Code Requirements1
The requirement is clear, however the actual construction and placement of the seismic separation joint is left
for interpretation. USG has a long history of product development and innovation for suspended ceiling systems
in seismic applications and continues to commit significant resources to this endeavor. We have thoroughly
examined this separation joint requirement and conducted full-scale seismic shake-table tests of our Donn DH4
4-way seismic separation joint clip at the University of California Berkeley, Pacific Earthquake Engineering and
Research Center (PEER). The findings of this study and our recommendations are presented in this technical
guide to assist in the interpretation of this important requirement. Seismically tested and listed in PEI Evaluation
Report, PER-12060. There are many factors that affect the arrangement of seismic separation joints and USG
recommends that the design team, consulting engineers and code officials work together to analyze these
factors and determine the appropriate construction and application of seismic separation joints.
Guidelines
Seismic separation joints can be installed in any combination of main tees or cross tees.
Seismic separation joints may be constructed at a main tee/cross tee intersection to conceal the separation joint
from below.
Suspension system tees may be broken to construct a seismic separation joint provided a device is used to secure
the tees together that allows movement or supplementary hanger wires should be installed.
- Care should be taken to avoid the construction of a seismic separation joint on a suspension system tee that
directly supports a light fixture or diffuser.
A device may be inserted onto a suspension system tee to conceal a seismic separation joint from below provided
the device allows sufficient movement of the joint.
Lateral force bracing should not be attached directly to seismic separation joints.
The requirements for seismic separation joints are meant for the suspension system alone and ceiling panels
should not be installed differently.
Where several separation joints occur in a large suspended ceiling, the border of the joint in the field of the
suspended ceiling should not be treated as a perimeter.
A braced partition or kicker may be constructed to minimize or eliminate seismic separation joints.
Seismic separation joints shall be capable of allowing 34 in [18 mm] axial movement.
Seismic separation joints should be installed such that the area less than 2,500 sq. ft. (232m2) has a ratio of the
long to short dimension less than or equal to 4.
A structural engineer should be consulted for very large suspended ceilings where multiple separation joints are
necessary to break the ceiling into areas less than 2,500 sq. ft. (232m2).
See last page for Seismic Code Reference Standards
Accessories
Catalog
Number
Description
DH4
Profile
Isometric
51/2"
1"
1"
13/8"
TFS-1
DX/DXL
Tee-Face Sleeve (39 long)
for 15/169 systems
3"
1/2"
1"
1/4"
1/16"
TFS-2
3"
1/2"
5/8"
1/4"
1/16"
Accessories
Catalog
Number
Description
TFS-3
Profile
Isometric
3"
5/8"
3/16"
3/8"
TFS-4
3"
5/8"
3/16"
3/8"
TFS-5
3"
5/8"
5/8"
5/8"
5/8"
DX/DXL Systems
Construction
U SG offers a clip developed and designed to provide the most robust hold in the most
stringent seismic design categories.
Note: Please see Donn DH4 4-way seismic separation joint clip submittal sheet (AC3271) for more information.
Application
Seismic
Separation Joint
Sample layout
on pages 9 and 10.
Symbol:
Seismic Expansion Joint
Lateral Force Bracing
4-way seismic
separation joint clip
4-way seismic
separation
joint clip
cross tee
main tee
fasteners
3/4"
typ.
fasteners
Alternative
main tee
4-way seismic
separation
joint clip
Sample layout
on pages 9 and 10.
Symbol:
Seismic Expansion Joint
Adjacent Expansion Joint
Adjacent
Separation Joints
1" gap
between field
cut main tee
main tee
1"
min.
typ.
main tee
4-way seismic
separation
joint clip
one side of splice
cap crimped to allow
movement only on
opposite end
cross tee
fastener
4-way seismic
separation
joint clip
Sample layout
on pages 9 and Lateral
10. Force Bracing
Adjacent Expansion Jointfastener
Symbol:
4-way seismic
separation joint clip
cross tee
cross tee
1" gap
between field
cut main tee
TFS-1 teeface sleeve
main tee
fastener
cross tee
1" gap
between field
cut main tee
main tee
ote: The performance of Donn seismic systems is based on the specific combination of superior components and design and installation methods shown.
N
Components from other manufacturers were not evaluated, and their use or any mixed use is not recommended.
Construction
U SG offers a clip developed and designed to provide the most robust hold in the most
stringent seismic design categories.
