not perpendicular, its orientation is random
generally take into consideration the dif- about the travel axis. If the electric vectors
ference in density of the different species from all the light rays were lined up by pass-
present in the sample. For most samples this ing the light through a filter that would only
is adequate. Simulation studies with similar let light rays with electric vectors oriented
materials must be carried out to apply in one direction pass, the light would then be
microvisual estimation for that purpose and POLARIZED.
is beyond the scope of this procedure. Polarized light interacts with matter in
(7) Where successive concentrations have the direction of the electric vector. This is
been made by chemical or physical means, the polarization direction. Using this prop-
the amount reported is the percentage of the erty it is possible to use polarized light to
material in the as submitted or original probe different materials and identify them
state. The percentage determined by micros- by how they interact with light.
copy is multiplied by the fractions remain- The speed of light in a vacuum is a con-
ing after pre-preparation steps to give the stant at about 2.99108 m/s. When light trav-
percentage in the original sample. For exam- els in different materials such as air, water,
ple: minerals or oil, it does not travel at this
Step 1. 60% remains after heating at 550 C speed. It travels slower. This slowing is a
for 1 h. function of both the material through which
Step 2. 30% of the residue of step 1 remains the light is traveling and the wavelength or
after dissolution of carbonate in 0.1 m HCl. frequency of the light. In general, the more

583

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00593 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)
dense the material, the slower the light trav- tion to fiber length is used to aid in the iden-
els. Also, generally, the higher the fre- tification of asbestos.
quency, the slower the light will travel. The
ratio of the speed of light in a vacuum to 4.3. Polarized Light Technique
that in a material is called the index of re-
Polarized light microscopy as described in
fraction (n). It is usually measured at 589 nm
this section uses the phase-polar microscope
(the sodium D line). If white light (light con-
taining all the visible wavelengths) travels described in Section 3.2. A phase contrast
through a material, rays of longer wave- microscope is fitted with two polarizing ele-
lengths will travel faster than those of short- ments, one below and one above the sample.
er wavelengths, this separation is called dis- The polarizers have their polarization direc-
persion. Dispersion is used as an identifier of tions at right angles to each other. Depend-
materials as described in Section 4.6. ing on the tests performed, there may be a
compensator between these two polarizing
4.2. Material Properties elements. A compensator is a piece of min-
Materials are either amorphous or crys- eral with known properties that com-
talline. The difference between these two de- pensates for some deficiency in the optical
scriptions depends on the positions of the train. Light emerging from a polarizing ele-
atoms in them. The atoms in amorphous ma- ment has its electric vector pointing in the
terials are randomly arranged with no long polarization direction of the element. The
range order. An example of an amorphous light will not be subsequently transmitted
material is glass. The atoms in crystalline through a second element set at a right
materials, on the other hand, are in regular angle to the first element. Unless the light is
arrays and have long range order. Most of altered as it passes from one element to the
the atoms can be found in highly predictable other, there is no transmission of light.
locations. Examples of crystalline material
are salt, gold, and the asbestos minerals. 4.4. Angle of Extinction
It is beyond the scope of this method to de-
Crystals which have different crystal regu-
scribe the different types of crystalline ma-
terials that can be found, or the full descrip- larity in two or three main directions are
tion of the classes into which they can fall. said to be anisotropic. They have a different
However, some general crystallography is index of refraction in each of the main direc-
provided below to give a foundation to the tions. When such a crystal is inserted be-
procedures described. tween the crossed polars, the field of view is
With the exception of anthophyllite, all no longer dark but shows the crystal in
the asbestos minerals belong to the color. The color depends on the properties of
monoclinic crystal type. The unit cell is the the crystal. The light acts as if it travels
basic repeating unit of the crystal and for through the crystal along the optical axes. If
monoclinic crystals can be described as hav- a crystal optical axis were lined up along one
ing three unequal sides, two 90 angles and of the polarizing directions (either the polar-
one angle not equal to 90. The orthorhombic izer or the analyzer) the light would appear
group, of which anthophyllite is a member to travel only in that direction, and it would
has three unequal sides and three 90 angles. blink out or go dark. The difference in de-
The unequal sides are a consequence of the grees between the fiber direction and the
complexity of fitting the different atoms angle at which it blinks out is called the
into the unit cell. Although the atoms are in angle of extinction. When this angle can be
a regular array, that array is not symmet- measured, it is useful in identifying the min-
rical in all directions. There is long range eral. The procedure for measuring the angle
order in the three major directions of the of extinction is to first identify the polariza-
crystal. However, the order is different in tion direction in the microscope. A commer-
each of the three directions. This has the ef- cial alignment slide can be used to establish
fect that the index of refraction is different
the polarization directions or use
in each of the three directions. Using polar-
anthophyllite or another suitable mineral.
ized light, we can investigate the index of re-
This mineral has a zero degree angle of ex-
fraction in each of the directions and iden-
tify the mineral or material under investiga- tinction and will go dark to extinction as it
tion. The indices a, b, and g are used to iden- aligns with the polarization directions. When
tify the lowest, middle, and highest index of a fiber of anthophyllite has gone to extinc-
refraction respectively. The x direction, as- tion, align the eyepiece reticle or graticule
sociated with a is called the fast axis. Con- with the fiber so that there is a visual cue as
versely, the z direction is associated with g to the direction of polarization in the field of
and is the slow direction. Crocidolite has a view. Tape or otherwise secure the eyepiece
along the fiber length making it length- in this position so it will not shift.
fast. The remainder of the asbestos min- After the polarization direction has been
erals have the g axis along the fiber length. identified in the field of view, move the par-
They are called length-slow. This orienta- ticle of interest to the center of the field of

584

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00594 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1101
view and align it with the polarization direc- used for this test is a gypsum plate of known
tion. For fibers, align the fiber along this di- thickness and birefringence. Such a compen-
rection. Note the angular reading of the ro- sator when oriented at 45 to the polarizer di-
tating stage. Looking at the particle, rotate rection, provides a retardation of 530 nm of
the stage until the fiber goes dark or blinks the 530 nm wavelength color. This enhances
out. Again note the reading of the stage. the red color and gives the background a
The difference in the first reading and the characteristic red to red-magenta color. If
second is an angle of extinction. this full-wave compensator is in place
The angle measured may vary as the ori- when the asbestos preparation is inserted
entation of the fiber changes about its long into the light train, the colors seen on the fi-
axis. Tables of mineralogical data usually re- bers are quite different. Gypsum, like asbes-
port the maximum angle of extinction. As- tos has a fast axis and a slow axis. When a
bestos forming minerals, when they exhibit fiber is aligned with its fast axis in the same
an angle of extinction, usually do show an direction as the fast axis of the gypsum
angle of extinction close to the reported plate, the ray vibrating in the slow direction
maximum, or as appropriate depending on is retarded by both the asbestos and the gyp-
the substitution chemistry. sum. This results in a higher retardation
than would be present for either of the two
4.5. Crossed Polars with Compensator
minerals. The color seen is a second order
When the optical axes of a crystal are not blue. When the fiber is rotated 90 using the
lined up along one of the polarizing direc- rotating stage, the slow direction of the fiber
tions (either the polarizer or the analyzer) is now aligned with the fast direction of the
part of the light travels along one axis and gypsum and the fast direction of the fiber is
part travels along the other visible axis. This aligned with the slow direction of the gyp-
is characteristic of birefringent materials. sum. Thus, one ray vibrates faster in the fast
The color depends on the difference of the direction of the gypsum, and slower in the
two visible indices of refraction and the slow direction of the fiber; the other ray will
thickness of the crystal. The maximum dif- vibrate slower in the slow direction of the
ference available is the difference between gypsum and faster in the fast direction of
the a and the g axes. This maximum dif- the fiber. In this case, the effect is subtrac-
ference is usually tabulated as the tive and the color seen is a first order yel-
birefringence of the crystal. low. As long as the fiber thickness does not
For this test, align the fiber at 45 to the add appreciably to the color, the same basic
polarization directions in order to maximize colors will be seen for all asbestos types ex-
the contribution to each of the optical axes. cept crocidolite. In crocidolite the colors
The colors seen are called retardation colors. will be weaker, may be in the opposite direc-
They arise from the recombination of light tions, and will be altered by the blue absorp-
which has traveled through the two separate tion color natural to crocidolite. Hundreds of
directions of the crystal. One of the rays is other materials will give the same colors as
retarded behind the other since the light in asbestos, and therefore, this test is not defin-
that direction travels slower. On recombina- itive for asbestos. The test is useful in dis-
tion, some of the colors which make up criminating against fiberglass or other
white light are enhanced by constructive in- amorphous fibers such as some synthetic fi-
terference and some are suppressed by de- bers. Certain synthetic fibers will show re-
structive interference. The result is a color tardation colors different than asbestos;
dependent on the difference between the in- however, there are some forms of poly-
dices and the thickness of the crystal. The ethylene and aramid which will show mor-
proper colors, thicknesses, and retardations phology and retardation colors similar to as-
are shown on a Michel-Levy chart. The three bestos minerals. This test must be supple-
items, retardation, thickness and mented with a positive identification test
birefringence are related by the following re- when birefringent fibers are present which
lationship: can not be excluded by morphology. This
R=t(nn) test is relatively ineffective for use on fibers
R=retardation, t=crystal thickness in m, less than 1 m in diameter. For positive con-
and firmation TEM or SEM should be used if no
n,=indices of refraction. larger bundles or fibers are visible.
Examination of the equation for asbestos
4.6. Dispersion Staining
minerals reveals that the visible colors for
almost all common asbestos minerals and Dispersion microscopy or dispersion stain-
fiber sizes are shades of gray and black. The ing is the method of choice for the identi-
eye is relatively poor at discriminating dif- fication of asbestos in bulk materials. Becke
ferent shades of gray. It is very good at dis- line analysis is used by some laboratories
criminating different colors. In order to and yields the same results as does disper-
compensate for the low retardation, a com- sion staining for asbestos and can be used in
pensator is added to the light train between lieu of dispersion staining. Dispersion stain-
the polarization elements. The compensator ing is performed on the same platform as the

585

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00595 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1101 29 CFR Ch. XVII (7112 Edition)
phase-polar analysis with the analyzer and note the color. Both colors must be con-
compensator removed. One polarizing ele- sistent with standard asbestos minerals in
ment remains to define the direction of the the correct direction for a positive identi-
light so that the different indices of refrac- fication of asbestos. If only one of the colors
tion of the fibers may be separately deter- is correct while the other is not, the identi-
mined. Dispersion microscopy is a dark-field fication is not positive. If the colors in both
technique when used for asbestos. Particles directions are bluish-white, the analyst has
are imaged with scattered light. Light which chosen a matching index oil which is higher
is unscattered is blocked from reaching the than the correct matching oil, e.g. the ana-
eye either by the back field image mask in a lyst has used n=1.620 where chrysotile is
McCrone objective or a back field image present. The next lower oil (Section 3.5.)
mask in the phase condenser. The most con- should be used to prepare another specimen.
venient method is to use the rotating phase If the color in both directions is yellow-
condenser to move an oversized phase ring white to straw-yellow-white, this indicates
into place. The ideal size for this ring is for that the index of the oil is lower than the
the central disk to be just larger than the index of the fiber, e.g. the preparation is in
objective entry aperture as viewed in the n=1.550 while anthophyllite is present. Select
back focal plane. The larger the disk, the the next higher oil (Section 3.5.) and prepare
less scattered light reaches the eye. This will another slide. Continue in this fashion until
have the effect of diminishing the intensity a positive identification of all asbestos spe-
of dispersion color and will shift the actual cies present has been made or all possible as-
color seen. The colors seen vary even on mi- bestos species have been ruled out by nega-
croscopes from the same manufacturer. This tive results in this test. Certain plant fibers
is due to the different bands of wavelength can have similar dispersion colors as asbes-
exclusion by different mask sizes. The mask tos. Take care to note and evaluate the mor-
may either reside in the condenser or in the phology of the fibers or remove the plant fi-
objective back focal plane. It is imperative bers in pre-preparation. Coating material on
that the analyst determine by experimen- the fibers such as carbonate or vinyl may de-
tation with asbestos standards what the ap- stroy the dispersion color. Usually, there
propriate colors should be for each asbestos will be some outcropping of fiber which will
type. The colors depend also on the tempera- show the colors sufficient for identification.
ture of the preparation and the exact chem- When this is not the case, treat the sample
istry of the asbestos. Therefore, some slight as described in Section 3.3. and then perform
differences from the standards should be al- dispersion staining. Some samples will yield
lowed. This is not a serious problem for com- to Becke line analysis if they are coated or
mercial asbestos uses. This technique is used electron microscopy can be used for identi-
for identification of the indices of refraction fication.
for fibers by recognition of color. There is no
direct numerical readout of the index of re- 5. References
fraction. Correlation of color to actual index 5.1. Crane, D.T., Asbestos in Air, OSHA meth-
of refraction is possible by referral to pub- od ID160, Revised November 1992.
lished conversion tables. This is not nec- 5.2. Ford, W.E., Danas Textbook of Min-
essary for the analysis of asbestos. Recogni- eralogy; Fourth Ed.; John Wiley and Son,
tion of appropriate colors along with the New York, 1950, p. vii.
proper morphology are deemed sufficient to 5.3. Selikoff, I.J., Lee, D.H.K., Asbestos and
identify the commercial asbestos minerals. Disease, Academic Press, New York, 1978,
Other techniques including SEM, TEM, and pp. 3,20.
XRD may be required to provide additional 5.4. Women Inspectors of Factories. Annual Re-
information in order to identify other types port for 1898, H.M. Statistical Office, Lon-
of asbestos. don, p. 170 (1898).
Make a preparation in the suspected 5.5. Selikoff,.I.J., Lee, D.H.K., Asbestos and
matching high dispersion oil, e.g., n=1.550 for Disease, Academic Press, New York, 1978,
chrysotile. Perform the preliminary tests to pp. 26,30.
determine whether the fibers are 5.6. Campbell, W.J., et al, Selected Silicate
birefringent or not. Take note of the mor- Minerals and Their Asbestiform Varieties,
phological character. Wavy fibers are indic- United States Department of the Interior,
ative of chrysotile while long, straight, thin, Bureau of Mines, Information Circular
frayed fibers are indicative of amphibole as- 8751, 1977.
bestos. This can aid in the selection of the 5.7. Asbestos, Code of Federal Regulations, 29
appropriate matching oil. The microscope is CFR 1910.1001 and 29 CFR 1926.58.
set up and the polarization direction is noted 5.8. National Emission Standards for Hazardous
as in Section 4.4. Align a fiber with the po- Air Pollutants; Asbestos NESHAP Revision,
larization direction. Note the color. This is FEDERAL REGISTER, Vol. 55, No. 224, 20 No-
the color parallel to the polarizer. Then ro- vember 1990, p. 48410.
tate the fiber rotating the stage 90 so that 5.9. Ross, M. The Asbestos Minerals: Defini-
the polarization direction is across the fiber. tions, Description, Modes of Formation, Phys-
This is the perpendicular position. Again ical and Chemical Properties and Health Risk

586

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00596 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1111
to the Mining Community, Nation Bureau of 1926.1103 13 carcinogens (4-
Standards Special Publication, Wash- Nitrobiphenyl, etc.).
ington, DC, 1977.
5.10. Lilis, R., Fibrous Zeolites and Endemic NOTE: The requirements applicable to con-
Mesothelioma in Cappadocia, Turkey, J. struction work under this section are iden-
Occ Medicine, 1981, 23,(8),548550. tical to those set forth at 1910.1003 of this
5.11. Occupational Exposure to Asbestos1972, chapter.
U.S. Department of Health Education and [61 FR 31433, June 20, 1996]
Welfare, Public Health Service, Center for
Disease Control, National Institute for Oc- 1926.1104 alpha-Naphthylamine.
cupational Safety and Health, HSM72
10267. NOTE: The requirements applicable to con-
5.12. Campbell,W.J., et al, Relationship of struction work under this section are iden-
Mineral Habit to Size Characteristics for tical to those set forth at 1910.1003 of this
Tremolite Fragments and Fibers, United chapter.
States Department of the Interior, Bureau [61 FR 31433, June 20, 1996]
of Mines, Information Circular 8367, 1979.
5.13. Mefford, D., DCM Laboratory, Denver, 1926.1105 [Reserved]
private communication, July 1987.
5.14. Deer, W.A., Howie, R.A., Zussman, J., 1926.1106 Methyl chloromethyl ether.
Rock Forming Minerals, Longman, Thetford,
UK, 1974. NOTE: The requirements applicable to con-
5.15. Kerr, P.F., Optical Mineralogy; Third Ed. struction work under this section are iden-
McGraw-Hill, New York, 1959. tical to those set forth at 1910.1003 of this
5.16. Veblen, D.R. (Ed.), Amphiboles and Other chapter.
Hydrous PyribolesMineralogy, Reviews in [61 FR 31433, June 20, 1996]
Mineralogy, Vol 9A, Michigan, 1982, pp 1
102. 1926.1107 3,3-Dichlorobenzidiene
5.17. Dixon, W.C., Applications of Optical Mi- (and its salts).
croscopy in the Analysis of Asbestos and
Quartz, ACS Symposium Series, No. 120, NOTE: The requirements applicable to con-
Analytical Techniques in Occupational struction work under this section are iden-
Health Chemistry, 1979. tical to those set forth at 1910.1003 of this
5.18. Polarized Light Microscopy, McCrone chapter.
Research Institute, Chicago, 1976. [61 FR 31433, June 20, 1996]
5.19. Asbestos Identification, McCrone Re-
search Institute, G & G printers, Chicago, 1926.1108 bis-Chloromethyl ether.
1987.
5.20. McCrone, W.C., Calculation of Refrac- NOTE: The requirements applicable to con-
tive Indices from Dispersion Staining struction work under this section are iden-
Data, The Microscope, No 37, Chicago, 1989. tical to those set forth at 1910.1003 of this
5.21. Levadie, B. (Ed.), Asbestos and Other chapter.
Health Related Silicates, ASTM Technical [61 FR 31433, June 20, 1996]
Publication 834, ASTM, Philadelphia 1982.
5.22. Steel, E. and Wylie, A., Riordan, P.H. 1926.1109 beta-Naphthylamine.
(Ed.), Mineralogical Characteristics of As-
bestos, Geology of Asbestos Deposits, pp. 93 NOTE: The requirements applicable to con-
101, SME-AIME, 1981. struction work under this section are iden-
5.23. Zussman, J., The Mineralogy of Asbes- tical to those set forth at 1910.1003 of this
tos, Asbestos: Properties, Applications and chapter.
Hazards, pp. 4567 Wiley, 1979. [61 FR 31433, June 20, 1996]
[51 FR 22756, June 20, 1986]
1926.1110 Benzidine.
EDITORIAL NOTE: For FEDERAL REGISTER ci-
NOTE: The requirements applicable to con-
tations affecting 1926.1101, see the List of
struction work under this section are iden-
CFR Sections Affected, which appears in the
tical to those set forth at 1910.1003 of this
Finding Aids section of the printed volume
chapter.
and at www.fdsys.gov.
[61 FR 31433, June 20, 1996]
1926.1102 Coal tar pitch volatiles; in-
terpretation of term. 1926.1111 4-Aminodiphenyl.
NOTE: The requirements applicable to con- NOTE: The requirements applicable to con-
struction work under this section are iden- struction work under this section are iden-
tical to those set forth at 1910.1002 of this tical to those set forth at 1910.1003 of this
chapter. chapter.
[61 FR 31433, June 20, 1996] [61 FR 31433, June 20, 1996]

587

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00597 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1112 29 CFR Ch. XVII (7112 Edition)

1926.1112 Ethyleneimine. another Federal government agency


NOTE: The requirements applicable to con-
(e.g., the treatment of wood with pre-
struction work under this section are iden- servatives);
tical to those set forth at 1910.1003 of this (3) Exposures to portland cement; or
chapter. (4) Where the employer has objective
[61 FR 31433, June 20, 1996]
data demonstrating that a material
containing chromium or a specific
1926.1113 beta-Propiolactone. process, operation, or activity involv-
ing chromium cannot release dusts,
NOTE: The requirements applicable to con-
struction work under this section are iden-
fumes, or mists of chromium (VI) in
tical to those set forth at 1910.1003 of this concentrations at or above 0.5 gm/m3
chapter. as an 8-hour time-weighted average
(TWA) under any expected conditions
[61 FR 31433, June 20, 1996]
of use.
1926.1114 2-Acetylaminofluorene. (b) Definitions. For the purposes of
this section the following definitions
NOTE: The requirements applicable to con-
apply:
struction work under this section are iden-
tical to those set forth at 1910.1003 of this Action level means a concentration of
chapter. airborne chromium (VI) of 2.5
micrograms per cubic meter of air (2.5
[61 FR 31433, June 20, 1996]
gm/m3) calculated as an 8-hour time-
1926.1115 4- weighted average (TWA).
Dimethylaminoazobenzene. Assistant Secretary means the Assist-
ant Secretary of Labor for Occupa-
NOTE: The requirements applicable to con-
tional Safety and Health, U.S. Depart-
struction work under this section are iden-
tical to those set forth at 1910.1003 of this ment of Labor, or designee.
chapter. Chromium (VI) [hexavalent chromium
or Cr(VI)] means chromium with a va-
[61 FR 31433, June 20, 1996]
lence of positive six, in any form and in
1926.1116 N-Nitrosodimethylamine. any compound.
Director means the Director of the
NOTE: The requirements applicable to con- National Institute for Occupational
struction work under this section are iden-
Safety and Health (NIOSH), U.S. De-
tical to those set forth at 1910.1003 of this
chapter. partment of Health and Human Serv-
ices, or designee.
[61 FR 31433, June 20, 1996] Emergency means any occurrence
1926.1117 Vinyl chloride. that results, or is likely to result, in an
uncontrolled release of chromium (VI).
NOTE: The requirements applicable to con- If an incidental release of chromium
struction work under this section are iden- (VI) can be controlled at the time of re-
tical to those set forth at 1910.1017 of this
lease by employees in the immediate
chapter.
release area, or by maintenance per-
[61 FR 31433, June 20, 1996] sonnel, it is not an emergency.
Employee exposure means the expo-
1926.1118 Inorganic arsenic.
sure to airborne chromium (VI) that
NOTE: The requirements applicable to con- would occur if the employee were not
struction work under this section are iden- using a respirator.
tical to those set forth at 1910.1018 of this High-efficiency particulate air [HEPA]
chapter.
filter means a filter that is at least 99.97
[61 FR 31433, June 20, 1996] percent efficient in removing mono-dis-
persed particles of 0.3 micrometers in
1926.1126 Chromium (VI). diameter or larger.
(a) Scope. (1) This standard applies to Historical monitoring data means data
occupational exposures to chromium from chromium (VI) monitoring con-
(VI) in all forms and compounds in con- ducted prior to May 30, 2006, obtained
struction, except: during work operations conducted
(2) Exposures that occur in the appli- under workplace conditions closely re-
cation of pesticides regulated by the sembling the processes, types of mate-
Environmental Protection Agency or rial, control methods, work practices,

588

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00598 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1126

and environmental conditions in the (ii) If initial monitoring indicates


employers current operations. that employee exposures are below the
Objective data means information action level, the employer may dis-
such as air monitoring data from in- continue monitoring for those employ-
dustry-wide surveys or calculations ees whose exposures are represented by
based on the composition or chemical such monitoring.
and physical properties of a substance (iii) If monitoring reveals employee
demonstrating the employee exposure exposures to be at or above the action
to chromium (VI) associated with a level, the employer shall perform peri-
particular product or material or a spe- odic monitoring at least every six
cific process, operation, or activity. months.
The data must reflect workplace condi- (iv) If monitoring reveals employee
tions closely resembling the processes, exposures to be above the PEL, the em-
types of material, control methods, ployer shall perform periodic moni-
work practices, and environmental toring at least every three months.
conditions in the employers current (v) If periodic monitoring indicates
operations. that employee exposures are below the
Physician or other licensed health care action level, and the result is con-
professional [PLHCP] is an individual firmed by the result of another moni-
whose legally permitted scope of prac- toring taken at least seven days later,
tice (i.e., license, registration, or cer- the employer may discontinue the
tification) allows him or her to inde- monitoring for those employees whose
pendently provide or be delegated the exposures are represented by such mon-
responsibility to provide some or all of itoring.
the particular health care services re- (vi) The employer shall perform addi-
quired by paragraph (i) of this section. tional monitoring when there has been
This section means this 1926.1126 any change in the production process,
chromium (VI) standard. raw materials, equipment, personnel,
(c) Permissible exposure limit (PEL). work practices, or control methods
The employer shall ensure that no em- that may result in new or additional
ployee is exposed to an airborne con- exposures to chromium (VI), or when
centration of chromium (VI) in excess the employer has any reason to believe
of 5 micrograms per cubic meter of air that new or additional exposures have
(5 gm/m3), calculated as an 8-hour occurred.
time-weighted average (TWA). (3) Performance-oriented option. The
(d) Exposure determination(1) Gen- employer shall determine the 8-hour
eral. Each employer who has a work- TWA exposure for each employee on
place or work operation covered by this the basis of any combination of air
section shall determine the 8-hour monitoring data, historical monitoring
TWA exposure for each employee ex- data, or objective data sufficient to ac-
posed to chromium (VI). This deter- curately characterize employee expo-
mination shall be made in accordance sure to chromium (VI).
with either paragraph (d)(2) or para- (4) Employee notification of determina-
graph (d)(3) of this section. tion results. (i) Within 5 work days after
(2) Scheduled monitoring option. (i) The making an exposure determination in
employer shall perform initial moni- accordance with paragraph (d)(2) or
toring to determine the 8-hour TWA paragraph (d)(3) of this section, the em-
exposure for each employee on the ployer shall individually notify each
basis of a sufficient number of personal affected employee in writing of the re-
breathing zone air samples to accu- sults of that determination or post the
rately characterize full shift exposure results in an appropriate location ac-
on each shift, for each job classifica- cessible to all affected employees.
tion, in each work area. Where an em- (ii) Whenever the exposure deter-
ployer does representative sampling in- mination indicates that employee ex-
stead of sampling all employees in posure is above the PEL, the employer
order to meet this requirement, the shall describe in the written notifica-
employer shall sample the employee(s) tion the corrective action being taken
expected to have the highest chromium to reduce employee exposure to or
(VI) exposures. below the PEL.

589

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00599 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1126 29 CFR Ch. XVII (7112 Edition)

(5) Accuracy of measurement. Where different jobs to achieve compliance


air monitoring is performed to comply with the PEL.
with the requirements of this section, (f) Respiratory protection(1) General.
the employer shall use a method of Where respiratory protection is re-
monitoring and analysis that can quired by this section, the employer
measure chromium (VI) to within an must provide each employee an appro-
accuracy of plus or minus 25 percent priate respirator that complies with
(25%) and can produce accurate meas- the requirements of this paragraph.
urements to within a statistical con- Respiratory protection is required dur-
fidence level of 95 percent for airborne ing:
concentrations at or above the action (i) Periods necessary to install or im-
level. plement feasible engineering and work
(6) Observation of monitoring. (i) practice controls;
Where air monitoring is performed to (ii) Work operations, such as mainte-
comply with the requirements of this nance and repair activities, for which
section, the employer shall provide af- engineering and work practice controls
fected employees or their designated are not feasible;
representatives an opportunity to ob- (iii) Work operations for which an
serve any monitoring of employee ex- employer has implemented all feasible
posure to chromium (VI). engineering and work practice controls
(ii) When observation of monitoring and such controls are not sufficient to
requires entry into an area where the reduce exposures to or below the PEL;
use of protective clothing or equipment (iv) Work operations where employ-
is required, the employer shall provide ees are exposed above the PEL for
the observer with clothing and equip- fewer than 30 days per year, and the
ment and shall assure that the ob- employer has elected not to implement
server uses such clothing and equip- engineering and work practice controls
ment and complies with all other appli- to achieve the PEL; or
cable safety and health procedures. (v) Emergencies.
(e) Methods of compliance. (1) Engi- (2) Respiratory protection program.
neering and work practice controls. (i) Where respirator use is required by this
Except as permitted in paragraph section, the employer shall institute a
(e)(1)(ii) of this section, the employer respiratory protection program in ac-
shall use engineering and work prac- cordance with 1910.134, which covers
tice controls to reduce and maintain each employee required to use a res-
employee exposure to chromium (VI) pirator.
to or below the PEL unless the em- (g) Protective work clothing and equip-
ployer can demonstrate that such con- ment(1) Provision and use. Where a
trols are not feasible. Wherever fea- hazard is present or is likely to be
sible engineering and work practice present from skin or eye contact with
controls are not sufficient to reduce chromium (VI), the employer shall pro-
employee exposure to or below the vide appropriate personal protective
PEL, the employer shall use them to clothing and equipment at no cost to
reduce employee exposure to the lowest employees, and shall ensure that em-
levels achievable, and shall supplement ployees use such clothing and equip-
them by the use of respiratory protec- ment.
tion that complies with the require- (2) Removal and storage. (i) The em-
ments of paragraph (f) of this section. ployer shall ensure that employees re-
(ii) Where the employer can dem- move all protective clothing and equip-
onstrate that a process or task does ment contaminated with chromium
not result in any employee exposure to (VI) at the end of the work shift or at
chromium (VI) above the PEL for 30 or the completion of their tasks involving
more days per year (12 consecutive chromium (VI) exposure, whichever
months), the requirement to imple- comes first.
ment engineering and work practice (ii) The employer shall ensure that
controls to achieve the PEL does not no employee removes chromium (VI)-
apply to that process or task. contaminated protective clothing or
(2) Prohibition of rotation. The em- equipment from the workplace, except
ployer shall not rotate employees to for those employees whose job it is to

590

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00600 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1126

launder, clean, maintain, or dispose of ing facilities capable of removing chro-


such clothing or equipment. mium (VI) from the skin, and shall en-
(iii) When contaminated protective sure that affected employees use these
clothing or equipment is removed for facilities when necessary.
laundering, cleaning, maintenance, or (ii) The employer shall ensure that
disposal, the employer shall ensure employees who have skin contact with
that it is stored and transported in chromium (VI) wash their hands and
sealed, impermeable bags or other faces at the end of the work shift and
closed, impermeable containers. prior to eating, drinking, smoking,
(iv) The employer shall ensure that chewing tobacco or gum, applying cos-
bags or containers of contaminated metics, or using the toilet.
protective clothing or equipment that (4) Eating and drinking areas. (i)
are removed from change rooms for Whenever the employer allows employ-
laundering, cleaning, maintenance, or ees to consume food or beverages at a
disposal shall be labeled in accordance worksite where chromium (VI) is
with the requirements of the Hazard present, the employer shall ensure that
Communication Standard, 1910.1200. eating and drinking areas and surfaces
(3) Cleaning and replacement. (i) The are maintained as free as practicable of
employer shall clean, launder, repair chromium (VI).
and replace all protective clothing and (ii) The employer shall ensure that
equipment required by this section as employees do not enter eating and
needed to maintain its effectiveness. drinking areas with protective work
(ii) The employer shall prohibit the clothing or equipment unless surface
removal of chromium (VI) from protec- chromium (VI) has been removed from
tive clothing and equipment by blow- the clothing and equipment by meth-
ing, shaking, or any other means that ods that do not disperse chromium (VI)
disperses chromium (VI) into the air or into the air or onto an employees
onto an employees body. body.
(iii) The employer shall inform any (5) Prohibited activities. The employer
person who launders or cleans protec- shall ensure that employees do not eat,
tive clothing or equipment contami- drink, smoke, chew tobacco or gum, or
nated with chromium (VI) of the poten- apply cosmetics in areas where skin or
tially harmful effects of exposure to eye contact with chromium (VI) oc-
chromium (VI) and that the clothing curs; or carry the products associated
and equipment should be laundered or with these activities, or store such
cleaned in a manner that minimizes products in these areas.
skin or eye contact with chromium
(i) Medical surveillance(1) General. (i)
(VI) and effectively prevents the re-
The employer shall make medical sur-
lease of airborne chromium (VI) in ex-
veillance available at no cost to the
cess of the PEL.
employee, and at a reasonable time and
(h) Hygiene areas and practices(1)
place, for all employees:
General. Where protective clothing and
(A) Who are or may be occupation-
equipment is required, the employer
ally exposed to chromium (VI) at or
shall provide change rooms in conform-
above the action level for 30 or more
ance with 29 CFR 1926.51 Where skin
days a year;
contact with chromium (VI) occurs,
the employer shall provide washing fa- (B) Experiencing signs or symptoms
cilities in conformance with 29 CFR of the adverse health effects associated
1926.51. Eating and drinking areas pro- with chromium (VI) exposure; or
vided by the employer shall also be in (C) Exposed in an emergency.
conformance with 1926.51. (ii) The employer shall assure that
(2) Change rooms. The employer shall all medical examinations and proce-
assure that change rooms are equipped dures required by this section are per-
with separate storage facilities for pro- formed by or under the supervision of a
tective clothing and equipment and for PLHCP.
street clothes, and that these facilities (2) Frequency. The employer shall
prevent cross-contamination. provide a medical examination:
(3) Washing facilities. (i) The employer (i) Within 30 days after initial assign-
shall provide readily accessible wash- ment, unless the employee has received

591

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00601 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1126 29 CFR Ch. XVII (7112 Edition)

a chromium (VI) related medical exam- (5) PLHCPs written medical opinion.
ination that meets the requirements of (i) The employer shall obtain a written
this paragraph within the last twelve medical opinion from the PLHCP,
months; within 30 days for each medical exam-
(ii) Annually; ination performed on each employee,
(iii) Within 30 days after a PLHCPs which contains:
written medical opinion recommends (A) The PLHCPs opinion as to
an additional examination; whether the employee has any detected
(iv) Whenever an employee shows medical condition(s) that would place
signs or symptoms of the adverse the employee at increased risk of ma-
health effects associated with chro- terial impairment to health from fur-
mium (VI) exposure; ther exposure to chromium (VI);
(v) Within 30 days after exposure dur- (B) Any recommended limitations
ing an emergency which results in an upon the employees exposure to chro-
uncontrolled release of chromium (VI); mium (VI) or upon the use of personal
or protective equipment such as res-
(vi) At the termination of employ- pirators;
ment, unless the last examination that (C) A statement that the PLHCP has
satisfied the requirements of paragraph explained to the employee the results
(i) of this section was less than six of the medical examination, including
months prior to the date of termi- any medical conditions related to chro-
nation. mium (VI) exposure that require fur-
(3) Contents of examination. A medical ther evaluation or treatment, and any
examination consists of: special provisions for use of protective
(i) A medical and work history, with clothing or equipment.
emphasis on: past, present, and antici- (ii) The PLHCP shall not reveal to
pated future exposure to chromium the employer specific findings or diag-
(VI); any history of respiratory system noses unrelated to occupational expo-
dysfunction; any history of asthma, sure to chromium (VI).
dermatitis, skin ulceration, or nasal (iii) The employer shall provide a
septum perforation; and smoking sta- copy of the PLHCPs written medical
tus and history; opinion to the examined employee
(ii) A physical examination of the within two weeks after receiving it.
skin and respiratory tract; and (j) Communication of chromium (VI)
(iii) Any additional tests deemed ap- hazards to employees(1) Hazard commu-
propriate by the examining PLHCP. nication. The employer shall include
(4) Information provided to the PLHCP. chromium (VI) in the program estab-
The employer shall ensure that the ex- lished to comply with the Hazard Com-
amining PLHCP has a copy of this munication Standard (HCS)
standard, and shall provide the fol- ( 1910.1200). The employer shall ensure
lowing information: that each employee has access to labels
(i) A description of the affected em- on containers of chromium and safety
ployees former, current, and antici- data sheets, and is trained in accord-
pated duties as they relate to the em- ance with the provisions of 1910.1200
ployees occupational exposure to chro- and paragraph (j)(2) of this section. The
mium (VI); employer shall provide information on
(ii) The employees former, current, at least the following hazards: Cancer;
and anticipated levels of occupational eye irritation; and skin sensitization.
exposure to chromium (VI); (2) Employee information and training.
(iii) A description of any personal (i) The employer shall ensure that each
protective equipment used or to be employee can demonstrate knowledge
used by the employee, including when of at least the following:
and for how long the employee has used (A) The contents of this section; and
that equipment; and (B) The purpose and a description of
(iv) Information from records of em- the medical surveillance program re-
ployment-related medical examina- quired by paragraph (i) of this section.
tions previously provided to the af- (ii) The employer shall make a copy
fected employee, currently within the of this section readily available with-
control of the employer. out cost to all affected employees.

592

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00602 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1126

(k) Recordkeeping(1) Air monitoring (E) Other data relevant to the oper-
data. (i) The employer shall maintain ations, materials, processing, or em-
an accurate record of all air moni- ployee exposures covered by the excep-
toring conducted to comply with the tion.
requirements of this section. (iii) The employer shall ensure that
(ii) This record shall include at least historical exposure records are main-
the following information: tained and made available in accord-
(A) The date of measurement for each ance with 29 CFR 1910.1020.
sample taken; (3) Objective data. (i) The employer
(B) The operation involving exposure shall maintain an accurate record of
to chromium (VI) that is being mon- all objective data relied upon to com-
itored; ply with the requirements of this sec-
(C) Sampling and analytical methods tion.
used and evidence of their accuracy; (ii) This record shall include at least
(D) Number, duration, and the results the following information:
of samples taken; (A) The chromium containing mate-
(E) Type of personal protective rial in question;
equipment, such as respirators worn; (B) The source of the objective data;
and (C) The testing protocol and results
(F) Name, social security number, of testing, or analysis of the material
and job classification of all employees for the release of chromium (VI);
represented by the monitoring, indi- (D) A description of the process, oper-
cating which employees were actually ation, or activity and how the data
monitored. support the determination; and
(iii) The employer shall ensure that (E) Other data relevant to the proc-
exposure records are maintained and ess, operation, activity, material, or
made available in accordance with 29 employee exposures.
CFR 1910.1020. (iii) The employer shall ensure that
(2) Historical monitoring data. (i) objective data are maintained and
Where the employer has relied on his- made available in accordance with 29
torical monitoring data to determine CFR 1910.1020.
exposure to chromium (VI), the em- (4) Medical surveillance. (i) The em-
ployer shall establish and maintain an ployer shall establish and maintain an
accurate record of the historical moni- accurate record for each employee cov-
toring data relied upon. ered by medical surveillance under
(ii) The record shall include informa- paragraph (i) of this section.
tion that reflects the following condi- (ii) The record shall include the fol-
tions: lowing information about the em-
(A) The data were collected using ployee:
methods that meet the accuracy re- (A) Name and social security number;
quirements of paragraph (d)(5) of this (B) A copy of the PLHCPs written
section; opinions;
(B) The processes and work practices (C) A copy of the information pro-
that were in use when the historical vided to the PLHCP as required by
monitoring data were obtained are es- paragraph (i)(4) of this section.
sentially the same as those to be used (iii) The employer shall ensure that
during the job for which exposure is medical records are maintained and
being determined; made available in accordance with 29
(C) The characteristics of the chro- CFR 1910.1020.
mium (VI) containing material being (l) Dates. (1) For employers with 20 or
handled when the historical moni- more employees, all obligations of this
toring data were obtained are the same section, except engineering controls re-
as those on the job for which exposure quired by paragraph (e) of this section,
is being determined; commence November 27, 2006.
(D) Environmental conditions pre- (2) For employers with 19 or fewer
vailing when the historical monitoring employees, all obligations of this sec-
data were obtained are the same as tion, except engineering controls re-
those on the job for which exposure is quired by paragraph (e) of this section,
being determined; and commence May 30, 2007.

