Puppet INC,
PUPP€T THeatTre ProJecrT
contract, Terms anD CONDITIONS
Cllent: Edrick Macalaguim
Project Manager: Adam Alvord
Owners: Roman Cardenas,
Julla Casillas,
Zavier Magpusao,
Alondra Ochoa,
Kala Santos,
Mae Ware
Contact at: salvord@hightechhigh.orgTable of Contents
TableioOEGontentsan ain et 1
Product Description...........:008 2
Terms and Conditions................. 3
BIVe prints iar eterna ranger ete 4
Sketchup Printouts..............0 5-8
Construction Calendar................. 9
Cost Estimate............ee 10
Approval of Estimate................. da
Signature Sheet... 12Puppet Inc. is building a collapsable puppet theatre for Edrick
Macalaguim. It is 6' 2" x 8' 6" total while unfolded, and 6' 2" x 4' 6"
total while folded. It has 1 handle on the back and 2 wheels for
portability. It will be made of 3" plywood, and have standard 2x4's as
a frame for the casters and hinges. The middle panel will be 6’ 2" x 4"
6" and will have a 3' x 1 8" window, and a track for a removable
wooden panel. Each side panel will be 6’ x 2’ (they will have a curve)
and will be attached to the middle panel with hinges. By signing this
form you agree to this Project Description.
Sign Here ->_-----=-
‘AdamAWord Fidy, October 5, 201283602 AM PTPuppet Inc, Terms and conditions
The puppet theatre is intended to be used for puppet
shows. Puppet Inc. is not responsible for any damage or
injury caused involving the puppet theatre. Being used
inappropriately by owner or user, such as leaning on,
hanging on, or lifting up. Warranty expires after Mr.
Macalaguim's puppet project is complete. By signing this
document you agree to the Puppet Inc. terms and
Conditions.
eee ee
Sign Here:
‘Mao Ware Thursday, October 4, 2012 10:97:20 AM PTFront
‘Adam Alvord Thursday, October 4, 2012 10:41:08 AM PT uiBack
‘Adar ANord_ Thursday, October 42012 1041:18 AM PT :S; de
‘Adam Alvord Thursday, October 4, 2012 10:41:28 AM PT. 7,‘dam Aber Thusdsy, tober 4, 2012 1040-50 AM PTMonday Tuesday Wednesda- | Thursday Friday
y
Do Work on Start Continue Try to
measuremen |measureme- | cutting out | cutting wood | finish
ts for wood, nts wood wood
Connect Create board | Cutout Create Attach
side panels | guidance board for curtains and | 2x4's for
with hinges system slide in curtain rod wheel
panel to attach frame
Attach FINISH Test Show to Meet with
wheels and Theatre Mr.Mac Mr-Mac
handles and sell
the theatre
‘adam Atvord—Thuredey, Ono 4 2012 101894 AM PTProject Estimate Detail
Project Puppet Theatre
Con: dick Macalsguim
Contact information: emacayuim@hightcthigh og
Materials StzlAmmount Quantity
“ex
“4x underayment
‘castors
hinges
handle
‘Adam Alvord Thursday, October 4, 2012 10:87:56 AM PT
‘Sut S783
(GA Sales Tax
Owners Adam 178% 555
2 Zavier Estimated tla $7718
3 Reman
‘uta
5 Kale
6 Aondra
T Mae
‘Adjustment Matra Price
siz $36.00
sit.00 $11.99
S248 3498
3367 $1468
56 34.00
Sign Here
10Approval Of
Estimate Puppet inc.
‘hve eda appro i xtra wart be xed, |= py amc apace fi doseer on coro fol" Lunde is neta
{twats compe a) se ath rat ay vay by wang neath espe by Pople | rend bel poo be oder ibe
‘imerh eraninsed tended sae: Atwngh isu nay oer paaant ste tome Sumpruen payrtt peat ay be sepa! ude be
‘Sows booncanes ith pst bua fone a oe suction spd nae Gosmers 2. Fa qouy of wera ete steer se
‘Seltetane sumed iee ccamen Stage peers proscar! ay on ecru Gnues 18 ceed sb ase, Suponni o payrat
‘oprctance ers seowrancoien han het oaresod cot Wsmansen pee eco pee cot apple ot aavrs@nechph ye rl
‘aloo Lr aig este open payne.
Denny One 06.2225 Sa srias 88) seus Cow
‘ors Pej arse
evniaes mers Spruce Date Pejettomger Sone Dae lee
Ais Costs [x i hwo AR oe
ena Oos fe gacanalne|
en eee
vances be KG
[I
[Asam ANord_ Flday, October, 2012 95398 AM PTBy signing this document you
agree to the Puppet Inc. contract
for Edrick Macalaguim’s puppet
theatre.
Edrick Macalaguim<_ ht “ECA
Adam Alvord: /¢ 4)
Julia Casillas: oil =
Roman Cardenas: Avan,
ag ee
Zavier Magpusao: i=
Alondra Ochoa’ a ie
WA es
Kaia Santos: ze
Mae Ware: at. id