Note: Please see Donn DH4 4-way seismic separation joint clip submittal sheet (AC3271) for more information.
Application
Seismic
Separation Joint
4-way seismic
separation joint clip
4-way seismic
separation
joint clip
9/16"
cross tee
Adjacent
Separation Joints
1" gap
between field
cut main tee
main tee
1"
min.
typ.
main tee
4-way seismic
separation
joint clip
one side of splice
cap crimped to allow
movement only on
opposite end
cross tee
fastener
4-way seismic
separation
joint clip
fastener
4-way seismic
separation joint clip
cross tee
fasteners
typ.
main tee
4-way seismic
separation
joint clip
cross tee
cross tee
main tee
fasteners
Alternative
fasteners
1" gap
between field
cut main tee
TFS-2 teeface sleeve
main tee
fastener
cross tee
1" gap
between field
cut main tee
main tee
ote: The performance of Donn seismic systems is based on the specific combination of superior components and design and installation methods shown.
N
Components from other manufacturers were not evaluated, and their use or any mixed use is not recommended.
Fineline/DXF/DXLF Systems
Construction
U SG offers a clip developed and designed to provide the most robust hold in the most
stringent seismic design categories.
Note: Please see Donn DH4 4-way seismic separation joint clip submittal sheet (AC3271) for more information.
Application
Seismic
Separation Joint
4-way seismic
separation joint clip
4-way seismic
separation
joint clip
cross tee
main tee
9/16" typ.
fasteners
cross tee
Alternative
fasteners
main tee
4-way seismic
separation
joint clip
4-way seismic
separation joint clip
fastener
cross tee
main tee
fasteners
cross tee
Adjacent
Separation Joints
1" gap
between field
cut main tee
1"
min.
typ.
main tee
4-way seismic
separation
joint clip
4-way seismic
separation
joint clip
fastener
fastener
cross tee
cross tee
1" gap
between field
cut main tee
TFS-3 teeface sleeve
main tee
1" gap
between field
cut main tee
main tee
ote: The performance of Donn seismic systems is based on the specific combination of superior components and design and installation methods shown.
N
Components from other manufacturers were not evaluated, and their use or any mixed use is not recommended.
Construction
U SG offers a clip developed and designed to provide the most robust hold in the most
stringent seismic design categories.
Note: Please see Donn DH4 4-way seismic separation joint clip submittal sheet (AC3271) for more information.
Application
Seismic
Separation Joint
4-way seismic
separation joint clip
4-way seismic
separation
joint clip
cross tee
main tee
9/16" typ.
fasteners
cross tee
Alternative
fasteners
main tee
4-way seismic
separation
joint clip
4-way seismic
separation joint clip
fastener
cross tee
main tee
fasteners
cross tee
Adjacent
Separation Joints
1" gap
between field
cut main tee
1"
min.
typ.
main tee
4-way seismic
separation
joint clip
4-way seismic
separation
joint clip
fastener
fastener
cross tee
cross tee
1" gap
between field
cut main tee
TFS-4 teeface sleeve
main tee
1" gap
between field
cut main tee
main tee
ote: The performance of Donn seismic systems is based on the specific combination of superior components and design and installation methods shown.
N
Components from other manufacturers were not evaluated, and their use or any mixed use is not recommended.
Construction
U SG offers a clip developed and designed to provide the most robust hold in the most
stringent seismic design categories.
Note: Please see Donn DH4 4-way seismic separation joint clip submittal sheet (AC3271) for more information.
Application
Seismic
Separation Joint
4-way seismic
separation
joint clip
4-way seismic
separation joint clip
DXI field-cut
intersection sleeve
TFS-5 DXI FC
fasteners
4-way seismic
separation
joint clip
Adjacent
Separation Joints
4-way seismic
separation joint clip
fastener
cross tee
1" gap
between field
cut main tee
TFS-5
tee-face
sleeve
1"
min.
typ.
main tee
4-way seismic
separation
joint clip
TFS-5 tee-face
sleeve
fastener
1" gap
between field
cut main tee
main tee
4-way seismic
separation
joint clip
cross tee
DXI field-cut
intersection sleeve
TFS-5 DXI FC
fasteners
cross tee
cross tee
main tee
9/16" typ.
main tee
cross tee
Alternative
fasteners
main tee
TFS-5 tee-face
sleeve
fasteners
cross tee
1" gap
between field
cut main tee
main tee
ote: The performance of Donn seismic systems is based on the specific combination of superior components and design and installation methods shown.