593

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00603 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1127 29 CFR Ch. XVII (7112 Edition)

(3) For all employers, engineering quired by work duties to be present in


controls required by paragraph (e) of regulated areas or any person author-
this section shall be implemented no ized by the OSH Act or regulations
later than May 31, 2010. issued under it to be in regulated areas.
[71 FR 10382, Feb. 28, 2006, as amended at 73
Competent person, in accordance with
FR 75589, Dec. 12, 2008; 75 FR 12686, Mar. 17, 29 CFR 1926.32(f), means a person des-
2010; 77 FR 17895, Mar. 26, 2012] ignated by the employer to act on the
employers behalf who is capable of
1926.1127 Cadmium. identifying existing and potential cad-
(a) Scope. This standard applies to all mium hazards in the workplace and the
occupational exposures to cadmium proper methods to control them in
and cadmium compounds, in all forms, order to protect workers, and has the
in all construction work where an em- authority necessary to take prompt
ployee may potentially be exposed to corrective measures to eliminate or
cadmium. Construction work is defined control such hazards. The duties of a
as work involving construction, alter- competent person include at least the
ation and/or repair, including but not following: Determining prior to the
limited to the following: performance of work whether cadmium
(1) Wrecking, demolition or salvage is present in the workplace; estab-
of structures where cadmium or mate- lishing, where necessary, regulated
rials containing cadmium are present; areas and assuring that access to and
(2) Use of cadmium containing-paints from those areas is limited to author-
and cutting, brazing, burning, grinding ized employees; assuring the adequacy
or welding on surfaces that were paint- of any employee exposure monitoring
ed with cadmium-containing paints; required by this standard; assuring
(3) Construction, alteration, repair, that all employees exposed to air cad-
maintenance, or renovation of struc- mium levels above the PEL wear ap-
tures, substrates, or portions thereof, propriate personal protective equip-
that contain cadmium, or materials ment and are trained in the use of ap-
containing cadmium; propriate methods of exposure control;
(4) Cadmium welding; cutting and assuring that proper hygiene facilities
welding cadmium-plated steel; brazing are provided and that workers are
or welding with cadmium alloys; trained to use those facilities; and as-
(5) Installation of products con- suring that the engineering controls
taining cadmium; required by this standard are imple-
(6) Electrical grounding with cad- mented, maintained in proper oper-
mium welding, or electrical work using ating condition, and functioning prop-
cadmium-coated conduit; erly.
(7) Maintaining or retrofitting cad- Director means the Director of the
mium-coated equipment; National Institute for Occupational
(8) Cadmium contamination/emer- Safety and Health (NIOSH), U.S. De-
gency cleanup; and partment of Health and Human Serv-
(9) Transportation, disposal, storage, ices, or designee.
or containment of cadmium or mate- Employee exposure and similar lan-
rials containing cadmium on the site guage referring to the air cadmium
or location at which construction ac- level to which an employee is exposed
tivities are performed. means the exposure to airborne cad-
(b) Definitions. mium that would occur if the employee
Action level (AL) is defined as an air- were not using respiratory protective
borne concentration of cadmium of 2.5 equipment.
micrograms per cubic meter of air (2.5 Final medical determination is the
g/m3), calculated as an 8-hour time- written medical opinion of the employ-
weighted average (TWA). ees health status by the examining
Assistant Secretary means the Assist- physician under paragraphs (l)(3)-(12) of
ant Secretary of Labor for Occupa- this section or, if multiple physician
tional Safety and Health, U.S. Depart- review under paragraph (l)(13) of this
ment of Labor, or designee. section or the alternative physician de-
Authorized person means any person termination under paragraph (l)(14) of
authorized by the employer and re- this section is invoked, it is the final,

594

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00604 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1127

written medical finding, recommenda- (iv) Eight-hour TWA exposures shall


tion or determination that emerges be determined for each employee on
from that process. the basis of one or more personal
High-efficiency Particulate Air [HEPA] breathing-zone air samples reflecting
filter means a filter capable of trapping full shift exposure on each shift, for
and retaining at least 99.97 percent of each job classification, in each work
mono-dispersed particles of 0.3 microm- area. Where several employees perform
eters in diameter. the same job tasks, in the same job
Regulated area means an area demar- classification, on the same shift, in the
cated by the employer where an em- same work area, and the length, dura-
ployees exposure to airborne con- tion, and level of cadmium exposures
centrations of cadmium exceeds, or can are similar, an employer may sample a
reasonably be expected to exceed the representative fraction of the employ-
permissible exposure limit (PEL). ees instead of all employees in order to
This section means this cadmium meet this requirement. In representa-
standard. tive sampling, the employer shall sam-
(c) Permissible Exposure Limit (PEL). ple the employee(s) expected to have
The employer shall assure that no em- the highest cadmium exposures.
ployee is exposed to an airborne con- (2) Specific. (i) Initial monitoring. Ex-
centration of cadmium in excess of five cept as provided for in paragraph
micrograms per cubic meter of air (5 (d)(2)(iii) of this section, where a deter-
g/m3), calculated as an eight-hour mination conducted under paragraph
time-weighted average exposure (d)(1)(i) of this section shows the possi-
(TWA). bility of employee exposure to cad-
(d) Exposure Monitoring(1) General. mium at or above the action level, the
(i) Prior to the performance of any con- employer shall conduct exposure moni-
struction work where employees may toring as soon as practicable that is
be potentially exposed to cadmium, the representative of the exposure for each
employer shall establish the applica- employee in the workplace who is or
bility of this standard by determining may be exposed to cadmium at or
whether cadmium is present in the above the action level.
workplace and whether there is the (ii) In addition, if the employee peri-
possibility that employee exposures odically performs tasks that may ex-
will be at or above the action level. pose the employee to a higher con-
The employer shall designate a com- centration of airborne cadmium, the
petent person who shall make this de- employee shall be monitored while per-
termination. Investigation and mate- forming those tasks.
rial testing techniques shall be used, as (iii) Where the employer has objec-
appropriate, in the determination. In- tive data, as defined in paragraph (n)(2)
vestigation shall include a review of of this section, demonstrating that em-
relevant plans, past reports, material ployee exposure to cadmium will not
safety data sheets, and other available exceed airborne concentrations at or
records, and consultations with the above the action level under the ex-
property owner and discussions with pected conditions of processing, use, or
appropriate individuals and agencies. handling, the employer may rely upon
(ii) Where cadmium has been deter- such data instead of implementing ini-
mined to be present in the workplace, tial monitoring.
and it has been determined that there (iv) Where a determination con-
is a possibility the employees exposure ducted under paragraphs (d)(1) or (d)(2)
will be at or above the action level, the of this section is made that a poten-
competent person shall identify em- tially exposed employee is not exposed
ployees potentially exposed to cad- to airborne concentrations of cadmium
mium at or above the action level. at or above the action level, the em-
(iii) Determinations of employee ex- ployer shall make a written record of
posure shall be made from breathing- such determination. The record shall
zone air samples that reflect the mon- include at least the monitoring data
itored employees regular, daily 8-hour developed under paragraphs (d)(2)(i)
TWA exposure to cadmium. (iii) of this section, where applicable,

595

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00605 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1127 29 CFR Ch. XVII (7112 Edition)

and shall also include the date of deter- taken by the employer to reduce em-
mination, and the name and social se- ployee exposure to or below the PEL.
curity number of each employee. (6) Accuracy of measurement. The em-
(3) Monitoring frequency (periodic mon- ployer shall use a method of moni-
itoring). (i) If the initial monitoring or toring and analysis that has an accu-
periodic monitoring reveals employee racy of not less than plus or minus 25
exposures to be at or above the action percent (25%), with a confidence level
level, the employer shall monitor at a of 95 percent, for airborne concentra-
frequency and pattern needed to assure tions of cadmium at or above the ac-
that the monitoring results reflect tion level and the permissible exposure
with reasonable accuracy the employ- limit.
ees typical exposure levels, given the (e) Regulated areas(1) Establishment.
variability in the tasks performed, The employer shall establish a regu-
work practices, and environmental lated area wherever an employees ex-
conditions on the job site, and to as- posure to airborne concentrations of
sure the adequacy of respiratory selec- cadmium is, or can reasonably be ex-
tion and the effectiveness of engineer- pected to be in excess of the permis-
ing and work practice controls. sible exposure limit (PEL).
(ii) If the initial monitoring or the (2) Demarcation. Regulated areas shall
periodic monitoring indicates that em- be demarcated from the rest of the
ployee exposures are below the action workplace in any manner that ade-
level and that result is confirmed by quately establishes and alerts employ-
the results of another monitoring ees of the boundaries of the regulated
taken at least seven days later, the em- area, including employees who are or
ployer may discontinue the monitoring may be incidentally in the regulated
for those employees whose exposures areas, and that protects persons out-
are represented by such monitoring. side the area from exposure to airborne
(4) Additional monitoring. The em- concentrations of cadmium in excess of
ployer also shall institute the exposure the PEL.
monitoring required under paragraphs (3) Access. Access to regulated areas
(d)(2)(i) and (d)(3) of this section when- shall be limited to authorized persons.
ever there has been a change in the raw (4) Provision of respirators. Each per-
materials, equipment, personnel, work son entering a regulated area shall be
practices, or finished products that supplied with and required to use a res-
may result in additional employees pirator, selected in accordance with
being exposed to cadmium at or above paragraph (g)(2) of this section.
the action level or in employees al- (5) Prohibited activities. The employer
ready exposed to cadmium at or above shall assure that employees do not eat,
the action level being exposed above drink, smoke, chew tobacco or gum, or
the PEL, or whenever the employer or apply cosmetics in regulated areas, or
competent person has any reason to carry the products associated with any
suspect that any other change might of these activities into regulated areas
result in such further exposure. or store such products in those areas.
(5) Employee notification of monitoring (f) Methods of compliance(1) Compli-
results. (i) The employer must, as soon ance hierarchy. (i) Except as specified in
as possible but no later than 5 working paragraph (f)(1)(ii) of this section, the
days after the receipt of the results of employer shall implement engineering
any monitoring performed under this and work practice controls to reduce
section, notify each affected employee and maintain employee exposure to
of these results either individually in cadmium at or below the PEL, except
writing or by posting the results in an to the extent that the employer can
appropriate location that is accessible demonstrate that such controls are not
to employees. feasible.
(ii) Wherever monitoring results indi- (ii) The requirement to implement
cate that employee exposure exceeds engineering controls to achieve the
the PEL, the employer shall include in PEL does not apply where the em-
the written notice a statement that ployer demonstrates the following:
the PEL has been exceeded and a de- (A) The employee is only intermit-
scription of the corrective action being tently exposed; and

596

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00606 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1127

(B) The employee is not exposed sult in a significant increase in em-


above the PEL on 30 or more days per ployee exposure to cadmium.
year (12 consecutive months). (iii) Recirculation of air. If air from
(iii) Wherever engineering and work exhaust ventilation is recirculated into
practice controls are not sufficient to the workplace, the system shall have a
reduce employee exposure to or below high efficiency filter and be monitored
the PEL, the employer nonetheless to assure effectiveness.
shall implement such controls to re- (iv) Procedures shall be developed
duce exposures to the lowest levels and implemented to minimize em-
achievable. The employer shall supple- ployee exposure to cadmium when
ment such controls with respiratory maintenance of ventilation systems
protection that complies with the re-
and changing of filters is being con-
quirements of paragraph (g) of this sec-
ducted.
tion and the PEL.
(iv) The employer shall not use em- (5) Compliance program. (i) Where em-
ployee rotation as a method of compli- ployee exposure to cadmium exceeds
ance. the PEL and the employer is required
(2) Specific operations(i) Abrasive under paragraph (f)(1) of this section to
blasting. Abrasive blasting on cadmium implement controls to comply with the
or cadmium-containing materials shall PEL, prior to the commencement of
be conducted in a manner that will pro- the job the employer shall establish
vide adequate protection. and implement a written compliance
(ii) Heating cadmium and cadmium- program to reduce employee exposure
containing materials. Welding, cutting, to or below the PEL. To the extent
and other forms of heating of cadmium that engineering and work practice
or cadmium-containing materials shall controls cannot reduce exposures to or
be conducted in accordance with the below the PEL, the employer shall in-
requirements of 29 CFR 1926.353 and 29 clude in the written compliance pro-
CFR 1926.354, where applicable. gram the use of appropriate respiratory
(3) Prohibitions. (i) High speed abra- protection to achieve compliance with
sive disc saws and similar abrasive the PEL.
power equipment shall not be used for (ii) Written compliance programs
work on cadmium or cadmium-con- shall be reviewed and updated as often
taining materials unless they are and as promptly as necessary to reflect
equipped with appropriate engineering significant changes in the employers
controls to minimize emissions, if the compliance status or significant
exposure levels are above the PEL. changes in the lowest air cadmium
(ii) Materials containing cadmium level that is technologically feasible.
shall not be applied by spray methods, (iii) A competent person shall review
if exposures are above the PEL, unless the comprehensive compliance pro-
employees are protected with supplied- gram initially and after each change.
air respirators with full facepiece,
(iv) Written compliance programs
hood, helmet, suit, operated in positive
shall be provided upon request for ex-
pressure mode and measures are insti-
amination and copying to the Assist-
tuted to limit overspray and prevent
contamination of adjacent areas. ant Secretary, the Director, affected
(4) Mechanical ventilation. (i) When employees, and designated employee
ventilation is used to control exposure, representatives.
measurements that demonstrate the ef- (g) Respirator protection(1) General.
fectiveness of the system in controlling For employees who use respirators re-
exposure, such as capture velocity, quired by this section, the employer
duct velocity, or static pressure shall must provide each employee an appro-
be made as necessary to maintain its priate respirator that complies with
effectiveness. the requirements of this paragraph.
(ii) Measurements of the systems ef- Respirators must be used during:
fectiveness in controlling exposure (i) Periods necessary to install or im-
shall be made as necessary within five plement feasible engineering and work-
working days of any change in produc- practice controls when employee expo-
tion, process, or control that might re- sures exceed the PEL.

597

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00607 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1127 29 CFR Ch. XVII (7112 Edition)

(ii) Maintenance and repair activi- paragraph (d)(3)(i)(A) of 29 CFR


ties, and brief or intermittent work op- 1910.134.
erations, for which employee exposures (B) Provide employees with full face-
exceed the PEL and engineering and piece respirators when they experience
work-practice controls are not feasible eye irritation.
or are not required. (C) Provide HEPA filters for powered
(iii) Work operations in the regulated and non-powered air-purifying res-
areas specified in paragraph (e) of this pirators.
section. (ii) The employer must provide a
(iv) Work operations for which the powered air-purifying respirator in-
employer has implemented all feasible stead of a negative-pressure respirator
engineering and work-practice con- when an employee entitled to a res-
trols, and such controls are not suffi- pirator chooses to use this type of res-
cient to reduce employee exposures to pirator and such a respirator will pro-
or below the PEL. vide adequate protection to the em-
(v) Work operations for which an em- ployee.
ployee, who is exposed to cadmium at (h) Emergency situations. The em-
or above the action level, requests a ployer shall develop and implement a
respirator. written plan for dealing with emer-
gency situations involving substantial
(vi) Work operations for which engi-
releases of airborne cadmium. The plan
neering controls are not required by
shall include provisions for the use of
paragraph (f)(1)(ii) of this section to re-
appropriate respirators and personal
duce employee exposures that exceed
protective equipment. In addition, em-
the PEL.
ployees not essential to correcting the
(vii) Emergencies. emergency situation shall be restricted
(2) Respirator program. (i) The em- from the area and normal operations
ployer must implement a respiratory halted in that area until the emer-
protection program in accordance with gency is abated.
1910.134 (b) through (d) (except (i) Protective work clothing and equip-
(d)(1)(iii)), and (f) through (m), which ment(1) Provision and use. If an em-
covers each employee required by this ployee is exposed to airborne cadmium
section to use a respirator. above the PEL or where skin or eye ir-
(ii) If an employee exhibits breathing ritation is associated with cadmium
difficulty during fit testing or res- exposure at any level, the employer
pirator use, the employer must provide shall provide at no cost to the em-
the employee with a medical examina- ployee, and assure that the employee
tion in accordance with paragraph uses, appropriate protective work
(l)(6)(ii) of this section to determine if clothing and equipment that prevents
the employee can use a respirator contamination of the employee and the
while performing the required duties. employees garments. Protective work
(iii) No employee must use a res- clothing and equipment includes, but is
pirator when, based on their most re- not limited to:
cent medical examination, the exam- (i) Coveralls or similar full-body
ining physician determines that the work clothing;
employee will be unable to continue to (ii) Gloves, head coverings, and boots
function normally while using a res- or foot coverings; and
pirator. If the physician determines the (iii) Face shields, vented goggles, or
employee must be limited in, or re- other appropriate protective equip-
moved from, their current job because ment that complies with 29 CFR
of the employees inability to use a res- 1910.133.
pirator, the job limitation or removal (2) Removal and storage. (i) The em-
must be conducted in accordance with ployer shall assure that employees re-
paragraphs (l) (11) and (12) of this sec- move all protective clothing and equip-
tion. ment contaminated with cadmium at
(3) Respirator selection. (i) Employers the completion of the work shift and do
must: so only in change rooms provided in ac-
(A) Select, and provide to employees, cordance with paragraph (j)(1) of this
the appropriate respirators specified in section.

598

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00608 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1127

(ii) The employer shall assure that no missible exposure limit prescribed in
employee takes cadmium-contami- paragraph (c) of this section.
nated protective clothing or equipment (v) The employer shall inform any
from the workplace, except for employ- person who launders or cleans protec-
ees authorized to do so for purposes of tive clothing or equipment contami-
laundering, cleaning, maintaining, or nated with cadmium of the potentially
disposing of cadmium-contaminated harmful effects of exposure to cad-
protective clothing and equipment at mium, and that the clothing and equip-
an appropriate location or facility ment should be laundered or cleaned in
away from the workplace. a manner to effectively prevent the re-
(iii) The employer shall assure that lease of airborne cadmium in excess of
contaminated protective clothing and the PEL.
equipment, when removed for laun- (j) Hygiene areas and practices(1)
dering, cleaning, maintenance, or dis- General. For employees whose airborne
posal, is placed and stored in sealed, exposure to cadmium is above the PEL,
impermeable bags or other closed, im- the employer shall provide clean
permeable containers that are designed change rooms, handwashing facilities,
to prevent dispersion of cadmium dust. showers, and lunchroom facilities that
(iv) The employer shall ensure that comply with 29 CFR 1926.51.
containers of contaminated protective (2) Change rooms. The employer shall
clothing and equipment that are to be
assure that change rooms are equipped
taken out of the change rooms or the
with separate storage facilities for
workplace for laundering, cleaning,
street clothes and for protective cloth-
maintenance or disposal shall bear la-
ing and equipment, which are designed
bels in accordance with paragraph
to prevent dispersion of cadmium and
(m)(3)(ii) of this section.
contamination of the employees street
(3) Cleaning, replacement, and disposal.
clothes.
(i) The employer shall provide the pro-
(3) Showers and handwashing facilities.
tective clothing and equipment re-
quired by paragraph (i)(1) of this sec- (i) The employer shall assure that em-
tion in a clean and dry condition as ployees whose airborne exposure to
often as necessary to maintain its ef- cadmium is above the PEL shower dur-
fectiveness, but in any event at least ing the end of the work shift.
weekly. The employer is responsible (ii) The employer shall assure that
for cleaning and laundering the protec- employees who are exposed to cad-
tive clothing and equipment required mium above the PEL wash their hands
by this paragraph to maintain its effec- and faces prior to eating, drinking,
tiveness and is also responsible for dis- smoking, chewing tobacco or gum, or
posing of such clothing and equipment. applying cosmetics.
(ii) The employer also is responsible (4) Lunchroom facilities. (i) The em-
for repairing or replacing required pro- ployer shall assure that the lunchroom
tective clothing and equipment as facilities are readily accessible to em-
needed to maintain its effectiveness. ployees, that tables for eating are
When rips or tears are detected while maintained free of cadmium, and that
an employee is working they shall be no employee in a lunchroom facility is
immediately mended, or the worksuit exposed at any time to cadmium at or
shall be immediately replaced. above a concentration of 2.5 g/m3.
(iii) The employer shall prohibit the (ii) The employer shall assure that
removal of cadmium from protective employees do not enter lunchroom fa-
clothing and equipment by blowing, cilities with protective work clothing
shaking, or any other means that dis- or equipment unless surface cadmium
perses cadmium into the air. has been removed from the clothing
(iv) The employer shall assure that and equipment by HEPA vacuuming or
any laundering of contaminated cloth- some other method that removes cad-
ing or cleaning of contaminated equip- mium dust without dispersing it.
ment in the workplace is done in a (k) Housekeeping. (1) All surfaces
manner that prevents the release of shall be maintained as free as prac-
airborne cadmium in excess of the per- ticable of accumulations of cadmium.

599

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00609 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1127 29 CFR Ch. XVII (7112 Edition)

(2) All spills and sudden releases of ployer demonstrates that the em-
material containing cadmium shall be ployee:
cleaned up as soon as possible. (1) Is not currently exposed by the
(3) Surfaces contaminated with cad- employer to airborne concentrations of
mium shall, wherever possible, be cadmium at or above the action level
cleaned by vacuuming or other meth- on 30 or more days per year (twelve
ods that minimize the likelihood of consecutive months); and,
cadmium becoming airborne. (2) Is not currently exposed by the
(4) HEPA-filtered vacuuming equip- employer in those tasks on 30 or more
ment or equally effective filtration days per year (twelve consecutive
methods shall be used for vacuuming. months).
The equipment shall be used and (B) Previously exposed The employer
emptied in a manner that minimizes shall also institute a medical surveil-
the reentry of cadmium into the work- lance program for all employees who
place. might previously have been exposed to
(5) Shoveling, dry or wet sweeping, cadmium by the employer prior to the
and brushing may be used only where effective date of this standard in tasks
vacuuming or other methods that min- specified under paragraph (l)(1)(i)(A) of
imize the likelihood of cadmium be- this section, unless the employer dem-
coming airborne have been tried and onstrates that the employee did not in
found not to be effective. the years prior to the effective date of
(6) Compressed air shall not be used this section work in those tasks for the
to remove cadmium from any surface employer with exposure to cadmium
unless the compressed air is used in for an aggregated total of more than 12
conjunction with a ventilation system months.
designed to capture the dust cloud cre- (ii) To determine an employees fit-
ated by the compressed air. ness for using a respirator, the em-
(7) Waste, scrap, debris, bags, and ployer shall provide the limited med-
containers, personal protective equip- ical examination specified in paragraph
ment and clothing contaminated with (l)(6) of this section.
cadmium and consigned for disposal (iii) The employer shall assure that
shall be collected and disposed of in all medical examinations and proce-
sealed impermeable bags or other dures required by this section are per-
closed, impermeable containers. These formed by or under the supervision of a
bags and containers shall be labeled in licensed physician, who has read and is
accordance with paragraph (m)(3)(ii) of familiar with the health effects section
this section. of appendix A to this section, the regu-
(l) Medical Surveillance(1) General latory text of this section, the protocol
(i) Scope(A) Currently exposedThe for sample handling and lab selection
employer shall institute a medical sur- in appendix F to this section, and the
veillance program for all employees questionnaire of appendix D to this sec-
who are or may be exposed at or above tion.
the action level and all employees who (iv) The employer shall provide the
perform the following tasks, operations medical surveillance required by this
or jobs: Electrical grounding with cad- section, including multiple physician
mium welding; cutting, brazing, burn- review under paragraph (l)(13) of this
ing, grinding or welding on surfaces section without cost to employees, and
that were painted with cadmium-con- at a time and place that is reasonable
taining paints; electrical work using and convenient to employees.
cadmium-coated conduit; use of cad- (v) The employer shall assure that
mium containing paints; cutting and the collecting and handling of biologi-
welding cadmium-plated steel; brazing cal samples of cadmium in urine (CdU),
or welding with cadmium alloys; fusing cadmium in blood (CdB), and beta-2
of reinforced steel by cadmium weld- microglobulin in urine (b2-M) taken
ing; maintaining or retrofitting cad- from employees under this section is
mium-coated equipment; and, wrecking done in a manner that assures their re-
and demolition where cadmium is liability and that analysis of biological
present. A medical surveillance pro- samples of cadmium in urine (CdU),
gram will not be required if the em- cadmium in blood (CdB), and beta-2

600

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00610 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1127

microglobulin in urine (b2-M) taken CdB level to be at or below 5 g/lwb,


from employees under this section is then:
performed in laboratories with dem- (A) For employees who are subject to
onstrated proficiency to perform the medical surveillance under paragraphs
particular analysis. (See appendix F to (l)(1)(i)(A) of this section because of
this section.) current or anticipated exposure to cad-
(2) Initial Examination. (i) For em- mium, the employer shall provide the
ployees covered by medical surveil- minimum level of periodic medical sur-
lance under paragraph (l)(1)(i) of this veillance in accordance with the re-
section, the employer shall provide an quirements in paragraph (l)(4)(i) of this
initial medical examination. The ex- section; and
amination shall be provided to those (B) For employees who are subject to
employees within 30 days after initial medical surveillance under paragraph
assignment to a job with exposure to (l)(1)(i)(B) of this section because of
cadmium or no later than 90 days after prior but not current exposure, the em-
the effective date of this section, ployer shall provide biological moni-
whichever date is later. toring for CdU, B2-M, and CdB one year
(ii) The initial medical examination after the initial biological monitoring
shall include: and then the employer shall comply
with the requirements of paragraph
(A) A detailed medical and work his-
(l)(4)(vi) of this section.
tory, with emphasis on: Past, present,
(ii) For all employees who are subject
and anticipated future exposure to cad-
to medical surveillance under para-
mium; any history of renal, cardio-
graph (l)(1)(i) of this section, if the re-
vascular, respiratory, hematopoietic,
sults of the initial biological moni-
reproductive, and/or musculo-skeletal
toring tests show the level of CdU to
system dysfunction; current usage of
exceed 3 g/g Cr, the level of b2-M to be
medication with potential nephrotoxic
in excess of 300 g/g Cr, or the level of
side-effects; and smoking history and
CdB to be in excess of 5 g/lwb, the em-
current status; and
ployer shall:
(B) Biological monitoring that in-
(A) Within two weeks after receipt of
cludes the following tests:
biological monitoring results, reassess
(1) Cadmium in urine (CdU), stand- the employees occupational exposure
ardized to grams of creatinine (g/Cr); to cadmium as follows:
(2) Beta-2 microglobulin in urine (b2- (1) Reassess the employees work
M), standardized to grams of creatinine practices and personal hygiene;
(g/Cr), with pH specified, as described (2) Reevaluate the employees res-
in appendix F to this section; and pirator use, if any, and the respirator
(3) Cadmium in blood (CdB), stand- program;
ardized to liters of whole blood (lwb). (3) Review the hygiene facilities;
(iii) Recent Examination: An initial (4) Reevaluate the maintenance and
examination is not required to be pro- effectiveness of the relevant engineer-
vided if adequate records show that the ing controls;
employee has been examined in accord- (5) Assess the employees smoking
ance with the requirements of para- history and status;
graph (l)(2)(ii) of this section within (B) Within 30 days after the exposure
the past 12 months. In that case, such reassessment, specified in paragraph
records shall be maintained as part of (l)(3)(ii)(A) of this section, take reason-
the employees medical record and the able steps to correct any deficiencies
prior exam shall be treated as if it were found in the reassessment that may be
an initial examination for the purposes responsible for the employees excess
of paragraphs (l)(3) and (4) of this sec- exposure to cadmium; and,
tion. (C) Within 90 days after receipt of bi-
(3) Actions triggered by initial biological ological monitoring results, provide a
monitoring. (i) If the results of the bio- full medical examination to the em-
logical monitoring tests in the initial ployee in accordance with the require-
examination show the employees CdU ments of paragraph (l)(4)(ii) of this sec-
level to be at or below 3 g/g Cr, b2-M tion. After completing the medical ex-
level to be at or below 300 g/g Cr and amination, the examining physician

601

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00611 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1127 29 CFR Ch. XVII (7112 Edition)

shall determine in a written medical or below 3 g/g Cr, b2-M level falls to or
opinion whether to medically remove below 300 g/g Cr and CdB level falls to
the employee. If the physician deter- or below 5 g/lwb, the employer shall:
mines that medical removal is not nec- (A) Periodically reassess the employ-
essary, then until the employees CdU ees occupational exposure to cad-
level falls to or below 3 g/g Cr, b2-M mium;
level falls to or below 300 g/g Cr and (B) Provide biological monitoring in
CdB level falls to or below 5 g/lwb, the accordance with paragraph (l)(2)(ii)(B)
employer shall: of this section on a quarterly basis; and
(1) Provide biological monitoring in (C) Provide semiannual medical ex-
accordance with paragraph (l)(2)(ii)(B) aminations in accordance with para-
of this section on a semiannual basis; graph (l)(4)(ii) of this section.
and (iv) For all employees to whom med-
(2) Provide annual medical examina- ical surveillance is provided, beginning
tions in accordance with paragraph on January 1, 1999, and in lieu of para-
(l)(4)(ii) of this section. graph (l)(3)(iii) of this section, when-
(iii) For all employees who are sub- ever the results of initial biological
ject to medical surveillance under monitoring tests show the employees
paragraph (l)(1)(i) of this section, if the CdU level to be in excess of 7 g/g Cr, or
results of the initial biological moni- b2-M level to be in excess of 750 g/g Cr,
toring tests show the level of CdU to be or CdB level to be in excess of 10 g/
in excess of 15 g/g Cr, or the level of lwb, the employer shall comply with
CdB to be in excess of 15 g/lwb, or the the requirements of paragraphs
level of b2-M to be in excess of 1,500 g/ (l)(3)(ii)(A)(B) of this section. Within
g Cr, the employer shall comply with 90 days after receipt of biological moni-
the requirements of paragraphs toring results, the employer shall pro-
(l)(3)(ii)(A)(B) of this section. Within vide a full medical examination to the
90 days after receipt of biological moni- employee in accordance with the re-
toring results, the employer shall pro- quirements of paragraph (l)(4)(ii) of
vide a full medical examination to the this section. After completing the med-
employee in accordance with the re- ical examination, the examining physi-
quirements of paragraph (l)(4)(ii) of cian shall determine in a written med-
this section. After completing the med- ical opinion whether to medically re-
ical examination, the examining physi- move the employee. However, if the
cian shall determine in a written med- initial biological monitoring results
ical opinion whether to medically re- and the biological monitoring results
move the employee. However, if the obtained during the medical examina-
initial biological monitoring results tion both show that: CdU exceeds 7 g/
and the biological monitoring results g Cr; or CdB exceeds 10 g/lwb; or b2-M
obtained during the medical examina- exceeds 750 g/g Cr, and in addition CdU
tion both show that: CdU exceeds 15 g/ exceeds 3 g/g Cr or CdB exceeds 5 g/
g Cr; or CdB exceeds 15 g/lwb; or b2-M liter of whole blood, then the physician
exceeds 1500 g/g Cr, and in addition shall medically remove the employee
CdU exceeds 3 g/g Cr or CdB exceeds 5 from exposure to cadmium at or above
g/liter of whole blood, then the physi- the action level. If the second set of bi-
cian shall medically remove the em- ological monitoring results obtained
ployee from exposure to cadmium at or during the medical examination does
above the action level. If the second set not show that a mandatory removal
of biological monitoring results ob- trigger level has been exceeded, then
tained during the medical examination the employee is not required to be re-
does not show that a mandatory re- moved by the mandatory provisions of
moval trigger level has been exceeded, this paragraph. If the employee is not
then the employee is not required to be required to be removed by the manda-
removed by the mandatory provisions tory provisions of this paragraph or by
of this paragraph. If the employee is the physicians determination, then
not required to be removed by the man- until the employees CdU level falls to
datory provisions of this paragraph or or below 3 g/g Cr, b2-M level falls to or
by the physicians determination, then below 300 g/g Cr and CdB level falls to
until the employees CdU level falls to or below 5 g/lwb, the employer shall:

602

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00612 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1127

(A) Periodically reassess the employ- (E) Biological monitoring, as re-


ees occupational exposure to cad- quired in paragraph (l)(2)(ii)(B) of this
mium; section;
(B) Provide biological monitoring in (F) Blood analysis, in addition to the
accordance with paragraph (l)(2)(ii)(B) analysis required under paragraph
of this section on a quarterly basis; and (l)(2)(ii)(B) of this section, including
(C) Provide semiannual medical ex- blood urea nitrogen, complete blood
aminations in accordance with para- count, and serum creatinine;
graph (l)(4)(ii) of this section. (G) Urinalysis, in addition to the
(4) Periodic medical surveillance. (i) analysis required under paragraph
For each employee who is covered by (l)(2)(ii)(B) of this section, including
medical surveillance under paragraph the determination of albumin, glucose,
(l)(1)(i)(A) of this section because of and total and low molecular weight
current or anticipated exposure to cad- proteins;
mium, the employer shall provide at (H) For males over 40 years old, pros-
least the minimum level of periodic tate palpation, or other at least as ef-
medical surveillance, which consists of fective diagnostic test(s), and;
periodic medical examinations and (I) Any additional tests or procedures
periodic biological monitoring. A peri- deemed appropriate by the examining
odic medical examination shall be pro- physician.
vided within one year after the initial (iii) Periodic biological monitoring
examination required by paragraph shall be provided in accordance with
(l)(2) of this section and thereafter at paragraph (l)(2)(ii)(B) of this section.
least biennially. Biological sampling (iv) If the results of periodic biologi-
shall be provided at least annually ei- cal monitoring or the results of bio-
ther as part of a periodic medical ex- logical monitoring performed as part of
amination or separately as periodic bi- the periodic medical examination show
ological monitoring. the level of the employees CdU, b2M,
(ii) The periodic medical examination or CdB to be in excess of the levels
shall include: specified in paragraphs (l)(3)(ii) or (iii)
of this section; or beginning on Janu-
(A) A detailed medical and work his-
ary 1, 1999, in excess of the levels speci-
tory, or update thereof, with emphasis
fied in paragraphs (l)(3)(ii) or (iv), the
on: Past, present and anticipated fu-
employer shall take the appropriate
ture exposure to cadmium; smoking actions specified in paragraphs
history and current status; reproduc- (l)(3)(ii)(iv) of this section, respec-
tive history; current use of medica- tively.
tions with potential nephrotoxic side-
(v) For previously exposed employees
effects; any history of renal, cardio- under paragraph (l)(1)(i)(B) of this sec-
vascular, respiratory, hematopoietic, tion:
and/or musculo-skeletal system dys-
(A) If the employees levels of CdU
function; and as part of the medical
did not exceed 3 g/g Cr, CdB did not
and work history, for employees who exceed 5 g/lwb, and b2M did not ex-
wear respirators, questions 311 and 25 ceed 300 g/g Cr in the initial biological
32 in appendix D to this section; monitoring tests, and if the results of
(B) A complete physical examination the followup biological monitoring re-
with emphasis on: blood pressure, the quired by paragraph (l)(3)(i)(B) of this
respiratory system, and the urinary section one year after the initial exam-
system; ination confirm the previous results,
(C) A 14 inch by 17 inch, or a reason- the employer may discontinue all peri-
ably standard sized posterior-anterior odic medical surveillance for that em-
chest X-ray (after the initial X-ray, the ployee.
frequency of chest X-rays is to be de- (B) If the initial biological moni-
termined by the examining physician); toring results for CdU, CdB, or b2M
(D) Pulmonary function tests, includ- were in excess of the levels specified in
ing forced vital capacity (FVC) and paragraph (l)(3)(i) of this section, but
forced expiratory volume at 1 second subsequent biological monitoring re-
(FEV1); sults required by paragraph (l)(3)(ii)

603

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00613 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1127 29 CFR Ch. XVII (7112 Edition)

(iv) of this section show that the em- if any; the employees smoking history
ployees CdU levels no longer exceed 3 and status; the respiratory protection
g/g Cr, CdB levels no longer exceed 5 program; the hygiene facilities; the
g/lwb, and b2M levels no longer ex- maintenance and effectiveness of the
ceed 300 g/g Cr, the employer shall relevant engineering controls; and take
provide biological monitoring for CdU, all reasonable steps to correct the defi-
CdB, and b2M one year after these ciencies found in the reassessment that
most recent biological monitoring re- may be responsible for the employees
sults. If the results of the followup bio- excess exposure to cadmium.
logical monitoring specified in this (B) Provide semi-annual medical re-
paragraph, confirm the previous re- examinations to evaluate the abnormal
sults, the employer may discontinue clinical sign(s) of cadmium toxicity
all periodic medical surveillance for until the results are normal or the em-
that employee. ployee is medically removed; and
(C) However, if the results of the fol- (C) Where the results of tests for
low-up tests specified in paragraph total proteins in urine are abnormal,
(l)(4)(v)(A) or (B) of this section indi- provide a more detailed medical eval-
cate that the level of the employees uation of the toxic effects of cadmium
CdU, b2M, or CdB exceeds these same on the employees renal system.
levels, the employer is required to pro- (6) Examination for respirator use. (i)
vide annual medical examinations in
To determine an employees fitness for
accordance with the provisions of para-
respirator use, the employer shall pro-
graph (l)(4)(ii) of this section until the
vide a medical examination that in-
results of biological monitoring are
cludes the elements specified in para-
consistently below these levels or the
graph (l)(6)(i)(A)(D) of this section.
examining physician determines in a
This examination shall be provided
written medical opinion that further
prior to the employees being assigned
medical surveillance is not required to
to a job that requires the use of a res-
protect the employees health.
pirator or no later than 90 days after
(vi) A routine, biennial medical ex-
this section goes into effect, whichever
amination is not required to be pro-
date is later, to any employee without
vided in accordance with paragraphs
a medical examination within the pre-
(l)(3)(i) and (l)(4) of this section if ade-
ceding 12 months that satisfies the re-
quate medical records show that the
quirements of this paragraph.
employee has been examined in accord-
ance with the requirements of para- (A) A detailed medical and work his-
graph (l)(4)(ii) of this section within tory, or update thereof, with emphasis
the past 12 months. In that case, such on: past exposure to cadmium; smoking
records shall be maintained by the em- history and current status; any history
ployer as part of the employees med- of renal, cardiovascular, respiratory,
ical record, and the next routine, peri- hematopoietic, and/or musculo-skeletal
odic medical examination shall be system dysfunction; a description of
made available to the employee within the job for which the respirator is re-
two years of the previous examination. quired; and questions 311 and 2532 in
(5) Actions triggered by medical exami- appendix D;
nations. (i) If the results of a medical (B) A blood pressure test;
examination carried out in accordance (C) Biological monitoring of the em-
with this section indicate any labora- ployees levels of CdU, CdB and b2M in
tory or clinical finding consistent with accordance with the requirements of
cadmium toxicity that does not require paragraph (l)(2)(ii)(B) of this section,
employer action under paragraphs unless such results already have been
(l)(2), (3) or (4) of this section, the em- obtained within the twelve months;
ployer shall take the following steps and
and continue to take them until the (D) Any other test or precedure that
physician determines that they are no the examining physician deems appro-
longer necessary. priate.
(A) Periodically reassess: The em- (ii) After reviewing all the informa-
ployees work practices and personal tion obtained from the medical exam-
hygiene; the employees respirator use, ination required in paragraph (l)(6)(i)

604

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00614 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1127

of this section, the physician shall de- this section, no termination of employ-
termine whether the employee is fit to ment medical examination is required.
wear a respirator. (9) Information provided to the physi-
(iii) Whenever an employee has ex- cian. The employer shall provide the
hibited difficulty in breathing during a following information to the exam-
respirator fit test or during use of a ining physician:
respirator, the employer, as soon as (i) A copy of this standard and appen-
possible, shall provide the employee dices;
with a periodic medical examination in (ii) A description of the affected em-
accordance with paragraph (l)(4)(ii) of ployees former, current, and antici-
this section to determine the employ- pated duties as they relate to the em-
ees fitness to wear a respirator. ployees occupational exposure to cad-
(iv) Where the results of the exam- mium;
ination required under paragraphs (iii) The employees former, current,
(l)(6)(i), (ii), or (iii) of this section are and anticipated future levels of occupa-
abnormal, medical limitation or prohi- tional exposure to cadmium;
bition of respirator use shall be consid- (iv) A description of any personal
ered. If the employee is allowed to wear protective equipment, including res-
a respirator, the employees ability to pirators, used or to be used by the em-
continue to do so shall be periodically ployee, including when and for how
evaluated by a physician. long the employee has used that equip-
(7) Emergency Examinations. (i) In ad- ment; and
dition to the medical surveillance re-
(v) Relevant results of previous bio-
quired in paragraphs (l)(2)(6) of this
logical monitoring and medical exami-
section, the employer shall provide a
nations.
medical examination as soon as pos-
sible to any employee who may have (10) Physicians written medical opin-
been acutely exposed to cadmium be- ion. (i) The employer shall promptly
cause of an emergency. obtain a written, medical opinion from
(ii) The examination shall include the examining physician for each med-
the requirements of paragraph (l)(4)(ii), ical examination performed on each
of this section, with emphasis on the employee. This written opinion shall
respiratory system, other organ sys- contain:
tems considered appropriate by the ex- (A) The physicians diagnosis for the
amining physician, and symptoms of employee;
acute overexposure, as identified in (B) The physicians opinion as to
paragraphs II(B)(1)(2) and IV of appen- whether the employee has any detected
dix A of this section. medical condition(s) that would place
(8) Termination of employment exam- the employee at increased risk of ma-
ination. (i) At termination of employ- terial impairment to health from fur-
ment, the employer shall provide a ther exposure to cadmium, including
medical examination in accordance any indications of potential cadmium
with paragraph (l)(4)(ii) of this section, toxicity;
including a chest X-ray where nec- (C) The results of any biological or
essary, to any employee to whom at other testing or related evaluations
any prior time the employer was re- that directly assess the employees ab-
quired to provide medical surveillance sorption of cadmium;
under paragraph (l)(1)(i) or (l)(7) of this (D) Any recommended removal from,
section. However, if the last examina- or limitation on the activities or duties
tion satisfied the requirements of para- of the employee or on the employees
graph (l)(4)(ii) of this section and was use of personal protective equipment,
less than six months prior to the date such as respirators;
of termination, no further examination (E) A statement that the physician
is required unless otherwise specified has clearly and carefully explained to
in paragraph (l)(3) or (l)(5) of this sec- the employee the results of the medical
tion; examination, including all biological
(ii) In addition, if the employer has monitoring results and any medical
discontinued all periodic medical sur- conditions related to cadmium expo-
veillance under paragraph (l)(4)(v) of sure that require further evaluation or

605

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00615 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1127 29 CFR Ch. XVII (7112 Edition)

treatment, and any limitation on the ployee must be permanently removed


employees diet or use of medications. from excess cadmium exposure.
(ii) The employer shall promptly ob- (E) The employer may not return an
tain a copy of the results of any bio- employee who has been medically re-
logical monitoring provided by an em- moved for any reason to his/her former
ployer to an employee independently of job status until a physician determines
a medical examination under para- in a written medical opinion that con-
graphs (l)(2) and (l)(4) of this section, tinued medical removal is no longer
and, in lieu of a written medical opin- necessary to protect the employees
ion, an explanation sheet explaining health.
those results. (ii) Where an employee is found unfit
(iii) The employer shall instruct the to wear a respirator under paragraph
physician not to reveal orally or in the (l)(6)(ii) of this section, the employer
written medical opinion given to the shall remove the employee from work
employer specific findings or diagnoses where exposure to cadmium is above
unrelated to occupational exposure to the PEL.
cadmium. (iii) Where removal is based upon any
(11) Medical Removal Protection reason other than the employees in-
(MRP)(i) General. (A) The employer ability to wear a respirator, the em-
shall temporarily remove an employee ployer shall remove the employee from
work where exposure to cadmium is at
from work where there is excess expo-
or above the action level.
sure to cadmium on each occasion that
(iv) Except as specified in paragraph
medical removal is required under
(l)(11)(v) of this section, no employee
paragraphs (l)(3), (l)(4), or (l)(6) of this
who was removed because his/her level
section and on each occasion that a
of CdU, CdB and/or b2M exceeded the
physician determines in a written med-
trigger levels in paragraph (l)(3) or
ical opinion that the employee should
(l)(4) of this section may be returned to
be removed from such exposure. The
work with exposure to cadmium at or
physicians determination may be
above the action level until the em-
based on biological monitoring results,
ployees levels of CdU fall to or below 3
inability to wear a respirator, evidence g/g Cr, CdB fall to or below 5 g/lwb,
of illness, other signs or symptoms of and b2M fall to or below 300 g/g Cr.
cadmium-related dysfunction or dis- (v) However, when in the examining
ease, or any other reason deemed medi- physicians opinion continued exposure
cally sufficient by the physician. to cadmium will not pose an increased
(B) The employer shall medically re- risk to the employees health and there
move an employee in accordance with are special circumstances that make
paragraph (l)(11) of this section regard- continued medical removal an inappro-
less of whether at the time of removal priate remedy, the physician shall fully
a job is available into which the re- discuss these matters with the em-
moved employee may be transferred. ployee, and then in a written deter-
(C) Whenever an employee is medi- mination may return a worker to his/
cally removed under paragraph (l)(11) her former job status despite what
of this section, the employer shall would otherwise be unacceptably high
transfer the removed employee to a job biological monitoring results. There-
where the exposure to cadmium is after and until such time as the em-
within the permissible levels specified ployees biological monitoring results
in that paragraph as soon as one be- have decreased to levels where he/she
comes available. could have been returned to his/her
(D) For any employee who is medi- former job status, the returned em-
cally removed under the provisions of ployee shall continue medical surveil-
paragraph (l)(11)(i) of this section, the lance as if he/she were still on medical
employer shall provide follow-up med- removal. Until such time, the employee
ical examinations semi-annually until, is no longer subject to mandatory med-
in a written medical opinion, the ex- ical removal. Subsequent questions re-
amining physician determines that ei- garding the employees medical re-
ther the employee may be returned to moval shall be decided solely by a final
his/her former job status or the em- medical determination.

606

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00616 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1127

(vi) Where an employer, although not ticipation in medical surveillance pro-


required by this section to do so, re- vided in accordance with this section.
moves an employee from exposure to (13) Multiple physician review. (i) If
cadmium or otherwise places limita- the employer selects the initial physi-
tions on an employee due to the effects cian to conduct any medical examina-
of cadmium exposure on the employ- tion or consultation provided to an em-
ees medical condition, the employer ployee under this section, the employee
shall provide the same medical re- may designate a second physician to:
moval protection benefits to that em- (A) Review any findings, determina-
ployee under paragraph (l)(12) of this tions, or recommendations of the ini-
section as would have been provided tial physician; and
had the removal been required under (B) Conduct such examinations, con-
paragraph (l)(11) of this section. sultations, and laboratory tests as the
(12) Medical removal protection benefits. second physician deems necessary to
(i) The employer shall provide medical facilitate this review.
removal protection benefits to an em- (ii) The employer shall promptly no-
ployee for up to a maximum of 18 tify an employee of the right to seek a
months each time, and while the em- second medical opinion after each oc-
ployee is temporarily medically re- casion that an initial physician pro-
moved under paragraph (l)(11) of this vided by the employer conducts a med-
section. ical examination or consultation pur-
(ii) For purposes of this section, the suant to this section. The employer
requirement that the employer provide may condition its participation in, and
medical removal protection benefits payment for, multiple physician review
means that the employer shall main- upon the employee doing the following
tain the total normal earnings, senior- within fifteen (15) days after receipt of
ity, and all other employee rights and this notice, or receipt of the initial
physicians written opinion, whichever
benefits of the removed employee, in-
is later:
cluding the employees right to his/her
(A) Informing the employer that he
former job status, as if the employee
or she intends to seek a medical opin-
had not been removed from the em-
ion; and
ployees job or otherwise medically
(B) Initiating steps to make an ap-
limited.
pointment with a second physician.
(iii) Where, after 18 months on med- (iii) If the findings, determinations,
ical removal because of elevated bio- or recommendations of the second phy-
logical monitoring results, the employ- sician differ from those of the initial
ees monitoring results have not de- physician, then the employer and the
clined to a low enough level to permit employee shall assure that efforts are
the employee to be returned to his/her made for the two physicians to resolve
former job status: any disagreement.
(A) The employer shall make avail- (iv) If the two physicians have been
able to the employee a medical exam- unable to quickly resolve their dis-
ination pursuant to this section in agreement, then the employer and the
order to obtain a final medical deter- employee, through their respective
mination as to whether the employee physicians, shall designate a third phy-
may be returned to his/her former job sician to:
status or must be permanently re- (A) Review any findings, determina-
moved from excess cadmium exposure; tions, or recommendations of the other
and two physicians; and
(B) The employer shall assure that (B) Conduct such examinations, con-
the final medical determination indi- sultations, laboratory tests, and dis-
cates whether the employee may be re- cussions with the other two physicians
turned to his/her former job status and as the third physician deems necessary
what steps, if any, should be taken to to resolve the disagreement among
protect the employees health; them.
(iv) The employer may condition the (v) The employer shall act consist-
provision of medical removal protec- ently with the findings, determina-
tion benefits upon the employees par- tions, and recommendations of the

607

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00617 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1127 29 CFR Ch. XVII (7112 Edition)

third physician, unless the employer (2) Warning signs. (i) Warning signs
and the employee reach an agreement shall be provided and displayed in regu-
that is consistent with the rec- lated areas. In addition, warning signs
ommendations of at least one of the shall be posted at all approaches to
other two physicians. regulated areas so that an employee
(14) Alternate physician determination. may read the signs and take necessary
The employer and an employee or des- protective steps before entering the
ignated employee representative may area.
agree upon the use of any alternate (ii) Warning signs required by para-
form of physician determination in lieu graph (m)(2)(i) of this section shall
of the multiple physician review pro- bear the following legend:
vided by paragraph (l)(13) of this sec-
DANGER
tion, so long as the alternative is expe- CADMIUM
ditious and at least as protective of the MAY CAUSE CANCER
employee. CAUSES DAMAGE TO LUNGS AND KID-
(15) Information the employer must pro- NEYS
vide the employee. (i) The employer WEAR RESPIRATORY PROTECTION IN
shall provide a copy of the physicians THIS AREA
written medical opinion to the exam- AUTHORIZED PERSONNEL ONLY
ined employee within five working (iii) The employer shall ensure that
days after receipt thereof. signs required by this paragraph (m)(2)
(ii) The employer shall provide the are illuminated, cleaned, and main-
employee with a copy of the employ- tained as necessary so that the legend
ees biological monitoring results and is readily visible.
an explanation sheet explaining the re- (iv) Prior to June 1, 2016, employers
sults within five working days after re- may use the following legend in lieu of
ceipt thereof. that specified in paragraph (m)(2)(ii) of
(iii) Within 30 days after a request by this section:
an employee, the employer shall pro-
vide the employee with the informa- DANGER
CADMIUM
tion the employer is required to pro-
CANCER HAZARD
vide the examining physician under CAN CAUSE LUNG AND KIDNEY DISEASE
paragraph (l)(9) of this section. AUTHORIZED PERSONNEL ONLY
(16) Reporting. In addition to other RESPIRATORS REQUIRED IN THIS AREA
medical events that are required to be
reported on the OSHA Form No. 200, (3) Warning labels. (i) Shipping and
the employer shall report any abnor- storage containers containing cad-
mal condition or disorder caused by oc- mium or cadmium compounds shall
cupational exposure to cadmium asso- bear appropriate warning labels, as
ciated with employment as specified in specified in paragraph (m)(1) of this
Chapter (V)(E) of the Reporting Guide- section.
lines for Occupational Injuries and Ill- (ii) The warning labels for containers
nesses. of cadmium-contaminated protective
(m) Communication of cadmium haz- clothing, equipment, waste, scrap, or
ards to employees(1) Hazard commu- debris shall include at least the fol-
nication. The employer shall include lowing information:
cadmium in the program established to DANGER
comply with the Hazard Communica- CONTAINS CADMIUM
tion Standard (HCS) ( 1910.1200). The MAY CAUSE CANCER
employer shall ensure that each em- CAUSES DAMAGE TO LUNGS AND KID-
ployee has access to labels on con- NEYS
AVOID CREATING DUST
tainers of cadmium and safety data
sheets, and is trained in accordance (iii) Where feasible, installed cad-
with the provisions of HCS and para- mium products shall have a visible
graph (m)(4) of this section. The em- label or other indication that cadmium
ployer shall provide information on at is present.
least the following hazards: Cancer; (iv) Prior to June 1, 2015, employers
lung effects; kidney effects; and acute may include the following information
toxicity effects. on shipping and storage containers

608

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00618 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1127

containing cadmium, cadmium com- (G) The contents of this section and
pounds, or cadmium-contaminated its appendices, and,
clothing, equipment, waste, scrap, or (H) The employees rights of access
debris in lieu of the labeling require- to records under 1926.33(g) (1) and (2).
ments specified in paragraphs (m)(3)(i) (iv) Additional access to information
and (m)(3)(ii) of this section: and training program and materials.
(A) The employer shall make a copy
DANGER
CONTAINS CADMIUM of this section and its appendices read-
CANCER HAZARD ily available to all affected employees
AVOID CREATING DUST and shall provide a copy without cost if
CAN CAUSE LUNG AND KIDNEY DISEASE requested.
(4) Employee information and training. (B) Upon request, the employer shall
(i) The employer shall train each em- provide to the Assistant Secretary or
ployee who is potentially exposed to the Director all materials relating to
cadmium in accordance with the re- the employee information and the
quirements of this section. The em- training program.
ployer shall institute a training pro- (5) Multi-employer workplace. In a
gram, ensure employee participation in multi-employer workplace, an em-
the program, and maintain a record of ployer who produces, uses, or stores
the contents of the training program. cadmium in a manner that may expose
(ii) Training shall be provided prior employees of other employers to cad-
to or at the time of initial assignment mium shall notify those employers of
to a job involving potential exposure to the potential hazard in accordance
cadmium and at least annually there- with paragraph (e) of the hazard com-
after. munication standard for construction,
(iii) The employer shall make the 29 CFR 1926.59.
training program understandable to (n) Recordkeeping(1) Exposure moni-
the employee and shall assure that toring. (i) The employer shall establish
each employee is informed of the fol- and keep an accurate record of all air
lowing: monitoring for cadmium in the work-
(A) The health hazards associated place.
with cadmium exposure, with special (ii) This record shall include at least
attention to the information incor- the following information:
porated in appendix A to this section; (A) The monitoring date, shift, dura-
(B) The quantity, location, manner of tion, air volume, and results in terms
use, release, and storage of cadmium in of an 8-hour TWA of each sample
the workplace and the specific nature taken, and if cadmium is not detected,
of operations that could result in expo- the detection level;
sure to cadmium, especially exposures (B) The name, social security num-
above the PEL; ber, and job classification of all em-
(C) The engineering controls and ployees monitored and of all other em-
work practices associated with the em- ployees whose exposures the moni-
ployees job assignment; toring result is intended to represent,
(D) The measures employees can take including, where applicable, a descrip-
to protect themselves from exposure to tion of how it was determined that the
cadmium, including modification of employees monitoring result could be
such habits as smoking and personal taken to represent other employees
hygiene, and specific procedures the exposures;
employer has implemented to protect (C) A description of the sampling and
employees from exposure to cadmium analytical methods used and evidence
such as appropriate work practices, of their accuracy;
emergency procedures, and the provi- (D) The type of respiratory protec-
sion of personal protective equipment; tive device, if any, worn by the mon-
(E) The purpose, proper selection, fit- itored employee and by any other em-
ting, proper use, and limitations of res- ployee whose exposure the monitoring
pirators and protective clothing; result is intended to represent;
(F) The purpose and a description of (E) A notation of any other condi-
the medical surveillance program re- tions that might have affected the
quired by paragraph (l) of this section; monitoring results.

