BORING LOG

DRILLING LOG
Project : DED Jalan Lintas Timur Date Commenced : September 13, 2020
Prov. Sumatera Selatan Date Complete : September 16, 2020
Location : Jembatan Air Waru A ABT 1 arah Palembang Field Geotechnical Eng : Mulyadi
Jl. Srijaya Raya Lintas Timur Sumatera Drilling Master : Mulyadi
Bore Hole Number : BH.01 Driling Type Machine : FM - 1
Method of Sampling : Rotary Drilling Core Type : Core Barrel
Core Diameter (mm) : Ø 73 mm
GWL : -2.00 m (dari muka tanah titik Boring) Weight of Hammer (kg) : 63.5 kg
Coordinate : 3°03'14.6"S 104°44'35.4"E Dist. Falling Hammer : 75 cm
Cassing Diametter (mm) : 89 mm
Total Depth : -30.0 meter Page : 1
Thickness

STANDARD PENETRATION TEST


GWL (m)

Sample
Core Description SPT
Bore " N " Value (Blows/Feet)
Depth
Profile
N1 N2 N3 N-SPT 0 10 20 30 40 50 60
0 0

1.00 1
Tanah Lempung, Warna Cokat Kemerahan
3.00

Plastisitas Rendah Bersifat Sangat Lunak 2


2.00 2
1 1 2 3
-3.00
3.00 3

4.00 4 1
0 0 1 1
5.00 5
Tanah Lumpur, Warna Hitam Kecoklatan
1
6.00

6.00 Plastisitas Sangat Rendah Bersifat Sangat 6


Lunak
0 0 1 1
7.00 7

1
8.00 8
0 0 1 1
-9.00
9.00 9
Tanah Gambut, Warna Hitam Bersifat Sangat
1.50

1
10.00 Lunak 10
-10.50 0 0 1 1
11.00 11

3
12.00 12
1 1 2 3
13.00 13
Tanah Lempung, Warna Hitam Plastisitas
6.00

Rendah Bersifat Lunak 4


14.00 14
1 2 2 4
15.00 15

16.00 16 6
-16.50 2 3 3 6
17.00 17

18.00 18 10
3 4 6 10
19.00 Tanah Lempung Berpasir, Warna Abu-abu 19
5.50

Plastisitas Sedang Bersifat Sedang


12
20.00 20
3 5 7 12
21.00 21

-22.00 15
22.00 22
5 6 9 15
23.00 23
34
24.00 24
10 15 19 34
25.00 25

Tanah Lempung, Warna Abu-abu Plastisitas 54


8.00

26.00 26
Tinggi Bersifat Padat 13 24 30 54
27.00 27

54
28.00 28
16 24 30 54
29.00 29

-30.00 60
30.00 30
19 27 33 60

REMARK SPT ( Standard Penetration Test ) Clay Organic Batu Bara


U D S ( Undisturbed Sampling ) Silt Sand Batuan Ground Water Lavel
Bore Hole Number
: BH.01 Mulai Kerja : 13 September 2020
Project : DED Jalan Lintas Timur Selesai kerja : 16 September 2020
Prov. Sumatera Selatan Dikerjakan oleh : Mulyadi
Location : Jembatan Air Waru A ABT 1 arah Palembang Diperiksa oleh : Mulyadi
Jl. Srijaya Raya Lintas Timur Sumatera
Total Depth : -30.00 m
GWL : -2.00 m (dari muka tanah titik Boring)
Jumlah Pukulan (Uji SPT) Koreksi Pengaruh Energi N60
Dalam

N1 N2 N3 Nm Brt Vol N60 Diagram SPT


(m)

pukulan/ pukulan/ pukulan/ pukulan/ Total CN CE CB CR CS pukulan/ Jumlah Pukulan


15 cm 15 cm 15 cm 30 cm (kN/m³) 30 cm 0 10 20 30 40 50
0
0.0 - - - - 0 0 0 0 0 0 0.00
1
1.0
2
2.0 1 1 2 3 18.5 1.500 0.60 1.00 0.75 1.00 2.02
3
3.0
4
4.0 0 0 1 1 18.5 1.500 0.60 1.00 0.80 1.00 0.72
5
5.0
6
6.0 0 0 1 1 18.5 1.500 0.60 1.00 0.85 1.00 0.76
7
7.0
8
8.0 0 0 1 1 18.5 1.500 0.60 1.00 0.95 1.00 0.85
9
9.0
10
10.0 0 0 1 1 18.5 1.500 0.60 1.00 0.95 1.00 0.85
11
11.0
12
12.0 1 1 2 3 18.5 1.500 0.60 1.00 1.00 1.00 2.70
13
13.0
14
14.0 1 2 2 4 18.5 1.500 0.60 1.00 1.00 1.00 3.60
15
15.0
16
16.0 2 3 3 6 18.5 1.500 0.60 1.00 1.00 1.00 5.40
17
17.0
18
18.0 3 4 6 10 18.5 1.500 0.60 1.00 1.00 1.00 9.00
19
19.0
20
20.0 3 5 7 12 19.0 1.500 0.60 1.00 1.00 1.00 10.80
21
21.0
22
22.0 5 6 9 15 19.0 1.500 0.60 1.00 1.00 1.00 13.50
23
23.0
24
24.0 10 15 19 34 19.5 1.500 0.60 1.00 1.00 1.00 30.59
25
25.0
26
26.0 13 24 30 54 19.5 1.500 0.60 1.00 1.00 1.00 48.59
27
27.0
28
28.0 16 24 30 54 19.5 1.500 0.60 1.00 1.00 1.00 48.59
29
29.0
30
30.0 19 27 33 60 19.5 1.500 0.60 1.00 1.00 1.00 50.00
DRILLING LOG
Project : DED Jalan Lintas Timur Date Commenced : September 17, 2020
Prov. Sumatera Selatan Date Complete : September 20, 2020
Location : Jembatan Air Waru A ABT 2 arah Indralaya Field Geotechnical Eng : Mulyadi
Jl. Srijaya Raya Lintas Timur Sumatera Drilling Master : Mulyadi
Bore Hole Number : BH.02 Driling Type Machine : FM - 1
Method of Sampling : Rotary Drilling Core Type : Core Barrel
Core Diameter (mm) : Ø 73 mm
GWL : -2.00 m (dari muka tanah titik Boring) Weight of Hammer (kg) : 63.5 kg
Coordinate : 3°03'15.4"S 104°44'35.5"E Dist. Falling Hammer : 75 cm
Cassing Diametter (mm) : 89 mm
Total Depth : -28.0 meter Page : 1
Thickness

STANDARD PENETRATION TEST


GWL (m)

Sample
Core Description SPT
Bore " N " Value (Blows/Feet)
Depth
Profile
N1 N2 N3 N-SPT 0 10 20 30 40 50 60
0 0
1.50

Tanah Timbunan Warna Coklat + Aggregate


1.00 1
-1.50
4
2.00 2
1 2 2 4
3.00 3

4.00 4 1
0 0 1 1
5.00 5
Tanah Lumpur, Warna Hitam Kecoklatan
8.50

1
6.00 Plastisitas Rendah Bersifat Sangat Lunak 6
0 0 1 1
7.00 7

1
8.00 8
0 0 1 1
9.00 9
-10.00 1
10.00 10
0 0 1 1
Tanah Gammbut, Warna Hitam Bersifat
2.00

