VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60F TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C 10.585 10.318 1,967.068 12,372 trace 12,372 31.1 88.0 43.4 0.98630 12,203 12.203 12,191 0.12630
2C 17.543 17.287 198.416 1,248 trace 1,248 31.5 88.7 43.4 0.98595 1,230 1.846 1,229 0.12630
3C 9.250 8.995 3,565.562 22,427 trace 22,427 31.5 88.7 43.4 0.98595 22,112 33.167 22,078 0.12630
4C 10.252 9.998 3,184.726 20,031 trace 20,031 31.2 88.2 43.4 0.98620 19,755 19.755 19,735 0.12630
5C 3.921 3.668 5,773.909 36,317 trace 36,317 31.6 88.9 43.4 0.98585 35,803 35.803 35,767 0.12630
6C 8.400 8.146 3,938.248 24,771 17.758 17.494 151.657 954 23,817 31.1 88.0 43.4 0.98630 23,491 35.236 23,455 0.12630
7C 11.406 11.150 2,699.842 16,981 trace 16,981 31.9 89.4 43.4 0.98560 16,737 16.737 16,720 0.12630
8C 8.586 8.336 3,419.882 21,510 trace 21,510 31.0 87.8 43.4 0.98640 21,218 31.827 21,186 0.12630
SL.P 7.386 7.100 357.034 2,246 11.412 11.113 228.065 1,434 811 31.3 88.3 43.4 0.98615 800 2.000 798 0.12630
SL.S 7.948 7.650 335.585 2,111 14.789 14.490 117.025 736 1,375 31.3 88.3 43.4 0.98615 1,356 3.389 1,352 0.12630
TOTAL
TOTAL 25,440 160,014 497 3,124 156,890 154,703 154,511
REMARKS: 1,110 51 1,058 1,047 1,046

: PRODUCTION LOADING INTO COT 6C

Gross Volume :(T.O.V.) 160,014 Oil Volume @ 60 F :(N.S.V.) 154,511 DRAFT FWD 8.60 m AFT
Less Free Water : 3,124 Less OBQ/ROB :
Oil Volume :(G.O.V.) 156,890 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 154,703 Long tons/Metric tons :
Long Tons/Metric Tons : 19,539 19,853 Vessel Experience Factor :
API 60 F : 43.4 Adjusted Volum @ 60 F : Capt. Juanda Pardede
B.S & W. % Vol :. 0.21 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 13-Feb-16

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

1,541.236 0.12833 1566.008


155.407 0.12833 157.905
2,792.697 0.12833 2837.583
2,495.043 0.12833 2535.145
4,521.907 0.12833 4594.587
2,966.869 0.12833 3014.555
2,113.878 0.12833 2147.854
2,679.817 0.12833 2722.889
101.034 0.12833 102.658
171.220 0.12833 173.972

19,539 19,853

10.80 m TRIM 2.20 m


LIST NIL

Capt. Ihwan Asrul


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 13-Feb-16 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Ihwan Asrul Santos Rep. Capt. Juanda Parde

Crude Storage Lifting

24 Hours Total (bbls) 1,110 Last Lifting 25-No

BS and W % 0.210 Lifting Vol (bbls) 228,952

Storage Gross (bbls) Next Lifting


156,890 N/A

Storage Net / G.S.V (Nbbls) 154,703 Next Lifting Vol (bbls) N/A

Storage Net / N.S.V (Nbbls) 154,511

Days to Tank Tops 145 Vessel ETA N/A

Total Crude This Month (Nbbls) 154,703

Water Offtake

Water Received 24hrs (bbls) 51 Offtake 24 Hours (bbls) 0

Total Water in Cargo (bbls) 3,124

Total P/W Received (bbls) 66,846

Water Drawn off (bbls) 0 Loading/Incoming Temp 40.0

Specific Gravity 0 Storage tanks's temperature 31.1

PFW PH 0
Note: : PRODUCTION LOADING INTO COT 6C
OIW Average (mg/I) 11

OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0 0

Non Metal Waste 0.0 0

Metal Waste 0 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0


OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 305,791 ###56754 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 0 1,542

Closing (m3) 305,791 55,212 0

Supply Remaining (days)

