Checklist for Tiling (Wall dadoing/flooring)

Project : Doc. No.


Client : Project Location

SITE LOCATION

BEFORE TILING

1 Check for any additions & alterations


2 Cleaning slab off loose mortar/ material

3 Check for levels, Button marking, Mortar thickness

4 Availability of Material - Sand, Tiles

5 Proper Stacking of Tiles

6 Quality of Tiles/ Sand

7 Check for any platform, B/w for wardrobe area

DURING TILING
1 Drg. No./ Date as per which pattern given / starting point

2 Line/ Level fixed, checked & Slopes are as per requirement


3 Check difference in colour shade of tiles and replace with same batch/ lot

4 Proportion of bedding mortar Mixing in A/2 tray

5 Clearing waste tiles/ mortar

6 Clearing for joints/ workmanship

7 Check the skirting for projection, Right angle etc.,

AFTER TILING
1 No material stacked after fixing? (Crack or any damage)

2 Tile surface cleaned properly before starting first coat?

3 Check for any hollow sound

4 Are there any Cracked tiles, should be replaced

5 Check the pointing and grouting materials

6 Curing for four days after grouting I.e. first coat?

Remarks of Quality Assurance Engineer:

Signature Date
Checked By:
Approved By:
: QA/CL-CON/
ect Location :

DATE

YES NO NA
/ lot

Remarks/ Comments