11.00 11
Sangat Lunak
-12.00 5
12.00 12
1 2 3 5
13.00 13
8
14.00 14
2 3 5 8
15.00 15
Tanah Lempung, Warna Abu-abu Plastisitas
7.00

Rendah Bersifat Lunak 12


16.00 16
4 5 7 12
17.00 17

18.00 18 17
5 7 10 17
-19.00
19.00 19

47
20.00 20
10 20 27 47
Tanah Lempung Berpasir, Warna Abu-abu
3.50

21.00 Bersifat Padat 21


54
22.00 22
-22.50 17 25 29 54
23.00 23
60
24.00 24
19 27 33 60
25.00 Tanah Lempung, Warna Abu-abu Plastisitas 25
5.50

Tinggi Bersifat Sangat Keras


60
26.00 26
20 29 34 63
27.00 27

-28.00 60
28.00 28
22 30 36 66
29.00 29

30.00 30

REMARK SPT ( Standard Penetration Test ) Clay Organic Batu Bara


U D S ( Undisturbed Sampling ) Silt Sand Batuan Ground Water Lavel
Bore Hole Number
: BH.02 Mulai Kerja : 17 September 2020
Project : DED Jalan Lintas Timur Selesai kerja : 20 September 2020
Prov. Sumatera Selatan Dikerjakan oleh : Mulyadi
Location : Jembatan Air Waru A ABT 2 arah Indralaya Diperiksa oleh : Mulyadi
Jl. Srijaya Raya Lintas Timur Sumatera
Total Depth : -28.00 m
GWL : -2.00 m (dari muka tanah titik Boring)
Jumlah Pukulan (Uji SPT) Koreksi Pengaruh Energi N60
Dalam

N1 N2 N3 Nm Brt Vol N60 Diagram SPT


(m)

pukulan/ pukulan/ pukulan/ pukulan/ Total CN CE CB CR CS pukulan/ Jumlah Pukulan


15 cm 15 cm 15 cm 30 cm (kN/m³) 30 cm 0 10 20 30 40 50
0
0.0 - - - - 0 0 0 0 0 0 0.00
1
1.0
2
2.0 1 2 2 4 18.5 1.515 0.60 1.00 0.75 1.00 2.73
3
3.0
4
4.0 0 0 1 1 18.5 1.515 0.60 1.00 0.80 1.00 0.73
5
5.0
6
6.0 0 0 1 1 18.5 1.515 0.60 1.00 0.85 1.00 0.77
7
7.0
8
8.0 0 0 1 1 18.5 1.515 0.60 1.00 0.95 1.00 0.86
9
9.0
10
10.0 0 0 1 1 18.5 1.515 0.60 1.00 0.95 1.00 0.86
11
11.0
12
12.0 1 2 3 5 18.5 1.515 0.60 1.00 1.00 1.00 4.55
13
13.0
14
14.0 2 3 5 8 18.5 1.515 0.60 1.00 1.00 1.00 7.27
15
15.0
16
16.0 4 5 7 12 19.0 1.515 0.60 1.00 1.00 1.00 10.91
17
17.0
18
18.0 5 7 10 17 19.0 1.515 0.60 1.00 1.00 1.00 15.45
19
19.0
20
20.0 10 20 27 47 19.5 1.515 0.60 1.00 1.00 1.00 42.73
21
21.0
22
22.0 17 25 29 54 19.5 1.515 0.60 1.00 1.00 1.00 49.09
23
23.0
24
24.0 19 27 33 60 19.5 1.515 0.60 1.00 1.00 1.00 50.00
25
25.0
26
26.0 20 29 34 63 19.5 1.515 0.60 1.00 1.00 1.00 50.00
27
27.0
28
28.0 22 30 36 66 19.5 1.515 0.60 1.00 1.00 1.00 50.00
29
29.0
30
30.0
DRILLING LOG
Project : DED Jalan Lintas Timur Date Commenced : September 19, 2020
Prov. Sumatera Selatan Date Complete : September 21, 2020
Location : Jembatan Kenangan A Box Culvert arah Indralaya Field Geotechnical Eng : Lukman
Jl. Srijaya Raya Lintas Timur Sumatera Drilling Master : Lukman
Bore Hole Number : BH.03 Driling Type Machine : FM - 1
Method of Sampling : Rotary Drilling Core Type : Core Barrel
Core Diameter (mm) : Ø 73 mm
GWL : -1.00 m (dari muka tanah titik Boring) Weight of Hammer (kg) : 63.5 kg
Coordinate : 3°03'55.1"S 104°44'33.6"E Dist. Falling Hammer : 75 cm
Cassing Diametter (mm) : 89 mm
Total Depth : -30.0 meter Page : 1
Thickness

STANDARD PENETRATION TEST


GWL (m)

Sample
Core Description SPT
Bore " N " Value (Blows/Feet)
Depth
Profile
N1 N2 N3 N-SPT 0 10 20 30 40 50 60
0 0

1.00 1
Tanah Lempung Berpasir Berbatu, Warna
3.00

Kuning Bersifat Lunak 2


2.00 2
0 1 1 2
-3.00
3.00 3

4.00 4 1
0 0 1 1
Tanah Lempung, Warna Coklat Plastisitas
4.00

5.00 5
Rendah Bersifat Sangat Lunak
1
6.00 6
0 0 1 1
-7.00
7.00 7

3
8.00 8
1 1 2 3
9.00 9

Tanah Lempung Organik, Warna Coklat 5


6.00

10.00 10
Bersifat Lunak 1 2 3 5
11.00 11

6
12.00 12
2 3 3 6
-13.00
13.00 13
5
14.00 14
2 2 3 5
15.00 15

Tanah Lempung, Warna Hitam Plastisitas 6


6.00

16.00 16
Rendah Bersifat Lunak 2 3 3 6
17.00 17

18.00 18 14
3 5 9 14
-19.00
19.00 19

28
20.00 20
5 13 15 28
21.00 21
Tanah Lempung Berpasir Halus, Warna Abu-
5.00

abu Muda Bersifat Sedang sampai Padat 33


22.00 22
7 15 18 33
23.00 23

-24.00 31
24.00 24
10 15 16 31
25.00 25

31
26.00 26
11 14 17 31
6.00

27.00 Pasir Halus, Bersifat Padat 27

34
28.00 28
11 15 19 34
29.00 29

-30.00 47
30.00 30
13 19 28 47

REMARK SPT ( Standard Penetration Test ) Clay Organic Batu Bara


U D S ( Undisturbed Sampling ) Silt Sand Batuan Ground Water Lavel
Bore Hole Number
: BH.03 Mulai Kerja : 19 September 2020
Project : DED Jalan Lintas Timur Selesai kerja : 21 September 2020
Prov. Sumatera Selatan Dikerjakan oleh : Lukman
Location : Jembatan Kenangan A Box Culvert arah Indralaya Diperiksa oleh : Lukman
Jl. Srijaya Raya Lintas Timur Sumatera
Total Depth : -30.00 m
GWL : -1.00 m (dari muka tanah titik Boring)
Jumlah Pukulan (Uji SPT) Koreksi Pengaruh Energi N60
Dalam