Remarks : NIL

Meetings

Type Time Comment

05.30 1. Review previous day activity


2. Schedule AHT. Tegap Jaya release to Maleo
3. Monitoring weather /current condition & keep good com
4. Electrical tagging additional welding machine
5. Installation new welding machine
6. Plan wet welding zinc anode at S/Side area
Tool box meeting UWILD
7. All Stb sea chest keep closed and open portside sea ch

1. Review previous day activity


2. Workplace inspection
3. Gathering garbage to garbage container
4. Assist UWILD activity and standby fire watcher
5. Transfer materials to AHT Tegap Jaya
6. Maintenance main deck, etc at COT 1C
7. Food stuff requisition
8. Installation of fresh water and drain pipe at laundry area
Tool box meeting 06.30
9. Maintenance RO No.1

1. Deck and engine Dept. routine maintenance


2. EHS reinduction to all crew
3. Review work place inspection
4. Abandon ship drill
Supervisory Meeting 16.30

Incidents

Type Reference Comments


NIL
Drills
Type Time Commen
NIL

S.T.O.P. Audit program

Hazard Observation Card :

###
Capt. Juanda Pardede

25-Nov-15

bbls

N/A

N/A

N/A

deg C

deg C

TO COT 6C

23460 / 154503
e Vessel

Comment

e to Maleo
on & keep good communication
g machine

Side area
open portside sea chest

tainer
fire watcher
aya
T 1C

n pipe at laundry area

ntenance
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
: PRODUCTION LOADING INTO COT 6C

Mooring/Unmooring :
13.50 : AHT. Tegap Jaya cast off

Bunkering/Debunkering :
NIL

Personnel & Material Transfer :


06.00 : 6 person DSN, 1 person Apexindo, 1 person RUI, 1 person Santos Rep. ( Capt. Juanda ) by KST 51 ( Ou
07.25 : 1 person Electrician SPJ by KST 51 ( Out )
07.40 : 1 person Electrician SPJ by KST 51 ( In )
09.30 : 1 person Santos. Rep by KST 51 ( In )
13.50 : 11 persons Jasalindo by AHT. Tegap Jaya ( In ), 1 person Santos Rep. ( Capt. Juanda ) by AHT. Tegap Ja
13.50 : 3 box waste ( 2 waste, 1 condensate waste ) Maleo by AHT. Tegap Jaya ( Out )
16.30 : 6 person DSN, 1 person Apexindo, 1 person RUI by KST 51 ( In )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist transferred Santos and contractor personnel
2. Continued maintenance main deck,etc at COT 1C
3. Assist UWILD activity and standby fire watcher
4. Checked and tested LSA & FFA and marked one lifebuoy on deck
5. Tested PV valve COT
6. Transferred Maleo garbage container to AHT Tegap Jaya
7. Gathering garbage on deck/accommodation to garbage container on deck

ENGINE :
1. Replaced fine filter for R.O No.1
2. Continued fabricated drain pipe for laundry area
3. Weekly checked & running tested all safety equipment/machinery
4. Running up two A/E for lifting materials and assist UWILD activity / moored at AHT Tegap Jaya :
05.18 - 06.42 : Reposition AHT Tegap Jaya
07.54 - 10.30 : Collected garbage to garbage container at laydown and shifted position of AHT Tegap Jaya
12.48 - 14.00 : Shifted AHT. Tegap Jaya and transferred 3 box Maleo container waste
5. Corrective action for the workplace inspection in E/R
6. Throwed garbage to garbage container in laydown

2. PERMIT TO WORK PW MW HW CSE IP VAL


290 815 271 126 6 377
2.1 J HA 290 815 271 126 4 377
3. BUNKERS(M3) CONS RCVD
M.F.O 0 0
M.D.O 1,542 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 0 0 5 20
DOM 16 0 0 2
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
21 22
MAN HOURS ( POB X 12 HRS )
Previous man hours 209528 Days W/O LTI 807 Since 28-Nov-13
Man hours today 276
Total man hours 209804
Safe man hours 209804
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings
Toolbox UWILD
Hazard observations
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by MST and C/E with deck/engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


13-Feb-16 @2400 HRS

da ) by KST 51 ( Out ), 11 persons Jasalindo by Tegap ( Out )

a ) by AHT. Tegap Jaya ( Out )

Jaya :

AHT Tegap Jaya

TOTAL
1885
1883
TRANS ROB
0 305,791
0 55,212
ROB `
125
158
ROB
200
POB
43

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1154 2 1156
50 1 51
768 0 768
3 0 3
0 0 0
1027 0 1027

