Condenser
2307
Evap. +
Drift
6497
ACW
(3).
3537
4117
Raw Water
Makeup
Raw Water
Reservior
(Strorage - 7 Days)
Cooling
Tower
COC 5
2972
331
583
163029 Blowdown
To CHP
Dust Supprs.
580
SSF
83
Backwash
Ash. MU*
Evap.
Loss
49
Filtration +
DM Plant
79
54
Cycle MU
Central
Monitoring Basin
(CMB)
Two
Compartments
To
291
Ash Sump
32
N Pit
76
To
Gardening
25
3488
Aerator +
Clarifier
63
(3). 291
3481
240
7
CPU
Service
Water
Regen
70
Sludge
Thicknr
22
Oil Water
Seperator
Waste:
- CHP
- AHP sealing
- HVAC
(AW + CT MU)
- SW
28
* Power
Com mon
Oily
* Transfor. Water
Pit
Area
House
Centriguge/F
ilter press
11
6
178
Solid Cakes
Potable
Water
Plant + Colony
* Fuel Oil
Area
FGD
From
CMB
AHP Sealing
291
(3).
25
Ash
Notes:
291
120
846
Ash Handling
Plant
966
270
(1)ThisWaterBalanceispreparedfortypical
2x660MWCoalFiredPlant
(2)DesignCOCisconsideredasFive(5).
(3)0%WaterRecoveryduringFirst
Ash Slurry
Sump
** 150
Conditioning
**
580
YearofPlantoperationofPlant,duringthis
periodmakeupforAHPshallbefromRawWater
Reservior.RecoveryfromAshPondisconsidered
as70%ofTotalSlurryDisposalfromSecondYear
ofOperation.
To Ash Pond
278
(3)
Raw Water
Reservior
966
580
270
**100%FlyAshdisposal/utilisationshallbe
progressivelyachievedinDryFormfromFourth
YearoperationofPlantasperMoEFnotification
dt.3.11.2009
(4)TurbineCycleMakeupisconsideredas1%
ofBMCR.DMplantconsistofUFROMBunits.
Ash Pond
** 162
To Evap.
386
loss
386
(5)*IndicatesIntermittentFlowandsameisnot
consideredhereforWaterBalance
**