N1 N2 N3 Nm Brt Vol N60 Diagram SPT


(m)

pukulan/ pukulan/ pukulan/ pukulan/ Total CN CE CB CR CS pukulan/ Jumlah Pukulan


15 cm 15 cm 15 cm 30 cm (kN/m³) 30 cm 0 10 20 30 40 50
0
0.0 - - - - 0 0 0 0 0 0 0.00
1
1.0
2
2.0 0 1 1 2 18.5 1.499 0.60 1.00 0.75 1.00 1.35
3
3.0
4
4.0 0 0 1 1 18.5 1.499 0.60 1.00 0.80 1.00 0.72
5
5.0
6
6.0 0 0 1 1 18.5 1.499 0.60 1.00 0.85 1.00 0.76
7
7.0
8
8.0 1 1 2 3 18.5 1.499 0.60 1.00 0.95 1.00 2.56
9
9.0
10
10.0 1 2 3 5 18.5 1.499 0.60 1.00 0.95 1.00 4.27
11
11.0
12
12.0 2 3 3 6 18.5 1.499 0.60 1.00 1.00 1.00 5.40
13
13.0
14
14.0 2 2 3 5 18.5 1.499 0.60 1.00 1.00 1.00 4.50
15
15.0
16
16.0 2 3 3 6 18.5 1.499 0.60 1.00 1.00 1.00 5.40
17
17.0
18
18.0 3 5 9 14 19.0 1.499 0.60 1.00 1.00 1.00 12.59
19
19.0
20
20.0 5 13 15 28 19.0 1.499 0.60 1.00 1.00 1.00 25.18
21
21.0
22
22.0 7 15 18 33 19.5 1.499 0.60 1.00 1.00 1.00 29.67
23
23.0
24
24.0 10 15 16 31 19.5 1.499 0.60 1.00 1.00 1.00 27.87
25
25.0
26
26.0 11 14 17 31 19.5 1.499 0.60 1.00 1.00 1.00 27.87
27
27.0
28
28.0 11 15 19 34 19.5 1.499 0.60 1.00 1.00 1.00 30.57
29
29.0
30
30.0 13 19 28 47 19.5 1.499 0.60 1.00 1.00 1.00 42.26
DRILLING LOG
Project : DED Jalan Lintas Timur Date Commenced : September 21, 2020
Prov. Sumatera Selatan Date Complete : September 23, 2020
Location : Jembatan Kenangan A Box Culvert arah Palembang Field Geotechnical Eng : Lukman
Jl. Srijaya Raya Lintas Timur Sumatera Drilling Master : Lukman
Bore Hole Number : BH.04 Driling Type Machine : FM - 1
Method of Sampling : Rotary Drilling Core Type : Core Barrel
Core Diameter (mm) : Ø 73 mm
GWL : -1.00 m (dari muka tanah titik Boring) Weight of Hammer (kg) : 63.5 kg
Coordinate : 3°03'54.7"S 104°44'33.9"E Dist. Falling Hammer : 75 cm
Cassing Diametter (mm) : 89 mm
Total Depth : -30.0 meter Page : 1
Thickness

STANDARD PENETRATION TEST


GWL (m)

Sample
Core Description SPT
Bore " N " Value (Blows/Feet)
Depth
Profile
N1 N2 N3 N-SPT 0 10 20 30 40 50 60
0 0

1.00 Tanah Lempung Berpasir, Warna Coklat 1


2.50

Bersifat Lunak
2
2.00 2
-2.50 0 1 1 2
3.00 3

4.00 4 1
Tanah Lempung, Warna Coklat Kehitaman
3.50

0 0 1 1
Plastisitas Rendah Bersifat Sangat Lunak
5.00 5
-6.00 3
6.00 6
1 1 2 3
7.00 7

3
8.00 8
1 1 2 3
Tanah Lempung Organik, Warna Hitam
6.00

9.00 9
Bersifat Lunak
5
10.00 10
1 2 3 5
11.00 11
-12.00 5
12.00 12
2 2 3 5
13.00 13
8
14.00 14
3 4 4 8
Tanah Lempung, Warna Abu-abu Muda
5.50

15.00 Plastisitas Sedang Bersifat Lunak 15

16.00 16 7
3 3 4 7
17.00 17
-17.50

18.00 18 29
5 7 12 19
Tanah Lempung, Warna Abu-abu Muda
2.50

19.00 Plastisitas Sedang Bersifat Sedang 19


-20.00 23
20.00 20
7 9 14 23
21.00 21
Tanah Lempung Berpasir, Warna Abu-abu
3.00

Muda Bersifat Sedang 25


22.00 22
8 10 15 25
-23.00
23.00 23
37
24.00 24
10 17 20 37
25.00 25

34
6.00

26.00 Pasir Halus, Warna Abu-abu Bersifat Padat 26


11 15 19 34
27.00 27

36
28.00 28
12 15 21 36
-29.00
29.00 29
1.00

Pasir Kasar, Bersifat Sangat Padat


-30.00 60
30.00 30
17 25 39 64

REMARK SPT ( Standard Penetration Test ) Clay Organic Batu Bara


U D S ( Undisturbed Sampling ) Silt Sand Batuan Ground Water Lavel
Bore Hole Number
: BH.04 Mulai Kerja : 21 September 2020
Project : DED Jalan Lintas Timur Selesai kerja : 23 September 2020
Prov. Sumatera Selatan Dikerjakan oleh : Lukman
Location : Jembatan Kenangan A Box Culvert arah Palembang Diperiksa oleh : Lukman
Jl. Srijaya Raya Lintas Timur Sumatera
Total Depth : -30.00 m
GWL : -1.00 m (dari muka tanah titik Boring)
Jumlah Pukulan (Uji SPT) Koreksi Pengaruh Energi N60
Dalam

N1 N2 N3 Nm Brt Vol N60 Diagram SPT


(m)

pukulan/ pukulan/ pukulan/ pukulan/ Total CN CE CB CR CS pukulan/ Jumlah Pukulan


15 cm 15 cm 15 cm 30 cm (kN/m³) 30 cm 0 10 20 30 40 50
0
0.0 - - - - 0 0 0 0 0 0 0.00
1
1.0
2
2.0 0 1 1 2 18.5 1.500 0.60 1.00 0.75 1.00 1.35
3
3.0
4
4.0 0 0 1 1 18.5 1.500 0.60 1.00 0.80 1.00 0.72
5
5.0
6
6.0 1 1 2 3 18.5 1.500 0.60 1.00 0.85 1.00 2.29
7
7.0
8
8.0 1 1 2 3 18.5 1.500 0.60 1.00 0.95 1.00 2.56
9
9.0
10
10.0 1 2 3 5 18.5 1.500 0.60 1.00 0.95 1.00 4.27
11
11.0
12
12.0 2 2 3 5 18.5 1.500 0.60 1.00 1.00 1.00 4.50
13
13.0
14
14.0 3 4 4 8 18.5 1.500 0.60 1.00 1.00 1.00 7.20
15
15.0
16
16.0 3 3 4 7 18.5 1.500 0.60 1.00 1.00 1.00 6.30
17
17.0
18
18.0 5 7 12 19 19.0 1.500 0.60 1.00 1.00 1.00 17.10
19
19.0
20
20.0 7 9 14 23 19.0 1.500 0.60 1.00 1.00 1.00 20.70
21
21.0
22
22.0 8 10 15 25 19.0 1.500 0.60 1.00 1.00 1.00 22.49
23
23.0
24
24.0 10 17 20 37 19.5 1.500 0.60 1.00 1.00 1.00 33.29
25
25.0
26
26.0 11 15 19 34 19.5 1.500 0.60 1.00 1.00 1.00 30.59
27
27.0
28
28.0 12 15 21 36 19.5 1.500 0.60 1.00 1.00 1.00 32.39
29
29.0
30
30.0 17 25 39 64 19.5 1.500 0.60 1.00 1.00 1.00 50.00
DRILLING LOG
Project : DED Jalan Lintas Timur Date Commenced : September 29, 2020
Prov. Sumatera Selatan Date Complete : October 1, 2020
Location : Jembatan Keramasan Lama Arah Palembang Field Geotechnical Eng : Jamil
Jl. Meyjen Yusuf Singedekane Drilling Master : Jamil
Bore Hole Number : BH.01 Driling Type Machine : FM - 1
Method of Sampling : Rotary Drilling Core Type : Core Barrel
: Core Diameter (mm) : Ø 73 mm
GWL : -3.00 m (dari muka titik Boring) Weight of Hammer (kg) : 63.5 kg
Coordinate : 3°02'40.1"S 104°44'14.9"E Dist. Falling Hammer : 75 cm
Cassing Diametter (mm) : 89 mm
Total Depth : -30.0 meter Page : 1
Thickness