N
Components from other manufacturers were not evaluated, and their use or any mixed use is not recommended.
DXW Systems
Construction
U SG offers a clip developed and designed to provide the most robust hold in the most
stringent seismic design categories.
Note: Please see Donn DH4 4-way seismic separation joint clip submittal sheet (AC3271) for more information.
Application
Seismic
Separation Joint
4-way seismic
separation
joint clip
4-way seismic
separation joint clip
DXW
main tee
fasteners
DX, DXT or
DXW cross tee
fasteners
DX, DXT or
DXW cross tee
Fixed/Floating
4-way seismic
separation joint clip
fasteners
Floating/Floating
4-way seismic
separation joint clip
fasteners
Fixed/Fixed
4-way seismic
separation joint clip
fasteners
ote: The performance of Donn seismic systems is based on the specific combination of superior components and design and installation
N
methods shown. Components from other manufacturers were not evaluated, and their use or any mixed use is not recommended.
Other seismic construction elements, restrictions and exemptions may apply. The specific application and location of seismic separation
joints should be verified by a design professional before installation.
Lateral Bracing
vertical hanger
wire adjacent
to post
spring clip
inserts in
hole in post
structure
45 or less
45 or less
45 or less
cross tee
install within
install within
2" oftee
cross tee
2" of cross
intersection
intersection
main tee
a fastener
or splay
a fastener
or wires
splay wires
maybe
inserted
into theinto the
maybe
inserted
tab oftab
theofpost
and
the post and
through a convenience
a convenience
hole through
in the main
tee bulb
Note: Please refer to SC2552 for more information about lateral bracing.
2" max.
Strength Analysis
U SG has conducted extensive testing and verified the strength analysis of lateral bracing on our
various suspension system profiles. Tests were conducted in three different configurations: 45 degrees
off plane, 45 degrees on plane and 90 degrees on plane.
Wire Pull A
45 Off Plane
Wire Pull - A
45 degrees off plane
Wire Pull B
45
OnPull
Plane
Wire
-B
45 degrees on plane
Wire Pull C
90 On Plane
Wire Pull - C
90 degrees on plane
Intermediate Duty
Heavy Duty
Main Tee
Product
Profile
DX/DXL24
Wire Pull A
Wire Pull B
Wire Pull C
Main Tee
45 Off Plane
45 On Plane
90 On Plane
Product
419 lbs
482 lbs
402 lbs
DX/DXL26
15/16"
Wire Pull A
Wire Pull B
Wire Pull C
45 Off Plane
45 On Plane
90 On Plane
426 lbs
482 lbs
402 lbs
431 lbs.
469 lbs.
468 lbs.
500 lbs.
500 lbs.
500 lbs.
15/16"
DXT24
488 lbs.
485 lbs.
430 lbs.
DXT26
9/16"
9/16"
454 lbs.
DXFF2824
9/16"
Profile
1/4"
499 lbs.
395 lbs.
DXFH2924
9/16"
1/8"
Sample Layouts
12' x 12' Pod
x 12' Pod
The suspended
ceiling layouts are provided as a guide to illustrate potential locations of seismic separation joints.12'There
are many
12' x 12' Pod
12' x 12' separation
Pod
Tee layouts should
factors Main
that Tee
determine the orientation of a suspended ceiling and location of seismic
joints on a project.Main
These
12'
x
12'
Pod
Cross
Tee (not
all cross tees shown)
be usedCross
as aTee
reference
only.
Other
restrictions
and
exemptions
may
apply.
The
specific
application
and
location
of
seismic
separation
(not all cross tees shown)
joints should
verified by a design12'professional
before installation.
x 12' Pod
Main Tee
Primeter Wall
Primeterbe
Wall
Seismic Expansion Joint
12' x 12'
PodBracing
Lateral
Force
Main Tee
Primeter Wall
12' x 12'Expansion
Pod
Adjacent
Joint
Main Tee
Primeter Wall
146'
Primeter29'Wall
Lateral28'
Force Bracing
32'
28'
29'
48'
146'
48'
48'
146'
48'
50'
146'
48'
48'
50'
48'
48'
77'
48'
48'
146'
146'
50'
146'
50'
146'
50'
146'
50'
69'
48'
48'
48'
48'
1'
12'
12'
12'
12'
12'
12'
12'
12'
1' 12'
12'
12' 12'
12' 12'
12' 1'
Note: Lateral force bracing shall be placed 12 ft. on center in both directions with
location within12'
6ft. of each wall.
installing lateral
1' the first 12'
12' To avoid 12'
12'force bracing
12'
on a separation joint the first location may be installed at a point closer to the wall within 6 ft. as illustrated.