609

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00619 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1127 29 CFR Ch. XVII (7112 Edition)

(F) Any exposure monitoring or ob- quired to be provided by this section,


jective data that were used and the lev- including biological tests, X-rays, pul-
els. monary function tests, etc., or that
(iii) The employer shall maintain have been obtained to further evaluate
this record for at least thirty (30) any condition that might be related to
years, in accordance with 1926.33 of cadmium exposure;
this part. (D) The employees medical symp-
(iv) The employer shall also provide a toms that might be related to exposure
copy of the results of an employees air to cadmium; and
monitoring prescribed in paragraph (d) (E) A copy of the information pro-
of this section to an industry trade as- vided to the physician as required by
sociation and to the employees union, paragraph (l)(9) of this section.
if any, or, if either of such associations (iii) The employer shall assure that
or unions do not exist, to another com- this record is maintained for the dura-
parable organization that is competent tion of employment plus thirty (30)
to maintain such records and is reason- years, in accordance with 1926.33 of
ably accessible to employers and em- this part.
ployees in the industry. (iv) At the employees request, the
(2) Objective data for exemption from re- employer shall promptly provide a
quirement for initial monitoring. (i) For copy of the employees medical record,
purposes of this section, objective data or update as appropriate, to a medical
are information demonstrating that a doctor or a union specified by the em-
particular product or material con- ployee.
taining cadmium or a specific process, (4) Availability. (i) Except as other-
operation, or activity involving cad- wise provided for in this section, access
mium cannot release dust or fumes in to all records required to be main-
concentrations at or above the action tained by paragraphs (n)(1) through (3)
level even under the worst-case release of this section shall be in accordance
conditions. Objective data can be ob- with the provisions of 29 CFR 1910.1020.
tained from an industry-wide study or (ii) Within 15 days after a request,
from laboratory product test results the employer shall make an employees
from manufacturers of cadmium-con- medical records required to be kept by
taining products or materials. The data paragraph (n)(3) of this section avail-
the employer uses from an industry- able for examination and copying to
wide survey must be obtained under the subject employee, to designated
workplace conditions closely resem- representatives, to anyone having the
bling the processes, types of material, specific written consent of the subject
control methods, work practices and employee, and after the employees
environmental conditions in the em- death or incapacitation, to the employ-
ployers current operations. ees family members.
(ii) The employer shall maintain the (5) Transfer of records. Whenever an
record for at least 30 years of the objec- employer ceases to do business and
tive data relied upon. there is no successor employer or des-
(3) Medical surveillance. (i) The em- ignated organization to receive and re-
ployer shall establish and maintain an tain records for the prescribed period,
accurate record for each employee cov- the employer shall comply with the re-
ered by medical surveillance under quirements concerning transfer of
paragraph (l)(1)(i) of this section. records set forth in 1926.33 (h) of this
(ii) The record shall include at least part.
the following information about the (o) Observation of monitoring(1) Em-
employee: ployee observation. The employer shall
(A) Name, social security number, provide affected employees or their
and description of duties; designated representatives an oppor-
(B) A copy of the physicians written tunity to observe any monitoring of
opinions and of the explanation sheets employee exposure to cadmium.
for biological monitoring results; (2) Observation procedures. When ob-
(C) A copy of the medical history, servation of monitoring requires entry
and the results of any physical exam- into an area where the use of protec-
ination and all test results that are re- tive clothing or equipment is required,

610

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00620 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1152

the employer shall provide the observer 1926.1128 Benzene.


with that clothing and equipment and
NOTE: The requirements applicable to con-
shall assure that the observer uses struction work under this section are iden-
such clothing and equipment and com- tical to those set forth at 1910.1028 of this
plies with all other applicable safety chapter.
and health procedures.
[61 FR 31434, June 20, 1996]
(p) [Reserved]
(q) Appendices. Except where portions 1926.1129 Coke oven emissions.
of appendices A, B, D, E, and F to this
section are expressly incorporated in NOTE: The requirements applicable to con-
struction work under this section are iden-
requirements of this section, these ap-
tical to those set forth at 1910.1029 of this
pendices are purely informational and chapter.
are not intended to create any addi-
tional obligations not otherwise im- [61 FR 31434, June 20, 1996]
posed or to detract from any existing
1926.1144 1,2-dibromo-3-
obligations. chloropropane.
APPENDIX A TO 1926.1127SUBSTANCE NOTE: The requirements applicable to con-
SAFETY DATA SHEET struction work under this section are iden-
NOTE: The requirements applicable to con- tical to those set forth at 1910.1044 of this
struction work under this appendix A are chapter.
identical to those set forth in appendix A to [61 FR 31434, June 20, 1996]
1910.1027 of this chapter.
APPENDIX B TO 1926.1127SUBSTANCE
1926.1145 Acrylonitrile.
TECHNICAL GUIDELINES FOR CADMIUM NOTE: The requirements applicable to con-
struction work under this section are iden-
NOTE: The requirements applicable to con-
tical to those set forth at 1910.1045 of this
struction work under this appendix B are
chapter.
identical to those set forth in appendix B to
1910.1027 of this chapter. [61 FR 31434, June 20, 1996]
APPENDIX C TO 1926.1127 [RESERVED] 1926.1147 Ethylene oxide.
APPENDIX D TO 1926.1127OCCUPATIONAL NOTE: The requirements applicable to con-
HEALTH HISTORY INTERVIEW WITH REF- struction work under this section are iden-
ERENCE TO CADMIUM EXPOSURE tical to those set forth at 1910.1047 of this
NOTE: The requirements applicable to con- chapter.
struction work under this appendix D are [61 FR 31434, June 20, 1996]
identical to those set forth in appendix D to
1910.1027 of this chapter. 1926.1148 Formaldehyde.
APPENDIX E TO 1926.1127CADMIUM IN NOTE: The requirements applicable to con-
WORKPLACE ATMOSPHERES struction work under this section are iden-
tical to those set forth at 1910.1048 of this
NOTE: The requirements applicable to con- chapter.
struction work under this appendix E are
identical to those set forth in appendix E to [61 FR 31434, June 20, 1996]
1910.1027 of this chapter.
1926.1152 Methylene chloride.
APPENDIX F TO 1926.1127NONMANDATORY
PROTOCOL FOR BIOLOGICAL MONITORING NOTE: The requirements applicable to con-
struction employment under this section are
NOTE: The requirements applicable to con- identical to those set forth at 29 CFR
struction work under this appendix F are 1910.1052.
identical to those set forth in appendix F to
1910.1027 of this chapter. [62 FR 1619, Jan. 10, 1997]

[57 FR 42452, Sept. 14, 1992, as amended at 57


FR 49272, Oct. 30, 1992; 58 FR 21787, Apr. 23, Subparts AABB [Reserved]
1993. Redesignated and amended at 59 FR 215,
Jan. 3, 1994; 61 FR 5510, Feb. 13, 1996; 61 FR Subpart CCCranes and Derricks
31433, 31434, June 20, 1996; 63 FR 1298, Jan. 8,
1998; 70 FR 1144, Jan. 5, 2005; 71 FR 16675, Apr.
in Construction
3, 2006; 71 FR 50192, Aug. 24, 2006; 73 FR 75589,
Dec. 12, 2008; 76 FR 33612, June 8, 2011; 77 FR AUTHORITY: Section 3704 of the Contract
17895, Mar. 26, 2012] Work Hours and Safety Standards Act (40

611

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00621 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1400 29 CFR Ch. XVII (7112 Edition)
U.S.C. 3701); sections 4, 6, and 8 of the Occu- excluded when used with chains, slings
pational Safety and Health Act of 1970 (29 or other rigging to lift suspended loads.
U.S.C. 653, 655, 657); Secretary of Labors (3) Automotive wreckers and tow
Order No. 52007 (72 FR 31159); and 29 CFR
trucks when used to clear wrecks and
part 1911.
haul vehicles.
SOURCE: 75 FR 48135, Aug. 9, 2010, unless (4) Digger derricks when used for
otherwise noted. augering holes for poles carrying elec-
tric and telecommunication lines, plac-
1926.1400 Scope.
ing and removing the poles, and for
(a) This standard applies to power-op- handling associated materials to be in-
erated equipment, when used in con- stalled on or removed from the poles.
struction, that can hoist, lower and Digger derricks used in work subject to
horizontally move a suspended load. 29 CFR part 1926, subpart V, must com-
Such equipment includes, but is not ply with 29 CFR 1910.269. Digger der-
limited to: Articulating cranes (such as ricks used in construction work for
knuckle-boom cranes); crawler cranes; telecommunication service (as defined
floating cranes; cranes on barges; loco- at 29 CFR 1910.268(s)(40)) must comply
motive cranes; mobile cranes (such as with 29 CFR 1910.268.
wheel-mounted, rough-terrain, all-ter- (5) Machinery originally designed as
rain, commercial truck-mounted, and vehicle-mounted aerial devices (for lift-
boom truck cranes); multi-purpose ma- ing personnel) and self-propelled ele-
chines when configured to hoist and vating work platforms.
lower (by means of a winch or hook) (6) Telescopic/hydraulic gantry sys-
and horizontally move a suspended tems.
load; industrial cranes (such as carry- (7) Stacker cranes.
deck cranes); dedicated pile drivers; (8) Powered industrial trucks (fork-
service/mechanic trucks with a hoist- lifts), except when configured to hoist
ing device; a crane on a monorail; and lower (by means of a winch or
tower cranes (such as a fixed jib, i.e., hook) and horizontally move a sus-
hammerhead boom), luffing boom pended load.
and self-erecting); pedestal cranes; por- (9) Mechanics truck with a hoisting
tal cranes; overhead and gantry cranes; device when used in activities related
straddle cranes; sideboom cranes; der- to equipment maintenance and repair.
ricks; and variations of such equip- (10) Machinery that hoists by using a
ment. However, items listed in para- come-a-long or chainfall.
graph (c) of this section are excluded (11) Dedicated drilling rigs.
from the scope of this standard. (12) Gin poles when used for the erec-
(b) Attachments. This standard applies tion of communication towers.
to equipment included in paragraph (a) (13) Tree trimming and tree removal
of this section when used with attach- work.
ments. Such attachments, whether (14) Anchor handling or dredge-re-
crane-attached or suspended include, lated operations with a vessel or barge
but are not limited to: Hooks, magnets, using an affixed A-frame.
grapples, clamshell buckets, orange (15) Roustabouts.
peel buckets, concrete buckets, drag (16) Helicopter cranes.
lines, personnel platforms, augers or (17) Material Delivery
drills and pile driving equipment. (i) Articulating/knuckle-boom truck
(c) Exclusions. This subpart does not cranes that deliver material to a con-
cover: struction site when used to transfer
(1) Machinery included in paragraph materials from the truck crane to the
(a) of this section while it has been ground, without arranging the mate-
converted or adapted for a non-hoist- rials in a particular sequence for hoist-
ing/lifting use. Such conversions/adap- ing.
tations include, but are not limited to, (ii) Articulating/knuckle-boom truck
power shovels, excavators and concrete cranes that deliver material to a con-
pumps. struction site when the crane is used to
(2) Power shovels, excavators, wheel transfer building supply sheet goods or
loaders, backhoes, loader backhoes, building supply packaged materials
track loaders. This machinery is also from the truck crane onto a structure,

612

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00622 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1401

using a fork/cradle at the end of the tracks, when used on railroad tracks
boom, but only when the truck crane is that are part of the general railroad
equipped with a properly functioning system of transportation that is regu-
automatic overload prevention device. lated pursuant to the Federal Railroad
Such sheet goods or packaged mate- Administration under 49 CFR part 213,
rials include, but are not limited to: and that comply with applicable Fed-
Sheets of sheet rock, sheets of ply- eral Railroad Administration require-
wood, bags of cement, sheets or pack- ments. See 1926.1402(f).
ages of roofing shingles, and rolls of
roofing felt. 1926.1401 Definitions.
(iii) This exclusion does not apply A/D director (Assembly/Disassembly di-
when: rector) means an individual who meets
(A) The articulating/knuckle-boom this subparts requirements for an A/D
crane is used to hold, support or sta- director, irrespective of the persons
bilize the material to facilitate a con- formal job title or whether the person
struction activity, such as holding ma- is non-management or management
terial in place while it is attached to personnel.
the structure; Articulating crane means a crane
(B) The material being handled by whose boom consists of a series of fold-
the articulating/knuckle-boom crane is ing, pin connected structural members,
a prefabricated component. Such pre- typically manipulated to extend or re-
fabricated components include, but are tract by power from hydraulic cyl-
not limited to: Precast concrete mem- inders.
bers or panels, roof trusses (wooden, Assembly/Disassembly means the as-
cold-formed metal, steel, or other ma- sembly and/or disassembly of equip-
terial), prefabricated building sections ment covered under this standard.
such as, but not limited to: Floor pan- With regard to tower cranes, erecting
els, wall panels, roof panels, roof struc- and climbing replaces the term as-
tures, or similar items; sembly, and dismantling replaces
(C) The material being handled by the term disassembly. Regardless of
the crane is a structural steel member whether the crane is initially erected
(for example, steel joists, beams, col- to its full height or is climbed in
umns, steel decking (bundled or stages, the process of increasing the
unbundled) or a component of a sys- height of the crane is an erection proc-
tems-engineered metal building (as de- ess.
fined in 29 CFR 1926 subpart R). Assist crane means a crane used to as-
(D) The activity is not specifically sist in assembling or disassembling a
excluded under 1400(c)(17)(i) and (ii). crane.
(d) All sections of this subpart CC Attachments means any device that
apply to the equipment covered by this expands the range of tasks that can be
standard unless specified otherwise. done by the equipment. Examples in-
(e) The duties of controlling entities clude, but are not limited to: An auger,
under this subpart include, but are not drill, magnet, pile-driver, and boom-at-
limited to, the duties specified in tached personnel platform.
1926.1402(c), 1926.1402(e) and Audible signal means a signal made by
1926.1424(b). a distinct sound or series of sounds. Ex-
(f) Where provisions of this standard amples include, but are not limited to,
direct an operator, crewmember, or sounds made by a bell, horn, or whistle.
other employee to take certain actions, Blocking (also referred to as crib-
the employer must establish, effec- bing) is wood or other material used
tively communicate to the relevant to support equipment or a component
persons, and enforce, work rules to en- and distribute loads to the ground. It is
sure compliance with such provisions. typically used to support lattice boom
(g) For work covered by subpart V of sections during assembly/disassembly
this part, compliance with 29 CFR and under outrigger and stabilizer
1910.269(p) is deemed compliance with floats.
1926.1407 through 1926.1411. Boatswains chair means a single-
(h) Section 1926.1402 does not apply to point adjustable suspension scaffold
cranes designed for use on railroad consisting of a seat or sling (which

613

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00623 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1401 29 CFR Ch. XVII (7112 Edition)

may be incorporated into a full body ject around which its weight is evenly
harness) designed to support one em- distributed. If you could put a support
ployee in a sitting position. under that point, you could balance the
Bogie means travel bogie, which is object on the support.
defined below. Certified welder means a welder who
Boom (equipment other than tower meets nationally recognized certifi-
crane) means an inclined spar, strut, or cation requirements applicable to the
other long structural member which task being performed.
supports the upper hoisting tackle on a Climbing means the process in which
crane or derrick. Typically, the length a tower crane is raised to a new work-
and vertical angle of the boom can be ing height, either by adding additional
varied to achieve increased height or tower sections to the top of the crane
height and reach when lifting loads. (top climbing), or by a system in which
Booms can usually be grouped into the entire crane is raised inside the
general categories of hydraulically ex- structure (inside climbing).
tendible, cantilevered type, latticed Come-a-long means a mechanical de-
section, cable supported type or articu- vice typically consisting of a chain or
lating type. cable attached at each end that is used
Boom (tower cranes): On tower cranes, to facilitate movement of materials
if the boom (i.e., principal horizontal through leverage.
structure) is fixed, it is referred to as a Competent person means one who is
jib; if it is moveable up and down, it is capable of identifying existing and pre-
referred to as a boom. dictable hazards in the surroundings or
Boom angle indicator means a device working conditions which are unsani-
which measures the angle of the boom tary, hazardous, or dangerous to em-
relative to horizontal. ployees, and who has authorization to
Boom hoist limiting device includes take prompt corrective measures to
boom hoist disengaging device, boom eliminate them.
hoist shut-off, boom hoist disconnect, Controlled load lowering means low-
boom hoist hydraulic relief, boom hoist ering a load by means of a mechanical
kick-outs, automatic boom stop device, hoist drum device that allows a hoisted
or derricking limiter. This type of de- load to be lowered with maximum con-
vice disengages boom hoist power when trol using the gear train or hydraulic
the boom reaches a predetermined op- components of the hoist mechanism.
erating angle. It also sets brakes or Controlled load lowering requires the
closes valves to prevent the boom from use of the hoist drive motor, rather
lowering after power is disengaged. than the load hoist brake, to lower the
Boom length indicator indicates the load.
length of the permanent part of the Controlling entity means an employer
boom (such as ruled markings on the that is a prime contractor, general con-
boom) or, as in some computerized sys- tractor, construction manager or any
tems, the length of the boom with ex- other legal entity which has the over-
tensions/attachments. all responsibility for the construction
Boom stop includes boom stops, (belly of the projectits planning, quality
straps with struts/standoff), tele- and completion.
scoping boom stops, attachment boom Counterweight means a weight used to
stops, and backstops. These devices re- supplement the weight of equipment in
strict the boom from moving above a providing stability for lifting loads by
certain maximum angle and toppling counterbalancing those loads.
over backward. Crane/derrick includes all equipment
Boom suspension system means a sys- covered by this subpart.
tem of pendants, running ropes, Crawler crane means equipment that
sheaves, and other hardware which sup- has a type of base mounting which in-
ports the boom tip and controls the corporates a continuous belt of sprock-
boom angle. et driven track.
Builder means the builder/constructor Crossover points means locations on a
of equipment. wire rope which is spooled on a drum
Center of gravity: The center of grav- where one layer of rope climbs up on
ity of any object is the point in the ob- and crosses over the previous layer.

614

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00624 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1401

This takes place at each flange of the Equipment criteria means instruc-
drum as the rope is spooled onto the tions, recommendations, limitations
drum, reaches the flange, and begins to and specifications.
wrap back in the opposite direction. Fall protection equipment means
Dedicated channel means a line of guardrail systems, safety net systems,
communication assigned by the em- personal fall arrest systems, posi-
ployer who controls the communica- tioning device systems or fall restraint
tion system to only one signal person systems.
and crane/derrick or to a coordinated Fall restraint system means a fall pro-
group of cranes/derricks/signal per- tection system that prevents the user
son(s). from falling any distance. The system
Dedicated pile-driver is a machine that is comprised of either a body belt or
is designed to function exclusively as a body harness, along with an anchorage,
pile-driver. These machines typically connectors and other necessary equip-
have the ability to both hoist the ma- ment. The other components typically
terial that will be pile-driven and to include a lanyard, and may also in-
pile-drive that material. clude a lifeline and other devices.
Dedicated spotter (power lines): To be Fall zone means the area (including
considered a dedicated spotter, the re- but not limited to the area directly be-
quirements of 1926.1428 (Signal person neath the load) in which it is reason-
qualifications) must be met and his/her ably foreseeable that partially or com-
sole responsibility is to watch the sepa- pletely suspended materials could fall
ration between the power line and the in the event of an accident.
equipment, load line and load (includ- Flange points are points of contact be-
ing rigging and lifting accessories), and tween rope and drum flange where the
ensure through communication with rope changes layers.
the operator that the applicable min- Floating cranes/derricks means equip-
imum approach distance is not ment designed by the manufacturer (or
breached. employer) for marine use by permanent
attachment to a barge, pontoons, ves-
Directly under the load means a part
sel or other means of flotation.
or all of an employee is directly be-
For example means one example, al-
neath the load.
though there are others.
Dismantling includes partial disman- Free fall (of the load line) means that
tling (such as dismantling to shorten a only the brake is used to regulate the
boom or substitute a different compo- descent of the load line (the drive
nent). mechanism is not used to drive the
Drum rotation indicator means a de- load down faster or retard its low-
vice on a crane or hoist which indicates ering).
in which direction and at what relative Free surface effect is the uncontrolled
speed a particular hoist drum is turn- transverse movement of liquids in com-
ing. partments which reduce a vessels
Electrical contact occurs when a per- transverse stability.
son, object, or equipment makes con- Hoist means a mechanical device for
tact or comes in close proximity with lifting and lowering loads by winding a
an energized conductor or equipment line onto or off a drum.
that allows the passage of current. Hoisting is the act of raising, low-
Employer-made equipment means float- ering or otherwise moving a load in the
ing cranes/derricks designed and built air with equipment covered by this
by an employer for the employers own standard. As used in this standard,
use. hoisting can be done by means other
Encroachment is where any part of than wire rope/hoist drum equipment.
the crane, load line or load (including Include/including means including,
rigging and lifting accessories) but not limited to.
breaches a minimum clearance dis- Insulating link/device means an insu-
tance that this subpart requires to be lating device listed, labeled, or accept-
maintained from a power line. ed by a Nationally Recognized Testing
Equipment means equipment covered Laboratory in accordance with 29 CFR
by this subpart. 1910.7.

615

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00625 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1401 29 CFR Ch. XVII (7112 Edition)

Jib stop (also referred to as a jib back- employees being hoisted during a ma-
stop), is the same type of device as a rine transfer and to facilitate rapid
boom stop but is for a fixed or luffing entry into and exit from the device.
jib. Such devices do not include boat-
Land crane/derrick is equipment not swains chairs when hoisted by equip-
originally designed by the manufac- ment covered by this standard.
turer for marine use by permanent at- Marine worksite means a construction
tachment to barges, pontoons, vessels, worksite located in, on or above the
or other means of floatation. water.
List means the angle of inclination Mobile crane means a lifting device
about the longitudinal axis of a barge, incorporating a cable suspended
pontoons, vessel or other means of latticed boom or hydraulic telescopic
floatation. boom designed to be moved between
Load refers to the object(s) being operating locations by transport over
hoisted and/or the weight of the ob- the road.
ject(s); both uses refer to the object(s) Moving point-to-point means the times
and the load-attaching equipment, during which an employee is in the
such as, the load block, ropes, slings, process of going to or from a work sta-
shackles, and any other ancillary at- tion.
tachment. Multi-purpose machine means a ma-
Load moment (or rated capacity) indi- chine that is designed to be configured
cator means a system which aids the in various ways, at least one of which
equipment operator by sensing (di- allows it to hoist (by means of a winch
rectly or indirectly) the overturning or hook) and horizontally move a sus-
moment on the equipment, i.e., load pended load. For example, a machine
multiplied by radius. It compares this that can rotate and can be configured
lifting condition to the equipments with removable forks/tongs (for use as
rated capacity, and indicates to the op- a forklift) or with a winch pack, jib
erator the percentage of capacity at (with a hook at the end) or jib used in
which the equipment is working. conjunction with a winch. When config-
Lights, bells, or buzzers may be incor- ured with the forks/tongs, it is not cov-
porated as a warning of an approaching ered by this subpart. When configured
overload condition. with a winch pack, jib (with a hook at
Load moment (or rated capacity) limiter the end) or jib used in conjunction with
means a system which aids the equip- a winch, it is covered by this subpart.
ment operator by sensing (directly or Nationally recognized accrediting agen-
indirectly) the overturning moment on cy is an organization that, due to its
the equipment, i.e., load multiplied by independence and expertise, is widely
radius. It compares this lifting condi- recognized as competent to accredit
tion to the equipments rated capacity, testing organizations. Examples of
and when the rated capacity is reached, such accrediting agencies include, but
it shuts off power to those equipment are not limited to, the National Com-
functions which can increase the sever- mission for Certifying Agencies and the
ity of loading on the equipment, e.g., American National Standards Insti-
hoisting, telescoping out, or luffing tute.
out. Typically, those functions which Nonconductive means that, because of
decrease the severity of loading on the the nature and condition of the mate-
equipment remain operational, e.g., rials used, and the conditions of use
lowering, telescoping in, or luffing in. (including environmental conditions
Locomotive crane means a crane and condition of the material), the ob-
mounted on a base or car equipped for ject in question has the property of not
travel on a railroad track. becoming energized (that is, it has high
Luffing jib limiting device is similar to dielectric properties offering a high re-
a boom hoist limiting device, except sistance to the passage of current
that it limits the movement of the under the conditions of use).
luffing jib. Operational aids are devices that as-
Marine hoisted personnel transfer de- sist the operator in the safe operation
vice means a device, such as a transfer of the crane by providing information
net, that is designed to protect the or automatically taking control of a

616

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00626 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1401

crane function. These include, but are Qualified evaluator (not a third party)
not limited to, the devices listed in means a person employed by the signal
1926.1416 (listed operational aids). persons employer who has dem-
Operational controls means levers, onstrated that he/she is competent in
switches, pedals and other devices for accurately assessing whether individ-
controlling equipment operation. uals meet the Qualification Require-
Operator means a person who is oper- ments in this subpart for a signal per-
ating the equipment. son.
Overhead and gantry cranes includes Qualified evaluator (third party) means
overhead/bridge cranes, semigantry, an entity that, due to its independence
cantilever gantry, wall cranes, storage and expertise, has demonstrated that it
bridge cranes, launching gantry cranes, is competent in accurately assessing
and similar equipment, irrespective of whether individuals meet the Quali-
whether it travels on tracks, wheels, or fication Requirements in this subpart
other means. for a signal person.
Paragraph refers to a paragraph in Qualified person means a person who,
the same section of this subpart that by possession of a recognized degree,
the word paragraph is used, unless certificate, or professional standing, or
otherwise specified. who by extensive knowledge, training
Pendants includes both wire and bar and experience, successfully dem-
types. Wire type: A fixed length of wire onstrated the ability to solve/resolve
rope with mechanical fittings at both problems relating to the subject mat-
ends for pinning segments of wire rope ter, the work, or the project.
together. Bar type: Instead of wire Qualified rigger is a rigger who meets
rope, a bar is used. Pendants are typi- the criteria for a qualified person.
cally used in a latticed boom crane sys- Range control limit device is a device
tem to easily change the length of the that can be set by an equipment oper-
boom suspension system without com- ator to limit movement of the boom or
pletely changing the rope on the drum jib tip to a plane or multiple planes.
when the boom length is increased or
Range control warning device is a de-
decreased.
vice that can be set by an equipment
Personal fall arrest system means a
operator to warn that the boom or jib
system used to arrest an employee in a
tip is at a plane or multiple planes.
fall from a working level. It consists of
an anchorage, connectors, a body har- Rated capacity means the maximum
ness and may include a lanyard, decel- working load permitted by the manu-
eration device, lifeline, or suitable facturer under specified working condi-
tions. Such working conditions typi-
combination of these.
cally include a specific combination of
Portal crane is a type of crane con-
factors such as equipment configura-
sisting of a rotating upperstructure,
tion, radii, boom length, and other pa-
hoist machinery, and boom mounted on
rameters of use.
top of a structural gantry which may
be fixed in one location or have travel Rated capacity indicator: See load mo-
capability. The gantry legs or columns ment indicator.
usually have portal openings in be- Rated capacity limiter: See load mo-
tween to allow passage of traffic be- ment limiter.
neath the gantry. Repetitive pickup points refer to, when
Power lines means electric trans- operating on a short cycle operation,
mission and distribution lines. the rope being used on a single layer
Procedures include, but are not lim- and being spooled repetitively over a
ited to: Instructions, diagrams, rec- short portion of the drum.
ommendations, warnings, specifica- Running wire rope means a wire rope
tions, protocols and limitations. that moves over sheaves or drums.
Proximity alarm is a device that pro- Runway means a firm, level surface
vides a warning of proximity to a designed, prepared and designated as a
power line and that has been listed, la- path of travel for the weight and con-
beled, or accepted by a Nationally Rec- figuration of the crane being used to
ognized Testing Laboratory in accord- lift and travel with the crane sus-
ance with 29 CFR 1910.7. pended platform. An existing surface

617

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00627 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1402 29 CFR Ch. XVII (7112 Edition)

may be used as long as it meets these to permit vertical wheel displacement


criteria. and equalize the loading on the wheels.
Section means a section of this sub- Trim means angle of inclination
part, unless otherwise specified. about the transverse axis of a barge,
Sideboom crane means a track-type or pontoons, vessel or other means of
wheel-type tractor having a boom floatation.
mounted on the side of the tractor, Two blocking means a condition in
used for lifting, lowering or trans- which a component that is uppermost
porting a load suspended on the load on the hoist line such as the load
hook. The boom or hook can be lifted block, hook block, overhaul ball, or
or lowered in a vertical direction only. similar component, comes in contact
Special hazard warnings means warn- with the boom tip, fixed upper block or
ings of site-specific hazards (for exam- similar component. This binds the sys-
ple, proximity of power lines). tem and continued application of power
Stability (flotation device) means the can cause failure of the hoist rope or
tendency of a barge, pontoons, vessel other component.
or other means of flotation to return to Unavailable procedures means proce-
an upright position after having been dures that are no longer available from
inclined by an external force. the manufacturer, or have never been
available, from the manufacturer.
Standard Method means the protocol
Upperstructure: See Upperworks.
in appendix A of this subpart for hand
Upperworks means the revolving
signals.
frame of equipment on which the oper-
Such as means such as, but not lim- ating machinery (and many cases the
ited to. engine) are mounted along with the op-
Superstructure: See Upperworks. erators cab. The counterweight is
Tagline means a rope (usually fiber) typically supported on the rear of the
attached to a lifted load for purposes of upperstructure and the boom or other
controlling load spinning and pendular front end attachment is mounted on
motions or used to stabilize a bucket the front.
or magnet during material handling Up to means up to and including.
operations. Wire rope means a flexible rope con-
Tender means an individual respon- structed by laying steel wires into var-
sible for monitoring and commu- ious patterns of multi-wired strands
nicating with a diver. around a core system to produce a
Tilt up or tilt down operation means helically wound rope.
raising/lowering a load from the hori-
zontal to vertical or vertical to hori- 1926.1402 Ground conditions.
zontal. (a) Definitions.
Tower crane is a type of lifting struc- (1) Ground conditions means the
ture which utilizes a vertical mast or ability of the ground to support the
tower to support a working boom (jib) equipment (including slope, compac-
in an elevated position. Loads are sus- tion, and firmness).
pended from the working boom. While (2) Supporting materials means
the working boom may be of the fixed blocking, mats, cribbing, marsh
type (horizontal or angled) or have buggies (in marshes/wetlands), or simi-
luffing capability, it can always rotate lar supporting materials or devices.
to swing loads, either by rotating on (b) The equipment must not be as-
the top of the tower (top slewing) or by sembled or used unless ground condi-
the rotation of the tower (bottom tions are firm, drained, and graded to a
slewing). The tower base may be fixed sufficient extent so that, in conjunc-
in one location or ballasted and move- tion (if necessary) with the use of sup-
able between locations. Mobile cranes porting materials, the equipment man-
that are configured with luffing jib ufacturers specifications for adequate
and/or tower attachments are not con- support and degree of level of the
sidered tower cranes under this sec- equipment are met. The requirement
tion. for the ground to be drained does not
Travel bogie (tower cranes) is an as- apply to marshes/wetlands.
sembly of two or more axles arranged (c) The controlling entity must:

618

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00628 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1404

(1) Ensure that ground preparations 1926.1406. NOTE: The employer must
necessary to meet the requirements in follow manufacturer procedures when
paragraph (b) of this section are pro- an employer uses synthetic slings dur-
vided. ing assembly or disassembly rigging.
(2) Inform the user of the equipment (See 1926.1404(r).)
and the operator of the location of haz-
ards beneath the equipment set-up area 1926.1404 Assembly/Disassembly
(such as voids, tanks, utilities) if those general requirements (applies to all
assembly and disassembly oper-
hazards are identified in documents ations).
(such as site drawings, as-built draw-
ings, and soil analyses) that are in the (a) Supervisioncompetent-qualified
possession of the controlling entity person.
(whether at the site or off-site) or the (1) Assembly/disassembly must be di-
hazards are otherwise known to that rected by a person who meets the cri-
controlling entity. teria for both a competent person and
a qualified person, or by a competent
(d) If there is no controlling entity
person who is assisted by one or more
for the project, the requirement in
qualified persons (A/D director).
paragraph (c)(1) of this section must be
(2) Where the assembly/disassembly
met by the employer that has author-
is being performed by only one person,
ity at the site to make or arrange for
that person must meet the criteria for
ground preparations needed to meet
both a competent person and a quali-
paragraph (b) of this section.
fied person. For purposes of this stand-
(e) If the A/D director or the operator ard, that person is considered the A/D
determines that ground conditions do director.
not meet the requirements in para- (b) Knowledge of procedures. The A/D
graph (b) of this section, that persons director must understand the applica-
employer must have a discussion with ble assembly/disassembly procedures.
the controlling entity regarding the (c) Review of procedures. The A/D di-
ground preparations that are needed so rector must review the applicable as-
that, with the use of suitable sup- sembly/disassembly procedures imme-
porting materials/devices (if nec- diately prior to the commencement of
essary), the requirements in paragraph assembly/disassembly unless the A/D
(b) of this section can be met. director understands the procedures
(f) This section does not apply to and has applied them to the same type
cranes designed for use on railroad and configuration of equipment (in-
tracks when used on railroad tracks cluding accessories, if any).
that are part of the general railroad (d) Crew instructions.
system of transportation that is regu- (1) Before commencing assembly/dis-
lated pursuant to the Federal Railroad assembly operations, the A/D director
Administration under 49 CFR part 213 must ensure that the crew members
and that comply with applicable Fed- understand all of the following:
eral Railroad Administration require- (i) Their tasks.
ments. (ii) The hazards associated with their
tasks.
1926.1403 Assembly/Disassemblyse- (iii) The hazardous positions/loca-
lection of manufacturer or em- tions that they need to avoid.
ployer procedures.
(2) During assembly/disassembly op-
When assembling or disassembling erations, before a crew member takes
equipment (or attachments), the em- on a different task, or when adding new
ployer must comply with all applicable personnel during the operations, the
manufacturer prohibitions and must requirements in paragraphs (d)(1)(i)
comply with either: through (d)(1)(iii) of this section must
(a) Manufacturer procedures applica- be met.
ble to assembly and disassembly, or (e) Protecting assembly/disassembly
(b) Employer procedures for assembly crew members out of operator view.
and disassembly. Employer procedures (1) Before a crew member goes to a
may be used only where the employer location that is out of view of the oper-
can demonstrate that the procedures ator and is either in, on, or under the
used meet the requirements in equipment, or near the equipment (or

619

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00629 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1404 29 CFR Ch. XVII (7112 Edition)

load) where the crew member could be (3) Proper location of blocking. When
injured by movement of the equipment used to support lattice booms or com-
(or load), the crew member must in- ponents, blocking must be appro-
form the operator that he/she is going priately placed to:
to that location. (i) Protect the structural integrity of
(2) Where the operator knows that a the equipment, and
crew member went to a location cov- (ii) Prevent dangerous movement and
ered by paragraph (e)(1) of this section, collapse.
the operator must not move any part (4) Verifying assist crane loads. When
of the equipment (or load) until the op- using an assist crane, the loads that
erator is informed in accordance with a will be imposed on the assist crane at
pre-arranged system of communication each phase of assembly/disassembly
that the crew member is in a safe posi- must be verified in accordance with
tion. 1926.1417(o)(3) before assembly/dis-
(f) Working under the boom, jib or other assembly begins.
components. (5) Boom and jib pick points. The
(1) When pins (or similar devices) are point(s) of attachment of rigging to a
being removed, employees must not be boom (or boom sections or jib or jib
under the boom, jib, or other compo- sections) must be suitable for pre-
nents, except where the requirements venting structural damage and facili-
of paragraph (f)(2) of this section are tating safe handling of these compo-
met. nents.
(2) Exception. Where the employer (6) Center of gravity.
demonstrates that site constraints re- (i) The center of gravity of the load
quire one or more employees to be must be identified if that is necessary
under the boom, jib, or other compo- for the method used for maintaining
nents when pins (or similar devices) are stability.
being removed, the A/D director must (ii) Where there is insufficient infor-
implement procedures that minimize mation to accurately identify the cen-
the risk of unintended dangerous move- ter of gravity, measures designed to
ment and minimize the duration and prevent unintended dangerous move-
extent of exposure under the boom. (See ment resulting from an inaccurate
Non-mandatory appendix B of this sub- identification of the center of gravity
part for an example.) must be used. (See Non-mandatory ap-
(g) Capacity limits. During all phases pendix B of this subpart for an exam-
of assembly/disassembly, rated capac- ple.)
ity limits for loads imposed on the (7) Stability upon pin removal. The
equipment, equipment components (in- boom sections, boom suspension sys-
cluding rigging), lifting lugs and equip- tems (such as gantry A-frames and jib
ment accessories, must not be exceeded struts), and components must be rigged
for the equipment being assembled/dis- or supported to maintain stability
assembled. upon the removal of the pins.
(h) Addressing specific hazards. The A/ (8) Snagging. Suspension ropes and
D director supervising the assembly/ pendants must not be allowed to catch
disassembly operation must address on the boom or jib connection pins or
the hazards associated with the oper- cotter pins (including keepers and
ation, which include: locking pins).
(1) Site and ground bearing conditions. (9) Struck by counterweights. The po-
Site and ground conditions must be tential for unintended movement from
adequate for safe assembly/disassembly inadequately supported counterweights
operations and to support the equip- and from hoisting counterweights.
ment during assembly/disassembly (see (10) Boom hoist brake failure. Each
1926.1402 for ground condition require- time reliance is to be placed on the
ments). boom hoist brake to prevent boom
(2) Blocking material. The size, movement during assembly/dis-
amount, condition and method of assembly, the brake must be tested
stacking the blocking must be suffi- prior to such reliance to determine if it
cient to sustain the loads and maintain is sufficient to prevent boom move-
stability. ment. If it is not sufficient, a boom

620

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00630 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1404

hoist pawl, other locking device/back- (p) Pile driving. Equipment used for
up braking device, or another method pile driving must not have a jib at-
of preventing dangerous movement of tached during pile driving operations.
the boom (such as blocking or using an (q) Outriggers and Stabilizers. When
assist crane) from a boom hoist brake the load to be handled and the oper-
failure must be used. ating radius require the use of out-
(11) Loss of backward stability. Back- riggers or stabilizers, or at any time
ward stability before swinging the when outriggers or stabilizers are used,
upperworks, travel, and when attach- all of the following requirements must
ing or removing equipment compo- be met (except as otherwise indicated):
nents. (1) The outriggers or stabilizers must
(12) Wind speed and weather. The ef- be either fully extended or, if manufac-
fect of wind speed and weather on the turer procedures permit, deployed as
equipment. specified in the load chart.
(2) The outriggers must be set to re-
(i) [Reserved.]
move the equipment weight from the
(j) Cantilevered boom sections. Manu- wheels, except for locomotive cranes
facturer limitations on the maximum (see paragraph (q)(6) of this section for
amount of boom supported only by use of outriggers on locomotive
cantilevering must not be exceeded. cranes). This provision does not apply
Where these are unavailable, a reg- to stabilizers.
istered professional engineer familiar (3) When outrigger floats are used,
with the type of equipment involved they must be attached to the out-
must determine in writing this limita- riggers. When stabilizer floats are used,
tion, which must not be exceeded. they must be attached to the stabi-
(k) Weight of components. The weight lizers.
of each of the components must be (4) Each outrigger or stabilizer must
readily available. be visible to the operator or to a signal
(l) [Reserved.] person during extension and setting.
(m) Components and configuration. (5) Outrigger and stabilizer blocking
(1) The selection of components, and must:
configuration of the equipment, that (i) Meet the requirements in para-
affect the capacity or safe operation of graphs (h)(2) and (h)(3) of this section.
the equipment must be in accordance (ii) Be placed only under the out-
with: rigger or stabilizer float/pad of the jack
(i) Manufacturer instructions, prohi- or, where the outrigger or stabilizer is
bitions, limitations, and specifications. designed without a jack, under the
Where these are unavailable, a reg- outer bearing surface of the extended
istered professional engineer familiar outrigger or stabilizer beam.
with the type of equipment involved (6) For locomotive cranes, when
using outriggers or stabilizers to han-
must approve, in writing, the selection
dle loads, the manufacturers proce-
and configuration of components; or
dures must be followed. When lifting
(ii) Approved modifications that loads without using outriggers or sta-
meet the requirements of 1926.1434 bilizers, the manufacturers procedures
(Equipment modifications). must be met regarding truck wedges or
(2) Post-assembly inspection. Upon screws.
completion of assembly, the equipment (r) Rigging. In addition to following
must be inspected to ensure compli- the requirements in 29 CFR 1926.251 and
ance with paragraph (m)(1) of this sec- other requirements in this and other
tion (see 1926.1412(c) for post-assembly standards applicable to rigging, when
inspection requirements). rigging is used for assembly/dis-
(n) [Reserved.] assembly, the employer must ensure
(o) Shipping pins. Reusable shipping that:
pins, straps, links, and similar equip- (1) The rigging work is done by a
ment must be removed. Once they are qualified rigger.
removed they must either be stowed or (2) Synthetic slings are protected
otherwise stored so that they do not from: Abrasive, sharp or acute edges,
present a falling object hazard. and configurations that could cause a

621

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00631 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1405 29 CFR Ch. XVII (7112 Edition)

reduction of the slings rated capacity, movement or collapse of part or all of


such as distortion or localized compres- the equipment is minimized.
sion. NOTE: Requirements for the pro- (b) Qualified person. Employer proce-
tection of wire rope slings are con- dures must be developed by a qualified
tained in 29 CFR 1926.251(c)(9). person.
(3) When synthetic slings are used,
the synthetic sling manufacturers in- 1926.1407 Power line safety (up to
structions, limitations, specifications 350 kV)assembly and disassembly.
and recommendations must be fol- (a) Before assembling or disassem-
lowed. bling equipment, the employer must
1926.1405 Disassemblyadditional determine if any part of the equipment,
requirements for dismantling of load line, or load (including rigging
booms and jibs (applies to both the and lifting accessories) could get, in
use of manufacturer procedures the direction or area of assembly/dis-
and employer procedures). assembly, closer than 20 feet to a power
Dismantling (including dismantling for line during the assembly/disassembly
changing the length of) booms and jibs. process. If so, the employer must meet
(a) None of the pins in the pendants the requirements in Option (1), Option
are to be removed (partly or com- (2), or Option (3) of this section, as fol-
pletely) when the pendants are in ten- lows:
sion. (1) Option (1)Deenergize and ground.
(b) None of the pins (top or bottom) Confirm from the utility owner/oper-
on boom sections located between the ator that the power line has been deen-
pendant attachment points and the ergized and visibly grounded at the
crane/derrick body are to be removed worksite.
(partly or completely) when the pend- (2) Option (2)20 foot clearance. En-
ants are in tension. sure that no part of the equipment,
(c) None of the pins (top or bottom) load line or load (including rigging and
on boom sections located between the lifting accessories), gets closer than 20
uppermost boom section and the crane/ feet to the power line by implementing
derrick body are to be removed (partly the measures specified in paragraph (b)
or completely) when the boom is being of this section.
supported by the uppermost boom sec- (3) Option (3)Table A clearance.
tion resting on the ground (or other
(i) Determine the lines voltage and
support).
the minimum clearance distance per-
(d) None of the top pins on boom sec-
mitted under Table A (see 1926.1408).
tions located on the cantilevered por-
tion of the boom being removed (the (ii) Determine if any part of the
portion being removed ahead of the equipment, load line, or load (including
pendant attachment points) are to be rigging and lifting accessories), could
removed (partly or completely) until get closer than the minimum clearance
the cantilevered section to be removed distance to the power line permitted
is fully supported. under Table A (see 1926.1408). If so,
then the employer must follow the re-
1926.1406 Assembly/Disassembly quirements in paragraph (b) of this sec-
employer proceduresgeneral re- tion to ensure that no part of the
quirements. equipment, load line, or load (including
(a) When using employer procedures rigging and lifting accessories), gets
instead of manufacturer procedures for closer to the line than the minimum
assembly/disassembly, the employer clearance distance.
must ensure that the procedures: (b) Preventing encroachment/electrocu-
(1) Prevent unintended dangerous tion. Where encroachment precautions
movement, and prevent collapse, of any are required under Option (2), or Option
part of the equipment. (3) of this section, all of the following
(2) Provide adequate support and sta- requirements must be met:
bility of all parts of the equipment. (1) Conduct a planning meeting with
(3) Position employees involved in the Assembly/Disassembly director (A/
the assembly/disassembly operation so D director), operator, assembly/dis-
that their exposure to unintended assembly crew and the other workers

622

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00632 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1408

who will be in the assembly/dis- worksite) visibly grounded the power


assembly area to review the location of line.
the power line(s) and the steps that (d) Assembly/disassembly inside Table A
will be implemented to prevent en- clearance prohibited. No part of a crane/
croachment/electrocution. derrick, load line, or load (including
(2) If tag lines are used, they must be rigging and lifting accessories), wheth-
nonconductive. er partially or fully assembled, is al-
(3) At least one of the following addi- lowed closer than the minimum ap-
tional measures must be in place. The proach distance under Table A (see
measure selected from this list must be 1926.1408) to a power line unless the
effective in preventing encroachment. employer has confirmed that the util-
The additional measures are: ity owner/operator has deenergized and
(i) Use a dedicated spotter who is in (at the worksite) visibly grounded the
continuous contact with the equipment power line.
operator. The dedicated spotter must: (e) Voltage information. Where Option
(A) Be equipped with a visual aid to (3) of this section is used, the utility
assist in identifying the minimum owner/operator of the power lines must
clearance distance. Examples of a vis- provide the requested voltage informa-
ual aid include, but are not limited to: tion within two working days of the
A clearly visible line painted on the employers request.
ground; a clearly visible line of stan- (f) Power lines presumed energized. The
chions; a set of clearly visible line-of- employer must assume that all power
sight landmarks (such as a fence post lines are energized unless the utility
behind the dedicated spotter and a owner/operator confirms that the
building corner ahead of the dedicated power line has been and continues to be
spotter). deenergized and visibly grounded at the
(B) Be positioned to effectively gauge worksite.
the clearance distance.
(g) Posting of electrocution warnings.
(C) Where necessary, use equipment
There must be at least one electrocu-
that enables the dedicated spotter to
tion hazard warning conspicuously
communicate directly with the oper-
posted in the cab so that it is in view
ator.
of the operator and (except for over-
(D) Give timely information to the
head gantry and tower cranes) at least
operator so that the required clearance
two on the outside of the equipment.
distance can be maintained.
(ii) A proximity alarm set to give the 1926.1408 Power line safety (up to
operator sufficient warning to prevent 350 kV)equipment operations.
encroachment.
(iii) A device that automatically (a) Hazard assessments and precautions
warns the operator when to stop move- inside the work zone. Before beginning
ment, such as a range control warning equipment operations, the employer
device. Such a device must be set to must:
give the operator sufficient warning to (1) Identify the work zone by either:
prevent encroachment. (i) Demarcating boundaries (such as
(iv) A device that automatically lim- with flags, or a device such as a range
its range of movement, set to prevent limit device or range control warning
encroachment. device) and prohibiting the operator
(v) An elevated warning line, barri- from operating the equipment past
cade, or line of signs, in view of the op- those boundaries, or
erator, equipped with flags or similar (ii) Defining the work zone as the
high-visibility markings. area 360 degrees around the equipment,
(c) Assembly/disassembly below power up to the equipments maximum work-
lines prohibited. No part of a crane/der- ing radius.
rick, load line, or load (including rig- (2) Determine if any part of the
ging and lifting accessories), whether equipment, load line or load (including
partially or fully assembled, is allowed rigging and lifting accessories), if oper-
below a power line unless the employer ated up to the equipments maximum
has confirmed that the utility owner/ working radius in the work zone, could
operator has deenergized and (at the get closer than 20 feet to a power line.

