Selection of Architectural Consultancy Firm (ACF)

Important instructions for prospective bidders

INDEX

About Gift City Project

Schedule of events

Points to remember while applying

Design competition and brief

FAQs

DISCLAIMER
The purpose of this document is to provide information to prospective bidders. This
is NOT a part of invitation for Expression of Interest for Architectural Consultancy
firm (ACF) for rendering comprehensive Architectural and Project Management
Consultancy Services (PMC) etc. for the proposed construction of a multi-storey
building having about 2,00,000 sq ft Built Up Area at GIFT CITY, Gandhinagar
(Gujarat). Bidders should NOT enclose any part of this document with technical bid.
Nothing in this document brings any obligation, contractual or otherwise, on State
Bank of India.

1. About Gift City Project


1.1 GIFT CITY
Gujarat International Finance Tec-City or GIFT is an under-construction central business
district in the Indian state of Gujarat. It will be built on 886 acres (3.59 km 2) of land. Its main
purpose is to provide high quality physical infrastructure (electricity, water, gas, district cooling,
roads, telecoms and broadband), so that finance and tech firms can relocate their operations
there from Mumbai, Bangalore, Gurgaon etc. where infrastructure is either inadequate or very
expensive. It will have a special economic zone (SEZ), international education zone, integrated
townships, an entertainment zone, hotels, a convention centre, an international techno
park, Software Technology Parks of India (STPI) units, shopping malls, stock exchanges and
service units.
To develop and implement the Project, Government of Gujarat (GOG) through its undertaking
Gujarat Urban Development Company Limited (GUDCOL) and Infrastructure Leasing & Financial
Services (IL&FS) have established a Joint Venture Company, "Gujarat International Finance
Tec-City Company Limited" (GIFTCL). The estimated cost of the entire project is Rs.
70,000 crore .
GIFTCL proposes to implement GIFT with an eventual built on area of 85,000,000 sq ft. The
company plans to develop, finance, implement all infrastructures in and around GIFT on a
turnkey basis to ensure that all conceivable services in relation to connectivity, communication,
technology, security, services for quality of life etc. are established and sustained.
Currently, two, 29-floor commercial towers have been completed.
It is centrally located in the state of Gujarat, between Ahmedabad and Gandhinagar, on the bank
of river Sabarmati, having geographical coordinates 23926N 724112E. The site is 18 km
from the Sardar Vallabhbhai Patel International Airport and 8 km from Gandhinagar.
All the electricity cables will be underground. Natural Gas will be distributed to every house and
building via pipes. GIFT will have a centralized air conditioning system called district cooling,
which is cheaper to run and uses less electricity.
GIFT offers real estate packages in the form of shell, furnished, plug and play or press and play
spaces. Uniformity of design and aesthetics would be maintained.
The office address of GIFT CITY authority is Zonal Facility Centre, Block-12, Road 1-D,
Zone-I,GIFT SEZ, Gandhinagar,Gujarat, Pin-382355. Further information regarding GIFT City
can be obtained by visiting its official website giftgujarat.in. Contact details are as under:
Phone: +91 79-30018300 Fax: +91 79 30018321 e-mail query@giftgujarat.in

1.2 State Bank building in GIFT City


State Bank of India (SBI) has acquired rights to develop and use 2,00,000 square feet Built
Up Area in GIFT City. GIFT CL has allotted building foot print to SBI in block 53. In that block
our plot is 53-A.
The shape of the foot print can be derived by removing a quadrilateral from left-bottom
portion of a rectangle. The top-left corner of foot print indicates north direction.. The length of
this rectangle is 55.00 m and width is 36.50 m. The quadrilateral is made up by placing a
rectangle (of 15.00 m length and of 10.00 m width) and a right-angled triangle (of legs of
10.00 m each and hypotenuse of 14.14 m) adjacent to each other. The area of foot-print is
1800 square meter. The basement can be projected from all sides of building foot-print. The
projection is 8.50 m from 55.00 m side (Top line) and 10.00 m from 36.50 m side and 3.00
m from remaining sides. If some portion of maximum allowable foot print is left unutilised
then basement can be extended from lines of actual foot print to the extent as mentioned
above. The maximum area of basement can be 3046 square meter. The maximum height of
building can be 60.00 m.
The site plan of block 53 is as under:

Full page image of Block 53 is also available at our Banks website along with RFP
document. You are advised to download it from there. We recommend you to visit the site.
For any assistance in this regard, you can contact officials of GIFT-CL.