12 Seismic Separation Joints
1'
12'
1'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
1'
12'
12
Sample Layouts
12' x 12' Pod
x 12' are
Pod many
The suspended
ceiling layouts are provided as a guide to illustrate potential locations of seismic separation joints.12'
There
12' x 12' Pod
12' x 12' separation
Pod
Tee layouts should
factors that
the orientation of a suspended ceiling and location of seismic
joints on a project.Main
These
Main determine
Tee
be usedCross
as a Tee
reference
only.
Other
restrictions
and
exemptions
may
apply.
The
specific
application
and
location
of
seismic
separation
12'
x
12'
Pod
Cross Tee (not
all cross tees shown)
(not all cross tees shown)
joints should
beWall
verified by a design12'professional
before installation.
x 12' Pod
Main Tee
Primeter Wall
Primeter
Seismic Separation Joint
12' x 12'Force
Pod Bracing
Lateral
Main Tee
Primeter Wall
Main Tee
Primeter Wall
48'
146'
48'
48'
50'
146'
48'
146'
48'
50'
146'
48'
48'
50'
48'
48'
48'
48'
48'
146'
146'
50'
50'
146'
50'
146'
50'
146'
50'
48'
48'
48'
48'
48'
1'
12'
12'
12'
12'
12'
12'
12'
12'
1' 12'
12'
12'
12'
12'
12'
12' 1'
Note: Lateral force bracing shall be placed 12 ft. on center in both directions with the first location within 6ft. of each wall. To avoid installing lateral force bracing
1'
12'
12'
12'
12'
12'
12'
on a separation joint the first location may be installed at a point closer to the wall within 6 ft. as illustrated.
1'
1'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
12'
1'
12'
12
Structural Analysis
Building configuration
Occupancy category
Story height
Note: A structural engineer should be consulted for each project. Always check with a local official prior to
designing and installing a ceiling system. Other restrictions and exemptions may apply. This is only intended
as a quick reference.
1
For more information please refer to SC2545, Seismic Separation Joint Exemption Through Analysis. Please visit usg.com
or seismicceilings.com. The USG resource listed here can be downloaded from these sites.
2003 IBC
2006 IBC
2009 IBC
2012 IBC
ASCE7-02
ASCE7-05
ASCE7-05
ASCE7-10
ASTM E580
or
Further References
Product Information
Purpose
See usg.com for the most
This seismic technical guide
up-to-date product information. (STG) is intended as a resource
for design professionals, to
Installation
promote more uniform criteria
Must be installed in compliance for plan review and jobsite
with ASTM C636, ASTM E580, inspection of projects. This
CISCA, and standard industry
STG indicates an acceptpractices.
able method for achieving
compliance with applicable
Code Compliance
codes and regulations, although
The information presented
other methods proposed by
is correct to the best of our
design professionals may be
knowledge at the date of issuconsidered and adopted.
ance. Because codes continue
to evolve, check with a local
official prior to designing and
installing a ceiling system.
Other restrictions and exemptions may apply.This is only
intended as a quick reference.
Manufactured by
USG Interiors, LLC
550 West Adams Street
Chicago, IL 60661
Progressive Engineering
Inc. Evaluation Report
Compliance
Seismically tested and listed
in PEI Evaluation Report,
PER-12060.
Notice
We shall not be liable for
incidental and consequential
damages, directly or indirectly
sustained, nor for any loss
caused by application of these
goods not in accordance with
L.A. Research Report
current printed instructions or
Compliance
Donn brand suspension systems for other than the intended use.
manufactured by USG Interiors, Our liability is expressly limited to
replacement of defective goods.
Inc., have been reviewed and
Any claim shall be deemed
are approved by listing in the
following L.A. Research Report waived unless made in writing
to us within thirty (30) days from
number: 25764.
date it was or reasonably should
have been discovered.
Note
The University of California does
not endorse specific products.
Safety First!
Follow good safety/industrial
hygiene practices during
installation. Wear appropriate
personal protective equipment.
Read MSDS and literature
before specification and
installation.
usg.com
seismicceilings.com
sustainableceilings.com
usgdesignstudio.com
SC2496/rev. 10-13
2013, USG Interiors, LLC
Printed in U.S.A.