STANDARD PENETRATION TEST


GWL (m)

Sample
Core Description SPT
Bore " N " Value (Blows/Feet)
Depth
Profile
N1 N2 N3 N-SPT 0 10 20 30 40 50 60
0 0
Tanah Lempung, Warna Merah Kecoklatan
1.00

Bersifat Lunak -1.00


1.00 1

2
2.00 2
1 1 1 2
Tanah Lempung, Warna Abu-abu Plastisitas
3.50

3.00 Rendah Bersifat Lunak 3

4.00 4 3
-4.50 1 1 2 3
5.00 5

5
6.00 6
1 2 3 5
7.00 Tanah Lempung, Warna Abu-abu Kehitaman 7
5.50

Plastisitas Rendah Bersifat Lunak


6
8.00 8
1 2 4 6
9.00 9
-10.00 7
10.00 10
2 3 4 7
11.00 11

17
4.00

12.00 Tanah Lempung Berpasir, Warna Abu-abu 12


4 7 10 17
13.00 13
-14.00 20
14.00 14
6 8 12 20
15.00 15
Pasir Halus, Warna Abu-abu Kehitaman
3.00

Bersifat Padat 25
16.00 16
7 9 16 25
-17.00
17.00 17

18.00 18 27
7 12 15 27
19.00 19

29
20.00 20
9 13 16 29
7.00

Pasir Halus, Warna Abu-abu Bersifat Padat


21.00 21
40
22.00 22
14 19 21 40
23.00 23

-24.00 43
24.00 24
15 18 25 43
2.00

25.00 Pasir, Warna Hitam Bersifat Padat 25

-26.00 47
26.00 26
16 19 28 47
27.00 27

Tanah Lempung Berpasir, Warna Abu-abu 49


4.00

28.00 28
Bersifat Padat 15 20 29 49
29.00 29

-30.00 51
30.00 30
17 21 30 51

REMARK SPT ( Standard Penetration Test ) Clay Organic Batu Bara


U D S ( Undisturbed Sampling ) Silt Sand Batuan Ground Water Lavel
Bore Hole No : BH.01 Mulai Kerja : 29 September 2020
Project : DED Jalan Lintas Timur Selesai kerja : 01 Oktober 2020
Prov. Sumatera Selatan Dikerjakan oleh : Jamil
Location : Jembatan Keramasan Lama Arah Palembang Diperiksa oleh : Eka Mahendra
Jl. Meyjen Yusuf Singedekane
Total Depth : -30.00 m
GWL : -3.00 m (dari muka titik Boring)
Jumlah Pukulan (Uji SPT) Koreksi Pengaruh Energi N60
Dalam

N1 N2 N3 Nm Brt Vol N60 Diagram SPT


(m)

pukulan/ pukulan/ pukulan/ pukulan/ Total CN CE CB CR CS pukulan/ Jumlah Pukulan


15 cm 15 cm 15 cm 30 cm (kN/m³) 30 cm 0 10 20 30 40 50
0
0.0 - - - - 0 0 0 0 0 0 0.00
1
1.0
2
2.0 1 1 1 2 18.5 1.494 0.60 1.00 0.75 1.00 1.34
3
3.0
4
4.0 1 1 2 3 18.5 1.494 0.60 1.00 0.80 1.00 2.15
5
5.0
6
6.0 1 2 3 5 18.5 1.494 0.60 1.00 0.85 1.00 3.81
7
7.0
8
8.0 1 2 4 6 18.5 1.494 0.60 1.00 0.95 1.00 5.11
9
9.0
10
10.0 2 3 4 7 18.5 1.494 0.60 1.00 0.95 1.00 5.96
11
11.0
12
12.0 4 7 10 17 19.0 1.494 0.60 1.00 1.00 1.00 15.23
13
13.0
14
14.0 6 8 12 20 19.0 1.494 0.60 1.00 1.00 1.00 17.92
15
15.0
16
16.0 7 9 16 25 19.0 1.494 0.60 1.00 1.00 1.00 22.40
17
17.0
18
18.0 7 12 15 27 19.0 1.494 0.60 1.00 1.00 1.00 24.20
19
19.0
20
20.0 9 13 16 29 19.0 1.494 0.60 1.00 1.00 1.00 25.99
21
21.0
22
22.0 14 19 21 40 19.5 1.494 0.60 1.00 1.00 1.00 35.85
23
23.0
24
24.0 15 18 25 43 19.5 1.494 0.60 1.00 1.00 1.00 38.53
25
25.0
26
26.0 16 19 28 47 19.5 1.494 0.60 1.00 1.00 1.00 42.12
27
27.0
28
28.0 15 20 29 49 19.5 1.494 0.60 1.00 1.00 1.00 43.91
29
29.0
30
30.0 17 21 30 51 19.5 1.494 0.60 1.00 1.00 1.00 45.70
DRILLING LOG
Project : DED Jalan Lintas Timur Date Commenced : October 2, 2020
Prov. Sumatera Selatan Date Complete : October 4, 2020
Location : Jembatan Keramasan Lama Arah Indralaya Field Geotechnical Eng : Jamil
Jl. Meyjen Yusuf Singedekane Drilling Master : Jamil
Bore Hole Number : BH.02 Driling Type Machine : FM - 1
Method of Sampling : Rotary Drilling Core Type : Core Barrel
Core Diameter (mm) : Ø 73 mm
GWL : - m Weight of Hammer (kg) : 63.5 kg
Coordinate : 3°02'41.2"S 104°44'19.3"E Dist. Falling Hammer : 75 cm
Cassing Diametter (mm) : 89 mm
Total Depth : -30.0 meter Page : 1
Thickness

STANDARD PENETRATION TEST


GWL (m)

Sample
Core Description SPT
Bore " N " Value (Blows/Feet)
Depth
Profile
N1 N2 N3 N-SPT 0 10 20 30 40 50 60
0 0
0.20 Pasir Bercampur Batu -0.20

1.00 Tanah Lempung Bercampur Batu, Warna 1


1.80

Merah Bersfiat Lunak


-2.00 5
2.00 2
2 2 3 5
3.00 3

Tanah Lempung , Warna Merah Plastisitas


4.00

4.00 4 5
Rendah Bersifat Lunak 1 2 3 5
5.00 5
-6.00 4
6.00 6
1 2 2 4
7.00 7
Tanah Lempung, Warna Abu-abu Kehitaman
3.00

Plastisitas Rendah Bersifat Lunak 3


8.00 8
1 1 2 3
-9.00
9.00 9

3
10.00 10
1 1 1 2
11.00 11
Tanah Lempung Sedikit Gambut, Warna Abu-
5.00

abu Kehitaman Bersifat Lunak 4


12.00 12
1 2 2 4
13.00 13
-14.00 5
14.00 14
1 2 3 5
15.00 15
Tanah Lempung, Warna Abu-abu Kehitaman
3.00