623

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00633 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1408 29 CFR Ch. XVII (7112 Edition)

If so, the employer must meet the re- used as described in 1926.1408(b)(4)(ii)
quirements in Option (1), Option (2), or in addition to implementing one of the
Option (3) of this section, as follows: measures described in
(i) Option (1)Deenergize and ground. 1926.1408(b)(4)(i), (iii), (iv) and (v).
Confirm from the utility owner/oper- (4) Implement at least one of the fol-
ator that the power line has been deen- lowing measures:
ergized and visibly grounded at the (i) A proximity alarm set to give the
worksite. operator sufficient warning to prevent
(ii) Option (2)20 foot clearance. En- encroachment.
sure that no part of the equipment, (ii) A dedicated spotter who is in con-
load line, or load (including rigging tinuous contact with the operator.
and lifting accessories), gets closer Where this measure is selected, the
than 20 feet to the power line by imple- dedicated spotter must:
menting the measures specified in (A) Be equipped with a visual aid to
paragraph (b) of this section. assist in identifying the minimum
(iii) Option (3)Table A clearance. clearance distance. Examples of a vis-
(A) Determine the lines voltage and ual aid include, but are not limited to:
the minimum approach distance per- A clearly visible line painted on the
mitted under Table A (see 1926.1408). ground; a clearly visible line of stan-
(B) Determine if any part of the chions; a set of clearly visible line-of-
equipment, load line or load (including sight landmarks (such as a fence post
rigging and lifting accessories), while behind the dedicated spotter and a
operating up to the equipments max- building corner ahead of the dedicated
imum working radius in the work zone, spotter).
could get closer than the minimum ap- (B) Be positioned to effectively gauge
proach distance of the power line per- the clearance distance.
mitted under Table A (see 1926.1408). If (C) Where necessary, use equipment
so, then the employer must follow the that enables the dedicated spotter to
requirements in paragraph (b) of this communicate directly with the oper-
section to ensure that no part of the ator.
equipment, load line, or load (including (D) Give timely information to the
rigging and lifting accessories), gets operator so that the required clearance
closer to the line than the minimum distance can be maintained.
approach distance. (iii) A device that automatically
(b) Preventing encroachment/electrocu- warns the operator when to stop move-
tion. Where encroachment precautions ment, such as a range control warning
are required under Option (2) or Option device. Such a device must be set to
(3) of this section, all of the following give the operator sufficient warning to
requirements must be met: prevent encroachment.
(1) Conduct a planning meeting with (iv) A device that automatically lim-
the operator and the other workers its range of movement, set to prevent
who will be in the area of the equip- encroachment.
ment or load to review the location of (v) An insulating link/device, as de-
the power line(s), and the steps that fined in 1926.1401, installed at a point
will be implemented to prevent en- between the end of the load line (or
croachment/electrocution. below) and the load.
(2) If tag lines are used, they must be (5) The requirements of paragraph
non-conductive. (b)(4) of this section do not apply to
(3) Erect and maintain an elevated work covered by subpart V of this part.
warning line, barricade, or line of (c) Voltage information. Where Option
signs, in view of the operator, equipped (3) of this section is used, the utility
with flags or similar high-visibility owner/operator of the power lines must
markings, at 20 feet from the power provide the requested voltage informa-
line (if using Option (2) of this section) tion within two working days of the
or at the minimum approach distance employers request.
under Table A (see 1926.1408) (if using (d) Operations below power lines.
Option (3) of this section). If the oper- (1) No part of the equipment, load
ator is unable to see the elevated warn- line, or load (including rigging and lift-
ing line, a dedicated spotter must be ing accessories) is allowed below a

624

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00634 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1408

power line unless the employer has (i) The procedures to be followed in
confirmed that the utility owner/oper- the event of electrical contact with a
ator has deenergized and (at the work- power line. Such training must include:
site) visibly grounded the power line, (A) Information regarding the danger
except where one of the exceptions in of electrocution from the operator si-
paragraph (d)(2) of this section applies. multaneously touching the equipment
(2) Exceptions. Paragraph (d)(1) of this and the ground.
section is inapplicable where the em- (B) The importance to the operators
ployer demonstrates that one of the safety of remaining inside the cab ex-
following applies: cept where there is an imminent dan-
(i) The work is covered by subpart V ger of fire, explosion, or other emer-
of this part. gency that necessitates leaving the
(ii) For equipment with non-exten- cab.
sible booms: The uppermost part of the (C) The safest means of evacuating
equipment, with the boom at true from equipment that may be energized.
vertical, would be more than 20 feet (D) The danger of the potentially en-
below the plane of the power line or ergized zone around the equipment
more than the Table A of this section (step potential).
minimum clearance distance below the (E) The need for crew in the area to
plane of the power line. avoid approaching or touching the
(iii) For equipment with articulating equipment and the load.
or extensible booms: The uppermost (F) Safe clearance distance from
part of the equipment, with the boom power lines.
in the fully extended position, at true (ii) Power lines are presumed to be
vertical, would be more than 20 feet energized unless the utility owner/oper-
below the plane of the power line or ator confirms that the power line has
more than the Table A of this section been and continues to be deenergized
minimum clearance distance below the and visibly grounded at the worksite.
plane of the power line. (iii) Power lines are presumed to be
uninsulated unless the utility owner/
(iv) The employer demonstrates that
operator or a registered engineer who
compliance with paragraph (d)(1) of
is a qualified person with respect to
this section is infeasible and meets the
electrical power transmission and dis-
requirements of 1926.1410.
tribution confirms that a line is insu-
(e) Power lines presumed energized. The
lated.
employer must assume that all power
(iv) The limitations of an insulating
lines are energized unless the utility
link/device, proximity alarm, and
owner/operator confirms that the
range control (and similar) device, if
power line has been and continues to be
used.
deenergized and visibly grounded at the
(v) The procedures to be followed to
worksite.
properly ground equipment and the
(f) When working near transmitter/ limitations of grounding.
communication towers where the (2) Employees working as dedicated
equipment is close enough for an elec- spotters must be trained to enable
trical charge to be induced in the them to effectively perform their task,
equipment or materials being handled, including training on the applicable re-
the transmitter must be deenergized or quirements of this section.
the following precautions must be (3) Training under this section must
taken: be administered in accordance with
(1) The equipment must be provided 1926.1430(g).
with an electrical ground. (h) Devices originally designed by the
(2) If tag lines are used, they must be manufacturer for use as: A safety de-
non-conductive. vice (see 1926.1415), operational aid, or
(g) Training. a means to prevent power line contact
(1) The employer must train each op- or electrocution, when used to comply
erator and crew member assigned to with this section, must meet the manu-
work with the equipment on all of the facturers procedures for use and condi-
following: tions of use.

625

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00635 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1409 29 CFR Ch. XVII (7112 Edition)

TABLE AMINIMUM CLEARANCE DISTANCES


Voltage Minimum clearance distance
(nominal, kV, alternating current) (feet)

up to 50 ....................................................................................... 10
over 50 to 200 ............................................................................. 15
over 200 to 350 ........................................................................... 20
over 350 to 500 ........................................................................... 25
over 500 to 750 ........................................................................... 35
over 750 to 1,000 ........................................................................ 45
over 1,000 .................................................................................... (as established by the utility owner/operator or registered pro-
fessional engineer who is a qualified person with respect to
electrical power transmission and distribution).
Note: The value that follows to is up to and includes that value. For example, over 50 to 200 means up to and including
200kV.

1926.1409 Power line safety (over 350 ance distance that must be maintained
kV). to prevent electrical contact in light of
The requirements of 1926.1407 and the on-site conditions. The factors that
1926.1408 apply to power lines over 350 must be considered in making this de-
kV except: termination include, but are not lim-
(a) For power lines at or below 1000 ited to: Conditions affecting atmos-
kV, wherever the distance 20 feet is pheric conductivity; time necessary to
specified, the distance 50 feet must bring the equipment, load line, and
be substituted; and load (including rigging and lifting ac-
(b) For power lines over 1000 kV, the cessories) to a complete stop; wind con-
minimum clearance distance must be ditions; degree of sway in the power
established by the utility owner/oper- line; lighting conditions, and other
ator or registered professional engineer conditions affecting the ability to pre-
who is a qualified person with respect vent electrical contact.
to electrical power transmission and (2) Paragraph (c)(1) of this section
distribution. does not apply to work covered by sub-
part V of this part; instead, for such
1926.1410 Power line safety (all work, the minimum clearance dis-
voltages)equipment operations
closer than the Table A zone. tances specified in 1926.950 Table V1
apply. Employers engaged in subpart V
Equipment operations in which any work are permitted to work closer than
part of the equipment, load line, or the distances in 1926.950 Table V1
load (including rigging and lifting ac- where both the requirements of this
cessories) is closer than the minimum section and 1926.952(c)(3)(i) or (ii) are
approach distance under Table A of
met.
1926.1408 to an energized power line is
(d) A planning meeting with the em-
prohibited, except where the employer
demonstrates that all of the following ployer and utility owner/operator (or
requirements are met: registered professional engineer who is
(a) The employer determines that it a qualified person with respect to elec-
is infeasible to do the work without trical power transmission and distribu-
breaching the minimum approach dis- tion) is held to determine the proce-
tance under Table A of 1926.1408. dures that will be followed to prevent
(b) The employer determines that, electrical contact and electrocution.
after consultation with the utility At a minimum these procedures must
owner/operator, it is infeasible to deen- include:
ergize and ground the power line or re- (1) If the power line is equipped with
locate the power line. a device that automatically reener-
(c) Minimum clearance distance. gizes the circuit in the event of a power
(1) The power line owner/operator or line contact, before the work begins,
registered professional engineer who is the automatic reclosing feature of the
a qualified person with respect to elec- circuit interrupting device must be
trical power transmission and distribu- made inoperative if the design of the
tion determines the minimum clear- device permits.

626

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00636 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1410

(2) A dedicated spotter who is in con- quate insulation for the purposes of
tinuous contact with the operator. The this paragraph.
dedicated spotter must: (v) Until November 8, 2013, the fol-
(i) Be equipped with a visual aid to lowing procedure may be substituted
assist in identifying the minimum for the requirement in (d)(4)(i) of this
clearance distance. Examples of a vis- section:
ual aid include, but are not limited to: (A) The employer must use a link/de-
A line painted on the ground; a clearly vice manufactured on or before Novem-
visible line of stanchions; a set of ber 8, 2011, that meets the definition of
clearly visible line-of-sight landmarks an insulating link/device, except that
(such as a fence post behind the dedi- it has not been approved by a Nation-
cated spotter and a building corner ally Recognized Testing Laboratory,
ahead of the dedicated spotter). and that is maintained and used in ac-
(ii) Be positioned to effectively gauge cordance with manufacturer require-
the clearance distance. ments and recommendations, and is in-
(iii) Where necessary, use equipment stalled at a point between the end of
that enables the dedicated spotter to the load line (or below) and the load;
communicate directly with the oper- and
ator. (B) All employees, excluding equip-
ment operators located on the equip-
(iv) Give timely information to the
ment, who may come in contact with
operator so that the required clearance
the equipment, the load line, or the
distance can be maintained.
load must be insulated or guarded from
(3) An elevated warning line, or barri- the equipment, the load line, and the
cade (not attached to the crane), in load through an additional means
view of the operator (either directly or other than the device described in
through video equipment), equipped paragraph (d)(4)(v)(A) of this section.
with flags or similar high-visibility Insulating gloves rated for the voltage
markings, to prevent electrical con- involved are adequate additional
tact. However, this provision does not means of protection for the purposes of
apply to work covered by subpart V of this paragraph.
this part. (5) Nonconductive rigging if the rig-
(4) Insulating link/device. ging may be within the Table A of
(i) An insulating link/device installed 1926.1408 distance during the oper-
at a point between the end of the load ation.
line (or below) and the load. (6) If the equipment is equipped with
(ii) For work covered by subpart V of a device that automatically limits
this part, the requirement in paragraph range of movement, it must be used
(d)(4)(i) of this section applies only and set to prevent any part of the
when working inside the 1926.950 equipment, load line, or load (including
Table V1 clearance distances. rigging and lifting accessories) from
(iii) For work covered by subpart V breaching the minimum approach dis-
of this part involving operations where tance established under paragraph (c)
use of an insulating link/device is in- of this section.
feasible, the requirements of (7) If a tag line is used, it must be of
1910.269(p)(4)(iii)(B) or (C) may be sub- the nonconductive type.
stituted for the requirement in (d)(4)(i) (8) Barricades forming a perimeter at
of this section. least 10 feet away from the equipment
(iv) Until November 8, 2011, the fol- to prevent unauthorized personnel
lowing procedure may be substituted from entering the work area. In areas
for the requirement in paragraph where obstacles prevent the barricade
(d)(4)(i) of this section: All employees, from being at least 10 feet away, the
excluding equipment operators located barricade must be as far from the
on the equipment, who may come in equipment as feasible.
contact with the equipment, the load (9) Workers other than the operator
line, or the load must be insulated or must be prohibited from touching the
guarded from the equipment, the load load line above the insulating link/de-
line, and the load. Insulating gloves vice and crane. Operators remotely op-
rated for the voltage involved are ade- erating the equipment from the ground

627

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00637 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1411 29 CFR Ch. XVII (7112 Edition)

must use either wireless controls that comply with this section, must comply
isolate the operator from the equip- with the manufacturers procedures for
ment or insulating mats that insulate use and conditions of use.
the operator from the ground. (l) [Reserved.]
(10) Only personnel essential to the (m) The employer must train each
operation are permitted to be in the operator and crew member assigned to
area of the crane and load. work with the equipment in accordance
(11) The equipment must be properly with 1926.1408(g).
grounded.
(12) Insulating line hose or cover-up 1926.1411 Power line safetywhile
must be installed by the utility owner/ traveling under or near power lines
operator except where such devices are with no load.
unavailable for the line voltages in- (a) This section establishes proce-
volved. dures and criteria that must be met for
(e) The procedures developed to com- equipment traveling under or near a
ply with paragraph (d) of this section power line on a construction site with
are documented and immediately no load. Equipment traveling on a con-
available on-site. struction site with a load is governed
(f) The equipment user and utility by 1926.1408, 1926.1409 or 1926.1410,
owner/operator (or registered profes- whichever is appropriate, and
sional engineer) meet with the equip- 1926.1417(u).
ment operator and the other workers (b) The employer must ensure that:
who will be in the area of the equip- (1) The boom/mast and boom/mast
ment or load to review the procedures support system are lowered sufficiently
that will be implemented to prevent to meet the requirements of this para-
breaching the minimum approach dis- graph.
tance established in paragraph (c) of
(2) The clearances specified in Table
this section and prevent electrocution.
T of this section are maintained.
(g) The procedures developed to com-
ply with paragraph (d) of this section (3) The effects of speed and terrain on
are implemented. equipment movement (including move-
(h) The utility owner/operator (or ment of the boom/mast) are considered
registered professional engineer) and so that those effects do not cause the
all employers of employees involved in minimum clearance distances specified
the work must identify one person who in Table T of this section to be
will direct the implementation of the breached.
procedures. The person identified in ac- (4) Dedicated spotter. If any part of the
cordance with this paragraph must di- equipment while traveling will get
rect the implementation of the proce- closer than 20 feet to the power line,
dures and must have the authority to the employer must ensure that a dedi-
stop work at any time to ensure safety. cated spotter who is in continuous con-
(i) [Reserved.] tact with the driver/operator is used.
(j) If a problem occurs implementing The dedicated spotter must:
the procedures being used to comply (i) Be positioned to effectively gauge
with paragraph (d) of this section, or the clearance distance.
indicating that those procedures are (ii) Where necessary, use equipment
inadequate to prevent electrocution, that enables the dedicated spotter to
the employer must safely stop oper- communicate directly with the oper-
ations and either develop new proce- ator.
dures to comply with paragraph (d) of (iii) Give timely information to the
this section or have the utility owner/ operator so that the required clearance
operator deenergize and visibly ground distance can be maintained.
or relocate the power line before re- (5) Additional precautions for traveling
suming work. in poor visibility. When traveling at
(k) Devices originally designed by night, or in conditions of poor visi-
the manufacturer for use as a safety bility, in addition to the measures
device (see 1926.1415), operational aid, specified in paragraphs (b)(1) through
or a means to prevent power line con- (4) of this section, the employer must
tact or electrocution, when used to ensure that:

628

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00638 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1412

(i) The power lines are illuminated or (ii) A safe path of travel is identified
another means of identifying the loca- and used.
tion of the lines is used.
TABLE TMINIMUM CLEARANCE DISTANCES WHILE TRAVELING WITH NO LOAD
Voltage While travelingminimum clearance distance
(nominal, kV, alternating current) (feet)

up to 0.75 .................................................................................... 4
over .75 to 50 .............................................................................. 6
over 50 to 345 ............................................................................. 10
over 345 to 750 ........................................................................... 16
Over 750 to 1,000 ....................................................................... 20
Over 1,000 ................................................................................... (as established by the utility owner/operator or registered pro-
fessional engineer who is a qualified person with respect to
electrical power transmission and distribution).

1926.1412 Inspections. (i) The qualified person must deter-


mine if the repair/adjustment meets
(a) Modified equipment.
manufacturer equipment criteria
(1) Equipment that has had modifica- (where applicable and available).
tions or additions which affect the safe (ii) Where manufacturer equipment
operation of the equipment (such as criteria are unavailable or inappli-
modifications or additions involving a cable, the qualified person must:
safety device or operational aid, crit- (A) Determine if a registered profes-
ical part of a control system, power sional engineer (RPE) is needed to de-
plant, braking system, load-sustaining velop criteria for the repair/adjust-
structural components, load hook, or ment. If an RPE is not needed, the em-
in-use operating mechanism) or capac- ployer must ensure that the criteria
ity must be inspected by a qualified are developed by the qualified person.
person after such modifications/addi- If an RPE is needed, the employer must
tions have been completed, prior to ini- ensure that they are developed by an
tial use. The inspection must meet all RPE.
of the following requirements: (B) Determine if the repair/adjust-
(i) The inspection must assure that ment meets the criteria developed in
the modifications or additions have accordance with paragraph (b)(1)(ii)(A)
been done in accordance with the ap- of this section.
proval obtained pursuant to 1926.1434 (iii) The inspection must include
(Equipment modifications). functional testing of the repaired/ad-
(ii) The inspection must include func- justed parts and other components that
tional testing of the equipment. may be affected by the repair/adjust-
(2) Equipment must not be used until ment.
an inspection under this paragraph (4) Equipment must not be used until
demonstrates that the requirements of an inspection under this paragraph
paragraph (a)(1)(i) of this section have demonstrates that the repair/adjust-
been met. ment meets the requirements of para-
(b) Repaired/adjusted equipment. graph (b)(1)(i) of this section (or, where
(1) Equipment that has had a repair applicable, paragraph (b)(1)(ii) of this
or adjustment that relates to safe oper- section).
ation (such as: A repair or adjustment (c) Post-assembly.
to a safety device or operator aid, or to (1) Upon completion of assembly, the
a critical part of a control system, equipment must be inspected by a
power plant, braking system, load-sus- qualified person to assure that it is
taining structural components, load configured in accordance with manu-
hook, or in-use operating mechanism), facturer equipment criteria.
must be inspected by a qualified person (2) Where manufacturer equipment
after such a repair or adjustment has criteria are unavailable, a qualified
been completed, prior to initial use. person must:
The inspection must meet all of the (i) Determine if a registered profes-
following requirements: sional engineer (RPE) familiar with

629

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00639 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1412 29 CFR Ch. XVII (7112 Edition)

the type of equipment involved is need- sive deterioration, dirt or moisture ac-
ed to develop criteria for the equip- cumulation.
ment configuration. If an RPE is not (ix) Tires (when in use) for proper in-
needed, the employer must ensure that flation and condition.
the criteria are developed by the quali- (x) Ground conditions around the
fied person. If an RPE is needed, the equipment for proper support, includ-
employer must ensure that they are de- ing ground settling under and around
veloped by an RPE. outriggers/stabilizers and supporting
(ii) Determine if the equipment foundations, ground water accumula-
meets the criteria developed in accord- tion, or similar conditions. This para-
ance with paragraph (c)(2)(i) of this graph does not apply to the inspection
section. of ground conditions for railroad
(3) Equipment must not be used until tracks and their underlying support
an inspection under this paragraph when the railroad tracks are part of
demonstrates that the equipment is the general railroad system of trans-
configured in accordance with the ap- portation that is regulated pursuant to
plicable criteria. the Federal Railroad Administration
(d) Each shift. under 49 CFR part 213.
(1) A competent person must begin a (xi) The equipment for level position
visual inspection prior to each shift the within the tolerances specified by the
equipment will be used, which must be equipment manufacturers rec-
completed before or during that shift. ommendations, both before each shift
The inspection must consist of observa- and after each move and setup.
tion for apparent deficiencies. Taking (xii) Operator cab windows for sig-
apart equipment components and nificant cracks, breaks, or other defi-
booming down is not required as part ciencies that would hamper the opera-
of this inspection unless the results of tors view.
the visual inspection or trial operation (xiii) Rails, rail stops, rail clamps
indicate that further investigation ne- and supporting surfaces when the
cessitating taking apart equipment equipment has rail traveling. This
components or booming down is need- paragraph does not apply to the inspec-
ed. Determinations made in conducting tion of rails, rail stops, rail clamps and
the inspection must be reassessed in supporting surfaces when the railroad
light of observations made during oper- tracks are part of the general railroad
ation. At a minimum the inspection system of transportation that is regu-
must include all of the following: lated pursuant to the Federal Railroad
Administration under 49 CFR part 213.
(i) Control mechanisms for mal-
(xiv) Safety devices and operational
adjustments interfering with proper
aids for proper operation.
operation.
(2) If any deficiency in paragraphs
(ii) Control and drive mechanisms for
(d)(1)(i) through (xiii) of this section
apparent excessive wear of components
(or in additional inspection items re-
and contamination by lubricants,
quired to be checked for specific types
water or other foreign matter.
of equipment in accordance with other
(iii) Air, hydraulic, and other pres- sections of this standard) is identified,
surized lines for deterioration or leak- an immediate determination must be
age, particularly those which flex in made by the competent person as to
normal operation. whether the deficiency constitutes a
(iv) Hydraulic system for proper fluid safety hazard. If the deficiency is de-
level. termined to constitute a safety hazard,
(v) Hooks and latches for deforma- the equipment must be taken out of
tion, cracks, excessive wear, or damage service until it has been corrected. See
such as from chemicals or heat. 1926.1417.
(vi) Wire rope reeving for compliance (3) If any deficiency in paragraph
with the manufacturers specifications. (d)(1)(xiv) of this section (safety de-
(vii) Wire rope, in accordance with vices/operational aids) is identified, the
1926.1413(a). action specified in 1926.1415 and
(viii) Electrical apparatus for mal- 1926.1416 must be taken prior to using
functioning, signs of apparent exces- the equipment.

630

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00640 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1412

(e) Monthly. (vi) Gasoline, diesel, electric, or


(1) Each month the equipment is in other power plants for safety-related
service it must be inspected in accord- problems (such as leaking exhaust and
ance with paragraph (d) of this section emergency shut-down feature) and con-
(each shift). ditions, and proper operation.
(2) Equipment must not be used until (vii) Chains and chain drive sprockets
an inspection under this paragraph for excessive wear of sprockets and ex-
demonstrates that no corrective action cessive chain stretch.
under paragraphs (d)(2) and (3) of this (viii) Travel steering, brakes, and
section is required. locking devices, for proper operation.
(3) Documentation. (ix) Tires for damage or excessive
(i) The following information must wear.
be documented and maintained by the (x) Hydraulic, pneumatic and other
employer that conducts the inspection: pressurized hoses, fittings and tubing,
(A) The items checked and the re- as follows:
sults of the inspection. (A) Flexible hose or its junction with
(B) The name and signature of the the fittings for indications of leaks.
person who conducted the inspection (B) Threaded or clamped joints for
and the date. leaks.
(ii) This document must be retained (C) Outer covering of the hose for
for a minimum of three months. blistering, abnormal deformation or
other signs of failure/impending fail-
(f) Annual/comprehensive.
ure.
(1) At least every 12 months the
(D) Outer surface of a hose, rigid
equipment must be inspected by a
tube, or fitting for indications of exces-
qualified person in accordance with
sive abrasion or scrubbing.
paragraph (d) of this section (each
(xi) Hydraulic and pneumatic pumps
shift) except that the corrective action
and motors, as follows:
set forth in paragraphs (f)(4), (f)(5), and
(A) Performance indicators: Unusual
(f)(6) of this section must apply in
noises or vibration, low operating
place of the corrective action required
speed, excessive heating of the fluid,
by paragraphs (d)(2) and (d)(3) of this
low pressure.
section.
(B) Loose bolts or fasteners.
(2) In addition, at least every 12 (C) Shaft seals and joints between
months, the equipment must be in- pump sections for leaks.
spected by a qualified person. Dis- (xii) Hydraulic and pneumatic valves,
assembly is required, as necessary, to as follows:
complete the inspection. The equip- (A) Spools: Sticking, improper return
ment must be inspected for all of the to neutral, and leaks.
following: (B) Leaks.
(i) Equipment structure (including (C) Valve housing cracks.
the boom and, if equipped, the jib): (D) Relief valves: Failure to reach
(A) Structural members: Deformed, correct pressure (if there is a manufac-
cracked, or significantly corroded. turer procedure for checking pressure,
(B) Bolts, rivets and other fasteners: it must be followed).
loose, failed or significantly corroded. (xiii) Hydraulic and pneumatic cyl-
(C) Welds for cracks. inders, as follows:
(ii) Sheaves and drums for cracks or (A) Drifting caused by fluid leaking
significant wear. across the piston.
(iii) Parts such as pins, bearings, (B) Rod seals and welded joints for
shafts, gears, rollers and locking de- leaks.
vices for distortion, cracks or signifi- (C) Cylinder rods for scores, nicks, or
cant wear. dents.
(iv) Brake and clutch system parts, (D) Case (barrel) for significant
linings, pawls and ratchets for exces- dents.
sive wear. (E) Rod eyes and connecting joints:
(v) Safety devices and operational Loose or deformed.
aids for proper operation (including (xiv) Outrigger or stabilizer pads/
significant inaccuracies). floats for excessive wear or cracks.

631

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00641 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1413 29 CFR Ch. XVII (7112 Edition)

(xv) Slider pads for excessive wear or capacity, prolonged exposure to a cor-
cracks. rosive atmosphere), the employer must
(xvi) Electrical components and wir- stop using the equipment and a quali-
ing for cracked or split insulation and fied person must:
loose or corroded terminations. (1) Inspect the equipment for struc-
(xvii) Warning labels and decals tural damage to determine if the equip-
originally supplied with the equipment ment can continue to be used safely.
by the manufacturer or otherwise re- (2) In light of the use/conditions de-
quired under this standard: Missing or termine whether any items/conditions
unreadable. listed in paragraph (f) of this section
(xviii) Originally equipped operator need to be inspected; if so, the qualified
seat (or equivalent): Missing. person must inspect those items/condi-
(xix) Operator seat: Unserviceable. tions.
(xx) Originally equipped steps, lad- (3) If a deficiency is found, the em-
ders, handrails, guards: Missing. ployer must follow the requirements in
(xxi) Steps, ladders, handrails, paragraphs (f)(4) through (6) of this sec-
guards: In unusable/unsafe condition. tion.
(3) This inspection must include func- (h) Equipment not in regular use.
tional testing to determine that the Equipment that has been idle for 3
equipment as configured in the inspec- months or more must be inspected by a
tion is functioning properly. qualified person in accordance with the
(4) If any deficiency is identified, an requirements of paragraph (e) (Month-
immediate determination must be ly) of this section before initial use.
made by the qualified person as to (i) [Reserved.]
whether the deficiency constitutes a (j) Any part of a manufacturers pro-
safety hazard or, though not yet a safe- cedures regarding inspections that re-
ty hazard, needs to be monitored in the late to safe operation (such as to a
monthly inspections. safety device or operational aid, crit-
(5) If the qualified person determines ical part of a control system, power
that a deficiency is a safety hazard, the plant, braking system, load-sustaining
equipment must be taken out of service structural components, load hook, or
until it has been corrected, except in-use operating mechanism) that is
when temporary alternative measures more comprehensive or has a more fre-
are implemented as specified in quent schedule of inspection than the
1926.1416(d) or 1926.1435(e). See requirements of this section must be
1926.1417. followed.
(6) If the qualified person determines (k) All documents produced under
that, though not presently a safety this section must be available, during
hazard, the deficiency needs to be mon- the applicable document retention pe-
itored, the employer must ensure that riod, to all persons who conduct inspec-
the deficiency is checked in the month- tions under this section.
ly inspections.
(7) Documentation of annual/com- 1926.1413 Wire ropeinspection.
prehensive inspection. The following in- (a) Shift inspection.
formation must be documented, main- (1) A competent person must begin a
tained, and retained for a minimum of visual inspection prior to each shift the
12 months, by the employer that con- equipment is used, which must be com-
ducts the inspection: pleted before or during that shift. The
(i) The items checked and the results inspection must consist of observation
of the inspection. of wire ropes (running and standing)
(ii) The name and signature of the that are likely to be in use during the
person who conducted the inspection shift for apparent deficiencies, includ-
and the date. ing those listed in paragraph (a)(2) of
(g) Severe service. Where the severity this section. Untwisting (opening) of
of use/conditions is such that there is a wire rope or booming down is not re-
reasonable probability of damage or ex- quired as part of this inspection.
cessive wear (such as loading that may (2) Apparent deficiencies.
have exceeded rated capacity, shock (i) Category I. Apparent deficiencies
loading that may have exceeded rated in this category include the following:

632

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00642 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1413

(A) Significant distortion of the wire (v) Wire rope in contact with saddles,
rope structure such as kinking, crush- equalizer sheaves or other sheaves
ing, unstranding, birdcaging, signs of where rope travel is limited.
core failure or steel core protrusion be- (4) Removal from service.
tween the outer strands. (i) If a deficiency in Category I (see
(B) Significant corrosion. paragraph (a)(2)(i) of this section) is
(C) Electric arc damage (from a identified, an immediate determination
source other than power lines) or heat must be made by the competent person
damage. as to whether the deficiency con-
(D) Improperly applied end connec- stitutes a safety hazard. If the defi-
tions. ciency is determined to constitute a
(E) Significantly corroded, cracked, safety hazard, operations involving use
bent, or worn end connections (such as of the wire rope in question must be
from severe service). prohibited until:
(ii) Category II. Apparent deficiencies (A) The wire rope is replaced (see
in this category are: 1926.1417), or
(A) Visible broken wires, as follows: (B) If the deficiency is localized, the
(1) In running wire ropes: Six ran- problem is corrected by severing the
domly distributed broken wires in one wire rope in two; the undamaged por-
rope lay or three broken wires in one tion may continue to be used. Joining
strand in one rope lay, where a rope lay lengths of wire rope by splicing is pro-
is the length along the rope in which hibited. If a rope is shortened under
one strand makes a complete revolu- this paragraph, the employer must en-
tion around the rope. sure that the drum will still have two
(2) In rotation resistant ropes: Two wraps of wire when the load and/or
randomly distributed broken wires in boom is in its lowest position.
six rope diameters or four randomly (ii) If a deficiency in Category II (see
distributed broken wires in 30 rope di- paragraph (a)(2)(ii) of this section) is
ameters. identified, operations involving use of
(3) In pendants or standing wire the wire rope in question must be pro-
ropes: More than two broken wires in hibited until:
one rope lay located in rope beyond end (A) The employer complies with the
connections and/or more than one bro- wire rope manufacturers established
ken wire in a rope lay located at an end criterion for removal from service or a
connection. different criterion that the wire rope
(B) A diameter reduction of more manufacturer has approved in writing
than 5% from nominal diameter. for that specific wire rope (see
(iii) Category III. Apparent defi- 1926.1417),
ciencies in this category include the (B) The wire rope is replaced (see
following: 1926.1417), or
(A) In rotation resistant wire rope, (C) If the deficiency is localized, the
core protrusion or other distortion in- problem is corrected by severing the
dicating core failure. wire rope in two; the undamaged por-
(B) Prior electrical contact with a tion may continue to be used. Joining
power line. lengths of wire rope by splicing is pro-
(C) A broken strand. hibited. If a rope is shortened under
(3) Critical review items. The com- this paragraph, the employer must en-
petent person must give particular at- sure that the drum will still have two
tention to all of the following: wraps of wire when the load and/or
(i) Rotation resistant wire rope in boom is in its lowest position.
use. (iii) If a deficiency in Category III is
(ii) Wire rope being used for boom identified, operations involving use of
hoists and luffing hoists, particularly the wire rope in question must be pro-
at reverse bends. hibited until:
(iii) Wire rope at flange points, cross- (A) The wire rope is replaced (see
over points and repetitive pickup 1926.1417), or
points on drums. (B) If the deficiency (other than
(iv) Wire rope at or near terminal power line contact) is localized, the
ends. problem is corrected by severing the

633

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00643 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1414 29 CFR Ch. XVII (7112 Edition)

wire rope in two; the undamaged por- (C) Wire rope subject to reverse
tion may continue to be used. Joining bends.
lengths of wire rope by splicing is pro- (D) Wire rope passing over sheaves.
hibited. Repair of wire rope that con- (iii) Exception: In the event an inspec-
tacted an energized power line is also tion under paragraph (c)(2) of this sec-
prohibited. If a rope is shortened under tion is not feasible due to existing set-
this paragraph, the employer must en- up and configuration of the equipment
sure that the drum will still have two (such as where an assist crane is need-
wraps of wire when the load and/or ed) or due to site conditions (such as a
boom is in its lowest position. dense urban setting), such inspections
(iv) Where a wire rope is required to must be conducted as soon as it be-
be removed from service under this sec- comes feasible, but no longer than an
tion, either the equipment (as a whole) additional 6 months for running ropes
or the hoist with that wire rope must and, for standing ropes, at the time of
be tagged-out, in accordance with disassembly.
1926.1417(f)(1), until the wire rope is (3) If a deficiency is identified, an im-
repaired or replaced. mediate determination must be made
(b) Monthly inspection. by the qualified person as to whether
(1) Each month an inspection must be the deficiency constitutes a safety haz-
conducted in accordance with para- ard.
graph (a) (shift inspection) of this sec- (i) If the deficiency is determined to
tion. constitute a safety hazard, operations
(2) The inspection must include any involving use of the wire rope in ques-
deficiencies that the qualified person tion must be prohibited until:
who conducts the annual inspection de- (A) The wire rope is replaced (see
termines under paragraph (c)(3)(ii) of 1926.1417), or
this section must be monitored. (B) If the deficiency is localized, the
(3) Wire ropes on equipment must not problem is corrected by severing the
be used until an inspection under this wire rope in two; the undamaged por-
paragraph demonstrates that no cor- tion may continue to be used. Joining
rective action under paragraph (a)(4) of lengths of wire rope by splicing is pro-
this section is required. hibited. If a rope is shortened under
this paragraph, the employer must en-
(4) The inspection must be docu-
sure that the drum will still have two
mented according to 1926.1412(e)(3)
wraps of wire when the load and/or
(monthly inspection documentation).
boom is in its lowest position.
(c) Annual/comprehensive.
(ii) If the qualified person determines
(1) At least every 12 months, wire that, though not presently a safety
ropes in use on equipment must be in- hazard, the deficiency needs to be mon-
spected by a qualified person in accord- itored, the employer must ensure that
ance with paragraph (a) of this section the deficiency is checked in the month-
(shift inspection). ly inspections.
(2) In addition, at least every 12 (4) The inspection must be docu-
months, the wire ropes in use on equip- mented according to 1926.1412(f)(7) (an-
ment must be inspected by a qualified nual/comprehensive inspection docu-
person, as follows: mentation).
(i) The inspection must be for defi- (d) Rope lubricants that are of the
ciencies of the types listed in para- type that hinder inspection must not
graph (a)(2) of this section. be used.
(ii) The inspection must be complete (e) All documents produced under
and thorough, covering the surface of this section must be available, during
the entire length of the wire ropes, the applicable document retention pe-
with particular attention given to all riod, to all persons who conduct inspec-
of the following: tions under this section.
(A) Critical review items listed in
paragraph (a)(3) of this section. 1926.1414 Wire ropeselection and
(B) Those sections that are normally installation criteria.
hidden during shift and monthly in- (a) Original equipment wire rope and
spections. replacement wire rope must be selected

634

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00644 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1414

and installed in accordance with the (iii) Type III rotation resistant wire
requirements of this section. Selection rope (Type III). Type III rotation re-
of replacement wire rope must be in ac- sistant rope is stranded rope con-
cordance with the recommendations of structed to have limited resistance to
the wire rope manufacturer, the equip- rotation. It has no more than nine
ment manufacturer, or a qualified per- outer strands, and comprises an assem-
son. bly of two layers of strands laid
(b) Wire rope design criteria: Wire rope helically over a center in two oper-
(other than rotation resistant rope) ations. The direction of lay of the
must comply with either Option (1) or outer strands is opposite to that of the
Option (2) of this section, as follows: underlying layer.
(1) Option (1). Wire rope must comply (2) Requirements.
with section 51.7.1 of ASME B30.52004 (i) Types II and III with an operating
(incorporated by reference, see 1926.6) design factor of less than 5 must not be
except that sections paragraph (c) used for duty cycle or repetitive lifts.
must not apply. (ii) Rotation resistant ropes (includ-
(2) Option (2). Wire rope must be de- ing Types I, II and III) must have an
signed to have, in relation to the equip- operating design factor of no less than
ments rated capacity, a sufficient 3.5.
minimum breaking force and design (iii) Type I must have an operating
factor so that compliance with the ap- design factor of no less than 5, except
plicable inspection provisions in where the wire rope manufacturer and
1926.1413 will be an effective means of the equipment manufacturer approves
preventing sudden rope failure. the design factor, in writing.
(c) Wire rope must be compatible (iv) Types II and III must have an op-
with the safe functioning of the equip- erating design factor of no less than 5,
ment. except where the requirements of para-
(d) Boom hoist reeving. graph (e)(3) of this section are met.
(1) Fiber core ropes must not be used (3) When Types II and III with an op-
for boom hoist reeving, except for der- erating design factor of less than 5 are
ricks. used (for non-duty cycle, non-repet-
(2) Rotation resistant ropes must be itive lifts), the following requirements
used for boom hoist reeving only where must be met for each lifting operation:
the requirements of paragraph (e)(4)(ii) (i) A qualified person must inspect
of this section are met. the rope in accordance with
(e) Rotation resistant ropes. 1926.1413(a). The rope must be used
(1) Definitions. only if the qualified person determines
(i) Type I rotation resistant wire rope that there are no deficiencies consti-
(Type I). Type I rotation resistant tuting a hazard. In making this deter-
rope is stranded rope constructed to mination, more than one broken wire
have little or no tendency to rotate or, in any one rope lay must be considered
if guided, transmits little or no torque. a hazard.
It has at least 15 outer strands and (ii) Operations must be conducted in
comprises an assembly of at least three such a manner and at such speeds as to
layers of strands laid helically over a minimize dynamic effects.
center in two operations. The direction (iii) Each lift made under
of lay of the outer strands is opposite 1926.1414(e)(3) must be recorded in the
to that of the underlying layer. monthly and annual inspection docu-
(ii) Type II rotation resistant wire rope ments. Such prior uses must be consid-
(Type II). Type II rotation resistant ered by the qualified person in deter-
rope is stranded rope constructed to mining whether to use the rope again.
have significant resistance to rotation. (4) Additional requirements for rotation
It has at least 10 outer strands and resistant ropes for boom hoist reeving.
comprises an assembly of two or more (i) Rotation resistant ropes must not
layers of strands laid helically over a be used for boom hoist reeving, except
center in two or three operations. The where the requirements of paragraph
direction of lay of the outer strands is (e)(4)(ii) of this section are met.
opposite to that of the underlying (ii) Rotation resistant ropes may be
layer. used as boom hoist reeving when load

