CBM FIELD DEVELOPMENT PROJECT
TEST REPORT FOR SOLO RUN TEST FOR
MOTORS
Owner
: Reliance Industries Ltd
Contractor : L&T Hydrocarbon Engineering Limited
Sheet
Date of
Testing :
AC MOTOR CHECKOUT/NAMEPLATE DATA
Motor Tested
Serial Number:
Type:
KW:
Phase:
Voltage Rating:
Frequenc
y:
Class:
Current Rating:
Motor Speed:
Manufacturer:
1.
MECHANICAL PREPARATION/CHECKS
CHECK
1. Motor Bearings are greased.
OK
2. Conduit and cable work complete.
OK
3. Turn the motor/fan by hand and check for rubs.
OK
4. Motor GROUNDING is done
OK
5. Cable terminal block is sealed with compound filling material
OK
2.
ELECTRICAL TEST PROCEDURES.
1. Lock main circuit breaker in the OFF position. (Door open)
OK
2. Check for loose wires or damaged components.
OK
3. From the MCC, Megger the motor from phase to phase and phase to
ground
OK
4. Measure the resistance between motor phases.
OK
5. Check the rating of the overload and set to rated full load current of the
motor.
OK
6. Unlock the circuit breaker, switch the selector switch to OFF and close
the breaker.
OK
7. Bump test the motor by switching selector to HAND, and verify correct
rotation.
OK
8. When the rotation is correct run the motor and record current.
OK
Testing Engineer
L&T
RIL(Projects)
RIL(O&M)
Name:
Designation:
Signature & Date:
Format No :LT/RIL/CBM/ELEC/ITP/016
Page No: 1 of 3
CBM FIELD DEVELOPMENT PROJECT
TEST REPORT FOR SOLO RUN TEST FOR
MOTORS
Owner
: Reliance Industries Ltd
Contractor : L&T Hydrocarbon Engineering Limited
Sheet
9. Run for 4 hours and record the temperature, vibration levels, voltage and
current.
OK
10. Switch off and lock out motor after test.
OK
Motor winding resistance:
REF
Resistance Value
Inductance
U1 - U2
V1 - V2
W1 - W2
Motor Insulation resistance:
REF
Resistance Value
R-Y
R-B
Y-B
R - Earth
Y - Earth
B - Earth
Direction of Rotation:
________________________________________________
RUN TEST RESULTS
PHASE
CURRENT
PHASE
VOLTAGE
Parameters/Ti
me
R-Y
START
30 MIN
60 MIN
90 MIN
120
MIN
150
MIN
180
MIN
210
MIN
240
MIN
Y
B
Y-B
B-R
TEMPER
ATURE
RPM
NDE
Testing Engineer
L&T
RIL(Projects)
RIL(O&M)
Name:
Designation:
Signature & Date:
Format No :LT/RIL/CBM/ELEC/ITP/016
SAMPLE
Page No: 2 of 3
CBM FIELD DEVELOPMENT PROJECT
TEST REPORT FOR SOLO RUN TEST FOR
MOTORS
Owner
: Reliance Industries Ltd
Contractor : L&T Hydrocarbon Engineering Limited
Sheet
DE
AMBIENT
TEMP
WINDING
TEMP
*For motors with VFD, RPM of motor as per VFD output also shall be measured and recorded separately.
Details of test equipments used:
IR Tester
Make:
.
Range: ..V
Sl. No: ..
Cal due Date:
Range: ..V
Sl. No: ..
Cal due Date:
Range: ..V
Sl. No: ..
Cal due Date:
Range: ..V
Sl. No: ..
Cal due Date:
Clamp meter
Make:
.
Thermometer
Make:
.
Digital Multi meter
Make:
.
Micro ohm meter
Make:
Range: ..V
Sl. No: ..
Cal due Date:
Sl. No: ..
Cal due Date:
.
Digital tachometer
Make:
Range: ..V
.
Testing Engineer
L&T
RIL(Projects)
RIL(O&M)
Name:
Designation:
Signature & Date:
Format No :LT/RIL/CBM/ELEC/ITP/016
Page No: 3 of 3
CBM FIELD DEVELOPMENT PROJECT
TEST REPORT FOR SOLO RUN TEST FOR
MOTORS
Owner
: Reliance Industries Ltd
Contractor : L&T Hydrocarbon Engineering Limited
Sheet
*all testing equipment details shall be added at time of preparation of final reports and
reports to be attached
Testing Engineer
L&T
RIL(Projects)
RIL(O&M)
Name:
Designation:
Signature & Date:
Format No :LT/RIL/CBM/ELEC/ITP/016