You are on page 1of 3

0

PT INDULEXCO
ENGINEERING & MANAGEMENT CONSULTING SERVICES

Project : DED Perluasan Bandara SMB II Palembang Depth : 30 m


Location
Client
: Bandara SMB II Palembang
: PT. Angkasa Pura II
Start Date
End Date
:
:
29-04-2016
1-05-2016 BORE LOG
Coord. X : 467248.00 Cor Dia. : Nx, 73 mm
Coord. Y : 9680058.00 Casing Dia. :
Elevasi : m Driller : Mamat Rahmat HOLE: BH 1
Logged by :
(m)

Shear Strength SPT Test

Remark
Water

Core

Elev.
Description
Depth

(m) C
N - Blows N
10 20 30 40 50 60
(Kpa) ( o)

0 0.00
LEMPUNG LANAUAN , COKLAT
KEMERAHAN, KONSISTENSI
SEDANG - TEGUH, PLASTISITAS :
SEDANG, MENGANDUNG
1 -1.00
MATERIAL TUFA TIMBUNAN )

5 6 8 14
2 -2.00
LEMPUNG LANAUAN , COKLAT
KEMERAHAN, KONSISTENSI
SEDANG - TEGUH, PLASTISITAS :
SEDANG, MENGANDUNG
3 -3.00
MATERIAL TUFA TIMBUNAN )

UD 1 : 3.00 - 3.50 m

3 10 10 20
4 -4.00

5 -5.00
LEMPUNG LANAUAN , COKLAT
KEMERAHAN, KONSISTENSI
SEDANG - TEGUH, PLASTISITAS :
SEDANG, MENGANDUNG
MATERIAL TUFA TIMBUNAN ) 5 8 10 18
6 -6.00

7 -7.00
UD 2 : 7.00 - 7.50 m

8 10 12 22
8 -8.00

LEMPUNG PASIRAN, ABU-ABU


KONSISTENSI SEDANG - TEGUH,
PLASTISITAS SEDANG, KEPADAT-
9 -9.00
AN : PADAT - SANGAT PADAT.

7 16 20 36
10 -10.00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 01
20 to 35 % Adjective UDS - Pitcher Disturbed Sample OF 03
35 to 50 % And
0

PT INDULEXCO
ENGINEERING & MANAGEMENT CONSULTING SERVICES

Project : DED Perluasan Bandara SMB II Palembang Depth : 30 m


Location
Client
:
:
Bandara SMB II Palembang
PT. Angkasa Pura II
Start Date
End Date
:
:
27-04-2016
29-04-2016 BORE LOG
Coord. X : 467248.000 Cor Dia. : Nx, 73 mm
Coord. Y : 9680058 Casing Dia. :
Elevasi : 0.00 m Driller : Mamat Rahmat HOLE: BH 1
Logged by :
(m)

Shear Strength SPT Test

Remark
Water

Core

Elev.
Description
Depth

(m) C
(Kpa)
N - Blows N
10 20 30 40 50 60
( o)

10 -10.00

11 -11.00
LEMPUNG PASIRAN, ABU-ABU
KONSISTENSI SEDANG - TEGUH,
PLASTISITAS SEDANG, KEPADAT-
AN : PADAT - SANGAT PADAT.
15 15 19 34
12 -12.00

13 -13.00

LEMPUNG PASIRAN, ABU-ABU


KONSISTENSI SEDANG - TEGUH,
PLASTISITAS SEDANG, KEPADAT- 10 12 18 30
14 -14.00
AN : PADAT - SANGAT PADAT.

15 -15.00

18 16 24 40
16 -16.00

LEMPUNG PASIRAN, ABU-ABU


KONSISTENSI SEDANG - TEGUH,
PLASTISITAS SEDANG, KEPADAT-
17 -17.00
AN : PADAT - SANGAT PADAT.

21 23 23 46
18 -18.00

LEMPUNG PASIRAN, ABU-ABU


19 -19.00
KONSISTENSI SEDANG - TEGUH,
PLASTISITAS SEDANG, KEPADAT-
AN : PADAT - SANGAT PADAT.
LEPAS.
20 22 26 48
20 -20.00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 02
20 to 35 % Adjective UDS - Pitcher Disturbed Sample OF 03
35 to 50 % And
0

PT INDULEXCO
ENGINEERING & MANAGEMENT CONSULTING SERVICES

Project : DED Perluasan Bandara SMB II Palembang Depth : 30 m


Location
Client
:
:
Bandara SMB II Palembang
PT. Angkasa Pura II
Start Date
End Date
:
:
27-04-2016
29-04-2016 BORE LOG
Coord. X : 467248.000 Cor Dia. : Nx, 73 mm
Coord. Y : 9680058 Casing Dia. :
Elevasi : 0.00 m Driller : Mamat Rahmat HOLE: BH 1
Logged by :
(m)

Shear Strength SPT Test

Remark
Water

Core

Elev.
Description
Depth

(m) C
(Kpa)
N - Blows N
10 20 30 40 50 60
( o)

20 -20.00

LEMPUNG PASIRAN, ABU-ABU


KONSISTENSI SEDANG - TEGUH,
PLASTISITAS SEDANG, KEPADAT-
21 -21.00
AN : PADAT - SANGAT PADAT.
LEPAS.

25 27 29 56
22 -22.00

23 -23.00
BATU LEMPUNG, BERWARNA
ABU-ABU, KEPADATAN :
PADAT - AGAK KERAS - KERAS.

24 29 31 60
24 -24.00

25 -25.00
BATU LEMPUNG, BERWARNA
ABU-ABU, KEPADATAN :
PADAT - AGAK KERAS - KERAS.
25 25 35 60
26 -26.00

27 -27.00
BATU LEMPUNG, BERWARNA
ABU-ABU, KEPADATAN :
PADAT - AGAK KERAS - KERAS.
20 28 32/9 >60
28 -28.00

29 -29.00
BATU LEMPUNG, BERWARNA
ABU-ABU, KEPADATAN :
PADAT - AGAK KERAS - KERAS.

21 26 34/11 >60
30 -30.00

0 to 10 % Trace UDS - Shelby Tube SPT Sample


10 to 20 % Some UDS - Piston PMT Test P. 03
20 to 35 % Adjective UDS - Pitcher Disturbed Sample OF 03
35 to 50 % And

You might also like