635

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00645 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1415 29 CFR Ch. XVII (7112 Edition)

hoists are used as boom hoists for at- 1926.1415 Safety devices.
tachments such as luffing attachments (a) Safety devices. The following safe-
or boom and mast attachment systems. ty devices are required on all equip-
Under these conditions, all of the fol- ment covered by this subpart, unless
lowing requirements must be met: otherwise specified:
(A) The drum must provide a first (1) Crane level indicator.
layer rope pitch diameter of not less (i) The equipment must have a crane
than 18 times the nominal diameter of level indicator that is either built into
the rope used. the equipment or is available on the
(B) The requirements in 1926.1426(a) equipment.
(irrespective of the date of manufac- (ii) If a built-in crane level indicator
ture of the equipment), and is not working properly, it must be
1926.1426(b). tagged-out or removed. If a removable
(C) The requirements in ASME B30.5 crane level indicator is not working
2004 sections 51.3.2(a), (a)(2) through properly, it must be removed.
(a)(4), (b) and (d) (incorporated by ref- (iii) This requirement does not apply
erence, see 1926.6) except that the min- to portal cranes, derricks, floating
imum pitch diameter for sheaves used cranes/derricks and land cranes/der-
in multiple rope reeving is 18 times the ricks on barges, pontoons, vessels or
nominal diameter of the rope used (in- other means of flotation.
stead of the value of 16 specified in sec- (2) Boom stops, except for derricks
tion 51.3.2(d)). and hydraulic booms.
(D) All sheaves used in the boom (3) Jib stops (if a jib is attached), ex-
hoist reeving system must have a rope cept for derricks.
pitch diameter of not less than 18 times (4) Equipment with foot pedal brakes
the nominal diameter of the rope used. must have locks.
(5) Hydraulic outrigger jacks and hy-
(E) The operating design factor for
draulic stabilizer jacks must have an
the boom hoist reeving system must be
integral holding device/check valve.
not less than five.
(6) Equipment on rails must have rail
(F) The operating design factor for clamps and rail stops, except for portal
these ropes must be the total minimum cranes.
breaking force of all parts of rope in (7) Horn
the system divided by the load imposed (i) The equipment must have a horn
on the rope system when supporting that is either built into the equipment
the static weights of the structure and or is on the equipment and imme-
the load within the equipments rated diately available to the operator.
capacity. (ii) If a built-in horn is not working
(G) When provided, a power-con- properly, it must be tagged-out or re-
trolled lowering system must be capa- moved. If a removable horn is not
ble of handling rated capacities and working properly, it must be removed.
speeds as specified by the manufac- (b) Proper operation required. Oper-
turer. ations must not begin unless all of the
(f) Wire rope clips used in conjunc- devices listed in this section are in
tion with wedge sockets must be at- proper working order. If a device stops
tached to the unloaded dead end of the working properly during operations,
rope only, except that the use of de- the operator must safely stop oper-
vices specifically designed for dead- ations. If any of the devices listed in
ending rope in a wedge socket is per- this section are not in proper working
mitted. order, the equipment must be taken
(g) Socketing must be done in the out of service and operations must not
manner specified by the manufacturer resume until the device is again work-
of the wire rope or fitting. ing properly. See 1926.1417 (Operation).
(h) Prior to cutting a wire rope, Alternative measures are not per-
seizings must be placed on each side of mitted to be used.
the point to be cut. The length and
number of seizings must be in accord- 1926.1416 Operational aids.
ance with the wire rope manufacturers (a) The devices listed in this section
instructions. (listed operational aids) are required

636

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00646 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1416

on all equipment covered by this sub- stall mirrors or remote video cameras
part, unless otherwise specified. and displays if necessary for the oper-
(1) The requirements in paragraphs ator to see the mark.
(e)(1), (e)(2), and (e)(3) of this section do (C) Clearly mark the boom hoist
not apply to articulating cranes. cable (so that it can easily be seen by
(2) The requirements in paragraphs a spotter) at a point that will give the
(d)(3), (e)(1), and (e)(4) of this section spotter sufficient time to signal the op-
apply only to those digger derricks erator and have the operator stop the
manufactured after November 8, 2011. hoist to keep the boom within the min-
(b) Operations must not begin unless imum allowable radius.
the listed operational aids are in prop- (ii) If the equipment was manufac-
er working order, except where an tured on or before December 16, 1969,
operational aid is being repaired the and is not equipped with a boom hoist
employer uses the specified temporary limiting device, at least one of the
alternative measures. The time periods measures in paragraphs (d)(1)(i)(A)
permitted for repairing defective oper- through (C) of this section must be
ational aids are specified in paragraphs used.
(d) and (e) of this section. More protec- (2) Luffing jib limiting device. Equip-
tive alternative measures specified by ment with a luffing jib must have a
the crane/derrick manufacturer, if any, luffing jib limiting device. Temporary
must be followed. alternative measures are the same as
(c) If a listed operational aid stops in paragraph (d)(1)(i) of this section,
working properly during operations, except to limit the movement of the
the operator must safely stop oper- luffing jib rather than the boom hoist.
ations until the temporary alternative (3) Anti two-blocking device.
measures are implemented or the de- (i) Telescopic boom cranes manufac-
vice is again working properly. If a re- tured after February 28, 1992, must be
placement part is no longer available, equipped with a device which auto-
the use of a substitute device that per- matically prevents damage from con-
forms the same type of function is per- tact between the load block, overhaul
mitted and is not considered a modi- ball, or similar component, and the
fication under 1926.1434. boom tip (or fixed upper block or simi-
(d) Category I operational aids and al- lar component). The device(s) must
ternative measures. Operational aids prevent such damage at all points
listed in this paragraph that are not where two-blocking could occur.
working properly must be repaired no Temporary alternative measures: Clear-
later than 7 calendar days after the de- ly mark the cable (so that it can easily
ficiency occurs. Exception: If the em- be seen by the operator) at a point that
ployer documents that it has ordered will give the operator sufficient time
the necessary parts within 7 calendar to stop the hoist to prevent two-block-
days of the occurrence of the defi- ing, and use a spotter when extending
ciency, the repair must be completed the boom.
within 7 calendar days of receipt of the (ii) Lattice boom cranes.
parts. See 1926.1417(j) for additional re- (A) Lattice boom cranes manufac-
quirements. tured after Feb 28, 1992, must be
(1) Boom hoist limiting device. equipped with a device that either
(i) For equipment manufactured after automatically prevents damage and
December 16, 1969, a boom hoist lim- load failure from contact between the
iting device is required. Temporary al- load block, overhaul ball, or similar
ternative measures (use at least one). One component, and the boom tip (or fixed
or more of the following methods must upper block or similar component), or
be used: warns the operator in time for the op-
(A) Use a boom angle indicator. erator to prevent two-blocking. The de-
(B) Clearly mark the boom hoist vice must prevent such damage/failure
cable (so that it can easily be seen by or provide adequate warning for all
the operator) at a point that will give points where two-blocking could occur.
the operator sufficient time to stop the (B) Lattice boom cranes and derricks
hoist to keep the boom within the min- manufactured after November 8, 2011
imum allowable radius. In addition, in- must be equipped with a device which

637

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00647 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1416 29 CFR Ch. XVII (7112 Edition)

automatically prevents damage and time to complete the repair in 30 cal-


load failure from contact between the endar days, the repair must be com-
load block, overhaul ball, or similar pleted within 7 calendar days of receipt
component, and the boom tip (or fixed of the parts. See 1926.1417(j) for addi-
upper block or similar component). tional requirements.
The device(s) must prevent such dam- (1) Boom angle or radius indicator. The
age/failure at all points where two- equipment must have a boom angle or
blocking could occur. radius indicator readable from the op-
(C) Exception. The requirements in erators station. Temporary alternative
paragraphs (d)(3)(ii)(A) and (B) of this measures: Radii or boom angle must be
section do not apply to such lattice determined by measuring the radii or
boom equipment when used for drag- boom angle with a measuring device.
line, clamshell (grapple), magnet, drop (2) Jib angle indicator if the equip-
ball, container handling, concrete ment has a luffing jib. Temporary alter-
bucket, marine operations that do not native measures: Radii or jib angle must
involve hoisting personnel, and pile be determined by ascertaining the
driving work. main boom angle and then measuring
(D) Temporary alternative measures. the radii or jib angle with a measuring
Clearly mark the cable (so that it can device.
easily be seen by the operator) at a (3) Boom length indicator if the
point that will give the operator suffi- equipment has a telescopic boom, ex-
cient time to stop the hoist to prevent cept where the rated capacity is inde-
two-blocking, or use a spotter. pendent of the boom length. Temporary
(iii) Articulating cranes manufac- alternative measures. One or more of the
tured after December 31, 1999, that are following methods must be used:
equipped with a load hoist must be (i) Mark the boom with measured
equipped with a device that automati- marks to calculate boom length,
cally prevents damage from contact be- (ii) Calculate boom length from boom
tween the load block, overhaul ball, or angle and radius measurements,
similar component, and the boom tip (iii) Measure the boom with a meas-
(or fixed upper block or similar compo- uring device.
nent). The device must prevent such (4) Load weighing and similar devices.
damage at all points where two-block- (i) Equipment (other than derricks
ing could occur. Temporary alternative and articulating cranes) manufactured
measures: When two-blocking could after March 29, 2003 with a rated capac-
only occur with movement of the load ity over 6,000 pounds must have at least
hoist, clearly mark the cable (so that one of the following: load weighing de-
it can easily be seen by the operator) vice, load moment (or rated capacity)
at a point that will give the operator indicator, or load moment (or rated ca-
sufficient time to stop the hoist to pre- pacity) limiter. Temporary alternative
vent two-blocking, or use a spotter. measures: The weight of the load must
When two-blocking could occur with- be determined from a source recognized
out movement of the load hoist, clearly by the industry (such as the loads
mark the cable (so that it can easily be manufacturer) or by a calculation
seen by the operator) at a point that method recognized by the industry
will give the operator sufficient time (such as calculating a steel beam from
to stop the hoist to prevent two-block- measured dimensions and a known per
ing, and use a spotter when extending foot weight). This information must be
the boom. provided to the operator prior to the
(e) Category II operational aids and al- lift.
ternative measures. Operational aids (ii) Articulating cranes manufac-
listed in this paragraph that are not tured after November 8, 2011 must have
working properly must be repaired no at least one of the following: automatic
later than 30 calendar days after the overload prevention device, load weigh-
deficiency occurs. Exception: If the em- ing device, load moment (or rated ca-
ployer documents that it has ordered pacity) indicator, or load moment
the necessary parts within 7 calendar (rated capacity) limiter. Temporary al-
days of the occurrence of the defi- ternative measures: The weight of the
ciency, and the part is not received in load must be determined from a source

638

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00648 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1417

recognized by the industry (such as the able in the cab at all times for use by
loads manufacturer) or by a calcula- the operator.
tion method recognized by the industry (2) Where rated capacities are avail-
(such as calculating a steel beam from able in the cab only in electronic form:
measured dimensions and a known per In the event of a failure which makes
foot weight). This information must be the rated capacities inaccessible, the
provided to the operator prior to the operator must immediately cease oper-
lift. ations or follow safe shut-down proce-
(5) The following devices are required dures until the rated capacities (in
on equipment manufactured after No- electronic or other form) are available.
vember 8, 2011: (d) The operator must not engage in
(i) Outrigger/stabilizer position (hori- any practice or activity that diverts
zontal beam extension) sensor/monitor his/her attention while actually en-
if the equipment has outriggers or sta- gaged in operating the equipment, such
bilizers. Temporary alternative measures: as the use of cellular phones (other
The operator must verify that the posi- than when used for signal communica-
tion of the outriggers or stabilizers is tions).
correct (in accordance with manufac- (e) Leaving the equipment unattended.
turer procedures) before beginning op- (1) The operator must not leave the
erations requiring outrigger or sta- controls while the load is suspended,
bilizer deployment. except where all of the following are
(ii) Hoist drum rotation indicator if met:
the equipment has a hoist drum not (i) The operator remains adjacent to
visible from the operators station. the equipment and is not engaged in
Temporary alternative measures: Mark any other duties.
the drum to indicate the rotation of (ii) The load is to be held suspended
the drum. In addition, install mirrors for a period of time exceeding normal
or remote video cameras and displays if lifting operations.
necessary for the operator to see the (iii) The competent person deter-
mark. mines that it is safe to do so and imple-
ments measures necessary to restrain
1926.1417 Operation.
the boom hoist and telescoping, load,
(a) The employer must comply with swing, and outrigger or stabilizer func-
all manufacturer procedures applicable tions.
to the operational functions of equip- (iv) Barricades or caution lines, and
ment, including its use with attach- notices, are erected to prevent all em-
ments. ployees from entering the fall zone. No
(b) Unavailable operation procedures. employees, including those listed in
(1) Where the manufacturer proce- 1926.1425(b)(1) through (3),
dures are unavailable, the employer 1926.1425(d) or 1926.1425(e), are per-
must develop and ensure compliance mitted in the fall zone.
with all procedures necessary for the (2) The provisions in 1926.1417(e)(1)
safe operation of the equipment and at- do not apply to working gear (such as
tachments. slings, spreader bars, ladders, and weld-
(2) Procedures for the operational ing machines) where the weight of the
controls must be developed by a quali- working gear is negligible relative to
fied person. the lifting capacity of the equipment
(3) Procedures related to the capacity as positioned, and the working gear is
of the equipment must be developed suspended over an area other than an
and signed by a registered professional entrance or exit.
engineer familiar with the equipment. (f) Tag-out.
(c) Accessibility of procedures. (1) Tagging out of service equipment/
(1) The procedures applicable to the functions. Where the employer has
operation of the equipment, including taken the equipment out of service, a
rated capacities (load charts), rec- tag must be placed in the cab stating
ommended operating speeds, special that the equipment is out of service
hazard warnings, instructions, and op- and is not to be used. Where the em-
erators manual, must be readily avail- ployer has taken a function(s) out of

639

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00649 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1417 29 CFR Ch. XVII (7112 Edition)

service, a tag must be placed in a con- tion requiring re-spooling of the rope,
spicuous position stating that the func- it must be verified (before starting to
tion is out of service and is not to be lift) that the rope is seated on the
used. drum and in the sheaves as the slack is
(2) Response to do not operate/tag- removed.
out signs. (n) The competent person must ad-
(i) If there is a warning (tag-out or just the equipment and/or operations
maintenance/do not operate) sign on to address the effect of wind, ice, and
the equipment or starting control, the snow on equipment stability and rated
operator must not activate the switch capacity.
or start the equipment until the sign (o) Compliance with rated capacity.
has been removed by a person author-
(1) The equipment must not be oper-
ized to remove it, or until the operator
ated in excess of its rated capacity.
has verified that:
(A) No one is servicing, working on, (2) The operator must not be required
or otherwise in a dangerous position on to operate the equipment in a manner
the machine. that would violate paragraph (o)(1) of
(B) The equipment has been repaired this section.
and is working properly. (3) Load weight. The operator must
(ii) If there is a warning (tag-out or verify that the load is within the rated
maintenance/do not operate) sign on capacity of the equipment by at least
any other switch or control, the oper- one of the following methods:
ator must not activate that switch or (i) The weight of the load must be de-
control until the sign has been re- termined from a source recognized by
moved by a person authorized to re- the industry (such as the loads manu-
move it, or until the operator has facturer), or by a calculation method
verified that the requirements in para- recognized by the industry (such as cal-
graphs (f)(2)(i)(A) and (B) of this sec- culating a steel beam from measured
tion have been met. dimensions and a known per foot
(g) Before starting the engine, the op- weight), or by other equally reliable
erator must verify that all controls are means. In addition, when requested by
in the proper starting position and that the operator, this information must be
all personnel are in the clear. provided to the operator prior to the
(h) Storm warning. When a local storm lift; or
warning has been issued, the com- (ii) The operator must begin hoisting
petent person must determine whether the load to determine, using a load
it is necessary to implement manufac- weighing device, load moment indi-
turer recommendations for securing cator, rated capacity indicator, or
the equipment. rated capacity limiter, if it exceeds 75
(i) [Reserved.] percent of the maximum rated capac-
(j) If equipment adjustments or re- ity at the longest radius that will be
pairs are necessary: used during the lift operation. If it
(1) The operator must, in writing, does, the operator must not proceed
promptly inform the person designated with the lift until he/she verifies the
by the employer to receive such infor- weight of the load in accordance with
mation and, where there are successive
paragraph (o)(3)(i) of this section.
shifts, to the next operator; and
(p) The boom or other parts of the
(2) The employer must notify all af-
fected employees, at the beginning of equipment must not contact any ob-
each shift, of the necessary adjust- struction.
ments or repairs and all alternative (q) The equipment must not be used
measures. to drag or pull loads sideways.
(k) Safety devices and operational (r) On wheel-mounted equipment, no
aids must not be used as a substitute loads must be lifted over the front
for the exercise of professional judg- area, except as permitted by the manu-
ment by the operator. facturer.
(l) [Reserved.] (s) The operator must test the brakes
(m) If the competent person deter- each time a load that is 90% or more of
mines that there is a slack rope condi- the maximum line pull is handled by

640

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00650 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1419

lifting the load a few inches and apply- in place as specified by the manufac-
ing the brakes. In duty cycle and repet- turer.
itive lifts where each lift is 90% or (ii) The maximum counterweight or
more of the maximum line pull, this ballast specified by the manufacturer
requirement applies to the first lift but for the equipment must not be exceed-
not to successive lifts. ed.
(t) Neither the load nor the boom (2) Counterweight/ballast require-
must be lowered below the point where ments for tower cranes are specified in
less than two full wraps of rope remain 1926.1435(b)(8).
on their respective drums.
(u) Traveling with a load. 1926.1418 Authority to stop oper-
(1) Traveling with a load is prohib- ation.
ited if the practice is prohibited by the Whenever there is a concern as to
manufacturer. safety, the operator must have the au-
(2) Where traveling with a load, the thority to stop and refuse to handle
employer must ensure that: loads until a qualified person has deter-
(i) A competent person supervises the mined that safety has been assured.
operation, determines if it is necessary
to reduce rated capacity, and makes 1926.1419 Signalsgeneral require-
determinations regarding load posi- ments.
tion, boom location, ground support, (a) A signal person must be provided
travel route, overhead obstructions, in each of the following situations:
and speed of movement necessary to (1) The point of operation, meaning
ensure safety. the load travel or the area near or at
(ii) The determinations of the com- load placement, is not in full view of
petent person required in paragraph the operator.
(u)(2)(i) of this section are imple- (2) When the equipment is traveling,
mented. the view in the direction of travel is
(iii) For equipment with tires, tire obstructed.
pressure specified by the manufacturer (3) Due to site specific safety con-
is maintained. cerns, either the operator or the person
(v) Rotational speed of the equipment handling the load determines that it is
must be such that the load does not necessary.
swing out beyond the radius at which it (b) Types of signals. Signals to opera-
can be controlled. tors must be by hand, voice, audible, or
(w) A tag or restraint line must be new signals.
used if necessary to prevent rotation of (c) Hand signals.
the load that would be hazardous. (1) When using hand signals, the
(x) The brakes must be adjusted in Standard Method must be used (see ap-
accordance with manufacturer proce- pendix A of this subpart). Exception:
dures to prevent unintended move- Where use of the Standard Method for
ment. hand signals is infeasible, or where an
(y) The operator must obey a stop (or operation or use of an attachment is
emergency stop) signal, irrespective of not covered in the Standard Method,
who gives it. non-standard hand signals may be used
(z) Swinging locomotive cranes. A loco- in accordance with paragraph (c)(2) of
motive crane must not be swung into a this section.
position where railway cars on an adja- (2) Non-standard hand signals. When
cent track could strike it, until it is using non-standard hand signals, the
determined that cars are not being signal person, operator, and lift direc-
moved on the adjacent track and that tor (where there is one) must contact
proper flag protection has been estab- each other prior to the operation and
lished. agree on the non-standard hand signals
(aa) Counterweight/ballast. that will be used.
(1) The following applies to equip- (d) New signals. Signals other than
ment other than tower cranes: hand, voice, or audible signals may be
(i) Equipment must not be operated used where the employer demonstrates
without the counterweight or ballast that:

641

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00651 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1420 29 CFR Ch. XVII (7112 Edition)

(1) The new signals provide at least 1926.1420 Signalsradio, telephone


equally effective communication as or other electronic transmission of
voice, audible, or Standard Method signals.
hand signals, or (a) The device(s) used to transmit
(2) The new signals comply with a na- signals must be tested on site before
tional consensus standard that pro- beginning operations to ensure that
vides at least equally effective commu- the signal transmission is effective,
nication as voice, audible, or Standard clear, and reliable.
Method hand signals. (b) Signal transmission must be
(e) Suitability. The signals used (hand, through a dedicated channel, except:
voice, audible, or new), and means of (1) Multiple cranes/derricks and one
transmitting the signals to the oper- or more signal persons may share a
ator (such as direct line of sight, video, dedicated channel for the purpose of
radio, etc.), must be appropriate for the coordinating operations.
site conditions. (2) Where a crane is being operated
(f) During operations requiring sig- on or adjacent to railroad tracks, and
nals, the ability to transmit signals be- the actions of the crane operator need
tween the operator and signal person to be coordinated with the movement
must be maintained. If that ability is of other equipment or trains on the
interrupted at any time, the operator same or adjacent tracks.
must safely stop operations requiring
(c) The operators reception of sig-
signals until it is reestablished and a
nals must be by a hands-free system.
proper signal is given and understood.
(g) If the operator becomes aware of 1926.1421 Signalsvoice signalsad-
a safety problem and needs to commu- ditional requirements.
nicate with the signal person, the oper-
(a) Prior to beginning operations, the
ator must safely stop operations. Oper-
operator, signal person and lift director
ations must not resume until the oper-
(if there is one), must contact each
ator and signal person agree that the
other and agree on the voice signals
problem has been resolved.
that will be used. Once the voice sig-
(h) Only one person may give signals
nals are agreed upon, these workers
to a crane/derrick at a time, except in
need not meet again to discuss voice
circumstances covered by paragraph (j)
signals unless another worker is added
of this section.
or substituted, there is confusion about
(i) [Reserved.]
the voice signals, or a voice signal is to
(j) Anyone who becomes aware of a
be changed.
safety problem must alert the operator
or signal person by giving the stop or (b) Each voice signal must contain
emergency stop signal. (NOTE: the following three elements, given in
1926.1417(y) requires the operator to the following order: function (such as
obey a stop or emergency stop signal). hoist, boom, etc.), direction; distance
(k) All directions given to the oper- and/or speed; function, stop command.
ator by the signal person must be given (c) The operator, signal person and
from the operators direction perspec- lift director (if there is one), must be
tive. able to effectively communicate in the
(l) [Reserved.] language used.
(m) Communication with multiple 1926.1422 Signalshand signal chart.
cranes/derricks. Where a signal person(s)
is in communication with more than Hand signal charts must be either
one crane/derrick, a system must be posted on the equipment or conspicu-
used for identifying the crane/derrick ously posted in the vicinity of the
each signal is for, as follows: hoisting operations.
(1) for each signal, prior to giving the
function/direction, the signal person 1926.1423 Fall protection.
must identify the crane/derrick the sig- (a) Application.
nal is for, or (1) Paragraphs (b), (c)(3), (e) and (f) of
(2) must use an equally effective this section apply to all equipment
method of identifying which crane/der- covered by this subpart except tower
rick the signal is for. cranes.

642

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00652 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1423

(2) Paragraphs (c)(1), (c)(2), (d), (g), (j) grip tape, expanded metal, or slip-re-
and (k) of this section apply to all sistant paint).
equipment covered by this subpart. (4) Tower cranes manufactured after
(3) Paragraphs (c)(4) and (h) of this November 8, 2011 must be equipped so
section apply only to tower cranes. as to provide safe access and egress be-
(b) Boom walkways. tween the ground and the cab, machin-
(1) Equipment manufactured after ery platforms, and tower (mast), by the
November 8, 2011 with lattice booms provision of devices such as steps,
must be equipped with walkways on handholds, ladders, and guardrails/rail-
the boom(s) if the vertical profile of ings/grabrails. These devices must
the boom (from cord centerline to cord meet the following criteria:
centerline) is 6 or more feet. (i) Steps, handholds, ladders, and
(2) Boom walkway criteria. guardrails/railings/grabrails must meet
(i) The walkways must be at least 12 the criteria of ISO 116601:2008(E) (in-
inches wide. corporated by reference, see 1926.6)
(ii) Guardrails, railings and other and ISO 116603:2008(E) (incorporated
permanent fall protection attachments by reference, see 1926.6) or SAE J185
along walkways are: (May 2003) (incorporated by reference,
(A) Not required. see 1926.6) except where infeasible.
(B) Prohibited on booms supported by (ii) Walking/stepping surfaces must
pendant ropes or bars if the guardrails/ have slip-resistant features/properties
railings/attachments could be snagged (such as diamond plate metal, strategi-
by the ropes or bars. cally placed grip tape, expanded metal,
(C) Prohibited if of the removable or slip-resistant paint).
type (designed to be installed and re- (d) Personal fall arrest and fall re-
moved each time the boom is assem- straint systems. Personal fall arrest sys-
bled/disassembled). tem components must be used in per-
(D) Where not prohibited, guardrails sonal fall arrest and fall restraint sys-
or railings may be of any height up to, tems and must conform to the criteria
but not more than, 45 inches. in 1926.502(d) except that
(c) Steps, handholds, ladders, grabrails, 1926.502(d)(15) does not apply to com-
guardrails and railings. ponents used in personal fall arrest and
(1) Section 1926.502(b) does not apply fall restraint systems. Either body
to equipment covered by this subpart. belts or body harnesses must be used in
(2) The employer must maintain in personal fall arrest and fall restraint
good condition originally-equipped systems.
steps, handholds, ladders and guard- (e) For non-assembly/disassembly
rails/railings/grabrails. work, the employer must provide and
(3) Equipment manufactured after ensure the use of fall protection equip-
November 8, 2011 must be equipped so ment for employees who are on a walk-
as to provide safe access and egress be- ing/working surface with an unpro-
tween the ground and the operator tected side or edge more than 6 feet
work station(s), including the forward above a lower level as follows:
and rear positions, by the provision of (1) When moving point-to-point:
devices such as steps, handholds, lad- (i) On non-lattice booms (whether
ders, and guardrails/railings/grabrails. horizontal or not horizontal).
These devices must meet the following (ii) On lattice booms that are not
criteria: horizontal.
(i) Steps, handholds, ladders and (iii) On horizontal lattice booms
guardrails/railings/grabrails must meet where the fall distance is 15 feet or
the criteria of SAE J185 (May 2003) (in- more.
corporated by reference, see 1926.6) or (2) While at a work station on any
ISO 116602:1994(E) (incorporated by ref- part of the equipment (including the
erence, see 1926.6) except where infea- boom, of any type), except when the
sible. employee is at or near draw-works
(ii) Walking/stepping surfaces, except (when the equipment is running), in
for crawler treads, must have slip-re- the cab, or on the deck.
sistant features/properties (such as dia- (f) For assembly/disassembly work,
mond plate metal, strategically placed the employer must provide and ensure

643

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00653 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1424 29 CFR Ch. XVII (7112 Edition)

the use of fall protection equipment for tion equipment for employees who are
employees who are on a walking/work- on a walking/working surface with an
ing surface with an unprotected side or unprotected side or edge more than 15
edge more than 15 feet above a lower feet above a lower level.
level, except when the employee is at (i) [Reserved.]
or near draw-works (when the equip- (j) Anchoring to the load line. A per-
ment is running), in the cab, or on the sonal fall arrest system is permitted to
deck. be anchored to the crane/derricks hook
(g) Anchorage criteria. (or other part of the load line) where
(1) Sections 1926.502(d)(15) and all of the following requirements are
1926.502(e)(2) apply to equipment cov- met:
ered by this subpart only to the extent (1) A qualified person has determined
delineated in paragraph (g)(2) of this
that the set-up and rated capacity of
section.
the crane/derrick (including the hook,
(2) Anchorages for personal fall arrest
load line and rigging) meets or exceeds
and positioning device systems.
the requirements in 1926.502(d)(15).
(i) Personal fall arrest systems must
be anchored to any apparently substan- (2) The equipment operator must be
tial part of the equipment unless a at the work site and informed that the
competent person, from a visual in- equipment is being used for this pur-
spection, without an engineering anal- pose.
ysis, would conclude that the criteria (3) No load is suspended from the load
in 1926.502(d)(15) would not be met. line when the personal fall arrest sys-
(ii) Positioning device systems must tem is anchored to the crane/derricks
be anchored to any apparently substan- hook (or other part of the load line).
tial part of the equipment unless a (k) Training. The employer must
competent person, from a visual in- train each employee who may be ex-
spection, without an engineering anal- posed to fall hazards while on, or hoist-
ysis, would conclude that the criteria ed by, equipment covered by this sub-
in 1926.502(e)(2) would not be met. part on all of the following:
(iii) Attachable anchor devices (port- (1) the requirements in this subpart
able anchor devices that are attached that address fall protection.
to the equipment) must meet the an- (2) the applicable requirements in
chorage criteria in 1926.502(d)(15) for 1926.500 and 1926.502.
personal fall arrest systems and
1926.502(e)(2) for positioning device 1926.1424 Work area control.
systems. (a) Swing radius hazards.
(3) Anchorages for fall restraint sys-
(1) The requirements in paragraph
tems. Fall restraint systems must be
(a)(2) of this section apply where there
anchored to any part of the equipment
are accessible areas in which the equip-
that is capable of withstanding twice
ments rotating superstructure (wheth-
the maximum load that an employee
er permanently or temporarily mount-
may impose on it during reasonably
ed) poses a reasonably foreseeable risk
anticipated conditions of use.
of:
(h) Tower cranes.
(1) For work other than erecting, (i) Striking and injuring an em-
climbing, and dismantling, the em- ployee; or
ployer must provide and ensure the use (ii) Pinching/crushing an employee
of fall protection equipment for em- against another part of the equipment
ployees who are on a walking/working or another object.
surface with an unprotected side or (2) To prevent employees from enter-
edge more than 6 feet above a lower ing these hazard areas, the employer
level, except when the employee is at must:
or near draw-works (when the equip- (i) Train each employee assigned to
ment is running), in the cab, or on the work on or near the equipment (au-
deck. thorized personnel) in how to recog-
(2) For erecting, climbing, and dis- nize struck-by and pinch/crush hazard
mantling work, the employer must pro- areas posed by the rotating super-
vide and ensure the use of fall protec- structure.

644

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00654 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1426

(ii) Erect and maintain control lines, (c) When employees are engaged in
warning lines, railings or similar bar- hooking, unhooking, or guiding the
riers to mark the boundaries of the load, or in the initial connection of a
hazard areas. Exception: When the em- load to a component or structure and
ployer can demonstrate that it is nei- are within the fall zone, all of the fol-
ther feasible to erect such barriers on lowing criteria must be met:
the ground nor on the equipment, the (1) The materials being hoisted must
hazard areas must be clearly marked be rigged to prevent unintentional dis-
by a combination of warning signs placement.
(such as DangerSwing/Crush Zone) (2) Hooks with self-closing latches or
and high visibility markings on the their equivalent must be used. Excep-
equipment that identify the hazard tion: J hooks are permitted to be
areas. In addition, the employer must used for setting wooden trusses.
train each employee to understand (3) The materials must be rigged by a
what these markings signify. qualified rigger.
(3) Protecting employees in the hazard (d) Receiving a load. Only employees
area. needed to receive a load are permitted
(i) Before an employee goes to a loca- to be within the fall zone when a load
tion in the hazard area that is out of is being landed.
view of the operator, the employee (or (e) During a tilt-up or tilt-down oper-
someone instructed by the employee) ation:
must ensure that the operator is in- (1) No employee must be directly
formed that he/she is going to that lo- under the load.
cation. (2) Only employees essential to the
(ii) Where the operator knows that operation are permitted in the fall zone
an employee went to a location covered (but not directly under the load). An
by paragraph (a)(1) of this section, the employee is essential to the operation
operator must not rotate the super- if the employee is conducting one of
structure until the operator is in- the following operations and the em-
formed in accordance with a pre-ar- ployer can demonstrate it is infeasible
ranged system of communication that for the employee to perform that oper-
the employee is in a safe position. ation from outside the fall zone: (1)
(b) Where any part of a crane/derrick Physically guide the load; (2) closely
is within the working radius of another monitor and give instructions regard-
crane/derrick, the controlling entity ing the loads movement; or (3) either
must institute a system to coordinate detach it from or initially attach it to
operations. If there is no controlling another component or structure (such
entity, the employer (if there is only as, but not limited to, making an ini-
one employer operating the multiple tial connection or installing bracing).
pieces of equipment), or employers, NOTE: Boom free fall is prohibited when an
must institute such a system. employee is in the fall zone of the boom or
load, and load line free fall is prohibited
1926.1425 Keeping clear of the load. when an employee is directly under the load;
(a) Where available, hoisting routes see 1926.1426.
that minimize the exposure of employ-
ees to hoisted loads must be used, to 1926.1426 Free fall and controlled
load lowering.
the extent consistent with public safe-
ty. (a) Boom free fall prohibitions.
(b) While the operator is not moving (1) The use of equipment in which the
a suspended load, no employee must be boom is designed to free fall (live
within the fall zone, except for employ- boom) is prohibited in each of the fol-
ees: lowing circumstances:
(1) Engaged in hooking, unhooking or (i) An employee is in the fall zone of
guiding a load; the boom or load.
(2) Engaged in the initial attachment (ii) An employee is being hoisted.
of the load to a component or struc- (iii) The load or boom is directly over
ture; or a power line, or over any part of the
(3) Operating a concrete hopper or area extending the Table A of 1926.1408
concrete bucket. clearance distance to each side of the

645

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00655 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1427 29 CFR Ch. XVII (7112 Edition)

power line; or any part of the area ex- (d) Load line free fall. In each of the
tending the Table A clearance distance following circumstances, controlled
to each side of the power line is within load lowering is required and free fall
the radius of vertical travel of the of the load line hoist is prohibited:
boom or the load. (1) An employee is directly under the
(iv) The load is over a shaft, except load.
where there are no employees in the (2) An employee is being hoisted.
shaft. (3) The load is directly over a power
(v) The load is over a cofferdam, ex- line, or over any part of the area ex-
cept where there are no employees in tending the Table A of 1926.1408 clear-
the fall zone of the boom or the load. ance distance to each side of the power
(vi) Lifting operations are taking line; or any part of the area extending
place in a refinery or tank farm. the Table A of 1926.1408 clearance dis-
(2) The use of equipment in which the tance to each side of the power line is
boom is designed to free fall (live within the radius of vertical travel of
boom) is permitted only where none of the load.
the circumstances listed in paragraph (4) The load is over a shaft.
(a)(1) of this section are present and: (5) The load is over a cofferdam, ex-
(i) The equipment was manufactured cept where there are no employees in
prior to October 31, 1984; or the fall zone of the load.
(ii) The equipment is a floating
crane/derrick or a land crane/derrick 1926.1427 Operator qualification and
on a vessel/flotation device. certification.
(b) Preventing boom free fall. Where (a) The employer must ensure that,
the use of equipment with a boom that prior to operating any equipment cov-
is designed to free fall (live boom) is ered under subpart CC, the person is
prohibited, the boom hoist must have a operating the equipment during a
secondary mechanism or device de- training period in accordance with
signed to prevent the boom from fall- paragraph (f) of this section, or the op-
ing in the event the primary system erator is qualified or certified to oper-
used to hold or regulate the boom hoist ate the equipment in accordance with
fails, as follows: the following:
(1) Friction drums must have: (1) When a non-military government
(i) A friction clutch and, in addition, entity issues operator licenses for
a braking device, to allow for con- equipment covered under subpart CC,
trolled boom lowering. and that government licensing pro-
(ii) A secondary braking or locking gram meets the requirements of para-
device, which is manually or automati- graphs (e)(2) and (j) of this section, the
cally engaged, to back-up the primary equipment operator must either be:
brake while the boom is held (such as a (i) Licensed by that government enti-
secondary friction brake or a ratchet ty for operation of equipment within
and pawl device). that entitys jurisdiction; or
(2) Hydraulic drums must have an in- (ii) qualified in compliance with
tegrally mounted holding device or in- paragraph (d) of this section.
ternal static brake to prevent boom (2) Where paragraph (a)(1) of this sec-
hoist movement in the event of hy- tion is not applicable, the certification
draulic failure. or qualification must comply with one
(3) Neither clutches nor hydraulic of the options in paragraphs (b)
motors must be considered brake or through (d) of this section.
locking devices for purposes of this (3) Exceptions: Operator qualification
subpart. or certification under this section is
(4) Hydraulic boom cylinders must not required for operators of derricks
have an integrally mounted holding de- (see 1926.1436), sideboom cranes (see
vice. 1926.1440), or equipment with a max-
(c) Preventing uncontrolled retraction. imum manufacturer-rated hoisting/lift-
Hydraulic telescoping booms must ing capacity of 2,000 pounds or less (see
have an integrally mounted holding de- 1926.1441).
vice to prevent the boom from retract- (4) Whenever operator qualification
ing in the event of hydraulic failure. or certification is required under

646

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00656 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1427

1926.1427, the employer must provide (3) A certification issued under this
the qualification or certification at no option is portable and meets the re-
cost to operators who are employed by quirements of paragraph (a)(2) of this
the employer on November 8, 2010. section.
(b) Option (1): Certification by an ac- (4) A certification issued under this
credited crane operator testing organiza- paragraph is valid for 5 years.
tion. (c) Option (2): Qualification by an au-
(1) For a testing organization to be dited employer program. The employers
considered accredited to certify opera- qualification of its employee must
tors under this subpart, it must: meet the following requirements:
(i) Be accredited by a nationally rec- (1) The written and practical tests
ognized accrediting agency based on must be either:
that agencys determination that in- (i) Developed by an accredited crane
dustry recognized criteria for written operator testing organization (see para-
testing materials, practical examina- graph (b) of this section); or
tions, test administration, grading, fa- (ii) Approved by an auditor in accord-
cilities/equipment and personnel have ance with the following requirements:
been met. (A) The auditor is certified to evalu-
ate such tests by an accredited crane
(ii) Administer written and practical
operator testing organization (see para-
tests that:
graph (b) of this section).
(A) Assess the operator applicant re- (B) The auditor is not an employee of
garding, at a minimum, the knowledge the employer.
and skills listed in paragraphs (j)(1) (C) The approval must be based on
and (2) of this section. the auditors determination that the
(B) Provide different levels of certifi- written and practical tests meet na-
cation based on equipment capacity tionally recognized test development
and type. criteria and are valid and reliable in
(iii) Have procedures for operators to assessing the operator applicants re-
re-apply and be re-tested in the event garding, at a minimum, the knowledge
an operator applicant fails a test or is and skills listed in paragraphs (j)(1)
decertified. and (2) of this section.
(iv) Have testing procedures for re- (D) The audit must be conducted in
certification designed to ensure that accordance with nationally recognized
the operator continues to meet the auditing standards.
technical knowledge and skills require- (2) Administration of tests.
ments in paragraphs (j)(1) and (2) of (i) The written and practical tests
this section. must be administered under cir-
(v) Have its accreditation reviewed cumstances approved by the auditor as
by the nationally recognized accred- meeting nationally recognized test ad-
iting agency at least every three years. ministration standards.
(2) An operator will be deemed quali- (ii) The auditor must be certified to
fied to operate a particular piece of evaluate the administration of the
equipment if the operator is certified written and practical tests by an ac-
under paragraph (b) of this section for credited crane operator testing organi-
that type and capacity of equipment or zation (see paragraph (b) of this sec-
for higher-capacity equipment of that tion).
type. If no accredited testing agency (iii) The auditor must not be an em-
offers certification examinations for a ployee of the employer.
particular type and/or capacity of (iv) The audit must be conducted in
equipment, an operator will be deemed accordance with nationally recognized
qualified to operate that equipment if auditing standards.
the operator has been certified for the (3) The employer program must be
type/capacity that is most similar to audited within 3 months of the begin-
that equipment and for which a certifi- ning of the program and at least every
cation examination is available. The 3 years thereafter.
operators certificate must state the (4) The employer program must have
type/capacity of equipment for which testing procedures for re-qualification
the operator is certified. designed to ensure that the operator

647

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00657 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1427 29 CFR Ch. XVII (7112 Edition)

continues to meet the technical knowl- (ii) Valid for the period of time stipu-
edge and skills requirements in para- lated by the issuing entity.
graphs (j)(1) and (2) of this section. The (e) Option (4): Licensing by a govern-
re-qualification procedures must be au- ment entity.
dited in accordance with paragraphs (1) For purposes of this section, a
(c)(1) and (2) of this section. government licensing department/of-
(5) Deficiencies. If the auditor deter- fice that issues operator licenses for
mines that there is a significant defi- operating equipment covered by this
ciency (deficiency) in the program, standard is considered a government
the employer must ensure that: accredited crane operator testing orga-
(i) No operator is qualified until the nization if the criteria in paragraph
auditor confirms that the deficiency (e)(2) of this section are met.
has been corrected. (2) Licensing criteria.
(ii) The program is audited again (i) The requirements for obtaining
within 180 days of the confirmation the license include an assessment, by
that the deficiency was corrected. written and practical tests, of the oper-
(iii) The auditor files a documented ator applicant regarding, at a min-
report of the deficiency to the appro- imum, the knowledge and skills listed
priate Regional Office of the Occupa- in paragraphs (j)(1) and (2) of this sec-
tional Safety and Health Administra- tion.
tion within 15 days of the auditors de- (ii) The testing meets industry recog-
termination that there is a deficiency. nized criteria for written testing mate-
rials, practical examinations, test ad-
(iv) Records of the audits of the em-
ministration, grading, facilities/equip-
ployers program are maintained by
ment and personnel.
the auditor for three years and are
(iii) The government authority that
made available by the auditor to the
oversees the licensing department/of-
Secretary of Labor or the Secretarys
fice, has determined that the require-
designated representative upon re-
ments in paragraphs (e)(2)(i) and (ii) of
quest.
this section have been met.
(6) A qualification under this para-
(iv) The licensing department/office
graph is:
has testing procedures for re-licensing
(i) Not portable. Such a qualification designed to ensure that the operator
meets the requirements of paragraph continues to meet the technical knowl-
(a) of this section only where the oper- edge and skills requirements in para-
ator is employed by (and operating the graphs (j)(1) and (2) of this section.
equipment for) the employer that (3) A license issued by a government
issued the qualification. accredited crane operator testing orga-
(ii) Valid for 5 years. nization that meets the requirements
(d) Option (3): Qualification by the U.S. of this option:
military. (i) Meets the operator qualification
(1) For purposes of this section, an requirements of this section for oper-
operator who is an employee of the ation of equipment only within the ju-
U.S. military is considered qualified if risdiction of the government entity.
he/she has a current operator qualifica- (ii) Is valid for the period of time
tion issued by the U.S. military for op- stipulated by the licensing department/
eration of the equipment. An employee office, but no longer than 5 years.
of the U.S. military is a Federal em- (f) Pre-qualification/certification train-
ployee of the Department of Defense or ing period. An employee who is not
Armed Forces and does not include em- qualified or certified under this section
ployees of private contractors. is permitted to operate equipment only
(2) A qualification under this para- as an operator-in-training and only
graph is: where the requirements of this para-
(i) Not portable. Such a qualification graph are met.
meets the requirements of paragraph (1) The employer must provide each
(a) of this section only where the oper- operator-in-training with sufficient
ator is employed by (and operating the training prior to operating the equip-
equipment for) the employer that ment to enable the operator-in-train-
issued the qualification. ing to operate the equipment safely

648

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00658 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1427

under limitations established by this following circumstances unless the ex-


section (including continuous moni- ception stated in paragraph (f)(5)(v) of
toring) and any additional limitations this section is applicable:
established by the employer. (i) If any part of the equipment, load
(2) The tasks performed by the oper- line or load (including rigging and lift-
ator-in-training while operating the ing accessories), if operated up to the
equipment must be within the oper- equipments maximum working radius
ator-in-trainings ability. in the work zone (see 1926.1408(a)(1)),
(3) Trainer. While operating the could get within 20 feet of a power line
equipment, the operator-in-training that is up to 350 kV, or within 50 feet
must be continuously monitored by an of a power line that is over 350 kV.
individual (operators trainer) who (ii) If the equipment is used to hoist
meets all of the following require- personnel.
ments: (iii) In multiple-equipment lifts.
(i) The operators trainer is an em- (iv) If the equipment is used over a
ployee or agent of the operator-in- shaft, cofferdam, or in a tank farm.
trainings employer. (v) In multiple-lift rigging oper-
(ii) The operators trainer is either a ations, except where the operators
certified operator under this section, or trainer determines that the operator-
has passed the written portion of a cer- in-training skills are sufficient for this
tification test under one of the options high-skill work.
in paragraphs (b) through (e) of this
(g) Under this section, a testing enti-
section, and is familiar with the proper
ty is permitted to provide training as
use of the equipments controls.
well as testing services as long as the
(iii) While monitoring the operator-
criteria of the applicable accrediting
in-training, the operators trainer per-
agency (in the option selected) for an
forms no tasks that detract from the
organization providing both services
trainers ability to monitor the oper-
are met.
ator-in-training.
(h) Language and Literacy Require-
(iv) For equipment other than tower
ments.
cranes: The operators trainer and the
operator-in-training must be in direct (1) Tests under this section may be
line of sight of each other. In addition, administered verbally, with answers
they must communicate verbally or by given verbally, where the operator can-
hand signals. For tower cranes: The op- didate:
erators trainer and the operator-in- (i) Passes a written demonstration of
training must be in direct communica- literacy relevant to the work.
tion with each other. (ii) Demonstrates the ability to use
(4) Continuous monitoring. The oper- the type of written manufacturer pro-
ator-in-training must be monitored by cedures applicable to the class/type of
the operators trainer at all times, ex- equipment for which the candidate is
cept for short breaks where all of the seeking certification.
following are met: (2) Tests under this section may be
(i) The break lasts no longer than 15 administered in any language the oper-
minutes and there is no more than one ator candidate understands, and the
break per hour. operators certificate must note the
(ii) Immediately prior to the break language in which the test was given.
the operators trainer informs the oper- The operator is qualified under para-
ator-in-training of the specific tasks graph (b)(2) of this section to operate
that the operator-in-training is to per- equipment that is furnished with mate-
form and limitations to which he/she rials required by this subpart that are
must adhere during the operator train- written in the language of the certifi-
ers break. cation. The operator may only operate
(iii) The specific tasks that the oper- equipment furnished with such mate-
ator-in-training will perform during rials.
the operator trainers break are within (i) [Reserved.]
the operator-in-trainings abilities. (j) Certification criteria. Qualifications
(5) The operator-in-training must not and certifications must be based, at a
operate the equipment in any of the minimum, on the following:

649

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00659 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1428 29 CFR Ch. XVII (7112 Edition)

(1) A determination through a writ- (i) The employer must ensure that
ten test that: operators of equipment covered by this
(i) The individual knows the informa- standard are competent to operate the
tion necessary for safe operation of the equipment safely.
specific type of equipment the indi- (ii) Where an employee assigned to
vidual will operate, including all of the operate machinery does not have the
following: required knowledge or ability to oper-
(A) The controls and operational/per- ate the equipment safely, the employer
formance characteristics. must train that employee prior to op-
(B) Use of, and the ability to cal- erating the equipment. The employer
culate (manually or with a calculator), must ensure that each operator is eval-
load/capacity information on a variety uated to confirm that he/she under-
of configurations of the equipment. stands the information provided in the
(C) Procedures for preventing and re- training.
sponding to power line contact.
1926.1428 Signal person qualifica-
(D) Technical knowledge similar to tions.
the subject matter criteria listed in ap-
pendix C of this subpart applicable to (a) The employer of the signal person
the specific type of equipment the indi- must ensure that each signal person
vidual will operate. Use of the appendix meets the Qualification Requirements
C criteria meets the requirements of (paragraph (c) of this section) prior to
this provision. giving any signals. This requirement
(E) Technical knowledge applicable must be met by using either Option (1)
to: or Option (2) of this section.
(1) The suitability of the supporting (1) Option (1)Third party qualified
ground and surface to handle expected evaluator. The signal person has docu-
loads. mentation from a third party qualified
evaluator (see Qualified Evaluator
(2) Site hazards.
(third party), 1926.1401 for definition)
(3) Site access.
showing that the signal person meets
(F) This subpart, including applicable the Qualification Requirements (see
incorporated materials. paragraph (c) of this section).
(ii) The individual is able to read and (2) Option (2)Employers qualified
locate relevant information in the evaluator. The employers qualified (see
equipment manual and other materials Qualified Evaluator (not a third party),
containing information referred to in 1926.1401 for definition) evaluator as-
paragraph (j)(1)(i) of this section. sesses the individual and determines
(2) A determination through a prac- that the individual meets the Quali-
tical test that the individual has the fication Requirements (see paragraph
skills necessary for safe operation of (c) of this section) and provides docu-
the equipment, including the following: mentation of that determination. An
(i) Ability to recognize, from visual assessment by an employers qualified
and auditory observation, the items evaluator under this option is not port-
listed in 1926.1412(d) (shift inspection). ableother employers are not per-
(ii) Operational and maneuvering mitted to use it to meet the require-
skills. ments of this section.
(iii) Application of load chart infor- (3) The employer must make the doc-
mation. umentation for whichever option is
(iv) Application of safe shut-down used available at the site while the sig-
and securing procedures. nal person is employed by the em-
(k) Phase-in. ployer. The documentation must speci-
(1) The provisions of this section are fy each type of signaling (e.g. hand sig-
applicable November 8, 2010, except for nals, radio signals, etc.) for which the
paragraphs (a)(2) and (f) which are ap- signal person meets the requirements
plicable November 10, 2014. of paragraph (c) of this section.
(2) When 1926.1427(a)(1) is not appli- (b) If subsequent actions by the sig-
cable, all of the requirements in para- nal person indicate that the individual
graphs (k)(2)(i) and (ii) of this section does not meet the Qualification Re-
apply until November 10, 2014: quirements (see paragraph (c) of this

650

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00660 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1430

section), the employer must not allow 1926.1430 Training.


the individual to continue working as a The employer must provide training
signal person until re-training is pro- as follows:
vided and a re-assessment is made in (a) Overhead powerlines. The employer
accordance with paragraph (a) of this must train each employee specified in
section that confirms that the indi- 1926.1408(g) and 1926.1410(m) in the
vidual meets the Qualification Re- topics listed in 1926.1408(g).
quirements. (b) Signal persons. The employer must
(c) Qualification Requirements. Each train each employee who will be as-
signal person must: signed to work as a signal persons who
(1) Know and understand the type of does not meet the requirements of
signals used. If hand signals are used, 1926.1428(c) in the areas addressed in
the signal person must know and un- that paragraph.
derstand the Standard Method for hand (c) Operators.
(1) Operators-in-Training for equipment
signals.
where certification or qualification is re-
(2) Be competent in the application quired by this subpart. The employer
of the type of signals used. must train each operator-in-training in
(3) Have a basic understanding of the areas addressed in 1926.1427(j). The
equipment operation and limitations, employer must provide re-training if
including the crane dynamics involved the operator-in-training does not pass
in swinging and stopping loads and a qualification or certification test.
boom deflection from hoisting loads. (2) Transitional Period. During the
(4) Know and understand the relevant four-year phase-in period for operator
requirements of 1926.1419 through certification or qualification, as pro-
1926.1422 and 1926.1428. vided in 1926.1427(k), employers must
(5) Demonstrate that he/she meets train each operator who has not yet
the requirements in paragraphs (c)(1) been certified or qualified in the areas
through (4) of this section through an addressed in 1926.1427(j).
oral or written test, and through a (3) Operators excepted from the require-
ments of 1926.1427. The employer must
practical test.
train each operator excepted under
1926.1429 Qualifications of mainte- 1926.1427(a) from the requirements of
nance & repair employees. 1926.1427 on the safe operation of the
equipment the operator will be using.
(a) Maintenance, inspection and re- (4) The employer must train each op-
pair personnel are permitted to operate erator of the equipment covered by this
the equipment only where all of the subpart in the following practices:
following requirements are met: (i) On friction equipment, whenever
(1) The operation is limited to those moving a boom off a support, first raise
functions necessary to perform mainte- the boom a short distance (sufficient to
nance, inspect the equipment, or verify take the load of the boom) to deter-
its performance. mine if the boom hoist brake needs to
(2) The personnel either: be adjusted. On other types of equip-
(i) Operate the equipment under the ment with a boom, the same practice is
direct supervision of an operator who applicable, except that typically there
meets the requirements of 1926.1427 is no means of adjusting the brake; if
(Operator qualification and certifi- the brake does not hold, a repair is nec-
essary. See 1926.1417(f) and (j) for addi-
cation); or
tional requirements.
(ii) Are familiar with the operation, (ii) Where available, the manufactur-
limitations, characteristics and haz- ers emergency procedures for halting
ards associated with the type of equip- unintended equipment movement.
ment. (d) Competent persons and qualified
(b) Maintenance and repair personnel persons. The employer must train each
must meet the definition of a qualified competent person and each qualified
person with respect to the equipment person regarding the requirements of
and maintenance/repair tasks per- this subpart applicable to their respec-
formed. tive roles.