2. Schedule of events
Event
Date
Announcement of RFP in Banks website
30 January 2015
Last date of submission of tender documents
19th February 2015 ; 5:00 PM
Opening of tender documents
20th February 2015; 3:30 PM
Declaration of names of bidders shortlisted for 27th February 2015
design competition
Design competition
12th March 2015
Opening of financial bids
14th March 2015; 4:30 PM
Declaration of name of successful bidders
16th March 2015
The bank has right to change date scheduled for any event. The revised date will be put up
at Banks website.
3. Points to remember while applying
i.

ii.

iii.

iv.

v.
vi.
vii.

viii.

ix.

Corrigendum, if any, to EOI invitation will be released only at Banks website.


Therefore we recommend you to regularly watch procurement news section of
www.sbi.co.in to get updates till selection process of ACF is over.
Format-II of EOI is a comprehensive check list of your eligibility. Before ticking
Yes on any column of that format, kindly critically examine the status. If you are
sure that you fulfil that particular criterion and have a documentary evidence to
support it then and only then tick yes. It is necessary that answer to every column
of Format-II is yes to become eligible to submit the bid.
Each page of Technical Bid should be signed by authorised signatory of the firm
along with affixing of seal of the firm. Only proprietor or one of the partners/
directors can be authorised signatories.
All enclosures must be signed by authorised signatory. All enclosures must be
serially numbered and index (on Format XI) be prepared and enclosed with
technical bid.
Demand Draft of earnest money should be enclosed with Technical Bid. The date
of issuance of the demand draft should be 30.01.2015 or later.
Financial bid must be kept in a separate sealed envelope.
You have to mention particulars of building project completed by you during last 5
years period ended on 31st December 2014 in Format -IX. For each of these
projects you must enclose a certificate from the owner/client of the building. The
certificate from the owner/client of the building should clearly mention particulars of
the project, scope of services offered by the consultant, actual project cost, date of
completion of project, existence of green building features, number of basements
and floors, height of building from ground and opinion of client on quality of
services rendered by the consultant.
While mentioning projects in Format-IX, please restrict to mentioning only those
projects which have bearing on selection process either as eligibility criteria or for
awarding of marks. Please dont mention any project having project cost less than
Rs. 20 cr because these projects will not be considered. Similarly dont mention
any incomplete project or any project which was completed before 1st January
2010.
In Format-VI you have to mention primary e-mail address and an alternate e-mail
address. All communications to you from the Bank will be send on this primary e-

mail address and CC to secondary e-mail address. Please ensure that these e-mail
addresses are functional during RFP process and mail send to these mail boxes
should not get bounced. Similarly you have to mention name and telephone
number of a contact person in your firm. Please mention name of a responsible
person from your firm for this purpose who knows the background of task of
bidding and can resolve queries raised by Bank in time bound manner.

4. Design competition and design brief


The Bank will shortlist 5 bidders to participate in design competition on basis of
parameters given in Part A of Format-V of RFP. The design competition will be held
on 13th March 2015.
The design brief for preparation of design for this competition is being given
hereunder. Please note that this brief is for limited purpose of holding design
competition. The brief which will be given to selected Architectural Consultancy Firm
for actual construction will be different from this brief.

The maximum height of the building prescribed by the GIFTCL is 60 mtr. However, this
height may be revised by GIFTCL. If it happens we shall advise this on our web site.
(All lengths are in feet and all areas are in square feet)
For size of plot, Built up Area, maximum permissible height please refer section 1.2 of this
document. Currently the building will be used by around 600 persons. In future number of
persons may increase gradually and this number may reach to maximum persons allowed by
National Building Code for 2,00,000 Sq Ft BUA.

Specifications of cabins
Type

To be used by

Area of
room

Area of
Ante Room

Chief General Manager

600

150

Area of
attached
toilet
80-100

Chairman/ MD (Transit Office)

600

150

80-100

General Manager

350

100

70

Dy. General Manager

250

None

60

Assistant General Manager

120

None

None

Area of
cubicle
100

Remark

Cubicles
Type

To be used by

Chief Manager

Remark

Wood
panelled
Wood
panelled
Wood
panelled
Wood
panelled
Glass
panelled

Work stations
Type

To be used by

Officers/ Assistant

Size of work
station
5x5

Remark
Total space will be 50 sq ft
including storage

Basements
3 numbers
B3 and B2 will be used for parking of cars. B1 will be used for parking of two wheelers and
utilities like transformers, chilling plants etc. Size of basement will be equal to maximum
area permissible (which is given in section 1.2 of this document). The basement will be
designed as per bye laws of GIFT authority. Basement area is free of FSI.
Ground floor
Ground floor will have two distinct areas with different entry areas. There will be a retail
branch having 3000 sq ft area. The branch will have following amenities and the layout will
be as per guidelines of the Business Process Reengineering viz. 70% area for customers and
30% for staff.
Amenity
Branch Manager Cabin
Locker room
Cash safe room
Server room/UPS
Record room
Gents Toilet
Ladies Toilet
Toilets for physically
challenged persons