NIL

NIL

NIL

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Feb-16

MDO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 77,059 0 0 1,700 0 75,359
02 75,359 0 0 1,900 0 73,459 Running test boiler
03 73,459 0 0 1,700 0 71,759
04 71,759 0 0 1,900 0 69,859 Running test boiler
05 69,859 0 0 1,700 0 68,159
06 68,159 0 0 1,650 0 66,509 Test after installation ups
07 66,509 0 0 1,700 0 64,809
08 64,809 0 0 1,964 0 62,845 Internal cargo transfer
09 62,845 0 0 1,521 0 61,324
10 61,324 0 0 1,530 0 59,794
11 59,794 0 0 1,515 0 58,279
12 58,279 0 0 1,525 0 56,754
13 56,754 0 0 1,542 0 55,212
18 16

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Feb-16

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 308,491 0 0 0 0 308,491
02 308,491 0 0 0 0 308,491
03 308,491 0 0 0 0 308,491
04 308,491 0 0 0 0 308,491
05 308,491 0 0 0 0 308,491
06 308,491 0 0 0 0 308,491
07 308,491 0 0 0 0 308,491
08 308,491 0 0 2,700 0 305,791 Internal cargo transfer
09 305,791 0 0 0 0 305,791
10 305,791 0 0 0 0 305,791
11 305,791 0 0 0 0 305,791
12 305,791 0 0 0 0 305,791
13 305,791 0 0 0 0 305,791
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 11 12
2 10 10
3 14 14
4 13 13
5 12 11
6 11 13
7 14 14
8 13 12
9 10 13
10 11 14
11 11 14
12 14 12
13 10 13
14 10
15 12
16 13
17 10
18 11
19 12
20 14
21 10
22 12
23 11
24 12
25 14
26 13
27 12
28 14
29 12
30 14
31 13

TOTAL 373 165 0 0 0 0 0 0 0 0 0 0


LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 7 8
2 8 7
3 8 8
4 7 8
5 8 8
6 8 8
7 7 8
8 8 7
9 8 8
10 8 8
11 8 8
12 8 8
13 7 8
14 8
15 7
16 7
17 8
18 8
19 8
20 8
21 7
22 8
23 8
24 8
25 8
26 8
27 7
28 8
29 8
30 8
31 8

TOTAL 240 102 0 0 0 0 0 0 0 0 0 0


LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,952 4,977
2 4,938 4,956
3 4,973 4,962
4 4,961 4,971
5 4,946 4,968
6 4,927 4,955
7 4,938 4,962
8 4,981 4,966
9 4,972 4,959
10 4,963 4,957
11 4,959 4,963
12 4,945 4,968
13 4,937 4,961
14 4,962
15 4,976
16 4,948
17 4,952
18 4,928
19 4,942
20 4,965
21 4,928
22 4,951
23 4,972
24 4,938
25 4,944
26 4,958
27 4,967
28 4,935
29 4,951
30 4,962
31 4,958

TOTAL 153,529 64,525 0 0 0 0 0 0 0 0 0 0

Averag
e/Day 4,953 2,304 0 0 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity R.O Waste Water ( M3 )


Date
JAN FEB MARC APR MEY JUN
1 130 65
2 30 80
3 130 125
4 40 120
5 75 125
6 40 70
7 125 100
8 100 75
9 110 85
10 135 85
11 120 65
12 80 105
13 50 110
14 125
15 120
16 95
17 115
18 100
19 105
20 145
21 95
22 120
23 110
24 80
25 105
26 115
27 100
28 110
29 105
30 145
31 100

TOTAL 3,155 1,210 0


DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : Feb 2016

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Feb-2016 22 1 16 39
2-Feb-2016 22 1 16 39
3-Feb-2016 22 0 25 47
4-Feb-2016 22 1 25 48
5-Feb-2016 23 1 18 42
6-Feb-2016 23 1 14 38
7-Feb-2016 23 0 12 35
8-Feb-2016 23 0 12 35
9-Feb-2016 23 0 16 39
10-Feb-2016 23 1 21 45
11-Feb-2016 23 0 21 44
12-Feb-2016 23 1 20 44
13-Feb-2016 23 0 20 43

TOTAL 295 7 236 538