DPS/
MRPU/
IGCAR/
CAP/
4427/
PT-658
COST
OF
TENDE
R
(INCL
USIVE
OF
TAX)
312/-
LAST
DATE
FOR
SALE
OF
TENDER
SET
25/06/
08
LAST
DATE
FOR
RECEI
PT OF
TENDER
(1300
HRS)
09/07/
08
DATE
OF
OPENIN
G OF
TENDER
(1100
HRS)
10/07/
08
EMD
(INR)
70000
SPECIFICATION AND
QUANTITY
Supply,
erection,
testing
and
commissioning
and
guarantee
of
Motor
driven
and
diesel
engine driven pumpsets
in
accordance
to
TAC/NFPA-20 norms for
fire water system of
FBTR, Kalpakkam.
(Detailed specification
and quantity are given
in the tender document
which can be purchased
Deputy
from
Controller
of
Accounts,
Madras
Regional
Accounts
Department
of
Unit,
Atomic
Energy,
VI
Floor, Shastri Bhavan,
4 Haddows Road, Chennai
600 006
by paying
the cost of the tender)
The Documents priced as above can be obtained in person from the above
address between 10.00 a.m.
And 1.00 p.m. on all working days on
submission of a written request in the firms letter head along with
an account payee DEMAND DRAFT or Bankers cheque drawn in favor of
Deputy Controller of Accounts, Madras Regional Accounts Unit (no MO,
cash or postal order acceptable), payable at Chennai.
Wherever the
tender documents are required to be sent by Post at Vendors risk, a
written request for the same along with an Account Payee Demand Draft
towards the tender fee, shall be sent to the Deputy Controller of
Accounts, Madras Regional Accounts Unit at the above address
indicating the details of the tender No., Name and address of the firm
is
also
available
at
and
================
TECHNICAL SPECIFICATIONS
Scope
Supply, erection, testing and commissioning of Motor driven pump 1 No. and Engine Driven
pump set 2 Nos, as per the following technical specifications for fire water system of FBTR,
IGCAR, Kalpakkam.
2.0
2.1
Technical Specification
Pump
a.
b.
c.
d.
e.
Type of pump
Application
Discharge capacity
(m3/hr)
Total head (mwc)
Capacity Vs Head
f.
g.
h.
i.
Shut-off head
Discharge pipe
orientation
Pump total
suspended length
Material of
construction
Shut-off head shall not exceed 140 % of the total head at duty point.
Above floor discharge
5.5 meters (Please see sketch for sump details)
Casing
: CI grade FG 210 as per IS 210
Impeller
: Bronze GR LTB 2 as per IS 318
Shaft
: SS 410
Shaft sleeves :SS 410
Wear rings
: IS 318Bronze GR LTB 2 / IS210 Gr/FG 260
Shaft sealing : Gland packing
Base plate
: MS IS 2062 Gr. B
Fasteners in water : SS 316
j. Corrosion resistance Anti corrosion resistance coating shall be given on the internal and
coating
external of components immersed in the water
k. Bearings
a. Thrust bearing shall be provided,
b. Line shaft bearing : Thordon type
l. Drive
1. Motor driven 1 No.
2. Engine Driven 2 Nos.
m. Speed
Shall not exceed 1500 rpm
n. Accessories
Couplings: Motor Lovejoy/ Pin and bush
Engine - Holset flexible coupling
Flanges: Conforming to BS10 Table E/F
Priming funnels and air vent cocks.
Suction and discharge pressure gauges.
Lubrication fittings.
o. Alignment
Axial or Parallel Misalignment: Within 0.05 mm
Angular misalignment: Within 0.05 mm
p. Balancing
The rotating assembly (pump & motor) shall be dynamically
balanced to the quality of G 6.3 as per ISO: 1940/IS: 11723
q. Vibration and Noise Vibration shall conform to IS: 11727, ISO 2372
level
2.2
Motor
a.
b.
Drive type
Rating
c.
d.
e.
Speed
Heaters
Enclosure/Protection
/Insulation
f.
g.
Orientation
AC Supply
h.
2.3
Control panel
Diesel Engine
i.
Type
j.
Rating
k. Speed
l. Rotation
m. Fuel System
n.
Governor
o.
Starting system
p.
Lubrication
q.
r.
s.
t.
u.
Cooling
Air intake system
Exhaust system
Coupling
Gauge panel
v.
Control panel
w.
2.4
Protections
Gear Box
Standard make right angle gear box shall be supplied to transmit power from
horizontal diesel engine to vertical pumps.
2.5
2.6
From panel to
Engine
Hydrant pressure switch
Low fuel level switch
3.0
Material
List of Standards
a.
b.
c.
d.
e.
f.
g.
2.7
Size
8/10 core, 2.5 m2
2 core, 2.5 m2
2 core, 2.5 m2
Engine
Motor
Pump
Gear box
Fuel pump
Pressure Gauges
Control Cables
Control Switches
Submission of drawings
Following drawings shall be prepared and submitted for approval.
General arrangement drawing indicating overall dimensions of all components
Concrete foundation plan and load details of all equipment.
Complete electrical drawings.
Instrumentation control circuit drawings and layout.
4.0
5.0
5.1
The Pump sets shall be installed on the concrete foundation block constructed by the department
as per the drawings submitted by the Supplier within one month of placing the purchase order.
The Contractor shall ensure that the foundation bolts are correctly embedded and the Pump &
engine are properly leveled before grouting of foundation bolts.
Pump & engine assembly shall be factory aligned. If necessary site alignment is to be
done by skilled fitter.
On completion of entire installation, the contractor shall test these pumps and the results
shall tally with the specifications and performance curves.
Vibration & noise level of the pump unit shall be with in acceptable limit of ISO 2372, IS
11727
5.2
5.3
5.4
6.0
Painting
After complete installation and testing, pumps, accessories and fittings shall be given two
coats of enamel paint of approved make of 0.076 mm thickness each over a coat of primer.
7.0
8.0
8.2
8.3
8.4
8.5
Supply, installation, testing and commissioning of 1 No. of pump coupled to ~ 37KW motor
and 2 Nos. of pumps coupled to ~ 72 HP air cooled diesel engine with gear box, having
capacity of 90 m3/hr @ 85 m head, and in a common base plate along with suitable
accessories viz., , coupling guard, foundation bolts, companion flange, battery, fuel tank,
gauge panel and control panel.
Exhaust piping and cladding including supply of bends based on site requirement.
Installation of control panel and control wiring.
Supply of the required first charge of lubricants, fuel, distilled water for battery and
other consumables.
Painting the equipments as per the approved color code.
8.6
8.7
9.0
9.1 Necessary civil works for the installation of engine driven fire fighting pump set and
fuel tank. Tenderer shall furnish detailed foundation drawing within one month of
placing the purchase order.
9.2 Inter connecting water piping
9.3 Laying of power cable up to control panel.
9.4 Power and water for erection, testing and commissioning work will be provided at no extra
cost.
3 Sets
2 Nos.
2 Nos.
1 Set
1 Set
3 Sets
3 Sets
3 Sets
1 Set
1 Set
1 Set
1 Set
1 Set
Injector cup
Piston rings
Hoses exhaust
Engine gaskets
Fuel oil filters
Lub oil filters
Pressure switch
Temperature switch
Level switch
1 No.
1 Set
1 Set
1 Set
2 Sets
2 Sets
3 Nos.
3 Nos.
3 Nos.
==============