You are on page 1of 1

PLANT: MODEL/TYPE: DATE:

MOTOR NO: O/L SETTING: MCC NO:


FRAME SIZE: C.T.RATIO: STARTER SIZE:
HP/KW: RPM: FLA: SF:
MOTOR MFG: DE BEARING NO:
O/L RANGE: NDE BEARING NO:

chick cleaning dust and aggregate (plowers) CHECK ground resistance in control rom

check brake work by eyes and cleaning CHECK MAIN/AUX. CONTACTS-----

chick gearbox oil don’t over filling of oil CHECK POWER/CONTROL FUSES-----
CHECK MOTOR GROUND CONNECTION ---- CHECK motors base bolt

CHECK MOTOR SHAFT FOR FREE ROTATION ---- INSPECT OPERATION OF MECHANICAL INTERLOCKS----
INSPECT MOTOR COOLING FINS, FAN &FAN
COVER FOR DUST DEPOSIT---. INSPECT BREAKER RATING/SETTING-----
INSPECT/CHECK CALIBRATION OF PROTECTIVE
CHECK BEARINGS FOR PROPER LUBRICATION----- RELAYS-

chick motor sounds and cable connection Motor earthing at two points are intact
chick all coil insulation RUN MOTOR/CHECK VIBRATION &TEMPERATURE----
POWER CABLE-FROM
CONDUCTOR STARTER A - B________ A - C______ B - C________
CONTINUITY CONTROL CABLE-FROM
STARTER START/STOP STA_____ INTERLOCKS____
CONDUCTANCE- FROM STARTER TO
MOTOR WINDINGS MOTOR A - B________ A - C______ B - C________
INSULATION RESISTANCE-FROM STARTER-MOTOR & CABLE.

MOTOR & POWER 1MIN READING_________ 10MIN READING________ PIR_________


CABLE-WITH (500Volts),
INSULATION TESTER.
REPLACEMENT PARTS
REQUIRED/USED AND
ENTERED ON
MATERIAL WORK
ORDER
FUNCTION CHECK CONTROL CIRCUIT-CLOSE AND OPEN STARTER USING ALL CONTROL DEVICES. LIST
THESE DEVICES___ ____ ____ ____ ________.
CONTROL FUSE
POWER FUSE
ELECTRICAL
INSPECTOR: NAME: SIGNATURE: DATE:
ELECTRICAL
SUPERVISOR: NAME: SIGNATURE: DATE:

PLANT SUPERINTENDENT NAME: SIGNATURE: DATE:

You might also like