Typical 2x660MW - Water & Waste Water Management

157114
Condenser

2307
Evap. +
Drift

6497

ACW

(3).

3537

4117
Raw Water
Makeup

Raw Water
Reservior
(Strorage - 7 Days)

Cooling
Tower
COC 5

2972

331

583

163029 Blowdown

To CHP
Dust Supprs.

580
SSF
83
Backwash

Ash. MU*
Evap.
Loss

49
Filtration +
DM Plant

79

54
Cycle MU

Central
Monitoring Basin
(CMB)
Two
Compartments

To
291
Ash Sump

32

N Pit

76
To
Gardening

25
3488

Aerator +
Clarifier

63

(3). 291

3481
240

7
CPU

Service
Water

Regen

70
Sludge
Thicknr

22

Oil Water
Seperator

Waste:
- CHP
- AHP sealing
- HVAC
(AW + CT MU)
- SW

28

* Power

Com mon
Oily
* Transfor. Water
Pit
Area
House

Centriguge/F

ilter press
11
6
178

Solid Cakes

Potable
Water
Plant + Colony

* Fuel Oil
Area

FGD
From
CMB

AHP Sealing

291
(3).

25
Ash

Notes:

291

120

Ash Water sump

846

Ash Handling
Plant

966
270

(1)ThisWaterBalanceispreparedfortypical
2x660MWCoalFiredPlant
(2)DesignCOCisconsideredasFive(5).
(3)0%WaterRecoveryduringFirst

Ash Slurry
Sump

** 150

Conditioning

**
580

YearofPlantoperationofPlant,duringthis
periodmakeupforAHPshallbefromRawWater
Reservior.RecoveryfromAshPondisconsidered
as70%ofTotalSlurryDisposalfromSecondYear
ofOperation.

To Ash Pond
278

(3)

Raw Water
Reservior

966

580

270

**100%FlyAshdisposal/utilisationshallbe
progressivelyachievedinDryFormfromFourth
YearoperationofPlantasperMoEFnotification
dt.3.11.2009
(4)TurbineCycleMakeupisconsideredas1%
ofBMCR.DMplantconsistofUFROMBunits.

Ash Pond

Ash Pond Recovery

** 162
To Evap.

386

loss

386

(5)*IndicatesIntermittentFlowandsameisnot
consideredhereforWaterBalance

**