PT.

MEGAPRIMA PERSADA
Bore Hole ID : A-02 Bore Type :- Date Start : 27/04/2015
Easting : 386,067.20 Total Depth : 7.5 m Date Finished : 27/04/2015
Northing : 9,949,590.48 Scale : 1 : 500 Drawn By : Agung P
Elevation : - Operator : - Checked By : Yudi Supriadi

m ) y
) a g
m GAMMA LONG DENSITY SHORT DENSITY s m
s r o Thickness
( e g ( l
7500 13000 CPS 25000 n o h o
h 0 CPS 100 0 CPS
d t h Description Coal
t t
r s p t
p Speed : 3-5 mt/mnt Speed : 3-5 mt/mnt Speed : 3-5 mt/mnt a i
e i e
D
T.C : 2 sec T.C : 2 sec T.C : 2 sec H H D L
Interval : 5 cm Interval : 5 cm Interval : 5 cm (m)

0 0
SILTSTONE: (0-1.0) :
Siltstone,Grey,Moderately.

ALLUVIUM: (1.0-7.5) :
Alluvium,White,Fine grained,Brittle

5 5

Lokasi Eksplorasi : PT. Sarana Marine Perkasa_ Kab : Kutai Barat _ Kalimantan Timur