651

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00661 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1431 29 CFR Ch. XVII (7112 Edition)

(e) Crush/pinch points. The employer ter (see paragraph (o) of this section for
must train each employee who works requirements for hoisting these em-
with the equipment to keep clear of ployees).
holes, and crush/pinch points and the (ii) In pile driving operations (see
hazards addressed in 1926.1424 (Work paragraph (p) of this section for re-
area control). quirements for hoisting these employ-
(f) Tag-out. The employer must train ees).
each operator and each additional em- (iii) Solely for transfer to or from a
ployee authorized to start/energize marine worksite in a marine-hoisted
equipment or operate equipment con- personnel transfer device (see para-
trols (such as maintenance and repair graph (r) of this section for require-
employees), in the tag-out and start-up ments for hoisting these employees).
procedures in 1926.1417(f) and (g). (iv) In storage-tank (steel or con-
(g) Training administration. crete), shaft and chimney operations
(1) The employer must evaluate each (see paragraph (s) of this section for re-
employee required to be trained under quirements for hoisting these employ-
this subpart to confirm that the em- ees).
ployee understands the information (c) Equipment set-up.
provided in the training. (1) The equipment must be uniformly
(2) The employer must provide re- level, within one percent of level grade,
fresher training in relevant topics for and located on footing that a qualified
each employee when, based on the con- person has determined to be suffi-
duct of the employee or an evaluation ciently firm and stable.
of the employees knowledge, there is (2) Equipment with outriggers or sta-
an indication that retraining is nec- bilizers must have them all extended
essary. and locked. The amount of extension
(3) Whenever training is required must be the same for all outriggers and
under subpart CC, the employer must stabilizers and in accordance with
provide the training at no cost to the manufacturer procedures and load
employee. charts.
(d) Equipment criteria.
1926.1431 Hoisting personnel. (1) Capacity: Use of suspended per-
The requirements of this section are sonnel platforms. The total load (with
supplemental to the other require- the platform loaded, including the
ments in this subpart and apply when hook, load line and rigging) must not
one or more employees are hoisted. exceed 50 percent of the rated capacity
(a) The use of equipment to hoist em- for the radius and configuration of the
ployees is prohibited except where the equipment, except during proof testing.
employer demonstrates that the erec- (2) Capacity: Use of boom-attached per-
tion, use, and dismantling of conven- sonnel platforms. The total weight of
tional means of reaching the work the loaded personnel platform must not
area, such as a personnel hoist, ladder, exceed 50 percent of the rated capacity
stairway, aerial lift, elevating work for the radius and configuration of the
platform, or scaffold, would be more equipment (except during proof test-
hazardous, or is not possible because of ing).
the projects structural design or work- (3) Capacity: Hoisting personnel with-
site conditions. This paragraph does out a personnel platform. When hoisting
not apply to work covered by subpart R personnel without a personnel platform
(Steel Erection) of this part. pursuant to paragraph (b)(2) of this sec-
(b) Use of personnel platform. tion, the total load (including the
(1) When using equipment to hoist hook, load line, rigging and any other
employees, the employees must be in a equipment that imposes a load) must
personnel platform that meets the re- not exceed 50 percent of the rated ca-
quirements of paragraph (e) of this sec- pacity for the radius and configuration
tion. of the equipment, except during proof
(2) Exceptions: A personnel platform testing.
is not required for hoisting employees: (4) When the occupied personnel plat-
(i) Into and out of drill shafts that form is in a stationary working posi-
are up to and including 8 feet in diame- tion, the load and boom hoist brakes,

652

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00662 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1431

swing brakes, and operator actuated Alternative measures are not per-
secondary braking and locking features mitted. (See 1926.1417 for tag-out and
(such as pawls or dogs) or automatic related requirements.)
secondary brakes must be engaged. (6) Direct attachment of a personnel
(5) Devices. platform to a luffing jib is prohibited.
(i) Equipment (except for derricks (e) Personnel platform criteria.
and articulating cranes) with a vari- (1) A qualified person familiar with
able angle boom must be equipped with structural design must design the per-
all of the following: sonnel platform and attachment/sus-
(A) A boom angle indicator, readily pension system used for hoisting per-
visible to the operator, and sonnel.
(B) A boom hoist limiting device.
(ii) Articulating cranes must be (2) The system used to connect the
equipped with a properly functioning personnel platform to the equipment
automatic overload protection device. must allow the platform to remain
(iii) Equipment with a luffing jib within 10 degrees of level, regardless of
must be equipped with: boom angle.
(A) A jib angle indicator, readily visi- (3) The suspension system must be
ble to the operator, and. designed to minimize tipping of the
(B) A jib hoist limiting device. platform due to movement of employ-
(iv) Equipment with telescoping ees occupying the platform.
booms must be equipped with a device (4) The personnel platform itself (ex-
to indicate the booms extended length cluding the guardrail system and per-
clearly to the operator, or must have sonal fall arrest system anchorages),
measuring marks on the boom. must be capable of supporting, without
(v) Anti two-block. A device which failure, its own weight and at least five
automatically prevents damage and times the maximum intended load.
load failure from contact between the (5) All welding of the personnel plat-
load block, overhaul ball, or similar form and its components must be per-
component, and the boom tip (or fixed formed by a certified welder familiar
upper block or similar component) with the weld grades, types and mate-
must be used. The device(s) must pre- rial specified in the platform design.
vent such damage/failure at all points (6) The personnel platform must be
where two-blocking could occur. Excep- equipped with a guardrail system
tion: This device is not required when which meets the requirements of sub-
hoisting personnel in pile driving oper- part M of this part, and must be en-
ations. Instead, paragraph (p)(2) of this closed at least from the toeboard to
section specifies how to prevent two- mid-rail with either solid construction
blocking during such operations. material or expanded metal having
(vi) Controlled load lowering. The load openings no greater than 12 inch (1.27
line hoist drum must have a system, cm). Points to which personal fall ar-
other than the load line hoist brake, rest systems are attached must meet
which regulates the lowering rate of the anchorage requirements in subpart
speed of the hoist mechanism. This sys- M of this part.
tem or device must be used when hoist- (7) A grab rail must be installed in-
ing personnel. side the entire perimeter of the per-
NOTE: Free fall of the load line hoist is pro- sonnel platform except for access
hibited (see 1926.1426(d); the use of equip-
ment in which the boom hoist mechanism
gates/doors.
can free fall is also prohibited (see (8) Access gates/doors. If installed, ac-
1926.1426(a)(1). cess gates/doors of all types (including
(vii) Proper operation required. Per- swinging, sliding, folding, or other
sonnel hoisting operations must not types) must:
begin unless the devices listed in this (i) Not swing outward. If due to the
section are in proper working order. If size of the personnel platform, such as
a device stops working properly during a 1-person platform, it is infeasible for
such operations, the operator must the door to swing inward and allow safe
safely stop operations. Personnel hoist- entry for the platform occupant, then
ing operations must not resume until the access gate/door may swing out-
the device is again working properly. ward.

653

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00663 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1431 29 CFR Ch. XVII (7112 Edition)

(ii) Be equipped with a device that (B) Closed and locked when attached.
prevents accidental opening. (ii) Shackles used in place of hooks
(9) Headroom must be sufficient to must be of the alloy anchor type, with
allow employees to stand upright in either:
the platform. (A) A bolt, nut and retaining pin, in
(10) In addition to the use of hard place; or
hats, employees must be protected by (B) Of the screw type, with the screw
overhead protection on the personnel pin secured from accidental removal.
platform when employees are exposed (iii) Where other detachable devices
to falling objects. The platform over- are used, they must be of the type that
head protection must not obscure the can be closed and locked to the same
view of the operator or platform occu- extent as the devices addressed in para-
pants (such as wire mesh that has up to
12 inch openings), unless full protection
graphs (g)(1)(i) and (ii) of this section.
Such devices must be closed and locked
is necessary.
when attached.
(11) All edges exposed to employee
(2) Rope bridle. When a rope bridle is
contact must be smooth enough to pre-
used to suspend the personnel plat-
vent injury.
form, each bridle leg must be con-
(12) The weight of the platform and
nected to a master link or shackle (see
its rated capacity must be conspicu-
paragraph (g)(1) of this section) in a
ously posted on the platform with a
manner that ensures that the load is
plate or other permanent marking.
evenly divided among the bridle legs.
(f) Personnel platform loading.
(1) The personnel platform must not (3) Rigging hardware (including wire
be loaded in excess of its rated capac- rope, shackles, rings, master links, and
ity. other rigging hardware) and hooks
(2) Use. must be capable of supporting, without
(i) Personnel platforms must be used failure, at least five times the max-
only for employees, their tools, and the imum intended load applied or trans-
materials necessary to do their work. mitted to that component. Where rota-
Platforms must not be used to hoist tion resistant rope is used, the slings
materials or tools when not hoisting must be capable of supporting without
personnel. failure at least ten times the maximum
(ii) Exception: Materials and tools to intended load.
be used during the lift, if secured and (4) Eyes in wire rope slings must be
distributed in accordance with para- fabricated with thimbles.
graph (f)(3) of this section may be in (5) Bridles and associated rigging for
the platform for trial lifts. suspending the personnel platform
(3) Materials and tools must be: must be used only for the platform and
(i) Secured to prevent displacement. the necessary employees, their tools
(ii) Evenly distributed within the and materials necessary to do their
confines of the platform while it is sus- work. The bridles and associated rig-
pended. ging must not have been used for any
(4) The number of employees occu- purpose other than hoisting personnel.
pying the personnel platform must not (h) Trial lift and inspection.
exceed the maximum number the plat- (1) A trial lift with the unoccupied
form was designed to hold or the num- personnel platform loaded at least to
ber required to perform the work, the anticipated liftweight must be
whichever is less. made from ground level, or any other
(g) Attachment and rigging. location where employees will enter
(1) Hooks and other detachable devices. the platform, to each location at which
(i) Hooks used in the connection be- the platform is to be hoisted and posi-
tween the hoist line and the personnel tioned. Where there is more than one
platform (including hooks on overhaul location to be reached from a single
ball assemblies, lower load blocks, bri- set-up position, either individual trial
dle legs, or other attachment assem- lifts for each location, or a single trial
blies or components) must be: lift, in which the platform is moved se-
(A) Of a type that can be closed and quentially to each location, must be
locked, eliminating the throat opening. performed; the method selected must

654

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00664 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1431

be the same as the method that will be (C) The primary attachment must be
used to hoist the personnel. centered over the platform.
(2) The trial lift must be performed (D) If the load rope is slack, the
immediately prior to each shift in hoisting system must be inspected to
which personnel will be hoisted. In ad- ensure that all ropes are properly seat-
dition, the trial lift must be repeated ed on drums and in sheaves.
prior to hoisting employees in each of (6) Any condition found during the
the following circumstances: trial lift and subsequent inspection(s)
(i) The equipment is moved and set that fails to meet a requirement of this
up in a new location or returned to a standard or otherwise creates a safety
previously used location. hazard must be corrected before hoist-
(ii) The lift route is changed, unless ing personnel. (See 1926.1417 for tag-
the competent person determines that out and related requirements.)
the new route presents no new factors (i) [Reserved.]
affecting safety. (j) Proof testing.
(3) The competent person must deter- (1) At each jobsite, prior to hoisting
mine that: employees on the personnel platform,
(i) Safety devices and operational and after any repair or modification,
aids required by this section are acti- the platform and rigging must be proof
vated and functioning properly. Other tested to 125 percent of the platforms
safety devices and operational aids rated capacity. The proof test may be
must meet the requirements of done concurrently with the trial lift.
1926.1415 and 1926.1416. (2) The platform must be lowered by
(ii) Nothing interferes with the controlled load lowering, braked, and
equipment or the personnel platform in held in a suspended position for a min-
the course of the trial lift. imum of five minutes with the test
load evenly distributed on the plat-
(iii) The lift will not exceed 50 per-
form.
cent of the equipments rated capacity
(3) After proof testing, a competent
at any time during the lift.
person must inspect the platform and
(iv) The load radius to be used during
rigging to determine if the test has
the lift has been accurately deter-
been passed. If any deficiencies are
mined.
found that pose a safety hazard, the
(4) Immediately after the trial lift, platform and rigging must not be used
the competent person must: to hoist personnel unless the defi-
(i) Conduct a visual inspection of the ciencies are corrected, the test is re-
equipment, base support or ground, and peated, and a competent person deter-
personnel platform, to determine mines that the test has been passed.
whether the trial lift has exposed any (See 1926.1417 for tag-out and related
defect or problem or produced any ad- requirements.)
verse effect. (4) Personnel hoisting must not be
(ii) Confirm that, upon the comple- conducted until the competent person
tion of the trial lift process, the test determines that the platform and rig-
weight has been removed. ging have successfully passed the proof
(5) Immediately prior to each lift: test.
(i) The platform must be hoisted a (k) Work practices.
few inches with the personnel and ma- (1) Hoisting of the personnel platform
terials/tools on board and inspected by must be performed in a slow, con-
a competent person to ensure that it is trolled, cautious manner, with no sud-
secure and properly balanced. den movements of the equipment or
(ii) The following conditions must be the platform.
determined by a competent person to (2) Platform occupants must:
exist before the lift of personnel pro- (i) Keep all parts of the body inside
ceeds: the platform during raising, lowering,
(A) Hoist ropes must be free of defi- and horizontal movement. This provi-
ciencies in accordance with sion does not apply to an occupant of
1926.1413(a). the platform when necessary to posi-
(B) Multiple part lines must not be tion the platform or while performing
twisted around each other. the duties of a signal person.

655

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00665 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1431 29 CFR Ch. XVII (7112 Edition)

(ii) Not stand, sit on, or work from impending or existing danger, it is not
the top or intermediate rail or safe to lift personnel. If it is not, the
toeboard, or use any other means/de- lifting operation must not begin (or, if
vice to raise their working height. already in progress, must be termi-
(iii) Not pull the platform out of nated).
plumb in relation to the hoisting (9) Employees being hoisted must re-
equipment. main in direct communication with the
(3) Before employees exit or enter a signal person (where used), or the oper-
hoisted personnel platform that is not ator.
landed, the platform must be secured (10) Fall protection.
to the structure where the work is to (i) Except over water, employees oc-
be performed, unless the employer can cupying the personnel platform must
demonstrate that securing to the be provided and use a personal fall ar-
structure would create a greater haz- rest system. The system must be at-
ard. tached to a structural member within
(4) If the platform is tied to the the personnel platform. When working
structure, the operator must not move over or near water, the requirements of
the platform until the operator re- 1926.106 apply.
ceives confirmation that it is freely (ii) The fall arrest system, including
suspended. the attachment point (anchorage) used
(5) Tag lines must be used when nec- to comply with paragraph (i) of this
essary to control the platform. section, must meet the requirements in
(6) Platforms without controls. Where 1926.502.
the platform is not equipped with con- (11) Other load lines.
trols, the equipment operator must re- (i) No lifts must be made on any
main at the equipment controls, on other of the equipments load lines
site, and in view of the equipment, at while personnel are being hoisted, ex-
all times while the platform is occu- cept in pile driving operations.
pied. (ii) Factory-produced boom-mounted
(7) Platforms with controls. Where the personnel platforms that incorporate a
platform is equipped with controls, all winch as original equipment. Loads are
of the following must be met at all permitted to be hoisted by such a
times while the platform is occupied: winch while employees occupy the per-
(i) The occupant using the controls in sonnel platform only where the load on
the platform must be a qualified person the winch line does not exceed 500
with respect to their use, including the pounds and does not exceed the rated
safe limitations of the equipment and capacity of the winch and platform.
hazards associated with its operation. (12) Travelingequipment other than
(ii) The equipment operator must be derricks.
at a set of equipment controls that in- (i) Hoisting of employees while the
clude boom and swing functions of the equipment is traveling is prohibited,
equipment, and must be on site and in except for:
view of the equipment. (A) Equipment that travels on fixed
(iii) The platform operating manual rails; or
must be in the platform or on the (B) Where the employer demonstrates
equipment. that there is no less hazardous way to
(8) Environmental conditions. perform the work.
(i) Wind. When wind speed (sustained (C) This exception does not apply to
or gusts) exceeds 20 mph at the per- rubber-tired equipment.
sonnel platform, a qualified person (ii) Where employees are hoisted
must determine if, in light of the wind while the equipment is traveling, all of
conditions, it is not safe to lift per- the following criteria must be met:
sonnel. If it is not, the lifting operation (A) Equipment travel must be re-
must not begin (or, if already in stricted to a fixed track or runway.
progress, must be terminated). (B) Where a runway is used, it must
(ii) Other weather and environmental be a firm, level surface designed, pre-
conditions. A qualified person must de- pared and designated as a path of trav-
termine if, in light of indications of el for the weight and configuration of
dangerous weather conditions, or other the equipment being used to lift and

656

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00666 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1431

travel with the personnel platform. An form are used in these paragraphs,
existing surface may be used as long as substitute them with boatswains
it meets these criteria. chair.
(C) Equipment travel must be limited (ii) A signal person must be stationed
to boom length. at the shaft opening.
(D) The boom must be parallel to the (iii) The employee must be hoisted in
direction of travel, except where it is a slow, controlled descent and ascent.
safer to do otherwise. (iv) The employee must use personal
(E) A complete trial run must be per- fall protection equipment, including a
formed to test the route of travel be- full body harness, attached inde-
fore employees are allowed to occupy pendent of the crane/derrick.
the platform. This trial run can be per- (v) The fall protection equipment
formed at the same time as the trial must meet the applicable requirements
lift required by paragraph (h) of this in 1926.502.
section which tests the lift route. (vi) The boatswains chair itself (ex-
(13) Travelingderricks. Derricks are cluding the personal fall arrest system
prohibited from traveling while per- anchorages), must be capable of sup-
sonnel are hoisted. porting, without failure, its own
(l) [Reserved.] weight and at least five times the max-
(m) Pre-lift meeting. A pre-lift meet- imum intended load.
ing must be:
(vii) No more than one person must
(1) Held to review the applicable re-
be hoisted at a time.
quirements of this section and the pro-
cedures that will be followed. (p) Hoisting personnel for pile driving
(2) Attended by the equipment oper- operations. When hoisting an employee
ator, signal person (if used for the lift), in pile driving operations, the fol-
employees to be hoisted, and the per- lowing requirements must be met:
son responsible for the task to be per- (1) The employee must be in a per-
formed. sonnel platform or boatswains chair.
(3) Held prior to the trial lift at each (2) For lattice boom cranes: Clearly
new work location, and must be re- mark the cable (so that it can easily be
peated for any employees newly as- seen by the operator) at a point that
signed to the operation. will give the operator sufficient time
(n) Hoisting personnel near power lines. to stop the hoist to prevent two-block-
Hoisting personnel within 20 feet of a ing, or use a spotter who is in direct
power line that is up to 350 kV, and communication with the operator to
hoisting personnel within 50 feet of a inform the operator when this point is
power line that is over 350 kV, is pro- reached. For telescopic boom cranes:
hibited, except for work covered by Clearly mark the cable (so that it can
subpart V of this part (Power Trans- be easily seen by the operator) at a
mission and Distribution). point that will give the operator suffi-
(o) Hoisting personnel in drill shafts. cient time to stop the hoist to prevent
When hoisting employees into and out two-blocking, and use a spotter who is
of drill shafts that are up to and in- in direct communication with the oper-
cluding 8 feet in diameter, all of the ator to inform the operator when this
following requirements must be met: point is reached.
(1) The employee must be in either a (3) If using a personnel platform,
personnel platform or on a boatswains paragraphs (b) through (n) of this sec-
chair. tion apply.
(2) If using a personnel platform, (4) If using a boatswains chair:
paragraphs (a) through (n) of this sec- (i) The following paragraphs of this
tion apply. section apply: (a), (c), (d)(1), (d)(3),
(3) If using a boatswains chair: (d)(4), (e)(1), (e)(2), (e)(3), (f)(1), (f)(2)(i),
(i) The following paragraphs of this (f)(3)(i), (g), (h), (j), (k)(1), (k)(6), (k)(8),
section apply: (a), (c), (d)(1), (d)(3), (k)(9), (k)(11)(i), (m), and (n). Where the
(d)(4), (e)(1), (e)(2), (e)(3), (f)(1), (f)(2)(i), terms personnel platform or plat-
(f)(3)(i), (g), (h), (k)(1), (k)(6), (k)(8), form are used in these paragraphs,
(k)(9), (k)(11)(i), (m), (n). Where the substitute them with boatswains
terms personnel platform or plat- chair.

657

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00667 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1432 29 CFR Ch. XVII (7112 Edition)

(ii) The employee must be hoisted in ployer can demonstrate that use of a
a slow, controlled descent and ascent. personnel platform is infeasible; in
(iii) The employee must use personal such a case, a boatswains chair must
fall protection equipment, including a be used.
full body harness, independently at- (2) If using a personnel platform,
tached to the lower load block or over- paragraphs (a) through (n) of this sec-
haul ball. tion apply.
(iv) The fall protection equipment (3) If using a boatswains chair:
must meet the applicable requirements (i) The following paragraphs of this
in 1926.502. section apply: (a), (c), (d)(1), (d)(3),
(v) The boatswains chair itself (ex- (d)(4), (e)(1), (e)(2), (e)(3), (f)(1), (f)(2)(i),
cluding the personal fall arrest system (f)(3)(i), (g), (h), (k)(1), (k)(6), (k)(8),
anchorages), must be capable of sup- (k)(9), (k)(11)(i), (m), (n). Where the
porting, without failure, its own terms personnel platform or plat-
weight and at least five times the max- form are used in these paragraphs,
imum intended load. substitute them with boatswains
(vi) No more than one person must be chair.
hoisted at a time. (ii) The employee must be hoisted in
(q) [Reserved.] a slow, controlled descent and ascent.
(r) Hoisting personnel for marine trans- (iii) The employee must use personal
fer. When hoisting employees solely for fall protection equipment, including a
transfer to or from a marine worksite, full body harness, attached inde-
the following requirements must be pendent of the crane/derrick. When
met: there is no adequate structure for at-
(1) The employee must be in either a tachment of personal fall arrest equip-
personnel platform or a marine-hoisted ment as required in 1926.502(d)(15), the
personnel transfer device. attachment must be to the lower load
(2) If using a personnel platform, block or overhaul ball.
paragraphs (a) through (n) of this sec-
(iv) The fall protection equipment
tion apply.
must meet the applicable requirements
(3) If using a marine-hoisted per-
in 1926.502.
sonnel transfer device:
(v) The boatswains chair itself (ex-
(i) The following paragraphs of this
cluding the personal fall arrest system
section apply: (a), (c)(2), (d)(1), (d)(3),
anchorages), must be capable of sup-
(d)(4), (e)(1) through (5), (e)(12), (f)(1),
porting, without failure, its own
(g), (h), (j), (k)(1), (k)(8), (k)(9),
weight and at least five times the max-
(k)(10)(ii), (k)(11)(i), (k)(12), (m), and
imum intended load.
(n). Where the terms personnel plat-
form or platform are used in these (vi) No more than one person must be
paragraphs, substitute them with hoisted at a time.
marine-hoisted personnel transfer de- 1926.1432 Multiple-crane/derrick
vice. liftssupplemental requirements.
(ii) The transfer device must be used
only for transferring workers. (a) Plan development. Before begin-
(iii) The number of workers occu- ning a crane/derrick operation in which
pying the transfer device must not ex- more than one crane/derrick will be
ceed the maximum number it was de- supporting the load, the operation
signed to hold. must be planned. The planning must
(iv) Each employee must wear a U.S. meet the following requirements:
Coast Guard personal flotation device (1) The plan must be developed by a
approved for industrial use. qualified person.
(s) Hoisting personnel for storage-tank (2) The plan must be designed to en-
(steel or concrete), shaft and chimney op- sure that the requirements of this sub-
erations. When hoisting an employee in part are met.
storage tank (steel or concrete), shaft (3) Where the qualified person deter-
and chimney operations, the following mines that engineering expertise is
requirements must be met: needed for the planning, the employer
(1) The employee must be in a per- must ensure that it is provided.
sonnel platform except when the em- (b) Plan implementation.

658

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00668 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1433

(1) The multiple-crane/derrick lift (8) In section 51.5 (Crane Travel),


must be directed by a person who all provisions except 51.5.3(d).
meets the criteria for both a competent (9) In section 51.6 (Controls), all
person and a qualified person, or by a provisions except 51.6.1 (c).
competent person who is assisted by (10) Section 51.7.4 (Sheaves).
one or more qualified persons (lift di- (11) Section 51.7.5 (Sheave sizes).
rector). (12) In section 51.9.1 (Booms),
(2) The lift director must review the paragraph (f).
plan in a meeting with all workers who (13) Section 51.9.3 (Outriggers).
will be involved with the operation. (14) Section 51.9.4 (Locomotive
Crane Equipment).
1926.1433 Design, construction and (15) Section 51.9.7 (Clutch and
testing. Brake Protection).
The following requirements apply to (16) In section 51.9.11 (Miscella-
equipment that has a manufacturer- neous equipment), paragraphs (a), (c),
rated hoisting/lifting capacity of more (e), and (f).
than 2,000 pounds. (c) Prototype testing: mobile (includ-
(a) Crawler, truck and locomotive ing crawler and truck) and locomotive
cranes manufactured prior to Novem- cranes manufactured on or after No-
ber 8, 2010 must meet the applicable re- vember 8, 2010 must meet the prototype
quirements for design, construction, testing requirements in Test Option A
and testing as prescribed in ANSI or Test Option B of this section. Tower
B30.51968 (incorporated by reference, cranes manufactured on or after No-
see 1926.6), PCSA Std. No. 2 (1968) (in- vember 8, 2010 must meet the prototype
corporated by reference, see 1926.6), testing requirements in BS EN
the requirements in paragraph (b) of 14439:2006 (incorporated by reference,
this section, or the applicable DIN see 1926.6).
standards that were in effect at the NOTE: Prototype testing of crawler, loco-
time of manufacture. motive and truck cranes manufactured prior
to November 8, 2010 must conform to para-
(b) Mobile (including crawler and
graph (a) of this section.
truck) and locomotive cranes manufac-
(1) Test Option A.
tured on or after November 8, 2010 must
(i) The following applies to equip-
meet the following portions of ASME
ment with cantilevered booms (such as
B30.52004 (incorporated by reference,
hydraulic boom cranes): All the tests
see 1926.6) as applicable:
listed in SAE J1063 (Nov. 1993) Table 1
(1) In section 51.1.1 (Load Ratings (incorporated by reference, see 1926.6)
Where Stability Governs Lifting Per- must be performed to load all critical
formance), paragraphs (a)(d) (in- structural elements to their respective
cluding subparagraphs). limits. All the strength margins listed
(2) In section 51.1.2 (Load Ratings in SAE J1063 (Nov. 1993) Table 2 (incor-
Where Structural Competence Governs porated by reference, see 1926.6) must
Lifting Performance), paragraph (b). be met.
(3) Section 51.2 (Stability (Back- (ii) The following applies to equip-
ward and Forward)). ment with pendant supported lattice
(4) In section 51.3.1 (Boom Hoist booms: All the tests listed in SAE J987
Mechanism), paragraphs (a), (b)(1) and (Jun. 2003) Table 1 (incorporated by ref-
(b)(2), except that when using rotation erence, see 1926.6) must be performed
resistant rope, 1926.1414(c)(4)(ii)(A) ap- to load all critical structural elements
plies. to their respective limits. All the
(5) In section 51.3.2 (Load Hoist strength margins listed in SAE J987
Mechanism), paragraphs (a)(2) (Jun. 2003) Table 2 (incorporated by ref-
through (a)(4) (including subpara- erence, see 1926.6) must be met.
graphs), (b) (including subparagraphs), (2) Test Option B. The testing and
(c) (first sentence only) and (d). verification requirements of BS EN
(6) Section 51.3.3 (Telescoping 13000:2004 (incorporated by reference,
Boom). see 1926.6) must be met. In applying
(7) Section 51.4 (Swing Mecha- BS EN 13000:2004, the following addi-
nism). tional requirements must be met:

659

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00669 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1433 29 CFR Ch. XVII (7112 Edition)

(i) The following applies to equip- (iv) Recommended reeving for the
ment with cantilevered booms (such as hoist lines must be shown.
hydraulic boom cranes): The analysis (v) Recommended parts of hoist
methodology (computer modeling) reeving, size, and type of wire rope for
must demonstrate that all load cases various equipment loads.
listed in SAE J1063 (Nov. 1993) (incor- (vi) Recommended boom hoist
porated by reference, see 1926.6) meet reeving diagram, where applicable;
the strength margins listed in SAE size, type and length of wire rope.
J1063 (Nov. 1993) Table 2. (vii) Tire pressure (where applicable).
(ii) The following applies to equip- (viii) Caution or warnings relative to
ment with pendant supported lattice limitations on equipment and oper-
booms: The analysis methodology ating procedures, including an indica-
(computer modeling) must dem- tion of the least stable direction.
onstrate that all load cases listed in (ix) Position of the gantry and re-
SAE J987 (Jun. 2003) (incorporated by quirements for intermediate boom sus-
reference, see 1926.6) meet the pension (where applicable).
strength margins listed in SAE J987 (x) Instructions for boom erection
(Jun. 2003) Table 2. and conditions under which the boom,
(iii) Analysis verification. The physical or boom and jib combinations, may be
testing requirements under SAE J1063 raised or lowered.
(Nov. 1993) (incorporated by reference, (xi) Whether the hoist holding mech-
see 1926.6) and SAE J987 (Jun. 2003) (in- anism is automatically or manually
corporated by reference, see 1926.6) controlled, whether free fall is avail-
must be met unless the reliability of able, or any combination of these.
the analysis methodology (computer (xii) The maximum telescopic travel
modeling) has been demonstrated by a length of each boom telescopic section.
documented history of verification (xiii) Whether sections are telescoped
through strain gauge measuring or manually or with power.
strain gauge measuring in combination (xiv) The sequence and procedure for
with other physical testing. extending and retracting the telescopic
(d) All equipment covered by this boom section.
subpart must meet the following re- (xv) Maximum loads permitted dur-
quirements: ing the boom extending operation, and
(1) Rated capacity and related informa- any limiting conditions or cautions.
tion. The information available in the (xvi) Hydraulic relief valve settings
cab (see 1926.1417(c)) regarding rated specified by the manufacturer.
capacity and related information (2) Load hooks (including latched and
must include, at a minimum, the fol- unlatched types), ball assemblies and
lowing information: load blocks must be of sufficient
(i) A complete range of the manufac- weight to overhaul the line from the
turers equipment rated capacities, as highest hook position for boom or
follows: boom and jib lengths and the number
(A) At all manufacturer approved op- of parts of the line in use.
erating radii, boom angles, work areas, (3) Hook and ball assemblies and load
boom lengths and configurations, jib blocks must be marked with their
lengths and angles (or offset). rated capacity and weight.
(B) Alternate ratings for use and non- (4) Latching hooks.
use of option equipment which affects (i) Hooks must be equipped with
rated capacities, such as outriggers, latches, except where the requirements
stabilizers, and extra counterweights. of paragraph (d)(4)(ii) of this section
(ii) A work area chart for which ca- are met.
pacities are listed in the load chart. (ii) Hooks without latches, or with
(NOTE: An example of this type of chart latches removed or disabled, must not
is in ASME B30.52004, section 51.1.3, be used unless:
Figure 11). (A) A qualified person has determined
(iii) The work area figure and load that it is safer to hoist and place the
chart must clearly indicate the areas load without latches (or with the
where no load is to be handled. latches removed/tied-back).

660

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00670 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1434

(B) Routes for the loads are pre- (v) Areas of the cab roof that serve as
planned to ensure that no employee is a workstation for rigging, maintenance
required to work in the fall zone except or other equipment-related tasks must
for employees necessary for the hook- be capable of supporting 250 pounds
ing or unhooking of the load. without permanent distortion.
(iii) The latch must close the throat (8) Belts, gears, shafts, pulleys,
opening and be designed to retain sprockets, spindles, drums, fly wheels,
slings or other lifting devices/acces- chains, and other parts or components
sories in the hook when the rigging ap- that reciprocate, rotate or otherwise
paratus is slack. move must be guarded where contact
(5) Posted warnings. Posted warnings by employees (except for maintenance
required by this subpart as well as and repair employees) is possible in the
those originally supplied with the performance of normal duties.
equipment by the manufacturer must (9) All exhaust pipes, turbochargers,
be maintained in legible condition. and charge air coolers must be insu-
(6) An accessible fire extinguisher lated or guarded where contact by em-
must be on the equipment. ployees (except for maintenance and
(7) Cabs. Equipment with cabs must repair employees) is possible in the
meet the following requirements: performance of normal duties.
(i) Cabs must be designed with a form (10) Hydraulic and pneumatic lines
of adjustable ventilation and method must be protected from damage to the
for clearing the windshield for main- extent feasible.
taining visibility and air circulation. (11) The equipment must be designed
Examples of means for adjustable ven- so that exhaust fumes are not dis-
tilation include air conditioner or win- charged in the cab and are discharged
dow that can be opened (for ventilation in a direction away from the operator.
and air circulation); examples of means (12) Friction mechanisms. Where fric-
for maintaining visibility include heat- tion mechanisms (such as brakes and
er (for preventing windshield icing), de- clutches) are used to control the boom
froster, fan, windshield wiper. hoist or load line hoist, they must be:
(ii) Cab doors (swinging, sliding) (i) Of a size and thermal capacity suf-
must be designed to prevent inad- ficient to control all rated loads with
vertent opening or closing while trav- the minimum recommended reeving.
eling or operating the machine. Swing- (ii) Adjustable to permit compensa-
ing doors adjacent to the operator tion for lining wear to maintain proper
must open outward. Sliding operator operation.
doors must open rearward. (13) Hydraulic load hoists. Hydraulic
(iii) Windows. drums must have an integrally mount-
(A) The cab must have windows in ed holding device or internal static
front and on both sides of the operator. brake to prevent load hoist movement
Forward vertical visibility must be suf- in the event of hydraulic failure.
ficient to give the operator a view of (e) The employers obligations under
the boom point at all times. paragraphs (a) through (c) and (d)(7)
(B) Windows may have sections de- through (13) of this section are met
signed to be opened or readily removed. where the equipment has not changed
Windows with sections designed to be (except in accordance with 1926.1434
opened must be designed so that they (Equipment modifications)) and it can
can be secured to prevent inadvertent refer to documentation from the manu-
closure. facturer showing that the equipment
(C) Windows must be of safety glass has been designed, constructed and
or material with similar optical and tested in accordance with those para-
safety properties, that introduce no graphs.
visible distortion or otherwise obscure
visibility that interferes with the safe 1926.1434 Equipment modifications.
operation of the equipment. (a) Modifications or additions which
(iv) A clear passageway must be pro- affect the capacity or safe operation of
vided from the operators station to an the equipment are prohibited except
exit door on the operators side. where the requirements of paragraphs

661

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00671 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1435 29 CFR Ch. XVII (7112 Edition)

(a)(1), (a)(2), (a)(3), (a)(4), or (a)(5) of paragraphs (a)(2)(i) and (ii) of this sec-
this section are met. tion are met.
(1) Manufacturer review and approval. (b) Modifications or additions which
(i) The manufacturer approves the affect the capacity or safe operation of
modifications/additions in writing. the equipment are prohibited where the
(ii) The load charts, procedures, in- manufacturer, after a review of the
struction manuals and instruction technical safety merits of the proposed
plates/tags/decals are modified as nec- modification/addition, rejects the pro-
essary to accord with the modification/ posal and explains the reasons for the
addition. rejection in a written response. If the
(iii) The original safety factor of the manufacturer rejects the proposal but
equipment is not reduced. does not explain the reasons for the re-
(2) Manufacturer refusal to review re- jection in writing, the employer may
quest. The manufacturer is provided a treat this as a manufacturer refusal to
detailed description of the proposed review the request under paragraph
modification/addition, is asked to ap- (a)(2) of this section.
prove the modification/addition, but it (c) The provisions in paragraphs (a)
declines to review the technical merits and (b) of this section do not apply to
of the proposal or fails, within 30 days, modifications made or approved by the
to acknowledge the request or initiate U.S. military.
the review, and all of the following are
met: 1926.1435 Tower cranes.
(i) A registered professional engineer
(a) This section contains supple-
who is a qualified person with respect
mental requirements for tower cranes;
to the equipment involved:
all sections of this subpart apply to
(A) Approves the modification/addi-
tower cranes unless specified other-
tion and specifies the equipment con-
wise.
figurations to which that approval ap-
plies, and (b) Erecting, climbing and dismantling.
(B) Modifies load charts, procedures, (1) Section 1926.1403 (Assembly/Dis-
instruction manuals and instruction assemblyselection of manufacturer
plates/tags/decals as necessary to ac- or employer procedures), 1926.1404 (As-
cord with the modification/addition. sembly/Disassemblygeneral require-
(ii) The original safety factor of the ments (applies to all assembly and dis-
equipment is not reduced. assembly operations)), 1926.1405 (Dis-
(3) Unavailable manufacturer. The assemblyadditional requirements for
manufacturer is unavailable and the dismantling of booms and jibs (applies
requirements of paragraphs (a)(2)(i) to both the use of manufacturer proce-
and (ii) of this section are met. dures and employer procedures)), and
(4) Manufacturer does not complete the 1926.1406 (Assembly/Disassemblyem-
review within 120 days of the request. The ployer proceduresgeneral require-
manufacturer is provided a detailed de- ments), apply to tower cranes (except
scription of the proposed modification/ as otherwise specified), except that the
addition, is asked to approve the modi- term assembly/disassembly is re-
fication/addition, agrees to review the placed by erecting, climbing and dis-
technical merits of the proposal, but mantling, and the term dis-
fails to complete the review of the pro- assembly is replaced by disman-
posal within 120 days of the date it was tling.
provided the detailed description of the (2) Dangerous areas (self-erecting tower
proposed modification/addition, and cranes). In addition to the requirements
the requirements of paragraphs (a)(2)(i) in 1926.1404(e), for self-erecting tower
and (ii) of this section are met. cranes, the following applies: Employ-
(5) Multiple manufacturers of equip- ees must not be in or under the tower,
ment designed for use on marine work jib, or rotating portion of the crane
sites. The equipment is designed for ma- during erecting, climbing and disman-
rine work sites, contains major struc- tling operations until the crane is se-
tural components from more than one cured in a locked position and the com-
manufacturer, and the requirements of petent person in charge indicates it is