Area
100-150
150-200
60-70
100-120
150-200
100-120
60-70
70

Remark

Besides the Branch Manager and public space in banking hall, the area to other staff shall be
provided as under
(a) Service Manager (1 no.)- 70 sq ft ,
(b) Case Manager ( 2 no)- 50 sq ft each
(c) CRO(2 no)- 70 sq ft each
(d) SWO(15 no) 30 sq ft each
(e) GrahakMitra (1 no)- 25 sq ft.
The area for other offices will be as under by a separate entry at ground floor.
Office
Dispensary

Size
800

Library
Office-one
Office-two
Office -three
Hall one
Hall two
Hall three
Telephone Exchange

400
300
900
150
1200
1200
500
120

Remark
Will have clinical cabins for 4
doctors, pharmacists counter,
waiting space for patients

2 E-type cabins
2 E-type cabins
2 E-type cabins

The entry of the retail branch will be from the side of the e-lobby. Size of e-lobby should be
700-800 Sq ft. There would be a lift and stair case to go to first floor, which will house CAG
branch. This lift and stair case will not lead to any other floor and first floor will not have any
other passage to connect with other floors of the building (except emergency fire exit).
The other area of ground floor will belong to LHO and entry to those areas will be from side
of e-lobby.
At the main entrance of the building there would be a reception area (800-1000 sq ft) and
office of security officer (150 sqft ), X-ray machine, equipment of biometric entry barriers
etc.
From reception visitors can go to lift lobby only. There should not be any access to other
portion of Ground Floor from there. Beyond entry area there will be a set of four lifts
(including lift for firefighting) and one VIP lift. VIP lift will not be adjacent to other lifts.
The lift shaft will be designed as per the requirement of National Building Code (NBC),
however, the lift cars will be installed as per our present need to serve around 600
employees. The speed and capacity of the lift will be decided in the beginning of the project.

First Floor
Entire first floor will be occupied by CAG Branch. The branch will have following
cabins/cubicles/WS
Type
C
D
E
F
G

Number
1
4
6
12
60

Additional requirement
Room
Audit room
Conference Hall-1
Conference Hall- 2

Area
100-120
200
400

Pantry
Visitors lobby
Record Room
Gents Toilet
Ladies Toilet
Toilets for physically
challenged persons

100
150-200
1500
120-180
70-80
70

Remark

With all modern amenities like


VC facility etc.

Second floor
Second floor will have following amenities
Room
Officers canteen
Employees canteen
Recreation room
Ladies room

Area
2500
4500
500
150

Remark

With attached toilet

Gents Toilet
Ladies Toilet
Toilets for physically
challenged persons

200
100
70

Third floor eighth floor


Each of these six floors will have following structures.
Type of cabin/cub./WS
D
E
F
G

Number
4
8
15
60

Room
Conference Room
Record room
Gents Toilet
Ladies Toilet
Toilets for physically challenged persons

Area
150-200
300
200
70-80
70

Remarks

Ninth and tenth floors


SPECIAL FLOORS
Ninth floor will have office of MCRO and GM (NW-III). Tenth floor will have offices of
GM (NW-I) and GM (NW-II)
Each of these floors will have following structures.
Type of cabin/cub./WS
C
D
E
F
G

Number
2
2
6
6
20

Room
Conference Room
Record room
Gents Toilet
Ladies Toilet
Toilets for physically challenged persons

Area
300
400
150-200
70-80
70

Remarks

Eleventh floor
VERY SPECIAL FLOOR
This floor will house office of Chief General Manager and transit offices of Chairman and
Managing Director.
Type of cabin/cub./WS
A
B

Number
1
2

In vicinity to CGM cabin there should be space for his PS and secretarial staff (5 in number)
and Board Room (of 20 capacities).
This floor will also have a main conferencehall (of total 70 capacity whereas around 35
persons can sit in oval shape table and 35 on back rows) and a VIP Dining Hall of 25
capacity in seat in position and 75 capacity in buffet arrangement. It should be ensured in
design that the food smell should not reach other portion of the floor.
Room
Gents Toilet
Ladies Toilet
Toilets for physically challenged persons

Area
150-200
70-80
70

Remarks

Twelfth floor
This floor will have an auditorium (Multipurpose Hall).The auditorium will have the flat
floor so in case of need it can be utilised as multipurpose hall. Apart from auditorium there
would be a lobby for catering, ladies , gents and physically challenged persons toilets. The
size of these should be commensurate with the capacity of auditorium. The capacity of
auditorium must be maximum possible. The auditorium will have a stage, two projection
screens and control room for controlling audio visual facilities.
Apart from these there should be a system of fire exit stair cases, service lift in separate area
and provision of dumping of waste at each floor. Electrical room (80sq.ft. ) each floor, Space
for data room ( 80-100 sq. ft.) at each floor, BMS room 500 sq. Ft. at GF, provision of driver
rest room/ change room (150-200 sq. Ft.) , provision of maintenance room 200 sq. ft. and
house keeping room 200 sq. ft. may be made in the basement ( B-I).
5. Frequently Asked Questions
Following are some queries raised by prospective bidders in banks earlier RFP. We
are furnishing Banks response on those queries.
S.No.
1

Question raised by bidders


SBI is requested to provide the breakup
of time for design and execution phase.