Plastisitas Rendah Bersifat Lunak 9


16.00 16
3 4 5 9
-17.00
17.00 17

18.00 18 29
8 13 16 29
19.00 19
5.00

Pasir Halus, Warna Hitam Bersifat Sedang


33
20.00 20
9 15 18 33
21.00 21

-22.00 38
22.00 22
11 17 21 38
23.00 23
38
24.00 24
14 18 20 38
25.00 25
8.00

Pasir Halus, Warna Hitam Bersifat Padat 41


26.00 26
16 19 22 41
27.00 27

44
28.00 28
18 21 23 44
29.00 29
-30.00
50
30.00 30
18 23 27 50

REMARK SPT ( Standard Penetration Test ) Clay Organic Batu Bara


U D S ( Undisturbed Sampling ) Silt Sand Batuan Ground Water Lavel
Bore Hole No : BH.02 Mulai Kerja : #REF!
Project : DED Jalan Lintas Timur Selesai kerja : #REF!
Prov. Sumatera Selatan Dikerjakan oleh : ####
Location : Jembatan Keramasan Lama Arah Indralaya Diperiksa oleh : ####
Jl. Meyjen Yusuf Singedekane
Total Depth : -30.00 m
GWL :
Jumlah Pukulan (Uji SPT) Koreksi Pengaruh Energi N60
Dalam

N1 N2 N3 Nm Brt Vol N60 Diagram SPT


(m)

pukulan/ pukulan/ pukulan/ pukulan/ Total CN CE CB CR CS pukulan/ Jumlah Pukulan


15 cm 15 cm 15 cm 30 cm (kN/m³) 30 cm 0 10 20 30 40 50
0
0.0 - - - - 0 0 0 0 0 0 0.00
1
1.0
2
2.0 2 2 3 5 18.5 1.499 0.60 1.00 0.75 1.00 3.37
3
3.0
4
4.0 1 2 3 5 18.5 1.499 0.60 1.00 0.80 1.00 3.60
5
5.0
6
6.0 1 2 2 4 18.5 1.499 0.60 1.00 0.85 1.00 3.06
7
7.0
8
8.0 1 1 2 3 18.5 1.499 0.60 1.00 0.95 1.00 2.56
9
9.0
10
10.0 1 1 1 2 18.5 1.499 0.60 1.00 0.95 1.00 1.71
11
11.0
12
12.0 1 2 2 4 18.5 1.499 0.60 1.00 1.00 1.00 3.60
13
13.0
14
14.0 1 2 3 5 18.5 1.499 0.60 1.00 1.00 1.00 4.50
15
15.0
16
16.0 3 4 5 9 18.5 1.499 0.60 1.00 1.00 1.00 8.09
17
17.0
18
18.0 8 13 16 29 19.0 1.499 0.60 1.00 1.00 1.00 26.08
19
19.0
20
20.0 9 15 18 33 19.5 1.499 0.60 1.00 1.00 1.00 29.67
21
21.0
22
22.0 11 17 21 38 19.5 1.499 0.60 1.00 1.00 1.00 34.17
23
23.0
24
24.0 14 18 20 38 19.5 1.499 0.60 1.00 1.00 1.00 34.17
25
25.0
26
26.0 16 19 22 41 19.5 1.499 0.60 1.00 1.00 1.00 36.87
27
27.0
28
28.0 18 21 23 44 19.5 1.499 0.60 1.00 1.00 1.00 39.56
29
29.0
30
30.0 18 23 27 50 19.5 1.499 0.60 1.00 1.00 1.00 44.96
DRILLING LOG
Project : DED Jalan Lintas Timur Date Commenced : October 3, 2020
Prov. Sumatera Selatan Date Complete : October 6, 2020
Location : Jembatan Musi II Lama Arah Palembang Field Geotechnical Eng : Lukman
Jl. Meyjen Yusuf Singedekane Drilling Master : Lukman
Bore Hole Number : BH.01 Driling Type Machine : FM - 1
Method of Sampling : Rotary Drilling Core Type : Core Barrel
: Core Diameter (mm) : Ø 73 mm
GWL : -0.55 m (Pasang Surut) Weight of Hammer (kg) : 63.5 kg
Coordinate : 3°01'01.9"S 104°43'15.6"E Dist. Falling Hammer : 75 cm
Cassing Diametter (mm) : 89 mm
Total Depth : -24.5 meter Page : 1
Thickness

STANDARD PENETRATION TEST


GWL (m)

Sample
Core Description SPT
Bore " N " Value (Blows/Feet)
Depth
Profile
N1 N2 N3 N-SPT 0 10 20 30 40 50 60
Bagan Kerja 0
0
0.55 -0.55

1.00 1

0
2.95

2.00 Air Sungai (Pasang Surut) 2


- - - -
3.00 3
-3.50

4.00 4 2
0 1 1 2
2.00

Pasir, Warna Hitam


5.00 5
-5.50
5
6.00 Tanah Lempung, Warna Coklat Kehitaman 6
1.50

1 2 3 5
Plastisitas Rendah Bersifat Sangat Lunak
-7.00
7.00 7

12
8.00 Tanah Lempung, Warna Abu-abu Plastisitas 8
2.50

3 5 7 12
Sedang Bersifat Lunak
9.00 9
-9.50
15
10.00 10
4 6 9 15
Tanah Lempung, Warna Merah Kepuihan
3.00

11.00 11
Plastisitas Sedang Bersifat Sedang
15
12.00 12
-12.50 5 6 9 15
13.00 13
35
14.00 14
9 14 21 35
15.00 15
Tanah Lempung, Warna Abu-abu Muda
6.00

Plastisitas Sedang Bersifat Keras 35


16.00 16
10 15 20 35
17.00 17

18.00 18 37
-18.50 9 15 22 37
19.00 19

60
20.00 20
13 25 40 65
21.00 21
Tanah Lempung, Warna Abu-abu Tua
6.00

Plastisitas Tinggi Bersifat Sangat Keras 60


22.00 22
15 27 45 72
23.00 23
60
24.00 24
-24.50 14 28 49 77
25.00 25

26.00 26

27.00 27

28.00 28

29.00 29

30.00 30

REMARK SPT ( Standard Penetration Test ) Organic Batu Bara


Clay
U D S ( Undisturbed Sampling ) Silt Sand Batuan Ground Water Lavel
Bore Hole No : BH.01 Mulai Kerja : 03 Oktober 2020
Project : DED Jalan Lintas Timur Selesai kerja : 06 Oktober 2020
Prov. Sumatera Selatan Dikerjakan oleh : Lukman
Location : Jembatan Musi II Lama Arah Palembang Diperiksa oleh : Lukman
Jl. Meyjen Yusuf Singedekane
Total Depth : -24.50 m
GWL : -0.55 m (dari muka tanah titik Boring)
Jumlah Pukulan (Uji SPT) Koreksi Pengaruh Energi N60
Dalam