662

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00672 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1435

safe to enter this area, unless the man- and/or ballast in place as specified by
ufacturers instructions direct other- the manufacturer or a registered pro-
wise and only the necessary personnel fessional engineer familiar with the
are permitted in this area. equipment.
(3) Foundations and structural sup- (ii) The maximum counterweight
ports. Tower crane foundations and and/or ballast specified by the manu-
structural supports (including both the facturer or registered professional en-
portions of the structure used for sup- gineer familiar with the equipment
port and the means of attachment) must not be exceeded.
must be designed by the manufacturer (c) Signs. The size and location of
or a registered professional engineer. signs installed on tower cranes must be
(4) Addressing specific hazards. The re- in accordance with manufacturer speci-
quirements in 1926.1404(h)(1) through fications. Where these are unavailable,
(9) apply. In addition, the A/D director a registered professional engineer fa-
must address the following: miliar with the type of equipment in-
(i) Foundations and structural sup- volved must approve in writing the size
ports. The A/D director must determine and location of any signs.
that tower crane foundations and (d) Safety devices.
structural supports are installed in ac- (1) Section 1926.1415 does not apply to
cordance with their design. tower cranes.
(ii) Loss of backward stability. Back- (2) The following safety devices are
ward stability before swinging self required on all tower cranes unless oth-
erecting cranes or cranes on traveling erwise specified:
or static undercarriages. (i) Boom stops on luffing boom type
(iii) Wind speed. Wind must not ex- tower cranes.
ceed the speed recommended by the (ii) Jib stops on luffing boom type
manufacturer or, where manufacturer tower cranes if equipped with a jib at-
does not specify this information, the tachment.
speed determined by a qualified person. (iii) Travel rail end stops at both
(5) Plumb tolerance. Towers must be ends of travel rail.
erected plumb to the manufacturers
(iv) Travel rail clamps on all travel
tolerance and verified by a qualified
bogies.
person. Where the manufacturer does
(v) Integrally mounted check valves
not specify plumb tolerance, the crane
on all load supporting hydraulic cyl-
tower must be plumb to a tolerance of
inders.
at least 1:500 (approximately 1 inch in
40 feet). (vi) Hydraulic system pressure lim-
(6) Multiple tower crane jobsites. On iting device.
jobsites where more than one fixed jib (vii) The following brakes, which
(hammerhead) tower crane is installed, must automatically set in the event of
the cranes must be located such that pressure loss or power failure, are re-
no crane can come in contact with the quired:
structure of another crane. Cranes are (A) A hoist brake on all hoists.
permitted to pass over one another. (B) Swing brake.
(7) Climbing procedures. Prior to, and (C) Trolley brake.
during, all climbing procedures (includ- (D) Rail travel brake.
ing inside climbing and top climbing), (viii) Deadman control or forced neu-
the employer must: tral return control (hand) levers.
(i) Comply with all manufacturer (ix) Emergency stop switch at the op-
prohibitions. erators station.
(ii) Have a registered professional en- (x) Trolley end stops must be pro-
gineer verify that the host structure is vided at both ends of travel of the trol-
strong enough to sustain the forces im- ley.
posed through the braces, brace an- (3) Proper operation required. Oper-
chorages and supporting floors. ations must not begin unless the de-
(8) Counterweight/ballast. vices listed in this section are in proper
(i) Equipment must not be erected, working order. If a device stops work-
dismantled or operated without the ing properly during operations, the op-
amount and position of counterweight erator must safely stop operations. The

663

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00673 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1435 29 CFR Ch. XVII (7112 Edition)

equipment must be taken out of serv- ducted within 10 feet of the outer or
ice, and operations must not resume inner trolley end stops.
until the device is again working prop- (ii) Boom hoist limiting device. The
erly. See 1926.1417(f). Alternative range of the boom must be limited at
measures are not permitted to be used. the minimum and maximum radius.
(e) Operational aids. Temporary alternative measures: Clearly
(1) Section 1926.1416 does not apply to mark the cable (so it can be seen by
tower cranes. the operator) at a point that will give
(2) The devices listed in this section the operator sufficient time to stop the
(operational aids) are required on all boom hoist within the minimum and
tower cranes covered by this subpart, maximum boom radius, or use a spot-
unless otherwise specified. ter who is in direct communication
(3) Operations must not begin unless with the operator to inform the oper-
the operational aids are in proper ator when this point is reached.
working order, except where the em- (iii) Anti two-blocking device. The
ployer meets the specified temporary tower crane must be equipped with a
alternative measures. More protective device which automatically prevents
alternative measures specified by the damage from contact between the load
tower crane manufacturer, if any, must block, overhaul ball, or similar compo-
be followed. See 1926.1417(j) for addi- nent, and the boom tip (or fixed upper
tional requirements. block or similar component). The de-
(4) If an operational aid stops work- vice(s) must prevent such damage at
ing properly during operations, the op- all points where two-blocking could
erator must safely stop operations occur. Temporary alternative measures:
until the temporary alternative meas- Clearly mark the cable (so it can be
ures are implemented or the device is seen by the operator) at a point that
again working properly. If a replace- will give the operator sufficient time
ment part is no longer available, the to stop the hoist to prevent two-block-
use of a substitute device that per- ing, or use a spotter who is in direct
forms the same type of function is per- communication with the operator to
mitted and is not considered a modi- inform the operator when this point is
fication under 1926.1434. reached.
(5) Category I operational aids and al- (iv) Hoist drum lower limiting device.
ternative measures. Operational aids Tower cranes manufactured after No-
listed in this paragraph that are not vember 8, 2011 must be equipped with a
working properly must be repaired no device that prevents the last 2 wraps of
later than 7 calendar days after the de- hoist cable from being spooled off the
ficiency occurs. Exception: If the em- drum. Temporary alternative measures:
ployer documents that it has ordered Mark the cable (so it can be seen by
the necessary parts within 7 calendar the operator) at a point that will give
days of the occurrence of the defi- the operator sufficient time to stop the
ciency, the repair must be completed hoist prior to last 2 wraps of hoist
within 7 calendar days of receipt of the cable being spooled off the drum, or use
parts. a spotter who is in direct communica-
(i) Trolley travel limiting device. The tion with the operator to inform the
travel of the trolley must be restricted operator when this point is reached
at both ends of the jib by a trolley (v) Load moment limiting device. The
travel limiting device to prevent the tower crane must have a device that
trolley from running into the trolley prevents moment overloading. Tem-
end stops. Temporary alternative meas- porary alternative measures: A radius in-
ures: dicating device must be used (if the
(A) Option A. The trolley rope must tower crane is not equipped with a ra-
be marked (so it can be seen by the op- dius indicating device, the radius must
erator) at a point that will give the op- be measured to ensure the load is with-
erator sufficient time to stop the trol- in the rated capacity of the crane). In
ley prior to the end stops. addition, the weight of the load must
(B) Option B. A spotter who is in di- be determined from a source recognized
rect communication with the operator by the industry (such as the loads
must be used when operations are con- manufacturer), or by a calculation

664

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00674 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1435

method recognized by the industry have a hook radius indicator readable


(such as calculating a steel beam from from the operators station.
measured dimensions and a known per (C) Temporary alternative measures:
foot weight), or by other equally reli- Hook radii or boom angle must be de-
able means. This information must be termined by measuring the hook radii
provided to the operator prior to the or boom angle with a measuring device.
lift. (ii) Trolley travel deceleration device.
(vi) Hoist line pull limiting device. The The trolley speed must be automati-
capacity of the hoist must be limited cally reduced prior to the trolley
to prevent overloading, including each reaching the end limit in both direc-
individual gear ratio if equipped with a tions. Temporary alternative measure:
multiple speed hoist transmission. The employer must post a notice in the
Temporary alternative measures: The op- cab of the crane notifying the operator
erator must ensure that the weight of that the trolley travel deceleration de-
the load does not exceed the capacity vice is malfunctioning and instructing
of the hoist (including for each indi- the operator to take special care to re-
vidual gear ratio if equipped with a duce the trolley speed when approach-
multiple speed hoist transmission). ing the trolley end limits.
(vii) Rail travel limiting device. The (iii) Boom hoist deceleration device.
travel distance in each direction must The boom speed must be automatically
be limited to prevent the travel bogies reduced prior to the boom reaching the
from running into the end stops or minimum or maximum radius limit.
buffers. Temporary alternative measures: Temporary alternative measure: The em-
A spotter who is in direct communica- ployer must post a notice in the cab of
tion with the operator must be used the crane notifying the operator that
when operations are conducted within the boom hoist deceleration device is
10 feet of either end of the travel rail malfunctioning and instructing the op-
end stops; the spotter must inform the erator to take special care to reduce
operator of the distance of the travel the boom speed when approaching the
bogies from the end stops or buffers. minimum or maximum radius limits.
(viii) Boom hoist drum positive locking (iv) Load hoist deceleration device. The
device and control. The boom hoist load speed must be automatically re-
drum must be equipped with a control duced prior to the hoist reaching the
that will enable the operator to posi- upper limit. Temporary alternative meas-
tively lock the boom hoist drum from ure: The employer must post a notice
the cab. Temporary alternative measures: in the cab of the crane notifying the
The device must be manually set when operator that the load hoist decelera-
required if an electric, hydraulic or tion device is malfunctioning and in-
automatic control is not functioning. structing the operator to take special
(6) Category II operational aids and al- care to reduce the load speed when ap-
ternative measures. Operational aids proaching the upper limits.
listed in this paragraph that are not (v) Wind speed indicator. A device
working properly must be repaired no must be provided to display the wind
later than 30 calendar days after the speed and must be mounted above the
deficiency occurs. Exception: If the em- upper rotating structure on tower
ployer documents that it has ordered cranes. On self erecting cranes, it must
the necessary parts within 7 calendar be mounted at or above the jib level.
days of the occurrence of the defi- Temporary alternative measures: Use of
ciency, and the part is not received in wind speed information from a properly
time to complete the repair in 30 cal- functioning indicating device on an-
endar days, the repair must be com- other tower crane on the same site, or
pleted within 7 calendar days of receipt a qualified person estimates the wind
of the parts. speed.
(i) Boom angle or hook radius indicator. (vi) Load indicating device. Cranes
(A) Luffing boom tower cranes must manufactured after November 8, 2011
have a boom angle indicator readable must have a device that displays the
from the operators station. magnitude of the load on the hook.
(B) Hammerhead tower cranes manu- Displays that are part of load moment
factured after November 8, 2011 must limiting devices that display the load

665

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00675 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1436 29 CFR Ch. XVII (7112 Edition)

on the hook meet this requirement. veloped by a registered professional en-


Temporary alternative measures: The gineer familiar with the type of equip-
weight of the load must be determined ment involved.
from a source recognized by the indus- (4) Monthly. The following additional
try (such as the loads manufacturer), items must be included:
or by a calculation method recognized (i) Tower (mast) bolts and other
by the industry (such as calculating a structural bolts (for loose or dislodged
steel beam from measured dimensions condition) from the base of the tower
and a known per foot weight), or by crane up or, if the crane is tied to or
other equally reliable means. This in- braced by the structure, those above
formation must be provided to the op- the upper-most brace support.
erator prior to the lift. (ii) The upper-most tie-in, braces,
(f) Inspections. floor supports and floor wedges where
(1) Section 1926.1412 (Inspections) ap- the tower crane is supported by the
plies to tower cranes, except that the structure, for loose or dislodged compo-
term assembly is replaced by erec- nents.
tion. Section 1926.1413 (Wire ropein- (5) Annual. In addition to the items
spection) applies to tower cranes. that must be inspected under
(2) Pre-erection inspection. Before each 1926.1412(f), all turntable and tower
crane component is erected, it must be bolts must be inspected for proper con-
inspected by a qualified person for dition and torque.
damage or excessive wear.
(i) The qualified person must pay par- 1926.1436 Derricks.
ticular attention to components that (a) This section contains supple-
will be difficult to inspect thoroughly mental requirements for derricks,
during shift inspections. whether temporarily or permanently
(ii) If the qualified person determines mounted; all sections of this subpart
that a component is damaged or worn apply to derricks unless specified oth-
to the extent that it would create a erwise. A derrick is powered equipment
safety hazard if used on the crane, that consisting of a mast or equivalent
component must not be erected on the member that is held at or near the end
crane unless it is repaired and, upon re- by guys or braces, with or without a
inspection by the qualified person, boom, and its hoisting mechanism. The
found to no longer create a safety haz- mast/equivalent member and/or the
ard. load is moved by the hoisting mecha-
(iii) If the qualified person deter- nism (typically base-mounted) and op-
mines that, though not presently a erating ropes. Derricks include: A-
safety hazard, the component needs to frame, basket, breast, Chicago boom,
be monitored, the employer must en- gin pole (except gin poles used for erec-
sure that the component is checked in tion of communication towers), guy,
the monthly inspections. Any such de- shearleg, stiffleg, and variations of
termination must be documented, and such equipment.
the documentation must be available (b) Operationprocedures.
to any individual who conducts a (1) Section 1926.1417 (Operation) ap-
monthly inspection. plies except for 1926.1417(c) (Accessi-
(3) Post-erection inspection. In addition bility of procedures).
to the requirements in 1926.1412(c), the (2) Load chart contents. Load charts
following requirements must be met: must contain at least the following in-
(i) A load test using certified formation:
weights, or scaled weights using a cer- (i) Rated capacity at corresponding
tified scale with a current certificate ranges of boom angle or operating
of calibration, must be conducted after radii.
each erection. (ii) Specific lengths of components to
(ii) The load test must be conducted which the rated capacities apply.
in accordance with the manufacturers (iii) Required parts for hoist reeving.
instructions when available. Where (iv) Size and construction of rope
these instructions are unavailable, the must be included on the load chart or
test must be conducted in accordance in the operating manual.
with written load test procedures de- (3) Load chart location.

666

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00676 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1436

(i) Permanent installations. For perma- (v) The mast cap must:
nently installed derricks with fixed (A) Permit the mast to rotate freely.
lengths of boom, guy, and mast, a load (B) Withstand tilting and cramping
chart must be posted where it is visible caused by the guy loads.
to personnel responsible for the oper- (C) Be secured to the mast to prevent
ation of the equipment. disengagement during erection.
(ii) Non-permanent installations. For (D) Be provided with means for at-
derricks that are not permanently in- taching guy ropes.
stalled, the load chart must be readily (3) Stiffleg derricks.
available at the job site to personnel (i) The mast must be supported in the
responsible for the operation of the vertical position by at least two
equipment. stifflegs; one end of each must be con-
(c) Construction. nected to the top of the mast and the
(1) General requirements. other end securely anchored.
(i) Derricks must be constructed to (ii) The stifflegs must be capable of
meet all stresses imposed on members withstanding the loads imposed at any
and components when installed and op- point of operation within the load
erated in accordance with the manufac- chart range.
turers/builders procedures and within (iii) The mast base must:
its rated capacity. (A) Permit the mast to rotate freely
(ii) Welding of load sustaining mem- (when necessary).
bers must conform to recommended (B) Permit deflection of the mast
practices in ANSI/AWS D14.394 (incor- without binding.
porated by reference, see 1926.6) or (iv) The mast must be prevented from
AWS D1.1/D1.1M:2002 (incorporated by lifting out of its socket when the mast
reference, see 1926.6). is in tension.
(2) Guy derricks. (v) The stiffleg connecting member
(i) The minimum number of guys at the top of the mast must:
must be 6, with equal spacing, except (A) Permit the mast to rotate freely
where a qualified person or derrick (when necessary).
manufacturer approves variations from (B) Withstand the loads imposed by
these requirements and revises the the action of the stifflegs.
rated capacity to compensate for such (C) Be secured so as to oppose sepa-
variations. rating forces.
(ii) Guy derricks must not be used (4) Gin pole derricks.
unless the employer has the following (i) Guy lines must be sized and spaced
guy information from the manufac- so as to make the gin pole stable in
turer or a qualified person, when not both boomed and vertical positions. Ex-
available from the manufacturer: ception: Where the size and/or spacing
(A) The number of guys. of guy lines do not result in the gin
(B) The spacing around the mast. pole being stable in both boomed and
(C) The size, grade, and construction vertical positions, the employer must
of rope to be used for each guy. ensure that the derrick is not used in
(iii) For guy derricks manufactured an unstable position.
after December 18, 1970, in addition to (ii) The base of the gin pole must per-
the information required in paragraph mit movement of the pole (when nec-
(c)(2)(ii) of this section, the employer essary).
must have the following guy informa- (iii) The gin pole must be anchored at
tion from the manufacturer or a quali- the base against horizontal forces
fied person, when not available from (when such forces are present).
the manufacturer: (5) Chicago boom derricks. The fittings
(A) The amount of initial sag or ten- for stepping the boom and for attach-
sion. ing the topping lift must be arranged
(B) The amount of tension in guy line to:
rope at anchor. (i) Permit the derrick to swing at all
(iv) The mast base must permit the permitted operating radii and mount-
mast to rotate freely with allowance ing heights between fittings.
for slight tilting of the mast caused by (ii) Accommodate attachment to the
guy slack. upright member of the host structure.

667

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00677 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1436 29 CFR Ch. XVII (7112 Edition)

(iii) Withstand the forces applied (iii) Repaired or modified hoists. Hoists
when configured and operated in ac- that have had repairs, modifications or
cordance with the manufacturers/ additions affecting their capacity or
builders procedures and within its safe operation must be evaluated by a
rated capacity. qualified person to determine if a load
(iv) Prevent the boom or topping lift test is necessary. If it is, load testing
from lifting out under tensile forces. must be conducted in accordance with
(d) Anchoring and guying. paragraphs (e)(2)(ii) and (iv) of this sec-
(1) Load anchoring data developed by tion.
the manufacturer or a qualified person (iv) Load test procedure. Load tests re-
must be used. quired by paragraphs (e)(2)(ii) or
(2) Guy derricks. (e)(2)(iii) of this section must be con-
(i) The mast base must be anchored. ducted as follows:
(ii) The guys must be secured to the (A) The test load must be hoisted a
ground or other firm anchorage. vertical distance to assure that the
(iii) The anchorage and guying must load is supported by the hoist and held
be designed to withstand maximum by the hoist brake(s).
horizontal and vertical forces encoun- (B) The test load must be lowered,
tered when operating within rated ca- stopped and held with the brake(s).
pacity with the particular guy slope (C) The hoist must not be used unless
and spacing specified for the applica- a competent person determines that
tion. the test has been passed.
(3) Stiffleg derricks. (f) Operational aids.
(i) The mast base and stifflegs must (1) Section 1926.1416 (Operational
be anchored. aids) applies, except for 1926.1416(d)(1)
(ii) The mast base and stifflegs must (Boom hoist limiting device),
be designed to withstand maximum 1926.1416(e)(1) (Boom angle or radius
horizontal and vertical forces encoun- indicator), and 1926.1416(e)(4) (Load
tered when operating within rated ca- weighing and similar devices).
pacity with the particular stiffleg spac- (2) Boom angle aid. A boom angle indi-
ing and slope specified for the applica- cator is not required but if the derrick
tion. is not equipped with a functioning one,
(e) Swingers and hoists. the employer must ensure that either:
(1) The boom, swinger mechanisms (i) The boom hoist cable must be
and hoists must be suitable for the der- marked with caution and stop marks.
rick work intended and must be an- The stop marks must correspond to
chored to prevent displacement from maximum and minimum allowable
the imposed loads. boom angles. The caution and stop
(2) Hoists. marks must be in view of the operator,
(i) Base mounted drum hoists must or a spotter who is in direct commu-
meet the requirements in the following nication with the operator; or
sections of ASME B30.72001 (incor- (ii) An electronic or other device that
porated by reference, see 1926.6): signals the operator in time to prevent
(A) Sections 71.1 (Load ratings and the boom from moving past its max-
markings). imum and minimum angles, or auto-
(B) Section 71.2 (Construction), matically prevents such movement, is
except: 71.2.13 (Operators cab); 7 used.
1.2.15 (Fire extinguishers). (3) Load weight/capacity devices.
(C) Section 71.3 (Installation). (i) Derricks manufactured more than
(D) Applicable terms in section 70.2 one year after November 8, 2010 with a
(Definitions). maximum rated capacity over 6,000
(ii) Load tests for new hoists. The em- pounds must have at least one of the
ployer must ensure that new hoists are following: load weighing device, load
load tested to a minimum of 110% of moment indicator, rated capacity indi-
rated capacity, but not more than 125% cator, or rated capacity limiter. Tem-
of rated capacity, unless otherwise rec- porary alternative measures: The weight
ommended by the manufacturer. This of the load must be determined from a
requirement is met where the manufac- source recognized by the industry (such
turer has conducted this testing. as the loads manufacturer), or by a

668

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00678 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1436

calculation method recognized by the (A) Hoisting the test load a few
industry (such as calculating a steel inches and holding to verify that the
beam from measured dimensions and a load is supported by the derrick and
known per foot weight), or by other held by the hoist brake(s).
equally reliable means. This informa- (B) Swinging the derrick, if applica-
tion must be provided to the operator ble, the full range of its swing, at the
prior to the lift. See 1926.1417(j) for ad- maximum allowable working radius for
ditional requirements. the test load.
(ii) A load weight/capacity device (C) Booming the derrick up and down
that is not working properly must be within the allowable working radius
repaired no later than 30 days after the for the test load.
deficiency occurs. Exception: If the em- (D) Lowering, stopping and holding
ployer documents that it has ordered the load with the brake(s).
the necessary parts within 7 days of the (iii) The derrick must not be used un-
occurrence of the deficiency, and the less the competent person determines
part is not received in time to com- that the test has been passed.
plete the repair in 30 days, the repair (4) Documentation. Tests conducted
must be completed within 7 days of re- under this paragraph must be docu-
ceipt of the parts. mented. The document must contain
(g) Post-assembly approval and test- the date, test results and the name of
ingnew or reinstalled derricks. the tester. The document must be re-
(1) Anchorages. tained until the derrick is re-tested or
(i) Anchorages, including the struc- dismantled, whichever occurs first. All
ture to which the derrick is attached such documents must be available, dur-
(if applicable), must be approved by a ing the applicable document retention
qualified person. period, to all persons who conduct in-
(ii) If using a rock or hairpin anchor- spections in accordance with 1926.1412.
age, the qualified person must deter- (h) Load testing repaired or modified
mine if any special testing of the an- derricks. Derricks that have had re-
chorage is needed. If so, it must be pairs, modifications or additions af-
tested accordingly. fecting the derricks capacity or safe
(2) Functional test. Prior to initial operation must be evaluated by a
use, new or reinstalled derricks must qualified person to determine if a load
be tested by a competent person with test is necessary. If it is, load testing
no hook load to verify proper oper- must be conducted and documented in
ation. This test must include: accordance with paragraph (g) of this
(i) Lifting and lowering the hook(s) section.
through the full range of hook travel. (i) [Reserved.]
(ii) Raising and lowering the boom (j) Power failure procedures. If power
through the full range of boom travel. fails during operations, the derrick op-
(iii) Swinging in each direction erator must safely stop operations.
through the full range of swing. This must include:
(iv) Actuating the anti two-block and (1) Setting all brakes or locking de-
boom hoist limit devices (if provided). vices.
(v) Actuating locking, limiting and (2) Moving all clutch and other power
indicating devices (if provided). controls to the off position.
(3) Load test. Prior to initial use, new (k) Use of winch heads.
or reinstalled derricks must be load (1) Ropes must not be handled on a
tested by a competent person. The test winch head without the knowledge of
load must meet the following require- the operator.
ments: (2) While a winch head is being used,
(i) Test loads must be at least 100% the operator must be within reach of
and no more than 110% of the rated ca- the power unit control lever.
pacity, unless otherwise recommended (l) [Reserved.]
by the manufacturer or qualified per- (m) Securing the boom.
son, but in no event must the test load (1) When the boom is being held in a
be less than the maximum anticipated fixed position, dogs, pawls, or other
load. positive holding mechanisms on the
(ii) The test must consist of: boom hoist must be engaged.

669

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00679 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1437 29 CFR Ch. XVII (7112 Edition)

(2) When taken out of service for 30 ricks on barges, pontoons, vessels or
days or more, the boom must be se- other means of flotation.
cured by one of the following methods: (c) Work area control.
(i) Laid down. (1) The requirements of 1926.1424
(ii) Secured to a stationary member, (Work area control) apply, except for
as nearly under the head as possible, by 1926.1424(a)(2)(ii).
attachment of a sling to the load (2) The employer must either:
block. (i) Erect and maintain control lines,
(iii) For guy derricks, lifted to a warning lines, railings or similar bar-
vertical position and secured to the riers to mark the boundaries of the
mast. hazard areas; or
(iv) For stiffleg derricks, secured (ii) Clearly mark the hazard areas by
against the stiffleg. a combination of warning signs (such
(n) The process of jumping the der- as, DangerSwing/Crush Zone) and
rick must be supervised by the A/D di- high visibility markings on the equip-
rector. ment that identify the hazard areas. In
(o) Derrick operations must be super- addition, the employer must train each
vised by a competent person. employee to understand what these
(p) Inspections. In addition to the re- markings signify.
quirements in 1926.1412, the following (d) Keeping clear of the load. Section
additional items must be included in 1926.1425 does not apply.
the inspections: (e) Additional safety devices. In addi-
(1) Daily: Guys for proper tension. tion to the safety devices listed in
(2) Annual. 1926.1415, the following safety devices
(i) Gudgeon pin for cracks, wear, and are required:
distortion. (1) Barge, pontoon, vessel or other
(ii) Foundation supports for contin- means of flotation list and trim device.
ued ability to sustain the imposed The safety device must be located in
loads. the cab or, when there is no cab, at the
(q) Qualification and Training. The operators station.
employer must train each operator of a (2) Positive equipment house lock.
derrick on the safe operation of equip- (3) Wind speed and direction indicator.
ment the individual will operate. Sec- A competent person must determine if
tion 1926.1427 of this subpart (Operator wind is a factor that needs to be con-
qualification and certification) does sidered; if wind needs to be considered,
not apply. a wind speed and direction indicator
must be used.
1926.1437 Floating cranes/derricks (f) Operational aids.
and land cranes/derricks on barges. (1) An anti two-block device is re-
(a) This section contains supple- quired only when hoisting personnel or
mental requirements for floating hoisting over an occupied cofferdam or
cranes/derricks and land cranes/der- shaft.
ricks on barges, pontoons, vessels or (2) Section 1926.1416(e)(4) (Load
other means of flotation (i.e., vessel/ weighing and similar devices) does not
flotation device). The sections of this apply to dragline, clamshell (grapple),
subpart apply to floating cranes/der- magnet, drop ball, container handling,
ricks and land cranes/derricks on concrete bucket, and pile driving work
barges, pontoons, vessels or other performed under this section.
means of flotation, unless specified (g) Accessibility of procedures applica-
otherwise. The requirements of this ble to equipment operation. If the crane/
section do not apply when using jacked derrick has a cab, the requirements of
barges when the jacks are deployed to 1926.1417(c) apply. If the crane/derrick
the river, lake, or sea bed and the does not have a cab, the employer must
barge is fully supported by the jacks. ensure that:
(b) General requirements. The require- (1) Rated capacities (load charts) are
ments in paragraphs (c) through (k) of posted at the operators station. If the
this section apply to both floating operators station is moveable (such as
cranes/derricks and land cranes/der- with pendant-controlled equipment),

670

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00680 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1437

the load charts are posted on the equip- respect to vessels/flotation devices and
ment. that the inspection includes the fol-
(2) Procedures applicable to the oper- lowing items:
ation of the equipment (other than (A) The items identified in para-
load charts), recommended operating graphs (h)(1) (Shift) and (h)(2) (Monthly)
speeds, special hazard warnings, in- of this section.
structions and operators manual, must (B) Cleats, bitts, chocks, fenders, cap-
be readily available on board the ves- stans, ladders, and stanchions, for sig-
sel/flotation device. nificant corrosion, wear, deterioration,
(h) Inspections. In addition to meeting or deformation that could impair the
the requirements of 1926.1412 for in- function of these items.
specting the crane/derrick, the em- (C) External evidence of leaks and
ployer must inspect the barge, pon- structural damage; evidence of leaks
toons, vessel or other means of flota- and damage below the waterline may
tion used to support a floating crane/ be determined through internal inspec-
derrick or land crane/derrick, and en- tion of the vessel/flotation device.
sure that: (D) Four-corner draft readings.
(1) Shift. For each shift inspection, (E) Firefighting equipment for serv-
the means used to secure/attach the iceability.
equipment to the vessel/flotation de-
(ii) Rescue skiffs, lifelines, work
vice is in proper condition, including
vests, life preservers and ring buoys are
wear, corrosion, loose or missing fas-
inspected for proper condition.
teners, defective welds, and (when ap-
(iii) If any deficiency is identified, an
plicable) insufficient tension.
immediate determination is made by
(2) Monthly. For each monthly in-
the qualified person whether the defi-
spection:
ciency constitutes a hazard or, though
(i) The means used to secure/attach
not yet a hazard, needs to be monitored
the equipment to the vessel/flotation
in the monthly inspections.
device is in proper condition, including
inspection for wear, corrosion, and, (A) If the qualified person determines
when applicable, insufficient tension. that the deficiency constitutes a haz-
(ii) The vessel/flotation device is not ard, the vessel/flotation device is re-
taking on water. moved from service until it has been
(iii) The deckload is properly se- corrected. See requirements in
cured. 1926.1417(f).
(iv) The vessel/flotation device is wa- (B) If the qualified person determines
tertight based on the condition of the that, though not presently a hazard,
chain lockers, storage, fuel compart- the deficiency needs to be monitored,
ments, and hatches. the deficiency is checked in the month-
(v) The firefighting and lifesaving ly inspections.
equipment is in place and functional. (5) Four-year: internal vessel/flotation
(3) The shift and monthly inspections device inspection. For each four-year in-
are conducted by a competent person, spection:
and: (i) A marine engineer, marine archi-
(i) If any deficiency is identified, an tect, licensed surveyor, or other quali-
immediate determination is made by a fied person who has expertise with re-
qualified person whether the deficiency spect to vessels/flotation devices sur-
constitutes a hazard. veys the internal portion of the barge,
(ii) If the deficiency is determined to pontoons, vessel, or other means of flo-
constitute a hazard, the vessel/flota- tation.
tion device is removed from service (ii) If the surveyor identifies a defi-
until the deficiency has been corrected. ciency, an immediate determination is
(4) Annual: external vessel/flotation de- made by the surveyor as to whether the
vice inspection. For each annual inspec- deficiency constitutes a hazard or,
tion: though not yet a hazard, needs to be
(i) The external portion of the barge, monitored in the monthly or annual in-
pontoons, vessel or other means of flo- spections, as appropriate.
tation used is inspected annually by a (A) If the surveyor determines that
qualified person who has expertise with the deficiency constitutes a hazard, the

671

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00681 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1437 29 CFR Ch. XVII (7112 Edition)

vessel/flotation device is removed from used in accordance with the manufac-


service until it has been corrected. turers specifications and limitations.
(B) If the surveyor determines that, (2) The employer must ensure that
though not presently a hazard, the de- the manufacturers specifications and
ficiency needs to be monitored, the de- limitations with respect to environ-
ficiency is checked in the monthly or mental, operational, and in-transit
annual inspections, as appropriate. loads for a barge, pontoon, vessel, or
(6) Documentation. The monthly and other means of flotation are not ex-
annual inspections required in para- ceeded or violated.
graphs (h)(2) and (h)(4) of this section (3) When the manufacturers speci-
are documented in accordance with fications and limitations are unavail-
1926.1412 (e)(3) and 1926.1412(f)(7), re- able, the employer must ensure that
spectively, and that the four-year in- the specifications and limitations es-
spection required in paragraph (h)(5) of tablished by a qualified person with re-
this section is documented in accord- spect to environmental, operational
ance with 1926.1412(f)(7), except that and in-transit loads for the barge, pon-
the documentation for that inspection toons, vessel, or other means of flota-
must be retained for a minimum of 4 tion are not exceeded or violated.
years. All such documents must be (l) [Reserved.]
made available, during the applicable (m) Floating cranes/derricks. For
document retention period, to all per- equipment designed by the manufac-
sons who conduct inspections in ac- turer (or employer) for marine use by
cordance with 1926.1412. permanent attachment to barges, pon-
(i) [Reserved.] toons, vessels or other means of flota-
(j) Working with a diver. The employer tion:
must meet the following additional re- (1) Load charts.
quirements when working with a diver (i) The employer must not exceed the
in the water: manufacturer load charts applicable to
(1) If a crane/derrick is used to get a operations on water. When using these
diver into and out of the water, it must charts, the employer must comply with
not be used for any other purpose until all parameters and limitations (such as
the diver is back on board. When used dynamic and environmental param-
for more than one diver, it must not be eters) applicable to the use of the
used for any other purpose until all charts.
divers are back on board. (ii) The employer must ensure that
(2) The operator must remain at the load charts take into consideration a
controls of the crane/derrick at all minimum wind speed of 40 miles per
times. hour.
(3) In addition to the requirements in (2) The employer must ensure that
1926.1419 through 1926.1422 (Signals), the requirements for maximum allow-
either: able list and maximum allowable trim
(i) A clear line of sight must be main- as specified in Table M1 of this section
tained between the operator and ten- are met.
der; or
(ii) The signals between the operator TABLE M1
and tender must be transmitted elec- Maximum Maximum
tronically. Rated capacity allowable allowable
list trim
(4) The means used to secure the (degrees) (degrees)
crane/derrick to the vessel/flotation de-
Equipment designed for marine use
vice (see paragraph (n)(5) of this sec- by permanent attachment (other
tion) must not allow any amount of than derricks):
shifting in any direction. 25 tons or less ................................... 5 5
(k) Manufacturers specifications and Over 25 tons ...................................... 7 7
Derricks designed for marine use by
limitations. permanent attachment:
(1) The employer must ensure that Any rated capacity ............................. 10 10
the barge, pontoons, vessel, or other
means of flotation must be capable of (3) The employer must ensure that
withstanding imposed environmental, the equipment is stable under the con-
operational and in-transit loads when ditions specified in Tables M2 and M3

672

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00682 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1437

of this section. (NOTE: Freeboard is the vessel or other means of flotation that
vertical distance between the water will be used, under the environmental
line and the main deck of the vessel.) conditions expected and encountered.
(iii) The conditions required in para-
TABLE M2 graphs (n)(3) and (n)(4) of this section
Wind Minimum are met.
Operated at speed freeboard (2) The rated capacity modification
(mph) (ft)
required in paragraph (n)(1) of this sec-
Rated capacity ................................... 60 2 tion is performed by the equipment
Rated capacity plus 25% .................. 60 1 manufacturer, or a qualified person
High boom, no load ........................... 60 2
who has expertise with respect to both
land crane/derrick capacity and the
TABLE M3 stability of vessels/flotation devices.
Wind
(3) For list and trim.
Operated at (i) The maximum allowable list and
speed
the maximum allowable trim for the
For backward stability of the boom:
High boom, no load, full back list (least stable 90 mph. barge, pontoon, vessel or other means
condition). of flotation must not exceed the
amount necessary to ensure that the
(4) If the equipment is employer- conditions in paragraph (n)(4) of this
made, it must not be used unless the section are met. In addition, the max-
employer has documents dem- imum allowable list and the maximum
onstrating that the load charts and ap- allowable trim does not exceed the
plicable parameters for use meet the least of the following: 5 degrees, the
requirements of paragraphs (m)(1) amount specified by the crane/derrick
through (3) of this section. Such docu- manufacturer, or, when, an amount is
ments must be signed by a registered not so specified, the amount specified
professional engineer who is a qualified by the qualified person.
person with respect to the design of (ii) The maximum allowable list and
this type of equipment (including the the maximum allowable trim for the
means of flotation). land crane/derrick does not exceed the
(5) The employer must ensure that amount specified by the crane/derrick
the barge, pontoons, vessel or other manufacturer, or, when, an amount is
means of flotation used: not so specified, the amount specified
(i) Are structurally sufficient to by the qualified person.
withstand the static and dynamic loads (4) For the following conditions:
of the crane/derrick when operating at (i) All deck surfaces of the barge,
the crane/derricks maximum rated ca- pontoons, vessel or other means of flo-
pacity with all planned and actual deck tation used are above water.
loads and ballasted compartments. (ii) The entire bottom area of the
(ii) Have a subdivided hull with one barge, pontoons, vessel or other means
or more longitudinal watertight bulk- of flotation used is submerged.
heads for reducing the free-surface ef- (5) Physical attachment, corralling,
fect. rails system and centerline cable sys-
(iii) Have access to void compart- tem meet the requirements in Option
ments to allow for inspection and (1), Option (2), Option (3), or Option (4)
pumping. of this section, and that whichever op-
(n) Land cranes/derricks. For land tion is used also meets the require-
cranes/derricks used on barges, pon- ments of paragraph (n)(5)(v) of this sec-
toons, vessels or other means of flota- tion.
tion, the employer must ensure that: (i) Option (1)Physical attachment.
(1) The rated capacity of the equip- The crane/derrick is physically at-
ment (including but not limited to tached to the barge, pontoons, vessel or
modification of load charts) applicable other means of flotation. Methods of
for use on land is reduced to: physical attachment include crossed-
(i) Account for increased loading cable systems attached to the crane/
from list, trim, wave action, and wind. derrick and vessel/flotation device,
(ii) Be applicable to a specified loca- bolting or welding the crane/derrick to
tion(s) on the specific barge, pontoons, the vessel/flotation device, strapping

673

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00683 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1438 29 CFR Ch. XVII (7112 Edition)

the crane/derrick to the vessel/flota- employer demonstrates implementa-


tion device with chains, or other meth- tion of a plan and procedures that meet
ods of physical attachment. the following requirements:
(ii) Option (2)Corralling. The crane/ (i) A marine engineer or registered
derrick is prevented from shifting by professional engineer familiar with
installing barricade restraints (i.e., a floating crane/derrick design develops
corralling system). Employers must en- and signs a written plan for the use of
sure that corralling systems do not the mobile auxiliary crane.
allow the equipment to shift by any (ii) The plan is designed so that the
amount of shifting in any direction. applicable requirements of this section
(iii) Option (3)Rails. The crane/der- are met despite the position, travel, op-
rick must be prevented from shifting eration, and lack of physical attach-
by being mounted on a rail system. ment (or corralling, use of rails or
Employers must ensure that rail cable system) of the mobile auxiliary
clamps and rail stops are used unless crane.
the system is designed to prevent (iii) The plan specifies the areas of
movement during operation by other the deck where the mobile auxiliary
means. crane is permitted to be positioned,
(iv) Option (4)Centerline cable system. travel, and operate, and the parameters
The crane/derrick is prevented from and limitations of such movements and
shifting by being mounted to a wire operation.
rope system. The employer must en- (iv) The deck is marked to identify
sure that the wire rope system meets the permitted areas for positioning,
the following requirements: travel, and operation.
(A) The wire rope and attachments (v) The plan specifies the dynamic
are of sufficient size and strength to and environmental conditions that
support the side load of crane/derrick. must be present for use of the plan.
(B) The wire rope is attached phys- (vi) If the dynamic and environ-
ically to the vessel/flotation device. mental conditions in paragraph
(C) The wire rope is attached to the (n)(6)(v) of this section are exceeded,
crane/derrick by appropriate attach- the mobile auxiliary crane is attached
ment methods (such as shackles or physically or corralled in accordance
sheaves) on the undercarriage, and that with Option (1), Option (2) or Option (4)
the method used will allow the crew to of paragraph (n)(5) of this section.
secure the crane/derrick from move- (7) The barge, pontoons, vessel or
ment during operation and to move the other means of flotation used:
crane/derrick longitudinally along the (i) Are structurally sufficient to
vessel/flotation device for repo- withstand the static and dynamic loads
sitioning. of the crane/derrick when operating at
(D) Means are installed to prevent the crane/derricks maximum rated ca-
the crane/derrick from passing the for- pacity with all anticipated deck loads
ward or aft end of the wire rope attach- and ballasted compartments.
ments. (ii) Have a subdivided hull with one
(E) The crane/derrick is secured from or more longitudinal watertight bulk-
movement during operation. heads for reducing the free surface ef-
(v) The systems/means used to com- fect.
ply with Option (1), Option (2), Option (iii) Have access to void compart-
(3), or Option (4) of this section are de- ments to allow for inspection and
signed by a marine engineer, registered pumping.
professional engineer familiar with
floating crane/derrick design, or quali- 1926.1438 Overhead & gantry cranes.
fied person familiar with floating (a) Permanently installed overhead and
crane/derrick design. gantry cranes. The requirements of
(6) Exception. For mobile auxiliary 1910.179, except for 1910.179(b)(1), and
cranes used on the deck of a floating not the requirements of this subpart
crane/derrick, the requirement speci- CC, apply to the following equipment
fied by paragraph (n)(5) of this section when used in construction and perma-
to use Option (1), Option (2), Option (3), nently installed in a facility: overhead
or Option (4) does not apply when the and gantry cranes, including

674

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00684 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1440

semigantry, cantilever gantry, wall (c) Section 1926.1416(e)(4) (Load


cranes, storage bridge cranes, and oth- weighing and similar devices) applies
ers having the same fundamental char- only to dedicated pile drivers manufac-
acteristics. tured after November 8, 2011.
(b) Overhead and gantry cranes that (d) In 1926.1433, only 1926.1433(d)
are not permanently installed in a facil- and (e) apply to dedicated pile drivers.
ity.
(1) This paragraph applies to the fol- 1926.1440 Sideboom cranes.
lowing equipment when used in con-
struction and not permanently in- (a) The provisions of this standard
stalled in a facility: Overhead and gan- apply, except 1926.1402 (Ground condi-
try cranes, overhead/bridge cranes, tions), 1926.1415 (Safety devices),
semigantry, cantilever gantry, wall 1926.1416 (Operational aids), and
cranes, storage bridge cranes, launch- 1926.1427 (Operator qualification and
ing gantry cranes, and similar equip- certification).
ment having the same fundamental (b) Section 1926.1426 (Free fall and
characteristics, irrespective of whether controlled load lowering) applies, ex-
it travels on tracks, wheels, or other cept 1926.1426(a)(2)(i). Sideboom cranes
means. in which the boom is designed to free
(2) The following requirements apply fall (live boom) are permitted only if
to equipment identified in paragraph manufactured prior to November 8,
(b)(1) of this section: 2010.
(i) Sections 1926.1400 through (c) Sideboom cranes mounted on
1926.1414; 1926.1417 through 1926.1425; wheel or crawler tractors must meet
1926.1426(d), 1926.1427 through all of the following requirements of
1926.1434; 1926.1437, 1926.1439, and ASME B30.142004 (incorporated by ref-
1926.1441.
erence, see 1926.6):
(ii) The following portions of
(1) Section 141.1 (Load Ratings).
1910.179:
(A) Paragraphs (b)(5),(6),(7); (2) Section 141.3 (Side Boom Trac-
(e)(1),(3),(5),(6); (f)(1),(4); (g); (h)(1),(3); tor Travel).
(k); and (n) of 1910.179. (3) Section 141.5 (Ropes and
(B) The definitions in 1910.179(a) ex- Reeving Accessories).
cept for hoist and load. For those (4) Section 141.7.1 (Booms).
words, the definitions in 1926.1401 (5) Section 141.7.2 (General Re-
apply. quirementsExhaust Gases).
(C) Section 1910.179(b)(2), but only (6) Section 141.7.3 (General Re-
where the equipment identified in quirementsStabilizers (Wheel-Type
paragraph (b)(1) of this section Side Boom Tractors)).
( 1926.1438) was manufactured before (7) Section 141.7.4 (General Re-
September 19, 2001. quirementsWelded Construction).
(iii) For equipment manufactured on
(8) Section 141.7.6 (General Re-
or after September 19, 2001, the fol-
quirementsClutch and Brake Protec-
lowing sections of ASME B30.22005 (in-
corporated by reference, see 1926.6) tion).
apply: 21.3.1; 21.3.2; 21.4.1; 21.6; 2 (9) Section 142.2.2 (TestingRated
1.7.2; 21.8.2; 21.9.1; 21.9.2; 21.11; 2 Load Test), except that it applies only
1.12.2; 21.13.7; 21.14.2; 21.14.3; 21.14.5; to equipment that has been altered or
21.15.; 22.2.2; 23.2.1.1. In addition, 2 modified.
3.5 applies, except in 23.5.1(b), 29 CFR (10) In section 143.1.2 (Operator
1910.147 is substituted for ANSI Qualifications), paragraph (a), except
Z244.1. the phrase When required by law.
(11) In section 143.1.3 (Operating
1926.1439 Dedicated pile drivers. Practices), paragraphs (e), (f)(1)
(a) The provisions of subpart CC (f)(4), (f)(6), (f)(7), (h), and (i).
apply to dedicated pile drivers, except (12) In section 143.2.3 (Moving the
as specified in this section. Load), paragraphs (j), (l), and (m).
(b) Section 1926.1416(d)(3) (Anti two-
blocking device) does not apply.

675

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00685 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1441 29 CFR Ch. XVII (7112 Edition)

1926.1441 Equipment with a rated (B) Approved modifications that


hoisting/lifting capacity of 2,000 meet the requirements of 1926.1434
pounds or less. (Equipment modifications).
The following paragraphs of this sec- (ii) Post-assembly inspection. Upon
tion specify requirements for employ- completion of assembly, the equipment
ers using equipment with a maximum is inspected to ensure that it is in com-
rated hoisting/lifting capacity of 2,000 pliance with paragraph (b)(2)(i) of this
pounds or less. section (see 1926.1412(c) for post-assem-
bly inspection requirements).
(a) The employer using this equip-
(3) Manufacturer prohibitions. The em-
ment must comply with the following
ployer must comply with applicable
provisions of this subpart: 1926.1400
manufacturer prohibitions.
(Scope); 1926.1401 (Definitions);
(c) Operationprocedures.
1926.1402 (Ground conditions);
1926.1403 (Assembly/disassemblyse- (1) The employer must comply with
lection of manufacturer or employer all manufacturer procedures applicable
to the operational functions of the
procedures); 1926.1406 (Assembly/dis-
equipment, including its use with at-
assemblyemployer procedures);
tachments.
1926.1407 through 1926.1411 (Power line
safety); 1926.1412(c) (Post-assembly); (2) Unavailable operation procedures.
The employer must:
1926.1413 through 1926.1414 (Wire
rope); 1926.1418 (Authority to stop op- (i) When the manufacturers proce-
eration); 1926.1419 through 1926.1422 dures are unavailable, develop, and en-
sure compliance with, all procedures
(Signals); 1926.1423 (Fall protection);
necessary for the safe operation of the
1926.1425 (Keeping clear of the load)
equipment and attachments.
(except for 1926.1425(c)(3) (qualified
(ii) Ensure that procedures for the
rigger)); 1926.1426 (Free fall and con-
operational controls are developed by a
trolled load lowering); 1926.1432 (Mul-
qualified person.
tiple crane/derrick liftssupplemental
(iii) Ensure that procedures related
requirements); 1926.1434 (Equipment
to the capacity of the equipment are
modifications); 1926.1435 (Tower
developed and signed by a registered
cranes); 1926.1436 (Derricks); 1926.1437
professional engineer familiar with the
(Floating cranes/derricks and land
equipment.
cranes/derricks on barges); 1926.1438
(3) Accessibility. The employer must
(Overhead & gantry cranes).
ensure that:
(b) Assembly/disassembly.
(i) The load chart is available to the
(1) In addition to compliance with operator at the control station;
1926.1403 (Assembly/disassemblyse- (ii) Procedures applicable to the op-
lection of manufacturer or employer eration of the equipment, rec-
procedures) and 1926.1406 (Assembly/dis- ommended operating speeds, special
assemblyemployer procedures), the hazard warnings, instructions, and op-
employer must also comply with erators manual are readily available
1926.1441(b)(2)(3). for use by the operator.
(2) Components and configuration. The (iii) When rated capacities are avail-
employer must ensure that: able at the control station only in elec-
(i) The selection of components, and tronic form and a failure occurs that
the configuration of the equipment, makes the rated capacities inacces-
that affect the capacity or safe oper- sible, the operator immediately ceases
ation of the equipment complies with operations or follows safe shut-down
either the: procedures until the rated capacities
(A) Manufacturer instructions, rec- (in electronic or other form) are avail-
ommendations, limitations, and speci- able.
fications. When these documents and (d) Safety devices and operational aids.
information are unavailable, a reg- (1) The employer must ensure that
istered professional engineer familiar safety devices and operational aids
with the type of equipment involved that are part of the original equipment
must approve, in writing, the selection are maintained in accordance with
and configuration of components; or manufacturer procedures.