SBI is requested to provide the


estimated cost of the project so as to
provide % quote of total professional
fees.

SBI is requested to provide charges


which do not include the fees of the
ACF.
10

Banks response
Design time will be given to the ACF
as per standard guidelines of the Bank
and execution time of the project will
be decided in consultation with the
appointed ACF at the time of
tendering.
The approximate cost for all works
like civil, plumbing, electrical, AC,
fire, lift, cabling/networking, interior
/furniture, green building works,
parking,
Building
Management
System, etc has to be worked out by
the ACF as per prevailing market
rates.
Testing charges of materials, testing
of soil, surveying of plot, proof
checking of drawing, fees to the GIFT

4
5

08

09

10

11

12

SBI is requested to provide Defect


liability period.
As Built drawings should be in the
scope of contractor.

Authority /other civic authority for


approval purpose, etc are not included
in the fees of ACF. However, any
miscellaneous expenses incurred for
repeated visits to various stake
holders, calls, conferences, and
meetings for clarifications etc. for
getting the plan passed or getting
Commencement
Certificate,
Occupancy Certificate, Completion
Certificate, etc will be borne by the
ACF within the fees.
One year.

It is responsibility of the ACF to


prepare required number of sets of as
built drawing on completion of the
project with the support of the
contractor(s).
SBI is requested not to link PMC or
The payment of fees to the ACF is
ACF fees with payment of the
strictly linked to the payment to the
contractors payment.
contractors.
SBI is requested to provide full form of PVA stands for price variation
PVA and standard PVA Clause
adjustment and it will be applicable to
the contractor(s) and not to the ACF.
Standard PVA clause of the Bank for
in corporation in the tender document
shall be made available to the ACF
later on at the time of finalizing the
tender(s).
SBI is requested to make mutual No. It will be Banks sole decision.
consent between SBI and ACF before
making any change in project ( Page 20
of agreement)
SBI is requested to allow change in The clause can not be deleted.
constitution of the firm without the
consent of SBI and requested to delete
the clause (page 15 of agreement)
SBI is requested not to appoint The clause mentioned in the
independent consultant in case of need agreement will remain in force
and requested to relook this clause ( without any change.
page 16 of agreement)
SBI is requested to clarify mode of the The bid can be dropped in the tender
submission of bid.
box or can be sent by courier or
registered post. In any case bid should
reach by 5.00 PM on 19.02.2015
SBI is requested to clarify whether the Yes. The interior works of the
Interior work like partitions, loose building are included in the scope.
furniture, storage units etc are in the However for this work estimate,
scope of ACF.
specifications, tender document etc
11

13

will be prepared by the ACF in due


course. Separate tenders will be
invited for this work.
SBI is requested to consider on going No. Only completed projects as on
projects also for eligibility criteria.
31.12.2014 will be considered for
eligibility criteria.

14

SBI is requested to clarify the fees


payable of which amount viz on
estimate or on tender amount or on
actual amount.

15

SBI
is
requested
to
set
minimum/maximum number of trades
(jobs) for which tender will be invited.

16

SBI is requested to clarify whether


basement is part of 2,00 ,000 sq ft area
or not.

17

SBI to clarify that whether the PMC


will record the measurements.

12

The fees will be calculated on


percentage basis on the basis of actual
work viz. Payment made to the
contractor(s). However the estimate
approved by the bank will be the base
for payment of the fees of stages
before award of the contract till work
is awarded. And similarly the contract
value will be the base till the final
bills of the contractors are settled.
The decision of the Bank regarding
number of trades (jobs) for which
tender shall be invited will be decided
later on and Banks decision shall be
final and binding to the ACF.
The proposed 2,00,000 sq ft area is
the Built Up Area as per the GIFT
Area
Development
Control
Regulations and it does not include
the area of basement/cellar, refuse
area , fire staircase, parking spaces,
interior open spaces and ducts,
staircase, lift and lift well, water tank,
stair cabin, sky-gardens. etc.
No. PMC will take the joint
measurement with the contractors of
work executed and maintain the
Measurement books. However if
Bank desires, the PMC will record the
measurements alone and maintain the
measurements books at no extra fees.