N1 N2 N3 Nm Brt Vol N60 Diagram SPT


(m)

pukulan/ pukulan/ pukulan/ pukulan/ Total CN CE CB CR CS pukulan/ Jumlah Pukulan


15 cm 15 cm 15 cm 30 cm (kN/m³) 30 cm 0 10 20 30 40 50
0
0.0 - - - - 0 0 0 0 0 0 0.00
1
1.0
2
2.0 - - - - 0.0 1.597 0.60 1.00 0.75 1.00 0.00
3
3.0
4
4.0 0 1 1 2 18.5 1.597 0.60 1.00 0.80 1.00 1.53
5
5.0
6
6.0 1 2 3 5 18.5 1.597 0.60 1.00 0.85 1.00 4.07
7
7.0
8
8.0 3 5 7 12 19.0 1.597 0.60 1.00 0.95 1.00 10.92
9
9.0
10
10.0 4 6 9 15 19.0 1.597 0.60 1.00 0.95 1.00 13.65
11
11.0
12
12.0 5 6 9 15 19.0 1.597 0.60 1.00 1.00 1.00 14.37
13
13.0
14
14.0 9 14 21 35 19.5 1.597 0.60 1.00 1.00 1.00 33.54
15
15.0
16
16.0 10 15 20 35 19.5 1.597 0.60 1.00 1.00 1.00 33.54
17
17.0
18
18.0 9 15 22 37 19.5 1.597 0.60 1.00 1.00 1.00 35.45
19
19.0
20
20.0 13 25 40 65 19.5 1.597 0.60 1.00 1.00 1.00 50.00
21
21.0
22
22.0 15 27 45 72 19.5 1.597 0.60 1.00 1.00 1.00 50.00
23
23.0
24
24.0 14 28 49 77 19.5 1.597 0.60 1.00 1.00 1.00 50.00
25
25.0
26
26.0
27
27.0
28
28.0
29
29.0
30
30.0
DRILLING LOG
Project : DED Jalan Lintas Timur Date Commenced : October 7, 2020
Prov. Sumatera Selatan Date Complete : October 10, 2020
Location : Jembatan Musi II Lama Arah Indralaya Field Geotechnical Eng : Mulyadi
Jl. Meyjen Yusuf Singedekane Drilling Master : Mulyadi
Bore Hole Number : BH.02 Driling Type Machine : FM - 1
Method of Sampling : Rotary Drilling Core Type : Core Barrel
Core Diameter (mm) : Ø 73 mm
GWL : -0.50 m (Pasang Surut) Weight of Hammer (kg) : 63.5 kg
Coordinate : 3°01'10.5"S 104°43'11.8"E Dist. Falling Hammer : 75 cm
Cassing Diametter (mm) : 89 mm
Total Depth : -35.0 meter Page : 1
Thickness

STANDARD PENETRATION TEST


GWL (m)

Sample
Core Description SPT
Bore " N " Value (Blows/Feet)
Depth
Profile
N1 N2 N3 N-SPT 0 10 20 30 40 50 60
Bagan Kerja 0
0
0.50 -0.50

1.00 1

0
2.00 2
- - - -
3.00 3
7.00

4.00 Air Sungai (Pasang Surut) 4 0


- - - -
5.00 5

0
6.00 6
- - - -
7.00 7
-7.50
1
8.00 8
0 0 1 1
Tanah Lempung, Warna Abu-abu Plastisitas
3.00

9.00 9
Rendah Bersifat Sangat Lunak
4
10.00 10
-10.50 1 2 2 4
11.00 11

13
12.00 12
3 5 8 13
13.00 13
23
14.00 14
6 10 13 23
15.00 15
9.50

Pasir Halus, Bersifat Sedang sampai Padat

16.00 16 40
9 13 27 40
17.00 17

18.00 18 24
7 11 13 24
19.00 19
-20.00 20
20.00 20
5 7 13 20
21.00 21
33
22.00 22
9 14 19 33
23.00 23
37
24.00 24
Tanah Lempung, Warna Abu-abu Plastisitas 11 16 21 37
9.00

Sedang Bersifat Keras


25.00 25

47
26.00 26
15 20 27 47
27.00 27

54
28.00 28
17 24 30 54
-29.00
29.00 29
Tanah Lempung, Warna Abu-abu Plastisitas
6.00

60
30.00 Tinggi Bersifat Sangat Padat 30
19 27 33 60

REMARK SPT ( Standard Penetration Test ) Clay Organic Batu Bara


U D S ( Undisturbed Sampling ) Silt Sand Batuan Ground Water Lavel
DRILLING LOG
Project : DED Jalan Lintas Timur Date Commenced : October 7, 2020
Prov. Sumatera Selatan Date Complete : October 10, 2020
Location : Jembatan Musi II Lama Arah Indralaya Field Geotechnical Eng : Mulyadi
Jl. Meyjen Yusuf Singedekane Drilling Master : Mulyadi
Bore Hole Number : BH.02 Driling Type Machine : FM - 1
Method of Sampling : Rotary Drilling Core Type : Core Barrel
Core Diameter (mm) : Ø 73 mm
GWL : -0.50 m (Pasang Surut) Weight of Hammer (kg) : 63.5 kg
Coordinate : 3°01'10.5"S 104°43'11.8"E Dist. Falling Hammer : 75 cm
Cassing Diametter (mm) : 89 mm
Total Depth : -35.0 meter Page : 2
Thickness

STANDARD PENETRATION TEST


GWL (m)

Sample
Core Description SPT
Bore " N " Value (Blows/Feet)
Depth
Profile
N1 N2 N3 N-SPT 0 10 20 30 40 50 60
30 60
19 27 33 60
32.00 31

60
32.00 32
Tanah Lempung, Warna Abu-abu Plastisitas 21 30 36 66
6.00

Tinggi Bersifat Sangat Padat


33.00 33

34.00 34 60
23 32 38 70
-35.00
35.00 35

36.00 36

37.00 37

38.00 38

39.00 39

40.00 40

41.00 41

42.00 42

43.00 43

44.00 44

45.00 45

45.00 46

47.00 47

48.00 48

49.00 49

50.00 50

51.00 51

52.00 52

53.00 53

54.00 54

55.00 55

56.00 56

57.00 57

58.00 58

59.00 59

60.00 60

REMARK SPT ( Standard Penetration Test ) Clay Organic Batu Bara


U D S ( Undisturbed Sampling ) Silt Sand Batuan Ground Water Lavel
Bore Hole No : BH.02 Mulai Kerja : 07 Oktober 2020
Project : DED Jalan Lintas Timur Selesai kerja : 10 Oktober 2020
Prov. Sumatera Selatan Dikerjakan oleh : Mulyadi
Location : Jembatan Musi II Lama Arah Indralaya Diperiksa oleh : Mulyadi
Jl. Srijaya Raya Lintas Timur Sumatera
Total Depth : -35.00 m
GWL : -0.50 m (dari muka tanah titik Boring)
Jumlah Pukulan (Uji SPT) Koreksi Pengaruh Energi N60
Dalam