676

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00686 Fmt 8010 Sfmt 8010 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. CC, App. A

(2) Anti two-blocking. The employer (h) Inspections. The employer must
must ensure that equipment covered by ensure that equipment is inspected in
this section manufactured more than accordance with manufacturer proce-
one year after November 8, 2010 have dures.
either an anti two-block device that (i) [Reserved.]
meets the requirements of (j) Hoisting personnel. The employer
1926.1416(d)(3), or is designed so that, must ensure that equipment covered by
in the event of a two-block situation, this section is not used to hoist per-
no damage or load failure will occur sonnel.
(for example, by using a power unit (k) Design. The employer must ensure
that stalls in response to a two-block that the equipment is designed by a
situation). qualified engineer.
(e) Operator qualifications. The em-
ployer must train each operator, prior 1926.1442 Severability.
to operating the equipment, on the safe Should a court of competent jurisdic-
operation of the type of equipment the tion hold any provision(s) of subpart
operator will be using. CC to be invalid, such action shall not
(f) Signal person qualifications. The affect any other provision of the sub-
employer must train each signal person part.
in the proper use of signals applicable
to the use of the equipment. APPENDIX A TO SUBPART CC OF PART
(g) [Reserved.] 1926STANDARD HAND SIGNALS

677

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00687 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. CC, App. A 29 CFR Ch. XVII (7112 Edition)

678
ER09AU10.003</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00688 Fmt 8010 Sfmt 8006 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. CC, App. B

APPENDIX B TO SUBPART CC OF PART implement procedures that minimize the


1926ASSEMBLY/DISASSEMBLY: SAM- risk of unintended dangerous movement and
PLE PROCEDURES FOR MINIMIZING minimize the duration and extent of expo-
THE RISK OF UNINTENDED DAN-
sure under the boom.
The following scenario is an example of
GEROUS BOOM MOVEMENT
how the exception applies: A boom cannot be
1. Section 1926.1404(f)(1) provides that when disassembled on the ground because of
pins (or similar devices) are being removed, aboveground piping (as might be found, for
employees must not be under the boom, jib, example, in an oil refinery) that precludes
or other components, except where the re- lowering the boom to the ground. The boom
quirements of 1926.1404(f)(2) are met. The must therefore be disassembled in the air,
exception in 1926.1404(f)(2) applies when the and the employees who remove the pins must
employer demonstrates that site constraints perform that work from an aerial lift whose
require one or more employees to be under base is positioned on one side (the near side)
the boom, jib, or other components when of the boom. To gain access to the pins on
pins (or similar devices) are being removed. the far side, the aerial lift basket must move
In such a situation, the A/D director must under the boom, since, due to lack of room,

679
ER09AU10.004</GPH>

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00689 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, Subpt. CC, App. C 29 CFR Ch. XVII (7112 Edition)
the aerial lift cannot be repositioned on the (1) The functions and limitations of the
far side. Due to lack of room, the aerial lift crane and attachments.
cannot be repositioned on the far side, so the (2) Wire rope:
aerial basket must move under the boom to (i) Background information necessary to
gain access to the pins on the far side. understand the inspection and removal from
To minimize the risk of unintended dan- service criteria in 1926.1413 and 1926.1414.
gerous movement while the pins are re- (ii) Capacity and when multi-part rope is
moved, the A/D director uses an assist crane needed.
that is rigged to support the boom section (iii) Relationship between line pull and
that is being detached, using particular care safe working load.
to ensure that the section end that is near (iv) How to determine the manufacturers
the employee(s) removing the pins is well recommended rope for the crane.
supported. The duration and extent of expo- (3) Rigging devices and their use, such as:
sure is minimized by removing the far side
(i) Slings.
pins first, moving the aerial lift basket as
(ii) Spreaders.
soon as possible to the near side so that the
(iii) Lifting beams.
employees are no longer under the boom, and
then removing the near side pins. (iv) Wire rope fittings, such as clips, shack-
2. Section 1926.1404(h)(6)(i) provides that, les and wedge sockets.
during assembly/disassembly, the center of (v) Saddles (softeners).
gravity of the load must be identified if that (vi) Clamps (beams).
is necessary for the method used for main- (4) The technical limitations of protective
taining stability. Section 1926.1404(h)(6)(ii) measures against electrical hazards:
states that, where there is insufficient infor- (i) Grounding.
mation to accurately identify the center of (ii) Proximity warning devices.
gravity, measures designed to prevent unin- (iii) Insulated links.
tended dangerous movement resulting from (iv) Boom cages.
an inaccurate identification of the center of (v) Proximity to electric power lines, radii,
gravity must be used. and microwave structures.
An example of the application of (5) The effects of load share and load trans-
1926.1404(h)(6)(ii) is as follows: The boom is fer in multi-crane lifts.
assembled by lowering boom sections se- (6) Basic crane terms.
quentially into place using an assist crane. (7) The basics of machine power flow sys-
The A/D directors plan is to keep the boom tems.
sections stable while they are lowered into (i) Mechanical.
place by attaching the assist crane hoist line (ii) Electrical.
above the center of gravity of each section. (iii) Pneumatic.
However, in assembling the non-symmetrical (iv) Hydraulic.
top section of the boom, the A/D director is
(v) Combination.
not able to determine where to attach the
(8) The significance of the instruments and
assist crane hoist line so that it is above the
gauge readings.
center of gravity. In this situation, before
raising the section, all personnel are kept (9) The effects of thermal expansion and
clear of the section and the section is first contraction in hydraulic cylinders.
raised a few inches to determine whether it (10) Background information necessary to
tips when raised (if it did tip, it would indi- understand the requirements of pre-oper-
cate it is not rigged over the center of grav- ation and inspection.
ity). If this occurs, the hoist line is reposi- (11) How to use the safety devices and oper-
tioned and the procedure repeated (with em- ational aids required under 1926.1415 and
ployees kept clear of the section while it is 1926.1416.
raised) until the A/D director determines (12) The difference between duty-cycle and
that it is rigged over the center of gravity lifting operations.
and can be moved into place without dan- (13) How to calculate net capacity for
gerous movement. every possible configuration of the equip-
ment using the manufacturers load chart.
APPENDIX C TO SUBPART CC OF PART (14) How to use manufacturer-approved at-
1926OPERATOR CERTIFICATION: tachments and their effect on the equipment.
WRITTEN EXAMINATION: TECHNICAL (15) How to obtain dimensions, weight, and
center of gravity of the load.
KNOWLEDGE CRITERIA
(16) The effects of dynamic loading from:
This appendix contains information for (i) Wind.
employers, accredited testing organizations, (ii) Stopping and starting.
auditors and government entities developing (iii) Impact loading.
criteria for a written examination to test an (iv) Moving with the load.
individuals technical knowledge relating to (17) The effect of side loading.
the operation of cranes. (18) The principles of backward stability.
(a) General technical information. (b) Site information.

680

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00690 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, Subpt. CC, App. C
(1) How to identify the suitability of the (iii) Operating near power lines.
supporting ground/surface to support the ex- (iv) Hoisting personnel.
pected loads of the operation. Elements in- (v) Using other than full outrigger/crawler
clude: or stabilizer extensions.
(i) Weaknesses below the surface (such as (vi) Lifting loads from beneath the surface
voids, tanks, loose fill). of the water.
(ii) Weaknesses on the surface (such as re- (vii) Using various approved counterweight
taining walls, slopes, excavations, depres- configurations.
sions). (viii) Handling loads out of the operators
(2) Proper use of mats, blocking/cribbing, vision (operating in the blind).
outriggers, stabilizers, or crawlers. (ix) Using electronic communication sys-
(3) Identification of site hazards such as tems for signal communication.
power lines, piping, and traffic. (14) Know the proper procedures for load
(4) How to review operation plans with su- control and the use of hand-held tag lines.
pervisors and other workers (such as the sig- (15) Know the emergency response proce-
nal person), including how to determine dure for:
working height, boom length, load radius, (i) Fires.
and travel clearance. (ii) Power line contact.
(5) How to determine if there is adequate (iii) Loss of stability.
room for extension of crawlers or outriggers/ (iv) Control malfunction.
stabilizers and counterweights. (v) Two-blocking.
(c) Operations. (vi) Overload.
(1) How to pick, carry, swing and place the (vii) Carrier or travel malfunction.
load smoothly and safely on rubber tires and (16) Know how to properly use outriggers
on outriggers/stabilizers or crawlers (where and stabilizers in accordance with manufac-
applicable). turer specifications.
(2) How to communicate at the site with (d) Use of load charts.
supervisors, the crew and the signal person. (1) Know the terminology necessary to use
(3) Proper procedures and methods of load charts.
reeving wire ropes and methods of reeving (2) Know how to ensure that the load chart
multiple-part lines and selecting the proper is the appropriate chart for the equipment in
load block and/or ball. its particular configuration and application.
(4) How to react to changes in conditions (3) Know how to use load charts. This in-
that affect the safe operation of the equip- cludes knowing:
ment. (i) The operational limitations of load
(5) How to shut down and secure the equip- charts and footnotes.
ment properly when leaving it unattended. (ii) How to relate the chart to the configu-
(6) Know how to apply the manufacturers ration of the crane, crawlers, or outriggers/
specifications for operating in various stabilizers extended or retracted, jib erected
weather conditions, and understand how en- or offset, and various counterweight configu-
rations.
vironmental conditions affect the safe oper-
(iii) The difference between structural ca-
ation of the equipment.
pacity and capacity limited by stability.
(7) How to properly level the equipment.
(iv) What is included in capacity ratings.
(8) How to verify the weight of the load and
(v) The range diagram and its relationship
rigging prior to initiating the lift.
to the load chart.
(9) How to determine where the load is to
(vi) The work area chart and its relation-
be picked up and placed and how to verify
ship to the load chart.
the radii.
(vii) Where to find and how to use the
(10) Know basic rigging procedures.
parts-of-line information.
(11) How to carry out the shift inspection
(4) Know how to use the load chart to-
required in this subpart.
gether with the load indicators and/or load
(12) Know that the following operations re-
moment devices.
quire specific procedures and skill levels:
(i) Multi-crane lifts.
(ii) Hoisting personnel. Subpart DDCranes and Derricks
(iii) Clamshell/dragline operations. Used in Demolition and Un-
(iv) Pile driving and extracting.
(v) Concrete operations, including poured-
derground Construction
in-place and tilt-up.
(vi) Demolition operations. AUTHORITY: Section 3704 of the Contract
(vii) Operations on water. Work Hours and Safety Standards Act (40
(viii) Magnet operations. U.S.C. 3701); Sections 4, 6, and 8 of the Occu-
(ix) Multi-drum operations. pational Safety and Health Act of 1970 (29
(13) Know the proper procedures for oper- U.S.C. 653, 655, 657); Secretary of Labors
ating safely under the following conditions: Order Nos. 1271 (36 FR 8754), 876 (41 FR
(i) Traveling with suspended loads. 25059), or 983 (49 FR 35736), and 52007 (72 FR
(ii) Approaching a two-block condition. 31159).

681

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00691 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1500 29 CFR Ch. XVII (7112 Edition)
SOURCE: 75 FR 48134, Aug. 9, 2010, unless (7) Wire rope shall be taken out of
otherwise noted. service when any of the following con-
ditions exist:
1926.1500 Scope. (i) In running ropes, six randomly
This subpart applies only to employ- distributed broken wires in one lay or
ers engaged in demolition work cov- three broken wires in one strand in one
ered by 1926.856 and 1926.858, and un- lay;
derground construction work covered (ii) Wear of one-third the original di-
by 1926.800. This subpart applies in ameter of outside individual wires.
lieu of 1926 subpart CC. Kinking, crushing, bird caging, or any
other damage resulting in distortion of
1926.1501 Cranes and derricks. the rope structure;
(a) General requirements. (1) The em- (iii) Evidence of any heat damage
ployer shall comply with the manufac- from any cause;
turers specifications and limitations (iv) Reductions from nominal diame-
applicable to the operation of any and ter of more than one-sixty-fourth inch
all cranes and derricks. Where manu- for diameters up to and including five-
facturers specifications are not avail- sixteenths inch, one-thirty-second inch
able, the limitations assigned to the for diameters three-eighths inch to and
equipment shall be based on the deter- including one-half inch, three-sixty-
minations of a qualified engineer com- fourths inch for diameters nine-six-
petent in this field and such determina- teenths inch to and including three-
tions will be appropriately documented fourths inch, one-sixteenth inch for di-
and recorded. Attachments used with ameters seven-eighths inch to 118
cranes shall not exceed the capacity, inches inclusive, three-thirty-seconds
rating, or scope recommended by the inch for diameters 114 to 112 inches in-
clusive;
manufacturer.
(v) In standing ropes, more than two
(2) Rated load capacities, and rec-
broken wires in one lay in sections be-
ommended operating speeds, special
yond end connections or more than one
hazard warnings, or instruction, shall
broken wire at an end connection.
be conspicuously posted on all equip-
(vi) Wire rope safety factors shall be
ment. Instructions or warnings shall be
in accordance with American National
visible to the operator while he is at
Standards Institute B30.51968 or SAE
his control station.
J9591966.
(3) [Reserved]
(8) Belts, gears, shafts, pulleys,
(4) Hand signals to crane and derrick sprockets, spindles, drums, fly wheels,
operators shall be those prescribed by chains, or other reciprocating, rotat-
the applicable ANSI standard for the ing, or other moving parts or equip-
type of crane in use. An illustration of ment shall be guarded if such parts are
the signals shall be posted at the job exposed to contact by employees, or
site. otherwise create a hazard. Guarding
(5) The employer shall designate a shall meet the requirements of the
competent person who shall inspect all American National Standards Institute
machinery and equipment prior to each B15.11958 Rev., Safety Code for Me-
use, and during use, to make sure it is chanical Power Transmission Appa-
in safe operating condition. Any defi- ratus.
ciencies shall be repaired, or defective (9) Accessible areas within the swing
parts replaced, before continued use. radius of the rear of the rotating super-
(6) A thorough, annual inspection of structure of the crane, either perma-
the hoisting machinery shall be made nently or temporarily mounted, shall
by a competent person, or by a govern- be barricaded in such a manner as to
ment or private agency recognized by prevent an employee from being struck
the U.S. Department of Labor. The em- or crushed by the crane.
ployer shall maintain a record of the (10) All exhaust pipes shall be guard-
dates and results of inspections for ed or insulated in areas where contact
each hoisting machine and piece of by employees is possible in the per-
equipment. formance of normal duties.

682

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00692 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1501

(11) Whenever internal combustion feet plus 0.4 inch for each 1 kV. over 50
engine powered equipment exhausts in kV., or twice the length of the line in-
enclosed spaces, tests shall be made sulator, but never less than 10 feet;
and recorded to see that employees are (iii) In transit with no load and boom
not exposed to unsafe concentrations of lowered, the equipment clearance shall
toxic gases or oxygen deficient be a minimum of 4 feet for voltages
atmospheres. less than 50 kV., and 10 feet for
(12) All windows in cabs shall be of voltages over 50 kV., up to and includ-
safety glass, or equivalent, that intro- ing 345 kV., and 16 feet for voltages up
duces no visible distortion that will to and including 750 kV.
interfere with the safe operation of the (iv) A person shall be designated to
machine.
observe clearance of the equipment and
(13) (i) Where necessary for rigging or
give timely warning for all operations
service requirements, a ladder, or
where it is difficult for the operator to
steps, shall be provided to give access
to a cab roof. maintain the desired clearance by vis-
(ii) Guardrails, handholds, and steps ual means;
shall be provided on cranes for easy ac- (v) Cage-type boom guards, insu-
cess to the car and cab, conforming to lating links, or proximity warning de-
American National Standards Institute vices may be used on cranes, but the
B30.5. use of such devices shall not alter the
(iii) Platforms and walkways shall requirements of any other regulation
have anti-skid surfaces. of this part even if such device is re-
(14) Fuel tank filler pipe shall be lo- quired by law or regulation;
cated in such a position, or protected (vi) Any overhead wire shall be con-
in such manner, as to not allow spill or sidered to be an energized line unless
overflow to run onto the engine, ex- and until the person owning such line
haust, or electrical equipment of any or the electrical utility authorities in-
machine being fueled. dicate that it is not an energized line
(i) An accessible fire extinguisher of and it has been visibly grounded;
5BC rating, or higher, shall be avail- (vii) Prior to work near transmitter
able at all operator stations or cabs of towers where an electrical charge can
equipment. be induced in the equipment or mate-
(ii) All fuels shall be transported, rials being handled, the transmitter
stored, and handled to meet the rules shall be de-energized or tests shall be
of subpart F of this part. When fuel is made to determine if electrical charge
transported by vehicles on public high- is induced on the crane. The following
ways, Department of Transportation precautions shall be taken when nec-
rules contained in 49 CFR Parts 177 and essary to dissipate induced voltages:
393 concerning such vehicular transpor- (a) The equipment shall be provided
tation are considered applicable. with an electrical ground directly to
(15) Except where electrical distribu- the upper rotating structure sup-
tion and transmission lines have been
porting the boom; and
deenergized and visibly grounded at
(b) Ground jumper cables shall be at-
point of work or where insulating bar-
riers, not a part of or an attachment to tached to materials being handled by
the equipment or machinery, have been boom equipment when electrical
erected to prevent physical contact charge is induced while working near
with the lines, equipment or machines energized transmitters. Crews shall be
shall be operated proximate to power provided with nonconductive poles hav-
lines only in accordance with the fol- ing large alligator clips or other simi-
lowing: lar protection to attach the ground
(i) For lines rated 50 kV. or below, cable to the load.
minimum clearance between the lines (c) Combustible and flammable mate-
and any part of the crane or load shall rials shall be removed from the imme-
be 10 feet; diate area prior to operations.
(ii) For lines rated over 50 kV., min- (16) No modifications or additions
imum clearance between the lines and which affect the capacity or safe oper-
any part of the crane or load shall be 10 ation of the equipment shall be made

683

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00693 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1501 29 CFR Ch. XVII (7112 Edition)

by the employer without the manufac- (3) Buffers shall be provided at both
turers written approval. If such modi- ends of travel of the trolley.
fications or changes are made, the ca- (4) Cranes mounted on rail tracks
pacity, operation, and maintenance in- shall be equipped with limit switches
struction plates, tags, or decals, shall limiting the travel of the crane on the
be changed accordingly. In no case track and stops or buffers at each end
shall the original safety factor of the of the tracks.
equipment be reduced. (5) All hammerhead tower cranes in
(17) The employer shall comply with use shall meet the applicable require-
Power Crane and Shovel Association ments for design, construction, instal-
Mobile Hydraulic Crane Standard No. lation, testing, maintenance, inspec-
2. tion, and operation as prescribed by
(18) Sideboom cranes mounted on the manufacturer.
wheel or crawler tractors shall meet (d) Overhead and gantry cranes. (1)
the requirements of SAE J743a1964. The rated load of the crane shall be
(19) All employees shall be kept clear plainly marked on each side of the
of loads about to be lifted and of sus- crane, and if the crane has more than
pended loads. one hoisting unit, each hoist shall have
(b) Crawler, locomotive, and truck its rated load marked on it or its load
cranes. (1) All jibs shall have positive block, and this marking shall be clear-
stops to prevent their movement of ly legible from the ground or floor.
more than 5 above the straight line of
(2) Bridge trucks shall be equipped
the jib and boom on conventional type
with sweeps which extend below the
crane booms. The use of cable type
top of the rail and project in front of
belly slings does not constitute compli-
the truck wheels.
ance with this rule.
(3) Except for floor-operated cranes, a
(2) All crawler, truck, or locomotive
gong or other effective audible warning
cranes in use shall meet the applicable
signal shall be provided for each crane
requirements for design, inspection,
equipped with a power traveling mech-
construction, testing, maintenance and
anism.
operation as prescribed in the ANSI
B30.51968, Safety Code for Crawler, Lo- (4) All overhead and gantry cranes in
comotive and Truck Cranes. However, use shall meet the applicable require-
the written, dated, and signed inspec- ments for design, construction, instal-
tion reports and records of the monthly lation, testing, maintenance, inspec-
inspection of critical items prescribed tion, and operation as prescribed in the
in section 52.1.5 of the ANSI B30.51968 ANSI B30.2.01967, Safety Code for
standard are not required. Instead, the Overhead and Gantry Cranes.
employer shall prepare a certification (e) Derricks. All derricks in use shall
record which includes the date the meet the applicable requirements for
crane items were inspected; the signa- design, construction, installation, in-
ture of the person who inspected the spection, testing, maintenance, and op-
crane items; and a serial number, or eration as prescribed in American Na-
other identifier, for the crane in- tional Standards Institute B30.61969,
spected. The most recent certification Safety Code for Derricks.
record shall be maintained on file until (f) Floating cranes and derricks(1)
a new one is prepared. Mobile cranes mounted on barges. (i)
(c) Hammerhead tower cranes. (1) Ade- When a mobile crane is mounted on a
quate clearance shall be maintained barge, the rated load of the crane shall
between moving and rotating struc- not exceed the original capacity speci-
tures of the crane and fixed objects to fied by the manufacturer.
allow the passage of employees without (ii) A load rating chart, with clearly
harm. legible letters and figures, shall be pro-
(2) Each employee required to per- vided with each crane, and securely
form duties on the horizontal boom of fixed at a location easily visible to the
hammerhead tower cranes shall be pro- operator.
tected against falling by guardrails or (iii) When load ratings are reduced to
by a personal fall arrest system in con- stay within the limits for list of the
formance with subpart M of this part. barge with a crane mounted on it, a

684

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00694 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1501

new load rating chart shall be pro- may be used as long as it meets these
vided. criteria.
(iv) Mobile cranes on barges shall be (2) General requirements. The use of a
positively secured. crane or derrick to hoist employees on
(2) Permanently mounted floating a personnel platform is prohibited, ex-
cranes and derricks. (i) When cranes and cept when the erection, use, and dis-
derricks are permanently installed on a mantling of conventional means of
barge, the capacity and limitations of reaching the worksite, such as a per-
use shall be based on competent design sonnel hoist, ladder, stairway, aerial
criteria. lift, elevating work platform or scaf-
(ii) A load rating chart with clearly fold, would be more hazardous, or is
legible letters and figures shall be pro- not possible because of structural de-
vided and securely fixed at a location sign or worksite conditions.
easily visible to the operator. (3) Cranes and derricks(i) Operational
(iii) Floating cranes and floating der- criteria. (A) Hoisting of the personnel
ricks in use shall meet the applicable platform shall be performed in a slow,
requirements for design, construction, controlled, cautious manner with no
installation, testing, maintenance, and sudden movements of the crane or der-
operation as prescribed by the manu- rick, or the platform.
facturer. (B) Load lines shall be capable of sup-
porting, without failure, at least seven
(3) Protection of employees working on
times the maximum intended load, ex-
barges. The employer shall comply with
cept that where rotation resistant rope
the applicable requirements for protec-
is used, the lines shall be capable of
tion of employees working onboard ma-
supporting without failure, at least ten
rine vessels specified in 1926.605.
times the maximum intended load. The
(g) Crane or derrick suspended per-
required design factor is achieved by
sonnel platforms(1) Scope, application
taking the current safety factor of 3.5
and definitions(i) Scope and applica-
(required under paragraph (b)(2)) of this
tion. This standard applies to the de-
section and applying the 50 per cent de-
sign, construction, testing, use and
rating of the crane capacity which is
maintenance of personnel platforms,
required by paragraph (g)(3)(i)(F) of
and the hoisting of personnel platforms
this section.
on the load lines of cranes or derricks.
(C) Load and boom hoist drum
(ii) Definitions. For the purposes of brakes, swing brakes, and locking de-
this paragraph (g), the following defini- vices such as pawls or dogs shall be en-
tions apply: gaged when the occupied personnel
(A) Failure means load refusal, break- platform is in a stationary working po-
age, or separation of components. sition.
(B) Hoist (or hoisting) means all (D) The crane shall be uniformly
crane or derrick functions such as low- level within one percent of level grade
ering, lifting, swinging, booming in and and located on firm footing. Cranes
out or up and down, or suspending a equipped with outriggers shall have
personnel platform. them all fully deployed following man-
(C) Load refusal means the point ufacturers specifications, insofar as
where the ultimate strength is exceed- applicable, when hoisting employees.
ed. (E) The total weight of the loaded
(D) Maximum intended load means the personnel platform and related rigging
total load of all employees, tools, ma- shall not exceed 50 percent of the rated
terials, and other loads reasonably an- capaciy for the radius and configura-
ticipated to be applied to a personnel tion of the crane or derrick.
platform or personnel platform compo- (F) The use of machines having live
nent at any one time. booms (booms in which lowering is con-
(E) Runway means a firm, level sur- trolled by a brake without aid from
face designed, prepared and designated other devices which slow the lowering
as a path of travel for the weight and speeds) is prohibited.
configuration of the crane being used (ii) Instruments and components. (A)
to lift and travel with the crane sus- Cranes and derricks with variable
pended platform. An existing surface angle booms shall be equipped with a

685

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00695 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
1926.1501 29 CFR Ch. XVII (7112 Edition)

boom angle indicator, readily visible to restraining device to prevent acci-


the operator. dental opening.
(B) Cranes with telescoping booms (E) Headroom shall be provided which
shall be equipped with a device to indi- allows employees to stand upright in
cate clearly to the operator, at all the platform.
times, the booms extended length, or (F) In addition to the use of hard
an accurate determination of the load hats, employees shall be protected by
radius to be used during the lift shall overhead protection on the personnel
be made prior to hoisting personnel. platform when employees are exposed
(C) A positive acting device shall be to falling objects.
used which prevents contact between (G) All rough edges exposed to con-
the load block or overhaul ball and the tact by employees shall be surfaced or
boom tip (anti-two-blocking device), or smoothed in order to prevent injury to
a system shall be used which deacti- employees from punctures or lacera-
vates the hoisting action before dam- tions.
age occurs in the event of a two-block- (H) All welding of the personnel plat-
ing situation (two block damage pre- form and its components shall be per-
vention feature). formed by a qualified welder familiar
(D) The load line hoist drum shall with the weld grades, types and mate-
have a system or device on the power rial specified in the platform design.
train, other than the load hoist brake,
(I) The personnel platform shall be
which regulates the lowering rate of
conspicuously posted with a plate or
speed of the hoist mechanism (con-
other permanent marking which indi-
trolled load lowering.) Free fall is pro-
cates the weight of the platform and
hibited.
its rated load capacity or maximum in-
(4) Personnel platforms(i) Design cri-
tended load.
teria. (A) The personnel platform and
suspension system shall be designed by (iii) Personnel platform loading. (A)
a qualified engineer or a qualified per- The personnel platform shall not be
son competent in structural design. loaded in excess of its rated load capac-
(B) The suspension system shall be ity. When a personnel platform does
designed to minimize tipping of the not have a rated load capacity then the
platform due to movement of employ- personnel platform shall not be loaded
ees occupying the platform. in excess of its maximum intended
(C) The personnel platform itself, ex- load.
cept the guardrail system and personal (B) The number of employees occu-
fall arrest system anchorages, shall be pying the personnel platform shall not
capable of supporting, without failure, exceed the number required for the
its own weight and at least five times work being performed.
the maximum intended load. Criteria (C) Personnel platforms shall be used
for guardrail systems and personal fall only for employees, their tools, and the
arrest system anchorages are con- materials necessary to do their work,
tained in subpart M of this Part. and shall not be used to hoist only ma-
(ii) Platform specifications. (A) Each terials or tools when not hoisting per-
personnel platform shall be equipped sonnel.
with a guardrail system which meets (D) Materials and tools for use during
the requirements of subpart M, and, a personnel lift shall be secured to pre-
shall be enclosed at least from the vent displacement.
toeboard to mid-rail with either solid (E) Materials and tools for use during
construction or expanded metal having a personnel lift shall be evenly distrib-
openings no greater than 12 inch (1.27 uted within the confines of the plat-
cm). form while the platform is suspended.
(B) A grab rail shall be installed in- (iv) Rigging. (A) When a wire rope bri-
side the entire perimeter of the per- dle is used to connect the personnel
sonnel platform. platform to the load line, each bridle
(C) Access gates, if installed, shall leg shall be connected to a master link
not swing outward during hoisting. or shackle in such a manner to ensure
(D) Access gates, including sliding or that the load is evenly divided among
folding gates, shall be equipped with a the bridle legs.

686

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00696 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor 1926.1501

(B) Hooks on overhaul ball assem- previously used location. Additionally,


blies, lower load blocks, or other at- the trial lift shall be repeated when the
tachment assemblies shall be of a type lift route is changed unless the oper-
that can be closed and locked, elimi- ator determines that the route change
nating the hook throat opening. Alter- is not significant (i.e. the route change
natively, an alloy anchor type shackle would not affect the safety of hoisted
with a bolt, nut and retaining pin may employees.)
be used. (iii) After the trial lift, and just prior
(C) Wire rope, shackles, rings, master to hoisting personnel, the platform
links, and other rigging hardware must shall be hoisted a few inches and in-
be capable of supporting, without fail- spected to ensure that it is secure and
ure, at least five times the maximum properly balanced. Employees shall not
intended load applied or transmitted to be hoisted unless the following condi-
that component. Where rotation resist- tions are determined to exist:
ant rope is used, the slings shall be ca- (A) Hoist ropes shall be free of kinks;
pable of supporting without failure at (B) Multiple part lines shall not be
least ten times the maximum intended twisted around each other;
load.
(C) The primary attachment shall be
(D) All eyes in wire rope slings shall
centered over the platform; and
be fabricated with thimbles.
(E) Bridles and associated rigging for (D) The hoisting system shall be in-
attaching the personnel platform to spected if the load rope is slack to en-
the hoist line shall be used only for the sure all ropes are properly stated on
platform and the necessary employees, drums and in sheaves.
their tools and the materials necessary (iv) A visual inspection of the crane
to do their work, and shall not be used or derrick, rigging, personnel platform,
for any other purpose when not hoist- and the crane or derrick base support
ing personnel. or ground shall be conducted by a com-
(5) Trial lift, inspection, and proof test- petent person immediately after the
ing. (i) A trial lift with the unoccupied trial lift to determine whether the
personnel platform loaded at least to testing has exposed any defect or pro-
the anticipated liftweight shall be duced any adverse effect upon any com-
made from ground level, or any other ponent or structure.
location where employees will enter (v) Any defects found during inspec-
the platform, to each location at which tions which create a safety hazard
the personnel platform is to be hoisted shall be corrected before hoisting per-
and positioned. This trial lift shall be sonnel.
performed immediately prior to plac- (vi) At each job site, prior to hoisting
ing personnel on the platform. The op- employees on the personnel platform,
erator shall determine that all sys- and after any repair or modification,
tems, controls and safety devices are the platform and rigging shall be proof
activated and functioning properly; tested to 125 percent of the platforms
that no interferences exist; and that all rated capacity by holding it in a sus-
configurations necessary to reach pended position for five minutes with
those work locations will allow the op- the test load evenly distributed on the
erator to remain under the 50 percent platform (this may be done concur-
limit of the hoists rated capacity. Ma- rently with the trial lift). After
terials and tools to be used during the prooftesting, a competent person shall
actual lift can be loaded in the plat- inspect the platform and rigging. Any
form, as provided in paragraphs deficiencies found shall be corrected
(g)(4)(iii) (D), and (E) of this section for and another proof test shall be con-
the trial lift. A single trial lift may be ducted. Personnel hoisting shall not be
performed at one time for all locations conducted until the proof testing re-
that are to be reached from a single set quirements are satisfied.
up position. (6) Work practices. (i) Employees shall
(ii) The trial lift shall be repeated keep all parts of the body inside the
prior to hoisting employees whenever platform during raising, lowering, and
the crane or derrick is moved and set positioning. This provision does not
up in a new location or returned to a apply to an occupant of the platform

687

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00697 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, App. A 29 CFR Ch. XVII (7112 Edition)

performing the duties of a signal per- (C) The boom must be parallel to the
son. direction of travel.
(ii) Before employees exit or enter a (D) A complete trial run shall be per-
hoisted personnel platform that is not formed to test the route of travel be-
landed, the platform shall be secured to fore employees are allowed to occupy
the structure where the work is to be the platform. This trial run can be per-
performed, unless securing to the formed at the same time as the trial
structure creates an unsafe situation. lift required by paragraph (g)(5)(i) of
(iii) Tag lines shall be used unless this section which tests the route of
their use creates an unsafe condition. the lift.
(iv) The crane or derrick operator (E) If travel is done with a rubber
shall remain at the controls at all tired-carrier, the condition and air
times when the crane engine is running pressure of the tires shall be checked.
and the platform is occupied. The chart capacity for lifts on rubber
(v) Hoisting of employees shall be shall be used for application of the 50
promptly discontinued upon indication percent reduction of rated capacity.
of any dangerous weather conditions or Notwithstanding paragraph (g)(3)(i)(E)
other impending danger. of this section, outriggers may be par-
(vi) Employees being hoisted shall re- tially retracted as necessary for travel.
main in continuous sight of and in di- (8) Pre-lift meeting. (i) A meeting at-
rect communication with the operator tended by the crane or derrick oper-
or signal person. In those situations ator, signal person(s) (if necessary for
where direct visual contact with the the lift), employee(s) to be lifted, and
operator is not possible, and the use of the person responsible for the task to
a signal person would create a greater be performed shall be held to review
hazard for that person, direct commu- the appropriate requirements of para-
nication alone such as by radio may be graph (g) of this section and the proce-
used. dures to be followed.
(vii) Except over water, employees (ii) This meeting shall be held prior
occupying the personnel platform shall to the trial lift at each new work loca-
use a body belt/harness system with tion, and shall be repeated for any em-
lanyard appropriately attached to the ployees newly assigned to the oper-
lower load block or overhaul ball, or to ation.
a structural member within the per- [44 FR 8577, Feb. 9, 1979; 44 FR 20940, Apr. 6,
sonnel platform capable of supporting a 1979, as amended at 52 FR 36382, Sept. 28,
fall impact for employees using the an- 1987; 53 FR 29139, Aug. 2, 1988; 54 FR 15406,
chorage. When working over water, the Apr. 18, 1989; 54 FR 24334, June 7, 1989; 58 FR
requirements of 1926.106 shall apply. 35183, June 30, 1993; 59 FR 40730, Aug. 9, 1994;
(viii) No lifts shall be made on an- 61 FR 5510, Feb. 13, 1996. Redesignated at 75
FR 48134, Aug. 9, 2010]
other of the cranes or derricks
loadlines while personnel are sus- APPENDIX A TO PART 1926DESIGNA-
pended on a platform. TIONS FOR GENERAL INDUSTRY
(7) Traveling. (i) Hoisting of employ- STANDARDS INCORPORATED INTO
ees while the crane is traveling is pro- BODY OF CONSTRUCTION STANDARDS
hibited, except for portal, tower and lo-
comotive cranes, or where the em- New Designations for General Industry
ployer demonstrates that there is no Standards Incorporated Into Body of Con-
less hazardous way to perform the struction Standards
work. 1926 DESIGNATIONS FOR APPLICABLE 1910
(ii) Under any circumstances where a STANDARDS
crane would travel while hoisting per-
sonnel, the employer shall implement Source no. and/or
New no. and/or para.
the following procedures to safeguard para.
employees:
(A) Crane travel shall be restricted to 1926.20 (c) ..................... 1910.5 (a)
[Do.] (d) ................... [Do.] (c)
a fixed track or runway; [Do.] (e) ................... [Do.] (d)
(B) Travel shall be limited to the 1926.32(g) ...................... 1910.12(b)
load radius of the boom used during the 1926.33 ........................... 1910.20
lift; and 1926.34 (a) ..................... 1910.36(b)(4)

688

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00698 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Occupational Safety and Health Admin., Labor Pt. 1926, App. A

1926 DESIGNATIONS FOR APPLICABLE 1910 1926 DESIGNATIONS FOR APPLICABLE 1910
STANDARDSContinued STANDARDSContinued

Source no. and/or Source no. and/or


New no. and/or para. New no. and/or para.
para. para.

[Do.] (b) ................... 1910.37 (q)(1) [Do.] (c)(10)(12) ........ [Do.] (c)(10)(12)
[Do.] (c) .................... [Do.] (k)(2) [Do.] (c)(13)(15) ........ [Do.](f) (2)(4)
1926.35 ........................... 1910.38(a) [Do.] (d)(3)(6) ............ [Do.] (h) (2)(5)
1926.50(g) ...................... 1910.151(c) [Do.] (e)(3)(5) ............ [Do.] (i) (2)(4)
1926.51(a)(6) .................. 1910.141(a)(2)(v) [Do.] (e)(6)(7) ............ [Do.] (i) (6)(7)
[Do.] (d)(2) ................... [Do.] (h) [Do.] (e)(8) ................... [Do.] (i)(9)
[Do.] (f) (2)(4) ............ [Do.] (d) (1)(3) 1926.300(b) (3) ............... 1910.212(a)(1)
[Do.] (g) ....................... [Do.] (g)(2) [Do.] (4) ................... [Do.] (a)(3)
[Do.] (h) ....................... [Do.] (a)(5) [Do.] (5) ................... [Do.] (a)(5)
[Do.] (i) ........................ [Do.] (e) [Do.] (6) ................... [Do.] (b)
1926.53 (c)(r) ................ 1910.96 [Do.] (7) ................... 1910.215(b)(9)
1926.57 (f)(i) ................. 1910.94 [Do.] (8) and (9) ....... [Do.] (b) (3) and (4)
1926.64 ........................... 1910.119 1926.302(b)(10) .............. 1910.244(b)
1926.65 ........................... 1910.120 1926.303(b)(2) ................ 1910.215(a) (2)
1926.66 (a) ..................... 1910.107 (a) [Do.] (e) ................... [Do.] (4)
[Do.] (b) ....................... [Do.] (b) (1)(10) 1926.304 (g) ................... 1910.213(h)(1)
[Do.] (c)(d) ............... [Do.] (c)(d) [Do.] (h) ................... [Do.] (d)(1)
[Do.] (e)(g) ............... [Do.] (h)(j) [Do.] (i) ..................... [Do.] (c)(1)
1926.95 ........................... 1910.132 1926.305(d)(1) ................ 1910.244(a)(2) (iii)(viii)
1926.96 ........................... 1910.136 1926.306 ......................... 1910.169
1926.97 (a)(e) ............. 1910.156(e) 1926.307 ......................... 1910.219
[Do.] (f)(h) .................. [Do.] Subpt. L App. 1926.350(a) (10) ............. 1910.253(b) (4)(iii)
E [Do.] (11) ................. [Do.] (2)(ii)
1926.98 ........................... 1910.156(f) [Do.] (12) ................. 1910.101(b)
1926.102(a) (6) ............... 1910.133(a) (2) 1926.353(b)(3) ................ 1910.252(b)(4)(iv)
[Do.] (7) ....................... [Do.] (4) 1926.416 (a)(4) ............... 1910.333(c)(2)
[Do.] (8) ....................... [Do.] (5) [Do.] (f) (1) .................. [Do.] (c)(10)
1926.103 (d) ................... 1910.134 (a) [Do.] (2) ................... 1910.334(a)(1)
[Do.] (e) ....................... [Do.] (b) [Do.] (3) ................... [Do.] (a)(2)(iii)
[Do.] (f)(i) ................... [Do.] (d)(g) [Do.] (4) ................... [Do.] (a)(5)
1926.150(c)(1) (xi) .......... 1910.157 (g)(1) [Do.] (5)(6) ............. [Do.] (b) (1)(2)
[Do.] (xii) .................. [Do.] (g)(2) [Do.] (7)(9) ............. [Do.] (c) (1)(3)
[Do.] (xiii) ................. [Do.] (c)(4) [Do.] (10) ................. [Do.] (d)
[Do.] (xiv) ................. [Do.] (e)(3) 1926.417(d) .................... 1910.333(b)(2)
1926.152 (b)(5) ............... 1910.107(e)(2) 1926.451(a) (22) ............. 1910.28(a) (15)
[Do.] (h) ................... 1910.106(j) [Do.] (23) ................. [Do.] (18)
[Do.] (i) ..................... [Do.] (b) [Do.] (24) ................. [Do.] (20)
[Do.] (j) ..................... [Do.] (c) 1926.453 (a) ................... 1910.29(a)
[Do.] (k) (1)(3) ........ [Do.] (g)(4) [Do.] (b) ................... [Do.] (c)
[Do.] (k)(4) ............... [Do.] (a)(22) 1926.600(a)(7) ................ 1910.176(f)
1926.153(a) (3) ............... 1910.110(a)(4) 1926.602(c)(1) (vii) ......... 1910.178(m) (3)
[Do.] (m) (1) ............. [Do.] (d)(1) [Do.] (viii) .............. [Do.] (12)
[Do.] (2) ................... [Do.] (d)(2) 1926.900 (s) ................... 1910.109 (g)(2)(ii)
[Do.] (3) ................... [Do.] (d)(7)(vii) [Do.] (t) .................... [Do.] (h)(3)(ii)
[Do.] (4) ................... [Do.] (d)(7)(viii) 1926.905(u) .................... [Do.] (e)(3)(iii)
[Do.] (n) ................... [Do.] (b)(5)(iii) 1926.914(aa) .................. [Do.] (a)(12)
[Do.] (o) ................ [Do.] (d)(10) 1926.1050(b) .................. 1910.21(g)(9)
1926.156 ......................... 1910.160
1926.157 ......................... 1910.162 1926.1071 ....................... 1910.401
1926.158 ......................... 1910.164 1926.1072 ....................... 1910.402
1926.159 ......................... 1910.165 1926.1076 ....................... 1910.410
1926.200(c)(3) ................ 1910.145(d)(4) 1926.1080 ....................... 1910.420
1926.250(c) ..................... 1910.176(c) 1926.1081 ....................... 1910.421
[Do.] (d) (1)(4) ....... 1910.30(a) (1), (2), (4) 1926.1082 ....................... 1910.422
and (5) 1926.1083 ....................... 1910.423
1926.251(a)(5) ................ 1910.184(a) 1926.1084 ....................... 1910.424
[Do.] (a)(6) ................... [Do.] (d) 1926.1085 ....................... 1910.425
[Do.] (b)(6)(i)(ii) ......... [Do.] (e)(3)(i)(ii) 1926.1086 ....................... 1910.426
[Do.] (c)(6)(7) ............ [Do.] (c) (2)(3) 1926.1087 ....................... 1910.427
[Do.] (c)(8) ................... [Do.] (c)(5) 1926.1090 ....................... 1910.430
[Do.] (c)(9) ................... [Do.] (c)(7) 1926.1091 ....................... 1910.440

689

VerDate Mar<15>2010 12:38 Aug 17, 2012 Jkt 226118 PO 00000 Frm 00699 Fmt 8010 Sfmt 8002 Q:\29\29V8.TXT ofr150 PsN: PC150
Pt. 1926, App. A 29 CFR Ch. XVII (7112 Edition)

1926 DESIGNATIONS FOR APPLICABLE 1910 1926 DESIGNATIONS FOR APPLICABLE 1910
STANDARDSContinued STANDARDSContinued

Source no. and/or Source no. and/or


New no. and/or para. New no. and/or para.
para. para.

1926.1092 ....................... 1910.441 1926.1115 ....................... 1910.1015


1926.1116 ....................... 1910.1016
1926.1102 ....................... 1910.1002 1926.1117 ....................... 1910.1017
1926.1103 ....................... 1910.1003
1926.1118 ....................... 1910.1018
1926.1104 ....................... 1910.1004
1926.1105 ....................... 1910.1005 1926.1128 ....................... 1910.1028
1926.1106 ....................... 1910.1006 1926.1129 ....................... 1910.1029
1926.1107 ....................... 1910.1007 1926.1144 ....................... 1910.1044
1926.1108 ....................... 1910.1008 1926.1145 ....................... 1910.1045
1926.1109 ....................... 1910.1009 1926.1147 ....................... 1910.1047
1926.1110 ....................... 1910.1010 1926.1148 ....................... 1910.1048
1926.1111 ....................... 1910.1011
1926.1112 ....................... 1910.1012
1926.1113 ....................... 1910.1013 [58 FR 35305, June 30, 1993, as amended at 61
1926.1114 ....................... 1910.1014 FR 9255, Mar. 7, 1996; 75 FR 48135, Aug. 9, 2010]

690