N1 N2 N3 Nm Brt Vol N60 Diagram SPT


(m)

pukulan/ pukulan/ pukulan/ pukulan/ Total CN CE CB CR CS pukulan/ Jumlah Pukulan


15 cm 15 cm 15 cm 30 cm (kN/m³) 30 cm 0 10 20 30 40 50
0
0.0 - - - - 0 0 0 0 0 0 0.00
1
1.0
2
2.0 - - - - 0.0 1.584 0.60 1.00 0.75 1.00 0.00
3
3.0
4
4.0 - - - - 0.0 1.584 0.60 1.00 0.80 1.00 0.00
5
5.0
6
6.0 - - - - 0.0 1.584 0.60 1.00 0.85 1.00 0.00
7
7.0
8
8.0 0 0 1 1 18.5 1.584 0.60 1.00 0.95 1.00 0.90
9
9.0
10
10.0 1 2 2 4 18.5 1.584 0.60 1.00 0.95 1.00 3.61
11
11.0
12
12.0 3 5 8 13 19.0 1.584 0.60 1.00 1.00 1.00 12.36
13
13.0
14
14.0 6 10 13 23 19.0 1.584 0.60 1.00 1.00 1.00 21.87
15
15.0
16
16.0 9 13 27 40 19.5 1.584 0.60 1.00 1.00 1.00 38.03
17
17.0
18
18.0 7 11 13 24 19.0 1.584 0.60 1.00 1.00 1.00 22.82
19
19.0
20
20.0 5 7 13 20 19.0 1.584 0.60 1.00 1.00 1.00 19.01
21
21.0
22
22.0 9 14 19 33 19.5 1.584 0.60 1.00 1.00 1.00 31.37
23
23.0
24
24.0 11 16 21 37 19.5 1.584 0.60 1.00 1.00 1.00 35.17
25
25.0
26
26.0 15 20 27 47 19.5 1.584 0.60 1.00 1.00 1.00 44.68
27
27.0
28
28.0 17 24 30 54 19.5 1.584 0.60 1.00 1.00 1.00 50.00
29
29.0
30
30.0 19 27 33 60 19.5 1.584 0.60 1.00 1.00 1.00 50.00
DRILLING LOG
Project : DED Jalan Lintas Timur Project : DED Jalan Lintas Timur Project : DED Jalan Lintas Timur Project : DED Jalan Lintas Timur Project : DED Jalan Lintas Timur Project : DED Jalan Lintas Timur Project : DED Jalan Lintas Timur Project : DED Jalan Lintas Timur
Prov. Sumatera Selatan Prov. Sumatera Selatan Prov. Sumatera Selatan Prov. Sumatera Selatan Prov. Sumatera Selatan Prov. Sumatera Selatan Prov. Sumatera Selatan Prov. Sumatera Selatan
Location : Jembatan Air Waru A ABT 2 arah Indralaya Location : Jembatan Air Waru A ABT 1 arah Palembang Location : Jembatan Kenangan A Box Culvert arah Indralaya Location : Jembatan Kenangan A Box Culvert arah Palembang Location : Jembatan Keramasan Lama Arah Indralaya Location : Jembatan Keramasan Lama Arah Palembang Location : Jembatan Musi II Lama Arah Indralaya Location : Jembatan Musi II Lama Arah Palembang
Jl. Srijaya Raya Lintas Timur Sumatera Jl. Srijaya Raya Lintas Timur Sumatera Jl. Srijaya Raya Lintas Timur Sumatera Jl. Srijaya Raya Lintas Timur Sumatera Jl. Meyjen Yusuf Singedekane Jl. Meyjen Yusuf Singedekane Jl. Meyjen Yusuf Singedekane Jl. Meyjen Yusuf Singedekane
Bore Hole Number : BH.02 Bore Hole Number : BH.01 Bore Hole Number : BH.03 Bore Hole Number : BH.04 Bore Hole Number : BH.02 Bore Hole Number : BH.01 Bore Hole Number : BH.02 Bore Hole Number : BH.01
Method of Sampling : Rotary Drilling Method of Sampling : Rotary Drilling Method of Sampling : Rotary Drilling Method of Sampling : Rotary Drilling Method of Sampling : Rotary Drilling Method of Sampling : Rotary Drilling Method of Sampling : Rotary Drilling Method of Sampling : Rotary Drilling
DPL : 5 m DPL : 5 m DPL : 6 m DPL : 6 m DPL : 8 m DPL : 6 m DPL : 4 m DPL : 4 m
GWL : -2.00 m (dari muka tanah titik Boring) GWL : -2.00 m (dari muka tanah titik Boring) GWL : -1.00 m (dari muka tanah titik Boring) GWL : -1.00 m (dari muka tanah titik Boring) GWL : - m GWL : -3.00 m (dari muka titik Boring) GWL : -0.50 m (Pasang Surut) GWL : -0.55 m (Pasang Surut)
Coordinate : 3°03'15.4"S 104°44'35.5"E Coordinate : 3°03'14.6"S 104°44'35.4"E Coordinate : 3°03'55.1"S 104°44'33.6"E Coordinate : 3°03'54.7"S 104°44'33.9"E Coordinate : 3°02'41.2"S 104°44'19.3"E Coordinate : 3°02'40.1"S 104°44'14.9"E Coordinate : 3°01'10.5"S 104°43'11.8"E Coordinate : 3°01'01.9"S 104°43'15.6"E

Total Depth : -28.0 meter Total Depth : -30.0 meter Total Depth : -30.0 meter Total Depth : -30.0 meter Total Depth : -30.0 meter Total Depth : -30.0 meter Total Depth : -35.0 meter Total Depth : -24.5 meter
Thickness

Thickness

Thickness

Thickness

Thickness

Thickness

Thickness

Thickness
GWL (m)

GWL (m)

GWL (m)

GWL (m)

GWL (m)

GWL (m)

GWL (m)

GWL (m)
Core Description Core Description Core Description Core Description Core Description Core Description Core Description Core Description
Bore Bore Bore Bore Bore Bore Bore Bore
Depth Depth Depth Depth Depth Depth Depth Depth
Profile Profile Profile Profile Profile Profile Profile Profile

Bagan Kerja Bagan Kerja


0.20 Pasir Bercampur Batu -0.20
1.00 Tanah Lempung Bercampur Batu, Warna

1.80
Merah Bersfiat Lunak
-2.00
0.00 0.00 2.00 0.00
Tanah Lempung, Warna Merah Kecoklatan

1.00
Tanah Lempung Berpasir, Warna Coklat Bersifat Lunak -1.00
0.00 0.00 1.00 1.00 3.00 1.00

2.50
Tanah Lempung Berpasir Berbatu, Warna
Bersifat Lunak

3.00
Kuning Bersifat Lunak
1.50

Tanah Lempung , Warna Merah Plastisitas


Tanah Timbunan Warna Coklat + Aggregate N-SPT : 0-2

4.00
1.00 1.00 Tanah Lempung, Warna Cokat Kemerahan 2.00 N-SPT : 0-2 2.00 4.00 Rendah Bersifat Lunak 2.00 0.00 0.00
-1.50 -2.50 0.50 0.55
3.00

N-SPT : 0-5 Tanah Lempung, Warna Abu-abu Plastisitas -0.50 -0.55


Plastisitas Rendah Bersifat Sangat Lunak

3.50
-3.00 Rendah Bersifat Lunak
2.00 2.00 N-SPT : 0-3 3.00 3.00 5.00 3.00 1.00 1.00
N-SPT : 0-3

2.95
3.00 3.00 -3.00 4.00 4.00 Tanah Lempung, Warna Coklat Kehitaman 6.00 -6.00 4.00 2.00 2.00 Air Sungai (Pasang Surut)

3.50
Plastisitas Rendah Bersifat Sangat Lunak -4.50
Tanah Lempung, Warna Coklat Plastisitas N-SPT : 1

4.00
4.00 4.00 5.00 Rendah Bersifat Sangat Lunak 5.00 7.00 Tanah Lempung, Warna Abu-abu Kehitaman 5.00 3.00 3.00

3.00
N-SPT : 1 -3.50
Plastisitas Rendah Bersifat Lunak

7.00
5.00 5.00 6.00 6.00 -6.00 8.00 N-SPT : 3-4 6.00 4.00 4.00
Air Sungai (Pasang Surut)
Pasir, Warna Hitam

2.00
Tanah Lumpur, Warna Hitam Kecoklatan Tanah Lumpur, Warna Hitam Kecoklatan
8.50

Plastisitas Rendah Bersifat Sangat Lunak Plastisitas Sangat Rendah Bersifat Sangat N-SPT : 0-2
6.00

-7.00 -9.00 Tanah Lempung, Warna Abu-abu Kehitaman


6.00 6.00 7.00 7.00 9.00 7.00 5.00 5.00

5.50
N-SPT : 1-4 Lunak Plastisitas Rendah Bersifat Lunak -5.50
N-SPT : 1 N-SPT : 5-6
7.00 7.00 8.00 8.00 10.00 8.00 6.00 6.00 Tanah Lempung, Warna Coklat Kehitaman

1.50
Plastisitas Rendah Bersifat Sangat Lunak
Tanah Lempung Organik, Warna Hitam N-SPT : 2-5

6.00
8.00 8.00 9.00 9.00 11.00 9.00 7.00 7.00 -7.00
Bersifat Lunak Tanah Lempung Sedikit Gambut, Warna Abu-

5.00
N-SPT : 3-5 -7.50
Tanah Lempung Organik, Warna Coklat abu Kehitaman Bersifat Lunak

6.00
-9.00 N-SPT : 2-4 -10.00 Tanah Lempung, Warna Abu-abu Plastisitas
9.00 9.00 10.00 Bersifat Lunak 10.00 12.00 10.00 8.00 8.00

2.50
Tanah Gambut, Warna Hitam Bersifat Sangat Sedang Bersifat Lunak
N-SPT : 3-6
1.50

Tanah Lempung, Warna Abu-abu Plastisitas N-SPT : 5-12


Lunak

3.00
10.00 -10.00 10.00 11.00 11.00 13.00 11.00 9.00 9.00
Rendah Bersifat Sangat Lunak
N-SPT : 1 -10.50 -9.50
Tanah Gammbut, Warna Hitam Bersifat N-SPT : 0-4
Tanah Lempung Berpasir, Warna Abu-abu
2.00

4.00
11.00 11.00 12.00 12.00 -12.00 14.00 -14.00 12.00 10.00 10.00
Sangat Lunak
N-SPT : 7-17 -10.50
N-SPT : 1 Tanah Lempung, Warna Merah Kepuihan

3.00
12.00 -12.00 12.00 13.00 -13.00 13.00 15.00 13.00 11.00 11.00
Tanah Lempung, Warna Abu-abu Kehitaman Plastisitas Sedang Bersifat Sedang

3.00
Plastisitas Rendah Bersifat Lunak N-SPT : 12-15
13.00 13.00 14.00 14.00 16.00 N-SPT : 5-9 14.00 -14.00 12.00 12.00
Tanah Lempung, Warna Hitam Plastisitas
6.00

Tanah Lempung, Warna Abu-abu Muda -12.50


Rendah Bersifat Lunak

5.50
Plastisitas Sedang Bersifat Lunak -17.00
14.00 14.00 N-SPT : 3-6 15.00 15.00 17.00 15.00 Pasir Halus, Warna Abu-abu Kehitaman 13.00 13.00
N-SPT : 5-8

3.00
Tanah Lempung, Warna Hitam Plastisitas Bersifat Padat
6.00

15.00 Tanah Lempung, Warna Abu-abu Plastisitas 15.00 16.00 Rendah Bersifat Lunak 16.00 18.00 16.00 N-SPT : 20-25 14.00 14.00
7.00

Rendah Bersifat Lunak N-SPT : 5-14


-17.00
16.00 N-SPT : 5-17 16.00 17.00 17.00 19.00 17.00 15.00 Pasir Halus, Bersifat Sedang sampai Padat 15.00

9.50
Tanah Lempung, Warna Abu-abu Muda
Pasir Halus, Warna Hitam Bersifat Sedang

5.00

6.00
-16.50 -17.50
N-SPT : 13-40 Plastisitas Sedang Bersifat Keras
N-SPT : 29-33
17.00 17.00 18.00 18.00 20.00 18.00 16.00 16.00 N-SPT : 35-37
Tanah Lempung, Warna Abu-abu Muda

2.50
-19.00 Plastisitas Sedang Bersifat Sedang
18.00 18.00 19.00 19.00 21.00 19.00 17.00 17.00
N-SPT : 19

19.00 -19.00 19.00 Tanah Lempung Berpasir, Warna Abu-abu 20.00 20.00 -20.00 22.00 -22.00 20.00 18.00 18.00
5.50

Plastisitas Sedang Bersifat Sedang Pasir Halus, Warna Abu-abu Bersifat Padat

7.00
-18.50
N-SPT : 10-12 N-SPT : 27-40
20.00 20.00 21.00 Tanah Lempung Berpasir Halus, Warna Abu- 21.00 Tanah Lempung Berpasir, Warna Abu-abu 23.00 21.00 19.00 19.00
5.00

3.00
Tanah Lempung Berpasir, Warna Abu-abu
abu Muda Bersifat Sedang sampai Padat Muda Bersifat Sedang
3.50

Bersifat Padat -20.00


21.00 21.00 22.00 N-SPT : 28-33 22.00 N-SPT : 23-25 24.00 22.00 20.00 20.00
N-SPT : 47-54

22.00 22.00 -22.00 23.00 23.00 -23.00 25.00 23.00 21.00 21.00 Tanah Lempung, Warna Abu-abu Tua
-22.50

8.00

6.00
Pasir Halus, Warna Hitam Bersifat Padat Plastisitas Tinggi Bersifat Sangat Keras
23.00 23.00 24.00 -24.00 24.00 26.00 24.00 -24.00 22.00 22.00 N-SPT : 60
N-SPT : 38-50

Pasir, Warna Hitam Bersifat Padat

2.00
24.00 24.00 25.00 25.00 27.00 25.00 23.00 23.00
N-SPT : 43
Pasir Halus, Warna Abu-abu Bersifat Padat

6.00
25.00 Tanah Lempung, Warna Abu-abu Plastisitas 25.00 26.00 26.00 28.00 26.00 -26.00 24.00 24.00
5.50

Tanah Lempung, Warna Abu-abu Plastisitas


Tinggi Bersifat Sangat Keras N-SPT : 34-37

9.00
-24.50
Tanah Lempung, Warna Abu-abu Plastisitas Sedang Bersifat Keras
N-SPT : 60 Pasir Halus, Bersifat Padat
8.00

6.00

26.00 26.00 Tinggi Bersifat Padat 27.00 27.00 29.00 27.00 25.00 N-SPT : 20-54 25.00
N-SPT : 31-47
N-SPT : 15-60 -30.00 Tanah Lempung Berpasir, Warna Abu-abu

4.00
27.00 27.00 28.00 28.00 30.00 28.00 Bersifat Padat 26.00 26.00
N-SPT : 47-51
28.00 -28.00 28.00 29.00 29.00 -29.00 29.00 27.00 27.00
Pasir Kasar, Bersifat Sangat Padat

1.00
-30.00 N-SPT : 60 -30.00 -30.00
29.00 29.00 30.00 30.00 30.00 28.00 28.00

30.00 30.00 -30.00 29.00 -29.00 29.00


Tanah Lempung, Warna Abu-abu Plastisitas
Tinggi Bersifat Sangat Padat
30.00 30.00
N-SPT : 60

32.00

6.00
32.00

33.00

34.00

-35.00
35.00